Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

23.07.2013 Views

PREPAINTED METAL SANDWICH PANEL ROOF WITH R20 RIGID INSULATION STRUCTURAL TRUSS EPOXY COATING ON 2" THICK INSULATED METAL SANDWICH PANEL CEILING METAL CORNER PIECE 8" CONCRETE BLOCK WALL EPOXY PAINTED INTERIOR FACE DETAIL INTERIOR BLOCK WALL & ROOF SCALE 3/4" = 1'-0" 4 1/4" DESCRIPTION: INTERIOR BLOCK WALL & ROOF PROJECT: CONTINUOUS EPOXY CAULKING AT METAL CORNER PIECE BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON FIRE RATED CAULKING 3" x 4" x 0.25 ANGLES FIRE RATED CAULKING AROUND BEAM AT WALL PENETRATON THE BLOCK WALLS SHALL BE REINFORCED BASED ON THE REQUIREMENTS BELOW: A. HORIZONTAL REINFORCEMENT SHALL CONSIST OF AT LEAST TWO LONGITUDINAL WIRES OF W1.7 BED JOINT REINFORCEMENT SPACED NOT MORE THAN 16 INCHES ON CENTER . B. VERTICAL REINFORCEMENT SHALL CONSIST OF ONE NO. 5 REBAR IN GROUTED CELLS SPACED NOT MORE THAN 48 INCHES ON CENTER. C. BOTH HORIZONTAL AND VERTICAL REINFORCEMENT SHALL BE LOCATED WITHIN 16 INCHES OF THE ENDS OF BLOCK WALLS. PROJECT NO. H340940 DRAWING NO. SK-2 DATE: REV.O APPROVED: 2012/07/02 E

8" THICK INSULATED PRECAST CONCRETE PANEL SEALANT AND BACKER ROD AT FRONT AND BACK OF JOINT CONTINUOUS 3" x 4" x 0.25 STEEL ANGLE EMBEDED IN FOUNDATION WALL 12" CONCRETE FOUNDATION WALL DETAIL OF PRECAST WALL PANEL AT COLUMN SCALE 3/4" = 1'-0" DESCRIPTION: COLUMN AT PRECAST WALL PROJECT: SEALANT AND BACKER ROD AT FRONT AND BACK OF JOINT EPOXY PAINTED INTERIOR FACE CONTINUOUS COMPRESSIBLE BUTYL STRIP BETWEEN PANELS 2 1/2" BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON 1'-3 1/2" 1'-0" 3'-11 3/4" STANDARD PANEL WIDTH PROJECT NO. H340940 DRAWING NO. SK-3 DATE: REV.O APPROVED: 2012/07/02 E

PREPAINTED METAL SANDWICH PANEL ROOF<br />

WITH R20 RIGID INSULATION<br />

STRUCTURAL TRUSS<br />

EPOXY COATING ON 2" THICK<br />

INSULATED METAL SANDWICH<br />

PANEL CEILING<br />

METAL CORNER PIECE<br />

8" CONCRETE BLOCK WALL<br />

EPOXY PAINTED INTERIOR FACE<br />

DETAIL INTERIOR BLOCK WALL & ROOF<br />

SCALE 3/4" = 1'-0"<br />

4 1/4"<br />

DESCRIPTION:<br />

INTERIOR BLOCK WALL & ROOF<br />

PROJECT:<br />

CONTINUOUS EPOXY<br />

CAULKING AT METAL<br />

CORNER PIECE<br />

BARRICK GOLDSTRIKE MINES<br />

PRECIOUS METALS RECOVERY PROJECT<br />

MERCURY TSDF BUILDING<br />

SCALE:<br />

DESIGN: DRAWN:<br />

3/4" = 1'-0" T. JACKSON T. JACKSON<br />

FIRE RATED CAULKING<br />

3" x 4" x 0.25 ANGLES<br />

FIRE RATED CAULKING AROUND<br />

BEAM AT WALL PENETRATON<br />

THE BLOCK WALLS SHALL BE<br />

REINFORCED BASED ON THE<br />

REQUIREMENTS BELOW:<br />

A. HORIZONTAL REINFORCEMENT SHALL<br />

CONSIST OF AT LEAST TWO<br />

LONGITUDINAL WIRES OF W1.7 BED<br />

JOINT REINFORCEMENT SPACED NOT<br />

MORE THAN 16 INCHES ON CENTER .<br />

B. VERTICAL REINFORCEMENT SHALL<br />

CONSIST OF ONE NO. 5 REBAR IN<br />

GROUTED CELLS SPACED NOT MORE<br />

THAN 48 INCHES ON CENTER.<br />

C. BOTH HORIZONTAL AND VERTICAL<br />

REINFORCEMENT SHALL BE LOCATED<br />

WITHIN 16 INCHES OF THE ENDS OF<br />

BLOCK WALLS.<br />

PROJECT NO.<br />

H340940<br />

DRAWING NO.<br />

SK-2<br />

DATE: REV.O<br />

APPROVED:<br />

2012/07/02 E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!