Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
A B C D E F $$W ATERMARKD$$ H340940-1400-05-030-0004 WASTE SOLUTION 1400-05-030-0001 RETORT S0 SCRUBBER BLOWDOWN 2 1400-05-030-0003 OXIDATION REACTOR WASTE SOLUTION LABORATORY WASH WATER OPEN SUMPS MISCELLANEOUS WASTEWATER NOTE 3 OFF-SPEC TREATED WASTE SOLUTION COMPRESSED AIR 1500-05-030-0001 DISTRIBUTION 1400-05-030-0002 WASTE SOLUTION TANK 204 1500-05-030-0003 455 WASTE SOLUTION STORAGE TANK #1 / #2 CAUSTIC LEACH WASTE SOLUTION 1 2 3 4 5 6 7 8 109 253 251 252 159 DWG. NO. DRAWING NO. DRAWING TITLE REFERENCE DRAWINGS EMERGENCY O/F SEAL DRUM 362 1440-TK-116 WASTE SOLUTION SETTLING TANK 361 1440-PP-117 WASTE SOLUTION SETTLING TANK O/F PUMP 1440-PP-119 WASTE SOLUTION SETTLING TANK U/F PUMP EMERGENCY O/F SEAL DRUM 360 254 2 1 0 C B A 1440-TK-114 WASTE SOLUTION COLLECTION TANK NOTE 1 1440-FL-118 CARTRIDGE FILTERS ISSUED FOR INFORMATION KM AO 1440-PP-115 WASTE SOLUTION COLLECTION PUMP ISSUE FOR DESIGN EC SS 2012-12-14 ISSUE FOR DESIGN ISSUE FOR DESIGN DE AO 2012-10-22 REVISED & ISSUED FOR DISCIPLINE REVIEW ISSUED FOR CLIENT REVIEW KM AO 2012-06-19 DR SS 2012-11-14 DE AO 2012-10-12 1440-CL-078 ACTIVATED CARBON COLUMN No. 1 1440-CL-079 ACTIVATED CARBON COLUMN No. 2 1440-CL-080 ACTIVATED CARBON COLUMN No. 3 1440-CL-081 ACTIVATED CARBON COLUMN No. 4 NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE REVISIONS ISSUE AUTHORIZATION NOTE 2 1440-CL-082 ACTIVATED CARBON COLUMN No. 5 1440-CL-083 ACTIVATED CARBON COLUMN No. 6 1440-CL-084 ACTIVATED CARBON COLUMN No. 7 1440-CL-085 ACTIVATED CARBON COLUMN No. 8 DESIGNED BY A. OURFALIAN DATE G. KERAMARIS M. SUCHARDA DRAWN BY K. MCLEAN CHECKED BY DISCIP. ENGR. DATE PROJ. DES. COORD. DATE R. FUKUZAWA DATE J. CHALMERS S. SENNIK DATE DATE PROJ. ENGR. PROJ. MGR. SCALE NTS OR AS NOTED NOTES: 1. 2. 3. NUMBER OF CARTRIDGE FILTERS REQUIRED TO BE CONFIRMED. NUMBER OF CARBON COLUMNS REQUIRED TO BE CONFIRMED. MISCELLANEOUS WASTE WATER INCLUDES POSSIBLE CONTAMINATED WATER FROM SAFETY SHOWER/EYE WASH STATION, LAUNDRY MACHINE, LABORATORY, SINKS, AND FLOOR DRAIN. 257 258 260 259 LEGEND WASTE SOLUTION 1400-05-030-0002 TANK OFF-GAS 1400-05-030-0005 VENT GAS TREATMENT TREATED WASTE SOLUTION 1500-05-030-0003 WASTE SOLUTION STORAGE TANKS 1400-05-030-0002 DECOMPOSITION TANK MAJOR PROCESS WASTE SOLUTION WASTE SOLUTION TANK SECONDARY PROCESS INTERMITTENT PROCESS VENDOR SUPPLY LIMIT DUST PICKUP POINTS COLLECTION AND TREATMENT PROCESS FLOW DIAGRAM H340940-1400-05-030-0004 TMT 15 - MERCURY PRECIPITATE PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT 1 2 3 4 5 6 7 8 DATE PRECIOUS METALS RECOVERY LLC DWG. NO. REV. 2 A B C D E
A B C D E F $$W ATERMARKD$$ H340940-1400-05-030-0003 PROCESS WATER 1500-05-030-0004 DISTRIBUTION RETORT OFF-GAS 1400-05-030-0001 RETORT CAUSTIC SODA 1300-05-030-0001 STORAGE TANK 1 2 3 4 5 6 7 8 DWG. NO. 509 108 DRAWING NO. DRAWING TITLE REFERENCE DRAWINGS 56 S0 SCRUBBER BYPASS LINE 2 2 1 0 C B A 201 1410-SR-051 PACKED TOWER SCRUBBER ISSUE FOR DESIGN 1410-PP-052 SCRUBBER PUMP ISSUE FOR DESIGN DE AO REVISED & ISSUED FOR DISCIPLINE REVIEW ISSUED FOR CLIENT REVIEW KM AO 2012-06-19 ISSUED FOR INFORMATION KM AO DR ATMOSPHERIC AIR (FROM PLANT SPACES) ISSUE FOR DESIGN EC SS 2012-12-14 SS 2012-11-14 1410-VP-121 1410-FA-053 OXIDATION REACTOR BLOWER SO SCRUBBER PACKAGE 2 2012-10-22 DE AO 2012-10-12 1410-TK-054 OXIDATION REACTOR 1410-FA-055 SCRUBBER OFF-GAS 1410-PP-057 OXIDATION FAN REACTOR PUMP NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE REVISIONS ISSUE AUTHORIZATION DESIGNED BY R. FUKUZAWA DATE G. KERAMARIS M. SUCHARDA DRAWN BY K. MCLEAN CHECKED BY DISCIP. ENGR. DATE PROJ. DES. COORD. DATE R. FUKUZAWA DATE J. CHALMERS S. SENNIK DATE DATE PROJ. ENGR. 202 PROJ. MGR. SCALE NTS OR AS NOTED 204 LEGEND MAJOR PROCESS RETORT OFF-GAS TREATED RETORT OFF-GAS 1400-05-030-0005 EXHAUST DUCT S0 SCRUBBER BLOWDOWN 2 1400-05-030-0004 WASTE SOLUTION COLLECTION TANK SECONDARY PROCESS INTERMITTENT PROCESS VENDOR SUPPLY LIMIT DUST PICKUP POINTS PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT PROCESS FLOW DIAGRAM DWG. NO. H340940-1400-05-030-0003 1 2 3 4 5 6 7 8 DATE PRECIOUS METALS RECOVERY LLC REV. 2 A B C D E
- Page 217 and 218: APPENDIX I-B Open House Comments
- Page 219 and 220: APPENDIX 1-A Drawings Facility draw
- Page 221 and 222: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 223 and 224: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 225 and 226: A B C D E F $$W ATERMARKD$$ N 4,475
- Page 227 and 228: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 229 and 230: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 231 and 232: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 233 and 234: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 235 and 236: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 237 and 238: A B C D E F $$W ATERMARKD$$ H340940
- Page 239 and 240: A B C D E F $$W ATERMARKD$$ H340940
- Page 241 and 242: A B C D E F $$W ATERMARKD$$ H340940
- Page 243 and 244: A B C D E F $$W ATERMARKD$$ H340940
- Page 245 and 246: A B C D E F $$W ATERMARKD$$ H340940
- Page 247 and 248: A B C D E F $$W ATERMARKD$$ H340940
- Page 249 and 250: A B C D E F $$W ATERMARKD$$ NOTE: 1
- Page 251 and 252: A B C D E F $$W ATERMARKD$$ H340940
- Page 253 and 254: B A B C D E F $$W ATERMARKD$$ H3409
- Page 255 and 256: A B C D E F $$W ATERMARKD$$ H340940
- Page 257 and 258: A B C D E F $$W ATERMARKD$$ H340940
- Page 259 and 260: APPENDIX 1-C Process Flow Diagrams
- Page 261 and 262: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 263 and 264: A B C D E F $$W ATERMARKD$$ H340940
- Page 265 and 266: A B C D E F $$W ATERMARKD$$ H340940
- Page 267: A B C D E F $$W ATERMARKD$$ H340940
- Page 271 and 272: A B C D E F $$W ATERMARKD$$ H340940
- Page 273 and 274: H - 340940 Precious Metals Recovery
- Page 275 and 276: H - 340940 Precious Metals Recovery
- Page 277 and 278: H - 340940 Precious Metals Recovery
- Page 279 and 280: H - 340940 Precious Metals Recovery
- Page 281 and 282: H - 340940 Precious Metals Recovery
- Page 283 and 284: APPENDIX 1-D Floor and Wall Sealant
- Page 285 and 286: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 287 and 288: 8" THICK INSULATED PRECAST CONCRETE
- Page 289 and 290: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 291 and 292: 2. PRODUCTS 2.1 Stonclad GS Stoncla
- Page 293 and 294: APPENDIX 2-A Waste Analysis Plan
- Page 295 and 296: WASTE ANALYSIS PLAN 1 PURPOSE AND S
- Page 297 and 298: Table 1: Analytical Methods for the
- Page 299 and 300: All wastes received will have been
- Page 301 and 302: Waste will not be accepted until th
- Page 303 and 304: Table 3: Waste Sampling Matrix Type
- Page 305 and 306: 9 LDR TREATMENT STANDARDS Waste Des
- Page 307 and 308: Drummed consolidation waste will be
- Page 309 and 310: eevaluated whenever the process tha
- Page 311 and 312: ATTACHMENT 2-A-1 Profile Instructio
- Page 313 and 314: PMR LLC 460 W. 50 North Suite 500 S
- Page 315 and 316: • Is the waste pyrophoric? a See
- Page 317 and 318: EPA's Chemical Compatibility Chart
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
$$W ATERMARKD$$<br />
H340940-1400-05-030-0004<br />
WASTE SOLUTION<br />
1400-05-030-0001<br />
RETORT<br />
S0 SCRUBBER BLOWDOWN<br />
2<br />
1400-05-030-0003<br />
OXIDATION REACTOR<br />
WASTE SOLUTION<br />
LABORATORY<br />
WASH WATER<br />
OPEN SUMPS<br />
MISCELLANEOUS WASTEWATER<br />
NOTE 3<br />
OFF-SPEC TREATED WASTE SOLUTION<br />
COMPRESSED AIR<br />
1500-05-030-0001<br />
DISTRIBUTION<br />
1400-05-030-0002<br />
WASTE SOLUTION TANK<br />
204<br />
1500-05-030-0003 455<br />
WASTE SOLUTION STORAGE<br />
TANK #1 / #2<br />
CAUSTIC LEACH WASTE SOLUTION<br />
1 2 3 4 5 6 7 8<br />
109 253<br />
251<br />
252<br />
159<br />
DWG. NO.<br />
DRAWING NO. DRAWING TITLE<br />
REFERENCE DRAWINGS<br />
EMERGENCY<br />
O/F SEAL DRUM<br />
362<br />
1440-TK-116<br />
WASTE SOLUTION<br />
SETTLING TANK<br />
361<br />
1440-PP-117<br />
WASTE SOLUTION<br />
SETTLING TANK<br />
O/F PUMP<br />
1440-PP-119<br />
WASTE SOLUTION<br />
SETTLING TANK<br />
U/F PUMP<br />
EMERGENCY<br />
O/F SEAL DRUM<br />
360<br />
254<br />
2<br />
1<br />
0<br />
C<br />
B<br />
A<br />
1440-TK-114<br />
WASTE SOLUTION<br />
COLLECTION TANK<br />
NOTE 1<br />
1440-FL-118<br />
CARTRIDGE FILTERS<br />
ISSUED FOR INFORMATION KM AO<br />
1440-PP-115<br />
WASTE SOLUTION<br />
COLLECTION PUMP<br />
ISSUE FOR DESIGN EC SS 2012-12-14<br />
ISSUE FOR DESIGN<br />
ISSUE FOR DESIGN DE AO 2012-10-22<br />
REVISED & ISSUED FOR DISCIPLINE REVIEW<br />
ISSUED FOR CLIENT REVIEW KM AO 2012-06-19<br />
DR<br />
SS 2012-11-14<br />
DE AO 2012-10-12<br />
1440-CL-078<br />
ACTIVATED CARBON COLUMN No. 1<br />
1440-CL-079<br />
ACTIVATED CARBON COLUMN No. 2<br />
1440-CL-080<br />
ACTIVATED CARBON COLUMN No. 3<br />
1440-CL-081<br />
ACTIVATED CARBON COLUMN No. 4<br />
NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE<br />
REVISIONS<br />
ISSUE AUTHORIZATION<br />
NOTE 2<br />
1440-CL-082<br />
ACTIVATED CARBON COLUMN No. 5<br />
1440-CL-083<br />
ACTIVATED CARBON COLUMN No. 6<br />
1440-CL-084<br />
ACTIVATED CARBON COLUMN No. 7<br />
1440-CL-085<br />
ACTIVATED CARBON COLUMN No. 8<br />
DESIGNED BY<br />
A. OURFALIAN<br />
DATE<br />
G. KERAMARIS<br />
M. SUCHARDA<br />
DRAWN BY<br />
K. MCLEAN<br />
CHECKED BY DISCIP. ENGR.<br />
DATE<br />
PROJ. DES. COORD.<br />
DATE<br />
R. FUKUZAWA<br />
DATE<br />
J. CHALMERS S. SENNIK<br />
DATE DATE<br />
PROJ. ENGR.<br />
PROJ. MGR. SCALE<br />
NTS<br />
OR AS NOTED<br />
NOTES:<br />
1.<br />
2.<br />
3.<br />
NUMBER OF CARTRIDGE FILTERS REQUIRED<br />
TO BE CONFIRMED.<br />
NUMBER OF CARBON COLUMNS REQUIRED<br />
TO BE CONFIRMED.<br />
MISCELLANEOUS WASTE WATER INCLUDES<br />
POSSIBLE CONTAMINATED WATER FROM<br />
SAFETY SHOWER/EYE WASH STATION,<br />
LAUNDRY MACHINE, LABORATORY, SINKS,<br />
AND FLOOR DRAIN.<br />
257<br />
258<br />
260<br />
259<br />
LEGEND<br />
WASTE SOLUTION<br />
1400-05-030-0002<br />
TANK OFF-GAS<br />
1400-05-030-0005<br />
VENT GAS TREATMENT<br />
TREATED WASTE SOLUTION<br />
1500-05-030-0003<br />
WASTE SOLUTION STORAGE<br />
TANKS<br />
1400-05-030-0002<br />
DECOMPOSITION TANK<br />
MAJOR PROCESS<br />
WASTE SOLUTION<br />
WASTE SOLUTION TANK<br />
SECONDARY PROCESS<br />
INTERMITTENT PROCESS<br />
VENDOR SUPPLY LIMIT<br />
DUST PICKUP POINTS<br />
COLLECTION AND TREATMENT<br />
PROCESS FLOW DIAGRAM<br />
H340940-1400-05-030-0004<br />
TMT 15 - MERCURY PRECIPITATE<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
DRY HILLS FACILITY PROJECT<br />
1 2 3 4 5 6 7 8<br />
DATE<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
DWG. NO.<br />
REV.<br />
2<br />
A<br />
B<br />
C<br />
D<br />
E