23.07.2013 Views

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

$$W ATERMARKD$$<br />

H340940-1400-75-031-0006<br />

PROCESS WATER<br />

TANK 1500-TK-015<br />

1500-75-031-0004<br />

1410-MR-003<br />

1400-75-031-0002<br />

CAUSITC SODA STORAGE<br />

TANK 1300-TK-002<br />

1300-75-031-0001<br />

NOTES:<br />

1.<br />

2.<br />

3.<br />

RETORT OFF-GAS<br />

1 2 3 4 5 6 7 8<br />

LINE SIZES TO BE CONFIRMED.<br />

1400-VOG-1044-PC1C-4-NI<br />

VBA-01<br />

1400-MV-1121<br />

COMMERCIAL SO2 SCRUBBER SPECIFICATION AS<br />

PER VENDOR BUDGET QUOTATION (PM008).<br />

DWG. NO.<br />

1500-WPR-1057-SF1B-2-NI<br />

1400-SP-1031<br />

SP-05001<br />

VBA-01<br />

1400-MV-1122<br />

ALL VENTS CAPTURED BY PLANT HYGIENE EXHAUST SYSTEM.<br />

DRAWING NO. DRAWING TITLE<br />

REFERENCE DRAWINGS<br />

D<br />

VBA-01<br />

1400-MV-1123<br />

HS<br />

112<br />

VBA-01<br />

1400-MV-1481<br />

VBA-01<br />

1400-MV-1480<br />

HS<br />

109<br />

V<br />

XV<br />

112<br />

NOTE 3<br />

1300-RCA-1022-PC1A-1-NI<br />

VBA-01<br />

1400-MV-1124<br />

XV<br />

109<br />

HS<br />

108<br />

XV<br />

108<br />

1410-SR-051<br />

PACKED TOWER<br />

SCRUBBER<br />

1410-PP-052<br />

SCRUBBER<br />

PUMP<br />

1410-SR-051<br />

ATMOSPHERIC AIR<br />

(FROM PLANT SPACES)<br />

1410-FA-053<br />

OXIDATION<br />

REACTOR BLOWER<br />

1410-PP-052<br />

1410-FA-053<br />

1410-VP-121<br />

SO2 SCRUBBER<br />

PACKAGE<br />

1410-VP-121<br />

1410-TK-054<br />

OXIDATION<br />

REACTOR<br />

1410-TK-054<br />

1410-PP-057<br />

OXIDATION<br />

REACTOR PUMP<br />

1400-VOG-1129-PC1C-4-NI<br />

1410-FA-055<br />

1410-PP-057<br />

NOTE 2<br />

D<br />

C<br />

B<br />

A<br />

1410-FA-055<br />

SCRUBBER OFF-GAS<br />

FAN<br />

ISSUE FOR DESIGN<br />

CLIENT REVIEW<br />

INTERNAL REVIEW<br />

J. HEIDA<br />

R.A. S.S.2012-07-27 J. CHALMERS<br />

NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE<br />

REVISIONS<br />

D. BARNATT<br />

DATE 2012-07-13 DATE 2012-07-13<br />

M. NENE J.HEIDA/R.ALADI<br />

E.C. S.S.2012-12-14<br />

DATE 2012-07-13 DATE 2012-07-13<br />

S. SENNIK<br />

R.A. S.S. 2012-07-13 DATE 2012-07-13 DATE 2012-07-13<br />

M. SUCHARDA<br />

V<br />

VBA-01<br />

1400-MV-1482<br />

VBA-01<br />

1400-MV-1483<br />

1400-VOG-1047-PC1C-4-NI<br />

VBF-01<br />

1400-MV-1125<br />

VBA-02<br />

1400-MV-1126<br />

1400-PWS-1054-PC1B-2-NI<br />

TANK 1400-TK-114<br />

RETORT OFF-GAS<br />

1400-75-031-0010<br />

SCRUBBER BLOWDOWN<br />

1400-75-031-0009<br />

ISSUE FOR DESIGN R.A. S.S.2012-11-14 PROJ. DES. COORD. PROJ. ENGR.<br />

SCRUBBER & OXIDATION REACTOR<br />

ISSUE AUTHORIZATION<br />

DESIGNED BY<br />

DATE 2012-07-13<br />

DRAWN BY<br />

CHECKED BY DISCIP. ENGR.<br />

NOTE 3<br />

PROJ. MGR. SCALE<br />

PIPING AND INSTRUMENTATION DIAGRAM<br />

NTS<br />

OR AS NOTED<br />

RETORT/SCRUBBER OFF-GAS<br />

1430-SK-045<br />

PRECIOUS METALS RECOVERY <strong>LLC</strong><br />

PRECIOUS METALS RECOVERY <strong>LLC</strong><br />

DRY HILLS FACILITY PROJECT<br />

DWG. NO.<br />

H340940-1400-75-031-0006<br />

1 2 3 4 5 6 7 8<br />

REV.<br />

D<br />

A<br />

B<br />

C<br />

D<br />

E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!