Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
A B C D E F $$W ATERMARKD$$ H340940-1600-75-031-0006 DIESEL SUPPLY TANKER NOTES: 1. 2. 3. COMFIRMED WITH SUPPLIER LINE SIZES TO BE COMFRIMED 1 2 3 4 5 6 7 8 REQUIREMENT FOR UNLOADING PUMP TO BE TANK TO BE EQUIPPED WITH DOUBLE WALL AND LOCATED WITHIN A BUNDED AREA. DWG. NO. 191A DRAWING NO. DRAWING TITLE REFERENCE DRAWINGS HS 1500-ODF-1098-CB1A-2-NI XV 191A SP-06006 1500-SP-1097 HS 194A HS 195A XV 194A XV 195A 1500-ODF-1103-CB1A-4-NI D 1500-MV-1308 VBA-09 1500-ODF-1097-CB1A-2-NI 4"X3" SP-06006 1500-SP-1098 SP-06006 1500-SP-1099 1550-PP-032 DIESEL RECEIVING PUMP UX 032 1550-PP-032 NOTE 1 D D 1500-MV-1317 VBA-09 1500-MV-1319 VBA-09 PSV 192 4"X3" 2"X1" 2"X1" 1550-PP-033 DIESEL TRANSFER PUMP #1 UX 033 PG 191 1550-PP-033 UX 034 1500-MV-1309 VBA-09 1550-PP-034 VBA-09 1500-MV-1310 D 1500-ODF-1096-CB1A-4-NI 2"X1" PSV 196 2"X1" PSV 1 500-ODF-1 124-CB1 A-2-NI 197 1550-PP-034 DIESEL TRANSFER PUMP #2 1500-ODF-1122-CB1A-4-NI D PG 194 1500-ODF-1123-CB1A-2-NI PG 195 1500-MV-1311 VBA-09 VBA-09 VBA-09 1500-MV-1321 1500-MV-1347 HS 191B D D D XV 191B VBA-09 1500-MV-1348 1500-MV-1318 VBA-09 D VBA-09 1500-MV-1349 1500-MV-1320 VBA-09 1500-MV-1312 VBA-09 1500-MV-1313 D D VGA-02 HS 194B ATM. VGA-02 HS 195B *V PSV XV 198 194B XV 195B 1500-ODF-1099-CB1A-2-NI 1550-TK-029 DIESEL STORAGE TANK LI 193 LIT 193 H L 1550-TK-029 NOTE 3 1500-ODF-1100-CB1A-2-NI D C B A D 1500-MV-1315 ISSUE FOR DESIGN CLIENT REVIEW INTERNAL REVIEW VBA-10 1500-MV-1314 1500-MV-1316 VBA-09 V 1500-SP-1045 1500-MV-1322 VBA-09 SP-18003 1500-MV-1326 VBA-10 J. HEIDA R.A. S.S.2012-07-27 J. CHALMERS 1620-GE-038 DIESEL GENERATOR #1 1500-ODF-1101-CB1A-1-NI VBA-10 1500-MV-1323 2"X1" VBA-10 1500-MV-1324 1500-ODF-1104-CB1A-1-NI D. BARNATT DATE 2012-07-13 DATE 2012-07-13 M. NENE J. HEIDA/R. ALADI E.C. S.S.2012-12-14 DATE 2012-07-13 DATE 2012-07-13 ISSUE FOR DESIGN R.A. S.S.2012-11-14 PROJ. DES. COORD. NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE REVISIONS ISSUE AUTHORIZATION DESIGNED BY S. SENNIK R.A. S.S. 2012-07-13 DATE 2012-07-13 DATE 2012-07-13 M. SUCHARDA DATE 2012-07-13 DRAWN BY CHECKED BY DISCIP. ENGR. PROJ. ENGR. PROJ. MGR. SCALE PIPING AND INSTRUMENTATION DIAGRAM NTS OR AS NOTED 1620-GE-039 DIESEL GENERATOR #2 DIESEL SYSTEMS 1620-GE-038 1620-GE-039 FIRE WEATER PUMP H340940-1500-75-031-0006 VENDOR SUPPLY PACKAGE 1500-75-031-0003 PRECIOUS METALS RECOVERY LLC PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT 1 2 3 4 5 6 7 8 DWG. NO. REV. D A B C D E
A B C D E F $$W ATERMARKD$$ H340940-1500-75-031-0005 NOTES: 1. 2. 3. 1 2 3 4 5 6 7 8 O SUPPLY TRUCK 2 N SUPPLY TRUCK LINE SIZES TO BE CONFIRMED. 2 DWG. NO. SUPPLIED AND OWNED BY NITROGEN/OXYGEN SUPPLIER. VENTS AND DRAINS TO BE DIRECTED TO A SAFE LOCATION. DRAWING NO. DRAWING TITLE REFERENCE DRAWINGS PG 171 PG 181 1500-MV-1351 VBA-05 1500-MV-1354 VBA-06 D D D VBA-05 1500-MV-1350 1500-MV-1352 VBA-05 D VBA-06 1500-MV-1353 1500-MV-1355 VBA-06 HS 172 HS 182 XV 172 XV 182 NOTE 1 NOTE 1 1560-TK-026 OXYGEN STORAGE TANK 1560-TK-026 1570-TK-027 NITROGEN STORAGE TANK LIQUID OXYGEN STORAGE TANK 1570-TK-027 LIQUID NITROGEN STORAGE TANK D C B A VBA-05 1500-MV-1304 VBA-06 1500-MV-1305 ISSUE FOR DESIGN CLIENT REVIEW INTERNAL REVIEW V V 1500-MV-1306 VBA-05 1500-MV-1307 VBA-06 SP-18002 1500-SP-1043 SP-18003 1500-SP-1044 J. HEIDA 1500-GOX-1040-SF1A-2-NI 1500-GNI-1041-CB1A-2-NI D. BARNATT DATE 2012-07-13 DATE 2012-07-13 M. NENE J.HEIDA/R.ALADI E.C. S.S.2012-12-14 DATE 2012-07-13 DATE 2012-07-13 ISSUE FOR DESIGN R.A. S.S.2012-11-14 PROJ. DES. COORD. R.A. S.S.2012-07-27 J. CHALMERS NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE REVISIONS ISSUE AUTHORIZATION DESIGNED BY S. SENNIK R.A. S.S. 2012-07-13 DATE 2012-07-13 DATE 2012-07-13 M. SUCHARDA DATE 2012-07-13 DRAWN BY CHECKED BY DISCIP. ENGR. PROJ. ENGR. PROJ. MGR. SCALE PIPING AND INSTRUMENTATION DIAGRAM NTS OR AS NOTED RETORT PACKAGE 1410-MR-003 1400-75-031-0002 RETORT PACKAGE 1410-MR-003 1400-75-031-0002 PRECIOUS METALS RECOVERY LLC PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT DWG. NO. GAS SYSTEMS H340940-1500-75-031-0005 1 2 3 4 5 6 7 8 REV. D A B C D E
- Page 193 and 194: 31.0 PROCESS VENTS - 40 CFR 270.24
- Page 195 and 196: 33.0 DRIP PADS - 40 CFR 270.26 & 26
- Page 197 and 198: 35.0 REFERENCES American Society of
- Page 199 and 200: At the PMR Dry Hills Facility Open
- Page 217 and 218: APPENDIX I-B Open House Comments
- Page 219 and 220: APPENDIX 1-A Drawings Facility draw
- Page 221 and 222: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 223 and 224: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 225 and 226: A B C D E F $$W ATERMARKD$$ N 4,475
- Page 227 and 228: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 229 and 230: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 231 and 232: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 233 and 234: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 235 and 236: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 237 and 238: A B C D E F $$W ATERMARKD$$ H340940
- Page 239 and 240: A B C D E F $$W ATERMARKD$$ H340940
- Page 241 and 242: A B C D E F $$W ATERMARKD$$ H340940
- Page 243: A B C D E F $$W ATERMARKD$$ H340940
- Page 247 and 248: A B C D E F $$W ATERMARKD$$ H340940
- Page 249 and 250: A B C D E F $$W ATERMARKD$$ NOTE: 1
- Page 251 and 252: A B C D E F $$W ATERMARKD$$ H340940
- Page 253 and 254: B A B C D E F $$W ATERMARKD$$ H3409
- Page 255 and 256: A B C D E F $$W ATERMARKD$$ H340940
- Page 257 and 258: A B C D E F $$W ATERMARKD$$ H340940
- Page 259 and 260: APPENDIX 1-C Process Flow Diagrams
- Page 261 and 262: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 263 and 264: A B C D E F $$W ATERMARKD$$ H340940
- Page 265 and 266: A B C D E F $$W ATERMARKD$$ H340940
- Page 267 and 268: A B C D E F $$W ATERMARKD$$ H340940
- Page 269 and 270: A B C D E F $$W ATERMARKD$$ H340940
- Page 271 and 272: A B C D E F $$W ATERMARKD$$ H340940
- Page 273 and 274: H - 340940 Precious Metals Recovery
- Page 275 and 276: H - 340940 Precious Metals Recovery
- Page 277 and 278: H - 340940 Precious Metals Recovery
- Page 279 and 280: H - 340940 Precious Metals Recovery
- Page 281 and 282: H - 340940 Precious Metals Recovery
- Page 283 and 284: APPENDIX 1-D Floor and Wall Sealant
- Page 285 and 286: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 287 and 288: 8" THICK INSULATED PRECAST CONCRETE
- Page 289 and 290: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 291 and 292: 2. PRODUCTS 2.1 Stonclad GS Stoncla
- Page 293 and 294: APPENDIX 2-A Waste Analysis Plan
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
$$W ATERMARKD$$<br />
H340940-1500-75-031-0005<br />
NOTES:<br />
1.<br />
2.<br />
3.<br />
1 2 3 4 5 6 7 8<br />
O SUPPLY TRUCK<br />
2<br />
N SUPPLY TRUCK<br />
LINE SIZES TO BE CONFIRMED.<br />
2<br />
DWG. NO.<br />
SUPPLIED AND OWNED BY NITROGEN/OXYGEN SUPPLIER.<br />
VENTS AND DRAINS TO BE DIRECTED TO A SAFE LOCATION.<br />
DRAWING NO. DRAWING TITLE<br />
REFERENCE DRAWINGS<br />
PG<br />
171<br />
PG<br />
181<br />
1500-MV-1351<br />
VBA-05<br />
1500-MV-1354<br />
VBA-06<br />
D<br />
D<br />
D<br />
VBA-05<br />
1500-MV-1350<br />
1500-MV-1352<br />
VBA-05<br />
D<br />
VBA-06<br />
1500-MV-1353<br />
1500-MV-1355<br />
VBA-06<br />
HS<br />
172<br />
HS<br />
182<br />
XV<br />
172<br />
XV<br />
182<br />
NOTE 1<br />
NOTE 1<br />
1560-TK-026<br />
OXYGEN STORAGE<br />
TANK<br />
1560-TK-026<br />
1570-TK-027<br />
NITROGEN STORAGE<br />
TANK<br />
LIQUID OXYGEN STORAGE TANK<br />
1570-TK-027<br />
LIQUID NITROGEN STORAGE TANK<br />
D<br />
C<br />
B<br />
A<br />
VBA-05<br />
1500-MV-1304<br />
VBA-06<br />
1500-MV-1305<br />
ISSUE FOR DESIGN<br />
CLIENT REVIEW<br />
INTERNAL REVIEW<br />
V<br />
V<br />
1500-MV-1306<br />
VBA-05<br />
1500-MV-1307<br />
VBA-06<br />
SP-18002<br />
1500-SP-1043<br />
SP-18003<br />
1500-SP-1044<br />
J. HEIDA<br />
1500-GOX-1040-SF1A-2-NI<br />
1500-GNI-1041-CB1A-2-NI<br />
D. BARNATT<br />
DATE 2012-07-13 DATE 2012-07-13<br />
M. NENE J.HEIDA/R.ALADI<br />
E.C. S.S.2012-12-14<br />
DATE 2012-07-13 DATE 2012-07-13<br />
ISSUE FOR DESIGN R.A. S.S.2012-11-14 PROJ. DES. COORD.<br />
R.A. S.S.2012-07-27 J. CHALMERS<br />
NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE<br />
REVISIONS<br />
ISSUE AUTHORIZATION<br />
DESIGNED BY<br />
S. SENNIK<br />
R.A. S.S. 2012-07-13 DATE 2012-07-13 DATE 2012-07-13<br />
M. SUCHARDA<br />
DATE 2012-07-13<br />
DRAWN BY<br />
CHECKED BY DISCIP. ENGR.<br />
PROJ. ENGR.<br />
PROJ. MGR. SCALE<br />
PIPING AND INSTRUMENTATION DIAGRAM<br />
NTS<br />
OR AS NOTED<br />
RETORT PACKAGE<br />
1410-MR-003<br />
1400-75-031-0002<br />
RETORT PACKAGE<br />
1410-MR-003<br />
1400-75-031-0002<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
DRY HILLS FACILITY PROJECT<br />
DWG. NO.<br />
GAS SYSTEMS<br />
H340940-1500-75-031-0005<br />
1 2 3 4 5 6 7 8<br />
REV.<br />
D<br />
A<br />
B<br />
C<br />
D<br />
E