Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
A B C D E F $$W ATERMARKD$$ H340940-1400-75-031-0011 COMPRESSED AIR DISTRIBUTION 1500-PV-003 1500-75-031-0001 RETORT PACKAGE 1410-MR-003 1400-75-031-0002 FILTER PRESS 1400-FL-036 1400-75-031-004 NOTES: 1. 2. 3. BUILDING VENTILATION 1 2 3 4 5 6 7 8 LINE SIZES TO BE CONFIRMED. 20" CS DUCT 1500-ACO-1032-SF1C-1-NI 10" SS DUCT TO ASSESS CHANGE-OUT REQUIREMENT. TO ASSESS CHANGE-OUT REQUIREMENT. 16" SS DUCT DWG. NO. DIFFERENTIAL PRESSURE MEASUREMENT ACROSS FILTER DIFFERENTIAL PRESSURE MEASUREMENT ACROSS DUST COLLECTOR DRAWING NO. DRAWING TITLE REFERENCE DRAWINGS 20" SS DUCT 1450-DC-101 1450-CV-102 1450-FE-111 1450-HO-103 1450-FL-105 1450-FL-106 1450-FA-107 1450-FA-112 DUST COLLECTOR HS 101 *V XV 101 UX 111 1400-VOG-1073-PC1C-2-NI DUST COLLECTOR SCREW CONVEYOR VBA-07 1400-MV-1490 1/2" NOTE 3 VBA-01 1400-MV-1424 1450-DC-101 M 1450-FE-111 DUCT COLLECTOR ROTARY VALVE 20" SS DUCT PDI 101 *V PDIT 101 H *V 1/2" *V SSL 111 *V VBA-01 1400-MV-1425 LS LS 102 DUST COLLECTOR DRUM HOOD LAH 101 101 SAL 111 HS 105 *V LAHH 102 XV 105 24"X20" 1450-HO-103 XV 107 HEPA FILTER CARBON FILTER HYGIENE FAN NO. 1 HS 107 24" SS DUCT REVISIONS 1/2" VBA-01 1400-MV-1426 PDI 105 PDIT 105 1/2" VBA-01 1400-MV-1427 STAND-BY HYGIENE FAN NO.2 NOTE 2 NOTE 2 PDI 106 PDIT 106 1450-FL-105 1450-FL-106 1/2" VBA-01 1400-MV-1428 1/2" VBA-01 1400-MV-1429 24" SS DUCT 24" CS DUCT TE 106 TIT 106 TI H 106 24" CS DUCT D C B A VBA-01 1400-MV-1492 VBA-01 1400-MV-1491 DAMPER D DAMPER DAMPER D CLIENT REVIEW INTERNAL REVIEW UX 112 M 1450-FA-112 DAMPER ISSUE FOR DESIGN UX 107 M VBA-01 1400-MV-1494 1450-FA-107 VBA-01 1400-MV-1493 D DAMPER DAMPER D 24" CS DUCT DAMPER DAMPER 24" CS DUCT J. HEIDA R.A. S.S.2012-07-27 J. CHALMERS D. BARNATT DATE 2012-07-13 DATE 2012-07-13 M. NENE J.HEIDA/R.ALADI E.C. S.S.2012-12-14 DATE 2012-07-13 DATE 2012-07-13 ISSUE FOR DESIGN R.A. S.S.2012-11-14 PROJ. DES. COORD. NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE ISSUE AUTHORIZATION DESIGNED BY S. SENNIK R.A. S.S. 2012-07-13 DATE 2012-07-13 DATE 2012-07-13 M. SUCHARDA DATE 2012-07-13 DRAWN BY CHECKED BY DISCIP. ENGR. PROJ. ENGR. PROJ. MGR. SCALE PIPING AND INSTRUMENTATION DIAGRAM NTS OR AS NOTED TREATED HYGIENE GAS 1430-SK-045 1400-75-031-0010 PRECIOUS METALS RECOVERY LLC PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT DWG. NO. HYGIENE GAS SYSTEM H340940-1400-75-031-0011 1 2 3 4 5 6 7 8 REV. D A B C D E
A B C D E F $$W ATERMARKD$$ H340940-1400-75-031-0010 VENT GAS 1400-TK-037 1400-75-031-0005 VENT GAS 1400-TK-114 1400-75-031-0009 VENT GAS 1400-TK-116 1400-75-031-0009 VENT GAS 1500-TK-012 1500-75-031-0002 VENT GAS 1400-TK-033 1400-75-031-0003 1 2 3 4 5 6 7 8 DWG. NO. 1400-VOG-1054-PC1C-2-NI 1400-VOG-1062-PC1C-2-NI 1400-VOG-1063-PC1C-2-NI 1400-VOG-1067-PC1C-2-NI 1400-VDT-1048-PC1C-4-NI DRAWING NO. DRAWING TITLE REFERENCE DRAWINGS TI 040 1430-CL-040 CARBON COLUMN No. 1 1430-CL-040 1430-CL-041 H TIT 040 TE 040 VBA-01 1400-MV-1180 VBA-01 1400-MV-1181 VBA-01 1400-MV-1182 VBA-01 1400-MV-1183 VBA-01 VBA-01 1400-MV-1486 VBA-01 1400-MV-1484 1400-MV-1179 V VBA-01 1400-VOG-1068-PC1C-4-NI 1400-MV-1485 1400-VOG-1069-PC1C-4-NI TE 041 TIT TI 041 041 H V VBA-01 1400-MV-1184 VBA-01 1400-MV-1422 1430-CL-041 CARBON COLUMN No. 2 NOTE 2 PDI 110 PDIT 110 H 1430-FL-110 1400-MV-1423 VBA-01 VBA-01 1400-MV-1487 1400-VOG-1070-PC1C-4-NI V 1400-MV-1488 VBA-01 VBA-01 1400-MV-1489 RETORT/SCRUBBER OFF-GAS 1410-VP-121 1400-75-031-0006 TREATED HYGIENE GAS 1450-FA-107 1400-75-031-0011 1400-VOG-1145-PC1C-4-NI D C B A UX 044 M 1430-FA-044 1400-VOG-1047-PC1C-4-NI 24" CS DUCT INTERNAL REVIEW 1430-FL-110 VENT GAS HEPA FILTER 1400-VOG-1133-PC1C-4-NI ISSUE FOR DESIGN CLIENT REVIEW UX 123 M 1430-FA-123 XV 122 HS 122 XV 123 1430-FA-044 VENT GAS FAN J. HEIDA AI 047 AIT 047 SO 2 1430-SK-045 AI 048 AIT 048 Hg D. BARNATT DATE 2012-07-13 DATE 2012-07-13 M. NENE J.HEIDA/R.ALADI E.C. S.S.2012-12-14 DATE 2012-07-13 DATE 2012-07-13 ISSUE FOR DESIGN R.A. S.S.2012-11-14 PROJ. DES. COORD. HS 123 R.A. S.S.2012-07-27 J. CHALMERS NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE REVISIONS ISSUE AUTHORIZATION DESIGNED BY S. SENNIK R.A. S.S. 2012-07-13 DATE 2012-07-13 DATE 2012-07-13 M. SUCHARDA EXHAUST DUCT 1400-VOG-1146-PC1C-4-NI DATE 2012-07-13 DRAWN BY CHECKED BY DISCIP. ENGR. PROJ. ENGR. FI 046 FIT 046 FE 046 NOTES: 1. 2. PROJ. MGR. SCALE LINE SIZE TO BE CONFIRMED. CALOMEL TREATMENT VENT GAS TREATMENT PIPING AND INSTRUMENTATION DIAGRAM NTS TO ATMOSPHERE 1430-SK-045 DIFFERENTIAL PRESSURE MEASUREMENT ACROSS FILTER TO ASSESS CHANGE-OUT REQUIREMENT. PRECIOUS METALS RECOVERY LLC OR AS NOTED PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT DWG. NO. H340940-1400-75-031-0010 1 2 3 4 5 6 7 8 REV. D A B C D E
- Page 187 and 188: 29.0 BOILERS/INDUSTRIAL FURNACE - 4
- Page 189 and 190: 30.1.3 Retort Operating Procedures
- Page 191 and 192: of 13.5 feet long by 4.7 feet wide
- Page 193 and 194: 31.0 PROCESS VENTS - 40 CFR 270.24
- Page 195 and 196: 33.0 DRIP PADS - 40 CFR 270.26 & 26
- Page 197 and 198: 35.0 REFERENCES American Society of
- Page 199 and 200: At the PMR Dry Hills Facility Open
- Page 217 and 218: APPENDIX I-B Open House Comments
- Page 219 and 220: APPENDIX 1-A Drawings Facility draw
- Page 221 and 222: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 223 and 224: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 225 and 226: A B C D E F $$W ATERMARKD$$ N 4,475
- Page 227 and 228: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 229 and 230: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 231 and 232: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 233 and 234: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 235 and 236: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 237: A B C D E F $$W ATERMARKD$$ H340940
- Page 241 and 242: A B C D E F $$W ATERMARKD$$ H340940
- Page 243 and 244: A B C D E F $$W ATERMARKD$$ H340940
- Page 245 and 246: A B C D E F $$W ATERMARKD$$ H340940
- Page 247 and 248: A B C D E F $$W ATERMARKD$$ H340940
- Page 249 and 250: A B C D E F $$W ATERMARKD$$ NOTE: 1
- Page 251 and 252: A B C D E F $$W ATERMARKD$$ H340940
- Page 253 and 254: B A B C D E F $$W ATERMARKD$$ H3409
- Page 255 and 256: A B C D E F $$W ATERMARKD$$ H340940
- Page 257 and 258: A B C D E F $$W ATERMARKD$$ H340940
- Page 259 and 260: APPENDIX 1-C Process Flow Diagrams
- Page 261 and 262: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 263 and 264: A B C D E F $$W ATERMARKD$$ H340940
- Page 265 and 266: A B C D E F $$W ATERMARKD$$ H340940
- Page 267 and 268: A B C D E F $$W ATERMARKD$$ H340940
- Page 269 and 270: A B C D E F $$W ATERMARKD$$ H340940
- Page 271 and 272: A B C D E F $$W ATERMARKD$$ H340940
- Page 273 and 274: H - 340940 Precious Metals Recovery
- Page 275 and 276: H - 340940 Precious Metals Recovery
- Page 277 and 278: H - 340940 Precious Metals Recovery
- Page 279 and 280: H - 340940 Precious Metals Recovery
- Page 281 and 282: H - 340940 Precious Metals Recovery
- Page 283 and 284: APPENDIX 1-D Floor and Wall Sealant
- Page 285 and 286: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 287 and 288: 8" THICK INSULATED PRECAST CONCRETE
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
$$W ATERMARKD$$<br />
H340940-1400-75-031-0011<br />
COMPRESSED AIR<br />
DISTRIBUTION 1500-PV-003<br />
1500-75-031-0001<br />
RETORT PACKAGE<br />
1410-MR-003<br />
1400-75-031-0002<br />
FILTER PRESS<br />
1400-FL-036<br />
1400-75-031-004<br />
NOTES:<br />
1.<br />
2.<br />
3.<br />
BUILDING<br />
VENTILATION<br />
1 2 3 4 5 6 7 8<br />
LINE SIZES TO BE CONFIRMED.<br />
20" CS DUCT<br />
1500-ACO-1032-SF1C-1-NI<br />
10" SS DUCT<br />
TO ASSESS CHANGE-OUT REQUIREMENT.<br />
TO ASSESS CHANGE-OUT REQUIREMENT.<br />
16" SS DUCT<br />
DWG. NO.<br />
DIFFERENTIAL PRESSURE MEASUREMENT ACROSS FILTER<br />
DIFFERENTIAL PRESSURE MEASUREMENT ACROSS DUST COLLECTOR<br />
DRAWING NO. DRAWING TITLE<br />
REFERENCE DRAWINGS<br />
20" SS DUCT<br />
1450-DC-101 1450-CV-102 1450-FE-111 1450-HO-103 1450-FL-105 1450-FL-106 1450-FA-107 1450-FA-112<br />
DUST COLLECTOR<br />
HS<br />
101<br />
*V<br />
XV<br />
101<br />
UX<br />
111<br />
1400-VOG-1073-PC1C-2-NI<br />
DUST COLLECTOR<br />
SCREW CONVEYOR<br />
VBA-07<br />
1400-MV-1490<br />
1/2"<br />
NOTE 3<br />
VBA-01<br />
1400-MV-1424<br />
1450-DC-101<br />
M<br />
1450-FE-111<br />
DUCT COLLECTOR<br />
ROTARY VALVE<br />
20" SS DUCT<br />
PDI<br />
101<br />
*V<br />
PDIT<br />
101<br />
H<br />
*V<br />
1/2"<br />
*V<br />
SSL<br />
111<br />
*V<br />
VBA-01<br />
1400-MV-1425<br />
LS<br />
LS<br />
102<br />
DUST COLLECTOR<br />
DRUM HOOD<br />
LAH<br />
101 101<br />
SAL<br />
111<br />
HS<br />
105<br />
*V<br />
LAHH<br />
102<br />
XV<br />
105<br />
24"X20"<br />
1450-HO-103<br />
XV<br />
107<br />
HEPA FILTER CARBON FILTER HYGIENE FAN NO. 1<br />
HS<br />
107<br />
24" SS DUCT<br />
REVISIONS<br />
1/2"<br />
VBA-01<br />
1400-MV-1426<br />
PDI<br />
105<br />
PDIT<br />
105<br />
1/2"<br />
VBA-01<br />
1400-MV-1427<br />
STAND-BY<br />
HYGIENE FAN NO.2<br />
NOTE 2 NOTE 2<br />
PDI<br />
106<br />
PDIT<br />
106<br />
1450-FL-105 1450-FL-106<br />
1/2"<br />
VBA-01<br />
1400-MV-1428<br />
1/2"<br />
VBA-01<br />
1400-MV-1429<br />
24" SS DUCT 24" CS DUCT<br />
TE<br />
106<br />
TIT<br />
106<br />
TI H<br />
106<br />
24" CS DUCT<br />
D<br />
C<br />
B<br />
A<br />
VBA-01<br />
1400-MV-1492<br />
VBA-01<br />
1400-MV-1491<br />
DAMPER<br />
D<br />
DAMPER DAMPER<br />
D<br />
CLIENT REVIEW<br />
INTERNAL REVIEW<br />
UX<br />
112<br />
M<br />
1450-FA-112<br />
DAMPER<br />
ISSUE FOR DESIGN<br />
UX<br />
107<br />
M<br />
VBA-01<br />
1400-MV-1494<br />
1450-FA-107<br />
VBA-01<br />
1400-MV-1493<br />
D<br />
DAMPER DAMPER<br />
D<br />
24" CS DUCT<br />
DAMPER DAMPER<br />
24" CS DUCT<br />
J. HEIDA<br />
R.A. S.S.2012-07-27 J. CHALMERS<br />
D. BARNATT<br />
DATE 2012-07-13 DATE 2012-07-13<br />
M. NENE J.HEIDA/R.ALADI<br />
E.C. S.S.2012-12-14<br />
DATE 2012-07-13 DATE 2012-07-13<br />
ISSUE FOR DESIGN R.A. S.S.2012-11-14 PROJ. DES. COORD.<br />
NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE<br />
ISSUE AUTHORIZATION<br />
DESIGNED BY<br />
S. SENNIK<br />
R.A. S.S. 2012-07-13 DATE 2012-07-13 DATE 2012-07-13<br />
M. SUCHARDA<br />
DATE 2012-07-13<br />
DRAWN BY<br />
CHECKED BY DISCIP. ENGR.<br />
PROJ. ENGR.<br />
PROJ. MGR. SCALE<br />
PIPING AND INSTRUMENTATION DIAGRAM<br />
NTS<br />
OR AS NOTED<br />
TREATED HYGIENE GAS<br />
1430-SK-045<br />
1400-75-031-0010<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
DRY HILLS FACILITY PROJECT<br />
DWG. NO.<br />
HYGIENE GAS SYSTEM<br />
H340940-1400-75-031-0011<br />
1 2 3 4 5 6 7 8<br />
REV.<br />
D<br />
A<br />
B<br />
C<br />
D<br />
E