A B C D E F $$W ATERMARKD$$ N 4,475,000 (N 14,681,729.17) A N 4,474,500 (N 14,680,089.75) DATUM (REF.) (NOTE 4) (GROUND SURVEY LIMITS) W LLS HI REFERENCE DATUM N 4,474,853.41 DRY ELL ( DH-2) 2 SEC. LINE 32/6 1 2 3 4 5 6 7 8 H340940-0000-50-014-0001 SEC. 32 (N 14,681,248.24) DRY HILLS WELL (DH-2) N 4,474,852.99 (N 14,681,246.84) E 553,500 (REF.) OBSERVATION WELL (OW-1) N 4,474,840.98 (N 14,681,207.45) N 4,474,840.00 (N 14,681,204.23) BLDG. COL. N 4,474,798.55 (N 14,681,068.24) (REF.) MONITORING WELL (MW-4) MONITORING WELL (MW-2A) N 4,474,640.00 (N 14,680,548.07) MONITORING WELL (MW-3) N 4,474,620.00 (N 14,680,482.45) DWG. NO. (E 1,815,941.25) REFERENCE DATUM E 553,608.28 (E 1,816,296.51) BATTERY LIMIT SEC. LINE 6/5 E 553,603.71 (E 1,816,281.50) N 00 35’ 12" W 4130.42 E 553,643.19 (E 1,816,411.02) OBSERVATION W ELL (OW-1) E 553,683.74 (E 1,816,544.07) MONITORING W ELL (MW-3) E 553,699.00 (E 1,816,594.14) MONITORING W ELL (MW-4) E 553,730.00 (E 1,816,695.84) E 553,743.92 7 (E 1,816,741.50) BLDG. COL. PROCESS/ STORAGE FACILITY NOM. GRADE EL. 4975’-6" NOM. GRADE EL. 4985’-6" MONITORING W ELL (MW-2a) E 553,823.00 (E 1,817,000.96) MONITORING W ELL (MW-1) N 553,872.49 (N 1,817,163.33) BATTERY LIMIT E 554,000 N 4,474,853.41 (N 14,681,248.24) BATTERY LIMIT N 4,474,548.61 (N 14,680,248.24) EXISTING WATERCOURSE BATTERY LIMIT (E 1,817,581.67) N 00 32’ 59" W 4126.20 E 554,005.46 (E 1,817,599.58) SECTION CORNER NOT FOUND. FALLS LOT LINE 4/3 MAIN SECURITY PASS GATE PERIMETER SECURITY GATE PLANT ACCESS ROAD N 4,474,727.23 ROAD INTERSECTION MONITORING WELL (MW-1) (N 14,680,834.25) SEC. 6 (REF.) SEC. 5/LOT 4 (REF.) SEC. 5/LOT 3 (REF.) DRAWING NO. DRAWING TITLE REFERENCE DRAWINGS UNDEVELOPED UTILITY BLDG. IN ROAD SECURITY BERM SEC LINE 32/33 PROPOSED IMPROVED EXISTING COUNTY ROAD (WILLOW CORRAL PASS) N 4,474,763.78 (N 14,680,954.16) 0 25 SCALE IN FEET SEC. 33 EL. 4979’-0" NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE REVISIONS ISSUE AUTHORIZATION 75 125 E.C. S.S.2012-12-14 DESIGNED BY (REF.) ROAD INTERSECTION E 554,274.13 (E 1,818,481.03) SEC. LINE 33/5 N89 34’ 38" E 5281.46 0 10 20 30 40 50 SCALE IN METRES ISSUE FOR DESIGN J.C. S.S.2012-11-29 J. CHALMERS D. EAILEY ISSUE FOR DESIGN DATE 2012-05-28 DATE 2012-05-28 J.C. S.S.2012-11-14 CHECKED BY DISCIP. ENGR. ISSUE FOR DESIGN J.C. S.S. 2012-10-11 J. CHALMERS D. KLUWAK FS FINAL REPORT J.C. S.S. 2012-07-30 DATE 2012-05-28 DATE 2012-05-28 J.C. S.S.2012-07-05 PROJ. DES. COORD. DRAWN BY PROJ. ENGR. GENERAL NOTES: 1. 2. 3. 4. 5. PROJ. MGR. SCALE ALL COORDINATES SHOWN ARE IN METERS (BRACKETED COORDINATES ARE IN U.S. SURVEY FEET). ALL ELEVATIONS ARE IN FEET UNLESS NOTED OTHERWISE. GRID COORDINATES SHOWN ARE BASED ON THE NORTH AMERICAN DATUM OF 1983, (UTM ZONE 11). SURVEY COORDINATES AND ELEVATIONS SHOWN ARE AS RECORDED BY SUMMIT ENGINEERING (RYAN COOK - 08/24/2012). WELL COORDINATES FOR MW-2A, MW-3 AND MW-4 AS PROVIDED BY JBR (09/26/2012). LEGEND: OR AS NOTED WIND ROSE STATION - CRESCENT VALLEY DEAN RANCH, 1 2 3 4 5 6 7 8 H G F E D C B A ISSUE FOR DESIGN FS FINAL REPORT DISCIPLINE ENGINEERING CLIENT REVIEW J.C. S.S.2012-06-18 J. CHALMERS DATE 2012-05-28 S. SENNIK J.C. S.S. 2012-05-28 DATE 2012-05-28 DATE 2012-05-28 M. SUCHARDA W DWG. NO. NEVADA. 18% 15% 12% 9% 6% 3% N CALM 11% S FACILITY FENCE PERIMETER FENCE LINE BERM FENCE BATTERY LIMIT SECTION\LOT LINE GRID COORDINATES EXISTING WATER COURSE DATUM POINT MPH 1.3 - 4 4 - 8 8 - 13 13 - 19 19 - 25 25 - 32 32 - 39 39 - 47 47+ E GROUND SURVEY LIMITS WELL (SURVEY 08/24/2012) WELL (JBR 09/26/2012) PRECIOUS METALS RECOVERY LLC 1:1500 PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT DRY HILLS FACILITY OVERALL SITE PLAN H340940-0000-50-014-0001 REV. H A B C D E
A B C D EF $ $ W A TERMARKA1$$ H340940-0000-75-004-0002 W G . N O . 1 2 3 4 5 6 7 D VOICE/DATA Data Communications Infrastructure PMR Facility Production Data Network PMR Facility Information Technology Systems PMR Facility Operation Technology Systems Primary / Secondary Critical Communications Path Primary Wireless Secondary (Cellular Data) Barrick Control Center and/or Continuous Monitoring Service Firm Alarms VOICE ONLY VHF Radio Trunking System Tertiary Critical Alarms Communications Path PRECIOUS METALS RECOVERY LLC METALS RECOVERY LLC DRY HILLS FACILITY PROJECT PRECIOUS DESCRIPTION REV. DATEBY DESIGNED REFERENCE DRAWINGS DRAWING NO. DRAWING TITLE REVISIONS NO. DESCRIPTION CHK'DAPP'DDATE REV. ISSUE FOR AUTH. BYDATE DATE DRAWN BY ISSUE AUTHORIZATION CHECKED BY DISCIP. ENGR. PROJ. ENGR. PROJ. MGR. SCALE OR AS NOTEDDWG. NO. REV. PROJ. DES. COORD. 1 2 3 4 5 6 7 8 BY DATE DATE H. Salermo H. Salermo DATE T. Doyle K. van Nes ADiscipline review 2012-07-31 S. Sennik M. Sucharda H.S Internal Review T.DK.vN A BClient review Client review B H.ST.DK.vN2012-08-15 For Information C H.ST.DK.vN2012-12-14 CFor Information REV. AUTHORIZATION ISSUE DATE DATE NO. REVISIONS Handheld Radios VHF VHF Radio Trunking Mobile Radios Product Transport CRITICAL ALARMS COMMUNICATIONS MECHANISMS H340940-0000-75-004-0002 8 C A B C D E
- Page 183 and 184: 25.0 WASTE PILES - 40 CFR 270.18 &
- Page 185 and 186: 27.0 LAND TREATMENT - 40 CFR 270.20
- Page 187 and 188: 29.0 BOILERS/INDUSTRIAL FURNACE - 4
- Page 189 and 190: 30.1.3 Retort Operating Procedures
- Page 191 and 192: of 13.5 feet long by 4.7 feet wide
- Page 193 and 194: 31.0 PROCESS VENTS - 40 CFR 270.24
- Page 195 and 196: 33.0 DRIP PADS - 40 CFR 270.26 & 26
- Page 197 and 198: 35.0 REFERENCES American Society of
- Page 199 and 200: At the PMR Dry Hills Facility Open
- Page 217 and 218: APPENDIX I-B Open House Comments
- Page 219 and 220: APPENDIX 1-A Drawings Facility draw
- Page 221 and 222: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 223 and 224: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 225 and 226: A B C D E F $$W ATERMARKD$$ N 4,475
- Page 227 and 228: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 229 and 230: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 231 and 232: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 233: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 237 and 238: A B C D E F $$W ATERMARKD$$ H340940
- Page 239 and 240: A B C D E F $$W ATERMARKD$$ H340940
- Page 241 and 242: A B C D E F $$W ATERMARKD$$ H340940
- Page 243 and 244: A B C D E F $$W ATERMARKD$$ H340940
- Page 245 and 246: A B C D E F $$W ATERMARKD$$ H340940
- Page 247 and 248: A B C D E F $$W ATERMARKD$$ H340940
- Page 249 and 250: A B C D E F $$W ATERMARKD$$ NOTE: 1
- Page 251 and 252: A B C D E F $$W ATERMARKD$$ H340940
- Page 253 and 254: B A B C D E F $$W ATERMARKD$$ H3409
- Page 255 and 256: A B C D E F $$W ATERMARKD$$ H340940
- Page 257 and 258: A B C D E F $$W ATERMARKD$$ H340940
- Page 259 and 260: APPENDIX 1-C Process Flow Diagrams
- Page 261 and 262: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 263 and 264: A B C D E F $$W ATERMARKD$$ H340940
- Page 265 and 266: A B C D E F $$W ATERMARKD$$ H340940
- Page 267 and 268: A B C D E F $$W ATERMARKD$$ H340940
- Page 269 and 270: A B C D E F $$W ATERMARKD$$ H340940
- Page 271 and 272: A B C D E F $$W ATERMARKD$$ H340940
- Page 273 and 274: H - 340940 Precious Metals Recovery
- Page 275 and 276: H - 340940 Precious Metals Recovery
- Page 277 and 278: H - 340940 Precious Metals Recovery
- Page 279 and 280: H - 340940 Precious Metals Recovery
- Page 281 and 282: H - 340940 Precious Metals Recovery
- Page 283 and 284: APPENDIX 1-D Floor and Wall Sealant
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
$$W ATERMARKD$$<br />
N 4,475,000<br />
(N 14,681,729.17)<br />
A<br />
N 4,474,500<br />
(N 14,680,089.75)<br />
DATUM (REF.) (NOTE 4)<br />
(GROUND SURVEY LIMITS)<br />
W LLS HI<br />
REFERENCE DATUM<br />
N 4,474,853.41 DRY ELL ( DH-2) 2<br />
SEC. LINE 32/6<br />
1 2 3 4 5 6 7 8<br />
H340940-0000-50-014-0001<br />
SEC. 32<br />
(N 14,681,248.24)<br />
DRY HILLS WELL (DH-2)<br />
N 4,474,852.99<br />
(N 14,681,246.84)<br />
E 553,500<br />
(REF.)<br />
OBSERVATION WELL (OW-1)<br />
N 4,474,840.98<br />
(N 14,681,207.45)<br />
N 4,474,840.00<br />
(N 14,681,204.23)<br />
BLDG. COL.<br />
N 4,474,798.55<br />
(N 14,681,068.24)<br />
(REF.)<br />
MONITORING WELL (MW-4)<br />
MONITORING WELL (MW-2A)<br />
N 4,474,640.00<br />
(N 14,680,548.07)<br />
MONITORING WELL (MW-3)<br />
N 4,474,620.00<br />
(N 14,680,482.45)<br />
DWG. NO.<br />
(E 1,815,941.25)<br />
REFERENCE DATUM<br />
E 553,608.28 (E 1,816,296.51)<br />
BATTERY LIMIT<br />
SEC. LINE 6/5<br />
E 553,603.71 (E 1,816,281.50)<br />
N 00 35’ 12" W 4130.42<br />
E 553,643.19 (E 1,816,411.02)<br />
OBSERVATION W ELL (OW-1)<br />
E 553,683.74 (E 1,816,544.07)<br />
MONITORING W ELL (MW-3)<br />
E 553,699.00 (E 1,816,594.14)<br />
MONITORING W ELL (MW-4)<br />
E 553,730.00 (E 1,816,695.84)<br />
E 553,743.92<br />
7<br />
(E 1,816,741.50)<br />
BLDG. COL.<br />
PROCESS/<br />
STORAGE<br />
FACILITY<br />
NOM. GRADE<br />
EL. 4975’-6"<br />
NOM. GRADE<br />
EL. 4985’-6"<br />
MONITORING W ELL (MW-2a)<br />
E 553,823.00 (E 1,817,000.96)<br />
MONITORING W ELL (MW-1)<br />
N 553,872.49 (N 1,817,163.33)<br />
BATTERY LIMIT<br />
E 554,000<br />
N 4,474,853.41 (N 14,681,248.24)<br />
BATTERY LIMIT<br />
N 4,474,548.61 (N 14,680,248.24)<br />
EXISTING<br />
WATERCOURSE<br />
BATTERY LIMIT<br />
(E 1,817,581.67)<br />
N 00 32’ 59" W 4126.20<br />
E 554,005.46 (E 1,817,599.58)<br />
SECTION CORNER<br />
NOT FOUND. FALLS<br />
LOT LINE 4/3<br />
MAIN SECURITY<br />
PASS GATE<br />
PERIMETER SECURITY<br />
GATE<br />
PLANT ACCESS<br />
ROAD<br />
N 4,474,727.23<br />
ROAD INTERSECTION<br />
MONITORING WELL (MW-1)<br />
(N 14,680,834.25)<br />
SEC. 6 (REF.)<br />
SEC. 5/LOT 4 (REF.)<br />
SEC. 5/LOT 3 (REF.)<br />
DRAWING NO. DRAWING TITLE<br />
REFERENCE DRAWINGS<br />
UNDEVELOPED<br />
UTILITY<br />
BLDG.<br />
IN ROAD<br />
SECURITY<br />
BERM<br />
SEC LINE 32/33<br />
PROPOSED IMPROVED<br />
EXISTING COUNTY ROAD<br />
(WILLOW CORRAL PASS)<br />
N 4,474,763.78 (N 14,680,954.16)<br />
0 25<br />
SCALE IN FEET<br />
SEC. 33<br />
EL. 4979’-0"<br />
NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE<br />
REVISIONS<br />
ISSUE AUTHORIZATION<br />
75<br />
125<br />
E.C. S.S.2012-12-14 DESIGNED BY<br />
(REF.)<br />
ROAD INTERSECTION<br />
E 554,274.13 (E 1,818,481.03)<br />
SEC. LINE 33/5<br />
N89 34’ 38" E 5281.46<br />
0 10 20<br />
30 40 50<br />
SCALE IN METRES<br />
ISSUE FOR DESIGN J.C. S.S.2012-11-29 J. CHALMERS D. EAILEY<br />
ISSUE FOR DESIGN<br />
DATE 2012-05-28 DATE 2012-05-28<br />
J.C. S.S.2012-11-14<br />
CHECKED BY DISCIP. ENGR.<br />
ISSUE FOR DESIGN J.C. S.S. 2012-10-11<br />
J. CHALMERS D. KLUWAK<br />
FS FINAL REPORT J.C. S.S. 2012-07-30<br />
DATE 2012-05-28 DATE 2012-05-28<br />
J.C. S.S.2012-07-05 PROJ. DES. COORD.<br />
DRAWN BY<br />
PROJ. ENGR.<br />
GENERAL NOTES:<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
PROJ. MGR. SCALE<br />
ALL COORDINATES SHOWN ARE IN METERS<br />
(BRACKETED COORDINATES ARE IN U.S.<br />
SURVEY FEET).<br />
ALL ELEVATIONS ARE IN FEET UNLESS NOTED<br />
OTHERWISE.<br />
GRID COORDINATES SHOWN ARE BASED ON THE<br />
NORTH AMERICAN DATUM OF 1983, (UTM ZONE 11).<br />
SURVEY COORDINATES AND ELEVATIONS SHOWN<br />
ARE AS RECORDED BY SUMMIT ENGINEERING<br />
(RYAN COOK - 08/24/2012).<br />
WELL COORDINATES FOR MW-2A, MW-3 AND<br />
MW-4 AS PROVIDED BY JBR (09/26/2012).<br />
LEGEND:<br />
OR AS NOTED<br />
WIND ROSE<br />
STATION - CRESCENT VALLEY DEAN RANCH,<br />
1 2 3 4 5 6 7 8<br />
H<br />
G<br />
F<br />
E<br />
D<br />
C<br />
B<br />
A<br />
ISSUE FOR DESIGN<br />
FS FINAL REPORT<br />
DISCIPLINE ENGINEERING<br />
CLIENT REVIEW<br />
J.C. S.S.2012-06-18 J. CHALMERS<br />
DATE 2012-05-28<br />
S. SENNIK<br />
J.C. S.S. 2012-05-28 DATE 2012-05-28 DATE 2012-05-28<br />
M. SUCHARDA<br />
W<br />
DWG. NO.<br />
NEVADA.<br />
18%<br />
15%<br />
12%<br />
9%<br />
6%<br />
3%<br />
N<br />
CALM<br />
11%<br />
S<br />
FACILITY FENCE<br />
PERIMETER FENCE LINE<br />
BERM FENCE<br />
BATTERY LIMIT<br />
SECTION\LOT LINE<br />
GRID COORDINATES<br />
EXISTING WATER COURSE<br />
DATUM POINT<br />
MPH<br />
1.3 - 4<br />
4 - 8<br />
8 - 13<br />
13 - 19<br />
19 - 25<br />
25 - 32<br />
32 - 39<br />
39 - 47<br />
47+<br />
E<br />
GROUND SURVEY LIMITS<br />
WELL (SURVEY 08/24/2012)<br />
WELL (JBR 09/26/2012)<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
1:1500<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
DRY HILLS FACILITY PROJECT<br />
DRY HILLS FACILITY<br />
OVERALL SITE PLAN<br />
H340940-0000-50-014-0001<br />
REV.<br />
H<br />
A<br />
B<br />
C<br />
D<br />
E