23.07.2013 Views

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

$$W ATERMARKD$$<br />

MONITORING<br />

WELL (MW-4)<br />

H340940-0000-50-014-0002<br />

N 4,474,840.00<br />

(N 14,681,204.23)<br />

N 4,474,800<br />

(N 14,681,073.00)<br />

N 4,474,700<br />

(N 14,680,744.92)<br />

E 553,600<br />

(E 1,816,269.33)<br />

BATTERY LIMIT E 553,608.28 (E 1,816.,276.51)<br />

H340940-0000-50-014-0003 AREA PLOT PLAN<br />

H340940-0000-50-014-0001<br />

1 2 3 4 5 6 7 8<br />

DATUM<br />

EL. 4994.44’ (REF.)<br />

N 4,474,852.99<br />

(N 14,681,246.84)<br />

PERIMETER SECURITY<br />

FENCE<br />

10’-0"<br />

70’-0"<br />

OVERALL SITE PLAN<br />

DWG. NO.<br />

DRY HILLS W ELL (DH-2)<br />

E 553,643.19 (E 1,816,411.02)<br />

DRAWING NO. DRAWING TITLE<br />

REFERENCE DRAWINGS<br />

N 4,474,840.98<br />

(N 14,681,207.45)<br />

SECURITY<br />

FENCE/BERM.<br />

T.O. BERM EL. 5095’-6"<br />

NOM. GRADE<br />

EL. 4985’-6"<br />

OBSERVATION W ELL (OW-1)<br />

E 553,683.74 (E 1,816,544.07)<br />

UNDEVELOPED<br />

E 553,700<br />

(E 1,816,597.42)<br />

20’-0"<br />

85’-0"<br />

N 4,474,812.28 (REF.)<br />

(N 14,681,113.28)<br />

N 4,474,798.55<br />

(N 14,681,068.24)<br />

N 4,474,749.46 (REF.)<br />

(N 14,680,907.19)<br />

MONITORING W ELL (MW-4)<br />

E 553,730.00 (E 1,816,695.84)<br />

40’-0"<br />

(REF.)<br />

E 553,743.92<br />

7 10 16<br />

(E 1,816,741.50)<br />

BLDG. COL.<br />

E 553,683.74 (REF.)<br />

PROPOSED BLDG.<br />

NE COR.<br />

(NOTE 2)<br />

(E 1,816,544.07)<br />

E 553,750.10 (REF.)<br />

(E 1,816,761.78)<br />

9 BAYS @ 20’-0" = 180’-0"<br />

HYD.<br />

No.8<br />

SE COR.<br />

123’-0"<br />

HYD.<br />

No.2<br />

6 BAYS @ 20’-0" = 120’-0"<br />

FACILITY<br />

(NOTE 2)<br />

160’-0" (REF.)<br />

PROCESS/STORAGE<br />

PROPOSED BLDG.<br />

PIPERACK<br />

6’-0" (WIDE)<br />

E 553,800<br />

(E 1,816,925.50)<br />

PERIMETER SECURITY<br />

FENCE<br />

ROADWAY<br />

(40’-0" WIDE)<br />

HYD.<br />

No.3<br />

SANITARY<br />

WASTE WATER<br />

DRAINAGE TRENCH<br />

T.O. BERM<br />

EL. 4995’-6"<br />

SANITARY<br />

WASTE WATER<br />

STORAGE TANK<br />

1540-TK-010<br />

MATCHLINE FOR CONT. SEE DWG. No. H340940-0000-50-014-0003<br />

E 553,872.49<br />

(E 1,817,163.33)<br />

8 BAYS @ 20’-0" = 160’-0"<br />

67’-6"<br />

H<br />

G<br />

F<br />

E<br />

D<br />

C<br />

B<br />

A<br />

A<br />

J<br />

L<br />

MONITORING<br />

WELL (MW-1)<br />

= 40’-0"<br />

N 4,474,727.23<br />

(N 14,680,834.25)<br />

ISSUE FOR DESIGN J.C. S.S.2012-11-14 J. CHALMERS K. AWAN<br />

ISSUE FOR DESIGN<br />

DATE 2012-05-28 DATE 2012-05-28<br />

J.C. S.S. 2012-10-11<br />

CHECKED BY DISCIP. ENGR.<br />

FOR WELL LOCATIONS (JBR) J.C. S.S. 2012-09-11<br />

S. SENNIK D. KLUWAK<br />

FS FINAL REPORT J.C. S.S.2012-07-30<br />

DATE 2012-05-28 DATE 2012-05-28<br />

FS FINAL REPORT J.C. S.S. 2012-07-05<br />

DISCIPLINE ENGINEERING J.C. S.S. 2012-06-18<br />

CLIENT REVIEW<br />

2 BAYS @ 20’-0"<br />

BATTERY LIMIT N 4,474,853.41 (N 14,681,248.24)<br />

MAIN SECURITY<br />

PASS GATE<br />

(TRUCK UNLOADING)<br />

E 553,900<br />

ISSUE FOR DESIGN<br />

(E 1,817,252.58)<br />

E.C. S.S.2012-12-14 DESIGNED BY<br />

J.C.<br />

S.S. 2012-05-28<br />

NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE<br />

REVISIONS<br />

ISSUE AUTHORIZATION<br />

0<br />

J. CHALMERS<br />

M. SUCHARDA<br />

25 50<br />

PROJ. DES. COORD.<br />

SCALE IN FEET<br />

S. SENNIK<br />

100<br />

DATE 2012-05-28 DATE 2012-05-28<br />

DATE 2012-05-28<br />

DRAWN BY<br />

PROJ. ENGR.<br />

PROJ. MGR. SCALE<br />

NOTES:<br />

1. FOR GENERAL NOTES SEE DWG.<br />

H340940-0000-50-014-0001.<br />

2. SURVEY COORDINATES AND ELEVATIONS SHOWN<br />

3. WELL COODINATES FOR MW-2A, MW-3 AND MW-4<br />

AS PROVIDED BY JBR (09/26/2012).<br />

1"=50’<br />

OR AS NOTED<br />

ARE AS RECORDED BY SUMMIT ENGINEERING<br />

(RYAN COOK - 08/24/2012).<br />

LEGEND:<br />

FACILITY FENCE<br />

PERIMETER FENCE LINE<br />

BERM FENCE<br />

BATTERY LIMIT<br />

ROADS<br />

FIRE HYDRANT AND HOSE BOX<br />

DATUM POINT<br />

WELL (SURVEY 08/24/2012)<br />

SURVEY POINTS (AUG 24)<br />

WELL (JBR 09/26/2012)<br />

THIS DRAWING<br />

PRECIOUS METALS RECOVERY <strong>LLC</strong><br />

DRY HILLS FACILITY PROJECT<br />

DWG. NO.<br />

KEY PLAN<br />

DRY HILLS FACILITY<br />

PROCESS AREA<br />

PLOT PLAN<br />

H340940-0000-50-014-0002<br />

1 2 3 4 5 6 7 8<br />

SCALE 1"-500’<br />

PRECIOUS METALS RECOVERY <strong>LLC</strong><br />

REV.<br />

H<br />

A<br />

B<br />

C<br />

D<br />

E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!