Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
A B C D E F $$W ATERMARKD$$ A B C D E F G H J K L 10@20’-0" = 200’-0" 1 2 3 4 5 6 7 8 H340940-0000-50-042-0001 2@20’-0" = 40’-0" H340940-0000-50-014-0002 PLOT PLAN H340940-0000-50-014-0001 OVERALL SITE PLAN DWG. NO. DRAWING NO. DRAWING TITLE 7 8 9 10 11 12 13 14 15 16 REFERENCE DRAWINGS ELEMENTAL MERCURY STORAGE (5.5 YEARS) ELEMENTAL MERCURY STORAGE (5.5 YEARS) 6’-0" WIDE PIPE RACK CLEAN STORAGE AND MAINTENANCE AREA TREATED ACTIVATED CARBON MCC ROOM 9@20’-0" = 180’-0" CALOMEL STORAGE RECEIVING OFFICE & INSPECTION AREA B - 6@20’-0" = 120’-0" REAGENT STORAGE ROOM SPENT ACTIVATED CARBON PLAN @ FIN FLR EL. 4989’-6" OFFICE CONTROL ROOM PROCESS AREA LAB TRUCK UNLOADING AREA A - FOR OFFICE DETAILS SEE DWG. H340940-0000-50-042-0002 FOR PROCESS AREA DETAILS SEE DWG. H340940-0000-50-042-0002 REVISIONS U/S STEEL EL. 5021’-4" U/S STEEL EL. 5021’-4" L J E A L TRUCK BAY 40’-0" 40’-0" TRUCK BAY 1450-DC-101 HYGIENE DUST COLLECTOR SECTION A-A J E TREATED ACTIVATED CARBON DRUM 80’-0" 1420-FL-036 FILTER PRESS 80’-0" CALOMEL DRUM SECTION B-B NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE ISSUE AUTHORIZATION A/C UNIT 1420-VP-029 CALOMEL FEED PREPARATION 0 DESIGNED BY 10 20 SCALE IN FEET DRAWN BY 80’-0" A/C UNIT 80’-0" MAKE UP AIR UNIT E.C. S.S.2012-12-14 J. CHALMERS K. AWAN DATE 2012-06-01 DATE 2012-06-01 E.C. S.S.2012-11-14 CHECKED BY DISCIP. ENGR. D.K. S.S.2012-10-18 J. CHALMERS D. KLUWAK J.C. S.S. 2012-10-11 DATE 2012-06-01 DATE 2012-06-01 FS FINAL REPORT J.C. S.S. 2012-07-31 PROJ. DES. COORD. PROJ. ENGR. PROJ. MGR. SCALE 40 DATE 2012-06-01 DATE 2012-06-01 OR AS NOTED A DWG. NO. FIN. FLR EL. 4989’-6" NOM. GRADE EL. 4985’-6" FIN. FLR EL. 4989’-6" NOM. GRADE EL. 4985’-6" KEY PLAN 1 2 3 4 5 6 7 8 G F E D C B A ISSUE FOR DESIGN ISSUE FOR DESIGN ISSUE FOR DESIGN ISSUE FOR DESIGN FS FINAL REPORT J.C. DISCIPLINE ENGINEERING L.Z. S.S. 2012-07-05 J.C. 2012-06-01 DECOMP. J. CHALMERS & WASTE TANK SKID M. SUCHARDA DATE 2012-06-01 S. SENNIK CARBON COLUMNS SCALE 1"-500’ PRECIOUS METALS RECOVERY LLC 1’ = 20’ U/S STL. EL. 5017’-2" (ENCLOSED CEILING) U/S STL. EL. 5017’-2" (ENCLOSED CEILING) THIS DRAWING PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT DRY HILLS FACILITY PROCESS/STORAGE BUILDING GENERAL ARRANGEMENT H340940-0000-50-042-0001 REV. G A B C D E
A B C D E F $$W ATERMARKD$$ 1 2 3 4 5 6 7 8 H340940-0000-50-015-0009 DRAWING NO. DRAWING TITLE A DWG. NO. REFERENCE DRAWINGS 18’-0" 9’-0" ANCHOR BOLTS TYP. FOR ALL POSTS FIN. FLR 6’-0" EL. 4976’-0" 2’-0" 1’-6" 1’-3" 2’-0" 4’-6" PLAN VIEW VIEW A-A B 6’-6" 8’-2" 1’-8" REVISIONS ISOMETRIC VIEW B VIEW B-B A FOR INFORMATION FOR INFORMATION K.A. S.S. 2012-10-11 NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE ISSUE AUTHORIZATION 0 DESIGNED BY 1 B. MUHAMMED 2 4 SCALE IN FEET K. AWAN DATE 2012-10-11 DATE 2012-10-11 J. CHALMERS H. MIN DATE 2012-10-11 DATE 2012-10-11 E.C. S.S.2012-12-14 J. CHALMERS S. SENNIK DATE 2012-10-11 DATE 2012-10-11 M. SUCHARDA DATE 2012-10-11 DRAWN BY CHECKED BY DISCIP. ENGR. PROJ. DES. COORD. PROJ. ENGR. PROJ. MGR. SCALE PRECIOUS METALS RECOVERY LLC 1/2"=1’-0" OR AS NOTED PRECIOUS METALS RECOVERY LLC DRY HILLS FACILITY PROJECT ELEMENTAL MERCURY STORAGE RACK SKETCH DWG. NO. H340940-0000-50-015-0009 1 2 3 4 5 6 7 8 SPILL TRAY (3" HIGH LIP) ELEMENTAL MERCURY STORAGE CONTAINER (1-MT "PIG") NOTES: 1. SPILL TRAYS DESIGNED TO CONTAIN ENTIRE VOLUME OF 1 MERCURY PIG AT FULL CAPACITY (WHEN 8 PIGS ARE BEING STORED ON THE TRAY). 2. THE STORAGE RACK SHOWN ON THIS DRAWING CAN HAVE MORE THAN 2 BAYS. 3. ANCHOR BOLT HOLES IN CONCRETE ARE SEALED WITH HARD WASHERS AND EPOXY TOUCH-UP PAINT. REV. B A B C D E
- Page 171 and 172: Tank Dimensions Waste Solution Stor
- Page 173 and 174: decomposed in the Decomposition Tan
- Page 175 and 176: Figure 23.1-3: Waste Solution Stora
- Page 177 and 178: The Water Storage Tank will supply
- Page 179 and 180: Tank Caustic Soda Storage Tank* Hyd
- Page 181 and 182: 23.13 Recordkeeping A recordkeeping
- Page 183 and 184: 25.0 WASTE PILES - 40 CFR 270.18 &
- Page 185 and 186: 27.0 LAND TREATMENT - 40 CFR 270.20
- Page 187 and 188: 29.0 BOILERS/INDUSTRIAL FURNACE - 4
- Page 189 and 190: 30.1.3 Retort Operating Procedures
- Page 191 and 192: of 13.5 feet long by 4.7 feet wide
- Page 193 and 194: 31.0 PROCESS VENTS - 40 CFR 270.24
- Page 195 and 196: 33.0 DRIP PADS - 40 CFR 270.26 & 26
- Page 197 and 198: 35.0 REFERENCES American Society of
- Page 199 and 200: At the PMR Dry Hills Facility Open
- Page 217 and 218: APPENDIX I-B Open House Comments
- Page 219 and 220: APPENDIX 1-A Drawings Facility draw
- Page 221: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 225 and 226: A B C D E F $$W ATERMARKD$$ N 4,475
- Page 227 and 228: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 229 and 230: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 231 and 232: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 233 and 234: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 235 and 236: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 237 and 238: A B C D E F $$W ATERMARKD$$ H340940
- Page 239 and 240: A B C D E F $$W ATERMARKD$$ H340940
- Page 241 and 242: A B C D E F $$W ATERMARKD$$ H340940
- Page 243 and 244: A B C D E F $$W ATERMARKD$$ H340940
- Page 245 and 246: A B C D E F $$W ATERMARKD$$ H340940
- Page 247 and 248: A B C D E F $$W ATERMARKD$$ H340940
- Page 249 and 250: A B C D E F $$W ATERMARKD$$ NOTE: 1
- Page 251 and 252: A B C D E F $$W ATERMARKD$$ H340940
- Page 253 and 254: B A B C D E F $$W ATERMARKD$$ H3409
- Page 255 and 256: A B C D E F $$W ATERMARKD$$ H340940
- Page 257 and 258: A B C D E F $$W ATERMARKD$$ H340940
- Page 259 and 260: APPENDIX 1-C Process Flow Diagrams
- Page 261 and 262: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 263 and 264: A B C D E F $$W ATERMARKD$$ H340940
- Page 265 and 266: A B C D E F $$W ATERMARKD$$ H340940
- Page 267 and 268: A B C D E F $$W ATERMARKD$$ H340940
- Page 269 and 270: A B C D E F $$W ATERMARKD$$ H340940
- Page 271 and 272: A B C D E F $$W ATERMARKD$$ H340940
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
$$W ATERMARKD$$<br />
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
J<br />
K<br />
L<br />
10@20’-0" = 200’-0"<br />
1 2 3 4 5 6 7 8<br />
H340940-0000-50-042-0001<br />
2@20’-0" = 40’-0"<br />
H340940-0000-50-014-0002 PLOT PLAN<br />
H340940-0000-50-014-0001<br />
OVERALL SITE PLAN<br />
DWG. NO.<br />
DRAWING NO. DRAWING TITLE<br />
7 8 9 10 11 12 13 14 15 16<br />
REFERENCE DRAWINGS<br />
ELEMENTAL MERCURY<br />
STORAGE (5.5 YEARS)<br />
ELEMENTAL MERCURY<br />
STORAGE (5.5 YEARS)<br />
6’-0" WIDE<br />
PIPE RACK<br />
CLEAN<br />
STORAGE<br />
AND<br />
MAINTENANCE<br />
AREA<br />
TREATED<br />
ACTIVATED<br />
CARBON<br />
MCC<br />
ROOM<br />
9@20’-0" = 180’-0"<br />
CALOMEL<br />
STORAGE<br />
RECEIVING<br />
OFFICE &<br />
INSPECTION<br />
AREA<br />
B<br />
-<br />
6@20’-0" = 120’-0"<br />
REAGENT<br />
STORAGE<br />
ROOM<br />
SPENT<br />
ACTIVATED<br />
CARBON<br />
PLAN @ FIN FLR<br />
EL. 4989’-6"<br />
OFFICE<br />
CONTROL<br />
ROOM<br />
PROCESS<br />
AREA<br />
LAB<br />
TRUCK UNLOADING AREA<br />
A<br />
-<br />
FOR OFFICE DETAILS SEE DWG.<br />
H340940-0000-50-042-0002<br />
FOR PROCESS AREA DETAILS SEE<br />
DWG. H340940-0000-50-042-0002<br />
REVISIONS<br />
U/S STEEL<br />
EL. 5021’-4"<br />
U/S STEEL<br />
EL. 5021’-4"<br />
L J E<br />
A<br />
L<br />
TRUCK<br />
BAY<br />
40’-0"<br />
40’-0"<br />
TRUCK<br />
BAY<br />
1450-DC-101<br />
HYGIENE DUST<br />
COLLECTOR<br />
SECTION A-A<br />
J E<br />
TREATED<br />
ACTIVATED<br />
CARBON<br />
DRUM<br />
80’-0"<br />
1420-FL-036<br />
FILTER PRESS<br />
80’-0"<br />
CALOMEL<br />
DRUM<br />
SECTION B-B<br />
NO. DESCRIPTION BY CHK’D APP’D DATE REV. ISSUE FOR AUTH. BY DATE<br />
ISSUE AUTHORIZATION<br />
A/C<br />
UNIT<br />
1420-VP-029<br />
CALOMEL FEED<br />
PREPARATION<br />
0<br />
DESIGNED BY<br />
10<br />
20<br />
SCALE IN FEET<br />
DRAWN BY<br />
80’-0"<br />
A/C<br />
UNIT<br />
80’-0"<br />
MAKE UP<br />
AIR UNIT<br />
E.C. S.S.2012-12-14 J. CHALMERS K. AWAN<br />
DATE 2012-06-01 DATE 2012-06-01<br />
E.C. S.S.2012-11-14<br />
CHECKED BY DISCIP. ENGR.<br />
D.K. S.S.2012-10-18<br />
J. CHALMERS D. KLUWAK<br />
J.C. S.S. 2012-10-11<br />
DATE 2012-06-01 DATE 2012-06-01<br />
FS FINAL REPORT J.C. S.S. 2012-07-31 PROJ. DES. COORD.<br />
PROJ. ENGR.<br />
PROJ. MGR. SCALE<br />
40<br />
DATE 2012-06-01 DATE 2012-06-01<br />
OR AS NOTED<br />
A<br />
DWG. NO.<br />
FIN. FLR EL. 4989’-6"<br />
NOM. GRADE EL. 4985’-6"<br />
FIN. FLR EL. 4989’-6"<br />
NOM. GRADE EL. 4985’-6"<br />
KEY PLAN<br />
1 2 3 4 5 6 7 8<br />
G<br />
F<br />
E<br />
D<br />
C<br />
B<br />
A<br />
ISSUE FOR DESIGN<br />
ISSUE FOR DESIGN<br />
ISSUE FOR DESIGN<br />
ISSUE FOR DESIGN<br />
FS FINAL REPORT<br />
J.C.<br />
DISCIPLINE ENGINEERING L.Z.<br />
S.S. 2012-07-05<br />
J.C. 2012-06-01<br />
DECOMP.<br />
J. CHALMERS<br />
& WASTE<br />
TANK SKID<br />
M. SUCHARDA<br />
DATE 2012-06-01<br />
S. SENNIK<br />
CARBON<br />
COLUMNS<br />
SCALE 1"-500’<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
1’ = 20’<br />
U/S STL. EL. 5017’-2"<br />
(ENCLOSED CEILING)<br />
U/S STL. EL. 5017’-2"<br />
(ENCLOSED CEILING)<br />
THIS DRAWING<br />
PRECIOUS METALS RECOVERY <strong>LLC</strong><br />
DRY HILLS FACILITY PROJECT<br />
DRY HILLS FACILITY<br />
PROCESS/STORAGE BUILDING<br />
GENERAL ARRANGEMENT<br />
H340940-0000-50-042-0001<br />
REV.<br />
G<br />
A<br />
B<br />
C<br />
D<br />
E