26.0 INCINERATORS – 40 CFR 270.19 & 264.340 Subpart O Based on a thorough review of 40 CFR 264.340 (Subpart O) and 40 CFR 270.19, it has been determined that this section is not applicable to the proposed TSF, because no unit that fits the description of incinerator is associated with the proposed TSF. PMR RCRA Permit Application, Dry Hills Facility Page 132 JBR Environmental Consultants, Inc. | HATCH March 2013
27.0 LAND TREATMENT - 40 CFR 270.20 & 264.270 Subpart M Based on a thorough review of 40 CFR 264.270 (Subpart M) and 40 CFR 270.20, it has been determined that this section is not applicable to the proposed TSF, because no unit that fits the description of land treatment is associated with the proposed TSF. PMR RCRA Permit Application, Dry Hills Facility Page 133 JBR Environmental Consultants, Inc. | HATCH March 2013
- Page 133 and 134: Delivery frequency of reagents will
- Page 135 and 136: 10.3 Traffic Control Signs Traffic
- Page 137 and 138: 11.4 Surrounding Land Use - 40 CFR
- Page 139 and 140: 12.0 PERSONNEL TRAINING PLAN - 40 C
- Page 141 and 142: that are not land based. Closure of
- Page 143 and 144: 13.4.6 Types of Off-site Waste Mana
- Page 145 and 146: 14.0 CLOSED HAZARDOUS WASTE DISPOSA
- Page 147 and 148: storage area (e.g., storage racks),
- Page 149 and 150: 16.0 POST-CLOSURE ESTIMATES - 40 CF
- Page 151 and 152: 18.0 TOPOGRAPHICAL MAP - 40 CFR 270
- Page 153 and 154: 20.0 GROUNDWATER MONITORING - 40 CF
- Page 155 and 156: 22.0 CONTAINERS AND CONTAINMENT - 4
- Page 157 and 158: Figure 22.1-2: Dedicated Transfer C
- Page 159 and 160: Larger sized HDPE drums may be used
- Page 161 and 162: 22.3.2 Labeling Containers - 40 CFR
- Page 163 and 164: 22.5 Description of Secondary Conta
- Page 165 and 166: will be done on the new waste strea
- Page 167 and 168: 23.0 TREATMENT AND STORAGE TANKS Me
- Page 169 and 170: Figure 23.0-2: HCl Tank and Locatio
- Page 171 and 172: Tank Dimensions Waste Solution Stor
- Page 173 and 174: decomposed in the Decomposition Tan
- Page 175 and 176: Figure 23.1-3: Waste Solution Stora
- Page 177 and 178: The Water Storage Tank will supply
- Page 179 and 180: Tank Caustic Soda Storage Tank* Hyd
- Page 181 and 182: 23.13 Recordkeeping A recordkeeping
- Page 183: 25.0 WASTE PILES - 40 CFR 270.18 &
- Page 187 and 188: 29.0 BOILERS/INDUSTRIAL FURNACE - 4
- Page 189 and 190: 30.1.3 Retort Operating Procedures
- Page 191 and 192: of 13.5 feet long by 4.7 feet wide
- Page 193 and 194: 31.0 PROCESS VENTS - 40 CFR 270.24
- Page 195 and 196: 33.0 DRIP PADS - 40 CFR 270.26 & 26
- Page 197 and 198: 35.0 REFERENCES American Society of
- Page 199 and 200: At the PMR Dry Hills Facility Open
- Page 217 and 218: APPENDIX I-B Open House Comments
- Page 219 and 220: APPENDIX 1-A Drawings Facility draw
- Page 221 and 222: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 223 and 224: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 225 and 226: A B C D E F $$W ATERMARKD$$ N 4,475
- Page 227 and 228: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 229 and 230: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 231 and 232: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 233 and 234: A B C D E F $$W ATERMARKD$$ 1 2 3 4
26.0 INCINERATORS – 40 CFR 270.19 & 264.340 Subpart O<br />
Based on a thorough review of 40 CFR 264.340 (Subpart O) and 40 CFR 270.19, it has been<br />
determined that this section is not applicable to the proposed TSF, because no unit that fits the<br />
description of incinerator is associated with the proposed TSF.<br />