11.10 Seismic Considerations – 40 CFR 270.14(b)(11), 264.18(a), & 264<br />

Appendix VI<br />

As documented in the COD Issuance Letter (Appendix 11-A), the site will not be located within<br />

3,000 feet of a fault that has had a displacement in Holocene time, as required by 40 CFR<br />

270.14(b)(11).<br />

Figure 11.3-1 in Appendix 11-B is a graphical representation of the proposed TSF. A<br />

geotechnical evaluation of the site was conducted in 2012. The report findings are contained in<br />

Appendix 20-C.<br />

All building structures, storage racks, process equipment, and supporting foundations/structures<br />

will be designed based on the seismic load criteria presented in Table 11.10-1 below.<br />

Table 11.10-1: Seismic Conditions<br />

Parameter Value<br />

Mapped Spectral Acceleration - Ss (g): 0.619 (g) for Site D<br />

Mapped Spectral Acceleration - S1 (g): 0.197 (g) for Site D<br />

Building Occupancy Category IV<br />

Seismic Importance Factor 1.5<br />

Ss and S1 are defined in ASCE7-2010 “Minimum Design Loads for Buildings and Other Structures” as:<br />

Ss = Mapped MCER, 5% damped, spectral response acceleration parameter at short periods.<br />

S1= Mapped MCER, 5% damped, spectral response acceleration parameter at a period of 1s.<br />

11.11 Buildings and Other Structures – 40 CFR 270.14(b)(19)<br />

As currently designed, two buildings will be located within the proposed TSF compound: the<br />

proposed TSF Building and the Utility Building, which is not located within the <strong>RCRA</strong> area.<br />

The total area of the proposed TSF Building will be approximately 33,600 square feet, and is<br />

further discussed in Section 1.1.<br />

The Utility Building is discussed in Section 1.5.<br />

PMR <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong>, <strong>Dry</strong> <strong>Hills</strong> Facility Page 86<br />

JBR Environmental Consultants, Inc. | HATCH March 2013