23.07.2013 Views

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Delivery frequency of reagents will be based on the design throughput.<br />

Crushed drums (and other containers) will be backhauled from the proposed TSF on<br />

trucks similar to those used to deliver mercury and mercury-bearing materials.<br />

There will be approximately 20 working days per month.<br />

The proposed TSF will be staffed by a team consisting of a maximum of five people<br />

(one manager, three operators, and one security person).<br />

Road surface composition and design loading characteristics are detailed in Section<br />

10.4.<br />

PMR <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong>, <strong>Dry</strong> <strong>Hills</strong> Facility Page 81<br />

JBR Environmental Consultants, Inc. | HATCH March 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!