Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

23.07.2013 Views

ITEM # REGULATIONS GENERAL DESCRIPTION PMR Nevada RCRA Permit Application - Completeness Checklist B-17 264.147(b) Coverage for Non-Sudden Accidental Occurrences Liability insurance [264.147(a)(1)] Financial test of guarantee of liability coverage [264.147(a)(2)] Letter of credit [264.147(a)(3)] Surety bond [264.147(a)(4)] Trust fund [264.147(a)(5) B-17 Multiple liability mechanisms [264.147(a)(6) 17.3 LOCATION IN APPLICATION B-17 264.147(c) Request for Variance Not Applicable B-18 270.14(b)(18) B-19 270.14(b)(19) Coverage by a State financial mechanism in compliance with 264.149 and 264.150, where appropriate Not Applicable A 1" = 200 ft topographic map with contours showing 1000 ft around the facility and: (i) Map scale and date (ii) 100-year floodplain (iii) Surface waters (iv) Surrounding land uses (v) Wind rose (vi) Orientation of the map (vii) Legal boundaries of the facility (viii) Access control (ix) Injection and withdrawal wells both on and offsite (x) Buildings, structures (xi) Barriers for drainage or flood control (xii) Location of operational units Part A, Introduction, 18.0, Appendices 1- A, 11-A, and 11-B ADMIN COMPLETE (Y / N / NA) TECH COMPLETE (Y / N / NA) COMMENTS Must show a distance of 1,000 ft around the unit at a scale of 1" to not more than 200' (multiple maps may be submitted at this scale); should be shown and should be similar to Part A topographic map. Use GPS coordinates for locations of the below requirements for the map. B-19 Contours [The contour interval must be sufficient to clearly show the pattern of surface water flow in the vicinity of and from each operational unit of the facility. For example, contours with an interval of 5', if relief is greater than 20', or an interval of 2' if relief is less than 20'. Mountainous areas should use large contour intervals to adequately show topographic profiles of facilities.] B-19 270.14(b)(19)(i) Map scale and date [Other scales may be used if justified.] Part A, Introduction, 18.0, Appendices 1- A, 11-A, and 11-B Part A, Introduction, 18.0, Appendices 1- A, 11-A, and 11-B Page 11 of 18 March 2013

ITEM # REGULATIONS GENERAL DESCRIPTION B-19 270.14(b)(19)(ii) NAC 444.8456[1.c] The 100-year floodplain area PMR Nevada RCRA Permit Application - Completeness Checklist B-19 270.14(b)(19)(iii) Surface waters (including intermittent streams) Surrounding land use (residential, commercial, agricultural, recreational) [Include considerations of EJ issues or National B-19 270.14(b)(19)(iv) Historic Preservation Act (especially Indian lands] B-19 270.14(b)(19)(v) LOCATION IN APPLICATION Part A, Appendices 11-A and 11-B 18.0, Appendices 1- A, Appendix 11-A, and 11-B Appendices 11-A and 11-B Wind Rose (i.e., prevailing wind-speed and direction) [The frequency of occurrence of various wind directions should be compared to sensitive (local/regional) receptor points downwind.] Appendix 11-B B-19 270.14(b)(19)(vi) Map orientation Maps and Figures B-19 270.14(b)(19)(vii) Legal boundaries Appendix 11-C B-19 270.14(b)(19)(viii) Access Control (fences, gate) 3.2, Appendix 1-A Not Applicable, Appendices 1-A and B-19 270.14(b)(19)(ix) Injection and withdrawal wells (on-site and off-site) Buildings and other structures [See 40 CFR 270.14(b)(19)(x) for 11-B, 18.0 B-19 270.14(b)(19)(x) an example list.] 18. 0, Appendix 1-A 3.2, 18.0, Appendix B-19 270.14(b)(19)(xi) Drainage and flood control barriers 1-A 1.0, 18.0, Appendix B-19 270.14(b)(19)(xii) Location of Operational TSD Units(s) and Decontamination Areas: 1-A • Property boundary and distance of treatment unit to property boundaries 1-A, Appendix 1-A • Distance to buildings on/off-site • Distance to public roadways • Distance to closest receptor [270.33(e)] • [Receptors include human and environmental B-19 receptors within the facility boundary.] ADMIN COMPLETE (Y / N / NA) TECH COMPLETE (Y / N / NA) COMMENTS Page 12 of 18 March 2013

ITEM # REGULATIONS GENERAL DESCRIPTION<br />

B-19<br />

270.14(b)(19)(ii)<br />

NAC 444.8456[1.c] The 100-year floodplain area<br />

PMR Nevada <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong> - Completeness Checklist<br />

B-19 270.14(b)(19)(iii) Surface waters (including intermittent streams)<br />

Surrounding land use (residential, commercial, agricultural,<br />

recreational) [Include considerations of EJ issues or National<br />

B-19 270.14(b)(19)(iv) Historic Preservation Act (especially Indian lands]<br />

B-19 270.14(b)(19)(v)<br />

LOCATION IN<br />

APPLICATION<br />

Part A, Appendices<br />

11-A and 11-B<br />

18.0, Appendices 1-<br />

A, Appendix 11-A,<br />

and 11-B<br />

Appendices 11-A and<br />

11-B<br />

Wind Rose (i.e., prevailing wind-speed and direction) [The<br />

frequency of occurrence of various wind directions should be<br />

compared to sensitive (local/regional) receptor points<br />

downwind.] Appendix 11-B<br />

B-19 270.14(b)(19)(vi) Map orientation Maps and Figures<br />

B-19 270.14(b)(19)(vii) Legal boundaries Appendix 11-C<br />

B-19 270.14(b)(19)(viii) Access Control (fences, gate) 3.2, Appendix 1-A<br />

Not Applicable,<br />

Appendices 1-A and<br />

B-19 270.14(b)(19)(ix) Injection and withdrawal wells (on-site and off-site)<br />

Buildings and other structures [See 40 CFR 270.14(b)(19)(x) for<br />

11-B, 18.0<br />

B-19 270.14(b)(19)(x) an example list.] 18. 0, Appendix 1-A<br />

3.2, 18.0, Appendix<br />

B-19 270.14(b)(19)(xi) Drainage and flood control barriers<br />

1-A<br />

1.0, 18.0, Appendix<br />

B-19 270.14(b)(19)(xii)<br />

Location of Operational TSD Units(s) and Decontamination<br />

Areas:<br />

1-A<br />

• Property boundary and distance of treatment unit to<br />

property boundaries<br />

1-A, Appendix 1-A<br />

• Distance to buildings on/off-site<br />

• Distance to public roadways<br />

• Distance to closest receptor [270.33(e)]<br />

• [Receptors include human and environmental<br />

B-19<br />

receptors within the facility boundary.]<br />

ADMIN<br />

COMPLETE<br />

(Y / N / NA)<br />

TECH<br />

COMPLETE<br />

(Y / N / NA)<br />

COMMENTS<br />

Page 12 of 18<br />

March 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!