<strong>City</strong> <strong>Development</strong> <strong>Plan</strong> for Vellakoil <strong>Municipal</strong>ity SMEC India Pvt Ltd<br />

Final Report TNUDP III<br />

the <strong>Municipal</strong>ity has large number of commercial and industrial assessments, which are<br />

presently untapped on account of water and sewerage connections.<br />

Thus it can be inferred that the investment capacity of the <strong>Municipal</strong>ity is around 46% of the total<br />

investment requirement.<br />

Based on the above, it can be inferred that the <strong>Municipal</strong>ity can take up only the small projects,<br />

where the funding is mostly by way of Grants as given below :<br />

Table 8.27 Priority projects suggested under CDP<br />

S.No. Particulars Total Priority Funding By<br />

A Physical Infrastructure Facilities L : G : O<br />

I Water Supply<br />

a) Improvements to Water Supply 1199.20 A 0:90:10<br />

II Sewerage & Sanitation<br />

a) New Underground Sewerage Scheme 3300.00 A 37:35;28<br />

Total 4499.20<br />

The above two projects can be taken up by the <strong>Municipal</strong>ity as there are large number of<br />

commercial and industrial assessments and on stand alone basis these projects are viable at the<br />

funding pattern given above.<br />

Besides the above, the following other small projects can be taken up, where the funding pattern<br />

is mainly by way of grants and deposit mobilization :<br />

Table 8.27a Priority projects suggested under CDP<br />

S.No. Particulars Total Priority Funding By<br />

A Physical Infrastructure Facilities L : G : O<br />

I Strom Water Drains<br />

a) Construction of new drains and providing mesh covers 300.00 A 0:90:10<br />

II Bus Shelter<br />

a) Construction of New Bus Shelter 10.00 A 100% Grant<br />

III Street Lights<br />

a) High mast lights at Old & New Bus Stand 14.00 A 100% Grant<br />

b) Retrofitting and energy saving devices 23.00 A ESCO<br />

c) Central Median lights at main roads for 3Km 45.00 A 0:90:10<br />

B Social Infrastructure Facilities<br />

I Slum Improvements<br />

a) Improvement to Slums 709.00 B 100% Grant<br />

II Market<br />

a) Construction of Daily Market 75.00 A 100% ULB<br />

b) Construction of Weekly Market 75.00 A 100% ULB<br />

C Other Projects<br />

I Remunerative Projects<br />

a) Commercial Building (G+2) at Erode Road near 50.00 A 100% ULB<br />