<strong>City</strong> <strong>Development</strong> <strong>Plan</strong> for Vellakoil <strong>Municipal</strong>ity SMEC India Pvt Ltd<br />

Final Report TNUDP III<br />

ii) Proposals<br />

Proposals under CDP<br />

An Energy Service Company (ESCO) identifies and evaluates energy saving opportunities in<br />

industrial units, commercial complexes, hospitals, municipalities, buildings and utilities by using<br />

energy audit tools and recommends a package of improvements that can pay for itself through<br />

the resultant savings.<br />

ESCOs provide their clients with comprehensive services - encompassing audits for energy<br />

saving performance, design & implementation of conservation measures, maintenance,<br />

operation and management of the introduced facilities and procurement of project funds. ESCOs<br />

conduct retrofitting for energy conservation without damaging the environment. The ESCO will<br />

guarantee the savings that would meet or exceed the annual payments to cover up the entire<br />

project costs usually a period of 5 to 10 years. The savings can be shared proportionately with<br />

the institution for which the project is designed and implemented for.<br />

The salient features of performance contracting for energy savings through ESCO based<br />

business model are as under:<br />

1. 'Nil' investment by customer.<br />

2. ESCO to identify Energy Efficient Measures (EEMs) to replace / modify existing in<br />

efficient systems.<br />

3. ESCO supplies, installs and maintains the Energy Efficient Measures (EEMs) during the<br />

contract period.<br />

4. Contract period could be 3-5 years or as mutually agreed upon.<br />

5. Energy saving is shared between ESCO and customer as per agreed terms. Total project<br />

cost is funded by ESCO. The O & M expenses will be met by the <strong>Municipal</strong>ity.<br />

6. Guarantee Energy savings and recover its investment including interest & other costs out<br />

of generated energy savings.<br />

Proposals by ULB<br />

The components suggested for improvements of street lights are<br />

• Retrofitting of tube lights<br />

• Provision of new street lights<br />

• Provision of High mast lights at<br />

o Old bus stand<br />

o Bus stand<br />

Table 5.9 Street lights - Proposals<br />

S. No Description units Rs. in lakhs<br />

1 High mast lights at old bus stand and bus stand 2 14.00<br />

2 Installation of street lights with poles ( T5 lamps ) 28 4.00<br />

3 New street lights (SV lamps) 66 8.00<br />

4 New street lights for newly developing areas 700 90.00<br />

5 Central median lights at main roads for 3 km 100 45.00<br />

6 Provision of timer switches 20 2.00<br />

7 Retrofitting existing tube lights 1777 18.00<br />

8 Retrofitting existing SV lamps with energy efficient lights 62 1.00<br />

Total 182.00<br />

Annual O&M cost 5.00<br />

Source: Analysis and discussions with municipal officials<br />