22.07.2013 Views

Vellakovil City Development Plan - Municipal

Vellakovil City Development Plan - Municipal

Vellakovil City Development Plan - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> <strong>Development</strong> <strong>Plan</strong> for Vellakoil <strong>Municipal</strong>ity SMEC India Pvt Ltd<br />

Final Report TNUDP III<br />

production of manure from composting. Wind rows composting is an established<br />

technology for dealing with bio degradable waste, which is the suggested option for this<br />

<strong>Municipal</strong>ity. The necessary infrastructure is given in the proposals.<br />

3. Conducting IEC campaigns to facilitate effective waste segregation at source and proper<br />

disposal.<br />

4. Implementing collection of conservancy fee for primary collection of waste and levy on<br />

commercial and industrial establishments.<br />

5. Involvement of voluntary agencies, SHGs in the various components of solid waste<br />

management on BOT, BOOT basis.<br />

6. Need to organize the rag pickers into waste-management associations/groups under the<br />

supervision of the urban local body and the relevant residents’ associations or market<br />

associations.<br />

The CDP proposals based on analysis, discussion with <strong>Municipal</strong> officials and norms is given in<br />

the table below:<br />

Table 5.5 Solid Waste management – Proposals*<br />

Sl.<br />

No Project details<br />

Small vehicle with containers for door to door collection @ 160 litres capacity<br />

Cost in lakhs<br />

1 (220 Nos) 25.00<br />

2 Dumper placer vehicle (2 nos) 15.00<br />

3 Purchase of land for additional Compost yard (2.50 acres)<br />

Improvements for existing and new compost yard - with one side compound<br />

wall, segregation sheds, internal roads and machineries for preparation of<br />

250.00<br />

4 compost 200.00<br />

5 Proportionate cost for regional land fill site 300.00<br />

6 IEC activities 10.00<br />

Total 800.00<br />

Annual Operation and Maintenance cost 6.25<br />

Source: Analysis and calculations<br />

Therefore, the total investment required for improvement in Solid Waste Management is<br />

Rs.800.00.00 lakhs.<br />

*-No rational decisions on municipal solid wastes system are possible until data of composition<br />

and quantity of solid waste are available. The method and capacity of storage, the correct type of<br />

collection vehicle, the optimum size of crew and the frequency of collection depend mainly on<br />

volume and density of wastes. Climate also has some influence.<br />

5.1.6 ROADS<br />

i) Existing status<br />

The major roads connecting the town to the surrounding urban centers are:<br />

• Coimbatore – Thiruchirapalli National Highway<br />

• Erode – Tharapuram road<br />

• Moolanur road<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!