City Corporate & Business Plan - Municipal
City Corporate & Business Plan - Municipal
City Corporate & Business Plan - Municipal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter ñ 8 Final Report: Ambur <strong>Municipal</strong>ity<br />
8.3.3 Performance Indicators<br />
Attributes Components Indicator Value unit<br />
Service level Strom water drains<br />
8.3.4 Issues in Drainage Sector<br />
percentage of road length having<br />
storm water drains<br />
- 61 -<br />
65 percentage<br />
Water stagnation is increasing in the katcha drains rather than the pucca drains in the<br />
town. About 23% of the households neither have a kutcha drain or drainage facility<br />
which needs a comprehensive planning.<br />
Kaspa ñB ñ Earthern drain<br />
Water stagnation is increasing due to dumping of garbage in the open storm water drain<br />
The mixed sewage and storm water were disposed in the Palar River without any<br />
treatment.<br />
The following main area are the most predominant water stagnation area : Ambur town<br />
police station to P.M.S Kollai , Kannadiyar Street to Kannar, Nethaji Road to Bazaar<br />
Junction, Bethalegam 1 to 11 Street, E.B office to bridge , Asananmbut<br />
Road,Kambikollai<br />
8.3.5 Proposals<br />
At present, municipality has temporary solutions like providing street storm water<br />
drain. For horizon year, the needs of the storm water drains are discussed in the<br />
Chapter10.<br />
8.4 SOLID WASTE MANAGEMENT<br />
8.4.1 Generation of Solid Waste<br />
Ambur town generates 40 MT of Solid Waste per day which is about 400gms per<br />
capita per day. The Solid Waste collected is transported and disposed daily. The<br />
Voyants Solutions Private Limited