Chapter ñ 8 Final Report: Ambur <strong>Municipal</strong>ity<br />

Pachakkupam Head works ñ Tannery Effluent Disposal to Palar River<br />

The transmission main from the Pachakuppam head works crossed its design period.<br />

Sarangal and Vanandurai water supply scheme can not sustainably fulfill the demand of<br />

the town. And the in future it will not be able to withstand pressure for additional<br />

demand.<br />

8.1.7 Proposals<br />

The detailed proposal and costing from our side are discussed in the chapter 10.<br />

8.2 SEWERAGE AND SANITATION<br />

8.2.1 Existing Sewerage<br />

There is no under ground drainage system in Ambur. Disposal of Night Soil is normally<br />

by way of individual facilities and liquid waste (Sullage and Kitchen Waste) is<br />

through the open drains.<br />

8.2.2 Sanitation<br />

The main mode of individual disposal in the town is through septic tanks, low cost<br />

Sanitation units and through public conveniences. The number of each form of<br />

sanitation facilities have been depicted in the table below.<br />

Table 8-7: Sanitation Facilities<br />

Description Detail<br />

Septic Tanks 14318<br />

Low Cost Sanitation 177<br />

Dry Latrines NIL<br />

Total HHs with Sanitation 14318<br />

- 57 -<br />

Voyants Solutions Private Limited