City Corporate & Business Plan - Municipal
City Corporate & Business Plan - Municipal
City Corporate & Business Plan - Municipal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter ñ 8 Final Report: Ambur <strong>Municipal</strong>ity<br />
8.1.5 Performance Indicators<br />
Attributes Components Indicator Formula Value unit<br />
Service<br />
Level<br />
Service<br />
Coverage<br />
Service<br />
Delivery<br />
Treatment<br />
plant capacity<br />
Storage<br />
capacity<br />
Service<br />
coverage in<br />
Slums<br />
Population<br />
coverage<br />
Physical<br />
coverage<br />
Water supply<br />
per day<br />
Average hours<br />
of supply per<br />
day<br />
Average<br />
number supply<br />
days in a week<br />
Treatment<br />
plant capacity<br />
as percentage<br />
of surface water<br />
supply<br />
Storage<br />
capacity<br />
adequacy<br />
Ratio of slum<br />
population to<br />
Public Stand<br />
Posts<br />
Percentage of<br />
Households<br />
covered by<br />
water<br />
connections<br />
Percentage of<br />
water supply<br />
pipe Length to<br />
Total Road<br />
Length<br />
8.1.6 Issues in Water Supply Sector<br />
Total supply to the<br />
city per day / total<br />
population of the city<br />
Hours of supply on<br />
supply day / number<br />
of days between two<br />
supply day<br />
(Capacity of<br />
treatment plant<br />
/water supplied from<br />
ground water<br />
resources)* 100<br />
(Total storage<br />
capacity(ML)/Total<br />
water supplied<br />
(MLD)* 100<br />
Slum population not<br />
covered by piped<br />
network /Total Public<br />
Stand Posts<br />
(Number of water<br />
connection/Total<br />
number of<br />
Households)* 100<br />
(Length of water<br />
supply<br />
pipelines/Total Road<br />
length)* 100<br />
- 56 -<br />
62.50 Liters per<br />
capita per<br />
day<br />
2 Hours<br />
2-3 Day<br />
NA Percent<br />
52.74 Percent<br />
NA Percent<br />
40 Percent<br />
63 Percent<br />
The Tanneries situated around Ambur town discharges their effluent directly into Palar<br />
River and due to this condition of Palar River from Ambur downwards has been polluted<br />
The head works at Pachakkupam is completely polluted. At present no pumping has<br />
been made from this head works.<br />
From Pachakkupam head works earlier supplied 7 mld of water was drawn, but as of<br />
now no water is supplied from this head works. This is due to increased salt content of<br />
water.<br />
Voyants Solutions Private Limited