22.07.2013 Views

City Corporate & Business Plan - Municipal

City Corporate & Business Plan - Municipal

City Corporate & Business Plan - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annexure Final Report: Ambur <strong>Municipal</strong>ity<br />

Tiru.Kumar, Assistant Engineer, TWAD (Sewerage Division), Urban Division, Vellore<br />

The Detailed Project Report was prepared by TWAD Board. The Town has been<br />

considered as single zone for designing of the sewage collection system.<br />

TWAD Board estimate total length of sewerage 82.00 km.<br />

The Sewage Treatment <strong>Plan</strong>t of capacity of 18.00 mld (ASP Technology) is proposed to<br />

be located near Sivarajapuram .<br />

Tiru.Karunakaran, Assistant Engineer, TWAD (Water Supply), PF Division, Vellore<br />

The Ultimate demand for Ambur Water supply shall be fulfilled using combined Mettur<br />

scheme.<br />

The Detailed Project Report for this scheme is under preparation by TWAD Board.<br />

Thiru.Muthukumar, President, Textile Association<br />

Public toilet is required for Kamarajar nagar.<br />

Need for Sewerage system<br />

Clean water should be provided to all<br />

Bituminous road is required in extension area.<br />

Thiru,Iqbal Ahmed, Pawn Brokers Associations<br />

Renovation of toilet in MC road bus stand<br />

Required toilet in Swami pillai nagar pudhumandi area.<br />

Over bridge is required near railway track for vehicles to cross.<br />

Public toilets required near Nethaji road & Market area.<br />

No community hall ,Government office, Public Library, parks etc. required,<br />

Thiru.T.Azar Mohd, President Samapangi Shoppers Associations<br />

Tannery effluent is mixed with Palar, which affects the drinking water quality<br />

All the streets in this ward required cement concrete road.<br />

Underground drainage for sewage is required<br />

From M C road to Kaspa-B, road should be widen.<br />

Market area & Jalal pettai required public toilet<br />

Tmt. K. Meenakshi, President, Rotract Member<br />

Required drinking water taps in each street.<br />

Drainage from Pethastha region is not sufficient for rainwater collection so NH and<br />

Highways are highly affected.<br />

Tiru V.Gunaselan, Ambur Consumer Protection Council<br />

The church road is situated parallel to railways track and connecting bethalegam ,<br />

reddythoppu, Wahab Nagar, Kambikkolai and hill places like Asnampet, Naickeneri ,<br />

Panamkatteri .<br />

This road is uneven with pits and holes here and there .As it is related to Railways;<br />

municipality is not taking any steps to repair the road.<br />

To overcome the Pachakkuappam Head works problem, by providing the Reverse<br />

Osmosis <strong>Plan</strong>t.<br />

- 177 -<br />

Voyants Solutions Private Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!