City Corporate & Business Plan - Municipal

City Corporate & Business Plan - Municipal City Corporate & Business Plan - Municipal

municipality.tn.gov.in
from municipality.tn.gov.in More from this publisher
22.07.2013 Views

Annexure Final Report: Ambur Municipality The stakeholdersí workshop started at 3.00 PM on Monday, 15 th December, 2008 in the Conference Hall of the Municipality. The workshop was chaired by Chairman ñ Mr. Thiru .Vavoor Azeer Ahmed. In His opening speech, Mr. Ahmed briefed the stakeholders about the objectives of the project and the workshop. The Commissioner, Municipality presented his view on the City Corporate cum Business Plan. Mr. Saravanan (Senior Engineer, Voyants Solutions Private Limited) briefed about the work completed by the consultant for the City Corporate cum Business Plan. After that Mr. Sreepathy presented the brief status, problem and issues relating to urban basic services an infrastructure in Ambur. And after this presentation, the stakeholders were asked to give their suggestions/ comments in three parts. In first part, the consultants invited comments on the contents of the presentation. In the second part stakeholders were invited to present the problems of the city which are hindrances to the development. In the last section of the workshop, stakeholders were asked to suggest the projects required for the integrated development of Ambur. The Suggestions: The suggestions given by the various stakeholders are presented below: Thiru .Vavoor Azeer Ahmed, Chairman City needs a bypass road to reach to bus stand so that bus will directly go to Bus Stand instead of moving through the town. Municipality has proposed to install the RO system for drinking water supply for the public as the water quality is very poor. City need sewerage system and it should be taken on priority. City has less fund and can not initiate the projects own its own. Town roads are encroached by the people so they should be fined and need widenening for congestion free traffic. Municipality has very less properties of its own and even land is not available so they need expansion of town. There is a need to provide infrastructure to Govt. School as the quality of infrastructure is very poor. Tmt. R. Tamilarasi, Vice Chairman There is a need to improve the quality of water for people as water is salty and dissolved solids proportion is more. Sewerage system is must for the town. Roads are to be converted to CC roads in every colony of the municipality. There is a need for street lights in the slums along with roads and water supply. Thriu. Manikandan, Commissioner Municipality has proposed to install the RO system for drinking water supply for the public as the water is salty and dissolved solids are not up to standards. Sewerage system should be taken on priority. There is a need to devise new methods for tax collection from the people. Town roads needs to resurface Drainage system needs improvement and needs to be treated. - 175 - Voyants Solutions Private Limited

Annexure Final Report: Ambur Municipality Thiru.Srinivasen, President, Ambur Traders Associations Since , City needs clean water supply , the municipality is proposing a Reverse Osmosis system to provide them non- contamination and clean water supply. There is need of fund for the up-gradation of burial ground and to provide gassifire Markets need up-gradation ad modern facilities. There is a need for bypass. Tiru. Dimbanan, A.E.E , PWD, Vellore At present, there has no project under PWD in and around Ambur Town Tiru. Nandagopal, A.D.E, TNEB, Ambur To maintain uninterrupted power supply for consumer satisfaction following steps to be take by Electricity Board. Enhancement of exiting 2 X 10 MVA power transformer to 2 X 16 MVA Enhancement of exiting distribution transformer 250 KVA to 500 KVA -2 numbers Enhancement of exiting distribution transformer 100 KVA to 250 KVA- 10 numbers. To provide11 KV feeder meter single phase - 10655 numbers and three phase -1200 numbers. Fuse off call centre 1 number and provision of cell phone to all officers and field staffs 36 numbers. Tmt.P.Rani, DEO, Education Department, Vellore To create the Solid Waste Management awareness from the school students To teach the traffic rules for students and public also. The schools maintained by the municipality, requires basic infrastructure facilities and Computers training programme. Tiru.Udayakumar, A.E, State Highways, Vellore At present, there has no project under State Highways Department in and around Ambur Town. Tiru.E.S.Selvaraju, A.D.E, Railway Department, Jolarpet At present, there has no project under Railway Department in and around Ambur Town Tiru.Ramesh Babu, A.E, National Highway Department, Vellore At present, there has no project under Railway Department in and around Ambur Town Tiru.S.Gopal, Assistant Engineer, TWAD (Water Supply ), Urban Division, Vellore The feasibility study carried out by the TWAD Board and it is mentioned that 6.7 MLD of water can be drawn by providing the check dam in Kamanuthattu , Naickaneri and Anaimadugu area. In order to meet the part of intermediate supply gap about 6.7 MLD by providing suitable open wells, rising mains, sump, and disinfection arrangements in the above mentioned areas. - 176 - Voyants Solutions Private Limited

Annexure Final Report: Ambur <strong>Municipal</strong>ity<br />

Thiru.Srinivasen, President, Ambur Traders Associations<br />

Since , <strong>City</strong> needs clean water supply , the municipality is proposing a Reverse Osmosis<br />

system to provide them non- contamination and clean water supply.<br />

There is need of fund for the up-gradation of burial ground and to provide gassifire<br />

Markets need up-gradation ad modern facilities.<br />

There is a need for bypass.<br />

Tiru. Dimbanan, A.E.E , PWD, Vellore<br />

At present, there has no project under PWD in and around Ambur Town<br />

Tiru. Nandagopal, A.D.E, TNEB, Ambur<br />

To maintain uninterrupted power supply for consumer satisfaction following steps to be take<br />

by Electricity Board.<br />

Enhancement of exiting 2 X 10 MVA power transformer to 2 X 16 MVA<br />

Enhancement of exiting distribution transformer 250 KVA to 500 KVA -2 numbers<br />

Enhancement of exiting distribution transformer 100 KVA to 250 KVA- 10 numbers.<br />

To provide11 KV feeder meter single phase - 10655 numbers and three phase -1200<br />

numbers.<br />

Fuse off call centre 1 number and provision of cell phone to all officers and field staffs 36<br />

numbers.<br />

Tmt.P.Rani, DEO, Education Department, Vellore<br />

To create the Solid Waste Management awareness from the school students<br />

To teach the traffic rules for students and public also.<br />

The schools maintained by the municipality, requires basic infrastructure facilities and<br />

Computers training programme.<br />

Tiru.Udayakumar, A.E, State Highways, Vellore<br />

At present, there has no project under State Highways Department in and around Ambur<br />

Town.<br />

Tiru.E.S.Selvaraju, A.D.E, Railway Department, Jolarpet<br />

At present, there has no project under Railway Department in and around Ambur Town<br />

Tiru.Ramesh Babu, A.E, National Highway Department, Vellore<br />

At present, there has no project under Railway Department in and around Ambur Town<br />

Tiru.S.Gopal, Assistant Engineer, TWAD (Water Supply ), Urban Division, Vellore<br />

The feasibility study carried out by the TWAD Board and it is mentioned that 6.7 MLD of<br />

water can be drawn by providing the check dam in Kamanuthattu , Naickaneri and<br />

Anaimadugu area.<br />

In order to meet the part of intermediate supply gap about 6.7 MLD by providing suitable<br />

open wells, rising mains, sump, and disinfection arrangements in the above mentioned<br />

areas.<br />

- 176 -<br />

Voyants Solutions Private Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!