City Corporate & Business Plan - Municipal
City Corporate & Business Plan - Municipal City Corporate & Business Plan - Municipal
Chapter ñ 10 Final Report: Ambur Municipality Table 10-12: Capital Investment Needs for the Market Development S.No Description Amount Rs.in Lacs 1 Weekly Market -1 Water Supply arrangements 2.00 Vehicle parking stand 1.00 Sub Total -I 3.00 2 Shopping Complex at V.A Kareem OHT Civil Structures for 14 shops 32.20 Lighting Arrangements 0.60 Parking 2.00 Toilet 2.00 Sub Total - II 36.80 3 Shopping Complex At E S I Hospital Civil Construction for 40 Shops 54.00 parking 2.00 Toilet 2.00 Lighting Arrangements 5.00 Total ñ III 63.20 4 Grand Total 103.00 10.1.11 Slaughter House Development 1. Needs: There is one slaughter house for goat located in the municipality limit. Its renovation work was completed recently. But treatment system was not provided in that slaughter House. 2. Slaughter House Development Proposals The treatment system is proposed for the existing slaughterhouse at a cost of Rs. 8.00 lacs. Table 10-13: Capital Investment Needs for the Slaughter House Development S. No Description Amount Rs.in Lacs Existing Slaughter House for goat 1 Providing treatment unit to proper disposal 8.00 2 One New Slaughter house for beef 28.00 Total 36.00 10.1.12 Burial Ground Development 1. Needs: There has totally 6 burial ground was there but out of 6 Burial ground, only 2 was approved by the municipality. One of the Burial grounds was located in Kaspa A, there has no compound wall and one main road also passed though the burial ground. - 105 - Voyants Solutions Private Limited
Chapter ñ 10 Final Report: Ambur Municipality Another one was located in Sanrorkuppam area with only land availability. Kaspa A burial requires modernized facility with Gasifier Crematorium. 2. Burial Ground Development Proposals The estimated cost for the burial grounds with inclusion of Gasifier Crematorium( for Kaspa A only), Compound wall and Lighting facility at a cost of Rs. 73 Lacs. Table 10-14: Capital Investment Needs for the Burial Ground S.No Description Amount Rs in Lacs 1 Existing Burial Ground Solar Light - 4 1 Compound Wall 2 Water Supply 1 Prayer Hall (Thidhi) 5 Office and security room 3 Landscaping and planting trees 2 Sub Total 14 Sub Total ( for 2 Burial Ground) 28 2 Gasifier with Room (at Kaspa ñA) 45 Total 73 10.1.13 Slum Improvement 1. Needs: Nearly, 11 slums are identifies with a population of 15089(6914 House holds), which account for 15 % of the total population in the town. The slums are mainly lack in physical infrastructure facilities 2. Slum Improvement Proposals The estimate cost for construction of shelter, Public toilets, Drainage facility, water supply arrangement and street lighting around Rs. 2271.00 Lacs. Table 10-15: Capital Investment Needs for the Slum Improvement S.No Description Amount in Rs Lacs 1 Shelter 1900.00 2 B T Roads 184.00 3 Strom water drain 126.00 4 C C Road 57.00 5 Street Light 5.00 Total 2272.00 - 106 - Voyants Solutions Private Limited
- Page 61 and 62: Chapter ñ 8 Final Report: Ambur Mu
- Page 63 and 64: Chapter ñ 8 Final Report: Ambur Mu
- Page 65 and 66: Chapter ñ 8 Final Report: Ambur Mu
- Page 67 and 68: Chapter ñ 8 Final Report: Ambur Mu
- Page 69 and 70: Chapter ñ 8 Final Report: Ambur Mu
- Page 71 and 72: Chapter ñ 8 Final Report: Ambur Mu
- Page 73 and 74: Chapter ñ 8 Final Report: Ambur Mu
- Page 75 and 76: Chapter ñ 8 Final Report: Ambur Mu
- Page 77 and 78: Chapter ñ 8 Final Report: Ambur Mu
- Page 79 and 80: Chapter ñ 8 Final Report: Ambur Mu
- Page 81 and 82: Chapter ñ 8 Final Report: Ambur Mu
- Page 83 and 84: Chapter ñ 9 Final Report: Ambur Mu
- Page 85 and 86: Chapter ñ 9 Final Report: Ambur Mu
- Page 87 and 88: Chapter ñ 9 Final Report: Ambur Mu
- Page 89 and 90: Chapter ñ 9 Final Report: Ambur Mu
- Page 91 and 92: Chapter ñ 9 Final Report: Ambur Mu
- Page 93 and 94: Chapter ñ 9 Final Report: Ambur Mu
- Page 95 and 96: Chapter ñ 9 Final Report: Ambur Mu
- Page 97 and 98: Chapter ñ 9 Final Report: Ambur Mu
- Page 99 and 100: Chapter ñ 9 Final Report: Ambur Mu
- Page 101 and 102: Chapter ñ 10 Final Report: Ambur M
- Page 103 and 104: Chapter ñ 10 Final Report: Ambur M
- Page 105 and 106: Chapter ñ 10 Final Report: Ambur M
- Page 107 and 108: Chapter ñ 10 Final Report: Ambur M
- Page 109 and 110: Chapter ñ 10 Final Report: Ambur M
- Page 111: Chapter ñ 10 Final Report: Ambur M
- Page 115 and 116: Chapter ñ 10 Final Report: Ambur M
- Page 117 and 118: Chapter ñ 11 Final Report: Ambur M
- Page 119 and 120: Chapter ñ 11 Final Report: Ambur M
- Page 121 and 122: Chapter ñ 12 Final Report: Ambur M
- Page 123 and 124: Chapter ñ 12 Final Report: Ambur M
- Page 125 and 126: Chapter ñ 12 Final Report: Ambur M
- Page 127 and 128: Chapter ñ 12 Final Report: Ambur M
- Page 129 and 130: Chapter ñ 12 Final Report: Ambur M
- Page 131 and 132: Chapter ñ 12 Final Report: Ambur M
- Page 133 and 134: Chapter ñ 12 Final Report: Ambur M
- Page 135 and 136: Chapter ñ 12 Final Report: Ambur M
- Page 137 and 138: Chapter ñ 12 Final Report: Ambur M
- Page 139 and 140: Chapter ñ 12 Final Report: Ambur M
- Page 141 and 142: Chapter ñ 13 Final Report: Ambur M
- Page 143 and 144: Chapter ñ 13 Final Report: Ambur M
- Page 145 and 146: Chapter ñ 13 Final Report: Ambur M
- Page 147 and 148: Chapter ñ 14 Final Report: Ambur M
- Page 149 and 150: Chapter ñ 14 Final Report: Ambur M
- Page 151 and 152: Chapter ñ 14 Final Report: Ambur M
- Page 153 and 154: Chapter ñ 14 Final Report: Ambur M
- Page 155 and 156: Chapter ñ 14 Final Report: Ambur M
- Page 157 and 158: Chapter ñ 14 Final Report: Ambur M
- Page 159 and 160: Chapter ñ 14 Final Report: Ambur M
- Page 161 and 162: Chapter ñ 14 Final Report: Ambur M
Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />
Table 10-12: Capital Investment Needs for the Market Development<br />
S.No Description Amount Rs.in Lacs<br />
1 Weekly Market -1<br />
Water Supply arrangements 2.00<br />
Vehicle parking stand 1.00<br />
Sub Total -I 3.00<br />
2 Shopping Complex at V.A Kareem OHT<br />
Civil Structures for 14 shops 32.20<br />
Lighting Arrangements 0.60<br />
Parking 2.00<br />
Toilet 2.00<br />
Sub Total - II 36.80<br />
3 Shopping Complex At E S I Hospital<br />
Civil Construction for 40 Shops 54.00<br />
parking 2.00<br />
Toilet 2.00<br />
Lighting Arrangements 5.00<br />
Total ñ III 63.20<br />
4 Grand Total 103.00<br />
10.1.11 Slaughter House Development<br />
1. Needs:<br />
There is one slaughter house for goat located in the municipality limit. Its renovation<br />
work was completed recently. But treatment system was not provided in that<br />
slaughter House.<br />
2. Slaughter House Development Proposals<br />
The treatment system is proposed for the existing slaughterhouse at a cost of Rs. 8.00<br />
lacs.<br />
Table 10-13: Capital Investment Needs for the Slaughter House Development<br />
S. No Description Amount Rs.in Lacs<br />
Existing Slaughter House for goat<br />
1 Providing treatment unit to proper disposal 8.00<br />
2 One New Slaughter house for beef 28.00<br />
Total 36.00<br />
10.1.12 Burial Ground Development<br />
1. Needs:<br />
There has totally 6 burial ground was there but out of 6 Burial ground, only 2 was<br />
approved by the municipality. One of the Burial grounds was located in Kaspa A,<br />
there has no compound wall and one main road also passed though the burial<br />
ground.<br />
- 105 -<br />
Voyants Solutions Private Limited