Chapter ñ 10 Final Report: Ambur Municipality S.No Description Table 10-6: Capital Investment Needs for the Solid Waste Management 1 Improvement of Solid Waste Collection System - 101 - Amount Rs. In Lacs Purchase and Distribution of household dustbins i.e. Segregated Format 37 2 Improvement of Solid Waste Transportation System Auto Tippers 26 Tricycle 1.9 Dumper Placer 29 Body Container 33 3 Improvement of Solid Waste Disposal System Land Requirement for Compost Yard 145.95 4 Purchase of Equipments for Compost Yard Management Dumper Pulsar 12.75 Turner 3 Shredder 10 Electricity 0.5 water Supply/ OHT 2 Internal road 1 Watch man Shelter 1 Weigh Bridge 6 5 Land fill Land cost for Land Fill 74.80 Landfill development cost 463 10.1.5 Street Light 1. Needs: Total 846.90 In the midst of unplanned growth of the town, there are numerous places with in the town where street light is essential for security. High mass poles of 25m height are to be installed at suitable places with in the town. As the city is under the pressure of heavy maintenance and electricity bill of street lights it need innovative ideas to reduce the reoccurring expenditure in this sector 2. Street Light Proposals The suggested innovation of existing street light with automatic timer switch will require Rs. 6.4 lacs. The high mass light is required for the specified 7 places in the town and electrical fittings for existing street lights. The total estimate cost for street light is Rs. 89.65 lacs. Voyants Solutions Private Limited
Chapter ñ 10 Final Report: Ambur Municipality Table 10-7: Capital Investment Needs for the Street Light S. No. Description Nos Amount in Rs Lacs 1 Sodium Vapour Light 50 2.25 2 High Mast light 7 63.00 3 Mini High Mast Light 6 18 4 Additional Automatic timer Switches 70 6.4 5 Conversion of Tube Lights to CFL (Gradual Installation ) 17.85 6 Proposed Lights for New Layouts 7.80 Total 103.20 10.1.6 Roads and transportation 1. Needs: The town has lot of important roads which connect it with the surrounding and most important is Vellore and Ambur road. There are city roads which need widening as well as resurfacing, apart from this these city roads are encroached and without drainage facility and side walks. So these roads need improvements. 2. Road and Transportation Proposals The capital works relating to improvements of roads in terms of converting exiting gravel road and WBM roads to Concrete Road and BT road repetitively . Also, included the road widening, road junction improvements and bus stand improvements at an estimated cost of Rs. 112 Lacs. Table 10-8: Capital Investment Needs for the Roads and Transportation S.No Description Amount Rs in Lacs 1 Road Improvement WBM to BT 81 Gravel Roads to CC Road Road Junction Improvement (Khdherpettai Junction, Kaspa A 37 2 Junction, Sanakuppam Madhakari, Krichnapuram Society, S.K Road Junction, M.G R Statue & Umor School Junction) 18 3 Bus Stand Improvement Improvement on Existing Bus stand 12 4 Proposed New Roads 120 Total 268 10.1.7 Educational Institutions 1. Needs: The school needs relate to renovation of exiting old buildings, the A.C roof and Mangalore tiles are to be convert the R C C roof Structures, sports materials and computers. 2. Educational Institutions Proposals Govindapuram Municipal School needs improvement in building structures as well as in basic minimum facilities for the students. For improvements of the building, - 102 - Voyants Solutions Private Limited
- Page 57 and 58: Chapter ñ 8 Final Report: Ambur Mu
- Page 59 and 60: Chapter ñ 8 Final Report: Ambur Mu
- Page 61 and 62: Chapter ñ 8 Final Report: Ambur Mu
- Page 63 and 64: Chapter ñ 8 Final Report: Ambur Mu
- Page 65 and 66: Chapter ñ 8 Final Report: Ambur Mu
- Page 67 and 68: Chapter ñ 8 Final Report: Ambur Mu
- Page 69 and 70: Chapter ñ 8 Final Report: Ambur Mu
- Page 71 and 72: Chapter ñ 8 Final Report: Ambur Mu
- Page 73 and 74: Chapter ñ 8 Final Report: Ambur Mu
- Page 75 and 76: Chapter ñ 8 Final Report: Ambur Mu
- Page 77 and 78: Chapter ñ 8 Final Report: Ambur Mu
- Page 79 and 80: Chapter ñ 8 Final Report: Ambur Mu
- Page 81 and 82: Chapter ñ 8 Final Report: Ambur Mu
- Page 83 and 84: Chapter ñ 9 Final Report: Ambur Mu
- Page 85 and 86: Chapter ñ 9 Final Report: Ambur Mu
- Page 87 and 88: Chapter ñ 9 Final Report: Ambur Mu
- Page 89 and 90: Chapter ñ 9 Final Report: Ambur Mu
- Page 91 and 92: Chapter ñ 9 Final Report: Ambur Mu
- Page 93 and 94: Chapter ñ 9 Final Report: Ambur Mu
- Page 95 and 96: Chapter ñ 9 Final Report: Ambur Mu
- Page 97 and 98: Chapter ñ 9 Final Report: Ambur Mu
- Page 99 and 100: Chapter ñ 9 Final Report: Ambur Mu
- Page 101 and 102: Chapter ñ 10 Final Report: Ambur M
- Page 103 and 104: Chapter ñ 10 Final Report: Ambur M
- Page 105 and 106: Chapter ñ 10 Final Report: Ambur M
- Page 107: Chapter ñ 10 Final Report: Ambur M
- Page 111 and 112: Chapter ñ 10 Final Report: Ambur M
- Page 113 and 114: Chapter ñ 10 Final Report: Ambur M
- Page 115 and 116: Chapter ñ 10 Final Report: Ambur M
- Page 117 and 118: Chapter ñ 11 Final Report: Ambur M
- Page 119 and 120: Chapter ñ 11 Final Report: Ambur M
- Page 121 and 122: Chapter ñ 12 Final Report: Ambur M
- Page 123 and 124: Chapter ñ 12 Final Report: Ambur M
- Page 125 and 126: Chapter ñ 12 Final Report: Ambur M
- Page 127 and 128: Chapter ñ 12 Final Report: Ambur M
- Page 129 and 130: Chapter ñ 12 Final Report: Ambur M
- Page 131 and 132: Chapter ñ 12 Final Report: Ambur M
- Page 133 and 134: Chapter ñ 12 Final Report: Ambur M
- Page 135 and 136: Chapter ñ 12 Final Report: Ambur M
- Page 137 and 138: Chapter ñ 12 Final Report: Ambur M
- Page 139 and 140: Chapter ñ 12 Final Report: Ambur M
- Page 141 and 142: Chapter ñ 13 Final Report: Ambur M
- Page 143 and 144: Chapter ñ 13 Final Report: Ambur M
- Page 145 and 146: Chapter ñ 13 Final Report: Ambur M
- Page 147 and 148: Chapter ñ 14 Final Report: Ambur M
- Page 149 and 150: Chapter ñ 14 Final Report: Ambur M
- Page 151 and 152: Chapter ñ 14 Final Report: Ambur M
- Page 153 and 154: Chapter ñ 14 Final Report: Ambur M
- Page 155 and 156: Chapter ñ 14 Final Report: Ambur M
- Page 157 and 158: Chapter ñ 14 Final Report: Ambur M
Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />
Table 10-7: Capital Investment Needs for the Street Light<br />
S. No. Description Nos Amount in Rs Lacs<br />
1 Sodium Vapour Light 50 2.25<br />
2 High Mast light 7 63.00<br />
3 Mini High Mast Light 6 18<br />
4 Additional Automatic timer Switches 70 6.4<br />
5 Conversion of Tube Lights to CFL (Gradual Installation ) 17.85<br />
6 Proposed Lights for New Layouts 7.80<br />
Total 103.20<br />
10.1.6 Roads and transportation<br />
1. Needs:<br />
The town has lot of important roads which connect it with the surrounding and most<br />
important is Vellore and Ambur road. There are city roads which need widening as<br />
well as resurfacing, apart from this these city roads are encroached and without<br />
drainage facility and side walks. So these roads need improvements.<br />
2. Road and Transportation Proposals<br />
The capital works relating to improvements of roads in terms of converting exiting<br />
gravel road and WBM roads to Concrete Road and BT road repetitively . Also,<br />
included the road widening, road junction improvements and bus stand<br />
improvements at an estimated cost of Rs. 112 Lacs.<br />
Table 10-8: Capital Investment Needs for the Roads and Transportation<br />
S.No Description<br />
Amount Rs in<br />
Lacs<br />
1 Road Improvement<br />
WBM to BT 81<br />
Gravel Roads to CC Road<br />
Road Junction Improvement (Khdherpettai Junction, Kaspa A<br />
37<br />
2 Junction, Sanakuppam Madhakari, Krichnapuram Society, S.K Road<br />
Junction, M.G R Statue & Umor School Junction)<br />
18<br />
3 Bus Stand Improvement<br />
Improvement on Existing Bus stand 12<br />
4 Proposed New Roads 120<br />
Total 268<br />
10.1.7 Educational Institutions<br />
1. Needs:<br />
The school needs relate to renovation of exiting old buildings, the A.C roof and<br />
Mangalore tiles are to be convert the R C C roof Structures, sports materials and<br />
computers.<br />
2. Educational Institutions Proposals<br />
Govindapuram <strong>Municipal</strong> School needs improvement in building structures as well<br />
as in basic minimum facilities for the students. For improvements of the building,<br />
- 102 -<br />
Voyants Solutions Private Limited