City Corporate & Business Plan - Municipal
City Corporate & Business Plan - Municipal
City Corporate & Business Plan - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />
discharge water in Palar River. The present condition of Storm Water Drainage is that<br />
it also carried the sludge and sewage water, which ultimately carried to the Palar<br />
River. This has created enormous environmental problems. Also there are certain<br />
length of roads which is unlined and needs to convert them in lined drains to use the<br />
Rain Water Harvesting in an effective way.<br />
2. Drainage Proposals<br />
The existing storm water drains are not up to mark as the pucca drains are open and<br />
the kutch drains are cover 65 % of the road length. Items including main roads<br />
having puuca and kutcha open drains are converting to pucca Closed drain is<br />
estimated to Rs. 194 lacs. The major construction is required on the following drains<br />
and the rest of the money will be spent on up-gradation of household drainage.<br />
Table 10-5: Capital Investment Needs for the Storm Water Drainage System<br />
S.No Description<br />
Length<br />
in Meter<br />
Amount Rs<br />
in Lacs<br />
1 BabuKollai to Paneerselvam Nagar 750 16<br />
2 Bethalagem to Kannar 1100 23<br />
3 Kaspa A to Kannar 946 20<br />
4 Samiyarmadam to Bye Pass Road 1000 22<br />
5 Sanakuppam to Bye Pass Road 900 20<br />
6 Judgemanai to Kannar 454 10<br />
7 K.M.Nagar to Paneerselvam Nagar 750 17<br />
8 Khardherpet 1000 22<br />
9 E.B Gate to Bridge 1000 22<br />
10 Edhka Road to Jalal Road 1000 22<br />
11 Proposed new Storm Water Drain 490<br />
Total 8900 684<br />
10.1.4 Solid Waste Management<br />
1. Needs:<br />
The household waste is dumped at various community collection points spread over<br />
entire town. Though municipality is doing its best to manage the solid waste yet it is<br />
not up to the mark to manage the solid waste from collection to disposal and lot<br />
has to be done for it.<br />
As of now, compost yard is used as a dumping yard only. As per <strong>Municipal</strong> Solid<br />
Waste rules, every town should be maintained compost yard and Land fill facility.<br />
But individual land fill facility requires high capital cost; instead of this consultant<br />
propose the regional land fill facilities.<br />
2. Solid Waste Management Proposals<br />
Based on the situation assessment and consultations with stakeholders, following<br />
urgent improvement needs has been identified and proposed.<br />
- 99 -<br />
Voyants Solutions Private Limited