Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />
10.1.2 Sewerage System<br />
1. Needs:<br />
At present municipality do not have sewerage system but Government of Tamil<br />
Nadu has proposed to lay new system in every municipality in Tamil Nadu. Ambur<br />
<strong>Municipal</strong>ity has prepared the DPR for the sewerage system for the town and sent it<br />
to CMA for approval.<br />
2. Sewerage Proposals<br />
The Detailed Project Report was prepared by TWAD Board. The Town has been<br />
considered as single zone for designing of the collection system. They estimate total<br />
length of sewerage 82.00 km .The Sewage Treatment <strong>Plan</strong>t of capacity of 18.00 mld<br />
(ASP Technology) is proposed to be located near Sivarajapuram .<br />
Table 10-4: Capital Investment Needs for the Sewerage System<br />
S.No Description Qty<br />
Amount<br />
Rs. Lacs<br />
1<br />
Supply, Delivery, Laying and Jointing of sewer Lines including<br />
Appurtenances<br />
81.72<br />
Km<br />
1744.00<br />
2 House Service Connection 11500 397.02<br />
3 Pumping Main 1 No 102.14<br />
4 Pumping Machineries and Diesel generator sets 1 No 200.00<br />
5<br />
Pumping main from main pumping main station to treatment plant<br />
800 mm DI K7<br />
1.10 km 86.60<br />
6 Sewage Treatment <strong>Plan</strong>t with ASP Technology<br />
14.65<br />
MLD<br />
623.00<br />
Sub total I 3152.76<br />
7 Petty supervision & Contingency @ 2.5 % 78.81<br />
8 Un-forseen Item @ about 2.5 % 78.81<br />
Sub Total II 3310.39<br />
9 Centage @ 5 % on sub total II 165.51<br />
Sub Total III 3475.91<br />
10 Miscellaneous Items<br />
Towards Road Restoration Charges for NH and state Highways<br />
Dept for sewers and Pumping Main<br />
Towards TNEB charges for separate Feeder main and connection<br />
85<br />
charges NH and state Highways Departments for sewers and<br />
pumping main<br />
25<br />
Towards Charges for telephone Connections 4<br />
Add service charges at 1 % on miscellaneous Items 1.2<br />
Add price escalation 10 % for 2 years 358.88<br />
Grand Total 3950.00<br />
10.1.3 Drainage<br />
1. Needs:<br />
The existing drainage condition of Ambur consists of tanks and manmade drainage<br />
system (Storm water open drains). Due to the natural slope of the town, all the drains<br />
- 98 -<br />
Voyants Solutions Private Limited