Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />
The total estimated cost including renovation of existing water supply scheme is Rs.<br />
13027 lacs.<br />
Table 10-3: Investment requirement in water supply sector for Ambur <strong>Municipal</strong>ity<br />
S.No Description<br />
1 Source Augmentation<br />
- 97 -<br />
Amount Rs<br />
in Lacs<br />
Infiltration well ( 8 Numbers) 64<br />
Open well ( 10 Numbers) 74<br />
Pumps 32<br />
Construction of GL Sump 2.0 LL 12<br />
2 Transmission System Improvement<br />
Construction of GL clear water sump 13<br />
Construction of BPT 18<br />
Sedimentation Tank 2.00 LL Capacity 6<br />
Construction of Rapid sand filter beds -2 numbers including all<br />
pipe connections<br />
10<br />
Supply ,delivery, Laying of 150 mm DI /K7 pipes to convey water<br />
by gravity from sump at HW to the sump at foot of hills<br />
336<br />
Provision for disinfection arrangements 6<br />
Construction of Service Reservoirs /Overhead tanks 241<br />
Improvements of Transmission Mains 310<br />
3 Improvement of Distribution System<br />
Supply and installation of bulk water meters( 15Nos) 45<br />
Supply and installation of consumer water meters 148<br />
Coverage of services in new areas/ uncovered areas 68<br />
4 Up-gradation of Existing System<br />
Desilting the existing Eri and extending the Eri Area to store and<br />
supply 10 LL of water per day to Ambur for 100 days during<br />
Summer<br />
30<br />
Raising and strengthening the existing bund of Naickaneri<br />
Construction of bund alround the Eri where ever necessary after<br />
2<br />
desilting and exceeding the Eri Area to the required peripheral<br />
length and depth<br />
10<br />
Provision for road cutting, restoration , culvert crossings and<br />
payments to forest dept<br />
13<br />
Anchoring arrangements wherever necessary 2<br />
Provision for getting power supply 5<br />
Provision for getting separate feeder main 9<br />
Rehabilitation of existing reservoir at V.A Kareem road 137<br />
5 Combined Mettur water supply Proportionate Cost 11436<br />
6 Water Treatment RO 640<br />
Total 13667<br />
Voyants Solutions Private Limited