Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />

The total estimated cost including renovation of existing water supply scheme is Rs.<br />

13027 lacs.<br />

Table 10-3: Investment requirement in water supply sector for Ambur <strong>Municipal</strong>ity<br />

S.No Description<br />

1 Source Augmentation<br />

- 97 -<br />

Amount Rs<br />

in Lacs<br />

Infiltration well ( 8 Numbers) 64<br />

Open well ( 10 Numbers) 74<br />

Pumps 32<br />

Construction of GL Sump 2.0 LL 12<br />

2 Transmission System Improvement<br />

Construction of GL clear water sump 13<br />

Construction of BPT 18<br />

Sedimentation Tank 2.00 LL Capacity 6<br />

Construction of Rapid sand filter beds -2 numbers including all<br />

pipe connections<br />

10<br />

Supply ,delivery, Laying of 150 mm DI /K7 pipes to convey water<br />

by gravity from sump at HW to the sump at foot of hills<br />

336<br />

Provision for disinfection arrangements 6<br />

Construction of Service Reservoirs /Overhead tanks 241<br />

Improvements of Transmission Mains 310<br />

3 Improvement of Distribution System<br />

Supply and installation of bulk water meters( 15Nos) 45<br />

Supply and installation of consumer water meters 148<br />

Coverage of services in new areas/ uncovered areas 68<br />

4 Up-gradation of Existing System<br />

Desilting the existing Eri and extending the Eri Area to store and<br />

supply 10 LL of water per day to Ambur for 100 days during<br />

Summer<br />

30<br />

Raising and strengthening the existing bund of Naickaneri<br />

Construction of bund alround the Eri where ever necessary after<br />

2<br />

desilting and exceeding the Eri Area to the required peripheral<br />

length and depth<br />

10<br />

Provision for road cutting, restoration , culvert crossings and<br />

payments to forest dept<br />

13<br />

Anchoring arrangements wherever necessary 2<br />

Provision for getting power supply 5<br />

Provision for getting separate feeder main 9<br />

Rehabilitation of existing reservoir at V.A Kareem road 137<br />

5 Combined Mettur water supply Proportionate Cost 11436<br />

6 Water Treatment RO 640<br />

Total 13667<br />