Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />

Table 10-2- : Water source to meet intermediate and Ultimate Demand<br />

S.no Source Intermediate<br />

Ultimate<br />

Demand(MLD)<br />

Demand(MLD)<br />

1 Palar Source 6.75 6.75<br />

2 Check Dam (source at 6.70 6.70<br />

Anaimadugu,<br />

Naickeneri )<br />

Kamanuthattu,<br />

3 Mettur Scheme 6.33 11.53<br />

Total 19.78 24.98<br />

. Following are the salient features of the water supply proposed scheme for<br />

intermediate year (2024).<br />

1. To develop Naickaneri tank by desilting , deepening and extending the<br />

periphery to the extent possible including raising and strengthening the<br />

exiting bund, conveying the water to foot of hills through 150 mm DI pumping<br />

main for 14 Km ,BPT ñ 5 Nos, Treating it through RSF , disinfecting and pumping<br />

to the existing Service reservoir.<br />

2. In Kamanurthattu, to Provide 3 open wells of 6 m dia X 18 m depth each to<br />

tap 200 lpm from each well for 16 Hours/Day to supply 5.76 LL/Day by<br />

providing components viz., BPT-4 Nos,2.00 LL sump -1 No, 0.50 LL sump -1 No,<br />

150 mm DI/K& pumping main for 11 km and disinfection arrangements.<br />

3. In Anaimadugu, to provide 3 open wells of 6 m diameter X 18 m depth each<br />

to tap 200 Lpm from each well for 16 hours /day to supply 5.76 LL/Day by<br />

providing components Viz., 150 mm DI pumping main for 3 Kms, 2.00 Ll sump -<br />

1 No and disinfection arrangements.<br />

4. Since the 18 LL at V.A.Kareem Road service reservoir has crossed the life<br />

period of 30 years, the new tank of sufficient capacity has been proposed to<br />

fulfil the future demand.<br />

5. The two infiltration wells to be proposed at sarangal river , three infiltration<br />

wells to be proposed in Malatar river and another 4 numbers of open wells<br />

are to be proposed at Vannandurai .<br />

The present water sources for the Ambur municipality is palar river, since the palar<br />

river source are polluted at some areas due to discharging of wastewater from<br />

leather processing industry and the yield of river also going down. The alternative<br />

water sources of mettur have been identified for combined water supply scheme<br />

for this municipality. The schematic and proportionate cost details of mettur scheme<br />

is presented in the above figure 10.1.<br />

The water can be drawn from palar river upto intermediate stage 2024 and after<br />

intermediate stage the mettur scheme can be used. The capital cost of mettur<br />

scheme is Rs. 1170 crores and O&M cost is Rs 40 crores per annum. The<br />

proportionate capital cost of Ambur municipality is Rs. 114 crores and O&M cost is<br />

Rs. 3.91 crores.<br />