Chapter ñ 10 Final Report: Ambur <strong>Municipal</strong>ity<br />
10.1 PHYSICAL INFRASTRUCTURE - IMPROVEMENT NEEDS<br />
In chapter - 8, we had identified the problems and issues of the Physical<br />
Infrastructure sector and mentioned about the projects identified the municipality<br />
for curative measures in this sector. Here we will discuss about the shortcomings in<br />
the projects identified by the municipality or by the different agencies i.e.<br />
<strong>Municipal</strong>ity, TWAD board etc. and discuss about the improvement needs and<br />
future proposals.<br />
10.1.1 Water Supply:<br />
1. Improvement Needs:<br />
Pachakkuppam scheme was commissioned during 1974 with River Palar as source.<br />
At that time, Pachakkuppam Scheme only supplies the water to whole Ambur town.<br />
Even now also pachakuppam head works have very good water yield from the<br />
palar river. This scheme has been designed to serve a horizon population of 80,000 in<br />
the year 2001 and to supply 70.00 lakh litres per day in the ultimate stage. But the<br />
tanneries situated around the town, discharges their effluent directly into Palar River<br />
and due to this activity; the head works at Pachakuppam is completely polluted. At<br />
present no pumping has been made from this head works.<br />
The existing distribution lines were mostly laid more than 30 years before and they<br />
need replacement. So there should be a comprehensive study for effective solution<br />
for water supply provision and rezoning.<br />
2. Water Supply Proposals<br />
It is proposed for the rehabilitation of exiting check dam for Anaimadugu,<br />
Kamanuthattu, Naickeneri areas, in order to meet the part of intermediate supply<br />
gap about 6.7 MLD by providing suitable open wells, rising mains , sump, and<br />
disinfection arrangement.<br />
The feasibility study carried out by the TWAD Board and it is mentioned that 6.7 MLD<br />
of water can be drawn by providing above facilities. The Ultimate demand shall be<br />
fulfilled using combined Mettur scheme. The Detailed Project Report for this scheme<br />
is under preparation by TWAD Board. The water allotment details from Mettur<br />
scheme for various municipalities are shown in Figure 10.1<br />