Sl.<br />

No.<br />

- 343 -<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

Major Heads / Minor Heads of Development<br />

Tenth Plan<br />

2002-07<br />

Projected<br />

Outlay (at 2001-<br />

02 prices)<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

Eleventh Plan<br />

2007-12<br />

Proposed<br />

Outlay<br />

GN STATEMENT - A<br />

0 1 2 3 4 5 6 7 8<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Proposed<br />

Outlay<br />

I. AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry 9266.00 3318.00 3335.00 3207.00 13314.39 21974.00 3428.00<br />

2 Horticulture 3033.00 737.33 684.00 687.00 2917.10 4510.00 753.00<br />

3 Soil & Water Conservation (incl. control of shifting<br />

cultivation)<br />

1633.00 387.51 400.00 290.00 1599.95 2078.00 440.00<br />

4 Animal Husbandry 2333.00 726.32 778.00 583.00 3239.00 3887.00 855.00<br />

5 Dairy Development 187.00 39.92 40.00 40.00 220.00 264.00 43.00<br />

6 Fisheries 607.00 229.86 280.00 195.00 845.13 999.00 308.00<br />

7 Plantations - - - - - - -<br />

8 Food, Storage & Warehousing - - - - - - -<br />

9 Agricultural Research & Education 47.00 10.00 8.00 8.00 38.34 402.00 64.00<br />

10 Agricultural Financial Institutions - - - - - - -<br />

11 Cooperation<br />

12 Other Agricultural Programmes:<br />

1398.00 515.09 530.00 645.50 2064.83 2510.00 539.00<br />

a) Agriculture Marketing (Trade & Commerce) 848.00 335.00 200.00 200.00 1093.31 1560.00 220.00<br />

b) Others (Horticulture Research & Education) - -<br />

TOTAL - I (1 to 12) 19352.00 6299.03 6255.00 5855.50 25332.05 38184.00 6650.00<br />

II. RURAL DEVELOPMENT<br />

1 Special Programme for Rural Development:<br />

a) Drought Prone Area Programme (DPAP) - - - - - - -<br />

b) Desert Development Programme (DDP) - - - - - - -<br />

c) Integrated Wasteland Development Projects Scheme 400.00 - - - 243.80 319.00 50.00<br />

d) DRDA Administration 480.00 322.65 137.37 137.37 427.53 880.00 104.00<br />

e) Others (DWCRA) 290.00 - 73.27 73.27 333.14 446.00 80.00<br />

f) Others (SIRD) 80.00 - 26.24 26.24 108.97 115.00 28.00<br />

Sub-Total (Special Prog. for Rural Dev.) 1250.00 322.65 236.88 236.88 1113.44 1760.00 262.00


Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

Tenth Plan<br />

2002-07<br />

Projected<br />

Outlay (at 2001-<br />

02 prices)<br />

- 344 -<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

Eleventh Plan<br />

2007-12<br />

Proposed<br />

Outlay<br />

0 1 2 3 4 5 6 7 8<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Proposed<br />

Outlay<br />

2 Rural Employment:<br />

a) Swaranjyanti Gram Swarozgar Yojana (SGSY) 150.00 - 100.12 100.12 278.82 850.00 110.00<br />

b) Sampoorna Gram Rozgar Yojana (SGRY) 1150.00 261.00 261.00 272.70 1162.90 1323.00 287.00<br />

c) National Food for Work Programme / National<br />

Employment Guarantee Programme<br />

- - - - - - -<br />

d) Others (IAY) 371.00 76.00 105.00 105.00 499.69 427.00 115.00<br />

Sub-Total (Rural Employment) 1671.00 337.00 466.12 477.82 1941.41 2600.00 512.00<br />

3 Land Reforms<br />

4 Other Rural Development Programmes:<br />

1171.00 362.87 420.00 385.00 1623.28 2310.00 462.00<br />

a) Community Development & Panchayats 5481.00 1327.00 1377.00 2550.90 7236.13 9406.00 1515.00<br />

b) Other Programmes of Rural Development 40.00 - - - - - -<br />

Sub-Total (Other Rural Development) 5521.00 1327.00 1377.00 2550.90 7236.13 9406.00 1515.00<br />

TOTAL - II (1 to 4) 9613.00 2349.52 2500.00 3650.60 11914.26 16076.00 2751.00<br />

III. SPECIAL AREAS PROGRAMMES<br />

a) Hill Areas Development Programme (Sinlung)<br />

b) Other Special Areas Programme:<br />

304.00 107.00 125.00 125.00 478.89 350.00 138.00<br />

i) Border Area Development Programme 3733.00 886.94 902.00 902.00 5351.33 4295.00 993.00<br />

ii) Backward Region Grant Fund (Backward Districts / Area<br />

Fund)<br />

750.00 2250.00 2250.00 3000.00 - -<br />

iii) Grants under proviso to article 275(1) - 264.00 264.00 264.00 1036.56 - -<br />

iv) Special Central Assistance to Tribal Sub-Plan - - - - - - -<br />

v) Others (MLA-LAD Scheme) - 200.00 400.00 400.00 600.00 - -<br />

Sub-Total (Other Special Programme) 3733.00 2100.94 3816.00 3816.00 9987.89 4295.00 993.00<br />

TOTAL - III (a+b) 4037.00 2207.94 3941.00 3941.00 10466.78 4645.00 1131.00<br />

IV. IRRIGATION & FLOOD CONTROL<br />

1 Major and Medium Irrigation 5.00 1.00 1.00 1.00 10.00 6.00 1.00<br />

2 Minor Irrigation 2683.00 1880.00 3153.00 3153.00 8308.95 16056.00 3799.00<br />

3 Command Area Development 140.00 15.00 15.00 15.00 69.58 125.00 20.00<br />

4 AIBP - - - - - - -<br />

5 Flood Control (includes flood protection works) - - - - - - -<br />

TOTAL - IV (1 to 5) 2828.00 1896.00 3169.00 3169.00 8388.53 16187.00 3820.00


Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

Tenth Plan<br />

2002-07<br />

Projected<br />

Outlay (at 2001-<br />

02 prices)<br />

- 345 -<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

Eleventh Plan<br />

2007-12<br />

Proposed<br />

Outlay<br />

0 1 2 3 4 5 6 7 8<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Proposed<br />

Outlay<br />

V. ENERGY<br />

1 Power 19280.00 9025.68 7200.00 8700.00 47772.22 55856.00 7927.00<br />

2 Non-Conventional Sources of Energy 205.00 50.00 50.00 50.00 250.00 300.00 50.00<br />

3 Integrated Rural Energy Programme 52.00 11.00 11.00 11.00 55.00 66.00 11.00<br />

TOTAL - V (1 to 3) 19537.00 9086.68 7261.00 8761.00 48077.22 56222.00 7988.00<br />

VI. INDUSTRY & MINERALS<br />

1 Village & Small Enterprises 4246.00 2436.84 1704.00 2039.00 8106.03 12160.00 1874.00<br />

i) Small Scale Industries<br />

ii) Handlooms / Powerlooms<br />

iii) Handicrafts<br />

iv) Sericulture / coir / wool 1027.00 362.32 400.00 347.50 1705.72 2558.00 312.00<br />

v) Food Processing Industries - - - - - -<br />

Sub-Total (VSE) 5273.00 2799.16 2104.00 2386.50 9811.75 14718.00 2186.00<br />

2 Other Industries (Other than VSE) 392.00 100.00 100.00 120.00 472.00 708.00 110.00<br />

3 Minerals 373.00 89.93 100.00 100.00 388.50 582.00 110.00<br />

TOTAL - IV (1 to 3) 6038.00 2989.09 2304.00 2606.50 10672.25 16008.00 2406.00<br />

VII. TRANSPORT<br />

1 Minor Ports - - - - - - -<br />

2 Civil Aviation - 6.50 - - 6.50 - -<br />

3 Roads and Bridges 46258.00 12647.26 10893.00 10998.00 46201.66 68716.00 16764.00<br />

4 Road Transport 1558.00 470.72 500.00 500.00 2371.42 2845.00 550.00<br />

5 Inland Water Transport 47.00 5.00 5.00 5.00 24.68 54.00 6.00<br />

6 Other Transport Services (Motor Vehicle Wing) 327.00 82.31 100.00 100.00 416.42 478.00 115.00<br />

TOTAL - VII (1 to 6)<br />

VIII. SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

48190.00 13211.79 11498.00 11603.00 49020.68 72093.00 17435.00<br />

1 Scientific Research 513.00 133.10 140.00 151.00 1063.20 982.00 154.00<br />

2 Information Technology & E-Governance # (Please Footnote<br />

on items to be included under this Head)<br />

- 40.96 530.00 579.54 620.50 639.00 86.00<br />

3 Ecology & Environment 19.00 4.00 4.00 4.00 19.00 22.00 5.00<br />

4 Forestry & Wildlife 2846.00 1047.21 1335.00 1335.00 4419.10 5523.00 1398.00<br />

TOTAL - VIII (1 to 4) 3378.00 1225.27 2009.00 2069.54 6121.80 7166.00 1643.00


Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

Tenth Plan<br />

2002-07<br />

Projected<br />

Outlay (at 2001-<br />

02 prices)<br />

- 346 -<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

Eleventh Plan<br />

2007-12<br />

Proposed<br />

Outlay<br />

0 1 2 3 4 5 6 7 8<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Proposed<br />

Outlay<br />

IX. GENERAL ECONOMIC SERVICES<br />

1 Secretariat Economic Sevices 5473.00 365.71 3096.00 1837.76 4744.50 11294.00 3454.00<br />

2 Tourism 1056.00 291.95 290.00 295.00 1229.23 1597.00 313.00<br />

3 Census, Surveys & Statistics 373.00 122.04 155.00 155.00 603.00 784.00 171.00<br />

4 Civil Supplies 826.00 490.27 560.00 380.00 1350.23 2025.00 616.00<br />

5 Other General Economic Services:<br />

a) Weights & Measures 233.00 72.50 80.00 80.00 329.14 418.00 88.00<br />

b) District Planning / District Councils 8324.00 2091.00 2166.00 2166.00 9999.66 11498.00 2382.00<br />

i) Lai Autonomous District Council 3336.00 850.00 875.00 875.00 4023.16 4626.00 963.00<br />

ii) Mara Autonomous District Council 2912.00 520.00 746.00 746.00 3451.50 3968.00 820.00<br />

iii) Chakma Autonomous District Council 2076.00 721.00 545.00 545.00 2525.00 2904.00 599.00<br />

c) Law & Judicial 598.00 53.85 80.00 80.00 479.20 512.00 86.00<br />

Sub-Total (Other General Eco. Services) 9155.00 2217.35 2326.00 2326.00 10808.00 12428.00 2556.00<br />

TOTAL - IX (1 to 5) 16883.00 3487.32 6427.00 4993.76 18734.96 28128.00 7110.00<br />

X. SOCIAL SERVICES<br />

1 General Education<br />

a) Elementary Education 8865.00 4561.96 4514.50 4594.50 19400.95 18559.00 4502.50<br />

b) Literacy / Adult Education 152.50 41.62 76.20 76.20 309.67 1695.00 76.50<br />

c) Secondary Education 8645.00 2342.86 2714.80 2714.80 9630.10 15980.00 3511.50<br />

d) Language Development 490.00 125.43 147.80 147.80 538.05 1513.00 160.50<br />

e) General 788.00 139.88 196.70 196.70 711.82 2434.00 252.00<br />

f) Physical Education 442.50 - - - - - -<br />

g) Higher Education 3897.00 1211.00 1353.00 1353.00 5227.40 9233.00 1487.00<br />

2 Technical Education 3948.00 1170.00 180.00 180.00 5076.65 4584.00 264.00<br />

3 Sports 814.00 485.00 1400.00 1435.00 3591.27 5386.00 1647.00<br />

4 Youth Services - - - - - - -<br />

5 Art & Culture 1210.00 123.54 395.00 395.00 1747.00 2086.00 303.00<br />

6 A. Medical & Public Health 12370.00 3378.10 2400.00 2354.60 14890.00 22333.00 2665.00<br />

i) Primary Health Care<br />

a) Rural - - - -<br />

b) Urban - - - -


Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

Tenth Plan<br />

2002-07<br />

Projected<br />

Outlay (at 2001-<br />

02 prices)<br />

- 347 -<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

Eleventh Plan<br />

2007-12<br />

Proposed<br />

Outlay<br />

0 1 2 3 4 5 6 7 8<br />

ii) Secondary Health Care - - - -<br />

iii) Tertiary Health Care / Super Speciality Services - - - -<br />

iv) Medical Education & Research - - - -<br />

v) Training - - - -<br />

vi) AYUSH - - - -<br />

vii) E.S.I. - - - -<br />

viii) Control of —<br />

a) Communicable diseases (to be specified) - - - -<br />

b) Non-Communicable diseases (to be specified) - - - -<br />

ix) National Rural Health Mission (activities to be specified) - - - -<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Proposed<br />

Outlay<br />

x) Other Programmes - - - -<br />

Sub-Total (Medical & Public Health) 12370.00 3378.10 2400.00 2354.60 14890.00 22333.00 2665.00<br />

B. Hospital & Dispensary - - 1600.00 1600.00 1600.00 17993.00 1760.00<br />

7 Water Supply & Sanitation<br />

i) Rural Water Supply 5000.00 2291.38 2291.38 9280.75 15527.00 5000.00<br />

ii) Rural Sanitation 230.00 4612.54 140.00 140.00 601.17 691.00 454.00<br />

iii) Urban Water Supply 7103.00 3318.62 4787.62 17606.99 21828.00 4543.00<br />

iv) Urban Sanitation - - - - - -<br />

8 Housing (incl. Police Housing)<br />

i) Govt. Housing (PWD) 472.00 257.13 320.00 320.00 1336.35 2013.00 363.00<br />

ii) Police Housing 2216.00 565.00 545.00 545.00 719.08 1078.00 600.00<br />

iii) Housing (LAD) 20060.00 3742.00 3692.00 688.00 15248.00 22819.00 3796.00<br />

Sub-Total (Housing) 22748.00 4564.13 4557.00 1553.00 17303.43 25910.00 4759.00<br />

9 Urban Development (incl. State Capital Projects & Slum<br />

Area Development)<br />

i) State Capital Project 8885.00 125.00 100.00 100.00 431.20 496.00 105.00<br />

ii) Urban Development & Poverty Alleviation - - - - - 5500.00 1049.00<br />

iii) IDSMT (Town & Country Planning) 532.00 119.33 144.00 144.00 595.71 684.00 159.00<br />

iv) Other Urban Development (LAD) 4187.00 552.00 1358.00 1458.50 3841.64 4032.00 1295.00<br />

Sub-Total (Urban Development) 13604.00 796.33 1602.00 1702.50 4868.55 10712.00 2608.00<br />

10 Information & Publicity 612.00 237.28 270.00 217.00 864.90 1036.00 297.00


Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

Tenth Plan<br />

2002-07<br />

Projected<br />

Outlay (at 2001-<br />

02 prices)<br />

- 348 -<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

Eleventh Plan<br />

2007-12<br />

Proposed<br />

Outlay<br />

0 1 2 3 4 5 6 7 8<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Proposed<br />

Outlay<br />

11 Development of SCs, STs & OBCs<br />

i) Development of SCs<br />

ii) Development of STs<br />

iii) Development of OBCs<br />

Sub-Total (SCs, STs & OBCs)<br />

12 Labour & Employment<br />

A. Labour Welfare<br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

i) Labour & Labour Welfare<br />

ii) Social Security for Labour<br />

iii) Labour Education<br />

iv) Rehabilitation of Bonded Labour<br />

v) Child Labour<br />

B. Employment Services<br />

C. Craftsmen Training (ITIs) and Apprenticeship Training<br />

350.00 130.01 150.00 150.00 528.75 633.00 165.00<br />

Sub-Total (Labour & Employment) 350.00 130.01 150.00 150.00 528.75 633.00 165.00<br />

13 Social Security & Social Welfare<br />

i) Insurance Scheme for the Poor through GIC, etc.)<br />

ii) National Social Assistance Programme & Annapurna<br />

iii) Welfare of the Handicapped (includes assistance for<br />

Voluntary Organisations)<br />

iv) Social Defence (inludes Drug Addicts, Rehabilitation<br />

Programmes, HIV/AIDS, etc.)<br />

v) Others (to be specified)<br />

1298.00 456.44 539.06 539.06 3097.30 4780.00 811.00<br />

Sub-Total (Social Security & Social Welfare)<br />

14 Empowerment of Women & Development of Children<br />

1298.00 456.44 539.06 539.06 3097.30 4780.00 811.00<br />

i) Empowerment of Women 95.00 68.94 68.94 267.57 343.00 97.00<br />

ii) Dev. of Children (includes Integrated Child Dev. Services,<br />

Balwadi Nutrition Programme, Day Care Centres, etc.)<br />

100.00 22.00 22.00 69.35 110.00 37.00<br />

iii) Nutrition 2925.00 682.00 682.00 763.00 3464.00 4133.00 821.00<br />

iv) Others Services - - - - - - -<br />

Sub-Total (Empowerment of Women & Development of<br />

Children)<br />

3120.00 682.00 772.94 853.94 3800.92 4586.00 955.00<br />

TOTAL - X (1 to 14) 95687.00 25058.12 28619.00 27282.10 120675.67 187499.00 36221.00


Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

Tenth Plan<br />

2002-07<br />

Projected<br />

Outlay (at 2001-<br />

02 prices)<br />

- 349 -<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

Eleventh Plan<br />

2007-12<br />

Proposed<br />

Outlay<br />

0 1 2 3 4 5 6 7 8<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Proposed<br />

Outlay<br />

XI. GENERAL SERVICES<br />

1 Jails 808.00 287.00 288.00 288.00 1142.50 1371.00 317.00<br />

2 Stationery & Printing 467.00 100.00 180.00 180.00 586.92 704.00 198.00<br />

3 Public Works 2969.00 972.85 1285.00 1306.00 4421.54 5305.00 1759.00<br />

4 Other Administrative Services:<br />

i) Administrative Training Institute 210.00 89.33 60.00 90.00 337.67 395.00 66.00<br />

ii) Others (Forensic Science Laboratory) 4.00 4.00 4.00 4.00 15.00 17.00 5.00<br />

TOTAL - XI (1 to 4) 4458.00 1453.18 1817.00 1868.00 6503.63 7792.00 2345.00<br />

GRAND TOTAL 230001.00 69263.94 75800.00 75800.00 315907.83 450000.00 89500.00


Sl.<br />

No.<br />

- 357 -<br />

GN STATEMENT - B (Part-I)<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

(From State Budget)<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12 Proposed<br />

Outlay (at 2006-07<br />

prices)<br />

0 1 2 3<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

I. AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry 21,974.00 3,428.00<br />

2 Horticulture 4,510.00 753.00<br />

3 Soil & Water Conservation (including control of shifting cultivation) 2,078.00 440.00<br />

4 Animal Husbandry 3,887.00 855.00<br />

5 Dairy Development 264.00 43.00<br />

6 Fisheries 999.00 308.00<br />

7 Plantations - -<br />

8 Food, Storage & Warehousing - -<br />

9 Agricultural Research & Education 402.00 64.00<br />

10 Agricultural Financial Institutions - -<br />

11 Cooperation 2,510.00 539.00<br />

12 Other Agricultural Programmes:<br />

a) Agriculture marketing (Trade & Commerce) 1,560.00 220.00<br />

b) Others (to be specified)<br />

TOTAL - I (1 to 12) 38,184.00 6,650.00<br />

II. RURAL DEVELOPMENT<br />

1 Special Programme for Rural Development:<br />

a) Drought Prone Area Programme (DPAP)<br />

b) Desert Development Programme (DDP)<br />

c) Integrated Wasteland Development Projects Scheme 319.00 50.00<br />

d) DRDA Administration 880.00 104.00<br />

e) Others (DWCRA) 446.00 80.00<br />

f) Others (SIRD) 115.00 28.00<br />

Sub-Total (Special Programme for Rural Development) 1,760.00 262.00


Sl.<br />

No.<br />

- 358 -<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12 Proposed<br />

Outlay (at 2006-07<br />

prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

0 1 2 3<br />

2 Rural Employment<br />

a) Swaranjyanti Gram Swarozgar Yojana (SGSY) 850.00 110.00<br />

b) Sampoorna Gram Rozgar Yojana (SGRY)<br />

c) National Food for Work Programme / National Employment Guarantee Programme<br />

1,323.00 287.00<br />

d) Others (tIAY) 427.00 115.00<br />

Sub-Total (Rural Employment) 2,600.00 512.00<br />

3 Land Reforms<br />

4 Other Rural Development Programmes:<br />

2,310.00 462.00<br />

a) Community Development & Panchayats 9,406.00 1,515.00<br />

b) Other Programmes of Rural Development - -<br />

Sub-Total (Other Rural Development) 9,406.00 1,515.00<br />

TOTAL - II (1 to 4) 16,076.00 2,751.00<br />

III. SPECIAL AREAS PROGRAMMES<br />

a) Hill Areas Development Programme (Sinlung Hills Development Council) 350.00 138.00<br />

b) Other Special Areas Programme:<br />

i) Border Area Development Programme 4,295.00 993.00<br />

ii) Backward Region Grant Fund (Backward Districts / Area Fund)<br />

iii) Grants under proviso to Article 275(1)<br />

iv) Special Central Assistance to Tribal Sub-Plan<br />

v) Others (to be specified)<br />

Sub-Total (Other Special Programme) 4,295.00 993.00<br />

TOTAL - III (a+b) 4,645.00 1,131.00<br />

IV. IRRIGATION & FLOOD CONTROL<br />

1 Major and Medium Irrigation 6.00 1.00<br />

2 Minor Irrigation 16,056.00 3,799.00<br />

3 Command Area Development 125.00 20.00<br />

4 AIBP - -<br />

5 Flood Control (includes flood protection works) - -<br />

TOTAL - IV (1 to 5) 16,187.00 3,820.00


Sl.<br />

No.<br />

- 359 -<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12 Proposed<br />

Outlay (at 2006-07<br />

prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

0 1 2 3<br />

V. ENERGY<br />

1 Power 55,856.00 7,927.00<br />

2 Non-Conventional Sources of Energy 300.00 50.00<br />

3 Integrated Rural Energy Programme 66.00 11.00<br />

TOTAL - V (1 to 3) 56,222.00 7,988.00<br />

VI. INDUSTRY & MINERALS<br />

1 Village & Small Enterprises<br />

i) Small Scale Industries<br />

ii) Handlooms / Powerlooms 12,160.00 1,874.00<br />

iii) Handicrafts<br />

iv) Sericulture / coir / wool 2,558.00 312.00<br />

v) Food Processing Industries - -<br />

Sub-Total (VSE) 14,718.00 2,186.00<br />

2 Other Industries (Other than VSE) 708.00 110.00<br />

3 Minerals 582.00 110.00<br />

TOTAL - IV (1 to 3) 16,008.00 2,406.00<br />

VII. TRANSPORT<br />

1 Minor Ports - -<br />

2 Civil Aviation - -<br />

3 Roads and Bridges 68,716.00 16,764.00<br />

4 Road Transport 2,845.00 550.00<br />

5 Inland Water Transport 54.00 6.00<br />

6 Other Transport Services (Motor Vehicle Wing) 478.00 115.00<br />

TOTAL - VII (1 to 6) 72,093.00 17,435.00<br />

VIII. SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

1 Scientific Research 982.00 154.00<br />

2 Information Technology & E-Governance # (Please Footnote on items to be included under this Head) 639.00 86.00<br />

3 Ecology & Environment 22.00 5.00<br />

4 Forestry & Wildlife 5,523.00 1,398.00


Sl.<br />

No.<br />

- 360 -<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12 Proposed<br />

Outlay (at 2006-07<br />

prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

0 1 2 3<br />

TOTAL - VIII (1 to 4) 7,166.00 1,643.00<br />

IX. GENERAL ECONOMIC SERVICES<br />

1 Secretariat Economic Sevices 11,294.00 3,454.00<br />

2 Tourism 1,597.00 313.00<br />

3 Census, Surveys & Statistics 784.00 171.00<br />

4 Civil Supplies<br />

5 Other General Economic Services:<br />

2,025.00 616.00<br />

a) Weights & Measures 418.00 88.00<br />

b) District Planning / District Councils 11,498.00 2,382.00<br />

Others (Law & Judicial) 512.00 86.00<br />

Sub-Total (Other General Economic Services) 12,428.00 2,556.00<br />

TOTAL - IX (1 to 5) 28,128.00 7,110.00<br />

X. SOCIAL SERVICES<br />

1 General Education<br />

a) Elementary Education 18,559.00 4,502.50<br />

b) Literacy / Adult Education 1,695.00 76.50<br />

c) Secondary Education 15,980.00 3,511.50<br />

d) Language Development 1,513.00 160.50<br />

e) General 2,434.00 252.00<br />

f) Physical Education<br />

g) Higher Education 9,233.00 1,487.00<br />

2 Technical Education 4,584.00 264.00<br />

3 Sports 5,386.00 1,647.00<br />

4 Youth Services - -<br />

5 Art & Culture 2,086.00 303.00<br />

6 A. Medical & Public Health 22,333.00 2,665.00<br />

i) Primary Health Care<br />

a) Rural<br />

b) Urban


Sl.<br />

No.<br />

- 361 -<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12 Proposed<br />

Outlay (at 2006-07<br />

prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

0 1 2 3<br />

ii) Secondary Health Care<br />

iii) Tertiary Health Care / Super Speciality Services<br />

iv) Medical Education & Research<br />

v) Training<br />

vi) AYUSH<br />

vii) E.S.I.<br />

viii) Control of —<br />

a) Communicable diseases (to be specified)<br />

b) Non-Communicable diseases (to be specified)<br />

ix) National Rural Health Mission (Activities to be specified)<br />

x) Other Programmes<br />

Sub-Total (Medical & Public Health) 22,333.00 2,665.00<br />

B. Hospital & Dispensary 17,993.00 1,760.00<br />

Sub-Total (Health)<br />

7 Water Supply & Sanitation<br />

40,326.00 4,425.00<br />

i) Rural Water Supply 15,527.00 5,000.00<br />

ii) Rural Sanitation 691.00 454.00<br />

iii) Urban Water Supply 21,828.00 4,543.00<br />

iv) Urban Sanitation - -<br />

Sub-Total (Water Supply & Sanitation)<br />

8 Housing (including Police Housing)<br />

38,046.00 9,997.00<br />

i) Govt. Housing (PWD) 2,013.00 363.00<br />

ii) Police Housing 1,078.00 600.00<br />

iii) Housing (LAD) 22,819.00 3,796.00<br />

Sub-Total (Housing)<br />

9 Urban Development (including State Capital Projects & Slum Area Development)<br />

25,910.00 4,759.00<br />

i) State Capital Project 496.00 105.00<br />

ii) Urban Development & Poverty Alleviation 5,500.00 1,049.00<br />

iii) IDSMT (Town & Country Planning) 684.00 159.00<br />

iv) Other Urban Development (LAD) 4,032.00 1,295.00<br />

Sub-Total (Urban Development) 10,712.00 2,608.00


Sl.<br />

No.<br />

- 362 -<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12 Proposed<br />

Outlay (at 2006-07<br />

prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

0 1 2 3<br />

10 Information & Publicity<br />

11 Development of SCs, STs & OBCs<br />

i) Development of SCs<br />

ii) Development of STs<br />

iii) Development of OBCs<br />

Sub-Total (SCs, STs & OBCs)<br />

12 Labour & Employment<br />

A. Labour Welfare<br />

1,036.00 297.00<br />

i) Labour & Labour Welfare<br />

ii) Social Security for Labour<br />

iii) Labour Education<br />

iv) Rehabilitation of Bonded Labour<br />

v) Child Labour<br />

B. Employment Services<br />

C. Craftsmen Training (ITIs) and Apprenticeship Training<br />

633.00 165.00<br />

Sub-Total (Labour & Employment) 633.00 165.00<br />

13 Social Security & Social Welfare<br />

i) Insurance Scheme for the Poor through GIC, etc.)<br />

ii) National Social Assistance Programme & Annapurna<br />

iii) Welfare of the Handicapped (includes assistance for Voluntary Organisations)<br />

iv) Social Defence (inludes Drug Addicts, Rehabilitation Programmes, HIV/AIDS, etc.)<br />

v) Others (to be specified)<br />

4,780.00 811.00<br />

Sub-Total (Social Security & Social Welfare)<br />

14 Empowerment of Women & Development of Children<br />

4,780.00 811.00<br />

i) Empowerment of Women 343.00 97.00<br />

ii) Dev. of Children (includes Integrated Child Dev. Services, Balwadi Nutrition Prog, Day Care Centres, etc.) 110.00 37.00<br />

iii) Nutrition 4,133.00 821.00<br />

iv) Others Services - -<br />

Sub-Total (Empowerment of Women & Development of Children) 4,586.00 955.00<br />

TOTAL - X (1 to 14) 187,499.00 36,221.00


Sl.<br />

No.<br />

- 363 -<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12 Proposed<br />

Outlay (at 2006-07<br />

prices)<br />

0 1 2 3<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

XI. GENERAL SERVICES<br />

1 Jails 1,371.00 317.00<br />

2 Stationery & Printing 704.00 198.00<br />

3 Public Works 5,305.00 1,759.00<br />

4 Other Administrative Services:<br />

i) Administrative Training Institute 395.00 66.00<br />

ii) Others (Forensic Science Laboratory) 17.00 5.00<br />

TOTAL - XI (1 to 4) 7,792.00 2,345.00<br />

GRAND TOTAL 450,000.00 89,500.00


Sl.<br />

No.<br />

- 371 -<br />

GN STATEMENT - B (Part-II)<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

(From Public Sector Enterprises)<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan<br />

2007-12<br />

Proposed Outlay<br />

(at 2006-07<br />

prices)<br />

0 1 2 3<br />

(Rs. in lakh)<br />

Annual Plan 2007-<br />

08 Proposed<br />

Outlay<br />

I. ENERGY<br />

1 Power 2500.00 500.00<br />

2 Non-Conventional Sources of Energy<br />

3 Integrated Rural Energy Programme<br />

TOTAL - V (1 to 3) 2500.00 500.00<br />

II. SOCIAL SERVICES<br />

7 Water Supply & Sanitation 24000.00 4800.00<br />

i) Rural Water Supply<br />

ii) Rural Sanitation<br />

iii) Urban Water Supply<br />

iv) Urban Sanitation<br />

TOTAL - X (1 to 14) 24000.00 4800.00<br />

GRAND TOTAL 26500.00 5300.00


Sl.<br />

No.<br />

- 373 -<br />

GN STATEMENT - B (Part-III)<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

(From Local Bodies)<br />

Major Heads / Minor Heads of Development<br />

@<br />

0 1 2 3<br />

N I L<br />

(Rs. in lakh)<br />

Eleventh Plan<br />

2007-12 Annual Plan<br />

Proposed Outlay 2007-08<br />

(at 2006-07 Proposed Outlay<br />

prices)


Sl.<br />

No.<br />

- 375 -<br />

GN STATEMENT - C (Part-I)<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

(Rural Local Bodies)<br />

0 1 2 3<br />

Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

@<br />

Eleventh Plan 2007-12<br />

Proposed Outlay (at 2006-<br />

07 prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-08<br />

Proposed Outlay<br />

GN STATEMENT - C (Part-II)<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

(Urban Local Bodies)<br />

0 1 2 3<br />

Sl.<br />

No.<br />

Major Heads / Minor Heads of Development<br />

@<br />

N I L<br />

N I L<br />

Eleventh Plan 2007-12<br />

Proposed Outlay (at 2006-<br />

07 prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-08<br />

Proposed Outlay<br />

GN STATEMENT - C (Part-III)<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

(Total of Rural Local Bodies & Urban Local Bodies)<br />

Major Heads / Minor Heads of Development<br />

@<br />

0 1 2 3<br />

N I L<br />

Eleventh Plan 2007-12<br />

Proposed Outlay (at 2006-<br />

07 prices)<br />

(Rs. in lakh)<br />

Annual Plan 2007-08<br />

Proposed Outlay


Sl. No.<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 377 -<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS (SCHEME-WISE)<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

0 1 2 3 4 5 6 7 8<br />

ANNEXURE - I<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

New Schemes<br />

1 01 0000 00 I. AGRI. & ALLIED ACTIVITIES 19352.00 13109.80 6242.20 19476.55 12087.88 7388.67<br />

1 01 2401 00 CROP HUSBANDRY (AGRI & HORTI) 12299.00 6299.00 6000.00 12337.49 5827.61 6509.88<br />

2401 00 CROP HUSBANDRY (AGRI) 9266.00 3266.00 6000.00 10107.39 4107.39 6000.00<br />

001 Direction & Administration State Govt. 823.00 823.00 - 990.50 990.50 -<br />

002 Foodgrain Crops - do - 348.00 348.00 - 415.50 415.50 -<br />

104 Agriculture Farms - do - 75.00 75.00 - 98.00 98.00 -<br />

105 Manures & Fertilizers & Soil Testing Lab. - do - 39.00 39.00 - 61.00 61.00 -<br />

107 Plant Protection - do - 8.00 8.00 - 19.50 19.50 -<br />

108 Commercial Crop Development - do - 5.00 5.00 - 25.50 25.50 -<br />

109 Extension & Training - do - 50.00 50.00 - 58.89 58.89 -<br />

110 Crop Insurance - do - - - - - - -<br />

113 Agriculture Engineering - do - 55.00 55.00 - 55.50 55.50 -<br />

114 Oilseed Development - do - - - - - - -<br />

115 Small & Marginal Farmers - do - - - - - - -<br />

800 a) State Soil Survey Orgn. & Land Use Board - do - 63.00 63.00 - 73.00 73.00 -<br />

b) Watershed Development Project - do - - - - - - -<br />

c) Modernisation of Agril. Farms & Research Centre - do - - - - - - -<br />

112 Pulses Development - do - - - - - - -<br />

800 Other Expenditure: -<br />

1) Control of Shifting Cultivation - do - 1800.00 1800.00 - 1870.00 1870.00 -<br />

2) <strong>Mizoram</strong> Intodelhna Project (MIP) - do - 6000.00 - 6000.00 6000.00 - 6000.00<br />

3) Baffacos - do - - - - 440.00 440.00 -<br />

2401 00 CROP HUSBANDRY (HORTI) 3033.00 3033.00 - 2230.10 1720.22 509.88<br />

1) Direction & Administration State Govt. 1399.70 1399.70 - 1139.54 1139.54 -<br />

2) Horti. Farms & Quality Seed Production - do - 45.00 45.00 - 40.25 40.25 -<br />

3) Manures & Fertilizers - do - 70.00 70.00 - 26.00 26.00 -<br />

4) Plant Protection - do - 92.80 92.80 - 33.00 33.00 -<br />

5) Extension & Farmers' Training - do - 95.80 95.80 - 70.00 70.00 -<br />

6) Horticulture Engineer - do - 90.50 90.50 - 26.43 26.43 -<br />

7) Horti. & Vegetable Development - do - 1239.20 1239.20 - 385.00 385.00 -<br />

8) Baffacos - do - - - - 500.00 - 500.00<br />

9) Horti. Research & Education - do - - - - 9.88 - 9.88<br />

2415 00 Agri. Research & Education 47.00 47.00 - 30.34 30.34 -


Sl. No.<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1 01 0000 00 I. AGRI. & ALLIED ACTIVITIES<br />

1 01 2401 00 CROP HUSBANDRY (AGRI & HORTI)<br />

2401 00 CROP HUSBANDRY (AGRI)<br />

001 Direction & Administration State Govt.<br />

002 Foodgrain Crops - do -<br />

104 Agriculture Farms - do -<br />

105 Manures & Fertilizers & Soil Testing Lab. - do -<br />

107 Plant Protection - do -<br />

108 Commercial Crop Development - do -<br />

109 Extension & Training - do -<br />

110 Crop Insurance - do -<br />

113 Agriculture Engineering - do -<br />

114 Oilseed Development - do -<br />

115 Small & Marginal Farmers - do -<br />

800 a) State Soil Survey Orgn. & Land Use Board - do -<br />

b) Watershed Development Project - do -<br />

c) Modernisation of Agril. Farms & Research Centre - do -<br />

112 Pulses Development - do -<br />

800 Other Expenditure:<br />

1) Control of Shifting Cultivation - do -<br />

2) <strong>Mizoram</strong> Intodelhna Project (MIP) - do -<br />

3) Baffacos - do -<br />

2401 00 CROP HUSBANDRY (HORTI)<br />

1) Direction & Administration State Govt.<br />

2) Horti. Farms & Quality Seed Production - do -<br />

3) Manures & Fertilizers - do -<br />

4) Plant Protection - do -<br />

5) Extension & Farmers' Training - do -<br />

6) Horticulture Engineer - do -<br />

7) Horti. & Vegetable Development - do -<br />

8) Baffacos - do -<br />

9) Horti. Research & Education - do -<br />

2415 00 Agri. Research & Education<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND AN<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

- 378 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

6255.00 5496.50 758.50 5855.50 5402.00 453.50<br />

4019.00 3619.00 400.00 3894.00 3494.00 400.00<br />

3335.00 3335.00 - 3207.00 3207.00 -<br />

305.50 305.50 - 305.50 305.50 -<br />

175.00 175.00 - 175.00 175.00 -<br />

15.00 15.00 - 15.00 15.00 -<br />

11.00 11.00 - 11.00 11.00 -<br />

10.00 10.00 - 10.00 10.00 -<br />

13.00 13.00 - 13.00 13.00 -<br />

16.50 16.50 - 31.50 31.50 -<br />

- - - - - -<br />

10.00 10.00 - 10.00 10.00 -<br />

- - - - - -<br />

- - - - - -<br />

29.00 29.00 - 29.00 29.00 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

550.00 550.00 - 550.00 550.00 -<br />

2000.00 2000.00 - 2000.00 2000.00 -<br />

200.00 200.00 - 57.00 57.00 -<br />

684.00 284.00 400.00 687.00 287.00 400.00<br />

245.50 245.50 - 248.50 248.50 -<br />

2.80 2.80 - 2.80 2.80 -<br />

1.20 1.20 - 1.20 1.20 -<br />

1.70 1.70 - 1.70 1.70 -<br />

10.50 10.50 - 10.50 10.50 -<br />

2.50 2.50 - 2.50 2.50 -<br />

15.80 15.80 - 15.80 15.80 -<br />

400.00 - 400.00 400.00 - 400.00<br />

4.00 4.00 - 4.00 4.00 -<br />

8.00 8.00 - 8.00 8.00 -


Sl. No.<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1 01 0000 00 I. AGRI. & ALLIED ACTIVITIES<br />

1 01 2401 00 CROP HUSBANDRY (AGRI & HORTI)<br />

2401 00 CROP HUSBANDRY (AGRI)<br />

001 Direction & Administration State Govt.<br />

002 Foodgrain Crops - do -<br />

104 Agriculture Farms - do -<br />

105 Manures & Fertilizers & Soil Testing Lab. - do -<br />

107 Plant Protection - do -<br />

108 Commercial Crop Development - do -<br />

109 Extension & Training - do -<br />

110 Crop Insurance - do -<br />

113 Agriculture Engineering - do -<br />

114 Oilseed Development - do -<br />

115 Small & Marginal Farmers - do -<br />

800 a) State Soil Survey Orgn. & Land Use Board - do -<br />

b) Watershed Development Project - do -<br />

c) Modernisation of Agril. Farms & Research Centre - do -<br />

112 Pulses Development - do -<br />

800 Other Expenditure:<br />

1) Control of Shifting Cultivation - do -<br />

2) <strong>Mizoram</strong> Intodelhna Project (MIP) - do -<br />

3) Baffacos - do -<br />

2401 00 CROP HUSBANDRY (HORTI)<br />

1) Direction & Administration State Govt.<br />

2) Horti. Farms & Quality Seed Production - do -<br />

3) Manures & Fertilizers - do -<br />

4) Plant Protection - do -<br />

5) Extension & Farmers' Training - do -<br />

6) Horticulture Engineer - do -<br />

7) Horti. & Vegetable Development - do -<br />

8) Baffacos - do -<br />

9) Horti. Research & Education - do -<br />

2415 00 Agri. Research & Education<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND AN<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

Total<br />

(col.6+12)<br />

- 379 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

ANNEXURE - I<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

25332.05 17489.88 7842.17 38184.00 30797.00 7387.00 6650.00 5534.00<br />

16231.49 9321.61 6909.88 26484.00 20678.00 5806.00 4181.00 3373.00<br />

13314.39 7314.39 6000.00 21974.00 20678.00 1296.00 3428.00 3373.00<br />

1296.00 1296.00 - 3053.00 3053.00 - 663.00 663.00<br />

590.50 590.50 - 3098.00 3098.00 - 553.00 553.00<br />

113.00 113.00 - 550.00 - 550.00 16.00 -<br />

72.00 72.00 - 548.00 548.00 - 16.00 16.00<br />

29.50 29.50 - 505.00 505.00 - 7.00 7.00<br />

38.50 38.50 - 687.00 687.00 - 35.00 35.00<br />

90.39 90.39 - 533.00 533.00 - 14.00 14.00<br />

- - - 7.00 - 7.00 2.00 -<br />

65.50 65.50 - 1876.00 1876.00 - 154.00 154.00<br />

- - - 72.00 - 72.00 11.00 -<br />

- - - - - - - -<br />

102.00 102.00 - 673.00 673.00 - 35.00 35.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

- - - 667.00 - 667.00 26.00 -<br />

-<br />

2420.00 2420.00 - 4700.00 4700.00 - 705.00 705.00<br />

8000.00 2000.00 6000.00 5005.00 5005.00 - 1123.00 1123.00<br />

497.00 497.00 - - - - 68.00 68.00<br />

2917.10 2007.22 909.88 4510.00 - 4510.00 753.00 -<br />

1388.04 1388.04 - 1866.00 - 1866.00 325.00 -<br />

43.05 43.05 - 315.00 - 315.00 19.00 -<br />

27.20 27.20 - 50.00 - 50.00 10.00 -<br />

34.70 34.70 - 75.00 - 75.00 15.00 -<br />

80.50 80.50 - 96.00 - 96.00 19.00 -<br />

28.93 28.93 - 30.00 - 30.00 6.00 -<br />

400.80 400.80 - 2058.00 - 2058.00 355.00 -<br />

900.00 - 900.00 - - - - -<br />

13.88 4.00 9.88 20.00 - 20.00 4.00 -<br />

38.34 38.34 - 402.00 376.00 26.00 64.00 63.00


ANNEXURE - I<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND AN<br />

(Rs. in lakh)<br />

Implementing prices)<br />

Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Agency -08)<br />

State Govt. / Public<br />

Sector Enterprises / New Schemes<br />

Local Bodies<br />

0 1 2<br />

23<br />

1 01 0000 00 I. AGRI. & ALLIED ACTIVITIES<br />

1 01 2401 00 CROP HUSBANDRY (AGRI & HORTI)<br />

2401 00 CROP HUSBANDRY (AGRI)<br />

001 Direction & Administration State Govt.<br />

002 Foodgrain Crops - do -<br />

104 Agriculture Farms - do -<br />

105 Manures & Fertilizers & Soil Testing Lab. - do -<br />

107 Plant Protection - do -<br />

108 Commercial Crop Development - do -<br />

109 Extension & Training - do -<br />

110 Crop Insurance - do -<br />

113 Agriculture Engineering - do -<br />

114 Oilseed Development - do -<br />

115 Small & Marginal Farmers - do -<br />

800 a) State Soil Survey Orgn. & Land Use Board - do -<br />

b) Watershed Development Project - do -<br />

c) Modernisation of Agril. Farms & Research Centre - do -<br />

112 Pulses Development - do -<br />

800 Other Expenditure:<br />

1) Control of Shifting Cultivation - do -<br />

2) <strong>Mizoram</strong> Intodelhna Project (MIP) - do -<br />

3) Baffacos - do -<br />

2401 00 CROP HUSBANDRY (HORTI)<br />

1) Direction & Administration State Govt.<br />

2) Horti. Farms & Quality Seed Production - do -<br />

3) Manures & Fertilizers - do -<br />

4) Plant Protection - do -<br />

5) Extension & Farmers' Training - do -<br />

6) Horticulture Engineer - do -<br />

7) Horti. & Vegetable Development - do -<br />

8) Baffacos - do -<br />

9) Horti. Research & Education - do -<br />

2415 00 Agri. Research & Education<br />

1116.00<br />

808.00<br />

55.00<br />

16.00<br />

2.00<br />

-<br />

11.00<br />

-<br />

-<br />

-<br />

-<br />

26.00<br />

-<br />

-<br />

-<br />

753.00<br />

325.00<br />

19.00<br />

10.00<br />

15.00<br />

19.00<br />

6.00<br />

355.00<br />

-<br />

4.00<br />

1.00<br />

- 380 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 381 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

1) Direction & Administration State Govt. - - - - - -<br />

2) Agril. Farms - do - - - - - - -<br />

3) Training & Demonstration - do - - - - - - -<br />

4) Research & Education 47.00 47.00 - 30.34 30.34 -<br />

2402 00 SOIL & WATER CONSERVATION 1633.00 1633.00 - 1309.95 915.16 394.79<br />

001 Direction & Administration State Govt. 369.07 369.07 - 638.91 638.91 -<br />

101 Soil Survey & Testing - do - 16.97 16.97 - 3.30 - 3.30<br />

102 Soil Conservation (incl. Water Conservation) - do - 377.53 377.53 - 234.92 205.76 29.16<br />

103 Land Reclamation & Development - do - 729.63 729.63 - 129.82 - 129.82<br />

109 Extension & Training - do - 33.94 33.94 - 48.76 - 48.76<br />

800 Other Expenditures - do - 105.86 105.86 - 254.24 70.49 183.75<br />

2403 00 ANIMAL HUSBANDRY 2333.00 2190.80 142.20 2656.00 2172.00 484.00<br />

001 Direction & Administration State Govt. 280.00 280.00 - 213.00 213.00 -<br />

101 Vety. Science & A.H. - do - 390.00 295.20 94.80 398.00 398.00 -<br />

102 Cattle Development - do - 250.00 250.00 - 266.00 266.00 -<br />

103 Poultry Development - do - 200.00 200.00 - 201.00 201.00 -<br />

105 Piggery Development - do - 230.00 230.00 - 237.00 237.00 -<br />

106 Other Livestock Development - do - 73.00 73.00 - 74.00 74.00 -<br />

107 Food & Fodder Development - do - 300.00 300.00 - 205.00 205.00 -<br />

109 Vety. Education & Research - do - 150.00 150.00 - 156.00 156.00 -<br />

113 Information & Statistics - do - 80.00 80.00 - 88.00 88.00 -<br />

800 Other Expenditure: - do - 180.00 132.60 47.40 214.00 214.00 -<br />

a) Baffacos - do - - - - 484.00 - 484.00<br />

b) CSS Matching Share - do - 200.00 200.00 - 120.00 120.00 -<br />

2404 00 DAIRY DEVELOPMENT 187.00 187.00 - 180.00 180.00 -<br />

102 Dairy Development State Govt. 187.00 187.00 - 180.00 180.00 -<br />

2405 00 FISHERIES 607.00 607.00 - 650.13 650.13 -<br />

001 Direction & Administration State Govt. 363.00 363.00 - 327.12 327.12 -<br />

101 Inland Fisheries - do - 169.00 169.00 - 269.33 269.33 -<br />

109 Extension & Training - do - 42.00 42.00 - 12.28 12.28 -<br />

105 Processing, Preservation & Marketing<br />

2435 00 Other Agri. Programme<br />

- do - 33.00 33.00 - 41.40 41.40 -<br />

a) Agri. Marketing (Trade & Commerce) 848.00 848.00 - 893.31 893.31 -<br />

01 Agril. Marketing State Govt. 510.00 510.00 - 476.91 476.91 -<br />

001 Direction & Administration - do - 28.00 28.00 - 21.06 21.06 -<br />

102 Grading & Quality Control - do - 10.00 10.00 - 4.16 4.16 -<br />

800 Other Expenditures - do - 300.00 300.00 - 391.18 391.18 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1) Direction & Administration State Govt.<br />

2) Agril. Farms - do -<br />

3) Training & Demonstration<br />

4) Research & Education<br />

2402 00 SOIL & WATER CONSERVATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Soil Survey & Testing - do -<br />

102 Soil Conservation (incl. Water Conservation) - do -<br />

103 Land Reclamation & Development - do -<br />

109 Extension & Training - do -<br />

800 Other Expenditures<br />

2403 00 ANIMAL HUSBANDRY<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Vety. Science & A.H. - do -<br />

102 Cattle Development - do -<br />

103 Poultry Development - do -<br />

105 Piggery Development - do -<br />

106 Other Livestock Development - do -<br />

107 Food & Fodder Development - do -<br />

109 Vety. Education & Research - do -<br />

113 Information & Statistics - do -<br />

800 Other Expenditure: - do -<br />

a) Baffacos - do -<br />

b) CSS Matching Share<br />

2404 00 DAIRY DEVELOPMENT<br />

- do -<br />

102 Dairy Development<br />

2405 00 FISHERIES<br />

State Govt.<br />

001 Direction & Administration State Govt.<br />

101 Inland Fisheries - do -<br />

109 Extension & Training - do -<br />

105 Processing, Preservation & Marketing<br />

2435 00 Other Agri. Programme<br />

a) Agri. Marketing (Trade & Commerce)<br />

- do -<br />

01 Agril. Marketing State Govt.<br />

001 Direction & Administration - do -<br />

102 Grading & Quality Control - do -<br />

800 Other Expenditures - do -<br />

- 382 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

8.00 8.00 - 8.00 8.00 -<br />

400.00 241.50 158.50 290.00 241.50 48.50<br />

178.50 178.50 - 178.50 178.50 -<br />

2.00 - 2.00 2.00 - 2.00<br />

48.00 38.00 10.00 48.00 38.00 10.00<br />

33.00 - 33.00 33.00 - 33.00<br />

13.50 13.50 - 13.50 13.50 -<br />

125.00 11.50 113.50 15.00 11.50 3.50<br />

778.00 578.00 200.00 583.00 578.00 5.00<br />

107.00 107.00 - 107.00 107.00 -<br />

102.00 102.00 - 102.00 102.00 -<br />

34.00 34.00 - 34.00 34.00 -<br />

39.00 39.00 - 39.00 39.00 -<br />

33.00 33.00 - 33.00 33.00 -<br />

6.00 6.00 - 6.00 6.00 -<br />

115.00 115.00 - 115.00 115.00 -<br />

44.00 44.00 - 44.00 44.00 -<br />

12.00 12.00 - 12.00 12.00 -<br />

6.00 6.00 - 6.00 6.00 -<br />

200.00 - 200.00 5.00 - 5.00<br />

80.00 80.00 - 80.00 80.00 -<br />

40.00 40.00 - 40.00 40.00 -<br />

40.00 40.00 - 40.00 40.00 -<br />

280.00 280.00 - 195.00 195.00 -<br />

91.00 91.00 - 91.00 91.00 -<br />

171.00 171.00 - 86.00 86.00 -<br />

14.00 14.00 - 14.00 14.00 -<br />

4.00 4.00 - 4.00 4.00 -<br />

200.00 200.00 - 200.00 200.00 -<br />

140.50 140.50 - 140.50 140.50 -<br />

6.50 6.50 - 6.50 6.50 -<br />

1.00 1.00 - 1.00 1.00 -<br />

52.00 52.00 - 52.00 52.00 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1) Direction & Administration State Govt.<br />

2) Agril. Farms - do -<br />

3) Training & Demonstration<br />

4) Research & Education<br />

2402 00 SOIL & WATER CONSERVATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Soil Survey & Testing - do -<br />

102 Soil Conservation (incl. Water Conservation) - do -<br />

103 Land Reclamation & Development - do -<br />

109 Extension & Training - do -<br />

800 Other Expenditures<br />

2403 00 ANIMAL HUSBANDRY<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Vety. Science & A.H. - do -<br />

102 Cattle Development - do -<br />

103 Poultry Development - do -<br />

105 Piggery Development - do -<br />

106 Other Livestock Development - do -<br />

107 Food & Fodder Development - do -<br />

109 Vety. Education & Research - do -<br />

113 Information & Statistics - do -<br />

800 Other Expenditure: - do -<br />

a) Baffacos - do -<br />

b) CSS Matching Share<br />

2404 00 DAIRY DEVELOPMENT<br />

- do -<br />

102 Dairy Development<br />

2405 00 FISHERIES<br />

State Govt.<br />

001 Direction & Administration State Govt.<br />

101 Inland Fisheries - do -<br />

109 Extension & Training - do -<br />

105 Processing, Preservation & Marketing<br />

2435 00 Other Agri. Programme<br />

a) Agri. Marketing (Trade & Commerce)<br />

- do -<br />

01 Agril. Marketing State Govt.<br />

001 Direction & Administration - do -<br />

102 Grading & Quality Control - do -<br />

800 Other Expenditures - do -<br />

Total<br />

(col.6+12)<br />

- 383 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

- - - 56.00 56.00 - 10.00 10.00<br />

- - - 102.00 102.00 - 15.00 15.00<br />

- - - 190.00 164.00 26.00 30.00 29.00<br />

38.34 38.34 - 54.00 54.00 - 9.00 9.00<br />

1599.95 1156.66 443.29 2078.00 757.00 1321.00 440.00 133.00<br />

817.41 817.41 - 697.00 697.00 - 112.80 112.80<br />

5.30 - 5.30 - - - - -<br />

282.92 243.76 39.16 520.00 - 520.00 148.00 -<br />

162.82 - 162.82 671.00 - 671.00 146.00 -<br />

62.26 13.50 48.76 - - - - -<br />

269.24 81.99 187.25 190.00 60.00 130.00 33.20 20.20<br />

3239.00 2750.00 489.00 3887.00 3887.00 - 855.00 855.00<br />

320.00 320.00 - 472.00 472.00 - 119.00 119.00<br />

500.00 500.00 - 780.00 780.00 - 113.00 113.00<br />

300.00 300.00 - 330.00 330.00 - 83.00 83.00<br />

240.00 240.00 - 372.50 372.50 - 71.50 71.50<br />

270.00 270.00 - 417.50 417.50 - 80.50 80.50<br />

80.00 80.00 - 120.00 120.00 - 41.00 41.00<br />

320.00 320.00 - 640.00 640.00 - 145.00 145.00<br />

200.00 200.00 - 280.00 280.00 - 73.00 73.00<br />

100.00 100.00 - 130.00 130.00 - 43.00 43.00<br />

220.00 220.00 - 130.00 130.00 - 43.00 43.00<br />

489.00 - 489.00 - - - - -<br />

200.00 200.00 - 215.00 215.00 - 43.00 43.00<br />

220.00 220.00 - 264.00 264.00 - 43.00 43.00<br />

220.00 220.00 - 264.00 264.00 - 43.00 43.00<br />

845.13 845.13 - 999.00 999.00 - 308.00 308.00<br />

418.12 418.12 - 462.00 462.00 - 115.00 115.00<br />

355.33 355.33 - 470.00 470.00 - 163.10 163.10<br />

26.28 26.28 - 29.00 29.00 - 12.90 12.90<br />

45.40 45.40 - 38.00 38.00 - 17.00 17.00<br />

1093.31 1093.31 - 1560.00 1326.00 234.00 220.00 220.00<br />

617.41 617.41 - 717.50 708.50 9.00 160.50 160.50<br />

27.56 27.56 - 32.50 32.50 - 6.50 6.50<br />

5.16 5.16 - 15.00 15.00 - 1.00 1.00<br />

443.18 443.18 - 795.00 570.00 225.00 52.00 52.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1) Direction & Administration State Govt.<br />

2) Agril. Farms - do -<br />

3) Training & Demonstration<br />

4) Research & Education<br />

2402 00 SOIL & WATER CONSERVATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Soil Survey & Testing - do -<br />

102 Soil Conservation (incl. Water Conservation) - do -<br />

103 Land Reclamation & Development - do -<br />

109 Extension & Training - do -<br />

800 Other Expenditures<br />

2403 00 ANIMAL HUSBANDRY<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Vety. Science & A.H. - do -<br />

102 Cattle Development - do -<br />

103 Poultry Development - do -<br />

105 Piggery Development - do -<br />

106 Other Livestock Development - do -<br />

107 Food & Fodder Development - do -<br />

109 Vety. Education & Research - do -<br />

113 Information & Statistics - do -<br />

800 Other Expenditure: - do -<br />

a) Baffacos - do -<br />

b) CSS Matching Share<br />

2404 00 DAIRY DEVELOPMENT<br />

- do -<br />

102 Dairy Development<br />

2405 00 FISHERIES<br />

State Govt.<br />

001 Direction & Administration State Govt.<br />

101 Inland Fisheries - do -<br />

109 Extension & Training - do -<br />

105 Processing, Preservation & Marketing<br />

2435 00 Other Agri. Programme<br />

a) Agri. Marketing (Trade & Commerce)<br />

- do -<br />

01 Agril. Marketing State Govt.<br />

001 Direction & Administration - do -<br />

102 Grading & Quality Control - do -<br />

800 Other Expenditures - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

1.00<br />

-<br />

307.00<br />

-<br />

-<br />

148.00<br />

146.00<br />

-<br />

13.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 384 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 385 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

2425 00 CO-OPERATION 1398.00 1298.00 100.00 1419.33 1419.33 -<br />

001 Direction & Administration State Govt. 634.00 534.00 100.00 539.85 539.85 -<br />

003 Training & Education - do - 12.70 12.70 - 20.49 20.49 -<br />

101 Audit of Cooperation - do - 34.80 34.80 - 39.18 39.18 -<br />

106 Assistance to Multipurpose Rural Coop. - do - 10.00 10.00 - 3.50 3.50 -<br />

107 Assistance to Credit & Banking - do - 200.00 200.00 - 300.00 300.00 -<br />

108 Assistance to other Coop. - do - - - - - - -<br />

109 Agri. Credit & Stabilisation Fund - do - - - - - - -<br />

190 Assistance to Public Sector & Other Undertakings - do - 82.00 82.00 - 172.70 172.70 -<br />

277 Coop. Training & Education - do - 323.50 323.50 - 261.40 261.40 -<br />

800 Other Expenditure - do - 101.00 101.00 - 82.21 82.21 -<br />

1 02 0000 00 II. RURAL DEVELOPMENT 9613.00 9613.00 - 8263.66 8263.66 -<br />

2501 00 SPL. PROGRAMME FOR RURAL DEV. 1400.00 1400.00 - 1055.26 1055.26 -<br />

01 Integrated Rural Dev. Prog. (IRDP)<br />

100 i) IRDP (Main Programme) State Govt. - - - - - -<br />

001 Direction & Administration (DRDA) - do - 480.00 480.00 - 290.16 290.16 -<br />

003 Training (TRYSEM) - do - - - - - - -<br />

101 Subsidy (DRDA) incl. IWDP - do - 400.00 400.00 - 243.80 243.80 -<br />

200 ii) Allied Programme for IRDP - do - - - - - - -<br />

201 Block Level Administration - do - - - - - - -<br />

202 D.W.C.R.A. - do - 290.00 290.00 - 259.87 259.87 -<br />

203 S.G.S.Y. - do - 150.00 150.00 - 178.70 178.70 -<br />

204 S.I.R.D. - do - 80.00 80.00 - 82.73 82.73 -<br />

2505 002 RURAL EMPLOYMENT 1521.00 1521.00 - 1284.89 1284.89 -<br />

a) S.G.R.Y. (JRSY/EAS) State Govt. 1150.00 1150.00 - 890.20 890.20 -<br />

b) I.A.Y. - do - 371.00 371.00 - 394.69 394.69 -<br />

c) M.W.S. - do - - - - - - -<br />

d) C.R.S.P. - do - - - - - - -<br />

2506 00 LAND REFORMS 1171.00 1171.00 - 1238.28 1238.28 -<br />

001 Direction & Administration State Govt. 295.99 295.99 - 186.41 186.41 -<br />

012 Statistics & Evaluation - do - 20.77 20.77 - 30.26 30.26 -<br />

101 Regulation of Land Holding & Tenancy - do - 311.58 311.58 - 127.83 127.83 -<br />

102 Consolidation of Holdings - do - - - - - - -<br />

103 Maintenance of Land Records - do - 537.46 537.46 - 579.78 579.78 -<br />

104 Assistance to allottees of surplus land - do - - - - - - -<br />

800 Other Expenditure:


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0<br />

2425 00 CO-OPERATION<br />

1 2<br />

001 Direction & Administration State Govt.<br />

003 Training & Education - do -<br />

101 Audit of Cooperation - do -<br />

106 Assistance to Multipurpose Rural Coop. - do -<br />

107 Assistance to Credit & Banking - do -<br />

108 Assistance to other Coop. - do -<br />

109 Agri. Credit & Stabilisation Fund - do -<br />

190 Assistance to Public Sector & Other Undertakings - do -<br />

277 Coop. Training & Education - do -<br />

800 Other Expenditure - do -<br />

1 02 0000 00 II. RURAL DEVELOPMENT<br />

2501 00 SPL. PROGRAMME FOR RURAL DEV.<br />

01 Integrated Rural Dev. Prog. (IRDP)<br />

100 i) IRDP (Main Programme) State Govt.<br />

001 Direction & Administration (DRDA) - do -<br />

003 Training (TRYSEM) - do -<br />

101 Subsidy (DRDA) incl. IWDP - do -<br />

200 ii) Allied Programme for IRDP - do -<br />

201 Block Level Administration - do -<br />

202 D.W.C.R.A. - do -<br />

203 S.G.S.Y. - do -<br />

204 S.I.R.D. - do -<br />

2505 002 RURAL EMPLOYMENT<br />

a) S.G.R.Y. (JRSY/EAS) State Govt.<br />

b) I.A.Y. - do -<br />

c) M.W.S. - do -<br />

d) C.R.S.P. - do -<br />

2506 00 LAND REFORMS<br />

001 Direction & Administration State Govt.<br />

012 Statistics & Evaluation - do -<br />

101 Regulation of Land Holding & Tenancy - do -<br />

102 Consolidation of Holdings - do -<br />

103 Maintenance of Land Records - do -<br />

104 Assistance to allottees of surplus land - do -<br />

800 Other Expenditure:<br />

- 386 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

530.00 530.00 - 645.50 645.50 -<br />

172.00 172.00 - 172.00 172.00 -<br />

3.00 3.00 - 3.00 3.00 -<br />

11.00 11.00 - 11.00 11.00 -<br />

- - - - - -<br />

158.50 158.50 - 269.00 269.00 -<br />

- - - - - -<br />

- - - - - -<br />

55.00 55.00 - 60.00 60.00 -<br />

81.00 81.00 - 81.00 81.00 -<br />

49.50 49.50 - 49.50 49.50 -<br />

2500.00 2500.00 - 3650.60 3650.60 -<br />

337.00 337.00 - 337.00 337.00 -<br />

- - - - - -<br />

137.37 137.37 - 137.37 137.37 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

73.27 73.27 - 73.27 73.27 -<br />

100.12 100.12 - 100.12 100.12 -<br />

26.24 26.24 - 26.24 26.24 -<br />

366.00 366.00 - 377.70 377.70 -<br />

261.00 261.00 - 272.70 272.70 -<br />

105.00 105.00 - 105.00 105.00 -<br />

- - - - - -<br />

- - - - - -<br />

420.00 420.00 - 385.00 385.00 -<br />

79.91 79.91 - 79.91 79.91 -<br />

17.60 17.60 - 17.60 17.60 -<br />

24.00 24.00 - 24.00 24.00 -<br />

- - - - - -<br />

181.49 181.49 - 181.49 181.49 -<br />

- - - - - -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0<br />

2425 00 CO-OPERATION<br />

1 2<br />

001 Direction & Administration State Govt.<br />

003 Training & Education - do -<br />

101 Audit of Cooperation - do -<br />

106 Assistance to Multipurpose Rural Coop. - do -<br />

107 Assistance to Credit & Banking - do -<br />

108 Assistance to other Coop. - do -<br />

109 Agri. Credit & Stabilisation Fund - do -<br />

190 Assistance to Public Sector & Other Undertakings - do -<br />

277 Coop. Training & Education - do -<br />

800 Other Expenditure - do -<br />

1 02 0000 00 II. RURAL DEVELOPMENT<br />

2501 00 SPL. PROGRAMME FOR RURAL DEV.<br />

01 Integrated Rural Dev. Prog. (IRDP)<br />

100 i) IRDP (Main Programme) State Govt.<br />

001 Direction & Administration (DRDA) - do -<br />

003 Training (TRYSEM) - do -<br />

101 Subsidy (DRDA) incl. IWDP - do -<br />

200 ii) Allied Programme for IRDP - do -<br />

201 Block Level Administration - do -<br />

202 D.W.C.R.A. - do -<br />

203 S.G.S.Y. - do -<br />

204 S.I.R.D. - do -<br />

2505 002 RURAL EMPLOYMENT<br />

a) S.G.R.Y. (JRSY/EAS) State Govt.<br />

b) I.A.Y. - do -<br />

c) M.W.S. - do -<br />

d) C.R.S.P. - do -<br />

2506 00 LAND REFORMS<br />

001 Direction & Administration State Govt.<br />

012 Statistics & Evaluation - do -<br />

101 Regulation of Land Holding & Tenancy - do -<br />

102 Consolidation of Holdings - do -<br />

103 Maintenance of Land Records - do -<br />

104 Assistance to allottees of surplus land - do -<br />

800 Other Expenditure:<br />

Total<br />

(col.6+12)<br />

- 387 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

2064.83 2064.83 - 2510.00 2510.00 - 539.00 539.00<br />

711.85 711.85 - 950.00 950.00 - 190.00 190.00<br />

23.49 23.49 - 10.00 10.00 - 6.00 6.00<br />

50.18 50.18 - 124.00 124.00 - 13.00 13.00<br />

3.50 3.50 - 10.00 10.00 - - -<br />

569.00 569.00 - 220.00 220.00 - 56.00 56.00<br />

- - - 10.00 10.00 - 10.00 10.00<br />

- - - - - - - -<br />

232.70 232.70 - 220.00 220.00 - 74.00 74.00<br />

342.40 342.40 - 380.00 380.00 - 81.00 81.00<br />

131.71 131.71 - 586.00 586.00 - 109.00 109.00<br />

11914.26 11914.26 - 16076.00 16076.00 - 2751.00 2751.00<br />

1392.26 1392.26 - 2610.00 2610.00 - 372.00 372.00<br />

- - - - - - - -<br />

427.53 427.53 - 880.00 880.00 - 104.00 104.00<br />

- - - - - - - -<br />

243.80 243.80 - 319.00 319.00 - 50.00 50.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

333.14 333.14 - 446.00 446.00 - 80.00 80.00<br />

278.82 278.82 - 850.00 850.00 - 110.00 110.00<br />

108.97 108.97 - 115.00 115.00 - 28.00 28.00<br />

1662.59 1662.59 - 1750.00 1750.00 - 402.00 402.00<br />

1162.90 1162.90 - 1323.00 1323.00 - 287.00 287.00<br />

499.69 499.69 - 427.00 427.00 - 115.00 115.00<br />

- - - - - - -<br />

- - - - - - -<br />

1623.28 1623.28 - 2310.00 2310.00 - 462.00 462.00<br />

266.32 266.32 - 540.00 540.00 - 127.60 127.60<br />

47.86 47.86 - 138.00 138.00 - 18.60 18.60<br />

151.83 151.83 - 380.00 380.00 - 50.00 50.00<br />

- - - 10.00 10.00 - 0.10 0.10<br />

761.27 761.27 - 1152.00 1152.00 - 248.80 248.80<br />

- - - - - - - -<br />

- -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0<br />

2425 00 CO-OPERATION<br />

1 2<br />

001 Direction & Administration State Govt.<br />

003 Training & Education - do -<br />

101 Audit of Cooperation - do -<br />

106 Assistance to Multipurpose Rural Coop. - do -<br />

107 Assistance to Credit & Banking - do -<br />

108 Assistance to other Coop. - do -<br />

109 Agri. Credit & Stabilisation Fund - do -<br />

190 Assistance to Public Sector & Other Undertakings - do -<br />

277 Coop. Training & Education - do -<br />

800 Other Expenditure - do -<br />

1 02 0000 00 II. RURAL DEVELOPMENT<br />

2501 00 SPL. PROGRAMME FOR RURAL DEV.<br />

01 Integrated Rural Dev. Prog. (IRDP)<br />

100 i) IRDP (Main Programme) State Govt.<br />

001 Direction & Administration (DRDA) - do -<br />

003 Training (TRYSEM) - do -<br />

101 Subsidy (DRDA) incl. IWDP - do -<br />

200 ii) Allied Programme for IRDP - do -<br />

201 Block Level Administration - do -<br />

202 D.W.C.R.A. - do -<br />

203 S.G.S.Y. - do -<br />

204 S.I.R.D. - do -<br />

2505 002 RURAL EMPLOYMENT<br />

a) S.G.R.Y. (JRSY/EAS) State Govt.<br />

b) I.A.Y. - do -<br />

c) M.W.S. - do -<br />

d) C.R.S.P. - do -<br />

2506 00 LAND REFORMS<br />

001 Direction & Administration State Govt.<br />

012 Statistics & Evaluation - do -<br />

101 Regulation of Land Holding & Tenancy - do -<br />

102 Consolidation of Holdings - do -<br />

103 Maintenance of Land Records - do -<br />

104 Assistance to allottees of surplus land - do -<br />

800 Other Expenditure:<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 388 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 389 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

1) Survey Training - do - 5.20 5.20 - 4.00 4.00 -<br />

2) Baffacos - do - - - - 310.00 310.00 -<br />

2515 00 OTHER RURAL DEVELOPMENT PROGRAMME 5521.00 5521.00 - 4685.23 4685.23 -<br />

001 Direction & Administration<br />

102 Community Development<br />

State Govt. 510.00 510.00 - 333.44 333.44 -<br />

a) Constn. of Community Hall / Baffacos - do - 500.00 500.00 - 496.33 496.33 -<br />

b) Rural Communication/Eco.Potential Connectivity - do - - - - 0.30 0.30 -<br />

c) Housing for Project Staff - do - 410.00 410.00 - 15.40 15.40 -<br />

d) Rural Housing - do - 2828.00 2828.00 - 2504.00 2504.00 -<br />

e) Block Level Administration - do - 1233.00 1233.00 - 1335.76 1335.76 -<br />

800 Other Expenditure - -<br />

a) N.L.U.P. State Govt. - - - - - -<br />

b) N.P.I.C. - do - 40.00 40.00 - - -<br />

1 03 0000 00 III. SPECIAL AREA DEV. PROGRAMME 4037.00 - 4037.00 6525.78 6171.89 353.89<br />

2551 00 SINLUNG HILLS DEVELOPMENT COUNCIL State Govt. 304.00 - 304.00 353.89 - 353.89<br />

2575 00 a) BORDER AREA DEV. PROGRAMME - do - 3733.00 - 3733.00 4449.33 4449.33 -<br />

b) Funds under Article 275(1) - do - - - - 772.56 772.56 -<br />

c) RSVY - do - - - - 750.00 750.00 -<br />

d) MLA-LAD Scheme - do - - - - 200.00 200.00 -<br />

104 0000 00 IV. IRRIGATION & FLOOD CONTROL 2828.00 2823.00 5.00 5219.53 5210.53 9.00<br />

2701 00 MAJOR & MEDIUM IRRIGATION 5.00 - 5.00 9.00 - 9.00<br />

80 General State Govt. - - - - - -<br />

005 Survey & Investigation - do - - - - - - -<br />

052 Machinery & Equipment - do - - - - - - -<br />

800 Other Expenditure - do - 5.00 - 5.00 9.00 - 9.00<br />

2702 00 MINOR IRRIGATION 2683.00 2683.00 - 5155.95 5155.95 -<br />

001 Direction & Administration State Govt. 846.00 846.00 - 627.77 627.77 -<br />

01 Surface Water - do - - - - - - -<br />

101 Water Tank Project - do - - - - - - -<br />

102 River Lift Irrigation - do - 0.50 0.50 - 0.40 0.40 -<br />

103 River Flow Irrigation - do - 1836.50 1836.50 - 4527.78 4527.78 -<br />

800 Other Expenditure - do - - - - - - -<br />

02 Ground Water Development - do - - - - - - -<br />

005 Survey & Investigation - do - - - - - - -<br />

2705 00 COMMAND AREA DEVELOPMENT 140.00 140.00 - 54.58 54.58 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1) Survey Training - do -<br />

2) Baffacos<br />

2515 00 OTHER RURAL DEVELOPMENT PROGRAMME<br />

- do -<br />

001 Direction & Administration<br />

102 Community Development<br />

State Govt.<br />

a) Constn. of Community Hall / Baffacos - do -<br />

b) Rural Communication/Eco.Potential Connectivity - do -<br />

c) Housing for Project Staff - do -<br />

d) Rural Housing - do -<br />

e) Block Level Administration<br />

800 Other Expenditure<br />

- do -<br />

a) N.L.U.P. State Govt.<br />

b) N.P.I.C. - do -<br />

1 03 0000 00 III. SPECIAL AREA DEV. PROGRAMME<br />

2551 00 SINLUNG HILLS DEVELOPMENT COUNCIL State Govt.<br />

2575 00 a) BORDER AREA DEV. PROGRAMME - do -<br />

b) Funds under Article 275(1) - do -<br />

c) RSVY - do -<br />

d) MLA-LAD Scheme - do -<br />

104 0000 00 IV. IRRIGATION & FLOOD CONTROL<br />

2701 00 MAJOR & MEDIUM IRRIGATION<br />

80 General State Govt.<br />

005 Survey & Investigation - do -<br />

052 Machinery & Equipment - do -<br />

800 Other Expenditure - do -<br />

2702 00 MINOR IRRIGATION<br />

001 Direction & Administration State Govt.<br />

01 Surface Water - do -<br />

101 Water Tank Project - do -<br />

102 River Lift Irrigation - do -<br />

103 River Flow Irrigation - do -<br />

800 Other Expenditure - do -<br />

02 Ground Water Development - do -<br />

005 Survey & Investigation - do -<br />

2705 00 COMMAND AREA DEVELOPMENT<br />

- 390 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

2.00 2.00 - 82.00 82.00 -<br />

115.00 115.00 - - - -<br />

1377.00 1377.00 - 2550.90 2550.90 -<br />

102.26 102.26 - 102.26 102.26 -<br />

165.00 165.00 - 1338.90 1338.90 -<br />

0.10 0.10 - 0.10 0.10 -<br />

29.04 29.04 - 29.04 29.04 -<br />

626.00 626.00 - 626.00 626.00 -<br />

454.60 454.60 - 454.60 454.60 -<br />

- - -<br />

- - - - - -<br />

- - - - - -<br />

3941.00 3816.00 125.00 3941.00 3816.00 125.00<br />

125.00 - 125.00 125.00 - 125.00<br />

902.00 902.00 - 902.00 902.00 -<br />

264.00 264.00 - 264.00 264.00 -<br />

2250.00 2250.00 - 2250.00 2250.00 -<br />

400.00 400.00 - 400.00 400.00 -<br />

3169.00 3167.90 1.10 3169.00 3167.90 1.10<br />

1.00 - 1.00 1.00 - 1.00<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

1.00 - 1.00 1.00 - 1.00<br />

3153.00 3152.90 0.10 3153.00 3152.90 0.10<br />

142.00 142.00 - 142.00 142.00 -<br />

- - - - - -<br />

- - - - - -<br />

0.10 - 0.10 0.10 - 0.10<br />

3010.90 3010.90 - 3010.90 3010.90 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

15.00 15.00 - 15.00 15.00 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1) Survey Training - do -<br />

2) Baffacos<br />

2515 00 OTHER RURAL DEVELOPMENT PROGRAMME<br />

- do -<br />

001 Direction & Administration<br />

102 Community Development<br />

State Govt.<br />

a) Constn. of Community Hall / Baffacos - do -<br />

b) Rural Communication/Eco.Potential Connectivity - do -<br />

c) Housing for Project Staff - do -<br />

d) Rural Housing - do -<br />

e) Block Level Administration<br />

800 Other Expenditure<br />

- do -<br />

a) N.L.U.P. State Govt.<br />

b) N.P.I.C. - do -<br />

1 03 0000 00 III. SPECIAL AREA DEV. PROGRAMME<br />

2551 00 SINLUNG HILLS DEVELOPMENT COUNCIL State Govt.<br />

2575 00 a) BORDER AREA DEV. PROGRAMME - do -<br />

b) Funds under Article 275(1) - do -<br />

c) RSVY - do -<br />

d) MLA-LAD Scheme - do -<br />

104 0000 00 IV. IRRIGATION & FLOOD CONTROL<br />

2701 00 MAJOR & MEDIUM IRRIGATION<br />

80 General State Govt.<br />

005 Survey & Investigation - do -<br />

052 Machinery & Equipment - do -<br />

800 Other Expenditure - do -<br />

2702 00 MINOR IRRIGATION<br />

001 Direction & Administration State Govt.<br />

01 Surface Water - do -<br />

101 Water Tank Project - do -<br />

102 River Lift Irrigation - do -<br />

103 River Flow Irrigation - do -<br />

800 Other Expenditure - do -<br />

02 Ground Water Development - do -<br />

005 Survey & Investigation - do -<br />

2705 00 COMMAND AREA DEVELOPMENT<br />

Total<br />

(col.6+12)<br />

- 391 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

86.00 86.00 - 80.00 80.00 - 16.00 16.00<br />

310.00 310.00 - 10.00 10.00 - 0.90 0.90<br />

7236.13 7236.13 - 9406.00 9406.00 - 1515.00 1515.00<br />

435.70 435.70 - 453.00 453.00 - 118.00 118.00<br />

1835.23 1835.23 - 1234.00 1234.00 - 200.00 200.00<br />

0.40 0.40 - 1.00 1.00 - 0.35 0.35<br />

44.44 44.44 - 620.00 620.00 - 8.65 8.65<br />

3130.00 3130.00 - 5098.00 5098.00 - 688.00 688.00<br />

1790.36 1790.36 - 2000.00 2000.00 - 500.00 500.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

10466.78 9987.89 478.89 4645.00 4295.00 350.00 1131.00 993.00<br />

478.89 - 478.89 350.00 - 350.00 138.00 -<br />

5351.33 5351.33 - 4295.00 4295.00 - 993.00 993.00<br />

1036.56 1036.56 - - 0.00<br />

3000.00 3000.00 - - 0.00<br />

600.00 600.00 - - 0.00<br />

8388.53 8378.43 10.10 16187.00 3432.00 12755.00 3820.00 2622.00<br />

10.00 - 10.00 6.00 - 6.00 1.00 -<br />

- - - - - - - -<br />

- - - - - - - -<br />

- - - - - - - -<br />

10.00 - 10.00 6.00 - 6.00 1.00 -<br />

8308.95 8308.85 0.10 16056.00 3307.00 12749.00 3799.00 2602.00<br />

769.77 769.77 - 880.00 880.00 - 175.00 175.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

0.50 0.40 0.10 860.00 - 860.00 100.00 -<br />

7538.68 7538.68 - 14316.00 2427.00 11889.00 3524.00 2427.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

- - - - - - - -<br />

69.58 69.58 - 125.00 125.00 - 20.00 20.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

1) Survey Training - do -<br />

2) Baffacos<br />

2515 00 OTHER RURAL DEVELOPMENT PROGRAMME<br />

- do -<br />

001 Direction & Administration<br />

102 Community Development<br />

State Govt.<br />

a) Constn. of Community Hall / Baffacos - do -<br />

b) Rural Communication/Eco.Potential Connectivity - do -<br />

c) Housing for Project Staff - do -<br />

d) Rural Housing - do -<br />

e) Block Level Administration<br />

800 Other Expenditure<br />

- do -<br />

a) N.L.U.P. State Govt.<br />

b) N.P.I.C. - do -<br />

1 03 0000 00 III. SPECIAL AREA DEV. PROGRAMME<br />

2551 00 SINLUNG HILLS DEVELOPMENT COUNCIL State Govt.<br />

2575 00 a) BORDER AREA DEV. PROGRAMME - do -<br />

b) Funds under Article 275(1) - do -<br />

c) RSVY - do -<br />

d) MLA-LAD Scheme - do -<br />

104 0000 00 IV. IRRIGATION & FLOOD CONTROL<br />

2701 00 MAJOR & MEDIUM IRRIGATION<br />

80 General State Govt.<br />

005 Survey & Investigation - do -<br />

052 Machinery & Equipment - do -<br />

800 Other Expenditure - do -<br />

2702 00 MINOR IRRIGATION<br />

001 Direction & Administration State Govt.<br />

01 Surface Water - do -<br />

101 Water Tank Project - do -<br />

102 River Lift Irrigation - do -<br />

103 River Flow Irrigation - do -<br />

800 Other Expenditure - do -<br />

02 Ground Water Development - do -<br />

005 Survey & Investigation - do -<br />

2705 00 COMMAND AREA DEVELOPMENT<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

138.00<br />

138.00<br />

-<br />

1198.00<br />

1.00<br />

-<br />

-<br />

-<br />

1.00<br />

1197.00<br />

-<br />

-<br />

-<br />

100.00<br />

1097.00<br />

-<br />

-<br />

-<br />

-<br />

- 392 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 393 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

101 Construction of Field Channel State Govt. 140.00 140.00 - 54.58 54.58 -<br />

2711 00 Flood Control - do - - - - - - -<br />

1 05 0000 00 V. ENERGY : 19537.00 15410.00 4127.00 19347.22 11011.58 8335.64<br />

2801 POWER 19280.00 15205.00 4075.00 19103.22 11011.58 8091.64<br />

Generation<br />

01 Hydel Generation State Govt. 1470.00 1240.00 230.00 1127.00 935.36 191.64<br />

02 Thermal Generation - do - 100.00 100.00 - 200.00 200.00 -<br />

04 Diesel Gas Generation - do - - - - - - -<br />

05 Transmission & Distribution (incl. APDRP) - do - 998.00 600.00 398.00 8338.27 438.27 7900.00<br />

06 Rural Electrification : (a) REC Loan - do - 3447.00 - 3447.00 2632.00 2632.00 -<br />

(b) PMGY / State Plan - do - - - - 2392.00 2392.00 -<br />

80 General :<br />

001 Direction & Administration - do - 13165.00 13165.00 - 4294.69 4294.69 -<br />

800 Other Expenditure - do - 100.00 100.00 - 119.26 119.26 -<br />

2 810 00 NON-CONVENTIONAL SOURCE OF ENERGY 205.00 205.00 - 200.00 - 200.00<br />

I.R.E.P. 52.00 - 52.00 44.00 - 44.00<br />

1 06 0000 00 VI. INDUSTRY & MINERALS 6038.00 6038.00 - 8065.75 8065.75 -<br />

2851 VILLAGE & SMALL INDUSTRIES 5273.00 5273.00 - 7425.25 7425.25 -<br />

A. INDUSTRIES 4246.00 4246.00 - 6067.03 6067.03 -<br />

001 Direction & Administration State Govt. 390.00 390.00 - 345.77 345.77 -<br />

003 Training - do - 25.00 25.00 - 9.18 9.18 -<br />

004 Research & Development - do - 340.00 340.00 - 223.36 223.36 -<br />

101 Industrial Estate - do - 430.00 430.00 - 345.94 345.94 -<br />

102 Small Scale Industries - do - 1742.00 1742.00 - 3611.71 3611.71 -<br />

103 Handloom Industry - do - 707.00 707.00 - 580.66 580.66 -<br />

104 Handicraft Industry - do - 126.00 126.00 - 81.20 81.20 -<br />

105 Khadi & Village Industries - do - 464.00 464.00 - 828.00 828.00 -<br />

110 Composite V&SI & Cooperatives - do - 22.00 22.00 - 41.21 41.21 -<br />

1 07 B. SERICULTURE 1027.00 1027.00 - 1358.22 1358.22 -<br />

1) Direction & Administration State Govt. 783.00 783.00 - 793.32 793.32 -<br />

2) Training - do - 21.00 21.00 - 35.49 35.49 -<br />

3) Promotion - do - 75.00 75.00 - 127.56 127.56 -<br />

4) Marketing - do - 97.00 97.00 - 91.29 91.29 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

101 Construction of Field Channel State Govt.<br />

2711 00 Flood Control - do -<br />

1 05 0000 00 V. ENERGY :<br />

2801 POWER<br />

Generation<br />

01 Hydel Generation State Govt.<br />

02 Thermal Generation - do -<br />

04 Diesel Gas Generation - do -<br />

05 Transmission & Distribution (incl. APDRP) - do -<br />

06 Rural Electrification : (a) REC Loan - do -<br />

(b) PMGY / State Plan - do -<br />

80 General :<br />

001 Direction & Administration - do -<br />

800 Other Expenditure - do -<br />

2 810 00 NON-CONVENTIONAL SOURCE OF ENERGY<br />

I.R.E.P.<br />

1 06 0000 00 VI. INDUSTRY & MINERALS<br />

2851 VILLAGE & SMALL INDUSTRIES<br />

A. INDUSTRIES<br />

001 Direction & Administration State Govt.<br />

003 Training - do -<br />

004 Research & Development - do -<br />

101 Industrial Estate - do -<br />

102 Small Scale Industries - do -<br />

103 Handloom Industry - do -<br />

104 Handicraft Industry - do -<br />

105 Khadi & Village Industries - do -<br />

110 Composite V&SI & Cooperatives - do -<br />

1 07 B. SERICULTURE<br />

1) Direction & Administration State Govt.<br />

2) Training - do -<br />

3) Promotion - do -<br />

4) Marketing - do -<br />

- 394 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

15.00 15.00 - 15.00 15.00 -<br />

- - - - - -<br />

8111.00 4411.50 3699.50 8111.00 4411.50 3699.50<br />

8050.00 4411.50 3638.50 8050.00 4411.50 3638.50<br />

1513.50 1500.00 13.50 1513.50 1500.00 13.50<br />

353.50 353.50 - 353.50 353.50 -<br />

- - - - - -<br />

2402.56 1900.00 502.56 2402.56 1900.00 502.56<br />

658.00 658.00 - 658.00 658.00 -<br />

- - - - - -<br />

2890.00 - 2890.00 2890.00 - 2890.00<br />

232.44 - 232.44 232.44 - 232.44<br />

50.00 - 50.00 50.00 - 50.00<br />

11.00 - 11.00 11.00 - 11.00<br />

2304.00 2304.00 - 2606.50 2606.50 -<br />

2104.00 2104.00 - 2386.50 2386.50 -<br />

1704.00 1704.00 - 2039.00 2039.00 -<br />

117.04 117.04 - 117.04 117.04 -<br />

16.00 16.00 - 16.00 16.00 -<br />

55.96 55.96 - 55.96 55.96 -<br />

69.39 69.39 - 69.39 69.39 -<br />

1003.82 1003.82 - 1138.82 1138.82 -<br />

154.51 154.51 - 154.51 154.51 -<br />

39.28 39.28 - 39.28 39.28 -<br />

240.00 240.00 - 440.00 440.00 -<br />

8.00 8.00 - 8.00 8.00 -<br />

400.00 400.00 - 347.50 347.50 -<br />

203.50 203.50 - 203.50 203.50 -<br />

12.00 12.00 - 12.00 12.00 -<br />

33.00 33.00 - 33.00 33.00 -<br />

17.50 17.50 - 17.50 17.50 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

101 Construction of Field Channel State Govt.<br />

2711 00 Flood Control - do -<br />

1 05 0000 00 V. ENERGY :<br />

2801 POWER<br />

Generation<br />

01 Hydel Generation State Govt.<br />

02 Thermal Generation - do -<br />

04 Diesel Gas Generation - do -<br />

05 Transmission & Distribution (incl. APDRP) - do -<br />

06 Rural Electrification : (a) REC Loan - do -<br />

(b) PMGY / State Plan - do -<br />

80 General :<br />

001 Direction & Administration - do -<br />

800 Other Expenditure - do -<br />

2 810 00 NON-CONVENTIONAL SOURCE OF ENERGY<br />

I.R.E.P.<br />

1 06 0000 00 VI. INDUSTRY & MINERALS<br />

2851 VILLAGE & SMALL INDUSTRIES<br />

A. INDUSTRIES<br />

001 Direction & Administration State Govt.<br />

003 Training - do -<br />

004 Research & Development - do -<br />

101 Industrial Estate - do -<br />

102 Small Scale Industries - do -<br />

103 Handloom Industry - do -<br />

104 Handicraft Industry - do -<br />

105 Khadi & Village Industries - do -<br />

110 Composite V&SI & Cooperatives - do -<br />

1 07 B. SERICULTURE<br />

1) Direction & Administration State Govt.<br />

2) Training - do -<br />

3) Promotion - do -<br />

4) Marketing - do -<br />

Total<br />

(col.6+12)<br />

- 395 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

69.58 69.58 - 125.00 125.00 - 20.00 20.00<br />

- - - - - - - -<br />

30673.49 21429.35 9244.14 56222.00 36080.00 20142.00 7988.00 4946.50<br />

30368.49 21429.35 8939.14 55856.00 36080.00 19776.00 7927.00 4946.50<br />

2640.50 2435.36 205.14 13600.00 10435.00 3165.00 1139.83 1099.83<br />

553.50 553.50 - - - - - -<br />

- - - - - - - -<br />

17264.10 8762.54 8501.56 21960.00 13785.00 8175.00 2116.17 635.67<br />

2632.00 2632.00 - 6537.00 2283.00 4254.00 658.00 -<br />

2632.00 2632.00 - - - - - -<br />

- - -<br />

4294.69 4294.69 - 9577.00 9577.00 - 3211.00 3211.00<br />

351.70 119.26 232.44 4182.00 - 4182.00 802.00 -<br />

250.00 - 250.00 300.00 - 300.00 50.00 -<br />

55.00 - 55.00 66.00 - 66.00 11.00 -<br />

10672.25 10672.25 - 16008.00 16008.00 - 2406.00 2406.00<br />

9811.75 9811.75 - 14718.00 14718.00 - 2186.00 2186.00<br />

8106.03 8106.03 - 12160.00 12160.00 - 1874.00 1874.00<br />

462.81 462.81 - 1500.00 1500.00 - 157.00 157.00<br />

25.18 25.18 - 445.00 445.00 - 33.00 33.00<br />

279.32 279.32 - 1055.00 1055.00 - 64.00 64.00<br />

415.33 415.33 - 995.00 995.00 - 117.00 117.00<br />

4750.53 4750.53 - 3295.00 3295.00 - 844.00 844.00<br />

735.17 735.17 - 1895.00 1895.00 - 319.00 319.00<br />

120.48 120.48 - 935.00 935.00 - 46.00 46.00<br />

1268.00 1268.00 - 1695.00 1695.00 - 284.00 284.00<br />

49.21 49.21 - 345.00 345.00 - 10.00 10.00<br />

1705.72 1705.72 - 2558.00 2558.00 - 312.00 312.00<br />

996.82 996.82 - 803.00 803.00 - 207.00 207.00<br />

47.49 47.49 - 241.00 241.00 - 15.00 15.00<br />

160.56 160.56 - 741.00 741.00 - 35.00 35.00<br />

108.79 108.79 - 291.00 291.00 - 25.00 25.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

101 Construction of Field Channel State Govt.<br />

2711 00 Flood Control - do -<br />

1 05 0000 00 V. ENERGY :<br />

2801 POWER<br />

Generation<br />

01 Hydel Generation State Govt.<br />

02 Thermal Generation - do -<br />

04 Diesel Gas Generation - do -<br />

05 Transmission & Distribution (incl. APDRP) - do -<br />

06 Rural Electrification : (a) REC Loan - do -<br />

(b) PMGY / State Plan - do -<br />

80 General :<br />

001 Direction & Administration - do -<br />

800 Other Expenditure - do -<br />

2 810 00 NON-CONVENTIONAL SOURCE OF ENERGY<br />

I.R.E.P.<br />

1 06 0000 00 VI. INDUSTRY & MINERALS<br />

2851 VILLAGE & SMALL INDUSTRIES<br />

A. INDUSTRIES<br />

001 Direction & Administration State Govt.<br />

003 Training - do -<br />

004 Research & Development - do -<br />

101 Industrial Estate - do -<br />

102 Small Scale Industries - do -<br />

103 Handloom Industry - do -<br />

104 Handicraft Industry - do -<br />

105 Khadi & Village Industries - do -<br />

110 Composite V&SI & Cooperatives - do -<br />

1 07 B. SERICULTURE<br />

1) Direction & Administration State Govt.<br />

2) Training - do -<br />

3) Promotion - do -<br />

4) Marketing - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

3041.50<br />

2980.50<br />

40.00<br />

-<br />

-<br />

1480.50<br />

658.00<br />

-<br />

-<br />

802.00<br />

50.00<br />

11.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 396 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 397 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

5) Silk Processing - do - 40.00 40.00 - 57.34 57.34 -<br />

6) Seed Organisation - do - 11.00 11.00 - 15.72 15.72 -<br />

7) Baffacos - do - - - - 237.50 237.50 -<br />

2852 00 INDUSTRIES (Other than V & SI) 392.00 392.00 - 352.00 352.00 -<br />

600 Others<br />

2853 00 MINES & MINERALS<br />

State Govt. 392.00 392.00 - 352.00 352.00 -<br />

2885 00 Minerals :<br />

02 Regulation & Development of Mines<br />

373.00 373.00 - 288.50 288.50 -<br />

1) Direction & Administration State Govt. 155.00 155.00 - 135.11 135.11 -<br />

2) Ground Water Investigation - do - 88.00 88.00 - 38.84 38.84 -<br />

3) Geo-Technical Investigation - do - 45.00 45.00 - 33.83 33.83 -<br />

3) Minor Mineral Investigation - do - 85.00 85.00 - 80.72 80.72 -<br />

1 07 0000 00 VII. TRANSPORT 48190.00 47588.50 601.50 37424.18 37386.50 37.68<br />

3053 00 CIVIL AVIATION - - - 6.50 - 6.50<br />

02 Airport State Govt. - - - 6.50 - 6.50<br />

3054 00 ROAD & BRIDGES 46258.00 45750.00 508.00 35203.66 35198.66 5.00<br />

03 State Highways<br />

337 Roads Works (S.H.)<br />

State Govt. 302.00 302.00 - - - -<br />

04 District & Other Roads : 1) Major District Roads State Govt. 1209.00 1209.00 - 232.90 232.90 -<br />

2) Other District Roads - do - 353.00 353.00 - 65.00 65.00 -<br />

3) Village Roads - do - 987.00 807.00 180.00 37.50 37.50 -<br />

4) Bridges - do - 328.00 - 328.00 5.00 - 5.00<br />

5) Satellite Towns & Villages - do - 416.00 416.00 - 89.30 89.30 -<br />

6) Roads within Towns - do - 990.00 990.00 - 937.20 937.20 -<br />

7) Direction & Administration - do - 5490.00 5490.00 - 2645.84 2645.84 -<br />

8) Planning & Research - do - - - - - - -<br />

9) Machinery & Equipment - do - - - - 33.00 33.00 -<br />

10) <strong>Mizoram</strong> State Road (Project Counterpart funding of World<br />

Bank Project)<br />

- do - 5250.00 5250.00 - 1750.00 1750.00 -<br />

11) NABARD - do - 1183.00 1183.00 - 2722.56 2722.56 -<br />

12) E.A.P. - do - 29750.00 29750.00 - 25955.36 25955.36 -<br />

13) 12th Finance Commission - do - - - - 730.00 730.00 -<br />

3055 00 ROAD TRANSPORT 1558.00 1558.00 - 1871.42 1871.42 -<br />

001 Direction & Administration State Govt. 588.00 588.00 - 1385.37 1385.37 -<br />

003/004 Training & Research - do - - - - - - -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

5) Silk Processing - do -<br />

6) Seed Organisation - do -<br />

7) Baffacos<br />

2852 00 INDUSTRIES (Other than V & SI)<br />

- do -<br />

600 Others<br />

2853 00 MINES & MINERALS<br />

2885 00 Minerals :<br />

02 Regulation & Development of Mines<br />

State Govt.<br />

1) Direction & Administration State Govt.<br />

2) Ground Water Investigation - do -<br />

3) Geo-Technical Investigation - do -<br />

3) Minor Mineral Investigation - do -<br />

1 07 0000 00 VII. TRANSPORT<br />

3053 00 CIVIL AVIATION<br />

02 Airport<br />

3054 00 ROAD & BRIDGES<br />

State Govt.<br />

03 State Highways<br />

337 Roads Works (S.H.)<br />

State Govt.<br />

04 District & Other Roads : 1) Major District Roads State Govt.<br />

2) Other District Roads - do -<br />

3) Village Roads - do -<br />

4) Bridges - do -<br />

5) Satellite Towns & Villages - do -<br />

6) Roads within Towns - do -<br />

7) Direction & Administration - do -<br />

8) Planning & Research - do -<br />

9) Machinery & Equipment - do -<br />

10) <strong>Mizoram</strong> State Road (Project Counterpart funding of World<br />

Bank Project)<br />

- do -<br />

11) NABARD - do -<br />

12) E.A.P. - do -<br />

13) 12th Finance Commission<br />

3055 00 ROAD TRANSPORT<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003/004 Training & Research - do -<br />

- 398 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

13.00 13.00 - 13.00 13.00 -<br />

6.00 6.00 - 6.00 6.00 -<br />

115.00 115.00 - 62.50 62.50 -<br />

100.00 100.00 - 120.00 120.00 -<br />

100.00 100.00 - 120.00 120.00 -<br />

100.00 100.00 - 100.00 100.00 -<br />

40.00 40.00 - 40.00 40.00 -<br />

16.00 16.00 - 16.00 16.00 -<br />

14.00 14.00 - 14.00 14.00 -<br />

30.00 30.00 - 30.00 30.00 -<br />

11498.00 11036.25 461.75 11603.00 11036.25 566.75<br />

10893.00 10436.25 456.75 10998.00 10436.25 561.75<br />

10.00 - 10.00 10.00 - 10.00<br />

- - - - - -<br />

- - - - - -<br />

20.00 - 20.00 20.00 - 20.00<br />

- - - - - -<br />

102.25 2.25 100.00 102.25 2.25 100.00<br />

326.75 - 326.75 431.75 - 431.75<br />

615.00 615.00 - 615.00 615.00 -<br />

- - - - - -<br />

24.00 24.00 - 24.00 24.00 -<br />

1000.00 1000.00 - 1000.00 1000.00 -<br />

700.00 700.00 - 700.00 700.00 -<br />

7500.00 7500.00 - 7500.00 7500.00 -<br />

595.00 595.00 - 595.00 595.00 -<br />

500.00 500.00 - 500.00 500.00 -<br />

327.00 327.00 - 327.00 327.00 -<br />

- - - - - -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

5) Silk Processing - do -<br />

6) Seed Organisation - do -<br />

7) Baffacos<br />

2852 00 INDUSTRIES (Other than V & SI)<br />

- do -<br />

600 Others<br />

2853 00 MINES & MINERALS<br />

2885 00 Minerals :<br />

02 Regulation & Development of Mines<br />

State Govt.<br />

1) Direction & Administration State Govt.<br />

2) Ground Water Investigation - do -<br />

3) Geo-Technical Investigation - do -<br />

3) Minor Mineral Investigation - do -<br />

1 07 0000 00 VII. TRANSPORT<br />

3053 00 CIVIL AVIATION<br />

02 Airport<br />

3054 00 ROAD & BRIDGES<br />

State Govt.<br />

03 State Highways<br />

337 Roads Works (S.H.)<br />

State Govt.<br />

04 District & Other Roads : 1) Major District Roads State Govt.<br />

2) Other District Roads - do -<br />

3) Village Roads - do -<br />

4) Bridges - do -<br />

5) Satellite Towns & Villages - do -<br />

6) Roads within Towns - do -<br />

7) Direction & Administration - do -<br />

8) Planning & Research - do -<br />

9) Machinery & Equipment - do -<br />

10) <strong>Mizoram</strong> State Road (Project Counterpart funding of World<br />

Bank Project)<br />

- do -<br />

11) NABARD - do -<br />

12) E.A.P. - do -<br />

13) 12th Finance Commission<br />

3055 00 ROAD TRANSPORT<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003/004 Training & Research - do -<br />

Total<br />

(col.6+12)<br />

- 399 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

70.34 70.34 - 266.00 266.00 - 20.00 20.00<br />

21.72 21.72 - 216.00 216.00 - 10.00 10.00<br />

300.00 300.00 - - - - - -<br />

472.00 472.00 - 708.00 708.00 - 110.00 110.00<br />

472.00 472.00 - 708.00 708.00 - 110.00 110.00<br />

388.50 388.50 - 582.00 582.00 - 110.00 110.00<br />

175.11 175.11 - 226.00 226.00 - 44.00 44.00<br />

54.84 54.84 - 88.00 88.00 - 17.60 17.60<br />

47.83 47.83 - 90.00 90.00 - 15.40 15.40<br />

110.72 110.72 - 178.00 178.00 - 33.00 33.00<br />

49020.68 48422.75 597.93 72093.00 55184.00 16909.00 17435.00 12249.00<br />

6.50 - 6.50<br />

46201.66 45634.91 566.75 68716.00 51861.00 16855.00 16764.00 11584.00<br />

10.00 - 10.00 1208.00 - 1208.00 300.00 -<br />

-<br />

232.90 232.90 - 2000.00 - 2000.00 800.00 -<br />

65.00 65.00 - 2000.00 - 2000.00 900.00 -<br />

57.50 37.50 20.00 2500.00 - 2500.00 568.00 -<br />

5.00 - 5.00 200.00 - 200.00 2.00 -<br />

191.55 91.55 100.00 1415.00 - 1415.00 675.00 -<br />

1368.95 937.20 431.75 2200.00 - 2200.00 1035.00 -<br />

3260.84 3260.84 - 4088.00 4088.00 - 816.00 816.00<br />

- - - - - - - -<br />

57.00 57.00 - 500.00 500.00 - 100.00 100.00<br />

2750.00 2750.00 - 6000.00 2000.00 4000.00 1700.00 1200.00<br />

3422.56 3422.56 - 1980.00 648.00 1332.00 868.00 468.00<br />

33455.36 33455.36 - 44625.00 44625.00 - 9000.00 9000.00<br />

1325.00 1325.00 - - - - - -<br />

2371.42 2371.42 - 2845.00 2845.00 - 550.00 550.00<br />

1712.37 1712.37 - 1356.00 1356.00 - 350.00 350.00<br />

- - - - - - - -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

5) Silk Processing - do -<br />

6) Seed Organisation - do -<br />

7) Baffacos<br />

2852 00 INDUSTRIES (Other than V & SI)<br />

- do -<br />

600 Others<br />

2853 00 MINES & MINERALS<br />

2885 00 Minerals :<br />

02 Regulation & Development of Mines<br />

State Govt.<br />

1) Direction & Administration State Govt.<br />

2) Ground Water Investigation - do -<br />

3) Geo-Technical Investigation - do -<br />

3) Minor Mineral Investigation - do -<br />

1 07 0000 00 VII. TRANSPORT<br />

3053 00 CIVIL AVIATION<br />

02 Airport<br />

3054 00 ROAD & BRIDGES<br />

State Govt.<br />

03 State Highways<br />

337 Roads Works (S.H.)<br />

State Govt.<br />

04 District & Other Roads : 1) Major District Roads State Govt.<br />

2) Other District Roads - do -<br />

3) Village Roads - do -<br />

4) Bridges - do -<br />

5) Satellite Towns & Villages - do -<br />

6) Roads within Towns - do -<br />

7) Direction & Administration - do -<br />

8) Planning & Research - do -<br />

9) Machinery & Equipment - do -<br />

10) <strong>Mizoram</strong> State Road (Project Counterpart funding of World<br />

Bank Project)<br />

- do -<br />

11) NABARD - do -<br />

12) E.A.P. - do -<br />

13) 12th Finance Commission<br />

3055 00 ROAD TRANSPORT<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003/004 Training & Research - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

5186.00<br />

5180.00<br />

300.00<br />

800.00<br />

900.00<br />

568.00<br />

2.00<br />

675.00<br />

1035.00<br />

-<br />

-<br />

-<br />

500.00<br />

400.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 400 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 401 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

50 Land & Buildings - do - 50.00 50.00 - 26.65 26.65 -<br />

800 Other Expenditure - do - - - - -<br />

a) Acquisition of fleet - do - 225.00 225.00 - 241.38 241.38 -<br />

b) Capital Repair & Maintenance - do - 645.00 645.00 - 171.04 171.04 -<br />

c) Workshop facilities - do - 50.00 50.00 - 46.98 46.98 -<br />

3056 00 INLAND WATER TRANSPORT 47.00 - 47.00 19.68 - 19.68<br />

104 Navigation State Govt. - - - - - -<br />

800 Other Expenditure<br />

3075 00 OTHER TRANSPORT<br />

- do - 47.00 - 47.00 19.68 - 19.68<br />

60 Motor Vehicle Wing 327.00 280.50 46.50 316.42 316.42 -<br />

001 Direction & Administration State Govt. 167.00 167.00 - 316.42 316.42 -<br />

003/004 Training & Research - do - 2.50 2.50 - - - -<br />

50 Land & Building - do - 70.00 23.50 46.50 - - -<br />

800 Other Expenditure - do - 87.50 87.50 - - - -<br />

1 09 0000 00 IX. SCIENCE, TECHNOLOGY & ENVIRONMENT 3378.00 3378.00 - 4052.26 3085.20 967.06<br />

3425 00 a) SCIENCE & TECHNOLOGY State Govt. 513.00 513.00 - 912.20 456.10 456.10<br />

b) INFORMATION & E-GOVERNANCE - - - 40.96 - 40.96<br />

01 Information & Communication Technology State Govt. - - - 40.96 - 40.96<br />

02 Capacity Building under E-governance - do - - - - - - -<br />

03 E-governance - do - - - - - - -<br />

04 Special Manpower Development - do - - - - - - -<br />

05 IT Promotional Development - do - - - - - - -<br />

06 Com. Information Centre - do - - - - - - -<br />

06 IT Infrastructure Development - do - - - - - - -<br />

3435 00 a) ECOLOGY & ENVIRONMENT State Govt. 19.00 19.00 - 15.00 15.00 -<br />

b) FORESTRY & WILDLIFE 2846.00 2846.00 - 3084.10 2614.10 470.00<br />

01 Forestry<br />

001 Direction & Administration State Govt. 1347.00 1347.00 - 1041.05 1041.05 -<br />

005 1) Resources Survey & Forest Resources - do - 170.00 170.00 - 101.74 101.74 -<br />

2) Consolidation of Forest & Working Plan - do - 131.50 131.50 - 16.34 16.34 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

50 Land & Buildings - do -<br />

800 Other Expenditure - do -<br />

a) Acquisition of fleet - do -<br />

b) Capital Repair & Maintenance - do -<br />

c) Workshop facilities<br />

3056 00 INLAND WATER TRANSPORT<br />

- do -<br />

104 Navigation State Govt.<br />

800 Other Expenditure<br />

3075 00 OTHER TRANSPORT<br />

60 Motor Vehicle Wing<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003/004 Training & Research - do -<br />

50 Land & Building - do -<br />

800 Other Expenditure - do -<br />

1 09 0000 00 IX. SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

3425 00 a) SCIENCE & TECHNOLOGY State Govt.<br />

b) INFORMATION & E-GOVERNANCE<br />

01 Information & Communication Technology State Govt.<br />

02 Capacity Building under E-governance - do -<br />

03 E-governance - do -<br />

04 Special Manpower Development - do -<br />

05 IT Promotional Development - do -<br />

06 Com. Information Centre - do -<br />

06 IT Infrastructure Development - do -<br />

3435 00 a) ECOLOGY & ENVIRONMENT State Govt.<br />

b) FORESTRY & WILDLIFE<br />

01 Forestry<br />

001 Direction & Administration State Govt.<br />

005 1) Resources Survey & Forest Resources - do -<br />

2) Consolidation of Forest & Working Plan - do -<br />

- 402 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

52.00 52.00 - 52.00 52.00 -<br />

- - - - - -<br />

54.00 54.00 - 54.00 54.00 -<br />

52.00 52.00 - 52.00 52.00 -<br />

15.00 15.00 - 15.00 15.00 -<br />

5.00 - 5.00 5.00 - 5.00<br />

- - - - - -<br />

5.00 - 5.00 5.00 - 5.00<br />

100.00 100.00 - 100.00 100.00 -<br />

100.00 100.00 - 100.00 100.00 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

2009.00 754.00 1255.00 2069.54 765.00 1304.54<br />

140.00 140.00 - 151.00 151.00 -<br />

530.00 - 530.00 579.54 - 579.54<br />

25.00 - 25.00 26.92 - 26.92<br />

505.00 - 505.00 505.00 - 505.00<br />

- - - 20.00 - 20.00<br />

- - - 3.00 - 3.00<br />

- - - 14.00 - 14.00<br />

- - - 10.62 - 10.62<br />

- - - - - -<br />

4.00 4.00 - 4.00 4.00 -<br />

1335.00 610.00 725.00 1335.00 610.00 725.00<br />

308.61 308.61 - 294.61 294.61 -<br />

27.50 27.50 - 26.50 26.50 -<br />

6.40 6.40 - 5.90 5.90 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

50 Land & Buildings - do -<br />

800 Other Expenditure - do -<br />

a) Acquisition of fleet - do -<br />

b) Capital Repair & Maintenance - do -<br />

c) Workshop facilities<br />

3056 00 INLAND WATER TRANSPORT<br />

- do -<br />

104 Navigation State Govt.<br />

800 Other Expenditure<br />

3075 00 OTHER TRANSPORT<br />

60 Motor Vehicle Wing<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003/004 Training & Research - do -<br />

50 Land & Building - do -<br />

800 Other Expenditure - do -<br />

1 09 0000 00 IX. SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

3425 00 a) SCIENCE & TECHNOLOGY State Govt.<br />

b) INFORMATION & E-GOVERNANCE<br />

01 Information & Communication Technology State Govt.<br />

02 Capacity Building under E-governance - do -<br />

03 E-governance - do -<br />

04 Special Manpower Development - do -<br />

05 IT Promotional Development - do -<br />

06 Com. Information Centre - do -<br />

06 IT Infrastructure Development - do -<br />

3435 00 a) ECOLOGY & ENVIRONMENT State Govt.<br />

b) FORESTRY & WILDLIFE<br />

01 Forestry<br />

001 Direction & Administration State Govt.<br />

005 1) Resources Survey & Forest Resources - do -<br />

2) Consolidation of Forest & Working Plan - do -<br />

Total<br />

(col.6+12)<br />

- 403 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

78.65 78.65 - 339.00 339.00 - 30.00 30.00<br />

- - - - - - - -<br />

295.38 295.38 - 535.00 535.00 - 76.00 76.00<br />

223.04 223.04 - 326.00 326.00 - 61.00 61.00<br />

61.98 61.98 - 289.00 289.00 - 33.00 33.00<br />

24.68 - 24.68 54.00 - 54.00 6.00 -<br />

- - - - - - - -<br />

24.68 - 24.68 54.00 - 54.00 6.00 -<br />

416.42 416.42 - 478.00 478.00 - 115.00 115.00<br />

416.42 416.42 - 478.00 478.00 - 115.00 115.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

- - - - - - - -<br />

6121.80 3850.20 2271.60 7166.00 6377.00 789.00 1643.00 1517.00<br />

1063.20 607.10 456.10 982.00 982.00 - 154.00 154.00<br />

620.50 - 620.50 639.00 - 639.00 86.00 -<br />

67.88 - 67.88 265.00 - 265.00 29.61 -<br />

505.00 - 505.00 - - - - -<br />

20.00 - 20.00 136.00 - 136.00 22.00 -<br />

3.00 - 3.00 50.00 - 50.00 3.71 -<br />

14.00 - 14.00 80.00 - 80.00 15.00 -<br />

10.62 - 10.62 68.00 - 68.00 11.68 -<br />

- - - 40.00 - 40.00 4.00 -<br />

19.00 19.00 - 22.00 22.00 - 5.00 5.00<br />

4419.10 3224.10 1195.00 5523.00 5373.00 150.00 1398.00 1358.00<br />

1335.66 1335.66 - 1275.00 1275.00 - 350.00 350.00<br />

128.24 128.24 - 150.00 150.00 - 30.00 30.00<br />

22.24 22.24 - 40.00 40.00 - 8.00 8.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

50 Land & Buildings - do -<br />

800 Other Expenditure - do -<br />

a) Acquisition of fleet - do -<br />

b) Capital Repair & Maintenance - do -<br />

c) Workshop facilities<br />

3056 00 INLAND WATER TRANSPORT<br />

- do -<br />

104 Navigation State Govt.<br />

800 Other Expenditure<br />

3075 00 OTHER TRANSPORT<br />

60 Motor Vehicle Wing<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003/004 Training & Research - do -<br />

50 Land & Building - do -<br />

800 Other Expenditure - do -<br />

1 09 0000 00 IX. SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

3425 00 a) SCIENCE & TECHNOLOGY State Govt.<br />

b) INFORMATION & E-GOVERNANCE<br />

01 Information & Communication Technology State Govt.<br />

02 Capacity Building under E-governance - do -<br />

03 E-governance - do -<br />

04 Special Manpower Development - do -<br />

05 IT Promotional Development - do -<br />

06 Com. Information Centre - do -<br />

06 IT Infrastructure Development - do -<br />

3435 00 a) ECOLOGY & ENVIRONMENT State Govt.<br />

b) FORESTRY & WILDLIFE<br />

01 Forestry<br />

001 Direction & Administration State Govt.<br />

005 1) Resources Survey & Forest Resources - do -<br />

2) Consolidation of Forest & Working Plan - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

-<br />

-<br />

6.00<br />

-<br />

6.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

126.00<br />

-<br />

86.00<br />

29.61<br />

-<br />

22.00<br />

3.71<br />

15.00<br />

11.68<br />

4.00<br />

-<br />

40.00<br />

-<br />

-<br />

-<br />

- 404 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 405 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

007 Communication & Building - do - 26.00 26.00 - 30.50 30.50 -<br />

101 Forest Conservation & Development / Protection - do - 207.00 207.00 - 194.58 194.58 -<br />

102 Social Farm Forestry - do - - - - - - -<br />

105 Forest Products / Utilization - do - 100.00 100.00 - 111.06 111.06 -<br />

109 Extension & Training<br />

800 Other Expenditure -<br />

- do - 113.50 113.50 - 48.03 48.03 -<br />

1) State share under IFP Scheme - do - 294.00 294.00 - 77.86 77.86 -<br />

2) Bamboo Plantation Development (Baffacos) - do - - - - 522.85 522.85 -<br />

3) Other Expenditure - do - - - - 12.32 12.32 -<br />

4) Maintenance of Forest (FC)<br />

02 Environment & Wildlife<br />

- do - - - - 470.00 - 470.00<br />

110 Preservation of Wildlife<br />

03 Wasteland Development<br />

- do - 282.00 282.00 - 331.64 331.64 -<br />

101 Afforestation - do - 150.00 150.00 - 81.13 81.13 -<br />

190 Assistance to MPCB - do - 25.00 25.00 - 45.00 45.00 -<br />

1 10 0000 00 X. GENERAL ECONOMIC SERVICES 16883.00 16883.00 - 13741.20 13303.75 437.45<br />

3451 00 SECRETARIAT ECONOMIC SERVICES 5473.00 5473.00 - 2906.74 2906.74 -<br />

101 PLANNING COMMISSION/PLANNING BOARD<br />

1) Plan Formulation State Govt. 375.00 375.00 - 275.25 275.25 -<br />

2) Evaluation & Monitoring - do - 2744.00 2744.00 - 2389.89 2389.89 -<br />

102 1) District Planning Machinery - do - 200.00 200.00 - 206.27 206.27 -<br />

2) Pilot Project for Lunglei District - do - 10.00 10.00 - 35.33 35.33 -<br />

3) Finance Commission (FC) - do - 2144.00 2144.00 - - - -<br />

4) Capacity Building - do - - - - - - -<br />

5) ACA for RSVY (Lawngtlai District) - do - - - - - - -<br />

3452 00 TOURISM 1056.00 1056.00 - 934.23 934.23 -<br />

01 Tourist Infrastructure<br />

101 Tourist Centre State Govt. 30.00 30.00 - 19.06 19.06 -<br />

102 Tourist Accommodation - do - 283.00 283.00 - 453.26 453.26 -<br />

103 Tourist Transport Services - do - - - - - - -<br />

800 Other Expenditure (Tourism & Rest Houses) - do - 183.80 183.80 - 50.07 50.07 -<br />

80 General<br />

001 Direction & Administration - do - 271.00 271.00 - 291.00 291.00 -<br />

003 Training - do - 5.00 5.00 - 57.28 57.28 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

007 Communication & Building - do -<br />

101 Forest Conservation & Development / Protection - do -<br />

102 Social Farm Forestry - do -<br />

105 Forest Products / Utilization - do -<br />

109 Extension & Training<br />

800 Other Expenditure -<br />

- do -<br />

1) State share under IFP Scheme - do -<br />

2) Bamboo Plantation Development (Baffacos) - do -<br />

3) Other Expenditure - do -<br />

4) Maintenance of Forest (FC)<br />

02 Environment & Wildlife<br />

- do -<br />

110 Preservation of Wildlife<br />

03 Wasteland Development<br />

- do -<br />

101 Afforestation - do -<br />

190 Assistance to MPCB - do -<br />

1 10 0000 00 X. GENERAL ECONOMIC SERVICES<br />

3451 00 SECRETARIAT ECONOMIC SERVICES<br />

101 PLANNING COMMISSION/PLANNING BOARD<br />

1) Plan Formulation State Govt.<br />

2) Evaluation & Monitoring - do -<br />

102 1) District Planning Machinery - do -<br />

2) Pilot Project for Lunglei District - do -<br />

3) Finance Commission (FC) - do -<br />

4) Capacity Building - do -<br />

5) ACA for RSVY (Lawngtlai District) - do -<br />

3452 00 TOURISM<br />

01 Tourist Infrastructure<br />

101 Tourist Centre State Govt.<br />

102 Tourist Accommodation - do -<br />

103 Tourist Transport Services - do -<br />

800 Other Expenditure (Tourism & Rest Houses) - do -<br />

80 General<br />

001 Direction & Administration - do -<br />

003 Training - do -<br />

- 406 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

- - - 1.75 1.75 -<br />

43.41 43.41 - 43.41 43.41 -<br />

- - - - - -<br />

- - - 8.00 8.00 -<br />

20.75 20.75 - 19.75 19.75 -<br />

81.00 81.00 - 88.75 88.75 -<br />

- - - - - -<br />

9.36 9.36 - 9.36 9.36 -<br />

725.00 - 725.00 725.00 - 725.00<br />

97.97 97.97 - 96.97 96.97 -<br />

- - - - - -<br />

15.00 15.00 - 15.00 15.00 -<br />

6427.00 6117.00 310.00 4993.76 4745.76 248.00<br />

3096.00 3096.00 - 1837.76 1837.76 -<br />

64.86 64.86 - 64.86 64.86 -<br />

2996.64 2996.64 - 1738.40 1738.40 -<br />

21.00 21.00 - 21.00 21.00 -<br />

13.50 13.50 - 13.50 13.50 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

290.00 290.00 - 295.00 295.00 -<br />

2.00 2.00 - 2.00 2.00 -<br />

143.75 143.75 - 148.75 148.75 -<br />

- - - - - -<br />

9.90 9.90 - 9.90 9.90 -<br />

111.00 111.00 - 111.00 111.00 -<br />

1.90 1.90 - 1.90 1.90 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

007 Communication & Building - do -<br />

101 Forest Conservation & Development / Protection - do -<br />

102 Social Farm Forestry - do -<br />

105 Forest Products / Utilization - do -<br />

109 Extension & Training<br />

800 Other Expenditure -<br />

- do -<br />

1) State share under IFP Scheme - do -<br />

2) Bamboo Plantation Development (Baffacos) - do -<br />

3) Other Expenditure - do -<br />

4) Maintenance of Forest (FC)<br />

02 Environment & Wildlife<br />

- do -<br />

110 Preservation of Wildlife<br />

03 Wasteland Development<br />

- do -<br />

101 Afforestation - do -<br />

190 Assistance to MPCB - do -<br />

1 10 0000 00 X. GENERAL ECONOMIC SERVICES<br />

3451 00 SECRETARIAT ECONOMIC SERVICES<br />

101 PLANNING COMMISSION/PLANNING BOARD<br />

1) Plan Formulation State Govt.<br />

2) Evaluation & Monitoring - do -<br />

102 1) District Planning Machinery - do -<br />

2) Pilot Project for Lunglei District - do -<br />

3) Finance Commission (FC) - do -<br />

4) Capacity Building - do -<br />

5) ACA for RSVY (Lawngtlai District) - do -<br />

3452 00 TOURISM<br />

01 Tourist Infrastructure<br />

101 Tourist Centre State Govt.<br />

102 Tourist Accommodation - do -<br />

103 Tourist Transport Services - do -<br />

800 Other Expenditure (Tourism & Rest Houses) - do -<br />

80 General<br />

001 Direction & Administration - do -<br />

003 Training - do -<br />

Total<br />

(col.6+12)<br />

- 407 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

32.25 32.25 - 84.00 84.00 - 17.00 17.00<br />

237.99 237.99 - 820.00 820.00 - 45.00 45.00<br />

- - - - - - - -<br />

119.06 119.06 - 50.00 50.00 - 10.00 10.00<br />

67.78 67.78 - 114.00 114.00 - 26.00 26.00<br />

166.61 166.61 - 150.00 - 150.00 40.00 -<br />

522.85 522.85 - - - - - -<br />

21.68 21.68 - 25.00 25.00 - 5.00 5.00<br />

1195.00 - 1195.00 2175.00 2175.00 - 725.00 725.00<br />

428.61 428.61 - 465.00 465.00 - 107.00 107.00<br />

81.13 81.13 - 100.00 100.00 - 20.00 20.00<br />

60.00 60.00 - 75.00 75.00 - 15.00 15.00<br />

18734.96 18049.51 685.45 28128.00 26118.66 2009.34 7110.00 6362.30<br />

4744.50 4744.50 - 11294.00 11294.00 - 3454.00 3454.00<br />

340.11 340.11 - 430.00 430.00 - 67.00 67.00<br />

4128.29 4128.29 - 10597.00 10597.00 - 3345.00 3345.00<br />

227.27 227.27 - 184.00 184.00 - 25.00 25.00<br />

48.83 48.83 - 83.00 83.00 - 17.00 17.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

- - - - - - - -<br />

1229.23 1229.23 - 1597.00 1597.00 - 313.00 313.00<br />

21.06 21.06 - 94.00 94.00 - 2.50 2.50<br />

602.01 602.01 - 460.00 460.00 - 155.00 155.00<br />

- 0.00 - - - - - -<br />

59.97 59.97 - 313.00 313.00 - 11.00 11.00<br />

402.00 402.00 - 434.00 434.00 - 118.50 118.50<br />

59.18 59.18 - 81.00 81.00 - 2.00 2.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

007 Communication & Building - do -<br />

101 Forest Conservation & Development / Protection - do -<br />

102 Social Farm Forestry - do -<br />

105 Forest Products / Utilization - do -<br />

109 Extension & Training<br />

800 Other Expenditure -<br />

- do -<br />

1) State share under IFP Scheme - do -<br />

2) Bamboo Plantation Development (Baffacos) - do -<br />

3) Other Expenditure - do -<br />

4) Maintenance of Forest (FC)<br />

02 Environment & Wildlife<br />

- do -<br />

110 Preservation of Wildlife<br />

03 Wasteland Development<br />

- do -<br />

101 Afforestation - do -<br />

190 Assistance to MPCB - do -<br />

1 10 0000 00 X. GENERAL ECONOMIC SERVICES<br />

3451 00 SECRETARIAT ECONOMIC SERVICES<br />

101 PLANNING COMMISSION/PLANNING BOARD<br />

1) Plan Formulation State Govt.<br />

2) Evaluation & Monitoring - do -<br />

102 1) District Planning Machinery - do -<br />

2) Pilot Project for Lunglei District - do -<br />

3) Finance Commission (FC) - do -<br />

4) Capacity Building - do -<br />

5) ACA for RSVY (Lawngtlai District) - do -<br />

3452 00 TOURISM<br />

01 Tourist Infrastructure<br />

101 Tourist Centre State Govt.<br />

102 Tourist Accommodation - do -<br />

103 Tourist Transport Services - do -<br />

800 Other Expenditure (Tourism & Rest Houses) - do -<br />

80 General<br />

001 Direction & Administration - do -<br />

003 Training - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

-<br />

-<br />

40.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

747.70<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 408 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 409 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

104 Promotion & Publicity<br />

800 Other Expenditure<br />

- do - 75.15 75.15 - 58.00 58.00 -<br />

1) Survey & Statistics - do - 8.05 8.05 - 5.56 5.56 -<br />

2) Tourist Information Centre - do - 200.00 200.00 - - - -<br />

3454 00 ECONOMIC & STATISTICS 373.00 373.00 - 448.00 414.28 33.72<br />

111 Vital Statistics State Govt. 75.00 75.00 - 121.33 121.33 -<br />

112 Economic Advice & Statistics - do - 26.00 26.00 - 24.10 24.10 -<br />

203 Computer - do - 5.00 5.00 - 10.00 10.00 -<br />

800 Other Expenditure - do - 37.00 37.00 - 89.73 56.01 33.72<br />

001 Direction & Administration - do - 230.00 230.00 - 202.84 202.84 -<br />

3456 00 CIVIL SUPPLIES 826.00 826.00 - 970.23 566.50 403.73<br />

001 Direction State Govt. 696.60 696.60 - 417.50 417.50 -<br />

800 Other Expenditure<br />

3475 00 OTHER GENERAL ECONOMIC SERVICES<br />

- do - 129.40 129.40 - 552.73 149.00 403.73<br />

(i) DISTRICT COUNCILS 8324.00 8324.00 - 7833.66 7833.66 -<br />

a) Lai Autonomous District Council State Govt. 3336.00 3336.00 - 3148.16 3148.16 -<br />

b) Mara Autonomous District Council - do - 2912.00 2912.00 - 2705.50 2705.50 -<br />

c) Chakma Autonomous District Council - do - 2076.00 2076.00 - 1980.00 1980.00 -<br />

(ii) WEIGHT & MEASURES - do - 233.00 233.00 - 249.14 249.14 -<br />

a) Direction & Administration - do - 195.00 195.00 - 227.74 227.74 -<br />

b) Other Expenditure - do - 38.00 38.00 - 21.40 21.40 -<br />

(iii) LAW & JUDICIAL - do - 598.00 598.00 - 399.20 399.20 -<br />

a) Construction of Buildings - do - 418.00 418.00 - 389.60 389.60 -<br />

b) State Commission & District Forum - do - 140.00 140.00 - - - -<br />

c) Information Technology / Other Expenditure - do - 40.00 40.00 - 9.60 9.60 -<br />

2 00 0000 00 XI. SOCIAL SERVICES 95687.00 59580.04 36106.96 93393.57 76522.14 16871.43<br />

2 21 0000 00 EDUCATION 29252.00 29222.00 30.00 35139.91 34514.91 625.00<br />

2 21 2202 00 GENERAL EDUCATION 23280.00 23280.00 - 26734.99 26734.99 -<br />

A. SCHOOL EDUCATION 19383.00 19383.00 - 22860.59 22860.59 -<br />

01 Elementary Education State Govt. 8865.00 8865.00 - 14806.45 14806.45 -<br />

02 Secondary Education - do - 8645.00 8645.00 - 6915.30 6915.30 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

104 Promotion & Publicity<br />

800 Other Expenditure<br />

- do -<br />

1) Survey & Statistics - do -<br />

2) Tourist Information Centre<br />

3454 00 ECONOMIC & STATISTICS<br />

- do -<br />

111 Vital Statistics State Govt.<br />

112 Economic Advice & Statistics - do -<br />

203 Computer - do -<br />

800 Other Expenditure - do -<br />

001 Direction & Administration<br />

3456 00 CIVIL SUPPLIES<br />

- do -<br />

001 Direction State Govt.<br />

800 Other Expenditure<br />

3475 00 OTHER GENERAL ECONOMIC SERVICES<br />

(i) DISTRICT COUNCILS<br />

- do -<br />

a) Lai Autonomous District Council State Govt.<br />

b) Mara Autonomous District Council - do -<br />

c) Chakma Autonomous District Council - do -<br />

(ii) WEIGHT & MEASURES - do -<br />

a) Direction & Administration - do -<br />

b) Other Expenditure - do -<br />

(iii) LAW & JUDICIAL - do -<br />

a) Construction of Buildings - do -<br />

b) State Commission & District Forum - do -<br />

c) Information Technology / Other Expenditure - do -<br />

2 00 0000 00 XI. SOCIAL SERVICES<br />

2 21 0000 00 EDUCATION<br />

2 21 2202 00 GENERAL EDUCATION<br />

A. SCHOOL EDUCATION<br />

01 Elementary Education State Govt.<br />

02 Secondary Education - do -<br />

- 410 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

19.00 19.00 - 19.00 19.00 -<br />

2.45 2.45 - 2.45 2.45 -<br />

- - - - - -<br />

155.00 125.00 30.00 155.00 125.00 30.00<br />

42.10 42.10 - 42.10 42.10 -<br />

7.00 7.00 - 7.00 7.00 -<br />

3.00 3.00 - 3.00 3.00 -<br />

47.09 17.09 30.00 47.09 17.09 30.00<br />

55.81 55.81 - 55.81 55.81 -<br />

560.00 280.00 280.00 380.00 162.00 218.00<br />

199.00 199.00 - 181.00 81.00 100.00<br />

361.00 81.00 280.00 199.00 81.00 118.00<br />

2166.00 2166.00 - 2166.00 2166.00 -<br />

875.00 875.00 - 875.00 875.00 -<br />

746.00 746.00 - 746.00 746.00 -<br />

545.00 545.00 - 545.00 545.00 -<br />

80.00 80.00 - 80.00 80.00 -<br />

72.00 72.00 - 72.00 72.00 -<br />

8.00 8.00 - 8.00 8.00 -<br />

80.00 80.00 - 80.00 80.00 -<br />

57.00 57.00 - 57.00 57.00 -<br />

- - - - - -<br />

23.00 23.00 - 23.00 23.00 -<br />

28619.00 23052.13 5566.87 27282.10 20246.23 7035.87<br />

10978.00 10353.00 625.00 11093.00 10468.00 625.00<br />

9003.00 9003.00 - 9083.00 9083.00 -<br />

7650.00 7650.00 - 7730.00 7730.00 -<br />

4514.50 4514.50 - 4594.50 4594.50 -<br />

2714.80 2714.80 - 2714.80 2714.80 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

104 Promotion & Publicity<br />

800 Other Expenditure<br />

- do -<br />

1) Survey & Statistics - do -<br />

2) Tourist Information Centre<br />

3454 00 ECONOMIC & STATISTICS<br />

- do -<br />

111 Vital Statistics State Govt.<br />

112 Economic Advice & Statistics - do -<br />

203 Computer - do -<br />

800 Other Expenditure - do -<br />

001 Direction & Administration<br />

3456 00 CIVIL SUPPLIES<br />

- do -<br />

001 Direction State Govt.<br />

800 Other Expenditure<br />

3475 00 OTHER GENERAL ECONOMIC SERVICES<br />

(i) DISTRICT COUNCILS<br />

- do -<br />

a) Lai Autonomous District Council State Govt.<br />

b) Mara Autonomous District Council - do -<br />

c) Chakma Autonomous District Council - do -<br />

(ii) WEIGHT & MEASURES - do -<br />

a) Direction & Administration - do -<br />

b) Other Expenditure - do -<br />

(iii) LAW & JUDICIAL - do -<br />

a) Construction of Buildings - do -<br />

b) State Commission & District Forum - do -<br />

c) Information Technology / Other Expenditure - do -<br />

2 00 0000 00 XI. SOCIAL SERVICES<br />

2 21 0000 00 EDUCATION<br />

2 21 2202 00 GENERAL EDUCATION<br />

A. SCHOOL EDUCATION<br />

01 Elementary Education State Govt.<br />

02 Secondary Education - do -<br />

Total<br />

(col.6+12)<br />

- 411 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

77.00 77.00 - 152.00 152.00 - 22.00 22.00<br />

8.01 8.01 - 63.00 63.00 - 2.00 2.00<br />

- - - - - - - -<br />

603.00 539.28 63.72 784.00 634.66 149.34 171.00 141.00<br />

163.43 163.43 - 194.42 193.09 1.33 49.37 49.37<br />

31.10 31.10 - 5.00 - 5.00 2.00 -<br />

13.00 13.00 - 82.88 72.25 10.63 4.75 1.25<br />

136.82 73.10 63.72 222.87 128.90 93.97 59.76 50.26<br />

258.65 258.65 - 278.83 240.42 38.41 55.12 40.12<br />

1350.23 728.50 621.73 2025.00 2025.00 - 616.00 306.00<br />

598.50 498.50 100.00 842.00 842.00 - 210.60 210.60<br />

751.73 230.00 521.73 1183.00 1183.00 - 405.40 95.40<br />

9999.66 9999.66 - 11498.00 10090.00 1408.00 2382.00 2047.00<br />

4023.16 4023.16 - 4626.00 3218.00 1408.00 963.00 628.00<br />

3451.50 3451.50 - 3968.00 3968.00 - 820.00 820.00<br />

2525.00 2525.00 - 2904.00 2904.00 - 599.00 599.00<br />

329.14 329.14 - 418.00 418.00 - 88.00 88.00<br />

299.74 299.74 - 353.00 353.00 - 74.00 74.00<br />

29.40 29.40 - 65.00 65.00 - 14.00 14.00<br />

479.20 479.20 - 512.00 60.00 452.00 86.00 13.30<br />

446.60 446.60 - 362.00 - 362.00 62.70 -<br />

- - - - - - - -<br />

32.60 32.60 - 150.00 60.00 90.00 23.30 13.30<br />

120675.67 96768.37 23907.30 187499.00 146790.30 40708.70 36221.00 28374.74<br />

46232.91 44982.91 1250.00 61470.00 59683.00 1787.00 12204.00 12204.00<br />

35817.99 35817.99 - 49414.00 48689.00 725.00 9990.00 9990.00<br />

30590.59 30590.59 - 40181.00 40181.00 - 8503.00 8503.00<br />

19400.95 19400.95 - 18559.00 18559.00 - 4502.50 4502.50<br />

9630.10 9630.10 - 15980.00 15980.00 - 3511.50 3511.50


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

104 Promotion & Publicity<br />

800 Other Expenditure<br />

- do -<br />

1) Survey & Statistics - do -<br />

2) Tourist Information Centre<br />

3454 00 ECONOMIC & STATISTICS<br />

- do -<br />

111 Vital Statistics State Govt.<br />

112 Economic Advice & Statistics - do -<br />

203 Computer - do -<br />

800 Other Expenditure - do -<br />

001 Direction & Administration<br />

3456 00 CIVIL SUPPLIES<br />

- do -<br />

001 Direction State Govt.<br />

800 Other Expenditure<br />

3475 00 OTHER GENERAL ECONOMIC SERVICES<br />

(i) DISTRICT COUNCILS<br />

- do -<br />

a) Lai Autonomous District Council State Govt.<br />

b) Mara Autonomous District Council - do -<br />

c) Chakma Autonomous District Council - do -<br />

(ii) WEIGHT & MEASURES - do -<br />

a) Direction & Administration - do -<br />

b) Other Expenditure - do -<br />

(iii) LAW & JUDICIAL - do -<br />

a) Construction of Buildings - do -<br />

b) State Commission & District Forum - do -<br />

c) Information Technology / Other Expenditure - do -<br />

2 00 0000 00 XI. SOCIAL SERVICES<br />

2 21 0000 00 EDUCATION<br />

2 21 2202 00 GENERAL EDUCATION<br />

A. SCHOOL EDUCATION<br />

01 Elementary Education State Govt.<br />

02 Secondary Education - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

30.00<br />

-<br />

2.00<br />

3.50<br />

9.50<br />

15.00<br />

310.00<br />

-<br />

310.00<br />

335.00<br />

335.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

72.70<br />

62.70<br />

-<br />

10.00<br />

7846.26<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 412 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 413 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

04 Adult Education - do - 152.50 152.50 - 233.47 233.47 -<br />

05 Language Development - do - 490.00 490.00 - 390.25 390.25 -<br />

80 General - do - 788.00 788.00 - 515.12 515.12 -<br />

2204/101 Physical Education - do - 442.50 442.50 - - - -<br />

B. HIGHER EDUCATION<br />

03 University & Higher Education<br />

3897.00 3897.00 - 3874.40 3874.40 -<br />

001 Direction & Administration State Govt. 62.00 62.00 - 73.60 73.60 -<br />

102 Assistance to University - do - - - - - - -<br />

103 Government Colleges & Institutes - do - 1279.00 1279.00 - 927.64 927.64 -<br />

104 Assistance to Non-Govt. Colleges & Institutes - do - 2411.00 2411.00 - 2770.90 2770.90 -<br />

107 Scholarship - do - 47.50 47.50 - 30.01 30.01 -<br />

05 Language Development - do - 97.50 97.50 - 72.25 72.25 -<br />

2203 00 TECHNICAL EDUCATION 3948.00 3918.00 30.00 4896.65 4896.65 -<br />

001 Direction & Administration State Govt. 283.00 253.00 30.00 67.12 67.12 -<br />

105 Polytechnics - do - 165.00 165.00 - 344.69 344.69 -<br />

EAP & Counterpart funding - do - 3446.00 3446.00 - 4477.00 4477.00 -<br />

108 Anthropological Survey - do - 26.00 26.00 - - - -<br />

800 Other Expenditure - do - 28.00 28.00 - 7.84 7.84 -<br />

2204 00 SPORTS & YOUTH SERVICES 814.00 814.00 - 2156.27 1531.27 625.00<br />

001 Direction & Administration State Govt. 264.00 264.00 - 301.51 301.51 -<br />

102 Youth Welfare Prog. for Students - do - 215.00 215.00 - 207.29 207.29 -<br />

103 Youth Welfare Prog. for Non-Students - do - 15.00 15.00 - 27.23 27.23 -<br />

104 Sports & Games (including Sports Council) - do - 320.00 320.00 - 995.24 995.24 -<br />

12th Finance Commission - do - - - - 625.00 - 625.00<br />

2205 00 ART & CULTURE 1210.00 1210.00 - 1352.00 1352.00 -<br />

001 Direction & Administration State Govt. 582.00 582.00 - 582.00 582.00 -<br />

101 Fine Arts & Education - do - 50.20 50.20 - 50.20 50.20 -<br />

102 Promotion of Art & Culture - do - 83.80 83.80 - 83.80 83.80 -<br />

103 Archaeology - do - 55.00 55.00 - 55.00 55.00 -<br />

104 Archives - do - 58.00 58.00 - 58.00 58.00 -<br />

105 Public Library - do - 223.00 223.00 - 223.00 223.00 -<br />

107 Museum - do - 104.00 104.00 - 104.00 104.00 -<br />

108 Anthropological Survey - do - 26.00 26.00 - 26.00 26.00 -<br />

800 District Gazetteer - do - 28.00 28.00 - 28.00 28.00 -<br />

Heritage Conservation (FC) - do - - - - 142.00 142.00 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

04 Adult Education - do -<br />

05 Language Development - do -<br />

80 General - do -<br />

2204/101 Physical Education<br />

B. HIGHER EDUCATION<br />

03 University & Higher Education<br />

- do -<br />

001 Direction & Administration State Govt.<br />

102 Assistance to University - do -<br />

103 Government Colleges & Institutes - do -<br />

104 Assistance to Non-Govt. Colleges & Institutes - do -<br />

107 Scholarship - do -<br />

05 Language Development<br />

2203 00 TECHNICAL EDUCATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

105 Polytechnics - do -<br />

EAP & Counterpart funding - do -<br />

108 Anthropological Survey - do -<br />

800 Other Expenditure<br />

2204 00 SPORTS & YOUTH SERVICES<br />

- do -<br />

001 Direction & Administration State Govt.<br />

102 Youth Welfare Prog. for Students - do -<br />

103 Youth Welfare Prog. for Non-Students - do -<br />

104 Sports & Games (including Sports Council) - do -<br />

12th Finance Commission<br />

2205 00 ART & CULTURE<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Fine Arts & Education - do -<br />

102 Promotion of Art & Culture - do -<br />

103 Archaeology - do -<br />

104 Archives - do -<br />

105 Public Library - do -<br />

107 Museum - do -<br />

108 Anthropological Survey - do -<br />

800 District Gazetteer - do -<br />

Heritage Conservation (FC) - do -<br />

- 414 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

76.20 76.20 - 76.20 76.20 -<br />

147.80 147.80 - 147.80 147.80 -<br />

196.70 196.70 - 196.70 196.70 -<br />

- - - - - -<br />

1353.00 1353.00 - 1353.00 1353.00 -<br />

18.40 18.40 - 18.40 18.40 -<br />

- - - - - -<br />

272.90 272.90 - 272.90 272.90 -<br />

1017.85 1017.85 - 1017.85 1017.85 -<br />

12.00 12.00 - 12.00 12.00 -<br />

31.85 31.85 - 31.85 31.85 -<br />

180.00 180.00 - 180.00 180.00 -<br />

20.50 20.50 - 20.50 20.50 -<br />

159.50 159.50 - 159.50 159.50 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

1400.00 775.00 625.00 1435.00 810.00 625.00<br />

122.00 122.00 - 122.00 122.00 -<br />

110.00 110.00 - 110.00 110.00 -<br />

20.00 20.00 - 20.00 20.00 -<br />

523.00 523.00 - 558.00 558.00 -<br />

625.00 - 625.00 625.00 - 625.00<br />

395.00 395.00 - 395.00 395.00 -<br />

56.33 56.33 - 56.33 56.33 -<br />

7.37 7.37 - 7.37 7.37 -<br />

106.82 106.82 - 106.82 106.82 -<br />

2.71 2.71 - 2.71 2.71 -<br />

3.46 3.46 - 3.46 3.46 -<br />

20.55 20.55 - 20.55 20.55 -<br />

69.61 69.61 - 69.61 69.61 -<br />

1.05 1.05 - 1.05 1.05 -<br />

2.10 2.10 - 2.10 2.10 -<br />

125.00 125.00 - 125.00 125.00 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

04 Adult Education - do -<br />

05 Language Development - do -<br />

80 General - do -<br />

2204/101 Physical Education<br />

B. HIGHER EDUCATION<br />

03 University & Higher Education<br />

- do -<br />

001 Direction & Administration State Govt.<br />

102 Assistance to University - do -<br />

103 Government Colleges & Institutes - do -<br />

104 Assistance to Non-Govt. Colleges & Institutes - do -<br />

107 Scholarship - do -<br />

05 Language Development<br />

2203 00 TECHNICAL EDUCATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

105 Polytechnics - do -<br />

EAP & Counterpart funding - do -<br />

108 Anthropological Survey - do -<br />

800 Other Expenditure<br />

2204 00 SPORTS & YOUTH SERVICES<br />

- do -<br />

001 Direction & Administration State Govt.<br />

102 Youth Welfare Prog. for Students - do -<br />

103 Youth Welfare Prog. for Non-Students - do -<br />

104 Sports & Games (including Sports Council) - do -<br />

12th Finance Commission<br />

2205 00 ART & CULTURE<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Fine Arts & Education - do -<br />

102 Promotion of Art & Culture - do -<br />

103 Archaeology - do -<br />

104 Archives - do -<br />

105 Public Library - do -<br />

107 Museum - do -<br />

108 Anthropological Survey - do -<br />

800 District Gazetteer - do -<br />

Heritage Conservation (FC) - do -<br />

Total<br />

(col.6+12)<br />

- 415 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

309.67 309.67 - 1695.00 1695.00 - 76.50 76.50<br />

538.05 538.05 - 1513.00 1513.00 - 160.50 160.50<br />

711.82 711.82 - 2434.00 2434.00 - 252.00 252.00<br />

- - - - - - - -<br />

5227.40 5227.40 - 9233.00 8508.00 725.00 1487.00 1487.00<br />

92.00 92.00 - 70.00 70.00 - 20.00 20.00<br />

- - - - - - - -<br />

1200.54 1200.54 - 4333.00 3628.00 705.00 295.00 295.00<br />

3788.75 3788.75 - 3680.00 3680.00 - 1126.00 1126.00<br />

42.01 42.01 - 550.00 550.00 - 13.00 13.00<br />

104.10 104.10 - 600.00 580.00 20.00 33.00 33.00<br />

5076.65 5076.65 - 4584.00 3522.00 1062.00 264.00 264.00<br />

87.62 87.62 - 2283.00 1221.00 1062.00 22.00 22.00<br />

504.19 504.19 - 2215.00 2215.00 - 171.00 171.00<br />

4477.00 4477.00 - 66.00 66.00 - 66.00 66.00<br />

- - - - - - - -<br />

7.84 7.84 - 20.00 20.00 - 5.00 5.00<br />

3591.27 2341.27 1250.00 5386.00 5386.00 - 1647.00 1647.00<br />

423.51 423.51 - 620.00 620.00 - 146.00 146.00<br />

317.29 317.29 - 570.00 570.00 - 164.00 164.00<br />

47.23 47.23 - 75.00 75.00 - 15.00 15.00<br />

1553.24 1553.24 - 2246.00 2246.00 - 697.00 697.00<br />

1250.00 - 1250.00 1875.00 1875.00 - 625.00 625.00<br />

1747.00 1747.00 - 2086.00 2086.00 - 303.00 303.00<br />

638.33 638.33 - 724.00 724.00 - 137.73 137.73<br />

57.57 57.57 - 77.00 77.00 - 13.00 13.00<br />

190.62 190.62 - 453.00 453.00 - 37.70 37.70<br />

57.71 57.71 - 59.00 59.00 - 13.75 13.75<br />

61.46 61.46 - 52.00 52.00 - 14.00 14.00<br />

243.55 243.55 - 465.00 465.00 - 43.00 43.00<br />

173.61 173.61 - 209.00 209.00 - 33.81 33.81<br />

27.05 27.05 - 21.00 21.00 - 5.61 5.61<br />

30.10 30.10 - 26.00 26.00 - 4.40 4.40<br />

267.00 267.00 - - - - - -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

04 Adult Education - do -<br />

05 Language Development - do -<br />

80 General - do -<br />

2204/101 Physical Education<br />

B. HIGHER EDUCATION<br />

03 University & Higher Education<br />

- do -<br />

001 Direction & Administration State Govt.<br />

102 Assistance to University - do -<br />

103 Government Colleges & Institutes - do -<br />

104 Assistance to Non-Govt. Colleges & Institutes - do -<br />

107 Scholarship - do -<br />

05 Language Development<br />

2203 00 TECHNICAL EDUCATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

105 Polytechnics - do -<br />

EAP & Counterpart funding - do -<br />

108 Anthropological Survey - do -<br />

800 Other Expenditure<br />

2204 00 SPORTS & YOUTH SERVICES<br />

- do -<br />

001 Direction & Administration State Govt.<br />

102 Youth Welfare Prog. for Students - do -<br />

103 Youth Welfare Prog. for Non-Students - do -<br />

104 Sports & Games (including Sports Council) - do -<br />

12th Finance Commission<br />

2205 00 ART & CULTURE<br />

- do -<br />

001 Direction & Administration State Govt.<br />

101 Fine Arts & Education - do -<br />

102 Promotion of Art & Culture - do -<br />

103 Archaeology - do -<br />

104 Archives - do -<br />

105 Public Library - do -<br />

107 Museum - do -<br />

108 Anthropological Survey - do -<br />

800 District Gazetteer - do -<br />

Heritage Conservation (FC) - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 416 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 417 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

2210 00 A. MEDICAL & PUBLIC HEALTH<br />

01 Urban Health Services : Allopathy<br />

12370.00 11197.00 1173.00 12535.40 11290.69 1244.71<br />

001 Direction & Administration State Govt. 745.00 723.00 22.00 1513.80 1376.50 137.30<br />

104 Medical Store Depot - do - 196.00 189.00 7.00 - - -<br />

109 School Health Programme - do - 33.00 33.00 - - - -<br />

110 Hospital & Dispensary<br />

02 Urban Health Services : Other System of Medicines<br />

- do - 3988.00 3454.00 534.00 2985.73 2856.60 129.13<br />

102 Homeopathy - do - 30.00 30.00 - 16.20 16.20 -<br />

03 Rural Health Services : Allopathy - do - 4805.00 4285.00 520.00 4521.90 4033.82 488.08<br />

05/105 Medical Edn. Research & Trg. : Allopathy<br />

06 Public Health<br />

- do - 1058.00 980.00 78.00 761.75 755.55 6.20<br />

101 Prevention & Control of Diseases - do - 1031.50 1031.50 - 1246.32 1246.32 -<br />

102 Prevention of Food Adulteration - do - 4.00 4.00 - - - -<br />

104 Drug Control Programme - do - 140.00 140.00 - 150.00 150.00 -<br />

105 Public Health Education - do - 38.00 38.00 - 40.00 40.00 -<br />

800 Others<br />

2210 00 B. HOSPITAL & DISPENSARY<br />

- do - 301.50 289.50 12.00 1299.70 815.70 484.00<br />

110 Hospital & Dispensary State Govt.<br />

05/105 Medical Edn. Research & Trg. : Allopathy - do -<br />

2215 00 WATER SUPPLY & SANITATION 12333.00 5329.30 7003.70 20269.91 5770.46 14499.45<br />

01 Water Supply 12103.00 5228.30 6874.70 19808.74 5669.56 14139.18<br />

001 Direction & Administration State Govt. 3616.00 3000.00 616.00 3328.82 3328.82 -<br />

003 Training - do - 10.00 - 10.00 247.41 - 247.41<br />

004 Research - do - 2.00 - 2.00 - - -<br />

005 Survey & Investigation - do - 2.00 - 2.00 - - -<br />

052 Machinery & Equipment - do - 100.00 - 100.00 10.66 - 10.66<br />

101 Urban Water Supply Programme - do - 3373.00 2000.00 1373.00 9232.48 2000.00 7232.48<br />

102 Rural Water Supply Programme - do - 5000.00 228.30 4771.70 6989.37 340.74 6648.63<br />

02 Sewerage & Sanitation 230.00 101.00 129.00 461.17 100.90 360.27<br />

105 (i) Rural Sanitation State Govt. 20.00 5.00 15.00 172.38 5.00 167.38<br />

106 Water Quality Monitoring - do - 10.00 - 10.00 - - -<br />

107 Integrated Project of Aizawl - do - - - - 0.00 -<br />

800 (a) Building - do - 50.00 9.00 41.00 8.90 8.90 -<br />

(b) Motor Vehicles - do - - - - 164.89 - 164.89<br />

(c) Emergency Water Supply - do - 150.00 87.00 63.00 115.00 87.00 28.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

2210 00 A. MEDICAL & PUBLIC HEALTH<br />

01 Urban Health Services : Allopathy<br />

001 Direction & Administration State Govt.<br />

104 Medical Store Depot - do -<br />

109 School Health Programme - do -<br />

110 Hospital & Dispensary<br />

02 Urban Health Services : Other System of Medicines<br />

- do -<br />

102 Homeopathy - do -<br />

03 Rural Health Services : Allopathy - do -<br />

05/105 Medical Edn. Research & Trg. : Allopathy<br />

06 Public Health<br />

- do -<br />

101 Prevention & Control of Diseases - do -<br />

102 Prevention of Food Adulteration - do -<br />

104 Drug Control Programme - do -<br />

105 Public Health Education - do -<br />

800 Others<br />

2210 00 B. HOSPITAL & DISPENSARY<br />

- do -<br />

110 Hospital & Dispensary State Govt.<br />

05/105 Medical Edn. Research & Trg. : Allopathy<br />

2215 00 WATER SUPPLY & SANITATION<br />

01 Water Supply<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003 Training - do -<br />

004 Research - do -<br />

005 Survey & Investigation - do -<br />

052 Machinery & Equipment - do -<br />

101 Urban Water Supply Programme - do -<br />

102 Rural Water Supply Programme<br />

02 Sewerage & Sanitation<br />

- do -<br />

105 (i) Rural Sanitation State Govt.<br />

106 Water Quality Monitoring - do -<br />

107 Integrated Project of Aizawl - do -<br />

800 (a) Building - do -<br />

(b) Motor Vehicles - do -<br />

(c) Emergency Water Supply - do -<br />

- 418 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

2400.00 2312.20 87.80 2354.60 2266.80 87.80<br />

278.50 254.50 24.00 278.50 254.50 24.00<br />

178.80 168.80 10.00 178.80 168.80 10.00<br />

17.50 17.50 - 17.50 17.50 -<br />

327.99 327.99 - 327.99 327.99 -<br />

3.50 3.50 - 3.50 3.50 -<br />

870.80 817.00 53.80 870.80 817.00 53.80<br />

10.00 10.00 - 10.00 10.00 -<br />

378.01 378.01 - 378.01 378.01 -<br />

1.00 1.00 - 1.00 1.00 -<br />

40.00 40.00 - 40.00 40.00 -<br />

22.00 22.00 - 22.00 22.00 -<br />

271.90 271.90 - 226.50 226.50 -<br />

1600.00 1600.00 - 1600.00 1600.00 -<br />

1384.40 1384.40 - 1384.40 1384.40 -<br />

215.60 215.60 - 215.60 215.60 -<br />

5750.00 1050.00 4700.00 7219.00 1050.00 6169.00<br />

5610.00 1050.00 4560.00 7079.00 1050.00 6029.00<br />

1050.00 1050.00 - 1050.00 1050.00 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

2268.62 - 2268.62 3737.62 - 3737.62<br />

2291.38 - 2291.38 2291.38 - 2291.38<br />

140.00 - 140.00 140.00 - 140.00<br />

100.00 - 100.00 100.00 - 100.00<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

40.00 - 40.00 40.00 - 40.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

2210 00 A. MEDICAL & PUBLIC HEALTH<br />

01 Urban Health Services : Allopathy<br />

001 Direction & Administration State Govt.<br />

104 Medical Store Depot - do -<br />

109 School Health Programme - do -<br />

110 Hospital & Dispensary<br />

02 Urban Health Services : Other System of Medicines<br />

- do -<br />

102 Homeopathy - do -<br />

03 Rural Health Services : Allopathy - do -<br />

05/105 Medical Edn. Research & Trg. : Allopathy<br />

06 Public Health<br />

- do -<br />

101 Prevention & Control of Diseases - do -<br />

102 Prevention of Food Adulteration - do -<br />

104 Drug Control Programme - do -<br />

105 Public Health Education - do -<br />

800 Others<br />

2210 00 B. HOSPITAL & DISPENSARY<br />

- do -<br />

110 Hospital & Dispensary State Govt.<br />

05/105 Medical Edn. Research & Trg. : Allopathy<br />

2215 00 WATER SUPPLY & SANITATION<br />

01 Water Supply<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003 Training - do -<br />

004 Research - do -<br />

005 Survey & Investigation - do -<br />

052 Machinery & Equipment - do -<br />

101 Urban Water Supply Programme - do -<br />

102 Rural Water Supply Programme<br />

02 Sewerage & Sanitation<br />

- do -<br />

105 (i) Rural Sanitation State Govt.<br />

106 Water Quality Monitoring - do -<br />

107 Integrated Project of Aizawl - do -<br />

800 (a) Building - do -<br />

(b) Motor Vehicles - do -<br />

(c) Emergency Water Supply - do -<br />

Total<br />

(col.6+12)<br />

- 419 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

14890.00 13557.49 1332.51 22333.00 22333.00 - 2665.00 2539.70<br />

1792.30 1631.00 161.30 7861.00 7861.00 - 446.30 391.30<br />

178.80 168.80 10.00 625.00 625.00 - 160.00 160.00<br />

17.50 17.50 - 38.00 38.00 - - -<br />

3313.72 3184.59 129.13 4586.00 4586.00 - 389.00 389.00<br />

19.70 19.70 - 35.00 35.00 - 3.50 3.50<br />

5392.70 4850.82 541.88 6226.00 6226.00 - 998.70 934.70<br />

771.75 765.55 6.20 1217.00 1217.00 - 10.00 10.00<br />

1624.33 1624.33 - 1187.00 1187.00 - 401.50 401.50<br />

1.00 1.00 - 5.00 5.00 - - -<br />

190.00 190.00 - 162.00 162.00 - 75.00 75.00<br />

62.00 62.00 - 44.00 44.00 - 25.00 25.00<br />

1526.20 1042.20 484.00 347.00 347.00 - 156.00 149.70<br />

1600.00 1600.00 - 17993.00 17993.00 - 1760.00 1760.00<br />

1384.40 1384.40 - 15997.00 15997.00 - 1544.90 1544.90<br />

215.60 215.60 - 1996.00 1996.00 - 215.10 215.10<br />

27488.91 6820.46 20668.45 38046.00 5847.30 32198.70 9997.00 3661.30<br />

26887.74 6719.56 20168.18 37355.00 5156.30 32198.70 9543.00 3278.30<br />

4378.82 4378.82 - 2646.00 2646.00 - 1050.00 1050.00<br />

247.41 - 247.41 91.00 91.00 - 10.00 -<br />

- - - 91.00 91.00 - 10.00 -<br />

- - - - - - - -<br />

10.66 - 10.66 700.00 - 700.00 100.00 -<br />

12970.10 2000.00 10970.10 18300.00 2000.00 16300.00 3373.00 2000.00<br />

9280.75 340.74 8940.01 15527.00 328.30 15198.70 5000.00 228.30<br />

601.17 100.90 500.27 691.00 691.00 - 454.00 383.00<br />

272.38 5.00 267.38 383.00 383.00 - 300.00 300.00<br />

- - - 49.00 49.00 - 10.00 -<br />

- - - - - - - -<br />

8.90 8.90 - 58.00 58.00 - 20.00 -<br />

164.89 - 164.89 - - - - -<br />

155.00 87.00 68.00 201.00 201.00 - 124.00 83.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

2210 00 A. MEDICAL & PUBLIC HEALTH<br />

01 Urban Health Services : Allopathy<br />

001 Direction & Administration State Govt.<br />

104 Medical Store Depot - do -<br />

109 School Health Programme - do -<br />

110 Hospital & Dispensary<br />

02 Urban Health Services : Other System of Medicines<br />

- do -<br />

102 Homeopathy - do -<br />

03 Rural Health Services : Allopathy - do -<br />

05/105 Medical Edn. Research & Trg. : Allopathy<br />

06 Public Health<br />

- do -<br />

101 Prevention & Control of Diseases - do -<br />

102 Prevention of Food Adulteration - do -<br />

104 Drug Control Programme - do -<br />

105 Public Health Education - do -<br />

800 Others<br />

2210 00 B. HOSPITAL & DISPENSARY<br />

- do -<br />

110 Hospital & Dispensary State Govt.<br />

05/105 Medical Edn. Research & Trg. : Allopathy<br />

2215 00 WATER SUPPLY & SANITATION<br />

01 Water Supply<br />

- do -<br />

001 Direction & Administration State Govt.<br />

003 Training - do -<br />

004 Research - do -<br />

005 Survey & Investigation - do -<br />

052 Machinery & Equipment - do -<br />

101 Urban Water Supply Programme - do -<br />

102 Rural Water Supply Programme<br />

02 Sewerage & Sanitation<br />

- do -<br />

105 (i) Rural Sanitation State Govt.<br />

106 Water Quality Monitoring - do -<br />

107 Integrated Project of Aizawl - do -<br />

800 (a) Building - do -<br />

(b) Motor Vehicles - do -<br />

(c) Emergency Water Supply - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

125.30<br />

55.00<br />

-<br />

-<br />

-<br />

-<br />

64.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

6.30<br />

-<br />

-<br />

-<br />

6335.70<br />

6264.70<br />

-<br />

10.00<br />

10.00<br />

-<br />

100.00<br />

1373.00<br />

4771.70<br />

71.00<br />

-<br />

10.00<br />

-<br />

20.00<br />

-<br />

41.00<br />

- 420 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 421 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

(d) Augmentation of Traditional Water Sources - do - - - - - - -<br />

(e) IEC activities - do - - - - - - -<br />

2216 00 HOUSING 22748.00 2704.50 20043.50 15750.43 15470.87 279.56<br />

01 (A) GOVT. HOUSING (PWD) 472.00 213.50 258.50 1016.35 736.79 279.56<br />

001 Direction & Administration State Govt. 211.00 211.00 - 235.00 235.00 -<br />

106 Construction - do - 261.00 2.50 258.50 781.35 501.79 279.56<br />

01 (B) POLICE HOUSING 2216.00 2216.00 - 174.08 174.08 -<br />

107 Police Housing State Govt. 2216.00 2216.00 - 174.08 174.08 -<br />

(C) HOUSING (LAD)<br />

02 Urban Housing<br />

20060.00 275.00 19785.00 14560.00 14560.00 -<br />

190 Investment State Govt. 18100.00 - 18100.00 13296.00 13296.00 -<br />

050 Land - do - 740.00 - 740.00 658.00 658.00 -<br />

800 Other Expenditure<br />

03 Rural Housing<br />

- do - 50.00 - 50.00 16.00 16.00 -<br />

101 Provision of House Site State Govt. 75.00 - 75.00 10.00 10.00 -<br />

102 Provision of Construction Assistance - do - 50.00 - 50.00 5.00 5.00 -<br />

800 Other Expenditure<br />

80 General<br />

- do - 720.00 - 720.00 205.00 205.00 -<br />

001 Direction & Administration State Govt. 275.00 275.00 - 325.00 325.00 -<br />

800 Other Expenditure - do - 50.00 - 50.00 45.00 45.00 -<br />

2217 00 URBAN DEVELOPMENT 13604.00 5747.24 7856.76 3166.05 3049.34 116.71<br />

01 A. STATE CAPITAL PROJECT 8885.00 4951.24 3933.76 331.20 331.20 -<br />

001 Direction & Administration State Govt. 300.00 300.00 - 331.20 331.20 -<br />

051 Construction - do - 8585.00 4651.24 3933.76 - - -<br />

052 Machinery & Equipment<br />

01 B. URBAN DEV. & POVERTY ALLEVIATION<br />

- do - - - - - - -<br />

001 Direction & Administration State Govt.<br />

051 Construction - do -<br />

03 IDSMT (TOWN & COUNTRY PLANNING) 532.00 396.00 136.00 451.71 335.00 116.71<br />

001 Direction & Administration State Govt. 230.00 230.00 - 225.00 225.00 -<br />

050 Land - do - 40.00 - 40.00 - - -<br />

051 Construction - do - 262.00 166.00 96.00 226.71 110.00 116.71<br />

052 Machinery & Equipment - do - - - - - - -<br />

05 OTHER URBAN DEVELOPMENT (LAD) 4187.00 400.00 3787.00 2383.14 2383.14 -<br />

001 Direction & Administration State Govt. 400.00 400.00 - 314.00 314.00 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

(d) Augmentation of Traditional Water Sources - do -<br />

(e) IEC activities - do -<br />

2216 00 HOUSING<br />

01 (A) GOVT. HOUSING (PWD)<br />

001 Direction & Administration State Govt.<br />

106 Construction<br />

01 (B) POLICE HOUSING<br />

- do -<br />

107 Police Housing<br />

(C) HOUSING (LAD)<br />

02 Urban Housing<br />

State Govt.<br />

190 Investment State Govt.<br />

050 Land - do -<br />

800 Other Expenditure<br />

03 Rural Housing<br />

- do -<br />

101 Provision of House Site State Govt.<br />

102 Provision of Construction Assistance - do -<br />

800 Other Expenditure<br />

80 General<br />

- do -<br />

001 Direction & Administration State Govt.<br />

800 Other Expenditure<br />

2217 00 URBAN DEVELOPMENT<br />

01 A. STATE CAPITAL PROJECT<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction - do -<br />

052 Machinery & Equipment<br />

01 B. URBAN DEV. & POVERTY ALLEVIATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction<br />

03 IDSMT (TOWN & COUNTRY PLANNING)<br />

- do -<br />

001 Direction & Administration State Govt.<br />

050 Land - do -<br />

051 Construction - do -<br />

052 Machinery & Equipment<br />

05 OTHER URBAN DEVELOPMENT (LAD)<br />

- do -<br />

001 Direction & Administration State Govt.<br />

- 422 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

- - - - - -<br />

- - - - - -<br />

4557.00 4423.93 133.07 1553.00 1419.93 133.07<br />

320.00 186.93 133.07 320.00 186.93 133.07<br />

89.00 89.00 - 89.00 89.00 -<br />

231.00 97.93 133.07 231.00 97.93 133.07<br />

545.00 545.00 - 545.00 545.00 -<br />

545.00 545.00 - 545.00 545.00 -<br />

3692.00 3692.00 - 688.00 688.00 -<br />

3254.00 3254.00 - 250.00 250.00 -<br />

357.00 357.00 - 357.00 357.00 -<br />

3.00 3.00 - 3.00 3.00 -<br />

- - - - - -<br />

- - - - - -<br />

- - - - - -<br />

58.00 58.00 - 58.00 58.00 -<br />

20.00 20.00 - 20.00 20.00 -<br />

1602.00 1581.00 21.00 1702.50 1681.50 21.00<br />

100.00 100.00 - 100.00 100.00 -<br />

100.00 100.00 - 100.00 100.00 -<br />

- - - - - -<br />

- - - - - -<br />

144.00 123.00 21.00 144.00 123.00 21.00<br />

65.00 55.00 10.00 65.00 55.00 10.00<br />

- - - - - -<br />

79.00 68.00 11.00 79.00 68.00 11.00<br />

- - - - - -<br />

1358.00 1358.00 - 1458.50 1458.50 -<br />

76.17 76.17 - 76.17 76.17 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

(d) Augmentation of Traditional Water Sources - do -<br />

(e) IEC activities - do -<br />

2216 00 HOUSING<br />

01 (A) GOVT. HOUSING (PWD)<br />

001 Direction & Administration State Govt.<br />

106 Construction<br />

01 (B) POLICE HOUSING<br />

- do -<br />

107 Police Housing<br />

(C) HOUSING (LAD)<br />

02 Urban Housing<br />

State Govt.<br />

190 Investment State Govt.<br />

050 Land - do -<br />

800 Other Expenditure<br />

03 Rural Housing<br />

- do -<br />

101 Provision of House Site State Govt.<br />

102 Provision of Construction Assistance - do -<br />

800 Other Expenditure<br />

80 General<br />

- do -<br />

001 Direction & Administration State Govt.<br />

800 Other Expenditure<br />

2217 00 URBAN DEVELOPMENT<br />

01 A. STATE CAPITAL PROJECT<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction - do -<br />

052 Machinery & Equipment<br />

01 B. URBAN DEV. & POVERTY ALLEVIATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction<br />

03 IDSMT (TOWN & COUNTRY PLANNING)<br />

- do -<br />

001 Direction & Administration State Govt.<br />

050 Land - do -<br />

051 Construction - do -<br />

052 Machinery & Equipment<br />

05 OTHER URBAN DEVELOPMENT (LAD)<br />

- do -<br />

001 Direction & Administration State Govt.<br />

Total<br />

(col.6+12)<br />

- 423 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

- - - - - - - -<br />

- - - - - - - -<br />

17303.43 16890.80 412.63 25910.00 25220.00 690.00 4759.00 4579.00<br />

1336.35 923.72 412.63 2013.00 1323.00 690.00 363.00 183.00<br />

324.00 324.00 - 733.00 733.00 - 98.00 98.00<br />

1012.35 599.72 412.63 1280.00 590.00 690.00 265.00 85.00<br />

719.08 719.08 - 1078.00 1078.00 - 600.00 600.00<br />

719.08 719.08 - 1078.00 1078.00 - 600.00 600.00<br />

15248.00 15248.00 - 22819.00 22819.00 - 3796.00 3796.00<br />

13546.00 13546.00 - 19285.00 19285.00 - 3579.00 3579.00<br />

1015.00 1015.00 - 1417.00 1417.00 - 5.00 5.00<br />

19.00 19.00 - 150.00 150.00 - 13.00 13.00<br />

- - -<br />

10.00 10.00 - - - - - -<br />

5.00 5.00 - - - - - -<br />

205.00 205.00 - 1260.00 1260.00 - 132.00 132.00<br />

- -<br />

383.00 383.00 - 347.00 347.00 - 58.00 58.00<br />

65.00 65.00 - 360.00 360.00 - 9.00 9.00<br />

4868.55 4730.84 137.71 10712.00 4959.00 5753.00 2608.00 1513.74<br />

431.20 431.20 - 496.00 496.00 - 105.00 105.00<br />

431.20 431.20 - 496.00 496.00 - 105.00 105.00<br />

- - - - - - - -<br />

- - - - - - - -<br />

5500.00 - 5500.00 1049.00 -<br />

500.00 - 500.00 100.00 -<br />

5000.00 - 5000.00 949.00 -<br />

595.71 458.00 137.71 684.00 456.00 228.00 159.00 113.74<br />

290.00 280.00 10.00 318.00 318.00 - 54.74 54.74<br />

- - - 68.00 - 68.00 10.30 -<br />

305.71 178.00 127.71 270.00 138.00 132.00 91.96 59.00<br />

- - - 28.00 - 28.00 2.00 -<br />

3841.64 3841.64 - 4032.00 4007.00 25.00 1295.00 1295.00<br />

390.17 390.17 - 484.00 484.00 - 60.00 60.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

(d) Augmentation of Traditional Water Sources - do -<br />

(e) IEC activities - do -<br />

2216 00 HOUSING<br />

01 (A) GOVT. HOUSING (PWD)<br />

001 Direction & Administration State Govt.<br />

106 Construction<br />

01 (B) POLICE HOUSING<br />

- do -<br />

107 Police Housing<br />

(C) HOUSING (LAD)<br />

02 Urban Housing<br />

State Govt.<br />

190 Investment State Govt.<br />

050 Land - do -<br />

800 Other Expenditure<br />

03 Rural Housing<br />

- do -<br />

101 Provision of House Site State Govt.<br />

102 Provision of Construction Assistance - do -<br />

800 Other Expenditure<br />

80 General<br />

- do -<br />

001 Direction & Administration State Govt.<br />

800 Other Expenditure<br />

2217 00 URBAN DEVELOPMENT<br />

01 A. STATE CAPITAL PROJECT<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction - do -<br />

052 Machinery & Equipment<br />

01 B. URBAN DEV. & POVERTY ALLEVIATION<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction<br />

03 IDSMT (TOWN & COUNTRY PLANNING)<br />

- do -<br />

001 Direction & Administration State Govt.<br />

050 Land - do -<br />

051 Construction - do -<br />

052 Machinery & Equipment<br />

05 OTHER URBAN DEVELOPMENT (LAD)<br />

- do -<br />

001 Direction & Administration State Govt.<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

180.00<br />

180.00<br />

-<br />

180.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

1094.26<br />

-<br />

-<br />

-<br />

-<br />

1049.00<br />

100.00<br />

949.00<br />

45.26<br />

-<br />

10.30<br />

32.96<br />

2.00<br />

-<br />

-<br />

- 424 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 425 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

050 Land - do - 1695.00 - 1695.00 783.40 783.40 -<br />

051 Construction - do - 733.00 - 733.00 198.50 198.50 -<br />

052 Machinery & Equipment - do - 200.00 - 200.00 182.00 182.00 -<br />

190 Investment - do - 59.00 - 59.00 6.00 6.00 -<br />

800 Other Expenditure - do - 475.00 - 475.00 315.00 315.00 -<br />

04 Slum Development - do - 625.00 - 625.00 584.24 584.24 -<br />

2220 00 INFORMATION & PUBLICITY<br />

01 Films<br />

612.00 612.00 - 647.90 541.90 106.00<br />

01 Direction & Administration State Govt. 110.00 110.00 - 89.08 89.08 -<br />

105 Production of Films<br />

60 Others<br />

- do - 45.00 45.00 - 21.33 21.33 -<br />

03 Research & Training - do - 30.00 30.00 - 24.22 24.22 -<br />

101 Advertising & Visual Publicity - do - 22.00 22.00 - 25.76 25.76 -<br />

102 Information Centres - do - 100.00 100.00 - 74.07 74.07 -<br />

103 Press Information Service - do - 50.00 50.00 - 32.36 32.36 -<br />

104 Public Exhibition of Films - do - 15.00 15.00 - - - -<br />

106 Field Publicity - do - 40.00 40.00 - 76.22 76.22 -<br />

107 Songs & Drama Services - do - 20.00 20.00 - 19.85 19.85 -<br />

109 Photo Services - do - 45.00 45.00 - 41.83 41.83 -<br />

110 Publication - do - 60.00 60.00 - 77.13 77.13 -<br />

111 Community Radio / TV<br />

800 Other Expenditure -<br />

- do - 20.00 20.00 - 23.55 23.55 -<br />

a) Cultural & Social Activities - do - 55.00 55.00 - 36.50 36.50 -<br />

b) Baffacos - do - - - - 106.00 - 106.00<br />

2230 00 LABOUR & EMPLOYMENT 350.00 350.00 - 378.75 378.75 -<br />

01 Labour<br />

001 Direction & Administration State Govt. 130.00 130.00 - 100.81 100.81 -<br />

02 Employment<br />

101 Employment Exchange - do - 70.00 70.00 - 87.33 87.33 -<br />

03 Training<br />

101 Industrial Training Institute - do - 150.00 150.00 - 190.61 190.61 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

050 Land - do -<br />

051 Construction - do -<br />

052 Machinery & Equipment - do -<br />

190 Investment - do -<br />

800 Other Expenditure - do -<br />

04 Slum Development<br />

2220 00 INFORMATION & PUBLICITY<br />

01 Films<br />

- do -<br />

01 Direction & Administration State Govt.<br />

105 Production of Films<br />

60 Others<br />

- do -<br />

03 Research & Training - do -<br />

101 Advertising & Visual Publicity - do -<br />

102 Information Centres - do -<br />

103 Press Information Service - do -<br />

104 Public Exhibition of Films - do -<br />

106 Field Publicity - do -<br />

107 Songs & Drama Services - do -<br />

109 Photo Services - do -<br />

110 Publication - do -<br />

111 Community Radio / TV<br />

800 Other Expenditure -<br />

- do -<br />

a) Cultural & Social Activities - do -<br />

b) Baffacos - do -<br />

2230 00 LABOUR & EMPLOYMENT<br />

01 Labour<br />

001 Direction & Administration State Govt.<br />

02 Employment<br />

101 Employment Exchange - do -<br />

03 Training<br />

101 Industrial Training Institute - do -<br />

- 426 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

275.53 275.53 - 275.53 275.53 -<br />

70.00 70.00 - 70.00 70.00 -<br />

55.30 55.30 - 55.30 55.30 -<br />

- - - - - -<br />

178.00 178.00 - 278.50 278.50 -<br />

703.00 703.00 - 703.00 703.00 -<br />

270.00 270.00 - 217.00 217.00 -<br />

30.00 30.00 - 30.00 30.00 -<br />

16.00 16.00 - 16.00 16.00 -<br />

16.00 16.00 - 16.00 16.00 -<br />

18.00 18.00 - 18.00 18.00 -<br />

21.00 21.00 - 21.00 21.00 -<br />

15.00 15.00 - 15.00 15.00 -<br />

- - - - - -<br />

21.00 21.00 - 21.00 21.00 -<br />

8.00 8.00 - 8.00 8.00 -<br />

15.00 15.00 - 15.00 15.00 -<br />

24.00 24.00 - 24.00 24.00 -<br />

2.00 2.00 - 2.00 2.00 -<br />

14.00 14.00 - 14.00 14.00 -<br />

70.00 70.00 - 17.00 17.00 -<br />

150.00 150.00 - 150.00 150.00 -<br />

38.10 38.10 - 38.10 38.10 -<br />

47.50 47.50 - 47.50 47.50 -<br />

64.40 64.40 - 64.40 64.40 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

050 Land - do -<br />

051 Construction - do -<br />

052 Machinery & Equipment - do -<br />

190 Investment - do -<br />

800 Other Expenditure - do -<br />

04 Slum Development<br />

2220 00 INFORMATION & PUBLICITY<br />

01 Films<br />

- do -<br />

01 Direction & Administration State Govt.<br />

105 Production of Films<br />

60 Others<br />

- do -<br />

03 Research & Training - do -<br />

101 Advertising & Visual Publicity - do -<br />

102 Information Centres - do -<br />

103 Press Information Service - do -<br />

104 Public Exhibition of Films - do -<br />

106 Field Publicity - do -<br />

107 Songs & Drama Services - do -<br />

109 Photo Services - do -<br />

110 Publication - do -<br />

111 Community Radio / TV<br />

800 Other Expenditure -<br />

- do -<br />

a) Cultural & Social Activities - do -<br />

b) Baffacos - do -<br />

2230 00 LABOUR & EMPLOYMENT<br />

01 Labour<br />

001 Direction & Administration State Govt.<br />

02 Employment<br />

101 Employment Exchange - do -<br />

03 Training<br />

101 Industrial Training Institute - do -<br />

Total<br />

(col.6+12)<br />

- 427 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

1058.93 1058.93 - 2728.00 2728.00 - 854.00 854.00<br />

268.50 268.50 - 530.00 530.00 - 236.00 236.00<br />

237.30 237.30 - 25.00 - 25.00 40.00 40.00<br />

6.00 6.00 - - - - - -<br />

593.50 593.50 - 265.00 265.00 - 105.00 105.00<br />

1287.24 1287.24 - - - - - -<br />

864.90 758.90 106.00 1036.00 1036.00 - 297.00 297.00<br />

119.08 119.08 - 157.00 157.00 - 50.00 50.00<br />

37.33 37.33 - 59.00 59.00 - 10.00 10.00<br />

40.22 40.22 - 60.00 60.00 - 18.00 18.00<br />

43.76 43.76 - 51.00 51.00 - 20.00 20.00<br />

95.07 95.07 - 140.00 140.00 - 40.00 40.00<br />

47.36 47.36 - 83.00 83.00 - 20.00 20.00<br />

0.00 0.00 - 60.00 60.00 - 10.00 10.00<br />

97.22 97.22 - 71.00 71.00 - 35.00 35.00<br />

27.85 27.85 - 48.00 48.00 - 18.00 18.00<br />

56.83 56.83 - 77.00 77.00 - 20.00 20.00<br />

101.13 101.13 - 94.00 94.00 - 32.00 32.00<br />

25.55 25.55 - 48.00 48.00 - 4.00 4.00<br />

50.50 50.50 - 88.00 88.00 - 20.00 20.00<br />

123.00 17.00 106.00 - - - - -<br />

528.75 528.75 - 633.00 633.00 - 165.00 165.00<br />

138.91 138.91 - 227.00 227.00 - 60.00 60.00<br />

134.83 134.83 - 157.00 157.00 - 40.00 40.00<br />

255.01 255.01 - 249.00 249.00 - 65.00 65.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

050 Land - do -<br />

051 Construction - do -<br />

052 Machinery & Equipment - do -<br />

190 Investment - do -<br />

800 Other Expenditure - do -<br />

04 Slum Development<br />

2220 00 INFORMATION & PUBLICITY<br />

01 Films<br />

- do -<br />

01 Direction & Administration State Govt.<br />

105 Production of Films<br />

60 Others<br />

- do -<br />

03 Research & Training - do -<br />

101 Advertising & Visual Publicity - do -<br />

102 Information Centres - do -<br />

103 Press Information Service - do -<br />

104 Public Exhibition of Films - do -<br />

106 Field Publicity - do -<br />

107 Songs & Drama Services - do -<br />

109 Photo Services - do -<br />

110 Publication - do -<br />

111 Community Radio / TV<br />

800 Other Expenditure -<br />

- do -<br />

a) Cultural & Social Activities - do -<br />

b) Baffacos - do -<br />

2230 00 LABOUR & EMPLOYMENT<br />

01 Labour<br />

001 Direction & Administration State Govt.<br />

02 Employment<br />

101 Employment Exchange - do -<br />

03 Training<br />

101 Industrial Training Institute - do -<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 428 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 429 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

0 1 2 3 4 5 6 7 8<br />

New Schemes<br />

2235 00 SOCIAL SECURITY & WELFARE 1493.00 1493.00 - 2804.22 2804.22 -<br />

1) Social Welfare<br />

001 Direction State Govt. 69.75 69.75 - 80.79 80.79 -<br />

002 District Administration - do - - - - 9.26 9.26 -<br />

101 Welfare of Handicapped - do - 80.75 80.75 - 71.05 71.05 -<br />

104 Welfare of Aged & Destitutes - do - 179.50 179.50 - 2.80 2.80 -<br />

105 Correctional Services - do - 467.50 467.50 - 215.88 215.88 -<br />

106 Prohibition - do - 450.50 450.50 - 384.41 384.41 -<br />

107 GIA to Voluntary Organisations - do - 50.00 50.00 - 29.00 29.00 -<br />

108 Information Technology & Software - do - - - - - - -<br />

800 Other Expenditure - do - - - - 1765.05 1765.05 -<br />

2) Women & Child Development<br />

001 Direction - do - - - - - - -<br />

102 Child Welfare - do - 100.00 100.00 - 47.35 47.35 -<br />

103 Women Welfare - do - 95.00 95.00 - 198.63 198.63 -<br />

2236 00 NUTRITION 2925.00 2925.00 - 2701.00 2701.00 -<br />

101 i) Supplementary Nutrition Prog. (PMGY) State Govt. 2925.00 2925.00 - 2652.00 2652.00 -<br />

ii) State Nutrition Programme - do - - - - - - -<br />

iii) NPAG - do - - - - 49.00 49.00 -<br />

iv) Community Food & Nutrition Extention Centre - do - - - - - - -<br />

3 00 0000 00 XII. GENERAL SERVICES 4458.00 3070.00 1388.00 4635.63 3625.63 1010.00<br />

2056 00 JAILS 808.00 808.00 - 854.50 854.50 -<br />

001 Direction & Administration State Govt. 22.00 22.00 - 43.00 43.00 -<br />

101 District Jails - do - 706.00 706.00 - 551.50 551.50 -<br />

102 Jail Manufacture - do - 40.00 40.00 - 60.00 60.00 -<br />

800 Other Expenditure - do - 40.00 40.00 - 200.00 200.00 -<br />

2058 00 PRINTING & STATIONERY 467.00 307.00 160.00 406.92 406.92 -<br />

101 Purchase & Supply of Stationery Items State Govt. 44.70 44.70 - 7.20 7.20 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

2235 00 SOCIAL SECURITY & WELFARE<br />

1) Social Welfare<br />

001 Direction State Govt.<br />

002 District Administration - do -<br />

101 Welfare of Handicapped - do -<br />

104 Welfare of Aged & Destitutes - do -<br />

105 Correctional Services - do -<br />

106 Prohibition - do -<br />

107 GIA to Voluntary Organisations - do -<br />

108 Information Technology & Software - do -<br />

800 Other Expenditure - do -<br />

2) Women & Child Development<br />

001 Direction - do -<br />

102 Child Welfare - do -<br />

103 Women Welfare - do -<br />

2236 00 NUTRITION<br />

101 i) Supplementary Nutrition Prog. (PMGY) State Govt.<br />

ii) State Nutrition Programme - do -<br />

iii) NPAG - do -<br />

iv) Community Food & Nutrition Extention Centre - do -<br />

3 00 0000 00 XII. GENERAL SERVICES<br />

2056 00 JAILS<br />

001 Direction & Administration State Govt.<br />

101 District Jails - do -<br />

102 Jail Manufacture - do -<br />

800 Other Expenditure - do -<br />

2058 00 PRINTING & STATIONERY<br />

101 Purchase & Supply of Stationery Items State Govt.<br />

- 430 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

630.00 630.00 - 630.00 630.00 -<br />

39.21 39.21 - 39.21 39.21 -<br />

12.00 12.00 - 12.00 12.00 -<br />

22.03 22.03 - 22.03 22.03 -<br />

0.50 0.50 - 0.50 0.50 -<br />

77.38 77.38 - 77.38 77.38 -<br />

100.54 100.54 - 100.54 100.54 -<br />

17.00 17.00 - 17.00 17.00 -<br />

- - - - - -<br />

270.40 270.40 - 270.40 270.40 -<br />

- - - - - -<br />

22.00 22.00 - 22.00 22.00 -<br />

68.94 68.94 - 68.94 68.94 -<br />

682.00 682.00 - 763.00 763.00 -<br />

665.00 665.00 - 746.00 746.00 -<br />

- - - - - -<br />

17.00 17.00 - 17.00 17.00 -<br />

- - - - - -<br />

1817.00 1405.51 411.49 1868.00 1456.51 411.49<br />

288.00 288.00 - 288.00 288.00 -<br />

19.00 19.00 - 19.00 19.00 -<br />

167.00 167.00 - 167.00 167.00 -<br />

13.00 13.00 - 13.00 13.00 -<br />

89.00 89.00 - 89.00 89.00 -<br />

180.00 180.00 - 180.00 180.00 -<br />

1.89 1.89 - 1.89 1.89 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

2235 00 SOCIAL SECURITY & WELFARE<br />

1) Social Welfare<br />

001 Direction State Govt.<br />

002 District Administration - do -<br />

101 Welfare of Handicapped - do -<br />

104 Welfare of Aged & Destitutes - do -<br />

105 Correctional Services - do -<br />

106 Prohibition - do -<br />

107 GIA to Voluntary Organisations - do -<br />

108 Information Technology & Software - do -<br />

800 Other Expenditure - do -<br />

2) Women & Child Development<br />

001 Direction - do -<br />

102 Child Welfare - do -<br />

103 Women Welfare - do -<br />

2236 00 NUTRITION<br />

101 i) Supplementary Nutrition Prog. (PMGY) State Govt.<br />

ii) State Nutrition Programme - do -<br />

iii) NPAG - do -<br />

iv) Community Food & Nutrition Extention Centre - do -<br />

3 00 0000 00 XII. GENERAL SERVICES<br />

2056 00 JAILS<br />

001 Direction & Administration State Govt.<br />

101 District Jails - do -<br />

102 Jail Manufacture - do -<br />

800 Other Expenditure - do -<br />

2058 00 PRINTING & STATIONERY<br />

101 Purchase & Supply of Stationery Items State Govt.<br />

Total<br />

(col.6+12)<br />

- 431 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

3434.22 3434.22 - 5233.00 5033.00 200.00 945.00 886.00<br />

120.00 120.00 - 139.00 114.00 25.00 32.35 27.35<br />

21.26 21.26 - 14.00 14.00 - 6.00 6.00<br />

93.08 93.08 - 222.00 162.00 60.00 46.95 35.95<br />

3.30 3.30 - 75.00 75.00 - 25.70 25.70<br />

293.26 293.26 - 382.00 382.00 - 82.67 82.67<br />

484.95 484.95 - 383.00 383.00 - 66.88 66.88<br />

46.00 46.00 - 50.00 50.00 - 16.00 16.00<br />

- - - - - - - -<br />

2035.45 2035.45 - 3515.00 3515.00 - 534.45 534.45<br />

- - - - - - - -<br />

69.35 69.35 - 110.00 70.00 40.00 37.00 19.00<br />

267.57 267.57 - 343.00 268.00 75.00 97.00 72.00<br />

3464.00 3464.00 - 4133.00 4053.00 80.00 821.00 769.00<br />

3398.00 3398.00 - 4133.00 4053.00 80.00 821.00 769.00<br />

- - - - - - - -<br />

66.00 66.00 - - - - - -<br />

- - - - - - - -<br />

6503.63 5082.14 1421.49 7792.00 6850.00 942.00 2345.00 2045.00<br />

1142.50 1142.50 - 1371.00 1371.00 - 317.00 317.00<br />

62.00 62.00 - 150.00 150.00 - 14.00 14.00<br />

718.50 718.50 - 721.00 721.00 - 199.00 199.00<br />

73.00 73.00 - 170.00 170.00 - 15.00 15.00<br />

289.00 289.00 - 330.00 330.00 - 89.00 89.00<br />

586.92 586.92 - 704.00 704.00 - 198.00 198.00<br />

9.09 9.09 - 65.00 65.00 - 2.00 2.00


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

2235 00 SOCIAL SECURITY & WELFARE<br />

1) Social Welfare<br />

001 Direction State Govt.<br />

002 District Administration - do -<br />

101 Welfare of Handicapped - do -<br />

104 Welfare of Aged & Destitutes - do -<br />

105 Correctional Services - do -<br />

106 Prohibition - do -<br />

107 GIA to Voluntary Organisations - do -<br />

108 Information Technology & Software - do -<br />

800 Other Expenditure - do -<br />

2) Women & Child Development<br />

001 Direction - do -<br />

102 Child Welfare - do -<br />

103 Women Welfare - do -<br />

2236 00 NUTRITION<br />

101 i) Supplementary Nutrition Prog. (PMGY) State Govt.<br />

ii) State Nutrition Programme - do -<br />

iii) NPAG - do -<br />

iv) Community Food & Nutrition Extention Centre - do -<br />

3 00 0000 00 XII. GENERAL SERVICES<br />

2056 00 JAILS<br />

001 Direction & Administration State Govt.<br />

101 District Jails - do -<br />

102 Jail Manufacture - do -<br />

800 Other Expenditure - do -<br />

2058 00 PRINTING & STATIONERY<br />

101 Purchase & Supply of Stationery Items State Govt.<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

59.00<br />

5.00<br />

-<br />

11.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

18.00<br />

25.00<br />

52.00<br />

52.00<br />

-<br />

-<br />

-<br />

300.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 432 -


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Total<br />

- 433 -<br />

Tenth Plan (2002-07) - Projected Outlay at<br />

2001-02 prices<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Cumulative Expenditure from 2002-03 to<br />

2005-06 (Actual)<br />

Continuing<br />

Schemes<br />

New Schemes<br />

0 1 2 3 4 5 6 7 8<br />

103 Government Press - do - 374.30 214.30 160.00 310.25 310.25 -<br />

105 Government Publication - do - 48.00 48.00 - 89.47 89.47 -<br />

2058 00 PUBLIC WORKS 2969.00 1745.00 1224.00 3115.54 2105.54 1010.00<br />

001 Direction & Administration State Govt. 685.00 685.00 - 1049.00 1049.00 -<br />

051 Construction - do - 2284.00 1060.00 1224.00 2066.54 1056.54 1010.00<br />

800 Other Expenditure (Finance Commission) - do - - - - - -<br />

2070 00 OTHER ADMINISTRATIVE SERVICES 214.00 210.00 4.00 258.67 258.67 -<br />

003 Administrative Training Institute State Govt. 210.00 210.00 - 247.67 247.67 -<br />

2555 00 FORENSIC SCIENCE LABORATORY State Govt. 4.00 - 4.00 11.00 11.00 -<br />

9 99 9999 99 GRAND TOTAL 230001.00 177493.34 52507.66 220145.33 184734.51 35410.82


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

103 Government Press - do -<br />

105 Government Publication<br />

2058 00 PUBLIC WORKS<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction - do -<br />

800 Other Expenditure (Finance Commission)<br />

2070 00 OTHER ADMINISTRATIVE SERVICES<br />

- do -<br />

003 Administrative Training Institute State Govt.<br />

2555 00 FORENSIC SCIENCE LABORATORY State Govt.<br />

9 99 9999 99 GRAND TOTAL<br />

- 434 -<br />

Total<br />

Annual Plan 2006-07<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

9 10 11 12 13 14<br />

152.97 152.97 - 152.97 152.97 -<br />

25.14 25.14 - 25.14 25.14 -<br />

1285.00 873.51 411.49 1306.00 894.51 411.49<br />

302.00 302.00 - 302.00 302.00 -<br />

983.00 571.51 411.49 1004.00 592.51 411.49<br />

- - - - - -<br />

64.00 64.00 - 94.00 94.00 -<br />

60.00 60.00 - 90.00 90.00 -<br />

4.00 4.00 - 4.00 4.00 -<br />

76650.00 64060.79 12589.21 75150.00 61304.25 13845.75


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

103 Government Press - do -<br />

105 Government Publication<br />

2058 00 PUBLIC WORKS<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction - do -<br />

800 Other Expenditure (Finance Commission)<br />

2070 00 OTHER ADMINISTRATIVE SERVICES<br />

- do -<br />

003 Administrative Training Institute State Govt.<br />

2555 00 FORENSIC SCIENCE LABORATORY State Govt.<br />

9 99 9999 99 GRAND TOTAL<br />

Total<br />

(col.6+12)<br />

- 435 -<br />

Continuing<br />

Schemes<br />

(col.7+13)<br />

(Rs. in lakh)<br />

Tenth Plan (2002-07) - Anticipated<br />

Expenditure<br />

New<br />

Schemes<br />

(col.8+14)<br />

Total<br />

Eleventh Five Year Plan 2007-12 - Proposed Outlay (at 2006-07 p<br />

Eleventh Plan (2007-12) Annual Plan (2007<br />

Continuing<br />

Schemes<br />

New Schemes Total<br />

Continuing<br />

Schemes<br />

15 16 17 18 19 20 21 22<br />

463.22 463.22 - 480.00 480.00 - 139.00 139.00<br />

114.61 114.61 - 159.00 159.00 - 57.00 57.00<br />

4421.54 3000.05 1421.49 5305.00 4363.00 942.00 1759.00 1459.00<br />

1351.00 1351.00 - 1339.00 1339.00 - 332.00 332.00<br />

3070.54 1649.05 1421.49 3966.00 3024.00 942.00 1427.00 1127.00<br />

- - - - -<br />

352.67 352.67 - 412.00 412.00 - 71.00 71.00<br />

337.67 337.67 - 395.00 395.00 - 66.00 66.00<br />

15.00 15.00 - 17.00 17.00 - 5.00 5.00<br />

298504.10 252045.03 46459.07 450000.00 348007.96 101992.04 89500.00 69800.54


Sl. No.<br />

Major Heads / Minor Heads of Development<br />

(Scheme-wise)<br />

Implementing<br />

Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

0 1 2<br />

103 Government Press - do -<br />

105 Government Publication<br />

2058 00 PUBLIC WORKS<br />

- do -<br />

001 Direction & Administration State Govt.<br />

051 Construction - do -<br />

800 Other Expenditure (Finance Commission)<br />

2070 00 OTHER ADMINISTRATIVE SERVICES<br />

- do -<br />

003 Administrative Training Institute State Govt.<br />

2555 00 FORENSIC SCIENCE LABORATORY State Govt.<br />

9 99 9999 99 GRAND TOTAL<br />

(Rs. in lakh)<br />

prices)<br />

-08)<br />

New Schemes<br />

23<br />

-<br />

-<br />

300.00<br />

-<br />

300.00<br />

-<br />

-<br />

-<br />

-<br />

19699.46<br />

- 436 -


PHYSICAL TARGETS AND ACHIEVEMENTS<br />

Sl. No. Item<br />

Unit<br />

Tenth Five Year Plan (2002-07)<br />

Annual Plans<br />

Tenth Plan (2002-03 to 2005-<br />

Target 06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan Annual Plan<br />

2007-12 Target 2007-08<br />

0 1<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

2 3 4 5 6 7 8<br />

1 Direction & Administration<br />

i) Construction of Buildings & Quarters No. 13 10 3 13 15 3<br />

ii) Maint. of existing building No. 100 100 100 100 180 80<br />

iii) Maint. & repairing of vehicles No. 23 23 23 23 10 10<br />

iv) Fencing of Agril complexes. Dist 5 5 5<br />

2 Food grain Development<br />

i) Land Development for WRC Ha. 291 298.51 50 348.51 500 100<br />

ii) Maint.Potential area connectivity KM. 20 98.35 25 123.35 1500 300<br />

iii) Distribution of Rice seeds Qtl. 750 120 - 120 162500 1900<br />

iv) Distribution of other seeds Qtls 348.3 - 348.3 13800 2540<br />

v) Maint. & repairing of Bull Dozer, Tractor & Power Tiller No. 35 35 35 35<br />

3 Manures & fertilizers<br />

i) Maint of Biofertilizer production Unit No. 1 1 1 1 1 1<br />

ii) Maint of Soil & SeedTesting lab. No. 2 2 2 2 2<br />

iii) Collection of soil samples for anlysis No. 40,000 32000 - 32000<br />

4 Plant Protection<br />

Maintenance of IPM Lab. No. 1 1 1 1 1<br />

5 Commercial Crop Development<br />

Distribution of Sugarcane Setts No. 15,00,000 105,000 8,00,000 18,50,000 3500 700<br />

6 Agril. Machineries<br />

i) Subsidy for Tractor No. 50 6 6 6 200 24<br />

ii) Subsidy for Power Tiller No. 30 - 30 30 600 100<br />

iii) Subsidy for water Pump set. No. - - - - 2000 300<br />

iv) Subsidy for Specialsed Implements No. - - - - 1000 160<br />

v) Susidy for Drip irrigation. Set - - - - 1000 100<br />

vi) Subsidy for Sprinkler irrigation Set - - - - 1250 150<br />

- 482 -


Sl. No. Item<br />

Unit<br />

- 483 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

Crop insurance<br />

i) Kharif maize premium subsidy Ha. - - - - 200 500<br />

ii) Kharif soyabean premium subsidy Ha. - - - - 1000 200<br />

iii) Babi Maize premium subsidy<br />

Oilsed Production Programme<br />

Ha. - - - - 2000 500<br />

1) Distribution fo Soyabean @ Rs. 3000 qtl. Qtl. - - - - 10500 1000<br />

Sesamum @ Rs. 1000 /qtl Qtl. - - - - 275 35<br />

Mustrad @ Rs. 1000 / qtl<br />

2) Production fo certificed seeds through SVP / RG<br />

Qtl. - - - - 900 160<br />

Soyabean @ Rs. 500 /qtl. Ha. - - - - 10500 1000<br />

Sesamum @ Rs. 500 /qtl Ha. - - - - 275 35<br />

Mustrad @ Rs. 500 / qtl<br />

Pulses Production Programme<br />

1) Distribution of Certified seeds.<br />

Ha. - - - - 900 160<br />

Redgram @ Rs. 800 / qtl Qtl. - - - - 2830 200<br />

Field pea @ Rs. 1800 / qtl Qtl. - - - - 3750 500<br />

Rajmah @ Rs. 1800 / qtl<br />

2) Production fo certificed seeds through SVP / RG<br />

Qtl. - - - - 3200 500<br />

Redgram @ Rs. 500 / qtl Ha. - - - - 2830 200<br />

Field pea @ Rs. 500 / qtl Ha. - - - - 3750 500<br />

Rajmah @ Rs. 500 / qtl Ha. - - - - 3200 500<br />

State Soil Survey Organisation (Delilineation)<br />

Control of shifting cultivation<br />

Ha. - - - - 32500 6500<br />

Project Management/Component -<br />

a) Administrative cost No. 10 10 10 10<br />

b) Maintenance of Vehicles and POLetc. No. 25 25 25 25<br />

c) Honorarium to projects staff No. 83 83 83 83<br />

d) Farmers Training and Exhibition No. 50 50 - 50


Sl. No. Item<br />

Unit<br />

- 484 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Development Component<br />

i) Land Dev. including conservation measures for WRC land Ha. 700 497.5 497.5<br />

ii) Terracing on hill slope<br />

Production system<br />

Ha. 395 263.25 263.25<br />

Maize development Ha. 3000 - 3000<br />

Pulses development Ha. 4000 - 4000<br />

Oilseed development Ha. 2100 - 2100<br />

Other cereal crops<br />

Land Use incentives<br />

Ha. 2500 - 2500<br />

Purchase of organic manure MT 2000 812 - 812<br />

Demonstration on Commercial crops Ha. 1000 600 - 600<br />

Demonstration on vegetable crops Ha. 2000 1500 - 1500<br />

Drainage line treatment No. 2500 4400 - 4400<br />

Household production system No. 2000 600 - 600<br />

Rain Water harvesting structure- individual and community No. 214 214 - 214<br />

Crop diversification like cultivation of Medicinal and Aromatic plants, as<br />

an alternative to jhuming.<br />

Ha. 200 200 - 200<br />

Innovative management practices of integrated Nutrient Managements. Ha. 1000 1000 - 1000<br />

10 <strong>Mizoram</strong> Intodelhna Programme (MIP)<br />

IWDP State Matching Share No. 44 - - -<br />

State Matching share for Oil Palm Development Programme under<br />

ISOPOM<br />

Ha. 4500 1000 3500 4500.00 5484.50 320<br />

Development of Passion fruit cultivation<br />

MIP (<strong>Mizoram</strong> Intodelhna Project)<br />

Ha. 741.7 741.70 741.70 10654 7759<br />

i) Assistance to individual farmers @ Rs. 7,5000/-per family No. 59306 24,306 - 35000<br />

ii) Land Development for WRC (5-8% ) (ACA) Ha. 1440 520 100 620<br />

iii) Development of terracing (8-10% ) (ACA) Ha. 1620 610 100 710<br />

30000<br />

Annual Plan<br />

2007-08<br />

3900


Sl. No. Item<br />

Unit<br />

- 485 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

iv) Development of terracing in hill slopes (10-15% slopes) (ACA) Ha. 3310 1,530 100 1,630<br />

v) Small scale pig rearing Unit 2000 1,000 1,000 - -<br />

vi) Construction of rain water harvesting dam No. 310 105 105 - -<br />

vii) Establishment of community nursery<br />

viii) Distribution of Inputs<br />

Ha. 47.96 23.98 23.98<br />

ix) Development of transit go-down for Agril marketing No.<br />

x) Potential Area Connectivity (ACA) Km. 205 205 592.67 116<br />

xi) Establishment of Oil Extraction Plant (Patchouli) No. 2 2<br />

xii) Establishment of turmeric/Ginger drying machines<br />

<strong>Mizoram</strong> Intodelhna Programme (MIP)<br />

No. 8 8 400 400<br />

xiii) Promotion of indigenous technology for Chicken Hatchery No. 32 - 32<br />

xiv) Solar drying Unit No. 60 - 60<br />

xv) Development of Aromatic Plants like Patchouli No. 300 500 800 2 2<br />

xvi) Mushroom cultivation No. 200 - 200 -<br />

xiii) Silk rearing No. 80 - 80 -<br />

xvii) R.O.P. Development Ha. 1,000 - 1,000<br />

xviii) Development of Bio-fuel – Jatropha Cultivation @ Rs.12,000/- per<br />

Ha.<br />

Ha. - 1,500 1,500 14727 266580<br />

xix) Assistance to Red Oil Palm Cultivators land preparation, seedlings,<br />

other inputs, etc.@ Rs.15,000/- per Ha.<br />

Ha. 1,500 1,500<br />

xx) Assistance to Passion Fruits Cultivators for land preparation,<br />

seedlings, other inputs, etc. @ Rs.15,000/- per Ha.<br />

Ha. 800 800<br />

xxi) Assistance to Grape Cultivators for land preparation, seedlings,<br />

other inputs, etc. @ Rs.15,000/- per Ha.<br />

Ha. 700 700<br />

xxii) Construction of multipurpose cold storage<br />

BAFFACOS<br />

No. 1 - 1 1<br />

Survey of sporadic bamboo flowering areas No. 24 24<br />

Survey of rodent surveillance at State and sub-divisional and Agril Circle Ha. 2544<br />

Cost of rat tails No. 173910<br />

Incentive for rat traps @ Rs 100/ per Ha Ha. 5900 5,900


Sl. No. Item<br />

Unit<br />

- 486 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Purchase of pesticides & Roden- ticides Ltr/Kg 240/5750 20,000<br />

Paddy (Local Tai) Tin 5580<br />

Paddy (High Yielding Varieties) Qtl. 1235<br />

Potato Qtl. 3205<br />

Maize Qtl. 627.84<br />

Garlic Qtl. 580<br />

Onion Qtl. 2<br />

Mustard (Var.M-27, Nath Sona) Qtl. 282.56<br />

Field Pea Qtl. 1108.33<br />

French bean Qtl. 150.31<br />

Cowpea Qtl. 75<br />

Sesamum Kg 80<br />

Asparagus No. 10000<br />

Bamboo Charcoal Tin 5875<br />

Bamboo Vinegar Ltr 3500<br />

Subsidy for purchase of Tractor No. 6<br />

Subsidy for purchase of Power tiller No. 45<br />

Subsidy for purchase of Rice huller No. 27<br />

Promotion of connectivity for market linkage Km 10<br />

Assistance for promotion of Bamboo charcoal & Vinegar No. 15<br />

11 BAFFACOS<br />

Survey for Rodent Surveillance Ha. 2544<br />

Incentives of traps No. 35,400<br />

Bromodiolone Ha. 10,000<br />

Early maturing rice/jatropha Ha. 300<br />

Promotion of cotton/maize/potao Ha. 1,000<br />

Promotion of oilseed (mustard) Ha. 100<br />

Promotion of Pulses Ha. 300<br />

Purchase of tractors/power tiller/maize/ sheller/oil expeller No. 12<br />

Connectivity for market linkage Km. 7<br />

Promotion of bamboo vinegar Lit. 3,000<br />

Promotion of bamboo charcoal Qtl.<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 487 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

Survey of sporadic bamboo flowering areas No. 24<br />

Survey of rodent surveillance at State and Sub-divisional and Agril.<br />

Circle level<br />

Rodent pest management :<br />

No. 2544<br />

a) Incentive for local rat traps @ Rs 100/ Ha/50 nos Ha. 5,900<br />

b) Purchase of pesticides & Rodenticides Ha. 20,000 30000<br />

Publicity- awareness campaign and documentation etc. No. 30 40<br />

1<br />

HORTICULTURE<br />

Direction<br />

1 Salary/T.E. of Officers and Staff No. 30 30 30 30 30 30<br />

2 Wages No. 20 20 20 20 20 20<br />

3 Maintenance of existing building<br />

4 Maintenance of Vehicles<br />

No. 1 1 1 1 1 1<br />

i) Heavy No. 12 1 1 1 1 1<br />

ii) Light<br />

Administration<br />

No. 9 2 2 2 3 3<br />

1 Salary/T.E. of Officers and Staff No. 84 84 84 84 84 84<br />

2 Wages No. 57 57 57 57 57 57<br />

3 Construction of ADHO Quarter at Kolasib No. 1<br />

4 Construction of ADHO Quarter at Serchhip No. 40 31 1 32<br />

20<br />

1<br />

5 Construction of Farm manager Quarter at Thingdawl No. 1<br />

6 Maintenance of existing building No. 14 38 11 49 40 10<br />

2 Horticulture Farm And Seed Production<br />

1 Field contingencies for raising of seedlings etc. and maintenance of<br />

existing farms<br />

No. 8 7 7 7 7 7<br />

2 Maintenance of godown/quarter in farm. No. 20 20 7 7<br />

3 Maintenance of farm No. 4 4 7 7


Sl. No. Item<br />

Unit<br />

- 488 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

4 Establishment of nursery for production of quality planting materials:<br />

a) Private Sector No. 1<br />

b) Public Sector No. 2<br />

5 Purchase of seed/seedling for distribution on Chapchar Kut etc Qtls 2000 2000<br />

3 Manures & Fertilizers<br />

1 Purchase of fertilizer, organic manures & bio-fertilizer & soil amendment<br />

like slaked lime etc for distribution at 50% subsidy<br />

Ton 350 347 10 357 200 40<br />

2 Micro-nutrients, plant hormones etc for sale at 50% subsidy. Ton 156 Lit 156 Lit 5 1<br />

3 Transportation & handling charges Ton 350 347 10 357 S 41<br />

4 Plant Protection<br />

1 Purchase of PP chemicals for distribution at 50% subsidy. Qtls/Lit No 1000 2507 pkt 200 2507 pkt 1500 300<br />

306 Qtls<br />

306 Qtls<br />

650 Nos.<br />

650 Nos.<br />

Annual Plan<br />

2007-08<br />

2 Cost of PP equipment for distribution at 50% subsidy. No. 25000 Pcs 1750 350<br />

3 Maintenance of Plant Health Clinic No. 1 1 1 1 1<br />

4 Transportation and handling charges Qtl/No 310 200 510 3250 650<br />

5 Horti. Inform. & Farmers Training.<br />

1 Exhibition/Seminar<br />

a) State Level No. 30 2 32 5 1<br />

b) District Level No. 25<br />

3 15 3<br />

c) Awareness camapign No. 3<br />

2 Farmers Training<br />

3 Publication of –<br />

No. 40 8<br />

a) Magazines No. 100000 166200 25000 191200 125000 23800<br />

b) Booklet, leaflets etc No. 150000 30000<br />

4 Purchase/subscription of book, journal, dailies etc No. 2524 1000 3524 5000 900


Sl. No. Item<br />

Unit<br />

- 489 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

6 Horticulture Engineering.<br />

1 Purchase of Horticulture tools & implements for distribution at 50%<br />

subsidy<br />

No 10000 5950 m HDPE<br />

Pipe,<br />

6123 Nos.<br />

400 5950 m HDPE<br />

Pipe,<br />

6523 Nos.<br />

Annual Plan<br />

2007-08<br />

5000 1000<br />

2 Miscellaneous transportation charges No 10000 12073 Nos. 400 14473 5000 1000<br />

7 Vegetable & Fruit Development<br />

A Fruits<br />

1 Area Expansion Scheme on fruit crops<br />

1) Passion Fruit Ha. 243 80<br />

2) Banana Ha. 400 100<br />

3) Orange Ha. 4000 190 10<br />

200<br />

157 50<br />

4) Grape Ha. 30 10<br />

5) Papaya Ha. 450 100<br />

2 Supply of planting materials of different friut crops for distribution at 50%<br />

subsidy<br />

B Vegetable<br />

1 Protected cultivation<br />

No. 320 320<br />

a) Tomato No ? 20 4<br />

b) Coloured capsicum No ? 20 4<br />

2a) Area Expansion Scheme on vegetable crops Acre 4000<br />

10 10 500<br />

b) Purchase of vegetable seed for distribution at 5-% subsidy Qtls 603 603 100 20<br />

3 Procurement of Planting Materials of root & tubers crops<br />

C Spices Development<br />

1 Area Expansion Scheme on spices crops<br />

Ton 155 155 50 10<br />

a) Turmeric Acre 2100 800<br />

b) Bird eye chillies<br />

D Floriculture & land scaping<br />

1 Area Expansion Scheme on Floriculture<br />

Acre 200 80<br />

a) Leather Leaf Fern<br />

2 Maintenance of flower garden at<br />

No. 40 10


Sl. No. Item<br />

Unit<br />

- 490 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

a) District park, Lunglei No.<br />

b) Aitiangtlang, Tuidam<br />

c) Hringlangtlang, Champhai<br />

No.<br />

No.<br />

4 4 4<br />

4<br />

4<br />

4<br />

d) Horticulture Flower Garden, Reiek No.<br />

3 Maintenance of VIP complex including Directorate roof top No. 4 4 4 4 4 4<br />

4 Purchase of flower seeds/bulbs, pot etc for distribution at 50% subsidy<br />

E Mushroom Development<br />

Pkt/No 4000 390 Pkts,<br />

1160 Nos<br />

390 Pkts,<br />

1160 Nos<br />

Annual Plan<br />

2007-08<br />

LS LS<br />

1 Area Expansion Scheme on Mushroom No. 350 50<br />

2 Maint. of Mushroom Lab & Mushroom demonstration centre including<br />

supply of different materials for production of spawn<br />

No. 1 2 5 5 5 5<br />

3 Training expenses (Trainers<br />

F Plantation Development<br />

No. 500 100<br />

1 Area Expansion Scheme on Plantation crops like Arecanut, coconut etc Ha. 1000 300<br />

G Construction of Potential Area Connectivity<br />

1 Survey, formation, cutting and supervision etc of Horticulture link rd. Km. 125 125 64 10<br />

2 Maintenance of existing link road Km. 100 4 104<br />

H Post Harvest Management<br />

1 Supply of packing materials/plastic creates etc No. 2000 200<br />

2 Supply of post harvest machineries and preservatives etc No. 50 10<br />

3 Training and demonstration of Post Harvest Technology No. 200 20<br />

4 Construction of post harvest, infrastructure like grading unit etc No. 35 4<br />

I Bee Keeping<br />

1 Purchase of bee hives box, bee colony with hives etc No. 2800 157 15 Nos,<br />

3033 Honey<br />

frame<br />

172 Nos,<br />

333 Honey<br />

frame<br />

250 50<br />

J Rain Water Harvesting<br />

1 Construction of rain water harvesting structures at individual farmer field No. 200 40


Sl. No. Item<br />

Unit<br />

- 491 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

K Aromatick & Medicinal Plant<br />

1 Area Expansion Scheme on Aromatic plant<br />

2415 Horticulture Research and Education<br />

Ha. 60 10<br />

1 Stipend, book grants etc including research No. 10 10 10 10 15 15<br />

1 Area Expansion Scheme on Passion Friut Ha. 400 400<br />

2 Area Expansion Scheme on Grape Ha. 300 300<br />

3 Area Expansion Scheme on Potato Ha. 350 350<br />

4 Area Expansion Scheme on Turmeric Ha. 260 260<br />

5 Area Expansion Scheme on Charcoal Kiln<br />

BAFFACOS (TFC)<br />

No. 197 197<br />

1 Area Expansion Scheme on Passion Fruit Acre 160 1837 1997<br />

2 Area Expansion Scheme on Jatropha Ha. 230 230<br />

I.<br />

SOIL & WATER CONSERVATION<br />

ORGANISATION<br />

A. Direction<br />

1) Salary (Officers & staff) No. 2 - 1 1 5 1<br />

2) Scho & Stipend.<br />

B. Administration<br />

No. - - - - 50 10<br />

1) Salary (Officers & Staff)<br />

C. Pub. & Advt<br />

No. 3 - - - - -<br />

1) Salary No. 1 1 - 1 - -<br />

2) Publication No. L.S. 5 1 6 20 4<br />

3) Advertisement<br />

D. Monitoring & Evaluation<br />

No. L.S. 20 10 30 50 10<br />

1) Salary<br />

E. Planning Cell<br />

No. 1 1 - 1 - -<br />

1) Salary<br />

F. Engineering Cell<br />

No. 1 1 - 1 - -<br />

1) Salary (Officers & staff) No. 9 - - - - -<br />

2) Wages No. 1 - - - - -<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 492 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

II. SOIL & LAND USE SURVEY<br />

1) Project Survey & preparation of Report Ha. 50 7 5 12 - -<br />

III. CONSERVATION PLANTATN.<br />

a) Cash Crops. Ha. - - - - 500 100<br />

b) Tree Species. Ha. - - - - 500 100<br />

c) Nursery No. - - - - 40 8<br />

IV. CASH CROP & SPICES DEV.<br />

a) CREATION<br />

1) Coffee Ha. 50 - - - - -<br />

2) Rubber Ha. 100 - - - - -<br />

3) Large Cardamom Ha. 50 - - - - -<br />

IV b) Maintenance<br />

1) Coffee Ha. 350 95 95 95 - -<br />

2) Rubber Ha. 250 21 21 21 - -<br />

3) Large Cardamom Ha. 40 5 - 5 - -<br />

4) Tea Ha. 25 13 13 13 - -<br />

5) Arecanut Ha. - 4 4 4 - -<br />

V. CASH CROP NURSERY<br />

a) CREATION<br />

1) Coffee No. 30 10 10 10 - -<br />

2) Rubber No. 2 1 1 1 - -<br />

3) Large Cardamom No. 30 3 3 3 - -<br />

4) Arecanut No. - 2 2 2 - -<br />

VI. WATER RESOURCES CONS. & DEVELOPMENT<br />

1) Water Harvesting Tanks/ponds. No. 500 400 100 500 950 340<br />

VII. Rural Area Development<br />

a) Coffee, Rubber etc. Ha. 1200 500 50 550 - -<br />

VIII Land Reclamation<br />

1) Erosion Control in jhum lands Ha. - - - - 5700 1833<br />

IX. Run-off Retarding Scheme<br />

1) Inward Terracing @ Rs. 12000 / Ha Ha. 3000 300 150 450 2080 416<br />

2) Contour Bunding/Trenching @ Rs. 10000/Ha Ha. 1000 82 100 182 300 60<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 493 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

X. Mechanical Conservation by Engineering Works<br />

1) Gully plugging No. 250 140 50 190 450 100<br />

2) River Training Works. @ Rs. 1000 / No No. 250 100 30 130 450 100<br />

XI. Watershed Survey & Management @ Rs. 1000 / No<br />

1) Survey, Consultation & Preparation of Project No. 20 7 5 12 50 10<br />

XII Research, Education & Training Institute<br />

a) Salary No. 6 - - - - -<br />

b) Wages No. 1 1 1 1 - -<br />

XIII. OTHER EXPENDITURE<br />

A. Building<br />

1) Construction No. -<br />

2) Maintenance No. 200 80 40 120 150 50<br />

B. Approach Road<br />

1) Construction Km. 5 - - - - -<br />

2) Maintenance Km. 15 5 5 10 10 5<br />

XIV. Input Supply<br />

a) Manurer/Fertilizers. MT. L.S. 20 5 25 25 5<br />

b) G.I. Wire Qtl. L.S. 15 3 18 25 5<br />

c) Fencing Materials. Qtl. L.S. 5 2 7 5 2<br />

d) Tools & Inplements. No. L.S. 10 5 15 100 25<br />

XV. BAFFACOS<br />

a) Terracing Ha. - 267 - 267 - -<br />

b) Contour Bunding/Trenching Ha. - 36 - 36 - -<br />

c) Water Harvesting Tank/Pond No. - 112 - 112 - -<br />

d) River Training Works.Minitoring Ha. - 200 - 200 - -<br />

I. ANIMAL HUSBANDRY (AH & VETY)<br />

1 Milk production 000 tone 30 15 16 16 33 17<br />

2 Eggs production lakh no 50 314 332 323 376 341<br />

3 Meat production 000 tone 15 8 10 9 15 10<br />

4 Chick production ( Broiler & Layer ) lakh no 50 40 10 50 60 15<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 494 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Animal Husbandry<br />

1 Milk production 000 tone 30 15 16 16 33 17<br />

2 Eggs production lakh no 50 314 332 323 376 341<br />

3 Meat production 000 tone 15 8 10 9 15 10<br />

4 Chick production ( Broiler & Layer ) lakh no 50 40 10 50 60 15<br />

AH & Vety Programme<br />

1 Artificial Insemination Centres Cum No 70 50 50 50 50 50<br />

2 No. of Artificial Insemination performed 000 nos 15 5 5 5 15 5<br />

3 LN Plant Cum Nos 3+5 2 2 2 2 2<br />

4 Cattle & Buffalo Breeding Farm Cum No 8 7 7 7 7 7<br />

5 Mithun Breeding Farm Cum No 1 1 1 1 1 1<br />

6 Poultry Production farm Cum No 12 7 10 10 38 14<br />

7 Pig Breeding Farm Cum No 9 9 9 9 9 9<br />

8 Slaughter House Cum No 1 1 1 2 2<br />

9 Rabit production farm Cum No 5 4 4 4 4 4<br />

10 Goat production farm Cum No 1 2 2 2 2 2<br />

11 Animal Grazing Ground Cum No 60 42 42 42 60 42<br />

12 Fodder Feed production Farm ( Grass ) Cum No 5 6 6 6 6 6<br />

13 Fodder Seed production qtls 60 5 5 5 5 5<br />

14 Vety Hospital Cum No 5 5 5 5 7 5<br />

15 Vety Dispensary Cum No 45 35 35 35 35 35<br />

16 Vety Aid Centres Cum No 100 103 13 13 103 103<br />

17 Rinderpest Surveillance Post Cum No 12 7 7 7 7 7<br />

1<br />

FISHERIES<br />

Direction & Administration<br />

I) Maintenance of existing staff No. 36 36 36* 36 36 36*<br />

ii) Construction of Buildings No. 24 3<br />

2 Fish Seed Production - Cum Farming<br />

a) Maintenance of existing fish seed farms No. 8 6 7* 7 3 3<br />

b) Construction / improvement of farm. No. 8 6 7 7 3 3<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 495 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

c) Pravatisation of Fish seed Farms No. 4<br />

d) Production of fish seeds from Depptl. Farms. Lakh 100 10 30 40 500 50<br />

e) Setting up of fish seed rearing centre. No. 3 1<br />

3 Fresh Water Aquaculture<br />

a) Water area covered under FFDA (CSS) etc. Ha. 1500 500 120 620 3600<br />

b) Supply of fish seed to Private farm at 50% subsidy. Lakh 500<br />

c) Supply of fish feed at 40% subsidy Qtls<br />

4 Development Riverine Fisheries<br />

Taken up under<br />

NEC<br />

a) Stocking of fish seeds Lakh 100 -<br />

b) Conservation/ Awareness Progemmes including survey No. Ls 3 2 5 5 1<br />

c) Rearing Units for fish seeds No. 12 5<br />

d) Training No. 250 50<br />

5 Cold Water Fisheries<br />

Annual Plan<br />

2007-08<br />

(i) Resource Survey/Investigation/Culture of Cold water fishes No.of ponds 2 -<br />

(ii) Water area covered Unit 580 109<br />

6 Information, Extension and Training<br />

a) Publication of extension materials and half yearly magazine No. 7000 6000 2000 8000 L/S L/S<br />

b) Maitenance of Demonstration Farms No. 6 3 3 3 3 3<br />

c) Training of fish farmers No. 100 330 100 430 3000 1000<br />

d) Training of fresh/inservice personnels No. 40 10 5 15 50 10<br />

e) Publication of handbook/extension manual No. L/S L/S<br />

7 Marketing<br />

a) Maintenance of Ice Plants and Cold Storages<br />

No. 3 Ice Plants 3 3* 3 3 3*<br />

2 Cold Storages 2 2* 2 2 2*<br />

b) Purchase of Insulated Van No. 2 -<br />

c) Production of Ice blocks M.T L/S 550 100 650 700 150<br />

8 Inland Fisheries Statistics<br />

Setting up of separate statistics cell/Maintenance No. 4 1 - 1 1 1<br />

9 Contract Farming<br />

Water area to be covered Ha. 83 13


Sl. No. Item<br />

Unit<br />

- 496 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

AGRI. RESEARCH & EDUCATION<br />

1 DIRECTION<br />

i) Maintenance of Building<br />

2 AGRIL FARM<br />

No. 1 3 3<br />

i) Maintenance of Farms No. 3 3 2 2<br />

ii) Production of Cert. Seeds Qtl. - - 800 50<br />

iii) On Farm Demonstration<br />

3 INTERGATED TRAINING CENTER<br />

Ha. 150 30<br />

i) Repair of Buildings No. 14 14 14 14<br />

ii) Purchase of books No. 10 10 100 10<br />

iii) Field Trips No. 3 3 15 3<br />

iv) Inputs for Demo<br />

4 EXTN. & FARMERS TRAINING<br />

Qtl. 1 1 50 1<br />

(i) Construction of road Km. 3 3 15 3<br />

(ii) Electrification Unit 2 2 5 1<br />

(iii) Water Connection No. - 6 3<br />

(iv) Drainage Lines<br />

5 DEMONSTRATION<br />

RMT - - 500 100<br />

i) Single Practice demostration No. 90 5<br />

ii) Composite demonstration<br />

AGRIL. RESEARCH & EDN.<br />

No. 90 5<br />

6i) Sustainable farming system Ha. 5 5 175 35<br />

ii) Book grant/ Stipend for B.Sc Agri. Students No. 7 7 270 54<br />

TRADE & COMMERCE<br />

1 Agricultural Marketing<br />

1) M.R. employees No. 24 24 10 34 - -<br />

2) Minor Works No. 85 70 20 90 125 25<br />

2 GIA to MAMCO No. 1 1 1 1 1 1<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 497 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

COOPERATION<br />

1 Training & HRD No 60 60 12 60 60 12<br />

2 Audit & Evaluation. No 1435 1435 1435 1245 1500 1500<br />

3 Rural Coop. No 1080 216 216 1080 1100 220<br />

4 Credit & Banking No 2 2 2 2 2 2<br />

5 Public Sector. No 135 27 27 135 155 31<br />

6 Other Coop, No 218 43 43 218 245 49<br />

I<br />

RURAL DEVELOPMENT<br />

DIRECTION & ADMINISTRATION<br />

a) Opening of New R.D. Block No. of RD Block 8 26 - 26 - -<br />

b) Establishment charges No. of Staff 38 38 - - 38 38<br />

II BLOCK LEVEL ADMINISTRATION<br />

a) Establishment charges Staff 404 404 - 404 404 404<br />

b) Publication of District Census of BPL families Household 37,384<br />

Annual Plan<br />

2007-08<br />

III RURAL HOUSING<br />

a) Construction and Upgradation of houses No. 1466 1466 3380 2596 15300 1563


Sl. No. Item<br />

Unit<br />

- 498 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

b) Infrastructure Development No. 150 150<br />

IV Social Education.<br />

a) Normal Community Hall No. 200 16 8 24 40 8<br />

b) Special Community Hall No. 8 1 1 5 1<br />

c) Playground No. 10<br />

V Rural Communication. Km. 100<br />

VI Housing For Project Staff. (RD.Blocks) No. 236 236 26 2<br />

Annual Plan<br />

2007-08<br />

02 2506 033 - LAND REFORM<br />

001 Direction & Administration<br />

1) Condtruction of building<br />

a) District Office No. 1 4 - 4 4 1<br />

b) Quarters/ Land Resources Room. No. 15 14 6 15 20 8<br />

2) House site Plan. No. 1500 7000 1000 8000 15000 1000<br />

3) 103 Maintenance of land Records.<br />

a) Cadastral Survey Ha. 21000 500 500 22000 70000 500<br />

b) Construction of Survey Station Marks No. 25000 500 400 2500 55000 40<br />

BORDER AREA DEVELOPMENT PROGRAMME<br />

1 Truck road Km. 90 72 18 90 94.42 22<br />

2 Jeep road Km. 157.6 11.6 46 157.6 157.6 46.6<br />

3 Maintenance/Extension/link/Bouldering/ IVP of road Km. 316.5 250.5 66 316.5 337.5 117.5<br />

4 Community/Conference/Multipurpose Hall No. 108 85 23 108 117 33<br />

5 Other Administrative Building No. 99 79 20 24 32 9<br />

6 School & Hostel Buildings No. 24 19 5 10 13 2<br />

7 Bazar/Market/Rest shed No. 10 8 2 17 19 27<br />

8 Pavillion / Waitingshed No. 17 14 3 47 48 17<br />

9 Playground No. 47 37 10 97 117.5 35


Sl. No. Item<br />

Unit<br />

- 499 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

10 Bridges (Wooden,& RCC) / Culverts/Drainage No. 97 78 19<br />

11 Retaining Wall No. 29 24 5 29 49 14<br />

12 Public Water Supply scheme – Water point/Water Reservoir/Water No. 56 44 12<br />

13 Irrigation Channel/WRC/Road, River Embankment 56 77 17<br />

14 Cemetryshed/Urinalshed No.. 6 5 1 6 12 6<br />

15 Teniis/Basket Ball /Criket Court No. 8 6 2 8 22 8<br />

16 Electrification / Fencing No. 2 1 1 2 9 6<br />

17 Police Outpost / Border Out Post No. 17 14 3 17 25 13<br />

18 Model Villages No. 10 8 2 10 6 4<br />

19 Rural Training Centre / Employment No. 2 2 - 2 2 -<br />

20 Medical Centre / Sub-Centre No. 4 3 1 4 7 5<br />

21 Recreation / De-Addiction Centre No. 15 12 3 15 31 12<br />

22 Information Centre / Library No. 6 5 1 6 16 7<br />

FUNDS UNDER ARTICLE - 275 (1) No. 9 7 2 9 33 4<br />

Project No. - 306 44 350 250 50<br />

1<br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

Construction of Truckable Road (Zohmun to Mauchar) Km. - - - - 15 5<br />

2 Constn. Of Agri. Link road (Zokhawthiang to Kani phai) Km. - - - - 7 2<br />

3 Constn. & Maintenance of Steps Metres - - - - 4500 900<br />

4 Constn. Of Water point No. 22 Nos. 90% 10% 100% 40 10<br />

5 Constn. Of Waiting Shed No. 10 Nos. 95% 5% 100% 20 5<br />

6 Constn. Of Pavillion No. 10 Nos. 95% 5% 100% 25 7<br />

7 Constn. Of Bridges No. 12 Nos. 100% 100% 25 5<br />

8 Constn of Approach road of Admn Complex Km. - - - - 2 2<br />

9 Cultivation of Bamboo, Pineapple and Passion Fruit No. in lakh - - - - 20 5<br />

11 Improvement of Internal Village Path Km. 15 kms 85% 15% 100% 20 5<br />

12 Kani minor Irrigation Km. - - - - 3.5 3.5<br />

13 Constn of Community Hall at Sakawrdai No. - - - - 1 1<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 500 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

1<br />

IRRIGATION & FLOOD CONTROL<br />

2701 - Major and Medium Irrigation (Plan)<br />

Protection of river bank at R.Tuipui % 100<br />

2 Protection of river bank at R.Tlawng, Bairabi % 100 100<br />

3 Protection of river bank at Sairang % 100<br />

4 Bank protection of R.Teirei under Kawrthah Division % 100 100 100<br />

5 Bank protection of R.Teirei under Mamit Division % 100 100 100 100 100 30<br />

Annual Plan<br />

2007-08<br />

MINOR IRRIGATION<br />

80-GENERAL<br />

001-Direction & Admn.<br />

Salary of Officers & staff<br />

102-River Lift Irrigation<br />

No. 87 87 87 87 87 87<br />

Irrigation Potentials No. - - - - 12 2<br />

to be created Ha. - - - - 400 50<br />

to be utilised<br />

800-Other Expenditure:<br />

Sprinkler, Hydram, etc<br />

Ha. - - - - 400 50<br />

Grant-in-Aid Subsidy for promotion of Drips & Sprinklers No. - - - - 40 5<br />

On Farm Demonstration of Drip & Sprinkler Irrigation 7 1<br />

005-Survey & Investigation No. - - - -<br />

103-Diversion Schemes<br />

Minor Irrigation Projects :<br />

- - - - - - -<br />

Irrigation Potentials No. 70 92 61 153 328 93<br />

to be created Ha. 1,659 5,467 3,533 9,000 35,000 8,312<br />

to be utilised Ha. 2,566 2,858 1,692 4,550 22,750 7,420<br />

1<br />

ENERGY<br />

POWER<br />

1) Renovation & Modernization<br />

a) Maicham MHP Ph-I (3MW) No. Completion Completed - Completed -


Sl. No. Item<br />

Unit<br />

- 501 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

b Vawra lui No. Completion Completed - Completed -<br />

c) Tuipui Small Hydel Project / CSS No. 80% 30% 10% 40% Completion<br />

d) Serlui 'A' Small hydel Project / CSS No. 80% 30% 10% 40% Completion<br />

e) R&M of Khawiva No. Completion 20%<br />

2 GENERATION<br />

1) Hydel Generation<br />

a) Teirei MHP (3MW) MW Completion Commissioned Commisioned<br />

b) Tuipanglui MHP (3MW) MW - Commissioned Commisioned<br />

c) Serlui 'B' MHP (12MW) MW 80% 55% 15% 70% Completion<br />

d Maicham Ph-II (3MW) MW Completion 60% 10% 90% Completion<br />

e) Repayment of PFC loan for Hydel Project Rs. In lakh 100% 100% - 100% -<br />

f) Kau Tlabung SHP (3MW) MW Completion Commissioned Commisioned<br />

g) Lamsial MHP (500KW) MW 90% 60% 5% 65% Completion<br />

h) Bairabi HP (80MW) MW - - - - 10%<br />

i) Tuivai HEP MW 10%<br />

j) S&I of Hydel projects<br />

Total Hydel Generation<br />

2. Thermal Generation<br />

MW 1 No. 80% 80% Completion<br />

a) Coal/HFO based Thermal Power Projects at Bairabi (20MW) MU - 3% 3% 50.00 10.00<br />

Total Thermal Generation<br />

(i) Transmission, Transformation & Distribution<br />

a) Construction of Transmission lines Km. 659.29 30% 117.71 500.00<br />

b) Transformation<br />

(ii) Other Transformation scheme<br />

MVA 76.60 10.00 8.00<br />

a) Indoor S/S at Aizawl<br />

(iii) Other Transmission scheme<br />

Completion 100% 100%<br />

a) Power supply to New Capital Complex at Khatla Completion Completed


Sl. No. Item<br />

Unit<br />

- 502 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

4 GENERAL<br />

a) Construction of functional buildings<br />

b) Maintenance D&A<br />

c) Thermal Generation<br />

No. 30% 30% 120.00<br />

5 Rec Nogotiated Loan Completion 100% Completion Completion<br />

6 Pradhan mantri Gramodaya Yojana (PMGY)<br />

a) Village electrification (Tribal area)<br />

TOTAL<br />

No. 5.00 5.00 1.00<br />

7 Additional Central Assistance (ACA) Completion Completion Completion<br />

8 Accelerated Power Development and Reform Programme (APDRP) 50% 45% 5% 50% Completion<br />

9 Integrated Rural Energy Programme (IREP) Completion 80% 10% 90% Completion<br />

10 Non Conventional Surces of Energy Completion 80% 10% 90% Completion<br />

i)<br />

INDUSTRIES AND MINERALS<br />

Village & Small Industries :<br />

a) Unit functioning No.'000 1.800 0.360 0.360 1.800 2.000 0.400<br />

b) Production Rs. In lakh 4000.00 800.00 800.00 4000.00 5000.00 1000.00<br />

c) Persons employed No.'000 10.800 2.160 2.160 10.800 12.000 2.400<br />

ii) Industrial Area/Estate :<br />

a) Estate/Area functioning No.(cum.) 7 4 4 7 15 5.00<br />

b) No. of Unit No.'000 0.200 0.036 0.036 0.200 0.5 0.05<br />

c) Production Rs. In lakh 150.00 25.00 25.00 150.00 400.00 30.00<br />

d) Employment No.'000 3.600 0.300 0.300 3.600 6.000 0.400<br />

iii) Handloom Industry :<br />

a) Production M.Metre 4.00 0.80 0.80 4.00 5.00 1.00<br />

b) Employment No.'000 20.500 4.100 4.100 20.500 30.000 5.000<br />

iv) Handicraft Industry :<br />

a) Production Rs. In lakh 300.00 60.00 60.00 300.00 400.00 0.80<br />

b) Employment No.'000 0.900 0.180 0.180 0.900 1.00 0.200


Sl. No. Item<br />

Unit<br />

- 503 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

v) Khadi & Village Industries :<br />

a) Within the purview of KVIC :<br />

i) Production Rs. In lakh 1000.00 750.00 150.00 1000.00 1200.00 240.00<br />

ii) Employment<br />

b) Outside the purview of KVIC :<br />

No.'000 5.000 4.000 1.000 5.000 6.000 1.200<br />

i) Production Rs. In lakh<br />

NOT APPLICABLE<br />

ii) Employment No.'000<br />

vi) District Industries Centre :<br />

a) Units registered No. 1800 1500 300 1800 2000 400<br />

b) No. of artisans assisted No.'000 2.000 1.600 0.400 2.000 2.500 0.500<br />

c) Financial asistance obtained from Financial Institutions including Banks Rs. In lakh 400.00 320.00 80.00 400.00 500.00 100.00<br />

d) Staff in position (as on date) :<br />

i) General Manager No. 3 3 3 3 8 3<br />

ii) Functional Manager No. 12 4 4 4 12 12<br />

iii) Project Manager No. 8 8 8 8 8 8<br />

1<br />

SERICULTURE<br />

Construction of Buildings No. 25 6 6 12 30 6<br />

2 No. of farmers to be trained No. 3000 2800 200 3000 10000 2000<br />

3 No. of Matriculate to be trained No. - - - - 10 -<br />

4 No. of BSc to be trained No. - - - - 5 1<br />

5 No. of inservice person to be trained No. 150 120 30 150 150 30<br />

6 Area to be covered under food plants<br />

1) Mulberry Acre 3000 4300 1750 5050 10000 2000<br />

2) Castor/Keseru Acre 350 300 50 350 500 100<br />

3) Som/Soalu Acre 350 300 50 350 500 100<br />

7 Production of Dfls<br />

a) Mulberry Lakh nos. 12.00 12.60 3.00 15.60 20.00 3.50<br />

b) Eri Lakh nos. 4.00 1.40 1.00 2.40 6.00 0.80<br />

c) Muga Lakh nos. 3.00 0.77 0.50 1.27 3.00 0.50<br />

d) Oak Tasar Lakh nos. 3.00 1.00 0.50 1.50 3.00 0.50


Sl. No. Item<br />

Unit<br />

- 504 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

8<br />

9<br />

10<br />

Annual Plan<br />

2007-08<br />

Production of Cocoon<br />

a) Mulberry MT 240.00 182.00 48.00 230.00 500.00 50.00<br />

b) Eri MT 45.00 12.73 5.00 17.73 75.00 5.00<br />

c) Muga Lakh No. 20.00 14.35 5.00 19.35 120.00 10.00<br />

d) Oak Tasar Lakh No. 15.00 9.13 3.00 12.13 120.00 10.00<br />

Production of Rawsilk<br />

a) Mulberry MT 12.00 8.70 4.00 12.70 50.00 5.00<br />

b) Eri MT 10.00 7.00 3.00 10.00 35.00 2.50<br />

c) Muga MT 2.00 0.28 0.10 0.38 2.40 0.10<br />

d) Oak Tasar MT 1.50 0.19 0.06 0.25 2.40 0.10<br />

Nos. of Family to be covered<br />

a) Mulberry No. 3000.00 4300.00 1750.00 5050.00 10000.00 2000.00<br />

b) Eri No. 350.00 300.00 50.00 350.00 500.00 100.00<br />

c) Muga No. 350.00 300.00 50.00 350.00 500.00 100.00<br />

d) Oak Tasar No. 350.00 300.00 50.00 350.00 500.00 100.00<br />

GEOLOGY AND MINING WINGS<br />

1 GWI<br />

It will include Hydro Geological/Geophysical, investigation including<br />

sesmal data collection<br />

2 GTI<br />

No./Villages 25 20 5 25 130 26<br />

It will include investigation of landslide/slope stability/Disaster<br />

3 MMI<br />

Toposheet/<br />

township<br />

10 8 2 10 21 5<br />

It will include investigation of quarry/sand/clay/hard rock etc. Districts/<br />

Location<br />

10 8 2 10 8 8<br />

I<br />

ROAD & BRIDGES<br />

State Highway<br />

1 Rengtekawn-NH-154.(6Kms). C=No 19 8


Sl. No. Item<br />

Unit<br />

- 505 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

SMBT=Km 6.00<br />

RS=Km 6.00<br />

RW=Rm 35.00<br />

LSD = KM<br />

2 Champhai to Tiau Road (18.50Kms) RS=Km 16.00 1.20 1.20 16.00 2.00<br />

RW=Rm 250.00 100.00<br />

C=No 10 10 4<br />

LSD = KM 3.50 2.00<br />

II Major District<br />

1 Lungsen - Chawngte ( 53.25 Kms ) C=No 19 15 -<br />

RW=Rm 70.00 75.00 -<br />

RS=Km 34.00 10.00 -<br />

SD=Km 35.00<br />

2 Lawngtlai -Nalkawn-Chamdur Road(45.00 Kms). C=No 15 20 4<br />

RW=Rm 35.00 250.00 -<br />

RS=Km 25.00 10.00 3.00<br />

SD=Km 25.00<br />

3 Ngopa-Mimbung Road (115.73 Kms). RW=Rm 70.00 150.00 -<br />

RS=Km 40.00 3.79 3.79 9.00<br />

C=No 15 16 -<br />

SD=Km 30.00<br />

4 Kawnpui-Hortoki (21.00Kms) C=No 8 - -<br />

RW=Rm 35.00 - -<br />

RS=Km 21.00 2.63 2.63 7.00 3.00<br />

SD=Km 7.00<br />

5 Zemabawk-Selesih Road (14.00 Kms). RW=Rm 100.00 - -<br />

C=No 17 - -<br />

SMBT=Km 10.00 - -<br />

RS=Km 14.00 2.00 -<br />

SD=Km 2.00<br />

6 Phairuang-Bunghmun road (69.00Kms) RS=Km 45.00 6.09 6.09 16.00 3.00<br />

C=No 16 14 10


Sl. No. Item<br />

Unit<br />

- 506 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

RW=Rm 70.00 150.00 90.00<br />

SD=Km 50.00<br />

7 Kawlkulh - Ngopa ( 64 Km) RS=Km 14.00 -<br />

C=No 12 -<br />

RW=Rm 96.00 -<br />

SD=Km 45.00 -<br />

8 Rawpuichhip - Buarpui Road RS=Km 9.00 2.00<br />

C=No 15 4<br />

RW=Rm 100.00 20.00<br />

SD=Km 25.00<br />

9 Aizawl - Reiek- W. Lungdar Road RS=Km 10.00 2.00<br />

C=No 15 2<br />

RW=Rm 85.00 10.00<br />

SD=Km 20.00<br />

10 Serkhan - Bhaga RS=Km 16.00 5.05 5.05 18.00 2.00<br />

C=No 9 16 4<br />

RW=Rm 35.00 200.00 -<br />

SD=Km 2.00 42.00 -<br />

11 Thenzawl - Bunghmun road. RS=Km 26.00 2.78 2.78 9.00<br />

C=No 10 6<br />

RW=Rm 30.00 -<br />

SD=Km<br />

III Other District Road<br />

1 Keitum-N.Vanlaiphai (48 Kms) C=No 10 8 -<br />

RW=Rm 60.00 30.00 -<br />

RS=Km 15.00 -<br />

SD=KM 2.00 -<br />

2 Phullen - Suangpuilawn(28.00Kms) C=No 6 6 -<br />

RW=Rm 20.00 200.00<br />

RS=Km 13.00 2.00 -<br />

3 Kawzawl-E.Lungdar-Biate.(60.00Kms) C=No 8 24 8<br />

RW=Rm 40.00 260.00 70.00


Sl. No. Item<br />

Unit<br />

- 507 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

RS=Km 22.00 13.00 2.00<br />

SD=Km 2.50 60.00 -<br />

4 Bilkhawthlir- Chemphai - Saiphai.(20.00KMs) C=No 2 6<br />

RW=Rm 10.00 260.00<br />

RS=Km 5.00 3.76 3.76 4.00<br />

SD=Km 1.00 4.00 -<br />

5 S.Hlimen -Samtlang -Lungleng (10.00 Kms) C=No 5 -<br />

RW=Rm 40.00 -<br />

M=Km 2.00 -<br />

RS=Km 4.00 2.00 -<br />

SD=Km 3.50 -<br />

6 App.rd.to Kolodyne from R.Ngengpui (9.00Kms) C=No 9 10 -<br />

SMBT=Km<br />

RW=Rm 100.00 100.00 -<br />

JC=Km 16.00 -<br />

SD=Km 1.50 -<br />

7 Tlabung - Borapansury C=No 9 3 3<br />

RS=Km 20.00 2.00 2.00<br />

RW=Rm 110.00 60.00 60.00<br />

LSD=Km 1.00 3.00 -<br />

8 Thenzawl - Thenhlum C=No 2<br />

RS=Km 3.16 3.16 2.00<br />

RW=Rm 40.00<br />

SD=Km 2.00 -<br />

9 Khawzawl - Sinzawl -Thanlawn (117.00 Kms) C=No 10 4<br />

RS=Km 1.00 1.00 5.00 2.00<br />

RW=Rm<br />

SD=Km 5.00 2.00<br />

IV VILLAGE ROADS<br />

1 Vairengte-Saiphai via Phainuam (16.00Kms) C=No 8 8 3<br />

RW=Rm 80.00 80.00 30.00<br />

RS=Km 16.00 4.50 1.00


Sl. No. Item<br />

Unit<br />

- 508 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

SD=Km 2.00 4.50 1.00<br />

2 E.Lungdar-Chekkawn (8.00Kms) C=No 8 8<br />

RW=Rm 88.00 88.00<br />

RS=Km 28.00 2.00<br />

SD=Km 1.00 2.00<br />

3 Zobawk-Haulawng (31.70 Kms) C=No 10 10 6<br />

RW=Rm 55.00 55.00 28.00<br />

RS=Km 14.50 14.00 4.00<br />

SD=Km 0.50 14.00 4.00<br />

4 Tamdil Approach Road RS=Km 7.00 3.00 -<br />

BT=Km 4.00 -<br />

IW=Km 30.00 -<br />

SD=Km 2.50 3.00 -<br />

5 Lunglei-Nghasih C=No 8 8<br />

RW=Rm 30.00 30.00 30.00<br />

RS=Km 15.00 6.00 2.00<br />

SD=Km 2.00 6.00 2.00<br />

6 Champhai-Sazaiphai-Farkawn (20.00 Kms) C=No 10 10 -<br />

RW=Rm 200.00 200.00 -<br />

S=Km 10.00 2.00 -<br />

M=Km 10.00 2.00 -<br />

BT=Km 2.00<br />

IW=Km 10.00 3.00 -<br />

SD=Km 2.00<br />

7 App.rd.to Maumual (4.00Kms) R/W=Rm 45.00 45.00 -<br />

C=No 6 6 -<br />

S=Km 2.00 1.00 -<br />

M=Km 2.00 1.00 -<br />

RS=Km 4.00 1.00 -<br />

SD=Km 4.00 1.00 -<br />

8 Lawngtlai - Saisihchhuah - Sangau (45.00Kms) RS=Km 45.00 45.00 -<br />

C=No 6 6 -


Sl. No. Item<br />

Unit<br />

- 509 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

RW=Rm 35.00 35.00 -<br />

S=Km 1.00<br />

M=Km 1.00<br />

BT=Km 1.00<br />

SD=Km 1.50 1.00 -<br />

9 Tuisumpui-Lungpher RS=Km 9.00 3.00 -<br />

C=No 5 15 -<br />

RW=Rm 50.00 250.00 -<br />

SD=Km 1.00 3.00 -<br />

10 Lawngtlai - Saiha Feeder (28.00Kms) C=No 9 24 10<br />

RW=Rm 70.00 200.00 100.00<br />

IW=Km 28.00<br />

SD=Km 28.00<br />

11 Chemphai-Phainuam-via Burchchep. RS=Km 20.00 -<br />

C=No 10 8 -<br />

RW=Rm 55.00 120.00 -<br />

SD=Km 1.50 4.00 -<br />

12 Baktawng - Hmawngkawn - Chawilung (13Km) FC=Km 8.00 8.00 -<br />

13 Lailak - Buhban (5Km) FC=Km 5.00 2.00 -<br />

C=No 7 3 -<br />

RW=Rm 30.00 10.00 -<br />

14 Builum - N. Hlimen (14 Km) FC=Km 5.00 5.00 -<br />

C=No 7 3 -<br />

RW=Rm 30.00 30.00 -<br />

15 Sertlangpui - Serte (4 Km) FC=Km 4.00 4.00 -<br />

C=No 5 5 -<br />

RW=Rm 20.00 20.00 -<br />

16 R.Mat - Lungmawi (12 Km) FC=Km 5.00 8.00 4.00<br />

17 Tuipuibari - W .Kawnpui RS=Km 3.76 3.76 6.00 3.00<br />

RW=Rm 250.00 200.00<br />

C=No 10 8<br />

SD=Km 10.00


Sl. No. Item<br />

Unit<br />

- 510 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

18 Kawlchaw - Tawngkawlawng RS=Km 2.53 2.53 5.06<br />

S=Km 2.00 1.00<br />

M=Km 2.00 1.00<br />

BT=Km 2.00 1.00<br />

SD=Km 2.00 1.00<br />

RW=Rm 550.00 420.00<br />

C=No 14 8<br />

V State Town & Village IW=Km 2.00 2<br />

SMBT=Km 2.00<br />

MBT=Km 3.36 3.36 6.00<br />

RS=Km 200.00 5.75 11.42 17.17 28.00 7.00<br />

RW=Rm 200.00 100.00<br />

C=No 10<br />

VI Road With Town RS=Km 233.00 134.78 41.14 175.92 83.00 15.00<br />

SMBT=Km<br />

MBT=Km<br />

0.47 0.47 8.00 2.00<br />

C=No 26 8<br />

RW=Rm 300.00 120.00<br />

FC=Km 3.00 3.00<br />

VII Bridge<br />

1 Constn. Of Bridge over R. Tlawng on Aizawl - Reiek % 100 - -<br />

2 Constn. Of Bridge over R.Mat on Pangzawl-Chhipphir % 100 - -<br />

3 Constn. Of Bridge over R. Chawngte on Diltlang - Chawngte Road % 100 - -<br />

4 Constn. Of Bridge over R. Tuikum on Chhingchhip - Hmuntha Road % 100 - -<br />

5 Constn. Of bridge over R.Tuichang on Vaseikai-Vaseitlang road. % 100 - -<br />

6 Consultancy on RCC bridge over R.Chite on Sihpui-Thuampui road. % 100 100


Sl. No. Item<br />

Unit<br />

- 511 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

7 Constn. Of Bridge over R.Mat on Pangzawl - Chhipphir Road % 100 100 1<br />

VIII NABARD<br />

1 Constn. of Rawpuichhip - Buarpui road & Aizawl - Reiek - W.Lungdar<br />

Road<br />

FC=Km<br />

IW=Km<br />

57.50 23.53 23.53<br />

C=No 379 179 179<br />

RW=Rm 5130.00 255.92 255.92<br />

SMBT=Km 109.00 59.90 59.90<br />

SD=Rm 37500.00 340.00 340.00<br />

2 Constn. of Hnahthial - Tarpho road ( 32 Km) FC=Km 32.00 16.00 12.00 28.00 4.00 4.00<br />

C=No 137 90 17 107.00 30 30<br />

RW=Rm 1380.00 800.00 180.00 980.00 300.00 300.00<br />

SD=Rm 32000.00 32000.00<br />

3 Constn. of Tumtukawn - Tarpho road ( 25 Km) FC=Km 25.00 16.00 7.00 23.00 2.00 2.00<br />

C=No 95 65 10 75 20 20<br />

RW=Rm 625 250.00 250.00 500.00 125.00 125.00<br />

Bridge =No 1 1 1 1 1<br />

4 Constn. of Aizawl - Lawipu - Tlawng road ( 3 Km) FC=Km 3.00 3.00 3.00<br />

C=No 10 10 10<br />

RW=Rm<br />

SMBT=Km<br />

100.00 100.00 100.00<br />

5 Pavement. of Hnahthial - Tarpho road ( 32 Km) C= No 10 10<br />

RW=Rm 300.00 300.00<br />

LSD=Km 3.00 3.00<br />

SMBT=Km 7.00 7.00<br />

6 Pavement of Tumtukawn - Tarpho road ( 25 Km) C= No 8 8<br />

RW=Rm 250.00 230.00<br />

LSD=Km 2.00 1.00<br />

SMBT=Km 7.00 7.00<br />

7 Constn. of Melriat - Khumtung road ( 37 Km) FC=Km 20.00<br />

C=No


Sl. No. Item<br />

Unit<br />

- 512 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

8 Constn. of Bunghmun - Marpara road ( 25 Km)<br />

RW=Rm<br />

Bridge =No<br />

SD=Km<br />

LSD=Km<br />

SMBT=Km<br />

FC=Km<br />

C=No<br />

RW=Rm<br />

SD=Km<br />

LSD=Km<br />

SMBT=Km<br />

13.00<br />

IX <strong>Mizoram</strong> State Road Project (Counterpart funding of World Bank<br />

Project)<br />

X <strong>Mizoram</strong> State Road Project (E.A.P)<br />

XI Counterpart funding of ADB Project i)<br />

Champhai - Khawbung Road<br />

ii) Serchhip - Buarpui Road<br />

IW=20Km<br />

C=200Nos<br />

RW=2000 Rm<br />

SD=30Km<br />

Pavement=<br />

10Km<br />

IW=170Km<br />

C=860Nos<br />

RW=8500 Rm<br />

SD=133Km<br />

Pavement= 22Km<br />

Annual Plan<br />

2007-08<br />

- IW= 136 kM IW = 30 KM C=<br />

C=600Nos 90 Nos RW= 600<br />

RW=7500 Rm SD Rm SD=30Km<br />

= 136 KM LSD=<br />

38 Km Pavement<br />

= 136 Km<br />

XII Baffacos S& I = KM 311.00 311.00 311.00<br />

FC=Km 311.00 170.00 141.00 311.00<br />

-<br />

IW=170Km<br />

C=930Nos<br />

RW=10300 Rm<br />

SD=181Km<br />

Pavement =<br />

197Km<br />

IW=150Km<br />

C=560Nos<br />

RW=6500 Rm<br />

SD=103Km<br />

Pavement= 12Km<br />

C=70Nos<br />

RW=1800 Rm<br />

SD=48Km<br />

Pavement = 175<br />

Km<br />

C=40Nos<br />

RW=1000 Rm<br />

SD=30Km<br />

Pavement= 40<br />

Km<br />

3055 - ROAD TRANSPORT<br />

Salary No. of staff 37 37 37 37 37 37<br />

Wages<br />

Booking Station<br />

No. of staff 2 2 2 2 2 2<br />

Minor Works No.<br />

1) construction of building 15 10 3<br />

27 7 5


Sl. No. Item<br />

Unit<br />

- 513 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

2) improvement of existing building 12 14<br />

Central Workshop<br />

Salary<br />

Entertainment of existing post No. of staff 44 44 44 44 44 44<br />

Wages No. 2 2 - 2 2 2<br />

Capital Section<br />

Central Workshop<br />

Major Works<br />

1) Upgradation of Central Workshop % - - 10 10 90 10<br />

2) Constr of Directorate Building % - - 15 15 85 50<br />

Acquisition of fleet<br />

Bus No. 40 17 5 22 65 5<br />

Tanker No. 4 2 - 2 - -<br />

Truck No. 2 - - - 2 1<br />

LMV No. - - - - 3 1<br />

2041-Taxes On Vehicles (MOTOR VEHICLE WING)<br />

Direction<br />

Maintenance of existing posts No. 3 3 3 3 4 4<br />

MInor Works No. - 6 3 9 13 5<br />

M & E<br />

Smoke Emission No. 3 1 - 1 1 1<br />

Weighbridge No. 1 - - - 2 -<br />

Telecommunication equipment No. 8 - - - - -<br />

Administration<br />

Salary - Maintenance of existing posts No. 16 16 16 16 25 25<br />

Wages No. 5 5 5 5 5 5<br />

Rent No. 1 1 1 1 2 2<br />

Motor Vehicles<br />

Maintenance of scooter No. - - - - 25 5<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 514 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

1<br />

COMMUNICATION<br />

Direction & Administration 10 46.92 20 26.92 46.92 265.95 42.62<br />

2 I.T Infrastructure Development 54 - - - - 136.8 15<br />

3 Special Manpower Development 15 3 - 3 3 136.8 5<br />

4 I.T Promotional Development 3026 14 - 14 14 103 14<br />

5 e-Governance 850 20 - 20 20 136.8 20<br />

6 Community Information Centre 36 10.62 - 10.62 10.62 330.55 48.02<br />

SCIENCE & TECHNILOGY<br />

1 Direction & Administration Persons 24 24 24 24 16 16<br />

2 Satellite Remote Sensing Centre Project 17 10 5 15 20 5<br />

3 Training of Scientific Manpower Persons 500 425 140 565 800 155<br />

4 Assistance to Scientifif Res.Project. Project 5 2 1 3 10 2<br />

5 Science Popularisation Progrmmes (Journal) Copy(pm) 180000 177000 177002 3000 360000 6000<br />

6 Low Head Microturbine Projects Project 3 1 1 2 1<br />

7 Establishment of Planetarium No 1<br />

8 Environment Awareness (Seminars etc) No 5 4 1 5 15 3<br />

9 Plasma Pyrolysis Unit Unit 3 1<br />

1<br />

FORESTRY & WILDLIFE<br />

Direction & Administration No. 158 15 15 15 15 15<br />

2 Res. Survey and Silviculture Resources No. 25 25 25 25 25 25<br />

3 Consolidation of Forest & Working Plan No. 1 1 1 1 1 1<br />

4 Forest Conser. & Dev. (Forest Prot.) " 75 75 75 75 75 75<br />

5 Afforestation HA Maintenance Maintenance - - Maint Maint<br />

6 Forest Utilization<br />

7 Extension of Traning : Salary No. 8 8 8 8 8 8<br />

8 Preservation of Wildlife Salary No. Maintenance 18 18 18 18<br />

9 Asst. MPCB No. - 1 1 1 1 1


Sl. No. Item<br />

Unit<br />

- 515 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

SECRETARIAT ECONIMMIC SERVICES (Planing)<br />

Plan Formulation<br />

1 Maintenance of existing posts<br />

2 Evaluation & Monitoring<br />

No. 9 9 9 9 9 9<br />

a) Maintenance of existing posts<br />

b) Creation of new posts<br />

No. 10 9 9 9 2 2<br />

i) Deputy Adviser (M) No. 1 - - - 1 1<br />

ii) Senior Research Officer No. 1 - - - 1 1<br />

iii) Research Officer<br />

3 District Planning Machinery<br />

No. 2 - - - 2 2<br />

a) Maintenance of existing posts<br />

b) Creation of new posts<br />

No. 35 35 35 35 35 35<br />

i) Chief Planning Officer No. 8 - - - 7 3<br />

ii) Project Expert / Research Officer No. 8 - - - 7 3<br />

iii) Research Assistant / Inspector No. 8 - - - 7 3<br />

iv) LDC No. 8 - - - 7 3<br />

v) IV Grade No. 8 - - - 7 3<br />

4 Pilot Project for Lunglei No. 1 1 1 1 1 1<br />

5 Finance Commission % 100 100 100 100 - -<br />

6 Capacity Building % 100 - 100 100 - -<br />

7 RSVY % 100 100 100 100 - -<br />

Annual Plan<br />

2007-08<br />

TOURISM<br />

1 International Tourist No. 2700 1152 350 1502 2250 350<br />

2 Domestic Tourist No. 181700 152753 37500 190253 243800 45000<br />

3 Construction New Tourist Facilities No. 15 18 2 20 7 2<br />

4 Commissioning of beds No. 120 311 20 331 125 10<br />

5 Revenue earning from Tourist establishment Rs. 141.00 222.34 60.00 282.34 325.50 65.00


Sl. No. Item<br />

Unit<br />

- 516 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

ECONOMIC & STATISTICS<br />

Census, Survey and Statistics<br />

Direction No.of Posts 7 7 7 7 7 7<br />

1 Administration -do- 11 11 11 11 145 91<br />

2 Vital Statistics -do- 9 9 9 9 8 8<br />

3 National Sample Survey -do- 9 9 9 9 9 9<br />

4 Estimation of State Income -do- - - - -<br />

5 Data Bank -do- - - - -<br />

6 Publication No. of<br />

Publication<br />

- - - - 55 11<br />

7 Crop Cutting Experiment -<br />

8 Price and Marketing No. of Post - 1 1<br />

9 Computer Service (a) No. of Post 10 - - - 1 1<br />

10<br />

(b) No. of Material 17 14<br />

Other Expenditure (a) No. of Post - - - - 5 5<br />

11 - Mini Press (b) No. of Material 1 -<br />

12 Training of Statistical Personnel No. - - - - 250 50<br />

13 Building No. 7 2<br />

FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />

1 Installation of Digital Weighbridge No. - - - - 7 5<br />

2 Brick Walled fencing of Government Godown No. - - - - 12 7<br />

3 Construction of Area Inspector Office & Quarter No. 10 10 - 10 15 12<br />

4 Purchase of Computers No. - - 4 4 15 15<br />

5 Construction of District For a Building No. - - - - 8 5<br />

LEGAL METROLOGY (Weight & Measure)<br />

Supply & Material<br />

1) Verification Stamp & plug Set.120 - 120 120 20<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 517 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

2) Minor Works Bdlg. 1 1 7 1<br />

LAI AUTO. DISTRICT COUNCIL<br />

I. Agriculture & Hosticulture Department<br />

A. Agriculture<br />

2 Land Development for WRC<br />

(1) Ngarsah (2) Chamdur<br />

(3) Diltlang (4) Ngengpui<br />

(5) Dillui (6) Tuiphal<br />

(7) Tuichawng (8) Hnahvutnel<br />

(9) Kawrthindeng (10) Zawlmawi Ha 1260 73 153 226 400 80<br />

3 Minor Irrigation for above Project Fa 800 20 - 20 200 40<br />

4 Const/Maint of Linked Road Km 5 6 - 6 10 2<br />

5 Fin. Asst. to Cultivators Fa 500 - 114 114 1000 400<br />

6 Const. of Agriculture Quarter with maint. at Bualpui & Mampui No 5 1 - 1 6 1<br />

7 Supply of Plaugh animal Fa 10 20 10 30 50 10<br />

8 Purchase of Power tiller No 2 - - - 50 2<br />

9 Const. of Contour trench Within LADC Area Ha 200 80 - 80 - -<br />

10 Maint of Bike No 1 1 1 2 2 2<br />

11 Maint. of Vehicle No 1 1 1 2 1 1<br />

12 Salary<br />

b) Horticulture.<br />

Pers 8 5 5 10 8 4<br />

1 GIA to sellected to Horticulturist Fa 800 - - - -<br />

2 Fin. Asst. to Horticulturist like Anthurium growers, Chillies grower,<br />

Gingers growers<br />

Fa 240 524 136 661 400 -<br />

3Upgradation & Maint. of Mampui seed farm No 1 1 1 2 1 1<br />

4 Purchase/Maint of Vehicle No 2 1 - - 1 1<br />

5 Salary Pers 8 8 5 13 5 5<br />

6 Purchase of Polythene Pipe/Polygon Fa 40 4 - 4 - 40<br />

7 Purchase & Supply of fingerling for distribution to fish farmers Fa 60 40 10 50 57 57<br />

8 Public demonstration and breeding No 2 1 1 2 2 1<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 518 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

9 Purchase of Fish net for distribution to fish farmers Fa - - - - 500 10<br />

10 Salary Pers 5 5 5 10 5 5<br />

III. PHE Department<br />

1 Constn. of RCC Water tank for Villages No. 130 50 25 75 100 25<br />

2 Constn. Of Water tank for Villages No. 200 150 50 200 200 50<br />

3 Harvesting of Rain Water No. 200 150 50 200 200 50<br />

4 Repair of existing RCC Water tank No. 120 100 30 130 200 80<br />

6 Purchase of Polygon No. - - 16 16 20 10<br />

7 Maint. of Vehicle No. 2 1 1 2 1 1<br />

8 Salary No. 12 7 7 14 7 7<br />

IV. Industries Department<br />

1Upgradation of Production-cum-Training Centre at Lawngtlai No. 1 1 1 2 1 1<br />

2 Purchase & distribution of sewing machines Fa. 100 10 - 10 - -<br />

3 GIA to small scale industry unit / in kind Fa. 180 10 - 10 160 137<br />

4 Installation of I.T. with maintenance No. 4 4 4 8 - -<br />

5 Purchase of Burma Looms with Maint. No. 16 5 5 10 - -<br />

6 Maint. of Vehicle No. 1 1 1 2 2 2<br />

7 Constn. of Training Centre Building:<br />

a) Training Centre Building No. - - - - 3 3<br />

b) Chowkidar Quarters No. - - - - 3 -<br />

8 Salary No. 8 19 19 38 19 19<br />

V. Sericulture Department<br />

1 Maint. of Seri. farm at Saikah No. 1 1 1 2 1 1<br />

2 GIA to Silk Warm rearers Fa 200 170 - 170 140 20<br />

3 Repair of Seri. Quarters at Saikah No. 1 1 1 2 1 1<br />

4 Creation of Mulberry Plantation Ha. - - - - 50 50<br />

5 Reward to top ten best Silk Worm rearers Fa - - - - 10 -<br />

6 Salary No. 5 4 2 6 2 2<br />

VI. A.H. & Veterinary<br />

1 GIA to Catle rearers/Piggery & Poultry farmers Fa 140 10 60 70 790 -<br />

2 Maint. of Vehicle No. 1 1 Ls 2 1 1<br />

3 Maint. of Scooter No. 1 1 1 2 1 1<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 519 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

4 Salary No. 9 5 5 10 5 5<br />

VII. Art & Culture<br />

A. Promotion of Art & Culture<br />

1 Improvement of Council Library/Constn. of Library Auditorium No. 1 1 1 2 1 1<br />

2 Maint.of Video Camera No. 1 1 1 2 1 1<br />

3 Maint. of Vehicle No. 1 1 1 2 1 1<br />

4 Contigencies No. 1 1 1 2 1 1<br />

5 Salary<br />

B. Information:<br />

No. 7 7 7 14 7 7<br />

1 Construction of LADC Conference Hall No. 1 1 1 2 1 1<br />

2 Purchase and maint. of Copier 2 Nos. No. - - - - 2 2<br />

3 Purchase/installation of 6 Nos of TV for installation of District Council<br />

Rest House<br />

No. - - - - 6 6<br />

4 Purchase of Digital Camera with maintenance for the use of Planning<br />

Deptt. & Information<br />

5 Purchase of different Maps/books like dic-<br />

No. - - - - 2 2<br />

6 Salary No. 11 11 11 22 11 11<br />

VIII. Social Welfare<br />

1Wages of old aged Pensioner No. 600 600 840 1440 1000<br />

2 Fin. Asst. to Widow Pers 100 120 40 160 50 50<br />

3 Fin. Asst. to Physically Handicapped Pers 100 120 40 160 50 50<br />

4 Fin. Asst. to Motherless babies Home at Lawngtlai No. 1 1 1 2 1 1<br />

5 Fin. Asst. to poor patient/Leprosy Pers 40 40 20 60 30 30<br />

6 Fin. Asst. to Motherless babies Pers 100 8 140 148 75 75<br />

7 GIA to Lairam Rescue Centre No. 1 1 1 2 1 1<br />

8 Constn. Of 6 Nos of Grave yard hut No. 60 25 10 35 - -<br />

9 Maint. of Vehicle No. 1 1 1 2 1 1<br />

10 Constn. of Picnic Spot at Sihtlangpui No. - - - - 1 -<br />

11 Salary No. 6 5 5 10 5 5<br />

IX. Soil Conservation<br />

1 Hill Terracing of eastern Side LADC. Ha. 50 5 20 25 16 6<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 520 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

2 Maint. of Existing Plantation Ha. 580 50 30 80 90 45<br />

3 Creation/maint. of Nursery bed No. 3 2 1 3 2 1<br />

4 (a) Maint. of vehicle No. 1 1 1 2 1 1<br />

(b) maint. of bike No. 1 1 1 2 1 1<br />

5 Salary No. 8 7 7 14 7 7<br />

X. LAD<br />

a) Urban Development<br />

1 Fin. Asst. to Low income group for constn. of Houses Fa. 100 50 10 60 200 20<br />

2 Maint of Market shed at Lawngtlai<br />

b) Minor Works<br />

No. 5 3 1 4 3 1<br />

1 Constn. of M/step at Lawngtlai and Other Division & subdivision Rm. 5000 2000 175 2175 2500 300<br />

2 Constn. of M/side drain at Lawngtlai and Other Division & subdivision Rm. 4000 1000 200 1200 1000 300<br />

3 Constn. R wall at Lawngtlai and Other Sob Div. No. 66 33 12 45 30 10<br />

4 Constn. Pavement / Cantilever. Rm. 400 200 100 300 300 100<br />

5 Constn. of Culvert/Stone laying at Lawngtlai No. 200 100 12 120 150 30<br />

6 Repair of existing steps & drainage Rm. 200 300 100 400 500 250<br />

7 Maint. of Vehicle No. 2 2 2 4 2 2<br />

8 Salary<br />

c) Sanitation<br />

No. 5 5 5 10 5 5<br />

1 Constn. of Pit Latrine No. 50 10 - 10 - -<br />

2 Constn. of Pucca Urinal 20 nos. of different Villages, School/Public<br />

Places<br />

No. 70 70 20 90 50 15<br />

3 Constn. of Public Urinal No. 50 40 - 40 75 15<br />

4 Maintenance fo Truck / Triper No. 1 1 1 2 1 1<br />

5 Constn. of slaughter house at Lawngtali No. 1 1 2 3 5 1<br />

6 Constn. of Bazar shed in Rural Areas No. 20 2 2 4 - 5<br />

7 Maintenance of Vehicle No. 1 1 1 1 1 1<br />

8 Maintenance of Bazar shed at Lawngtlai No. 2 1 3 4 - 1<br />

9 Salary No. 21 20 20 40 21 20<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 521 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

XI. Forest Department<br />

1 Pre-Work Ha. 500 400 100 500 500 100<br />

2 Creation Ha. 500 400 100 500 500 100<br />

3 Weeding of Plantation Ha. 500 400 100 500 100<br />

4 Maint. of existing Plantation @ Rs. 500 per Ha. 2 times in a year Ha. 200 100 100 2500 50<br />

5 Maint. of previous Plantation handed over to LADC by<strong>Mizoram</strong> Forest<br />

Deptt<br />

Ha. 1000 200 460 660 200 80<br />

6 Collection of Teak Stump for the per Ha. or Rs 200/- No. 10000 1000 - 1000 4000 40<br />

7 Constn. of Forest road/sand Quarry at Kawlchaw Km. 2 - 5 5 20 10<br />

8 Preservation/Maint. of Ngengpui Rs 2.00 Lakhs per No. for 2 Nos. No. 2 1 2 3 7 2<br />

9 Constn. of Inspection Path Km. 6 1 - 1 500 2<br />

10 Maint. of Vehicle No. 2 2 2 4 1 1<br />

11 Purchase of Bike with Maint. No. 1 1 1 - 1 1<br />

12 Salary No. 36 25 25 50 25 25<br />

XII. Transport<br />

1 Constn. of Bus waiting Shed at Bungtlang, Kawnpui, Ngengpui,<br />

Kawlchaw etc.<br />

No. 2 1 - 1 3 3<br />

2 Maint. of Bike No. 1 1 1 2 1 1<br />

3 Maint. of Vehicle No. 1 1 1 2 1 1<br />

4 Constn. of Bus waiting Shed at Lungpher, Siachangkawn & Bualpui No. - - - - 3 3<br />

5 Maintenance of Garage / Store-room No. 1 1 1 2 1 1<br />

6 Purchase/Maint of two wheelers No. - - - - 1 1<br />

7 Salary No. 9 7 7 14 7 7<br />

XIII. Sport & Youth Services<br />

1 Constn. / Extention of Playground at rural area No. 40 30 10 40 8 8<br />

2 Constn. of Pavilion attached to rural villages Playground No. 10 7 - 7 2 2<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 522 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

Annual Plan<br />

2007-08<br />

0 1 2 3 4 5 6 7 8<br />

3 Constn. of District Playground No. 1 1 1 Ls 1 -<br />

4 Purchase / Maint. of Vehicle No. 1 1 1 2 1 1<br />

5 Salary No. 9 8 8 10 8 8<br />

XIV. Cooperation<br />

1 Fin. Asst. to Various Co-operative Societies No. 50 40 10 50 40 34<br />

2 Purchase/Maint. of Vehicle No. 1 1 1 2 1 1<br />

3 Salary Per 4 4 4 8 4 4<br />

XV. PWD :<br />

1 (a) Furnishing of Dokulha's Hall No. 1 1 1 2 1 1<br />

(b) Maint. of white washing of Dokulha Hall No. 1 1 1 2 1 1<br />

2 Maint. of Lai house at Aizawl and Extension of Lai House No. 1 1 1 2 1 1<br />

3 Maint. of Rest house at Chawngte,Vathuampui, Bungtlang 'S', Vawmbuk<br />

& Siachangkawn<br />

No. 5 5 5 10 5 5<br />

4 Constn. Of Session Hall No. 1 1 1 2 1<br />

5 Furnishing of RO/ARO Office at Diltlang, Chawngte, Vathuampui,<br />

Bualpui 'Ng', Sangau & Lungtian<br />

No. 5 - 6 - 6 6<br />

6 House rent of LSA Hostel/Lai House in N.Delhi No. - - - - 1 each 1 each<br />

7 Constn. Of CEMs/Chairman Quarter No. - - - - 1 1<br />

8 Constn. Of EM's Quarter No. - - - - 9 2<br />

9 Constn. Of Truck road Km 16 5 1 6 - -<br />

10 Constn. Of Jeep road Km 45 10 5 15 - -<br />

11 Constn. Of stone laying at Lawngtlai Town & other Division & Sub-<br />

Division of LADC<br />

Rm 400 300 60 360 500 100<br />

12 Constn. Of R/Wall, Culvert, Side drain at Lawngtlai & other Division &<br />

Sub-Division of LADC<br />

Rm 800 700 60 760 1000 200<br />

13 Maint.of Truck/Jeep road Km 250 83 20 103 75 25<br />

14 Purchase/Maint. of Bike No 2 2 2 4 2 2<br />

15 Purchase of Dugout Boat No 5 2 - 2 2 -<br />

16 Constn. & Extension of Pandal & Steel Structure No. 1 1 1 2 1 1<br />

17 Maint. Main Building including step/corridor No. 1 1 1 2 1 1<br />

18 Maint. of Vehicle No. 2 2 2 4 2 2<br />

19 Salary No. 29 29 29 29 29 29


Sl. No. Item<br />

Unit<br />

- 523 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

XVI. Education Department<br />

A. Middle School (Recurring)<br />

1 Salary of 40 teachers of Gov't Middle School & salary of Hindi Teachers No. 93 93 72 72 72 72<br />

Non Recurring<br />

1 Building<br />

B. Adult Education<br />

No. 20 - - - 60 -<br />

1 Honorarium for 2 Paraks No. 2 2 2 4 2 2<br />

Honorarium to 100 Nos. of Inspector Under (MPFL)<br />

C. Primary School (Recurring)<br />

No. 100 100 100 200 100 100<br />

1 Salary of 137 Teachers & 22 Additional Teachers<br />

Non Recurring<br />

No. 159 159 159 318 159 159<br />

1 Building construction No. 40 - 3 3 - -<br />

2 GIA to private school No. - 2 1 - 10 1<br />

XVII. Rural Development Deptt.<br />

1 Rural housing schemes Fa. 500 350 150 500 350 180<br />

2 Constn. of Community Hall in Rural Villages No. 10 7 3 10 - -<br />

3 Maint. of Internal Jeep road within LADC area Km 40 22 14 36 40 10<br />

4 Maint. of inter Village Path within LADC area Km 200 60 20 80 100 40<br />

5 Maint. of Vehicle No. 2 2 2 4 2 2<br />

6 Constn. of LADC godown No. - Ls - Ls 5 -<br />

7 Salary No. 15 13 13 26 13 13<br />

XVIII. Water Way Department<br />

1 Purchase of Dugout Boat @ Rs 10000/- per No. No. - - - - 20 10<br />

2 Purchase of Speed Boat 2 Nos @ Rs 70000/- per No. No. 4 1 2 3 2 1<br />

3 Salary No. 4 3 3 6 3 3<br />

1<br />

MARA AUTO. DISTRICT DISTRICT<br />

Environment & Forest<br />

1 Salary No. 35 35 35 35 35 35<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 524 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

2 Maintn of Vehicle (Gypsy & 2 wheeler) No. 2 2 - 2 2+5 1<br />

3 Maintn of rest House at Kaochao ‘E’ & Phura No. 6 6 4 6 4 1<br />

4 Collection of seeds No in Lakh 2 1.8 0.2 2.0 12 Lakhs 80,000<br />

5 Maintn of previous years plantations Ha. 400 400 400 400 550 50<br />

6 Maintn/new constn of Buildings at Siaha No. - - - - 3 1<br />

7 Creation of Nursery Beds at Kaochao 'E' No. 2000 1750 250 2000 110 10<br />

8 Creation of Plantations at Tipa & Siaha Ha. 100 100 - 100 500 50<br />

9 Contn of road for collection of good quality sand Km - - - - 5 1<br />

2 Art & Culture<br />

1 Salary No. 10 9 9<br />

2 Research investigation No. 10 10 10 Ls Ls<br />

3 Maintn of Museum No. 1 1 1 1 1<br />

4Organisation of Cultural meets at Siaha No. 1 1 1 Ls Ls<br />

5 Procurement of Cultural dress No. 35 25 10 Ls Ls<br />

6 Procurement of Musical articles No. 10 7 3 Ls Ls<br />

7 Maintn of Video & Still camera No. 2 2 2 2 1<br />

8 Assistance to Local artists No. 15 15 12 60 12<br />

9Organisation of Drama/Essay competion at Siaha No. 5 5 1 Ls Ls<br />

10 Tour/excursion for cultural troupe. No. 4 4 1 Ls Ls<br />

11 Constn of Typical Mara Thatch House No. 5 1<br />

3 Rural Development<br />

A. Administration<br />

1 Salary for RD Staff and Data Operators No. 30 30 30 30 30 30<br />

2Wages No. 18 18 18 18 18 18<br />

3 Maintenance of Vehicle No. 3 3 3 3 3 3<br />

4 Purchase of Vehicles No. - - - - 5<br />

B. Rural Communication<br />

5 Maintn of Village Link road @Rs. 1500/- per Km Kms 3250 2600 650 3250 3250 650<br />

6 Contn of seasonal wooden bridges at IVP roads No. 250 200 50 250 300 16<br />

7 Constn of suspension rope bridge over River No. 4 3 1 4 10 4<br />

8 Provision of LPG Gas connection alongwith Stove and Cylinders in free Family - - - 150 150<br />

9 Constn of Public Latrine No. - - - 16


Sl. No. Item<br />

Unit<br />

- 525 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

10 Medical Assistance to BPL families @Rs.1000/- per head per family Family - - - 500 500<br />

Annual Plan<br />

2007-08<br />

C. Rural Housing<br />

11 Purchase of GCI Sheets for distribution Family 2500 2010 490 2500 -<br />

12 Constn of Residential House for shelterless poor families @Rs. 40,000/per<br />

family<br />

Family - - - - 100<br />

13 Contn of Planning conference Hall (on-going)<br />

E INFO. & PUBLICITY :<br />

No. - - - - 1<br />

14 Publication of Hmahsiena Time 240 240 48 240 240 48<br />

15 Publication of MADC Calendar No. 5 5 1 5 5 1<br />

16 Maintn of PA Set & Cameras No. 10 10 10 10 5 5<br />

4 Agriculture & Horticulture<br />

A. Administration<br />

1 Salary No. 22 22 22 22 22 22<br />

2Wages No. 8 4 4 8 8 8<br />

3 Purchase & Maintn of Vehicle<br />

B. Agriculture<br />

No. 1 1 1 1 3 1<br />

1 Agri seed cum demonstration farm No. 3 3 3 3 3 3<br />

2 Constn of Link roads Km 2.5 2 0.5 2.5 121 8.75<br />

3 Land development by manual Ha. 100 85 15 100 390 35<br />

4 Plough animal/Power Tiller No. 20 16 4 20 780 70<br />

5 Maintn of Agri farm Qtrs at Lohry No. 4 4 4 4 10 3<br />

6 Tea/Maize/Oil Seed plantation project<br />

C. Horticulture<br />

Ha. - - - - 500 50<br />

1 Citrus & Horti crop plantation Family 200 170 30 200 1120 100<br />

2 Garden terracing programme Ha. 50 30 20 50 580 60<br />

3 Quality Horti seed/seedling distribution No. in lac 4 3 1 4 90 1<br />

4Vegetable Development Programme Family - - - - 630 50<br />

5 Medicinal & Ornamental Plant Dev. Schemes<br />

D. MINOR IRRIGATION:<br />

Family - - - - 550 50<br />

1 Constn of Minor Irrigation channel Kms 10 8 2 10 208 20


Sl. No. Item<br />

Unit<br />

- 526 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

2 Pipe irrigation development scheme RM - - - - 2002 200<br />

3 Constn of water tank/reservation No. - - - - 79 5<br />

5 Soil & Water Conservation<br />

1 Salary No. 19 19 19 19 19 19<br />

2 Maintn of Vehicles No. 1 1 1 1 1 1<br />

3a) Creation of Coffee Plantation Ha. 10 8 2 10 495 55<br />

b) Maintenance of previous year plantation Ha. 10 10 10 10 470<br />

c) Creation of Nursery Ha. 3 0.5<br />

d) Seeds collection Kg Ls Ls Ls Ls 532 66.6<br />

e) Procurement of Pipe etc. RM 3400 200<br />

4a) Creation of Rubber plantations Ha. 235 30<br />

b) Maintenance of previous year plantation Ha. 45 45 45 45 246<br />

c) Creation of Nursery Ha. 2 0.3<br />

d) Seeds collection Kg 533 66.6<br />

e) Procurement of Rubber pipe for Nursery RM 1100 100<br />

5a) Creation of Jatropa plantations Ha. 440 50<br />

b) Maintenance of previous year plantation Ha. 470<br />

c) Creation of Nursery Ha. 3 0.5<br />

d) Seed Collection Kg 3000 500<br />

e) Procurement of Rubber pipe for Nursery RM 2400 200<br />

6 Constn of Check dam No. 7 1<br />

6 Social Welfare<br />

1 Salary No. 8 6 6 6 6 6<br />

2 Asstn to Motherless babies for nutrition No. 35 30 5 35 1360 120<br />

3 Assistance to Handicapped person No. 45 40 5 45 80<br />

4 Assistn to Poor patients for medical treatment No. 50 45 5 50 125<br />

5 Assistance to Old aged person No. 410 407 400 407 4800 2000<br />

6 Assistance to NGOs No. Ls Ls Ls Ls 15<br />

7 Assistance to M.T.P Gen Hqrs. No. 1 1 1 1 1 1<br />

7 A.H. & Vety.<br />

1 Salary No. 8 8 8 8<br />

2Wages No. 10 10 10 10<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 527 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

3 Constn of Cow Shed at Vety farm, Siaha No. 5 4 1 5 3<br />

4 Constrn of Farm Qtrs No. 1 1 1 1 4 1<br />

5 Repairing of Farm Qtrs at Vety farm, Siaha No. 4 3 1 4 4 1<br />

6 Constn of Poultry Farm at Vety farm, Siaha No. 1 1 1 1 2<br />

7 Purchase of poultry No. 200 200 200 400<br />

8 Encouragement of private farmers Family 20 10 10 20 120<br />

9Pigerry Farming Scheme Family 5<br />

10 Constn of Building for Dispensary/OT No. 3 1<br />

8 Industry<br />

1 Salary No. 8 7 7 7<br />

2 Constn of Production Centre Building No. - - - - 1 -<br />

3 Constn of Approach road to Industrial Centre Km - - - - 0.9 -<br />

4 Maintn of Light & Medium Vehicle No. - - - - 1 -<br />

5 Contn of Staff Qtrs at Siaha No. - - - - 3 1<br />

6 An extension site for Industrial Land Ha. - - - - 7 -<br />

7 Fencing for Industrial Centre RM - - - - 1000 -<br />

9 Fisheries<br />

1 Salary No. 5 5 5 5 5 5<br />

2Wages No. 4 4 4 4 27 4<br />

3 Procurement of fish seed for Pala Lake No in Lac 2 1.5 0.5 2 137 14<br />

4 Grant-in-aid for Fishery Pond Development Family 213 13<br />

5 Purchase of G.I/Rubber Pipe for distribution No. 2500 200<br />

6 Procurement & maintn of Bike No. 1 1<br />

7 Creation & maintn of Departmental fish pond No. 4 1<br />

10 P.H.E.<br />

‘A’ Administration<br />

1 Salary No. 6 6 6 6 6 6<br />

2 Purchase & Maintn of Vehicle No. 1 1 1 1 1 1<br />

‘B’ DEVELOPMENT<br />

3 Constn of RCC Water reservoirs No. 5 5 - 5 53 3<br />

4 Constn of RCC Water Point/Tanks No. 21 6 15 21 141 8<br />

5 Contn of Intake chamber No. 50 8<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 528 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

6 Supply of GI Pipe, etc RM - - - - 29200 970<br />

7 Maintn of Water /tankspoints at Siaha & Tipa V No. 20 15 5 20 205 20<br />

8 Constn of retaining wall RM 5 2 3 5 555 50<br />

11 Sericulture<br />

1 Salary No. 4 4 4 4 4 4<br />

2Wages No. 8 8 8 8 24 9<br />

3 Maintn of Seed farm at Thosai Ha. 40 40 40 40 40 40<br />

4 Assitance to Private rearers Family 81 10<br />

5 Contn of Farm House No. 1 1<br />

6 Contn of Farm Road and maintenance Km 2<br />

7 Constn of Rearing House No. 3 1<br />

8 Purchase of Computer sets set 7 1<br />

9 Maintn of Farm House No. 2 2<br />

10 Purchase of 2-Wheeler with maintenance No. 2 1<br />

11 Creation and Maintn of Demonstration farm Ha. 3<br />

12 Contn and maintn of Grainage House No. 1<br />

13 Purchase and maintn of Generator No. 2 1<br />

14 Contn of Quarters No. 3<br />

12 Local Administration<br />

a) Administration<br />

1 Salary No. 37 37 37 37 37 37<br />

2Wages No. 32 32 32 32 40 35<br />

3 Maintn of Vehicle (including puchase of Gypsy) No. 4 4 4 4 4 4<br />

4 Puchase of Tripper No. - - - - 1<br />

b) Sanitation<br />

5 Constn of Dumping No. - - - - 6 1<br />

6 Constn of Urinal shed/Latrine at Siaha & Tipa V No. 50 48 2 50 106 10<br />

7 Contn & Maintn of Drainage RM 1920 200<br />

8 Maintn/Extn of Town road Km 10 1<br />

9 Repairing/clearance of Stone Steps RM 500 400 100 500 5200 500<br />

10 Constn of Slaughter House/Dustbin No. 15 13 2 15 72 12<br />

11 Approach road to Grave yard Km - - - 33.5 3.5<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 529 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

12 Constn of Retaining Wall No. - - - - 43<br />

13 Contn of Community Public Bathroom No. 78<br />

14 Contn of Pedestrial pavement RM 1500<br />

c) Market 106<br />

15 Constn/Repairing of Bazar sheds No. 10 8 2 10 29 10<br />

16 Purchase of Land Ha. 1 1 1 1 1 3<br />

17 Contn of Super market at Siaha (on-going) No. 1 1 1 1 1<br />

18 Contn of LAD Office (RCC Building - on-going) No. - - - - 1<br />

19 Constn of Garrage No. - - - - 1<br />

13 Road Transport<br />

1 Salary No. 5 5 5 5 5 5<br />

2Wages No. 5 5 5 5 10 6<br />

3 Constn of Garage at MADC Complex, Siaha No. 1 1 1 1 3 1<br />

4 Purchase of Tripper No. - - - - 3<br />

5 Purchase of Bus No. - - - - 2<br />

14 Sport & Youth Services<br />

a) Administration<br />

1 Salary No. 7 7 7 7 7 7<br />

b) MADC Sport Council<br />

1 Purchase of Sports Materials No. 1000 750 250 1000 2006 252<br />

2 Dist. Level Sports Competition Times 10 8 2 10 10 2<br />

3 Assitance to Sporting Clubs No. 20 16 4 20 70 10<br />

4 Incentives to Talented Individuals No. - - - - 60 10<br />

5 Construction of Playgrounds No. 1 1 1 1 28 2<br />

6 Construction of Pavillions No. 1 1 1 1 23 2<br />

7 Contruction of Lawn Tennis Courts No. - - - - 12 1<br />

8 Construction of Indoor Stadium (On-going) No. - - - - 1 1<br />

15 Co-operation<br />

1 Salary No. 2 2 2 2 2 2<br />

2 Construction of Godown for Vegetable Stock No. - - - - 2 1<br />

3 Purchase of Bike & Maintenance to verify of each Society No. - - - - 1 1<br />

4 Improvement of Society Store No. - - - - 21 2<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 530 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

5 Assistance to Milk Producer Family - - - - 28<br />

6 Construction of Ponds for Fish No. - - - - 4<br />

16 Public Works<br />

a) Administration<br />

1 Salary No. 26 26 26 26 26 26<br />

2Wages No. 10 10 10 10 16 12<br />

3 Training Expenses No. 3 3 3 3 20 5<br />

4 Maintenance of Vehicles No. 1 1 1 1 2 2<br />

5 Purchase of Blasting Materials Set 1 1 1 1 13 2<br />

6 Purchase of JCB No. - - - - 1<br />

7 Purchase of Tripper No. - - - - 1<br />

b) Sub Division Building<br />

1 Construction of E.E PWD Office No. - - - - 1<br />

2 Construction of MADC Quarter No. 3 2 1 3 3 1<br />

3 Construction of Administration Office, Tipa No. 1 1 1 1 1 1<br />

4 Construction of R.O. Office, Phura No. 1 1 1 1 1<br />

5 Construction of PWD Godown No. - - - - 1<br />

6 Construction of I.B No. - - - - 1<br />

7 Maintenance of Office Quarter No. 12 12 12 12 14 12<br />

8 Maintenance of MADC main Office No. 1 1 1 1 1 1<br />

c) Sub Division Road<br />

1 Construction of Fresh Jeep Road Km 10 8 2 10 31.25 2.5<br />

2 Extension/Maintenance of Jeep Road Km 300 250 50 300 104 8<br />

3 Construction of Stone Step RM 250 250 250 250 3750 350<br />

4 Construction of Drainage RM 700 450 250 700 4650 350<br />

5 Construction of Retaining Wall RM - - - - 284 20<br />

6 Construction of RCC Culvert No. 30 20 10 30 54 4<br />

7 Maintenance of Stone Steps RM 600 400 200 600 6300 500<br />

8 Town Road Extension Km 5 4 1 5 81 3<br />

9 Solling & Metalling Km - - - - 86 4<br />

17 Inland Waterway<br />

1 Salary No. 7 7 7 7 7 7<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 531 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

2 Purchase of Fibre Boat with Maintenance No. - - - - 7 1<br />

3 Maintenance of Existing Boat No. 7 7 7 7 7 7<br />

4 Constn & Maitn of approach road - R.Beino Ferry Km - - - - 6 1<br />

5 Air Compresser with Maintenance No. - - - - 1 1<br />

6 Jack-Hammer with drill bit and horse pipe No. - - - - 1 -<br />

7 Tripper Truck No. - - - - 1 -<br />

8 Construction of Marboat at Lomasu Ferry No. - - - - 1 -<br />

9 Construction of suspension brigde maintenance over R.Salyu No. - - - - 1 -<br />

18 Education & Human Resources Dptt.<br />

A PRIMARY SCHOOL EDN (Dir. & Admn)<br />

1 Purchase of Computer No. - - - - - 1<br />

2 Honararium to Computer Operator No. - - - - - 1<br />

3 Purchase of Xerox Machine No. - - - - - 1<br />

4 Maintenance of Motor Vehicles No. - - - - 1 -<br />

5 Purchase of Generator No. - - - - 1 -<br />

B PRIMARY SCHOOL EDN (Teaching Staff)<br />

1 Salary No. 47 47 47 47 - -<br />

2 Construction of P/S Building No. - - - - 3<br />

3 Supply of Computer to Schools No. - - - - 3<br />

4 Purchase of Xerox Machine No. - - - - 5 1<br />

5 Maintenance of Vehicles No. - - - - 1 1<br />

6 Medical Assistance @ Rs. 500 per teacher per yr No. - - - - 120<br />

7 Zonal Sport Time - - - - 5 1<br />

C MIDDLE SCHOOL EDN (Dir. & Admn)<br />

1 Purchase of Computer No. - - - - 5 1<br />

2 Honararium of Computer Operators No. - - - - 2 1<br />

3 Purchase of Xerox machine No. - - - - 2<br />

4 Maintenance of Vehicle No. 1 1 1 1 1<br />

D MIDDLE SCHOOL EDN (Teaching Staff)<br />

1 Salary No. 105 105 105 105 - -<br />

2Upgradation of Private M/S No. - - - - 1<br />

3 Construction of M.S Building No. - - - - 3<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 532 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

4 Purchase of Motore vehicle for E.O. No. - - - - 2 1<br />

5 Supply of Computers for School No. - - - - 2<br />

6 Purchase of Xerox Machine No. - - - - 3 1<br />

7 Maintenance of Motor Vehicle No. - - - - 5 1<br />

8 Medical Assistance @ Rs. 500 per teacher per yr No. - - - - 120<br />

9 Zonal Sports Time - - - - 5 1<br />

E BOARD OF SCHOOL EDUCATION<br />

1 Purchase of Computers No. - - - - 6 2<br />

2 Purchase of Xerox Machine No. - - - - 1 1<br />

3 Purchase of Printer No. - - - - 1 1<br />

4 Honararium for Computer Operators No. - - - - 2 1<br />

5 Purchase of Motor vehicle No. - - - - 1 1<br />

6 Maintenance of Motor Vehicle No. - - - - 1 1<br />

7 Establishment and manintn of Library No. - - - - 1 1<br />

8 Construction of BSE Building No. - - - - 1 1<br />

F ADULT EDUCATION<br />

1 Honararium for Animators No. 100 100 100 100 500<br />

2 Observance of International Literacy Day Time 1 1 1 1 5 1<br />

3 Maintenance of Motore Vehicle No. - - - - 1 1<br />

4 Purchase of Computer & Printer No. - - - - 2 -<br />

5 Honararium for Computer Operators No. - - - - 2 1<br />

6 Purchase of Motor Bike for CAEO's No. - - - - 1 -<br />

7 Construction of DAEO's Office Building No. - - - - 1 -<br />

CHAKMA AUTO. DISTRICT COUNCIL<br />

1 Agriculture & Horticulture<br />

A. Agriculture<br />

1 Salary of existing staff Post 9 9 9 9 9 9<br />

2Wages of C/L No. 4 4 - - - -<br />

3Wages of M/R No. 2 2 2 - - -<br />

4 Maintenance of Vehicle No. 1 1 - - - -<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 533 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

5 Land Development by Mannual @ Rs. 45,000/- per Hect. Ha. 433 67 33 31 31 131<br />

6 Maint. of Existing Agri.farm.<br />

B. Horticulture<br />

No. 1 - - -- - -<br />

7 Supply of orange, hatkora seedlings for distribution to Jhumia families of<br />

Rajmondal Village.<br />

No. 35000 19000 - - - -<br />

8 Financial Assistance to orange gardeners for weeding, Rajmondal<br />

Village.<br />

FAM 280 173 -<br />

2 Fishery<br />

1 Salary of existing staff. POST 3 3 3 3<br />

2 Maint of vehicle. NO 1 1 - - - -<br />

3 Maint. of existing fishery dams. NO 1 1 - - - -<br />

4 Financial Assistance to fish farmer for development of fish ponds. FAM 100 80 - - - -<br />

3 Public Health Engineering<br />

1 Salary of existing staff. POST 14 14 14 14<br />

2Wages of C.L NO 15 15 - - 14 14<br />

3Wages of M/R NO - 2 - - - 15<br />

4 Office Expenses. LS LS LS LS LS - 2<br />

6 Maint. of vehicle. NO 1 1 - - - -<br />

7 Constn. of Ring Wells. NO 10 1 20 - - -<br />

8 Constn. of Rain water Harvesting Tanks. NO 50 30 - - - 21<br />

9 Improvement of village spring water Sources (IVVS). NO 10 4 4 4 - 30<br />

4 Industry<br />

1 Salary of existing staff. POST 8 8 8 8 - 1<br />

2Wages of M/R NO - 2 - -<br />

3 Trainees Stipend. PER 225 30 - -<br />

4 Maint. of vehicle. NO 1 1 - - 8 8<br />

5 Construction of Training Centre including Land acquisition. NO 1 - 1 - - 30<br />

6 Purchase & distribution of Sewing machines. NO - 10 - 5 5 15<br />

5 Animal Husbandry & Veterinary<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 534 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

1 Salary of existing staff. POST 3 3 3 3 3 3<br />

2 Maint. of vehicle.<br />

3 Financial Assistance for :-<br />

NO 1 1 - - - 1<br />

(a) Cattle farming. FAM 20 - 10 20 20 30<br />

(b) Piggery farming FAM 20 - 10 20 20 30<br />

(C) Paultry farming. FAM 20 - 10 20 20 30<br />

(d) Duckery farming FAM 20 - 10 20 20 30<br />

6 Art & Culture<br />

A. Infrastructure:<br />

1 Salary of existing staff. POST 12 12 12 12 12 12<br />

2 Maint. of vehicle. NO 1 1 - - - 1<br />

7 Social Welfare<br />

A. Pre-Schools:<br />

1Wages of Anganwadi Workers<br />

B. Handicapped & weaker Section:<br />

PER 39 39 - - -<br />

1 Old Aged pension PER 380 380 380 - -<br />

8 Soil Conservation<br />

1 Salary of existing staff. POST 9 9 9 9 9 9<br />

2 Maint. of Vehicle. NO 1 1 - - - 1<br />

3 Construction of check- dam. NO 1 - 1 - - 1<br />

4 Maint./weeding of plantation at Samuksury. HACT 4 1 - - - 1<br />

5 Creation of nursery farm at Samuksury. NO - 1 - - - 1<br />

6 Purchase of Cyclo Machine. NO - 1 - - - 1<br />

7 Maint. of existing Champa Plantation. NO - - - 1 1 1<br />

9 Local Administration<br />

A. Management & Control of Market:<br />

1 Const. of Kamalanagara Bazar Bldg. NO 1 - - - - -<br />

2 Maint. of LAD office NO - 1 - - - 1<br />

3 Const. of Bazar Shed NO 10 4 - - - 4<br />

4 Bouldering of K/nagar town Road MTR - 134.5 - - - 134.5<br />

5 Const. of drainage system/Steps MTR - 267 - - - 267<br />

6 Purchase of type machine NO - - 1 - - 1


Sl. No. Item<br />

Unit<br />

- 535 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

7 Renovation of Super market building at Kamalanagar NO - - - 1 1 1<br />

8 Const. of Market building NO - - - - - -<br />

9 Renovation of existing Bazar bldg. NO - - - - - -<br />

B. Sanitation<br />

10 Const. of Garbage bins. NO - - - 10 10 10<br />

11 Purchase of Mini Truck/Tripper for carrying garbage including maint. NO - - - - - -<br />

10 Environment & Forest<br />

A. Direction & Administration:<br />

1 Salary of existing staff. POST 9 9 9 9 9 9<br />

2Wages of C.L NO 7 7 - - - 7<br />

3Wages of P/Mali. NO 13 13 - - - 13<br />

4 Maint. of vehicle.<br />

C. Aforestation & Forest Protection:<br />

NO 1 1 - - - 1<br />

5 Completion/Extension/ Maint. of Children Park at Kamalanagar.<br />

6 Const. of Lake cum-Botanical garden at Sadarasora.:-<br />

NO 1 1 1 1 1<br />

a) Const. of R.C.C Dam. NO 1 1 - - -<br />

b) Providing of net/fencing around botanical garden LS LS LS - - - -<br />

11 Road Transport<br />

1 Salary of existing staff. POST 15 15 15 15 15 15<br />

2Wages of Driver NO 2 2 - - - 2<br />

3 Maint. of vehicle. NO 1 7 7 7 7 7<br />

4 Purchase of vehicle. NO 1 - - - - -<br />

5 Purchase of Cyclo Machine. NO - 1 - - - 1<br />

12 Sports & Youth Services<br />

1 Salary of existing staff. POST 3 3 3 3<br />

2 Maint. of Vehicle. NO 1 1 - -<br />

3 Conduct of. Sports meet. NO LS 4 2 -<br />

4 Conduct of Zonal Sports meets. ZONE LS 16 10 -<br />

5 Maint. of Kamalanagar playground. NO 1 1 1 -<br />

13 Cooperation<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 536 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

1 Salary of existing staff. POST 3 3 3 - - 3<br />

14 Public Works<br />

A. Direction & Administration:<br />

1 Salary of existing staff. POST 11 11 11 11 11 11<br />

2Wages of C.L NO 17 17 - - - 17<br />

3Wages of M/R NO - 4 - - - 4<br />

4 Maint. of vehicle. NO 1 1 - - - 1<br />

5 Maint. of Xerox machine.<br />

B. Building division:<br />

NO 1 1 - - - 1<br />

6 Completion/Const. of CADC Rest House at Aizawl. NO 1 1 - - - 1<br />

7 Vertical extension of Council Guest House including furnishing at<br />

K/nagar<br />

NO - - - 1 1 1<br />

8 Completion of vertical extension of guest house including furnishing at<br />

K/naghar<br />

- - - -<br />

9 Black Topping of Town roads KM -<br />

15 Education<br />

A. Direction & Administration:-<br />

1 Salary of Existing Staff POST 197 197 197 197 197 197<br />

2Wages of NF Teachers. NO 66 66 - - - 66<br />

3 Maint. of vehicle. NO 1 1 - - - 1<br />

4 Const. of training hall at K/nagar including furnishing<br />

B. Student Welfare:-<br />

NO - - - - - -<br />

5 Scholarship/Cash reward/stipend<br />

C. School Infrastructure:<br />

LS LS 110 110 75 75 285<br />

6 Grant-in -aid to private Middle School NO 4 12 - - - 12<br />

16 Rural Development<br />

1 Salary of existing staff POST 9 9 9 9 9 9<br />

2Wages of C/L NO 4 4 - - - 4<br />

3Wages of M/R NO - 2 - - - 2<br />

4 Maintenance of IVP KM KM 800 800 800 500 500<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 537 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

17 Waterways<br />

1 Salary of existing staff. POST 5 5 5 5 5 5<br />

2Wages of Boatman NO 2 2 - - - 2<br />

3 Maint. of vehicle NO 1 1 - - - 1<br />

18 Planning & Development<br />

1 Maint. of Vehicles NO 1 1 - - - 1<br />

2 Maint. of Computer/Fax/Xerox, etc. NO 3 3 3 3 3 3<br />

3 Purchase of Xerox Machine/Copier. NO 1 1 - - - 1<br />

4 Information & Technology NO - 5 - - - 5<br />

5 Purchase of Xerox machine/Fax Machine/computer for installation at<br />

Chakma House, Aizawl<br />

NO - - 3 - - 3<br />

6 House Rent NO - - - 1 1 1<br />

7 Salary and Wages of all existing plan staff. POST - - - - - -<br />

19 Information & Public Relations<br />

1 Purchase of Video Camera & equipments NO 1 - - - -<br />

2 Purchase of still/ SLR camera with accessories. NO 1 1 1 - -<br />

3 Maint. of Generator. NO 1 - - - -<br />

4 Maint. of Video/ SLR camera. NO 2 2 - - -<br />

5 Purchase of Motor bike/scooter NO 1 1 - - -<br />

LAW AND JUDICIAL<br />

1 Construction of Distrct court buildings and residential quarters for<br />

Judicial Officers<br />

No. 6 2 2 4 9 2<br />

2 Information Technology in Court. No. 6 4 2 6 6 2<br />

Annual Plan<br />

2007-08<br />

33<br />

SCHOOL EDUCATION<br />

Primary Enrolment<br />

Class I - IV (age 6-10)<br />

Boys 0.000 350.000 231.982 69.000 300.982 365.00 73.000<br />

Girls 0.000 340.000 213.256 64.500 276.756 335.00 67.000<br />

Total 0.000 690.000 445.238 133.500 577.738 700.000 140.000


Sl. No. Item<br />

Unit<br />

- 538 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

Percentage of Age Group<br />

Boys Pc 95.00 95.50 96.50 96.00 100.00 98.00<br />

Girls Pc 94.00 96.00 96.00 95.00 100.00 97.00<br />

Total Pc 94.50 95.25 96.25 95.50 100.00 97.50<br />

Enrolment SC/ST<br />

Boys 0.000 349.910 231.982 69.000 300.982 365.00 73.000<br />

Girls 0.000 339.670 213.256 64.500 276.756 335.00 67.000<br />

Total 0.000 659.580 445.238 132.500 577.738 800.00 140.000<br />

34 Upper Primary School Enrolment<br />

Class V - VII (age 11-13)<br />

Boys 0.000 130.000 131.063 46.700 177.763 248.50 49.700<br />

Girls 0.000 125.000 123.930 45.600 169.530 243.00 48.600<br />

Total 0.000 255.000 254.993 92.300 347.293 491.50 98.300<br />

Percentage of Age Group<br />

Boys Pc 76.00 78.00 80.00 79.00 95.00 82.00<br />

Girls Pc 75.00 77.50 80.00 79.00 95.00 82.00<br />

Total Pc 75.50 77.75 80.00 79.00 95.00 82.00<br />

35 Secondary Education<br />

Class VIII - X<br />

Boys 0.000 50.000 84.505 21.600 105.605 115.500 23.100<br />

Girls 0.000 50.000 84.987 21.000 105.587 115.000 23.000<br />

Total 0.000 100.000 169.492 42.100 211.192 230.500 46.100<br />

Percentage of Age Group<br />

Boys Pc 64.00 69.00 73.00 71.00 80.00 75.00<br />

Girls Pc 63.00 69.00 73.00 71.00 80.00 75.00<br />

Total Pc 63.00 69.00 73.00 71.00 80.00 75.00<br />

36 Higher Secondary Education<br />

Class XI - XII<br />

Boys 0.000 35.000 31.970 5.700 37.670 33.500 6.700<br />

Girls 0.000 35.000 30.092 5.200 35.292 31.000 6.200<br />

Total 0.000 70.000 62.060 10.900 72.962 64.500 12.900<br />

Percentage of Age Group


Sl. No. Item<br />

Unit<br />

- 539 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

Boys Pc 45.00 56.00 60.00 58.00 70.00 64.00<br />

Girls Pc 45.00 56.00 60.00 58.00 70.00 63.00<br />

Total Pc 45.00 56.00 60.00 58.00 70.00 63.50<br />

1<br />

HIGHER & TECHNICAL EDUCATION<br />

Construction of College buildings No. 2 - - - 5<br />

2 Provincialization No. 5 1 - 1 12 12<br />

3 Construction of CTE building No. - - - - 1<br />

4 Construction of Boys & Girls Hostel No. 2 - - - 2<br />

5 Upgradation to Deficit GIA Colleges No. 5 4 1 5 1 1<br />

6 Construction of GZRSC building No. 4 - - - 5<br />

7 Construction of MHTC building No. - - - - 2<br />

8 Estt. Of <strong>Mizoram</strong> Engineering College No. 1 - - - 1<br />

9 Construction of Technical buildings No. 1 - - 1 -<br />

10 Construction of MPL buildings No. 1 1 - 1 -<br />

11 Construction of WPA buildings No. 1 1 - 1 -<br />

12 Setting up of 6 nos. of Polytechnics No. 1 1 - - 6<br />

I.<br />

SPORT & YOUTH SERVICES<br />

DIRECTION :<br />

1. Supplies & Materials/Purchase of UPS-1 no. No. - 1 1<br />

2. Purchase of Mini Bus - 1 no. No. - 1 1<br />

II. DISTRICT ADMINISTRATION:<br />

1) Dist.Sports & Youth Office, Lunglei<br />

1. Conduct of Sports Coaching/Tournaments No. 40 32 8 40 45 9<br />

2. Maint.of existing Bldg./Construction new Building<br />

2) Dist.Sports & Office Office, Kolasib<br />

No. 1 1 1 2 2<br />

1. Conduct of Sports Coaching/Tournament/Participation No. - 8 2 10 25 5<br />

2. Construction of Sports Hostel Building<br />

3) Dist.Sports & Youth Office, Champhai<br />

No. - - - - 4 1


Sl. No. Item<br />

Unit<br />

- 540 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

1. Conduct of Sports Coaching/Tournts/Pariticipations No. - 8 2 10 25 5<br />

2. Construction of Office Building etc No. - - - - 1 1<br />

III. YOUTH WELFARE PROG. FOR STUDENTS :<br />

1) 20-<strong>Mizoram</strong> Indep Doy NCC:<br />

1. PRDC/CATC/Army attachment/Training<br />

2) I-Mizo Bn. NCC<br />

No. 33 28 5 33 55 11<br />

1. Army attachment/Trg/PRDC/CATC Camps etc<br />

3) Girls Cadet Coy NCC<br />

No. - 8 2 10 50 10<br />

1. Army attachment/Trg/PRDC/CATC Camps<br />

4) Air Wing NCC :<br />

No. - - - - 5 1<br />

1. Construction of Aircraft Hanger No. - - - - 1 1<br />

2. Training etc<br />

5) Navy Wing NCC<br />

No. - - - - 10 2<br />

1. Training etc.<br />

6) Scouts & Guides<br />

No. - - - - 5 1<br />

1. Conduct of Training/Participations etc/.<br />

7) Youth Adventure :<br />

No. 60 50 10 60 60 12<br />

1. Conduct of Adventure Trg/Trekking/Paticipation.<br />

8) N.S.S.<br />

No. 35 28 7 35 35 7<br />

1. Construction of Public Waiting shed/Urinals<br />

9) State Training Centre, Tanhril<br />

No. 300 240 60 300 350 70<br />

1. Construction/Maintenance of Buildings No. - - - - 3 2<br />

IV. YOUTH WELFARE PROG. FOR NON-STUDENTS (General Youth) :<br />

1) Youth Welfare Activities :<br />

1. Conduct of Wokshops/Seminers etc. 45 39 6 45 50 10<br />

V. SPORTS & GAMES<br />

1) Sports & Games<br />

1. Conduct of Sports Tournmt/Coachings/Participn.<br />

2) Sports Council :<br />

No. 45 36 9 45 45 9<br />

1. Construction/Maint. of Sports Infrastructures No. 20 17 3 20 30 12<br />

2. Conduct of Sports Tournaments<br />

3) <strong>Mizoram</strong> Olympic Assn.<br />

No. 40 35 5 45 45 9<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 541 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

1. Other Charges/Participation/Tournament etc No. ~ 25 5<br />

4) State Hockey Academy, Thenzawl<br />

1. Other Charges/Participation/Tournament etc No. ~ 3 1 4 20 4<br />

5) State Sports Coaching Centre, Luangmual<br />

1. Other charges/participation/tournament etc. No. ~ 15 3<br />

2. Extension & Improvement of Artificial Rock Climbing Wall No. ~ 1 1<br />

6) Aizawl Sport Complex/FC<br />

1. Construction of Conplex/Infrastructure No. ~ 1 1<br />

I.<br />

ART & CULTURE<br />

Direction<br />

1 Appointment No. 25 - - - 10<br />

2 Purchase of Cultural Costume No. 5000 1000 1000 2000 5000 500<br />

3 Cultural Prog. Chapcharkut No. 200 20 20 40 40 5<br />

4 Construction of Building No. 8 - - - 5<br />

II. Institute of Music & Fine Arts<br />

1 Training No. 600 100 100 200 200 10<br />

2 Faculti exchange No. 1 - - - 20 3<br />

3 Mobile training No. 50 10 10 20 100 10<br />

4 Workshop(Art,Music,Drama etc)No No. 15 3 3 6 100 10<br />

III. Cultural Programme<br />

1Organisation of Cultural Meet No. 100 20 20 20 100 10<br />

2 Cultural Exchange Programme No. 5 1 1 2 10 1<br />

3 Essay, Drama, Solo, Painting etc. Competition No. 4 1 1 2 10 10<br />

IV. Public Libraries<br />

1 Purchase of Library Building No. 5000 1000 1000 1000 6000 500<br />

2 Setting of of Dist. Library No. 8 20 20 20 20<br />

V <strong>Mizoram</strong> State Museum<br />

1 Collection of Museum Objects No. 1800 400 400 800 1000 50<br />

VI Tribal Research Institute<br />

1 Reprinted of rare books No. - - - - 30 3<br />

VII <strong>Mizoram</strong> State Archives<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 542 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

1 Preservation and collection of Records No 2000 2000 - 2000 2000 20<br />

VIII District Gazetteer<br />

1 Publication of Books and Repairing books for publication<br />

HEALTH & FAMILY WELFARE.<br />

No 1000 - - 1000.00 100 10<br />

A. Primary Health Care<br />

1) Estt. of CHC No. 11 2 1 3 3 3<br />

2) Estt. of PHC -do- 5 1 1 2 - -<br />

3) Estt. of SC -do- 20 15 - 15 - -<br />

4) Reconstn. of CHC/PHC/SC -do- - 1 1 9 1<br />

5) Reconstn. of S.Qtrs/SC -do- L.S. 50 20 70 387 10<br />

6) Creation of new posts -do- 589 - - - 354 -<br />

7) Entertainment of posts -do- 854 - 738 854 854 854<br />

B. Hospitals (Secondary Health Care)<br />

1) Estt. of Hospital -do- 1 1 - 1 - -<br />

2) Estt. of Mental Hospital -do- 1 - - - - -<br />

3) Creation of posts -do- 416 - - - - -<br />

4) Entertainment of posts -do- 508 - - 508 - -<br />

C. MER & T<br />

1) Constn. of GNM Trg School -do- 2 - 1 1 - -<br />

2) Constn. of Nurses Hostel -do- 2 - 1 1 - -<br />

3) Entertainment of post -do- 25 25 - 25 - -<br />

D AYUSH<br />

2) Entertainment posts -do- 1 1 - 1 - -<br />

E. Control of Communicable Diseases<br />

1) Entertainment of post -do- 263 263 - 263 263 263<br />

F. Non-Communicable Diseases<br />

1) Entertainment of post -do- 38 38 - 38 - 38<br />

G. Others<br />

1) Entertainment of post -do- 20 136 - 136 136 136<br />

HOSPITAL & MEDICAL EDUCATION.


Sl. No. Item<br />

Unit<br />

- 543 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

1 Primary Health Care No.<br />

(a) Rural - Entertainment of posts -do- 165 165<br />

(b) Urban - Entertainment of posts -do- 18 21 23<br />

2 Secondary Health Care<br />

1) Entertainment of posts -do- 212 161 446<br />

2) Construction of Staff Qtrs. at Dist. Hosp. -do- 86<br />

3) Construction of DMS Qtrs. -do- 7<br />

4) Construction of DMS Office -do- 7<br />

5) Upgradation of District Hospital -do- 6<br />

6) Construction of Maternity Building -do- 7<br />

7) Construction of Cancer Hosp. at Aizawl -do- 1<br />

3 Tertiary Health Care<br />

1) Entertainment of posts -do- 710<br />

3) Fencing of Hospital Compound -do- 1<br />

4) Retaining Wall for Hospitals -do- 4<br />

5) Construction of Electronic Library No. 1<br />

6) Construction of Oxygen Plan -do- 1<br />

4 Medical Education & Research<br />

1) Entertainment of posts -do- 23 23 24<br />

2) Construction of Nursing College -do- 1<br />

3) Fencing of whole Compound -do- 1<br />

5 AYUSH - Entertainment of posts -do- 1 1 1<br />

6 (a) Control of Communicable Disease<br />

1) Entertainment of post<br />

-do- 15 23<br />

(b) Control of Non-Communication Disease -do-<br />

2) Entertainment of posts -do- 17 17<br />

7 Others - Entertainment of posts -do- 22 22<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 544 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

1<br />

PUBLIC HEALTH ENGINEERING<br />

Direction & administration<br />

a) CE ( Directorate) No. of post Continued &<br />

Strengthening<br />

- - - 7 4<br />

b) Circle No. of post 2 1 - 1 12 5<br />

c) Divisions No. of post 10 10 - 10 20 7<br />

d) Laboratories No. of post 4 - - - 4 2<br />

2 Training<br />

a) Post Graduate (ME.PH) No. 20 10 1 11 15 3<br />

b) Short Term Course No. 100 95 20 115 150 20<br />

c) Training in <strong>Mizoram</strong> No. 500 360 70 430 3500 600<br />

d) Sponsored Engineering Student No. 125 - - - - -<br />

3 Survey & Investigation<br />

a) No of Scheme to be surveyed No. 100 380 70 450 620 70<br />

b) Scientific Survey by remote sensing No. 100 - - - 776 230<br />

4 Research<br />

a) Water Sample collection/Ananlysis No. 5000 4000 1000 5000 6000 1000<br />

b) Water Testing Laboratory Equipment % 40 30 10 40 50 -<br />

c) Experimental Works No. 20 15 5 20 20 -<br />

5 Machinery and Equipment<br />

a) Diesel Engine/Pump/ Electrict Motor No. 3 2 1 3 4 -<br />

b) Water Meter No. 10000 - - - 15000 1000<br />

d) Electro-Chlorinator No. - - - - 20 2<br />

6 Urban Water Supply<br />

a) Serchhip (Imp) WSS % - - - - 100 -<br />

b) Saiha (Aug) WSS % - - - - 100 -<br />

c) Saitual (Aug) WSS % - - - - 100 -


Sl. No. Item<br />

Unit<br />

- 545 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

d) Darlawn(Imp) WSS % - - - - 100 100<br />

e) Sairang (Imp) WSS % 10 10 - 10 100 -<br />

f) Zawlnuam (Aug) WSS % - - - - 100 -<br />

g) Thenzawl (Aug) WSS % 20 20 - 20 100 -<br />

h) Khawzawl (Aug) WSS % 20 20 - 20 100 -<br />

i) Greater Lunglei WSS (upgration /renovation) % 30 30 - 30 100 20<br />

j) Greater Aizawl WSS Phase-I (Upgration / renovation) % - - - - 100 20<br />

k) Bairabi (Aug) WSS % - - - - 100 -<br />

l) Greater Champhai WSS % - - - - 100 -<br />

m) Khawhai, Biate & N.Vanlaiphai Combine WSS % - - - - 100 10<br />

n) Greater Tlabung WSS % - - - - 100 20<br />

o) Hnahthial WSS % - - 70 70 30 30<br />

p) Greater Lawngtlai WSS % - - - - 100 20<br />

a) Coverage of Villages/Habitation No. 40 727 140<br />

8 Integrated Project of Aizawl<br />

a) Aizawl WSS Phase-II % 70 100 15<br />

c) Aizawl Storm Drainage Scheme Ph-I % 100 100 20<br />

d) Aizawl Solid Waste Management % 100 100 20<br />

9 Water Quality Monitoring % 100 100 20<br />

10 Building No. 25 15 2<br />

11 Motor Vehicles No. 42<br />

12 Emergency Water Supply % 100 80 20 100 100 38<br />

13 Eleventh Finance Commission % 76 24 100<br />

14 Communication & Capacity Development % 100 30<br />

15 Urban Sanitation<br />

a) Sewerage % 30 10<br />

b) Storm Drainage % 30 10<br />

c) Solid Waste Management % 40 10<br />

PUBLIC WORK DEPARTMENT<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 546 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

2216 Direction & Administration<br />

4216 Government Housing<br />

100 100 100 100 100<br />

1 Constn of PWD Staff Qtr Type-II 4 Units at Chanmari, Phase -II. % 100 40 60 100<br />

2 Constn.of SDO's Qtr. 4 units at Rahsi veng, Lunglei. % 100 100 100<br />

3 Constn of Type-II Qtr 4 Units & Type-I Qtr 2 Units at Zuangtui % 100<br />

4 Improvement and Renovation of M.L.A. Hostel complex at Aizawl % 100<br />

5 Renovation and Retrofitting of staff Qtr at Saiha. % 100 100 100<br />

6 Constn of R/Wall,Roof treatment, etc. % 100<br />

7 Constn of Taxation Staff Qtr at Vairengte % 100 100 100<br />

8 Constn of Taxation Staff Qtr Type-I 2 Nos at Vairengte % 100<br />

9 Improvement and Renovation of <strong>Mizoram</strong> House complex at Silchar % 100<br />

10 Improvement and Renovation of I/E for Qtrs at various 'District' % 100<br />

11 Constn of Civil officers & Staff Qtr at various District % 100<br />

12 Constn of Qtr complex at Laipuitlang % 100<br />

13 Constn of Qtr complex at Zuangtui % 100<br />

14 Constn of Qtr complex at Shivaji Tillah % 100<br />

15 Constn of Qtr complex at Luangmual % 100<br />

16 Improvement & construction of VIP Bungalow at Aizawl % 100<br />

17 Constn. of Speaker Bungalow at old CM Bungalow % 95 5 100<br />

18 Constn of Multi Storeyed Qtrs. for Assembly Staff at Old Assembly<br />

Press Building<br />

% 100 100<br />

19 Renovation of Internal Electrification of various Govt Buildings % 100 100 100 85<br />

20 Construction of addl . Staff Qtr at Lawngtlai % 100 100<br />

21 Construction of functional quarters for Engineer-in-Chief, PWD office % 50 50 50 50<br />

22 Construction of DLAO office at Ramhlun % 5 100<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 547 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

23 Improvement and renovation of Govt quarters at Lunglei % 100 100<br />

24 Improvement and renovation of Govt quarters at Saiha % 100 100<br />

25 Improvement and renovation of Govt quarters at Kolasib % 100 100 100 100<br />

26 Improvement and renovation of Govt quarters at Champhai % 100 100 100 100<br />

27 Improvement and renovation of Govt quarters at Mamit % 100 100 100 100<br />

28 Improvement and renovation of Govt quarters at Serchhip % 100 100 100 100<br />

29 Construction of Treasury Officer quarters at Saiha %<br />

30 Improvement, renovation of various quarters, Septic tanks, Furnishing of<br />

VIP Bungalows under Aizawl Building Division, Aizawl<br />

% 100 100 100 85<br />

31 Improvement of Government quarters at Saiha % 100 100<br />

32 Improvement & Retrofitting of Government quarters at Lawngtlai % 100 100<br />

33 Construction of SA qtrs at Phura % 100 100<br />

34 Construction of SDO quarters at Bualpui NG % 100 100<br />

35 Construction of Staff quarters at Bualpui NG % 100 100<br />

36 Improvement & Renovation Works under Lunglei Bldg Division % 100 100<br />

37 Improvement & Retrofitting of Government quarters at Luangmual % 100 100<br />

38 Reconstruction staff quarters at old location of Qtr No L4 at Laipuitlang % 100 100<br />

39 Construction of Staff quarters at Tuikhuahtlang % 100 100<br />

40 Construction of staff quarter at Zuangtui Phase - II % 100 100<br />

41 Construction of SDO PWD quarter at Serchhip % 100 100<br />

42 Renovation of Internal Electrification of various staff quarters under<br />

Electrical Sub - Division, Lunglei<br />

% 100 100<br />

43 Renovation of Internal Electrification of various staff quarters under<br />

Electrical Sub - Division, Aizawl<br />

% 100 100<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 548 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

44 Renovation of Internal Electrification of various staff quarters under<br />

Electrical Sub - Division, Aizawl<br />

% 100 100<br />

45 Construction of staff quarters at Tlabung % 100 100<br />

46 Improvement of Govt quarters at Khawzawl % - 100 100<br />

47 Improvement of Govt quarters at Saitual % - 100 100<br />

48 Improvement & Retrofitting of PWD Division Office for staff quarters at<br />

Luangmual<br />

% - 100 100<br />

49 Construction of staff quarter at Champhai % - 100 100<br />

50 Construction of staff quarter at Lunglei % - 100 100<br />

51 Restoration of Cyclone damaged at Zuangtui % - 100 100<br />

52 Construction of R/Wall on approach road to Excise staff qtr at Vairengte % - 100 100<br />

53 Construction of Vehicle shed cum Godown for Taxation staff at<br />

Vairengte<br />

% - 100 100<br />

54 Construction of Water tank at Kawrthah % - 100 100<br />

55 Restoration of Cyclone damaged at Kawrthah % - 100 100<br />

56 Construction of Water tank at Aibawk % - 100 100<br />

57 Restoration of Cyclone damaged at Saitual % - 100 100<br />

58 Renovation of staff Qtr at Suangpuilawn % 100 100<br />

59 Retrofitting of Type - III quarters, Block-B (6 units) at New Capital<br />

Complex, Khatla.<br />

% - 100 100<br />

60 Construction of RCC staff quarters Type -III - 4 units 1No & Type - II - 4<br />

units -2 nos at Serchhip<br />

% - 13 13 87 75<br />

HOUSING (L.A.D.)<br />

A.02 URBAN HOUSING<br />

190 INVESTMENT<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 549 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

1 LIG Housing Loan No. 1250.00 1072 160 1232 920 140<br />

2 MIG Housing Loan No. 1500.00 815 150 965 862 175<br />

3 Composite Cash Loan to Govt. Servant (HBA)<br />

50 LAND<br />

No. 18500.00 8797 2032 10829 15111 2583<br />

4 Site and Services No. 50.00 1600 500 2100 6700 800<br />

5 Land Acquisition & Development<br />

800 OTHER EXPENDITURE<br />

No. 690.00 321 76 397 627 74<br />

6 EWS Housing No. 50.00 640 120 760 2000 200<br />

B.03 RURAL HOUSING<br />

7 1-01 Provision of House site No. 175.00 1000 - 1000 - -<br />

8 1-02 ConstructionAssistance<br />

800 OTHER EXPR.<br />

No. 125.00 200 - 200 - -<br />

9 Internal Improvement of Village No. 730.00 - - - - -<br />

10 Resettlement of Village<br />

80 GENERAL<br />

No. 100.00 - - - - -<br />

11 Building Techology & Extention No. 150.00 - - - - -<br />

12 01-Direction & Administration<br />

Urban Development (LAD)<br />

50 LAND<br />

No. 325.00 - - - - -<br />

1 Construction of M/R Km. 10 Kms 3Kms 0.5Km 3.5 52 12<br />

2 Construction of step, R/wall, Footpath, Rm. 95000RM 36485RM 15000RM 51485RM 35082m3 8310m3<br />

3 Protection & Rehabilitation (under MDS)<br />

51 CONSTRUCTION<br />

Item 1200 - - - - -<br />

4 Domestic Waste Disposal Line Rm. - - - - 108645RM 21729RM<br />

5 Public Utilities at No. - - - - 125 25<br />

6 Office Building<br />

52 MACHINERY & EQUIPTMENT<br />

No. 50 - - - 150 10<br />

7 Disaster Management No. - - - - - -


Sl. No. Item<br />

Unit<br />

- 550 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

8 Information & Education & Communication No. - - - - - -<br />

Annual Plan<br />

2007-08<br />

POLICE HOUSING<br />

Construction of residential buildings and administrative buildings No. 412 220 38 Units 258 nos. 217 nos. 36 nos.<br />

23 2217 00 URBAN DEVELOPMENT (PWD)<br />

Direction & Administration<br />

Machinery & Equipment<br />

100 100 100 100 100 100<br />

4217 - Works ( Urban Development) % 100 100 100<br />

Improvement of Drainage System- % 100 100 100<br />

1 (a) Constn.ofdrain underAizawl Road 'N' Division. % 100 100 100<br />

(b) Constn. of drain under Aizawl Road 'S'Division. % 100 100 100 100 100 2<br />

(c) Constn. of drain under Lunglei Division. % 100 100 100 100 100 2<br />

(d) Constn. of drain under Saiha Division. % 100 100 100 100<br />

(e) Constn. of drain under Kolasib Division. % 100 100 100 100<br />

(f) Constn. of drain under Lawngtlaii Division. % 100 100 100 100<br />

(g) Constn. of drain under Serchhip Division. % 100<br />

(h) Constn. of drain under Mamit Division. % 100<br />

(i) Constn. of drain under Champhai Division. % 100<br />

Upgradation of City Road including land acquisition. % 100<br />

2 Selection, design, improvement of busy city road intersection<br />

(SH:Intersection)<br />

% 100 100<br />

3 Selection. Survey, design of fly over in Aizawl City % 100 100<br />

4 Selection, survey, design of road tunnel at Aizawl City % 100 100<br />

5 Construction of Car parking at various location in Aizawl City % 100 100<br />

6 Storm water drainage- % 100 100


Sl. No. Item<br />

Unit<br />

- 551 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

7 4217(P)-Special Problem Schemes :- % 100 100<br />

1. Constn.of New Capital Project at Khatla % 100 100 100<br />

2. Construction of Raj Bhavan- % 100 100 100<br />

Annual Plan<br />

2007-08<br />

URBAN DEVELOPMENT (LAD)<br />

050 - Land<br />

1 Construction of Minor Roads Km. 10 Km 3 Km 0.5 Km 3.5 Km 52 Km 12 Km<br />

2 Construction of park & recreation - - - - - - -<br />

3 Construction of steps, R/Wall, footpath Rm. 97000 RM 56250 RM 15000 RM 71250 RM 35082m 3<br />

4 Protection & rehabilitation (under MDS) Item/m 3 1200 720 200 920 19525m 3<br />

051 - Construction<br />

5 Domestic Waste Disposal Line Rm. - - - - 108645 RM 21729 RM<br />

6 Office Building<br />

052 - Machinery and equipment<br />

No. 50 - - - 150 10<br />

7 Disaster Management No. - - - - - -<br />

8 Information & Edu & Communication No. - - - - - -<br />

URBAN DEVELOPMENT & POVERTY ALLEVIATION<br />

1 Construction and maintenance of link roads within Urban area Km. 35<br />

2 Construction and maintenance of Parks & Recreation centre within<br />

Urban area<br />

2 2<br />

3 Construction of Steps, R/Wall & Footpath within Urban area Rm. 450<br />

4 Domestic Waste Disposal Line at Urban area No. 125<br />

5 Public Utility at Urban area No. 26 20<br />

223 ‘A’ 2217 – URBAN DEVELOPMENT 03-IDSMT (TOWN & COUNTRY<br />

PLANNING)<br />

1. Preparation of Master Plan Town 6 5 1 6 8 3<br />

2. Action Plan/Project preparation Town 6 6 6 5<br />

3. Implementation of Master Plan Scheme Town 4 2 2 4 4 3<br />

8310m 3<br />

3905m 3


Sl. No. Item<br />

Unit<br />

- 552 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

4. Revision of Master Plan<br />

‘B’ 4217-Urban Development 03-IDSMT (Capital)<br />

No. 6 6 6<br />

5. Construction of Market Building. No. 6 4 3 7 6 3<br />

1<br />

INFORMATION AND PUBLIC RELATION<br />

4220 - C.O. on Information & Publicity<br />

101 - Buildings<br />

a Furnishing of Auditorium-cum-Conference Hall at Aizawl 2nos 1) Auditorium<br />

2) Conference<br />

Hall<br />

100% 100%<br />

Annual Plan<br />

2007-08<br />

b Maintenance of Directorate (Old Building) No. Maintenance 20% 10% 3% 1 Maintenance<br />

c Construction of IPRO's Office Building at Lunglei No. Maintenance 100% 100%<br />

d Construction of IPRO's quarter at Lunglei No. Maintenance - - 8 4<br />

2 2220 - Information & Publicity<br />

1 Production of Films No. 80% 20% 100%<br />

2 Public Exhibition of films No. 80% 20% 100%<br />

3 Research & Training in Mass Communication No. 15 80% 20% 100% 15 3<br />

4 Advertising & Visual Publicity No. 80% 20% 100%<br />

5 Information Centre -<br />

a) Setting up of database and information in the Information Centre,<br />

New Delhi, <strong>Mizoram</strong> Houses in Mumbai, Kolkata, Vellore, Guwahati,<br />

Shillong and Silchar<br />

b) Installation of Information kiosk in the Directorate, all districts<br />

Information Offices, Lengpui Airport and existing six rural Information<br />

Centres<br />

No. 100% 100% 7 2<br />

6 Press Information Services<br />

a) Subscription of PTI/UNI Services % 60% 20% 80%<br />

b) Subscription of Local Newspapers/periodical Newspapers/ Magazines % 80% 20% 100%


Sl. No. Item<br />

Unit<br />

- 553 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

c) Subscription of National Newsapers periodical newspers/ magazines.<br />

Annual Plan<br />

2007-08<br />

7<br />

d) Purchase of Video Camera.<br />

Fields Publicity.<br />

a) Purchse of Mobile Video van equipped with LCD Projector and<br />

screens.<br />

No. 1 1 1<br />

b) Purchase of Gypsy. No. 2 100% 100%<br />

c) Purchase of Generators and Projectors. No. 4 100% 100%<br />

8 Song & Drama Services, No. 80% 20% 100%<br />

9 Photo Services -<br />

a) Printing and developing of Roll Films. No. 80% 20% 100%<br />

4 No Camera<br />

b) Purchase of still Camera, Video Camera. No. 10 100% 100% 10<br />

10 Publication No. 80% 20% 100% a) Publication of Calendar 250000 Publication of<br />

11 Community Radio and Television. % 80 20 100<br />

12 Cultural & Social Activities. % 80 20 100<br />

13 BAFFACOS. % 100 100<br />

50000 Calendar<br />

etc.<br />

LABOUR AND EMPLOYMENT<br />

1 Administration<br />

a) Maintenance of existing posts. 7 7 7 7 7 7<br />

2 Craftment Training<br />

a) Maintenance of existing posts. 51 51 51 51 51 51<br />

SOCIAL WELFARE<br />

b) Publication of booklet, Leaflet<br />

Brochures, Folders, etc.<br />

c) Publication of Press Note Book<br />

etc.


Sl. No. Item<br />

Unit<br />

- 554 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

1 Welfare of Handicapped :<br />

(a) Disability Pension Persons 200 200 200 200 450 250<br />

(b) Grants to Handicapped Persons Persons 1000 800 200 1000 2500 500<br />

(c) Grants to Educated Unemployed Persons 25 25 25 25 250 50<br />

(e) N.P.R.P.D. Centres - 2 2 2 2 2<br />

2 Child Welfare :<br />

(a) Creches / Daycare Centres Centres 30 30 30 30 30 30<br />

(b) Protection of Child's Right Act 2005 Centres 40 40 40 40 40 40<br />

5 Women Welfare :<br />

(a) Socio-Eco. Prog. For Destitute Women Centres - - - - 1 1<br />

(b) R.I.T.C. Persons 2000 1500 400 1900 2000 400<br />

(c) Women Commission Centres 1 1 1 1 1<br />

(d) Platform Strategies for Women / IWEP :- Centres 1 1 1 1 1 1<br />

(i) Protection Against Sexual Harrassment Maintenance - - - - - -<br />

(ii) Implementation of Protection of Women from domestic violence Maintenance - - - - - -<br />

Annual Plan<br />

2007-08<br />

6 Welfare of Aged, Infirm & Destitute :<br />

(a) State Policy for Elderly Persons Boards - - - - 1 -<br />

(b) Old Age Home Home 1 1 1 1 1 1<br />

(c) Social Rehabilitation Assistance Programme Persons - - - - 500 100<br />

(d) N.S.A.P. :-<br />

(i) N.O.A.P. Persons 10525 10525 10525 10525 10525 10525<br />

(ii) N.F.B.S. Persons - 1065 408 1473 3085 617<br />

7 Prohibition :<br />

(a) M.S.D. & R.B. Boards 1 1 1 1 1 1<br />

8 Correctional Services :<br />

(a) Reception Centre Centres 1 1 1 1 1 1<br />

(b) Protective Home Centres 1 1 1 1 1 1<br />

(c) Y.D.C. / Aftercare Centre Centres 1 1 1 1 1 1<br />

9 Juvenile Justice Act 2000 :<br />

(a) Observation Home Home 2 2 2 2 2 2<br />

(b) Special Home Home 1 1 1 1 1 1


Sl. No. Item<br />

Unit<br />

- 555 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

Annual Plan<br />

2007-08<br />

(c) Juvenile Justice Unit Centres 1 1 1 1 1 1<br />

(d) Care & Protection of Children Home - - - - 5 5<br />

(e) Adoption Cell Home - - - - 1 1<br />

10 Assistance to N.G.O.s<br />

NUTRITION<br />

Organizations 1500 1200 300 1500 2500 500<br />

1 Special Nutrition Programme<br />

(a) Supplementary Nutrition Programme Persons 560000 646635 174955 821590 910471 174955<br />

(b) F.N.E.C. Centre - - 1 1 1 1<br />

(c) Analysis Plant Unit - - - - 1 1<br />

1<br />

PRISION<br />

001(01) - Direction<br />

(i) Entertainment of staff No. 2 2 2 2 5 5<br />

(ii) Repair/renovation of existing Dte. Office building P.C. 100% 100% 100% 100% 100% 100%<br />

2 101(01) - Dist. Jails<br />

(i) Creation of posts No. 123 123<br />

(ii) Construction of prisoners barrack No. 10 3 3<br />

(iii) Construction of staff quarters No. 10 5 5 5<br />

(iv) Construction of administrative buildings No. 3 3 3<br />

(v) Repair and renovation of existing buildings P.C. 100% 100% 100% 100% 100% 100%<br />

3 101(03) - Sub Jails<br />

(i) Creation of posts No. 52 52<br />

(ii) Repair/renovation of existing Dte. Office building P.C. 100% 100% 100%<br />

4 102(01) - Jail Manufacture<br />

(i) Entertainment of staff No. 4 4 4 4<br />

(ii)Construction of workshop building No. 5 5 5<br />

5 800 - Other Expenditure<br />

Modernisation of Jails<br />

(i) Construction of new jails No. 4 3 3 3 4 4<br />

(ii) Expansion and renovation of existing jails No. 6 6 6 6


Sl. No. Item<br />

Unit<br />

- 556 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

(iii) Construction of staff quarters No. 6 6 6 6<br />

(iv) Sanitation and water supply No. 6 6 6 6<br />

(v) Correctional Scheme No. 2 2<br />

1<br />

STATIONERY AND PRINTING<br />

House Rents for Govt. Press. No. 2 2 2 2 2 2<br />

2 Maintenance of Staff No. 3 3 3 3 3 3<br />

3 Purchase of Machineries No. 4 2 1 3 20 5<br />

4 Repair & Maintenance of Machines No. 12 8 - 8 13 7<br />

5 Repairs and Renovation of Department Buildings No. 40 30 10 40 50 15<br />

6 Establishment of training wing No. - - - - 1 1<br />

2059 PUBLIC WORKS BUILDING(P)<br />

Direction & Administration<br />

Machinery & Equipment<br />

4059 PUBLIC WORKS BUILDING(P)<br />

% 100 100 100 100 100 100<br />

1 Consnt.of Circle & Division Office at Ramhlun % 10<br />

2 Construction of Excise & Taxation Offices at various Districts % 82<br />

i) Excise Commissioners Office building at Aizawl % 50 40 90 10 10<br />

ii) Taxation Directorate Office building at Aizawl % 10 10 90 90<br />

3 Re-constn. Of DC's office at Lunglei %<br />

i) Construction of DC Office Complex at Lunglei phase-I % 5 100<br />

ii) Additional Work of Construction of DC Office Complex at Lunglei<br />

%<br />

phase-I<br />

80<br />

iii) Additional Work of Construction of DC Office Complex at Lunglei<br />

phase-II<br />

%<br />

iv) Constn. Of DC Office building Ph-III at Lunglei %<br />

4 Constn. Of Millenium Trade Centre at Aizawl % 80<br />

5 Construction of S.P. Offices at various places (Sh: at Lunglei ) % 100<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 557 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

6 Vertical extension of SP Office building at Aizawl Ph-II % 100<br />

7 Construction of SDO/SDPO Offices at various places. % 100<br />

8 Improvement & renovation of I/E to Govt. buildings at various district % 100<br />

9 Painting of Government Buildings % 100<br />

10 Constn. of DLAO Office at Ramhlun % 100<br />

11 Construction of Truck Parking at Aizawl % 100<br />

12 Construction of various Directorate Offices for Tourism Deptt., Taxation<br />

Deptt., Weigh & measures Deptt., & Labour & Employment Deptt.<br />

% 100<br />

13 Constn. of Relief & Rehabilitation Office (Basement floor) at Aizawl % 100<br />

14 Construction of Circuit Houses at various District Headquarters % 100 30 30 70 70<br />

15 Construction of Treasury Office buildings at five new districts. % 100 20 40 60 40 40<br />

i) Vertical Extension of Accounts & Treasuries Office at Chandmari,<br />

Aizawl<br />

% 100 -<br />

ii) Additional extension of Treasury Office at Serchhip % 100 -<br />

16 Construction of <strong>Mizoram</strong> House at Chanakyapuri (SH : Architectural<br />

consultancy for design of building)<br />

% 100 35 65 100<br />

17 Constn. of New <strong>Mizoram</strong> House at Vasant Vihar, New Delhi % 100 98 2 100<br />

18 Construction of <strong>Mizoram</strong> House at Bangalore % 100<br />

19 Improvement of <strong>Mizoram</strong> House and Construction of staff qtrs. at<br />

Guwahati<br />

% 100 99 1 100<br />

20<br />

21<br />

Construction of <strong>Mizoram</strong> House at Imphal & Churachandpur<br />

Construction of <strong>Mizoram</strong> House at Shillong.<br />

%<br />

%<br />

100<br />

20 20 80 40<br />

22 Constn. of Engineer-in-Chief Office Annexe Building at Tuikhuahtlang,<br />

Aizawl<br />

% 100 100 100<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 558 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

23 Construction of SDO Offices- 6Nos i/c full fledged laboratory at Lunglei % 100 100 100<br />

24 Improvement & Renovation of I/E to Govt buildings at various districts. % - 100 100 100 100 20<br />

25 Shifting & Reconstruction of IB at Champhai % - 100<br />

26 Reconstruction of IB at E.Lungdar % - 100<br />

27 Renovation of I/E if E-in-C Office building % - 100<br />

28 Construction of Finance Secretariat building at Aizawl % - 100<br />

29 Construction of <strong>Mizoram</strong> Legislative Assembly Annexe building at Aizawl % - 40 10 50 50 20<br />

30 Improvement of State Guest House at Bawngkawn % - 100 100<br />

31 Construction of Ceiling of Directorate of A&T % - 100 100<br />

32 Remodification of SE Building Office % - 100 100<br />

33 Reconstruction of Retaining Wall at Assembly House % - 100 100<br />

34 Fencing of Secretariat Complex % - 100 100<br />

35 Roof treatment of Terminal Building at Lengpui Airport % - 100 100<br />

36 Extension of PWD Central Laboratory building at Zuangtui % - 100 100<br />

37 Renovation of Lawngtlai IB for Division Office % - 100 100<br />

38 Vertical extension of CM Secretariat building % - 26 33 59 41 35<br />

39 Renovation of Vanapa Hall (Electrification) % - 50 50 100<br />

40 Renovation of Circuit House at Lawngtlai % - 100<br />

41 Re-constn. of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi % - 1 25 26 74 15<br />

42 Improvement of E-in-C, PWD Office flooring % - 100 100<br />

43 Construction of PWD Divisional Office at Lawngtlai % - 45 45<br />

44 Installation of Sound system at <strong>Mizoram</strong> Assembly House , Aizawl % - 100 100<br />

45 Installation of submersible pump and enhancement of Power<br />

transformer capacity at <strong>Mizoram</strong> House, Guwahati<br />

% - 100 100<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 559 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

46 Improvement & renovation of <strong>Mizoram</strong> House at Chanakyapuri, New<br />

Delhi<br />

% -<br />

47 Installation of Air conditioner at <strong>Mizoram</strong> House, Teen Murti, New Delhi % - 100 100<br />

48 Improvement & renovation of Water Treatment Plant at <strong>Mizoram</strong><br />

House, Salt Lake, Kolkata<br />

% - 100 100<br />

49 Improvement of <strong>Mizoram</strong> House at Vellore % - 100 100<br />

50 Improvement of <strong>Mizoram</strong> House and Construction of staff qtrs at<br />

Shillong<br />

% -<br />

51 Improvement of <strong>Mizoram</strong> House at Silchar % -<br />

52 Renovation of SE PWD, Eastern Circle Office at Chaltlang % - 100 100<br />

53 Vertical extension of SE, PWD Mechanical Office building at Laipuitlang % - 100 100<br />

54 Vertical extension of Project Division - III Office building % - 100 100<br />

55 Construction of Pedestrian side walk and fencing in front of MLA Hostel % - 100 100<br />

56 Construction of DC Office at Aizawl phase-I % - 100 100<br />

57 Constn. of Protection wall near Circuit House & MLA Hostel % - 100 100<br />

58 Constn. of Vehicle checking shed cum Godown for Taxation Dept % - 100 100<br />

59 Renovation of EE & SDO PWD Offices at Kolasib % - 100 100<br />

60 Roof treatment of Mechanical Workshop building and Electrical Sub-<br />

Division Office building at Lunglei<br />

% - 100 100<br />

61 Renovation & Retrofitting of Government building at Lunglei % - 100 100<br />

62 Vertical extension of Electrical Sub- Division Office for Store at Lunglei. % - 100 100<br />

63 Renovation of existing laboratory building at Lunglei % - 100 100<br />

64 Improvement of Lengpui Airport % - 100 100<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 560 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

65 Renovation of laboratory building and Sub-Division offices at Zuangtui % - 100 100<br />

66 Renovation of Internal Electrification under Electrical Sub - Division,<br />

Lunglei<br />

% - 100 100<br />

67 Renovation of Internal Electrification under Electrical ( Rural) Sub -<br />

Division<br />

% - 100 100<br />

68 Renovation of Internal Electrification under Electrical Sub - Division,<br />

Aizawl<br />

% - 100 100<br />

69 Renovation of IB at Serchhip % - 100 100<br />

70 Improvement of IB at N. Vanlaiphai including Fencing. % - 100 100<br />

71 Renovation of Staff Lodge at Mamit % - 100 100<br />

72 Renovation of IB at Champhai % - 100 100<br />

73 Renovation of Circuit House at Saiha % - 100 100<br />

74 Construction of SDO PWD Office at Bualpui NG % - 100 100<br />

75 Constn. Of DC Office building at Saiha - I % - 100 100<br />

76 Renovation of Mechanical Circle Office for accomodation of EE (<br />

Electrical ) PWD Office<br />

% - 100 100<br />

77 Renovation of IB at Serchhip % - 100 100<br />

78 Improvement & Renovation of I/E of various buildings including<br />

electrification of Hnahlan IB<br />

% - 100 100<br />

79 Improvement of DVOA and DME of Lengpui Airport % - 100 100<br />

80 Improvement of Fire hydeout line at Lengpui Airport % - 100 100<br />

81 Improvement of Fire station % - 100 100<br />

82 Improvement of Runway side slope fro obstruction clearance % - 100 100<br />

83 Improvement, Renovation of IB at Ratu % - 100 100<br />

84 Improvement, Renovation of IB at Darlawn % - 100 100<br />

85 Improvement, Renovation of IB at Sakawrdai % - 100 100<br />

86 Construction of elevated water tank 20 kl capacity for PWD Central<br />

Laboratory, Zuangtui.<br />

% - 100 100<br />

87 Registration of landed property at Cleve Colony, Shillong % - 100 100.00<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 561 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

88 Construction of DC Office at Serchhip % - 15 15.00<br />

89 Construction of SDO Offices- 6Nos i/c full fledged laboratory at Lunglei<br />

Phase - II<br />

% - 100 100.00<br />

90 Renovation of Treasury Office Building at Lunglei % - 100 100.00<br />

91 Renovation & Vertical Extension of Treasury Office Building at Saiha % - 100 100<br />

92 Re-construction of EE, PWD, Lunglei Office at Lunglei % - 10 10.00 90 40<br />

93 Renovation of Internal Electrification of MLA Hostel at Tuikhuahtlang,<br />

Aizawl.<br />

% - 100 100.00<br />

94 Supplementary award No. 2 of 1997 as per Judgement & Order<br />

dt.14.03.2005 in RFA No.3 of 2004 (Case No L.A. No 1 of 1998) and<br />

approved by Planning Dept. vide No G-28014/32/2005-06/SPB Dt<br />

09.05.2006<br />

% - 100 100.00<br />

95 Completion of New Market Top Floor, Aizawl % - 100 100<br />

96 Construction of Raj Bhavan at Khatla % - 100 30<br />

97 Construction of New Capital Complex at Khatla % - 100 30<br />

98 Construction of DC Complex at Lawngtlai, Mamit and Serchhip % - 100 40<br />

99 Construction of MPSC Building at Khatla % - 100 50<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

Training No. 150 129 30 159 180 36<br />

FORENSIC SCIENCE LABORATORY<br />

1 Fingerprint Lifting Tape No. 200 150 50 200 300 50<br />

2 Chemicals No. 500 400 100 400 700 100<br />

3 Glasswares No. 200 150 50 200 300 50<br />

4 Crime Scene Instrument No. 50 30 10 40 70 10<br />

5 Calorimeter No. 1 1 - 1 - -<br />

6 Books & Jounals No. 70 70 - 70 200 100<br />

Annual Plan<br />

2007-08


Sl. No. Item<br />

Unit<br />

- 562 -<br />

Tenth Five Year Plan (2002-07)<br />

Tenth Plan<br />

Target<br />

Annual Plans<br />

(2002-03 to 2005-<br />

06) Actual<br />

Achievement<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Achivement<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Achivement<br />

(col.4+5)<br />

ANNEXURE II<br />

11th Five Year Plan (2007-12)<br />

Eleventh Plan<br />

2007-12 Target<br />

0 1 2 3 4 5 6 7 8<br />

7 Hot Air Oven No. 1 1 - 1 2 -<br />

8 HP Colour Printer No. 1 - 1 1 - -<br />

9 Fingerprint Kit Box No. - - - - 20 5<br />

10 Fingerprint Powder No. 20 10 10 20 30 15<br />

Annual Plan<br />

2007-08


Remarks<br />

9<br />

- 563 -


Remarks<br />

9<br />

- 564 -


Remarks<br />

9<br />

- 565 -


Remarks<br />

9<br />

- 566 -


Remarks<br />

9<br />

- 567 -


Remarks<br />

9<br />

- 568 -


Remarks<br />

9<br />

- 569 -


Remarks<br />

9<br />

- 570 -


Remarks<br />

9<br />

- 571 -


Remarks<br />

9<br />

10 Nos. officers &<br />

staff<br />

7Nos<br />

- 572 -


Remarks<br />

9<br />

@ 20,000/No.<br />

@Rs. 3000/Ha.<br />

@Rs. 12,000/Ha.<br />

@Rs. 10,000/Ha.<br />

- 573 -


Remarks<br />

9<br />

@Rs. 10,000/No.<br />

@Rs. 10,000/No.<br />

7<br />

Targets and<br />

achievements are<br />

recorded in level of<br />

production.<br />

- 574 -


p<br />

Remarks<br />

9<br />

- 575 -


Remarks<br />

9<br />

- 576 -


Remarks<br />

9<br />

Internal Roads<br />

New Scheme<br />

New Scheme<br />

- 577 -


Remarks<br />

9<br />

4 additional RD<br />

Blocks were<br />

opened and made<br />

functional during<br />

2006-07<br />

The Census to<br />

determine the<br />

number of BPL<br />

families in the state<br />

of <strong>Mizoram</strong> was<br />

conducted and<br />

completed during<br />

2002-03. BPL<br />

Census 2002 is now<br />

stands approved/<br />

notified.<br />

- 578 -


Remarks<br />

9<br />

Rs. 0.10 lakh is<br />

provided as a token<br />

provision.<br />

- 579 -


Remarks<br />

9<br />

- 580 -


Remarks<br />

9<br />

- 581 -


Remarks<br />

9<br />

- 582 -


Remarks<br />

9<br />

- 583 -


Remarks<br />

9<br />

- 584 -


Remarks<br />

9<br />

- 585 -


Remarks<br />

9<br />

- 586 -


Remarks<br />

9<br />

- 587 -


Remarks<br />

9<br />

- 588 -


Remarks<br />

9<br />

- 589 -


Remarks<br />

9<br />

- 590 -


Remarks<br />

9<br />

- 591 -


Remarks<br />

9<br />

- 592 -


Remarks<br />

9<br />

- 593 -


Remarks<br />

9<br />

- 594 -


Remarks<br />

9<br />

As per MOU<br />

signed between<br />

Central & State<br />

Govt., the CIC<br />

project is to be<br />

handed over to<br />

State from 2007<br />

- 595 -


Remarks<br />

9<br />

- 596 -


Remarks<br />

9<br />

- 597 -


Remarks<br />

9<br />

- 598 -


Remarks<br />

9<br />

- 599 -


Remarks<br />

9<br />

- 600 -


Remarks<br />

9<br />

- 601 -


Remarks<br />

9<br />

- 602 -


Remarks<br />

9<br />

- 603 -


Remarks<br />

9<br />

- 604 -


Remarks<br />

9<br />

- 605 -


Remarks<br />

9<br />

- 606 -


Remarks<br />

9<br />

- 607 -


Remarks<br />

9<br />

- 608 -


Remarks<br />

9<br />

- 609 -


Remarks<br />

9<br />

- 610 -


Remarks<br />

9<br />

- 611 -


Remarks<br />

9<br />

- 612 -


Remarks<br />

9<br />

-<br />

-<br />

-<br />

-<br />

- 613 -


Remarks<br />

9<br />

-<br />

2<br />

LS<br />

3<br />

LS<br />

-<br />

-<br />

-<br />

-<br />

-<br />

2000<br />

500<br />

-<br />

-<br />

30<br />

-<br />

- 614 -


Remarks<br />

9<br />

-<br />

-<br />

200<br />

200<br />

200<br />

200<br />

-<br />

-<br />

-<br />

-<br />

1<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

7<br />

-<br />

-<br />

-<br />

- 615 -


Remarks<br />

9<br />

-<br />

5<br />

1<br />

200<br />

2<br />

-<br />

-<br />

-<br />

-<br />

5<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 616 -


Remarks<br />

9<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

1<br />

10<br />

-<br />

-<br />

-<br />

1<br />

LS<br />

-<br />

-<br />

-<br />

-<br />

800<br />

- 617 -


Remarks<br />

9<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 618 -


Remarks<br />

9<br />

- 619 -


Remarks<br />

9<br />

- 620 -


Remarks<br />

9<br />

- 621 -


Remarks<br />

9<br />

- 622 -


Remarks<br />

9<br />

- 623 -


Remarks<br />

9<br />

- 624 -


Remarks<br />

9<br />

-<br />

-<br />

-<br />

- 625 -


Remarks<br />

9<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

- 626 -


Remarks<br />

9<br />

- 627 -


Remarks<br />

9<br />

- 628 -


Remarks<br />

9<br />

- 629 -


Remarks<br />

9<br />

Fresh scheme<br />

Fresh scheme<br />

Fresh scheme<br />

Fresh scheme<br />

- 630 -


Remarks<br />

9<br />

Fresh scheme<br />

- 631 -


Remarks<br />

9<br />

Renamed<br />

Fresh Scheme<br />

Fresh Scheme<br />

Fresh Scheme<br />

Fresh Scheme<br />

- 632 -


Remarks<br />

9<br />

One Projector<br />

purchased<br />

1<br />

- 633 -


Remarks<br />

9<br />

- 634 -


Remarks<br />

9<br />

- 635 -


Remarks<br />

9<br />

- 636 -


Remarks<br />

9<br />

- 637 -


Remarks<br />

9<br />

- 638 -


Remarks<br />

9<br />

- 639 -


Remarks<br />

9<br />

- 640 -


Remarks<br />

9<br />

- 641 -


Remarks<br />

9<br />

- 642 -


Remarks<br />

9<br />

- 643 -


I. ROADS & BRIDGES (PWD)<br />

1 Continuting Schemes -<br />

i) Roads & Bridges:<br />

<strong>Mizoram</strong> State Road Project,<br />

<strong>Mizoram</strong> (Credit No. 3618-IN<br />

International Development<br />

Association)<br />

2 New Schemes of Eleventh Plan -<br />

i) North Eastern State Roads Project:<br />

a) Champhai - Khawbung Road =<br />

72.00 km<br />

b) Serchhip - Buarpui Road = 64.00<br />

km<br />

ii) N.E.U.D.P. (ADB)<br />

3.6.2002<br />

(effective date<br />

of Credit) civil<br />

works<br />

commencement<br />

date is<br />

8.8.2002<br />

- 724 -<br />

ANNEXURE III<br />

STATEMENT REGARDING EXTERNALLY AIDED PROJECTS<br />

Sl.<br />

No.<br />

Date of<br />

Name, nature & location of the Project<br />

sanction / date<br />

with Project Code and name of<br />

of commence-<br />

external funding agency<br />

ment of work<br />

Terminal date<br />

of disburse-<br />

Estimated cost:<br />

ment of<br />

external aid:<br />

(a) Original (a) Original<br />

(b) Revised (b) Revised<br />

(latest)<br />

Cumulative<br />

Tenth Plan (2002- Expenditure from<br />

Pattern of<br />

07) (at 2001-02 (2002-03 to 2005funding:<br />

proces) 06) at current<br />

prices<br />

a) State's share a) State's share a) State's share<br />

b) Central b) Central b) Central<br />

Assistance Assistance Assistance<br />

Annual Plan 2006-07<br />

Outlay Anti. Expenditure<br />

a) State's share a) State's share<br />

b) Central b) Central<br />

Assistance Assistance<br />

(Rs. in lakh)<br />

Proposed Outlay<br />

11th Plan 2007-<br />

Annual Plan<br />

12 (at current<br />

2006-07<br />

prices)<br />

a) State's share a) State's share<br />

b) Central b) Central<br />

Assistance Assistance<br />

c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources<br />

(to be specified) (to be specified) (to be specified) (to be specified) (to be specified) (to be specified) (to be specified)<br />

d) Total d) Total d) Total d) Total d) Total d) Total d) Total<br />

0 1 2 3 4 5 6 7 8 9 10 11<br />

31.12.2007 a) 35000.00 a) 8329.41 a) 8125.01 a) 2560.00 a) 1000.00 a) 1000.00 a) 6000 a) 1200.00<br />

b) 38329.41 b) - b) - b) - b) - b) - b) - b) -<br />

c) 1005.00 c) 28995.00 c) 7500.00 (IDC c) 7500.00 (IDC c) 7500.00 (IDC c) 30430.00 c) 8000.00<br />

(IDA financing) (IDC financing) financing) financing) financing) (IDC financing) (IDC financing)<br />

d) 38329.41<br />

(Retroactive<br />

financing)<br />

d) 37120.01 d) 26735.80 d) 8500.00 d) 8500.00 d) 36430.00 d) 9200.00<br />

a) 4000 a) 500.00<br />

b) - b) -<br />

c) 19000.00 c) 3500.00<br />

(IDC financing) (IDC financing)<br />

d) 23000.00 d) 4000.00<br />

a) 10% a) 1156.00 a) 100.00<br />

b) - b) - b) -<br />

c) ADB - 90% c) 11553.00 c) 1000.00<br />

d) 100% d) 12709.00 d) 1100.00


- 725 -<br />

Sl.<br />

No.<br />

Date of<br />

Name, nature & location of the Project<br />

sanction / date<br />

with Project Code and name of<br />

of commence-<br />

external funding agency<br />

ment of work<br />

Terminal date<br />

of disburse-<br />

Estimated cost:<br />

ment of<br />

external aid:<br />

(a) Original (a) Original<br />

(b) Revised (b) Revised<br />

(latest)<br />

Cumulative<br />

Tenth Plan (2002- Expenditure from<br />

Pattern of<br />

07) (at 2001-02 (2002-03 to 2005funding:<br />

proces) 06) at current<br />

prices<br />

a) State's share a) State's share a) State's share<br />

b) Central b) Central b) Central<br />

Assistance Assistance Assistance<br />

Annual Plan 2006-07<br />

Outlay Anti. Expenditure<br />

a) State's share a) State's share<br />

b) Central b) Central<br />

Assistance Assistance<br />

(Rs. in lakh)<br />

Proposed Outlay<br />

11th Plan 2007-<br />

Annual Plan<br />

12 (at current<br />

2006-07<br />

prices)<br />

a) State's share a) State's share<br />

b) Central b) Central<br />

Assistance Assistance<br />

c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources<br />

(to be specified) (to be specified) (to be specified) (to be specified) (to be specified) (to be specified) (to be specified)<br />

d) Total d) Total d) Total d) Total d) Total d) Total d) Total<br />

0 1 2 3 4 5 6 7 8 9 10 11<br />

II. HIGHER & TECHNICAL EDUCATION<br />

1 Continuing Schemes -<br />

i) Estt. of SPIU 2001 459.60 World Bank 456.18 410.18 46.00 46.00 17.00 17.00<br />

ii) MPL 2001 1441.13 World Bank 2121.96 2047.96 74.00 74.00 23.50 23.50<br />

iii) WPA 2001 1593.27 World Bank 2098.86 2018.86 80.00 80.00 25.50 25.50<br />

TOTAL 3494.00 4677.00 4477.00 200.00 200.00 66.00 66.00<br />

III. P.H.E.<br />

1 Continuing Schemes<br />

i)<br />

ii)<br />

iii)<br />

...<br />

Total<br />

......Nil.....<br />

2 New Schemes of Annual Plan (2004-05)<br />

i) Water Supply a) 10 a) 482.80<br />

Asian Development Bank (ADB) b) 90 b) 4345.20<br />

c) - c) -<br />

d) 100 d) 4828.00<br />

ii) Sewerage a) 10 a) 382.30<br />

Asian Development Bank (ADB) b) 90 b) 3440.07<br />

c) - c) -


- 726 -<br />

Sl.<br />

No.<br />

Date of<br />

Name, nature & location of the Project<br />

sanction / date<br />

with Project Code and name of<br />

of commence-<br />

external funding agency<br />

ment of work<br />

Terminal date<br />

of disburse-<br />

Estimated cost:<br />

ment of<br />

external aid:<br />

(a) Original (a) Original<br />

(b) Revised (b) Revised<br />

(latest)<br />

Cumulative<br />

Tenth Plan (2002- Expenditure from<br />

Pattern of<br />

07) (at 2001-02 (2002-03 to 2005funding:<br />

proces) 06) at current<br />

prices<br />

a) State's share a) State's share a) State's share<br />

b) Central b) Central b) Central<br />

Assistance Assistance Assistance<br />

Annual Plan 2006-07<br />

Outlay Anti. Expenditure<br />

a) State's share a) State's share<br />

b) Central b) Central<br />

Assistance Assistance<br />

(Rs. in lakh)<br />

Proposed Outlay<br />

11th Plan 2007-<br />

Annual Plan<br />

12 (at current<br />

2006-07<br />

prices)<br />

a) State's share a) State's share<br />

b) Central b) Central<br />

Assistance Assistance<br />

c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources c) Other sources<br />

(to be specified) (to be specified) (to be specified) (to be specified) (to be specified) (to be specified) (to be specified)<br />

d) Total d) Total d) Total d) Total d) Total d) Total d) Total<br />

0 1 2 3 4 5 6 7 8 9 10 11<br />

iii) Solid Waste Management a) 10 a) 99.80<br />

Asian Development Bank (ADB) b) 90 b) 898.20<br />

c) - c) -<br />

d) 100 d) 998.00<br />

iv) Storm Water Drainage and<br />

Landslip protection<br />

a) 10 a) 349.80<br />

Asian Development Bank (ADB) b) 90 b) 3148.20<br />

c) - c) -<br />

d) 100 d) 3498.00<br />

Total a) 13147<br />

b) 8683.27<br />

Grand Total 13,147.00<br />

IV. URBAN DEVELOPMENT & POVERTY ALLEVIATION<br />

1 Continuting Schemes -<br />

Slum Development Project<br />

a) 50.00 a) 10% a) 5.00 a) 0.50<br />

b) - b) 90% b) 45.00 b) 5.00<br />

c) - c) - c) -<br />

d) 50.00 d) 5.50


Sl.<br />

No.<br />

- 730 -<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : BHARAT NIRMAN PROGRAMMES - PROPOSED OUTLAYS<br />

Name of Items / Programmes<br />

Annual Plan 2005-<br />

06<br />

Annual Plan 2006-07<br />

Eleventh Plan<br />

2007-12<br />

ANNEXURE IV<br />

(Rs. in lakh)<br />

Annual Plan<br />

2007-08<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

Proposed Outlay Proposed Outlay<br />

0 1 2 3 4 5 6<br />

1 Minor Irrigation 1,707.00 3,006.20 3,006.20<br />

2 Rural Drinking Water Supply 4,616.30 5,495.63 5,495.63<br />

3 Rural Roads 4,452.17 12,498.63 12,199.57<br />

4 Rural Housing 626.00 626.00 626.00<br />

5 Rural Electrification (RRGVY) Nil Nil 2,962.00<br />

6 Rural Telephone Connectivity -<br />

-<br />

Total (1 to 6 ) :<br />

11,401.47 21,626.46 24,289.40<br />

11th Plan 2007-12 (at current prices)<br />

23,150.00<br />

25,196.65<br />

42,987.40<br />

3,800.00<br />

31,802.11<br />

-<br />

126,936.16<br />

3,530.00<br />

6,900.00<br />

23,431.94<br />

688.60<br />

3,000.00<br />

-<br />

37,550.54


- 732 -<br />

ANNEXURE V<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

CENTRALLY SPONSORED SCHEMES<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

1. AGRICULTURE<br />

1 Strengthening of Agril. Extension &<br />

Training<br />

100% - 31.00 - - - - 31.00 - - - - -<br />

2 Promotion of Agriculture Mechanisation<br />

(MM)<br />

100% - 652.47 - 535.00 - 535.00 652.47 - - - - -<br />

3 Land Use Board (MM) 100% - 50.00 - 8.00 - 8.00 50.00 - - - - -<br />

4 SUBACS (MM) 100% - 96.00 - 20.00 - 20.00 96.00 - - - - -<br />

5 NWDPRA (MM) 100% - 3828.94 - 820.00 - 820.00 3828.94 - - - - -<br />

6 Balance & Integrated use of Fertiliser<br />

(MM)<br />

100% - 758.28 - 379.00 - 379.00 758.28 - - - - -<br />

7 IPM (MM) 100% - 71.50 - 25.00 - 25.00 71.50 - - - - -<br />

8 Rodent Control (MM) 100% - 130.50 - 35.00 - 35.00 130.50 - - - - -<br />

9 Extension Education (MM) 100% - 103.30 - - - - 103.30 - - - - -<br />

10 ICDP (MM) 100% - 219.30 - 89.00 - 89.00 219.30 - - - - -<br />

11 Potential Area Management & Agri.<br />

Marketing<br />

100% - 275.52 - - - - 275.52 - - - - -<br />

12 OPP 75% 25% 158.00 26.30 - - - 158.00 26.30 - - - -<br />

13 NPDP 75% 25% 75.00 8.30 - - - 76.00 8.30 - - - -<br />

14 Women in Agriculture 100% - 27.19 - - - - 27.19 - - - - -<br />

15 AMDP 75% 25% 66.82 6.90 - - - 66.82 6.90 - - - -<br />

16 Oilseeds Pulses and Maize<br />

Development (MM)<br />

100% - 474.25 - 181.00 - 181.00 474.25 - - - - -<br />

17 Oil Palm Development Programme 75% 25% 299.87 132.39 102.87 45.00 147.87 299.87 132.39 16442.00 1412.18 929.48 232.37<br />

18 Organic Farming 100% - 127.39 - 59.57 - 59.57 108.32 - 964.40 - 198.20 -<br />

19 Plant Quanrantine Station 100% - 17.50 - - - - 17.50 - - - - -<br />

20 Transport Subsidy 100% - 20.84 - - - - 20.84 - - - - -<br />

21 State Pesticide Testing Lab 100% - 30.00 - - - - 30.00 - - - - -<br />

TOTAL 7513.67 173.89 2254.44 45.00 2299.44 7495.60 173.89 17406.40 1412.18 1127.68 232.37


- 733 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

2. SOIL & WATER CONSERVATION<br />

1 Singla RVP/FPR (CSS) 99.50% 0.50% 579.52 2.92 - - - 579.52 2.92 - - - - Completed<br />

2 Tlawng RVP/FPR (CSS) ” ” 210.64 1.05 198.89 100.00 199.89 198.89 1.00 11.69 0.06 11.69 0.06 On-going<br />

3 Tlawng RVP/FPR (CSS) ” ” - - - - - - - 715.50 3.59 148.93 0.75 New<br />

4 Langkaih RVP/FPR (CSS) ” ” 196.11 0.98 48.50 0.24 48.74 48.50 0.24 132.85 0.74 132.85 0.74 On-going<br />

5 Langkaih RVP/FPR (CSS) ” ” - - - - - - - 120.78 0.60 39.40 0.20 New<br />

6 Large Cardamom Plantation at MADC<br />

(NEA-NEC)<br />

100% - 214.15 - - - - 214.15 - - - - - Completed<br />

7 Rubber Plantation (NEC) ” ” - - - - - - - 703.00 - 111.00 - New<br />

8 Coffee Plantation (NEC) ” ” - - - - - - - 740.00 - 118.00 - New<br />

9 Terrace Cultivation of Potato & Water<br />

Harvesting<br />

” ” - - - - - - - 320.00 - 64.00 - New<br />

10 Estt. Div. Complex, Mamit (NLCPR) 90% 10% 103.06 11.45 34.35 3.81 38.16 34.35 3.81 68.71 6.87 68.71 6.87 On-going<br />

11 WDPSCA (CSS) ” ” - - - - - - - 2250.00 250.00 450.00 50.00 New<br />

12 Watershed Dev. for Mat Valley (NLCPR) ” ” - - - - - - - 1350.00 150.00 270.00 30.00 New<br />

13 Anti-Erosion Scheme at Champhai<br />

(NLCPR)<br />

” ” - - - - - - - 486.00 48.60 162.00 16.20 New<br />

14 Organic Farming & Vermi-Composting<br />

(CSS)<br />

100% - 15.00 - 7.50 - 7.50 7.50 - 7.50 - 7.50 - On-going<br />

15 Organic Farming & Vermi-Composting<br />

(CSS)<br />

100% - - - - - - - - 1000.00 - 200.00 - New<br />

TOTAL 1318.48 16.40 289.24 104.05 294.29 1082.91 7.97 7906.03 460.46 1784.08 104.82<br />

3. A.H. & VETY.<br />

1 National Project on Rinderpest<br />

Eradication Programme<br />

2 Assistance to State for Control of Animal<br />

Disease<br />

50% 50% - 20.00 20.00 40.00 97.00 70.00 75.00 75.00 15.00 15.00<br />

Total Rs.200 lakh is<br />

proposed for matching<br />

share of all CSS<br />

75% 25% - 100.00 30.00 120.00 611.60 60.00 157.50 52.50 31.50 10.50<br />

3 Professional Efficiency Development 50% 50% - 12.00 1.00 2.00 60.60 6.00 10.00 10.00 6.00 2.00<br />

4 Sample Survey 50% 50% - 26.00 7.00 33.00 104.00 14.00 20.00 20.00 4.00 4.00<br />

5 Bio-gas Development 75% 25% - 44.00 22.00 44.00 86.50 50.00 172.50 57.50 34.50 11.50<br />

TOTAL - 202.00 80.00 239.00 959.70 200.00 435.00 215.00 91.00 43.00<br />

In respect of Biogas<br />

Dev., beneficiary share<br />

is 25% in the funding<br />

pattern


- 734 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

4. FISHERIES<br />

1 Fresh Water Aquaculture: FFDA, 75% 25% 210.00 70.00 98.00 24.50 122.50 337.50 74.60 299.40 100.00 179.70 60.00 (1)(2):<br />

Capture Fisheries, Cold Water Fisheries<br />

Scheme-wise<br />

detail shown<br />

2 National Fisheries Dev. Board<br />

80% 20% - - - - - - - 744.00 186.00 328.00 66.00 under Scheme<br />

Scheme: Aquaculture, Reservoir,<br />

No.3 of Draft<br />

Fisheries, Domestic Marketing<br />

Plan<br />

3 Extension & Training: Human<br />

80% 20% 32.00 8.00 48.00 12.00 60.00 77.00 18.35 80.00 20.00 35.60 8.90 Scheme-wise<br />

Resource Development, Publication,<br />

detail shown<br />

Workshop, etc.<br />

under No.6 of<br />

Draft Plan<br />

TOTAL 242.00 78.00 146.00 36.50 182.50 414.50 92.95 1123.40 306.00 543.30 134.90<br />

5. FORESTRY & WILDLIFE<br />

1 AOFFP 50% 50% 97.61 97.61 - - - 110.72 81.13 - - - - Completed<br />

2 NTFP 100% - 132.72 - - - - 161.50 - - - - - On-going<br />

3 IAEP 100% - 166.02 - - - - 147.61 - - - - - New<br />

4 ASTRP 100% - 6.54 - - - - - - - - - - On-going<br />

5 Preservation of Wildlife - - - - 246.14 21.50 267.64 1614.66 21.50 1825.00 180.00 350.00 35.00 New<br />

6 Integration Forest Protection Scheme 90% 10% * - - 468.60 81.09 549.69 1703.05 81.09 3100.00 300.00 600.00 60.00 Completed<br />

7 Intern. Years of Mountain 100% - - - - - - 8.00 - - - - - New<br />

8 Development of Botanical Park 100% - - - - - - 7.16 - - - - - New<br />

9 Wetland Development 100% - - - - - - 7.50 - - - - - New<br />

10 Management of gregarious flowering of<br />

multi bamboos<br />

100% - - - 1360.00 - 1360.00 1316.60 - 1000.00 - 500.00 - On-going<br />

TOTAL 402.89 97.61 2074.74 102.59 2177.33 5076.80 183.72 5925.00 480.00 1450.00 95.00<br />

(* The scheme was on 75:25 share basis for one year of the 10th Five Year Plan<br />

6. TRADE & COMMERCE<br />

1 Establishment of Trade Centre for<br />

handloom & handicraft product at Aizawl<br />

100% - 320.00 - - - - - - 320.00 - - -


- 735 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

2 Setting up Special Economic Zone at<br />

Khawnuam (Melbuk)<br />

100% - 1833.00 - - - - - - 1833.00 - - -<br />

3 Construction of Cold Storage at<br />

Kawrpuichhuah and Zokhawthar<br />

100% - 300.00 - - - - - - 300.00 - - -<br />

4 Establishment of Agri-Business Zone at<br />

Kanhmun<br />

100% - 900.00 - - - - - - 900.00 - - -<br />

5 Establishment of Agri-Business Zone at<br />

Kawrpuichhuah<br />

100% - 900.00 - - - - - - 900.00 - - -<br />

6 Organisation & Participation in Trade<br />

Expo, Exchange of Trade Delegation<br />

100% - 50.00 - - - - - - 50.00 - - -<br />

7 Construction of market infrastructures in<br />

rural areas<br />

100% - 250.00 - - - - - - 250.00 - - -<br />

8 Provision of Price Support and Transport<br />

subsidy (MIS / Macro-Management)<br />

80% 20% 1125.00 225.00 - - - - - 1125.00 225.00 - -<br />

9 Development of Border Haats 100% - 50.00 - - - - - - 50.00 - - -<br />

10 Entreprereurship Development<br />

Programme & Training<br />

100% - 15.00 - - - - - - 15.00 - - -<br />

11 Construction of Shopping Mall at<br />

Zokhawthar<br />

100% - 390.00 - - - - - - 390.00 - - -<br />

TOTAL 6133.00 225.00 - - - - - 6133.00 225.00 - -<br />

7. RURAL DEVELOPMENT<br />

1 SGRY (EAS/JRY) 75% 25% 3450.00 1150.00 746.94 261.00 222.56 667.68 222.56 4740.00 1580.00 861.00 287.00<br />

2 IAY 75% 25% 1113.00 371.00 371.70 105.00 109.40 328.20 109.40 1911.00 637.00 346.50 115.50<br />

3 SGSY 75% 25% 450.00 150.00 92.04 43.12 42.52 127.56 42.52 1815.00 605.00 330.45 110.15<br />

4 DRDA (Administration) 75% 25% 1200.00 400.00 212.40 95.00 63.27 189.82 63.27 1733.10 577.70 313.50 104.50<br />

5 SIRD 50% 50% 160.00 80.00 63.72 26.24 26.20 52.40 26.20 474.00 135.00 85.80 28.60<br />

6 IWDP 75% 25% 960.00 320.00 - - 324.00 260229.18 804.00 5370.00 1790.00 972.00 324.00<br />

TOTAL 7333.00 2471.00 1486.80 530.36 787.95 261594.84 1267.95 16043.10 5324.70 2909.25 969.75<br />

8. LAND REFORMS


- 736 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

1 Strengthening of Revenue Administration a) 50% a) 50% 1242.00 1242.00 370.00 389.86<br />

and Updating of Land Records<br />

b) 90% b) 10% - - - -<br />

759.00 1242.00 1242.00 2500.00 2500.00 700.00 700.00<br />

2 Computerisation of –<br />

a) Land Records 75% 25% 450.00 - - - 159.00 450.00 - 1250.00 - 136.00 -<br />

b) Cadastral Maps 50% 50% 796.00 - - - - 796.00 - 1600.00 - 200.00 -<br />

TOTAL 2488.00 1242.00 370.00 389.86 918.00 2488.00 1242.00 5350.00 2500.00 1036.00 700.00<br />

9. POWER & ELECTRICITY<br />

A NLCPR/DoNER<br />

1 Construction of 132kV S/C line on D/C<br />

towers from Kolasib to Aizawl (Melriat)<br />

2 Construction of 33kV D/C Serlui 'B' to<br />

Kolasib (Bawktlang)<br />

3 Construction of 132kV S/C line Bairabi to<br />

Bawktlang<br />

4 Construction of 132kV S/C line<br />

Khawzawl to Champhai<br />

1935.99 561.01 677.50 - - - - 1258.50 561.01 800.00 250.00<br />

283.59 50.41 199.00 - - - - 84.59 50.41 84.59 50.41<br />

456.00 149.00 456.00 149.00 - 78.00 78.00 - 21.00 - 21.00<br />

530.60 60.00 160.00 - - - - 530.6 60.00 160 -<br />

Release of 1st instalment awaited for starting the project<br />

5 Improvement of Sub-Transmission<br />

Distribution Network in Aizawl<br />

2583.00 650.10 1583.00 650.10 - 60.00 60.00 - 483.00 - 50.00<br />

Estimate for addl. requirement of Rs. 650.00 lakh for completion of<br />

the project submitted to Planning Commission<br />

6 Improvement of Sub-Transmission<br />

Distribution Network in Lunglei Town<br />

830.00 350.00 830.00 350.00 - - - - 350.00 - 56.00<br />

Addl. requirement of Rs. 350.10 lakh for completion of the project<br />

submitted to Planning Commission<br />

Total NLCPR/DoNER 6619.18 1820.52 3905.50 1149.10 0.00 138.00 138.00 1873.69 1525.42 1044.59 427.41<br />

B NEC


- 737 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

1 33/11kV S/S at Darlawn 288.13 32.27 288.13 - 37.30 - - 445.50 49.50 - -<br />

The estimate is revised to Rs. 495.00 lakh and submitted to Govt.<br />

of <strong>Mizoram</strong> on 24.10.06<br />

2 33/11kV S/S at Hnahlan 354.10 39.34 354.10 39.34 - - - 542.35 60.26 - -<br />

3 Construction of 2 nd Circuitline between<br />

PGCIL 132kV S/S Aizawl to Zuangtui<br />

S/S<br />

4 Construction<br />

Melriat<br />

of 132kV Central S/S<br />

The estimate is revised to Rs. 602.61 lakh and submitted to Govt.<br />

of <strong>Mizoram</strong> on 24.10.06<br />

228.60 25.40 228.60 25.40 - - - 132.70 25.40 - -<br />

1333.80 148.20 360.00 - - - - 973.80 148.20 - -<br />

Total NEC 2204.63 245.21 1230.83 64.74 37.30 0.00 0.00 2094.35 283.36 0.00 0.00<br />

C MNES<br />

1 Serlui 'B' HEP (12MW) 2250.00 11270.00 2250.00 11270.00 - 1500.00 1500.00 707.00 3568.00 - 1500.00<br />

2 Maicham - II HEP (3MW) 900.00 987.80 900.00 987.80 180.00 - 180.00 - 212.22 - -<br />

3 Lamsial (0.5MW) 300.00 145.00 300.00 145.00 120.00 - 120.00 90.00 - - -<br />

Revised estimate is under preparation due to cost overrun<br />

4 R&M of Serlui 'A' 143.40 65.31 143.40 65.31 28.68 - 28.68 78.88 35.31 - 20.00<br />

5 R&M of Tuipui 103.26 48.02 103.26 48.02 - 13.50 13.50 77.46 28.02 - 20.00<br />

10. INDUSTRIES<br />

Total MNES 3696.66 12516.13 3696.66 12516.13 328.68 1513.50 1842.18 953.34 3843.55 0.00 1540.00<br />

Grand Total 12520.47 14581.86 8832.99 13729.97 365.98 1651.50 1980.18 4921.38 5652.33 1044.59 1967.41


- 738 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1<br />

CSS to be transferred to the States as<br />

per the decision of NDC -<br />

a) Already transferred:<br />

2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

i) D.I.C.<br />

b) Yet to be transferred:<br />

50% 50% - 680.00 - 221.69 221.69 - 927.54 - 2637.00 - 402.61<br />

i) Tribal Handloom Dev. Project 50% 50% - 40.00 - 20.00 20.00 - 89.95 - 147.00 - 23.00<br />

ii) Industrial Growth Centre 100% - - - 1.00 - 1.00 - 2.00 - 60.00 - 0.10<br />

iii) Export Promotion Industrial Park 80% 20% - 170.00 - 5.00 5.00 - 15.00 - 30.00 - 0.10<br />

TOTAL - 890.00 1.00 246.69 247.69 - 1034.49 - 2874.00 - 425.81<br />

11. ROADS & BRIDGES<br />

A E & I Schemes<br />

1 Construction of Single lane Builtup<br />

Girder Bridge over R.Tuichang on<br />

Hnahthial - Thingsai road<br />

2 Construction of Single lane Builtup<br />

Girder Bridge over R.Tlawng on Aibawk -<br />

Darlung road<br />

3 Improvement of Rengtekawn to NH-154<br />

Road<br />

4 Improvement of Reiek to West Lungdar<br />

road<br />

5 Construction of Kawlchaw -<br />

Tawngkawlawng road (upto new Latawh)<br />

0 to 16 Kmp<br />

6 Upgradation of KDZKT road (Kawrthah-<br />

Lowerpoo) 40km<br />

7 Upgradation of Bilkhawthlir - Saiphai-<br />

Natasura rd<br />

8 Upgradation of Tuipuibari-W.Kawnpui rd<br />

18 km<br />

9 Improvement of Melthum - Samtlang<br />

Road<br />

50% 50% 0.000 0.000 0.000 0.000 0.000 141.500 141.500 0.000 0.000 0.000 0.000 completed<br />

50% 50% 101.650 101.650 2.610 2.610 5.220 101.650 101.650 0.000 0.000 0.000 0.000 completed<br />

50% 50% 244.970 244.970 244.970 0.000 244.970 244.970 244.970 0.000 0.000 0.000 0.000 completed<br />

50% 50% 0.000 0.000 218.880 229.880 448.760 269.375 269.375 0.000 0.000 0.000 0.000 completed<br />

50% 50% 0.000 0.000 0.000 0.000 0.000 500.910 500.910 0.000 0.000 0.000 0.000 completed<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1975.000 0.000 500.000 0.000<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1950.000 0.000 500.000 0.000<br />

50% 50% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 467.000 467.000 150.000 150.000<br />

50% 50% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 83.830 83.830 15.000 15.000


- 739 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

10 Construction of BUG bridges over<br />

R.Cheppui, R.Chepte and R.Sesih on<br />

Bilkhawthlir - Saiphai Road<br />

50% 50% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 126.320 126.320 20.000 20.000<br />

11 Resurfacing of Champhai - N.Vanlaiphai<br />

road from Artahkawn to N.Vanlaiphai<br />

50% 50% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 55.535 55.535<br />

15.000 15.000<br />

B Central Road Fund<br />

1 Improvements of Aizawl Town Road 100% 400.020 0.000 0.000 0.000 0.000 400.020 0.000 0.000 0.000 0.000 0.000<br />

2 Improvement of :<br />

1) M & BT of approach road to Don<br />

Bosco School at Darlawn<br />

2) Lunglei Town Road<br />

3) Kolasib Town Road<br />

4) Saiha Town Road<br />

5) Lawngtlai Town Road<br />

6) Champhai Town Road<br />

7) Mamit Town Road<br />

8) Serchhip Town Road<br />

100% 452.550 0.000 198.500 0.000 198.500 452.550 0.000 0.000 0.000 0.000 0.000<br />

3 Impvt. of roads within Chakma<br />

Autonomous District Council -<br />

100% 313.000 0.000 158.000 0.000 158.000 158.000 0.000 155.000 0.000 155.000 0.000<br />

4 Improvement of Lunglei Town Road 100% 51.200 0.000 5.000 0.000 5.000 51.200 0.000 0.000 0.000 0.000 0.000<br />

5 Improvement of Ramrikawn - PTC 100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 225.640 0.000 95.470 0.000<br />

6 Construction of Bridge on Bilkhawthlir -<br />

Saiphai road<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 252.640 0.000 50.000 0.000<br />

7 Improvement and resurfacing of<br />

Vaivakawn-Ropaiabawk road<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 158.530 0.000 158.530 0.000<br />

8 Improvement of Kahrawt - Hmunhmeltha 100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 78.480 0.000 0.000 0.000<br />

9 Improvement of narrow portions within<br />

Aizawl City including Sikulpuikawn-<br />

Legislature Home<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 148.330 0.000 0.000 0.000


- 740 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

10 Improvement of Melthum - Khawchhete<br />

Road<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 167.659 0.000 0.000 0.000<br />

11 Improvement of KDZKT road (Kawrthah -<br />

Kawrtethawveng)<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 839.900 0.000 0.000 0.000<br />

12 Resurfacing and construction of side<br />

drain from Vaivakawn-Companypeng<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 18.120 0.000 0.000 0.000<br />

13 Resurfacing of Buarpui-Bunghmun 100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 275.260 0.000 0.000 0.000<br />

14 Improvement of and resurfacing of Saiha<br />

Town road<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 516.740 0.000 0.000 0.000<br />

15 Resurfacing of Champhai - N.Vanlaiphai<br />

road (Artahkawn-N.Vanlaiphai)<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 111.070 0.000 0.000 0.000<br />

16 Improvement and resurfacing of Lunglei<br />

Town road<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 190.420 0.000 0.000 0.000<br />

17 Improvement of drainage on Champhai -<br />

N.Vanlaiphai road<br />

100% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 20.000 0.000 0.000 0.000<br />

C NLCPR Schemes<br />

1 Construction of Lungtian - Mamte via<br />

Vartek Kai road in <strong>Mizoram</strong><br />

90% 10% 2398.077 266.453 250.000 0.000 250.000 2194.000 0.000 204.077 266.450 204.077 266.450<br />

2 Construction of Chawngte - Borapansuri<br />

upto Momtala road in <strong>Mizoram</strong><br />

90% 10% 940.932 104.548 0.000 0.000 0.000 975.000 0.000 0.000 70.480 0.000 70.480<br />

3 Construction of bridge over R.Vanva on<br />

Haulawng-Bualpui-Chhipphir road in<br />

<strong>Mizoram</strong><br />

90% 10% 131.103 14.567 0.000 6.950 6.950 0.000 6.950 0.000 0.000 0.000 0.000<br />

4 Construction of bridge over R.Tuisih on<br />

Tuipang-Zawngling-Chheihhlu road in<br />

<strong>Mizoram</strong><br />

90% 10% 102.654 11.406 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000<br />

5 Construction of bridge over<br />

R.Chawngtelui on Diltlang-Chawngte<br />

road in <strong>Mizoram</strong><br />

90% 10% 183.141 20.349 0.000 9.520 9.520 0.000 9.520 0.000 0.000 0.000 0.000<br />

6 Construction of bridge over R.Chawngte<br />

at (Chawngte 'P' to 'C') within Lai and<br />

Chakma District Council in <strong>Mizoram</strong><br />

90% 10% 229.977 25.553 0.000 11.560 11.560 0.000 11.560 0.000 0.000 0.000 0.000


- 741 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

7 Construction of Link road to Bamboo<br />

plantation-From Dur Lui to 1)Sairum 2)<br />

Mualkhang in <strong>Mizoram</strong>.<br />

90% 10% 554.958 61.662 0.000 0.000 0.000 616.620 0.000 0.000 0.000 0.000 0.000<br />

8 Construction of Link road to Bamboo<br />

plantation-From W.Serzawl-<br />

Saiphai/Saitlaw (18 km) to Plot A<br />

90% 10% 523.683 58.187 0.000 0.000 0.000 581.870 0.000 0.000 0.000 0.000 0.000<br />

9 Improvement and widenning of<br />

Bawngkawn-Durtlang Road (0.000-2.260<br />

kmp)<br />

10 Construction of 3 Bailey Bridges in<br />

<strong>Mizoram</strong><br />

90% 10% 612.900 68.100 0.000 0.000 0.000 612.900 68.100 0.000 0.000 0.000 0.000<br />

a. Over R.Tuikum - span 50m<br />

b. Over R.Lunghmullui span-40m<br />

c. Over R.Tuisa span-50m<br />

New NLCPR Schemes<br />

90% 10% 584.478 64.942 204.570 0.000<br />

204.570 204.570 0.000 379.908 64.942 379.910 64.940<br />

11 Construction of Link road to proposed<br />

Bamboo plantation areas from Tuirial to<br />

Bukpui Ph-I (0-40kmp)<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2144.700 238.300 900.000 0.000<br />

12 Construction of Link road to proposed<br />

Bamboo plantation areas from Tuirial to<br />

Bukpui Ph-II (40-79 kmp)<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1935.900 215.100 800.000 0.000<br />

13 Construction of Link road to Bamboo<br />

plantation areas from Saiphal to Hortoki<br />

(0-27.50 kmp)<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1360.800 151.200 600.000 0.000<br />

14 Construction of Melriat - Khumtung road 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3526.000 391.780 1500.000 158.440<br />

15 Construction of Lungpho - Khawhai road 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2750.000 305.560 550.000 61.112<br />

16 Construction of Thingsai - Muallianpui<br />

road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2700.000 300.000 540.000 60.000


- 742 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

17 Construction of E.Phaileng - N.Chaltlang<br />

via Hmuizawl - Chhanchhuahna Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7740.000 860.000 1548.000 172.000<br />

18 Upgradation of Kawnpui - Hortoki Road 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1980.000 220.000 40.000 4.440<br />

Bridge over R.Tuichang on Keitum –<br />

N.Vanlaiphai Road<br />

Bridge over R.Tuipuibari on Tuipuibari –<br />

W.Kawnpui Road<br />

19 Construction of Missing bridge over<br />

R.Tuisumpui on Lawngtlai - Saiha<br />

Feeder road<br />

20 Construction of Missing bridge over<br />

R.Tuiphal on Hnahthial - Thingsai Road<br />

21 Construction of Missing bridge over<br />

R.Teirei on Bairabi - Zamuang Road<br />

22 Construction of Missing bridge over<br />

R.Kawlchaw on Serkawr - Tuipang road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 539.730 59.970 107.946 11.994<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 406.160 45.130 81.232 9.026<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 340.000 37.780 68.000 7.556<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 298.000 33.110 59.600 6.622<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 298.000 33.110 59.600 6.622<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 298.000 33.110 59.600 6.622<br />

23 Construction of Missing bridge over<br />

R.Tlawng on Aizawl - Reiek Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 340.000 37.780 68.000 7.556<br />

D NEC Schemes<br />

1 Construction of Tlabung -<br />

Kawrpuichhuah Road<br />

90% 10% 1274.400 141.600 495.000 0.000 495.000 695.000 0.000 579.400 141.600 579.400 141.600<br />

2 Construction of Saitual-Saichal- NE<br />

Bualpui Road<br />

90% 10% 3009.240 334.360 0.000 0.000 0.000 1100.000 0.000 1909.240 334.360 1100.000 0.000<br />

3 Upgradation of Bairabi-Zamuang Road 90% 10% 3052.080 339.120 0.000 0.000 0.000 1550.000 0.000 1502.080 339.120 1502.080 339.120<br />

4 Upgradation of Keitum-Artahkawn Road 90% 10% 2617.560 290.840 0.000 0.000 0.000 1450.000 0.000 1167.560 290.840 1167.560 290.840<br />

5 Upgradation of Mamit-Bairabi Road 90% 10% 3006.900 334.100 0.000 0.000 0.000 950.000 0.000 2056.900 334.100 2056.900 334.100<br />

6 Upgradation of Saitual-Phullen Road 90% 10% 4695.480 521.720 500.000 0.000 500.000 1450.000 0.000 3245.480 521.720 3245.480 521.720


- 743 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

7 Upgradation of Silchar-Dwarbon-Phaisen<br />

Buhchang Road<br />

90% 10% 792.063 88.007 0.000 0.000 0.000 580.000 0.000 212.063 88.007 212.063 88.007<br />

8 Chalfilh-Vanzau Road 90% 10% 380.000 40.229 0.000 0.000 0.000 380.000 0.000 0.000 40.229 0.000 40.229<br />

9 Construction of Vaikhawtlang to<br />

Khuangphah Road<br />

90% 10% 437.238 48.582 198.000 0.000 198.000 198.000 0.000 239.238 48.582 239.238 48.582<br />

10 Construction of missing link between NH-<br />

150 and approach road to chalfilh<br />

(Vanzau)<br />

90% 10% 310.797 34.533 100.000 0.000 100.000 100.000 0.000 210.797 34.533 210.797 34.533<br />

11 Upgradation of Lengpui Airport<br />

Bridges<br />

90% 10% 592.200 65.800 203.000 0.000 232.000 592.200 65.800 0.000 0.000 0.000 0.000<br />

12 Construction of BUG Bridge over<br />

R.Ngengpui on Nalkawn-Chamdur<br />

Valley Road<br />

90% 10% 256.869 28.541 0.000 0.000 0.000 256.869 28.541 0.000 0.000 0.000 0.000<br />

13 Construction of Bridge over<br />

R.Khawchhaktuipui on CNV Road<br />

90% 10% 232.353 25.817 132.000 0.000 132.000 232.353 25.817 0.000 0.000 0.000 0.000<br />

14 Improvement of Kolodyne river for<br />

navigation<br />

New NEC Schemes<br />

90% 10% 350.145 38.905 0.000 0.000 0.000 285.000 28.500 65.145 38.905 65.145 38.905<br />

15 Upgradation of Serkhan – Bagha Bazar<br />

Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 11286.000 1254.000 2257.200 250.800<br />

16 Upgradation of Ngopa – Tuivai Road 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3296.700 366.300 659.340 73.260<br />

17 Upgradation of Khedacherra –<br />

Damcherra – Zamuang –<br />

Kawrtethawveng – Tuilutkawn Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10129.500 1125.500 2025.900 225.100<br />

18 Upgradation of Tuipuibari – W.Kawnpui<br />

Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1891.800 210.200 378.360 42.040<br />

19 Upgradation of Khawbung –<br />

N.Vanlaiphai Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6138.000 682.000 1227.600 136.400<br />

20 Upgradation of Ngopa – Mimbung Road 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5093.550 565.950 1018.710 113.190<br />

21 N.E Bualpui – Rabung - Hnalan 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 8716.500 968.500 1743.300 193.700<br />

22 Construction of Bamboo Link Roads<br />

a. Kolasib District 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6300.000 700.000 1260.000 140.000


- 744 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

b. Mamit District 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6300.000 700.000 1260.000 140.000<br />

c. Lunglei District 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6300.000 700.000 1260.000 140.000<br />

d. Lawngtlai District 90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3150.000 350.000 630.000 70.000<br />

23 Bridge over R.Tuiphal on Kawlkulh –<br />

Ngopa Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 233.325 25.925 46.665 5.185<br />

24 Bridge over R.Chhimluang on Silchar-<br />

Dwarband-Phaisen Road<br />

90% 10% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 143.820 15.980 28.764 3.196<br />

TOTAL OF ROADS & BRIDGES 28832.62 3374.54 2910.53 260.52 3200.05 17324.56 1503.19 115223.85 13972.84 33399.47 4524.37<br />

12. TOURISM<br />

1 Tourist Lodge, Zokhawthar 80% 20% 50.00 - - - - 50.00 - - - - -<br />

2 Tourist Lodge, Sakawrdai ” ” 50.00 - - - - 50.00 - - - - -<br />

3 Tourist Lodge, Khamrang ” ” 31.00 - - - - 31.00 - - - - -<br />

4 Tourist Resort, Hmuifang ” ” 195.85 - - - - 151.72 - - - - -<br />

5 Illumination ” ” 20.85 - - - - 18.00 - - - - -<br />

6 Tourist Lodge, Saichho ” ” 45.00 - - - - 33.00 - - - - -<br />

7 Tourist Lodge, Kanhmun ” ” 76.00 - - - - 62.00 - - - - -<br />

8 Tourist Lodge, Tlabung ” ” 76.00 - - - - 62.00 - - - - -<br />

9 Tourist Reception Centre, Beraw ” ” 54.00 - - - - 40.00 - - - - -<br />

10 Eco-Tourism, Reiek ” ” 90.00 - - - - 75.50 - - - - -<br />

11 Destination Champhai and its<br />

surrounding<br />

” ” 442.35 - - - - 355.53 - - - - -<br />

12 Tourist Circuit, Aizawl - Lunglei ” ” 634.00 - - - - 507.20 - - - - -<br />

13 Destination Reiek & Beraw ” ” 479.49 - - - - 383.59 - - - - -<br />

14 Norther Tourist Circuit ” ” 783.92 - - - - 627.00 - - - - -<br />

15 Thal Favang Kut ” ” 25.00 - 5.00 - 5.00 25.00 - - - - -<br />

16 Chapchar Kut ” ” 25.00 - 5.00 - 5.00 25.00 - - - - -<br />

17 Anthurium Festival ” ” 10.00 - 10.00 - 10.00 10.00 - - - - -<br />

18 Information Technology ” ” 15.02 - - - - 15.02 - - - - -<br />

TOTAL 3103.48 - 20.00 - 20.00 2521.56 - - - - -<br />

13. ECONOMICS & STATISTICS


- 745 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

1 Agriculture Census 100% - 49.03 - 12.19 - 12.19 49.03 - 60.00 - 14.00 -<br />

2 National Sample Survey (NSS) 75% 25% 118.00 39.34 26.00 8.60 26.00 118.00 39.34 130.00 43.33 26.00 8.60<br />

TOTAL 167.03 39.34 38.19 8.60 38.19 167.03 39.34 190.00 43.33 40.00 8.60<br />

14. LAI AUTO. DISTRICT COUNCIL<br />

1 Construction of School Building under<br />

LADC<br />

- - - - - - - 435.00 - 435.00 -<br />

2 Construction of Road within LADC - - - - - - - 1107.00 - 225.00 -<br />

3 Construction of official buildings within<br />

LADC<br />

- - - - - - - 245.00 - 245.00 -<br />

4 Construction of Steel Girder Bridge over<br />

landslide area between Bara Bazar and<br />

Council Secretariat within Lawngtlai<br />

Town<br />

- - - - - - - 288.00 - 288.00 -<br />

5 BADP for LADC - - - - - - - 200.00 - 100.00 -<br />

6 Diltlang Integrated Watershed<br />

Development Project - large project<br />

- - - - - - - 600.00 - 120.00 -<br />

7 Special Watershed Development<br />

Programme for rural economy under<br />

LADC area<br />

- - - - - - - 150.00 - 150.00 -<br />

TOTAL - - - - - - - 3025.00 - 1563.00 -<br />

15. LEGAL METROLOGY<br />

1 Direction & Administration - - - - - - - - 200.00 - -<br />

2 Machinery & Equipment - - - 12.00 - 12.00 12.00 - 15.00 - -<br />

3 Minor Works - - - - - - - - 15.00 - -<br />

TOTAL - - - 12.00 - 12.00 12.00 - 230.00 - -<br />

16. LAW & JUDICIAL<br />

1 CSS for development of infrastructure<br />

facilities for the Judiciary<br />

50% 50% 475.55 284.00 100.00 57.00 157.00 475.55 284.00 1220.00 326.60 100.00 62.70<br />

2 Information Technology in Courts - - 29.68 12.60 - 3.00 3.00 29.68 12.60 - 14.49 - 3.30<br />

TOTAL 505.23 296.60 100.00 60.00 160.00 505.23 296.60 1220.00 341.09 100.00 66.00<br />

Fund under CSS during 2006-07 will be released by the Ministry of Law & Justice. Ten Year Perspective Plan under CSS is being submitted to the Ministry of Law & Justice for their approva


- 746 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

17. SCHOOL EDUCATION<br />

1Operation Blackboard 100% - 0.10 - - - - 29.79 - - - - -<br />

2 New Education Technology 100% - 0.10 - - - - 0.84 - - - - -<br />

3 SCERT 100% - 0.10 - 14.00 - 14.00 40.23 - 0.50 - 0.10 -<br />

4 IEDC 100% - 0.10 - 52.35 - 52.35 138.89 - 0.50 - 0.10 -<br />

5 NFE 100% - 0.10 - - - - 54.38 - 0.50 - 0.10 -<br />

6Inprovement of Science Education 100% - 0.10 - - - - 65.25 - 0.50 - 0.10 -<br />

7 Class 75% 25% 0.10 - - - - 100.00 34.00 0.50 - 0.10 -<br />

8 DIET 100% - 0.10 - 107.67 - 107.67 560.54 - 0.50 - 0.10 -<br />

9 Adult Education 100% - 0.10 - - - - 7.42 - 0.50 - 0.10 -<br />

10 ERIP 100% - - - - - - 19.70 7.00 0.50 - 0.10 -<br />

11 MLT - Hindi 100% - 0.10 - 796.00 - 796.00 2238.83 - 0.50 - 0.10 -<br />

12 VSE 100% - 0.10 - 684.30 - 684.30 712.51 10.00 0.50 0.50 0.10 0.10<br />

13 DRC 100% - - - 250.00 - 250.00 744.40 - 0.50 - 0.10 -<br />

14 Scholarship 100% - - - - - - 1.10 - 0.50 - 0.10 -<br />

15 ICT 75% 25% - - 150.00 - 150.00 150.00 - 0.50 0.50 0.10 0.10<br />

TOTAL 1.10 - 2054.32 - 2054.32 4863.88 51.00 6.50 1.00 1.30 0.20<br />

18. HIGHER & TECHNICAL EDUCATION<br />

1 PMS 100% - 2000.00 - 1153.00 - 1153.00 - - 6000.00 - 2000.00 -<br />

2Upgradation of CTE 100% - 30.25 - - - - 30.25 - - - - -<br />

3 Construction of MHTC 100% - 163.40 - - - - 163.40 - - - - -<br />

TOTAL 2193.65 - 1153.00 - 1153.00 193.65 - 6000.00 - 2000.00 -<br />

19. SPORTS & YOUTH SERVICES<br />

1 Development of Sports Infrastructure /<br />

MSSC (Indoor & Outdoor Stadium)<br />

75% 25% 1930.00 1375.17 750.00 250.00 1000.00 1000.00 950.00 1200.00 400.00 294.00 98.00<br />

2 NSS Estt. (Cell) 100% - 35.00 - 8.00 - 8.00 36.71 - 36.00 - 9.00 -<br />

3 NSS regular activities )Special Camping<br />

Programmes)<br />

75% 25% 315.00 105.00 84.00 28.00 122.00 315.00 105.00 450.00 150.00 90.00 30.00


- 747 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

TOTAL 2280.00 1480.17 842.00 278.00 1130.00 1351.71 1055.00 1686.00 550.00 393.00 128.00<br />

20. HEALTH & FAMILY WELFARE<br />

1 NGCP 100% 25.00 - 12.00 - 12.00 25.00 - 30.00 - 12.00 -<br />

2 NVBDCP / NMEP - 545.00 - 170.00 - 170.00 545.00 - 654.00 - 180.00 -<br />

3 Homeo / Ayush 100% - - 231.91 - 231.91 231.91 - - - 250.00 -<br />

4 NPCB 100% 125.00 - 93.20 - 93.20 125.00 - 649.00 - 261.70 -<br />

5 NCCP - 60.00 - 10.00 - 10.00 60.00 - 72.00 - 15.00 -<br />

6 FW 60% 2900.00 - 413.16 - 413.16 2900.00 - 3480.00 - 500.00 -<br />

TOTAL 3655.00 - 930.27 - 930.27 3886.91 - 4885.00 - 1218.70 -<br />

21. HOSPITAL & MEDICAL EDUCATION<br />

1 District Mental Health Programme 100% - 100.00 100.00 11.59 100.00 61.59 - 54.00 38.41 0.09<br />

TOTAL 100.00 100.00 11.59 100.00 61.59 - 54.00 38.41 0.09<br />

22. P.H.E.<br />

1 Accelerated Rural Water Supply<br />

Programme (ARWSP)<br />

50% 50% 684.00 6000.00 2920.00 2162.80 5082.80 8432.53 - 17019.00 7000.00<br />

2 Rural Sanitation - CRSP/TSC - - 250.00 50.00 - 100.00 - - - 2432.23 780.81<br />

3 Sub-Mission 75% 25% 1719.00 573.00 116.24 128.59 244.83 1350.47 - 3400.00 850.00<br />

4 Accelerated Urban Water Supply 50% 50% 800.00 51.00 - - - 93.10 - - - Programme<br />

Programme (AUWSP)<br />

terminated<br />

5 Comunication and Capacity<br />

Development<br />

100% - - - 88.82 - 40.00 - - 150.00 50.00<br />

6 Water Quality Monitoring and<br />

Surveillance<br />

100% - - - 13.30 - 13.30 13.30 - 398.00 25.00<br />

7 Swajaldhara 90% - - - 168.00 - 168.00 - - 3981.00 -<br />

TOTAL 3453.00 6674.00 3306.36 2391.39 5548.93 9889.40 - 27380.23 8705.81<br />

23. SOCIAL WELFARE<br />

1 ICDS 100% - 4038.02 - 990.06 - 990.06 990.06 - 5000.00 - 1000.00 -<br />

2 Training Programme for ICDS 100% - - - 10.95 - 10.95 10.95 - 60.00 - 60.00 -


- 748 -<br />

Central State<br />

Share Share<br />

Central<br />

State Share<br />

Share<br />

(Rs. in lakh)<br />

Central<br />

State Share<br />

Share<br />

Central Share State Share<br />

Central<br />

State Share<br />

Share<br />

Central<br />

Sl.<br />

No.<br />

Name of the Schemes<br />

Pattern of Funding<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

Annual Plan 2006-07<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan 2002-07<br />

Anticipated Expenditure<br />

Proposed Outlay<br />

Eleventh Plan Annual Plan<br />

(2007-12)<br />

(2007-08)<br />

State Share<br />

Share<br />

Remarks<br />

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

3 Correctional Services 50% 50% 97.98 127.69 23.47 44.35 67.82 23.47 44.35 147.00 147.00 50.00 50.00<br />

4 Women Welfare (Swayamsidha) 100% - 87.12 - 27.12 - 30.00 30.00 - 150.00 - 30.00 -<br />

5 Vocational Training Centre 100% - 244.87 - 65.00 - 65.00 65.00 - 325.00 - 65.00 -<br />

6 BSY 100% - 66.00 - 33.00 - 33.00 33.00 - 165.00 - 33.00 -<br />

7 KSY 100% - 46.65 - 12.00 - 12.00 12.00 - 60.00 - 12.00 -<br />

TOTAL 4580.64 127.69 1161.60 44.35 1208.83 1164.48 44.35 5907.00 147.00 1250.00 50.00<br />

24. NUTRITION<br />

1 State Special Nutrition Programme 50% 50% 942.48 3447.50 471.24 746.00 1217.24 942.48 3447.50 3524.65 4133.00 676.65 821.00<br />

TOTAL 942.48 3447.50 471.24 746.00 1217.24 942.48 3447.50 3524.65 4133.00 676.65 821.00<br />

25. PRISONS<br />

1 Construction of new jails 75% 25% 637.50 212.50 123.75 41.25 165.00 637.50 212.50 150.00 240.00 80.00<br />

2 Expansion and renovation of existing<br />

jails<br />

75% 25% 300.00 100.00 67.50 22.50 90.00 300.00 100.00 - - -<br />

3 Construction of staff quarters 75% 25% 267.75 89.25 30.00 10.00 40.00 267.75 89.25 - - -<br />

4 Sanitation and water supply 75% 25% 127.50 42.50 45.00 15.25 60.25 127.50 42.50 - - -<br />

5 Correctional Scheme 75% 25% - - - - - - - 50.00 26.25 9.00<br />

TOTAL 1332.75 444.25 266.25 89.00 355.25 1332.75 444.25 200.00 266.25 89.00


- 766 -<br />

ANNEXURE VI-A<br />

TRIBAL SUB-PLAN (TSP) - I<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : FINANCIAL OUTLAYS : PROPOSALS FOR TSP<br />

Sl.<br />

No.<br />

Major Head / Sub-Head / Schemes<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

(at 2001-02 prices)<br />

Of which flow<br />

Total Outlay<br />

to TSP<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

under TSP<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Expenditure<br />

under TSP<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

under TSP<br />

(Rs. in lakh)<br />

Eleventh Plan (2007-12) - Proposed Outlays<br />

(at 2006-07 prices)<br />

Eleventh Plan (2007-12) Annual Plan (2007-08)<br />

Of which flow<br />

Of which flow<br />

Total Outlay Total Outlay<br />

to TSP<br />

to TSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

1 Lai District Councill - - - - -<br />

1) Rural Housing - - - - - 8471.00 8471.00 1708.00 1708.00<br />

2) Const of Village Council House - - - - - 174.00 174.00 174.00 174.00<br />

3) Const of Housing at Lawngtlai - - - - - 100.00 100.00 100.00 100.00<br />

4) Water Supply Scheme for Rural Area. - - - - - 769.00 769.00 153.00 153.00<br />

5) Costn. of Agriculture Lnk Road - - - - - 6110.00 6110.00 152.00 152.00<br />

6) Re-Constn. of Dokulha Hall. - - - - - 300.00 300.00 150.00 150.00<br />

Total<br />

- - - - - 15924.00 15924.00 2437.00 2437.00<br />

2 Social Welfare<br />

1) 800- T.S.P for Development of Forest Villages - - - 1275.00 1275.00 - - - -


- 768 -<br />

TRIBAL SUB-PLAN (TSP) - II<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PHYSICAL TARGETS AND ACHIEVEMENTS : PROPOSALS FOR TSP<br />

ANNEXURE VI-B<br />

Sl.<br />

No.<br />

Major Head / Sub-Head / Schemes<br />

Unit<br />

Tenth Plan<br />

(2002-07)<br />

Target<br />

Annual Plan 2005-06<br />

Actual<br />

Target<br />

Achievement<br />

Annual Plan 2006-07<br />

Anticipated<br />

Target<br />

Achievement<br />

Tenth Plan<br />

(2002-07)<br />

Anticipated<br />

Achievement<br />

Eleventh Five Year Plan (2007-12)<br />

Eleventh Plan Annual Plan 2007-<br />

2007-12<br />

08<br />

Target Target<br />

0 1 2 3 4 5 6 7 8 9 10<br />

1 Lai District Council<br />

1) Rural Housing Fam. - - - - - - 4958 1000<br />

2) Const of Village Council House No. - - - - - - 85 85<br />

3) Contruction of Guest House Lawngtlai. No. - - - - - - 1 1<br />

4) Water Supply Scheme for Rural Area. Unit - - - - - - 300 60<br />

5) Costn. of Agriculture Lnk Road Km. - - - - - - 293 60<br />

6) Re-Constn. of Dokulha Hall. No. - - - - - - 1 1<br />

2 Social Welfare<br />

800-T.S.P for Development of Forest Villages - 85.00 85.00 85.00 85.00 - -


- 770 -<br />

ANNEXURE VII-A<br />

SCHEDULED CASTE SUB-PLAN (SCSP) - I<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : FINANCIAL OUTLAYS : PROPOSALS FOR SCSP<br />

Sl.<br />

No.<br />

Major Head / Sub-Head / Schemes<br />

Tenth Plan 2002-07<br />

Projected Outlay<br />

(at 2001-02 prices)<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

under SCSP<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Expenditure<br />

under SCSP<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

under SCSP<br />

(Rs. in lakh)<br />

Eleventh Plan (2007-12) - Proposed Outlays<br />

(at 2006-07 prices)<br />

Eleventh Plan (2007-12) Annual Plan (2007-08)<br />

Of which flow<br />

Of which flow<br />

Total Outlay Total Outlay<br />

to SCSP<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

N I L<br />

SCHEDULED CASTE SUB-PLAN (SCSP) - II<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PHYSICAL TARGETS AND ACHIEVEMENTS : PROPOSALS FOR SCSP<br />

ANNEXURE VII-B<br />

Sl.<br />

No.<br />

Major Head / Sub-Head / Schemes Unit<br />

Tenth Plan<br />

(2002-07)<br />

Target<br />

Annual Plan 2005-06<br />

Actual<br />

Target<br />

Achievement<br />

Annual Plan 2006-07<br />

Anticipated<br />

Target<br />

Achievement<br />

Tenth Plan<br />

(2002-07)<br />

Anticipated<br />

Achievement<br />

Eleventh Five Year Plan (2007-<br />

Eleventh Plan Annual Plan<br />

2007-12 2007-08<br />

Target Target<br />

0 1 2 3 4 5 6 7 8 9 10<br />

N I L


Sl.<br />

No.<br />

Schemes<br />

- 772 -<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PROPOSED OUTLAYS<br />

FINANCIAL OUTLAYS / EXPENDITURE FOR VOLUNTARY SECTOR<br />

Tenth Plan<br />

(2002-07)<br />

Projected<br />

Outlay<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

Annual Plan 2006-07<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

Tenth Plan<br />

(2002-07)<br />

Anticipated<br />

Expenditure<br />

ANNEXURE VIII<br />

(Rs. in lakh)<br />

Eleventh Five Year Plan 2007-12<br />

Eleventh Plan Annual Plan<br />

2007-12 2007-08<br />

Proposed Outlay Proposed Outlay<br />

0 1 2 3 4 5 6 7 8<br />

1 Child Welfare 100.00 12.33 22.00 22.00 34.33 - -<br />

2 Assistance to Voluntary Organizations 50.00 5.00 17.00 17.00 22.00 100.00 20.00<br />

Total 150.00 17.33 39.00 39.00 56.33 100.00 20.00


- 774 -<br />

ANNEXURE IX-A<br />

WOMEN COMPONENT (WC) IN THE STATE PLAN PROGRAMMES - I<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : FINANCIAL OUTLAYS : PROPOSALS FOR WC<br />

Sl.<br />

No.<br />

Major Head / Sub-Head<br />

Schemes *<br />

Tenth Plan 2002-07<br />

Projected Outlays<br />

(at 2001-02 prices)<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Annual Plan<br />

2005-06<br />

Actual<br />

Expenditure<br />

under WC<br />

Annual Plan<br />

2006-07<br />

Anticipated<br />

Expenditure<br />

under WC<br />

Tenth Plan<br />

2002-07<br />

Anticipated<br />

Expenditure<br />

under WC<br />

(Rs. in lakh)<br />

Eleventh Plan (2007-12) - Proposed Outlays<br />

(at 2006-07 prices)<br />

Eleventh Plan (2007-12) Annual Plan (2007-08)<br />

Of which flow<br />

Of which flow<br />

Total Outlay Total Outlay<br />

to SCSP<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10 11<br />

Lai Autonomous Dist. Council<br />

1 Major Head Constn of Girls Hostel for H/S & HSS<br />

Students at Lawngtlai<br />

Social Services<br />

2 Minor Head Voluntary Training Cum-Counselling<br />

Centre for women at Lawngtlai<br />

3 Social Security & Social Welfare AIDS Awareness Campaign for Rural<br />

Villages<br />

Total<br />

Technical Education<br />

1 Women Polytechnic Aizawl Women Development in Tech.<br />

Education<br />

- - - - - 70.00 70.00 70.00 70.00<br />

- - - - - 20.00 20.00 20.00 20.00<br />

- - - - - 10.00 10.00 10.00 10.00<br />

100.00 100.00 100.00 100.00<br />

2380.44 2380.44 471.50 169.00 2380.44 275.50 275.50 126.50 126.50<br />

2235-Social Security & Welfare<br />

103-Women Welfare :- a) Social-Eco. for Poor & Destitute<br />

Women<br />

50.00 50.00 5.50 10.00 50.00 50.00 50.00 10.00 10.00<br />

b) R.I.T.C - 25.00 25.00 5.00 5.00<br />

c) Women Commission 45.00 45.00 10.51 10.51 45.00 70.50 70.50 14.10 14.10<br />

d) Platform Strategies for Women<br />

/IWEP<br />

- 10.00 10.00 2.00 2.00<br />

Total<br />

95.00 95.00 16.01 20.51 95.00 155.50 155.50 31.10 31.10


- 776 -<br />

WOMEN COMPONENT (WC) IN THE STATE PLAN PROGRAMMES - II<br />

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL PLAN (2007-08) : PHYSICAL TARGETS AND ACHIEVEMENTS : PROPOSALS FOR WC<br />

ANNEXURE IX-B<br />

Sl.<br />

No.<br />

Major Head / Sub-Head / Schemes<br />

Unit<br />

Tenth Plan<br />

(2002-07)<br />

Target<br />

Annual Plan 2005-06<br />

Actual<br />

Target<br />

Achievement<br />

Annual Plan 2006-07<br />

Anticipated<br />

Target<br />

Achievement<br />

Tenth Plan<br />

(2002-07)<br />

Anticipated<br />

Achievement<br />

Eleventh Five Year Plan (2007-12)<br />

Eleventh Plan Annual Plan 2007-<br />

2007-12<br />

08<br />

Target Target<br />

0 1 2 3 4 5 6 7 8 9 10<br />

1 Lai Autonomous Dist. Council<br />

Major Head<br />

Social Srvices<br />

Minor Head<br />

Social Security & Welfare<br />

Constn of Girls Hostel for H/S & HSS<br />

Students at Lawngtlai.<br />

Voluntary Training Cum-Councelling<br />

1 - - - - - 1 1<br />

Centre for women at Lawngtlai 1 1 1<br />

AIDS Awareness Campaign for Rural Villages Ls - - - - - -<br />

2 Technical Education<br />

Women Polytechnic Aizawl Nos. 1 1 1 1 1 1 1 1<br />

3 2235-Social Security & Welfare<br />

103-Women Welfare<br />

a) Sicio-Eco. For Poor & Destitute Persons 1500.00 300.00 300.00 300.00 300.00 1500.00 2000.00 400.00<br />

b) R.I.T.C. Centres - - - - - - 1 1<br />

c) Women Commission Centres 1 1 1 1 1 1 1 1


Items<br />

- 778 -<br />

Targets and Achievements in Roads & Bridges Sector<br />

Physical Financial Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin<br />

1 07 0000 00 VII TRANSPORT<br />

1 07 3054 00 ROADS & BRIDGES<br />

1. State Highways<br />

i) Strengthening<br />

ii) Widening to 2 lanes<br />

iii) Widening to 4 lanes<br />

iv) Paved Shoulders<br />

302.00<br />

v) Blacktopping<br />

vi) Others<br />

6 Km<br />

(a) Culverts 29 Nos<br />

(b) Resurfacing<br />

(c) Retaining Walls<br />

(d) Lined Side drains<br />

16 Km<br />

2. Major District Roads<br />

i) Strengthening<br />

ii) Widening to 2 lanes<br />

iii) Widening to 4 lanes<br />

iv) Paved Shoulders<br />

vi) Others<br />

1209.00 2.90 2.90 68.00 68.00<br />

(a) Culverts 154 Nos<br />

(b) Blacktopping 6Km<br />

(c) Resurfacing 357 Km 2 Km 2 Km 8.61 Km 8.61 Km<br />

(d) Retaining Wall<br />

(e) Side drains<br />

3. Bypasses<br />

4. Railway Overbridges on SH /<br />

MDR<br />

568 Rm<br />

5. Missing bridges on SH / MDR<br />

328.00<br />

(a) Bridge 100%<br />

6. Rehabilitation of bridges<br />

7. Research & Development<br />

8. Highways Safety<br />

10th Plan Target<br />

2002 - 03 2003 - 04<br />

2004 - 05<br />

Targets Achi Targets Achi Targets Achi<br />

APPENDIX-B<br />

(Km./Rs. in lakh)


Items<br />

1 07 0000 00 VII TRANSPORT<br />

1 07 3054 00 ROADS & BRIDGES<br />

1. State Highways<br />

i) Strengthening<br />

ii) Widening to 2 lanes<br />

iii) Widening to 4 lanes<br />

iv) Paved Shoulders<br />

v) Blacktopping<br />

vi) Others<br />

(a) Culverts<br />

(b) Resurfacing<br />

(c) Retaining Walls<br />

(d) Lined Side drains<br />

2. Major District Roads<br />

i) Strengthening<br />

ii) Widening to 2 lanes<br />

iii) Widening to 4 lanes<br />

iv) Paved Shoulders<br />

vi) Others<br />

(a) Culverts<br />

(b) Blacktopping<br />

(c) Resurfacing<br />

(d) Retaining Wall<br />

(e) Side drains<br />

3. Bypasses<br />

4. Railway Overbridges on SH /<br />

MDR<br />

5. Missing bridges on SH / MDR<br />

(a) Bridge<br />

6. Rehabilitation of bridges<br />

7. Research & Development<br />

8. Highways Safety<br />

Targets<br />

- 779 -<br />

Targets and Achievements in Roads & Bridges Sector<br />

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin<br />

10.00 10.00 347.00 40.00<br />

37 Nos 14 Nos<br />

1.20Km 1.20Km 142 Km 12 Km<br />

885 m 135 m<br />

25 Km 3 Km<br />

162.00 162.00 1390.00 200.00<br />

129 Nos 26 Nos<br />

20.47 Km 20.47Km 11.25Km 11.25Km 312 Km 65 Km<br />

1106 m 180 m<br />

292 Km<br />

5.00 5.00<br />

100% 100%<br />

APPENDIX-B<br />

(Km./Rs. in lakh)<br />

2005 - 06 2006 - 07<br />

2007 - 08<br />

11th Plan Targets<br />

Achi Targets Anti. Achi<br />

Targets


Items<br />

10th Plan Target<br />

- 780 -<br />

Targets and Achievements in Roads & Bridges Sector<br />

2002 - 03 2003 - 04<br />

2004 - 05<br />

Targets Achi Targets Achi Targets Achi<br />

APPENDIX-B<br />

(Km./Rs. in lakh)<br />

Physical Financial Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin<br />

9. Technology Upgradation<br />

10. Others<br />

i) Direction & Administration 100% 5490.00 100% 789.00 100% 789.00 100% 632.37 100% 632.37 100% 599.00 100% 599.00<br />

ii) Machinery & Equipment 100% 33.00 100% 33.00<br />

iii) Other District Roads 353.00 35.00 35.00<br />

(a) Resurfacing 30 Km 12 Km 12 Km 4.16 Km 4.16 Km<br />

(b) Culverts 24 Nos<br />

(c) Blacktopping<br />

(d) Retaining Wall<br />

(e) Side drains<br />

(f) Lined Side drains<br />

iv) Village Roads 987.00<br />

(a) Formation Cutting<br />

(b) Improvement & Widening<br />

(c) Resurfacing 80 Km<br />

(d) Culverts 36 Nos<br />

(e) Blacktopping<br />

(f) Retaining Wall<br />

(g) Side drains<br />

(h) Lined Side drains<br />

v) Sattelite Towns & Vills 416.00 63.80 63.80<br />

(a) Improvement & Widening<br />

(b) Resurfacing 30 Km 17.02Km 17.02Km<br />

(c) Culverts 26 Nos<br />

(d) Blacktopping<br />

(e) Retaining Wall<br />

vi) Roads Within Town 990.00 72.00 72.00 277.00 277.00 88.20 88.20<br />

(a) Formation Cutting<br />

(b) Resurfacing 70 Km 49 Km 49 Km 11.13 Km 11.13 Km<br />

(c) Culverts 56 Nos<br />

(d) Blacktopping


Items<br />

9. Technology Upgradation<br />

10. Others<br />

i) Direction & Administration<br />

ii) Machinery & Equipment<br />

iii) Other District Roads<br />

(a) Resurfacing<br />

(b) Culverts<br />

(c) Blacktopping<br />

(d) Retaining Wall<br />

(e) Side drains<br />

(f) Lined Side drains<br />

iv) Village Roads<br />

(a) Formation Cutting<br />

(b) Improvement & Widening<br />

(c) Resurfacing<br />

(d) Culverts<br />

(e) Blacktopping<br />

(f) Retaining Wall<br />

(g) Side drains<br />

(h) Lined Side drains<br />

v) Sattelite Towns & Vills<br />

(a) Improvement & Widening<br />

(b) Resurfacing<br />

(c) Culverts<br />

(d) Blacktopping<br />

(e) Retaining Wall<br />

vi) Roads Within Town<br />

(a) Formation Cutting<br />

(b) Resurfacing<br />

(c) Culverts<br />

(d) Blacktopping<br />

Targets<br />

- 781 -<br />

Targets and Achievements in Roads & Bridges Sector<br />

APPENDIX-B<br />

(Km./Rs. in lakh)<br />

2005 - 06 2006 - 07<br />

2007 - 08<br />

11th Plan Targets<br />

Achi Targets Anti. Achi<br />

Targets<br />

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin<br />

100% 608.00 100% 608.00 100% 615.00 100% 615.00 100% 6313.00 100% 703.00<br />

100% 24.00 100% 24.00 100% 24.00 100% 24.00<br />

30.00 30.00 406.00 80.00<br />

3.76 Km 3.76 Km 2 Km 2 Km 266 Km 61 Km<br />

166 Nos 62 Nos<br />

9 Km<br />

2388 m 660 m<br />

208 Km<br />

3 Km<br />

50.00 50.00 20.00 20.00 1135.00 200.00<br />

38 Km 20 Km<br />

30 Km 4 Km<br />

6.29 Km 6.29 Km 1.25 Km 1.25 Km 120 Km 23 Km<br />

156 Nos 62 Nos<br />

17 Km 2 Km<br />

1963 m 868 m<br />

119 Km 23 Km<br />

13.00 13.00 102.25 102.25 478.00 90.00<br />

46.32 Km 9.16 Km<br />

10.66Km 10.66Km 218.56 Km 38.34Km<br />

10 Nos<br />

32.8 Km 10 Km<br />

200 m<br />

500.00 500.00 431.75 431.75 1138.00 220.00<br />

30 Km 5 Km<br />

61.86Km 61.86Km 55.65Km 55.65Km 407 Km 85 Km<br />

26 Nos 5 Nos<br />

30 Km 4 Km


Items<br />

10th Plan Target<br />

- 782 -<br />

Targets and Achievements in Roads & Bridges Sector<br />

2002 - 03 2003 - 04<br />

2004 - 05<br />

Targets Achi Targets Achi Targets Achi<br />

APPENDIX-B<br />

(Km./Rs. in lakh)<br />

Physical Financial Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin<br />

(e) Retaining Wall<br />

(vii) Bridges<br />

(viii) NABARD 1183.00 810.36 810.36 852.00 852.00 839.00 839.00<br />

(a) Formation Cutting 60 Km 17 Km 17 Km 27 Km 27 Km 39.23 Km 39.23 Km<br />

(b) Culverts 123 No 123 No 120 No 120 No 96 No 96 No<br />

(c) Bridge 1 No<br />

(d) Retaining Walls 500 Rm 500 Rm 1000 Rm 1000 Rm<br />

(e) Blacktopping 20 Km 20 Km 39 Km 39 Km 0.70 Km 0.70 Km<br />

(f) Side drains<br />

(g) Lined Side drains<br />

ix) <strong>Mizoram</strong> State Road Project<br />

340 Rm 340 Rm<br />

(Counterpart funding of World<br />

Bank Project)<br />

5250.00 750.00 750.00 500.00 500.00<br />

x) <strong>Mizoram</strong> State Road Project<br />

(E.A.P)<br />

29750.00 1551.80 1551.80 5918.00 5918.00 7500.00 7500.00<br />

(a) Improvement and Widening<br />

170 Km 25 Km 25 Km 35 Km 35 Km 80 Km 80 Km<br />

(b) Culverts 930Nos 50Nos 50Nos 120Nos 120Nos 400Nos 400Nos<br />

(c) Side drains 181 Km 35 Km 35 Km 50 Km 50 Km<br />

(d) Retaining Walls 10300 Rm 500 Rm 500 Rm 1500 Rm 1500Rm 4000Rm 4000Rm<br />

(e) Pavement<br />

xi) Counterpart funding of ADB<br />

Aided Project<br />

197 Km 40 Km 40 Km 50 Km 50 Km<br />

(a) Improvement and Widening<br />

(b) Culverts<br />

(c) Side drains<br />

(d) Retaining Walls<br />

(e) Pavement<br />

xi) BAFFACOS<br />

(a) Formation Cutting<br />

GRAND TOTAL 46258.00 3226.06 3226.06 8429.37 8429.37 9726.00 9726.00


Items<br />

(e) Retaining Wall<br />

(vii) Bridges<br />

(viii) NABARD<br />

(a) Formation Cutting<br />

(b) Culverts<br />

(c) Bridge<br />

(d) Retaining Walls<br />

(e) Blacktopping<br />

(f) Side drains<br />

(g) Lined Side drains<br />

ix) <strong>Mizoram</strong> State Road Project<br />

(Counterpart funding of World<br />

Bank Project)<br />

x) <strong>Mizoram</strong> State Road Project<br />

(E.A.P)<br />

(a) Improvement and Widening<br />

(b) Culverts<br />

(c) Side drains<br />

(d) Retaining Walls<br />

(e) Pavement<br />

xi) Counterpart funding of ADB<br />

Aided Project<br />

(a) Improvement and Widening<br />

(b) Culverts<br />

(c) Side drains<br />

(d) Retaining Walls<br />

(e) Pavement<br />

xi) BAFFACOS<br />

(a) Formation Cutting<br />

GRAND TOTAL<br />

Targets<br />

- 783 -<br />

Targets and Achievements in Roads & Bridges Sector<br />

APPENDIX-B<br />

(Km./Rs. in lakh)<br />

2005 - 06 2006 - 07<br />

2007 - 08<br />

11th Plan Targets<br />

Achi Targets Anti. Achi<br />

Targets<br />

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin<br />

300 m 120 m<br />

100% 200.00 1% 2.00<br />

839.00 839.00 700.00 700.00 1360.00 863.00<br />

21 Km 21 Km 39 Km 39 Km 68 Km 6 Km<br />

39 No 39 No 198 No 198 No 368 Nos 68 Nos<br />

1 No<br />

350 Rm 350 Rm 1605 Rm 1605 Rm 4975 m 975 m<br />

2 Km 2 Km 119 Km 10 Km<br />

94 Km 32 Km<br />

12 Km 2 Km<br />

500.00 500.00 1000.00 1000.00 6000.00 1200.00<br />

9206.00 9206.00 7500.00 7500.00 30430.00 8000.00<br />

20 Km 20 Km 20 Km 20 Km<br />

200Nos 200Nos 200Nos 200Nos 70 Nos 40 Nos<br />

80 Km 80 Km 80 Km 80 Km 48 Km 30 Km<br />

2000Rm 2000Rm 2000Rm 2000Rm 1800 m 1000 m<br />

80 Km 80 Km 80 Km 80 Km 175 Km 40 Km<br />

4000.00 500.00<br />

136 Km 30 Km<br />

600 Nos 90 Nos<br />

136 Km 30 Km<br />

7500 m<br />

136 Km<br />

600 m<br />

500.00 500.00 595.00 595.00<br />

170Km 170Km<br />

12437.00 12437.00 10998.00 10998.00 53197.00 12098.00


- 790 -<br />

STATE : MIZORAM<br />

Head of Account : 5054 Road & Bridges (Plan) Name of Department : Public Works Department<br />

(a) PHYSICAL (Rs. in lakh)<br />

Population<br />

Target Achi. Target Achi. Target Achi. Target Achi. Target Achi.<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16<br />

1500 & above 167 157 10 3 1 3 1 4 3 2<br />

1000 - 1500 89 68 21 11 2 4 3 5 6 1 5 5<br />

500 - 999 194 90 104 7 3 7 1 6 7 15 2 26 47 18<br />

250 - 499 195 80 115 8 2 7 5 3 4 3 6 7 86 5<br />

Below 250 150 38 112 2 2 4 98 6<br />

Total 795 433 362 29 8 21 10 20 20 21 15 37 0 236 29<br />

(b) FINANCIAL<br />

State/U.T<br />

Outlay Exp. Outlay Exp. Outlay Exp. Outlay Exp. Outlay<br />

Ant.<br />

Exp.<br />

Eleventh<br />

Plan<br />

Propose<br />

d Outlay<br />

2007 -<br />

08<br />

Propose<br />

d Outlay<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

MIZORAM 33298.84 2797.86 2624.15 4937.9 2118.54 4887.63 3866.28 9278.88 4452.17 12199.57 20657.79 42987.4 23431.9<br />

II. Road Maintenance<br />

Year<br />

Total No.<br />

of Habi.<br />

(2001<br />

census)<br />

Tenth<br />

Plan<br />

Outlay<br />

Requirement<br />

Total No.<br />

of Habi.<br />

connected<br />

upto<br />

31.3.2002<br />

Anti.<br />

Exp.<br />

Tenth<br />

Plan<br />

Target<br />

Actual<br />

Exp.<br />

2006-2007 93.04 92.00<br />

2005-2006 71.32 71.32<br />

2004-2005 10.86 9.60<br />

2003-2004 0.00 0.00<br />

2002 - 03 2003 - 04 2004 - 05 2005 - 06<br />

2002 - 03 2003 - 04 2004 - 05 2005 - 06 2006 - 07<br />

2006 - 07<br />

Eleventh<br />

Plan<br />

Target<br />

2007 -<br />

08<br />

Target


2002-2003 0.00 0.00<br />

- 791 -


- 793 -<br />

Continuing/new schemes - Transport Sector (State)<br />

Apendix - B (Contd)<br />

Sl.<br />

No.<br />

Name of the Project/Scheme<br />

Type of<br />

Scheme<br />

Cost<br />

Original/<br />

Revised (Rs.<br />

lakhs)<br />

Commissioning<br />

date Expendi. till Tenth Plan<br />

Original/ Mar-05 Outlay<br />

Revised<br />

2002 - 03<br />

Outlay Exp.<br />

2003 - 04<br />

Outlay Exp.<br />

(Figures in Rs. lakh)<br />

2004 - 05<br />

Outlay Exp.<br />

1 2 3.00 4 5 6 7 8 9 10 11 12<br />

A. Continuing Schemes<br />

i) State Sector<br />

(i) NABARD<br />

1 Constn of Hnahthial-Tarpho road SP 1014.79<br />

2 Constn of Tumtukawn-Trapho rd SP 831.34<br />

TOTAL SP 1846.13<br />

ii) Centrally Sponsored<br />

1<br />

Impvt. of roads within Chakma Autonomous District<br />

Council -<br />

CRF 313.00 30.9.08 158.00<br />

TOTAL CRF 313.00 158.00<br />

2<br />

Construction of Lungtian - Mamte via Vartek Kai road in<br />

<strong>Mizoram</strong><br />

NLCPR 2664.53 31.3.08 600.00 1944.00 300.00 300.00 300.00 300.00<br />

3<br />

Construction of Chawngte - Borapansuri upto Momtala<br />

road in <strong>Mizoram</strong><br />

NLCPR 1045.48 31.3.08 200.00 975.00 200.00 200.00 400.00 400.00<br />

4 Construction of 3 Bailey Bridges in <strong>Mizoram</strong><br />

a. Over R.Tuikum - span 50m<br />

b. Over R.Lunghmullui span-40m<br />

c. Over R.Tuisa span-50m<br />

NLCPR 649.42 31.3.08 0.00 204.570<br />

TOTAL NLCPR 4359.43 800.000 3123.570 500.000 500.000 700.000 700.000<br />

5 Constn of Tlabung-Kawrpuichhuah Road NEC 1416.00 31.3.08 200.00 695.00 200.00 200.00<br />

6 Constn of Saitual-Saichal-NE Bualpui Road NEC 3343.60 31.3.09 650.00 1100.00 400.00 400.00 250.00 250.00<br />

7 Upgradation of Bairabi-Zamuang Road NEC 3391.20 31.3.08 1100.00 1550.00 400.00 400.00 700.00 700.00<br />

8 Upgradation of Keitum-Artahkawn Road NEC 2908.40 31.3.08 1000.00 1450.00 500.00 500.00 500.00 500.00<br />

9 Upgradation of Mamit-Bairabi Road NEC 3341.00 31.3.08 500.00 950.00 500.00 500.00<br />

10 Upgradation of Saitual-Phullen Road NEC 5217.20 31.3.08 500.00 1450.00 500.00 500.00<br />

11 Upgradation of Silchar-Dwarbon-Phaisen-Buhchang Road NEC 880.07 31.3.08 0.00 580.00<br />

12 Chalfilh-Vanzau Road NEC 402.29 31.3.08 200.00 380.00 200.00 200.00<br />

13 Construction of Vaikhawtlang to Khuangphah Road NEC 485.82 31.3.08 198.00<br />

14<br />

Construction of missing link between NH-150 and<br />

approach road to chalfilh (Vanzau)<br />

NEC 345.33 31.3.08 100.00


Sl.<br />

No.<br />

A. Continuing Schemes<br />

Name of the Project/Scheme<br />

i) State Sector<br />

(i) NABARD<br />

1 Constn of Hnahthial-Tarpho road<br />

2 Constn of Tumtukawn-Trapho rd<br />

TOTAL<br />

ii) Centrally Sponsored<br />

Impvt. of roads within Chakma Autonomous District<br />

1<br />

Council -<br />

TOTAL<br />

Construction of Lungtian - Mamte via Vartek Kai road in<br />

2<br />

<strong>Mizoram</strong><br />

Construction of Chawngte - Borapansuri upto Momtala<br />

3<br />

road in <strong>Mizoram</strong><br />

4 Construction of 3 Bailey Bridges in <strong>Mizoram</strong><br />

a. Over R.Tuikum - span 50m<br />

b. Over R.Lunghmullui span-40m<br />

c. Over R.Tuisa span-50m<br />

TOTAL<br />

5 Constn of Tlabung-Kawrpuichhuah Road<br />

6 Constn of Saitual-Saichal-NE Bualpui Road<br />

7 Upgradation of Bairabi-Zamuang Road<br />

8 Upgradation of Keitum-Artahkawn Road<br />

9 Upgradation of Mamit-Bairabi Road<br />

10 Upgradation of Saitual-Phullen Road<br />

11 Upgradation of Silchar-Dwarbon-Phaisen-Buhchang Road<br />

12 Chalfilh-Vanzau Road<br />

13 Construction of Vaikhawtlang to Khuangphah Road<br />

14<br />

Construction of missing link between NH-150 and<br />

approach road to chalfilh (Vanzau)<br />

1<br />

- 794 -<br />

Apendix - B (Contd)<br />

(Figures in Rs. lakh)<br />

2005 - 06 2006 - 07 Eleventh Plan 2007-08<br />

Proposed Proposed<br />

Outlay Exp. Outlay RE Outlay Outlay<br />

13 14 15 16 17 18<br />

380.00 380.00 339.00 339.00 295.79 295.79<br />

359.00 359.00 300.00 300.00 172.34 172.34<br />

739.00 739.00 639.00 639.00 468.13 468.13<br />

58.00 58.00 100.00 100.00 155.00 155.00<br />

58.00 58.00 100.00 100.00 155.00 155.00<br />

600.00 600.00 744.00 744.00 470.53 470.53<br />

200.00 200.00 175.00 175.00 70.48 70.48<br />

204.570 204.570 444.85<br />

444.85<br />

800.000 800.000 1123.570 1123.570 985.857 985.857<br />

495.00 495.00 721.00 721.00<br />

450.00 450.00 2243.60 1100.00<br />

450.00 450.00 1841.20 1841.20<br />

450.00 450.00 1458.40 1841.20<br />

450.00 450.00 2391.00 1841.20<br />

450.00 450.00 500.00 500.00 3767.20 1841.20<br />

580.00 580.00 300.07 1841.20<br />

180.00 180.00 22.29 1841.20<br />

198.00 198.00 287.82 1841.20<br />

100.00 100.00 245.33 1841.20


- 795 -<br />

Sl.<br />

No.<br />

Name of the Project/Scheme<br />

Type of<br />

Scheme<br />

Cost<br />

Original/<br />

Revised (Rs.<br />

lakhs)<br />

Commissioning<br />

date Expendi. till Tenth Plan<br />

Original/ Mar-05 Outlay<br />

Revised<br />

2002 - 03<br />

Outlay Exp.<br />

2003 - 04<br />

Outlay Exp.<br />

2004 - 05<br />

Outlay Exp.<br />

1 2 3.00 4 5 6 7 8 9 10 11 12<br />

15 Improvement of Kolodyne river for navigation NEC 389.05 30.6.07 150.00 285.00 150.00 150.00<br />

TOTAL 22119.96 4300.00 8738.00 1650.00 1650.00 2650.00 2650.00<br />

Total : Centrally Sponsored Scheme (A) 26792.39 0.000 5900.000 15301.14 0.00 2650.00 2650.00 4050.00 4050.00<br />

iii) Externally Aided<br />

World Bank Aided <strong>Mizoram</strong> State Roads Project (MSRP) WB 38329.00 31.12.08 3725.520 34455.36 1500.00 1582.36 5800.00 6667.00 8000.00 8000.00<br />

iv) Private Sector<br />

B. New Schemes<br />

i) State Sector<br />

(a) State Highways<br />

1 Rengtekawn-NH-154. (6Kms). SP 85.00<br />

2 Champhai to Tiau Road (18.50Kms) SP 262.00<br />

(b) Major District Roads<br />

1 Lungsen - Chawngte ( 53.25 Kms ) SP 160.00<br />

2 Lawngtlai-Nalkawn-Chamdur Road (45 Km) SP 120.00<br />

3 Ngopa - Mimbung Road (52.73 Kms). SP 130.00<br />

4 Kawnpui-Hortoki (21Kms) SP 80.00<br />

5 Zemabawk-Selesih Road (14.00 Kms). SP 20.00<br />

6 Phairuang-Bunghmun road (69.00Kms) SP 180.00<br />

7 Kawlkulh - Ngopa (63Km) SP 160.00<br />

8 Rawpuichhip - Buarpui SP 120.00<br />

9 Aizawl - Reiek - W.Lungdar SP 120.00<br />

10 Serkhan - Bhaga SP 200.00<br />

11 Thenzawl - Bunghmun road. SP 100.00<br />

(c) Other District Roads<br />

1 Keitum-N.Vanlaiphai (48 Kms) SP 20.00<br />

2 Phullen - Suangpuilawn (28.00Kms) SP 40.00<br />

3 Kawzawl-E.Lungdar-Biate.(60.00Kms) SP 150.00<br />

4 Bilkhawthlir- Chemphai - Saiphai.(20.00Km) SP 60.00<br />

5 S.Hlimen -Samtlang -Lungleng (10.00 Km) SP 20.00<br />

6 App.rd.to Kolodyne from R.Ngengpui (9.00Km) SP 15.00<br />

7 App.rd.to Kolodyne from R.Ngengpui (9.00Km) SP 20.00<br />

8 Thenzawl - Thenhlum SP 20.00<br />

9 Khawzawl - Sinzawl -Thanlawn (117.00 Km) SP 61.00<br />

(d) Viilage Roads<br />

1 Vairengte-Saiphai via Phainuam (16.00Kms) SP 60.00


Sl.<br />

No.<br />

Name of the Project/Scheme<br />

1<br />

15 Improvement of Kolodyne river for navigation<br />

TOTAL<br />

Total : Centrally Sponsored Scheme (A)<br />

iii) Externally Aided<br />

World Bank Aided <strong>Mizoram</strong> State Roads Project (MSRP)<br />

iv) Private Sector<br />

B. New Schemes<br />

i) State Sector<br />

(a) State Highways<br />

1 Rengtekawn-NH-154. (6Kms).<br />

2 Champhai to Tiau Road (18.50Kms)<br />

(b) Major District Roads<br />

1 Lungsen - Chawngte ( 53.25 Kms )<br />

2 Lawngtlai-Nalkawn-Chamdur Road (45 Km)<br />

3 Ngopa - Mimbung Road (52.73 Kms).<br />

4 Kawnpui-Hortoki (21Kms)<br />

5 Zemabawk-Selesih Road (14.00 Kms).<br />

6 Phairuang-Bunghmun road (69.00Kms)<br />

7 Kawlkulh - Ngopa (63Km)<br />

8 Rawpuichhip - Buarpui<br />

9 Aizawl - Reiek - W.Lungdar<br />

10 Serkhan - Bhaga<br />

11 Thenzawl - Bunghmun road.<br />

(c) Other District Roads<br />

1 Keitum-N.Vanlaiphai (48 Kms)<br />

2 Phullen - Suangpuilawn (28.00Kms)<br />

3 Kawzawl-E.Lungdar-Biate.(60.00Kms)<br />

4 Bilkhawthlir- Chemphai - Saiphai.(20.00Km)<br />

5 S.Hlimen -Samtlang -Lungleng (10.00 Km)<br />

6 App.rd.to Kolodyne from R.Ngengpui (9.00Km)<br />

7 App.rd.to Kolodyne from R.Ngengpui (9.00Km)<br />

8 Thenzawl - Thenhlum<br />

9 Khawzawl - Sinzawl -Thanlawn (117.00 Km)<br />

(d) Viilage Roads<br />

1 Vairengte-Saiphai via Phainuam (16.00Kms)<br />

- 796 -<br />

2005 - 06 2006 - 07 Eleventh Plan 2007-08<br />

Proposed Proposed<br />

Outlay Exp. Outlay RE Outlay Outlay<br />

13 14 15 16 17 18<br />

135.00 135.00 104.05 1841.20<br />

3010.00 3010.00 1428.00 1428.00 13381.96 18391.80<br />

4726.00 4726.00 3875.14 3875.14 15663.674 20673.514<br />

9706.00 9706.00 8500.00 8500.00 10200.00 10200.00<br />

85.00 0.00<br />

262.00 40.00<br />

160.00 0.00<br />

120.00 40.00<br />

130.00 0.00<br />

80.00 30.00<br />

20.00 0.00<br />

180.00 40.00<br />

160.00 0.00<br />

120.00 30.00<br />

120.00 30.00<br />

200.00 30.00<br />

100.00 0.00<br />

20.00 0.00<br />

40.00 0.00<br />

150.00 40.00<br />

60.00 0.00<br />

20.00 0.00<br />

15.00 0.00<br />

20.00 20.00<br />

20.00 0.00<br />

61.00 20.00<br />

60.00 20.00


- 797 -<br />

Sl.<br />

No.<br />

Name of the Project/Scheme<br />

Type of<br />

Scheme<br />

Cost<br />

Original/<br />

Revised (Rs.<br />

lakhs)<br />

Commissioning<br />

date Expendi. till Tenth Plan<br />

Original/ Mar-05 Outlay<br />

Revised<br />

2002 - 03<br />

Outlay Exp.<br />

2003 - 04<br />

Outlay Exp.<br />

2004 - 05<br />

Outlay Exp.<br />

1 2 3.00 4 5 6 7 8 9 10 11 12<br />

2 E.Lungdar-Chekkawn (8.00Kms) SP 30.00<br />

3 Zobawk-Haulawng (31.70 Kms) SP 160.00<br />

4 Tamdil Approach Road SP 30.00<br />

5 Lunglei-Nghasih SP 67.00<br />

6 Champhai-Sazaiphai-Farkawn (20.00 Kms) SP 100.00<br />

7 App.rd.to Maumual (4.00Kms) SP 40.00<br />

8 Lawngtlai - Saisihchhuah - Sangau (45.00Km) SP 40.00<br />

9 Tuisumpui-Lungpher SP 45.00<br />

10 Lawngtlai - Saiha Feeder (28.00Kms) SP 100.00<br />

11 Chemphai-Phainuam-via Burchchep. SP 23.00<br />

12 Baktawng-Hmawngkawn-Chawilung (13Km) SP 50.00<br />

13 Lailak - Buhban (5Km) SP 20.00<br />

14 Builum - N. Hlimen (14 Km) SP 50.00<br />

15 Sertlangpui - Serte (4 Km) SP 40.00<br />

16 R.Mat - Lungmawi (12 Km) SP 96.00<br />

17 Tuipuibari - W .Kawnpui SP 84.00<br />

18 Kawlchaw - Tawngkawlawng road<br />

(f) Satellite Roads & Viilages<br />

SP 100.00<br />

1 Improvement of Saitual internal road SP 30.00<br />

2 Improvement of Hnahthial internal road SP 25.00<br />

3 Improvement of Sakawrdai internal road SP 24.00<br />

4 Improvement of Khawzawl internal road SP 30.00<br />

5 Improvement of Tuidam internal road SP 24.00<br />

6 Improvement of Kanhmun internal road SP 24.00<br />

7 Improvement of W. Phaileng internal road SP 24.00<br />

8 Improvement of Kawrthah internal road SP 30.00<br />

9 Improvement of Thenzawl internal road SP 24.00<br />

10 Improvement of Ngopa internal road SP 24.00<br />

11 Improvement of Sialsuk internal road SP 24.00<br />

12 Improvement of Bualpui ( Ng) internal road SP 24.00<br />

13 Improvement of Kwnpui internal road SP 29.00<br />

14 Improvement of Vairengte internal road SP 24.00<br />

15 Improvement of Bilkhawthlir internal road SP 24.00<br />

16 Improvement of Tlabung internal road SP 30.00<br />

17 Improvement of Darlawn internal road SP 24.00<br />

18 Improvement & SMBT of Pangzawl internal road SP 20.00


Sl.<br />

No.<br />

Name of the Project/Scheme<br />

1<br />

2 E.Lungdar-Chekkawn (8.00Kms)<br />

3 Zobawk-Haulawng (31.70 Kms)<br />

4 Tamdil Approach Road<br />

5 Lunglei-Nghasih<br />

6 Champhai-Sazaiphai-Farkawn (20.00 Kms)<br />

7 App.rd.to Maumual (4.00Kms)<br />

8 Lawngtlai - Saisihchhuah - Sangau (45.00Km)<br />

9 Tuisumpui-Lungpher<br />

10 Lawngtlai - Saiha Feeder (28.00Kms)<br />

11 Chemphai-Phainuam-via Burchchep.<br />

12 Baktawng-Hmawngkawn-Chawilung (13Km)<br />

13 Lailak - Buhban (5Km)<br />

14 Builum - N. Hlimen (14 Km)<br />

15 Sertlangpui - Serte (4 Km)<br />

16 R.Mat - Lungmawi (12 Km)<br />

17 Tuipuibari - W .Kawnpui<br />

18 Kawlchaw - Tawngkawlawng road<br />

(f) Satellite Roads & Viilages<br />

1 Improvement of Saitual internal road<br />

2 Improvement of Hnahthial internal road<br />

3 Improvement of Sakawrdai internal road<br />

4 Improvement of Khawzawl internal road<br />

5 Improvement of Tuidam internal road<br />

6 Improvement of Kanhmun internal road<br />

7 Improvement of W. Phaileng internal road<br />

8 Improvement of Kawrthah internal road<br />

9 Improvement of Thenzawl internal road<br />

10 Improvement of Ngopa internal road<br />

11 Improvement of Sialsuk internal road<br />

12 Improvement of Bualpui ( Ng) internal road<br />

13 Improvement of Kwnpui internal road<br />

14 Improvement of Vairengte internal road<br />

15 Improvement of Bilkhawthlir internal road<br />

16 Improvement of Tlabung internal road<br />

17 Improvement of Darlawn internal road<br />

18 Improvement & SMBT of Pangzawl internal road<br />

- 798 -<br />

2005 - 06 2006 - 07 Eleventh Plan 2007-08<br />

Proposed Proposed<br />

Outlay Exp. Outlay RE Outlay Outlay<br />

13 14 15 16 17 18<br />

30.00 0.00<br />

160.00 45.00<br />

30.00 0.00<br />

67.00 20.00<br />

100.00 0.00<br />

40.00 0.00<br />

40.00 0.00<br />

45.00 0.00<br />

100.00 15.00<br />

23.00 0.00<br />

50.00 0.00<br />

20.00 0.00<br />

50.00 0.00<br />

40.00 0.00<br />

96.00 48.00<br />

84.00 12.00<br />

100.00 40.00<br />

30.00 7.00<br />

25.00 6.00<br />

24.00 4.00<br />

30.00 7.00<br />

24.00 4.00<br />

24.00 4.00<br />

24.00 4.00<br />

30.00 7.00<br />

24.00 4.00<br />

24.00 4.00<br />

24.00 4.00<br />

24.00 4.00<br />

29.00 4.00<br />

24.00 4.00<br />

24.00 4.00<br />

30.00 7.00<br />

24.00 4.00<br />

20.00 4.00


- 799 -<br />

Sl.<br />

No.<br />

Name of the Project/Scheme<br />

Type of<br />

Scheme<br />

Cost<br />

Original/<br />

Revised (Rs.<br />

lakhs)<br />

Commissioning<br />

date Expendi. till Tenth Plan<br />

Original/ Mar-05 Outlay<br />

Revised<br />

2002 - 03<br />

Outlay Exp.<br />

2003 - 04<br />

Outlay Exp.<br />

2004 - 05<br />

Outlay Exp.<br />

1 2 3.00 4 5 6 7 8 9 10 11 12<br />

19 Improvement & SMBT of S.Vanlaiphai internal road<br />

(g) Roads within Towns<br />

SP 20.00<br />

1 Construction of Ring Road at Lunglei. SP 100.00<br />

2 Improvement of Lunglei town roads SP 150.00<br />

3 Improvement of Saiha town roads SP 98.00<br />

4 Improvement of Champhai town roads SP 98.00<br />

5 Improvement of Serchhip town roads SP 98.00<br />

6 Improvement of Mamit town roads SP 98.00<br />

7 Improvement of Kolasib town roads SP 98.00<br />

8 Improvement of Lawngtlai town roads SP 98.00<br />

9 Improvement of Aizawl city roads<br />

a. Roads wirhin Aizawl Road North Division SP 150.00<br />

b. Roads wirhin Aizawl Road South Division SP 150.00<br />

(h) Bridges SP 1138.00<br />

1<br />

Construction of Bridge over R. Mat on Pangzawl -<br />

Chhipphir road<br />

(i) NABARD<br />

SP 200.00<br />

1 Pavement of Hnahthial - Tarpho road SP 200.00<br />

2 Pavement of Tumtukawn - Tarpho road SP 200.00<br />

3 Construction of Melriat - Khumtung road SP 300.00<br />

4 Construction of Bunghmun - Marpara road SP 191.87<br />

Total SP 7123.87<br />

ii) Centrally Sponsored<br />

1 Upgradation of KDZKT road (Kawrthah-Lowerpoo) 40km E&I 1975.00 31.3.10<br />

2 Upgradation of Bilkhawthlir - Saiphai-Natasura road E&I 1950.00 31.3.10<br />

3 Upgradation of Tuipuibari-W.Kawnpui road (18 km) E&I 934.00 31.3.09<br />

4 Improvement of Melthum - Samtlang Road E&I 167.66 31.3.11<br />

5<br />

Construction of BUG bridges over R.Cheppui, R.Chepte<br />

and R.Sesih on Bilkhawthlir - Saiphai Road<br />

E&I 252.64 31.3.12<br />

6<br />

Resurfacing of Champhai - N.Vanlaiphai road from<br />

Artahkawn to N.Vanlaiphai<br />

E&I 111.07 31.3.12<br />

TOTAL E&I 5390.37<br />

7 Improvement of Ramrikawn-P.T.C. CRF 225.64 31.3.09<br />

8 Construction of Bridge on Bilkhawthlir - Saiphai road CRF 252.64 31.3.09


Sl.<br />

No.<br />

Name of the Project/Scheme<br />

1<br />

19 Improvement & SMBT of S.Vanlaiphai internal road<br />

(g) Roads within Towns<br />

1 Construction of Ring Road at Lunglei.<br />

2 Improvement of Lunglei town roads<br />

3 Improvement of Saiha town roads<br />

4 Improvement of Champhai town roads<br />

5 Improvement of Serchhip town roads<br />

6 Improvement of Mamit town roads<br />

7 Improvement of Kolasib town roads<br />

8 Improvement of Lawngtlai town roads<br />

9 Improvement of Aizawl city roads<br />

a. Roads wirhin Aizawl Road North Division<br />

b. Roads wirhin Aizawl Road South Division<br />

(h) Bridges<br />

Construction of Bridge over R. Mat on Pangzawl -<br />

1<br />

Chhipphir road<br />

(i) NABARD<br />

1 Pavement of Hnahthial - Tarpho road<br />

2 Pavement of Tumtukawn - Tarpho road<br />

3 Construction of Melriat - Khumtung road<br />

4 Construction of Bunghmun - Marpara road<br />

Total<br />

ii) Centrally Sponsored<br />

1 Upgradation of KDZKT road (Kawrthah-Lowerpoo) 40km<br />

2 Upgradation of Bilkhawthlir - Saiphai-Natasura road<br />

3 Upgradation of Tuipuibari-W.Kawnpui road (18 km)<br />

4 Improvement of Melthum - Samtlang Road<br />

Construction of BUG bridges over R.Cheppui, R.Chepte<br />

5<br />

and R.Sesih on Bilkhawthlir - Saiphai Road<br />

Resurfacing of Champhai - N.Vanlaiphai road from<br />

6<br />

Artahkawn to N.Vanlaiphai<br />

TOTAL<br />

7 Improvement of Ramrikawn-P.T.C.<br />

8 Construction of Bridge on Bilkhawthlir - Saiphai road<br />

- 800 -<br />

2005 - 06 2006 - 07 Eleventh Plan 2007-08<br />

Proposed Proposed<br />

Outlay Exp. Outlay RE Outlay Outlay<br />

13 14 15 16 17 18<br />

20.00 4.00<br />

100.00 20.00<br />

150.00 20.00<br />

98.00 20.00<br />

98.00 20.00<br />

98.00 20.00<br />

98.00 20.00<br />

98.00 20.00<br />

98.00 20.00<br />

150.00 30.00<br />

150.00 30.00<br />

200.00 2.00<br />

200.00 200.00<br />

200.00 194.87<br />

300.00 0.00<br />

191.87 0.00<br />

5985.87 1226.87<br />

1975.00 600.00<br />

1950.00 600.00<br />

934.00 400.00<br />

167.66<br />

252.64<br />

111.07<br />

5390.370 1600.000<br />

225.64 100.00<br />

252.64 125.00


Sl.<br />

No.<br />

Name of the Project/Scheme<br />

Type of<br />

Scheme<br />

Cost<br />

Original/<br />

Revised (Rs.<br />

lakhs)<br />

Commissioning<br />

date Expendi. till Tenth Plan<br />

Original/ Mar-05 Outlay<br />

Revised<br />

2002 - 03<br />

Outlay Exp.<br />

2003 - 04<br />

Outlay Exp.<br />

2004 - 05<br />

Outlay Exp.<br />

1 2 3.00 4 5 6 7 8 9 10 11 12<br />

9<br />

Improvement and resurfacing of Vaivakawn-Ropaiabawk<br />

road<br />

CRF 158.53 31.3.08<br />

10 Improvement of Kahrawt - Hmunhmeltha CRF 78.48 31.3.08<br />

11<br />

Improvement of narrow portions within Aizawl City<br />

including Sikulpuikawn-Legislature Home<br />

CRF 148.33 31.3.09<br />

12 Improvement of Melthum -Khawchhete Road CRF 167.66 31.3.09<br />

13 Improvement of KDZKT road (Kawrthah-Kawrtethawvwng) CRF 839.90 31.3.10<br />

14<br />

Resurfacing and construction of side drain from Vaivakawn-<br />

Companypeng<br />

CRF 18.12 31.3.11<br />

15 Resurfacing of Buarpui-Bunghmun CRF 275.26 31.3.11<br />

16 Improvement of and resurfacing of Saiha Town road CRF 516.74 31.3.12<br />

17<br />

Resurfacing of Champhai - N.Vanlaiphai road (Artahkawn-<br />

N.Vanlaiphai)<br />

CRF 111.07 31.3.12<br />

18 Improvement and resurfacing of Lunglei Town road CRF 190.42 31.3.12<br />

19 Improvement of drainage on Champhai - N.Vanlaiphai road CRF 20.00 31.3.12<br />

TOTAL CRF 3002.79<br />

20<br />

Construction of Link road to proposed Bamboo plantation<br />

areas from Tuirial to Bukpui Ph-I (0-40kmp)<br />

NLCPR 2383.00 31.3.10<br />

21<br />

Construction of Link road to proposed Bamboo plantation<br />

areas from Tuirial to Bukpui Ph-II (40-79 kmp)<br />

NLCPR 2151.00 31.3.10<br />

22<br />

Construction of Link road to Bamboo plantation areas from<br />

Saiphal to Hortoki (0-27.50 kmp)<br />

NLCPR 1512.00 31.3.10<br />

23 Construction of Melriat - Khumtung road NLCPR 3917.78 31.3.11<br />

24 Construction of Lungpho - Khawhai road NLCPR 3055.56 31.3.12<br />

25 Construction of Thingsai - Muallianpui road NLCPR 3000.00 31.3.11<br />

26<br />

Construction of E.Phaileng - N.Chaltlang via Hmuizawl -<br />

Chhanchhuahna Road<br />

NLCPR 8600.00 31.3.11<br />

27 Upgradation of Kawnpui - Hortoki Road NLCPR 2200.00 31.3.12<br />

28 Bridge over R.Tuichang on Keitum – N.Vanlaiphai Road NLCPR 599.70 31.3.10<br />

29 Bridge over R.Tuipuibari on Tuipuibari – W.Kawnpui Road NLCPR 451.29 31.3.10<br />

30<br />

Construction of Missing bridge over R.Tuisumpui on<br />

Lawngtlai - Saiha Feeder road<br />

NLCPR 377.78 31.3.09<br />

- 801 -


Sl.<br />

No.<br />

Name of the Project/Scheme<br />

9<br />

1<br />

Improvement and resurfacing of Vaivakawn-Ropaiabawk<br />

road<br />

10 Improvement of Kahrawt - Hmunhmeltha<br />

11<br />

Improvement of narrow portions within Aizawl City<br />

including Sikulpuikawn-Legislature Home<br />

12 Improvement of Melthum -Khawchhete Road<br />

13 Improvement of KDZKT road (Kawrthah-Kawrtethawvwng)<br />

14<br />

Resurfacing and construction of side drain from Vaivakawn-<br />

Companypeng<br />

15 Resurfacing of Buarpui-Bunghmun<br />

16 Improvement of and resurfacing of Saiha Town road<br />

17<br />

Resurfacing of Champhai - N.Vanlaiphai road (Artahkawn-<br />

N.Vanlaiphai)<br />

18 Improvement and resurfacing of Lunglei Town road<br />

19 Improvement of drainage on Champhai - N.Vanlaiphai road<br />

TOTAL<br />

20<br />

Construction of Link road to proposed Bamboo plantation<br />

areas from Tuirial to Bukpui Ph-I (0-40kmp)<br />

21<br />

Construction of Link road to proposed Bamboo plantation<br />

areas from Tuirial to Bukpui Ph-II (40-79 kmp)<br />

22<br />

Construction of Link road to Bamboo plantation areas from<br />

Saiphal to Hortoki (0-27.50 kmp)<br />

23 Construction of Melriat - Khumtung road<br />

24 Construction of Lungpho - Khawhai road<br />

25 Construction of Thingsai - Muallianpui road<br />

26<br />

Construction of E.Phaileng - N.Chaltlang via Hmuizawl -<br />

Chhanchhuahna Road<br />

27 Upgradation of Kawnpui - Hortoki Road<br />

28 Bridge over R.Tuichang on Keitum – N.Vanlaiphai Road<br />

29 Bridge over R.Tuipuibari on Tuipuibari – W.Kawnpui Road<br />

30<br />

Construction of Missing bridge over R.Tuisumpui on<br />

Lawngtlai - Saiha Feeder road<br />

- 802 -<br />

2005 - 06 2006 - 07 Eleventh Plan 2007-08<br />

Proposed Proposed<br />

Outlay Exp. Outlay RE Outlay Outlay<br />

13 14 15 16 17 18<br />

158.53 158.53<br />

78.48 78.48<br />

148.33<br />

167.66<br />

839.90<br />

18.12<br />

275.26<br />

516.74<br />

111.07<br />

190.42<br />

20.00<br />

3002.789 462.010<br />

2383.00 700.00<br />

2151.00 600.00<br />

1512.00 500.00<br />

3917.78 300.00<br />

3055.56<br />

3000.00<br />

8600.00<br />

2200.00<br />

599.70 150.00<br />

451.29 150.00<br />

377.78 150.00


- 803 -<br />

Sl.<br />

No.<br />

Name of the Project/Scheme<br />

Type of<br />

Scheme<br />

Cost<br />

Original/<br />

Revised (Rs.<br />

lakhs)<br />

Commissioning<br />

date Expendi. till Tenth Plan<br />

Original/ Mar-05 Outlay<br />

Revised<br />

2002 - 03<br />

Outlay Exp.<br />

2003 - 04<br />

Outlay Exp.<br />

2004 - 05<br />

Outlay Exp.<br />

1 2 3.00 4 5 6 7 8 9 10 11 12<br />

31<br />

Construction of Missing bridge over R.Tuiphal on Hnahthial<br />

- Thingsai Road<br />

NLCPR 331.11 31.3.09<br />

32<br />

Construction of Missing bridge over R.Teirei on Bairabi -<br />

Zamuang Road<br />

NLCPR 331.11 31.3.09<br />

33<br />

Construction of Missing bridge over R.Kawlchaw on<br />

Serkawr - Tuipang road<br />

NLCPR 331.11 31.3.09<br />

34<br />

Construction of Missing bridge over R.Tlawng on Aizawl -<br />

Reiek Road<br />

NLCPR 377.78 31.3.09<br />

TOTAL NLCPR 29619.22<br />

35 Upgradation of Serkhan – Bagha Bazar Road NEC 12540.00 31.3.11<br />

36 Upgradation of Ngopa – Tuivai Road NEC 3663.00 31.3.12<br />

37<br />

Upgradation of Kheda- cherra – Damcherra – Zamuang –<br />

Kawrtethaw- veng – Tuilutkawn Road<br />

NEC 11255.00 31.3.12<br />

38 Upgradation of Tuipuibari – W.Kawnpui Road NEC 2102.00 31.3.10<br />

39 Upgradation of Khawbung – N.Vanlaiphai Road NEC 6820.00 31.3.12<br />

40 Upgradation of Ngopa – Mimbung Road NEC 5659.50 31.3.12<br />

41 N.E Bualpui – Rabung - Hnahlan NEC 9685.00 31.3.14<br />

42 Construction of Bamboo Link Roads<br />

a. Kolasib District NEC 7000.00 31.3.12<br />

b. Mamit District NEC 7000.00 31.3.12<br />

c. Lunglei District NEC 7000.00 31.3.12<br />

d. Lawngtlai District NEC 3500.00 31.3.12<br />

43 Bridge over R.Tuiphal on Kawlkulh – Ngopa Road NEC 259.25 31.3.09<br />

44<br />

Bridge over R.Chhimluang on Silchar-Dwarband-Phaisen<br />

Road<br />

NEC 159.80 31.3.08<br />

TOTAL NEC 76643.55<br />

Total Centrally sponsored scheme (B) 114655.93<br />

iii) Externally Aided<br />

1 Noth Eastern State Roads Project (NESRP) ADB 25000.00 31.12.11<br />

iv) Private Sector<br />

Total (A) + (B)<br />

i) State Sector 8970.00<br />

ii) Centrally Sponsored 141448.32 5900.00 15301.14 2650.00 2650.00 4050.00 4050.00<br />

iii) Externally Aided 63329.00 3725.52 34455.36 1500.00 1582.36 5800.00 6667.00 8000.00 8000.00<br />

iv) Private Sector


Sl.<br />

No.<br />

Name of the Project/Scheme<br />

31<br />

1<br />

Construction of Missing bridge over R.Tuiphal on Hnahthial<br />

- Thingsai Road<br />

32<br />

Construction of Missing bridge over R.Teirei on Bairabi -<br />

Zamuang Road<br />

33<br />

Construction of Missing bridge over R.Kawlchaw on<br />

Serkawr - Tuipang road<br />

34<br />

Construction of Missing bridge over R.Tlawng on Aizawl -<br />

Reiek Road<br />

TOTAL<br />

35 Upgradation of Serkhan – Bagha Bazar Road<br />

36 Upgradation of Ngopa – Tuivai Road<br />

37<br />

Upgradation of Kheda- cherra – Damcherra – Zamuang –<br />

Kawrtethaw- veng – Tuilutkawn Road<br />

38 Upgradation of Tuipuibari – W.Kawnpui Road<br />

39 Upgradation of Khawbung – N.Vanlaiphai Road<br />

40 Upgradation of Ngopa – Mimbung Road<br />

41 N.E Bualpui – Rabung - Hnahlan<br />

42 Construction of Bamboo Link Roads<br />

a. Kolasib District<br />

b. Mamit District<br />

c. Lunglei District<br />

d. Lawngtlai District<br />

43 Bridge over R.Tuiphal on Kawlkulh – Ngopa Road<br />

44<br />

Bridge over R.Chhimluang on Silchar-Dwarband-Phaisen<br />

Road<br />

TOTAL<br />

Total Centrally sponsored scheme (B)<br />

iii) Externally Aided<br />

1 Noth Eastern State Roads Project (NESRP)<br />

iv) Private Sector<br />

Total (A) + (B)<br />

i) State Sector<br />

ii) Centrally Sponsored<br />

iii) Externally Aided<br />

iv) Private Sector<br />

- 804 -<br />

2005 - 06 2006 - 07 Eleventh Plan 2007-08<br />

Proposed Proposed<br />

Outlay Exp. Outlay RE Outlay Outlay<br />

13 14 15 16 17 18<br />

331.11 150.00<br />

331.11 150.00<br />

331.11 150.00<br />

377.78 150.00<br />

29619.220 3150.000<br />

12540.00 3000.00<br />

3663.00<br />

11255.00 400.00<br />

2102.00 700.00<br />

6820.00<br />

5659.50<br />

9685.00<br />

7000.00 1400.00<br />

7000.00 1400.00<br />

7000.00 1400.00<br />

3500.00 700.00<br />

259.25 120.00<br />

159.80 159.80<br />

76643.550 9279.800<br />

114655.93 14491.81<br />

25000.00 6000.00<br />

739.00 739.00 639.00 639.00 6454.00 1695.00<br />

4726.00 4726.00 3875.14 3875.14 130319.60 35165.32<br />

9706.00 9706.00 8500.00 8500.00 35200.00 16200.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!