22.07.2013 Views

detailed plan - Mizoram

detailed plan - Mizoram

detailed plan - Mizoram

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTRODUCTION<br />

- 1 -<br />

AGRICULTURE DEPARTMENT<br />

CROP HUSBANDRY<br />

The Annual Plan 2004 - 2005 is prepared by keeping the policy of increased food<br />

production in view but within the limitation of fund constraints.<br />

Under Crop Husbandry priorities are land development, construction of Link Roads<br />

and replacement of local variety of seed of different crops such as paddy, pulses, oilseeds<br />

etc., with High Yielding Varieties. Farm Mechanisation is given due weightage as the<br />

farmers have taken the scheme favourably. The other schemes are in line with the major<br />

schemes, supporting each other.<br />

Some important such as Commercial Crops Development, Oilseeds Development and<br />

Development of Pulses are also figured again after omitting for some years due to certain reasons.<br />

To attain self sufficiency in foodgrains, pulses, oilseeds, fruits, spices and help the<br />

farmers to adopt settled cultivation, the Govt. of <strong>Mizoram</strong> launched a special Scheme<br />

known as <strong>Mizoram</strong> Intodelhna Project (MIP) during 2002-2003. The programme will be<br />

continued during 2004 - 2005 with an outlay of Rs. 2,000.00 lakh. In addition to 24,306<br />

families assisted during 2003-2004, 35,000 families will be assisted during 2004 - 2005.<br />

The Annual Plan 2004 - 2005 Outlay is Rs. 2,900.00 lakhs for Crop Husbandry while<br />

the approved Outlay for the 10 th Plan is Rs. 3,266.00 lakhs.<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION &MINISTRATION<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 249.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 260.50 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 1<br />

During 2003 - 2004 two new Agricultural Districts that is Champhai and Mamit<br />

were created along with one Agricultural Sub-Division at Khawzawl. In order to create<br />

infrastructure in the newly created districts and sub-divisions, it is approved to construct<br />

office buildings at Mamit and Khawzawl and construction of AEO Quarter will be taken up<br />

at Kawnpui. In addition to the existing Agricultural District it is approved to create two<br />

new districts at Lawngtlai and Serchhip. The newly created Districts will be maintained<br />

from the existing stall without incurring additional financial expenses.<br />

A. DIRECTION<br />

Sl.<br />

No<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. In lakh.)<br />

Financial<br />

Outlay<br />

1. Salary of Officer and Staff No. 11 10.50<br />

2. T.E No L.S 2.50<br />

3. Maintenance of existing buildings No. 20 10.00<br />

4. Maintenance of heavy vehicles No. 6 10.00<br />

5. Misc. contingencies No. L.S 11.00<br />

6. Repair and maintenance of light<br />

Vehicles and purchase of parts, POL etc.<br />

No. 17 15.00<br />

Sub-total 59.00


B. ADMINISTRATION<br />

Sl.<br />

No.<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

- 2 -<br />

AGRICULTURE DEPARTMENT<br />

Items Unit<br />

Salary of Officers & Staff at District and<br />

Sub-Division<br />

T.E<br />

Wages<br />

Misc. contingencies<br />

Repairing & maintenance of light vehicles.<br />

Maint of existing Staff qrts. in the Districts.<br />

Fencing Agril. Complex at different places<br />

Constn. of DAO Office building at Mamit<br />

Const. of SDAO quarter at Khawzawl.<br />

Construction of AEO quarter at Kawnpui<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

Physical<br />

Target<br />

59<br />

L.S<br />

38<br />

L.S<br />

17<br />

20<br />

L.S<br />

1<br />

1<br />

1<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

62.00<br />

20.00<br />

21.50<br />

15.00<br />

14.00<br />

15.00<br />

18.00<br />

17.50<br />

4.00<br />

3.00<br />

Sub-Total : 190.00<br />

Total : 249.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : FOODGRAIN DEVELOPMENT<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 53.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 166.50 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 2<br />

Land Development for WRC by hiring private Bulldozers is the major item of the<br />

work under this scheme while Land Development on hillside slopes by terracing is also<br />

given importance along with distribution of Certified Seeds to the cultivators for<br />

replacement of low yielding local varieties of seeds with high yielding good quality seeds.<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. In lakhs)<br />

Financial<br />

Outlay<br />

1 Salary of Officers and staff No. 112 15.50<br />

2. T.E No. L.S 1.50<br />

3. Land Development for WRC<br />

By machineries @ Rs. 50,804/ha.<br />

No. 29 15.00<br />

4. Repairing and maintenance of :<br />

a) Bulldozer<br />

No. 5 }<br />

5.00<br />

b) Tractor<br />

No. 20 }<br />

c) power Tiller<br />

No. 10 }<br />

5. Purchase &distribution of seeds including<br />

transportation charge 6.25% State Share<br />

for the following Programmes (CSS) :<br />

Qtl. LS<br />

1.00<br />

a) Oilseed Production Programme - As per GOI<br />

guidelines<br />

5.00<br />

b) National Pulses Development Project - As per GOI<br />

guidelines<br />

5.00


- 3 -<br />

AGRICULTURE DEPARTMENT<br />

c) Accelerated Maize Development Project - As per GOI<br />

guidelines<br />

5.00<br />

TOTAL 53.00<br />

SCHEME NO. 3<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : AGRIL. FARM & QUALITY SEED PRODUCTION<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 5.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 20.24 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

4(four) Departmental farms are maintained at Chemphai (Bilkhawthlir), Thingdawl,<br />

Rotlang (Lunglei) and Neihbawih (Sihphir) for production of certified seeds of cereal crops<br />

and <strong>plan</strong>ting materials while demonstration of cultivation of various crops are also taken<br />

up.<br />

(Rs. In lakhs)<br />

Sl.<br />

Physical Financial<br />

Items Unit<br />

No.<br />

Target Outlay<br />

1 Operational cost & maintenance of farms No. 4 5.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MANURES & FERTILIZER<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 14.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 19.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 4<br />

Government of <strong>Mizoram</strong> has lifted all subsidy on the sale of fertilizer including<br />

price subsidy and transport subsidy. However, privatisation on the sale of chemical<br />

fertilizer through private dealers was encouraged where the dealers were allowed to sell<br />

the fertilizers with a minimum margin of profit. Under the scheme thrust will be given<br />

towards the use of organic manures to encourage the farmers to take up organic farming.<br />

The Bio-fertilizer Production Unit which was established at Sihphir will be maintained<br />

along with the Static Soil Testing Laboratory in the Directorate of Agriculture.<br />

A. MANURES & FERTILIZES<br />

Sl<br />

No.<br />

Items Units<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

1 Maint. of Bio-fertilizer production unit No 1 1.00<br />

2. Purchase of Neem cake and other<br />

organic manures<br />

Qtls. 835 M.T 6.00<br />

3. Purchase of generator set for Biofertilizer<br />

Production Unit<br />

No. 1 4.00<br />

Sub-Total 11.00


B. SOIL TESTING LABORATORY<br />

- 4 -<br />

AGRICULTURE DEPARTMENT<br />

Sl<br />

No.<br />

Items Units<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1. Operational cost and maintenance of Static<br />

Laboratory at Aizawl<br />

No. 1 1.50<br />

2. Cost of collection of soil samples to be analysed No. 8,000 0.50<br />

3. Office expenditure and other contingencies No. LS 1.00<br />

Sub-Total 3.00<br />

Total 14.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : PLANT PROTECTION<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 3.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 7.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 5<br />

<strong>Mizoram</strong> receives high rainfall during Monsoon, humid climate results in outbreak<br />

of insect pests and diseases and excessive weeds problems. To meet the requirement of<br />

the farmers various insecticides and Plant Protection equipments may be purchased for<br />

distribution to the farmers on 50 % subsidy. Also, to encourage the farmers to take up<br />

Integrated Pest Management, a Bio-Control Laboratory set up at Neihbawi will be<br />

maintained which is at present mass producing trichogramma spp.<br />

(Rs. in lakh)<br />

Sl Items Units Physical<br />

Financial<br />

No.<br />

Target<br />

Outlay<br />

1 Cost of various insecticides<br />

including PP chemicals for sale at<br />

50% subsidy<br />

MT LS 2.00<br />

2 Maintenance of IPM Laboratory No 1 1.00<br />

Total 3.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : COMMERCIAL CROP DEVELOPMENT<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 2.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 14.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 6<br />

Under the scheme, quality <strong>plan</strong>ting materials and seeds of commercial crops will be<br />

made available to the farmers who are taking up cultivation of commercial crops in the<br />

hills as well as in the plains. The main objectives of the scheme is to replace the low<br />

yielding local varieties of commercial crops with high yielding varieties.


- 5 -<br />

AGRICULTURE DEPARTMENT<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Units<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1 Cost of sugarcane sets, cotton, potato etc. - 1,50,000 setts. 2.00<br />

Total 2.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : EXTENSION & FARMERS TRAINING<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 8.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 12.50 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 7<br />

This scheme is to impart knowledge and skill to the farmers through Agril.<br />

Extension for which printed media are the most important tools and therefore, thrust will<br />

be given for publications of Zoram Loneitu and other printed materials.<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

1.<br />

2.<br />

3.<br />

Items Units<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

Agril. Information<br />

a) Publication of Periodicals such as Zoram<br />

Loneity, Loneity Kantu, Agril. News letters etc.<br />

No. LS 2.00<br />

b) Misc. contingencies<br />

ITC, Hnahthial<br />

No LS 1.00<br />

a) Renovation & repair of ITC building<br />

No. LS 2.00<br />

b) Purchase of books, journals, etc. No LS 2.00<br />

c) Misc. including maintenance of vehicles, etc.<br />

Extension & training centre<br />

No. LS 0.50<br />

a) Conducting training, seminar, etc.<br />

No. LS 0.50<br />

TOTAL 8.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : AGRIL. MACHINERIES & IMPLEMENTS<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 9.50 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 9.50 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 8<br />

Subsidy of Rs. 1.00 lakh per tractor is offered to encourage the farmers to take up<br />

farm mechanisation. Small farm tools and implements are also made available for sale on<br />

50 % subsidy.


- 6 -<br />

AGRICULTURE DEPARTMENT<br />

(Rs. In lakh)<br />

Sl.<br />

No.<br />

Items Units<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1 Subsidy for Tractors @ Rs. 1.00 lakhs per tractor No 2 2.00<br />

2 Small tools and implements for sale @ 50%<br />

subsidy<br />

No LS 7.50<br />

Total 9.50<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : STATE SOIL SURVEY ORGANISATION<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 16.50 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 16.50 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 9<br />

Soils are our most precious natural resource. As such, a knowledge of soils in<br />

respect of their extent, distribution, characteristics and potential use is extremely<br />

important for optimising land use. Areas to be put under intensive use and management<br />

or other priority areas call for Detail or High Intensity Survey for accurate and sound<br />

<strong>plan</strong>ning, to prevent further deterioration and to avoid risk of failure. As such a Detailed<br />

Soil Survey of all the land potential for Agriculture, Horticulture etc. is essential.<br />

Sl<br />

No.<br />

Items Units<br />

Physical<br />

Target<br />

(Rs. In lakh)<br />

Financial<br />

Outlay<br />

1. Salary/TE of Officers and Staff (ASSO-3, UDC-2,<br />

LADC-3,DriverII-1, Tracer-1, OSA-I, IV Grade-2)<br />

No 13 14.00<br />

2. T.E No LS 0.50<br />

3. Misc. contingencies No LS 2.00<br />

Total 16.50<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : CONTROL OF SHIFTING CULTIVATION<br />

(EARMARKED)<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 350.00 lakhs<br />

2. EXPENDITURE 2003 - 2004 Rs. 490.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

SCHEME NO. 10<br />

During the 10 th Five Year Plan, 42 projects under WDPSCA that is Control of<br />

Shifting Cultivation have been identified with the total area of 20,000 ha. During 2004-<br />

2005 it is approved to treat 4,000 ha. of land under the projects with the following<br />

components with an objective of Control of Shifting Cultivation in the watersheds.


Sl<br />

No.<br />

I. (A) Project Management/Component<br />

- 7 -<br />

AGRICULTURE DEPARTMENT<br />

Items Units<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

a) Administrative cost No 10 15.00<br />

b) Maintenance of Vehicles and POL No 5 20.00<br />

c) Misc. contingencies LS LS 5.00<br />

d) Honorarium to projects staff No 35 8.00<br />

Sub-Total 48.00<br />

(B) Training<br />

a) Publication of Zoram Loneitu / Loneitu<br />

Kantu, Agril. News letters etc.<br />

LS LS 12.00<br />

b) Farmers Training and Exhibition No 5 10.00<br />

c) Purchase of Audio visual equipment and<br />

maintenance<br />

LS LS 4.00<br />

Sub-Total 26.00<br />

II. Development Component<br />

(A) Natural Resources Management<br />

i) Land Dev. including conservation measures:<br />

a) WRC land Ha. 49 25.00<br />

b) Terracing on hill slope Ha. 39 20.00<br />

Sub-Total 45.00<br />

(B) Production system/Demonstration Programme<br />

i) Maize Development Ha 1000 10.00<br />

ii) Oilseeds Development Programme Ha 5000 25.00<br />

iii) Pulses Development Programme Ha 700 10.24<br />

iv) Other Cereal Crops Ha 1000 9.76<br />

Sub-Total 55.00<br />

(C) Land use incentive<br />

i) Purchase of Organic Manures Tonnes 1000 25.00<br />

ii) Demonstration on commercial crops Ha 1200 24.00<br />

iii) Demonstration on vegetable Development Ha 500 10.00<br />

iv) Transportation charge of Agril. Inputs LS LS 5.00<br />

Sub-Total 64.00<br />

(D) Drainage Line Treatment RMT 1225 49.00<br />

(E)<br />

Agro-forestry & Regeneration of veg. cover LS LS 3.16<br />

Sub-Total 52.16<br />

III. Rehabilitation/Community Organisation<br />

i) Agril. Potential Area Connectivity Km 11 35.00<br />

ii) Household production system i.e. Piggery No/ 138 24.84<br />

Handlooms, Cultivation of grapes, kitchen<br />

Garden etc.<br />

family<br />

Sub-Total 59.84<br />

Total of Control of Shifting Cultivation 350.00


- 8 -<br />

AGRICULTURE DEPARTMENT<br />

SCHEME NO. 11<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MIZORAM INTODELHNA PROJECT (M.I.P)<br />

(EARMARKED)<br />

1. APPROVED OUTLAY FOR 2004 - 2005 Rs. 2,000.00 lakhs<br />

2. EXPENDITURE 2003 – 2004 Rs. 2,000.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY 2004 - 2005<br />

The main purpose of this project is upliftment of the rural poor especially the<br />

shifting cultivators. Its main concern is attainment of self-sufficiency, food security and<br />

better livelihood for the cultivators.<br />

This programme will minimise the undesirable consequences of Shifting<br />

Cultivations such as destruction of forests, removal of top soils, landslides and<br />

degradation of land. The farmers will be assisted to adopt a more profitable, sustainable,<br />

permanent system of farming through Agro-Horticulture, Soil Conservation and Animal<br />

Husbandry Sectors.<br />

Under this project, 35,000 Nos. of families are to be assisted during 2004 - 2005<br />

with an outlay of Rs. 2,000.00 lakhs.<br />

Sl.<br />

No.<br />

Items Units<br />

I. Land Development<br />

1 Irrigated Areas<br />

Land Development (5-8%) slopes @<br />

Rs.40,820/- per Ha.<br />

a) Development of Terracing (8-10%) slopes @<br />

Rs. 50,804/ per ha.<br />

2 Rainfed Areas<br />

a) Development of Terracing on hill slopes<br />

(10-15) @ Rs. 59,000/ per ha<br />

II. Production of Livestock & Income Generation<br />

a) Small Scale Pig rearing @ Rs. 8,120/per<br />

unit<br />

III. Promotion of Village Water Resource<br />

a) Construction of Rain Water Harvesting<br />

Dam @ Rs. 1.00 lakh per dam<br />

IV. Development of Quality Planting Materials<br />

a) Establishment of Community Nursery<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

Ha. 520.00 212.26<br />

Ha 610.00 309.90<br />

Ha<br />

Unit<br />

No.<br />

Ha.<br />

1,530.00<br />

1,000.00<br />

105.00<br />

23.98<br />

902.70<br />

81.20<br />

105.00<br />

88.00<br />

b) Distribution of Inputs like Quality seeds,<br />

fertilizers, <strong>plan</strong>t protection chemicals and<br />

soil amendment.<br />

L.S 2,600.00 300.94<br />

TOTAL 2,000.00


- 9 -<br />

AGRICULTURE DEPARTMENT<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : BAMBOO FLOWERING & FAMINE<br />

COMBAT SCHEME (EARMARKED)<br />

1. APPROVED OUTLAY FOR 2004-2005 Rs. 200.00 lakhs.<br />

2. ANTICIPATED EXPENDITURE DURING 2004-2005 Rs. 200.00 lakhs<br />

SCHEME NO. 12<br />

Famine visits <strong>Mizoram</strong> at regular intervals during the flowering of Melocanna<br />

baccifera and Bambusa tulda. The occurrence of the past famines is due to the outbreak of<br />

rats, which devour the fruits/seeds of the flowering bamboos and after finishing the<br />

fruits/seeds of the bamboos, they continue to attack the rice crops, thereby causing a<br />

famine in the state. Thus, the government of <strong>Mizoram</strong> has initiated the formulation of a<br />

comprehensive programme of assistance for the farmers to combat bamboo flowering and<br />

famine, with an aim to reduce poverty among farmers during famine period. It is expected<br />

that large-scale bamboo flowering will take place around 2007.<br />

This programme would be achieved through adoption of intensified and diversified<br />

cropping system through mechanization in agriculture, post harvest technology,<br />

connectivity for market linkage, water harvesting ponds and Rodent Control Programmes.<br />

Sl<br />

No.<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR 2004-2005<br />

Items Units<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

A Promotion of Rodent Control Measures<br />

1. Survey of rodent surveillance at State<br />

and Sub-divisional level<br />

2. Rodent pest management<br />

No. 2 5.00<br />

a) Purchase of traps No 35,400 7.00<br />

b) Cost of rat tails No 2,00,000 2.00<br />

c) Bromodiolone (R/B)© Ha 10,000 16.00<br />

Sub-Total 30.00<br />

B Promotion of early maturing rice/Jatropha Ha 300 15.00<br />

C Promotion of alternative crops like cotton/<br />

Potato/Maize/Garlic<br />

Ha 3626 86.60<br />

D Production of Oilseeds Mustard Ha 100 6.60<br />

E Production of Pulses Arhar and Field Pea Ha 300 15.80<br />

F Promotion of Agril. Mechanisation<br />

a) Purchase of Tractor/Power tiller with<br />

attachment like Rotovator/Maize Sheller<br />

Engine Operated/Oil Expeller and<br />

maintenance<br />

No 12 15.00<br />

G Promotion of connectivity for Market<br />

linkage<br />

Km 7 21.00<br />

H Promotion of Bamboo Vinegar Lit 8500 7.70<br />

I Promotion of Bamboo Charcoal Qtl 500 2.30<br />

Total 200.00<br />

Grand Total of Crop Husbandry 2900.00


- 14 -<br />

HORTICULTURE DEPARTMENT<br />

HORTICULTURE<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />

SCHEME NO. I<br />

The Department of Horticulture is functioning with 1 (one) Directorate, 8(eight)<br />

Divisions, 3(three) Sub-Divisions and 38(thirty eight) Circles. A post of Director, 2(two)<br />

posts of Joint Director, 6 (six) posts of Deputy Director, 5(five) posts of Divisional Officers<br />

with supporting Officers and Staff will be maintained during the year.<br />

DHOs Offices at Serchhip, Kolasib and Lawngtlai will be constructed. Lunglei DHOs<br />

Office will be extended. Maintenance of existing Departmental buildings and vehicles will<br />

also be taken up during the year.<br />

Sl.<br />

No.<br />

APPROVED OUTLAY DURING 2003-04 = Rs. 299.00 lakhs<br />

APPROVED OUTLAY FOR ANNUAL PLAN 2004-05 = Rs. 280.00 lakhs<br />

(Rs. in lakh)<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

Financial<br />

outlay for<br />

2004–05<br />

A. DIRECTION<br />

1. Salary/T.E. of Officers and Staff No. 30 38.00<br />

2. Wages No. 20 6.00<br />

3. Maintenance of existing buildings<br />

4. Maintenance of Vehicles Including POL<br />

No. 1 2.00<br />

(a) Heavy (Truck/Tractor/ Bulldozer) No. 8 6.00<br />

(b) Light No. 14 10.00<br />

5. Office Stationery No. 30 5.00<br />

TOTAL OF ‘A’: 67.00<br />

B. ADMINISTRATION<br />

1. Salary / T.E. of Officers and Staff No. 84 131.00<br />

2. Wages No. 57 12.00<br />

3. Maintenance of existing buildings at<br />

Divisions, Sub-Divisions and Circles<br />

No. 30 8.00<br />

4. Extension and Maintenance of Cold<br />

Storage at Serchhip<br />

No. 1 18.00<br />

5. (a) Construction of DHO Office at Lawngtlai<br />

(b) Extension of DHO Office at Lunglei<br />

No. 1 5.00<br />

& Kolasib No. 2 10.00<br />

(c) Constn. of Staff quarter at Thingsai No. 1 1.00<br />

(d) Constn. of Chowkider qtrs. at Lawngtlai No. 1 1.50<br />

(e) Constn. of HEO qtrs-cum-Office at Tlabung No.<br />

6. Maintenance of Vehicles including POL<br />

1 3.50<br />

(a) Light No. 13 10.00<br />

7. Office Stationery No. - 13.00<br />

TOTAL OF ‘B’: 213.00<br />

CAPITAL : 39.00<br />

REVENUE : 241.00<br />

G. TOTAL : 280.00


- 15 -<br />

HORTICULTURE DEPARTMENT<br />

SCHEME NO. II<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : HORTICULTURE FARM & SEED PRODUCTION<br />

Maintenance of Departmental farms at Tuitlawk, Rihte, Champhai, Khanpui,<br />

Vairengte, Thingdawl & Zawlnuam will be continued during 2004 - 2005. Emphasis will be<br />

given on raising of seeds and seedlings in the Departmental farms. Improved varieties of<br />

seeds and seedlings will be produced through vegetative propagation like budding,<br />

grafting, layering etc. Demonstration and trials of different crops will also be done in the<br />

farms.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 10.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 8.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

SEED PRODUCTION<br />

1. Field contingencies for raising of No. 8 5.00<br />

seedlings etc. and normal maintenance<br />

of farms including maintenance of<br />

Horticulture Centre, Chite<br />

2. Repairs of godowns, staff quarters, etc. No. 10 1.50<br />

3. Maintenance of fencing, internal road etc. No. 10 1.00<br />

4. Office Stationeries No. 8 0.50<br />

TOTAL : 8.00<br />

CAPITAL : 7.50<br />

REVENUE : 0.50<br />

G. TOTAL : 8.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MANURES AND FERTILIZERS<br />

SCHEME NO. III<br />

Organic and Bio-fertilizers such as Bonemeal, slaked lime etc. as well as Micronutrients<br />

and <strong>plan</strong>t hormones etc. will be made available to the farmers at subsidized rate<br />

during the year. Transportation of these materials will be arranged by the Department<br />

upto Horticulture circle headquarters.<br />

APPROVED FINANCIAL OUTLAY FOR 2003 - 2004 - Rs. 7.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004 - 2005 - Rs. 10.00


Sl.<br />

No.<br />

- 16 -<br />

HORTICULTURE DEPARTMENT<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

MANURES & FERTILIZERS<br />

1. Purchase of organic manures, bio-fertilizers Ton. 22 3.00<br />

and soil amendments like Slaked lime,<br />

Bone-meal, Neem products etc. for<br />

Distribution at 50% subsidy.<br />

2. Micro-nutrients, Plant Hormones, etc. Ton. 1 1.00<br />

3. Handling charges & other charges 1.00<br />

TOTAL : 5.00<br />

CAPITAL : 4.00<br />

REVENUE : 1.00<br />

G. TOTAL : 5.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : PLANT PROTECTION.<br />

SCHEME NO. IV<br />

Pests and diseases cause considerable loss to the farmers on their crops. Outbreak<br />

of diseases and pests are experienced in fruits, vegetables, spices and flowers. To tackle<br />

the problem of pests and diseases on Horticulture crops, the Department proposes to<br />

distribute the required <strong>plan</strong>t protection chemicals and equipments to the farmers at 50%<br />

subsidy and for Departmental use. Provision is also kept for emergency use so that timely<br />

and effective control measures can be taken up.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 10.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 12.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

PLANT PROTECTION<br />

1. Plant Health Clinic No. 1 1.00<br />

2. Other charges 1.00<br />

TOTAL: 2.00<br />

CAPITAL : -<br />

REVENUE : 2.00<br />

G. TOTAL : 2.00


- 17 -<br />

HORTICULTURE DEPARTMENT<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : EXTENSION AND FARMERS TRAINING<br />

SCHEME NO. V<br />

For effective and efficient extension services, it is necessary to provide farmers an<br />

exchange programme within the state, arrange exhibition and seminar at Division level.<br />

Publication and subscription of papers, booklets, magazine including ‘HUAN ENKAWLTU’<br />

will be continued.<br />

Demonstration of newly developed tools and implements, seeds and other<br />

materials will be taken up for the benefit of the Farmers.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 16.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 22.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

HORTICULTURE INFORMATION<br />

1. Exhibition, Seminar at state & Division level No. 8 4.00<br />

2. Publication of magazine. No. 50,000 6.00<br />

3. (a) Publication of booklets, leaflets etc. No. 10,000 1.50<br />

(b) Honorarium 0.50<br />

4. Purchase/Subscription of books,<br />

Journals, Diaries, etc.<br />

No. 1,000 3.00<br />

5. Office Expenses including advertisement, IT, etc. - 3.00<br />

TOTAL : 18.00<br />

CAPITAL : -<br />

REVENUE : 18.00<br />

GRAND TOTAL : 18.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE ENGINEERING<br />

SCHEME NO. VI<br />

By use of improved tools and implements, farmers could minimize their working<br />

time and maintain efficiency in their works. Therefore, provision of different Horticultural<br />

tools and implements at 50% subsidy to the poor farmers will be continued during 2004 - 05.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 8.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 6.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Horticulture tools and implements for No. 250 1.00<br />

distribution at 50% subsidy and for departmental use.<br />

2. Miscellaneous expenses and other charge 1.00<br />

TOTAL: 2.00<br />

CAPITAL : 1.00<br />

REVENUE : 1.00<br />

G. TOTAL : 2.00


- 18 -<br />

HORTICULTURE DEPARTMENT<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE & VEGETABLE DEVELOPMENT<br />

A. VEGETABLE DEVELOPMENT:<br />

In order to boost vegetable production in the State, quality vegetable seeds that are<br />

not easily affordable to the farmers will be made available to vegetable growers at<br />

subsidised rate.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Nil<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 5.50<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Vegetable seeds for sale at 50% subsidy Pkts LS 2.00<br />

2. Transportation etc. LS 0.50<br />

TOTAL: 2.50<br />

CAPITAL : 2.00<br />

REVENUE : 0.50<br />

G. TOTAL : 2.50<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE & VEGETABLE DEVELOPMENT<br />

B. FLORICULTURE AND LANDSCAPING:<br />

Floriculture in <strong>Mizoram</strong> has been flourishing during the past few years as a result<br />

of the Department undertaking. Distribution of seeds, bulbs and other <strong>plan</strong>ting materials<br />

at subsidy will be continued. Provision is also made for beautification of tourist<br />

Complexes, Parks etc. and VIP. Complexes will be maintained<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 20.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 25.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Purchase of flower seeds/ Bulbs flower<br />

Pots, etc. for distribution at 50% subsidy<br />

2. Maintenance of flower gardens<br />

Pkts LS 10.00<br />

a)Tourist Complex at Berawtlang No. 1 2.00<br />

b) District Park at Lunglei<br />

3. Maintenance of VIP Complexes<br />

No. 1 0.50<br />

including Directorate Top Floor No. 4 10.00<br />

4. Tissue Culture Laboratory at Chite. No. 1 2.00<br />

5. Transportation etc. LS 0.50<br />

TOTAL: 25.00


- 19 -<br />

HORTICULTURE DEPARTMENT<br />

CAPITAL : 10.00<br />

REVENUE : 15.00<br />

G. TOTAL : 25.00<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE & VEGETABLE DEVELOPMENT<br />

C. MUSHROOM DEVELOPMENT :<br />

Due to unavailability of spawn Production Unit at private sector in <strong>Mizoram</strong>, the<br />

Department will continue to maintain the existing Mushroom Laboratories at Chite,<br />

Champhai and Lunglei. Integrated Mushroom Units established under Government of<br />

India’s assistance for button Mushroom cultivation at Chite, Champhai and Lunglei will be<br />

maintained during 2004 - 2005.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 10.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 10.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Maintenance of Mushroom laboratories<br />

including supply of different materials<br />

for production of Spawn at: —<br />

a) Chite No. 1 2.00<br />

b) Lunglei No. 1 2.00<br />

c) Champhai No. 1 2.00<br />

2. Training Expenses No. of 1,500 1.50<br />

farmers<br />

3. Other Charges LS 2.50<br />

TOTAL: 10.00<br />

CAPITAL : NIL<br />

REVENUE : 10.00<br />

G. TOTAL : 10.00


- 20 -<br />

HORTICULTURE DEPARTMENT<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE & VEGETABLE DEVELOPMENT<br />

D. PLANTATION DEVELOPMENT:<br />

The Department proposes to distribute seeds/<strong>plan</strong>ting materials of various<br />

Plantation crops of improved varieties under Area Expansion Programme during the year<br />

in selected pockets having potentiality of the crops.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 5.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 5.50<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Area Expansion Scheme on Plantation crops Ha. 100 5.00<br />

2. Transportation charges etc. No. LS 0.50<br />

TOTAL: 5.50<br />

CAPITAL : 5.00<br />

REVENUE : 0.50<br />

G. TOTAL : 5.50<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE & VEGETABLE DEVELOPMENT<br />

E. BEE KEEPING:<br />

Gardeners will be encouraged to take up Bee Keeping by giving Bee-Hives and<br />

accessories for Bee Keeping in order to increase the productivity of crops through cross<br />

pollination.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 1.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 1.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Bee-hive boxes including accessories<br />

for distribution to Gardeners No. 37 1.00<br />

TOTAL: 1.00<br />

CAPITAL : 1.00<br />

REVENUE : -<br />

G. TOTAL : 1.00


- 21 -<br />

HORTICULTURE DEPARTMENT<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE & VEGETABLE DEVELOPMENT<br />

F. HORTICULTURE POTENTIAL AREA CONNECTIVITY<br />

Creation of Horticulture Potential Area Connectivity for Tractor plying to facilitate<br />

conveyance of farm inputs and outputs from the garden to the villages or main road will<br />

still be given high priority during the year. Moreover, maintenance of the existing ones will<br />

be made.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 75.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 55.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Maintenance of existing area connectivity Ha. LS 5.00<br />

TOTAL: 5.00<br />

CAPITAL : -<br />

REVENUE : 5.00<br />

G. TOTAL : 5.00<br />

SCHEME NO. VIII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : HORTICULTURE RESEARCH & EDUCATION<br />

The scheme aims at providing technical studies at the level of Post Graduation,<br />

Doctorate of the in-service person. It is also approved to sponsor candidates for B.Sc.<br />

(Horti) course where - in stipend, book grant, T.E. will be given to the selected candidates<br />

during the normal course of studies.<br />

Sl.<br />

No.<br />

APPROVED FINANCIAL OUTLAY FOR 2003-2004 - Rs. 3.00<br />

APPROVED FINANCIAL OUTLAY FOR 2004-2005 - Rs. 3.00<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

1. Stipend & book grant / TE / O.E. etc. No. 10 3.00<br />

TOTAL: 3.00<br />

CAPITAL : -<br />

REVENUE : 3.00<br />

G. TOTAL : 3.00


- 22 -<br />

HORTICULTURE DEPARTMENT<br />

HEAD OF DEVELOPMENT<br />

NAME OF THE SCHEME : BAFFACOS<br />

SCHEME NO.VIII<br />

The Department keeping in view the gregarious flowering of bamboo taking place<br />

during 2004-2007 resulting in mass mortality and destruction of bamboo forest, incurring<br />

rapid increase in rodent population thereby causing famine the department selected<br />

4(four) crops i.e. Passion fruit, Grape, Potato and Turmeric as there crops have short<br />

gestation period with good academic return for <strong>plan</strong>tation to provide alternative means of<br />

livelihood to the rural population dependent on jhum and bamboo forest.<br />

Moreover to utilized the bamboo before flowering establishment of charcoal kiln<br />

for production of charcoal vinegar etc. which can be utilized for nutrient in the form of<br />

soil supplement and as insect repellant.<br />

Sl.<br />

No.<br />

APPROVED OUTLAY FOR ANNUAL PLAN 2004-2005 = Rs. 260.00 lakhs<br />

ITEM Unit<br />

Physical<br />

Target for<br />

2004–05<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

2004–05<br />

A. Area Expansion for<br />

1. Passion fruit Ha. 200 90.00<br />

2. Grape Ha. 150 67.50<br />

3. Field Potato Ha. 150 50.60<br />

4. Turmeric Ha. 100 22.50<br />

B. Charcoal Kiln No. 196 29.40<br />

TOTAL: 260.00


- 29 -<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

SOIL & WATER CONSERVATION<br />

INTRODUCTION<br />

Food, fibre and shelter are the basic needs of every human being. All these are<br />

obtained from the soil. Water gives life to vegetation. Water remains in soil mostly in<br />

moisture, liquid and gas forms. Moisture or liquid in soil keeps the <strong>plan</strong>t food in soluble<br />

forms available to <strong>plan</strong>t intake. To ensure healthy vegetation, it is imperative that soil<br />

should be rich in nutrients and water. Nature in its own scheme of eco-conservation<br />

maintains soil in healthy condition. Unfortunately, man and animal in their living and<br />

working environment disturb the soil cover, accelerating the erosion of soil and depletion<br />

of water. With enhanced erosion, soil fertility deteriorates and vegetation growth capacity<br />

reduces. Soil erosion also leads to depletion of water content and results in desertification<br />

of land.<br />

1.10: Soil erosion in rainfed areas is mainly caused by surface run off/flood. When the<br />

flow of water is free of any obstruction, then it starts eroding the surface bed. Under<br />

excessive rainfall condition, as exist in <strong>Mizoram</strong>, enormous volumes of water generates<br />

velocities and hydraulic dynamics causing heavy erosion. This results in formation of<br />

galleys and ravines. The impact is tremendous and the volume of soil loss is very high.<br />

1.20: The terrain in <strong>Mizoram</strong> is hilly and the entire landscape varies from mild to very<br />

steep gradients.. The intensity of rainfall is also very high and the total annual rainfall is<br />

2500 mm. “Jhum” or shifting cultivation has been the traditional mode of livelihood for<br />

the tribal people in the State. Pertinent statistics reveal that around 40,000 hacs is covered<br />

by this primitive system of land management. Burning of the soil along with the dried<br />

vegetation during jhum leads to soil fragmentation and increases land vulnerability to easy<br />

erosion during the monsoons.<br />

1.30: The monsoon that the state receives is both intensive and extensive. Torrential<br />

rainwaters storm down descending gradients at high velocity in undefined directions. The<br />

resulting floods cause excessive bank erosion and removal of debris over long distances.<br />

The low lying areas which are cultivable lands, thus get avoidable silt cover, apart from<br />

causing damage to standing crops. Another inevitable impact of such erosion is the<br />

decreasing filtration of water towards sub soil layers reducing soil moisture content.<br />

1.40: The excessive rainfall in habited locales and environments, along roadsides, where<br />

subsisting unregulated drainage systems are ineffective causes substantial dislodging of<br />

soil mass with frequent havoc causing landslides, landslips, area sinking etc. These are the<br />

visible signs of soil erosion that can cause immediate disruption to human and other<br />

forms of activity. However, the loss of fertile topsoil is not visible.<br />

1.50: Jhum cultivation, by virtue of its shifting nature, is a low productivity technology<br />

applicant. This is why a “Jhumia” migrates from one location to another ever so frequently.<br />

Arising out of this age-old practice, abandoned jhum <strong>plan</strong>tations serve very poorly for<br />

agro-horti-forest crops cultivation.<br />

1.60: The hilly terrains such as ours, human settlement are traditionally located on the<br />

upper hill ridges. Notwithstanding the abundant rainfall that the state received annually,<br />

yet these settlements suffer inadequate water supply especially during the dry season.<br />

That apart, depleted moisture content in the soil layers, because of speedy runoff and<br />

cumulative soil erosion, dries up even otherwise flourishing vegetation. The spectre of fire<br />

and forest fires looms large all over the state.


- 30 -<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

1.70: Off-season agriculture typically tends to take place in remote and undulating areas,<br />

access to which is tough, time and labour consuming. This adversely affects the health of<br />

the agriculture labour rendering it vulnerable to disease and pestilence. Premature aging is<br />

often the result. Labour costs thus become prohibitive. It is essential to connect cultivable<br />

and potentially cultivable areas with main and arterial roads- which although expensive is<br />

inescapable for the speedy economic development in the state.<br />

1.80: The absolute need for soil and water conservation measures in the state is a<br />

prerequisite for effective socio-economic development. Public awareness, education,<br />

association and participation in soil and water conservation is a matter of public concern<br />

and priority.<br />

1.90: The Agro-climatic conditions prevalent in <strong>Mizoram</strong> are entirely conducive to<br />

successful agriculture practices through soil and water conservation measures and<br />

objectives.<br />

2.00: Keeping in view of the above stated strategy, the Soil & Water Conservation<br />

Department proposes the following schemes to implement during the year 2005-2006.<br />

3.00: ORGANISATION :<br />

I. Direction & Administration.<br />

II. Soil & Land Use Survey.<br />

III. Soil Conservation Plantation.<br />

IV. Cash Crop & Spices Development.<br />

V. Quality Planting Material Production.<br />

VI. Water Resource Development.<br />

VII. Research, Education & Training (Capacity Building)<br />

VIII. Commercial Cash Crop Plantation (For rural economy building programme)<br />

IX. Run-off Retarding Scheme (For conservation farming)<br />

X. Soil Conservation Engineering Programmes (for restoration, protection and<br />

improvement of erosion effected and erosion endangered agri-potential)<br />

XII. Micro-Watershed Management.<br />

XIII. Other Expenditures (Building & Road sector)<br />

XIV. Input Supply.<br />

XV. Central Sponsored Programmes.<br />

1) Singla RVP/FPR<br />

2) AIBP - Mat Catchment Treatment<br />

3) Tuirial Hydel Catchment Project.<br />

4) Tlawng RVP/FPR<br />

2.01: All the schemes from I - XIV are State Sector Schemes and these are continuing<br />

ones. These scheme characters are that these are implemented as a new schemes at new<br />

locations with fresh group of beneficiaries.<br />

2.02: The Schemes at XV above under CSS programmes. (1) The Singla Project is a River<br />

Valley Project and it is a spill over programme from 9 th Plan. Total outlay approved is<br />

Rs.419.30 lakhs plus Rs.163.14 lakhs i.e. Rs.582.44 lakhs during 9 th Plan Rs.197.03 lakhs is<br />

being spent. The agreed outlay for 10 th Five Year Plan is Rs. 385.41 lakhs and that for<br />

2003-04 is Rs.100.00 lakhs. It is 100% CSS programme. (2) The AIBP - Mat Catchment


- 31 -<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

Treatment Scheme is an approved program of 9th Five Plan. It is 1:3 (State:Central)<br />

matching shared programme. Due to non-availability of State matching share, this scheme<br />

could not be undertaken till date. Total outlay is Rs. 537.00 lakhs over 2 years. Outlay for<br />

1st year is Rs. 254.00 lakhs State matching share for the project is Rs. 84.70 lakhs for 2<br />

(two) years.<br />

3.00: It is also being approved for Tlawng catchment RVP/FPR Scheme costing Rs.10.00<br />

crores to include in the 10 th Five Year Plan.<br />

3.01: The Mat Catchment Treatment Project that was earlier posed for EAP take off will<br />

be approved again during 10 th Five Plan. Total cost was Rs. 40.00 crores. This was<br />

prepared by engaging consultancy of CSWR & TI, Dehradun under the sponsorship of<br />

Planning Commission. This scheme is submitted through the State Planning Department to<br />

Planning Commission.<br />

3.02: In the Catchment of Tuirial, Serlui ‘B’, Tuivai and Bairabi Hydel Projects, there is<br />

Soil & Water Conservation shares of activities. Total approved outlay is Rs.3.19 crores of<br />

which Rs.66.11 lakhs to be revalidated for execution during 2004 - 05.<br />

4.00: The Annual Plan, 2004-05 outlay approved is 360.00 lakhs under State Plan Sector.<br />

5.00: Priority will be imposed on Commercial Cash Crop of Coffee and Large Cardamom<br />

<strong>plan</strong>tation expansion in the marginal farmer’s sector.<br />

SCHEME DESCRIPTION<br />

6.00: DIRECTION:<br />

For maintenance of vehicles, machineries, purchase of office contingencies<br />

including machineries & equipments, etc. in the Directorate, a provision of Rs. 33.07 lakhs<br />

are approved in Annual Plan 2004-05.<br />

6.02: ADMINISTRATION:<br />

There are 8 functional and one Engineering Divisions in the Department for<br />

implementation of the Projects/Schemes. Further, there is one Training Institute for<br />

training of field staff up to Demonstrators level. These functional units are under staff at<br />

Officers level. Some extension unit of Ranges and Soil & Water Conservation Centres are<br />

also under staff. Besides, there is pressures from public to open some centres and Ranges<br />

at some potential areas as Saitual, North Hlimen, Mamit, etc. which cannot be afforded to<br />

open at the existing staff strength. There is also instruction from Government to post<br />

ASCO(SDO) ranked officers in newly opened civil sub-divisions. For that it is unavoidable<br />

to create some new posts. Rs.103.00 lakh is approved during 2004-2005.<br />

6.02.1: The present post of Principal is required to be upgraded. This is essential for his<br />

higher responsibilities to entrust in the Institute. Also this is essential when it is seen for<br />

the future of the Department. After 2005, there shall be no Joint Director to overtake the<br />

responsibility of the Head of the Department.


- 32 -<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

6.02.2: Publicity & Advertisement, Monitoring and Evaluation, Planning Cell, Engineering<br />

Division, Plan Formation Cell are part of administration. Reasonable fund provision is<br />

made to run these wings efficiently and effectively. Provision for Rs. 20.02 lakh for<br />

Annual Plan 2004-05.<br />

7.00: SOIL & LAND USE SURVEY:<br />

Project survey, investigation and project preparation. An area of 400 ha. in 2004-<br />

05 Annual Plan will be undertaken. To conduct these works, Rs. 1.00 lakh is approved<br />

during Annual Plan, 2004-05.<br />

8.00: SOIL & WATER CONSERVATION PLANTATION:<br />

For stabilisation of sliding zone along the lifeline National Highway and State<br />

Highways, there is hardly any other alternative than tree <strong>plan</strong>ting and deep rooting grass<br />

<strong>plan</strong>ting. Further, vegetation roots and leaf litters allows, in Situ, water retention over<br />

longer period and that reduces the chances of run-off causing landslides and reduces<br />

threat to life and property in human dwelling zone. To such a situation soil conservation<br />

<strong>plan</strong>tation is the only effective preventive remedy.<br />

9.00: CASH CROP SPICES DEVELOPMENT:<br />

The Department has demonstration <strong>plan</strong>tation of Coffee, Rubber and Large<br />

Cardamom in various locations of the State. The purpose of this <strong>plan</strong>tation is to support<br />

demonstration and training to the farmers and data formation. Particularly from Coffee<br />

<strong>plan</strong>tation a good amount of return is received every year. Rubber <strong>plan</strong>tation also pays<br />

return but due to lack of fund during the past few years maintenance part could not be<br />

attended properly. Similarly, the Black Pepper cultivation in Coffee <strong>plan</strong>tation is required<br />

to be introduced and therefore, from 10 th Five Year Plan it is approved to intensify care<br />

after of these <strong>plan</strong>tations for profitable return in addition to other goal. The Coffee<br />

<strong>plan</strong>tation requires replacement <strong>plan</strong>ting or rejuvenation. For this purpose, provision is<br />

made for rejuvenation and maintenance for Rs. 21.50 lakhs in Annual Plan 2004-05.<br />

10.00: PRODUCTION OF QUALITY PLANTING MATERIAL:<br />

From 2001-2002 Annual Plan of 9 th Five Plan, priority importance has been imposed<br />

on Expansion of Coffee and Large Cardamom in the marginal farmers sector. For a<br />

meaningful production of yield of this crop it is essential that the <strong>plan</strong>ting material to be<br />

of good quality from known seed origin. The reliable <strong>plan</strong>ting material production, it is<br />

experienced to be had from Departmental nursery and therefore, the Department has<br />

approved establishment of these nurseries near the <strong>plan</strong>ting areas and their maintenance.<br />

2004-2005 Annual Plan projection is Rs. 21.30 lakhs.<br />

11.00: WATER RESOURCE DEVELOPMENT:<br />

To overcome the water difficulties in nursery growing, it is essential to construct<br />

water harvesting device near living spring close to the nurseries. Also in <strong>plan</strong>tation water<br />

need is unignorable. Above all needs the water resource development near the <strong>plan</strong>tations<br />

gets the priority for its water use by the <strong>plan</strong>tations in clusters. Besides <strong>plan</strong>tation it is<br />

necessary to improve the water condition in the rural areas. In villages it is approved to<br />

construct and improve water points. During 2004-05 Annual Plan Rs. 7.70 lakh will be<br />

spent.


- 33 -<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

12.00: RESEARCH, EDUCATION AND TRAINING:<br />

For conducting training and education of the grass-root level staff of the<br />

Department it is essential to continue this Training Institute at Durtlang. The training in<br />

Departmental technical activities which are up-dated due to technical updation. The<br />

training course is also being arranged for farmers in the <strong>plan</strong>tation technology and other<br />

soil conservation activities in the 10 th Five Year Plan.<br />

The salary of teaching staff is committed to Non-Plan during 10th Plan onward. But<br />

the training expenditure and maintenance expenditure on infrastructures including office<br />

expenses are approved to be provided under Plan sector. Rs. 14.21 lakh is approved under<br />

Annual Plan 2004-05.<br />

13.00: RURAL ECONOMY INCENTIVE COMMERCIAL PLANTATION (R.A.D.):<br />

Under this scheme expansion of Coffee, Large Cardamom has been given high<br />

priority since the year ending 9th Five Year Plan. Under the existing agro-climatic and<br />

edaphic condition these crops are found growing jubilantly under the virgin forest of the<br />

State. Coffee per ha. yield is recorded 13 quintals from Bualpui experimental and<br />

demonstration Coffee <strong>plan</strong>tation of Coffee Board during 2000. The crop yield is found to<br />

be higher than national average. The Cardamom is also shows encouraging yield in the<br />

recent past that preludes for going for the <strong>plan</strong>tation in jhumia sector. It is necessary to<br />

keep the farmer attentive to his <strong>plan</strong>tation during his peak jhum working season. For<br />

expansion of this cultivation Rs. 19.10 lakhs has been provided in Annual Plan 2004-05.<br />

14.00: RUN-OFF RETARDING SCHEME:<br />

On a slope ground surface rainwater moves faster with high erosive fertility from<br />

up level downwards in intensive rain. The surface run is a mobile flood and this causes<br />

intensive erosion damage. The damage is in terms of soil volume that includes Plan<br />

nutrients and soil.<br />

An open area cultivation is not productive and therefore, amendment of soil<br />

surface is required. This method of amendment of slope land is terracing, contouring and<br />

any other type of land use method across the slope is a safety measure for protection of<br />

soil and moisture.<br />

Soil & Water Conservation Department recommends this terrace construction on<br />

moderate slope land for its use in agriculture, horticulture or forest <strong>plan</strong>tation<br />

development. This shapes the soil and soil fertility. The terracing programme provides a<br />

scope for developing agri, horticultural platform near the residential area of a farmer and<br />

agriculture exercise nearer the residential areas experiences high scope of success as the<br />

farmer is able to pay close attention to his farming. Under the present nature of<br />

habitation, the agricultural potential areas had been placed at a considerable long distance<br />

from the habitation areas. To remove this gap it is compelling that the agricultural land<br />

which are stable and can be used year after year for vegetables and other crops should be<br />

developed nearer to the habitation areas. Even a small plot of 0.25 ha. in the kitchen<br />

garden of a farmer should be encouraged so that self-sufficiency for a particular family is<br />

assured. Thus, this scheme is envisaged.


- 34 -<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

Terracing above 5-25% slope is proposed, as it is the safest for conservation of soil<br />

and moisture. The terrace shall be constructed with all technique parameters so that the<br />

terrace does not get damage with the annual rain impact. These terraces will be<br />

constructed in the near habitation area only. Rs. 6.00 lakh is provided in Annual Plan 2004-<br />

05.<br />

15.00: SOIL CONSERVATION ENGINEERING:<br />

The Soil Conservation Engineering Works provides facility for protection of land<br />

damage by run of flood during peak monsoon. The agricultural land in the plateau, river<br />

banks and foot hills are ravaged by such kind of damages. The farmers who hold land in<br />

these areas are very much in need of such kind of assistance to engineering works. The<br />

main works of long term permanent are rock fill, wire boxes, spurs and stream course<br />

straightening. Rs. 8.00 lakhs is approved under Annual Plan 2004-05.<br />

16.00: MICRO-WATERSHED MANAGEMENT:<br />

Micro-Watershed Management is given a priority importance by the Government of<br />

India under Central sector programmes. These programmes are supported on detail<br />

project report preparation. Therefore, for survey and preparation of detail project reports<br />

of such programmes in the State sector a token fund of Rs. 1.00 lakh is provided in Annual<br />

Plan, 2004-05. Within this amount it is also targeted to take up one sample microwatershed<br />

project near Aizawl capital.<br />

7.00: OTHER EXPENDITURE:<br />

The expenditure on construction and maintenance of buildings and roads and<br />

machinery and equipments are placed under this head of expenditure. The Department<br />

has as many as 240 buildings which are quite old and needs maintenance badly. The<br />

Divisional and Range headquarters are connected with approach road. These approach<br />

roads required annual maintenance and improvement. Provision is made for taking care of<br />

these approach roads. Rs. 16.10 lakhs is approved in the Annual Plan 2004-05.<br />

13.00: INPUT SUPPLY:<br />

To meet the various needs for essential tools and implements, fertilizers and<br />

chemicals and time spelling requirements for <strong>plan</strong>tation development and maintenance of<br />

the various sectors, it is approved Rs. 8.00 lakhs in Annual Plan 2004-05.<br />

14.00: BAFACOS:<br />

Bamboo flowering and famine combating scheme (BAFACOS) for Soil Conservation<br />

Engineering works consisting of Land development, Water Harvesting Pond, Gully control<br />

and Stream Bank Erosion Control for maximum mandays generation provision is made<br />

Rs.80.00 lakhs in the Annual Plan during 2004-05.


INTRODUCTION<br />

- 41 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

ANIMAL HUSBANDRY & VETERINARY<br />

There are two major heads of development. The Annual Plan comprises mainly<br />

continuous Schemes which included maintenance, improvement and upgradation of the<br />

existing infrastructure for upkeeping livestock health, prevention and control of animal &<br />

poultry diseases and also managing different Departmental Livestock Farms for<br />

demonstration purposes and for making for foundation stock available to the farmers.<br />

Grant-in-aid subsidy for the local farming families & societies as incentives are also<br />

included.<br />

The approved outlay for the year 2004-2005 is Rs. 654.00 lakhs which includes<br />

approved outlay of Rs. 220.00 lakhs for BAFFACOS and Rs.40.00 lakhs only for Animal<br />

Husbandry and Dairy Development respectively. The total approved outlay of the<br />

Department comes to Rs. 694.00 lakhs only.<br />

A & B. DIRECTION: With a total outlay of Rs. 68.30 lakhs only it is intended for<br />

maintenance of existing infrastructure and for administration cost.<br />

C. VETERINARY SCIENCE & ANIMAL HEALTH: In order to cover Animal Health Care<br />

and for prevention of Animal Disease and for maintenance of various Veterinary Hospitals,<br />

Dispensaries a total amount of Rs. 65.50 lakhs had been earmarked during 2004-2005.<br />

D. CATTLE DEVELOPMENT: For maintenance of existing Departmental Cattle Farm at<br />

different places a total amount of Rs. 25.50 lakhs only had been approved during 2004-<br />

2005.<br />

E. POULTRY DEVELOPMENT: During 2004-2005, a total amount of Rs.30.50 lakhs<br />

only is being set aside for Poultry Works which included the maintenance of existing<br />

Departmental Poultry Farm. Provision is made for replacement of Old Stock and<br />

procurement of hatching egg. It is also intended to give 50% Chicks subsidy to the Local<br />

Farmers<br />

F. PIGGERY DEVELOPMENT: With a total outlay of Rs.26.50 lakhs the Piggery<br />

Development work will comprises Grant-in- aid to Coop. Societies/Pig Fed. And 50% Grantin-aid<br />

to Pig rearing families.<br />

G. OTHER LIVESTOCK DEVELOPMENT: Provision of Grant-in-aid to Sheep & Goat<br />

rearing families and Hill Cattle rearing families and maintenance of existing Goat and<br />

Rabbit Farm shall be carried out with on outlay of Rs.6.50 lakhs.<br />

H. FEED AND FODDER DEVELOPMENT: The main task will be the procurement of<br />

Feed Ingredients for different Livestock and Poultry Farms of the Department and for<br />

construction of Animal Grazing Ground. The total outlay during 2004-2005 under Feed &<br />

Fodder in Rs.75.00 lakhs only.<br />

I. VETERINARY EDUCATION RESEARCH AND TRAINING: For improvement and<br />

continuation of School of Vety. Science for Vety. Field Assistant and for stipend and Book<br />

Grant of B.V Sc & A.H, VFA and M.V Sc. etc. students a total amount of Rs.49.00 lakhs is<br />

being provided during 2004-2005.


- 42 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

J. VETY. INFORMATION: Collection of information data, publication and for<br />

extension works a total amount of Rs.9.00 lakhs is being approved.<br />

K. OTHER EXPENDITURE: For preliminary Survey works for the establishment of<br />

Animal Slaughter House and Regulation of Animal Movement Act, a total amount of<br />

Rs.9.00 lakhs is earmarked during 2004-2005.<br />

L. CENTRALLY SPONSORED SCHEME: In order to match the Central share of<br />

Centrally Sponsored Schemes being operated by the Department a total amounting of<br />

Rs.69.20 lakhs is being provided as a state matching share during this period.<br />

M. BAFFACOS: In order to combat the coming bamboo flowering which may cause<br />

increase rats population resulting in famine, the State Government had formed Bamboo<br />

flowering and Famine Control Schemes. The Department had been allocated a total amount<br />

of Rs.220.00 lakhs during 2004-05 which will be utilized for providing various animal<br />

rearing schemes for the local farmers.<br />

N. DAIRY DEVELOPMENT: For maintenance of Dairy Plant at Lunglei Grant-in-aid to<br />

Milk Union/Milk Producer’s Society and transportation charges a total amount of Rs.40.00<br />

lakhs only is approved during 2004-2005.<br />

A : DIRECTION<br />

( Rupees in lakh )<br />

Sl. PHYSICAL FINANCIAL<br />

No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

1 Salary<br />

a) Salary of existing Officers and Staff 4 4.50<br />

2 Wages :<br />

Skilled Labour ( Typist ) 4 1.80<br />

3 Travelling Expenses L.S. 1.50<br />

4 Office Expenses<br />

a) Maintenance of Light Vehicle and 15 Nos. 2.00<br />

purchase of spare parts, etc.<br />

b) Electric, Water and Telephone charges L.S. 1.20<br />

5 Minor Works :<br />

Maintenance and improvement of 2 Nos. 2.00<br />

subordinate offices<br />

6 Machinery/Equipments :<br />

Purchase of Office Equipments, etc. L.S. 0.50<br />

7 Material/Supply :<br />

Purchase of Liveries, etc. L.S. 0.50<br />

T O T A L OF 'A' 14.00


- 43 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

B : ADMINISTRATION<br />

( Rupees in lakhs )<br />

Sl. PHYSICAL FINANCIAL<br />

No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

B - I Joint Director Office. Lunglei :<br />

1 Salary of Officer and Staff 11 Nos 9.00<br />

2 Wages :<br />

Unskilled 1 No. 0.40<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 2.50<br />

5 Minor Works :<br />

Maintenance of existing Quarter L.S. 0.60<br />

T O T A L : 13.50<br />

T O T A L O F B – 1 13.50<br />

B-II DISTRICT OFFICES :<br />

1 a) Salary of Officers 8 Nos. 19.70<br />

2 Wages :<br />

a) Skilled - II 5 Nos. 2.14<br />

b) Unskilled 6 Nos. 1.84<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses :<br />

a) Maintenance of Light Vehicles with. POL etc. 8 Nos. 2.32<br />

b) Purchase of Stationeries, etc. L.S.<br />

5 Minor Works :<br />

Maintenance of existing buildings 25 Nos. 1.00<br />

T O T A L OF B-II : 29.00<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

B-III SUB-DIVISIONAL OFFICES :<br />

1 Salary of existing Officers and Staff 8 Nos. 8.50<br />

2 Wages :<br />

Unskilled 1 No. 0.40<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 1.60<br />

5 Minor Works :<br />

Maintenance of existing buildings 12 Nos. 0.30<br />

T O T A L : 11.80<br />

T O T A L OF B-III 11.80<br />

T O T A L OF B : 54.30


- 44 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

C : VETY. SERVICES & ANIMAL HEALTH :<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

C-I Vety. Services/Hospitals<br />

1 Salary of existing Officers and Staff 12 Nos. 14.00<br />

2 Wages :<br />

Unskilled Labour for Night Chowkiders 2 Nos. 0.64<br />

3 Travelling Expenses L.S. 2.36<br />

4 Office Expenses L.S. 2.00<br />

5 Minor Works :<br />

Maintenance of existing buildings and repair of<br />

buildings<br />

20 Nos.<br />

1.00<br />

6 Motor Vehicles :<br />

Maintenance of existing vehicles L.S. 0.50<br />

T O T A L OF C - I : 20.50<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

C-II: VETY. DISPENSARIES :<br />

1 Salary of existing Officers and Staff 13 Nos. 18.00<br />

2 Wages :<br />

Unskilled Labours 37 Nos. 11.35<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses L.S. 1.65<br />

5 Minor Works :<br />

Improvement & repair of existing buildings 22 Nos. 1.00<br />

T O T A L 34.00<br />

T O T A L OF C - II : 34.00<br />

C-III RURAL ANIMAL HEALTH CENTRES :<br />

1 Salary of existing Staff 4 Nos. 3.53<br />

2 Wages :<br />

Unskilled 2 Nos. 0.65<br />

3 Travelling Expenses L.S. 1.50<br />

4 Office Expenses L.S. 2.32<br />

5 Minor Works :<br />

Maintenance of Existing buildings 35 Nos. 1.00<br />

T O T A L OF C - III : 9.00


- 45 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

C-IV CENTRAL MEDICINE, VACCINE AND EQUIPMENT DEPOT :<br />

1 Office Expenses L.S. 1.00<br />

2. Machinery/Equipments :<br />

Purchase of essential instruments appliances<br />

for Vety. Hospitals, Dispensaries and Rural<br />

Animal Health Centres<br />

L.S. 0.50<br />

3. Material / Supply L.S. 0.50<br />

T O T A L OF C-IV : 2.00<br />

T O T A L OF 'C' : 65.50<br />

D : CATTLE DEVELOPMENT :<br />

1 Salary of existing Officers & Staff 18 Nos. 13.79<br />

2 Wages :<br />

a) Skilled - II 1 No. 0.43<br />

b) Unskilled Labour 8 Nos. 2.42<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses : Electric Charges etc. L.S. 4.00<br />

5 Minor Works :<br />

Maintenance and repair of existing quarters and<br />

farms<br />

12 Nos. 1.36<br />

6 Motor Vehicles :<br />

Maintenance of existing Vehicles L.S. 1.00<br />

7 Material & Supply L.S. 0.50<br />

T O T A L O F 'D' 25.50<br />

E : POULTRY DEVELOPMENT :<br />

1 Salary of existing Officers and Staff 13 Nos. 11.50<br />

2 Wages :<br />

a) Skilled - II 2 Nos. 0.85<br />

b) Unskilled Labour 27 Nos 8.19<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses :<br />

Stationery, Bulk energy charge of Poultry Farms L.S. 5.00<br />

5 Minor Works :<br />

Improvement alteration of existing buildings<br />

and Poultry Farm<br />

10 Nos. 0.50<br />

6 Machinery/Equipments<br />

Waterer, Feeder, Brooder etc. L.S. 0.46<br />

7 Material & Supply :<br />

Purchase of replacement stock hatching L.S. 1.00<br />

8 G.I.A. to farmers on 50% chick subsidy L.S. 2.00<br />

T O T A L OF ' E ' : 30.50


- 46 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

F : PIGGERY DEVELOPMENT :<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

1 Salary of existing Officers and Staff 12 Nos. 12.12<br />

2 Wages :<br />

Unskilled Labour for Pig Attendant 18 Nos 5.47<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses :<br />

For Stationeries & maintenance of Light Vehicles L.S. 2.41<br />

5 Minor Works :<br />

Improvement & repair of existing buildings<br />

16 Nos.<br />

2.00<br />

6 Machinery/Equipments L.S. 0.50<br />

7 Motor Vehicles :<br />

Maintenance of Heavy Vehicles & body repair<br />

etc.<br />

2 Nos. 0.50<br />

8 Material & supply :<br />

Replacement of stocketc.. L.S. 0.50<br />

8 Grand-in-Aid :<br />

a) GIA to PIGFED and Co-op. Societies L.S. 1.00<br />

T O T A L OF 'F' : 26.50<br />

G : OTHER LIVESTOCK DEVELOPMENT :<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

I. GOAT PRODUCTION FARM :<br />

1 Minor Works :<br />

Improvement of Goat Production Farm L.S. 0.50<br />

2 RABBIT PRODUCTION FARM :<br />

a) Wages :<br />

Unskilled Labour for Rabbit Attendant 11 Nos. 3.50<br />

b) Minor Works :<br />

Maintenance of existing Rabbit House, etc. 5 Nos. 0.50<br />

3 Grant-inAid/Subsidy :<br />

a) Assistance to Sheep/Goat rearing families @ 50 families 1.00<br />

Rs. 2000/- per family<br />

b) Assistance to Hill Cattle rearing families 25 families 1.00<br />

@ Rs.4000.<br />

T O T A L OF G : 6.50


- 47 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

H : FEED AND FODDER DEVELOPMENT :<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M S TARGET TARGET<br />

1 2 3 4<br />

H-I Salary of existing Staff 3 Nos. 2.41<br />

2 Wages :<br />

Unskilled Labour for Fodder Farms 39 Nos 12.79<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 2.80<br />

5 Minor Works :<br />

Maintenance of Feed Godown & Feed Mill L.S. 1.00<br />

6 Machinery/Equipments :<br />

Purchase of Farm Tools etc. L.S. 0.50<br />

7 Motor Vehicles :<br />

Maintenance of Heavy Vehicles 3 Nos. 0.50<br />

8 Material & Supply :<br />

Purchase of Feed Ingredients & ready mixed L.S. 50.00<br />

feed for Departmental farms<br />

T O T A L OF H-I : 71.00<br />

H-II ANIMAL GRAZING GROUND :<br />

1 Office Expenses L.S. 2.00<br />

2 Minor Works<br />

Renovation and construction of Animal Shed;<br />

Construction of Animal fencing etc.<br />

L.S.<br />

1.00<br />

3 Material & Supply :<br />

Procurement of Fencing Materials like Barbed<br />

Wire Goat Proof, Fencing Post etc.<br />

L.S. 1.00<br />

T O T A L OF H - II : 4.00<br />

T O T A L OF ' H ' : 75.00<br />

I : VETY. EDUCATION RESEARCH & TRAINING :<br />

1 Salary of existing Officers and Staff 11 Nos. 20.00<br />

2 Wages :<br />

a) Semi - Skilled 2 Nos. 0.68<br />

b) Unskilled 3 Nos. 0.92<br />

3 Travelling Expenses L.S. 1.40<br />

4 Office Expenses L.S. 2.00<br />

5 Professional Charges :<br />

a) Orientation and refresher training to personnel<br />

and farmers<br />

L.S.<br />

b) Study Tour for Vety. Field Assistant and B.V.Sc.<br />

Students and inservice personnels<br />

L.S.<br />

6 Minor Works : L.S. 1.00<br />

7 Material & Supply :<br />

Purchase of study materials, Books etc. L.S. 1.00<br />

8 Stipend and Book Grant, Thesis Grant etc. for<br />

MVSc, BVSc. and VFA Students<br />

L.S. 21.00<br />

T O T A L OF ' I ' : 49.00


- 48 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

J : VETERINARY INFORMATION WING :<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M TARGET TARGET<br />

1 2 3 4<br />

1 Salary of existing Staff 1 No. 3.50<br />

2 Travelling Expenses L.S. 1.00<br />

3 Office Expenses L.S. 3.00<br />

4 Publication :<br />

Magzine, Leaflets, Periodicals, etc. L.S. 0.50<br />

5 Advertisement L.S. 0.50<br />

6 Materials & Supply :<br />

Purchase of Roll Films, Video Films, etc. L.S. 0.50<br />

T O T A L OF 'J ' : 9.00<br />

K : OTHER EXPENDITURE :<br />

K-1 ANIMAL SLAUGHTER HOUSE<br />

1. Office Expenses:<br />

For stationeries, preparation of Project Reports<br />

etc.<br />

L.S. 1.00<br />

T O T A L OF K-1 1.00<br />

K-II ANIMAL MOVEMENT :<br />

1. Wages :<br />

Unskilled Labour for various Animal Check Gate<br />

Attendant 19 Nos. 5.80<br />

2. Office Expenses :<br />

Purchase of POL and Stationeries etc. L.S. 1.00<br />

4.<br />

3. Minor Works :<br />

Construction of Check Gates and Isolation Shed<br />

etc.<br />

Material & Supply :<br />

Purchase of animal marking materials etc.<br />

T O T A L O F K-II<br />

T O T A L O F K :<br />

L.S. 0.80<br />

L.S<br />

.<br />

0.40<br />

8.00<br />

9.00


- 49 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

L : CENTRALLY SPONSORED SCHEMES :<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M TARGET TARGET<br />

1 2 3 4<br />

L-I NATIONAL PROJECT ON RINDERPEST ERADICATION :<br />

1 Salary of existing Officers and Staff 21 Nos. 18.00<br />

2 Travelling Expenses L.S. 1.00<br />

3 Office Expenses :<br />

For Stationeries and maintenance of Light Vehicles L.S<br />

1.00<br />

4. Machinery / Equipments L.S. 1.00<br />

T O T A L OF L - I : 21.00<br />

L-II ASCAD (Assistance to State for Control of<br />

Animal Disease :<br />

1 Salary 3 Nos. 4.00<br />

2 Travelling expenses L.S. 2.00<br />

3 Office Expenses L.S. 3.00<br />

4 Minor Works L.S. 0.50<br />

5 Machinery/Equipments L.S. 0.50<br />

6 Material & Supply L.S. 2.00<br />

T O T A L OF L - II : 12.00<br />

L-III PROFESSIONAL EFFICIENCY DEVELOPMENT :<br />

STATE VETERINARY COUNCIL :<br />

1 Office Expenses<br />

Office Stationeries, etc. L.S. 0.50<br />

T O T A L OF L - III : 0.50<br />

L-IV ANIMAL HUSBANDRY AND STATISTICS :<br />

SAMPLE SURVEY & STATISTICS :<br />

1 Salary of Existing Staff 6 Nos. 5.00<br />

2 Travelling Expenses L.S. 1.00<br />

3 Office Expenses :For Stationeries and purchase of<br />

POL etc.<br />

L.S<br />

0.50<br />

4 Publication :<br />

Sample Survey and Statistical Hand Book, etc. L.S. 0.50<br />

T O T A L OF L-IV : 7.00


- 50 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M TARGET TARGET<br />

1 2 3 4<br />

L-V NATIONAL PROGRAMME ON BIOGAS DEVELOPMENT :<br />

1 Salary of existing Staff 10 Nos. 12.00<br />

2 Travelling Expenses L.S. 1.00<br />

3 Office expenses :<br />

For purchase of Stationeries and maintenance of<br />

Vehicles<br />

L.S. 0.70<br />

4 G.I.A./Subsidy :<br />

Government contribution for installation of Biogas<br />

Plant @ Rs. 7500/- per unit<br />

200 units 15.00<br />

T O T A L OF L - V : 28.70<br />

T O T A L OF L : 69.20<br />

M. BAMBOO FLOWERING & FAMINE COMBAT SCHEME (BAFFACOS)<br />

Sl. I T E M PHYSICAL FINANCIAL<br />

No.<br />

TARGET TARGET<br />

1 2 3 4<br />

1. Office Expenses :<br />

For procurement of litters, electrification, water<br />

charges, medicines, utensils etc. for Poultry,<br />

Piggery & Dairy<br />

L.S. 20.04<br />

2. Material / Supply :<br />

Purchase of animals and feeds<br />

L.S. 122.21<br />

3. Minor Works :<br />

For construction of Broiler House, Layer house,<br />

Pig Sty and Dairy Shed.<br />

L.S. 77.75<br />

T O T A L : 220.00


- 51 -<br />

ANIMAL HUSBANDRY & VETERINARY<br />

N : DAIRY DEVELOPMENT<br />

( Rupees in lakhs )<br />

PHYSICAL FINANCIAL<br />

Sl. No. I T E M TARGET TARGET<br />

1 2 3 4<br />

N-1 Salary of existing Staff 3 Nos. 0.10<br />

2 Wages :<br />

a) Skilled - II 7 Nos. 3.00<br />

b) Unskilled Labour for Milkman, 57 Nos. 18.00<br />

Dairy Farm Attendant, etc.<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses :<br />

Bulk Energy charges, Stationary etc. L.S. 7.30<br />

Light Vehicles<br />

5 Minor Works :<br />

Maintenance of existing Farm buildings 10 Nos. 4.60<br />

6 Motor Vehicles :<br />

Maintenance of Milk Van and Purchase of Parts etc.<br />

5 Nos.<br />

4.00<br />

7 Material and Supply :<br />

Purchase of materials for Dairying Farms etc. L.S. 2.00<br />

T O T A L OF 'N' 40.00


- 54 -<br />

FISHERIES DEPARTMENT<br />

FISHERIES<br />

1. Background<br />

The Annual Plan allocation of Fisheries Department for 2004-05 is Rs.182.00 lakhs<br />

which has two components, viz. — (1) Annual Plan outlay of Rs.82.00 lakhs for<br />

implementation of all the ongoing Annual Plan Schemes as shown below & (2) Baffacos<br />

outlay of Rs. 100.00 lakhs.<br />

Scheme-wise Break-up and Additional Requirement of Fund<br />

Highlight of Fresh Water Aquaculture Scheme:<br />

The Scheme has 2 major components, viz., (1) Baffacos and (2) Fish Farmers<br />

Development Agency (CSS). Under Baffacos programme, the tentative target is to cover 56<br />

ha. of water area for construction of new ponds / renovation of existing ponds and<br />

training of beneficiaries (fish farmers) under the scheme. Detailed Action Plan on Baffacos<br />

during 2004-05 has already been submitted separately to Planning Department,<br />

Government of <strong>Mizoram</strong>.<br />

The second component under Fresh Water Aquaculture is Fish Farmers<br />

Development Agency (CSS) under which it is targeted to bring another 194 ha. of<br />

additional water are for renovation of fish ponds during 2004-05 through Fish Farmers<br />

Development Agency (CSS). Under the scheme only 25% of expenditure will be borne by the<br />

State Government and 75% of by the Government of India as per the pattern of assistance<br />

of Government of India. The Government of India has already sanctioned an amount of<br />

Rs.32.00 lakhs as Central Share under Fish Farmers Development Agency (CSS) and<br />

therefore, a State Matching Share of Rs. 12.50 lakhs (25% of the expenditure) has to be<br />

provided in the Annual Plan 2004-05 so as to enable to utilise the Central Share for<br />

renovation of fish ponds in the culture sector for production of fish flesh. The preliminary<br />

formalities, viz., verification of ponds are completed.<br />

Now, since the Sectoral Allocation of Annual Plan 2004-05 is restricted within<br />

Rs.182.00 lakhs including Baffacos, there is no scope for providing the State Matching<br />

Share separately under Annual Plan Outlay for 2004-05 and hence, it is approved to<br />

provide the State Matching Share for Fish Farmers Development Agency (CSS), i.e., Rs.12.50<br />

lakhs under Baffacos allocation during 2004-05 if the Planning Department, Government<br />

of <strong>Mizoram</strong> agrees, viz. — (i) Rs. 87.50 lakhs for Baffacos and (ii) Rs. 12.50 lakhs for State<br />

Matching Share of Fish Farmers Development Agency (CSS) as mentioned above. Details of<br />

the Scheme may be seen under the Scheme-wise description under Chapter-II.<br />

Marketing:<br />

Under Marketing Scheme, 3 Ice Plants and 2 Cold Storages are maintained and<br />

these assets are providing the requirement of Ice Blocks and Cold Storages to the fish<br />

farmers and fish sellers for facilitating marketing of local fresh fishes to a great extent.<br />

However, due to constraints of Plan Fund, the Department has not been able to clear off<br />

the pending bills for maintenance of aforesaid Plants, viz. — maintenance charge of<br />

contractor which has been pending since last year (Rs. 8.15 lakhs), power & electricity bills<br />

(Rs. 1.36 lakhs). Repairing cost of Kolasib and Bawngkawn Ice Plants-cum-Cold Storages<br />

(Rs.2.59 lakhs), etc. besides maintenance cost for the remaining period of 2004-05 (Rs.2.57<br />

lakhs). The detail requirement is shown separately under the scheme-wise description in<br />

the following paras. Therefore, an amount of Rs.16.30 lakhs is approved under Marketing<br />

Scheme during the Annual Plan 2004-05.


- 55 -<br />

FISHERIES DEPARTMENT<br />

Fish Seed Production-cum-Farming:<br />

Similarly, an amount of Rs.15.00 lakhs has to be provided under Fish Seed<br />

Production-cum-Farming Scheme for maintenance of the Fish Seed Farm which have been<br />

constructed under Non-Lapsable Central Pool of Resources so as to make it possible to<br />

start fish production (targeted at 60 lakhs of fish seed production during 2004-05) by<br />

providing inputs (fish feed, manures/fertilizers, liming, etc.) labours, machinery &<br />

equipment and nets & gears during Annual Plan 2004-05. (Details of requirement are<br />

shown separately under the scheme-wise description).<br />

Therefore, the minimum requirement of fund for the Annual Plan is Rs.231.00<br />

lakhs including Baffacos out of which only Rs.182.00 lakhs could be allocated in the<br />

Annual Plan 2004-05 as per Sectoral Allocation of Planning Department. Therefore, an<br />

additional fund of Rs.49.00 lakhs is required immediately during 2004-05 without which<br />

the Plan Schemes will not be able to implement successfully.<br />

2. Details of the Schemes<br />

1) Direction & Administration:<br />

The requirement of fund under the scheme Direction & Administration is Rs.87.60<br />

lakhs at the minimum for maintenance of the existing staff as well as for Office Expenses,<br />

Travelling Expenses etc. towards Administrative Costs as a part of development scheme<br />

during the Annual Plan 2004-05.<br />

Under Direction & Administration, the expenditure already incurred towards Salary,<br />

O.E., T.E., etc. till 30 th November 2004 is Rs.59.32 lakhs and committed liability for the<br />

remaining period of 2004-05 is Rs.28.28 lakhs. Therefore, the actual requirement of fund<br />

under Direction & Administration is Rs.87.60 lakhs wherein the additional requirement of<br />

fund is Rs.13.20 lakhs.<br />

The outlay which could be allotted within the Sectoral Allocation of Planning<br />

Department, i.e., Rs.82.00 lakhs for Direction & Administration is only Rs.74.40 lakhs<br />

against the actual requirement of Rs.87.60 lakhs during 2004-05 as per details shown<br />

below: —<br />

A. Direction<br />

Annual Plan Actual<br />

(Rs. in lakh)<br />

Additional<br />

Sl.<br />

No.<br />

Items Unit<br />

2004-05<br />

Physical Financial<br />

requirement<br />

for<br />

2004-05<br />

requirement<br />

for<br />

2004-05<br />

1 2 3 4 5 6 7<br />

1. Maintenance of existing staff No. LS 7.60 8.60 1.00<br />

2. Wages No. LS 3.60 3.60 -<br />

3. T.E. No. LS 2.00 2.50 0.50<br />

4. O.E. No. LS 4.00 7.20 3.20<br />

5. Rents No. LS 3.00 3.00 -<br />

6. Other Charges No. LS 0.50 1.50 1.00<br />

7. Motor Vehicles No. LS 2.00 4.00 2.00<br />

Sub-Total of ‘A’ 22.70 30.40 7.70


Sl.<br />

No.<br />

B. Administration<br />

Items Unit<br />

- 56 -<br />

FISHERIES DEPARTMENT<br />

Annual Plan<br />

2004-05<br />

Physical Financial<br />

Actual<br />

requirement<br />

for<br />

2004-05<br />

(Rs. in lakh)<br />

Additional<br />

requirement<br />

for<br />

2004-05<br />

1 2 3 4 5 6 7<br />

1. Maintenance of existing staff No. 32 41.91 43.41 1.50<br />

2. Wages No. LS 0.89 0.89 -<br />

3. T.E. No. LS 2.90 4.40 1.50<br />

4. O.E. No. LS 5.00 7.00 2.00<br />

5. Maintenance / Minor Works No. LS 1.00 1.50 0.50<br />

Sub-Total of ‘A’ 51.70 57.20 5.50<br />

TOTAL (Direction & Administration) 74.40 87.60 13.20<br />

INLAND FISHERIES<br />

2) Fish Seed Production-cum-Farming:<br />

In order to meet the fish seed demand in the State, 7 nos. of Fish Seed Farms have<br />

been constructed at Lengpui, Tamdil, Thenzawl, Zawlnuam, Ngengpui, Zobawk and<br />

Saikhawthlir under the Non-Lapsable Pool of Resources. Therefore, until and unless these<br />

fish seed farms are put into operation and produce fish seeds, it will have no impact.<br />

Hence, it is required to maintain these farms under Annual Plan 2004-05 to produce<br />

sufficient fish seeds to cater the demand of local of local farmers. It requires sufficient<br />

start-up fund towards cost of inputs, wages nets & gears, machineries and equipments etc.<br />

as per details shown below for production of fish seeds in these farms. Detail Estimate<br />

showing maintenance costs / operational costs of Fish Seed Farms is also enclosed in<br />

Annexure ‘A’. It is targeted to produce around 60 lakhs of fish seeds during 2004-05 in the<br />

aforesaid Departmental Fish Seed Farms if the fund requirement is provided by the<br />

Government properly, viz., a minimum of Rs.15.50 lakhs will be required for maintenance<br />

costs of above fish seed farms. However, an allotment of Rs.2.00 lakhs only is approved in<br />

the Annual Plan 2004-05.<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan<br />

2004-05<br />

Physical Financial<br />

Actual<br />

requirement<br />

for<br />

2004-05<br />

Additional<br />

requirement<br />

for<br />

2004-05<br />

1 2 3 4 5 6 7<br />

1.<br />

Fish Seed Production-cum-Farming<br />

Maintenance of Fish Seed Farm<br />

i) Cost of Inputs 0.50 5.28 4.78<br />

ii) Labour Charges Fish<br />

0.80 3.65 2.85<br />

iii) Nets & Gears<br />

iv) Machinery & Equipment<br />

Seeds<br />

(in<br />

60<br />

0.20<br />

0.30<br />

2.10<br />

1.90<br />

1.90<br />

1.60<br />

v) Incidentals, repairing of<br />

ponds, etc.<br />

lakh)<br />

0.20 2.57 2.37<br />

Total 2.00 15.50 13.50


- 57 -<br />

FISHERIES DEPARTMENT<br />

3) Fresh Water Aquaculture:<br />

The strategy in the Annual Plan 2004-05 is to boost up the fish flesh production in<br />

the culture sector by bringing around 250 hectares of additional water area under Fresh<br />

Water Aquaculture Scheme through Baffacos and Fish Farmers Development Agency (CSS).<br />

As already mentioned earlier in the Background under Chapter-I, the Government<br />

of India has already sanctioned an amount of Rs.37.50 lakhs as Central Share (75% of total<br />

cost of scheme) under the Fish Farmers Development Agency (CSS) for the year 2004-05<br />

for development of Fresh Water Aquaculture (see Annexure ‘B’) against which a State<br />

Matching Share of Rs.12.50 lakhs (25%) has to be provided in the Annual Plan 2004-05 so<br />

as to enable to utilise the Central Share of Rs. 37.50 lakhs for renovation and improvement<br />

of fish ponds in the private sector for fish production.<br />

However, due to restriction in the fund allocation for Annual Plan 2004-05, i.e., total<br />

outlay of Rs. 182.00 lakhs only for implementation of all the ongoing Plan Schemes, there is<br />

no scope for providing the aforesaid State Matching Share of Rs.12.50 lakhs separately un<br />

the Plan Budget. Therefore, it is approved to provide the State Matching Share of Rs.12.50<br />

lakhs for Fish Farmers Development Agency (CSS) under Baffacos allocation during Annual<br />

Plan 2004-05 if the Government of <strong>Mizoram</strong> agrees the proposal, viz., (i) Rs.87.50 lakhs for<br />

Baffacos for construction of new ponds / renovation of existing ponds and training of<br />

beneficiaries (fish farmers) and (ii) Rs.12.50 lakhs as State Matching Share for Fish Farmers<br />

Development Agency (CSS) against Government of India’s Share of Rs.37.50 lakhs which is<br />

already sanctioned for renovation of fish ponds in the culture sector.<br />

Detail Action Plan on Baffacos for 2004-05 has already been submitted separately<br />

to the Planning Department, Government of <strong>Mizoram</strong>. Details of the Scheme, Fresh Water<br />

Aquaculture for Annual Plan 2004-05 is shown below: —<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan 2004-05<br />

Physical Financial<br />

Remarks<br />

1 2 3 4 5 6<br />

1. BAFFACOS:<br />

1. * The physical &<br />

Construction of<br />

financial targets are<br />

new ponds /<br />

tentatively indicated which<br />

renovation of<br />

would be utilised after<br />

existing ponds<br />

approval of Planning<br />

and supply of<br />

Deptt., Govt. of <strong>Mizoram</strong><br />

inputs including Ha. 250* 87.50*<br />

for State matching share,<br />

training of fish<br />

i.e., Rs.12.50 lakhs for<br />

farmers<br />

FFDA (2004-05) which is<br />

proposed to be met within<br />

Baffacos allocation of<br />

Rs.100.00 lakhs as per<br />

details shown at Sl. 2.


2. FFDA (CSS):<br />

Renovation and<br />

improvement of<br />

pond and<br />

supply of inputs<br />

(subsidy) under<br />

FFDA<br />

- 58 -<br />

FISHERIES DEPARTMENT<br />

GOM<br />

(25%)<br />

12.50<br />

(State<br />

matching<br />

share<br />

proposed<br />

under<br />

Baffacos)<br />

GOI (75%)<br />

37.50<br />

(Already<br />

sanctioned<br />

by GOI as<br />

Central<br />

Share<br />

Total 250 100.00 37.50<br />

2. There is no scope of<br />

providing the State<br />

Matching Share (FFDA)<br />

separately under Annual<br />

Plan 2004-05 due to<br />

restriction in Sectoral<br />

Allocation of Plan Outlay.<br />

Hence, State Matching<br />

Share is tentatively<br />

proposed herewith under<br />

Baffacos allocation if the<br />

Planning Department, Govt<br />

of <strong>Mizoram</strong> agrees<br />

4) Development of Riverine Fisheries:<br />

Conservation and protection of Riverine Fisheries is quite essential to enhance the<br />

fish yield from the rivers, etc. (capture sector). The Department has taken up ranching<br />

programme in the rivers by stocking fish seeds to propagate the riverine stock. More<br />

efforts are required to study and survey the major riverine systems towards conservation<br />

of economic species declaration of sanctuaries, etc. The <strong>Mizoram</strong> Fisheries Acts and Rules<br />

are also under consideration at the Government level for implementation.<br />

During Annual Plan 2004-05, it is required to provide fund for conservation and<br />

exploitation of riverine fisheries, viz. — purchase of Nets & Gears and Machineries &<br />

Equipments for which the fund requirement is Rs. 0.50 lakh at the minimum for 2004-05.<br />

However, due to fund restriction, only Rs. 0.10 lakh could be provided in the Annual Plan<br />

2004-05 as per details shown below: —<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan<br />

2004-05<br />

Physical Financial<br />

Actual<br />

requirement<br />

for<br />

2004-05<br />

Additional<br />

requirement<br />

for<br />

2004-05<br />

1 2 3 4 5 6 7<br />

1. Development of Riverine Fisheries:<br />

Development of Riverine System,<br />

Maintenance, Awareness Programmes -<br />

i) Nets & Gears No. LS 0.10 0.30 0.20<br />

ii) Machinery & Equipment No. LS - 0.20 0.20<br />

Total 0.10 0.50 0.40<br />

5) Information, Extension & Training:<br />

The Department has also been disseminating the technology of fish farming to the<br />

fish farmers in the State with the objective to enhance fish production through various<br />

activities, viz. — (a) Publication of magazines, pamphlets, radio talks, advertisements; (b)<br />

Training of fish farmers; (c) Organisation of workshop; (d) Practical demonstrations in the<br />

field level as well as in the Departmental Fish Farms, etc. The impact is that the per hectare<br />

production to table size fish in the State has been augmented to @ 1800 kg with the<br />

Extension & Training activities from the normal rate of 12 kg/ha.


- 59 -<br />

FISHERIES DEPARTMENT<br />

During the current year, the Department has also committed to organise fish<br />

farmers training inside the State as well as conduct fish farmers training as an awareness<br />

programme required under Baffacos and also farmers are proposing for farmers tour<br />

outside the State to see progress in Fisheries of other States for which the requirement of<br />

fund is Rs.2.00 lakhs. There is also a proposal for Central Sponsored Scheme under<br />

Extension & Training in which the Government of India’s share is in the tune of Rs.3.60<br />

lakhs (80% of total cost of the scheme) as per details shown below. Hence, a State Matching<br />

Share of Rs.0.90 lakh is required to avail the Central Assistance of Rs.3.60 lakhs. Besides<br />

the above, the Department has also committed to publish Fisheries Magazine and to<br />

prepare a Documentary Film on Fisheries during the current year for dissemination of<br />

fisheries technology through mass media and awareness programme for which an<br />

additional fund of Rs.3.77 lakhs will be required during 2004-05. There is also a<br />

committed liability of Rs.0.50 lakh against Advertisement Bills which is required to be<br />

cleared off during the current year. However, due to fund restriction Rs.2.00 lakhs only is<br />

approved in the Annual Plan for 2004-05.<br />

Details of the Scheme showing the Plan Allocation of Rs.2.00 lakhs for Annual Plan<br />

2004-05: —<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1 2<br />

Information, Extension & Training:<br />

3 4 5<br />

A. State Plan -<br />

1. Publication:<br />

a) Magazine, pamphlet, etc. No. LS 0.36<br />

b) Production of documentary film on<br />

Fisheries<br />

No. 1 -<br />

c) Clearance of advertisement bills No. LS -<br />

2. Extension materials / I.T. application No. LS 0.50<br />

3. Maintenance of demonstration farms No. 3 0.24<br />

4. Training of technical in-service / fresh<br />

personnel in fisheries<br />

No. 10 -<br />

5. Organisation of fish farmers tour outside<br />

the State to see progress in Fisheries of<br />

other States<br />

No. 1 -<br />

TOTAL ‘A’ 1.10<br />

B. CSS – State Matching Share (20% towards<br />

Extension & Training (CSS)<br />

1. Training of fish farmers including cost of<br />

training<br />

GOM<br />

(20%)<br />

GOI<br />

(80%)<br />

No. 150 0.77 3.08<br />

2. Publication of training / extension manual No. 3 0.05 0.20<br />

3. Organisation of workshop / seminar No. 1 0.08 0.32<br />

TOTAL ‘B’ 0.90 3.60<br />

TOTAL OF (A + B) 2.00 3.60


- 60 -<br />

FISHERIES DEPARTMENT<br />

6) Marketing:<br />

Under the Scheme, 3 Ice Plants and 2 Cold Storages are maintained at Bawngkawn,<br />

Kolasib and Bilkhawthlir. These marketing assets have been functioning quite well during the<br />

last two years (2000-01 and 2001-02) and have already produced around 400 M.T. of Ice Blocks<br />

so far since its inception (2001-02). Now it needs some minor repairing works required to run<br />

well again. The assets are providing the requirement of Ice Blocks and Cold Storages at 50%<br />

subsidy to the fish farmers and fish sellers in Aizawl, Bilkhawthlir, etc. for marketing of local<br />

marketing of local fresh fishes in the State to great extent. Therefore, maintenance of these Ice<br />

Plants and Cold Storages are necessary. However, due to constraint of Plan Fund, the<br />

Department has not been able to clear off the pending bills during 2004-05 for the maintenance<br />

of aforesaid Plants and the committed liabilities are shown as per details given below: —<br />

(1) The maintenance of Cold Storages-cum-Ice Plants at Bawngkawn and Kolasib was<br />

taken up by the Contractor for a period of 2 years (November 2001 to October<br />

2003) as per the Agreement of the Government for which the total bill is Rs.21.12<br />

lakhs out of which Rs.8.15 lakhs is not yet paid to the Contractor till today. Also,<br />

failure of payment of above dues may entail Court Case as the matter has already<br />

appealed by the Contractor to the Department. Since an outlay of Rs.3.00 lakhs<br />

could not be allotted for Marketing Scheme during 2004-05 due to Plan Fund<br />

restriction, the committed liability of Rs.8.15 lakhs has to be provided as additional<br />

fund during 2004-05 for clearance of dues as mentioned above.<br />

(2) Besides, there are other committed liabilities amounting to Rs.5.58 lakhs, viz.<br />

Power & Electricity bills (Rs.1.36 lakhs) repairing cost of Kolasib and Bawngkawn<br />

Ice Plant-cum-Cold Storage Units (Rs.2.59 lakhs), etc. and maintenance cost for<br />

the remaining period of 2004-05 including repairing of Ice Canning Tins of<br />

Bilkhawthlir Ice Plant, etc. (Rs.2.57 lakhs).<br />

Therefore, altogether the additional fund requirement under Marketing Scheme<br />

during Annual Plan 2004-05 against committed liabilities is Rs.13.30 lakhs.<br />

Details of the Scheme showing the Annual Plan Outlay of Rs.2.00 lakhs during<br />

2004-05 which has been restricted within the Plan Fund allocation is Rs.3.00 lakhs as<br />

shown below: —<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1 2<br />

Maintenance of Ice Plant & Cold Storages:<br />

3 4 5<br />

A. Pending Bills -<br />

1. Maintenance charge (Contractor’s Bill) for<br />

Bawngkawn and Kolasib Ice Plants & Cold<br />

Storages (Feb/03 to Oct/03)<br />

2. Power & Electricity Bills of Bawngkawn and<br />

Kolasib Ice Plants & Cold Storages and<br />

Bilkhawthlir Ice Plant<br />

No. 2 Ice Plants,<br />

2 Cold<br />

Storages<br />

No. 3 Ice Plants,<br />

2 Cold<br />

Storages<br />

3. Repairing cost of Kolasib and Bawngkawn Plant No. 2 1.40<br />

4. Labour charge of Bawngkawn and Kolasib Ice<br />

Plant-cum-Cold Storages<br />

No. 2 0.30<br />

5. Water Bill No. 1 0.30<br />

6. Salt, tools, etc. No. LS 0.20<br />

TOTAL ‘A’ 3.00<br />

-<br />

0.80


Sl.<br />

No.<br />

- 61 -<br />

FISHERIES DEPARTMENT<br />

Items Unit<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1 2 3 4 5<br />

B. Requirement for Dec/04 to March/05 –<br />

1. Power Bill of Bawngkawn, Kolasib and<br />

Bilkhawthlir Plants<br />

No. 3 Ice Plants,<br />

2 Cold<br />

Storages<br />

2. Labour charges of Bawngkawn & Kolasib Plants No. 2 -<br />

3. Water Bill No. 1 -<br />

4. Salt, tools and repairing of Ice Canning Tins of<br />

Bilkhawthlir Ice Plant<br />

No. LS -<br />

5. Unforeseen expenditure No. LS -<br />

TOTAL ‘B’ -<br />

TOTAL OF (A + B) 3.00<br />

7) Inland Fisheries Statistics:<br />

The Government of India has introduced the Central Sector Scheme for<br />

Development of Inland Fisheries Statistics for improving the Inland Fisheries Statistics<br />

data in the States through information, networking, geographical information system and<br />

census on important attributes, viz. potential areas of culture and capture sector, etc. on<br />

Inland Fisheries of the States.<br />

According to the Government of India’s pattern of assistance, the expenditure on<br />

Pay and Allowances of the sanctioned staff (to the State Government) which is shown<br />

below will be met as 100% grant-in-aid by the Central Government under the scheme.<br />

Government of India sanctioned Rs.4.00 lakhs during the 2003-04 and Rs.0.50 lakh during<br />

2002-03 as 100% grant against Salary of Staff. Accordingly, the State Government has<br />

agreed for creation of 4 posts under the scheme, viz. Deputy Director of Fisheries – 1 no.,<br />

Technical Assistant/Computer – 1 no. and Investigator – 2 nos. on Co-Terminus basis and<br />

creation of post is in process with the Government.<br />

Therefore, a token provision of Rs.0.50 lakh is approved for maintenance of<br />

Statistics Wing under the scheme during Annual Plan 2004-05 as per details shown below: -<br />

Sl.<br />

No.<br />

Items Unit<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1 2<br />

Development of Inland Fisheries Statistics:<br />

3 4 5<br />

1. Office Expenses No. LS 0.15<br />

2. Maintenance / Minor Works No. LS 0.10<br />

3. Machineries & Equipment No. LS 0.25<br />

TOTAL 0.50<br />

-


- 62 -<br />

FISHERIES DEPARTMENT<br />

ANNEXURE ‘A’<br />

DETAILS OF MAINTENANCE / OPERATIONAL COST OF FISH SEED FARMS DURING 2004-05<br />

Fish Seed Farms (7 nos.), viz. — Lengpui, Tamdil, Ngengpui, Zawlnuam, Thenzawl,<br />

Zobawk & Saikhawthlir.<br />

1. Total Water area - 16.2 ha.<br />

2. Total Farm area - 36.5 ha.<br />

Sl.<br />

No.<br />

Inputs Quantity Rate Amount<br />

1. Cost of Inputs per hectare of water<br />

area: -<br />

1) Liming 3 Qtl. Rs. 600/- Qtl. Rs. 1,800/-<br />

2) Manuring with RCD<br />

3) Fish Feed -<br />

100 Qtl. Rs. 100/- Qtl. Rs. 10,000/i)<br />

Mustard Oil Cake 20 Qtl. Rs. 700/- Qtl. Rs. 14,000/ii)<br />

Rice Bran 20 Qtl. Rs. 340/- Qtl. Rs. 6,800/-<br />

Sub-Total of (1)<br />

Total requirement of inputs for 7 farms (16.2 ha. of water area):<br />

Rs. 32,600/-<br />

Rs. 32,600 × 16.2 ha. = Rs. 5,28,120/-<br />

Say: — Rs. 5,28,000/-<br />

2. Nets & Gears (minimum requirement 7 nos. of Rs. 30,000/- Rs. 2,10,000/at<br />

the initial stage)<br />

farms per farm<br />

3. Machinery & Equipments (minimum 7 nos. of Rs. 27,000/- Rs. 1,90,000/requirement)<br />

farms per farm<br />

4. Labour Charges & Incidentals: —<br />

1) Wages for weed clearance,<br />

Rs. 3,65,000/feeding,<br />

manuring, dewatering, 36.5 ha. of Rs. 100×100<br />

upkeeping of farms, etc.<br />

farm area manday per ha.<br />

2) Incidentals, repairing of ponds<br />

etc.<br />

Rs. 2,57,000/-<br />

Sub-Total (4): Rs. 6,22,000/-<br />

TOTAL OF 1+2+3+4: Rs. 15,50,000/-


- 66 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

FORESTRY & WILDLIFE<br />

1. BACKGROUND AND STRATEGY :<br />

<strong>Mizoram</strong> State with hilly terrain and primarily agricultural economy is inhabited by<br />

tribal population. Soil and Water are two important resources on which growth and<br />

productivity of agricultural economy depends. Forests play important role in production<br />

and conservation of soil and water. Forests also provide many important day-today needs<br />

of local population such as fuel, fodder, timber, food in form of wild fruits and vegetables<br />

and other non-wood forests produce. Forests play a vital role in environment stability,<br />

ecological balance and over all economic development of the state like <strong>Mizoram</strong><br />

undoubtedly revolves around the Forests.<br />

National Forest Policy 1988 stipulate that hilly and mountainous regions like<br />

<strong>Mizoram</strong> need to maintain at least 2/3 of the total geographical area under tree cover in<br />

order to prevent soil erosion, land degradation and protection of the fragile eco-system. As<br />

against this goal, at present notified forests (reserved/protected forests) constitute about<br />

38% of the geographical area and even most of these are open, degraded and subjected to<br />

pressure of shifting cultivation, forest fire and other forms of biotic pressures.<br />

Shifting cultivation is still widely practised in <strong>Mizoram</strong>. These practices not only<br />

affect ecology of the area but also decrease natural regeneration of tree species to a<br />

considerable extent. The destruction of habitat of <strong>plan</strong>ts and animals has not only led to<br />

the reduction in population of wild animals in the forest, but also rendering many species<br />

of rare <strong>plan</strong>ts and animals to the extent of becoming endangered/extinction.<br />

The survey demarcation, mapping and settlement of land including forest lands is<br />

a pre-requisite for evolving proper integrated land use system. This task is yet to be<br />

completed in the state. Hence for proper control and scientific management of forests on a<br />

sustainable basis, consolidation of notified forests/reserved forests will be necessary.<br />

The productivity of forests is already very low in <strong>Mizoram</strong>. There has been very<br />

little silvicultural research to evolve technologies and practices suiting to local conditions<br />

to increase productivity. Destruction of forests by illicit fellings and removal of forest<br />

produce to meet domestic need of Timber and Firewood, besides, forest fire,<br />

encroachments and grazing are common. Protection of forests from such detrimental<br />

factors is inevitable for ecological and environmental security.<br />

There is a wide gap between supplies from existing forests and the ever increasing<br />

demands. Hence to increase production of timber and non-timber forest produce to meet<br />

local needs and to reduce the gap between demands and the supply, undertaking massive<br />

afforestation programme through <strong>plan</strong>tation of utility tree species and aided natural<br />

regeneration would be necessary. Plantations created earlier need periodic tendings for<br />

managing the forest to scientifically achieve maximum biomass and non-timber forest<br />

produce from the forests. To meet increasing demand of forest produce and at the same<br />

time reduce pressure on existing shrinking forest resources, extension of tree cover<br />

beyond conventional forest areas would be necessary. For this purpose, tree growing and<br />

protecting forests with active involvement and participation of private individuals need to<br />

be promoted on massive scale through proper extension programmes to cope up with the<br />

increased work programme.<br />

North-East India is considered to be a mega-bio-diversity region. Wildlife is an<br />

important resource which plays vital role in ensuring ecological stability. In recent years<br />

poaching of animals for the purpose of earning money has become a big challenge to the<br />

Forest Department is Protection capabilities in terms of mobility, equipments and trained<br />

manpower to keep this undesirable activity under proper check.


- 67 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

To cope up with the increased work programmes, and to ensure better<br />

preservation, and management of forests and wildlife for sustainable use of forest<br />

resources strengthening of forest organisation with respect to manpower and human<br />

resource development through training is necessary. Equipments technology and facilities<br />

are also extremely necessary.<br />

APPROVED OUTLAY FOR ANNUAL PLAN 2004–2005<br />

Sl. No. Name of Scheme Approved Outlay<br />

(Rs. in lakh)<br />

(1) Direction and Administration<br />

A - Direction 117.27<br />

B - Administration 163.74<br />

(2) Survey of Forest Resources<br />

A - Forest Research 26.37<br />

B - Consolidation of Forest and Working Plans 3.31<br />

(3) Communications & Buildings<br />

A - Communications 0.20<br />

B - Buildings 1.00<br />

(4) Forest Conservation & Development<br />

A - Forest Protection 53.97<br />

(5) Afforestation 8.02<br />

(6) Development of Bamboo Plantation 200.00<br />

(7) Forest Produce / Utilisation 4.16<br />

(8) Extension & Training<br />

A - Forestry Training 6.96<br />

B - Forest Extension 6.00<br />

(9) Preservation of Wildlife 94.21<br />

(10) Other Expenditures -<br />

(11) Assistance to <strong>Mizoram</strong> Pollution Control Board 84.79<br />

Total 770.00<br />

DESCRIPTION OF SCHEMES APPROVED FOR ANNUAL PLAN 2004–2005<br />

1. DIRECTION AND ADMINISTRATION<br />

(i) DIRECTION<br />

This scheme is to provide for expenditure towards salary/allowances of the<br />

existing staff (46 nos.) and establishment cost of PCCF & Circle Offices. Financial outlays<br />

approved are as follows: —


- 68 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

Items of Expenditure (Rs. in lakh)<br />

001(01) - Direction<br />

(01) - Salary 72.00<br />

(02) - Wages 11.46<br />

(11) - Travelling Expenses 8.30<br />

(13) - Office Expenses 17.05<br />

(14) - Rent 0.96<br />

(26) - Advertisement 3.00<br />

(34) - Scholarship / Stipend 0.50<br />

(51) - Motor Vehicles 4.00<br />

(52) - Machinery & Equipment -<br />

Total 117.27<br />

(ii) ADMINISTRATION<br />

This scheme is to provide for expenditure towards salary/allowances of the<br />

existing staff (90 nos.) and establishment cost of 11 Territorial Divisions besides<br />

the normal expenses to run these establishments. Financial proposals are as<br />

follows: —<br />

Items of Expenditure (Rs. in lakh)<br />

001(02) - Administration<br />

(01) - Salary 100.32<br />

(02) - Wages 37.61<br />

(11) - Travelling Expenses 7.40<br />

(13) - Office Expenses 12.00<br />

(14) - Rent 2.41<br />

(26) - Advertisement 1.00<br />

(51) - Motor Vehicles 3.00<br />

Total 163.74<br />

2. SURVEY OF FOREST RESOURCES<br />

The main object of the scheme is to carry out Forestry Research for improving the<br />

productivity of forest resources and to undertake status survey of forest produce besides,<br />

consolidation of forest including preparation of management <strong>plan</strong>s (Working Plans) for<br />

forest resources of the State.<br />

(i) RESOURCES SURVEY & SILVICULTURE RESEARCH<br />

The need has been felt of conduct forestry research on various aspects such as: —<br />

(a) Phonological studies of important local tree species.<br />

(b) Standardisation of nursery technique of important indigenous species to<br />

be used for Afforestation programmes.<br />

(c) Undertaking experimental <strong>plan</strong>tations of new species (local as well as<br />

exotic) to standardise their Silviculture practice for adoption in our<br />

Afforestation programmes.<br />

(d) Survey of Minor Forest Produce like Cane, Medicinal Plants, etc. and<br />

their development for better utility and value addition.


- 69 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

Financial approvals are as follows: —<br />

Items of Expenditure (Rs. in lakh)<br />

005(01) - Forest Resources Survey<br />

(01) - Salary 23.37<br />

(11) - Travelling Expenses 1.50<br />

(13) - Office Expenses 1.50<br />

(27) - Minor Works -<br />

Total 26.37<br />

(ii) CONSOLIDATION OF FOREST & WORKING PLAN<br />

Forest survey, demarcation, consolidation of forests, collection, compilation &<br />

analysis of various data on Forest Resources are required to be taken up before<br />

management <strong>plan</strong>s for managing forests on scientific lines could be prepared. Hon’ble<br />

Supreme Court has directed that Working Plans should be completed within a period of<br />

two years. This direction could not be complied with mainly due to financial constraints.<br />

Financial outlays approved are: —<br />

Items of Expenditure (Rs. in lakh)<br />

005(02) - W.P.O.<br />

(01) - Salary 1.31<br />

(11) - Travelling Expenses 1.00<br />

(13) - Office Expenses 1.00<br />

(27) - Minor Works / Maintenance -<br />

Total 3.31<br />

3. COMMUNICATIONS AND BUILDINGS<br />

(i) ROADS<br />

Under this scheme, it is approved to maintain roads / inspection paths to various<br />

field Offices in remote places, for facilitation inspection and supervision works. However,<br />

due to financial constraint only provision of Rs.0.20 lakh is earmarked.<br />

Items of Expenditure (Rs. in lakh)<br />

070(01) - Communications<br />

(27) - Minor Works / Maintenance 0.20<br />

Total 0.20<br />

(ii) BUILDINGS<br />

The objective of the sub-scheme is to make provision for accommodation (both<br />

offices and residential) to Officers and Staff. Besides this, it will provide for maintenance<br />

of existing assets which are about 900 buildings including 51 nos. Forest Rest House.<br />

Therefore, an amount of Rs.1.00 lakhs is approved for maintenance.<br />

Items of Expenditure Approved Outlay<br />

(Rs. in lakh)<br />

070(02) - Building<br />

(27) - Minor Works / Maintenance 1.00<br />

Total 1.00<br />

4. FOREST CONSERVATION AND DEVELOPMENT<br />

(i) FOREST PROTECTION<br />

Forest is a biological entity and a renewable subject to damages from<br />

various factors, namely, fire encroachment, illicit cutting/removal of forest<br />

produce, faulty land use practices (Shifting Cultivation), etc. These factors are<br />

prevalent in the State with the significant extent thereby degrading and depleting<br />

the forest resources much to the detriment to its fragile ecology, environmental


- 70 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

stability and ecological balance, which ultimately reduce the productivity of land.<br />

With the increasing population of both human and livestock and demand for wood<br />

and other forest produce which is far beyond the sustainable supplies of the<br />

shrinking forest cover, protection of forest is becoming more challenging.<br />

Protection of forest from Forest Fire is very important in the context of <strong>Mizoram</strong>.<br />

The approved financial outlay for meeting the salary / allowances of staff (67 nos.)<br />

and other establishment cost during 2004–2005 are given below: —<br />

Items of Expenditure (Rs. in lakh)<br />

101(01) - Forest Protection<br />

(01) - Salary 50.87<br />

(11) - Travelling Expenses 0.50<br />

(13) - Office Expenses 1.60<br />

(27) - Minor Works / Maintenance 1.00<br />

Total 53.97<br />

5. AFFORESTATION<br />

There is a wide gap between demand and supplies of wood from the<br />

existing Forests. It is necessary to augment wood resources by undertaking<br />

<strong>plan</strong>tation programme over wasteland and degraded areas. At present, all the<br />

Afforestation works under State Plan are executed through Centrally Sponsored<br />

Scheme of “Area Oriented Fuel Wood and Fodder Plantation Project” on 50:50<br />

Matching Share basis. It is approved to keep an outlay of Rs.8.02 lakhs as State<br />

Matching Share for maintenance of 7500 ha. <strong>plan</strong>tation.<br />

(a) Maintenance of older <strong>plan</strong>tations - 14,000 ha.<br />

Items of Expenditure (Rs. in lakh)<br />

101(02) - Afforestation<br />

(13) - Office Expenses 7.89<br />

(27) - Minor Works / Maintenance 0.13<br />

Total 8.02<br />

6. DEVELOPMENT OF MINOR FOREST PRODUCES ( BAFFACOS):<br />

Bamboo Action Plan (2004 – 05)<br />

The Action Plan to combat gregarious flowering of Bamboo is envisaged to prepare<br />

the people especially in the rural areas to tide over the likely socio-economic problems and<br />

comprises of the following main components such as infrastructure development, bamboo<br />

extraction & enumeration, rodent control, regeneration of flowered areas through farm<br />

sector and Departmental bamboo <strong>plan</strong>tations and research aspects.<br />

The <strong>detailed</strong> Action Plan for the current year (2004-05) is as below :<br />

(1) Raising of Bamboo seedlings for <strong>plan</strong>ting during 2005-06 :<br />

Immediately following mass seedling, all bamboo stands will die. In areas<br />

undisturbed by biotic interference (grazing, fire etc.), there will be profuse regeneration,<br />

which will require a minimum of 4-5 years to mature. To tide over the lean period,<br />

bamboo <strong>plan</strong>tation of desired species will have to be undertaken. Species such as<br />

Bambusa bambos, Dendrocalamus hamiltonii, D.strictus, etc will be raised from seeds.<br />

Rhizome cuttings of B.tulda, D. longispathus will also be raised. Tissue cultured <strong>plan</strong>ts of<br />

D.gigateus and B balcoa will also be obtained.<br />

Tissue culture being a highly specialized activity, component firms and laboratories<br />

of national repute will be invited for their rates (For Aizawl).


- 71 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

To facilitate <strong>plan</strong>ting of seedlings with the first onset of Monsoon in the following<br />

year (2005-06), a provision of preliminary works that will include site preparation, survey<br />

and demarcation of the <strong>plan</strong>ting site has been kept in addition to seedling preparation.<br />

(2) Infrastructure Development:<br />

(2.1) Construction of bamboo extraction/link road: A huge growing stock of bamboo is<br />

located in area accessible neither by road nor by river. However, the bamboo can be<br />

harvested and transported to the main road by constructing makeshift semipermanent<br />

roads and through ropeway trolleys.<br />

(2.2) Establishment of bamboo collection centres: There are four major outlets in the<br />

State for transportation and sale of bamboo. Kanhmun is located in the northwestern<br />

border having feeder extraction channel by Langkaih river and Serhmun –<br />

Kanhmun road. Bairabi lies at the confluence of Tlawng, Teirei and Tut rivers. It is<br />

also connected by roads from Kolasib and has a major link with the border district of<br />

Cachar in the State of Assam through railroad. Vairengte is another outlet along the<br />

national highway NH 54. Another important outlet is located near the Tuirial Hydro<br />

Power Plant along Tuirial river. Likewise, a common centre can be established at<br />

Tlabung on the river Kolodyne to facilitate export of Muli bamboo to Bangladesh.<br />

It is imperative that bamboo collection centres be established at these locations so<br />

as to maintain control and check on the movement of Bamboo outside the State.<br />

Bamboo depots have to be developed and established for stocking and sale and<br />

booms will be constructed at suitable locations along the major rivers. Besides<br />

some staff quarters and checkgates will also be constructed at suitable locations to<br />

regulate and monitor movement of bamboo.<br />

(2.3) Facilitating Extraction : Demarcation of annual coupes and enumeration of all Muli<br />

bamboo areas will be done to facilitate extraction on scientific lines.<br />

(3) Public Awareness Campaign: Past experiences have shown that gregarious<br />

flowering of bamboo has always been accompanied by tremendous increase in rat<br />

population. The rodent not only feed on bamboo, but also invades the paddy fields and<br />

granaries resulting in disastrous famines. At that situation, chaos reign supreme among<br />

the rural areas. People fight for survival alone and almost all other development activity is<br />

stalled. Mass awareness campaign on preventive3 measures has to be imparted on a<br />

massive scale. It is proposed to take up publication of books, pamphlets, brochures, etc.,<br />

for distribution. Awareness campaign such as public meetings, house-to-house campaign<br />

etc., could be taken up though overheads.<br />

(4) Benefits to the people: Forestry works is highly labour intensive. It has been<br />

estimated that about 70% of the works goes towards component in the form of wages.<br />

Therefore, from this year’s outlay also, a substantial amount will go towards wage<br />

employment thereby benefiting the rural people.<br />

The benefit will increase during next year, when both advance work and <strong>plan</strong>ting<br />

will be taken up.<br />

WORK PROGRAMME FOR 2004 – 05 :<br />

A. Nursery - Rs. 125.00 lakh<br />

B. Infrastructure requirement for<br />

extraction of bamboo - Rs. 65.00 lakh<br />

C. Extraction costs - Rs. 3.00 lakh<br />

D. Overheads - Rs. 7.00 lakh<br />

TOTAL - Rs. 200.00 lakh


- 72 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

7. FOREST UTILISATION<br />

The object of the scheme is to provide for marking, removal of dead / dying<br />

/ fallen/ thinning trees from <strong>plan</strong>tation areas or from areas diverted for nonforestry<br />

purposes (development projects). Also in compliance with Hon’ble<br />

Supreme Court directions, the Department take up Timber Operation for meeting<br />

the local needs besides executing the works of regeneration in those areas where<br />

timber harvesting are done. In this regard, an Administrative Approval for<br />

Rs.248.54 lakhs was already conveyed by the Government of <strong>Mizoram</strong>, out of which<br />

Rs.53.93 lakhs was spent during the year 2002–2003. However, due to the financial<br />

constraint, the Department could allocate only an amount of Rs.4.16 lakhs during<br />

the year 2004–2005.<br />

Items of Expenditure Approved Outlay<br />

(Rs. in lakh)<br />

105(01) - Forest Utilisation<br />

(27) - Minor Works / Maintenance 4.16<br />

Total 4.16<br />

8. EXTENSION AND TRAINING<br />

(i) FORESTRY TRAINING (HUMAN RESOURCES DEVELOPMENT)<br />

The objective here is to import training in Forestry Subject to the field-Staff and<br />

Officers and of this Department and to make them partake periodic training in other Sates<br />

so as to update their skills/knowledge and thus enable them to discharge their<br />

responsibilities more effectively. Approved outlay is as follows:<br />

Items of Expenditure (Rs. in lakh)<br />

003(01) – Training of Forestry Personnel<br />

(01) - Salary 5.77<br />

(11) - Travelling Expenses 0.69<br />

(13) - Office Expenses 0.50<br />

Total 6.96<br />

(ii) EXTENSION<br />

The objective here is to promote, motivate and seek cooperation of the public to<br />

protect existing Forests and Wildlife through suitable programmes and awareness<br />

campaign along with observation of events and festivals like Vanamahotsava, Wildlife<br />

Week. Raising of seedlings for distribution for <strong>plan</strong>ting by individuals and organisations<br />

on their lands, etc. Approved outlay is as follows:<br />

Items of Expenditure Approved Outlay<br />

(Rs. in lakh)<br />

003(02) - Forest Extension<br />

(01) - Salary 2.50<br />

(11) - Travelling Expenses 0.50<br />

(13) - Office Expenses 1.00<br />

(16) - Publication 1.00<br />

(27) - Minor Works / Maintenance 1.00<br />

Total 6.00<br />

9. PRESERVATION OF WILDLIFE<br />

Conservation and Management of Wildlife & Bio-diversity in the protected areas of<br />

the State are done through protection measures by way of engaging Wildlife Guards. The<br />

provision of feeds and sanitation to Mini Zoo at Aizawl and Deer Park at Thenzawl are also<br />

necessary. Payment of salary and allowances of staff (16 nos.) and maintenance/<br />

development of zoo. Government of India has also approved the re-location of zoo from


- 73 -<br />

ENVIRONMENT & FOREST DEPARTMENT<br />

present location at Bethlehem Veng to a new site at Aizawl – Sairang road. It is also<br />

necessary to provide matching share for availing financial assistance from Central Zoo<br />

Authority and Project Tiger Scheme of Govt. of India. As such, an amount of Rs.52.10 lakhs<br />

is included under the Head of Minor Works.<br />

Items of Expenditure Approved Outlay<br />

(Rs. in lakh)<br />

02 – Environment Forestry & Wildlife<br />

110(01) – Preservation of Wildlife<br />

(01) - Salary 23.54<br />

(02) - Wages 7.18<br />

(11) - Travelling Expenses 1.50<br />

(13) - Office Expenses 1.49<br />

(14) - Rents 0.13<br />

(50) - Other Charges 7.77<br />

(51) - Motor Vehicles 0.50<br />

Total 94.21<br />

10. The Ministry has formulated a new Scheme titled “Integrated Forest<br />

Protection Scheme” for implementation during the 10 th Plan. The Scheme has since been<br />

approved by the Cabinet Committee on Economic affairs. The main components of the<br />

Scheme are :<br />

A. Forest Fire Control and management<br />

B. Infrastructure Development which has two sub components as<br />

(i) Working Plan Preparation/survey demarcation<br />

(ii) Strengthening of Infrastructure for Forest Protection.<br />

During the year 2003-04 under CSS – Integrated Forest Protection Scheme (IFP) for<br />

<strong>Mizoram</strong>, the Govt. of India has sanctioned and released Rs. 357.04 lakh to this<br />

department on 75:25 % cost sharing basis. Due to fund paucity the department could<br />

contribute only Rs. 49.76 lakhs as the state share against Rs. 87.26 lakh. Accordingly, the<br />

department is a defaulting department with a pending liability to the tune of Rs. 37.50<br />

lakh.<br />

During the 2004-05, the funding pattern has been changed as 90:10% and the Govt.<br />

of India has sanctioned an amount of Rs. 472.86 lakh out of which the state Govt. share<br />

should be Rs. 47.286 lakh.<br />

lakhs.<br />

As the case of the above, the department has provided an amount of Rs. 84.79


INTRODUCTION<br />

- 76 -<br />

COOPERATION DEPARTMENT<br />

COOPERATION<br />

The main theme of today Cooperative Movement is a people movement. In the<br />

changed scenario of National Policy in India with the policy of economic liberation of<br />

Trades and Industrial Policy and infusion of New Technology in most of the Industrial and<br />

allied activities, the Cooperatives may gives a major thrust to the new technological<br />

processings and other field areas of development process such like Diary/Poultry<br />

Farmings, Fruits and Vegetable Growings, Tribal Women Development and Multi-purposes,<br />

etc for incomes and employment generation so as to attain self-sufficiency.<br />

Cooperatives in <strong>Mizoram</strong> is moving headways to bring all socio-economic process<br />

and activities under the fold of Cooperative Movement. The Cooperative Movement has<br />

played a vital roles to overcome the problems of common people.<br />

Accordingly, the Annual Plan 2004 – 2004 envisages successful implementation of<br />

all major thrust of the 9 th Plan with a special emphasis to the following objectives: -<br />

1. Strengthening the Organisational structure of the Cooperation Department in<br />

keeping with the needs to restructure the Cooperative Movement as<br />

suggested by the Planning Commission and revitalize non-functioning<br />

Cooperatives and weed out the non-functional Cooperatives Societies that<br />

cannot be revitalized.<br />

2. To launch different effective Projects in all potential trades in the Cooperative<br />

Field area to transform the rural economy in <strong>Mizoram</strong> and to attain selfsufficiency<br />

as well as to transform the rural economy.<br />

3. To diversify Cooperative activities and its movements covering all potential<br />

field area of developmental process.<br />

4. To reframe a Cooperative Laws in a most suitable manner, to provide<br />

adequate legal safeguards to all types of Cooperative Institutions in all level.<br />

5. To provide remunerative market facilities to the real producers and farmers<br />

through a Cooperatives.<br />

6. To strengthen a Cooperative Credit Structure by obtaining different credit<br />

facilities from the Financing Institutions at the State and National Level by<br />

presenting a reliable Project Schemes.<br />

7. To launch a suitable programmes for Cooperative Education, Training,<br />

Publicity and to implement a Central Cooperative Field Education<br />

Programmes in <strong>Mizoram</strong>.<br />

8. To establish appropriate linkages to ensure remunerative prices to member<br />

Farmers and provide remunerative market facilities to the real producers.<br />

9. To restructure a Cooperative Movement to boost up the effort of attaining<br />

self-sufficiency in the State of <strong>Mizoram</strong>.


Sl.<br />

No.<br />

- 77 -<br />

COOPERATION DEPARTMENT<br />

BREAK-UP OF THE OUTLAY OF VARIOUS SCHEMES FOR 2004 – 2005<br />

Name of the Scheme<br />

(Rs. in lakhs)<br />

Annual Plan Outlay for<br />

2004 - 2005<br />

Revenue Capital Total<br />

1 2 3 4 5<br />

1 Direction & Administration 127.80<br />

2 Training & Education 4.50<br />

3 Audit of Coop. Societies 9.20<br />

4 Assistance to Multi. & Rural Coops.<br />

5 Assistance to Credit & Banking 5.00<br />

6 Assistance to Public Sector & Other undertaking 75.00<br />

7 Coop. Training & Education 62.50<br />

8. Assistance to other types of Coop. Societies 16.00<br />

TOTAL 300.00<br />

Thus, the approved Plan Outlay of 2004 – 2005 is Rs. 300.00 lakhs.<br />

1. DIRECTION & ADMINISTRATION<br />

(a) Direction: Over all Supervision, Registration, Assistance, Counsel and Control of<br />

Registered Societies is the main works in the Directorate. There are 6 Officers and 20 other<br />

Staff under this head, it is proposed to up-grade one Assistant Registrar of Cooperative<br />

Post to Addl. Registrar of Cooperative Societies Post during this year i.e. 2004–2005.<br />

The following is the break-up of fund provision to meet salaries and other<br />

administrative costs.<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 Salary 40.20<br />

2 Wages 0.30<br />

3 Travelling Expense 2.50<br />

4 Office Expenses 15.00<br />

5 Minor Works/Maintenance 1.50<br />

6 Other Charges 2.50<br />

TOTAL 62.00<br />

(b) Administration: There are 6 Districts Offices at present under this head. Two<br />

more District Offices are approved to be opened at Serchhip and Mamit during this year<br />

and this will be manned from the existing Staff of the Department. Audit, Inspections,<br />

Verifications, Organisation, Cancellation etc., works of the Department are carried out<br />

from the District Offices.<br />

The following is the break-up of the Plan Outlay of the District during 2004 – 2005 :


Sl.<br />

No.<br />

- 78 -<br />

COOPERATION DEPARTMENT<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 Salary 48.40<br />

2 Wages 0.50<br />

3 Travelling Expense 4.50<br />

4 Office Expenses 10.00<br />

5 Rents, Rates & Taxes 0.40<br />

6 Minor Works/Maintenance 2.00<br />

TOTAL 65.80<br />

There are 2 Officers and 33 Staff under the Head of Administration.<br />

2. TRAINING & EDUCATION: To propagate effectively the Cooperative Movements<br />

among the public, training of those Official and Cooperative members who are associated<br />

with imparting Cooperative Principles, Accounting and Ideology is necessary. It is also<br />

obligatory to celebrate the All India Cooperative Week from 14 th – 20 th November every<br />

year. Fund requirement of these Training are included here.<br />

Centenary Celebration of Cooperative in India is to be done this year. Fund<br />

required for this is sought to be provided additionally.<br />

The following is the break-up of Plan Outlay in this head during 2004 – 2005 :<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 Office Expenses 4.00<br />

2 Other Charges 0.50<br />

TOTAL 4.50<br />

3. AUDIT OF COOPERATIVE SOCIETIES: The Department is looking after 1386<br />

functioning Area, District, Block and Primary Level Cooperative Societies. Scrutinisation<br />

and approval of Audited Report, decision on cancellations, liquidations etc., have been<br />

done after careful examination from this section. Chief Audit Officer, Accountant, U.D.C<br />

and L.D.C manned this section.<br />

The following is the Plan Outlay for 2004 – 2005 under this head :<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 Salary 6.80<br />

2 Travelling Expenses 0.90<br />

3 Office Expenses 1.00<br />

4 Other Charges 0.50<br />

TOTAL 9.20


- 79 -<br />

COOPERATION DEPARTMENT<br />

4. ASSISTANCE TO CREDIT AND BANKING: Under this head, the following Banking<br />

Institutions are included: -<br />

(a) <strong>Mizoram</strong> Cooperative Apex Bank Ltd. (MCAB)<br />

(b) <strong>Mizoram</strong> Cooperative Urban Development Bank Ltd. (MUCO)<br />

(a) MCAB Ltd.: Established during the year 1981, the <strong>Mizoram</strong> Cooperative Apex Bank<br />

(MCAB) Ltd., functions through its 11 Branched in <strong>Mizoram</strong>. It caters the credit<br />

requirement of the Cooperative Societies and Private Enterprises. Increase of Share<br />

Contribution is necessary. But this cannot be provided this year due to less allocation of<br />

Fund to the Department.<br />

The following is the fund approved:<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/Managerial 2.50<br />

TOTAL 2.50<br />

(b) MUCO Bank Ltd.: Established during the year 1986 – 87, <strong>Mizoram</strong> Urban<br />

Cooperative Development Bank (MUCO) Ltd., has 3365 Share Holder members. It plays vital<br />

roles in the economic improvement of the public by issuing Loans to viable enterprises.<br />

Increase of Govt. Share Contribution is found necessary. This cannot be done here due to<br />

less Plan allocation to the Department. Additional allocation for this may be done.<br />

The following is the Fund approved for MUCO Bank during 2004 – 2005:<br />

Sl.<br />

No.<br />

Particulars<br />

1 2 3<br />

1 GIA/Managerial 2.50<br />

TOTAL 2.50<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

5. ASSISTANCE TO PUBLIC SECTOR AND OTHER UNDERTAKING: Under this head,<br />

MIZOFED, set up during 1982 is included. It plays vital role in improving Consumer<br />

Movement in the State.<br />

MIZOFED also undertakes distribution of Petroleum Products and LPG as an agent<br />

of both IOC (AOD) and IOC (MD). For the successful operation of the programmes, the<br />

establishment costs and enhance its POL and LPG operation to fulfill the demands of the<br />

Public, infusion of more fund is required. Due to financial constraint MIZOFED could not<br />

make payment of Salaries of its employees and also Employees Provident Fund (EPF) to<br />

Commissioner of Employees Insurance, Govt. of India. To meet this Salaries and EPF<br />

requirement fund provision during 2004 – 2005 is made as follows.


Sl.<br />

No.<br />

- 80 -<br />

COOPERATION DEPARTMENT<br />

Particulars<br />

1 2 3<br />

1 GIA/Managerial 75.00<br />

TOTAL 75.00<br />

6. COOPERATIVE TRAINING AND EDUCATION:<br />

The followings are the Cooperative Union included under this head: -<br />

1) <strong>Mizoram</strong> State Cooperative Union (MSCU) Ltd.<br />

2) Lunglei District Cooperative Union (LDCU) Ltd.<br />

3) Chhimtuipui District Cooperative Union (CDCU) Ltd.<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

(1) <strong>Mizoram</strong> State Cooperative Union (MSCU) Ltd. : Since its inception in the year<br />

1975, the <strong>Mizoram</strong> State Cooperative Union has been engaging itself in activities like<br />

Publicity and Propaganda, Publication of Journals, holding of Seminars/Conference,<br />

Celebration of Cooperative Week and also imparting the Cooperative Education and<br />

Training to all the management members of different Cooperative Societies in the State.<br />

With the establishment of Junior Cooperative Training Centre which is at present placed<br />

under MSCU, imparting of better quality Cooperative Education and Training to<br />

Cooperative Members is expected to be done.<br />

The following is the fund approved during 2004 – 2005 :<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/MSCU Training & Managerial 39.88<br />

2 GIA/JCTC Training 4.12<br />

TOTAL 44.00<br />

(2) Lunglei District Cooperative Union (LDCU) Ltd. : Registered during the year<br />

1993, Lunglei District Cooperative Union took up imparting Cooperative Education and<br />

Training to Cooperative Societies members of Lunglei District. The Cooperative Officers of<br />

the rank of ARCS is deputed to head the management.<br />

The following is the fund approved during 2004 – 2005.<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/MSCU Training & Managerial 10.00<br />

TOTAL 10.00


- 81 -<br />

COOPERATION DEPARTMENT<br />

(3) Chhimtuipui District Cooperative Union (CDCU) Ltd.: Registered during the year<br />

1993. The Chhimtuipui District Cooperative Union takes the responsibility of imparting<br />

Cooperative Training and Education to members of Cooperative Societies within<br />

Chhimtuipui District.<br />

The following is the fund approved during 2004 – 2005 :<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/MSCU Training & Managerial 8.50<br />

TOTAL 8.50<br />

7. ASSISTANT TO OTHER COOPERATIVE SOCIETIES :<br />

(1) Diary and Livestock Cooperative Societies: Under this head, MULCO is the<br />

leading State Level Cooperative Societies. The Milk supply of Primary Multi-Commodity<br />

Cooperative Societies Ltd., affiliated to MULCO are collected and processed in the Chilling<br />

Machine and packed it into half litre packet and distribute to the Consumers in Aizawl<br />

Town and its surrounding area. One Cooperative Officer is deputed by the Government as<br />

Accounts Superintendent. To meet his salary etc., the following amount is approved as<br />

financial assistance :-<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/ Managerial 2.50<br />

TOTAL 2.50<br />

(2) Handloom and Weaving Cooperative Societies: Under this head, MAHCO is the<br />

leading Cooperative Societies. It provides raw-materials to its member Primary Handloom<br />

Cooperative Societies and buy back their finished products and sold out to the publics.<br />

The management top post is manned by Cooperative Officer of the rank of Deputy<br />

Registrar of Cooperative Societies.<br />

The following is the fund approved during 2004 – 2005.<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/ Managerial 4.00<br />

TOTAL 4.00


- 82 -<br />

COOPERATION DEPARTMENT<br />

(3) Fruits and Vegetables Cooperative Societies: Under this head, <strong>Mizoram</strong> State<br />

Cooperative Fruit, Forestry and Vegetable Federation (MAFF) Ltd., at the Apex, plays an<br />

important role. Primary Cooperative Societies, among fruits and vegetables growers,<br />

farmers and gardeners in all potentials areas, have been organized and registered. MAFF<br />

Ltd., supply their requirement of Agriculture Inputs and procure their surplus produces<br />

whenever available and disposed off to the Market.<br />

Govt. of <strong>Mizoram</strong> select MAFF Ltd., as one of the dealers of the Agriculture Inputs.<br />

The fertilizers requirement of <strong>Mizoram</strong> is lifted by MAFF and sell it to the needy Publics at<br />

reasonably cheap rate. One Assistant Registrar of Cooperative Societies is deputed as<br />

Manager-cum-Accounts Officer.<br />

The following is the fund approved during 2004 – 2005.<br />

Sl.<br />

No.<br />

Particulars<br />

1 2 3<br />

1 GIA/ Managerial 2.50<br />

2 GIA/Fertilizer Transportation 1.50<br />

TOTAL 4.00<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

(4) Women Cooperative Societies: The Women Cooperative Federation Ltd.<br />

(WOMENFED) at the Apex of Primary Women Cooperative Societies plays a significant roles<br />

in Women upliftment by imparting affective training in different kinds of trades such as<br />

Tailoring, Knitting and other allied activities that boost up the income of Women of the<br />

concerned families. The following is the fund approved during 2004 – 2005.<br />

Sl.<br />

No.<br />

Particulars<br />

1 2 3<br />

1 GIA/Purchase of Raw-Materials 1.00<br />

TOTAL 1.00<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

(5) Fisheries Farming Cooperative Societies: Under this head there are 75 Primary<br />

Fisheries Farming Cooperative Societies which were all affiliated to ZOFISFED, the State<br />

Level Federation. Fund approved for this ZOFISFED during 2004 – 2005 is as follows: -<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/Purchase of Fish Seeds 1.00<br />

TOTAL 1.00


- 83 -<br />

COOPERATION DEPARTMENT<br />

(6) Sericulture Farming Cooperative Societies: Under this head, MASCOS is the State<br />

Level Cooperative Societies which links about 30 Primary Sericulture Farming Cooperative<br />

Societies in <strong>Mizoram</strong>. Purchase of Cocoon from the members of its affiliated Primary<br />

Sericulture Cooperative Societies have been made and sold it to the processing Plan of<br />

Sericulture Department. The following is the fund approved for 2004 – 2005.<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/Purchase of Cocoons 1.00<br />

TOTAL 1.00<br />

(7) Piggery Cooperative Societies: There are 213 Primary Piggery Cooperative<br />

Societies in <strong>Mizoram</strong> which formed the State Level Federation naming “<strong>Mizoram</strong> Pig<br />

Producers’ Cooperative Federation Ltd.” (PIGFED Ltd.) The main objective of this Federation<br />

is to meet the public demands of Pork and supply piglets at a reasonable cheaper rate to<br />

pig rearers. The following is the assistance approved to be given during 2004 – 2005:<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakhs)<br />

Annual Plan<br />

2004 - 2005<br />

1 2 3<br />

1 GIA/Fencing of the Farm 2.50<br />

TOTAL 2.50


INTRODUCTION<br />

- 86 -<br />

TRADE & COMMERCE DEPARTMENT<br />

TRADE & COMMERCE<br />

The Department was created on 20.2.1987 with a heavy task which involved<br />

regulatory matters. It was required to prepare Acts and Rules. As such, the Department<br />

concentrated in preparing complicated and sensitive Acts and Rules. The <strong>Mizoram</strong> State<br />

Agricultural Produce Marketing (Regulation) Act, 1996 and the Rules 1996 have already<br />

been legislated for implementation. To implement these Acts & Rules, it is required to<br />

provide sufficient fund.<br />

The Department of Trade & Commerce is allotted the following business by the<br />

Government of <strong>Mizoram</strong> ( Allocation of Business ) Rules 1987.<br />

1) Promotion and regulation of trading in <strong>Mizoram</strong>,<br />

2) Agricultural Marketing,<br />

3) Regulated Markets,<br />

4) Establishment of Market Yards and Trade Centres,<br />

5) Border Trades,<br />

6) Trading by Non-Tribal and<br />

7) Inter-State trades.<br />

Administration and management of agricultural marketing was handed over by<br />

Central Government to the State Government from 1.4.1992. Hence, all the expenditure<br />

incurred for implementation of the agricultural marketing have to be borne by the State<br />

Government.<br />

In pursuance of the State Government Allocation of Business Rules, management<br />

and administration of Markets have been transfered from Land Revenue & Settlement<br />

Department and LAD to Trade & Commerce Department. As such additional fund is much<br />

required for construction of Garbage Bins, Dumping Grounds and other infrastructural<br />

facilities.<br />

As 5 (five) new Districts have been created by the Government of <strong>Mizoram</strong> in<br />

addition to three existing Districts, creation of additional Offices with new post will be<br />

necessary for the District Head-quarters, and additional fund is required.<br />

The Central and the State Governments have been taking all possible steps for<br />

operationalisation of Indo-Myanmar Border Trade at Champhai-Rih Sector. Hence, it is<br />

required to provide fund for operation of Indo-Myanmar Border Trade. Moreover, the State<br />

Government is taking every possible step for operation of Indo-Bangladesh Border Trade at<br />

Kawrpuichhuah, Tlabung, hence it is required to provide sufficient fund for this.


- 87 -<br />

TRADE & COMMERCE DEPARTMENT<br />

SCHEME - WISE DESCRIPTION<br />

I. AGRICULTURE MARKETING<br />

Due to recent enactment of the <strong>Mizoram</strong> State Agricultural Produce Marketing (<br />

Regulation ) Act 1996 and the Rules 1996 thereunder, Indo-Myanmar Border Trade (<br />

Champhai Rih-Sector ) which is already Inaugurated in 2004. State Master Plan prepared by<br />

Directorate of Marketing and Inspection, Government of India, already approved by the<br />

State Government, transfer of administration and management of Markets from Land<br />

Revenue & Settlement Department and LAD to Trade & Commerce Department, creation of<br />

additional Districts Offices and for giving priority to market, Agricultural Marketing for<br />

the upliftment of the mass rural farmers, the Department is required to be strengthened.<br />

Existing Posts under Plan<br />

Sl. Name of Post & Scale No. of Existing Fund Requirement<br />

No. of Pay Posts<br />

1. Marketing Officer 2 Rs. 4.50 lakhs<br />

( Rs. 6500 - 10500/- )<br />

2. Assistant 1 Rs. 2.00 lakhs<br />

( Rs. 5500 - 9000/- )<br />

3. UDC 2 Rs. 3.50 lakhs<br />

( Rs. 5000 - 8000/- )<br />

4. LDC 2 Rs. 2.50 lakhs<br />

( Rs. 4000 - 6000/- )<br />

5. Driver 1 Rs. 1.00 lakhs<br />

( Rs. 3040 - 4590/- )<br />

6. Grade IV 2 Rs. 1.50 lakhs<br />

( Rs. 2650 - 4000/- )<br />

TOTAL 10 Rs. 15.00 lakhs<br />

GRAND TOTAL 23 Rs. 17.00 lakhs<br />

Note : The Scale of pay mentioned above are as per the 5 th Pay Commission<br />

Recommendation.<br />

The financial outlay under Agriculture Marketing is as follows:<br />

1) Salary and T.E.: A sum of Rs. 17.00 lakhs is approved for Salary and Rs 2.50<br />

lakhs is approved for T.E. with total amount of Rs. 19.50 lakhs during 2004 - 2005.<br />

2) Office Expenses: A sum of Rs. 19.00 lakhs is approved for Office Expenses.<br />

3) Motor Vehicle: A sum of Rs. 2.00 lakhs is approved for maintenance of (one)<br />

Departmental Truck during 2004 - 2005.


- 88 -<br />

TRADE & COMMERCE DEPARTMENT<br />

4) Promotion & Regulation of Markets: Before the legislation of the <strong>Mizoram</strong> State<br />

Agricultural Produce Marketing (Regulation) Act, 1996 and the Rules thereunder,<br />

management of Markets and its administration are done by different Departments and<br />

Institution like Land Revenue & Settlement Department, Local Administration Department<br />

and the Village Councils in their respective jurisdictions. In the meantime, Agricultural<br />

Department constructed market-sheds along the roadside of the National Highway. To<br />

remove this duplicacy, management and administration of markets have now been placed<br />

under one Department i.e. Trade & Commerce Department as per the Government of<br />

<strong>Mizoram</strong> ( Allocation of Business ) Rules, 1987.<br />

5) Minor Works and Establishment and Regulation of Border Trades: <strong>Mizoram</strong> has<br />

404 Kms. of International Border with Myanmar and 306 Kms. of International Border with<br />

Bangladesh. The Government of India and Myanmar signed Memorandum of<br />

Understanding ( MOU ) on Border Trade on 21.1.1994 and leaders of both sides have had<br />

series of talks. Border Trade is already going on the Manipur Border and the same is<br />

expected to take place in <strong>Mizoram</strong> very soon. The State Government is taking every<br />

possible step to establish border township of ‘Zokhawthar. Trade & Commerce<br />

Department, being a nodal Department for Border Trades, has been awarded lands for the<br />

development of Trade Complex, Office, Residential Quarters, Godown and Warehouse at<br />

Zokhawthar. Besides, this Department looks after various Markets of the State. As such the<br />

following works are approved to be taken up during 2004 - 2005.<br />

1) Construction of D.M.O. Quarter at Champhai.<br />

2) IV Grade Quarter Construction/Renovation and repair of various Markets.<br />

3) Maintenance of Office Buildings, Check gate Buildings.<br />

4) Construction of Market Garbage bins.<br />

5) Repair of Market Buildings.<br />

6) Construction of <strong>Mizoram</strong> State Agricultural Marketing Board Building.<br />

Hence, Rs. 41.00 lakhs is approved under Minor Works during 2004 - 2005.<br />

6) Wages: There are 23 Nos. of M.R. employees and Rs. 10.00 lakhs is approved<br />

during 2004 - 2005.<br />

7) Other Charges: A sum of Rs. 25.00 lakhs is approved for disposal of markets<br />

garbages and other miscellaneous expenditure during 2004 - 2005.<br />

Thus the total approved financial outlays under Direction and Administration is<br />

as follows: -<br />

Sl. No. Particulars Fund Requirement<br />

(Rs. In lakhs)<br />

1. Salary Rs. 17.00<br />

2. Wages Rs. 10.00<br />

3. T.E. Rs. 2.50<br />

4. Office Expenses Rs. 19.00<br />

5. Minor works / Maintenance Rs. 41.00<br />

6. Motor Vehicle Rs. 1.00<br />

7. Other charges Rs. 25.00<br />

TOTAL Rs. 115.50


- 89 -<br />

TRADE & COMMERCE DEPARTMENT<br />

II. ADMINISTRATION<br />

1) Setting up of District Offices: The function of Trade & Commerce Department<br />

like, Promotion and Regulation of Trading in <strong>Mizoram</strong> and improvement of Agricultural<br />

Marketing and its infrastructure cannot be confined in the State Capital alone. It may also<br />

be difficult and ineffective to administer from Headquarters i.e. Directorate. For smooth,<br />

efficient and effective administration and management, District Offices are opened at the<br />

following centres: -<br />

1) Champhai 2) Lunglei<br />

The approved break-up of expenditure to be incurred under District Offices is as<br />

follows: -<br />

a) Office Expenses: A sum of Rs. 6.00 lakhs is approved for Office Expenses<br />

(O.E.) for Annual Plan 2004 - 2005.<br />

b) Advertisement: For meeting Advertisement charges of market Auction,<br />

garbage disposal etc., a sum of Rs.0.50 lakhs is approved during 2004 - 2005.<br />

Sl. No. Particulars Fund Requirement<br />

( Rs. In lakhs )<br />

(a) Office Expenses Rs. 6.00<br />

(b) Advertisement Rs. 0.50<br />

TOTAL Rs. 6.50<br />

III. GRADING AND QUALITY CONTROL<br />

1) Grading and Standardisation: The importance of Grading and Standardisation has<br />

not received so much attention in <strong>Mizoram</strong>. The importance of Grading and<br />

Standardisation are summarised as follows: -<br />

a) Protection of the interest of the sellers and buyers by introducing some<br />

quality in grade and standards.<br />

b) Facilitation of quoting the quality of the products with uniform grades and<br />

standards between distant places.<br />

c) To give better chance for those who produce better quality and for those<br />

who can produce more in future.<br />

The benefits of standardisation and Grading are as follows: -<br />

a) It facilitates uniformity in fixation of prices of the commodities.<br />

b) It facilitates collection of the same quality of products.<br />

c) It facilitates management of stocking or storage facilities.<br />

d) It facilitates arrangement of fund for procurements and it makes the dealers<br />

more reliable.<br />

e) The intended sellers and interested purchasers can contact each other from<br />

distant places through letters, wireless, telegraphs, telephone or Fax.<br />

For purchase of Grading Laboratory and standards weight and measure<br />

Instruments and to educate and motivate the producers, a sum of 1.00 lakh<br />

is approved.


- 90 -<br />

TRADE & COMMERCE DEPARTMENT<br />

2) Quality Control: The need of Quality control has no deep root in the mind of<br />

producers in <strong>Mizoram</strong>. For this reason, the Agricultural Produces in <strong>Mizoram</strong> are regarded<br />

as inferior in quality. As such the producer cannot fetch better prices from their produces<br />

due to lack of Quality Control. Some of the producers may think Quality Control is meant<br />

for the consumers only, but this is not so. Quality Control is also beneficial to the<br />

producers and consumers both. Thus it is necessary to educate and motivate the<br />

producers in respect of Quality Control.<br />

A sum of Rs. 1.00 lakh is approved for imparting awareness of Quality Control.<br />

Hence, the approved financial outlay under Grading & Quality Control is as follows:<br />

Sl. No. Particulars Fund Requirement<br />

(Rs. In lakhs)<br />

1. O.E Rs. 1.00<br />

Total Rs. 1.00<br />

IV. ASSISTANCE TO PUBLIC SECTOR AND OTHER UNDERTAKINGS :<br />

1) Assistance to MAMCO Ltd.: The Government of <strong>Mizoram</strong> constituted “The<br />

<strong>Mizoram</strong> Agricultural Marketing Corporation Limited (MAMCO)” in 1993 with share capital<br />

of Rs. 10.00 crores to take up marketing of marketable surpluses of <strong>Mizoram</strong> Agricultural<br />

products outside the State. Trade & Commerce Department is nodal Department of this<br />

Corporation. The Corporation needs to be taken care by the Department until it can stand<br />

by itself. An amount to the tune of Rs. 152.00 lakhs is approved during 2004–2005 to be<br />

disbursed as share capital to MAMCO Ltd. Rs. 100.00 lakhs is earmarked for repayment of<br />

ginger liabilities.<br />

The approved financial break-up under Assistance to Public Sector undertaking<br />

and Subsidy is as follows: -<br />

Sl. No. Particulars Fund Requirement 2004 - 2005<br />

1. Assistance to Public Rs. 152.00 lakhs<br />

Sector Undertakings etc.<br />

TOTAL : Rs. 152.00 lakhs<br />

ABSTRACT OF APPROVED FINANCIAL OUTLAY<br />

Sl. No. Particulars Fund Requirement 2004 - 2005<br />

1. Agril. Marketing Rs. 115.50 lakhs<br />

2. Administration Rs. 6.50 lakhs<br />

3. Grading & Quality Control Rs. 1.00 lakhs<br />

4. Asst. to Public Sector undertaking Rs. 152.00 lakhs<br />

TOTAL Rs. 275.00 lakhs


- 93 -<br />

RURAL DEVELOPMENT DEPARTMENT<br />

RURAL DEVELOPMENT (Including SLMC)<br />

1. Direction, SLMC & IAC: For maintenance of 13 Officers and staff at SLMC Rs.32.90<br />

lakhs is approved in the Annual Plan 2003-04 under Plan Fund. Proposal for creation of 2<br />

[two] posts of IV Grade have been duly approved by DP & AR and concurred by Finance<br />

Department and formal creation of the 2 [two] posts is awaited. Hence token provision for<br />

maintenance of 2[two] additional posts of IV grade is also made in the Annual Plan. The<br />

total fund earmarked for maintenance of staff during the Tenth Five Year Plan 2002-07 is<br />

Rs. 140.00 lakhs. During 2003-04 the approved outlay in the Annual Plan for maintenance<br />

of Officers and staff is Rs. 32.90 lakhs and Rs. 32.49 lakhs is approved for maintenance of<br />

staff under SLMC & IAC during 2004-05 in the Annual Plan.<br />

2. DRDA Administration: There are 8 numbers of District Rural Development<br />

Agencies in <strong>Mizoram</strong> and the Government of India has allocated separate fund for DRDA<br />

Administration and the sharing basis between the Central and the State in the ratio of 75:25.<br />

During the Financial Year 2003-04 Rs. 60.00 lakhs is approved under Plan Fund for DRDA<br />

Administration as State Matching share. Rs. 400.00 lakhs is earmarked for DRDA<br />

Administration during the Tenth Five Year Plan and Rs. 85.30 lakhs is approved for DRDA<br />

Administration under Plan Fund as State matching share during 2004-05 in the Annual Plan.<br />

3. Direction & Administration, DWCRA [Development of Women and Children under<br />

Rural Areas]: Maintenance of 50 existing staff under DWCRA is fully borned by the State<br />

Government and Rs. 62.10 lakhs is approved in the Annual Pan 2003-04. Tentative outlay for<br />

maintenance of DWCRA Staff during the Tenth Five Year Period is Rs. 290.00 lakhs and<br />

Rs.63.27 lakhs is earmarked for maintenance of DWCRA staff in the Annual Plan 2004-05.<br />

4. Direction and Administration, SIRD [State Institute of Rural Dev.]: Maintenance<br />

of Officers and staff under SIRD is to be borned by the Government of India and the State<br />

Government n the ratio of 50:50. During 2003-04, Rs. 18.00 lakhs is approved under Plan<br />

fund for maintenance of staff under SIRD as State matching share. Rs. 80.00 lakhs is<br />

earmarked during the Tenth Five Year Plan period and Rs. 18.00 lakhs is approved for<br />

maintenance of staff under SIRD in the Annual Plan 2004-05.<br />

5. Swarnjayanti Gram SwarozgarYojana [SGSY]: With the launching of SGSY, several<br />

Centrally Sponsored Schemes like IRDP, TRYSEM, CITRA and GKY were amalgamated in<br />

SGSY. SGSY Schemes is funded by the Central and State Govt. in the ratio of 75:25.<br />

Rs.26.00 lakhs is approved in the Annual Plan during 2003-04 as State matching share for<br />

SGSY. Rs. 150.00 lakhs is earmarked during the Tenth Five Year Plan period and Rs. 40.00<br />

lakhs is approved for State matching share under SGSY in the Annual Plan 2004-05.<br />

6. Integrated Watershed Development Programme [IWDP]: With the objective of<br />

promoting economic development of the village community which is directly and<br />

indirectly dependent on the watershed. Watershed Development has been implemented by<br />

Rural Development Department under IWDP. Due to the increase of costs norm per hectare<br />

from Rs. 4000/- to Rs. 6000/- the difference between the costs norm has to be shared by<br />

the Centre and the State in the ratio of 75:25 basis. During 2003-04 Rs. 78.00 lakhs is<br />

approved in the Annual Plan under IWDP as State matching share and Rs. 320.00 is<br />

earmarked for IWDP during 2002-07 Plan and Rs. 33.24 lakhs is approved for IWDP in the<br />

Annual Plan 2004-05 as State Matching Share.<br />

7. Information Technology [IT]: In pursuance of the recommendation of National<br />

Task Force, Rs. 20.00 lakhs is earmarked during the Tenth Five Year Plan for effective<br />

monitoring and internal audit of Centrally Sponsored Schemes in <strong>Mizoram</strong>. During the<br />

Financial Year 2003-04 Rs. 3.00 lakhs is approved outlay in the Annual Plan for<br />

Information Technology and Rs. 3.00 lakhs is earmarked in the Annual Plan 2004-05.


- 94 -<br />

RURAL DEVELOPMENT DEPARTMENT<br />

8. Sampoorna Gramin Rozgar Yojana (SGRY): With a view to ensure development of<br />

village infrastructure in <strong>plan</strong>ned manner, the Government of India have decided to merge<br />

the two Rural Employment Assurance Schemes (EAS) and Jawahar Gram Swarozgar Yojana<br />

(JGSY) into a single Scheme viz. Sampoona Gramin Rozgar Yojana (SGRY) with the<br />

objective of providing additional wage employment in the rural areas along with creation<br />

of durable community, social and economic assets and infrastructure development in<br />

these areas in a <strong>plan</strong>ned manner. The approved outlay under SGRY in the Annual Plan<br />

2003-04 is Rs. 211.00 lakhs and Rs. 211.00 lakhs is approved in the Annual Plan 2004-05<br />

under SGRY as State matching share.<br />

9. Indira Awaas Yojana (IAY): The objective of IAY is to help construction of houses<br />

for dwelling for rural poor below the poverty line by providing them with grant-in-aid. Under<br />

the Scheme, 80% of the total funds available will have to be utilised for new construction and<br />

the remaining 20% will have to be utilised for upgradation of the existing houses. The<br />

approved outlay under IAY in the Annual Plan 2003-04 is Rs. 105.00 lakhs and Rs. 105.00<br />

lakhs is approved under IAY as State matching share in the Annual Plan 2004-2005.<br />

Direction & Administration: Under this scheme, there are as many as 36 numbers<br />

of posts, out of which 31 numbers are presently filled up. An Engineering Wing has been<br />

created in the Directorate to solve the ever-increasing technical complexity of Rural<br />

Development schemes. The Wing will be made functional from 2004-05 and will be<br />

manned by one Executive Rural Engineer (ERE), 2 Assistant Rural Engineers (ARE) and other<br />

Technicians. Moreover with the discontinuation of NPIC scheme, the Govt. is being moved<br />

to re-allocate one post of LDC under Direction and Administration.<br />

The total outlay under Direction & Administration for the Draft Annual Plan 2004-<br />

05 is Rs. 92.50 lakhs as indicated in the table below.<br />

Sl. No. Detailed Head<br />

Amount<br />

(Rs. in lakhs)<br />

1. Salary 60.00<br />

2. Wages 5.00<br />

3. Travelling Expenses 13.00<br />

4. Office Expenses 10.00<br />

5. Publication 0.50<br />

6. Hospitality Expenses 0.50<br />

7. Advertising 0.50<br />

8. Motor Vehicles 6.00<br />

9. Machinery & Equipments<br />

TOTAL : 92.50<br />

10. Block level Administration: There are at present 404 numbers of posts under the<br />

Block Level Administration scheme, out of which 234 posts are being filled up and 170<br />

numbers of posts are lying vacant. Out of the 234 filled up posts, 10 posts of Veterinary<br />

Field Assistants (VFA) will be repatriated to their parent department during 2003-04.<br />

During the 10 th Plan period (2002-2007), 8 new R.D. Blocks are approved to be created. One<br />

such block has been created and made functional during 2003-04 at Bilkhawthlir as an<br />

Additional Block. So the vacant posts under BLA is likely to be filled up during 2004-2005.


- 95 -<br />

RURAL DEVELOPMENT DEPARTMENT<br />

The total outlay for the Approved Annual Plan 2004-2005 is Rs.327.10. The breakup<br />

is indicated in the table below: —<br />

Sl. No. Detailed Head<br />

Amount<br />

(Rs. in lakhs)<br />

1. Salary 270.00<br />

2. Wages 5.00<br />

3. Travelling Expenses 20.00<br />

4. Office Expenses 30.00<br />

5. Rent -<br />

6. Minor Works 2.00<br />

7. Other Charges 0.10<br />

8. Grant-in-Aid. -<br />

TOTAL : 327.10<br />

11. Rural Housing (PMGY): This scheme provides housing for rural poor families and<br />

the healthy development of their habitat. There are two types of assistance, namely,<br />

(i) New Construction of houses and<br />

(ii) Upgradation of kutcha houses into pucca / semi-pucca houses. Besides these, this<br />

scheme also provides for the development of their habitat in the form of<br />

construction of internal roads, drainage system, sanitary latrines, good drinking<br />

water facilities and development of <strong>plan</strong>tation. For new construction of houses,<br />

each beneficiary is assisted with an amount of Rs. 27,500/- and with Rs. 12,500/-<br />

for upgradation.<br />

The total outlay for the Approved Annual Plan 2004-2005 is Rs.626.00 lakhs. The<br />

break-up is as indicated in the table below.<br />

Sl.<br />

No.<br />

Items<br />

Financial<br />

(Rs. in lakhs)<br />

Physical<br />

(in nos.)<br />

1. New Construction 440.00 1600<br />

2. Up-gradation 125.00 1000<br />

3. Infrastructure Development 61.00 150<br />

TOTAL 626.00<br />

12. Rural Communication: Due to the inability of state Public Works Department to<br />

cover the whole of the state, the Department had constructed a number of roads in the<br />

rural areas. Due to constraint of fund, the work has been discontinued for some years. For<br />

the Approved Annual Plan 2004-05, a token of Rs. 0.10 lakhs is provided.<br />

13. Housing for Project Staff: Under this scheme, construction and repair of office<br />

and staff quarters in the R.D. Blocks are mainly done. During 2003-04, one new Additional<br />

R.D. Block has been opened and made functional. Most of the Block offices and staff<br />

quarters, especially the buildings in the non-BADP area R.D. Blocks have deteriorated and<br />

need extensive repairs and renovation. An outlay of Rs. 3.20 lakhs is provided in the<br />

Approved Annual Plan 2004-05 to repair and renovate the offices and staff quarters of the<br />

10 non-BADP covered R.D. Blocks.


- 96 -<br />

RURAL DEVELOPMENT DEPARTMENT<br />

14. Social Education: Under this scheme, construction of Community Halls and<br />

Playgrounds are mainly undertaken. The life of the people of <strong>Mizoram</strong> revolves around the<br />

Community. Public meeting places play an integral and important part in the life of the<br />

Mizo Community. Construction of playgrounds also forms a catalyst in shaping the sociomoral<br />

fibre of the youth. Hence, this scheme assumes importance.<br />

During the 9 th Plan period, 38 numbers of Community halls were left unfinished<br />

due to paucity of funds. For the Approved Annual Plan 2004-2005, Rs.83.10 lakhs is<br />

provided for completion of at least a number of the unfinished Community Halls.<br />

16. BAFFACOS: According to the tentative allotment of fund under BAFFACOS, Rural<br />

Development submitted a project proposal for construction of link-road to Bamboo<br />

concentrated areas under various R.D. Blocks amounting Rs. 49.83 crore. A total of<br />

Rs.11.00 lakhs has been allotted to Rural Development Department for implementation of<br />

BAFFACOS during Annual Plan 2004-05 and Action Plan was prepared accordingly to cover<br />

a total length of 6.02 Kms for New Construction and 7.40 Kms for maintenance/widening<br />

under Reiek, Bilkhawthlir and Thingdawl RD Blocks.


- 102 -<br />

LAND REFORMS<br />

LAND REFORMS<br />

Approved Outlay : Rs. 340.00 lakhs<br />

INTRODUCTION<br />

Since <strong>Mizoram</strong> is non-land recorded State where jhumming is widely practised, it is<br />

vitally important to take measures for allotment of lands to the inhabitants for permanent<br />

cultivation and ownership of land. As such, jhum control measure has been adopted and<br />

at the same time house sites are also <strong>plan</strong>ned at various locations for allotment to the<br />

poor and needy families. The whole activities of the Department are, therefore, closely<br />

linked with Land Reforms Programme.<br />

Meanwhile, the Department, due to inadequate administrative infrastructure,<br />

cannot cope with the phenomenal increase in the range and volume of work in the pattern<br />

of land management particularly in rural areas.<br />

The Centrally Sponsored Scheme for Strengthening of Revenue Administration and<br />

Updating of Land Records at 50 : 50 (Central : State) sharing basis is being implemented,<br />

and the Annual Plan is also prepared in conformity with this Scheme.<br />

SCHEME-WISE BREAK-UP<br />

The Scheme-wise break-ups within the Plan outlay of Rs. 390.00 lakhs for the<br />

Annual Plan 2005 - 2006, is summarised as follows: -<br />

Sl. Name of Scheme Outlay Of which<br />

No. capital content<br />

1. Direction & Administration = Rs. 36.93 lakhs -<br />

2. Statistics & Evaluation = Rs. 7.54 lakhs -<br />

3. Maintenance of Land Records = Rs. 122.01 lakhs -<br />

4. Other charges (Survey Training) = Rs. 0.01 lakhs -<br />

5. Regulation of Land holdings & Tenancy = Rs. 173.51 lakhs -<br />

TOTAL = Rs. 340.00 lakhs -<br />

DETAILS OF THE SCHEMES<br />

I. DIRECTION & ADMINISTRATION (Rs. 36.93 lakhs) :-<br />

1. CONSTRUCTION OF BUILDING : (Rs. 2.00 lakhs)<br />

Lack of village level Record Room-cum-Staff Quarter had created problem<br />

of Revenue Administration at primary unit level. The Department urgently needs<br />

buildings for Record room-cum-residential accommodation for Staff posted at such<br />

centres. Hence, Rs. 2.00 lakhs has been provided for construction of four record<br />

rooms-cum- Staff quarters at Aizawl, Champhai, Mamit & Serchhip Districts. The<br />

fund will be utilised for matching contribution of C.S.S.<br />

2. HOUSE SITE PLAN (Rs. 4.00 lakhs)<br />

The Department has been taking up the scheme of house site <strong>plan</strong>ning at various<br />

convenient locations within town areas. The house sites so <strong>plan</strong>ned are meant for<br />

allotment to the poor and needy families. During the year 2005-2006, it is approved<br />

to give house sites to 6,000 families. Rs. 4.00 lakhs is provided for house site <strong>plan</strong><br />

and the fund will be utilised for matching contribution of C.S.S.


- 103 -<br />

LAND REFORMS<br />

3. PURCHASE OF MACHINERY & EQUIPMENTS (Rs. 0.01 lakhs) :<br />

In order to carry on Survey works and preparation of Land Records and to maintain<br />

and issue certificates and connected documents for earning more and more<br />

revenue, purchase of survey, drawing and printing equipment/ materials is<br />

required every year. For this purpose, Rs. 0.01 lakh is provided and the same fund<br />

will be utilised as a matching share of C.S.S.<br />

4. CREATION OF POSTS & SALARY (Rs. 10.36 lakhs) :<br />

Lack of man power, both technical and non-technical is the main problem<br />

constantly faced by the Department. The present staff strength is too inadequate to<br />

deal with the increasing volume of works. The following posts are already approved<br />

during 2002-2003 and the same posts are again approved for creation during 2004-<br />

2005. A provision of fund Rs. 10.36 lakhs is provided for maintenance of the<br />

existing posts and new creation of posts.<br />

Sl. No. Name of Posts already<br />

approved<br />

GROUP 'A'<br />

(1) Jt. Director of Survey 1<br />

( Rs. 12000 - 16500)<br />

(2) GROUP 'C'<br />

Stenographer (Grade-III) 1<br />

(Rs. 4500 - 7000)<br />

TOTAL : 2<br />

5. OFFICE EXPENSES (Rs. 7.64 lakhs) :-<br />

A provision of Rs. 7.64 lakhs is earmarked for Office expenses and other charges<br />

which will be utilised for a matching share of C.S.S.<br />

6. TRAVELLING EXPENSES (Rs. 2.00 lakhs) :-<br />

Rs. 2.00 lakhs is earmarked for travelling expenses and the fund will be utilised as<br />

a matching share of C.S.S.<br />

7. ENGAGEMENT OF CONTINGENT KHALASIS (Rs. 9.00 lakhs) :-<br />

In order to carry out the works relating to verification and demarcation of the<br />

Inter-State, Inter-District, Inter-Sub-Division and inter-Village boundaries assigned<br />

by the Government of <strong>Mizoram</strong>, it is required to engage contingent Khalasis who<br />

are to encamp in the forest of remote areas from time to time. As such, a provision<br />

of Rs. 9.00 lakhs is earmarked for wages, and the fund will be utilised with a<br />

matching contribution of C.S.S.<br />

8. I.T. DEVELOPMENT ( Rs. 1.82 lakhs) :-<br />

Government of <strong>Mizoram</strong> has felt the need to work out a practical modality for<br />

improving management of land records on a statewide scale utilising tools of<br />

Information Technology. The Government of India, Ministry of Rural Development,<br />

Department of Land Resources had provided Central assistance for<br />

Computerisation of Land Records, especially for purchase of Computer Hardware/<br />

Software and Data Entry works. It is the responsibility of the State Government to<br />

provide infrastructure, manpower, maintenance of computers and consumable<br />

items and to expand the network system. The focus to this scheme is to design a<br />

multi functional support for creation of reliable Data Bank for generation of Land


- 104 -<br />

LAND REFORMS<br />

Information System to provide information about the land, the resources upon it<br />

and the improvements made to it. Rs. 1.82 lakhs is provided herewith to meet such<br />

expenses and the fund will be utilised for matching contribution of C.S.S. for<br />

Computerisation of Land Records.<br />

9. OTHER CHARGES/ COMPENSATION (Rs. 0.10 lakhs) :-<br />

The Land Reforms measure has requires payment of compensation for acquisition<br />

of Private land for public interest. Hence, Rs. 0.10 lakhs is provided as a token for<br />

meeting such expenses and other charges. This fund will be utilised for matching<br />

contribution of C.S.S.<br />

II. STATISTICS & EVALUATION (Rs. 1.03 lakhs) :<br />

1. SALARY FOR CREATION OF POSTS (Rs. 1.03 lakhs) :<br />

Setting up of Statistics & Evaluation Cell is felt necessary for preparation and<br />

maintenance of Land Records, assessment and collection of various Taxes. Thus,<br />

the following posts which are already approved in the last year, 2003-2004 and the<br />

same posts are approved for creation during 2004-2005.<br />

Sl. No. Name of Posts Already<br />

approved<br />

GROUP 'A'<br />

1. Research Officer 1<br />

( Rs. 8000 - 13500)<br />

2. GROUP 'B'<br />

Inspector of Statistics 1<br />

(Rs. 5500 - 9000)<br />

3. GROUP 'C'<br />

Electronic Technician 1<br />

(Rs. 4500 - 7000)<br />

TOTAL : 3<br />

Preparation and Updating of Land Records with assessment of Land Revenue is the<br />

main trust of the Department. Preparation of Record-of-Rights and conferment of<br />

ownership rights to land owners has requires Printing of Forms and Certificates for<br />

various functionaries. For successful implementation of this scheme, creation of<br />

the above posts is urgently required. Thus Rs. 1.03 lakhs is earmarked for salary of<br />

the existing and newly created posts.<br />

2. OFFICE EXPENSES (Rs. 6.00 lakhs) :-<br />

Rs. 6.00 lakhs is earmarked for Office stationery, printing of maps, forms and<br />

Certificates etc,.and the fund will be utilised for matching contribution of C.S.S.<br />

3. TRAVELLING EXPENSES ETC. (Rs. 0.50 lakhs) :-<br />

The reliability and accuracy of work relating to collection and preparation of land<br />

data or statistics mainly depend on the performance of field Officers and Staff at<br />

various centres. Hence, Rs. 0.50 lakhs is provided for travelling expenses and other<br />

charges and this fund will be utilised for matching contribution of C.S.S.<br />

4. OTHER CHARGES/ COMPENSATION (Rs. 0.01 lakhs) :-<br />

The implementation of Land Reforms Programme has requires payment of<br />

compensation for acquisition of Land for public interest. Hence, Rs. 0.10 lakh is<br />

provided in token for such purposes and other charges. The fund will be utilised<br />

for matching contribution of C.S.S.


- 105 -<br />

LAND REFORMS<br />

III. MAINTENANCE OF LAND RECORDS (Rs. 122.01 lakhs) :<br />

1. CADASTRAL SURVEY ( Rs. 10.00 lakhs )<br />

Comprehensive Cadastral Survey is considered necessary for preparation of<br />

Cadastral maps and Land Information System. Sixty six (66) notified Towns/Subtowns<br />

have already been cadastrally surveyed. It is proposed to cover at least 28<br />

Nos. of notified towns/villages covering 500.00 hectares during 2005-06. Rs.10.00<br />

lakhs is earmarked to meet the expenses of Cadastral Survey of the Notified areas /<br />

Sub-towns and W.R.C., which will be utilised as a matching share of C.S.S.<br />

2. SURVEY STATION MARKS ( Rs. 0.50 lakhs ) :-<br />

During 2004 - 2005, it is approved to construct 5,000 nos. of Survey Station Marks,<br />

and a provision of Rs. 0.50 lakh is earmarked for this purpose which will be utilised<br />

as a matching share of C.S.S.<br />

3. WORK-CHARGE EXPENSES FOR ENGAGEMENT OF TRAINED SURVEYORS (Rs.16.00 lakhs):<br />

The existing technical staff is too inadequate for successful and progressive<br />

implementation of various Schemes especially Cadastral Survey which is one of the<br />

foremost important measures for land reforms. Due to ban on creation of Posts, a<br />

number of persons, who had already completed a two-year course in Survey<br />

training at the Survey Training Institute, Hyderabad, have to be engaged on<br />

contract/ Muster Roll basis as their service is required by the Department for<br />

Survey, Settlement and preparation of land record operations. Thus, Rs. 16.00 lakhs<br />

is earmarked for engagement of 33 trained personnel. The fund will be utilised as a<br />

matching contribution of C.S.S.<br />

4. STRENGTHENING OF SURVEY ORGANISATION AND SALARY (Rs. 72.50 lakhs):<br />

With the re-organisation of Civil Districts and the increasing volume of Works in<br />

Land Reform Programme, the services of more technical staff are urgently required<br />

by the Department. Therefore, the following posts are already approved during<br />

2003-2004 and the same posts are again approved for creation during 2004 - 2005.<br />

Sl. Name of Posts No. of Posts<br />

No. already approved<br />

GROUP 'A'<br />

1. Assistant Survey Officer 1<br />

(Rs. 8000 - 13500)<br />

GROUP 'B'<br />

2. Head Surveyor 3<br />

(Rs. 6500 - 10500)<br />

3. Surveyor - I 1<br />

(Rs. 5500 - 9000)<br />

GROUP 'C'<br />

4. Surveyor - II 5<br />

(Rs. 4500 - 7000)<br />

5. Surveyor - III 4<br />

(Rs. 4500 - 7000)<br />

6. Cartographer - II 1<br />

(Rs. 4500 - 7000)<br />

7. Cartographer - III 1<br />

(Rs. 4500 - 7000)<br />

TOTAL 16


- 106 -<br />

LAND REFORMS<br />

A provision of Rs. 72.50 lakhs is earmarked for salary of the existing and the newly<br />

created posts for 2005 - 2006.<br />

5. PURCHASE OF MACHINERY AND EQUIPMENT (Rs. 0.01 lakhs) :-<br />

In order to achieve a high standard of accuracy in land survey, new and better<br />

quality of various modern Survey, Drawing and Printing equipments/materials have<br />

to be procured this year. It is, therefore, approved that Rs. 0.01 lakh be provided<br />

for purchase of machineries and equipments during 2004-05 which will be utilised<br />

as a matching share of C.S.S. fund.<br />

6. OFFICE EXPENSES (Rs. 6.00 lakhs) :-<br />

The Department recently introduced new Land Settlement Certificates which will be<br />

in a more durable and exhaustive by using computerised and laminated material<br />

with plastic channel for the cover. With this end in view, a provision of Rs. 6.00<br />

lakhs is provided to meet the Office expenses during 2004 - 2005. The fund will be<br />

utilised as a matching share of Central Assistance.<br />

7. TRAVELLING EXPENSES (Rs. 2.00 lakhs) :-<br />

Rs. 2.00 lakhs is earmarked for travelling expenses of the Officers and Staff during<br />

2004-05 and the fund will be utilised for matching contribution of C.S.S.<br />

8. MOTOR VEHICLES AND HIRING OF VEHICLES (Rs. 1.50 lakhs) :-<br />

Due to lack of sufficient number of vehicles, the Department suffers a great deal in<br />

implementation of Land Reforms programmes. A number of good condition<br />

vehicles both heavy and light are required by the Survey parties who launched<br />

operations at various places during the working dry seasons. Besides, the District<br />

level functionary has to be increased in number. The vehicles being used for Survey<br />

Operation also need proper maintenance. As such, Rs. 1.50 lakhs is earmarked for<br />

maintenance of vehicles and hiring of private vehicles for Survey Operation during<br />

2004 - 2005 and the fund will be utilised for a matching contribution of C.S.S.<br />

9. AERIAL CADASTRAL SURVEY (Rs. 13.50 lakhs) :-<br />

The Pilot Project on Aerial Cadastral Survey was taken up by Survey of India in the<br />

District of Aizawl (undivided Aizawl) during 1996 - 98. The area covering 3737.00<br />

Sq.kms was photographed at the scale of 1:10,000. The photographs are now<br />

readily available for further processing through photogrammetric instruments for<br />

preparation of line maps and the work have to be taken up by the Department<br />

through Government of India approved agency. The Government of India, Ministry<br />

of Rural Development had already released Rs. 66.159 lakhs as its matching share<br />

(50:50) for further processing of such photographs during 1999 - 2000. The same<br />

fund had been utilised with State matching contribution during 2002-2003 with a<br />

physical achievement for production of graphical map covering 2000.00 Square<br />

Kilometres. It is therefore, approved to continue the same project for the remaining<br />

area covering 725.52 Sq. Kms. during 2004-2005 and also 725.52 Sq. Kms. during<br />

2005 - 2006 with total area of 1451.04 Sq. Kms. out of 3737.00 Sq. Kms. Hence, Rs.<br />

13.50 lakhs is provided to meet necessary expenses for processing Aerial<br />

Photographs and ground control / detail survey works.<br />

IV. SURVEY TRAINING ( Rs. 0.01 lakh) :-<br />

It is approved to send two in-service personnel at S.T.I., Hyderabad for Short term<br />

Course in Cadastral Survey & Cartography and also to conduct refresher course for<br />

technical personnel during 2004 - 2005. Rs. 0.01 lakhs is earmarked for this<br />

purpose which will be utilised for matching share of C.S.S.


- 107 -<br />

LAND REFORMS<br />

V. REGULATION OF LAND HOLDINGS & TENANCY (Rs. 173.51 lakhs) :<br />

Summary Survey and Records Operation :-<br />

The Government of <strong>Mizoram</strong> has formulated the New Land Reforms Policy envisaging<br />

Regulation of land holdings and tenancy. The first phase of the programme covers<br />

Summary Survey and Records Operation consisting of verification, measurement of<br />

areas and demarcation of boundaries of land holdings under Permit/ Periodic Patta/<br />

Pass as well as all lands for which ownership are claimed without Government Permit/<br />

Periodic Patta by the individuals in rural areas. The area covering 18 R.D. Blocks<br />

had already been covered. In order to confer ownership rights to land holders it is<br />

required to conduct Revision Survey of 10 R.D. Blocks during 2004 - 2005.<br />

01) Engagement of Work-charged personnel (Rs. 6.50 lakhs) :<br />

It is approved to engage 15 Nos. of Contingent Record Assistants and some<br />

Contingent Field Assistants to carry out Summary Survey and Record Operation of<br />

all land holdings in the 10 R.D. Blocks. A provision of Rs. 6.50 lakhs has been<br />

provided to meet the expenses for engagement of those casual employees. This<br />

fund will be utilised as matching contribution of C.S.S.<br />

02) Field Summary Survey Works (Rs. 10.00 lakhs) :<br />

The Summary Survey consists of two stages of operation, viz. (a) Control Survey<br />

and (b) Detail Survey. In Control Survey, the village boundaries and other<br />

prominent points/ survey stations are fixed with the help of 1:50,000 scale map of<br />

Survey of India. The sufficient control networks are provided for easy identification<br />

of individual land holdings which are located in scattered areas. In the <strong>detailed</strong><br />

Survey, the boundaries of individual land holdings are demarcated and the<br />

dimension of such land holdings are also measured accurately for preparation of<br />

Record-of-Right and assessment of annual land revenue. The Survey work requires<br />

clearing of jungle for survey lines and fixing of Survey Station marks at various<br />

pockets of all villages in 10 Nos. of R.D. Blocks. Hence, Rs. 10.00 lakhs is provided<br />

for engagement of casual labours and the fund will be utilised for matching<br />

contribution of C.S.S.<br />

03) Hiring of light vehicles (Rs. 0.50 lakh) :<br />

For conducting Summary Survey and Record Operation in the interior areas it is<br />

required to hire light vehicles for transportation of Survey party. Hence, Rs. 0.50<br />

lakh has been provided and this will be utilised as a matching contribution of C.S.S.<br />

04) Purchase of Machinery & Equipments (Rs. 0.01 lakh) :<br />

For conducting the Summary Survey and Record Operation it is required to<br />

purchase some minor Survey and Drawing instruments. Hence, Rs. 0.01 lakh has<br />

been provided and this fund will be utilised as matching share of C.S.S.<br />

05) Construction of Survey Field Camp (Rs. 0.50 lakh) :<br />

The Surveyors deployed for Summary Survey works are to encamp in the interior<br />

areas of villages and they require construction of temporary field camp. Hence,<br />

Rs.0.50 lakh is provided for meeting such expenses and the same fund will be<br />

utilised for matching share of C.S.S.


- 108 -<br />

LAND REFORMS<br />

06) Office Expenses (Rs. 5.00 lakhs) :<br />

The preparation of Record-of-Rights for issuance of Periodic Patta to land holders<br />

and preparation of Land Records at Directorate and District Office has require<br />

purchase of office stationeries. Hence, Rs. 5.00 lakhs has been provided to meet<br />

such expenses and the same fund will be utilised as matching share of C.S.S.<br />

07) Travelling Expenses (Rs. 1.00 lakh) :<br />

The summary survey work had involves camping of Survey Party in the interior<br />

areas of villages. Hence, Rs. 1.00 lakh is provided to meet such expenses and this<br />

will be utilised as a matching share of CSS.<br />

08) MULTIPURPOSE CADASTRE DEVELOPMENT PROJECT SURVEY FOR ALLOTMENT OF<br />

BAMBOO PLANTATION AND TO FAMINE AFFETCED FAMILIES (Rs. 150.00 lakhs)<br />

(BAFFACOS).<br />

(a) <strong>Mizoram</strong> covers geographical area measuring 21,087.00 Sq.Kms where<br />

jhumming is widely practised. As such jhum control measure has been adopted<br />

and at the same time the land reform programme envisages to wean off such<br />

primitive type of cultivation by means of modern land use <strong>plan</strong>ning, allotment and<br />

settlement of land to the famine affected and needy families. The whole activities<br />

of the Land Reforms Department are therefore, closely linked with the New Land<br />

Reforms Programme of the State. Under the New Land Reforms Programme.<br />

Summary Land Survey of villages are conducted since 1999 and now 18 R.D. Blocks<br />

are already surveyed and recorded. Under this programme the Development Project<br />

Survey for the allotment of Agricultural Land for Bamboo Plantation had also been<br />

taken up since 2001-2002 in the river valley of R. Tlawng and R. Tuirial valleys in<br />

scatter areas.<br />

The Government of <strong>Mizoram</strong> had therefore proposed to take up the scheme<br />

in large scale during 2004-2005 keeping in view of ensuing Mautam, 2007 (Bamboo<br />

flowering). It is estimated that Bamboo grown area in <strong>Mizoram</strong> covers about<br />

10,333.00 Sq. Kms consisting of about 20 species of bamboo. <strong>Mizoram</strong> is having<br />

about 14 % of India's bamboo products. It is therefore proposed to conduct<br />

multipurpose cadastre Development Project Survey covering 10,333.00 Sq. Kms<br />

during 2004-2009. Out of the above area, 20,000 Hectares is approved to be<br />

covered by this estimated amount i.e. Rs. 150.00 lakhs.<br />

(b) SCOPE OF THE PROJECT : The scope of the project is to conduct<br />

multipurpose Cadastre Development Project Survey and allotment and settlement<br />

of Agricultural Land to famine effected families for allotment of Bamboo Plantation<br />

and to wean off shifting cultivation. So that the famine effected people will get<br />

labour employment to earn money by jungle clearance in the survey work and to<br />

sell the natural bamboo without paying royalty before bamboo flowering. Better<br />

quality of Bamboo may be <strong>plan</strong>ted in the land after bamboo flowering year.


- 109 -<br />

LAND REFORMS<br />

(c) PHASING ACTIVITIES<br />

The sequences of activities will be as follows: -<br />

(i) Reconnaissance Survey<br />

(ii) Control Survey<br />

(iii) Detail Survey<br />

(iv) Procurement of Survey, Drawing, printing/ Computer Hardware<br />

(v) Generation and Production of Village cadastral map/ Parcel Map<br />

(vi) Selection and Allotment of land to individual families<br />

(vii) Identification of plots and construction of survey line marks.<br />

(d) SCHEME WISE BREAK-UP :<br />

(Rs. in lakh)<br />

Sl. Items Outlay<br />

No.<br />

1 Cadastral Survey<br />

(a) Control Survey 110.00<br />

(b) Detail Survey<br />

2 Purchase of Survey, Drawing & Printing 15.00<br />

equipment and technical stationeries<br />

3 Hiring of Vehicle 5.00<br />

4 Construction of Survey Work Camp 6.70<br />

5 Construction of Record Room and fixtures 6.30<br />

6 Travelling Expenses 5.00<br />

7 Survey Training 2.00<br />

Total 150.00<br />

This fund will be utilised as a matching share of C.S.S.


- 115 -<br />

SINLUNG HILLS DEVELOPMENT COUNCIL (SHDC)<br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

STORY OF SHDC<br />

1. The Hmar People’s Convention [HPC] Party started their Political movement for the<br />

creation of Hmar Autonomous District Council in 1986. Since, the Govt. of <strong>Mizoram</strong> did<br />

not give satisfactory response to the cause. The HPC Party called a non-violence peaceful<br />

bandh in March 1981. In protest against the first bandh, the State Govt. started violence and<br />

blood shedding on the HPC people that HPC volunteers were forced to underground. As a<br />

result, Arms confrontation between the Govt. of <strong>Mizoram</strong> and HPC started on 16.7.1989.<br />

As such escalation of violence between the two took place for quite sometime. Finally at the<br />

kind initiative of the then Governor of <strong>Mizoram</strong> His Excellency, Mr. Swaraj Kausal<br />

negotiation has implemented and Memorandum of Settlement between the Government of<br />

<strong>Mizoram</strong> and HPC Party was sign on 27.7.1994.<br />

2. As per para 5.4 of the Memorandum of Settlement [MOS] thereof, the SHDC has<br />

been constituted since 1997. The main objective of the accord is to give adequate autonomy<br />

to the SHDC, as per para 3 of the MOS.<br />

3. Para 5.4 of the Memorandum of Settlement states that separate fund will be<br />

earmarked for schemes which may be specified for implementation within the area of the<br />

council. As per para 5.4 of the MOS and as per our proposal of even no. dated 31.1.2005 a<br />

provision of Rs. 90.00 lakhs had been allocated and approved by the Planning Department<br />

vide their letter no.G.28014/93/2004-05/SPB dt. 8.2.2005. But as per their sectoral<br />

Allocation of outlays for the Annual Plan 2004-05 [vide No.G.28014/55/SPB dt. 10.2.2005]<br />

This budget has reduced to Rs. 89.00 lakhs which shall be utilised as under<br />

1 Salary Rs. 2.34 lakhs<br />

2. Wages Rs. 5.00 lakhs<br />

3. Travelling expenses Rs. 2.00 lakhs<br />

4. Office expenses Rs. 20.00 lakhs<br />

5. Rent Rs. 1.00 lakh<br />

6. Publication Rs. 0.25 lakh<br />

7. Minor works Rs. 39.66 lakhs<br />

8. Other charges Rs. 19.75 lakhs<br />

TOTAL Rs. 90.00 lakhs<br />

[a] Salary: The increase in the salary head by 0.09 lakhs is due to inclusion of<br />

allowances for chairman and members of the council as well as insufficiency of normal<br />

<strong>plan</strong>t Budget.<br />

[b] Minor Works: This office is executing various construction works like Waiting<br />

Shed, Inter Village Path, Step, Suspension Bridge, Water Point and improvement of internal<br />

road within the area of Sinlung Hills Development Council. Some construction works [at<br />

annexure –II] were completed and payment had been made from the normal Plan Budget.<br />

Therefore, increase in the minor head by at least Rs. 16.66 lakhs is necessary for completion<br />

of the said works and clearance of the unpaid bills.


- 116 -<br />

SINLUNG HILLS DEVELOPMENT COUNCIL (SHDC)<br />

[c] Other Charges: The Sinlung Hills Development Council is catering rehabilitation<br />

of HPV/ MAIDA returnees and Political Victims of HPC Movement. Rs. 17.50 lakhs is<br />

earmark for the normal <strong>plan</strong> budget. But is not sufficient for the rehabilitation. This head of<br />

account is also use for discretionary fund of Hon’ble Chairman. As the normal <strong>plan</strong> Budget<br />

could not meet the requirement during the year, it is necessary to increase by at least<br />

Rs.2.25 lakhs only.<br />

ANNEXURE ‘A’<br />

Major, sub-major, Minor, Sub-head, Detail head and object head<br />

of Account<br />

[Rs. in lakhs]<br />

Budget<br />

estimate as<br />

per Demand<br />

for grants<br />

2004-05<br />

1 2<br />

2053-Dist. Admn.<br />

094 -Dist. Esstb.<br />

094[10]-SHDC<br />

[01]-Salary 2.34<br />

[02]-Wages 5.00<br />

[11]-T.E 2.00<br />

[13]-Office Expenses 20.00<br />

[14]- Rent 1.00<br />

[16]- Publication 0.25<br />

[27]- Minor works 39.66<br />

[50]- Other charges 19.75<br />

TOTAL 90.00


- 118 -<br />

BORDER AREA DEVELOPMENT PROGRAMME (BADP)<br />

BORDER AREA DEVELOPMENT PROGRAMME<br />

Government of India has included the Border Area Development Programme under<br />

Plan Sector since the 1997-98 of the 9 th Five Year Plan.<br />

In <strong>Mizoram</strong>, there are 4(four) RD Blocks located along the Indo-Bangladesh border<br />

and 8(eight) RD Blocks along the Myanmar border.<br />

During the Tenth Five Year Plan period, schemes will be continued giving priority<br />

on roads, building and sport infrastructures. The approved outlay for Annual Plan 2004-05<br />

will be utilised as follows: —<br />

(Rs. in lakh)<br />

Sl. No. Name of Border / RD Block Annual Plan<br />

Approved Outlay<br />

Indo-Myanmar Border<br />

1. Ngopa RD Block 55.00<br />

2. Khawzawl RD Block 100.00<br />

3. Khawbung RD Block 64.50<br />

4. Lungdar East RD Block 52.00<br />

5. Hnahthial RD Block 70.00<br />

6. Sangau RD Block 48.50<br />

7. Tuipang RD Block 90.00<br />

8. Lawngtlai RD Block 55.00<br />

Sub-Total 535.00<br />

Indo-Bangladesh Border<br />

1. West Phaileng RD Block 66.00<br />

2. Bunghmun RD Block 65.00<br />

3. Lungsen RD Block 65.00<br />

4. Chawngte RD Block 65.00<br />

Sub-Total 261.00<br />

ADMINISTRATION<br />

1. Monitoring Cell<br />

a) Wages 3.50<br />

b) T.E. 1.00<br />

c) O.E. 20.50<br />

Total 25.00<br />

2. Documentation 5.00<br />

3. Purchase & distribution of Community 5.00<br />

Viewing sets (12 nos.)<br />

4. Purchase & distribution of Community 1.00<br />

Listening sets (12 nos.)<br />

Grand Total 832.00


INTRODUCTION<br />

- 120 -<br />

MEDIUM IRRIGATION & FLOOD CONTROL (PWD)<br />

MEDIUM IRRIGATION & FLOOD CONTROL<br />

<strong>Mizoram</strong> is having a hilly topography. Shifting cultivation is the main method of<br />

cultivation of food grains and vegetables. The method causes vast destruction of natural<br />

resources in the form of deforestation and heavy soil erosion. However, at a few scattered<br />

pockets in plain areas of major river banks, wet rice cultivation is also carried out.<br />

The scope of Medium Irrigation in <strong>Mizoram</strong> is therefore very limited, but protection<br />

of riverbanks from overflowing to the existing cultivable plain is very much required.<br />

Since, Irrigation Department exists in <strong>Mizoram</strong>, it is, therefore, approved to take up this<br />

work with a provision of only Rs. 1.00 lakh during 2004-2005.<br />

DIRECTION AND ADMINISTRATION:<br />

No provision is made for Direction and Administration during 2004-2005 under<br />

this Head of Accounts.<br />

MACHINERY AND EQUIPMENT:<br />

WORKS:<br />

No provision is kept for Machinery and Equipment during 2004-2005.<br />

Rs. 1.00 lakh is kept under this Head of Account during 2004-2005 for bank<br />

protection of R. Teirei under Mamit Division.


- 123 -<br />

AGRICULTURE DEPARTMENT<br />

MINOR IRRIGATION & COMMAND AREA DEVELOPMENT<br />

The total expenditure under Minor Irrigation and Command Area Development<br />

Schemes during the Ninth Plan was Rs. 2,823.32 lakhs. By end of the Ninth Plan period,<br />

102 Nos. of Minor Irrigation Projects with the total command area of 4,235 Ha. have been<br />

completed while 18 Nos. of projects with total command area 1,267 Ha. spilled over from<br />

the Ninth Plan to the Tenth Plan period.<br />

By end of 2003-04, 120 Minor Irrigation projects covering 4534 ha. have been<br />

completed. Main sources of funding for execution of Minor Irrigation Projects are Central<br />

Loan Assistance (CLA) under Accelerated Irrigation Benefits Programme (AIBP) and Rural<br />

Infrastructure Development Fund (RIDF) under NABARD Schemes.<br />

Under Accelerated Irrigation Benefits Programme during 2004-05, there are 20 spill<br />

over projects. Rs.260.41 lakhs is required for completion of these 20 projects. Another 43<br />

new projects with total estimated cost of Rs. 2,667.00 lakhs are being started from 2004-<br />

05 with an outlay of Rs. 1,000.00 lakhs during 2004-05.<br />

Under NABARD Schemes, there is no new project during 2004-05. Out of 16 Minor<br />

Irrigation Projects started during 2003-04 with RIDF-X under NABARD Schemes, 15<br />

projects spilled over to 2004-05 and the outlay for execution of Minor Irrigation Projects<br />

under NABARD Schemes during 2004-05 is Rs.222.22 lakhs (Rs.200.00 lakhs = NABARD<br />

loan and Rs.22.22 lakhs = State matching share).<br />

To maximize utilization potential created in completed Minor Irrigation Projects,<br />

various works on Command Area Development have been taken up. A Centrally Sponsored<br />

Command Area Development Scheme for a cluster of 40 Nos. of completed Minor<br />

Irrigation Scheme have been approved and being executed. A new scheme of Centrally<br />

Sponsored Command Area Development Scheme to cover 60 nos. of completed projects<br />

and projects on the stage of completion is under consideration. During 2004-05, Rs. 15.00<br />

lakhs is earmarked for implementation of Command Area Development Schemes.<br />

Flood Control Schemes have been allocated to Department of Agriculture & Minor<br />

Irrigation April, 2003. Technical clearance was obtained during 2003-04 for execution of<br />

Flood Control / Anti-River Erosion Scheme for protection of Agriculture land of Palak<br />

Valley, Phura, Saiha District at the total estimated cost of Rs. 722.45 lakhs. The project is<br />

being posed for inclusion in the Central Sector Scheme Critical Flood Control Schemes<br />

during the Tenth Plan Period.<br />

During the year 2004-2005, the approved outlays for Minor Irrigation Schemes and<br />

Command Area Development Scheme are Rs. 1,420.00 lakhs and Rs. 15.00 lakhs<br />

respectively.


- 124 -<br />

AGRICULTURE DEPARTMENT<br />

SCHEME NO. 1<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (CENTRAL)<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />

1. REVISED OUTLAY 2004 - 2005 - Rs. 168.00 lakhs.<br />

2. EXPENDITURED DURING 2003 - 2004 - Rs. 190.50 lakhs.<br />

There are 140 No. of created posts under Minor Irrigation Schemes, out of which 87<br />

posts are under Plan Scheme. There are four Irrigation Divisions at Aizawl, Champhai,<br />

Kolasib and Lunglei, with nine Sub-Divisions. Minor Irrigation Wing in the Headquarters is<br />

manned by Joint Director (Minor Irrigation) with supporting staff to assist Director of<br />

Agriculture & Minor Irrigation in <strong>plan</strong>ning and monitoring of Minor Irrigation Schemes<br />

including Command Area Development and Flood Control Schemes. There is no proposal<br />

for creation of new posts during 2004-05.<br />

The Revised Outlay for Direction & Administration under Minor Irrigation Schemes<br />

is as <strong>detailed</strong> below: —<br />

Sl.<br />

No<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR 2004-05<br />

Items Unit<br />

Physical<br />

Targets<br />

Financial Outlay<br />

(in lakhs of Rs.)<br />

ESTABLISHMENTS :<br />

1 Salary of Officers & Staff No. 87 115.00<br />

2 Travelling Expenses No. 87 8.00<br />

3 Wages L.S. - 10.00<br />

4 Office Expenses No. 14 20.00<br />

5 Special Repair & Renovation of existing buildings No. 10 3.00<br />

6 Repairing of vehicle 2.00<br />

7 Maintenance (Const. of building) L.S. - 10.00<br />

Sub-total : Direction & Administration : - - 168.00<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE WATER)<br />

NAME OF THE SCHEME : RIVER LIFT IRRIGATION.<br />

SCHEME NO.2<br />

1. REVISED OUTLAY FOR 2004-05 : Rs. 0.10 lakh<br />

2. EXPENDITURE DURING 2003-04 : Rs. 0.10 lakh<br />

Under River Lift Irrigation Scheme, it is proposed to purchase light-weight<br />

kerosene-petrol engine pump sets for sale at 50 % subsidy to cultivators.<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR 2004-05<br />

Sl. No. Items Unit<br />

Physical<br />

Targets<br />

Financial Outlay<br />

(in lakhs of Rs.)<br />

1. Purchase of light-weight kerosene-petrol<br />

engine pump sets for sale at 50 % subsidy<br />

No. 1 0.10<br />

Sub-total: River Lift Irrigation - - 0.10


- 125 -<br />

AGRICULTURE DEPARTMENT<br />

SCHEME NO. 3<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE WATER)<br />

NAME OF THE SCHEME : DIVERSION SCHEME.<br />

1. REVISED OUTLAY FOR 2004-05 : Rs. 1,420.00 lakhs<br />

2. ANTICIPATED EXPENDITURE DURING 2003-04 : Rs. 1,331.00 lakhs<br />

Sources of funding for implementation of Diversion Schemes are Central Loan<br />

Assistance (CLA) under Accelerated Irrigation Benefits Programme (AIBP) and Rural<br />

Infrastructure Development Fund (RIDF) under NABARD Schemes. Under Accelerated<br />

Irrigation Benefits Programme during 2004-05, there are 20 spill over projects and<br />

Rs.260.41 lakhs is required for completion of these 20 projects, but the same could not be<br />

envisaged during 2004-05 due to shortage of fund. Another 43 new projects with total<br />

estimated cost of Rs.2.667.00 lakhs are being started during 2004-05 with the total outlay<br />

of Rs. 1,000.00 lakhs during 2004-05. Out of these 43 new Projects, 14 projects are<br />

scheduled for completion during 2004-05 while 29 projects will spill over to 2005-06.<br />

Under NABARD Schemes, there is no new project during 2004-05. Out of 16 Minor<br />

Irrigation Projects started with RIDF-X under NABARD Schemes during 2003-04, 15 projects<br />

spilled over to 2004-05 and the outlay for execution of Minor Irrigation Projects under<br />

NABARD Schemes during 2004-05 is Rs.222.22 lakhs (Rs.200.00 lakhs = NABARD loan and<br />

Rs.22.22 lakhs = State matching share). Out of these 15 spill-over projects, 7 projects are<br />

scheduled for completion during 2004-05 while 8 projects will spill over to 2005-06.<br />

While Operation & Maintenance of completed Minor Irrigation Projects is under the<br />

joint responsibilities of the project beneficiaries and the Department, frequent repairs and<br />

reconstruction of monsoon damages are required due to torrential rains during monsoon.<br />

A provision of Rs.9.68 lakhs is made during 2004-05.<br />

Sl.<br />

No<br />

1<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR 2004-05<br />

Items Unit<br />

Physical<br />

Targets<br />

Financial Outlay<br />

(in lakhs of Rs.)<br />

Execution of Minor Irrigation Projects with<br />

Central Loan Assistance under AIBP<br />

A. Ongoing Schemes<br />

State Matching Share Nos. 20 0.00<br />

B. New Schemes Nos.<br />

(i) Central Loan Assistance 1,000.00<br />

(ii) State Matching Share 0.00<br />

Sub-Total New Schemes Nos. 43 1,000.00<br />

Total of AIBP Scheme : Nos. 63 1,000.00<br />

2 Execution of Minor Irrigation Projects with<br />

Loan Assistance under NABARD<br />

(i) NABARD Loan L.S. - 200.00<br />

(ii) State Matching Share L.S. - 22.22<br />

Total of NABARD Scheme : Nos. 15 222.22<br />

3<br />

Execution of Minor Irrigation Projects with<br />

State Plan Fund Nos. 5 10.00<br />

4<br />

Repair and re-construction of Monsoon Damages on<br />

completed Minor Irrigation Projects. L.S. - 9.68<br />

5 Maintenance L.S. - 10.00<br />

TOTAL - DIVERSION SCHEMES 1,251.90


- 126 -<br />

AGRICULTURE DEPARTMENT<br />

SCHEME NO. 4<br />

HEAD OF DEVELOPMENT : COMMAND AREA DEVELOPMENT PROGRAMME<br />

NAME OF THE SCHEME : COMMAND AREA DEVELOPMENT PROGRAMME<br />

1. REVISED OUTLAY 2004-2005 = Rs. 15.00 lakhs.<br />

2. EXPENDITURE DURING 2003-2004 = Rs. 15.00 lakhs.<br />

A study of several completed irrigation projects has revealed hardly 50% of the<br />

potentials created by completed minor irrigation projects is being utilized and the<br />

productivity is low. Absence of distribution channels, lining of water channels to save<br />

water, land levelling and other activities has not been taken up. Under Command Area<br />

Development Programmes like adoptive trials, supply of inputs, extension service and<br />

other activities as mentioned above will be taken up.<br />

As such cluster of 28 completed Minor Irrigation projects in Aizawl, 4 clusters in<br />

Lunglei and 8 clusters in Chhimtuipui covering gross command area of 1361 have been<br />

sanctioned by Government of India to be taken under Command Area Development<br />

Programme w.e.f. 2001-2002. The same projects will continue in 2004-05. Detail Physical<br />

and Financial target approved for 2004-05 are as follows: -<br />

Sl.<br />

No.<br />

1<br />

PHYSICAL TARGET & FINANCIAL OUTLAY FOR 2004-2005<br />

Items Unit Physical<br />

Targets<br />

Financial Outlay<br />

(in lakhs of Rs.)<br />

A. Establishment<br />

(i) Misc. Contingencies<br />

(ii) Maintenance and repair of Machineries<br />

L.S. L.S. 0.30<br />

Vehicle including Pol charges<br />

B. Survey<br />

L.S. L.S. 0.50<br />

(i) Soil Survey Ha. 150 0.01<br />

(ii) Topological Survey Ha. 150 0.01<br />

(iii) Planning & Design<br />

C. Construction of Field Channels including<br />

Ha. 150 0.50<br />

control structure Ha. 200 8.00<br />

D. Construction of Field drains Ha. 200 4.00<br />

E. Land Levelling & Shaping Ha. 150 1.50<br />

F. Warabandi<br />

G. Demonstration of Crop Production<br />

Ha. 150 0.15<br />

Technology. Nos. 3 0.03<br />

TOTAL OF COMMAND AREA DEVELOPMENT SCHEMES :<br />

15.00


- 127 -<br />

AGRICULTURE DEPARTMENT<br />

HEAD OF DEVELOPMENT : IRRIGATION & FLOOD CONTROL<br />

NAME OF THE SCHEME : FLOOD CONTROL<br />

1. REVISED OUTLAY 2004-2005 = Rs. N I L lakhs.<br />

2. EXPENDITURE DURING 2003-2004 = Rs. N I L lakhs.<br />

SCHEME NO. 5<br />

In view of the fact that large areas of agricultural lands in the state are affected<br />

every year by flood, it is imperative that Critical Flood Control/Anti-Erosion Control<br />

Schemes and Drainage Schemes be formulated and implemented to minimize crop losses<br />

and check further damages due to flood. Ministry of Water Resources, Government of India<br />

referred the matter to Secretary, Irrigation and Flood Control Department, Govt. of<br />

<strong>Mizoram</strong> for formulation and submission of Schemes to be implemented during the Tenth<br />

Plan. Amongst the various schemes which may be taken up under Flood Control,<br />

Embankment Scheme, Drainage Scheme and Bank Protection Scheme are proposed to be<br />

taken up in <strong>Mizoram</strong> for which Preliminary Survey & Investigation have been started.<br />

Sl.<br />

No<br />

PHYSICAL TARGET & FINANCIAL OUTLAY FOR 2004-2005.<br />

Financial Outlay<br />

(in lakhs of Rs.)<br />

Items Unit Physical<br />

Targets<br />

1 Embankment Schemes No. 1 0.00<br />

2 Drainage Schemes No. 1 0.00<br />

3 Bank Protection Works No. 1 0.00<br />

4 Establishment costs L.S. L.S 0.00<br />

TOTAL OF FLOOD CONTROL SCHEMES :<br />

0.00<br />

MINOR IRRIGATION Rs. 1,420.00<br />

COMMAND AREA DEVELOPMENT Rs. 15.00<br />

FLOOD CONTROL Rs. -<br />

TOTAL : Rs. 1,435.00<br />

lakhs<br />

lakhs<br />

lakhs<br />

lakhs


- 130 -<br />

POWER & ELECTRICITY DEPARTMENT<br />

POWER & ELECTRICITY<br />

Introduction:<br />

In order to have substantial economic development availability of energy (Power) to<br />

the required level plays an important role. The progress of power development can be<br />

assessed from the budgetary provision for the last 4 - 5 years as highlighted below: –<br />

ANNUAL PLANS AT A GLANCE<br />

Rs. in Lakhs<br />

Sl. No. Year<br />

Non-<br />

Earmarked<br />

Earmarked<br />

NCSE /<br />

IREP<br />

TOTAL<br />

1. 1998 - 1999 3856.00 160.00 55.00 4071.00<br />

2. 1999 - 2000 4270.00 565.00 55.00 4890.00<br />

3. 2000 - 2001 3867.00 1065.00 55.00 4987.00<br />

4. 2001 - 2002 2947.00 1196.00 55.00 4198.00<br />

5. 2002 - 2003 1089.00 3111.00 142.22 4342.87<br />

6. 2003 -2004 1076.00 3464.00 61.00 4601.00<br />

There are 674 nos. of work charge staff and 2324 nos. of Muster Roll labours to<br />

maintain existing Power Systems under <strong>plan</strong>. The total expenditure for the year 2002-2003<br />

under Direction and Administration was Rs. 2523.65 lakhs. However, for 2003-2004 due to<br />

financial constraint Rs. 740.28 lakhs only could be made available for Direction and<br />

Administration whereas the minimum requirement is Rs.25.00 crores.<br />

Item-wise provision of fund are as follows:<br />

Direction & Administration: There are 1098 nos. of <strong>plan</strong> posts which had not been<br />

converted into non-<strong>plan</strong> posts. The establishment of these 1098 posts had to be<br />

met from <strong>plan</strong> fund. In addition to the above posts there are many infrastructural<br />

assets created since 7 th Five year Plan. The maintenance of these assets are still met<br />

from <strong>plan</strong> fund as the same are not yet committed to non-<strong>plan</strong>. The total<br />

requirement for maintenance, Direction & Administration and work charge &<br />

muster roll establishment for 2004-2005 is anticipated as Rs.2635.00 lakhs.<br />

The approved total outlay of the Department during 2004–05 is Rs. 5847.00<br />

lakhs out of which Rs. 4761.00 lakhs was earmarked. Hence, Non-Earmarked fund<br />

is only Rs. 1176.00 lakhs which was not sufficient to meet require Direction and<br />

Administration. Based on availability of fund Rs. 632.34 lakhs only could be made<br />

available to meet Direction and Administration. It may please be noted that the<br />

present amount could meet only half of the requirement.<br />

2. REC Loan:<br />

Under negotiated loan, within State Plan Rs. 658.00 lakhs has to be taken from<br />

Rural Electrification Corporation (R.E.C.) Government of India during 2003-2004.<br />

During 2004-2005 the same amount is approved to be utilised for continuation of<br />

Maicham Hydel Project Phase-II.<br />

3. Pradhan Mantri Gromodaya Yojana (PMGY):<br />

This scheme is under earmarked sector of which Rs. 1598.00 lakhs for 2004-2005<br />

was allotted. The fund shall be utilised for electrification of villages and connected<br />

works such as conversion of non-conventional electrified villages into conventional<br />

type, re-electrification of damaged electrified villages and construction of<br />

distribution sub-stations wherever necessary.<br />

4. Accelerate Power (Reform) Development Programme (APRDP):<br />

During 2004-2005 Rs.2896.00 lakhs is earmarked for improvement of subtransmission<br />

& Distribution networks under Power & Electricity Department<br />

Government of <strong>Mizoram</strong>. Based on the fund release by Government of India, items<br />

of work would be programmed.


- 131 -<br />

POWER & ELECTRICITY DEPARTMENT<br />

5. A.C.A.(One-time Additional Central Assistance):<br />

This One Time Additional Central Assistance (ACA) amounting to Rs. 408.00 lakhs<br />

is earmarked for Power Development during 2004 –2005. The fund will be utilised<br />

for construction of 132 kV Transmission line and improvement of power system<br />

within Aizawl Town.<br />

6. Non-Conventional Source of Energy (NCSE):<br />

For Non Conventional Source of Energy Rs. 50.00 lakhs is set aside during 2004 -<br />

2005 for taking up non-conventional system of energy sources. This fund will be<br />

transferred to ZEDA as grant-in-aid, as this organisation is nodal agency for such<br />

works. This fund comes separately from Central Ministry.<br />

7. Integrated Rural Electric Programme (IREP):<br />

Under this scheme Rs. 43.50 lakhs is made available from Rural Development<br />

Ministry and Rs. 43.50 lakhs is earmarked for 2004-2005. The fund will be<br />

transferred to nodal agency ZEDA as grant-in-aid.<br />

8. Renovation and Modernization of Hydel Stations in <strong>Mizoram</strong>:<br />

1) To enable the existing Small Hydel Stations in tip-top condition to give<br />

optimum generation, Rs.50.00 lakhs is provided in the Annual Plan 2004-2005<br />

as mentioned below:<br />

2) Tuipui SHP = Rs.20.00 lakhs<br />

3) Serlui 'A' MHP = Rs.30.00 lakhs<br />

4) Vâwra Lui = Rs. 2.65 lakhs<br />

Total = Rs.52.65 lakhs<br />

9. Power Generation: For resumption and continuation of on-going Power Generation<br />

schemes, fund provisions are to be made available and distributed for the<br />

respective projects as below:<br />

1) S&I of Hydel Projects = Rs. 60.00 lakhs<br />

2) Maicham-II = Rs. 90.00 lakhs<br />

3) Lamsial = Rs. 180.00 lakhs<br />

Total : Rs. 330.00 lakhs<br />

10. Thermal Generation: For operation and maintenance of thermal generating station<br />

in <strong>Mizoram</strong>, Rs. 124.54 lakhs is provided during 2004-05.<br />

11. 8 th Plan Transmission, Transformation and Other Transmission, Transformation<br />

Schemes: There are 4(four) Transmission lines and 6(six) Sub-Stations on-going<br />

projects taken up by the department since the year 2000.These projects were<br />

administratively approved due to which the projects could be neither dropped nor<br />

stopped. Unfortunately fund could not be provided from State Normal Plan fund to<br />

continue the works during 2004 – 05.<br />

12. Functional Building: The Department requires more functional buildings for<br />

operation and maintenance of the existing assets. But due to shortage of fund, to<br />

meet minimum requirement, Rs. 27.35 lakhs is made available during 2004 – 05.<br />

13. CONCLUSION:<br />

Annual Plan 2004-2005 is framed based on approved outlay by the Government of<br />

<strong>Mizoram</strong>. Further, due to same pattern of funding as that of 2003-2004 the normal<br />

assistance (non-earmarked) become very meagre. This, inadequate fund under nonearmarked<br />

sector does not permit continuation of schemes which have been<br />

started under non-earmarked sector. Therefore all these works/schemes under<br />

non-earmarked sector are being standstill until and unless sufficient nonearmarked<br />

fund could be provided. It is, therefore, requested to provide nonearmarked<br />

fund as stated above in order to continue or complete the schemes<br />

which were already committed by State Government.


A. LARGE & MEDIUM INDUSTRIES:<br />

Scheme No. A – 1<br />

- 139 -<br />

INDUSTRIES DEPARTMENT<br />

INDUSTRIES<br />

Name of the Scheme : Development of Food & Allied Industries :<br />

<strong>Mizoram</strong> Food & Allied Industries Corporation Ltd. (MIFCO) :<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

During the 10 th Five Year Plan 2002-07 commencing from Annual Plan 2002-03,<br />

MIFCO, in addition to the project of Pork & Poultry Processing Plant at Zemabawk under<br />

implementation, proposes to take up the following projects/schemes so as to further<br />

promote food processing industries in the State with the financial assistance of the Central<br />

and State Government:<br />

(1) Upgradation and expansion of Fruit Juice Concentrate Plant, Chhingchhip.<br />

(2) Upgradation and expansion of Food Processing Plant, Sairang.<br />

(3) Setting up of Food Park, Chhingchhip.<br />

(4) Setting up of Mobile Food Processing Unit.<br />

(5) Contract Farming.<br />

As the authorized share capital has been enhanced from Rs. 10 crores to Rs. 20<br />

crores, it is approved to continue contribution of share capital to the Corporation for their<br />

commercial operations.<br />

Approved Annual Plan 2004-05 is as follows :-<br />

(Rs. In lakhs)<br />

Programme of work Annual Plan 2004-05<br />

Contribution of share capital 84.00<br />

B. VILLAGE & SMALL INDUSTRIES:<br />

Scheme No. B – 1<br />

Total : 84.00<br />

Name of the Scheme : Direction & Administration<br />

(Strengthening of Administration)<br />

(Budget Head : 2851 – Village & Small Industries, 001(02) –Direction)<br />

This is an ongoing scheme under which most of the liabilities of posts and<br />

establishment created during the 7th Five Year Plan are maintained during the 8th Five<br />

Year Plan also. These liabilities cannot be passed on to Non-Plan side, these liabilities have<br />

to be continued during the 10th Five Year Plan also. Apart from that during the year 1999-<br />

2000, 5 (five) Sub-Divisional Offices have become functional in Kolasib, Serchhip,<br />

Champhai, West Phaileng, Lawngtlai and the Sub-Divisional Industries Offices at Chawngte<br />

and Tlabung will be made functional during the 10th Plan. However, these will be done<br />

without creation of new posts by way of deployment of the existing staff available with the<br />

Department.<br />

To establish these Sub-Divisional Offices for their full-fledged operation, it will be<br />

necessary to incur recurring and non-recurring expenditures during the 10th Five Year<br />

Plan by creation of necessary infrastructure for operation of these offices.


- 140 -<br />

INDUSTRIES DEPARTMENT<br />

Since this Department is executing cost of civil construction works for<br />

infrastructure development etc. and maintenance thereof.<br />

Therefore, provision of fund for construction works and maintenance of existing<br />

ones and newly constructed buildings, roads, fences etc. are given as follows: -<br />

Sl.<br />

No.<br />

Approved Annual Plan 2004-05 are as follows:<br />

Description of works<br />

(Rs. in lakhs)<br />

Financial<br />

outlays<br />

2004-05<br />

1. Salary of :<br />

a) Existing staff – 17 nos. 15.34<br />

2. Wages for muster roll workers - 26 nos. 8.21<br />

3. Travelling Expenses 4.50<br />

4. Office Expenses 25.00<br />

5. Rent for R.M. Depots at Kolasib, West Phaileng, Serchhip, Champhai,<br />

Lunglei, Lawngtlai & Saiha<br />

3.50<br />

6. Minor Works/Maintenance :<br />

a) Constn. of retaining wall at appr. road to SDIO office, Serchhip Ph-II 1.50<br />

b) Renovation of Directorate office building 2.50<br />

c) Maintenance of Directorate Office building and quarters 1.50<br />

d) Maintenance of Office building at DIC Aizawl 1.00<br />

e) Maintenance of Office building at DIC Lunglei 1.00<br />

f) Maintenance of office building at DIC Saiha 1.00<br />

g) Maintenance & impvt. of SDIO Office & staff quarters, Serchhip 0.50<br />

h) Maintenance & impvt. of SDIO Office & staff quarters at Champhai 0.50<br />

i) Maintenance office and staff quarters at SDIO W.Phaileng 0.50<br />

j) Maintenance of Office and staff quarters at SDIO, Kolasib 0.50<br />

k) Maintenance of buildings at SDIO, Lawngtlai 0.50<br />

7. Write off :<br />

Provision for Departmental write off 0.10<br />

8. Other charges 0.40<br />

Total : 68.05<br />

Scheme No. B – 2<br />

Name of the Scheme : Research, Design & Development :<br />

1. Development of Tea Industries :<br />

(Budget Head : 2851 – Village & Small Industries, 004(02) – Dev. of Tea Industries)<br />

Development of Tea Nursery by individual small tea growers and <strong>plan</strong>tation of tea<br />

seedling in scientific and commercial method is being continued through 325 nos. of small<br />

family growers at Biate and 142 nos. At Ngopa village under strict supervision and<br />

guidance of Tocklai trained 4 numbers of field officer as per TRA norms.<br />

As much as 33.11 lakhs tea seedlings are <strong>plan</strong>ted in Biate covering 234 hectare and<br />

10.95 lakh are <strong>plan</strong>ted in Ngopa 92 hectare. Tea Factory is being set up at Biate with grant<br />

from NEC, loan from NEDFi and equity participation of the State Govt. One tea factory of 3<br />

lakh Kg. capacity of made tea has already been set up under private sector. Tea <strong>plan</strong>tation<br />

is to be continued during the 10 th Plan period.


- 141 -<br />

INDUSTRIES DEPARTMENT<br />

Approved Annual Plan 2004-05 is tabulated below :<br />

Sl. No Programme of work<br />

(Rs. In lakhs)<br />

Annual Plan<br />

2004-05<br />

1 Wages – 2 nos. 0.40<br />

2 Travelling Expenses 1.20<br />

3 Office expenses 2.50<br />

4 Advertising/Publicity 0.50<br />

5 Grant-in-aid :<br />

a) Financial assistance to Tea Planters/equity participation in<br />

tea factory<br />

13.50<br />

6 Minor Works / Maintenance :<br />

a) Tea nursery / garden verification works 0.50<br />

b) Repair & maintenance of Tea Houses and quarters 1.50<br />

7 Motor Vehicle 2.00<br />

8. Material & Supply :<br />

Cost of polythene, tea seeds, tea seedlings, organic manure,<br />

<strong>plan</strong>t protection<br />

34.70<br />

9 Other Charges 1.50<br />

Total : 58.30<br />

2. Development of Aromatic Oil distribution project as pilot project :<br />

INTRODUCTION<br />

Perfumes and flavours have been known to mankind since time immemorial,<br />

Sandalwood, Comphor, etc. have been mentioned in VEDAS. In the beginning natural<br />

Aromatic Essential Oil & Oleoresins were used in perfumery. Demand for natural Aromatic<br />

Essential Oil is increasing rapidly, the world over with increasing population and growing<br />

awareness.<br />

(i) POGOSTEMON-PATCHOULI (ii) GERANIUM (iii) PALMORASA (iv) VERTIVERT<br />

(khus) (v) CYMBOPOGON-JWARANCUSA (kush bon) (vi) GINGER GRASS (vii) MINT<br />

(viii) CITRONELLIA (ix) LEMON GRASS (x) LEVENDAR etc. are the Romantic<br />

Plants/Herbs containing Essential Oil.<br />

AGRO-CLIMATIC & SOIL :<br />

Agro-climatic condition, rainfall, meteorological condition, soil & water condition of<br />

<strong>Mizoram</strong> is suitable for development of cultivation & distillation of oil from (i)<br />

POGOSTEMON-PATCHAOULI (ii) GERANUIM (iii) PALMORAOSA (iv) VETIVERT (khus) (v)<br />

CYMBOPOGON-JWARANCUSA (kush bob) (vi) GINGER GRASS (vii) MINT (viii) CITRONELLA<br />

(ix) LEMON GRASS (x) LEVENDAR and cultivation and processing of Edible best variety of<br />

European white button MUSHROOM etc. as multiple crops.<br />

TECHNOLOGY :<br />

Regional Research Laboratory (RRL) CSIR Jorhat, Assam, India have Designed &<br />

developed the Technology & Economics of the Projects. Regional Research Laboratory<br />

(RRL) Jorhat, is the Technical consultant for the Project who will arrange tie-up for<br />

marketing of Aromatic Essential Oil producing in <strong>Mizoram</strong>.


- 142 -<br />

INDUSTRIES DEPARTMENT<br />

UTILITY OF FINSIHED PRODUCT :<br />

Aromatic Essential Oil are using by Soaps, Perfumery, Cosmetics, Face-creams,<br />

Tooth paste, Hair Oil, Cleaners, Detergent, Food Flavours Beaverers, Bakery confectionery,<br />

Pesticides, Liquor, Distilleries, Aromatic Chemicals, Medicine, Pharmaceutical Industries, &<br />

Tobacco Industries.<br />

GLOBAL MARKET DEMAND :<br />

Presently, India is importing 1500 – 2000 tonnes of Aromatic Essential Oil from<br />

France and European Countries etc. Consumption of PATCHAOULI OIL alone, in the world<br />

is about 2000-5000 tones per annum. U.S.A., alone, import about 580-680 tones of<br />

Patchouli Oil annually from Indonesia. India consumes about 300-500 tines of patchouli oil<br />

per annum. But India hardly produces 30 tones per year, the rest quantity is imported<br />

from Indonesia.<br />

Similarly present market demand for Geranuim Oil, in India requires more than 160<br />

tones annually. But India is producing only about 10 tones, which is negligible in regards<br />

to domestic requirement. The bulk of Geranium Oil is being imported from China,<br />

Germany, Japan etc. Similarly there is high market demand in the country as well as world<br />

for CITRONELLA OIL, LEMON GRASS OIL, CYMBOPOGON-JWARANCUSA (kush Bob) OIL,<br />

LAVENDAR OIL and VETIVERT OIL etc.<br />

The essential Oil has an upward demand in the Global market. The world demand<br />

is larger and production is limited. Observing the market demand for Aromatic Essential<br />

Oil within country and the world, it is proposed to developed for cultivation of Aromatic<br />

Essential Oil bearing <strong>plan</strong>t/herbs and Oil distillation Plants (Processing Factory), and best<br />

varieties of European white button MUSHROOM cultivation and processing as Pilot Projects<br />

for Socio-economic development of rural areas of <strong>Mizoram</strong>.<br />

The project will be implemented through Self Help Group (SHF) of peoples in<br />

potential villages to encourage the people for socio-economic development in the rural<br />

area as family oriented scheme and to earn REVENUE for a State Government of <strong>Mizoram</strong>.<br />

HARVESTING, ROTATION PERIOD & OIL DISTILLATION :<br />

Essential Oil bearing <strong>plan</strong>ts/herbs can harvest & Oil can distill after 90 days of<br />

<strong>plan</strong>ting subsequently 4-5 harvests per year. The same <strong>plan</strong>t/herbs will be surviving for 3<br />

years. Rotation period is 3 years. The people will be starting earning money just after 3<br />

months onwards of <strong>plan</strong>ting. After 3 years re-<strong>plan</strong>tation practice can be adopted in the<br />

same plot of <strong>plan</strong>t.<br />

ECONOMIC OF PROJECTS :<br />

NET RETURN : (a) Rs.1,92,055.00 per hectare/year in case of Patchouli, Geranium, etc.<br />

(b) Rs.52,230.00 per hectare per harvest with 3-4 harvest / year in case of<br />

Citronella, Lemon Grass, Cybopogon-Jwarancusa, etc.<br />

PROJECT ESTIMATE FOR DEVELOPMENT OF AROMATIC ESSENTIAL OIL DISTILLATION<br />

PLANT IN MIZORAM<br />

Sl. No Particulars<br />

Amount<br />

(Rs. In lakhs)<br />

1. Land survey & land development in 10 potential different<br />

villages at Rural areas of <strong>Mizoram</strong><br />

5.50<br />

2. Development/Cultivation & Plants/Herbs of Patchouli,<br />

Geranium etc. for 50 hectares of land in 5 different potential<br />

villages @ Rs.68.700/- per hectares in rural area<br />

34.35


- 143 -<br />

INDUSTRIES DEPARTMENT<br />

3. Setting up of Aromatic Essential Oil Distillation Plant<br />

(Processing Factory) 1(one) centrally located village within 5<br />

difference village in rural area<br />

12.00<br />

4. Development/Cultivation of <strong>plan</strong>t/herbs of Citronelia, Lemon<br />

Grass, Cymbopogon-Jwarancusa etc. in 5 different potential<br />

villages of rural areas<br />

15.00<br />

5. Setting up of Aromatic Essential Oil Distillation Plants<br />

(Processing Factory) 1 (one) village central located within 5<br />

different villages of rural areas<br />

12.00<br />

6. Miscellaneous Expenditure/consultation charges to RRL 2.15<br />

7. Development of improvement varieties edible Mushroom<br />

European White button mushroom, oyster mushroom, etc with<br />

average – yield 5 Kg/Sq.m 200 beds 2 crops/year including<br />

setting up of a central laboratory for development of<br />

improvement varieties of edible mushroom<br />

4.00<br />

Total : 85.00<br />

Sl. No<br />

Approved Annual Plan 2004-05 is as follows :<br />

Programme of work<br />

Annual Plan<br />

2004-05<br />

1 Other charges – Token for consultancy 0.50<br />

Total : 0.50<br />

Scheme No.B-3<br />

Name of Scheme : Export Promotion Industrial Park (EPIP)<br />

(Budget Head : 2851-Village & Small Industries 101(01)-Export Promotion Industrial Park)<br />

Export Promotion Industrial Park Lengte:- The M inistry of Commerce , Govt.of<br />

India has approved a scheme of Export Promotion Industrial Park at Lengte which was<br />

framed by engaging M/S Dalal consultant and Engineering Ltd., New Delhi to prepare the<br />

DRP which amounted to a total cost of Rs. 2753.26 lakhs. The Govt.of <strong>Mizoram</strong> has to<br />

contribute Rs. 584.42 lakhs as matching grants with a loan of Rs. 1168.24 lakhs from<br />

financial institution . Acquisition of the land measuring 144.48 hectares for this purpose is<br />

to be borne by Govt.of <strong>Mizoram</strong> as a part of its contribution to the establishment of this<br />

Export Promotion Industrial Park.<br />

Negotiation were held with the land owners of this area and a final agreement for<br />

payment of a total of Rs. 89.60 lakhs has been arrived at, which is deemed to be less<br />

expensive and time saving than acquiring the land through land acquisition act. During the<br />

financial year 2002 - 2003 payment of the first instalment of Rs. 20.30 lakhs was made,<br />

another Rs.16.50 lakhs is to be paid as 2 nd instalment during 2003-04 and 3 rd and final<br />

instalment amounting to Rs.52.80 lakhs is remaining.<br />

Therefore, it is approved to pay the third and last instalment of compensation<br />

amounting to Rs. 52.80 lakhs during 2004-05 so that the Department can initiate all<br />

necessary development works with funds whatever available.<br />

(Rs. In lakhs)<br />

Sl. No. Description of works<br />

Financial<br />

outlay<br />

1. Other Charges / Compensation :<br />

Acquisition of land / payment of compensation 11.00<br />

Total : 11.00


Scheme No. B. 4<br />

- 144 -<br />

INDUSTRIES DEPARTMENT<br />

Name of the Scheme : Development of Industrial Infrastructure :<br />

(Industrial Estates)<br />

(Budget Head : 2851 – Village & Small Industries, 101(02)–Industrial Estate)<br />

This is an on-going scheme and to be continued during the 10th Five Year Plan also.<br />

Development of Industrial Infrastructure is on the priority list on the agenda of New<br />

Industrial Policy of the Govt. of India and therefore, the scheme cannot be dispensed with.<br />

Under the scheme the following projects were taken up.<br />

a) Industrial Growth Centre at Luangmual, Aizawl.<br />

b) Industrial Estate at Zuangtui<br />

c) Industrial Estate at Kolasib<br />

d) Industrial Estate at Chawngte<br />

e) Integrated Infrastructure Development Centre at Pukpui, Lunglei under the<br />

Centrally Sponsored Scheme of Integrated Infrastructure Development<br />

Centre (IIDC)<br />

Apart from the above, land has been donated by local inhabitants for setting up of<br />

new Industrial Estate at Hmunhmeltha, Champhai. Attempts are also being made to have<br />

new Industrial Estates at Serchhip, Mamit, Lawngtlai and Saiha. This Department also owns<br />

land for industrial purposes at Bairabi.<br />

a) Industrial Growth Centre, Luangmual: The Govt. of India, Ministry of Industry,<br />

Department of Industrial Promotion & Policy has already approved the project for<br />

Industrial Growth Centre, Luangmual at the Project Cost of Rs. 1,524.46 lakhs. This<br />

scheme is to be implemented under the Prime Minister's Special Package Programme for<br />

the North Eastern Region. Of this amount Rs.1000.00 lakhs was to be borne by the Govt.<br />

of India and Rs. 524.46 lakhs is to be borne by the Govt. of <strong>Mizoram</strong>. However, in the<br />

latest Industrial Policy for the North Eastern Region notified by the Govt of India, the full<br />

amount up to Rs. 15.00 crores will come as Central assistance. Govt. of India has since<br />

released Rs.300.00 lakhs and works has been taken up with the fund released; and has<br />

been fully utilised for the project. Further release of fund from the Govt. of India is being<br />

awaited. Therefore, a token provision of Rs. 1.00 lakh is made under C.S.S.<br />

b) Industrial Estate Zuangtui: This Industrial Estate has been functional for a number<br />

of years albeit in a haphazard manner. New Industrial rules is being framed and is on the<br />

verge of enactment. Hence, minor works and maintenance work of the existing<br />

infrastructure is necessary.<br />

c) Industrial Estate Kolasib :- This Estate is also at the functional stage Development<br />

of the infrastructure of this Estate has been regularly taken up since its inception .This<br />

Department has incurred liability for fencing of this Industrial Estate for which the lapsed<br />

sanction for the particular works needs to revalidated by seeking fresh sanction. Provision<br />

for clearing this liability is provided.<br />

(d) New Industrial Estate at Champhai :- The villagers of Hmunhmeltha within the<br />

vicinity of Champhai Town has donated land for Industrial Estate free of cost. Hence<br />

proper demarcation of the land and for preservation of the donated land it is necessary to<br />

erect boundary pillars at strategic points and proper fencing to encompass the land, for<br />

which provision is being made.


- 145 -<br />

INDUSTRIES DEPARTMENT<br />

Sl. No. Programme of works<br />

(Rs. in lakhs)<br />

Financial<br />

Outlays<br />

2004-05<br />

1. Salary of existing staff – 5 nos. 3.60<br />

2. Wages for Muster roll workers at IGC, Luangmual and Industrial<br />

Estates at Zuangtui, Kolasib - 12 nos.<br />

3.63<br />

3. Travelling Expenses 1.00<br />

4. Office Expenses 5.50<br />

5. Minor Works/Maintenance :<br />

a) Token provision for IGC, Luangmual under CSS<br />

b) Demarcation of plots at Industrial Estate Zuangtui<br />

0.50<br />

i) Boundary pillars – 500 Nos.<br />

2.50<br />

ii) Jungle clearance<br />

0.50<br />

c) Matching Grant to CSS for IIDC, Pukpui, Lunglei (transfer of<br />

fund to implementing agency )<br />

10.00<br />

d) Survey of Industrial estate at Hmunhmeltha, Champhai 7.50<br />

e) Maintenance & improvement of existing roads, buildings, steps<br />

and fencing at Industrial Estate<br />

6.50<br />

f) Car parking services charge to ZIDCO 20.00<br />

g) Maintenance of heavy machineries 2.00<br />

Total of B-3 63.23<br />

Scheme No. B - 5<br />

Name of the Scheme : Promotion of Village, Cottage & Tiny Industries :<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01)– Supervision of SSI)<br />

This is an on-going scheme under which grants-in-aid are provided to the rural<br />

artisans for setting up of village and cottage industries. The target group of this scheme is<br />

the poorer section of the society. This is a promotional scheme and need to be continued<br />

during the 10th Five Year Plan.<br />

Approved Annual Plan 2004-05 are as follows :<br />

Sl.<br />

No.<br />

Description of works<br />

Financial Outlay<br />

(Rs. In lakhs)<br />

2004-05<br />

Physical Targets<br />

(Nos.)<br />

2004-05<br />

1. GIA to rural artisans 6.00 400<br />

Total : 6.00 400<br />

Scheme No. B - 6<br />

Name of the Scheme : Entrepreneurial Development & Training<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01)– Supervision of SSI)<br />

This scheme is meant for human resource development in industrial sector. One of<br />

the most important inhibiting factors for industrial development in <strong>Mizoram</strong> is lack of<br />

manpower resources both at the level of technical manpower and entrepreneurs. This<br />

scheme is purely promotional nature and targets to educate and train both industrial


- 146 -<br />

INDUSTRIES DEPARTMENT<br />

workers and entrepreneurs. The Officers and staff of the Department also needed<br />

exposure to acquire up-to-date knowledge of industrial development and therefore, need<br />

on the spot study and conduct tour to different parts of the country.<br />

However, due to financial constraint, provision for the scheme cannot be made<br />

during Annual Plan 2004-05.<br />

Sl.<br />

No.<br />

Description of works<br />

Financial Outlay<br />

(Rs. In lakhs)<br />

2004-05<br />

Physical Targets<br />

(Nos.)<br />

2004-05<br />

1. Scholarship/Stipend :<br />

a) EDP Training to entrepreneurs 0.00 -<br />

b) Study tour for entrepreneurs 0.00 -<br />

c) Training of PMRY entrepreneurs 0.00 -<br />

d) Training of educated unemployed youths<br />

in food processing technology<br />

0.00 -<br />

e) Training of departmental Officers / staff<br />

to guide entrepreneurs<br />

0.00 -<br />

Total : 0.00 -<br />

Scheme No. B - 7<br />

Name of the Scheme : Industrial Information<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01) – Supervision of SSI)<br />

Under this scheme, the Department disseminates information by means of<br />

publicity, advertisement, etc. Under this scheme, the Department conducts exhibition, etc.<br />

and also participates in International and National Exhibitions. This is a promotional<br />

scheme and therefore need to be continued during the 10th Five Year Plan.<br />

Approved Annual Plan 2004-05 are as follows :<br />

Sl. No. Description of works<br />

Financial Outlay<br />

2004-05<br />

1. Rent :<br />

Annual Ground Rent of <strong>Mizoram</strong> Pavilion at Pragati<br />

Maidan, New Delhi 2004-05<br />

4.50<br />

2. Advertising :<br />

a) Interior decoration of <strong>Mizoram</strong> Pavilion for IITF 2004 5.00<br />

b) Participation expense for IITF 2004 15.00<br />

c) Publication of Industry Meichher 0.50<br />

3. Office expenses 1.00<br />

Total : 26.00<br />

Scheme No. B - 8<br />

Name of the Scheme : Incentive/ Subsidy to Industries :<br />

(Promotion & Development of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(02) –Pro. & Development of SSI)<br />

Under this ongoing scheme incentives/ subsidies are provided to the Small<br />

Scale Industries of <strong>Mizoram</strong> as announced.


- 147 -<br />

INDUSTRIES DEPARTMENT<br />

In the Industrial Policy of <strong>Mizoram</strong> State, 2000. Equity participation by the<br />

Government in the assisted is also entertained. This is a promotional scheme to encourage<br />

investment in industrial sector and therefore to be continued during the 10th Five Year<br />

Plan. The following subsidies are given under this scheme.<br />

1. Interest Subsidy 2. Power Subsidy 3. Land Subsidy<br />

4. State Transport Subsidy on Plant & Machinery 5. Factory rent subsidy<br />

6. Subsidy on Man Power Development 7. Subsidy on Drawal of Powerline<br />

8. Subsidy on Power Generating Set 9. Subsidy on Re-Imbursement of the<br />

Cost of Project Report<br />

Approved Annual Plan 2004-05 are as follows :<br />

Sl.<br />

No.<br />

Description of works<br />

Financial<br />

Outlay<br />

(Rs. In lakhs)<br />

Physical<br />

Targets<br />

(Nos.)<br />

1. Grant-in-aid/Subsidy :<br />

a) Providing State Incentive Subsidies to SSI Unit 18.00 75<br />

b) Matching Grant to MIFCO for FJCP 50.00 -<br />

c) Grant to MIFCO for EPF contribution 20.00 -<br />

Total : 88.00<br />

Scheme No. B – 9<br />

Name of the Scheme : District Industries Centre :<br />

(Budget Head : 2851 – Village & Small Industries, 102(03) –District Industries Centre)<br />

3 District Industries Centres of <strong>Mizoram</strong> created and functioning under the<br />

Centrally Sponsored Scheme of the Govt. of India stands transferred to the State Plan w.e.f.<br />

1994-95 and hence all the liabilities are being met from the State Plan funds.<br />

The DIC Scheme, therefore, needs to be continued during 10 th Five Year Plan also.<br />

As the newly opened 5(five) Sub-Divisional Industries Offices at Serchhip, Champhai,<br />

Kolasib, West Phaileng and Lawngtlai are placed under the control of the DICs. As such,<br />

Approved Annual Plan 2004-05 as follows:<br />

(Rs. In lakhs)<br />

Sl. No. Description of works Annual Plan 2004-05<br />

1. Salary for 3 DICs and 5 SDIOs 90.98<br />

2. Office Expenses for 3 DICs and 5 SDIOs 5.00<br />

3. Travelling Expenses for 3 DICs and 5 SDIOs 6.00<br />

4. Wages 5.00<br />

5. Grant-in-aid to rural artisans 1.00<br />

Total : 115.98<br />

Scheme No. B – 10<br />

Name of the Scheme : Common Facility Centre<br />

(Development of Rural Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(05) – Dev. of Rural Industries)<br />

These schemes were taken up during 8 th Five Year Plan for setting up of<br />

Multidisciplinary Workshop cum Training Centre for upgradation of the local skilled


- 148 -<br />

INDUSTRIES DEPARTMENT<br />

artisan and service facilities to the local SSI units in <strong>Mizoram</strong>. Out of 8 districts 3 nos. are<br />

already set up and another five of this type is proposed. Every year about 35 nos. of<br />

trainees are undergoing training in different engineering trades at RIDC Aizawl and it is<br />

proposed to start this type training at CFC Lunglei and Saiha for 15 nos. each of artisan<br />

w.e.f. 2003-04 financial year. It is also approved to set up at least one multidisciplinary<br />

workshop during 10 th Five Year Plan and start from 2003-2004.<br />

Approved Financial Target for Annual Plan 2004-05: —<br />

Sl. No. Description of works<br />

( Rs. In lakhs)<br />

Financial outlay<br />

2004-05<br />

1. Wages of casual employees :<br />

a) RIDC Aizawl - 28 nos. 10.83<br />

b) Common Facility Centre, Lunglei – 1 no. 0.31<br />

c) Common Facility Centre, Saiha – 1 no. 0.31<br />

Sub-Total : 11.45<br />

2. Office Expenses :<br />

a) Other Office expenses under RIDC, Aizawl 1.00<br />

b) Furniture Fixture, water supply, etc. at CFC Lunglei 0.30<br />

c) Furniture Fixture, Water supply, etc. at CFC Saiha 0.30<br />

Sub-Total 1.60<br />

3. Scholarship/Stipend :<br />

a) Stipend & Book grant for trainees under RIDC Aizawl, CFC<br />

Lunglei and CFC Saiha<br />

3.50<br />

b) Industrial tour for trainees, RIDC Aizawl, CFC Lunglei and<br />

CFC Saiha<br />

0.00<br />

Sub-Total 3.50<br />

4. Minor Works/Maintenance :<br />

a) Maintenance of building under RIDC, Aizawl, CFC Lunglei<br />

and CFC Saiha<br />

1.80<br />

b) Maintenance of <strong>plan</strong>ts and machineries under RIDC Aizawl<br />

CFC Lunglei CFC Saiha<br />

3.20<br />

Sub-Total : 5.00<br />

5. Machineries & Equipment :<br />

a) Procurement of tools & equipment under RIDC Aizawl 2.00<br />

b) Procurement of tools & equipment under CFC Lunglei 0.50<br />

c) Procurement of tools & equipment under CFC Saiha 0.50<br />

Sub-Total : 3.00<br />

6. Materials & Supply :<br />

Procurement of training materials for RIDC, Aizawl CFC<br />

Lunglei CFC & Saiha<br />

2.03<br />

• Total of (1+2+3+4+5+6) 26.58<br />

Scheme No. B – 11<br />

Name of Scheme : Development of Electronics<br />

A. Electronics & IT Wing in Directorate :<br />

(Budget Head : 2851 – Village & Small Industries, 102(06) – Dev. of Electronics)


- 149 -<br />

INDUSTRIES DEPARTMENT<br />

Development of Electronics Scheme is an on-going scheme which includes matters<br />

related to Electronics and Information Technology. Apart from promotion of the<br />

industries, the department is nodal department for computerization and its related<br />

matters. Keeping these in view, the dept. formulates and implements the policy of the<br />

Government in respect of Electronics and Information Technology, and guides various<br />

departments regarding the steps to be taken for computerization, and co-ordinates these<br />

efforts.<br />

Approved Plan during 2004-2005 is as below: -<br />

1. To implement various e-governance Projects such as;<br />

(a) Secretariat Networking,<br />

(b) Creation and maintenance of web-based Citizen Centric Services,<br />

(c) Maintenance and better utilization of CICs established in the whole of <strong>Mizoram</strong>,<br />

(d) Establishment of <strong>Mizoram</strong> Education Network (MEDNET) using ERNET as the main<br />

connectivity backbone,<br />

(e) Departmental Networking up to sub-divisional offices,<br />

(f) Development of customized application software for computerization of various<br />

office procedures.<br />

2. Manpower development and computer literacy:<br />

The Department set up two training Institutions namely, Golden Republic<br />

Information Technology Centre, Directorate of Industries, Aizawl, and Academy of<br />

Computer and Electronic Centre, District Industries Centre, Lunglei. Various<br />

DOEACC recognized courses, computer courses and electronic courses are<br />

conducted for local people, officers/staff of Government Departments, NGOs, etc.<br />

It is also <strong>plan</strong>ned to conduct computer literacy programme for government<br />

servants throughout the year in these institutions.<br />

3. To sponsor graduate and post graduate students pursuing various electronic and<br />

computer courses.<br />

4. To organize Seminar, Exhibition, Workshop, Training, Awareness Campaign,<br />

Publicity, etc.<br />

5. To motivate students for IT development, it is approved to give cash incentive as<br />

below:<br />

Sl.<br />

Particulars First Prize Second Third<br />

no<br />

prize prize<br />

1. Class X students securing highest mark in Rs.30,000 Rs.20,000 Rs.10,000<br />

computer science subject at MBSE<br />

2.<br />

examination, 2004<br />

Class XII students securing highest mark in Rs.30,000 Rs.20,000 Rs.10,000<br />

computer science subject at MBSE<br />

examination, 2004<br />

The scheme is prepared for implementation within the allocation of Rs. 76.78 lakhs<br />

as detail head given below.


Sl.<br />

No.<br />

1<br />

- 150 -<br />

INDUSTRIES DEPARTMENT<br />

Head<br />

Salary<br />

a) For existing staff – 1 no.<br />

b) For 1(one) Asst. Software Engineer<br />

c) For 2 (two) Senior Technicians<br />

d) For 6 (six) Teaching Faculties at GRITC, Aizawl and AC & EC, Lunglei<br />

Financial<br />

Outlay<br />

(Rs. In lakhs)<br />

2.00<br />

2 Wages for muster roll workers – 10 nos. 6.00<br />

3 Travelling expenses 1.00<br />

4 Office expenses 13.55<br />

5 Advertisement 3.00<br />

6 GIA/Subsidy :<br />

a) Grant-in-aid to electronic artisans 1.00<br />

7 Scholarship/Stipend :<br />

a) Stipend and book grant for graduate and post-graduate students in<br />

Electronics & IT fields<br />

3.00<br />

b) Training 2.00<br />

8 Other charges :<br />

a) Development of customized application software<br />

b) Connectivity charges for <strong>Mizoram</strong> Education Network (MEDNET)<br />

9.10<br />

9 Machinery and equipment :<br />

a) Procurement of networking equipments for providing internet<br />

connectivity to various places using ERNET backbone and CICs<br />

b) Procurement of Computer and accessories.<br />

17.00<br />

10 Materials and supply :<br />

a) Procurement of training materials for GRITC, Aizawl and AC & EC,<br />

Lunglei<br />

b) Procurement of materials for office needs<br />

4.61<br />

11 Minor works/Maintenance :<br />

a) Maintenance of computer and accessories at the directorate<br />

b) Maintenance of computer and accessories at GRITC, Aizawl and AC &<br />

EC, Lunglei<br />

c) Maintenance of computer and accessories at DIC and Sub-divisional<br />

offices<br />

d) Maintenance of <strong>plan</strong>t and machineries at CICs<br />

4.00<br />

TOTAL 66.26<br />

B. Zoram Electronics Development Corporation Ltd. (ZENICS) :<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

During the 10 th Five Year Plan 2002-07, ZENICS Ltd. proposed to take up the<br />

following projects in addition to continuing the on-going projects of Computer Academy<br />

and Consumer Electronics Training Centre: -<br />

1. Computerisation of certain Govt. offices and cable laying initiating from<br />

Directorate of Industries and Block ‘C’ of Civil Secretariat<br />

2. Preparation of Electors’ Photo Identity Card for <strong>Mizoram</strong> State under Election<br />

Department<br />

3. Preparation of <strong>Mizoram</strong> Portal in the Internet<br />

4. Preparation of separate Tourism Portal for Tourism Department


- 151 -<br />

INDUSTRIES DEPARTMENT<br />

5. Multi-Media Content Creation Centre<br />

6. Training of Unemployed Engineers and Science Degree Holders in collaboration<br />

with M/s Informatics<br />

7. Restructuring of the Corporation<br />

8. Human Resource Development Project to make <strong>Mizoram</strong> State IT literate<br />

9. Connectivity to Education Research Network<br />

(Rs. In lakhs)<br />

Sl. No. Particulars Annual Plan 2004-05<br />

1 Share Capital contribution 35.00<br />

Scheme No. B – 12<br />

Name of the Scheme : Handloom & Handicraft Industries<br />

In order to accomplish the objectives of national and state level agenda announced<br />

in various policy resolutions the following works shall be undertaken for the development<br />

of Handloom & Handicrafts sectors in the state during 2004-05.<br />

Approved Annual Plan 2004-05 are as follows :-<br />

A. Handloom Industry :<br />

1. Handloom Industry<br />

(Budget Head : 2851 – Village & Small Industries, 103(01) – Handloom Industry)<br />

(Rs. In lakhs)<br />

Sl.<br />

No.<br />

Programmes of Works<br />

Financial Outlays<br />

2000-05<br />

1. Salary of existing staff – 7 nos. 7.66<br />

2. Wages 1.59<br />

3. Travelling Expenses 3.00<br />

4. Office Expenses 7.00<br />

Total of 1 : 19.25<br />

2. Promotion & Development Of Handloom Industry<br />

(Budget Head : 2851–Village & Small Industries, 103(02)–Pro. & Dev. of Handloom Industry)<br />

Sl.<br />

No.<br />

Programmes of Works<br />

Financial Outlays<br />

2003-04<br />

1. Wages for muster roll workers – 8 nos. 2.00<br />

2. Advertising : (publication & dissemination of information) 1.00<br />

3. Grant-in-aid/Subsidy :<br />

a) Rebate on sales of handloom & handicraft products<br />

through exhibition<br />

9.00<br />

b) Grants to Departmentally trained weavers in the form of<br />

looms and accessories<br />

7.50<br />

c) Gandhi Jayanti Rebate and Grants to Bee-Keepers 1.50<br />

d) Working Capital Grant to weavers @ Rs. 2500/- for 140<br />

weavers<br />

2.00<br />

e) Matching contribution to CSS 12.00<br />

f) Promotional Grant to ZOHANDCO 10.00<br />

Sub-total : 42.00<br />

4. Scholarship/Stipend :<br />

a) Stipend for 50 trainees under Decentralised Training<br />

Programme @ Rs.500/- per month for six months<br />

1.50<br />

b) Stipends for 50 trainees @ Rs. 250/- for one year 1.50<br />

Sub-total : 3.00


- 152 -<br />

INDUSTRIES DEPARTMENT<br />

5. Minor Works/Maintenance :<br />

a) Repairs and maint. of Training Centres at various places 4.00<br />

b) Maintenance of computer and its peripherals 0.30<br />

Sub-total : 4.30<br />

6. Machinery & Equipment :<br />

a) Purchase of loom, warping drum & accessories for<br />

Departmental Training & Decentralised Training Programme<br />

1.50<br />

b) Technology upgradation – purchase of improve looms with<br />

Jacquard and Dobby attachments<br />

1.50<br />

Sub-total : 3.00<br />

7. Material & Supply :<br />

a) Procurement of building materials for temporary sheds for<br />

Decentralised Training Programme<br />

0.50<br />

b) Purchase of training materials for departmental training<br />

and decentralized training programme<br />

3.80<br />

Sub-total : 4.30<br />

8. Other Charges/compensation - (production of cloth sample) 0.80<br />

Total of 2 : 60.40<br />

3. Tribal Handloom Development Project<br />

(Budget Head : 2851 – Village & Small Industries, 103(03)– Tribal Handloom Dev. Project)<br />

Sl.<br />

No.<br />

Programmes of Works<br />

Financial Outlays<br />

2004-05<br />

1. Establishment grant for Tribal Handloom Dev. Project 20.00<br />

Total of ‘A’ (1 + 2 + 3): 99.65<br />

B. Handicraft Industry :<br />

(Promotion & Development of Handicraft Industry)<br />

(Budget Head : 2851–Village & Small Industries, 104(01)–Pro. & Dev. of Handicraft Industry)<br />

(Rs. in lakhs)<br />

Sl.<br />

No.<br />

Programmes of Works<br />

Financial Outlays<br />

2004-05<br />

1. Salary of existing staff – 4 nos. 2.50<br />

2. Travelling expenses 0.50<br />

3. Rent 0.70<br />

4. Grant-in-aid/Subsidy - to Departmentally trained artisans as<br />

per prevailing GIA Rules for 400 artisans<br />

7.00<br />

5. Scholarship/Stipend :<br />

a) Stipend for Departmentally trained artisans – 250x250x6 3.75<br />

b) Sponsoring of officials/artisans for bamboo craft training<br />

in China<br />

1.40<br />

6. Minor Works – repair & maint. of Craft Centre buildings 1.00<br />

7. Material & Supply – purchase of training materials for<br />

knitting, tailoring, embroidery, cane & bamboo<br />

5.35<br />

8. Other charges – Institution of state award 0.25<br />

Total of ‘B’ : 22.45


- 153 -<br />

INDUSTRIES DEPARTMENT<br />

C. <strong>Mizoram</strong> Handloom & Handicrafts Development Corporation Ltd. (ZOHANDCO):<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

The <strong>Mizoram</strong> Handloom and Handicrafts Development Corporation Ltd. Was duly<br />

incorporated under the Companies Act, 1956 on the 20.12.1988 as the main objectives was<br />

to develop Handloom & Handicraft units under the state of <strong>Mizoram</strong>.<br />

However, due to financial constraint, the Department approved to contribute share<br />

capital to the Corporation as follows: -<br />

(Rs. In lakhs)<br />

Sl. No. Programme of work Annual Plan 2004-05<br />

1 C. Share capital contribution 40.00<br />

Scheme No. B – 13 :<br />

Name of the Scheme : <strong>Mizoram</strong> Khadi & Village Industries Board<br />

(Promotion & Development of Khadi & Village Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 105(01) –Pro. & Dev. of KVI)<br />

The Board was established in 1986. As it is a statutory Board it is the responsibility<br />

of State Government to bear the establishment charges . ( vide chapter-V 28(1) ).<br />

The existing establishment which require to be maintained consists of 173 nos. of<br />

staff of the following categories.<br />

Group A - 12<br />

Group B - 7<br />

Group C - 114<br />

Group D - 40<br />

Total - 173<br />

However, due to financial constraint, the Department approved to contribute<br />

establishment grants to MKVI Board as follows: -<br />

Particulars<br />

Grant-in-aid :<br />

Annual Plan 2004-05<br />

Establishment Grant to the Board Rs. 190.00 lakhs<br />

Scheme No. B – 14<br />

Name of the Scheme : Development of Bamboo Based Industries :<br />

(Budget Head : 2851 – Village & Small Industries, 800(01) –Dev. of Bamboo Industry)<br />

The State Government, in its endeavour to tap the economic potential of vast<br />

bamboo resources available in the state, has placed bamboo as a thrust sector which is<br />

reflected in the Industrial Policy of <strong>Mizoram</strong> 2000 and separate Bamboo Policy of <strong>Mizoram</strong><br />

2002 has also been announced.<br />

The importance and prospects of bamboo has also been now clearly felt by NEC<br />

and Government of India. NEC has now also currently approved National Mission on<br />

Bamboo Technology and Trade Development.


- 154 -<br />

INDUSTRIES DEPARTMENT<br />

The total requirement on bamboo development especially on utilization aspect is<br />

so high and as such, the major projects involving huge expenditure are being taken up<br />

from other sources and the practice may be continued. However, certain expenditure<br />

which cannot be met from earmarked project funds are to be met from State Plan as<br />

below:<br />

1. Grant of Bamboo Development Agency :<br />

Bamboo Development Agency has been established by State Government for<br />

effective implementation of bamboo utilization activities. The Agency is now entrusted<br />

with the task of forming and running M/s Venus Bamboo Products (P) Limited (A joint<br />

Venture Company), Development of Bamboo Concrete Technology, Construction of<br />

Bamboo Demonstration Houses, Bamboo Shoot Preservation by Vacuum Packing,<br />

Hardening Units for Tissue Cultured Plants etc., besides project proposal awaiting sanction<br />

within a short period.<br />

Hence, an amount of Rs.7.00 lakh is approved as Grant to Bamboo Development<br />

Agency for establishment etc.<br />

2. Other Expense on Bamboo :<br />

Even though Bamboo Development Agency has been established and entrusted with<br />

many projects, there is a need to carry on mechanism for monitoring from the Department<br />

in view of bamboo becoming a thrust area for not only the State of <strong>Mizoram</strong> but for NEC<br />

and Government of India.<br />

Hence, an amount of Rs.1.00 lakh is approved for miscellaneous expenditure for<br />

the Department of Industries.<br />

With the coming flowering of Bamboo, a scheme of Bamboo Flowering and Famine<br />

Combat Scheme (BAFFACOS) is approved to be implemented on war-footing and hence a<br />

provision is earmarked separately so as to utilize the existing Bamboo resources before<br />

they flower and extinct.<br />

It is, therefore, approved to give grant-in-aid to the Bamboo Development Agency<br />

during 2004-05 as follows: -<br />

Sl. Programmes of Works<br />

Financial Outlays<br />

No.<br />

2004-05<br />

1. Grant-in-aid :<br />

a) Grant-in-aid to the Bamboo Development Agency 7.00<br />

b) GIA for construction of building at Sairang 86.00<br />

2. Other charges/Compensation<br />

a) Other charges 1.00<br />

b) For BAFFACOS 365.00<br />

Total : 459.00


Scheme No. B - 15<br />

- 155 -<br />

INDUSTRIES DEPARTMENT<br />

Name of the Scheme : Zoram Industrial Development Corporation Ltd. (ZIDCO)<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

Zoram Industrial Development Corporation Ltd. (ZIDCO) was set up in 1978 having<br />

twin functions of Industries Development and Finance. However, its activities are more or<br />

less limited to Industrial financing.<br />

The Main sources of funds are:<br />

1) Share Capital<br />

2) Loan/Refinance from IDBI/SIDBI & NMDFC<br />

3) Recovery of loans<br />

4) Interest on saving A/C<br />

As there is very little chance of survival from giving loans, ZIDCO is taking steps to<br />

undertake development projects and fortunately the Govt. of <strong>Mizoram</strong> has recently<br />

appointed ZIDCO as an implementing agency for IIDC, Pukpui.<br />

In view of the above few points, the Govt. of <strong>Mizoram</strong> is expected to kindly allot<br />

Share Capital Contribution to ZIDCO to meet at least 50% of the Annual Pay & Allowances<br />

which stands at Rs.90.00 lakhs approximately (i.e. Rs. 45.00 lakhs per year) and Rs.20.00<br />

lakhs per year for IIDC, Pukpui as shown below:<br />

Fund requirement for IIDC, Pukpui is to be met from the concerned Scheme i.e.<br />

“Development of Industrial Infrastructure”, as such, provision to meet the share capital<br />

requirement is approved under this scheme.<br />

(Rs. In lakhs)<br />

Particular Annual Plan 2004-05<br />

Share Capital contribution to ZIDCO 25.00<br />

TOTAL OF ‘B’ : Rs. 1401.00 lakhs<br />

GRAND TOTAL OF ‘A’ & ‘B’: Rs. 1485.00 lakhs


- 158 -<br />

SERICULTURE DEPARTMENT<br />

SERICULTURE<br />

Introduction:<br />

Sericulture is an industry ideally suited to countries in the tropical belt where<br />

unemployment continues to be a serious problem. By its situation, climatic condition,<br />

fertility of soil and distribution of rain, <strong>Mizoram</strong> is proved to be an ideal place for the<br />

development of Sericulture Industry.<br />

Sericulture practices can rightly fit into Socio-economic structure of the rural area<br />

and play significant role for reconstruction of rural economy benefiting mostly the weaker<br />

section of the society. The most important consideration is the effective utilisation of<br />

family manpower, particularly the aged, handicapped, illiterate and women folk.<br />

It has also been said to be the most important tool in bridging the gap between the<br />

rich class and the poor section of the society, distributing wealth among the farmers,<br />

reelers, twisters, weavers and traders. The major share goes to the poor farmers followed<br />

by traders, weavers and twisters / reelers.<br />

Sericulture is successfully practised as a viable rural industry as it gives<br />

remunerative employment to family labour throughout the year and ensures periodic<br />

income even from small land-holding and low financial investment. It has a ready market<br />

and is export-oriented industry.<br />

In spite of all the aforesaid advantages, the growth of Sericulture Industry in<br />

<strong>Mizoram</strong> is rather slow and the reasons attributed to this are lack of infrastructural<br />

facilities, paucity of fund, insufficiency of field staff and lack of sense of responsibility<br />

amongst the workers, even then the production of silkworm seed, cocoons and silk<br />

products in the recent past has been found to be satisfactory and encouraging.<br />

During the Tenth Plan period (2002-07) and in the first two years of the Tenth Plan<br />

(2002-04), Sericulture Department will intensify its Plan and Implementation Programme<br />

towards production of Bivoltine Mulberry Silk and also Eri and Muga Sectors shall be given<br />

importance simultaneously. To meet these ends, maximum quantity of high yielding<br />

Mulberry variety, som / soalu and kesseru / castor shall be introduced in the private<br />

sectors. In the meantime seed granages, rearing and post cocoon technologies shall be<br />

upgraded / improved as far as practicable.<br />

Various Catalytic Programmes under Silk Board are implemented during the Tenth<br />

Plan period, which continues during 2004-05 also along with the Normal Plan Schemes.


- 159 -<br />

SERICULTURE DEPARTMENT<br />

THE SCHEMES<br />

There are seven ongoing schemes implemented by the Department during the<br />

Ninth Plan period and these schemes shall continue to be implemented in the Tenth Plan<br />

period also as 2002-03 the base year. The same Schemes shall continue even during 2004-<br />

05. One new Scheme called as Baffacos is approved to be implemented during 2004-05 as a<br />

preparatory to combat the impending famine caused by Bamboo Flowering.<br />

Priority shall be given to the following work sectors during 2004-05:<br />

1) During 2003-04, 1630 acres have been covered with new Mulberry Plantation as<br />

against the target of 500 acres. Another 500 acres of land shall be covered under<br />

improved variety of mulberry during 2004-05.<br />

2) One Staff quarter is proposed to be constructed at Sericulture Complex, Chaltlang<br />

and the existing buildings at different farms shall be renovated / repaired as per<br />

availability of fund.<br />

3) Silk reeling Factory shall be improved as far as possible in order to produce quality<br />

Raw Silk Meanwhile the Silk weaving Unit shall either be improved or kept in<br />

abeyance as economic measure.<br />

4) Seed production shall be increased to cater the demand of the farmers far and wide<br />

in the State.<br />

Scheme-wise approved outlays for the year 2004-05 are: -<br />

1. Direction Rs. 41.50 lakhs<br />

2. Administration Rs. 115.00 lakhs<br />

3. Promotion Rs. 33.00 lakhs<br />

4. Marketing Rs. 22.00 lakhs<br />

5. Research & Training Rs. 4.50 lakhs<br />

6. Silk Processing Rs. 12.00 lakhs<br />

7. Seed Organization Rs. 2.00 lakhs<br />

8. Baffacos Rs. 75.00 lakhs<br />

Total Rs. 305.00 lakhs<br />

DETAILS OF THE SCHEMES<br />

Scheme No. I : Direction<br />

This Scheme aims at improvement and upkeep of Directorate Office Establishment,<br />

Strengthening of Planning Cell, Information Cell, Publicity through different media,<br />

organization of Seminars, participation of Industrial fairs. Planning, monitoring of all <strong>plan</strong><br />

implementation programmes, overall control of financial expenditures, etc. etc.<br />

The main components of the scheme are: -<br />

1] Purchase of required stationary items.<br />

2] Maintenance of 2 heavy vehicles and 4 light vehicles.<br />

3] Up keep of staff and office administration.<br />

4] Monitoring / control of all work implementation.<br />

5] Construction Staff quarter at Sericulture Complex, Chaltlang.


Sl.<br />

No.<br />

- 160 -<br />

SERICULTURE DEPARTMENT<br />

Name of post Scale of pay Existing Total<br />

Approved<br />

Outlay<br />

(Rs. in lakh)<br />

1. Director of Seri 14,300-18,300 - -<br />

2. Jt. Director 12,000-16,500 1 1<br />

3. D.D.S. [Planning] 10,000-15,200 - -<br />

4. Office Superintendent 8,000–13,500 1 1<br />

5. Assistant 5,500-9,000 3 3 20.00<br />

6. F.A.O 8,000-13,500 - -<br />

7. Steno-III 5,000- 8,000 1 1<br />

8. UDC 5,000- 8,000 1 1<br />

9. LDC 4,000-6,000 2 2<br />

10. Mechanic 5,000-8,000 1 1<br />

11. Driver 3,050-4,590 4 4<br />

12. IV Grade 2,650-4,000 9 9<br />

13. J.E. 5,500-9,000 1 1<br />

14. Duftry 3,050-4,590 1 1<br />

TOTAL 25 nos. 25 nos. 20.00<br />

Item-wise financial break-up:<br />

Sl. No. Item<br />

Approved Outlay<br />

[Rs. in lakhs]<br />

1. Salary of Staff 20.00<br />

2. Wages of M/R 5.00<br />

3. Travelling Expenses 1.00<br />

4. Office Expenses 7.00<br />

5. Publicity / Advertisement 1.50<br />

6. Maintenance of Vehicle 7.00<br />

7. Minor Works -<br />

TOTAL 41.50<br />

Scheme No. II : Administration<br />

All District level Office establishments, maintenance and upkeep of these<br />

establishments, farms/ centres come under this scheme.<br />

During 2003-04, it is an obligatory of the Department to create and establish new<br />

District establishments and sub-divisional establishments corresponding to the new<br />

districts and sub-divisions recently created by the Govt. of <strong>Mizoram</strong>. However, due to<br />

continuous financial constraint prevailing in the state only 2 [two] new District at Serchhip<br />

and Kolasib were opened as against the requirement of 4 district establishments.<br />

Brief components of the scheme are: —<br />

1] Construction of District sericulture Office buildings at Kolasib if fund<br />

available.<br />

2] Maintenance of farms/ Centres for Silkworm rearing and seed cocoon<br />

production.<br />

3] Repair of buildings shall also be taken up as per the availability of fund.<br />

4] Purchase of all kind of appliances, equipment, fertilizers manure etc.


- 161 -<br />

SERICULTURE DEPARTMENT<br />

Position of staff and requirement on salary:<br />

Sl.<br />

No.<br />

Name of Post Scale of Pay<br />

Existing<br />

No.<br />

Proposed<br />

No.<br />

Total<br />

Required<br />

Approved<br />

Outlay<br />

1. D.S.O. 8000-13500 4 3 4<br />

2. S.P.O. 6500-10500 10 - 10<br />

3. Head Asstt. 5500- 9000 4 3 4<br />

4. UDC 5000- 8000 2 3 2<br />

5. LDC 4000-6000 3 6 3<br />

6. Driver 3050-4590 - - -<br />

7. E.O. 5500-9000 7 - 7<br />

8. Farm Manager 5000-8000 6 - 6 70.00<br />

9. S/D & S.W Instr. 4000-6000 19 - 19<br />

10. Rearer 2750-4400 10 - 10<br />

11. IV Grade 2650-4000 1 3 1<br />

TOTAL<br />

Financial targets:<br />

66 18 66 70.00<br />

Sl. No. Item<br />

[Rs. in lakhs]<br />

Approved Outlay<br />

(Rs. in lakh)<br />

1. Salary of Staff 70.00<br />

2. Travelling Expenses 3.00<br />

3. Office Expenses 5.00<br />

4. Rent 1.50<br />

5. Wages 32.00<br />

6. Other Charges 0.50<br />

7. Minor Works / Maintenance 3.00<br />

TOTAL 115.00<br />

Scheme No. III : Promotion<br />

This scheme mainly concern with extension and promotional activities benefiting<br />

mostly the private sectors. it provides technical assistance and gives subsidy/GIA to the<br />

registered farmers from time to time.<br />

Various Catalytic Development Projects [CSB] had been incorporated under this<br />

scheme for upgradation of Mulberry, Erie, Muga and Oak Tasar development in the state.<br />

These Central Silk Board schemes are mostly funded directly by the Central Silk<br />

Board and the State Department, at times, has to provide matching contribution.<br />

Main components of the scheme are: -<br />

1] Maintenance of the existing Chowki Rearing Centres and Technical Service<br />

Centres at Aizawl and Lunglei.<br />

2] Distribution of Mulberry Cuttings to 500 families.<br />

3] Upgradation of Farms and Augmentation Silkworm Food Plants.<br />

Position of staff and posts approved:<br />

Sl.<br />

No.<br />

Name of post Scale of pay<br />

Existing<br />

No.<br />

Proposed<br />

No.<br />

Total<br />

[Rs. in lakh]<br />

Fund<br />

required<br />

1. Seri. Demonstrator 4,000-6,000 9 - 9 9.00<br />

2. IV Grade 1,650-4,000 - - -<br />

TOTAL 9 - 9 9.00


Financial Targets:<br />

- 162 -<br />

SERICULTURE DEPARTMENT<br />

Sl. No. Item Fin. Outlay [Rs. in lakh]<br />

1. Salary of Staff 9.00<br />

2. M & S / CDP 24.00<br />

3. M & E -<br />

TOTAL 33.00<br />

Scheme No. IV : Marketing<br />

Since a separate marketing cell has not yet been created, the marketing activity is<br />

directly controlled by the Directorate through the District Officers. Generally, marketing<br />

activities should not come within the purview of the Department in case there exists<br />

Master Reelers and Weavers in the private sector in the State. In the absence of Reelers and<br />

Weavers in the State, the marketing activities are bound to be looked after by the<br />

Department alone. In this circumstance, the Department is compelled to continue to<br />

purchase cocoons produced by the farmers and reel them in the reeling factory for<br />

producing raw silk.<br />

With a view to improve the system of purchase of cocoons, the Department has<br />

fixed five cocoon-purchasing centres at Aizawl, Serchhip, Champhai, Kolasib and Lunglei.<br />

The cocoons purchased at these centres will be brought to the reeling factory, Zemabawk<br />

for conversion into silk yarn.<br />

Sl.<br />

No.<br />

Position of staff and requirement of salary:<br />

Name of post Scale of pay<br />

Existing<br />

No.<br />

Proposed<br />

No<br />

Total<br />

Fund<br />

required<br />

(Rs. in lakh)<br />

1. LDC/Sales Asst. 4,000-6,000 1 - 1 1.00<br />

TOTAL 1 - 1 1.00<br />

Financial Targets:<br />

Sl. No. Item<br />

Approved Financial Outlay<br />

[Rs. in lakh]<br />

1. Salary of Staff 1.00<br />

2. M/S [purchase of cocoon, etc.] 21.00<br />

TOTAL 22.00<br />

Scheme No. V : Research & Training<br />

As already mentioned in the aforesaid Para, Sericulture Industry is an Agro-based<br />

which requires wide range of scientific technologies with different financial investments.<br />

Therefore, proper studies of Silkworm Metamorphose, Pathology, Agronomy, Aboriculture<br />

and Ecology are indispensable to make Sericulture Industry flourish economically viable.<br />

The success of Sericulture Industry largely depends on the availability of required<br />

scientific knowledge and its application in the field at the right time and at the right place.<br />

This can be achieved through realisation of the importance of Research and<br />

Training activities based on well-organised scientific lines, equipped with the most<br />

advanced scientific instruments to evolve new concepts of scientific methodology for<br />

application to field activities with minimum financial investment.


- 163 -<br />

SERICULTURE DEPARTMENT<br />

At this end, the Department of Sericulture had established one Research and<br />

Training Institute at Zemabawk with the following objectives —<br />

1. To depute B.Sc. graduates for training in Post Graduate Diploma in Sericulture to<br />

various Sericulture Institutes in India.<br />

2. To impart training to Matriculates for one year Certificate Course Training.<br />

3. To impart short-term training to the in-service personnel and the private farmers.<br />

4. To conduct study tours for trainees from time to time.<br />

5. To conduct mobile training to farmers of far-flung areas. During 2004-05, it is<br />

approved to train 500 farmers and 50 in-service persons.<br />

Sl.<br />

No.<br />

Since the Research and Training Institute is of recent origin, the main activity of the<br />

institution, apart from Training programmes, will be building up infrastructural<br />

facilities like construction of buildings, purchase of machinery and equipment.<br />

However due to paucity of fund improvement of the infrastructural facilities shall<br />

not be taken up during 2004-05.<br />

Position of staff and requirement of Salary:<br />

Name of post Scale of pay<br />

Existing<br />

No.<br />

Proposed<br />

No.<br />

Total<br />

Fund<br />

required<br />

(Rs. in lakh)<br />

1. Principal 10,000-15,200 1 - 1<br />

2 Farm Manager 5,000-8,000 1 - 1 3.00<br />

TOTAL 2 - 2 3.00<br />

Financial target:<br />

Sl. No. Item<br />

Approved Financial Outlay<br />

[Rs. in lakh]<br />

1. Salary of Staff 3.00<br />

2. Wages 0.50<br />

3. Scholarship / Stipend 1.00<br />

TOTAL 4.50<br />

Scheme No. VI : Silk Processing<br />

The main theme of sericulture Industry is to make earnings through sales of<br />

various sericulture products to individuals, societies in the State.<br />

Unless the cocoons so produced are processed to produce raw silk and silk fabrics,<br />

Sericulture activities are said to be incomplete. The cocoons produced are subjected to<br />

various Post Cocoon Technologies in order to produce quality raw silk and silk goods for<br />

sale in the market.<br />

The cocoon processing comprises of selection of quality cocoons, stifling, cooking,<br />

degumming, reeling/spinning, twisting, weaving and so on. Cocoon processing required<br />

highly skilled hands in order to produce quality raw silk and silk fabrics to catch viable<br />

markets.<br />

At this objective, the Sericulture Department is having one Reeling Factory at<br />

Zemabawk. Apart from producing raw silk and silk fabrics these units have also been<br />

producing silk quilts in abundance, which has marketing potential everywhere in the


- 164 -<br />

SERICULTURE DEPARTMENT<br />

country. Since the production of reeling cocoons is increasing year after year, it has<br />

become a necessity to have one more reeling machine like the existing ones. Under this<br />

scheme there is one silk weaving and dyeing unit at Aizawl where silk fabrics of various<br />

designs are produced.<br />

Therefore, the main aim of this scheme is to create and encourage private reelers/<br />

weavers so as sustain their livelihood through sales of their products.<br />

However, to make the department capable of increasing the revenue through Sales<br />

of Sericultural products, the reeling factory has to be strengthened by providing necessary<br />

infrastructures.<br />

Financial Targets:<br />

Sl. No. Item<br />

Approved Financial Outlay<br />

[Rs. in lakh]<br />

1. Wages 12.00<br />

TOTAL 12.00<br />

Scheme No. VII : Seed Organization<br />

Common occurrence of crop failure is exclusively attributed to bad quality of<br />

silkworm seeds. Therefore production of quality seed is a vital aspect for the success of<br />

Sericulture Industry. Quality seed may be defined as seed which is completely free from<br />

diseases.<br />

The whole gamut of seed production comprises of seed organisation for systematic<br />

and methodical multiplication of basic seed and industrial seed on scientific line and its<br />

proper and efficient management of breeders’ stock and its multiplication for the ultimate<br />

production of Industrial hybrid seed. Seed production involved in maintenance of<br />

breeders’ stock, basic seed and industrial seed and maintaining the purity, its vigour and<br />

vitality.<br />

Although three District phases for seed production are involved in systematic seed<br />

organisation in normal case, the seed organisation designed to be operative in <strong>Mizoram</strong><br />

consists of a simple three-tier system, namely, (a) Basic Seed Centre, (b) Multiplication<br />

Centre and (c) Industrial Grainage.<br />

The Basic Seed Centre, Rangvamual is acting as Breeders’ Stock which will produce<br />

only pure bred silkworm races of not less than four varieties. The seeds produced are then<br />

distributed equally to the selected Multiplication Centres.<br />

The distinctive characteristic of the Kultiplication Centres in seed organization in<br />

<strong>Mizoram</strong> is that they only produce quality seed cocoons whereas in other states they are<br />

producing seed cocoons and silkworm seeds [eggs]. The seed cocoons produced by these<br />

centres are then brought to the Industrial Grainage, Zemabawk for production of hybrid<br />

eggs to feed the private farmers.<br />

Maintenance of all the Multiplications Centres like Vairengte, Kolasib, Serchhip,<br />

Thenzawl, Baktawng, Lunglei, Champhai, Phullen, Rangvamual and Zemabawk will<br />

henceforth be looked after under this scheme.


- 165 -<br />

SERICULTURE DEPARTMENT<br />

Depending on the actual requirement of hybrid seeds in the States, the industrial<br />

Grainage is expected to produce as much seeds as possible from season to season.<br />

Main components of the scheme are: —<br />

1) Purchase of equipment/ appliances etc. etc.<br />

2) To produce as much seeds as possible as per the requirements and the<br />

targets made for the concerned year.<br />

Financial Targets:<br />

Sl. No. Item<br />

Approved Financial Outlay<br />

[Rs. in lakh]<br />

1. O.E. 2.00<br />

2. M & S -<br />

TOTAL 2.00<br />

Scheme No. VIII : Scheme for Bamboo Flowering & Famine Combat Scheme for the year<br />

2004-05<br />

Considering the potential of using Sericulture as a tool to wean away devastating<br />

Jhum Cultivation together with the role it plays towards reconstruction of rural economy<br />

in the State and after realising the success of various schemes implemented during the 8 th<br />

and 9 th Plan period, the State Level Committee on preparation for impending gregarious<br />

Bamboo Flowering in 2006-07 has selected / included Sericulture Department as one of the<br />

items / trades to effectively combat with the possible occurrence of catastrophic famine<br />

due to sudden and large scale destruction of paddy crop by rodents.<br />

Accordingly, a new scheme called ‘Bamboo Flowering and Famine Combat Scheme’<br />

has been prepared for the benefit of 150 farmers in the rural areas who would be affected<br />

by the famine. The scheme will provide assistance to the selected beneficiaries for<br />

cultivation of mulberry farms which will include land development cost, raising of<br />

<strong>plan</strong>tation, construction of rearing houses and supply of rearing equipment, etc. Each<br />

beneficiary will have a land of 1 hectare area where mulberry <strong>plan</strong>ts will be cultivated.<br />

The main objective of the Scheme is to let the farmer earn his livelihood through<br />

sale of Silk Cocoons which will not be hampered by the famine caused by the bamboo<br />

flowering or rapid and multiple increase of rodents.<br />

The broad objectives of the Scheme are: —<br />

To combat the possible catastrophic famine due to bamboo flowering.<br />

To enhance annual Mulberry Silk Production.<br />

Creating awareness among the rural populace particularly women folk about silk<br />

activities and its potential to remove poverty.<br />

To bring technology upgradation among the user groups through training and<br />

input support for taking up cocoon and silk production activities.<br />

Identify thrust areas, and bridge the gaps for comprehensive development of<br />

Mulberry Culture in <strong>Mizoram</strong> during the 10 th Plan period.


Sl.<br />

No.<br />

- 166 -<br />

SERICULTURE DEPARTMENT<br />

Beneficiaries in the target areas would be motivated to adopt mulberry silk<br />

activities to enhance their income for sustenance of livelihood.<br />

The beneficiaries would be guided and assisted for raising of Mulberry Plantation at<br />

minimum of 1 hectare per farmer and taking Mulberry Silkworm Rearing in a viable<br />

manner by giving stress on quality and productivity of cocoons for better returns.<br />

Efforts would be made to develop self-reliance among the beneficiaries and ensure<br />

management by local initiatives thereby reducing extent of dependence on<br />

Government Agencies.<br />

The Scheme envisaged to assist individual farmers for raising of mulberry<br />

<strong>plan</strong>tation, construction of rearing houses and supply of rearing equipments.<br />

Imparting training to farmers and officials on different technical aspects.<br />

Components of the Scheme:<br />

Components<br />

Physical<br />

Target<br />

(in No.)<br />

Financial<br />

Target<br />

(Rs. in lakh)<br />

1. Providing GCI sheets for roofing of Rearing Houses 97 9.70<br />

2. Providing assistance for Mulberry Plantation @ 1 ha. 150 34.80<br />

3. Supply of Rearing Equipments to farmers 150 30.00<br />

4. Providing training to the farmers (Stip. @ Rs.1000/each)<br />

100 0.50<br />

Total 75.00<br />

Detailed Description of the Components:<br />

(1) Assistance to Commercial Rearer:<br />

Under the component, it is proposed to assist the individual commercial rearer by<br />

raising 150 ha. of systematic mulberry <strong>plan</strong>tation at 3’×3’ spacing @ 1 ha. by each rearer. A<br />

minimum unit area of 1.00 ha., per commercial rearer will be raised by accommodating<br />

10,000 <strong>plan</strong>ts/ha. The Directorate of Sericulture, Government of <strong>Mizoram</strong> will supply the<br />

required 10,000 cuttings. Each beneficiary will be assisted with Land Development cost of<br />

Rs. 12,700/- and Plantation Development cost of Rs. 23,460/-. Besides, rearing appliances,<br />

disinfectants and silkworm seed cost worth Rs. 21,850/- will be provided to conduct<br />

silkworm rearing. The Directorate of Sericulture, <strong>Mizoram</strong> would arrange 2,000 dfls/year @<br />

400 dfls/crop per beneficiary (per 1.00 ha. <strong>plan</strong>tation) from Government Seed Production<br />

Centres against payment @ Rs. 2.00 per dfls.<br />

(2) Development of Plantation:<br />

The low bush type systematic <strong>plan</strong>tation will be initially raised at 3’×3’ spacing<br />

adopting the package of practices recommended by Central Silk Board. The Plantation<br />

raised with nearly 8-12 months old cuttings will be ready for harvesting of leaves for<br />

feeding to silkworm. The rearing capacity of the <strong>plan</strong>tation will be 2,000 dfls per 1.00 ha.<br />

in third year onwards.<br />

Once the Plantation is settled, the commercial rearer may uproot one alternate row<br />

after 3 years of <strong>plan</strong>tation and the <strong>plan</strong>tation may be maintained as low tree type<br />

<strong>plan</strong>tation with a canopy height at 6 feet above the ground level to avoid grazing and<br />

regular maintenance problems.


- 167 -<br />

SERICULTURE DEPARTMENT<br />

(3) Assistance for Rearing House facility:<br />

Unlike other variety of silkworms, Mulberry Silkworm is more sensitive to climatic<br />

variations and food quality. Their rearing and culture requires more hygienic conditions<br />

and minimum variations in temperature and humidity. Most of the rearer in <strong>Mizoram</strong> are<br />

not having separate rearing house for conducting rearing of silkworm. By and large,<br />

rearers in <strong>Mizoram</strong> are conducting silkworm rearing in their dwelling house.<br />

Therefore, the project envisaged to assist all the selected beneficiaries for<br />

construction of low cost rearing house worth Rs. 20,000/- to each rearer. The assistance<br />

will be Rs. 10,000/- each, i.e., 50% of the estimated cost.<br />

(4) Beneficiaries Training Programme:<br />

Since Bivoltine Sericulture is new to the farmers of <strong>Mizoram</strong> State and needs lots of<br />

care during the rearing, all the 160 commercial rearers covered under the Scheme will be<br />

extended training for a period of one month on raising a <strong>plan</strong>tation, maintenance and<br />

silkworm rearing. Necessary provision has been earmarked for hiring training hall,<br />

accommodation, TA/DA, contingencies, honorarium for trainers, etc. A lumpsum of<br />

Rs.500/- per farmer has been earmarked.<br />

(5) Location of the Scheme:<br />

Aizawl, Champhai, Serchhip & Lunglei Districts. The total number of beneficiaries is<br />

150 nos. and each of the beneficiary has to undertake 1 hectare Mulberry Cultivation.<br />

Approved Financial Targets for 2004-05:<br />

Sl. No. Items<br />

Financial Target<br />

(Rs. in lakh)<br />

1. Salary -<br />

2. Minor Works 34.50<br />

3. Scholarship / Stipend 0.50<br />

4. Materials & Supplies 40.00<br />

Total 75.00


C. MINERALS:<br />

- 171 -<br />

GEOLOGY & MINING<br />

GEOLOGY & MINING<br />

SCHEME NO. C - 1<br />

Name of the Scheme : Mines & Minerals<br />

Geology and Mining Department (a Wing under Directorate of Industries) proposes<br />

to undertake various projects and works as highlighted below under the following<br />

Schemes [Sub-Heads] during this Annual Plan: —<br />

I. Direction (PLAN)<br />

II. Ground Water Investigation (PLAN)<br />

III. Geo-technical Investigation (PLAN)<br />

IV. Minor Mineral Investigation (PLAN)<br />

V. NEC (New Scheme): Setting up of Geo-Technical Laboratory.<br />

Geology & Mining Wing had been declared as the Nodal Agency for Ground Water<br />

Investigation, Development and Monitoring in the State. Developmental works,<br />

Investigation and Monitoring of ground water will be taken up during this year.<br />

The Department proposes to continue undertaking investigation works relating to<br />

landslides with preventive measures and treatment thereof. The Department is also<br />

entrusted with foundation and slope stability investigation. In this connection, risk/<br />

hazard zonations (classification) of various localities along with geological and<br />

geographical survey will be conducted in continuation of the ongoing works. Hazard<br />

Management and Mitigation Centre is proposed to be set up in the Department. Geo-<br />

Technical Laboratory with the assistance from NEC is being set up by the Department.<br />

Further, Indian Metrological Department (IWD), Government of India has assented to set up<br />

two Seismic Observatory Centres at Aizawl and Saiha as a joint venture with the<br />

Government of <strong>Mizoram</strong>.<br />

In the field of Minor Mineral Investigation, investigation works at various sites<br />

(shell limestone, hard sandstones and other minor minerals) is proposed to be continues<br />

during this Annual Plan. At the same time, contour survey, geological mapping and<br />

geophysical surveys will also be conducted in association with organisations like GSI, IBM,<br />

AMD, etc.<br />

The <strong>Mizoram</strong> Minor Mineral Concession Rules, 2000 is being enforced by the<br />

Department. In this connection, investigation of mapping of stone quarries will be<br />

continued in order to guide mining and for monitoring the operation.<br />

During this Annual Plan, it is proposed top conduct training in various technical<br />

fields under organisations like GSI, CGWB, NGRI, etc. for Technical Officers and Staff of<br />

this Department. Moreover, training in computer courses is also approved to be conducted<br />

for Ministerial as well as Technical Staff.


- 172 -<br />

GEOLOGY & MINING<br />

I. Minor Head : Direction & Administration<br />

Sub-Head : (01) - Direction / Plan<br />

Detail Head : 00 -<br />

(Rs. in lakh)<br />

Sl. No. Particulars Financial Outlay<br />

1. Salary for 1 Officer and 10 Staff 12.50<br />

2. Wages for 6 M/R Employees 3.90<br />

3. Travelling Expenses 2.00<br />

4. Office Expenses –for POL, Office Stationery,<br />

Contingent Bills, Workshop Tools<br />

10.00<br />

5. Publication 0.10<br />

6. Advertisement 0.50<br />

7. Minor Works / Maintenance — Repair /maintenance/<br />

construction of G&M Quarters, Workshop, Office<br />

Building, Pump Shed, Black Topping of approach road<br />

to G&M Office at Luangmual, Computers, Printers,<br />

Xerox Machine, Blue Printing Machine, etc.<br />

7.00<br />

Sub-Total 36.00<br />

II. Minor Head : 101 - Survey & Mapping<br />

Sub-Head : (01) - Ground Water Investigation<br />

Detail Head : 00 -<br />

(Rs. in lakh)<br />

Sl. No. Particulars Financial Outlay<br />

1. Minor Works — Detail Hydro-geological/Geophysical<br />

Mapping of District Headquarters (Saiha & Lawngtlai)<br />

including Collection of Surface & Ground Water Data &<br />

Samples (Pre, Post & Monsoonal), Geo-chemical<br />

Analyses of water samples and creation of data bank,<br />

seasonal data collection and monitoring of ground<br />

water in Aizawl City, Kolasib, Champhai, Mamit,<br />

Serchhip & Lunglei Towns (Pre, Post & Monsoonal).<br />

Systematic Hydro-geological Mapping (1:50,000)<br />

covering Kolasib District<br />

7.00<br />

2. Motor Vehicles 2.00<br />

3. Machinery & Equipment — Procurement of chemicals<br />

like Thermo-reactor, Spectroquant kits, Laboratory<br />

Reagents, Glassware, etc.; Global Positioning System<br />

for <strong>detailed</strong> survey<br />

0.50<br />

Sub-Total 9.50<br />

III. Minor Head : 101 - Survey & Mapping<br />

Sub-Head : (02) - Geo-Technical Investigation / Plan<br />

Detail Head : 00 -


- 173 -<br />

GEOLOGY & MINING<br />

(Rs. in lakh)<br />

Sl. No. Particulars Financial Outlay<br />

1. Minor Works / Maintenance —<br />

8.00<br />

(i) Geo-Technical Investigation of landslide hazard<br />

risk/ classification mapping involving Geo-<br />

Physical Investigation and Contour Survey for two<br />

topo-sheets.<br />

2.<br />

(ii) Slope Stability Analysis and Studies of landslide<br />

high risk area for Saiha Town and Kolasib Town.<br />

(iii) Disaster Investigation and Sport Verification<br />

monsoon.<br />

Machinery & Equipment —<br />

0.50<br />

(i) Purchase of spare parts for Drilling Rig.<br />

Sub-Total 8.50<br />

IV. Minor Head : 101 - Survey & Mapping<br />

Sub-Head : (03) - Minor Mineral Investigation / Plan<br />

Detail Head : 00 -<br />

(Rs. in lakh)<br />

Sl. No. Particulars Financial Outlay<br />

1. Travelling Expenses 2.00<br />

2. Office Expenses — Purchase of POL for payment of bills<br />

pertaining to stationery, telephone and other<br />

contingent expenditures<br />

5.00<br />

3. Minor Works / Maintenance —<br />

6.00<br />

(i) Investigation of minor minerals like Shell Limestone,<br />

Hard Rock, Clay, Sand, Coal, etc. along with<br />

physical and contour surveys.<br />

4.<br />

(ii) Specific investigations on reports of mineral<br />

occurrences and works to be undertaken with<br />

organisations like GSI, IBM, AMD, etc.<br />

(iii) Mapping of quarries and minor mineral deposits<br />

including Mine Planning in <strong>Mizoram</strong>.<br />

Professional Services 0.50<br />

5. Other Charges / Compensation — Operational Charges<br />

for Shell Limestone / Sandstone factory at Zuangtui.<br />

2.00<br />

6. Machinery & Equipment — Procurement of Survey &<br />

Petrological Instruments like GPS, Compass, Still Camera,<br />

etc. Purchase of Satellite Imagery and topo-sheets.<br />

0.50<br />

Sub-Total 16.00<br />

TOTAL OF I, II, III & IV 70.00<br />

GRAND TOTAL - Rs. 70.00 lakhs


INTRODUCTION:<br />

- 176 -<br />

ROADS & BRIDGES (PWD)<br />

ROADS & BRIDGES<br />

Roads construction activities in <strong>Mizoram</strong> started from the 5 th Five Year Plan. The<br />

main target of the Annual Plan under 5054 C.O. on Roads & Bridges [P] is to continue the<br />

9 th Plan scheme and to improve the existing pavement. During 2004-05, Rs. 9,726.00 lakhs<br />

is earmarked under 5054 C.O on Roads & Bridges [P].<br />

DIRECTION & ADMINISTRATION :<br />

Rs. 5490.00 lakhs is provided during 10 th Five Year Plan. Rs. 599.00 lakhs is<br />

earmarked for salary and establishment of the existing staffs during 2004-05.<br />

The break up of Direction & Administration is as below: -<br />

1] Salary = 100.00 lakhs<br />

2] T.E = 28.00 lakhs<br />

3] Office expenses = 93.00 lakhs<br />

4] Rent = 2.00 lakhs<br />

5] Advertisement = 6.00 lakhs<br />

6] Stipend = 5.00 lakhs<br />

7] Motor vehicle = 35.00 lakhs<br />

8] Professional charge = 2.00 lakhs<br />

9] Other charges = 38.00 lakhs<br />

10] Maintenance = 290.00 lakhs<br />

Total = 599.00 lakhs<br />

MACHINERY & EQUIPMENT :<br />

Rs. 33.00 lakhs is kept for Machinery and Equipment during 2004-05.<br />

PLANNING & RESEARCH :<br />

No provision is kept for Planning & Research during 2004-05<br />

WORKS :<br />

i) Rs. 839.00 lakhs is kept for ongoing works and new scheme of NABARD scheme<br />

during 2004-05.<br />

ii) Rs. 7500.00 lakhs is provided for works under <strong>Mizoram</strong> State Road Project [EAP]<br />

iii) Rs. 500.00 lakhs is provided as counterpart funding of World Bank Aided project<br />

[MSRP]<br />

iv) Rs. 255.00 lakhs is provided for improvement of Lunglei Town road, Saiha,<br />

Lawngtlai, Champhai, Serchhip, Mamit and Kolasib town roads and Satellite Town &<br />

Villages roads.<br />

STATE HIGHWAYS :<br />

1. Kolasib – Bairabi – Zamuang road [ 6 km]<br />

During 10 th Five year Plan Rs. 187.00 lakh is the proposed outlay. During 2004-05,<br />

no provision is kept for the road.<br />

2. Champhai – Tiau Road [18.50 Km]<br />

During 10 th Five Year Plan Rs. 115.00 lakhs is the proposed outlay. During 2004-05,<br />

no provision is made for the road.


Major District Roads<br />

- 177 -<br />

ROADS & BRIDGES (PWD)<br />

1. Lungsen – Chawngte road [53.25 km]<br />

Rs. 62.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is made<br />

during 2004-05.<br />

2. Lawngtlai – Nalkawn – Chamdur road [45km]<br />

Rs. 93.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

3. Champhai – N.Vanlaiphai road [92.50 km]<br />

Rs. 124.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

4. Kawlkulh – Ngopa – Mimbung road [115.73 km]<br />

Rs. 93.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

5. Kawnpui – Hortoki road [ 21 km]<br />

Rs. 93.00 lakhs is proposed outlay during 10 th Five Year Plan. Rs. 5.00 lakhs is<br />

earmarked during 2003-04.<br />

6. Zemabawk – Selesih road [14 km]<br />

Rs. 118.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

7. Thenzawl – Buarpui road [45 km]<br />

Rs. 124.00 lakhs is proposed outlay during 10 th five Year Plan. No provision is made<br />

during 2004-05.<br />

8. Phairuang – Bunghmun road [ 69 km]<br />

Rs. 155.00 lakhs is proposed outlay during 10 th Five year Plan. Rs. 18.00 lakhs is<br />

kept during 2004-05.<br />

9. Khawzawl – Ngopa road<br />

Rs. 155.00 lakhs is proposed outlays during 10 th five Year Plan. No provision is kept<br />

during 2004-05.<br />

10. Serkhan – Bagha road [30 km]<br />

Rs. 68.00 lakhs is proposed outlay during 10 th Five year Plan. Rs. 10.00 lakhs is<br />

provided during 2004-05.<br />

11. Kanhmun – Tuidam – Tuilutkawn road [96 km]<br />

Rs. 124.00 lakhs is proposed outlay during 10 th Five year Plan. No provision is kept<br />

during 2004-05.<br />

12. Serchhip – Thenzawl road :<br />

Rs. 5.00 lakhs is earmarked for improvement of this road during 2004-05.<br />

Other District Roads<br />

1. Keitum – N.Vanlaiphai Road [48 km]<br />

Rs 62.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

2. Phullen – Suangpuilawn Road [28 km]<br />

Rs. 44.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.


- 178 -<br />

ROADS & BRIDGES (PWD)<br />

3. Khawzawl – E.Lungdar Road [ 83 km]<br />

Rs. 80.00 lakhs is proposed outlay during 10 th Five year Plan. No provision is kept<br />

during 2004-05.<br />

4. Bilkhawthlir – Chemphai – Saiphai road [20 km]<br />

Rs. 18.00 lakhs is approved outlay during 10 th Five year Plan. No provision is made<br />

during 2004-05.<br />

5. S.Hlimen – Samtlang – Lungleng road [ 4 km]<br />

Rs. 25.00 lakhs is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

6. Approach road to Kolodyne – R. Ngengpui [9 km]<br />

Rs. 62.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

7. Tlabung – Borapansury road<br />

Rs. 62.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

8. Thenzawl – Thenhlum road<br />

Rs. 25.00 lakhs is earmarked for improvement of this road during 2004-05.<br />

9. Khawzawl – Sinzawl – Thanlawn road [117 kms]<br />

Rs. 10.00 lakhs is earmarked for improvement of this road during 2004-05.<br />

Village Roads<br />

1. Vairengte – Saiphai via Phainuam [16 kms]<br />

Rs. 105.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

2. E.Lungdar – Chekawn road [8 km]<br />

Rs. 102.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

3. Zobawk – Haulong road [31.70 km]<br />

Rs. 59.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

4. Tamdil approach road [7.50 km]<br />

Rs 31.00 lakhs is proposed outlay during 10 th Five year Plan. No provision is kept<br />

during 2004-05.<br />

5. Lunglei – Nghasih road<br />

Rs. 59.00 lakhs is proposed outlay during 10 th Five year Plan. No provision is kept<br />

during 2004-05.<br />

6. Khawzawl – Phaisen road [ 5km]<br />

Rs 50.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is<br />

provided during 2004-05.<br />

7. Approach road to Maumual [4 km]<br />

Rs. 55.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

8. Lawngtlai – Saisihchhuah – Sangau road [45 km]<br />

Rs. 146.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is<br />

provided during 2004-05.


- 179 -<br />

ROADS & BRIDGES (PWD)<br />

9. Champhai – Sazaiphai – Farkawn road [20 km]<br />

Rs. 93.00 lakhs is proposed outlay during 10 th five Year Plan. No provision is<br />

provided during 2004-05.<br />

10. Tuisumpui – Lungpher road<br />

Rs 37.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is<br />

provided during 2004-05.<br />

11. Saiha – Lawngtlai Feeder Road [28 km]<br />

Rs. 62.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is<br />

provided during 2004-05.<br />

12. Chemphai – Phainuam via burchep road<br />

Rs. 77.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is<br />

provided during 2004-05.<br />

13. Baktawng – Hmawngkawn – Chawilung road [ 15 km]<br />

Rs. 25.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is<br />

provided during 2004-05.<br />

14. Lailak – Buhban Road [5 km]<br />

Rs. 25.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

15. Bumlum – N.Hlimen road [14 Km]<br />

Rs 25.00 lakhs is proposed outlay during 10 th Five Year Plan. No provision is kept<br />

during 2004-05.<br />

16. Sertlangpui – Serte road [4 km]<br />

Rs 18.00 lakhs is proposed outlay during 10 th Five year Plan. No provision is<br />

provided during 2004-05.<br />

17. R. Mat – Lungmawi road [12 km]<br />

Rs. 18.00 lakhs is proposed outlay during 10 th Five Year Plan,. No provision is<br />

provided during 2004-05.<br />

Bridges:<br />

Rs. 328.00 lakhs is approved during 10 th five Year Plan. No provision is kept for<br />

Bridges during 2004-05.<br />

Satellite Towns & Villages:<br />

A sum of Rs. 416.00 lakhs is proposed during 10 th Plan for eight Districts. Rs. 63.80<br />

lakhs is earmarked during 2004-05 for the following.<br />

1. Resurfacing of Zobawk Town Road<br />

Rs. 1.00 lakh is earmarked during 2004-05.<br />

2. Resurfacing of Hnahthial Town Road<br />

Rs 2.00 lakhs is earmarked during 2004-05.<br />

3. Metalling & Black topping of approach road to SDO Office and Quarters at<br />

Bualpui [NG]<br />

Rs. 4.00 lakhs is earmarked during 2004-05.<br />

4. Resurfacing of satellite Town roads under Hmuifang Division<br />

Rs. 4.00 lakhs is earmarked during 2004-05.<br />

5. Resurfacing of Satellite Town roads under Kolasib Division<br />

Rs. 33.00 lakhs is earmarked during 2004-05.


- 180 -<br />

ROADS & BRIDGES (PWD)<br />

6. Improvement and widening of Ngopa town road<br />

Rs 5.00 lakhs is earmarked during 2004-05.<br />

7. Metalling & Black topping of approach road to Don Bosco School at Darlawn<br />

Rs. 6.80 lakhs is earmarked during 2004-05.<br />

8. Improvement of Ratu Town Road<br />

Rs. 8.00 lakhs is earmarked during 2004-05.<br />

Roads within Town:<br />

A sum of Rs. 990.00 lakhs is proposed during 10 th Plan for eight districts. Rs. 88.20<br />

lakhs is earmarked during 2004-05 for the following: -<br />

1. Improvement of Lunglei Town road<br />

Rs. 43.20 lakhs is earmarked kduring 2004-05<br />

2. Improvement of Saiha Town road<br />

Rs 10.00 lakhs is earmarked during 2004-05.<br />

3. Improvement of Champhai Town road<br />

Rs. 10.00 lakhs is earmarked during 2004-05<br />

4. Improvement of Serchhip town Road<br />

Rs. 5.00 lakhs is earmarked during 2004-05<br />

5. Improvement of Mamit town road<br />

Rs 7.00 lakhs is earmarked during 2004-05<br />

6. Improvement of Kolasib town road<br />

Rs 5.00 lakhs is earmarked during 2004-05.<br />

7. Improvement of Lawngtlai town road.<br />

Rs 8.00 lakhs is earmarked during 2004-05.<br />

NABARD:<br />

Rs. 839.00 lakhs is earmarked during 2004-05 for the following:<br />

1. On-going construction of Rawpuichhip – Buarpui road<br />

[a] Pavement: [30 – 46 kmp]<br />

[b] Formation cutting & permanent works [48-62 kmp]<br />

Rs. 79.00 lakhs is earmarked during 2004-05.<br />

2. Hnahthial – Tarpho road [32 km]<br />

Rs. 350.00 lakhs is earmarked during 2004-05.<br />

3. Tumtukawn – Tarpho road [25 km]<br />

Rs. 350.00 lakhs is earmarked during 2004-05.<br />

4. Lawipu – Tlawng road [3 km]<br />

Rs 60.00 lakhs is earmarked during 2004-05.<br />

Counterpart funding of World Bank Aided Project:<br />

A sum of Rs. 5250.00 lakhs is approved during 10 th Five Year Plan and Rs. 500.00<br />

lakhs is earmarked for Counterpart funding of World Bank Aided Project during<br />

2004-05.<br />

EAP [<strong>Mizoram</strong> State road Project]<br />

A sum of Rs. 29750.00 lakhs is approved during 10 th Five Year Plan and Rs. 7500.00<br />

lakhs is earmarked for this project during 2004-05.


- 189 -<br />

TRANSPORT DEPARTMENT<br />

ROAD TRANSPORT<br />

Due to lack of other means of transport facilities, Road Transport continues to be<br />

the main means of transport in <strong>Mizoram</strong>. The increasing industrial and commercial<br />

activities and the remarkable growing of population have led to heavy demand on better<br />

Road Transport system in <strong>Mizoram</strong>. To cope with the demand, a good transport<br />

infrastructure is essential for all round development of the State and for easy movement<br />

from one place to another at a minimum rate of fare. Further, for the interest of the<br />

public, Transport Department inevitably have to render services to remote places where<br />

private Buses could not render services even with no profit and no gain.<br />

Besides, the construction of Inter-State Bus Terminus has been started at Chaltlang<br />

Workshop; hence, the latter has to be shifted to Central Workshop at South Hlimen<br />

necessitating upgradation of Central Workshop during this Annual Plan 2004-05.<br />

The Annual Plan 2004-05, therefore, envisages for providing upgradation of Central<br />

workshop, and for promoting security, the profession of an efficient, adequate, economical<br />

and properly coordinated system of Road Transport services in the State. These schemes<br />

have been made for inclusion within the limited outlay of Rs. 400.00 lakhs for the Annual<br />

Plan 2004-2005.<br />

CODE<br />

NO.<br />

The following are the schemes to be taken up during the Annual Plan 2004-2005.<br />

MAJOR /<br />

MINOR HEAD<br />

NAME OF SCHEME<br />

APPROVED OUTLAY<br />

(Rs. In lakhs)<br />

(1) (2) (3) (4)<br />

07 3055 004 REVENUE SECTION<br />

3055 - ROAD TRANSPORT<br />

001(01) DIRECTION<br />

(01) Salary 44.00<br />

(11) Travelling Expenses 8.50<br />

(13) Office Expenses 10.50<br />

(16) Publication 1.00<br />

(34) Scholarship/stipend 0.50<br />

(50) Other charges (MACT) 22.00<br />

(51) Motor Vehicles 107.00<br />

(52) Machinery & equipment 1.50<br />

Sub-Total of Direction & Administration : 195.00<br />

800 (02) - BOOKING STATION<br />

(27) Minor works/Maintenance 10.00<br />

Sub-Total : 10.00<br />

800 (03) - CENTRAL WORKSHOP<br />

(01) Salary 28.00<br />

(02) Wages 0.50<br />

(11) Travelling expenses 2.00<br />

(13) Office Expenses 2.00<br />

(50) Other Charges 0.50<br />

(52) Machinery & equipments 10.00<br />

Sub-Total of Central Workshop : 43.00<br />

TOTAL OF 3055 : 248.00


- 190 -<br />

TRANSPORT DEPARTMENT<br />

5055 – C.O. ON ROAD TRANSPORT<br />

CAPITAL SECTION<br />

103 (01) - Central Workshop<br />

(53) Major Works–upgradation of Central workshop 2.00<br />

102 (01) -Acquisition of Fleet<br />

(51) Motor Vehicles 60.00<br />

(24) a) Purchase POL for CPP at Aizawl 90.00<br />

b) For Operating CPP at Lunglei<br />

(27) Maintenance/minor works<br />

Total of Capital Section : 152.00<br />

GRAND TOTAL OF ROAD TRANSPORT : 400.00<br />

ITEM-WISE BREAK UP OF THE SCHEME<br />

NAME OF SCHEME<br />

Annual Plan 2004-2005<br />

Approved Outlay<br />

(Rs. in lakhs)<br />

001 (01) - Direction<br />

(01) For entertainment of existing 37 nos. of posts 44.00<br />

(11)-Travelling Expenses 8.50<br />

(13)- Office Expenses :<br />

(1) Stationeries & Advertisement<br />

(2) Purchase of uniform for Mechanics(Tech.staff) 10.50<br />

(3) Normal Office expenses<br />

(4) Purchase of furniture<br />

(16)- Publication :<br />

(1) Printing of Forms & Tickets<br />

(2) Publication of Statistical Data 1.00<br />

(3) Publication of other book-let<br />

(34) -Scholarship/Stipend :<br />

For imparting training of officers & staff 0.50<br />

(50) Other Charges :<br />

(a) Liabilities to be paid on compensation to 22.00<br />

Accident victims<br />

(51) Motor Vehicles : Maint. of existing Vehicles 107.00<br />

(52)- Machinery & Equipments :<br />

1) For purchase and installation of 1(one) No. of<br />

Computers for A.E (T) 1.50<br />

2) Implementation of E-governance<br />

3) Annual maintenance of existing computers<br />

4) Typewriter (Long roll), Duplicating machine,<br />

Fax machine, computer printer<br />

SUB TOTAL (DIRECTION) : 195.00


NAME OF SCHEME<br />

- 191 -<br />

TRANSPORT DEPARTMENT<br />

Annual Plan 2004-2005<br />

Approved Outlay<br />

(Rs. in lakhs)<br />

800(02) - Booking Station :<br />

(27) - Minor Works/Maintenance :<br />

(1) Improvement of various existing MST stations<br />

including Directorate building<br />

(2) Repair/reconstruction of septic tank at Saiha,<br />

Tlabung and Directorate 10.00<br />

(3) Reconstruction of MST booking office at Mimbung<br />

Sub Total (Booking Station) : 10.00<br />

800(03) - Central Workshop :<br />

(01) For entertainment of existing 44 nos. of posts 28.00<br />

(02) Wages :<br />

Wages for 2 nos. of casual labour 0.50<br />

(11) Travelling Expenses 2.00<br />

(13)-Office Expenses :<br />

(1) Stationeries<br />

(2) Maintenance of 1(one) Light Vehicle 2.00<br />

(3) Normal Office expenses<br />

(50) Other Charges 0.50<br />

(52)- Machinery & Equipments :<br />

For purchase of – Rod cutter, Torque wrench<br />

Bench Grinder(8”), Electric Planner, Bench Vice 10.00<br />

Poprevitgun, Timing Light for LMV, Piller Drilling<br />

machine, Portable Drilling machine, RPM Tester,<br />

Hydraulic Jack, Trolley Hydraulic Jack, Hand<br />

Grinding machine, Cell Tester, HD Battery Charger,<br />

Circular saw, Servicing Trolley, Car Washer, HD<br />

Sewing machine, Automatic Tyre-changer, Air<br />

compressor.<br />

SUB-TOTAL : (CENTRAL WORKSHOP) 43.00<br />

TOTAL OF 3055 : 248.00


NAME OF SCHEME<br />

- 192 -<br />

TRANSPORT DEPARTMENT<br />

Annual Plan 2004-2005<br />

Approved Outlay<br />

(Rs. in lakhs)<br />

CAPITAL SECTION<br />

5055 – C.O. on Road Transport<br />

103(01) - Central Workshop<br />

(53) - Major Works :<br />

For upgradation of Central Workshop<br />

- construction of Staff Quarters 2.00<br />

102(01) – Acquisition of Fleet :<br />

(51) - Motor Vehicles:<br />

1) Purchase of 5 (Five) nos. of Buses for<br />

replacement of condemned vehicle 60.00<br />

2) Purchase of Truck and LCV<br />

(24) POL :<br />

a) Purchase of POL for CPP Aizawl 90.00<br />

b) For operating CPP at Lunglei for<br />

Lunglei, Chhimtuipui and Lawngtlai districts<br />

TOTAL OF 5055 : 152.00<br />

GRAND TOTAL OF ROAD TRANSPORT : 400.00


INTRODUCTION<br />

- 195 -<br />

INLAND WATER TRANSPORT (PWD)<br />

INLAND WATER TRANSPORT<br />

Due to the absence of good navigable waterways in <strong>Mizoram</strong>, less work is<br />

undertaken under Inland Water Transport. Presently, there is hardly any Inland Water<br />

Transport in use. This may be partly attributed to the discharge of rivers in <strong>Mizoram</strong><br />

which varies very widely. During rainy season, the discharge of water become very high<br />

carrying large quantities of debris, logs, boulders, etc. making navigation difficult whereas<br />

during dry period, water level is low and the debris, etc. deposited during rainy season<br />

becomes obstructions.<br />

The road network in <strong>Mizoram</strong> is such that in remote and interior areas, roads have<br />

to cross rivers. Bridges could not be constructed due to fund constraints. Marboats and<br />

Country boats have to be utilised for carrying vehicles and men across the rivers.<br />

Therefore, the fund provided under this Head is approved to be utilised for<br />

improving river crossing facilities. Rs. 5.00 lakhs is provided under this Head of Accounts<br />

during the Annual Plan 2004-05.<br />

DIRECTION & ADMINISTRATION<br />

No provision is made for Direction & Administration during 2004-05 under this<br />

Head of Accounts.<br />

MACHINERY & EQUIPMENT<br />

WORKS<br />

No provision is kept for Machinery & Equipment during 2004-05.<br />

The following works will be taken up during 2004-05 under this Head of Accounts:<br />

i) Improvement of Ferry and Marboat at Tuipui on Lawngtlai – Saiha Feeder roads:<br />

Rs. 2.00 lakhs is provided during 2004-05 for improvement of existing Marboat at<br />

R.Tuipui.<br />

ii) Improvement of Ferry and Marboat at Bairabi:<br />

Rs. 3.00 lakhs is provided during 2004-05 for improvement of existing Marboat at<br />

Biarabi.


- 198 -<br />

MOTOR VEHICLE WING<br />

MOTOR VEHICLE WING<br />

The Motor Vehicle Wing under Transport Department functions with its<br />

subordinate offices at District headquarters enforcing MV Acts and Rules and also looks<br />

after all matters relating to State Transport Authority.<br />

As a result of the enormously increasing vehicle population in the State, its duties<br />

and responsibilities have considerably increased. Therefore, to cope with the future<br />

expansion, it is felt necessary to upgrade its standard with modern technology such as<br />

introduction of I.T. with computerisation and installation of Smart Card, strengthening and<br />

widening its functions.<br />

Further, creation of new Districts by the State Government automatically led to the<br />

need for opening of DTO’s Offices to each headquarters. Therefore, new DTO’s offices<br />

such as Champhai, Kolasib and Serchhip were opened and are functioning with no fullfledged<br />

establishment. Thus, creation of posts will automatically be needed as the existing<br />

position is inadequate for proper running of the newly opened offices. Thus, keeping in<br />

view the need for creation of posts and upgradation of standard, the Annual Plan<br />

Approved Outlay for M.V. Wing for the year 2004-05 comes to Rs. 77.00 lakhs.<br />

The following are the schemes approved to be taken up during the Annual Plan<br />

2004-2005.<br />

CODE NO.<br />

MAJOR /<br />

MINOR HEAD<br />

NAME OF SCHEME<br />

APPROVED OUTLAY<br />

(Rs. In lakhs) 2004-2005<br />

(5) (6) (7) (8)<br />

07 3075 00 4<br />

2041 - Taxes on Vehicles<br />

001(01) - Direction :<br />

(01) Salary 6.50<br />

(11) Travelling Expenses 0.50<br />

(13) Office Expenses 6.50<br />

(16) Publication 4.00<br />

(27) Minor Works/Maintenance 18.00<br />

(34) Scholarship/Stipend 0.50<br />

(50) Other charges 10.00<br />

(51) Motor vehicles 1.50<br />

(52) Machinery & Equipments 0.50<br />

Sub-Total : 48.00<br />

001(02) - Administration<br />

(01) Salary 13.75<br />

(02) Wages 3.00<br />

(11) Travelling expenses 3.00<br />

(13) Office Expenses 6.00<br />

(14) Rent 0.25<br />

(27) M.V 3.00<br />

Sub-Total : 29.00<br />

GRAND TOTAL : M.V. WING : 77.00


001 (01) - DIRECTION<br />

- 199 -<br />

MOTOR VEHICLE WING<br />

ITEM-WISE BREAK-UP OF THE SCHEME<br />

NAME OF SCHEME<br />

Annual Plan 2004-05<br />

APPROVED OUTLAY<br />

(Rs. in lakhs)<br />

(01) For entertainment of existing 3 nos. of posts and creation of<br />

already approved 4 nos. of posts of the followings :- 6.50<br />

a} Sr. Research Officer 1 no<br />

b) Deputy Commissioner of Transport 1 no.<br />

c) Inspector of Statistics. 2 nos.<br />

(11) - To meet Travelling Expenses of STA/MV Wing 0.50<br />

(13) - Office Expenses<br />

(a) Stationeries and advertisement<br />

(b) Maintenance of motor vehicle 6.50<br />

(c) Purchase of uniforms for uniformed-staff<br />

and IV Grade<br />

(d) Normal Office Expenses<br />

(16) - Publication<br />

(a) Publication of Driving License<br />

(b) Publication of Book & booklet (including MV Acts 4.00<br />

& Rules)<br />

(c) Combine Registers etc.<br />

(27) - Minor Works<br />

(a) Construction of check gate at Kanhmun 4.50<br />

(b) Vertical extension of DTO office for staff quarter at Kolasib 5.00<br />

(c) Construction enforcement check gate at Bairabi 4.00<br />

(d) Maintenance of existing buildings 4.50<br />

Sub-Total (Minor Works) : 18.00<br />

(34) - Scholarship/Stipend :<br />

(a) For imparting training to enforcement staff 0.50<br />

(b) Expenses for officers & staff who undergo training<br />

(50) - Other Charges :<br />

1) Computerisation of DTO office, Lunglei 1.50<br />

2) Upgradation of Computer hardwares/software & 1.00<br />

documentation of DTO Aizawl<br />

3) Observance of Road Safety 7.50<br />

Sub total of O.C. : 10.00<br />

(51) Motor Vehicle : Maintenance of existing vehicles 1.50<br />

(52) Machineries and Equipments :<br />

Induction of High Security Registration Plate 0.50<br />

Sub-Total : 001 (01) - DIRECTION : 48.00


2041 - Taxes on Vehicles<br />

001(02) - ADMINISTRATION<br />

NAME OF SCHEME<br />

- 200 -<br />

MOTOR VEHICLE WING<br />

Annual Plan 2004-05<br />

APPROVED OUTLAY<br />

(Rs. in lakhs)<br />

(01) For entertainment of existing 16 nos. of posts 13.75<br />

and creation of already approved 13 nos. of posts of<br />

the following:-<br />

a) D.T.O 1 post for Serchhip<br />

b) M.V.I 3 posts for Serchhip, Champhai & Kolasib<br />

c) Enforcement Inspector 3 posts.<br />

d) Enforcement Sub- Inspector 6 posts.<br />

(02) Wages to be paid to casual labour – 2 Nos. of skilled<br />

and 6 Nos. of unskilled 3.00<br />

(11) - Travelling Expenses :<br />

For meeting travelling expenses of officers and<br />

staff under DTO's offices 3.00<br />

(13) - Other Expenditure :<br />

(a) Stationeries and advertisement<br />

(b) Maintenance of vehicles 6.00<br />

(c) Purchase of uniform for uniformed staff and<br />

IV Grade<br />

(d) Normal Office expenses<br />

(14) - Rent : Rent for Site Office of DTO Aizawl and<br />

DTO Lunglei 0.25<br />

(51) - M.V.<br />

- Maintenance of existing assets 3 .00<br />

Sub-Total of ADMINISTRATION : 29.00<br />

GRAND TOTAL : (M.V. WING) 77.00


- 204 -<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

At the start of the 10 th Five Year Plan, various Schemes / Projects were initiated and<br />

undertaken under Science, Technology & Environment. The Schemes / Projects proposed<br />

to be undertaken during the Annual Plan 2004-2005 were continuation of the ones already<br />

started.<br />

1. Direction and Administration: The following statement indicates both physical<br />

and financial targets for Annual Plan 2004-2005.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1. Entertainment of Existing Staff 24 29.00<br />

2. Accommodation (Rental) - 2.20<br />

3. Travelling Expenses - 1.00<br />

4. Office Expenses - 9.30<br />

5. Wages - 4.50<br />

6. Maintenance of Vehicle - 3.00<br />

T O T A L : 24 49.00<br />

2. Satellite Remote Sensing Centre: The State Satellite Remote Sensing Centre had<br />

carried out various projects and the data generated from the project had been utilised by<br />

concerned development Departments. It is proposed that Remote Sensing Projects will be<br />

carried out on a larger scale to provide more accurate database.<br />

The following statement indicates the physical and financial targets for the Annual<br />

Plan for 2004-2005.<br />

(Rs. in lakh)<br />

Sl. No. Item of Expenditure<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1. Mapping of Road Network of <strong>Mizoram</strong> using<br />

Remote Sensing and GIS<br />

1 8.00<br />

T O T A L : 1 8 .00<br />

3. Training of Scientific Manpower: This is an ongoing Scheme. Under this Scheme, a<br />

Post Matric Merit Science Scholarship Programme was introduced for students who are<br />

taking up basic science subjects in the College & University level to solve the problem of<br />

Scientific Manpower requirement of the State. The Scheme is approved to be continued.<br />

The following statement indicates the Physical and Financial Targets Annual Plan<br />

for 2004-2005.<br />

(Rs. in lakh)<br />

Sl. No. Item of Expenditure<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1. Post Matric Merit Science Scholarship 110 12.00<br />

T O T A L : 110 12.00


- 205 -<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

4. Assistance to Scientific Research Projects: Under this Scheme, Scientific Research<br />

Project which has direct relevance to the problems of the State were given financial<br />

assistance. The Scheme is approved to be continued.<br />

The following statement indicates the Physical and Financial Targets for Annual<br />

Plan 2004-2005.<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Sl. No. Item of Expenditure<br />

Physical Financial<br />

1. Assistance to Scientific Research Project 1 2.50<br />

T O T A L : 1 2.50<br />

5. Computer Centres: Being a coordinating Department for NIC, Govt. of India, we<br />

have established one State Unit of NIC at Aizawl and 3 District Units at Aizawl, Lunglei and<br />

Saiha. It is necessary to maintain the Centres. It is also approved to establish NIC Centres<br />

in the 5 newly created Districts in a phase manner.<br />

The following statement indicates the Physical and Financial Targets for Annual<br />

Plan 2004-2005.<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Sl. No. Item of Expenditure<br />

Physical Financial<br />

1. Maintenance of Centres 1.00<br />

T O T A L : 1.00<br />

6. Science Popularisation Programme: Under this Scheme, various activities such as<br />

publication of <strong>Mizoram</strong> Science Journal, holding of Science Exhibitions, Seminars, Science<br />

Fairs & Science Congress are taken up in collaboration with STAM, SCERT, MSS etc. The<br />

activities are approved to be continued.<br />

The following statement indicates the Physical and Financial Targets for Annual<br />

Plan for 2004 - 2005.<br />

(Rs. in lakh)<br />

Sl. No. Item of Expenditure<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1. Publication of Science Journal 3000 cpm 5.00<br />

2. Science Exhibitions, Seminars, Science Congress - 3.00<br />

T O T A L : 3000 cpm 8.00<br />

7. Research Laboratory: To solve the long felt need of the state, a small laboratory<br />

had been initiated. As the Govt. approved proposal for ‘State Research Laboratory’ as one<br />

of its Millennium Projects under Science & Technology, it is proposed to improve the<br />

existing facility by purchasing modern scientific equipments in a phase-manner during the<br />

10 th Five Year Plan.


- 206 -<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

The following statement indicates the physical and financial targets for Annual<br />

Plan for 2004 - 2005.<br />

(Rs. in lakh)<br />

Sl. No. Item of Expenditure<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1. Purchase of Chemical Reagents & Glasswares - 0.50<br />

TOTAL : - 0.50<br />

8. Low-Head Microturbine Project: Using Cross-flow turbine designed by DST, Govt.<br />

of India, a project is proposed to be undertaken at Sihmit river, Bulfekzawl using the water<br />

canal constructed by Minor Irrigation, Agriculture Department. The site had already been<br />

investigated and found to be suitable for producing 50 KW of Power.<br />

The following statement indicates the physical and financial targets for Annual<br />

Plan for 2004 - 2005.<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Sl. No. Item of Expenditure<br />

Physical Financial<br />

1. Final (Tlawng) - 1.00<br />

2. Construction of Approach Road for Bulfekzawl - 2.00<br />

T O T A L : - 3.00<br />

9. Meteorological Centre: The following statement indicates the physical and<br />

financial targets for Annual Plan for 2004 - 2005.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Physical Financial<br />

1. Site preparation - 1.50<br />

2. Maintenance of Equipments - 0.50<br />

T O T A L : - 2.00<br />

10. <strong>Mizoram</strong> Science Centre: The <strong>Mizoram</strong> Science Centre at Berawtlang, Aizawl was<br />

inaugurated on 26 th July, 2003 which is well appreciated by all sections of the people.<br />

However, some developmental works are still necessary to be carried out for smooth<br />

functioning of the Centre.<br />

The following statement indicates the physical and financial targets for Annual<br />

Plan 2004-05: —


Sl. No. Item of Expenditure<br />

- 207 -<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

Annual Plan 2004-05<br />

(Rs. in lakh)<br />

Physical Financial<br />

1. Construction of Workshop - 6.00<br />

2. Construction of Outdoor Pavilion - 3.00<br />

3. Plantation - 1.00<br />

4. Purchase of Technical Tools and materials - 2.00<br />

5. Construction of Retaining Wall - 2.50<br />

6. Maintenance of Centre - 1.00<br />

7. Purchase of 1 no. Generator - 4.50<br />

TOTAL - 20.00<br />

ECOLOGY & ENVIRONMENT<br />

1. Biotechnological Research: <strong>Mizoram</strong> is rich in natural resources, which are yet to<br />

be tapped for economic growth. It is known that some of the valuable medicinal <strong>plan</strong>ts and<br />

orchids are on the brink of extinction due to deforestation through jhumming. It is<br />

proposed that extensive survey and documentation of these valuable <strong>plan</strong>ts be carried out.<br />

The germ-plasm of the rare-species may be conserved and propagated through tissue<br />

culture.<br />

The following statement indicates the physical and financial targets for Annual<br />

Plan for 2004 - 2005.<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Sl. No. Item of Expenditure<br />

Physical Financial<br />

1. Purchase of Chemical Reagents - 1.00<br />

T O T A L : - 1.00<br />

2. Environment Awareness: Environment issue is a global one. It is felt necessary to<br />

educate the students and public on the importance of clean & healthy environment<br />

through seminars / exhibitions in and outside the State.<br />

The following statement indicates the physical and financial targets for Annual<br />

Plan for 2004 - 2005.<br />

(Rs. in lakh)<br />

Annual Plan 2004-05<br />

Sl. No. Item of Expenditure<br />

Physical Financial<br />

1. Expenditure for Seminars/Exhibitions 2 3.00<br />

T O T A L : 2 3.00


- 209 -<br />

PLANNING DEPARTMENT<br />

PLANNING<br />

Planning Department is co-ordinating and also Nodal Department for all the<br />

Development Departments in the State. The main functions of the Department are as<br />

follows:<br />

1. Formulation of Five Year Plan & Annual Plan.<br />

2. Monitoring & Evaluation of Plan Schemes.<br />

3. District Planning Machinery.<br />

4. Monitoring & Evaluation of CSS & NEC Schemes.<br />

Due to inadequacy of Technical Manpower in the Department, Plan Formulation<br />

only has been taken up satisfactorily whereas monitoring and evaluation could not be<br />

taken up meaningfully during 9 th Plan period. During the 10 th Five Year Plan (2002–2007)<br />

more emphasis will be given on Evaluation & Monitoring. The approved outlay for the 10 th<br />

Five Year Plan (2002-07) is Rs. 6456.00 lakhs and the approved Annual Plan during 2004-<br />

05 including EFC & RSVY is Rs. 7801.00 lakhs.<br />

I. Plan Formulation: This is the main function of the State Planning Board (State<br />

Planning Commission). Owing to inadequacy of Technical Manpower in the Department,<br />

Formulation of Annual Plan is being done by manual up to the end of 9 th Plan period.<br />

During the 10 th Five Year Plan formulation of Annual Plan will be computerized and 10<br />

nos. of computers and its accessories will be procured during 2004-2005. Detailed<br />

financial outlay under Plan Formulation is given below:<br />

(Rupees in lakhs)<br />

1. Salary 7.00<br />

2. Wages 6.00<br />

3. TA/DA 3.00<br />

4. Office expenses 50.50<br />

5. Other Charges 1.00<br />

T o t a l 67.00<br />

II. Monitoring & Evaluation: More emphasis will be given to monitoring and<br />

evaluation during 10 th Five Year Plan. A Monitoring Team under the Chairmanship of Vice<br />

Chairman, State Planning Board had already been set up by the State Government with four<br />

Members to make on the spot verification of all-important schemes/projects implemented<br />

in the State. Besides, four Monitoring Teams of officials have been engaged for physical<br />

verification of the projects being implemented and they submit the report to the<br />

Government of India as well as Minister i/c Planning and all Heads of Department<br />

concerned for follow-up action where necessary. Special emphasis will be given on<br />

Monitoring & Evaluation of Plan Schemes/ CSS/NEC Schemes during the 10 th Plan period<br />

2002–2007. All Monitoring and Evaluation will be computerised during the 10 th Five Year<br />

Plan and Rs.978.50 lakhs is approved for maintenance of existing Officers/staff during<br />

2004–2005. Details financial provisions is given below:<br />

(Rupees in lakhs)<br />

1. Salary 25.50<br />

2. TA/DA 2.00<br />

3. Office expenses 8.00<br />

4. Other charges 943.00<br />

T o t a l 978.50


- 210 -<br />

PLANNING DEPARTMENT<br />

Establishment of Monitoring & Evaluation cell: Special emphasis will be given on<br />

Monitoring & Evaluation of Plan Schemes/NEC/CSS/ NLCPR/BAFFACOS during the 10 th Five<br />

Year Plan period. But due to inadequacy of manpower, the Department is unable to do<br />

monitoring & evaluation fruitfully such being the case, it is felt necessary to set up a<br />

Monitoring & Evaluation Cell in the State Planning Board to do monitoring of all schemes,<br />

projects and programmes being implemented in the State. In order to strengthen the<br />

Monitoring and Evaluation, the Department approved creation of the following bare<br />

minimum posts to man the Cell in the State Planning Board during 2004 – 2005 as below:<br />

Sl. No. Name of Post Scale of Pay No. of Post<br />

1. Deputy Adviser, Monitoring Rs. 12000-16500/- 1 no.<br />

2. Sr. Research Officer (M) Rs. 10000-15200/- 1 no.<br />

3. Research Officer (M) Rs. 8000 – 13500/- 2 nos.<br />

No provision is made during 2004 – 05<br />

III. District Planning Machinery: District Planning Machinery had been set up at the<br />

State level since the early part of 7 th Plan period. During the 10 th Five Year Plan, District<br />

Planning Machinery has been set up at the District level for which the following posts have<br />

already been approved by Planning Commission (MLD), Government of India, vide<br />

No.PC(P)35/Mizo/97-MLD dt.28.1.1998 for the three districts viz. Aizawl, Lunglei and<br />

Chhimtuipui as shown against each.<br />

1. Chief District Planning Officer - 3 posts<br />

2. Project Expert/Research Officer - 3 posts<br />

3. Assistant Research Officer - 3 posts<br />

4. L.D.C. - 3 posts<br />

5. Grade IV Staff - 3 posts<br />

Detailed financial provisions for Establishment of District Planning Machinery<br />

during 2004–2005 are given here under:<br />

(Rupees in lakhs)<br />

1. Salary 11.00<br />

2. TA/DA 1.00<br />

3. Office expenses 6.00<br />

4. Other charges 1.00<br />

T o t a l 19.00<br />

IV. Pilot Project: The State Government has set up District Planning Machinery in<br />

Lunglei District as a Pilot Project. Creation and maintenance of one post each of Chief<br />

District Planning Officer, Project Expert, Assistant Research Officer, LDC and IV Grade<br />

Staff during 10 th Five Year Plan is approved. Detailed approved Financial Provision for Pilot<br />

Projects during 2004 – 05 is as follows: -<br />

(Rupees in lakhs)<br />

1. Salary 2.50<br />

2. Wages 2.00<br />

3. Travelling expenses 0.50<br />

4. Office expenses 8.00<br />

5. Rent 1.00<br />

6. Other charges 0.00<br />

T o t a l 14.50<br />

V. Eleventh Finance Commission (EFC): The approved outlay for unspent balance<br />

amount under EFC during 2004 – 05 is Rs. 5222.00 lakhs.<br />

VI. Rashtriya Sam Vikas Yojana (RSVY): The approved outlay for RSVY programme<br />

for Lawngtlai District during 2004 – 05 is Rs. 1500.0 lakhs.


- 213 -<br />

TOURISM DEPARTMENT<br />

TOURISM<br />

Tourism Department is one of the fastest growing departments in <strong>Mizoram</strong> having<br />

an approved outlay of Rs. 240.00 lakhs during 2004-05. Scheme-wise description for the<br />

year 2004-05 is as follows: —<br />

1. TOURIST CENTRE:<br />

A. MAMIT TOURIST LODGE: Mamit is the District Headquarters of the Western part of<br />

<strong>Mizoram</strong>. This is 98 kms from Aizawl, the capital, A tourist Lodge has been<br />

constructed in his District Headquarter. As such, the main building has been<br />

constructed under the Centrally Sponsored Scheme of the Ministry of Tourist. The<br />

internal electrification and water connection has to be borne by the State<br />

Government. The department has earmarked an amount of Rs. 7.28 lakh for the<br />

same.<br />

Non-Recurring : Rs 7.28 lakh<br />

B. HRANGCHALKAWN TOURIST LODGE: A tourist lodge has been constructed at an<br />

vantage point, before entering Lunglei town. This has also been constructed under<br />

the Centrally Sponsored Scheme of the Ministry of Tourism, Government of India.<br />

The lodge is situated a little away from the National Highway entering Lunglei<br />

town. As such, the Department proposes an amount of Rs. 2.50 lakh for the<br />

construction of an approach road to this Tourist Lodge.<br />

Non-Recurring : Rs. 2.50 lakhs<br />

C. SAIPUM TOURIST LODGE: Saipum Tourist Lodge has been constructed under the<br />

Centrally Sponsored Scheme of the Ministry of Tourism, Government of India. As<br />

per the norms of the ministry. Internal electrification and water connection has to<br />

be met by the State Government. As such, an outlay of Rs. 1.50 lakhs is approved<br />

for the same.<br />

Non-Recurring : Rs. 1.50 lakh<br />

Total of ‘A’ & ‘B’ & ‘C’ : Rs. 11.28 lakhs<br />

2. TOURIST ACCOMMODATION:<br />

Maintenance of existing Staff: For the continuation and maintenance of existing<br />

staff’s [31 nos] salary and other expenditure under Tourist Lodges at Chaltlang,<br />

Berawtlang, Kolasib, Vairengte, Lunglei, Saiha, Bairabi, Thenzawl, Champhai, Chhiahtlang<br />

and Luangmual and also Rs. 33.20 lakhs is approved for engaging 92 nos. Muster Roll<br />

employee for all Tourist establishment run by the department an amount of Rs. 73.50<br />

lakhs is approved as follows :-<br />

Salary - Rs. 24.98 lakhs<br />

Wages for M/R - Rs. 35.55 lakhs<br />

Travelling expenses - Rs. 2.50 lakhs<br />

Office expenses - Rs. 18.00 lakhs<br />

Material & supply - Rs. 39.76 lakhs<br />

Other charges - Rs. 10.00 lakhs<br />

Minor works - Rs. 4.00 lakhs<br />

Total of Recurring - Rs. 134.79 lakhs


- 214 -<br />

TOURISM DEPARTMENT<br />

3. OTHER EXPENDITURE [ TOURISM & REST HOUSE] :<br />

Maintenance of existing staff : For maintenance and continuation of the existing<br />

staff’s [30 nos.] salary and other expenditure, an outlay of Rs. 8.26 lakhs is approved for<br />

the year 2004-05.<br />

Recurring : Rs. 8.26 lakhs<br />

4. DIRECTION & ADMINISTRATION :<br />

Maintenance of existing staff : For maintenance of existing staff under the head of<br />

Direction & Administration, an amount of Rs. 68.52 lakhs is approved during Annual Plan<br />

2004-05.<br />

Salary - Rs. 42.66 lakhs<br />

Travelling expenses - Rs. 2.00 lakhs<br />

Office expenses - Rs. 11.00 lakhs<br />

Minor works - Rs. 1.85 lakhs<br />

Other charges - Rs. 11.01 lakhs<br />

Total Recurring - Rs. 68.52 lakhs<br />

5. TRAINING :<br />

Stipend : The Department is sending trainees to undergo training in various travel<br />

Management, Hotel Management and Food Craft in various National Institute for which<br />

Rs.3.50 lakhs is approved for stipend, book grant, etc. during 2004-05.<br />

Recurring : Rs. 3.50 lakhs.<br />

6. PROMOTION & PUBLICITY :<br />

A. Promotion of fairs and festivals : Celebration of Chapchar Kut [Spring Festival],<br />

Christmas, etc. will be encouraged more and more and the department will participate in<br />

National and International travel & Tourism Fairs and Festivals for which Rs. 6.00 lakhs is<br />

approved during Annual Plan 2004-05.<br />

Recurring : Rs. 6.00 lakhs<br />

B. Publication of Tourist Information & Literature: An amount of Rs. 6.00 lakhs is<br />

approved for publication of Tourist Information Literature during Annual Plan 2004-05.<br />

Recurring : Rs. 6.00 lakhs<br />

Total of Recurring ‘A’ & ‘B’ : Rs. 12.00 lakhs<br />

7. SURVEY & STATISTICS [OTHER EXPENDITURE]: For maintenance of staff’s salary<br />

and expenditures, an amount of Rs. 1.65 lakhs is approved during 2004-05.<br />

Recurring : Rs. 1.65 lakhs<br />

Non- Recurring : Rs. 11.28 lakhs<br />

Total of recurring : Rs. 228.72 lakhs<br />

Grand Total : Rs. 240.00 lakhs


- 215 -<br />

TOURISM DEPARTMENT<br />

SUMMARY<br />

Sl. No. Major Head/ Sub-Head of Development Rupees in lakhs<br />

1103452002 – TOURISM<br />

1. 01- Tourist Infrastructure Nil<br />

2. 101- Tourist Centre 11.28<br />

3. 102 - Tourist Accommodation 134.79<br />

4. 103 - Tourist Transport Services Nil<br />

5. 800 - Other expenditure [Tourism & Rest House] 8.26<br />

6. 80 - GENERAL<br />

001 - Direction & Administration 68.52<br />

003 - Training 3.50<br />

7. 104 - PROMOTION & PUBLICITY<br />

a] Fairs & Festivals 6.00<br />

b] Publication of Tourist information and<br />

Literature 6.00<br />

8. 800 - Other Expenditure [Survey & Statistics] 1.65<br />

9. 5452- [Co. on Tourism] – Creation of Tourist<br />

Tourist Information Centres [EFC] at<br />

New Delhi, Kolkata & Guwahati -<br />

GRAND TOTAL 240.00


- 218 -<br />

ECONOMICS & STATISTICS DEPARTMENT<br />

ECONOMICS & STATISTICS<br />

ABSTRACT (FINANCIAL OUTLAY)<br />

Sl.<br />

No.<br />

Name of Scheme / Major Head / Minor Head<br />

Approved Outlay 2004-05<br />

(Rs. in lakhs)<br />

1 2 3<br />

1 Direction<br />

19.63<br />

2 Administration<br />

Vital Statistics<br />

34.10<br />

3 State Plan<br />

20.68<br />

4 State Matching Share<br />

5.40<br />

5 National Sample Survey (NSS)<br />

Economic Advise & Statistics<br />

6.00<br />

6 State Income Estimation<br />

0.10<br />

7 Price Statistics<br />

5.20<br />

8 Public Finance<br />

0.10<br />

9 Socio-Economic Survey<br />

0.10<br />

10 Industrial Statistics<br />

0.10<br />

11 Computer Service<br />

3.00<br />

12 Other Expenditure: (1) Mini Press<br />

4.70<br />

13 Training of Statistical Personnel<br />

0.89<br />

14 Agriculture Census (CSS)<br />

-<br />

15 Economic Census (CSS)<br />

-<br />

TOTAL: 100.00<br />

The main function of Economics & Statistics Department is to under take various<br />

kinds of Census and Surveys, collect up-to-date reliable Statistical data, and further to<br />

analyses, tabulate, published and disseminate them for use by Government <strong>plan</strong>ners,<br />

researchers, etc.<br />

Economics and Statistics Department has not been well equipped even today in<br />

terms of personnel and modern scientific equipments. Meanwhile the scope and<br />

coverage activity has been considerably increasing. In the coming Annual Plan, the<br />

Department is <strong>plan</strong>ning to streamline and re-vitalize the Statistical System to generate<br />

a more comprehensive data pertaining to every aspects of the economy of the State so<br />

as to facilitate all other Departments to formulate a sound data-base <strong>plan</strong>ning in the<br />

years to come. The Department has given an outlay of Rs. 100.00 lakhs for the Annual<br />

Plan 2004-05.


- 219 -<br />

ECONOMICS & STATISTICS DEPARTMENT<br />

The Scheme-wise descriptions are as follows: —<br />

1. DIRECTION: The Approved Outlays for the year 2004-05 under this Scheme are as<br />

follows:<br />

Sl.<br />

No.<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1. Deputy Director<br />

1 -<br />

2 Research Officer<br />

1 -<br />

3 Assistant Research Officer<br />

1 - 11.97<br />

4 Computer Operator<br />

1 -<br />

5 Stenographer – II<br />

1 -<br />

6 Driver<br />

2 -<br />

7 Travelling Expenses<br />

-<br />

1.00<br />

8 Wages<br />

-<br />

0.50<br />

9 Office Expenses<br />

-<br />

2.83<br />

10 Publication<br />

-<br />

0.10<br />

11 House rent<br />

-<br />

3.23<br />

TOTAL 7 19.63<br />

2. ADMINISTRATION: At present, the Department has only three District Offices at<br />

Aizawl, Lunglei and Saiha. It is proposed to establish three new Districts Offices at<br />

Champhai, Kolasib and Mamit during 2004-2005. However, as there is no scope for<br />

creation of new posts, these new Districts Offices will be manned by existing Officers and<br />

Staff for which a token provision of Rs. 0.50 lakh each is provided. Construction of DRO<br />

Quarter at Saiha is also proposed during the coming year. Item-wise break & up is are<br />

follows:<br />

Sl.<br />

No.<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Research Officer<br />

3 -<br />

2 Assistant<br />

3 -<br />

3 Driver<br />

3 - 16.95<br />

4 Grade – IV<br />

2 -<br />

5 Wages<br />

- -<br />

2.05<br />

6 Travelling Expenses<br />

- -<br />

2.00<br />

7 Office Expenses<br />

- -<br />

2.00<br />

8 Minor Works-Const. of DRO Quarter at Saiha<br />

Opening of New Districts at (1) Champhai,<br />

- 1 10.00<br />

(2) Kolasib (3) Mamit.<br />

- 3 1.10<br />

TOTAL 11 4 34.10


- 220 -<br />

ECONOMICS & STATISTICS DEPARTMENT<br />

Under this Scheme, raw as well as tabulated, analysed and developed data<br />

temperature, rainfall and humidity in every district of <strong>Mizoram</strong> are needed to be stored in<br />

book form or CD / Floppy.<br />

VITAL STATISTICS:<br />

3. State Plan: Under this scheme, data of vital events, births and deaths are collected<br />

through 700 local Registrars. Births and Deaths (RBD) wing is functioning under this<br />

scheme. To strengthen this wing and to achieve 100% registration as desired by<br />

Government of India, it is intended to undertake more effective inspection, conducting<br />

annual training for Registrars and monitoring, to ensure regular flow of reports and<br />

returns and to check irregularities in the registration system, an outlay of Rs. 20.68 lakhs<br />

is given for the year 2004-05.<br />

Details of the scheme are as follows:<br />

Sl.<br />

No.<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Inspector of Statistics<br />

1 -<br />

2 L.D.C<br />

1 -<br />

3 Driver<br />

1 -<br />

5.40<br />

4 Group ‘D’<br />

2 -<br />

5 Wages (Honorarium of RBD)<br />

- - 12.60<br />

6 Travelling Expenses<br />

- -<br />

1.00<br />

7 Office Expenses<br />

- -<br />

1.68<br />

TOTAL 5 20.68<br />

4. State Matching Share (RBD CSS): The existing four posts are to be maintained<br />

through CSS. 75% and 25 % are State Share : Central Share.<br />

Details are as below:<br />

Sl.<br />

No.<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Inspector of Statistics<br />

1 -<br />

2 Sub-inspector of Statistics<br />

3 - 4.45<br />

3 Travelling Expenses<br />

- - 0.45<br />

4 Office Expenses<br />

- - 0.50<br />

TOTAL 4 - 5.40


- 221 -<br />

ECONOMICS & STATISTICS DEPARTMENT<br />

5. NATIONAL SAMPLE SURVEY (NSS): National Sample Survey is conducted at National<br />

Level sponsored by Government of India. Surveys are taken up by State Government for<br />

both Central and State Samples. The Central share is 75% while the State Share is 25%.<br />

The following posts are to be maintained under the State Plan:<br />

Sl.<br />

No.<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Inspector of Statistics<br />

2 -<br />

2 Sub-Inspector of Statistics<br />

7 - 4.00<br />

3 Travelling Expenses<br />

- - 1.00<br />

4 Office Expenses<br />

- - 1.00<br />

TOTAL 9 6.00<br />

ECONOMIC ADVICE & STATISTICS:<br />

6. State Income Estimation: Earlier this Scheme is integrated with Public Finance.<br />

Due to increase in workload, this scheme is bifurcated. Under this scheme, various<br />

baseline survey are to be undertaken, such as, Kitchen Garden production Survey,<br />

Computer software, transport and communication for the purpose of estimating State<br />

Domestic Products which is one of the most important indicators of the Economy of<br />

<strong>Mizoram</strong>. An outlay of Rs. 0.10 lakh is approved for the Annual Plan 2004-05.<br />

7. Price Statistics: Activities under this scheme is concerned mainly with Survey on –<br />

(1) Retail Price<br />

(2) Wholesale Price<br />

(3) Farm Harvest Price<br />

Price situation, data on current price level and prices over a period of time largely<br />

affect the general masses, employers, employees and the administration as such<br />

observation of price situation is important. The Department collects retail prices of<br />

essential commodities from every district headquarters and regularly published the<br />

Quarterly Price Bulletin. Besides, Survey on Farm Harvest price is periodically<br />

undertaken.<br />

But this Wing is still handicapped in the sense that till Consumer Price Index (CPI)<br />

of <strong>Mizoram</strong> for Urban Non-Manual Employees (UNME) could not constructed. The<br />

Department proposed to undertake FBE Survey for construction of CPI of <strong>Mizoram</strong> under<br />

the guidance of CSO, New Delhi. Detail physical and financial targets under this scheme<br />

are as follow:


- 222 -<br />

ECONOMICS & STATISTICS DEPARTMENT<br />

Sl.<br />

No.<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 A.R.O/Statistical Officer<br />

1 -<br />

2 Inspector of Statistics<br />

1 -<br />

3 Sub-Inspector of Statistics<br />

1 - 4.20<br />

4 Travelling Expenses<br />

- - 0.50<br />

5 Office Expenses<br />

- - 0.50<br />

TOTAL 3 - 5.20<br />

8. Public Finance: This Scheme covers a wide range of Statistics such as sources of<br />

revenue and expenditure of the Government, <strong>plan</strong> outlay and investment, public debt and<br />

budget financing, domestic savings and capital formation. The Statistical data pertaining to<br />

these sectors are necessary for <strong>plan</strong> formulation and also for monitoring the <strong>plan</strong> and for<br />

assessment of the achievements. An outlay of Rs. 0.10 lakh is approved for Annual Plan 2004-<br />

05.<br />

The Statistical analyses under this scheme mainly relates to —<br />

(i) Budget classification and analyses.<br />

(ii) Five Year Plan Analysis and reports, study of resource mobilization, etc.<br />

(iii) Census of Government Employees.<br />

9. Socio-Economic Survey: Socio-Economic data is a true indicator of the economic<br />

condition of any State. Periodical Survey on Socio-economic Review for the official uses by<br />

the government and <strong>plan</strong>ners is a part and parcel of the activities of this Department.<br />

Besides, other activities to be taken under this scheme are —<br />

(i) Block Statistics (ii) Building and Housing Statistics<br />

An outlay of Rs. 0.10 lakh is approved for the coming financial year 2004-05.<br />

10. Industrial Statistics: Survey on trade, Annual Survey of Industries are pooled<br />

together and categories as Industrial Statistics. The study of this scheme will be concerned<br />

with the activities mainly —<br />

(i) Survey of Industries<br />

(ii) Trade Survey including Distributive Trade (tax)<br />

(iii) Manpower and Labour Statistics.<br />

(iv) Mining and Quarrying<br />

(v) Electricity, Gas and Water Supply<br />

(vi) Construction.<br />

An outlay of Rs. 0.10 lakh is approved for 2004-05.<br />

11. COMPUTER SERVICES /INFORMATION TECHNOLOGY: As this Department is<br />

dealing with all kinds of Statistical data, full computerization of work is necessary. Manual<br />

tabulation and processing of data could no longer sustain the workload, as such, it is<br />

emphasized to strengthen the Computer Wing.<br />

The Department proposed to purchase software and hardware i.e., Dot Matrix<br />

Printer and to improve and upgrade the existing Computers. Details are as given below:


- 223 -<br />

ECONOMICS & STATISTICS DEPARTMENT<br />

Sl.<br />

No.<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Computer Operator<br />

- 1 0.50<br />

2 Purchase lesser (Colour Printer) & Software - 1 2.00<br />

3 Office Expenses<br />

- -<br />

-<br />

TOTAL - - 3.00<br />

12. OTHER EXPENDITURE:<br />

(i) Mini press and Publication: The Department is running a small Printing Press<br />

for printing booklets, leaflets, various type of forms, covers of different publication. The<br />

physical and financial targets for the year 2004-05 are as below: —<br />

Sl.<br />

No<br />

Name of Item / Scheme<br />

Annual Plan 2004-2005<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Machine man<br />

1 -<br />

2 Compositor<br />

2 -<br />

3 Proof Puller<br />

1 - 4.59<br />

4 Publication<br />

- - 0.11<br />

TOTAL 4 - 4.70<br />

13. TRAINING OF STATISTICAL PERSONNEL: This Scheme mainly emphasized to<br />

improve and augment the skill of Statistical personnel through training, especially primary<br />

and intermediate level of functionaries which is essential from time to time to effect<br />

improvement in their field of works.<br />

It is necessary to organize training in and outside <strong>Mizoram</strong> for primary and<br />

intermediate level and functionaries that will aim at widening their horizon by providing<br />

them with some useful Statistical tools and familiarize them with the latest development<br />

in various Statistical methodology. An amount of Rs. 0.89 lakh is given in the Approved<br />

Plan 2004-05.


- 226 -<br />

FOOD & CIVIL SUPPLIES DEPARTMENT<br />

FOOD & CIVIL SUPPLIES<br />

The main task of the Department of Food & Civil Supplies is to ensure food<br />

security in <strong>Mizoram</strong> through efficient Public Distribution System. The Department<br />

procures foodstuff from Food Corporation of India Depots and despatches them to various<br />

Supply Centres for equitable distribution to the public by Fair Price Shop retailers through<br />

Ration Cards. The Department is now functioning with 6 (six) District Offices, 4 (four) Sub-<br />

Divisional Offices, 9 (nine) Principal Distribution Centres, 18 Sub- Distribution Centres and<br />

94 Supply Centres. The Department is having one of the largest network operations<br />

among the various Departments in <strong>Mizoram</strong>.<br />

The Proposed outlay for the 10th Five Year Plan 2002 - 2007 in respect of<br />

the Department of Food & Civil Supplies is Rs 826.00 lakhs. This will be utilised for<br />

maintenance of existing 27 posts of various categories of Officers & Staff under Plan,<br />

maintenance of 11 nos. of heavy vehicles and 20 nos. light vehicles under Plan Schemes.<br />

Besides providing funds for construction of Supply Godowns and Department Quarters, it<br />

is intended to construct approach road and to provide funds for maintenance of the<br />

existing 188 nos. of Godowns and 250 nos. of Staff Quarters at various Supply Centres.<br />

The break up of total approved outlay of Rs. 200.00 lakhs for the Annual Plan 2004<br />

- 2005 is as follows: -<br />

1. CIVIL SUPPLIES<br />

A. Direction: An amount of Rs 86.00 lakhs is approved for maintenance of the<br />

existing 14 nos. of Staff under Plan, maintenance of heavy & light departmental vehicles,<br />

office expenses, materials & supply, travelling expenses, advertisement, other charges and<br />

for clearance of liabilities as shown below: -<br />

Sl.No. Particulars Amount approved<br />

( Rupees in lakh)<br />

1. Salary of existing 14 Staff - 18.00<br />

2. Travelling expenses - 2.00<br />

3. Office expenses - 7.00<br />

4. Material & Supply - 47.00<br />

5. Advertisement - 1.00<br />

6. Other charges - 1.00<br />

7. Maintenance of vehicles - 10.00<br />

TOTAL - 86.00<br />

2. STORAGE & WAREHOUSE :<br />

A. Administration : A sum of Rs. 17.00 lakhs in Annual Plan<br />

2004 - 2005 is approved for maintenance of the existing 13 nos. of Staff under<br />

Plan, Office expenses and Travelling expenses as given below :-<br />

Sl No. Particulars Amount ( in lakh )<br />

1. Salary of existing 13 Staff - 11.00<br />

2. Travelling expenses - 2.00<br />

3. Office expenses - 4.00<br />

TOTAL = 17.00<br />

B. Food Subsidies : The Department of Food & Civil Supplies is now<br />

having as much as 188 nos. of Godowns and 250 Staff Quarters. Some of these Godowns<br />

and Quarters were constructed more than 15 years ago, as such, repair works need to be<br />

done for these buildings. It is also proposed that repair of side drains, retaining walls and<br />

approach road to Godowns for which an amount of Rs. 7.00 lakhs is earmarked in Annual<br />

Plan 2004 - 2005.


- 227 -<br />

FOOD & CIVIL SUPPLIES DEPARTMENT<br />

3. BAFFACOS<br />

The Department of Food, Civil Supplies is now having as much as 188 nos.<br />

Godowns in different parts of the state. Most of the Godown were constructed some 15<br />

years back and hardly fit for storage of foodstuff. Hence it proposes to take up reconstructed<br />

of 31 (thirty one) old Godowns @ Rs.2.00 lakhs and repair of 28 (twenty eight)<br />

existing Godowns @ Rs.1.00 lakh during the current Financial Year (2004-2005). It is,<br />

therefore, approved to earmark Rs. 90.00 lakhs under the scheme of ACA (BAFFACOS).<br />

A. The proposed reconstruction of old Godowns are as under :-<br />

Sl.<br />

No.<br />

Centre District Implementing<br />

Agency<br />

Amount Remar<br />

ks<br />

1 2 3 4 5 6<br />

1. Ratu DCSO ‘E’ Departmental Works 2.00 lac<br />

2. Phuaibuang DCSO ‘E’ Departmental Works 2.00 lac<br />

3. Vanbawng DCSO ‘E’ Departmental Works 2.00 lac<br />

4. Khawlian DCSO ‘E’ Departmental Works 2.00 lac<br />

5. Phullen DCSO ‘E’ Departmental Works 2.00 lac<br />

6. Hmunpui DCSO ‘W’ Departmental Works 2.00 lac<br />

7. Saipum DCSO ‘W’ Departmental Works 2.00 lac<br />

8. Reiek DCSO ‘W’ Departmental Works 2.00 lac<br />

9. Pukzing DCSO ‘W’ Departmental Works 2.00 lac<br />

10. Rengdil DCSO ‘W’ Departmental Works 2.00 lac<br />

11. Vaseitlang DCSO( Lawngtlai) Departmental Works 2.00 lac<br />

12. Damdep DCSO( Lawngtlai) Departmental Works 2.00 lac<br />

13. Tuithumhnar DCSO( Lawngtlai) Departmental Works 2.00 lac<br />

14. Parva DCSO( Lawngtlai) Departmental Works 2.00 lac<br />

15. Diltlang DCSO( Lawngtlai) Departmental Works 2.00 lac<br />

16. Siata DCSO( Saiha) Departmental Works 2.00 lac<br />

17. Tongkolong DCSO( Saiha) Departmental Works 2.00 lac<br />

18. Laki DCSO( Saiha) Departmental Works 2.00 lac<br />

19. Zawngling DCSO( Saiha) Departmental Works 2.00 lac<br />

20. Chakhang DCSO( Saiha) Departmental Works 2.00 lac<br />

21. Maubawk DCSO( Saiha) Departmental Works 2.00 lac<br />

22. Bungzung DCSO( Champhai) Departmental Works 2.00 lac<br />

23. Lungpho DCSO( Champhai) Departmental Works 2.00 lac<br />

24. Vaphai DCSO( Champhai) Departmental Works 2.00 lac<br />

25. Khuangleng DCSO( Champhai) Departmental Works 2.00 lac<br />

26. N.E.Khawdungsei DCSO( Champhai) Departmental Works 2.00 lac<br />

27. Lunglei DCSO( Lunglei) Departmental Works 2.00 lac<br />

28. Lungsen DCSO( Lunglei) Departmental Works 2.00 lac<br />

29. Buarpui DCSO( Lunglei) Departmental Works 2.00 lac<br />

30. Chhipphir DCSO( Lunglei) Departmental Works 2.00 lac<br />

31. Bunghmun DCSO( Lunglei) Departmental Works 2.00 lac<br />

Total = Rs. 62.00 lakhs


- 228 -<br />

FOOD & CIVIL SUPPLIES DEPARTMENT<br />

B. List of existing Godowns proposed for repair.<br />

Sl. Name of Scheme with items of Workers Location District Unit Amount<br />

No.<br />

(Rs. in lakh)<br />

1 2 3 4 5 6<br />

1. Repair of FCS Godown roof, wall and floor. Serchhip DCSO ‘E’ 1no. 1.00<br />

2. Repair of FCS Godown roof, wall and floor. Saitual DCSO ‘E’ 1no. 1.00<br />

3. Repair of FCS Godown roof, wall and floor N.Vanlaiphai DCSO ‘E’ 1no. 1.00<br />

and approach road.<br />

4. Repair of FCS Godown roof, wall and floor. Thenzawl DCSO ‘E’ 1no. 1.00<br />

5. Repair of FCS Godown roof, wall and floor. Khawlailung DCSO ‘E’ 1no. 1.00<br />

6. Repair of FCS Godown no.II roof, Saitual DCSO ‘E’ 1no. 1.00<br />

wall and floor.<br />

7. Repair of FCS Godown no. II roof, N.Vanlaiphai DCSO ‘E’ 1no. 1.00<br />

wall and floor and approach road.<br />

8. Repair of FCS Godown no. II roof, Thenzawl DCSO ‘E’ 1no. 1.00<br />

wall and floor.<br />

9. Repair of FCS Godown roof, Khawruhlian DCSO ‘E’ 1no. 1.00<br />

wall and floor.<br />

10. Repair of FCS Godown roof, wall and floor. E.Lungdar DCSO ‘E’ 1no. 1.00<br />

11. Repair of FCS Godown roof, wall and floor. W.Phaileng DCSO ‘W’ 1no. 1.00<br />

12. Repair of FCS Godown roof, wall and floor. Kawrthah DCSO ‘W’ 1no. 1.00<br />

13. Repair of R/Wall (30mts) Vairengte DCSO ‘W’ 1no. 1.00<br />

14. Repair of FCS Godown no. II, wall, Vairengte DCSO ‘W’ 1no 1.00<br />

roof and floor<br />

15. Repair of approach Road at FCS Godown. Tuidam DCSO ‘W’ 1no. 1.00<br />

16. Repair of FCS Godown roof, wall and floor. Niawhtlang DCSO Saiha 1no. 1.00<br />

17. Repair of FCS Godown roof, wall and floor. Bualpui NG DCSO Saiha 1no. 1.00<br />

18. Repair of FCS Godown roof, wall and floor. Chapui DCSO Saiha 1no. 1.00<br />

19. Repair of FCS Godown roof, wall and floor. S.Vanlaiphai. DCSO Lunglei 1no. 1.00<br />

20. Repair of FCS Godown roof, wall and floor. Tarpho DCSO Lunglei 1no. 1.00<br />

21. Repair of FCS Godown roof, wall and floor. Borapansuri DCSO Lunglei 1no. 1.00<br />

22. Repair of FCS Godown roof, wall and floor. Putlungasih DCSO Lunglei 1no. 1.00<br />

23. Repair of FCS Godown roof, wall and floor. Cherhlun DCSO Lunglei 1no. 1.00<br />

24. Repair of FCS Godown roof, wall and floor Lawngtlai DCSO Lawngtlai 1no. 1.00<br />

floor with loading shed<br />

25. Repair of FCS Godown roof, wall and floor. Lungdai DCSO ‘W’ 1no. 1.00<br />

26. Repair of FCS Godown roof, wall and floor. Farkawn DCSO Champhai 1no. 1.00<br />

27. Repair of FCS Godown roof, wall and floor Khawbung DCSO Champhai 1no. 1.00<br />

28. Repair of FCS Godown roof, wall and floor Kawnpui DCSO ‘W’ 1no. 1.00<br />

Total = 28 nos. 28.00


- 231 -<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

LAI AUTO. DISTRICT COUNCIL<br />

INTRODUCTION<br />

The Lai Autonomous District Council is one of the largest District Councils in<br />

<strong>Mizoram</strong>. It covers an area of 1870.75 Sq. Kms and with the population of 62,000 people.<br />

The revised Outlay of Annual Plan 2003-2004 is Rs.758.00 Lakhs. As per tentative Outlay<br />

given by <strong>Mizoram</strong> Government Rs.740.00 Lakhs is approved for 2004-2005. Further,<br />

Rs.60.00 Lakhs has been added by <strong>Mizoram</strong> Government, totalling of Rs.800.00 Lakhs.<br />

Hence, sectoral allocation is made for 2004 - 2005 as given below: -<br />

Approved Outlay<br />

2004-05<br />

I. Agriculture & Horticulture Deptt. 41.45<br />

II. Fisheries Deptt. 16.15<br />

III. Public Health Engineer Deptt. 25.35<br />

IV. Industry Deptt. 24.50<br />

V. Sericulture Deptt. 6.15<br />

VI. A.H. & Vety Deptt. 12.20<br />

VII. Art & Culture Deptt.<br />

‘A’ Promotion of Art & Culture 15.80<br />

‘B’ Information 14.90<br />

VIII. Social Welfare Deptt. 26.75<br />

IX. Soil Conservation Deptt. 14.60<br />

X. Local Administration Deptt.<br />

‘A’, ‘B’ & ‘C’ 42.60<br />

XI. Forest Deptt. 32.80<br />

XII. Transport Deptt. 18.95<br />

XIII. Sport & Youth Services Deptt 17.00<br />

XIV. Co - Operation Deptt. 8.60<br />

XV. Public Work Deptt. 152.40<br />

XVI. Education Deptt. 280.80<br />

XVII. Rural Development Deptt. 45.40<br />

XVIII. Water way Deptt. 3.60<br />

GRAND TOTAL: 800.00<br />

I. AGRICULTURE & HORTICULTURE DEPTT.:<br />

‘A’ AGRICULTURE: This sector is basically meant for wet-rice cultivation for attaining<br />

self sufficiency in food production. Since, the fund allocation of Annual Plan outlay is so<br />

limited, the Council could not effort the basic needs of the schemes. It is however,<br />

submitted D.P.R to seek Central Fund (CSS) for the development of this area. Hence, a few<br />

items have been provided in this sector. Rs.23.05 Lakhs only provided during the approved<br />

Annual Plan 2004–05. And the post of D.C.A.O had been transferred to Non-Plan Budget.<br />

‘B’ HORTICULTURE: Development of Agriculture for <strong>plan</strong>tation within Lai<br />

Autonomous District Council area is the main aims and objects of this sector. But due to<br />

constraint of fund, sufficient of items / schemes could not be provided so far. It is<br />

however, allocated a few items / schemes in this sector. The approved outlay is Rs.18.40<br />

Lakhs during 2004 – 2005 Annual Plan. And the post of D.C.H.O had been transferred to<br />

Non-Plan Budget.


- 232 -<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

II. FISHERY: Although this sector is so important to uplift fish rearing production in<br />

the area. There are a number of suitable land for the construction of fish pond. But due to<br />

financial constraint Rs.16.15 Lakhs only provided in this sector for the approved Annual<br />

Plan 2004 – 2005 so as to upgrade the area.<br />

III. PUBLIC HEALTH ENGINEER: The main aims object of this sector is to provide<br />

clean drinking water for the general public. To fulfil the above policy, schemes like<br />

Harvesting of rain water, Water tank, Water point are provided. The approved outlay is<br />

Rs.25.35 Lakhs during 2004 – 2005.<br />

IV. INDUSTRY: The post of D.C.I.O had been transferred to Non-Plan in this sector, an<br />

Institution of production cum training centre both Handloom and Tailoring is provided which was<br />

established since ten years back. And it is also provided the provision of information technology.<br />

The total approved outlay is Rs.24.50 Lakhs during 2004–05 Annual Plan Budget.<br />

V. SERICULTURE: Although the land of Lai Autonomous District Council is quite<br />

suitable for rearing Silk Worm. The people living in the area have an awareness in this field<br />

to a great extent. But sufficient fund could not be provided due to limited outlay of fund.<br />

The total approved outlay is Rs.6.15 Lakhs during 2004 – 2005 Annual Plan.<br />

VI. A.H. & VETY: The Council established one Vety dispensary to take care the health<br />

of domestic animals. The schemes serve the public needs to a great extent. The total<br />

approved outlay in this sector is Rs.12.20 Lakhs during the Annual Plan 2004 – 2005. And<br />

the post of D.C.V.O had been transferred to Non-Plan so as to minimize salary component.<br />

VII. ART & CULTURE: The main aims and objects of this sector is to presurve the<br />

culture and tradition of Lai. Within the limited outlay of fund, a few items of such objects<br />

are included. Such items are: - Collection of cultural materials, Cultural dresses, Holding of<br />

Cultural meets, Printing of Books, Remuneration of Casual Artist and so on. The total<br />

approved outlay is Rs.30.70 Lakhs for the Annual Plan of 2004 – 2005.<br />

VIII. SOCIAL WELFARE: The target of this sector is to uplift the social life of this people<br />

of Lai Autonomous District Council area. Hence, it provided Old-Aged pension which was<br />

on-going schemes, construction of Grave-Yards Huts, purchase of Silpouline, purchase of<br />

Cups for distribution to N.G.O and financial assistant to N.G.O. The total approved outlay<br />

is Rs.26.75 Lakhs during 2004–05 Annual Plan. And the post of D.C.S.W.O. had been<br />

transferred to Non-Plan.<br />

IX. SOIL CONSERVATION: In this sector, only maintenance of <strong>plan</strong>tation, creation of<br />

nursery beds etc. are provided. The total approved outlay is Rs.14.60 Lakhs for Annual Plan<br />

of 2004–05. It is therefore seeking central assistance by submitting D.P.R to DoNER.<br />

X. LOCAL ADMINISTRATION: The main aims and objects of this sector is to<br />

developed urban and rural areas of Lai Autonomous District Council area. It proposed the<br />

schemes like protection of Lawngtlai Town landslides and erosion, construction of R/wall/,<br />

Side Drain, Culvert, Steps. The total approved outlay is Rs.42.60 Lakhs during 2004 – 2005<br />

Annual Plan.<br />

XI. FOREST: So as to increase a forestation within Lai Autonomous District Council<br />

area, schemes like creation of <strong>plan</strong>tation, maintenance of <strong>plan</strong>tation, collection of seed /<br />

seedling, road side avenue <strong>plan</strong>tation could not be provided due to financial constraint. It<br />

is however submitted to DoNER and is being implemented in L.A.D.C area. The total<br />

approved outlay is Rs.32.80 Lakhs during 2004 – 2005.


- 233 -<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

XII. TRANSPORT: This sector is the sole responsible over the matter of vehicles owned<br />

by the Lai Autonomous District Council as well as detailment of drivers and controlling<br />

there of. Whatsoever, maintenance of vehicles are provided in the schemes. The total<br />

outlay is Rs.18.95 Lakhs for the approved outlay of Annual Plan 2004 - 2005. And the post<br />

of D.C.T.O had been transferred to Non-Plan.<br />

XIII. SPORT & YOUTH SERVICES: Promotion of Zonal Sports items within Lai<br />

Autonomous District Council area is the main object of this sector. For the upliftment of<br />

the standard of sports, several efforts have been taken up by this Department. Hence,<br />

construction of Pavilion, purchase of sports goods are provided in the schemes. The total<br />

approved outlay is 17.00 Lakhs during 2004 – 2005 Annual Plan. The post of D.C.S & Y.O<br />

had been transferred to Non-Plan.<br />

XIV. CO-OPERATION: For improvement and promotion of Co-operative Societies within<br />

Lai Autonomous District Council area, a little effort have been taken up with a limited<br />

outlay of fund. Provision for financial assistance to Co-operative Societies is provided. The<br />

total approved outlay is Rs.8.60 Lakhs for the Annual Plan of 2004 – 2005.<br />

XV. PUBLIC WORK: This sector is the main and major head of development sector in<br />

Lai Autonomous District Council, major works like construction of building, maintenance<br />

of building, Culvert and Retaining wall etc. are provided in the schemes. The total<br />

approved outlay is Rs.152.40 Lakhs during the Annual Plan of 2004 – 2005. In respect of<br />

road construction, D.P.R had been submitted to DoNER which is under consideration.<br />

XVI. EDUCATION: The Lai Autonomous District Council under took School Education<br />

up to the level of Middle School. It is divided in to three Administrative head for<br />

Controlling Educational Institution (i.e., (1) Administrative (2) Education Board (3)<br />

Controller of Examination). There are 62 Middle School Teachers and 10 Hindi Teachers<br />

and also 93 Primary teachers and 44 regularised teachers and another 23 additional<br />

teachers (fixed pay). Hence, huge amount money has to be spent in salary component. As<br />

such, almost out of the total outlay of Annual Plan has to be spent in salary component.<br />

Schemes like construction of school building, furniture, textbooks etc. could not be<br />

provided due to limited fund. So, the total outlay is Rs.280.80 Lakhs for approved Annual<br />

Plan of 2004 – 2005.<br />

XVII. RURAL DEVELOPMENT: This department is also one of the major head of<br />

development department. For the upliftment of the people living in remote places schemes<br />

like rural housing schemes, construction of I.V.P and rural connectively are provided. The<br />

total approved outlay is Rs.45.40 Lakhs for 2004 – 2005 Annual Plan. And the post RDO &<br />

ARDO had been transferred to Non-Plan so as to minimize the expenditure on salary.<br />

XVIII. WATER WAY: This sector is a minor sector in development department effort<br />

could hardly be taken up in this sector. Hence, only maintenance of office, TA / DA of<br />

fund. The total approved outlay is Rs.3.60 Lakhs for 2004–2005 Annual Plan.<br />

Hence, the approved outlay of Annual Plan of Lai Autonomous District Council is<br />

Rs. 800.00 Lakhs <strong>detailed</strong> items of different sectoral allocation as well as schemes wise<br />

break-up are enclosed in Annexure.


Introduction:<br />

- 235 -<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

MARA AUTO. DISTRICT COUNCIL<br />

By the provisions of paragraph 20-B of the Sixth Schedule to the CONSTITUTION OF<br />

INDIA, LAKHER REGIONAL COUNCIL along with PAWI AND CHAKMA REGIONAL COUNCIL<br />

were elevated to the status of District Council with effect from the 29 th April, 1972 under<br />

the MIZORAM DISTRICT COUNCIL (miscellaneous Provision) Order 1972. Thus, the<br />

LAKHER AUTONOMOUS DISTRICT COUNCIL came into existence and was re-named as the<br />

MARA AUTONOMOUS DISTRICT COUNCIL from 1 st May 1989. The area of the Council is<br />

1445 Sq.Kms. with a population of 51,073 as per latest Census. It is lying on the South<br />

eastern corner of <strong>Mizoram</strong>, contiguous by MYANMAR on the east and south and Lai<br />

District Council on the west.<br />

There are many rivers in the District, but only a few of them are worth mentioning.<br />

The most important and useful rivers are the KOLODYNE (Chhimtuipui), SALYT, TISI and<br />

PALA. There is one of the largest lakes in <strong>Mizoram</strong> called PALA LAKE in the District. This<br />

Lake has now being developed from the Centrally Sponsored Schemes.<br />

Agriculture is the main stay in this District. The people of this area live on<br />

jhumming and wet rice cultivation. They also grow cash crops like cotton, millet, maize,<br />

potatoes, groundnut, coffee, pepper, ginger, etc. in their jhum lands. They also reared all<br />

kinds of domestics’ animals.<br />

BRIEF SECTOR-WISE DESCRIPTION<br />

1. Environment & Forest: The approved outlay is Rs.31.00 lakhs only. The objective<br />

of the schemes is for maintenance of existing Staff, office expenses, TA/DA., Maintenance<br />

of Vehicle. Purchase of Uniforms, maintenance of Rest House, purchase of Arms &<br />

Ammunition, collection of seed, maintenance of previous year <strong>plan</strong>tation, maint. of Forest<br />

buildings and creation of nursery beds.<br />

2. Arts & Culture: The approved outlay for the scheme is Rs.16.00 lakhs only. Under<br />

the schemes maintenance of staff, Office expenses, TA/DA, research investigation,<br />

maintenance of Museum, Organization of Cultural meet, and musical articles, maintenance<br />

of Video and still Camera Grant-in-aid to Local artists Drama, Essay, etc. competitions and<br />

organisation of cultural troupe will be taken up.<br />

3. Rural Development: The approved outlay under the schemes for the year 2004-05<br />

is Rs. 121.50 lakhs only which would be utilised on the following schemes: Maintenance of<br />

existing staff, Office Expenses, TA/DA, maintenance of vehicles, furniture for Quarters &<br />

Office, House Rent at Shillong, Maintenance of Mara House at Aizawl, provision for<br />

clearance of outstanding liabilities in different departments (Plan) which was incurred<br />

from the past years, Rural Communication, Community Development, Rural Housing and<br />

Information and Publicity.<br />

4. Agri. & Horticulture: The approved outlay for the scheme is Rs.47.50 lakhs only.<br />

The following schemes viz. maintenance of Agri. seed-cum-demonstration farm,<br />

construction of Agri. link road, Maize <strong>plan</strong>tation schemes, land development by manual and<br />

purchase of plough animal for WRC, development of Horti. Garden and Minor Irrigation.<br />

5. Soil & Water Conservation: The approved outlay for the schemes is Rs.21.00<br />

lakhs. This scheme provides maintenance of Coffee, rubber and Passion fruit <strong>plan</strong>tation,<br />

and maintenance of permanent nursery at Thosai, etc.


- 236 -<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

6. Social Welfare: Under this programme, various schemes will be taken up during<br />

2004-05 such as — Assistance to Motherless Babies, handicapped persons, poor patients,<br />

Old aged pension, and procurement of socially needed materials for distribution. The<br />

approved outlay for the schemes is Rs. 14.00 lakhs only.<br />

7. A.H. & Vety.: The approved outlay for the scheme is Rs.17.00 lakhs only. Under<br />

this programme, the following schemes are proposed to be implemented during the year:<br />

(a) Direction & Administration (b) Cattle development and (c) Poultry development.<br />

8. Industry: The Rural Industry is purely a promotional scheme and is meant for<br />

upgrading skill of artisans by imparting necessary training in different trades in addition<br />

to rendering service facilities to small-scale Industry units. The following programmes are<br />

approved to take up during 2004-05 viz. procurement of equipment, grant-in-aid to<br />

artisans and Carpentry tools. The approved outlay is Rs. 12.00 lakhs only.<br />

9. Fishery: The Annual Plan of fisheries for the year 2004-05 envisages procuring of<br />

fish seeds for the Departmental fish Pond and private farm as well. To encourage production<br />

of fish seeds in the private sector steps have been taken to select 5 private farms at Saiha in<br />

MADC area, which will be assisted by the department both financially and technically<br />

during the current, year and the approved outlay for the scheme is Rs. 9.00 lakhs only.<br />

10. PHE: The approved outlay for the scheme is Rs. 11.00 lakhs only. Under this programme,<br />

the following schemes are approved to be implemented during the year. Construction of<br />

RCC Water tanks, procurement of plumbing tools and repairing of water points/ tanks.<br />

11. Sericulture: The scheme includes procurement of equipment, maintenance of seed<br />

farm and existing staff Rs. 7.50 lakhs is approved for the scheme during the year.<br />

12. L.A.D.: The approved outlay for the scheme is Rs. 54.00 lakhs only. Under this<br />

programme, the following schemes are earmarked to implement during the current year.<br />

Such schemes are construction of Bazar Shed, Stone steps, pit latrines, dustbins,<br />

maintenance of slaughterhouses, and maintenance of existing staff.<br />

13. Road and Transport: The amount of Rs. 11.00lakhs only is approved for the<br />

scheme. Under this programme, Pay and allowances of Drivers, handyman and other staff,<br />

management, operation, repairs and maintenance and other expenditure is provided.<br />

14. Sports & Youth Services: This scheme includes procurement of Sports materials for<br />

free distribution organization of competition, construction of play field and pavilion and<br />

maintenance of existing staff. The approved outlay for the scheme is Rs. 13.00 lakhs only.<br />

15. Cooperation: This sector includes seminar/training for awareness and<br />

encouragement of Cooperative Societies and maintenance of existing staff. The approved<br />

outlay for this sector is Rs. 2.00 lakhs only.<br />

16. Public works Department: The approved outlay for the scheme is Rs.103.50 lakhs<br />

only. This sector includes construction of — a] Revenue office at Tipa / Phura b] EM qtrs<br />

c] Fresh Jeepable roads and d] Stone steps, culverts and side drain, maintenance of a]<br />

Jeep roads b] Offices and Quarters and c] existing staff and labours.<br />

17. Water way [Inland]: The approved outlay for the scheme is Rs. 5.50 lakhs only for<br />

employment of boatmen, purchase & maintenance of Boats are includes in the scheme.<br />

16. Education & Human Resources: This scheme includes organisation of zonal<br />

sports, Seminar training, Adult Education programmes, maintenance of BSE, and other<br />

minor works to be implemented under this sector. The approved outlay for the scheme is<br />

Rs. 189.50 lakhs only.


- 246 -<br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

CHAKMA AUTO. DISTRICT COUNCIL<br />

INTRODUCTION:<br />

The approved outlay for 2004-05 in respect of Chakma Autonomous District<br />

Council is Rs. 495.00 lakhs and the sector-wise break-up on priority basis is given below: –<br />

Sl.<br />

No.<br />

Name of Sector<br />

Budget Outlay<br />

2003-2004<br />

(Rupees in lakhs)<br />

Amount Approved<br />

2004-2005<br />

1. Agriculture & Horticulture 26.66 24.75<br />

2. Fishery 2.30 4.28<br />

3. Public Health Engineering 16.35 16.18<br />

4. Industry 11.42 11.60<br />

5. Sericulture 3.40 3.09<br />

6. Animal & Vety. 3.50 2.99<br />

7. Arts & Culture 20.58 23.77<br />

8. Social Welfare 10.08 2.20<br />

9. Soil Conservation 9.78 9.08<br />

10. Local Administration 9.33 11.56<br />

11. Forest & Environment 13.11 17.40<br />

12. Road Transport 14.52 29.69<br />

13. Sports & Youth Services 6.38 7.81<br />

14. Co-operation 4.02 4.14<br />

15. Public Works Department 41.34 64.40<br />

16. Education 243.31 229.68<br />

17. Rural Development 23.46 19.90<br />

18. Water Ways 5.15 5.53<br />

19. Planning 5.91 3.50<br />

20. Public Relations 3.40 3.45<br />

T o t a l 470.00 495.00<br />

Write Up Description Approved Annual Plan 2004-2005<br />

1. Agriculture & Horticulture:<br />

The Department was divided into two sectors Agriculture and Horticulture Sector.<br />

The main items of schemes are Land Development by manual @ Rs.15,000/- per hectares<br />

and under the Horticulture purchase and distribution of seeds/seedlings, Tool and<br />

equipments on 75% subsidy, and financial assistance to orange gardener to for weeding of<br />

the garden at Rajmandal and supply of orange, hadcora seedlings for distribution of<br />

Jhumia families of Rajmandal village and provision for salary and wages and other<br />

administrative charges Rs. 24.75 lakh is approved in 2004-05.<br />

2. Fisheries:<br />

In this sector Rs. 4.28 lakhs is approved during 2004-05 for salary of existing staff<br />

and other administrative charges.


- 247 -<br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

3. Public Health Engineering:<br />

In this sector the main items is Improvement of Village Spring Sources (IVSS) and<br />

salary of existing staff and other administrative charges Rs. 16.18 lakhs is approved<br />

during 2004-05.<br />

4. Industry:<br />

Rs. 11.60 lakhs is approved during 2004-05 for purchase & distribution of<br />

carpentry tools on 75% subsidy and purchase & distribution sewing machine on 75%<br />

subsidy and salary of existing staff and other administrative charges.<br />

5. Sericulture:<br />

In this sector also there is no any items of works only salary of existing staff.<br />

Rs.3.09 lakhs is approved during 2004-05.<br />

6. Animal & Vety.:<br />

Rs.2.99 lakhs is approved for 2004-05 for financial assistance for Poultry/ Piggery,<br />

salary of existing staff and other administrative charges.<br />

7. Arts & Culture: Rs.23.77 lakhs is approved for 2004-05. In this sector, the new<br />

items, Conduct of District Cultural Meet, conduct of cultural zonal meet and financial<br />

assistance to Oja/Badhya and salary of existing staff and other administrative charges.<br />

8. Social Welfare:<br />

Rs. 2.20 lakhs is approved during 2004-05. The main item is for financial assistance<br />

to handicapped persons, financial assistance to NGOs and salary of existing staff and other<br />

administrative charges.<br />

9. Soil Conservation:<br />

In this Sector the main items of works is maintenance of <strong>plan</strong>tation at Samuksury,<br />

construction of earthen check dam and salary of existing staff and other administrative<br />

charges Rs. 9.08 lakhs is approved during 2004-05.<br />

10. Local Administration:<br />

Rs. 11.56 lakhs is approved during 2004-05. The main item of works is<br />

construction of drains/steps/culvert etc. construction of drainage system at Kamalanagar,<br />

completion of market at Kamalanar. Salary of existing staff and other administrative<br />

charges.<br />

11. Environment & Forest:<br />

In these sector Rs. 17.40 lakhs is approved for 2004-05 for completion of existing<br />

children park at Kamalanagar and continuing of fencing around the botanical garden and<br />

salary of existing staff and other administrative charges.<br />

12. Road Transport:<br />

In these sectors included for purchase of one vehicle and construction of<br />

Departmental workshop building, purchase of tools & equipments etc. salary of existing<br />

staff and other administrative charges. Rs. 29.69 lakhs is approved during 2004-05.


- 248 -<br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

13. Sports & Youth Services:<br />

Rs. 7.81 lakhs is approved for Annual Plan 2004-05 to conduct of District Sports<br />

meet, conduct of zonal sports meet, purchase & distribution sports materials and 75%<br />

subsidy and financial assistance to registered sporting club. Salary of existing staff and<br />

other charges.<br />

14. Co-operation:<br />

Rs. 4.14 lakhs is approved during 2004-05. The main item is only salary and other<br />

administrative charges.<br />

15. Public Works:<br />

Rs. 64.40 lakhs is approved during 2004-05 for completion of CADC Rest at Aizawl,<br />

furnishing of CADC rest houses at Aizawl and Iron cats & black topping of CADC Rest<br />

House Complex. Black topping of Kamalanagar town and salary of existing staff and other<br />

administrative charges.<br />

16. Education & Human Resources:<br />

Rs. 229.68 lakhs is approved during 2004-05. There is only salary component for<br />

Middle, Primary and Non Formal Teachers and other works for completion of Teacher Inn<br />

at K/nagar and financial assistance to poor meritorious, scholarship/cash reward and<br />

purchase of textbooks. Financial assistance to DSEB and printing of confidential exam, a<br />

sum of Rs. 11.55 lakhs is provided under Approved Annual Plan, 2004-05.<br />

17. Rural Development:<br />

Rs. 19.90 lakhs is approved for 2004-05. In these sector the main items is for<br />

construction of CADC Rest House at K/nagar (2 nd Floor), maintenance of IVP, Installation of<br />

AC for CADC Rest House and salary of existing staff and other administrative charges.<br />

18. Water Ways:<br />

Rs. 5.53 lakhs is approved for 2004-05 the main one item is only removal<br />

obstruction and Salary and Other Charges.<br />

19. Planning:<br />

In these sector the items for maintenance of Computer, TA/DA to Planning Board<br />

members, contingency charges and purchase of Computer. Rs. 3.50 lakhs is approved<br />

during 2004-05.<br />

20. Information & Public Relation:<br />

In these sectors, distribution of community viewing listening set, celebration of<br />

festival Biju/Independence Day, etc. and publication of calendar/dairy Rs.3.45 lakhs is<br />

approved for 2004-05.


- 254 -<br />

LEGAL METROLOGY<br />

LEGAL METROLOGY<br />

The Approved Annual Plan 2004-2005 is Rs.60.00 lakhs. The Plan mainly aims for<br />

continuation of the existing establishment and strengthening thereof with a view to<br />

achieve better and more effective enforcement of Weights & Measures Acts & Rules<br />

throughout the State.<br />

The break up of the Plan are as follows: -<br />

1. Administration - Rs. 55.50 lakhs<br />

2. Supply & Material - Rs. 3.50 lakhs<br />

3. Minor Works - Rs. 1.00 lakhs<br />

Total - Rs. 60.00 lakhs<br />

1. ADMINISTRATION:<br />

Rs.55.50 lakhs are earmark for administration during the year 2004-2005 and the<br />

break up are as follows: -<br />

a) Salary: Rs.41.57 lakhs is earmark for the salary of Officers and Staffs under Plan.<br />

b) Wages: Due to shortage of manpower especially Manual Assistant to assist the<br />

Inspectors on Enforcement duties, enforcement works hampered a lot causing<br />

inefficiency in our day-to-day works. There are 17 Inspectors of Legal Metrology<br />

and only 13 Manual Assistant to assist them. It is therefore proposed to engage at<br />

least 4 (four) Manual Assistant on Muster roll/Casual basis for which an amount of<br />

Rs.0.50 lakh is approved for wages.<br />

c) Travelling Expenses: The Enforcement Staff are required to visit different places,<br />

trading premises, Government Godowns in towns and interior villages for effective<br />

enforcement of Weights & Measures Act & Rules in the interest of Public Services to<br />

protect Consumers interest. Rs.2.50 lakhs is approved for T.E.<br />

d) Office Expenses: For the expenditure of Office expenses at different offices i.e.<br />

Aizawl, Lunglei, Saiha, Kolasib, Champhai and Site Office at Zokhawthar for<br />

implementation of Rule 33 of the Standard of Weights & Measures (Packaged<br />

Commodities) Rules (Amended 2000). For which Rs.10.00 lakhs is approved for<br />

Office Expenses.<br />

e) Rent: The Department has got no Office Building of its own at Aizawl, Lunglei and<br />

Saiha. For rent of the above building Rs.0.93 lakhs is approved.<br />

2. SUPPLY & MATERIAL:<br />

Date stamp and Date plugs are statutory requirements of each Inspector of Legal<br />

Metrology every year. Besides, one Electronic Balance for Lunglei and 10 qtls. of<br />

lead for Verification purpose are required to purchase for which Rs.3.50 lakhs is<br />

approved.<br />

3. MINOR WORKS:<br />

For maintenance and repairs of Offices and staff quarter at Kolasib, Champhai and<br />

Mamit, a sum of Rs.1.00 lakh is approved for this purpose.<br />

Therefore, the total approved outlay for the year 2004-2005 comes to Rs.60.00 lakhs.


- 257 -<br />

LAW & JUDICIAL<br />

LAW & JUDICIAL<br />

A. Centrally Sponsored Scheme:<br />

During the Annual Plan 2004-05, the department proposes to continue those items<br />

projects which are not completed during Annual Plan 2003-04 as follows: -<br />

1. Construction of Dist. Court building at Tuikhuahtlang - Rs. 1.24<br />

(SH: Grills at Windows and Ventilation)<br />

2. Vertical Extension of District Court bldg at - Rs. 48.46<br />

Dy. Commissioner Complex Aizawl.<br />

3. Additional works of District Court bldg at Aizawl - Rs. 0.30<br />

(SH : Fixing of window glass)<br />

TOTAL - Rs. 50.00<br />

B. State Commission and District Fora:<br />

An additional fund of Rs. 4.50 lakhs have been allocated for the maintenance of the<br />

office of State Commission and District Forum, Aizawl are functioning on full time basis<br />

while the 7 [seven] District Forum at Lunglei, Saiha, Lawngtlai, Serchhip, Kolasib, Champhai<br />

and Mamit are functioning on part time basis. The Approved Annual Plan 2004-05 is as<br />

follows: -<br />

1. Maint. of Office of State Commission - Rs. 10.60<br />

2. Office Expenses - Rs. 2.50<br />

3. Maint. of 8 District Fora - Rs. 16.40<br />

Total - Rs. 29.50<br />

C. I.T. in courts:<br />

For Computerization of Courts, the department have allocated an additional fund<br />

of Rs. 0.50 lakh during the Annual Plan 2004–05 for maintenance of Computers in Courts.<br />

The abstract of Annual Plan 2004–05 showing details of approved outlays for<br />

Annual Plan 2004-05 is enclosed at annexure.<br />

Sl. No. Major/Minor Head<br />

Approved<br />

Outlays<br />

(Rs in lakhs)<br />

1. Administration of Justice<br />

(02) State Commission<br />

Salary/wages/T.E./O.E./O.C.<br />

(03) District Forum<br />

10.60<br />

Salary/wages/T.E./O.E./O.C.<br />

(04) I.T. in Court<br />

16.40<br />

Office Expenses 3.00<br />

2. Constn of Judiciary buildings<br />

a) Court building at Tuikhuahtlang 1.24<br />

b) Vertical extn of Dist Court bldg at DC Complex Aizawl 48.46<br />

c) Addl. work of Dist Court Bldg at Aizawl 0.30<br />

GRAND TOTAL 80.00


Sl. No. Name of Scheme<br />

- 258 -<br />

SCHOOL EDUCATION DEPARTMENT<br />

SCHOOL EDUCATION<br />

Tenth Plan<br />

Approved<br />

(Rupees in lakh)<br />

Annual Plan 2004-05<br />

Outlay Physical Financial<br />

I. ELEMENTARY EDUCATION<br />

1. DIRECTION & ADMINISTRATION:<br />

A. Maintenance of existing staff 1 3.50<br />

B. Wages 50 3.80<br />

C. Office Expenses LS 15.00<br />

D. Travelling Expenses LS 3.00<br />

E. Other Charges LS -<br />

Total of Direction and Administration 45.00 25.30<br />

2. INSPECTION:<br />

A. Maintenance of existing staff 27 30.00<br />

B. Wages 38 14.00<br />

C. Office expenses LS 5.00<br />

D. Travelling expenses LS 2.00<br />

Total of Inspection 222.00 51.00<br />

3. GOVT. PRIMARY SCHOOLS:<br />

A. 1) Maintenance of existing staff 226 299.00<br />

2) Regularisation of Fixed pay teachers 20 1.00<br />

B. Office expenses LS 5.00<br />

C. Travelling expenses LS -<br />

Total of Govt. Primary Schools 1745.00 305.00<br />

4. NON-GOVT. PRIMARY SCHOOLS:<br />

A. Maintenance of existing staff 89 24.00<br />

Total of Non-Govt. Primary School 24.00<br />

5. GOVT. MIDDLE SCHOOLS:<br />

A. 1) Maintenance of existing staff 92 88.00<br />

2) Salary for officiating/Substitute Teachers LS 1.00<br />

3) Condonation of educational qualification<br />

deficiency under graduate teachers LS 1.00<br />

4) Upgradation of Aided Schools into Govt. 38 10.00<br />

B. Office expenses LS 5.00<br />

C. Travelling expenses LS 2.00<br />

Total of Govt. Middle Schools 658.00 107.00<br />

OPERATION BLACKBOARD:<br />

A. Maintenance of existing Staff 26 30.00<br />

Total of Operation Blackboard 30.00


- 259 -<br />

SCHOOL EDUCATION DEPARTMENT<br />

Sl. No. Name of Scheme<br />

Tenth Plan<br />

Approved<br />

(Rupees in lakh)<br />

Annual Plan 2004-05<br />

Outlay Physical Financial<br />

6. NON-GOVT. MIDDLE SCHOOLS:<br />

Grant-in-aid for —<br />

1] Salary of Teaching and Non-Teaching Staff 1310 1923.00<br />

2] G.I.A. for Govt. Aided M/S 66 Schools 41.00<br />

3] DCRG LS 10.00<br />

4] CPF LS 1.00<br />

Total of Non-Govt. Middle School 5695.00 1975.00<br />

7. GOVERNMENT ELEMENTARY [PMGY]:<br />

A. G.I.A. to Elementary Teachers [Salary]<br />

B. Other charges:<br />

LS -<br />

1] State Matching Share of SSA LS 398.13<br />

2] Conversion Cost/Kitchen Set of Mid-Day<br />

Meal in Elementary<br />

LS 246.87<br />

TOTAL OF PMGY 500.00 645.00<br />

TOTAL OF ELEMENTARY EDUCATION 8865.00 3162.30<br />

II. SECONDARY EDUCATION<br />

8. DISTRICT INSTITUTE OF EDUCATION & TRAINING:<br />

A. Maintenance of existing post 11 12.00<br />

B. Office expenses LS 1.00<br />

C. Travelling expenses LS 0.50<br />

D. Minor works:<br />

Restructuring of DIET Building LS 0.50<br />

E. Scholarship/Stipend/ Book Grant for DIET Trainees LS 7.60<br />

TOTAL OF DIET 85.00 21.60<br />

9. SCHOLARSHIP:<br />

A. Other charges<br />

1] Merit Scholarship<br />

a] Middle School @ Rs. 100/- pm 430 stds 10.00<br />

b] High School @ Rs. 150/- pm<br />

2] Special Scholarship<br />

270 stds<br />

a] Middle School @ Rs. 60/- pm 2750 stds 40.00<br />

b] High School @ Rs. 80/- pm 2100 stds<br />

3) Hostel stipend 200 stds 2.00<br />

4) Sainik School, Imphal 22 stds 11.00<br />

5) Annual token grant to Banasthali 13 stds 0.50<br />

6) Armed Force Children LS 2.50<br />

7) RIMC, Dehradun 3 stds 1.00<br />

7) National talent Search 200 stds 1.00<br />

Total of SCHOLARSHIP 343.70 68.00


- 260 -<br />

SCHOOL EDUCATION DEPARTMENT<br />

Sl. No. Name of Scheme<br />

Tenth Plan<br />

Approved<br />

(Rupees in lakh)<br />

Annual Plan 2004-05<br />

Outlay Physical Financial<br />

10. S.C.E.R.T.:<br />

A. Maintenance of existing post 25 37.00<br />

B. Office expenses LS 3.00<br />

C. Travelling expenses LS 1.50<br />

D. Publication LS 1.00<br />

E. Award of stipend/Scholarship 5 -<br />

F. Rents 1 0.40<br />

G. Prof. charges<br />

H. Other charges<br />

LS 0.10<br />

1) Training for organising consultation<br />

meeting for curriculum<br />

LS 0.23<br />

2) Training under Vocational Guidance<br />

and Counselling<br />

LS 0.83<br />

3) For implementation of MLL Programme LS 0.87<br />

4) Training of Head Teacher under C.C.E. LS 1.21<br />

5) For implementation of Educational<br />

Technology Programme<br />

LS 1.12<br />

6) Training for implementation of<br />

Teacher Education Programme<br />

LS 0.74<br />

TOTAL OF SCERT 580.00 47.00<br />

11. SCIENCE PROMOTION :<br />

A. Maintenance of existing staff 10 13.00<br />

B. Office Expenses LS 1.00<br />

C. Travelling Expenses LS 0.50<br />

D. Award / scholarship<br />

E. Other Charges<br />

300 stds 2.00<br />

1) Training of Science and Mathematics 200 tchrs. 2.19<br />

2) Organization of Science Fair/Seminar LS 0.99<br />

3) Implementation of Modified CLASS LS 6.07<br />

4) For training of Middle School Teachers LS 0.94<br />

5) For training of H/S Teachers in Science<br />

and Mathematics<br />

LS 1.37<br />

6) For organisation of Eastern India Science Fair LS 1.25<br />

7) Science Equipment to HSS/Chemicals for HSS LS 3.00<br />

TOTAL OF SCIENCE PROMOTION 299.50 32.31<br />

12. GOVT. HIGH SCHOOL :<br />

A. 1) Maintenance of existing Staff 166 205.00<br />

2) Salary of Officiating/Substitute Teachers LS 5.00<br />

3) Upgradation of Aided into Government 10 10.00<br />

B. Office Expenses LS 5.00<br />

C. Maintenance of Buildings LS 1.00<br />

TOTAL OF GOVT. HIGH SCHOOL 1501.00 226.00


- 261 -<br />

SCHOOL EDUCATION DEPARTMENT<br />

Sl. No. Name of Scheme<br />

Tenth Plan<br />

Approved<br />

(Rupees in lakh)<br />

Annual Plan 2004-05<br />

Outlay Physical Financial<br />

13. NON-GOVT. HIGH SCHOOL :<br />

A. Grant-in-Aid for —<br />

1] Maintenance of existing staff 425 572.00<br />

2] GIA for Govt. Aided H/S 132 schools 82.00<br />

3] Matching contribution of CPF LS 5.00<br />

4] DCRG LS 1.00<br />

TOTAL OF NON-GOVT. HIGH SCHOOL 3158 660.00<br />

14. GOVT. HIGHER SECONDARY SCHOOL<br />

A. 1] Maintenance of existing staff 221 330.00<br />

2] Leave/Training Officiating salary LS 4.00<br />

3] Salary of PGT Teacher on fixed pay LS 3.00<br />

B. Office Expenses LS 10.00<br />

C. Travelling Expenses LS 2.00<br />

D. Maintenance of Building LS 0.50<br />

E. Other Charges LS 0.50<br />

TOTAL OF GOVT. HSS 1668.00 350.00<br />

15. NON-GOVT. HIGHER SECONDARY SCHOOL<br />

A. Grant-in-Aid for :<br />

1] Maintenance of existing staff 112 247.30<br />

2] GIA for Govt. Aided H.S.S. 15 Schools 11.50<br />

3] Contribution of CPF LS 2.00<br />

4] DCRG LS 1.00<br />

TOTAL OF NON-GOVT. H.S.S. 1009.00 261.80<br />

16. VOCATIONALISATION OF SECONDARY EDUCATION<br />

A. Salary 26 43.00<br />

B. Matching Share of Salary of VSE Staff 6 3.29<br />

Total of Vocationalisation of Sec. Education 46.29<br />

TOTAL OF SECONDARY EDUCATION 8645.00 1713.00<br />

III. ADULT EDUCATION<br />

17. DIRECTION & ADMINISTRATION<br />

A. Maintenance of existing Staff 1 0.50<br />

B. Wages LS 0.70<br />

C. Office Expenses LS 2.00<br />

D. Publication of Meichher 12 issues 4.50<br />

E. Matching contribution of continuing Education<br />

F. Other Charges<br />

LS 29.70<br />

1) EOTOS 2500 2.50<br />

2) Incentive award 2500 1.00<br />

3) Teaching learning Materials LS -<br />

4) Celebration of ILD LS 1.50<br />

5) VAEC contingency LS -<br />

Total of Direction & Administration 152.50 42.40<br />

TOTAL OF ADULT EDUCATION 152.50 42.40


- 262 -<br />

SCHOOL EDUCATION DEPARTMENT<br />

Sl. No. Name of Scheme<br />

Tenth Plan<br />

Approved<br />

(Rupees in lakh)<br />

Annual Plan 2004-05<br />

Outlay Physical Financial<br />

IV. LANGUAGE DEVELOPMENT<br />

18. PROPAGATION OF HINDI<br />

A. Maintenance of existing staff 81 74.50<br />

TOTAL OF PROMOTION OF MIL 390.00 74.50<br />

19. SPECIAL HINDI SCHOOL [MICE]<br />

A Salary 2 3.00<br />

B. Office Expenses LS 0.50<br />

C. Travelling Expenses LS 0.10<br />

D. Advertisement<br />

E. Minor Works —<br />

LS -<br />

Repair of School Buildings LS -<br />

F. Machinery & Equipment LS -<br />

G. Other Charges LS 0.20<br />

TOTAL OF SPECIAL HINDI SCHOOL [MICE] 100.00 3.80<br />

TOTAL OF LANGUAGE DEVELOPMENT 490.00 78.30<br />

V. GENERAL<br />

20. DIRECTIONS AND ADMINISTRATION<br />

A. 1) Maintenance of existing Staff 8 11.00<br />

B. Office Expenses LS 15.00<br />

C. Travelling Expenses LS 2.00<br />

D. Maintenance of Office Building, etc. LS 2.50<br />

E. Other Charges<br />

1) Award to Teachers LS 0.50<br />

2) Hospitality of State Guest, etc. LS 1.50<br />

TOTAL 447.00 37.50<br />

21. STATISTICAL & EDUCATIONAL SURVEY<br />

A. Maintenance of existing staff 9 13.00<br />

B. Publication of Statistical Booklet LS 5.00<br />

TOTAL 115.00 18.00<br />

22. MIZORAM BOARD OF SCHOOL EDUCATION<br />

A. Grant-in-Aid for —<br />

1) Salary of +2 Staff 12 13.00<br />

2) Improvement of Library LS 1.00<br />

3) Repair & renovation of Office Building LS 2.00<br />

4) Training/Workshop/Seminar LS 6.00<br />

5) Contribution to Pension Fund LS 8.00<br />

6) DCRG LS 5.00<br />

7) GP Fund (2004-05) LS 4.00<br />

8) Improvement of Text Books & Curricula LS 1.00<br />

TOTAL OF MBSE 226.00 40.00


Sl. No. Name of Scheme<br />

- 263 -<br />

SCHOOL EDUCATION DEPARTMENT<br />

Tenth Plan<br />

Approved<br />

(Rupees in lakh)<br />

Annual Plan 2004-05<br />

Outlay Physical Financial<br />

23. PHYSICAL EDUCATION<br />

A. 1) Maintenance of existing Staff 5 8.50<br />

B. Office Expenses LS 2.50<br />

C. Travelling Expenses LS 0.50<br />

D. Material Supply LS 3.00<br />

E. Scholarship / Stipend - -<br />

F. Other Charges<br />

Organization of School Sports<br />

i) Organization of Zonal Sports —<br />

a) Primary School Zonal Sports 185 Zones 4.62<br />

b) Middle School Zonal Sports 123 Zones 4.34<br />

ii) <strong>Mizoram</strong> School Games Group ‘A’ [H/S Section] LS 8.00<br />

iii) <strong>Mizoram</strong> School Games Group ‘B’ [H/S/S Section] LS 6.46<br />

iv) National School Games LS 1.44<br />

v) Affiliation Fee to S.G.F.I. LS 0.30<br />

vi) Printing of Certificate for M/S & P/S Zonal Sports LS 1.54<br />

vii) District High School Sports 8 Districts 3.30<br />

TOTAL OF PHYSICAL EDUCATION 442.50 43.00<br />

TOTAL OF GENERAL 788.00 140.00<br />

TOTAL OF SCHOOL EDUCATION 19383.00 5136.00


Schem<br />

e<br />

- 267 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

Name of Schemes<br />

HIGHER & TECHNICAL EDUCATION<br />

I N D E X<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Revenue Capital Total<br />

Remarks<br />

1 2 3 4 5 6<br />

2202 – General Education / 03 – University & Higher Education<br />

I Direction & Administration 32.60 - 32.60<br />

II Govt. Colleges 131.00 - 131.00<br />

III C.T.E. 11.40 - 11.40<br />

IV Collegiate Hostel 15.60 7.00 22.60<br />

V Asst. to Non-Govt. Colleges 725.80 - 725.80<br />

VI Res. Sc. College 71.59 5.00 76.59<br />

VII MSB 6.01 - 6.01<br />

05 – Language Development<br />

VIII Miz. Hindi Trg. College 17.00 - 17.00<br />

TOTAL OF 2202-GEN. EDN. 1011.00 12.00 1023.00<br />

2203 – Technical Education<br />

A. Direction & Admn. 13.51 - 13.51<br />

B. M.S.C.T.E. 1.12 - 1.12<br />

C. M.P.L. 37.70 - 37.70<br />

D. W.P(A) 47.64 - 47.64<br />

E. Engineering College 0.03 - 0.03<br />

TOTAL OF 2203-Tech. Edn.(Plan) 100.00 - 100.00<br />

EXTERNAL AIDED PROJECT (World Bank Assistance)<br />

F. Estt. of SPIU/DTE/BTE 90.24 7.00 97.24<br />

G. Women Polytechnic, Aizawl 295.56 318.00 613.00<br />

H. <strong>Mizoram</strong> Polytechnic, Lunglei 289.20 320.00 609.20<br />

TOTAL OF World Bank Assistance 675.00 645.00 1320.00<br />

Scheme – I: Direction & Administration<br />

1. Maintenance of existing Post:<br />

Sl.<br />

No.<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1 Salary 1 9.30


- 268 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

2. Establishment of Engineering Cell: The Department is badly in need of Technical<br />

hands to look after the existing buildings which are departmentally constructed and<br />

maintained and also for execution of work under Non-Lapsable Pool fund, CSS, etc. The<br />

existing post of Junior Engineer may be upgraded to the post of one Assistant Engineer<br />

and, therefore, an Assistant Engineer may be deputed to this Department during 2005-06.<br />

For maintenance of the Deputed Asst. Engineer, a provision of Rs.0.10 lakh during the<br />

Annual Plan 2005-06 is approved.<br />

3. Establishment of Statistical Cell: It is essential to collect and maintain the<br />

Statistical Data of the Department which is required by Govt. of India for the purpose of<br />

framing Plans and Programmes through Ministry of Human Resources Development. to<br />

prepare precise, concrete, factual and latest data, the existing one Inspector of Statistics is<br />

far from adequate, the post of Research Officer, Sub-Inspector of Statistic and IV Grade are<br />

approved to be created to which Research Officer and Sub-Inspector of Statistic may be<br />

deputed to this Department during the 2004-05.<br />

Sl.<br />

No.<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

a] Research Officer [8000 – 13500] 1 0.10<br />

b] Sub-Inspector of Statistic [5000 – 8000] 1<br />

c] IV Grade [2650 – 4000] 1<br />

Sub-Total 3 0.10<br />

4. Wages LS 0.50<br />

5. Office expenses LS 7.00<br />

6. Travelling expenses LS 2.10<br />

7. Maintenance/Minor works LS 1.00<br />

8. Advertisement LS 0.50<br />

9. Refresher Course/ Seminar/ O.C etc. LS 9.00<br />

10. Motor vehicle LS 3.00<br />

TOTAL OF DIRECTION & ADMINISTRATION 32.60<br />

Scheme – II: Govt. Colleges<br />

1. Maintenance of existing posts:<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

Salary 82 111.80<br />

2. Guest Lecturers:<br />

Since the Government has banned appointment of substitute teachers against those<br />

teachers who were on study leave/ maternity leave, etc., it is extremely essential to<br />

engage Guest Lecturers when classes are in full swing. And also when new subjects<br />

are introduced engagement of Guest Lecturers for a considerable period of time is<br />

required before regular Lecturers are appointed. The following is the approved<br />

requirement of fund during 2004-05.


- 269 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

Subject<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

1] Sociology 1<br />

2] Psychology 1<br />

3] Public Administration 1<br />

4] Commerce 1<br />

5] Economics 1 1.00<br />

6] English 1<br />

7] Political Science 1<br />

8] Geography 1<br />

9] Botany 1<br />

10] Mathematics 1<br />

SUB- TOTAL 10 1.00<br />

3. Provincialisation of Deficit College:<br />

During 2005-06, 12[twelve] Colleges are approved to provincialised. A token<br />

provision of Rs. 0.20 lakh is earmarked for provincialisation of 12[twelve] Deficit Colleges<br />

during 2004-05.<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Particulars Physical Financial<br />

I] Recurring Expenditure LS 0.10<br />

II] Non-recurring Expenditure LS 0.10<br />

SUB-TOTAL 0.20<br />

4. Minor works LS 4.00<br />

5. O.E LS 5.70<br />

6. T.E LS 2.00<br />

7. Advertisement LS 0.70<br />

8. M.V. LS 1.00<br />

9. O.C. LS 4.60<br />

TOTAL OF GOVT. COLLEGES 131.00<br />

Scheme – III: College of Teacher Education<br />

1. Maintenance of existing post:<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

Salary 4 8.80<br />

2. T.E LS 0.30<br />

3. O.E. LS 1.00<br />

4. Advertisement LS 0.30<br />

5. O.C LS 1.00<br />

Total of CTE 11.40


- 270 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

Scheme – IV: Hostel for Post Matric Students<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

1] Wages LS 5.00<br />

2] Rent 4 9.00<br />

3] Other Charges LS 1.40<br />

4] Maintenance/Minor works LS 0.20<br />

5] Construction of Boys Hostel at Shillong 1 1.00<br />

6] Construction of approach road at Boys Hostel,<br />

Luangmual 1 6.00<br />

TOTAL OF HOSTEL 22.60<br />

Scheme – V: Assistance to Non-Govt. Colleges<br />

Grants-in-aid for Maintenance of Existing posts in Deficit Colleges<br />

1. Maintenance of existing post:<br />

Sl. No. Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

a] Salary 417 702.70<br />

2. Guest Lecturer:<br />

Since the Govt. has banned appointment of substitute teachers against those<br />

teachers who were on study leave/ Maternity leave etc. It is extremely essential to<br />

engage Guest Lecturers when classes are in full swing. And also for fulfilment of<br />

UGC Norms engagement of Guest Lecturers for a considerable period of time is<br />

required before regular Lecturers are appointed a token provision of Rs. 10 lakh is<br />

approved during 2004 – 2005.<br />

Sl. No. Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

3. Matching contribution of CPF LS 10.00<br />

4. Gratuity/ pension fund etc. LS 1.00<br />

5. Non-recurring grants for existing Deficit Colleges<br />

and Private Colleges LS 2.00<br />

6. Up-gradation of Private College to Deficit Status<br />

For up-gradation to Deficit Status/ Grants-in-aid to Law Colleges, etc., a provision<br />

of Rs 0.10 lakh is approved.<br />

TOTAL OF ASSISTANCE TO NON-GOVT. COLL. 725.80


- 271 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

Scheme – VI: Zirtiri Residential Science College<br />

1. For maintenance of existing staff<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

a] Senior Lecturer 2 58.75<br />

b] Lecturer 21<br />

2. T.E. LS 0.80<br />

3. O.E. LS 2.00<br />

4. Adv. LS 0.20<br />

5. M & E LS 0.50<br />

6. M & S LS 0.50<br />

7. M.V. LS 0.50<br />

8. O.C. LS 3.00<br />

9. Major works for site preparation at Zirtiri<br />

Residential Science College, Mualpui 5.00<br />

10. Minor Works LS 5.34<br />

TOTAL OF ZRSC 76.59<br />

Scheme - VII: <strong>Mizoram</strong> Scholarship Board<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

1. O.E. LS 1.51<br />

2. Advertisement LS 0.50<br />

3. Stipend / Scholarship LS 4.00<br />

Total of <strong>Mizoram</strong> Scholarship Board 6.01<br />

D. Scheme - VIII: Language Development<br />

<strong>Mizoram</strong> Hindi Training College:<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan<br />

Physical Financial<br />

1. For maintenance of existing post 7 14.49<br />

2. O.E. LS 1.00<br />

3. T.E LS 0.50<br />

4. O.C LS 1.00<br />

5. Scho/Stip LS 0.01<br />

Total of <strong>Mizoram</strong> Hindi Training College 17.00<br />

GRAND TOTAL OF 2202- Higher Education [Plan] 1023.00


- 272 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

TECHNICAL EDUCATION<br />

E. Scheme – A: Direction & Administration<br />

1. Maintenance of existing post:<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

Salary 1 4.51<br />

2. Wages LS 1.00<br />

3. Travelling Expenses LS 0.50<br />

4. Office Expenses LS 1.00<br />

5. Advertisement LS 0.50<br />

6. Scho. to NERIST/ Stipend LS 5.00<br />

7. Misc. expenditure for IT Development / O.C. LS 1.00<br />

TOTAL OF Direction & Administration : 13.51<br />

Scheme – B: <strong>Mizoram</strong> State Council for Technical Education<br />

Sl. No. Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1. Travelling Expenses LS 0.30<br />

2. Office Expenses LS 0.02<br />

3. Advertisement LS 0.30<br />

4. Other Charges LS 0.50<br />

TOTAL OF M.S.C.T.E. 1.12<br />

Scheme - C: <strong>Mizoram</strong> Polytechnic, Lunglei<br />

1. Maintenance of Existing Posts:<br />

Sl. No. Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1. Salary 14 14.48<br />

2. Travelling Expenses LS 0.50<br />

3. Office Expenses LS 1.00<br />

4. Scholarship / Stipend / Book grant LS 21.20<br />

5. Materials and Supply LS 0.01<br />

6. Other Charges LS 0.50<br />

7. Maintenance / Minor Works LS 0.01<br />

TOTAL OF MIZORAM POLYTECHNIC 37.70


- 273 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

Scheme – D: Women Polytechnic, Aizawl<br />

1. Maintenance of existing posts:<br />

Sl. No. Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1. Salary 25 28.14<br />

2. Wages LS 0.50<br />

3. Travelling Expenses LS 0.30<br />

4. Office Expenses LS 2.00<br />

5. Advertisement LS 0.30<br />

6. M & E LS 0.10<br />

7. Purchase of Library Books / M & S LS 0.10<br />

8. M.V LS 0.20<br />

9. Scholarship / Stipend / Book grants LS 11.00<br />

10. Other Charges LS 1.00<br />

11. Rent 1 4.00<br />

TOTAL OF WOMEN POLYTECHNIC: 47.64<br />

Scheme – E: <strong>Mizoram</strong> Engineering College<br />

Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1. For Misc. Expenses LS 0.03<br />

TOTAL OF ENGINEERING COLLEGE 0.03<br />

GRAND TOTAL OF TECHNICAL EDUCATION 100.00<br />

EXTERNAL AIDED PROJECT FOR WORLD BANK ASSISTANCE<br />

The Department is availing World Bank Project for strengthening of Women<br />

Polytechnic, Aizawl and <strong>Mizoram</strong> Polytechnic, Lunglei and establishment of Directorate of<br />

Technical Education and strengthening of <strong>Mizoram</strong> State Council for Technical Education<br />

for funding from the World Bank under 3 rd Technician Education Project of World Bank<br />

Assistance. The Project has been approved by Govt. of India and the World Bank, Legal<br />

Agreement has been signed after Negotiation was done in Washington with the World Bank<br />

in July 2000. The Project has become effective from January, 2001.<br />

Out of the total Project Cost of Rs. 3615.00 lakhs, the Project Cost of Rs. 1320.00<br />

lakhs will be taken up during 2004-05 and expenditure is to be reimbursed by the World<br />

Bank. The Project was started during 9 th Plan and is expected to be completed during the<br />

10 th Five Year Plan 2002-07.<br />

One of the conditions laid down by the World Bank for availing the Assistance is<br />

that the Project should be taken up as a State Sector Plan by the concerned State by<br />

providing the required amount in the Plan either from EAP or State fund to be reimbursed<br />

by the World Bank as soon as the expenditure is incurred within less than a period of three<br />

months. The World Bank Project is to last for 5 years and EAP provide by Govt. of India<br />

from time to time may be reflected in the Plan Budget as required by the State Govt.<br />

The condition was approved by the Planning Department, Govt. <strong>Mizoram</strong> vide their<br />

I.D. No. 28014/1/192/LG dated 24.3.2000 with the clarification that the project relating to<br />

existing and proposed Polytechnics to be implemented with the World Bank funding will<br />

be earmarked with required fund under External Aided Project in the Sectoral allocation of<br />

Plan fund depending on the duration of the Project.


- 274 -<br />

HIGHER & TECHNICAL EDUCATION DEPARTMENT<br />

Scheme – F: Establishment of SPIU / DTE / BTE (EAP)<br />

Sl. No. Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1. Maintenance of existing post 14 9.24<br />

2. Furniture [M & S] LS 9.00<br />

3. Equipment [M & E] LS 10.00<br />

4. Vehicles / Stationery [O.E] LS 6.00<br />

5. Local & Foreign Trng./Fellowship [T.E] LS 15.00<br />

6. Book LRs/local Consultants/O&M/Consumable [O.C] LS 40.00<br />

7. Minor Works LS 7.00<br />

8. Advertisement LS 1.00<br />

TOTAL OF SPIU 97.24<br />

Scheme – G: WOMEN POLYTECHNIC, AIZAWL (EAP)<br />

Sl. No. Particulars<br />

(Rs. in lakhs)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1 Maintenance of existing posts 16 11.76<br />

2. Civil works [Major Works] 1 318.00<br />

3. Furniture [M & S] LS 27.00<br />

4. Equipment [M & E] LS 154.00<br />

5. Vehicles / Stationery [O.E] LS 7.00<br />

6. Local Training / Fellowships [T.E] LS 16.00<br />

7. Book and LRs / consumable/ Local<br />

Consultants / O & M [O.C] LS 56.00<br />

8. Rent LS 6.00<br />

9. Advertisement LS 0.30<br />

10. Motor vehicle [M.V.] LS 12.00<br />

11. Scholarship / Stipend LS 5.50<br />

TOTAL OF WOMEN POLYTECHNIC, AIZAWL 613.56<br />

Scheme - H: <strong>Mizoram</strong> Polytechnic, Lunglei (EAP)<br />

Sl. No. Particulars<br />

(Rupees in lakh)<br />

Approved Annual Plan 2004-05<br />

Physical Financial<br />

1. Maintenance of existing posts 10 7.86<br />

2. Civil works [Major Works] 1 320.00<br />

3. Furniture [M & S] LS 24.00<br />

4. Equipment [M & E] LS 155.00<br />

5. Vehicles / Stationery [O.E] LS 8.00<br />

6. Local Training / Fellowship [T.E] LS 17.00<br />

7. Books & LRs / Local Consultants / O & M/<br />

Consumable [O.C] LS 57.54<br />

8. Rent LS 1.00<br />

9. Advertisement LS 0.30<br />

10. Motor Vehicle [M.V.] LS 13.00<br />

11. Scholarship / Stipend LS 5.50<br />

TOTAL OF MIZORAM POLYTECHNIC, LUNGLEI 609.20<br />

GRAND TOTAL OF E.A.P. 1320.00


- 277 -<br />

SPORTS & YOUTH SERVICES DEPARTMENT<br />

SPORTS & YOUTH SERVICES<br />

The Department of Sports & Youth Services, <strong>Mizoram</strong> was established and<br />

bifurcated from Education Department on 8th December 1986 into a full-fledged<br />

Department with the sole purpose of promoting Sports of different disciplines and youth<br />

activities including Adventure Sports, Scouts & Guides, National Cadet Corps and National<br />

Service Scheme amongst the youths in <strong>Mizoram</strong>.<br />

Promotion of Sports also includes provision/construction of much needed Sports<br />

infrastructural facilities like Indoor Stadia, Open Stadia, Playground at city and town.<br />

In spite of limited Officers and Ministerial staff as well as a handful of Coaches and<br />

other Field Staff of the Department, the Department within a short span of 16 years,<br />

achieved a commendable records. The name <strong>Mizoram</strong> has been brought to the Notice of<br />

the Sports arena not only at the National Level but also at the International Level.<br />

With a limited allocation of fund, the Department performed to the best of its<br />

ability by producing World Class Boxer and World Class Archer and Wushu players. More<br />

International players are coming up in the discipline of Football. Countable member of<br />

players joined the famous Mohammedan and East Bengal Football Clubs and not only this<br />

four Mizo players have been included in Indian Junior Team participated in the recently<br />

held AFC Tournament in Japan.<br />

The Department proposed to upgrade our existing Scheme and new establishment<br />

of NCC Bn., /NCC Company and District Administrations like District Sports & Youth<br />

Offices, Kolasib and Champhai.<br />

The financial break-up of the approved expenditure under various heads of the<br />

Department are as below:<br />

(A) DIRECTION: The provision under direction and break-up of item-wise expenditure<br />

is as enumerated under: -<br />

1) Salaries - 26.50 lakhs<br />

2) Wages - 6.90 lakhs<br />

3) Domestic Travel expenses - 2.50 lakhs<br />

4) Foreign Travel Expenses - 1.00 lakhs<br />

5) Office expenses - 3.20 lakhs<br />

6) Rents, Rates, Taxes - 0.70 lakhs<br />

7) Supplies & Materials/Equipments<br />

a) I.T Purchase of Computer -3 nos. & Accessories - 3.00 lakhs<br />

b) Purchase of Sports Goods etc. - 3.00 lakhs<br />

8) Advertising & Publicity - 1.30 lakhs<br />

9) Minor Works - 2.00 lakhs<br />

10) Tournaments/Participation/coaching etc. (other charges) - 5.20 lakhs<br />

TOTAL : - 55.30 lakhs<br />

(B) DISTRICT ADMINISTRATION :<br />

There are 3 (three) District Offices under Sports & Youth Services Department at<br />

present (i) District Sports & Youth Office, Lunglei (ii) District Sports & Youth Office, Kolasib<br />

and (iii) District Sports & Youth Office Champhai.


- 278 -<br />

SPORTS & YOUTH SERVICES DEPARTMENT<br />

(1) District Sports & Youth Office, Lunglei :<br />

(a) Salaries - 9.20 lakhs<br />

(b) Domestic Travel Expenses - 0.10 lakhs<br />

(c) Office expenses - 1.00 lakhs<br />

(d) Supplies and materials - 0.80 lakhs<br />

(e) Advertising and Publicity - 0.20 lakhs<br />

(f) Minor works - 2.00 lakhs<br />

(g) Participations/coaching etc. - 1.90 lakhs<br />

TOTAL : - 15.20 lakhs<br />

(2) District Sports & Youth Office, Kolasib :<br />

It was inaugurated by the Hon’ble Minister, Sports etc. on 27.4.2000 and now Coach<br />

Gr.-I has been posted temporarily to look after the District Office. The ministerial staff<br />

have not been filled up and posted to this District till date due to ban of filling up the<br />

vacant post and financial constraint while the following posts have already been created<br />

for this District Sports & Youth Office.<br />

The approved expenditure is as below :<br />

(a) Salaries - 0.10 lakhs<br />

(b) Wages - 2.70 lakhs<br />

(c) Office expenses - 0.80 lakhs<br />

(d) Rents, Rates, Taxes - 0.60 lakhs<br />

(e) Supplies & materials - 0.50 lakhs<br />

(f) Participations/Tournaments/coaching etc.(other charges) - 2.30 lakhs<br />

TOTAL : - 7.00 lakhs<br />

(3) District Sports & Youth Office, Champhai:<br />

Since the Government created this District Office, the posts for this District Office<br />

has not been created till date due to ban on creation under the State Government of<br />

<strong>Mizoram</strong>. It is proposed to establish to function in full - fledged District Office and in<br />

Kolasib. The requirement of fund has been incorporated in the Budget Estimated for 2004-<br />

2005.<br />

The approved expenditure in as below :<br />

(a) Salaries - 0.10 lakhs<br />

(b) Wages - 2.60 lakhs<br />

(c) Office expenses - 0.50 lakhs<br />

(d) Rents, Rates, Taxes - 0.30 lakhs<br />

(e) Supplies & materials - 0.50 lakhs<br />

(f) Participation/Tournaments/coaching, etc.(other charges) - 1.80 lakhs<br />

TOTAL : - 5.80 lakhs<br />

(C) National Cadet Corp (N.C.C) :<br />

There is only one NCC Company under Sports & Youth Servies Department since so<br />

far i.e. (i) 20 <strong>Mizoram</strong> NCC Indep Coy and now establishing two divisions like Battalion and<br />

Company i.e. (ii) 1 <strong>Mizoram</strong> NCC Bn. and (iii) 20 <strong>Mizoram</strong> NCC Girls Cadet Coy. Out of<br />

which, 20 <strong>Mizoram</strong> Indep Coy only is functioned in full fledged establishment since so far<br />

from the <strong>Mizoram</strong> District under Assam State Government. And another 2 started<br />

functioning during 2004 -2005.


- 279 -<br />

SPORTS & YOUTH SERVICES DEPARTMENT<br />

The break-up of expenditure an item-wise are enumerated as the following :-<br />

(1) 20- <strong>Mizoram</strong> NCC Indep Coy. :<br />

(a) Salaries - 3.27 lakhs<br />

(b) Domestic Travel expenses - 0.10 lakhs<br />

(c) Office expenses - 0.63 lakhs<br />

(d) Supplies & materials - 0.20 lakhs<br />

(e) Coaching/Training Camps etc(other charges) - 10.80 lakhs<br />

TOTAL : - 15.00 lakhs<br />

(2) I <strong>Mizoram</strong> NCC Bn.<br />

As approved by the Ministry of Defence, Government of India and with the<br />

approval of Government of <strong>Mizoram</strong>, Planning Department in principle which is received<br />

recently the 1 <strong>Mizoram</strong> NCC Bn. has been established and head of this Bn. and other<br />

Officers and Ministerial staff are being posted from the Headquarter Shillong and Ministry<br />

of Defence, Government of India. The Admn. Officers have already joined the post and<br />

some of the civilian staff are manned by the existing staff of 20- <strong>Mizoram</strong> NCC Indep. Coy<br />

to initiate the 1st <strong>Mizoram</strong> NCC Battalion Govt. of <strong>Mizoram</strong> posted 1 Head Asst., 1 UDC & 1<br />

LDC very recently. Pay & Allowances of the staff are to be borne by the <strong>Mizoram</strong> State<br />

Government Casual Employees such as 1(one) Storekeeper, 2(two) Drivers Skilled and<br />

3(three) Group ‘D’ unskilled are also sanctioned.<br />

The minimum requirement of fund for this Battalion is as below :-<br />

(a) Wages - 0.75 lakhs<br />

(b) Office expenses - 2.05 lakhs<br />

(c) Domestic Travelling Expenses - 0.90 lakhs<br />

(d) Rent - 1.25 lakhs<br />

(e) Other charges/Participations etc. - 5.15 lakhs<br />

TOTAL : - 10.10 lakhs<br />

(3) NCC Girls Cadet Coy. :<br />

This Company is also proposed and approved in principle by the Planning<br />

Department, Government of <strong>Mizoram</strong> with Govt. of India, Ministry of Defence Ministry as<br />

mentioned above. The minimum approved fund for establishment of this Company is as<br />

below:<br />

(a) Office expenses - 0.05 lakhs<br />

(b) Other charges/Participations etc. - 0.05 lakhs<br />

TOTAL : - 0.10 lakhs<br />

(D) Scouts & Guides :<br />

The Scouts & Guides movement in the State of <strong>Mizoram</strong> is run by the Department<br />

of Sports & Youth Services. During 2004-2005, the Department proposed conduct various<br />

Training Camps and Courses and participations at the National/International Programmes.<br />

The approved outlay in item-wise expenditure are as below :<br />

(a) Salaries - 0.80 lakhs<br />

(b) Office expenses - 1.00 lakhs<br />

(c) Supplies & Materials - 1.00 lakhs<br />

(d) Advertising & Publicity - 0.20 lakhs<br />

(e) Trainings / participations etc. (other charges) - 2.80 lakhs<br />

TOTAL : - 5.80 lakhs


- 280 -<br />

SPORTS & YOUTH SERVICES DEPARTMENT<br />

(E) Youth Adventure :<br />

Promotion of all forms of Adventure activities in the State of <strong>Mizoram</strong> is the<br />

responsibility of Adventure Wing of Sports & Youth Services Department. The Adventure<br />

Wing of the Department proposed conducting Trekking, Watermanship, Mountaineering<br />

and Refresher Course etc. at Regional & National and International level.<br />

The Break-up of approved financial outlay is as below :<br />

(a) Salaries - 6.00 lakhs<br />

(b) Domestic Travel expenses - 0.10 lakhs<br />

(c) Office expenses - 1.00 lakhs<br />

(d) Supplies and materials - 4.40 lakhs<br />

(e) Conduct of Trekking etc. (other charges) - 0.50 lakhs<br />

TOTAL :- - 12.00 lakhs<br />

(F) National Service Scheme (NSS) :<br />

Programme implementation under NSS is co-ordinated by Sports & Youth Services<br />

Department. The approved funding scheme under NSS is 75:25 basis. The matching Share<br />

of the Department is as follows: -<br />

(a) Grant-in-Aid Matching Share. - 24.00 lakhs<br />

(G) Youth Welfare Activities (General Youth):<br />

Youth Welfare activities basically covered all the activities of the programmes<br />

under Youth Hostel Association of India and general Youth programmes such as conduct<br />

of Blood Donation Camp, Tree Planting includes Seminar/Workshop and participation at<br />

various YHAI- National Trekking programmes like Himalayan Trekking, Desert Trekking<br />

and other National and International programmes.<br />

(a) Office expenses - 0.10 lakhs<br />

(b) Other charges/participations etc. - 5.40 lakhs<br />

TOTAL : - 5.50 lakhs<br />

(H) Sports & Games :<br />

The Coaching Wing of Sports & Youth Services Department is responsible for<br />

conduct of various Sports Coaching and participations at National Level, International<br />

Level Tournament. During the year, 2004-05, Department approved to conduct/participate<br />

the various Tournaments.<br />

(a) Salaries - 9.10 lakhs<br />

(b) Domestic Travel Expenses - 0.50 lakhs<br />

(c) Office expenses - 1.00 lakhs<br />

(d) Supplies & Materials - 0.80 lakhs<br />

(e) Scholarship/Stipend - 0.80 lakhs<br />

(f) Participation/coaching/incentive cash award etc. - 12.00 lakhs<br />

(Other charges)<br />

TOTAL : - 24.20 lakhs


- 281 -<br />

SPORTS & YOUTH SERVICES DEPARTMENT<br />

( I ) <strong>Mizoram</strong> State Sports Council:<br />

<strong>Mizoram</strong> State Sports Council is responsible for promotion of different disciplines<br />

through State Level Association and development of Sports Infrastructure in the State. It is<br />

also responsible for creation of Sports Infrastructure in the State. Very recently Govt. of<br />

India agreed in principle for construction of Sports Complex at Aizawl and the following<br />

6(six) Districts i.e. Aizawl, Lunglei, Lawngtlai, Champhai, Kolasib and Saiha as follows: -<br />

1. Matching Share of C.S.S. - 100.00 lakhs<br />

2. Sports Promotional Programmes/<br />

Maintenance of infrastructures - 50.00 lakhs<br />

3. Construction/maintenance of<br />

Bungkawn Indoor Stadium - 3.00 lakhs<br />

TOTAL : - 153.00 lakhs<br />

GRAND TOTAL OF PLAN SCHEME : - 333.00 lakhs


- 286 -<br />

ART & CULTURE DEPARTMENT<br />

ART & CULTURE<br />

(ABSTRACT)<br />

1. Direction -<br />

In lakhs of Rupees<br />

39.33<br />

2. Administration - 2.08<br />

3. Publication Board - 10.30<br />

4. District Administration - 4.00<br />

5. Institute of Music & Fine Arts - 7.13<br />

6. Cultural Programme - 6.20<br />

7. Improvement of Vanapa Hall - 4.06<br />

8. Archaeology - 1.22<br />

9. Archaeological Survey - 0.70<br />

10. Archives - 2.99<br />

11. State Library - 17.73<br />

12. District Library - 6.16<br />

13. Museum & Art Gallery - 5.10<br />

14. District Museum - 0.85<br />

15. Anthropological Survey - 0.75<br />

16. District Gazetteer - 1.40<br />

TOTAL - 110.00<br />

The Art & Culture Department is undertaking the task of promotion and<br />

preservation of Mizo culture in general. Survey of Archaeological, Anthropological and<br />

vanishing cultural heritage of <strong>Mizoram</strong> is being given importance. Promotion of Literature<br />

and Public Library Services are also becoming a big task of the Department. The<br />

Department is consisting of the following Wings: —<br />

1. Direction<br />

2. Administration<br />

3. Publication Board<br />

4. District Administration<br />

5. Institute of Music & Fine Arts<br />

6. Cultural Programme<br />

7. Improvement of Vanapa Hall<br />

8. Tribal Research Institute<br />

9. Archaeology<br />

10. Archaeological Survey<br />

11. Archives<br />

12. Public Library (State, District Libraries)<br />

13. Museum (State & District Museum)<br />

14. Anthropological Survey<br />

15. District Gazetteer<br />

1. THE DIRECTORATE OF ART & CULTURE: Direction and supervision of all<br />

activities under the Department is under the Directorate. Various activities pertaining to<br />

Mizo culture have been undertaken through the Directorate. Sending cultural troupes<br />

outside <strong>Mizoram</strong>, receiving cultural troupes from outside <strong>Mizoram</strong> and giving cultural<br />

programmes at the reception functions for VIPs, VVIPs and high dignitaries from outside<br />

<strong>Mizoram</strong> are some of the most important and unavoidable functions and duties of this<br />

Department.


- 287 -<br />

ART & CULTURE DEPARTMENT<br />

The Annual Plan provision for 2004-05 is approved as under: —<br />

(1) Appointment (Salary)<br />

Existing (a) Driver - 1 (Rs.3050-4590) 1.08<br />

(2) Wages (Driver 4 nos., 2 Art Instructors & 1<br />

Anthropological Survey Wing - Skilled I) - 1.75<br />

(3) Travelling Expenses - 1.60<br />

(4) Office Expenses - 6.00<br />

(5) Publication - -<br />

(6) Advertisement - 0.40<br />

(7) (a) G.I.A. to Voluntary Organizations - 7.00<br />

(8) Minor Works/Maintenance - 0.50<br />

(9) Motor Vehicle - 3.00<br />

(10) Other Charges (Participation in Inter State<br />

Cultural Programme, Local Cultural Programmes,<br />

Celebration of Important Days, Cultural<br />

Competition and Chapchar Kut, etc.) - 18.00<br />

TOTAL - 39.33<br />

2. ADMINISTRATION:<br />

CULTURAL CENTRE: The Cultural Centre aims at preservation of cultural heritage<br />

and protection of vanishing arts by way of setting up Traditional Mizo Village with all its<br />

activities around it. The Mizo houses are now deteriorating which need replacement for<br />

which Rs.1.25 lakhs is earmarked for Approved Annual Plan 2004-2005.<br />

(1) Wages (Casual IV Grade Staff -1 no ) - 0.33<br />

(2) Minor Works for construction &<br />

maintenance of Traditional Mizo Village<br />

and erection of traditional monument - 1.25<br />

(3) Other Charges for purchase of Cultural<br />

implements materials, Hospitality, etc. - 0.50<br />

TOTAL - 2.08<br />

3. PUBLICATION BOARD: The <strong>Mizoram</strong> Publication Board Act of 1993 was passed<br />

and the Board has been constituted by the Govt. of <strong>Mizoram</strong>. At initial stage it is<br />

functioning as a cell under the supervision of Directorate of Art & Culture. Fund is<br />

provided in the form of Grants-in-Aid for which a provision is earmarked with Mizo<br />

Academy of Letters as follows :-<br />

(1) Wages - -<br />

(2) Travelling Expenses - -<br />

(3) Office Expenses - 0.30<br />

(4) Grant-in-Aid - 10.00<br />

TOTAL - 10.30<br />

4. DISTRICT ADMINISTRATION: For better Administration and speedy discharge of<br />

works, District Office at Lunglei had been started since 1998 with existing staff of District<br />

Library Office and a few officers and staff drawn from other offices and attached<br />

temporarily as stop gap arrangement. This District Office is to cater the need of the whole<br />

of southern region. The Annual Plan aims at gradual improvement and expansion of the<br />

establishment construction of District Office is projected. The Annual Budget Provision is<br />

approved as follows: -


- 288 -<br />

ART & CULTURE DEPARTMENT<br />

(1) Wages ( LDC-Cum-Typist, Driver & IV Grade Staff )- 1.30<br />

(2) Travelling Expenses - 0.20<br />

(3) Office Expenses - 0.90<br />

(4) Rents - 0.60<br />

(5) Other Charges - 1.00<br />

TOTAL - 4.00<br />

5. INSTITUTE OF MUSIC & FINE ARTS: The Institute of Music & Fine Arts consists<br />

mainly four trades like traditional music & dances, modern music, drama and fine arts. It<br />

conducts training in cultural dances and modern music regularly. Drama and fine arts<br />

have not been taken up much due to the fund constraints. Small beginning will be made<br />

for opening fine arts classes by engaging professionals when needed. Sophisticated<br />

Musical Instruments which have been purchased ten years back are now needed<br />

replacement for which a sum of Rs. 1.50 lakhs is earmarked. The Annual Plan is work out<br />

as follows.<br />

(1) Appointment (Salary)<br />

Existing Staff — (a) Dance Instructor - 3 (Rs.4000-6000) 3.28<br />

(2) Wages (Professional Technician –1 no.<br />

Skilled - I) - 0.55<br />

(3) Travelling Expenses - 0.30<br />

(4) Office Expenses - 1.50<br />

(5) Publication of Leaflets folders, etc. - -<br />

(6) O.C. (Purchase of Costumes, Sounds, Musical Instruments,<br />

Engagement of Trained Artists, etc.) - 1.50<br />

TOTAL - 7.13<br />

6. CULTURAL PROGRAMME: <strong>Mizoram</strong> now has involved herself more and more in<br />

national level cultural activities. The Inter State Cultural Exchange Programme is an annual<br />

feature while the local programme is increasing rapidly. The minimum requirement of<br />

fund as earmarked is as follows: -<br />

(1) Wages - 0.20<br />

(2) Travelling Expenses - 1.00<br />

(3) Office Expenses - -<br />

(4) Professional Charges - -<br />

(5) O.C. (Art Workshop, Drama, Music Training, Inter State and<br />

State Cultural Exchange Programme, Organization of<br />

Cultural Competitions, Documentation, etc.) - 5.00<br />

TOTAL - 6.20<br />

7. IMPROVEMENT OF VANAPA HALL: The only standard auditorium Vanapa Hall is<br />

equipped with costly sophisticated sound and light systems for general public utility as<br />

well as for the Government. It is very necessary that it is manned efficiently and properly<br />

maintained. Now over all repair of the Building urgently needed. The following provision is<br />

approved.<br />

(1) Existing Post (Salary)<br />

(a) Programme Coordinator - 1 (Rs.6500-10500) 1.71<br />

(2) Travelling Expenses - 0.05<br />

(3) Office Expenses - 0.50<br />

(4) Minor Works / Maintenance<br />

(Repair & Maintenance of Vanapa Hall) - 1.50<br />

(5) Other Charges - 0.30<br />

TOTAL - 4.06


- 289 -<br />

ART & CULTURE DEPARTMENT<br />

8. ARCHAEOLOGY: Proper survey of Archaeological wealth of <strong>Mizoram</strong> is being<br />

carried out in collaboration with Archaeological Survey of India. To execute the<br />

programmes, the following provision is approved.<br />

(1) Wages - 0.62<br />

(2) Travelling Expenses - 0.05<br />

(3) Office Expenses - 0.35<br />

(4) Other Charges - 0.20<br />

TOTAL - 1.22<br />

9. ARCHAEOLOGICAL SURVEY: It is felt imperative to undertake the survey and<br />

documentation of the Archaeological Wealth of <strong>Mizoram</strong>. A token provision is approved as<br />

under: -<br />

(1) Office Expenses - 0.50<br />

(2) Other Charges - 0.20<br />

TOTAL - 0.70<br />

10. STATE ARCHIVES: The main function of State Archives is to concentrate in a<br />

single repository of all the non-current records. All these records are being preserved in a<br />

scientific manner. It may be mentioned here that this year a provision of Rs. 0.84 lakhs has<br />

been earmarked under Minor Works for maintenance of Archives building. The financial<br />

implication for the Approved Annual <strong>plan</strong> 2004 - 2005 for this wing are as follows :-<br />

(1) Appointment Existing Staff (Salary)<br />

(a) Dark Room Attendant - 1 (Rs.2650-4000) -<br />

(2) Wages - 0.45<br />

(3) Travelling Expenses - 0.30<br />

(4) Office Expenses (including I.T. Programme) - 0.80<br />

(5) Advertisement - 0.10<br />

(5) Publication - -<br />

(6) Grants-in-Aid - -<br />

(7) Minor Works - 0.84<br />

(8) Other Charges (Including I.T. Programme) - 0.50<br />

TOTAL - 2.99<br />

11. PUBLIC LIBRARY:<br />

STATE LIBRARY: Since the <strong>Mizoram</strong> Public Libraries Act, 1993 has been passed by<br />

the <strong>Mizoram</strong> Legislative Assembly, gradual implementation of the act under the head State<br />

Library is proposed. In case additional fund is available the Department desired that this<br />

scheme be given priority and also proposed Casual Driver and Casual Computer Operator<br />

for this Wing. The financial implication for the Approved Annual Plan of 2004-2005 as<br />

follows: -<br />

(1) Appointment Existing (Salary)<br />

(a) Assistant Librarian - 1 (Rs.5500-9000) 1.82<br />

(2) Wages (Casual Driver 1 no ) - 0.01<br />

(3) Travelling Expenses - 0.15<br />

(4) Office Expenses - 0.91<br />

(5) Rents - 2.04<br />

(6) Publication - -<br />

(7) Grants-in-Aid for contribution fund to RRRLF- 12.00<br />

(8) Other Charges<br />

(including I.T. Programme) - 0.80<br />

TOTAL - 17.73


- 290 -<br />

ART & CULTURE DEPARTMENT<br />

12. DISTRICT LIBRARY: Under the supervision of State Library, the four District<br />

Libraries are functioning while the following approved provision.<br />

(1) Salary<br />

Existing Post — IV Grade - 1 (Rs. 2650 - 4000) 0.80<br />

(2) Travelling Expenses - 0.50<br />

(3) Offices Expenses - 1.50<br />

(4) Rents - 1.76<br />

(5) Other Charges - 1.60<br />

TOTAL - 6.16<br />

13. MUSEUM & ART GALLERIES:<br />

STATE MUSEUM: The <strong>Mizoram</strong> State Museum started functioning in 1977. The<br />

main function is preservation, upkeep of Museum records, collection of Museum objects<br />

and display. The fund during the Annual Plan 2003-2004 is concentrated for collection of<br />

Museum objects and for installation of internal equipments. Budget provision for the year<br />

2004-2005 is approved as follows: -<br />

(1) Existing Posts (Salary)<br />

(a) Checker - 1 (Rs.2650-4000)<br />

(b) Receptionist - 1 (Rs.4000-6000) 2.50<br />

(c) Museum Guide - 1 (Rs.5500-9000)<br />

(2) Wages<br />

(Gallery Attendant 3 nos. Unskilled) - 1.00<br />

(3) Travelling Expenses - 0.20<br />

(4) Office Expenses - 0.50<br />

(5) Advertisement - 0.10<br />

(6) Maintenance - 0.30<br />

(7) Other Charges (Purchase of Museum<br />

Objects, Organisation of Seminars and<br />

Symposium, Art Exhibition Purchase and<br />

Maintenance of Showcase) - 0.50<br />

TOTAL - 5.10<br />

14. DISTRICT MUSEUM: The National Policy is to extend Museum facility in the rural<br />

areas and as rural development has been given priority it is comparative to set up<br />

District Museum in the Southern District of Lunglei and Chhimtuipui.<br />

(1) Wages (Casual IV Grade Unskilled - 1 no ) - 0.33<br />

(2) Travelling Expenses - 0.02<br />

(3) Office Expenses - 0.20<br />

(4) Publication - -<br />

(5) Advertisement - -<br />

(6) Other Charges (Purchase of Museum<br />

Objects, Organisation of Seminars and<br />

Symposium, Art Exhibition, etc. at<br />

District Level) - 0.30<br />

TOTAL - 0.85


- 291 -<br />

ART & CULTURE DEPARTMENT<br />

15. ANTHROPOLOGICAL SURVEY: The Anthropological Survey has been part and<br />

parcel of this Department. The extreme South and South Eastern belt of <strong>Mizoram</strong><br />

have to be surveyed where there are various ethnic groups of tribal.<br />

(1) Travelling Expenses - 0.05<br />

(2) Office Expenses - 0.40<br />

(3) Advertisement - -<br />

(4) Other Charges - 0.30<br />

TOTAL - 0.75<br />

16. DISTRICT GAZETTEER: The main assignment of District Gazetteer is to prepare<br />

<strong>Mizoram</strong> District Gazetteer. With <strong>Mizoram</strong> becoming a state, more districts are<br />

coming up which enlarge the work of the unit.<br />

(1) Travelling Expenses - 0.10<br />

(2) Office Expenses - 0.45<br />

(3) Publication<br />

(reprint & rare books) - 0.50<br />

(4) Other Charges - 0.35<br />

TOTAL - 1.40<br />

GRAND TOTAL OF ART & CULTURE - 110.00


- 294 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

HEALTH & FAMILY WELFARE<br />

(Rupees in lakh)<br />

Heads of Development<br />

Works<br />

PWD Deptt.<br />

Salary Other Total<br />

1 2 3 4 5 6<br />

A. Rural Health Services:<br />

1. PHC 23.20 36.00 2.10 61.30<br />

2. PMGY 12.50 59.50 934.00 1006.00<br />

B. a) Hospitals & Dispensaries 5.00 5.00 618.40 31.00 659.40<br />

b) State Hospital<br />

C. MER & T<br />

0.01 0.01 0.01 0.06 0.09<br />

1. Aizawl 0.50 0.50 119.00 120.00<br />

2. Lunglei 34.50 9.50 44.00<br />

D. ISM & H<br />

E. Control of Communicable<br />

Disease<br />

2.60 1.90 4.50<br />

1. NMEP (NAMP) 198.00 1.07 199.07<br />

2. TB Control Programme 39.20 0.80 40.00<br />

3. STD 9.30 0.56 9.86<br />

4. Epidemic Control 0.10 2.00 2.10<br />

5. NLEP<br />

F. Non-Communicable Diseases<br />

60.00 1.00 61.00<br />

1. Cobalt Therapy Unit 0.58 18.00 33.40 51.98<br />

2. Cancer Research &<br />

Treatment<br />

G. Other Programmes<br />

35.00 2.30 37.30<br />

1. Direction: a) Direction 9.80 26.76 22.24 58.80<br />

b) DHME 1.00 1.00 2.00 4.00<br />

2. Administration 15.00 110.00 13.00 138.00<br />

3. P H Education 7.00 1.70 8.70<br />

4. School Health Programme 6.80 2.40 9.20<br />

5. Drug Control Programme 33.60 1.40 35.00<br />

6. Medical Store Depot 2.00 21.50 113.20 136.70<br />

7. Mental Health Programme 0.01 0.02 0.07 0.10<br />

8. National Goitre Control Prog. 1.00 0.60 1.60<br />

9. Public Health Lab. 1.00 1.00<br />

10. NPCB 10.50 0.50 11.00<br />

11. Nursing Council 5.00 5.00<br />

12. Pharmacy Council 2.00 2.00<br />

13. Blood Transfusion Council<br />

H. Family Welfare Programme<br />

1.00 1.00<br />

1. Rural FW Services 110.00 2.00 112.00<br />

2. PP Unit (Sub-Division) 50.30 1.50 51.80<br />

3. PP Unit (District) 26.70 0.80 27.50<br />

BAFFACOS 100.00 100.00<br />

Total (A – H) 18.02 116.59 1456.29 1409.10 3000.00<br />

NB: (1) Revenue Outlay - Rs. 2865.39 lakhs<br />

(2) Capital Outlay - Rs. 134.61 lakhs<br />

Total - Rs. 3000.00 lakhs


- 295 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

ITEM-WISE DESCRIPTIONS OF THE SCHEMES<br />

A. Rural Health Schemes:<br />

Rs.1258.95 lakhs is provided for the following —<br />

1) PHC<br />

(i) Salary - 36.00 lakhs<br />

(ii) Wages - 0.10 lakhs<br />

(iii) T.E. - 1.00 lakhs<br />

(iv) O.E. - 1.00 lakhs<br />

(v) Minor Works/Maintenance (Deptt.) - 23.20 lakhs<br />

Sub-Total (1) - 61.30 lakhs<br />

2) Community Health Programme (PMGY)<br />

(i) T.E. - 5.00 lakhs<br />

(ii) O.E. - 5.00 lakhs<br />

(iii) M & S - 10.00 lakhs<br />

(iv) M & E - 10.00 lakhs<br />

(v) O.C. - 904.00 lakhs<br />

(vi) Minor Works/Maintenance (Deptt.) - 59.50 lakhs<br />

(vii) Major Works (PWD) - 12.00 lakhs<br />

Sub-Total (2) - 1006.00 lakhs<br />

Total (1+2) - 1095.10 lakhs<br />

3) New Schemes<br />

(i) Reconstruction of Haulawng PHC - 0.50 lakh<br />

(ii) Upgradation of 10 bedded PHC at - 0.50 lakh<br />

N.E.Khawdungsei into 30 bedded<br />

4) Continuing Schemes<br />

(i) Thingsulthliah Constn. of CHC bldg. - 0.50 lakh<br />

(ii) Khawzawl -do- - 0.50 lakh<br />

(iii) Phuldungsei -do- - 10.00 lakh<br />

(vi) Bungtlang ‘S’ -do- - 0.50 lakh<br />

(viii) Reconstn. Of Sub-Centres & Staff Qtrs. - 59.50 lakh<br />

5) Staff : Entertainment of post already created and creation of other essential posts<br />

during 2003-2004 are as follows: —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts<br />

already<br />

approved<br />

1 2 3 4 5<br />

1. Specialist (Surgeon) 10000-16500 3<br />

2. Specialist (Gynea.) -do- 3<br />

3. Specialist (Paed.) -do- 3<br />

4. Physician -do- 3<br />

5. M & HO 8000-13500 23 5


Sl.<br />

No.<br />

- 296 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts<br />

already<br />

approved<br />

1 2 3 4 5<br />

6. Dental Surgeon -do- 11 2<br />

7. Asst. Nursing Supdt. 6500-10500 1<br />

8. Com. Health Officer 5000-8000 32<br />

9. Health Super (M) -do- 24<br />

10. Health Super (F) -do- 23<br />

11. Sister 6500-10500 3<br />

12. Staff Nurse 5500-9000 117<br />

13. Lab. Technician 4500-7000 20<br />

14. X-Ray Technician -do- 30<br />

15. Pharmacist -do- 32<br />

16. LDC 4000-6000 17<br />

17. Health Worker (M) 4500-7000 40<br />

18. Health Worker (F) -do- 47<br />

19. Microscopist 3050-4000 24<br />

20. Driver -do- 35<br />

21. Female Attendant 2650-4000 40<br />

22. Wardboy -do- 43<br />

23. Sweeper -do- 45<br />

24. Mali -do- 28<br />

25. Bhisty -do- 33<br />

26. Peon -do- 33<br />

27. Cook -do- 38<br />

28. A.C. Operator 4000-6000 2<br />

Total 738 19<br />

B. Hospitals & Dispensaries:<br />

Rs.724.40 lakhs is provided under these programmes for the following —<br />

1) Hospitals<br />

(i) Salary - 618.40 lakhs<br />

(ii) Wages - 5.00 lakhs<br />

(iii) T.E. - 5.00 lakhs<br />

(iv) O.E. - 5.00 lakhs<br />

(v) O.C. - 5.00 lakhs<br />

(vi) Hospital Expenses - 1.00 lakhs<br />

(vii) M & S - 5.00 lakhs<br />

(viii) M & E - 5.00 lakhs<br />

(ix) Minor Works (Deptt.) - 5.00 lakhs<br />

(x) Major Works (PWD) - 5.00 lakhs<br />

Sub-Total (1) - 659.40 lakhs<br />

2) State Hospitals<br />

(i) Salary - 0.01 lakh<br />

(ii) Wages - 0.01 lakh<br />

(iii) T.E. - 0.01 lakh<br />

(iv) O.E. - 0.01 lakh<br />

(v) O.C. - 0.01 lakh<br />

(vi) M & S - 0.01 lakh<br />

(vii) M & E - 0.01 lakh<br />

(viii) Minor Works (Deptt.) - 0.01 lakh<br />

(ix) Major Works (PWD) - 0.01 lakh<br />

Sub-Total (2) - 0.09 lakh


- 297 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

3) Continuing Schemes<br />

(i) Upgradation of Champhai Hospital into 100 bedded- 1.00 lakh<br />

(ii) -do- Serchhip - 1.00 lakh<br />

(iii) -do- Saiha - 1.00 lakh<br />

(iv) Upgradation of Lawngtlai CHC into 50 bedded - 1.00 lakh<br />

(v) Upgradation of Kolasib into 100 bedded - 1.00 lakh<br />

Sub-Total (3) - 5.00 lakh<br />

4) Minor Works<br />

For providing repair/renovation of buildings/quarters, Rs.50.00 lakhs is provided.<br />

5) Staff<br />

Rs.618.40 lakhs is provided for entertainment of post already created and other<br />

essential posts to be created: —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts<br />

already<br />

approved<br />

1 2 3 4 5<br />

1. Consultant 12000-16500 2 4<br />

2. Dy. Medical Supdt. -do- 1<br />

3. Sr. Specialist (Ortho.) 10000-15200 1<br />

4. Sr. Specialist (Surgery) -do- 1<br />

5. Sr. Specialist (Medicine) -do- 1<br />

6. Sr. Specialist (Eye) -do- 1<br />

7. Sr. Specialist (Psychiatrist) -do- 1<br />

8. Sr. Specialist (Dermatologist) -do- 1<br />

9. Sr. Specialist (Pathologist) -do- 1<br />

10. Sr. Specialist (ENT) -do- 1<br />

11. Sr. Specialist (Cardiologist) -do-<br />

12. Sr. Specialist (Gynae.) -do-<br />

13. Sr.Specialist (Microbiologist) -do- 1<br />

14. Cyto. Technologist -do- 1<br />

15. Spl. Gynaecologist -do- 1<br />

16. Spl. Radiotherapist -do- 1<br />

17. Spl. Dermatologist -do- 1 1<br />

18. Spl. Psychiatrist -do- 1 1<br />

19. Spl. Pathologist -do- 3 1<br />

20. Spl. Bio-Chemist -do- 1<br />

21. Spl. Anaesthetist -do- 2<br />

22. Spl. Microbiologist -do- 1 1<br />

23. Spl. Ortho-surgeon -do- 1<br />

24. Spl. General Surgeon -do- 1<br />

25. Spl. Forensic Specialist -do- 1<br />

26. Spl. ENT -do- 1<br />

27. Spl. Ophthalmologist -do- 1<br />

28. Blood Bank Officer -do- 1<br />

29. Sr. Casualty Officer -do- 1<br />

30. Sr. BDS -do- 1 1<br />

31. Sr. Med. Record Officer -do- 1<br />

32. MRO 8000-13500<br />

33. Dental Surgeon -do- 10 2


Sl.<br />

No.<br />

- 298 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts to be<br />

created<br />

1 2 3 4 5<br />

34. M & HO -do- 6 5<br />

35. Nursing Supdt. -do- 1<br />

36. X-Ray Technologist -do- 1 1<br />

37. Asst. Nursing Supdt. 6500-10500 6<br />

38. Ward Superintendent -do- 12<br />

39. Dy. Medl. Record Officer 5500-9000 1 1<br />

40. Staff Nurse -do- 94 30<br />

41. Staff Nurse (Contract) 4000/- Fixed 65<br />

42. Sr. X-Ray Tech. 5500-9000 2 1<br />

43. Sr. Lab. Tech. -do- 2 1<br />

44. Sr. CSSD Tech. -do- 1<br />

45. Sr. Cyto. Tech. -do- 1<br />

46. Sr. ECG Tech. -do- 1<br />

47. Sr. Orthotist / Prosth. Tech. -do- 1<br />

48. Sr. Ophth. Tech. -do- 1<br />

49. Computer Operator -do- 3<br />

50. UDC 5000-8000 3<br />

51. X-Ray Technician 4500-7000 6<br />

52. Lab. Technician -do- 8<br />

53. Cyto. Technician -do- 1 1<br />

54. Electrician -do- 3<br />

55. S.I. of Statistics -do- 4 1<br />

56. Pharmacist -do- 5 1<br />

57. Receptionist -do- 1<br />

58. A.C. Technician -do- 2 1<br />

59. Medl. Record Tech. -do- 6<br />

60. Pros. / Ortho. Tech. -do- 2<br />

61. Medl. Record Assistant 4000-6000 3<br />

62. Acupuncturist -do- 6<br />

63. LDC -do- 6<br />

64. Driver Grade-II -do- 6<br />

65. Multi-Rehab. Tech. -do-<br />

66. ECG Technician -do- 2<br />

67. Driver 3050-5000 12<br />

68. Carpenter -do- 1<br />

69. Lab. Assistant 2650-4000 12<br />

70. Dark Room Assistant -do- 3<br />

71. Barber -do- 4<br />

72. Tailor -do- 3<br />

73. Female Attendant -do- 51<br />

74. Wardboy -do- 52<br />

75. Sweeper -do- 50<br />

76. Mali -do- 18<br />

77. Cook -do- 20<br />

78. Bhisty -do- -<br />

79. Peon -do- 20<br />

80. Guard -do-<br />

81. CSSD Technician 4500-7000 1<br />

82. Laundry Supervisor -do- 1<br />

83. Laundry Operator 4000-6000 1<br />

Total 546 81


- 299 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

C. MER & T:<br />

Under this programme, Rs.162.30 lakhs is provided for the following —<br />

1. AIZAWL<br />

(i) O.E. - 0.50 lakhs<br />

(ii) O.C. - 0.50 lakhs<br />

(iii) Scholarship / Stipend - 118.00 lakhs<br />

(iv) Minor Works (Deptt.) - 0.50 lakhs<br />

(v) Major work(upgradation of school of nursing<br />

to college - 0.50 lakhs<br />

Sub-Total (1) - 120.00 lakhs<br />

2. NURSING SCHOOL, LUNGLEI<br />

(i) Salary - 34.50 lakhs<br />

(ii) T.E. - 0.50 lakhs<br />

(iii) O.E. - 0.90 lakhs<br />

(iv) Rent - 2.60 lakhs<br />

(v) Publication - 0.10 lakhs<br />

(vi) PP & SS - 0.10 lakhs<br />

(vii) Stipend - 5.00 lakhs<br />

(viii) O.C. - 0.20 lakhs<br />

(ix) M & E - 0.10 lakhs<br />

Sub-Total (2) - 44.00 lakhs<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay No. of Posts<br />

1 2 3 4<br />

1. Principal 8000-13500 1<br />

2. Vice Principal -do- 1<br />

3. Tutor 6500-10500 6<br />

4. Librarian 5500-9000 1<br />

5. Steno-II -do- 1<br />

6. UDC 5000-8000 1<br />

7. LDC 4000-6000 1<br />

8. Driver 3000-4590 1<br />

9. Lab. Attendant 2650-4000 1<br />

10. Chowkider -do- 4<br />

11. Peon -do- 3<br />

12. Cleaner -do- 1<br />

13. Sweeper -do- 3<br />

Total 25<br />

D. INDIAN SYSTEM OF MEDICINE & HOMEOPATHY (ISM & H)<br />

Rs.4.50 lakhs is provided under this programme for the following —<br />

(i) Salary - 2.60 lakhs<br />

(ii) T.E. - 0.40 lakhs<br />

(iii) O.E. - 0.50 lakhs<br />

(iv) M & S - 1.00 lakhs<br />

Total - 4.50 lakhs


- 300 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Posts already created to be continued:<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts to be<br />

created<br />

1 2 3 4 5<br />

1. B.H.M.S. / B.A.M.S. 8000-12500 1 5<br />

2. IV Grade 2650-4000<br />

E. CONTROL OF COMMUNICABLE DISEASES<br />

(i) National Malaria Eradication Programme (NMEP)<br />

Rs.199.07 lakhs is provided for the following —<br />

(i) Salary - 198.00 lakhs<br />

(ii) Wages - 0.01 lakhs<br />

(iii) T.E. - 1.00 lakhs<br />

(iv) M & E - 0.02 lakhs<br />

(v) M & S - 0.02 lakhs<br />

(vi) O.E. - 0.02 lakhs<br />

Sub-Total - 199.07 lakhs<br />

Entertainment of posts already created to be continued are: —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts to be<br />

created<br />

1 2 3 4 5<br />

1. Jt. Director (Malaria) 12000-16500 1<br />

2. Dy. Director (Malaria) 10000-15200 1<br />

3. Entomologist 8000-13500 1<br />

4. DMO (Special Officer) -do- 2 8<br />

5. Asst. DMO 5000-8000 3 5<br />

6. Lab. Technician 4500-7000 2 10<br />

7. UDC -do- 3 5<br />

8. Health Worker (M) -do- 124<br />

9. Driver Gr-I -do- 2<br />

10. LDC 4000-6000 3 5<br />

11. Store Keeper -do- 1<br />

12. Microscopist -do- 16<br />

13. Sr. Malaria Inspector -do- 3<br />

14. Malaria Inspector -do- 6 2<br />

15. M.T. Mechanic -do- 1 1<br />

16. Insect Collector -do- 2<br />

17. Driver Gr-II -do- 3<br />

18. Driver 3050-4590 5<br />

19. Van Cleaner 2650-4000 4<br />

20. Sweeper -do- 1<br />

21. Peon -do- 5 4<br />

22. Chowkider -do- 4 4<br />

Total 185 52<br />

(ii) T.B. Control Programme<br />

(i) Salary - 39.20 lakhs<br />

(ii) T.E. - 0.30 lakhs<br />

(iii) O.E. - 0.20 lakhs<br />

(iv) M & S - 0.30 lakhs<br />

Sub-Total - 40.00 lakhs


- 301 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Entertainment of posts already created to be continued are: —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts to be<br />

created<br />

1 2 3 4 5<br />

1. State T.B. Officer 10000-15200 1<br />

2. District T.B. Officer -do- 2<br />

3. M & HO 8000-13500 2<br />

4. Staff Nurse 5500-9000 2 1<br />

5. UDC 5000-8000 2<br />

6. Treatment Organiser -do- 2<br />

7. Lab. Technician 4500-7000 3 1<br />

8. X-Ray Technician -do- 2 1<br />

9. BCG Technician -do- 2<br />

10. LDC 4000-6000 2<br />

11. Lab. Assistant 3200-4900 1 1<br />

12. Peon 2650-4000 2<br />

13. Technical Assistant 4500-7000 2<br />

Total 26 5<br />

(iii) Sexually Transmitted Diseases (STD)<br />

Rs.9.86 lakhs is provide for the following:<br />

i) Salary of Staff - 9.30 lakhs<br />

ii) T.E. - 0.36 lakhs<br />

iii) O.E. - 0.10 lakhs<br />

iv) O.C. - 0.10 lakhs<br />

Sub-Total - 9.86 lakhs<br />

Entertainment of posts already created to be continued are: —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

1 2 3 4<br />

1. M & HO 8000-13500 1<br />

2. Staff Nurse 5500-9000 2<br />

3. LDC 4000-6000 1<br />

4. Peon 2650-4000 1<br />

5. Sweeper -do- 1<br />

Total 6<br />

(iv) Epidemic Control<br />

Rs.2.10 lakhs is provided for the following —<br />

i) Salary - 0.10 lakhs<br />

ii) Medicines & Supplies - 1.00 lakhs<br />

iii) Office Expenses - 1.00 lakhs<br />

Sub-Total - 2.10 lakhs<br />

(v) National Leprosy Elimination Programme (NLEP)<br />

i) Salary - 60.00 lakhs<br />

ii) Travelling Expenses - 0.50 lakhs<br />

iii) Office Expenses - 0.50 lakhs<br />

Sub-Total - 61.00 lakhs


- 302 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

1 2 3 4<br />

1. DLO 10000-15200 1<br />

2. SMO -do- 1<br />

3. M & HO 8000-13500 2<br />

4. I.S. 5500-9000 2<br />

5. UDC 5000-8000 3<br />

6. Sr. Lab. Tech. 5500-9000 2<br />

7. Sr. NMS -do- 1<br />

8. Sr. H.E. -do- 1<br />

9. Sr. PMO -do- 4<br />

10. PMO 4500-7000 10<br />

11. NMS 5000-8000 2<br />

12. Lab. Tech. 4500-7000 1<br />

13. S.I.S. 4000-6000 1<br />

14. LDC -do- 3<br />

15. Driver 2650-4000 4<br />

16. Sweeper -do- 1<br />

17. IV Grade -do- 3<br />

18. Peon -do- 2<br />

19. Helper -do- 2<br />

Total 46<br />

F. NON-COMMUNICABLE DISEASES<br />

(i) Cancer Research & Treatment Programme<br />

i) Salary - 35.00 lakhs<br />

ii) T.E. - 0.50 lakhs<br />

iii) O.E. - 0.50 lakhs<br />

iv) M & E - 0.10 lakhs<br />

v) M & S - 0.20 lakhs<br />

vi) O.C. - 1.20 lakhs<br />

Sub-Total (i) - 37.30 lakhs<br />

Sl.<br />

No.<br />

Entertainment of posts already created are —<br />

Name of Posts Scale of Pay<br />

No. of posts<br />

already<br />

created<br />

No. of<br />

posts to be<br />

created<br />

1 2 3 4 5<br />

1. Physician 10000-15200 1<br />

2. Surgeon -do- 1<br />

3. ENT Specialist -do- 1<br />

4. Paediatrician -do- 1<br />

5. Dermatologist -do- 1<br />

6. Pathologist -do- 1<br />

7. Gynaecologist -do- 1<br />

8. M & HO 8000-15200 2<br />

9. Staff Nurse 5500-9000 8<br />

10. Assistant -do-<br />

11. Computer Operator -do- 2<br />

12. Sweeper 2650-4000 2<br />

Total 18 3


- 303 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

(ii) Cobalt Therapy Unit, Zemabawk<br />

i) Salary of Staff - 18.00 lakhs<br />

ii) Wages - 0.50 lakhs<br />

iii) T.E. - 0.50 lakhs<br />

iv) O.E. - 1.00 lakhs<br />

v) M & E - 1.00 lakhs<br />

vi) M & S - 30.40 lakhs<br />

vii) Minor Works (Deptt.) - 0.58 lakhs<br />

Sub-Total (ii) - 51.98 lakhs<br />

G. OTHER PROGRAMMES<br />

1) Directions<br />

i) Salary - 26.76 lakhs<br />

ii) Wages - 1.00 lakhs<br />

iii) T.E. - 5.00 lakhs<br />

iv) O.E. (Including I.T.) - 10.00 lakhs<br />

v) O.C. - 5.00 lakhs<br />

vi) H.E. - 1.24 lakhs<br />

vii) Minor Works (Deptt.) - 9.80 lakhs<br />

Total - 58.80 lakhs<br />

Entertainment of posts already created to be continued and to be created are —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of Posts<br />

already to be<br />

created created<br />

1 2 3 4 5<br />

1. Principal Director 16400-20900<br />

2. Jt. DHS (Plan) 12000-16500 1<br />

3. Jt. Director (N) -do-<br />

4. Dy. DHS (SH) 10000-15200<br />

5. DD (Admn) -do- 1<br />

6. Executive Engineer -do-<br />

7. Sr. Research Officer -do- 1<br />

8. Assistant Engineer 8000-13500 1<br />

9. Junior Engineer 5500-9000 1<br />

10. Inspector of Statistics -do- 2<br />

11. Computer Operator -do- 1<br />

12. Vehicle Supervisor -do-<br />

13. Steno-III 5000-8000 4<br />

14. Motor Mechanic 4000-6000 1<br />

15. Despatch Rider 3050-4590<br />

16. Duftry -do- 2<br />

17. Driver -do-<br />

Total 14 1<br />

• For proper administration in the Department, creation of Principal Director is<br />

imperative.


- 304 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

2) Hospital & Medical Education<br />

i) Salary - 1.00 lakh<br />

ii) Wages - 0.50 lakh<br />

iii) T.E. - 0.50 lakh<br />

iv) O.E. - 0.50 lakh<br />

v) O.C. - 0.50 lakh<br />

vi) Minor Works (Deptt.) - 1.00 lakh<br />

Total - 4.00 lakhs<br />

For implementation of Directorate of Hospital & Medical Education, the<br />

following posts are proposed to be created —<br />

3) District & Sub-Division Administration<br />

Rs.138.00 lakhs is provided for the following —<br />

i) Salary - 110.00 lakhs<br />

ii) T.E. - 5.00 lakhs<br />

iii) O.E. (including I.T.) - 5.00 lakhs<br />

iv) O.C. - 3.00 lakhs<br />

v) Minor Works (Deptt.) - 15.00 lakhs<br />

Total - 138.00 lakhs<br />

Entertainment of posts already created to be continued and to be created are —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of Posts<br />

Already to be<br />

created created<br />

1 2 3 4 5<br />

1. CMO 10000-15200 1 4<br />

2. SMO -do- 7 7<br />

3. Supdt. Pharmacist 6500-10500 4<br />

4. Head Assistant 5500-9000 1<br />

5. Inspector of Statistics -do- 2<br />

6. UDC 5000-8000 17<br />

7. Steno-III -do- 2<br />

8. Driver-I -do- 1<br />

9. S.I. of Statistics 4500-7000 2<br />

10. LDC 4000-6000 17<br />

11. Driver-II -do- 2<br />

12. Peon 2650-4000 4<br />

13. Chowkider -do- 5<br />

14. Sweeper -do- 9<br />

15. SPHNO -do-<br />

16. Driver -do-<br />

Total 74 11<br />

4) Public Health Education (HEB)<br />

Rs.8.70 lakhs is provided for the following —<br />

i) Salary - 7.00 lakhs<br />

ii) T.E. - 0.20 lakhs<br />

iii) O.E. - 0.50 lakhs<br />

iv) M & E - 0.50 lakhs<br />

v) Advertisement - 0.50 lakhs<br />

Total - 8.70 lakhs


- 305 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Entertainment of posts already created to be continued are —<br />

Sl. No. Name of Posts Scale of Pay No. of Posts<br />

1. UDC 5000-8000 1<br />

2. LDC 4000-6000 1<br />

3. Projectionist -do- 4<br />

4. Peon 2650-4000 2<br />

Total 8<br />

5) School Health Programme<br />

Rs.9.20 lakhs is provided for the following —<br />

i) Salary - 6.80 lakhs<br />

ii) T.E. - 0.50 lakhs<br />

iii) O.E. - 0.50 lakhs<br />

iv) M & E - 0.20 lakhs<br />

v) M & S - 1.20 lakhs<br />

Total - 9.20 lakhs<br />

Entertainment of posts already created to be continued under School Health<br />

Programme —<br />

Sl. No. Name of Posts Scale of Pay No. of Posts<br />

1. Assistant 5500-9000 1<br />

2. UDC 5000-8000 1<br />

3. LDC 4000-6000 1<br />

4. Driver 3050-4500 1<br />

5. Peon 2650-4000 1<br />

Total 5<br />

6) Drugs Control<br />

Rs.35.00 lakhs is provided for the following —<br />

i) Salary - 33.60 lakhs<br />

ii) T.E. - 0.20 lakhs<br />

iii) O.E. - 0.20 lakhs<br />

iv) O.C. - 1.00 lakhs<br />

Total - 35.00 lakhs<br />

Entertainment of posts already created are —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of Posts<br />

already<br />

created<br />

1 2 3 4<br />

1. Dy. Drugs Controller 12000-16500<br />

2. Asst. Drugs Controller 10000-15200 1<br />

3. Drugs Inspector 8000-13200 11<br />

4. Grade IV 2650-4000<br />

Total 12<br />

7) Medical Store Depot<br />

Rs.136.70 lakhs is provided for the following —<br />

i) Salary - 21.50 lakhs<br />

ii) T.E. - 1.20 lakhs<br />

iii) O.E. - 1.00 lakhs<br />

iv) O.C. - 1.00 lakhs<br />

v) M & E - 15.00 lakhs<br />

vi) M & S - 95.00 lakhs<br />

vii) Minor Works (Deptt.) - 2.00 lakhs<br />

Total - 136.70 lakhs


- 306 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Entertainment of posts already created are —<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of Posts<br />

already<br />

created<br />

1 2 3 4<br />

1. Supdt. Pharmacist 6500-10500 1<br />

2. Pharmacist 5000-8000 2<br />

3. LDC 4000-6000 3<br />

4. Packer 2650-4000 10<br />

5. Grade IV -do- 7<br />

Total 23<br />

8) Mental Health Programme: Rs. 0.10 lakhs is provided for the following:<br />

i) Salary - 0.02 lakhs<br />

ii) T.E. - 0.01 lakhs<br />

iii) O.E. - 0.01 lakhs<br />

iv) O.C. - 0.01 lakhs<br />

v) M.S. - 0.01 lakhs<br />

vi) M.V. - 0.01 lakhs<br />

vii) M & E - 0.01 lakhs<br />

viii) Rent - 0.01 lakhs<br />

ix) Major Works (PWD) - 0.01 lakhs<br />

Total - 0.10 lakhs<br />

9) National Goitre Control Programme (NGCP)<br />

Rs.1.60 lakhs is provided for the following —<br />

i) Salary - 1.00 lakhs<br />

ii) T.E. - 0.50 lakhs<br />

iii) O.E. - 0.10 lakhs<br />

Total - 1.60 lakhs<br />

Entertainment of one post of Lab. Technician already created and to be<br />

continued.<br />

10) Public Health Laboratory<br />

Rs.1.00 lakh is provided for the following —<br />

i) O.E. - 0.50 lakh<br />

ii) O.C. - 0.50 lakh<br />

Total - 1.00 lakh<br />

11) National Programme for Control of Blindness (NPCB)<br />

Rs.11.00 lakhs is provided for the following —<br />

i) Salary - 10.50 lakhs<br />

ii) T.E. - 0.25 lakhs<br />

iii) O.E. - 0.25 lakhs<br />

Total - 11.00 lakhs


- 307 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Entertainment of posts already created are as listed below —<br />

Sl. No. Name of Posts Scale of Pay No. of Posts<br />

1 2 3 4<br />

1. Dy. Director (BLN) 10000-15200 1<br />

2. Inspector of Statistics 5500-9000 1<br />

3. Ophth. Assistant 4500-7000 3<br />

4. LDC 4000-6000 1<br />

5. Grade IV 2650-4000 1<br />

Total 7<br />

12) Nursing Council - Rs.5.00 lakhs is provided in the form of G-I-A.<br />

13) Pharmacy Council - Rs.2.00 lakhs is provided in the form of G-I-A.<br />

14) Blood Transfusion Council - Rs.1.00 lakh is provided in the form of G-I-A.<br />

H. Family Welfare Programme:<br />

This programme has been taken up under Central Sponsored Scheme (CSS) and<br />

discontinued by the Government of India wherefore it was directed that the<br />

following programmes should be taken up by State Government. As such, as<br />

amount of Rs.194.70 lakhs is provided for continuation under Plan as follows: —<br />

1) Rural Family Welfare Services (RFWS)<br />

i) Salary - 110.00 lakhs<br />

ii) T.E. - 1.00 lakhs<br />

iii) O.E. - 1.00 lakhs<br />

Total - 112.00 lakhs<br />

Entertainment of posts already created to be continued are as below —<br />

Sl. No. Name of Posts Scale of Pay No. of Posts<br />

1 2 3 4<br />

1. M & HO 8000-13500 14<br />

2. Health Supervisor (F) 5000-8000 14<br />

3. UDC -do- 7<br />

4. Extension Educator 4500-7000 14<br />

5. V.W. -do- 14<br />

6. S.I.S. -do- 7<br />

Total 70<br />

2) P.P. Unit (Sub-Division)<br />

i) Salary - 50.30 lakhs<br />

ii) T.E. - 0.50 lakhs<br />

iii) O.E. - 1.00 lakhs<br />

Total - 51.80 lakhs


- 308 -<br />

HEALTH & FAMILY WELFARE DEPARTMENT<br />

Entertainment of posts to be continued are as below —<br />

Sl. No. Name of Posts Scale of Pay No. of Posts<br />

1 2 3 4<br />

1. Specialist (Paed.) 10000-15200 1<br />

2. Specialist (Gynea.) -do- 3<br />

3. Paediatrician -do- 2<br />

4. O.T. Nurse 5500-9000 3<br />

5. LHV (H/S) 5000-8000 3<br />

6. Lab. Tech. 4500-7000 3<br />

7. H.W. (M) -do- 3<br />

8. UDC 5000-8000 3<br />

9. Driver 3050-4950 3<br />

10. O.T. Attendant 2650-4000 3<br />

Total 27<br />

3) P.P. Unit (District)<br />

i) Salary - 26.70 lakhs<br />

ii) T.E. - 0.30 lakhs<br />

iii) O.E. - 0.50 lakhs<br />

Total - 27.50 lakhs<br />

Entertainment of posts to be continued —<br />

Sl. No. Name of Posts Scale of Pay No. of Posts<br />

1 2 3 4<br />

1. M & HO 8000-13500 4<br />

2. Sister 6500-10500 2<br />

3. P.H.N. 5500-9000 2<br />

4. UDC 5000-8000 2<br />

5. H.W. (M) 4500-7000 2<br />

Total 12<br />

4) BAFFACOS :<br />

Under this programme Rs.100.00 lakhs is provided for the following —<br />

i) T.E. - 5.00 lakhs<br />

ii) O.E. - 44.78 lakhs<br />

iii) M & S - 18.00 lakhs<br />

iv) M & E - 9.60 lakhs<br />

v) O.C. - 22.62 lakhs<br />

Total - 100.00 lakhs


- 311 -<br />

PUBLIC HEALTH ENGINEERING DEPARTMENT<br />

WATER SUPPLY & SANITATION<br />

The approved outlay during the 10 th Five Year Plan 2002-2007 for Water Supply and<br />

Sanitation is Rs. 12,333.00 lakh. Out of which Rs. 7772.00 lakh is for Rural Sector,<br />

Rs.3373.00 lakh for Urban Sector and Rs. 1188.00 lakh for Other Sector. The <strong>detailed</strong> break<br />

up is as below: -<br />

Sl. Head of Scheme 10 th Five Year Plan 2002-2007<br />

No. State Plan Central Assistance<br />

1 2 3 4<br />

A. RURAL SECTOR :<br />

1. Rural Water Supply :<br />

(a) Water Supply Scheme PWS,<br />

IVSS, HPTW, RWHS etc.<br />

5,000.00 8590.00<br />

(b) Direction & Administration<br />

Wages/Salaries<br />

2,590.00<br />

(c) Water Quality Testing / Monitoring 10.00<br />

(d) Emergency Water Supply 150.00<br />

(c) Survey & Investigation 2.00<br />

2. Rural Sanitation : 20.00 250.00<br />

SUB-TOTAL OF 'A' 7,772.00 8,840.00<br />

B. URBAN SECTOR :<br />

1. Urban Water Supply 3,373.00 2,000.00<br />

(UWS, AUWSP, NLPF etc.)<br />

2. Integrated Project of Aizawl (I.P.A) - 30,000.00<br />

SUB-TOTAL OF 'B' 3,373.00 32,000.00<br />

C. OTHER SECTORS :<br />

1. Direction & Administration 1,026.00 -<br />

2. Research 2.00 -<br />

3. Training 10.00 -<br />

4. Machineries & Equipments 100.00 -<br />

5. Building 50.00 -<br />

6. Motor Vehicles - -<br />

SUB-TOTAL OF 'C' 1,188.00 -<br />

GRAND TOTAL 12,333.00 40,840.00<br />

The tentative outlay during Annual Plan 2004-2005 is Rs. 3525.00 lakh out of which<br />

Rs. 1591.00 lakh is for Rural Sector (including Rs. 611.00 lakh for Wages/Salaries),<br />

Rs.1870.40 lakh for Urban Sector and Rs. 63.60 lakh for Other Sector which includes<br />

Direction & Administration, Office Expenses, Motor Vehicles, Travelling Expenses, other<br />

charges and Scholarship and Stipend for Engineer Sponsored Students, etc.<br />

In <strong>Mizoram</strong> there are 911 nos. of villages/habitations identified in survey<br />

conducted during 1996 with representatives of Govt. of India and Pachhunga University<br />

College, <strong>Mizoram</strong>. Till 1.4.2004, 275 P.C. habitations and 636 F.C habitations have been<br />

covered with safe drinking water supply at the rate of 10 - 40 lpcd and 40 lpcd respectively<br />

under Rural Water Supply programmed leaving no N.C. habitations. And during 2004-<br />

2005, the tentative villages/ habitation to be covered/commissioned is 100 Nos. under<br />

Plan Schemes.


- 312 -<br />

PUBLIC HEALTH ENGINEERING DEPARTMENT<br />

There are 22 towns according to 2001 census. All the towns identified during 2001<br />

census are considered as urban area in respect of Water Supply & Sanitation. In addition,<br />

Lawngtlai, although not declared town by 2001 census, it is also included in the urban<br />

areas. Out of these towns, the following towns viz. — Aizawl, Bairabi, Darlawn, Hnahthial,<br />

Kolasib, Lunglei, Saiha, Sairang, Saitual, Serchhip, Thenzawl, Tlabung, Vairengte,<br />

Zawlnuam, Lengpui and Khawzawl are already covered fully.<br />

During 2004-05, under Non-Lapsable Pool Fund, Mamit, Champhai and Aizawl<br />

Water Supply Scheme Phase-II will continue. And new schemes of N.Vanlaiphai, Khawhai,<br />

Lungsen, Theiriat and Biate are also proposed to be taken up.<br />

The infrastructure of Public Health Engineering Department is too inadequate and<br />

needs to be strengthened immediately to cope up with the continuously increasing work<br />

load considering necessity and importance of Water Supply & Sanitation Sector.<br />

The Planning Department, Government of <strong>Mizoram</strong> has approved Rs. 3211.00 lakh<br />

for Annual Plan 2003-2004. The item-wise break up of the Annual Plan 2003 - 2004 outlay<br />

and Approved Annual Plan 2004-2005 are given below: -<br />

APPROVED ANNUAL PLAN 2003-2004<br />

(A) RURAL SECTOR B.E. (Rs. in Lakh)<br />

1. Rural Water Supply :<br />

a) Water Supply Scheme 980.00 P.M.G.Y.<br />

b) Direction & Administration<br />

Wages / Salaries 685.05<br />

c) Water Quality Testing Nil<br />

d) Emergency Water Supply Nil<br />

e) Survey & Investigation Nil<br />

2. One time ACA for WSS (Rural Water Supply) 150.00<br />

3. Rural Sanitation & Total Sanitation Campaign 22.22<br />

Total of Rural Sector : Rs. 1837.27<br />

(B) URBAN SECTOR :<br />

a) Urban Water Supply(LIC=522, NABARD=631and<br />

Normal Urban Water Supply =73) 1226.00<br />

b) Integrated Project of Aizawl(IPA) Nil<br />

c) Maintenance (Urban) 60.00<br />

Total of Urban Sector : Rs. 1286.00<br />

(C) OTHER SECTOR :<br />

1. Direction & Administration Rs. Nil<br />

2. Research Nil<br />

3. Training Rs.3.50<br />

4. Machineries & Equipments Nil<br />

5. Building Rs. 8.23<br />

Total of Other Sector : Rs. 11.73<br />

(D) AUGMENTATION OF TRADITIONAL Rs. 76.00<br />

WATER SOURCE UNDER EFC.<br />

Grand Total : Rs. 3211.00


- 313 -<br />

PUBLIC HEALTH ENGINEERING DEPARTMENT<br />

APPROVED ANNUAL PLAN 2004-2005<br />

(A) RURAL SECTOR: B.E. (Rs. in Lakh)<br />

1. Rural Water Supply: a) Water Supply Scheme<br />

PWS, IVSS, HPTW, etc, 780.00 PMGY<br />

b) Direction & Administration<br />

Salaries etc. 611.00<br />

c) Emergency Water Supply 35.00<br />

d) Survey & Investigation Nil<br />

e) Water Quality Testing Nil<br />

2. One time ACA for WSS (Rural Water Supply) 150.00<br />

3. Total Sanitation Campaign (Saiha & Mamit=Rs.7.50 lakh each) 15.00<br />

Total of Rural Sector : Rs. 1591.00<br />

(B) URBAN SECTOR:<br />

1. Urban Water Supply<br />

a) On-going Urban WSS Viz. GLWSS-Rs.24.29 lakh<br />

GSWSS, Rs.3.71 lakh, GKWSS Rs.18.00 lakh. Rs. .......…....<br />

b) Construction of Aizawl 'S' Draw line Rs.11.10 lakh Rs. 10.00<br />

c) Water Supply for New Capital Complex at Khatla Rs.62.78 lakh Rs. 40.00<br />

d) Improvement of Aizawl WSS Phase-I (LIC Loan) Rs. 522.00<br />

e) Composite 'N'Kawnpui WSS (NABARD Loan) Rs. 361.00<br />

2. AUWSP (State Matching Share)<br />

a) Sailtual WSS (Rs. 23.29 lakh) Rs. 7.50<br />

b) Thenzawl WSS (Rs. 30.72 lakh) Rs. 11.00<br />

c) Lengpui WSS (Rs. 93.14 lakh) Rs. 25.00<br />

3. GAWSS PH-II (State Matching Share) Rs. 550.00<br />

4. O &M of Urban WSS<br />

a) Clearing of Liabilities as per High Court JudgementRs.68.13 Rs. 69.00<br />

b) O&M of Water Supply Schemes during 2004-05. Rs. 274.90<br />

c) Clearing of committed liabilities under UWS ( Maint) Rs. 700.00 Rs. ...........<br />

TOTAL : Rs. 1870.40<br />

(C) OTHER SECTOR:<br />

1. Direction & Administration<br />

a) Office Expenses Rs. 26.50<br />

b) Motor Vehicles Rs. 15.00<br />

c) Travelling Expenses Rs. 15.00<br />

d) Other Charges Rs. 4.10<br />

2. Scholarship & Stipend for Engineer Sponsored Students (Training) Rs. 3.00<br />

Total of Other Sector : Rs. 63.60<br />

Grand Total : Rs. 3525.00


- 314 -<br />

PUBLIC HEALTH ENGINEERING DEPARTMENT<br />

DETAILED DESCRIPTION<br />

A. RURAL SECTOR:<br />

1. Rural Water Supply:<br />

(A) Water Supply Scheme (RWS, IVSS, HPTW) etc:<br />

There are 275 Partially Covered villages/habitations out of 911 habitations<br />

as on 1.4.2004.<br />

During 2004-2005, a sum of Rs.780.00lakh (PMGY-Rural Drinking Water) is<br />

earmarked for coverage of 100 Nos. of Rural habitations of Partially Covered (P.C.)<br />

status to make Fully Covered (F.C.) (i.e. 40 lpcd). The <strong>detailed</strong> break up is as<br />

follows:<br />

4215 - Rural Water Supply (Capital Outlay) = Rs. 495.60 lakh<br />

2215 - Rural Water Supply = Rs. 120.00 lakh<br />

2215 - Sub-Mission (State Share) = Rs. 47.40 lakh<br />

Maintenance of Completed R.W.S.S. @15% = Rs. 117.00 lakh<br />

TOTAL : = Rs. 780.00 lakh PMGY<br />

(B) Direction and Administration:<br />

The approved outlay for Direction & Administration (Salary) during 2004-2005 is<br />

Rs. 611.00 lakh.<br />

(C) Emergency Water Supply:<br />

To cater for minimum drinking water supply needs to villages/towns where regular<br />

water supply schemes of Piped Water Supply Scheme, I.V.S.S. & HPTW could not<br />

meet their barest minimum, the Department is left with no option except to<br />

provide safe drinking water by means of water tankers (i.e. EWS) every year. So, a<br />

sum of Rs. 35.00 lakh is approved during 2004-2005.<br />

(D) Survey & Investigation:<br />

To have a good <strong>detailed</strong> project of the scheme, it is extremely required to have<br />

good survey & investigation using latest technology and equipments etc. But due to<br />

limitation of Plan Fund, no fund could be provided during 2004-2005.<br />

(E) Water Quality Testing:<br />

Public Health Engineering Department is having 1(one) State Level Laboratory<br />

stationed at Aizawl, District level 4(four) Laboratories at Lunglei, Champhai,<br />

Lawngtlai & Mamit to cover Urban areas & Rural areas. Those Laboratories<br />

examines the water sample within a fixed period of time to ascertain present and<br />

content of disease producing bacteria of harmful minerals. Due to paucity of fund,<br />

no fund provision can be made for the same during 2004-2005<br />

2. One time ACA for Water Supply Scheme (Rural Water Supply):<br />

During 2004-2005 it is proposed that Darlawn W.S.S and Tuipang 'V' W.S.S. and<br />

Kamlanagar -I WSS, will be taken up under one time Additional Central Assistance.<br />

3. Total Sanitation Campaign (Saiha & Mamit) :<br />

The Government of India selected Saiha & Mamit District under Total Sanitation<br />

Campaign (TSC) within <strong>Mizoram</strong> during 2003-2004. Hence, Rs.15.00 lakh (Rs. 7.50<br />

lakh for each District) is approved as State Matching during 2004-2005.


- 315 -<br />

PUBLIC HEALTH ENGINEERING DEPARTMENT<br />

B. URBAN SECTOR:<br />

1. Urban Water Supply Scheme:<br />

(a) For clearing liabilities and completion of on-going Urban Water Supply Schemes like<br />

Greater Lunglei WSS, Greater Serchhip WSS and Greater Kolasib WSS, a sum of<br />

Rs.46.00 lakh is required. But due to limitation of Fund, no provision can be made<br />

during 2004-2005.<br />

(b) Construction of Aizawl 'S' Draw line:<br />

For proper distribution of water for Aizawl Water Supply Scheme (Phase-I)<br />

construction of Aizawl 'S' Draw line is obligatory, sum of Rs. 11.10 lakh is required<br />

for of the same, but due to limitation of Fund, Rs. 10.00 lakh only is provided<br />

during 2004-2005.<br />

(c) Water Supply for new Capital Complex at Khatla :<br />

Building New Capital Complex cannot be occupied till date due to non-availability<br />

of Water Supply. A sum of Rs. 62.78 lakh is required for the same, but due to<br />

limitation of fund only Rs. 40.00 lakh is earmarked during 2004-2005.<br />

(d) Improvement of Greater Aizawl Water Supply Scheme Phase-I:<br />

Before the commissioning of Greater Aizawl Water Supply Scheme Phase-II,<br />

Improvement and rejuvenation of existing Aizawl Water Supply such as<br />

improvement of some existing Zonal Tank, Pump & Machineries and some<br />

Distribution pipes is compulsory for the safety of Public around the periphery.<br />

Hence a sum of Rs.522.00 lakh is earmarked during 2004-2005.<br />

(e) Composite N. Kawnpui Water Supply Scheme:<br />

Administrative Approval amount Rs. 1844.00 lakh. It is targeted to complete<br />

during 2004-2005, for which a total requirement of fund is Rs. 599.61 lakh. But due<br />

to limitation of fund a sum of Rs. 361.00 lakh only can be approved during 2004-<br />

2005 (under NABARD).<br />

2. Accelerated Urban Water Supply Project (AUWSP): Saitual Water Supply Scheme,<br />

Thenzawl Water Supply Scheme and Lengpui Water Supply Scheme were executed<br />

since 3 to 4 years ago under AUWSP in Pattern of funding 50:50 sharing Central<br />

Government and State Government. The Central Government has already released<br />

full amount of its share whereas the State Government has to release 147.15 lakh<br />

(Saitual 23.29 lakh, Thenzawl Rs. 30.72 lakh, and Lengpui Rs. 93.14 lakh). However<br />

due to limitation of fund, a sum of Rs. 43.50 lakh only (Saitual Rs. 7.50 lakh,<br />

Thenzawl-Rs.11.00 lakh and Lengpui - Rs. 25.00 lakh) is provided during 2004-05.<br />

3. Integrated Project of Aizawl: (Greater Aizawl Water Supply Scheme Phase-II)<br />

Integrated Project of Aizawl consists the following schemes -<br />

(1) Aizawl Water Supply Scheme Phase-II - 7,180.00<br />

(2) Aizawl Sewerage Scheme Phase-I - 7,510.00<br />

(3) Aizawl Storm Drainage Scheme Phase-I - 2,900.00<br />

(4) Aizawl Solid Waste Management Scheme - 10.00<br />

(Feasibility survey)<br />

(5) Water Quality Monitoring & Public Health<br />

Education - 55.00<br />

Total - 17,655.00


- 316 -<br />

PUBLIC HEALTH ENGINEERING DEPARTMENT<br />

It is one of the Prime Minister's Economic Packages. The fund is to be borne by<br />

Central and State Government on 75:25 percent sharing basis. The central<br />

Government is being requested for cent per cent funding, but not succeeded<br />

Government of India has already released Rs. 4500.00 lakh for Aizawl Water Supply<br />

Water Supply Scheme Phase-II i.e. 85% of its total Share of Rs. 5385.00 lakh whereas<br />

the State Government has released only 419.00 lakh for Aizawl Water Supply<br />

Scheme Phase-II i.e. 23% of its share to be released (Rs. 1795.00 lakh). Until and<br />

unless State Government released Fund to match fund released by Central, No<br />

more fund will be released by the Central. The balance fund to be released by the<br />

State for Aizawl Water Supply Scheme Phase-II is Rs. 1376.00 lakh, but due to<br />

limitation of fund. A sum of Rs. 550.00 lakh only is approved during 2004-2005.<br />

4. (A) Q & M OF URBAN WATER SUPPLY SCHEME :<br />

(a) Clearing of Liabilities as per High Court Judgement:<br />

Liabilities amounting Rs. 68.13 lakh on account of operation and maintenance is to<br />

be cleared as per High Court Judgement. Hence a sum of Rs. 69.00 lakh is<br />

earmarked during 2004-2005.<br />

(b) Maintenance of Completed Urban Water Supply Schemes :(Operation &<br />

Maintenance):<br />

Fund for operation and maintenance of the completed urban pumping schemes is<br />

very limited. More fund is required for procurement of spare parts and repairs,<br />

purchase of diesel and oil, for wages and maintenance staff as more and more<br />

pumping scheme have been completed and other new pumping schemes are also<br />

being taken up. For Operation and Maintenance completed schemes of Aizawl,<br />

Lunglei, Serchhip, Kolasib, Saiha, Ratu, Darlawn, the barest minimum requirement<br />

of fund for 1(one) year is Rs. 2200.00 lakh, but due to limitation of fund only<br />

Rs.274.90 lakh can be provided during 2004-2005.<br />

(c) Committed Liabilities under Urban Water Supply :<br />

As already stated above, the actual requirement of fund for maintenance of Urban<br />

Water Supply Scheme is Rs. 2200.00 lakh every year. Since 3 to 4 year ago the<br />

actual requirement of fund for operation and maintenance cannot be allocated due<br />

to scarcity of Fund. But as nature of work is urgent and Public Demand. Preside,<br />

Operation and Maintenance carry on by hook or by crook with liabilities from<br />

Private Firm or Agency wherever possible. As a result the commuted liabilities<br />

accumulated since 3 to 4 years back is about Rs.700.00 lakh. But due lto paucity of<br />

fund no provision can be made for liabilities unde Operation and Maintenance<br />

during 2004-2005.<br />

C. OTHER SECTOR :<br />

1. Direction and Administration: Presently the Department is headed by Chief<br />

Engineer, who is assisted by 1(one) No. of Addl. Chief Engineer with 4 (four)<br />

working circles and 12(twelve) working divisions. To cope up with ever-increasing<br />

workload, the infrastructure of the Department needs to be strengthened and<br />

expanded and re-organised immediately. A sum of Rs. 1026.00 lakh is provided<br />

during the 10 th Plan Period, (Note that under Rural Sector, provision for Direction &<br />

Administration is Rs. 2590.00 lakh, hence the grand total allocation / provision for<br />

Direction & Administration comes to be Rs. 3616.00 lakh during Tenth Five Year<br />

Plan 2002-2007).


- 317 -<br />

PUBLIC HEALTH ENGINEERING DEPARTMENT<br />

2. Research: Experiment & Research works need to be taken up to find out the<br />

feasibility and using cheap/locally available materials, which in turn will result in<br />

efficient and cost effective technology.<br />

No fund is approved to research works during 2004-2005.<br />

3. Training: For sponsoring of Engineering Students, the Department usually kept<br />

aside sum fund, for which Rs. 3.00 lakh is approved during 2004-2005.<br />

4. Machineries & Equipments: As Public Health Engineering Department is now<br />

looking after pumping schemes and taking up new pumping schemes, it is required<br />

to purchase machineries and equipments like welding machineries, transformer oil<br />

filters, weighing machineries, altimeters etc. But due to financial constraint, no<br />

fund can be allocated during 2004-2005.<br />

5. Building (Champhai & Mamit): For accommodation office and staff quarters, it is<br />

required to provide a sum of Rs. 42.00 lakh during 2004-2005. For Champhai and<br />

Mamit. But no fund can be provided so far.<br />

ABSTRACT OF SECTORAL ALLOCATION<br />

SECTOR Amount (in lakh)<br />

A. RURAL SECTOR Rs. 1591.00<br />

B. URBAN SECTOR Rs. 1870.40<br />

C. OTHER SECTOR Rs. 63.60<br />

TOTAL : Rs. 3525.00


- 321 -<br />

HOUSING (LAD)<br />

HOUSING (LAD)<br />

A. Proposed Tenth Five Year Plan Outlay 2002 – 2007 - Rs. 20,060.00 lakhs<br />

B. Approved Annual Plan Outlay for 2003 – 2004 - Rs. 3,699.74 lakhs<br />

C. Approved Annual Plan Outlay for 2004 – 2005 - Rs. 3,682.00 lakhs<br />

Following Schemes are approved to be taken up during 2004 - 2005.<br />

A. 02 - URBAN HOUSING<br />

190 - INVESTMENT<br />

1. LIG Housing Loan - Rs. 100.00 lakhs<br />

2. MIG Housing Loan - Rs. 160.00 lakhs<br />

3. Composite Cash Loan to Govt. Servant (HBA) - Rs. 3,090.00 lakhs<br />

050 - LAND<br />

4. Sites & Services - NIL<br />

5. Land Acquisition & Development - Rs. 164.00 lakhs<br />

800 - OTHER EXPENDITURE<br />

6. E.W.S. Housing - Rs. 3.00 lakhs<br />

B. 03 - RURAL HOUSING<br />

7. 1-01 : Provision of House site - NIL<br />

8. 1-02 : Construction Assistance - NIL<br />

800 - OTHER EXPENDITURE<br />

9. Internal Improvement of Villages - NIL<br />

10. Resettlement of Villages - NIL<br />

80 - GENERAL<br />

11. Building Technology Extension - Rs. 10.00 lakhs<br />

12. 01 - Direction & Administration - Rs. 155.00 lakhs<br />

Total - Rs. 3,682. 00 lakhs


- 322 -<br />

HOUSING (LAD)<br />

BRIEF DESCRIPTION OF THE SCHEME<br />

1. LOW INCOME GROUP HOUSING LOAN:<br />

During the 9 th Five Year Plan, many households were given LIGHT loans at the rate<br />

of Rs. 0.30 lakh which was increased to Rs. 0.50 lakh. This is an important scheme for<br />

developing dwelling houses in Urban Centres and it is proposed to be continued in the 10 th<br />

Plan with the same rate. Each and every annual <strong>plan</strong> target has to be taken up as new<br />

items while the Scheme itself is a continuing one. The 10 th Plan Scheme is to grant LIGHT<br />

to 1800 households each Rs. 50,000/- within an outlay of Rs. 900.00 lakhs and the Annual<br />

Plan 2004–2004 is to benefit 200 households within an outlay of Rs. 100.00 lakhs.<br />

2. MIDDLE INCOME GROUP HOUSING LOAN:<br />

The 10 th Plan scheme is to benefit 1500 households at the rate of Rs. 80,000/- per<br />

one within an outlay of Rs. 1200.00 lakhs. Target for Annual Plan 2004–2005 is to be<br />

benefited 200 households within Rs. 160.00 lakhs.<br />

3. COMPOSITE CASH LOAN (HBA) TO GOVERNMENT EMPLOYEES:<br />

During the 9 th Plan period Rs. 106.10 crores were given to Government<br />

Employees in the form of HBA for house construction under this composite cash loan<br />

scheme. As many as 8910 Government Employees were benefited under the scheme. Loan<br />

recoveries and interest payments are affected from pay bills through Treasuries. The<br />

Scheme has been found to be very beneficial and fruitful and a proposal is made to<br />

continue the scheme during the 10 th Plan Rs. 3,090.00 lakhs is approved during 2004–05.<br />

Physical Targets for the year 2004–2005 is as follows: —<br />

(a) MIG I for 498 Nos. = Rs. 996/- @ 2.00 lakhs<br />

(b) MIG II for 666 Nos. = Rs. 999/- @ 1.50 lakhs<br />

(c) LIG for 876 Nos. = Rs. 1095/- @ 1.25 lakhs<br />

TOTAL : for 2040 Nos. = Rs. 3,090.00 lakhs<br />

4. SITE AND SERVICES:<br />

No earmarked during 2004 – 2005.<br />

5. LAND AQUISITION AND DEVELOPMENT:<br />

With rapid expansion of Towns in <strong>Mizoram</strong>, as a result of mass migration of the<br />

people from villages to the area of Towns and Sub-Towns, it becomes imperative to<br />

develop lands for human settlement in the Towns and Sub-Towns to attract persons to<br />

settle with a view to checking further mass migration to Towns. The programme of land<br />

developments such as to make <strong>plan</strong>s for houses sites, roads steps, etc. within the District<br />

Headquarters like Aizawl, Lunglei, Champhai, Kolasib, Mamit, Serchhip, Saiha and<br />

Lawngtlai areas. The scheme of 10 th Five Year Plan is to develop 332 hectares of land within<br />

Rs. 665.00 lakhs and that of the Annual Plan 2004–2005 is to develop 82 hectares within<br />

Rs. 164.00 lakhs.


- 323 -<br />

HOUSING (LAD)<br />

6. E.W.S. HOUSING:<br />

During the 9 th Plan, EWS Housing was introduced in the form of grant for giving<br />

Construction Assistance of Rs. 2500/- each per family in urban areas as has been done in<br />

rural areas under the scheme of construction Assistance. The scheme of the 10 th Plan is to<br />

benefit 2000 families within Rs. 50.00 lakhs, and Rs. 3.00 lakhs is approved for providing<br />

assistance to 120 families during 2004 – 2005.<br />

7. PROVISION OF HOUSE SITE (MNP):<br />

No earmarked during 2004 - 2005.<br />

8. CONSTRUCTION ASSISTANCE (MNP):<br />

No earmarked during 2004 - 2005.<br />

9. INTERNAL IMPROVEMENT OF VILLAGES:<br />

No earmarked during 2004 - 2005.<br />

10. RESETTLEMENT OF VILLAGES:<br />

No earmarked during 2004 - 2005.<br />

11. BUILDING TECHNOLOY EXTENSION:<br />

This scheme is started since 1995 - 96 with a meagre fund. <strong>Mizoram</strong> depends on<br />

building materials, mostly procured from neighbouring states such as iron rods, GCI<br />

Sheets, Tiles, Brick, Cements etc. and the cost of house construction is very high. It is<br />

necessary to identify materials, which are locally available and technologically and<br />

economically sound for used in building construction for the purpose of checking<br />

materials imported from neighbouring states as well as reducing the construction cost.<br />

Attempts shall be made to identify such materials and to collaboration with HUDCO.<br />

Aizawl Building Centre has been set up and Seminar and practical training on House<br />

Construction has been started. Rs.50.00 lakhs is proposed for the whole 10 th Plan and the<br />

Annual Plan provision shall be as under. It is not readily possible to fix physical targets<br />

which will come to light after research, physical training etc. Rs. 10.00 lakhs is earmarked<br />

during 2004–2005.<br />

12. DIRECTION AND ADMINISTRATION:<br />

During the 8 th Plan, the following posts have been created and filled up to<br />

implement the housing <strong>plan</strong>. It is necessary to provide certain outlay for continuance and<br />

retention of the posts during the 10 th Plan. It is to be mentioned that just 137% of the<br />

whole outlay is required for such retention of posts, i.e. Rs. 250.00 lakhs for the whole 10 th<br />

Plan and for the current year 2004–2005, Rs 155.00 lakhs is ear marked which includes to<br />

developing the Common Cemetery for Aizawl City amounting to Rs 100.00 lakhs and<br />

Rs.4.00 lakhs For Construction of DLAO Office, Serchhip and the remaining Rs 51.00 lakhs<br />

is marked for retention of the posts with other official normal expenditure.<br />

The following are the Break up showing the expenditure of Rs 155.00 lakhs as well<br />

as retention of the post.


- 324 -<br />

HOUSING (LAD)<br />

Break-up of Direction & Administration<br />

A. For Common Cemetery - Rs. 100.00 lakhs<br />

B. For Construction of DLAO Office, Serchhip - Rs. 4.00 lakhs<br />

C. Normal Direction & Administration: -<br />

(a) Salary - Rs. 24.00<br />

(b) Wages - Rs. 4.10<br />

(c) T.E - Rs. 1.50<br />

(d) Office Expenses - Rs. 13.00<br />

(e) Motor Vehicles - Rs. 7.00<br />

(f) Publications - Rs 1.00<br />

(g) Advertising & Publicity - Rs 0.40<br />

Total - Rs. 51.00 lakhs<br />

G. Total - Rs 155.00 lakhs<br />

Retention of Post<br />

1. 1 (one) Assistant Engineer 8,000 – 13,500<br />

2. 3 (three) Assistant 5,500 – 9,000<br />

3. 2 (two) Junior Engineer 5,500 – 9,000<br />

4. 1 (one) UDC 5,000 – 8,000<br />

5. 6 (six) LDC 4,000 – 6,000<br />

6. 1 (one) Driver 3,050 – 4,590<br />

7. 2 (two) IV Grade 2,650 – 4,000


Introduction<br />

- 327 -<br />

GOVERNMENT HOUSING (PWD)<br />

GOVERNMENT HOUSING (PWD)<br />

The works falling under this Head of Accounts are mainly construction and<br />

improvement of Government residential quarters at various places in and outside<br />

<strong>Mizoram</strong>. During 2004-05, Rs. 270.00 lakhs is provided under this Head of Accounts.<br />

Direction & Administration :<br />

Rs. 211.00 lakhs is approved during 10 th Five Year Plan.<br />

Rs. 50.00 lakhs is approved for salary and establishment of the existing staffs<br />

during 2004-05.<br />

The break-up of Direction and Administration is as follows: -<br />

1) Salary - 3.00 lakhs<br />

2) T.E - 2.00 lakhs<br />

3) Office expenses - 5.00 lakhs<br />

4) Maintenance - 40.00 lakhs<br />

Total - 50.00 lakhs<br />

Machinery & Equipment :<br />

No provision is kept for Machinery and equipment during 2004-05.<br />

Works :<br />

Rs. 220.00 lakhs is provided for works under this Head of Accounts during 2004-<br />

2005.<br />

Spill over Schemes<br />

1. Constn. of Multi Storeyed quarters for Assembly Staff at Old assembly Press<br />

building<br />

Rs. 20.00 lakhs is earmarked during 2004-05.<br />

2. Completion of Staff quarters at Tuikhuahtlang<br />

Rs. 5.00 lakhs is earmarked during 2004-05<br />

3. Construction of Speaker Bungalow at Old CM Bungalow<br />

Rs. 15.00 lakhs is earmarked during 2004-05<br />

4. Construction of Govt. quarter Type-II 6 units at Zuangtui Phase-I<br />

Rs. 5.70 lakhs is earmarked during 2004-05.<br />

5. Construction of Retaining Wall on approach road to Excise staff quarter at<br />

Vairengte<br />

Rs. 0.90 lakhs is earmarked during 2004-05.<br />

6. Construction of Type-III quarters – 2 nos. at Champhai<br />

Rs. 4.00 lakhs is earmarked during 2004-05.<br />

7. Construction of RCC quarters Type-II 4 units at Champhai<br />

Rs. 8.40 lakhs is earmarked during 2004-05.


New Schemes<br />

- 328 -<br />

GOVERNMENT HOUSING (PWD)<br />

1. Improvement & Retrofitting of govt. quarters at Govt. Complex at Luangmual<br />

Phase-III, Type-III – 6 nos.<br />

Rs. 6.00 lakhs is earmarked during 2004-05.<br />

2. Improvement & Retrofitting of Govt. quarters at Zonuam, Luangmual<br />

Rs. 2.00 lakhs is earmarked during 2004-05<br />

3. Renovation of single senior officer’s quarters at Babutlang Phase-II<br />

Rs. 3.00 lakhs is earmarked during 2004-05<br />

4. Vertical extension of single senior Officer’s quarter at Babutlang<br />

Rs. 10.00 lakhs is earmarked during 2004-05.<br />

5. Construction of type-II quarters 4 units at Chanmari, Lunglei Ph-II<br />

Rs. 7.50 lakhs is earmarked during 2004-05.<br />

6. Construction of protection wall below combined type-I & Type-II quarters at Rahsi<br />

Veng, Lunglei.<br />

Rs. 1.00 lakh is earmarked during 2004-05<br />

7. Roof treatment of combined EE and SDO quarters at Rahsi Veng, Lunglei<br />

Rs. 2.50 lakhs is earmarked during 2004-05.<br />

8. Renovation and retrofitting of staff quarters at Lunglei<br />

Rs. 5.00 lakhs is earmarked during 2004-05<br />

9. Improvement and Renovation on Internal electrification<br />

Rs. 30.00 lakhs is earmarked during 2004-05.<br />

10. Construction of Staff quarters at Lawngtlai<br />

Rs. 25.00 lakhs is earmarked during 2004-05<br />

11. Renovation and retrofitting of staff quarters at Saiha<br />

Rs. 4.00 lakhs is earmarked during 2004-05.<br />

12. Re-modification of Chief Minister’s Bungalow, construction of garage, painting<br />

Rs. 2.50 lakhs is earmarked during 2004-05<br />

13. Retrofitting, renovation and improvement of Govt. quarters under building North<br />

Sub-Division<br />

Rs. 6.00 lakhs is earmarked during 2004-05.<br />

14. Constn. of Water tank, Septic tank, including soak pits for Govt. quarters under<br />

North Sub-Division.<br />

Rs. 2.00 lakhs is earmarked during 2004-05<br />

15. Retrofitting and improvement of Govt. quarters within Raj Bhavan compound.<br />

Rs. 3.00 lakhs is earmarked during 2004-05.<br />

16. Preparation of A.R. ground and Governor’s lawn for Independence Day and<br />

Republic day<br />

Rs. 1.50 lakhs is earmarked during 2004-05.<br />

17. Retrofitting and improvement of quarters under Headquarters sub-Division<br />

Rs. 4.00 lakhs is earmarked during 2004-05


- 329 -<br />

GOVERNMENT HOUSING (PWD)<br />

18. Construction of Septic Tank, under headquarters sub-Division<br />

Rs. 2.00 lakhs is earmarked during 2004-05<br />

19. Renovation and improvement of quarters under Building Sub-Division South<br />

Rs. 5.00 lakhs is earmarked during 2004-05.<br />

20. Improvement of Raj Bhavan on occasion of visit of President of India<br />

Rs. 1.00 lakh is earmarked during 2004-05<br />

21. Construction of toe wall within Chief Secretary compound<br />

Rs. 1.00 lakhs is earmarked during 2004-05<br />

22. Reconstruction of fencing of Chief Secretary bungalow<br />

Rs. 2.00 lakhs is earmarked during 2004-05<br />

23. Construction of Water tank and Septic tank within sub-Division south area<br />

Rs. 2.00 lakhs is earmarked during 2004-05<br />

24. Renovation of MLA Hostel<br />

Rs. 2.50 lakhs is earmarked during 2004-05<br />

25. Construction of Guard barrack at Dr. Lalzama’s residence [Minister of State]<br />

Rs. 2.40 lakhs is earmarked during 2004-05<br />

26. Construction of Security fencing of the resident of Dr. Lalzama Minister of State.<br />

Rs. 1.18 lakhs is earmarked during 2004-05.<br />

27. Rent for Security Guard barrack and fencing of Pu Z.H.Ropuia’s residence at<br />

Mission Veng<br />

Rs. 0.20 lakhs is earmarked during 2004-05.<br />

28. Furnishing of VIP Bungalow<br />

Rs. 22.60 lakhs is earmarked during 2004-05.<br />

29. Rent for Security Guard barrack speaker Residence at Electric Veng<br />

Rs. 0.12 lakhs is earmarked during 2004-05<br />

30. Construction of R/Wall below quarters No. L-II at Laipuitlang<br />

Rs. 0.50 lakh is earmarked during 2004-05.<br />

31. Construction of R/Wall below quarters No. 21 & 22 at PWD Mual Ramhlun<br />

Rs. 0.30 lakh is earmarked during 2004-05.<br />

32. Construction of r/wall near Dr. Biakzual’s quarters<br />

Rs. 0.80 lakh is earmarked during 2004-05.<br />

33. Renovation Assam type, type-II quarters at Suangpuilawn [6 nos.]<br />

Rs. 2.40 lakhs is earmarked during 2004-05.


- 338 -<br />

POLICE HOUSING<br />

POLICE HOUSING<br />

There has been acute shortage of accommodation for functional and residential<br />

building in the Police Department. The level of satisfaction housing in <strong>Mizoram</strong> is very low<br />

compared to other states. This obviously and adversely affected the performance of<br />

<strong>Mizoram</strong> Police as they need to be collected from different locations to attend emergency<br />

calls.<br />

In our Annual Plan 2004-05 it is approved to construct 72 Nos. (77 units) of<br />

accommodation with an amount of Rs. 425.00 lakhs.<br />

LIST OF WORKS TO BE TAKEN UP DURING 2004-05 UNDER PLAN (POLICE HOUSING)<br />

S/n Location Type of buildings No. Rate Amount<br />

AIZAWL DISTRICT<br />

1 Saitual Type-II (Semi) 2 5,00,000/- 10,00,000/-<br />

Type-III (Semi) 1 6,02,400/- 6,02,400/-<br />

2. Sialsuk Type-II (Semi) 1 5,00,000/- 5,00,000/-<br />

3 Sairang Type-III (Semi) 1 6,02,400/- 6,02,400/-<br />

4 Durtlang Type-II (Semi) for MPRO 1 5,00,000/- 5,00,000/-<br />

10 Men Barrack for MPRO 1 4,64,000/- 4,64,000/-<br />

Kitchen-cum-Dining 1 2,82,000/- 2,82,000/-<br />

5 Armed Veng Type-II (RCC) 6 5,46,000/- 32,76,000/-<br />

MAMIT DISTICT<br />

6 Mamit Type-I ‘B’ 2 Units (RCC) 1 5,76,000/- 5,76,000/-<br />

Type-II (Semi) 1 5,00,000/- 5,00,000/-<br />

7 Zamuang Type-II (Semi) 1 5,00,000/- 5,00,000/-<br />

10 Men Barrack 1 4,64,000/- 4,64,000/-<br />

Kitchen-cum-Dining 1 2,82,000/- 2,82,000/-<br />

8 New Kawnpui 10 Men Barrack for 3 rd MAP 2 4,64,000/- 9,28,000/-<br />

Kitchen-cum-Dining 1 2,82,000/- 2,82,000/-<br />

9 Phuldungsei 10 Men Barrack for 3 rd MAP 1 4,64,000/- 4,64,000/-<br />

Kitchen-cum-Dining 1 2,82,000/- 2,82,000/-<br />

10. Damparengpui 15 Men Barrack 1 6,53,000/- 6,53,000/-<br />

Kitchen-cum-Dining 1 2,82,000/- 2,82,000/-<br />

KOLASIB DISTRICT<br />

11 Kolasib Type-II (Semi) for FSO 1 5,00,000/- 5,00,000/-<br />

Type-II (Semi) for MPRO 1 5,00,000/- 5,00,000/-<br />

12 Vairengte Type-III (Semi) 1 6,02,400/- 6,02,400/-<br />

13 Bairabi Type-II (Semi) 1 5,00,000/- 5,00,000/-<br />

15 Men Barrack 1 6,53,000/- 6,53,000/-<br />

Kitchen-cum-Dining 1 2,82,000/- 2,82,000/-<br />

14. Bilkhawthlir Type-II (Semi) 1 5,00,000/- 5,00,000/-<br />

15 Zophai 20 Men Barrack 1 9,28,100/- 9,28,100/-<br />

Kitchen-cum-Dining 1 2,82,000/- 2,82,000/-<br />

Type-III (Semi) 1 6,02,400/- 6,02,400/-<br />

Approach road to Police OP 1 26,63,300/- 26,63,300/-<br />

Security fencing 1 1,73,000/- 1,73,000/-<br />

Parade ground 1 3,51,200/- 3,51,200/-


- 339 -<br />

POLICE HOUSING<br />

S/n Location<br />

SERCHHIP DISTRICT<br />

Type of buildings No. Rate Amount<br />

16 Serchhip Type-III (Semi) 1 6,02,400/- 6,02,400/-<br />

Type-II (Semi) 2 5,00,000/- 10,00,000/-<br />

CHAMPHAI DISTRICT<br />

17 Champhai Type-II (Semi) 1 5,00,000/- 5,00,000/-<br />

Type-II 2 Storied (RCC) for<br />

MPRO<br />

2 9,28,300/- 18,56,600/-<br />

LAWNGTLAI DISTRICT<br />

18 Lawngtlai Type-III (Semi) for FSO 1 6,73,700/- 6,73,700/-<br />

Type-III (Semi) 1 6,73,700/- 6,73,700/-<br />

Type-I ‘B’ 2 Units (RCC) 1 6,50,000/- 6,50,000/-<br />

19. Tlabung Type-III (Semi) for FSO 1 6,73,700/- 6,73,700/-<br />

SAIHA DISTRICT<br />

20 Saiha Type-II (RCC) for FSO 1 6,12,300/- 6,12,300/-<br />

Type-III (Semi) 1 6,73,700/- 6,73,700/-<br />

21 Sangau Type-II (Semi) 1 5,60,000/- 5,60,000/-<br />

22 Phura Type-II (Semi) 1 5,60,000/- 5,60,000/-<br />

23 Tuipang Type-II (Semi) 1 5,60,000/- 5,60,000/-<br />

24 Lungbun Type-II (Semi) 1 5,60,000/- 5,60,000/-<br />

1 ST IR BATTALION<br />

25 Mualvum Type-II (Semi) 4 5,00,000/- 20,00,000/-<br />

2 ND IR BATTALION<br />

26 Khawzawl Type-II (RCC) 6 5,46,000/- 32,76,000/-<br />

Type-III (Semi) 2 6,02,400/- 12,04,800/-<br />

2 ND BATTALION MAP<br />

27 Lunglei Type-II (Semi) 1 5,60,000/- 5,60,000/-<br />

Type-III (Semi) 1 6,73,700/- 6,73,700/-<br />

3 RD BATTALION MAP<br />

28. Mualpui Type-III (Semi) 1 6,02,400/- 6,02,400/-<br />

Type-I ‘B’ 2 Units (RCC) 1 5,76,000/- 5,76,000/-<br />

Type-II (Semi) for FSL Staff 1 5,00,000/- 5,00,000/-<br />

29 Renovation - - 19,73,800/-<br />

TOTAL 72 (i.e. 77 Units 425,00,000/-<br />

LIST OF INSTRUMENTS TO BE PURCHASED DURING 2004-05 UNDER PLAN (FORENSIC<br />

SCIENCE LABORATORY)<br />

Sl/No Instruments Approx. Cost (in Rs.)<br />

1<br />

Purchase of New Low cost Crime Lite<br />

(Mason Vactron Ltd.)<br />

3,50,000/-<br />

2 Cotton for bullet recovery box 5,000/-<br />

3 Instant Fingerprint Lifting Pad 10,000/-<br />

4 Fingerprint lifting powder/sheet 10,000/-<br />

5<br />

Magnetic Magnifier with ridge counting<br />

plate<br />

25,000/-<br />

TOTAL : 4,00,000/-


- 341 -<br />

URBAN DEVELOPMENT (LAD)<br />

URBAN DEVELOPMENT (LAD)<br />

A. Proposed Tenth Five Year Plan 2002 – 2007 - Rs. 3,988.00 lakhs<br />

B. Approved Annual Plan Outlay 2003 – 2004 - Rs. 516.00 lakhs<br />

C. Approved Annual Plan Outlay 2004 – 2005 - Rs. 663.00 lakhs<br />

Following schemes are approved to be taken up during 2004 – 2005:<br />

050 - LAND<br />

1. Construction of Minor Roads - Rs. 1.00 lakhs<br />

2. Construction of Parks - Rs. 20.00 lakhs<br />

3. Construction of Steps - Rs. 111.00 lakhs<br />

4. Dumping Grounds - Rs. 5.00 lakhs<br />

5. Monsoon Damage Scheme - Rs. 55.00 lakhs<br />

051 - CONSTRUCTION<br />

6. RCC Footpath / Pedestrian Pavement - Rs. 20.00 lakhs<br />

7. High-mast Lightning - NIL<br />

8. Fly-Over Bridge - NIL<br />

9. Office Building - Rs. 14.00 lakhs<br />

10. Solid Wasted Management - NIL<br />

11. Garbage Truck Terminal - NIL<br />

12. Cleanliness Week / Beautification of City - Rs. 12.00 lakhs<br />

052 - MACHINERY & EQUIPMENT<br />

13. Sanitation - Rs. 44.00 lakhs<br />

190 - INVESTMENT<br />

14. Shops & Market Centre - NIL<br />

800 - OTHER EXPENDITURE<br />

15. Matching Share of SJSRY - Rs. 80.00 lakhs<br />

16. Environmental Improvement of Urban Slum (EIUS) - Rs. 28.00 lakhs<br />

17. 01 - Direction & Administration - Rs. 173.00 lakhs<br />

18. 04 - National Slum Development Programme - Rs. 100.00 lakhs<br />

TOTAL - Rs. 663.00 lakhs<br />

BRIEF DESCRIPTION OF THE SCHEME<br />

1. CONSTRUCTION OF MINOR ROADS:<br />

The programmed is to maintain approach road to Dumping Grounds and also for<br />

approach to Departmental areas etc. and Rs. 1.00 lakh is approved for 2004 – 2005.


- 342 -<br />

URBAN DEVELOPMENT (LAD)<br />

2. CONSTRUCTION OF PARKS:<br />

Busy and unrest lives in the congested Towns and Cities are in need of some<br />

recreation places, where people could enjoy their leisure time. Without such places, lives in<br />

Towns and Cities could be frustrated and vain. During the 9 th Plan, 2(two) such<br />

recreational places were constructed, one at Aizawl called Public Recreational Centres and<br />

the other at Lunglei called District Park Zobawk. Within an expenditure of Rs. 60.00 lakhs,<br />

many works have been done with very useful achievements. But there are many scopes of<br />

further improvement and the two places are again proposed to be continued in the 10 th<br />

Plan as continuing schemes. Apart from this, the Department is starting establishment of<br />

Recreation Centre & Public Park at Kolasib, Lengpui, Lawibual, Lunglei and Rulchawm.<br />

Fund amounting to Rs. 100.00 lakhs is approved for the 10 th Plan and Rs. 20.00 lakhs is<br />

approved for 2004–2005 to continue the schemes.<br />

3. CONSTRUCTIONS OF STEPS/RETAINING WALLS:<br />

Towns in <strong>Mizoram</strong> are situated on spur of Hills which steep down to the gorges of<br />

streams below between the spurs. Roads and residential lines go on the spurs in<br />

horizontal lines. The only possible vertical link between the adjacent rows could be<br />

provided by construction of public foot steps just like staircases in multi-stories buildings.<br />

Due to irregular topography each and every spur in the Towns requires a number of foot<br />

steps. During the 9 th Plan Rs. 275.00 lakhs was utilised for construction of 3,98,400<br />

running metres of public steps at may places in the various Towns. Still much has to be<br />

done and the scheme is approved to be continued in the 10th Plan as new schemes in view<br />

of the fact that every item of works shall be taken up as new works. Rs. 950.00 lakhs is<br />

approved for the 10 th Plan for target of 1,07,670 running metres Rs. 111.00 lakhs is<br />

approved for 2004–2005. The allocation is for distribution to District Headquarters as<br />

necessary.<br />

4. DUMPING GROUND:<br />

The existing two dumping grounds in Aizawl City are in need of<br />

Improvement. Similarly, Dumping Ground in other towns viz. — Lunglei, Champhai and<br />

Kolasib are in need of expansion and improvement. A need has been felt to construct<br />

another dumping ground in the other direction route in order that town garbage could be<br />

disposed off all through the seasons. For this purpose, Rs. 80.00 lakhs is approved for the<br />

10 th Plan Rs. 5.00 lakhs is approved for 2004–2005. The main work shall be road<br />

construction for some distance from the main road, digging of dumping pits, construction<br />

of dumping platform as well as protection walls and vehicle turning points, etc.<br />

5. MONSOON DAMAGE SCHEME:<br />

Damage caused to roads, lanes, houses, properties and even lives due to heavy rains<br />

during rainy season are almost annual phenomenon in <strong>Mizoram</strong>. Here annual rainfall is<br />

mostly 250cm to 350cm, and the approximate intensity of rainfall is 70m per hour. Due to<br />

steep topography, the concentration flow of rain water is short and rapid. The very high peak<br />

flow of rain water causes landslides, thereby damaging roads, lanes, houses and properties.<br />

Hence restoration and repair works have to be taken up every year. A need is there to set<br />

apart certain outlay for such purposes as Monsoon damage fund. The approved outlay for the<br />

10 th Plan 2002-2007 is Rs. 300.00 lakhs. Rs. 55.00 lakhs is approved for 2004–05.<br />

6. RCC FOOTPATH/PEDESTRIAN PAVEMENT:<br />

Rs. 20.00 lakhs is earmarked for the construction and also for the maintenance of<br />

the existing Pedestrian pavements for the year 2004 – 2005.


- 343 -<br />

URBAN DEVELOPMENT (LAD)<br />

7. HIGH MAST LIGHTING:<br />

No earmarked for the year 2004 – 2005.<br />

8. FLY-OVER BRIDGE:<br />

No earmarked for the year 2004 – 2005.<br />

9. OFFICE BUILDING:<br />

During the 9 th Plan, two District Level Offices were constructed in Aizawl and it is<br />

badly required the expansion of the size as well as activities of the department. There is an<br />

urgent need of extending the Directorate Office, the Circle Officers at Champhai, Kolasib<br />

and the DLAO Office at Aizawl and Lunglei. It is, therefore, approved to be provided<br />

Rs.70.00 lakhs during the 10 th Plan for Office building. During 2004–2005, Rs. 14.00 lakhs<br />

is provided for the vertical extension of DLAO Office Building and also for the<br />

maintenances of other existing office Buildings.<br />

10. SOLID WASTE MANAGEMENT:<br />

No earmarked for the year 2004 – 2005.<br />

11. GARBAGE TRUCK TERMINAL:<br />

No earmarked for the year 2004 – 2005.<br />

12. CLEANLINESS / BEAUTIFICATION OF CITY:<br />

Cleanliness Drive has been carried out in <strong>Mizoram</strong> since 1977 without break.<br />

Awareness campaign as well as physical works of cleanliness have been done every year.<br />

The local authorities, the NGOs, the Church leaders and the students of various levels have<br />

been involved in such important drives. It has long been felt necessary to make <strong>plan</strong><br />

provision for such kind of important public activities. Besides this, the Department is<br />

intending to take steps towards beautification of Aizawl City for the 10 th Plan. Rs.80.00 lakhs<br />

is approved, Rs.12.00 lakhs is approved for implementation of the programme like<br />

observance of cleanliness week and also for the beautification of Aizawl City during 2004–05.<br />

13. SANITATION:<br />

The term Sanitation is hereby used to express the problems of garbage in the towns<br />

with clearance and disposal there of with all the required devices such as man powers,<br />

vehicles and other implements, maintenance of dumping grounds, public urinals and many<br />

other urban problems of the like nature. A separate establishment to deal with this kind<br />

of problems has been set up in Aizawl mostly paid and run from Non-Plan provisions. A<br />

need has long been felt to expand the Sanitation establishment by creating few more posts<br />

like the Joint Director (Sanitation) field staff including Sweepers. The reason is that the<br />

problems are numerous and the existing level of the one Sanitation Officer, two Assistant<br />

Sanitation Officers and Supporting Offices Staff and Field Staff could not cope with the<br />

problems. It is approved to take up this expansion scheme in the <strong>plan</strong> site during the 10 th<br />

Plan. A need is also felt to open new Sanitation Establishments in Lunglei, Champhai and<br />

Kolasib. However, the details of the requirement for the expansion is shown against point<br />

No.16-Direction & Administrations. Exclusively for management of collection and disposal<br />

of garbage, daily cleaning of important public places, public urinals, etc. Rs. 200.00 lakhs<br />

is approved for the 10 th Plan. Recently collection of garbage two times a day was<br />

introduced at Aizawl and for which Rs. 44.00 lakhs is earmarked for maintenance and<br />

keep up of garbage trucks and other expenditures to run the sanitation function at Aizawl<br />

and other District Headquarters.


- 344 -<br />

URBAN DEVELOPMENT (LAD)<br />

Break up of Rs. 44.00 lakhs<br />

HEAD PARTICULARS AMOUNT<br />

(Rs. in lakhs)<br />

(a) For maintenance of Light Vehicle<br />

2.50<br />

(13) O.E. (There are 3 nos. of LMV and 8 Two Wheeler)<br />

(b) For Office expenditure 2.50<br />

(50) O.C (a) For implementation of various Office charge 5.00<br />

(a) P.O.L. 17.00<br />

(51) M.V.<br />

(b) For repairing of Vehicle<br />

(c) For Purchase of Tyres<br />

(There are 19 Heavy Vehicles for Sanitation)<br />

10.00<br />

7.00<br />

TOTAL 44.00<br />

The above total amounting to Rs 44 lakhs consist of SOLID WASTE MANAGEMENT<br />

and GARBAGE TRUCK TERMINAL, which was marked with a separate head in the Previous<br />

Draft Annual Plan i.e. 2004–2005. For the Draft Annual Plan 2005–2006, the said two<br />

schemes are amalgamated and included under the sanitation, as the schemes are<br />

implemented through Sanitation.<br />

14. SHOPS AND MARKETING CENTRES:<br />

No earmarked for the year 2004 – 2005.<br />

15. MATCHING SHARE OF SJSRY:<br />

During the 9 th Plan, the annual central grant for SJSRY in <strong>Mizoram</strong> is mostly<br />

Rs.128.00 lakhs per year. It is expected to receive more grants every year and the approved<br />

matching share is slightly higher for during the 10 th Plan than those during the 9 th Plan<br />

period. Hence, Rs. 80.00 lakhs is approved during 2004–2005.<br />

16. ENVIRONMENTAL IMPROVEMENT OF URBAN SLUM:<br />

Although any part or portion of towns in <strong>Mizoram</strong> has not been identified a Slum<br />

area, yet any parts there of, mostly in the lower reaches, are obviously in the condition of<br />

slums. Link road is a problem, scarcity of drinking water is there, electricity is a problem<br />

and above all drainage problems have assumed proportion that is more serious. With<br />

rapid urbanisation during the last 20 years, the towns are rapidly expanding and the larger<br />

parts of the towns now occupy the lower reaches of the hill slopes where drainage<br />

problems are very serious due to uncontrolled flow of storm water. In short, cluster of<br />

dwelling houses are without basic amenities. For the 10 th Plan, Rs. 175.00 lakhs is<br />

proposed for EIUS. During 2004–2005, Rs. 28.00 lakhs is approved for this scheme.<br />

17. DIRECTION & ADMINISTRATION:<br />

During the 8 th Plan, the following post have been created and filled up, and were<br />

continued during the 9th <strong>plan</strong>. Obviously the posts are required to implement the 10 th<br />

Plan schemes as well as carry on the Administrative aspects connected with the <strong>plan</strong>s. In<br />

addition to the existing posts, certain new posts are also urgently as briefly explained<br />

against point No. 12 (Sanitation). For the 10 th Plan Rs. 400.00 lakhs is approved. Rs. 173.00<br />

is approved during 2004–2005, which includes for establishment of Clean <strong>Mizoram</strong><br />

amounting to Rs 9.00 lakhs, Observation and Celebration for V.C. Golden Jubilee<br />

amounting to Rs 15.00 lakhs, Developing Truck terminal at Rangvamual amounting to<br />

Rs.80.00 lakhs and the remaining amounting to Rs 69.00 lakhs is being for Direction and<br />

Administration.


- 345 -<br />

URBAN DEVELOPMENT (LAD)<br />

The following break up shows the actual expenditure under Direction and<br />

Administration as well as list of existing posts with proposed new posts: -<br />

A. Establishment of Clean <strong>Mizoram</strong> Rs. 9.00 lakhs<br />

B. Observation and celebration of V.C. Golden Jubilee Rs. 15.00 lakhs<br />

C. Purchase and Development of Truck Terminal Rs. 80.00 lakhs<br />

D. Normal Direction and Administration: -<br />

i) Salary : Rs. 41.00 lakhs<br />

(ii) Wages : Rs. 8.00 lakhs<br />

(iii) T.E. : Rs. 1.50 lakhs<br />

(iv) O.E. : Rs. 10.00 lakhs<br />

(v) Motor Vehicles : Rs. 7.00 lakhs<br />

(vi) Other Charges : Rs. 1.50 lakhs<br />

Total : Rs. 69.00 lakhs Rs. 69.00 lakhs<br />

F. LIST OF EXISTING POSTS<br />

G. Total Rs. 173.00 lakhs<br />

1. 1 (One) Joint Director - 12,000 – 18,000<br />

2. 2 (two) Deputy Director - 10,000 – 15,200<br />

3. 1 (one) Circle Officer - 6,500 – 10,500<br />

4. 1 (one) Assistant Engineer - 8,000 – 13,500<br />

5. 1 (one) Junior Engineer - 5,500 – 9,000<br />

6. 2 (two) Assistants - 5,500 – 9,000<br />

7. 3 (three) UDCs - 5,500 – 9,000<br />

8. 5 (five) LDCs - 4,000 – 6,000<br />

9. 2 (two) Town Supervisors - 4,500 – 7,000<br />

10. 1 (one) Steno Gr. III - 5,000 – 8,000<br />

11. 7 (seven) Drivers - 3,050 – 4,590<br />

12. 4 (four) Handyman - 2,650 – 4,000<br />

13. 7 (seven) Sweepers - 2,650 – 4,000<br />

PROPOSED NEW POSTS<br />

1. 1 (one) Jt. Director or its equivalent post (Sanitation) - 12,000 – 80,000<br />

2. 1 (one) Steno Gr. III - 5,000 – 8,000<br />

3. 1 (one) Office Superintendent - 8,000 – 13,500<br />

4. 1 (one) Driver - 3,050 – 4,590<br />

5. 1 (one) Sanitation Officer (Lunglei) - 8,000 – 13,500<br />

6. 1 (one) Assistant (Lunglei) - 5,500 – 9,000<br />

7. 2 (two) LDC (Lunglei) - 4,000 – 6,000<br />

8. 1 (one) Drive (Lunglei) - 3,050 – 4,590<br />

9. 40 (forty) Sweepers - 2,650 – 4,000<br />

10. 10 (ten) Lorry Attendants - 2,650 – 4,000


- 346 -<br />

URBAN DEVELOPMENT (LAD)<br />

18. NATIONAL SLUM DEVELOPMENT PROGRAMME:<br />

During the 8 th , 9 th and 10 th Plan period, earmarked grants of NSPD were received<br />

from the government of India as under: -<br />

1996 – 1997 - Rs 34.00 lakhs<br />

1997 – 1998 - Rs. 88.00 lakhs<br />

1998 – 1999 - Rs. 88.00 lakhs<br />

1999 – 2000 - Rs. 122.00 lakhs<br />

2000 – 2001 - Rs. 110.00 lakhs<br />

2001 – 2002 - Rs. 110.00 lakhs<br />

2002 – 2003 - Rs 104.00 lakhs<br />

2003 – 2004 - Rs 104.00 lakhs<br />

Total - Rs. 760.00 lakhs<br />

A slightly larger amount is expected to be received for the 10 th Plan, and proposal<br />

for Rs. 625.00 lakhs is made. During 2004–2005, Rs. 100.00 lakhs is earmarked for<br />

implementation of the schemes as already earmarked and provided by the Central<br />

Government in the Scheme of Financing the State Annual Plan.


URBAN DEVELOPMENT<br />

- 349 -<br />

URBAN DEVELOPMENT (PWD)<br />

URBAN DEVELOPMENT (Including State Capital Project)<br />

Rs. 125.00 lakhs is earmarked for Urban Development during 2004-05<br />

DIRECTION & ADMINISTRATION<br />

A sum of Rs. 230.00 lakhs is provided for Direction & Administration during 10 th<br />

Five Year Plan.<br />

Rs. 96.00 lakhs is earmarked for Salary and establishment of the existing staff.<br />

The break up of Direction & Administration is as below: -<br />

1] Salary - Rs. 85.00 lakhs<br />

2] Travelling expenses- Rs. 2.00 lakhs<br />

3] Office expenses - Rs. 5.00 lakhs<br />

4] Motor vehicles - Rs. 4.00 lakhs<br />

Total - Rs. 96.00 lakhs<br />

MACHINERY & EQUIPMENT:<br />

No provision is kept for Machinery & Equipment during 2004-05.<br />

PLANNING & RESEARCH :<br />

No provision is kept for Planning and Research during 2004-05<br />

WORKS [Urban Development]:<br />

Rs. 4.00 lakhs is provided during 2004-05 for improvement of road side drains<br />

within Aizawl city and Rs. 25.00 lakhs is earmarked for improvement of Urban road within<br />

Aizawl city.


- 352 -<br />

TOWN & COUNTRY PLANNING (LAD)<br />

TOWN & COUNTRY PLANNING<br />

HIGHLIGHTS OF APPROVED ANNUAL PLAN 2004 – 2005<br />

(Rupees in lakh)<br />

A. 2217 - 03 IDSMT (REVENUE SECTION): AIZAWL LUNGLEI TOTAL<br />

1. Land Planning & Development : 4.00 - 4.00<br />

2. M & E-cum-I.T. : 2.00 - 2.00<br />

3. D & A : 39.33 10.20 49.53<br />

TOTAL OF 2217 : 45.33 10.20 55.53<br />

B. 4217 - 03 IDSMT (CAPITAL SECTION):<br />

1. Building Regulation / Control and<br />

Slope stability measures : Rs. 14.47 lakh<br />

2. Aizawl Action Plan (Project) : Rs. 6.00 lakh<br />

3. Lengpui Action Plan (Project) : Rs. 12.00 lakh<br />

4. Mamit Action Plan (Project) : Rs. 12.00 lakh<br />

5. Hnahthial Action Plan (Project) : Rs. 10.00 lakh<br />

6. Kawrthah Action (Project) Plan : Rs. 4.00 lakh<br />

GRAND TOTAL : Rs. 58.47 lakh<br />

C. ABSTRACT IN BRIEF:<br />

1) WORK COMPONENT : 54.80%<br />

2) PROCUREMENT OF TOOLS & PLANTS/<br />

IMPLEMENTS : 1.75%<br />

3) DIRECTION & ADMINISTRATION, ETC. : 43.45%<br />

TOTAL : 100.00%<br />

APPROVED ANNUAL PLAN 2004 - 2005<br />

Subject : Integrated Development of Small & Medium Towns.<br />

(IDSMT)<br />

Five Years Plan Outlay (2002 - 2007) = Rs. 532.00 lakhs<br />

Annual Plan 2002 - 2003 = Rs. 114.00 lakhs<br />

Annual Plan 2003 - 2004 = Rs. 111.97 lakhs<br />

Annual Plan 2004-2005 = Rs. 114.00 lakhs<br />

The main trust of Integrated Development of Small and Medium Towns (IDSMT)<br />

during 2004 – 2005 are: —<br />

Preparation of Action Plans (Projects) within approved Master Plan for various<br />

urban infrastructure facilities as per priority list of the <strong>Mizoram</strong> Urban Development<br />

Strategy to strengthen economic base of the towns and creation of employment<br />

opportunities.


- 353 -<br />

TOWN & COUNTRY PLANNING (LAD)<br />

To continue implementation & execution of 3 (three) On-going projects and take up<br />

additional 2 Projects (new Projects) as approved by the Govt. of India under Centrally<br />

Sponsored Scheme of IDSMT and to pursue 3 (three) Detail Project Reports (DPR) under<br />

submission.<br />

Implementation of approved Market Action Plan (Project) under Non-Lapsable<br />

Central Pool of Resources (NLCPR) in various towns in the State.<br />

To Upgrade and strengthen the existing Administrative set up of the Sr. Town &<br />

Country Planner’s Office to assist the <strong>Mizoram</strong> Urban Planning & Development Board and 9<br />

Towns/City Planning & Development Committees to mobilise resources and arrest<br />

haphazard growth and regulate development and control of building construction as<br />

<strong>plan</strong>ned manner by enforcing the <strong>Mizoram</strong> Urban & Regional Developments Act, 1990<br />

amended in 2004 & Rules. In short, for better and more effective development control &<br />

management of urban problems in the state.<br />

FINANCIAL OUTLAY FOR 2004 - 2005<br />

A. 2217 - INTEGRATED DEVELOPMENT OF SMALL & MEDIUM TOWNS (REV.)<br />

AIZAWL LUNGLEI TOTAL<br />

1. Land Planning & Development : 4.00 - 4.00<br />

2. M & E-cum-I.T. : 2.00 - 2.00<br />

3. D & A : 39.33 10.20 49.53<br />

TOTAL OF 2217 : 45.33 10.20 55.53<br />

DETAILS OF DIRECTION & ADMINISTRATION = (Rs. 49.53 lakhs)<br />

A. 2217 - 03 IDSMT (REVENUE SECTION): AIZAWL LUNGLEI TOTAL<br />

Sl. Aizawl Lunglei<br />

No. Detail Description Hq. Sub-Division Total<br />

1. Salary : 22.60 6.50 29.10<br />

2. Wages : 0.70 - 0.70<br />

3. Travelling Expenses : 1.30 0.50 1.80<br />

4. Office Expenses : 6.43 2.00 8.43<br />

5. Rent : 2.00 - 2.00<br />

6. Workshop / Seminar / Stipend : 0.30 - 0.30<br />

7. Motor Vehicle : 5.00 1.00 6.00<br />

8. Other Charges : 1.00 0.20 1.20<br />

TOTAL OF D & A : 39.33 10.20 49.53<br />

B. 4217 - INTEGRATED DEVELOPMENT OF SMALL & MEDIUM TOWNS (CAPITAL)<br />

1. Land Planning & Development - - NIL-<br />

2. Construction - 58.47<br />

TOTAL OF 4217 - 58.47<br />

GRAND TOTAL OF (A +B) - Rs.114.00 lakh


- 354 -<br />

TOWN & COUNTRY PLANNING (LAD)<br />

C. 4217 - INTEGRATED DEVELOPMENT OF SMALL & MEDIUM TOWNS (IDSMT)<br />

(CAPITAL) (STATE SHARE)<br />

1) Land : Rs. NIL<br />

2) Construction : Rs. 58.47 lakh<br />

DETAIL OF CONSTRUCTION (STATE MATCHING SHARE)<br />

Sl. No. Name of On-going Schemes Allocation of Funds<br />

1. BUILDING REGULATION/CONTROL & STRENGTHENING WITHIN APPROVED MASTER PLANS<br />

1) Aizawl City Building Regulation & Control etc. - Rs. 5.00 lakh<br />

2) Kolasib Town Building Regulation & Control etc. - Rs. 2.00 lakh<br />

3) Hnahthial Town Building Regulation & Control etc. - Rs. 2.00 lakh<br />

4) Slope Stability Measures of Aizawl City - Rs. 3.00 lakh<br />

5) Slope Stability Measures of Hnahthial Town - Rs. 2.47 lakh<br />

TOTAL - Rs. 14.47 lakh<br />

2. AIZAWL ACTION PLAN (PROJECT) :<br />

1) Renovation of Car Parking at Tuikual - Rs. 1.00 lakh<br />

2) Construction of Market at Zemabawk - Rs. 5.00 lakh<br />

TOTAL - Rs. 6.00 lakh<br />

3. LENGPUI ACTION PLAN (PROJECT) :<br />

1) Construction of Lengpui Market - Rs. 12.00 lakh<br />

TOTAL - Rs. 12.00 lakh<br />

4. MAMIT ACTION PLAN (PROJECT) :<br />

1) Construction of Mamit Market - Rs. 12.00 lakh<br />

TOTAL - Rs. 12.00 lakh<br />

5. HNAHTHIAL ACTION PLAN (PROJECT) :<br />

1) Construction of Strom drains/link road/site office - Rs. 10.00 lakh<br />

6. KAWRTHAH ACTION PLAN (PROJECT) :<br />

Market construction & Side drain - Rs. 4.00 lakh<br />

GRAND TOTAL OF B (CONSTRUCTION) - Rs. 58.47 lakh<br />

A. SCHEME-WISE DESCRIPTION OF 2217 [REVENUE]<br />

1. LAND PLANNING & DEVELOPMENT :<br />

i) Preparation of Action Plan (Project): As State fund is meagre for development of<br />

revenue generating schemes in urban and semi-urban areas, it is absolutely<br />

necessary to avail more and more Central Assistance under IDSMT which, however,<br />

necessitates preparation of Action Plan (Projects) to be approved by the Govt. of<br />

India. Preparation of Action Plan (Projects) within approved Master Plan involve<br />

extensive field surveys, collection of data, preparation of detail <strong>plan</strong> & estimate,<br />

maps, drawings, printing of <strong>plan</strong> documents etc. Therefore, a provision of Rs. 1.50<br />

lakh is earmarked for preparation of Action Plans (Project) of Sairang and<br />

Vairengte.<br />

ii) Implementation of Master Plan Schemes: There are 9nos. of Master Plan<br />

which has been prepared under <strong>Mizoram</strong> Urban & Regional Development Act 1990<br />

as amended & Rules 1998 and Approved by the Govt. of <strong>Mizoram</strong>. The Govt. has<br />

also constituted Town Planning & Development Committee for 9 towns to erect


- 355 -<br />

TOWN & COUNTRY PLANNING (LAD)<br />

boundaries pillars of Master <strong>plan</strong> areas demarcation of land designated for various<br />

purposes, construction of trace path, Layout Plan preparation for Implementation<br />

of Master Plan Schemes. The Committee has resolved that all the Master Plans<br />

must be implemented immediately so as to develop infrastructure in urban areas<br />

as <strong>plan</strong>ned manner. However, a token provision of Rs. 2.00 lakh only is earmarked<br />

for implementation of Aizawl Master Plan during 2004 - 2005.<br />

Besides, Rs. 0.50 lakh is earmarked for said purpose for implementation of<br />

Hnahthial Master Plan Schemes as <strong>plan</strong>ned manner.<br />

2. MACHINERY & EQUIPMENT INCLUDING INFORMATION TECHNOLOGY:<br />

The rapid Urbanisation process in <strong>Mizoram</strong> coupled with tremendous urban<br />

problem necessitated Modern Equipments and Scientific Instruments like Computers,<br />

Optical Pantograph, etc. The Optical Pantograph is urgently required for reduction or<br />

enlargement of topographical maps prepared by Survey of India. Hence, to augment the<br />

technical capabilities of officer and staffs of the office purchase of above stated machines<br />

are badly needed during 2004-2005. Therefore, a token provision of Rs. 2.00 lakhs is<br />

earmarked for purchase of those instruments and maintenance of existing instruments.<br />

DIRECTION & ADMINISTRATION (D & A)<br />

i) Entertainment of Existing Staff & Creation of New Post Salary, etc. :<br />

In dealing with the Urban Planning and Management and creation of essential<br />

infrastructure like Market Buildings, Car Parkings, Bus/Truck Terminals etc. at the State<br />

capital, District Headquarters and some other growing towns under Centrally Sponsored<br />

Scheme of IDSMT the Town & Country Planning wing is over burdened with workload.<br />

Besides there are 9 Nos. of Master Plan which has been approved by the Govt. of<br />

<strong>Mizoram</strong>. The Master Plan of Aizawl, Champhai, Kolasib, Thenzawl, etc. are<br />

published in the Government Gazette which need immediate implementation. It is,<br />

therefore, necessary to strengthen existing Town & Country Planning<br />

administration for the Implementation of the said approved Master Plans Schemes.<br />

The Govt. of <strong>Mizoram</strong> has realised the need for relevant Act and Rules for dealing<br />

with urban problems in the state of <strong>Mizoram</strong>. Hence the <strong>Mizoram</strong> Urban &<br />

Regional Development Act 1990 amended in 1996 & 2004 and Rules 1998 have<br />

been enacted by the <strong>Mizoram</strong> Legislative Assembly for regulating, promoting and<br />

controlling undesirable land development and building construction activities in<br />

the urban centres. It is, therefore, absolutely necessary to strengthen Town &<br />

Country Planning administration by creation of additional technical posts to deal<br />

with the problems of human settlements in the state of <strong>Mizoram</strong>.<br />

In addition, the Govt. of <strong>Mizoram</strong> has availed Central Assistant under Non-lapsable<br />

Central Pool of Resources amounting to Rs. 15 crores for construction of Market<br />

building at various towns in <strong>Mizoram</strong>. This work is being executed by Sr. Town &<br />

Country Planner’s Office. As there is an acute shortage of technical man-power in<br />

the Town & Country Planning Wing creation of additional technical post is<br />

absolutely necessary for implementation of this project.<br />

Further, <strong>Mizoram</strong> is the most urbanised state in India. There are a lot of problems<br />

in the urban areas which need to solve systematically. In spite of this there is no<br />

Town & Country Planning Directorate in the state to deal with Urban Planning &<br />

Development. It is, therefore, absolutely necessary to upgrade the existing Town &<br />

Country Planning Wing into Directorate of Town & Country Planning to take up pre-


- 356 -<br />

TOWN & COUNTRY PLANNING (LAD)<br />

disaster mitigation and prevention to meet the challenges arising out of natural<br />

calamities like earthquakes, cyclone, etc.<br />

Hence, Rs. 29.10 lakh is earmarked for entertainment of existing staff and for<br />

creation of new posts during 2004 - 2005.<br />

ii) Wages: Due to ban on creation of post the Town & Country Planning Wing is facing<br />

tremendous problem both in fields and offices thereby resulting delay in execution<br />

of Master Plan preparation and execution of Project works. So, a sum of Rs. 0.70<br />

lakh is earmarked for engagement of existing Master Roll employees like LDC /<br />

Typist etc. for the year 2004 - 2005.<br />

iii) Travelling Expense (T.E.): Apart from the on-going works under NLCPR and IDSMT<br />

Programmes, the office is bound to conduct physical survey, socio-economic survey<br />

etc. of various towns of the state for Master Plan preparation. A provision of<br />

Rs.1.80 lakhs, 0.50 lakhs for Lunglei & Rs. 1.30 lakhs for Aizawl is earmarked<br />

during 2004-2005 to meet the travelling Expenses for supervision of works under<br />

NLPF and IDSMT which are scattered throughout the state and also for survey of<br />

towns and Growth centres.<br />

iv) Office Expense (O.E.): A token Provision of Rs. 8.43 lakh, of which Rs. 6.43 lakhs<br />

for Aizawl Hqrs. & Rs. 2.00 lakh for Lunglei Town & Country Planning Sub-Division<br />

is earmarked to meet expenditure for stationery, furniture and other miscellaneous<br />

during 2004 - 2005.<br />

v) Rent/Office Accommodation : Since the office has no building of its own, private<br />

building is occupied for office on rent. Therefore, to meet the expenditure of rent<br />

for the whole year (2004 - 2005) a sum of Rs. 2.00 lakh for Aizawl only is<br />

earmarked.<br />

vi) Maintenance of Vehicle (M.V.): Projects undertaken by the office are located far<br />

from Headquarters and that good condition of Vehicle is absolutely necessary for<br />

supervision of Planning, Development and Construction of Works. Therefore, a<br />

provision of Rs. 6.00 lakh of which Rs. 5.00 lakh for Aizawl Headquarters & Rs.1.00<br />

lakh for Lunglei Town & Country Planning Sub-Division for the year 2004 - 2005.<br />

vii) Workshop / Seminar / Stipend : As per National Norms, One town needs 4 (four)<br />

qualified Town Planners, whereas, there are only 4 (four) numbers of qualified<br />

Town Planners in the State to deal with <strong>plan</strong>ning and development Control &<br />

management of 22 towns. Therefore, to send students to various technical<br />

Institutes outside <strong>Mizoram</strong> and also to educate public and organise<br />

Workshop/Seminar, a sum of Rs. 0.30 lakh is earmarked for the year 2004 - 2005.<br />

viii) Other charges (OC): A provision of Rs. 1.20 lakh is earmarked for other<br />

expenditure of which Rs. 1.00 lakh for Aizawl and Rs. 0.20 lakh for Lunglei.<br />

B. 4217 - IDSMT MATCHING SHARE (CAPITAL SECTION) TO C.S.S.: In order to<br />

create Urban infrastructures and to strengthen the economic base of Towns and to<br />

generate employment opportunities, Integrated Action Plans (Projects) have been prepared<br />

and approved by the Govt. of India, out of 22 Census towns, 9 (Nine) priority towns have<br />

been approved and executed under Centrally Sponsored Schemes for which State matching<br />

contribution is required to be provided. The required amount of matching State share<br />

cannot be met in one financial year due to shortage of fund which necessitates provision<br />

of state share in a phase manner. During 2004 - 2005, a provision of Rs. 58.47 lakhs is<br />

earmarked for state contribution for the approved Action Plans (Projects).


- 357 -<br />

INFORMATION & PUBLIC RELATIONS DEPARTMENT<br />

INFORMATION & PUBLIC RELATIONS<br />

Introduction:<br />

With the ushering in of an era of Peace in <strong>Mizoram</strong>, the role of Information & Public<br />

Relations has shifter from propaganda missing to publicity for Public education of the<br />

various developmental schemes of the Government an added important role which is<br />

known as Public Relations has to be taken up in order that public confidence may be<br />

earned so that all the developmental schemes and <strong>plan</strong>s may be translated into peoples<br />

movement.<br />

The Department is functioning with a Directorate at the Headquarters and Districts<br />

and Sub-Divisions in their respective areas. There as 6 (six) Rural Information Centres in<br />

the whole State manned by Technicians Grade III who function in the Centres in rented<br />

houses. With the rapid progress of development in various fields, it is felt inadequate to<br />

remit the functioning of the Department from these 6 (six) Rural Centres only as the<br />

majority of the people in the interior are deprived of their rights to information.<br />

With the advancement of Technology it is indispensable for the Department to<br />

equipped itself with modern techniques of communication such as Television, Video,<br />

Radio, Computers and all kinds of electronic media in order that the people of the State<br />

may be exposed to the rest of the country and vice-versa thus cementing National<br />

Integration to bring the people closer to the mainstream of National life. Cultural and<br />

Social Exchanges with other States must also be carried out.<br />

Therefore, the following items are approved to be taken up during this year and<br />

Rs.175.00 lakhs is approved for 2004-2005.<br />

1. DIRECTION & ADMINISTRATION: During this year, the following works will be<br />

taken up from this head completion of our on-going construction of Office building at<br />

Lunglei and modernisation of our Auditorium and Installation of Air-Conditions of<br />

Conference Hall in the Directorate building is ready demanding, purposes an amount of<br />

Rs. 28.00 lakhs is earmarked.<br />

1. Installation of Air conditioners in the Conference<br />

Hall and modernisation of Auditorium in our - Rs.13.00 lakhs<br />

Directorate building.<br />

2. Completion of the on-going constructed IPRO’s<br />

Office Building at Lunglei - Rs. 15.00 lakhs<br />

TOTAL - Rs. 28.00 lakhs<br />

2. PRODUCTION OF FILMS: During the 9 th Five Year Plan we produced a few<br />

documentary video films mainly for telecast over Doordarshan, New Delhi. Since it has not<br />

been possible for Doordarshan to make sufficient coverage on <strong>Mizoram</strong>, it has become<br />

necessary for the Government to produce a true image of <strong>Mizoram</strong> an its people so that<br />

the Mizos will be known to the rest of the country in a correct perspective and thereby<br />

removing misinformation about <strong>Mizoram</strong> and its people. The local transmission-cumproduction<br />

centre of Doordarshan which came up recently is expected to open up more<br />

opportunities to participate in this powerful media. In addition to this the Department<br />

produce <strong>Mizoram</strong> Today, a video monthly news capsules which is included in the local<br />

programme of cable T.V. Networks. To intensify production and improve standard and<br />

quality better equipments and technical know-how are required. Also we will continue Live


- 358 -<br />

INFORMATION & PUBLIC RELATIONS DEPARTMENT<br />

Telecast of the session of the State Legislative Assembly through local Cable T.V. Network.<br />

For these purposes Rs. 5.00 lakhs is approved for 2004-2005.<br />

3. PUBLIC EXHIBITION OF FILMS: With the growing menace of drug abuse and social<br />

evils it has become necessary to intensify public exhibition of films shows to educate the<br />

mass of people. For procurement and purchase of films on National Integration, Family<br />

Planning, Drug Abuse and other education films in the interior villages, an amount of<br />

Rs.5.00 lakh is approved during the year 2004-2005.<br />

4. OTHERS:<br />

(a) TRAINING IN MASS COMMUNICATION: With the introduction of new techniques in<br />

Mass Communication, it is necessary for the Officers of this Department to undergo<br />

training courses to catch up with modern techniques and skills.<br />

(b) RESEARCH AND REFERENCE: Research and Reference Wing will have to be<br />

strengthened at the Directorate as well as in the Districts and Sub-Divisions.<br />

For above 2 (two) purposes, Rs. 6.00 lakh is approved during 2004-2005.<br />

5. ADVERTISING & VISUAL PUBLICITY: Advertising and Visual Publicity being the<br />

core of publicity for building the image of the Government in Government Public Relations<br />

works, it is approved to intensify support of the Developmental activities in the form of<br />

Advertising and Visual Publicity. Hence, an amount of Rs.5.00 lakhs is approved for the<br />

year 2004-2005.<br />

6. INFORMATION CENTRES: Information Centres in rural areas presently is<br />

operational and are housed in rented buildings and are inadequately staffed with<br />

minimum Audio visual equipments. To improve the conditions of this Information Centres<br />

and for renting of House for Information Centre at Delhi, an amount of Rs. 15.00 lakh is<br />

approved during 2004-2005.<br />

7. PRESS INFORMATION SERVICES: Presently we are subscribing 3 (three) P.T.I.<br />

Services at Raj Bhavan, Chief Minister's Office and the Directorate and 3 (three) U.N.I.<br />

Services at Raj Bhavan, Chief Minister's Secretariat and the Directorate. During this year we<br />

approved to continue subscription of PTI/UNI services. With price escalation and the<br />

subscription rate almost trebled, it has become necessary to increase the financial target to<br />

cover the expenditure for the services. Also the main function of the Departmental issue of<br />

Press Releases. For improving our press releases we approved to purchase one high quality<br />

Xerox machine. Hence, Rs. 8.00 lakhs is approved during 2004-2005.<br />

8. FIELD PUBLICITY: With the Government emphasis on rural development and<br />

bringing democracy at the grassroots level, it is necessary that field publicity is<br />

strengthened in all Districts, Sub-Division and wherever we have Information Centres,<br />

maximum mobility is necessary to reach the people at the grassroots level. For the<br />

functioning and maintenance of above, Rs. 16.00 lakh is approved during the year 2004-05.<br />

9. SONGS AND DRAMA: To promote National Integration we have been receiving and<br />

sending cultural troupes from various states and to various states during the previous<br />

years. We propose to send more cultural troupes to different parts of the country.<br />

VVIPs/VIPs and officials from Central and other states visiting the state are gifted with<br />

traditional presentation items. An amount of Rs. 4.00 lakh is approved for taking up<br />

activities mentioned during 2004-2005.


- 359 -<br />

INFORMATION & PUBLIC RELATIONS DEPARTMENT<br />

10. PHOTO SERVICES: To record various development activities for publications as<br />

well as for release to the National papers, it has become necessary to enlarge and<br />

strengthen our Photo Service Section. As already mentioned earlier, with the<br />

commissioning of local T.V. Transmission-cum-Production Centre at Aizawl, it has become<br />

necessary to support this centre. We have to continue Photo coverages of important<br />

function within the State and the visit of VVIP/VIP and tours of our State VIPs. For this, an<br />

amount of Rs. 9.00 lakh is approved for the year 2004-2005 as per break up below.<br />

11. PUBLICATION: Publication of developmental activities and facts about <strong>Mizoram</strong><br />

will be intensified for both National as well as local consumption. We also purpose to<br />

continue publication of Calendar and Diaries in the coming year. For this, an amount of<br />

Rs.15.00 lakhs is approved during 2004-2005.<br />

12. COMMUNITY RADIO AND TELEVISION: During the previous <strong>plan</strong>s we have<br />

installed quite a number of Community Listening Sets as well as Community Viewing sets<br />

in rural areas. During this year we propose to continue this scheme and Rs.2.00 lakhs is<br />

approved.<br />

13. CULTURAL AND SOCIAL ACTIVITIES: This Department is organising teams for<br />

performance both in <strong>Mizoram</strong> and outside. It has been the responsibility of this<br />

Department to receive visiting Cultural Troupes from outside <strong>Mizoram</strong>. Besides, the<br />

Department has also been sending Cultural Troupes to participate in the Republic Day<br />

Celebration in New Delhi under the Baffacos scheme. The Department will take up the<br />

responsibility to create awareness among the public about the coming famine and how to<br />

tackle the problem and creation of awareness through Multi Media Publicity Campaign,<br />

publishing brochures, leaflets making of documentary films and holding of seminar on<br />

Bamboo flowering and Famine in New Delhi etc.<br />

1. Sending of Tribal Representative in the Republic Day<br />

Celebration at New Delhi, Republic Day Rs. 7.00 lakhs<br />

Celebration in the State capital, Aizawl Darshan, etc.<br />

2. BAFFACOS Publication of leaflets and brochures<br />

(Distributing gratis) Rs. 10.00 lakhs<br />

3. Presentation of Tableau in the Republic Day<br />

Parade at New Delhi with Cultural Troupe Rs. 16.00 lakhs<br />

4. The Theme will be “Abundance of bamboo Growth in<br />

<strong>Mizoram</strong> vis-avis - the integral role of Bamboo in Rs. 8.00 lakhs<br />

Mizo life. Production of Documentary Films about<br />

Bamboo flowering and famine<br />

5. Multi Media Publicity Campaign on Bamboo Flowering<br />

and how to combat Famine, Conducting tour of Media Rs. 8.00 lakhs<br />

persons and Travel writers to <strong>Mizoram</strong> from<br />

outside the state Rs. 4.00 lakhs<br />

6. Publicity and International Advertisement Rs. 4.00 lakhs<br />

T O T A L Rs. 57.00 lakhs<br />

GRAND TOTAL - Rs. 175.00 lakhs


- 364 -<br />

LABOUR & LABOUR WELFARE<br />

LABOUR & EMPLOYMENT<br />

The Directorate of Labour & Employment came into being during the middle of<br />

1980, while an Employment Exchange was established at Aizawl in 1958 and Industrial<br />

Training Institute existed since 1964 while <strong>Mizoram</strong> was a part of the erstwhile Assam.<br />

During the period of Union Territory, two District Employment Exchanges were established<br />

at Lunglei and Saiha along with the opening of two Sub-Divisional Employment Exchange at<br />

Champhai had been upgraded to a full-fledged District Employment Exchange. With the<br />

creation of new Districts in <strong>Mizoram</strong>, the Council of Ministers in its meeting decided to<br />

open District Employment Exchange at Kolasib and Lawngtlai District headquarters.<br />

Under the Centrally Sponsored Scheme, three new Special Employment Exchanges<br />

are approved to be set up at Aizawl, Lunglei and Saiha exclusively for the benefit of the<br />

Physically Handicapped Persons during 2003-04 at the Central : State share of 80:20 ratio.<br />

Similarly, under the Prime Minister’s Special Economic Package of North-Eastern<br />

States for Vocational Training (Craftsmen Training) at 100% Centrally funded <strong>plan</strong> scheme<br />

under non-lapsable central pool fund, the Government of India have already approved to<br />

strengthen/modernise the existing ITI at Aizawl and establish two new it is at Lunglei and<br />

Saiha to the tune of Rs. 635.12 lakhs. The scheme is to be financed from the Plan funds<br />

provided during FYs 2000-2003 as per the procedure laid down for the Centrally<br />

Sponsored Schemes.<br />

There are three wings under the Department namely: -<br />

1. LABOUR WELFARE<br />

2. EMPLOYMENT SERVICE<br />

3. CRAFTSMAN TRAINNING<br />

The Approved Financial Outlay for 2004-2005 for Labour & Employment<br />

Department is as under: -<br />

1. Direction -<br />

(Rs. in lakhs)<br />

14.95<br />

2. Labour Administration - 7.00<br />

3. Employment Service - 20.15<br />

4. Craftsman Training - 51.90<br />

5. Grant-in-Aid to NGO - 1.00<br />

Total - 95.00


- 365 -<br />

LABOUR & LABOUR WELFARE<br />

DESCRIPTION OF HEAD-WISE SUB-SECTOR WISE ALLOTMENT OF FUND AND<br />

THE OUTLINE OF PHYSICAL TARGET<br />

1. DIRECTION:<br />

The Directorate of Labour & Employment has been run by just two Officers — one<br />

Director and one Deputy Director to look after Labour Administration, Employment Service<br />

and Craftsman Training. The main functions of the Directorate are: —<br />

(a) Labour Welfare: A considerable number of Central Acts adapted under the State of<br />

<strong>Mizoram</strong>. Adoption of Laws Order (No.2) 1987 may be classified as Labour Laws. Certain<br />

Labour Acts promulgated after <strong>Mizoram</strong> became State on 20.2.1987 are also applicable to<br />

<strong>Mizoram</strong>. Framing regulations and rules and to implement in <strong>Mizoram</strong> as per statutory<br />

requirements of these Central Acts are the functions of the Directorate of Labour &<br />

Employment. A few numbers of such Acts requiring immediate application in <strong>Mizoram</strong> are<br />

given here under: -<br />

1) Minimum Wages Act<br />

2) Payment of Wages Act<br />

3) Workmen Compensation Act<br />

4) Inter-State Migrant Worker’s Act<br />

5) Trade Union Act<br />

6) Contract Labour (Abolition and Regulation) Act<br />

7) Shops and Establishment Act<br />

8) Payment of Bonus Act<br />

9) Factories Act<br />

10) The Child Labour (Prohibition and Regulation) Act<br />

11) Compulsory Notification of Vacancies Act.<br />

12) The Persons with Disabilities (Equal Opportunities, Protection of Rights And<br />

Full Participation) Act.<br />

(b) Employment Service: The State Directorate of Labour & Employment functions as a<br />

manpower organisation and <strong>plan</strong>ning agency for the state. It provides leadership, guidance<br />

and expertise in such technical fields as: -<br />

(i) Surveys and studies relating to employment and un-employment<br />

(ii) Manpower <strong>plan</strong>ning and forecasting<br />

(iii) Enforcement of Employment Exchange compulsory Notification of Vacancies Act.<br />

(iv) Collection of Employment Market Information and Public Relation in the matter of<br />

self-employment programmes.<br />

(v) Vocational Training, Vocational Guidance and Career Advice.<br />

(vi) Occupational Research and Information.<br />

(vii) Supervision of Employment Exchanges Coaching-cum-Guidance Centres in the<br />

State.<br />

(viii) Staff Training.<br />

(c) Craftsman Training: The Directorate exercise full control over Industrial Training<br />

Institute operating under the Craftsman Training Scheme. The scheme, the most important<br />

in the field of Vocational training, has been introduced to ensure a steady flow of skilled<br />

workers in different trades for industries as also for self-employment ventures to reduce


- 366 -<br />

LABOUR & LABOUR WELFARE<br />

un-employment among the educated youths by providing their employable training and to<br />

cultivate a technical and industrial attitude in the minds of the younger generation.<br />

Supervision, evaluation, yearly conducts of tests and final trade tests for the intakes of<br />

these Industrial Training Institutes are the responsibilities of the Directorate.<br />

Strengthening of the Directorate:<br />

The strength of the Directorate in terms of Officers and technical staff has<br />

remained unchanged for the last 23 years since its inception in 1980. It requires to be<br />

strengthened with at least one Joint Director to enable authoritative and decisive disposal<br />

of matters at high level and some essential additional inspectorial functionaries. It also<br />

requires to be strengthened to cope with variety of its functions, to be more relevant and<br />

responsive to changing scenario in industrial relations, labour employment market, day to<br />

day administration of it is and to cater the needs of the physically handicapped persons<br />

along with the unemployed youths. Yet, in order to maintain maximum austerity in<br />

realisation of the adverse fiscal situation prevailing in <strong>Mizoram</strong>, only one post of Joint<br />

Director of Labour, Employment Services and Craftsman Training is approved instead of<br />

separate incumbencies.<br />

The break up of financial implication for Direction is as under: -<br />

(Rs. in lakhs)<br />

(i) Salary - 0.50<br />

(ii) Wages - 0.50<br />

(iii) T.E. - 1.00<br />

(iv) O.E. - 5.75<br />

(v) O.C. - 5.00<br />

(vi) Works (Office building) - 1.00<br />

(vii) Grant-in-Aid to NGO - 1.00<br />

(viii) Advertisement - 0.20<br />

Total - 14.95<br />

2. ADMINISTRATION:<br />

Administration of Labour & Labour Welfare involving enforcement of Labour Acts,<br />

Rules and Regulations is the responsibility of Labour & Employment Department. The<br />

activities also cover registration, inspection, authentication & issue of standing orders,<br />

conciliation adjudication of claims etc.<br />

Under this head the following posts had already been approved and created but not<br />

yet filled up: -<br />

a) Labour Officer - 1<br />

b) Inspector of Factories - 1<br />

c) Assistant Labour Officer - 1<br />

The following posts had already been filled up: -<br />

a) Assistant - 1<br />

b) U.D.C. - 1<br />

c) L.D.C. - 1<br />

d) Group D - 1


- 367 -<br />

LABOUR & LABOUR WELFARE<br />

The break-up of financial implication for Administration is as under: -<br />

(a) Salary - Rs. 3.50 lakh<br />

(b) T.E. - Rs. 0.50 lakh<br />

(c) O.E. - Rs. 2.00 lakh<br />

(d) O.C. - Rs. 1.00 lakh<br />

TOTAL - Rs. 7.00 lakh<br />

3. EMPLOYMENT SERVICE:<br />

As of today, there are 4(four) District Employment Exchanges, one each at Aizawl,<br />

Lunglei, Saiha and Champhai along with two Sub-Divisional Employment Exchanges at<br />

Chawngte and at Lawngtlai. The Exchanges constitute the basic unit for implementing and<br />

co-ordinating all programmes of employment assistance, career advice, collection, survey<br />

and studies of employment market information in the area.<br />

A. Provision is also made for maintenance of existing staff under Planned<br />

Schemes.<br />

B. Further, there is another Centrally Sponsored Scheme at the instance of<br />

Govt. of India, Ministry of Social Justice and Empowerment to set up three<br />

new and separate Special Employment Exchanges one each at Aizawl,<br />

Lunglei and Saiha exclusively for the benefit of the Physically Handicapped<br />

Persons at the Central-State share of 80:20 ratio.<br />

A. Staff for Three Special Employment Exchanges (CSS)<br />

Recurring Expenditure:<br />

Sl.<br />

No.<br />

Designation No. of<br />

Posts<br />

Salary for one month for<br />

all the three exchanges<br />

1. Assistant Director 3<br />

2. Technical Officer (Placement) 3<br />

3. UDC 3<br />

4. LDC 6 Rs. 2,04,416.66<br />

5. Steno-Typist 3<br />

6. Driver 3<br />

7. Group ‘D’ Staff 9<br />

(For each Exchange) Total 7 Rs. 2,04,416.66<br />

i.e., Rs. 2,04,417.00<br />

B. Rent, Expenses on POL and Other Contingent Expenditure - Nil<br />

C. Non-recurring Expenditure.<br />

i) Purchase of Vehicle – Gypsy – 3 Nos. (Soft Top 450000x3) - Rs. 13,50,000<br />

ii) Furniture<br />

1) Such as Officer/Staff Table Chair<br />

2) Benches and Chairs for candidates @ 50000/- - Rs. 1,50,000<br />

3) Cabinets, racks etc for each exchange<br />

4) Almirah<br />

5) Other special equipments<br />

iii) Typewriter - 2 Nos. each 212500 × 5 Nos. - Rs. 1,50,000<br />

TOTAL - Rs. 16,97,000


- 368 -<br />

LABOUR & LABOUR WELFARE<br />

iv) Total Proposed expenditure i.e. (A+B+C) - Rs. 19,01,417<br />

(Rs. 2,04,417 + 16,97,000) as 100% share)<br />

v) Less 20% share of State Govt. -(-) Rs.3,80,283<br />

vi) Less 80% share of Govt. of India,<br />

(i.e. Grant to be released to State Government) - Rs. 15,21,134<br />

D. The Govt. of <strong>Mizoram</strong> has allotted a suitable Land for District Employment<br />

Exchange, Champhai free of cost. In order to have drain on rent, it is approved to<br />

constructed Office building for District Employment Exchange, Champhai during 2004-<br />

2005 for which a token provision of Rs. 0.50 lakh is approved.<br />

The break up of financial implication for Employment Services is as under: -<br />

Rs. in lakhs<br />

i) Salary - Rs. 1.00 lakhs<br />

ii) Wages - Rs. 0.95 lakhs<br />

iii) T.E. - Rs. 2.00 lakhs<br />

iv) O.E. - Rs. 7.00 lakhs<br />

v) O.C. - Rs. 6.00 lakhs<br />

vi) Minor works/Maint. - Rs. 3.00 lakhs<br />

vii) Rents - Rs. 0.20 lakhs<br />

GRAND TOTAL - Rs. 20.15 lakhs<br />

4. CRAFTSMAN TRAINING:<br />

Till 2001, the pioneer ITI, Aizawl has been imparting training in 14 Vocational<br />

Trades of which 7 trades are under Planned Scheme. As mentioned in the introductory<br />

note, under the Prime Minister’s Special Economic Package for North Eastern States for<br />

Establishment of ITI’s in North Eastern States and Sikkim, the Govt. of India have<br />

approved the scheme for strengthening/modernising of existing ITI, Aizawl by introducing<br />

additional 9(nine) trades and 4 (four) new trades each for new ITI Lunglei and Saiha to the<br />

tune of Rs. 635.12 lakhs. Further funding beyond 2002-03 will be continued for recurring<br />

cost only in the following manner: -<br />

a) Second and third years of the X Plan – 75% cost by the Central Government<br />

and 25% by the State Government.<br />

b) Fourth and Fifth years of the X Plan – 50% cost by the Central Government<br />

and 50% by the State Government.<br />

c) Thereafter the full operational costs would be borne by the State<br />

Governments.<br />

AIZAWL Units Seating Capacity<br />

1. IT & ESM (Information Technology &<br />

Electronic System Maintenance) 2 32<br />

2. Surveyor 1 16<br />

3. Mechanic (Refrigerator & Air<br />

conditioning) 2 32


- 369 -<br />

LABOUR & LABOUR WELFARE<br />

4. Mason (Building Constructor) 2 32<br />

5. COPA (Computer Operator &<br />

Programming Assistant) 1 16<br />

6. Cutting & Tailoring 1 16<br />

7. Hair & Skin Care 1 16<br />

8. Mechanic (Radio & T.V.) 1 16<br />

9. Draughtsman (Civil) 1 16<br />

TOTAL 12 196<br />

LUNGLEI<br />

1. Carpentry 1 16<br />

2. Mechanic (Motor Vehicle) 2 32<br />

3. Dress Making 1 16<br />

4. COPA 1 20<br />

TOTAL 5 84<br />

SAIHA<br />

1. Electrician 1 16<br />

2. Mechanic (Motor Vehicle) 2 32<br />

3. IT & ESM 2 32<br />

4. Hair & Skin Care 1 16<br />

TOTAL 6 96<br />

GRAND TOTAL 23 376<br />

Thus there are 31 trades, 44 Units with 708 seating capacity. These trainees are<br />

awarded a monthly stipend @ Rs. 500/- per head per month and a book grant of Rs.1000/-<br />

per head per annum.<br />

Under the Scheme, Central Government approved creation of posts as shown in the<br />

table: —<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

Designation Aizawl Lunglei Saiha Total<br />

Principal / Superintendent<br />

(Non-Gazette Grade)<br />

Group Instructor<br />

Vocational Instructor<br />

V.I.s for Engn. Drawing/<br />

W.Shop Calculation<br />

Workshop Attendant<br />

U.D.C.<br />

L.D.C.<br />

Chowkidar<br />

Sweeper<br />

-<br />

1<br />

12<br />

-<br />

1<br />

-<br />

-<br />

-<br />

1<br />

TOTAL 15 13 14 42<br />

1<br />

-<br />

5<br />

1<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

-<br />

6<br />

1<br />

2<br />

1<br />

1<br />

1<br />

1<br />

2<br />

1<br />

23<br />

2<br />

5<br />

2<br />

2<br />

2<br />

3


- 370 -<br />

LABOUR & LABOUR WELFARE<br />

The existing posts under Planned Scheme are as below: -<br />

1. INSTRUCTOR – 9 POSTS<br />

i) Stenography - 1<br />

ii) Confectionery - 1<br />

iii) Carpentry - 1<br />

iv) Plumber - 1<br />

v) Draughtsman - 1<br />

vi) Diesel Mechanic - 1<br />

vii) T.V. & Radio Mechanic - 1<br />

viii) Electronic - 2<br />

2. Driver - 1<br />

3. Workshop Attendant - 2<br />

4. Conductor - 1<br />

The break–up of financial implication is as under: -<br />

i) Salary - Rs. 16.00 lakhs<br />

ii) Wages - Rs. 1.75 lakhs<br />

iii) T.E. - Rs. 1.00 lakhs<br />

iv) Advertisement - Rs. 0.50 lakhs<br />

v) Office Expenses - Rs. 5.00 lakhs<br />

vi) Professional Charge - Rs. 0.25 lakhs<br />

vii) Stipend / Book Grant - Rs. 16.50 lakhs<br />

viii) Machinery & Equipment - Rs. 6.29 lakhs<br />

ix) Minor Works - Rs. 2.00 lakhs<br />

vi) Other Charges - Rs. 2.61 lakhs<br />

TOTAL - Rs. 51.90 lakhs<br />

5. GRANT-IN-AID TO NGO:<br />

The Department provided Rs. 1.00 lakh for Grant-in-Aid to Non-Governmental<br />

Organisations during 2004-05.


Introduction:<br />

- 373 -<br />

SOCIAL WELFARE DEPARTMENT<br />

SOCIAL WELFARE<br />

The activities of the Department extends to formulation and endorsement of Social<br />

Legislation like Juvenile Act, Immoral Traffic in person, etc., Welfare of Handicapped<br />

Persons, Aged and Destitute persons, Welfare of Women and Children, Social Defence<br />

against Drug Addicts and Alcoholism and strengthening of Non-Governmental<br />

Organizations by rendering Grants-in-aid to them. The Department also implements<br />

I.C.D.S. Scheme and Special Nutrition Programme.<br />

The Annual Plan 2004-2005 is Rs.639.00 lakhs.<br />

The abstract of Scheme-wise requirement of fund for Annual Plan during 2004-<br />

2005 is given below:<br />

1. Direction & Administration - 11.69 lakhs<br />

2. Welfare of Handicapped - 22.50 lakhs<br />

3. S.I.T. Act:<br />

(a) Protective Home - 17.18 lakhs<br />

(b) Reception Centre - 16.32 lakhs<br />

4. Welfare of Poor & Destitute:<br />

(a) National Social Assistance Programme - 132.00 lakhs<br />

(N.S.A.P.)<br />

(b) Old Age Home - 0.50 lakh<br />

5. Prohibition:<br />

(a) De-addiction Centre - 69.79 lakhs<br />

(b) M.S.D. & R.B. - 15.00 lakhs<br />

6. Correctional Services:<br />

(a) Remand Home - 33.99 lakhs<br />

(b) Special Approved Home - 9.25 lakhs<br />

(c) Children’s Court - 6.68 lakhs<br />

(d) Social Service in Jail - 7.32 lakhs<br />

7. Grants-in-aid to Voluntary Organizations - 7.00 lakhs<br />

8. Schemes under Article 275(1) - 264.00 lakhs<br />

9. Women & Child development:<br />

Child Welfare - 9.93 lakhs<br />

10. Women Welfare:<br />

(a) Women Commission - 12.10 lakhs<br />

(b) Socio-Economic / I.W.E.P. etc. - 3.75 lakhs<br />

TOTAL : Rs.639.00 lakhs


1. DIRECTION & ADMINISTRATION<br />

- 374 -<br />

SOCIAL WELFARE DEPARTMENT<br />

(a) Direction :<br />

For the maintenance of the existing post of Stenographer Grade III, an amount of<br />

Rs.1.69 lakhs only is approved during 2004-2005.<br />

Name of Post Scale of Pay<br />

Existing<br />

No. of Post<br />

New Total<br />

Stenographer-III 5000-150-8000/- 1 - 1<br />

TOTAL : 1 - 1<br />

(b) Construction, repair and maintenance of Departmental buildings:<br />

For maintenance and repairs of various Departmental buildings numbering more<br />

than 200 buildings constructed under Plan, C.S.S. and B.A.D.P. Schemes. As some of the<br />

buildings are old and depleted, they require certain renovations and repairs for which<br />

Rs.5.00 lakhs only is set aside.<br />

(c) Information Technology and Software Development :<br />

Fund of Rs.1.00 lakhs only out of the total Annual Plan Outlay is required for the<br />

implementation of Information Technology and Software Development vide letter<br />

No.G.28014/99-SPB dt.30.3.2000.<br />

As per direction from Govt. of India and Govt. of <strong>Mizoram</strong>, the Information<br />

Technology is <strong>plan</strong>ned to be promoted as shown below during 2004-2005.<br />

(i) Computers be installed in all Officers’ rooms.<br />

(ii) All computers be connected together by means of networking.<br />

(iii) Bare minimum Printers be provided at each room except in the main<br />

Computer Room where three types of Printers – Laser, Dot and Ink Jet<br />

Printers shall be installed.<br />

(iv) Internet Connection be subscribed at the main Computer Room.<br />

Detail financial requirement is given below :<br />

(i) Salary - 1.69 lakhs<br />

(ii) Office Expenses - 5.00 lakhs<br />

(iii) Minor Works - 5.00 lakhs<br />

2. WELFARE OF HANDICAPPED<br />

TOTAL : Rs.11.69 lakhs<br />

(a) Persons with Disabilities (Equal Opportunities, Protection of Rights and Full<br />

Participation) Act, 1995 :<br />

Parliament has passed the Persons with Disabilities (Equal Opportunities,<br />

Protection of Rights and Full Participation) Act, 1995. All State Governments except<br />

Jammu and Kashmir are instructed to implement this Act 1995 immediately.<br />

As envisaged in the Act, ‘Disability’ includes: (i) Blindness, (ii) Low Vision, (iii)<br />

Leprosy cured, (iv) Hearing Impairment, (v) Mental Retardation, and (vi) Mental<br />

Illness.


- 375 -<br />

SOCIAL WELFARE DEPARTMENT<br />

It is approved to function the following Schemes during 2004-2005: —<br />

(i) Disability Pension<br />

(ii) G.I.A. to Handicapped Persons<br />

(iii) G.I.A. to Handicapped Educated Unemployed Allowances<br />

(i) Disability Pension :As many as 200 Disability Pension is given to those<br />

handicapped persons who are totally blind and bedridden @ Rs.100/- per month<br />

per head during 2004-2005. It is approved to continue to provide Disability Pension<br />

to 200 handicapped persons during 2004-2005. Financial requirement comes to<br />

Rs.2.40 lakhs.<br />

(ii) G.I.A. to Handicapped Persons: It is also approved to give special appliances<br />

and grants-in-aid to handicapped persons as per the individual needs like Hearing<br />

Aids, Spectacles, Wheelchairs, Crutches, Artificial Limbs Fitting and Plastic Surgery,<br />

etc. Rs.7.30 lakhs is approved during 2004-2005.<br />

(iii) G.I.A. to Handicapped Educated Unemployed Allowances : All handicapped<br />

educated unemployed are approved to be given Financial Assistance @ Rs.100/- per<br />

month per head during 2004-2005 and Rs.0.30 lakhs is approved.<br />

Financial requirement is as follows:<br />

Grant-in-aid - 10.00 lakhs<br />

TOTAL _ Rs.10.00 lakhs<br />

(b) Hostel for Handicapped Persons:<br />

Male and female handicapped persons are given training in vocational trades like<br />

knitting, tailoring and shoe making at Aizawl. Hostel facility is provided for these<br />

handicapped persons who have no relatives at Aizawl and to look after the Hostel,<br />

a post of Warden is created and Rs.1.50 lakhs is approved for salary during 2004-<br />

2005.<br />

Name of Post Scale of Pay Existing New Total<br />

Warden 5000-8000/- 1 - 1<br />

Financial Requirement for 2004-2005 :<br />

Salary - 1.50 lakhs<br />

(c) National Programme for Rehabilitation of Persons with Disabilities (NPRPD):<br />

The N.P.R.P.D. is a new State Sector Scheme launched in the country during 1999-<br />

2000 with the basic objective of providing comprehensive rehabilitation services to<br />

persons with disabilities (PWDs). The Govt. of India released fund for the<br />

programme up to 2001-2002 and the State Govt. should continue the programme<br />

from its own resources for which the Secretary, Ministry of Social Justice &<br />

Empowerment (D.O.No.16-24/2000-NPRPD dt.14.5.2002) and the Planning<br />

Commission (D.O.No.PC (P) 2/11/2001-SPC (Vol.III) dt.19.4.2002) wrote to the Chief<br />

Secretary to the Govt. of <strong>Mizoram</strong> to ensure adequate provision for rehabilitation<br />

services to the PWDs.<br />

In spite of this, only Rs.11.00 lakhs is provided for the programme during 2004-<br />

2005 and the Department has to confine its activities for the welfare of persons


- 376 -<br />

SOCIAL WELFARE DEPARTMENT<br />

with disabilities in view of the inadequate fund provision. It is, therefore, approved<br />

to maintain the existing two State Referral Centres (separately for mentally<br />

retarded and other Disabilities) and the District Referral Centre exclusively set up<br />

for the PWDs, training of persons in disabilities and manpower development for<br />

which Rs.11.00 lakhs is earmarked during 2004-2005 as below :-<br />

(i) Grant-in-aid - 11.00 lakhs<br />

3. S.I.T. ACT<br />

TOTAL - Rs.11.00 lakhs<br />

Immoral Traffic (Prevention) Act, 1986 : As envisaged in the Act, two kinds of<br />

institutions are established, viz. the Reception Centre, where women arrested<br />

under the Act are remanded and Protective Home where persons convicted by the<br />

Court are institutionalised. Training of different trades are imparted for their<br />

economic rehabilitation and counselling and guidance for their moral<br />

rehabilitation. These two institutions started since 1995-1996 and will be continued<br />

during 2004-2005.<br />

(a) Protective Home :<br />

Sl. No. Name of Post Scale of Pay Existing TOTAL<br />

1. Superintendent 8000-13500/- 1 1<br />

2. Warden 5000-8000/- 1 1<br />

3. Instructor 4000-6000/- 1 1<br />

4. L.D.C. 4000-6000/- 1 1<br />

5. IV Grade 2650-4000/- 5 5<br />

TOTAL : 9 9<br />

Financial requirement during 2004-2005 as below :<br />

1. Salary - Rs. 11.28 lakh<br />

2. T.E. - Rs. 0.10 lakh<br />

3. O.E. - Rs. 0.80 lakh<br />

4. Minor Works - Rs. 0.50 lakh<br />

5. Materials & Supply - Rs. 4.00 lakh<br />

6. Other Charges - Rs. 0.50 lakh<br />

(b) Reception Centre :<br />

TOTAL - Rs. 17.18 lakh<br />

Financial requirement of reception Centre during 2004-2005 is given below :<br />

1. Salary - Rs. 16.02 lakh<br />

2. Other Charges - Rs. 0.30 lakh<br />

TOTAL - Rs. 16.32 lakh<br />

Sl. No. Name of Post Scale of Pay Existing Proposed TOTAL<br />

1. IV Grade 2650-4000/- 18 - 18


- 377 -<br />

SOCIAL WELFARE DEPARTMENT<br />

4. WELFARE OF POOR & DESTITUTE PERSONS<br />

(a) National Social Assistance Programme (N.S.A.P.) :<br />

The N.S.A.P. is a centrally sponsored Programme to extend 100 percent Central<br />

Assistance to the States / U.T.s to provide the benefits under it in accordance with<br />

the norms, guidelines and conditions laid down by the Central Govt. The N.S.A.P.<br />

introduces a National Policy for Social Assistance to poor households. The<br />

Programme represents a significant step towards the fulfillment of the Directive<br />

Principles in Article 41 & 42 of the Constitution recognizing the concurrent<br />

responsibility of the Central and State Govt. in the matter.<br />

The N.S.A.P. Scheme includes :<br />

(i) National Old Age Pension Scheme (N.O.A.P.S.)<br />

(ii) National Family Benefit Scheme (N.F.B.S.)<br />

N.O.A.P.S.: Beneficiaries under the State Plan were given Old Age Pension @<br />

Rs.100/- p.m. per head in the previous years. Those beneficiaries under the State<br />

Plan are now transferred to N.O.A.P.S. due to paucity of fund under State Plan. As<br />

the rate of Govt. of India (i.e. Rs.75/- p.m. per head) is short of Rs.25/- p.m. per<br />

head, it was felt necessary to enhance the rate by Rs.25/- p.m. per head so as to<br />

bring the rate to Rs.100/- p.m. per head as was given to the beneficiaries under the<br />

State Plan during 2001-2002. To meet the requirement for 10525 beneficiaries @<br />

Rs.100/- p.m. per head, Rs.126.30 lakhs is approved during 2004-2005.<br />

N.F.B.S.: Under this Scheme, the family of a household below the poverty line shall<br />

get an assistance of Rs.10,000/- on the death of its primary breadwinner whose age<br />

is between 18 yrs. and 65 yrs. During the previous year 47 persons were given this<br />

benefit and it is approved to continue the Scheme during 2004-2005. 57 persons<br />

are approved to be given this benefit during 2004-2005 and an amount of Rs.5.70<br />

lakhs will be required.<br />

(b) Old Age Home :<br />

For the better maintenance of the Home, Rs.0.50 lakhs is approved in addition to<br />

Rs.8.25 lakhs provided under Non-Plan Budget.<br />

5. PROHIBITION<br />

(a) De-Addiction Centre :<br />

The Budget provision for 70 bedded De-addiction Centre at Armed Veng for the<br />

year 1997-1998 was Rs.34.00 lakhs only. This Centre had been shifted to Sethawn<br />

with the inmate capacity of 200 persons to be provided with rehabilitation<br />

programme. The requirement of fund during 2004-2005 is earmarked as under:


- 378 -<br />

SOCIAL WELFARE DEPARTMENT<br />

Sl. No. Name of Posts Scale of Pay Existing Post<br />

1 2 3 4<br />

1. Centre Director 10000-15200/- 1<br />

2. Medical Officer 8000-13500/- 1<br />

3. Case Worker 6500-10500/- 2<br />

4. Psychologist 6500-10500/- 1<br />

5. Sister 6500-10500/- 1<br />

6. Staff Nurse 5500-9000/- 6<br />

7. Pharmacist 5000-8000/- 1<br />

8. Warden 5000-8000/- -<br />

9. U.D.C. 5000-8000/- -<br />

10. Vocational Instructor 4500-7000/- -<br />

11. Security Officer 4500-7000/- 3<br />

12. Physical Instructor 4500-7000/- 2<br />

13. Laboratory Technician 4500-7000/- 1<br />

14. L.D.C. 4000-6000/- -<br />

15. A.N.M. 4000-6000/- 2<br />

16. Storekeeper 3050-4590/- -<br />

17. Driver 3050-4590/- 2<br />

18. Cook 2650-4000/- 3<br />

19. Mali 2650-4000/- -<br />

20. Office Peon 2650-4000/- 1<br />

21. Chowkidar 2650-4000/- 1<br />

22. Barber 2650-4000/- -<br />

23. Watch & Watch as M.R. 12<br />

24. Guards / Watchman -<br />

Financial requirement is as follows:<br />

TOTAL : 28<br />

(+) 12<br />

1. Salary - 45.86 lakhs<br />

2. Wages - 5.23 lakhs<br />

3. T.E. - 0.70 lakh<br />

4. O.E. - 6.00 lakhs<br />

5. Publication - -<br />

6. Minor Works - 1.00 lakhs<br />

7. M & S (including Mess) - 10.00 lakhs<br />

8. O.C. (incl. Purchase of medicines, etc.) - 1.00 lakhs<br />

TOTAL - Rs.69.79 lakhs<br />

(b) <strong>Mizoram</strong> Social Defense & Rehabilitation Board :<br />

As per decision to the Minutes of the Meeting of the Advisory Board on Deaddiction<br />

Centre and Allied Institutions under the Chairmanship of Hon’ble Chief Minister<br />

on the 17 th April, 1999. Rs.1.00 crore should be allocated for the immediate successful<br />

implementation of the functioning of the Board on De-addiction Centre and Allied<br />

Institutions. The Scheme will be continued during 2004-2005. Rs.15.00 lakhs is approved.


- 379 -<br />

SOCIAL WELFARE DEPARTMENT<br />

6. CORRECTIONAL SERVICES / JUVENILE JUSTICE ACT :<br />

(a) Remand Home, Aizawl & Lunglei :<br />

This Act primarily aims at prevention of crime committed by and against children<br />

up to the age of 16yrs. in the case of boys and 18yrs. in the case of girls. The Act<br />

also provides care and protection to children subjected to abuse and exploitation.<br />

Under the Act as well, rounded Juvenile Justice System had been incorporated in<br />

conformity with the United Nations Standard Rules for the administration of the<br />

Juvenile Justice with a view of fulfilling the statutory responsibility of the State as<br />

laid down under this law. The Scheme strength of the staff which is to be continued<br />

during 2004-2005 is given in the table below :<br />

Remand Home, Aizawl & Lunglei :<br />

Sl. No. Name of Post Scale of Pay Existing<br />

Total<br />

1. Superintendent 8000-13500/- 2 2<br />

2. Probation Officer / 6500-10500/- 2 2<br />

Case Worker<br />

3. Warden 5000-8000/- 1 1<br />

4. Craft Instructor 4000-6000/- 3 3<br />

5. L.D.C. 4000-6000/- 2 2<br />

6. Driver 3050-4590/- 1 1<br />

7. IV Grade 2650-4000/- 7 7<br />

Financial requirement during 2004-2005 :<br />

TOTAL : 18 18<br />

1. Salary - 23.63 lakhs<br />

2. T.E. - 0.56 lakh<br />

3. O.E. - 1.50 lakhs<br />

4. M & S - 7.00 lakhs<br />

5. Minor Works - 0.50 lakh<br />

6. O.C. - 0.80 lakh<br />

(b) Juvenile Home / Certified School :<br />

TOTAL - Rs.33.99 lakhs<br />

Sl. No. Name of Post Scale of Pay Existing<br />

1. Superintendent 8000-13500/- 1<br />

2. Psychologist / Case Worker 6500-10500/- 1<br />

3. Warden 5000-8000/- 1<br />

4. Craft Instructor 4000-6000/- 1<br />

5. Driver 3050-4590/- 1<br />

6. IV Grade 2650-4000/- 6<br />

TOTAL : 11


- 380 -<br />

SOCIAL WELFARE DEPARTMENT<br />

Financial requirement of Juvenile Home / Certified School, Aizawl during 2004-<br />

2005 is given below:<br />

1. Salary - 8.85 lakhs<br />

2. T.E. - 0.10 lakh<br />

3. O.E. - 0.20 lakh<br />

4. O.C. - 0.10 lakh<br />

TOTAL - Rs.9.25 lakhs<br />

(c) Children’s Court :<br />

Sl. No. Name of Post Scale of Pay No. of Post (existing)<br />

1. Assistant 5500-9000/- 1-Post at Aizawl<br />

2. U.D.C. 5000-8000/- 1-Post at Aizawl<br />

3. L.D.C. 4000-6000/- 1-Post at Aizawl<br />

4. IV Grade 2650-4000/- 2-Posts at Aizawl<br />

TOTAL : 5 posts<br />

Financial requirement for the year 2004-2005 is given below :<br />

1. Salary - Rs. 6.68 lakhs<br />

(d) Social Service in Jail :<br />

Sl. No. Name of Post Scale of Pay No. of Post (existing)<br />

1. Vocational Instructor 4000-6000/- 2<br />

2. Educational Instructor 5500-9000/- 2<br />

3. L.D.C. 4000-6000/- 1<br />

TOTAL : 5 posts<br />

Financial requirement during 2004-2005 is given below :<br />

1. Salary - Rs. 7.12 lakhs<br />

2. O.E. - Rs. 0.20 lakhs<br />

TOTAL - Rs. 7.32 lakhs<br />

7. GRANTS-IN-AID TO VOLUNTARY ORGANIZATIONS<br />

(a) For the purpose of strengthening and promoting voluntary organizations rendering<br />

Welfare Service, Grants-in-Aid either in cash or in kind are given. The bare<br />

minimum financial requirement during 2004-2005 in this account is Rs.5.00 lakhs.<br />

(b) Grants-in-Aid to Rehabilitation Centre, De-addiction Centres and Counselling<br />

Centres run by NGOs: For the prevention and treatment of drug addicts,<br />

alcoholism and diseases relating to AIDS, etc., certain Centres have been<br />

established in <strong>Mizoram</strong> by NGOs. Financial assistance to those deserving Centres to<br />

strengthen their Welfare Services will be given. Rs.2.00 lakhs is approved.<br />

8. CONSTRUCTION WORKS UNDER ARTICLE 275(1) OF THE CONSTITUTION<br />

Under Article 275(1), the Department proposes to undertake various construction<br />

works like construction of village steps with drains, small bridges, agriculture link<br />

road type to facilitate MFP / SAP Collection, infrastructure for Community-cum-<br />

Sports / Recreation Centre, etc.


Sl.<br />

No.<br />

- 381 -<br />

SOCIAL WELFARE DEPARTMENT<br />

Rs.264.00 lakhs is, therefore, approved during 2004-2005 for execution of<br />

infrastructural development of rural areas as permissible under Article 275(1) of<br />

the Constitution.<br />

Name of the Project<br />

No. / Unit of<br />

Work<br />

Amount<br />

1 2 3 4<br />

1.<br />

Construction of Tribal Art Centre 1 91.80<br />

2. Construction of Internal Road @ 100,000/- × 8 at College<br />

Veng to Venghlui, College Veng Area, Baktawng High<br />

School to Tlangnuam, Appr. Road to CDPO Office, E.<br />

Lubgdar, Hunzami’s residence to Kapzawna’s residence,<br />

Tanhril, Venghlui Area, ITI Veng area.<br />

3. Construction of steps @ 100,000/- × 8 at Chanmari West<br />

near Kaptluangi’s residence, Model Veng, Chanmari<br />

(Chepa Road), Tuithiang (Appr. Road to AWC), Zemabawk<br />

Mualmawi, Upper Republic, Republic<br />

4. Constructions of Drains @ 100,000/- × 2 at Khatla (near<br />

Vawra’s resident) Mission Venglai<br />

5. Construction of small and suspension bridges @<br />

300,000/- × 7 at Khawbung to E. Lungdar over Tuipui at<br />

Pu Zapa Kai, Mualmawi Vanapa Section, Vaikai Lei over R.<br />

Tuivai, Tuithiang to Armed Veng, Tuithiang lei, Ekpaih lei,<br />

Saron Veng lui.<br />

6. Construction of Farmers’ waiting shed @ 75,000/- × 12<br />

within Biate area, within Artahkawn area, within<br />

Rulpuihlim area, within Phuldungsei area, within<br />

Muallungthu area, within Bethlehem Vengthlang area,<br />

within Durtlang area, within ITI Veng area, within<br />

Sakawrtuichhun area, within Dampui area, within Mamit<br />

area, within Sialsuk area.<br />

7. Construction of Community Hall @ 500,000/- × 7 at<br />

Upper Republic, Aizawl, Bungkawn, Dinthar, Bethlehem,<br />

Forest Veng, Zarkawt, Chanmari West.<br />

8. Construction of Residential Training Centre for women in<br />

Distress at Maumual.<br />

9. Construction of Waiting Room for Old Age Pensioner and<br />

Disabled Persons at Chaltlang.<br />

10. Construction of Certified School for Observation Home<br />

for Juvenile at Durtlang<br />

11. Construction of Fish Ponds @ 330,000/- × 6 at Sihhmui,<br />

Buhchang, Sakawrtuichhun, Bawngva, Darlak, Lunglei.<br />

12. Renovation of existing Fish Pond @ 95,000/- × 2 at<br />

Lawibual Fish Farm, Lawibual, Zawngram<br />

4.49 km at 8<br />

locations<br />

1200 steps<br />

at 8<br />

locations<br />

8.00<br />

8.00<br />

2 units 2.00<br />

7 units 21.00<br />

12 units 9.00<br />

7 units 35.00<br />

1 unit 16.00<br />

1 unit 5.00<br />

1 unit 8.00<br />

6 units 19.80<br />

2 units 1.90


- 382 -<br />

SOCIAL WELFARE DEPARTMENT<br />

13. Plantation of Mulberry Trees @ 25,000/- × 101 at :<br />

i) Bairabi, Thingdawl ICDS Project<br />

ii) Thingdawl ICDS Project<br />

iii) Kolasib, Thingdawl ICDS Project<br />

iv) Buhchang ICDS Project<br />

v) Samtlang, Tlangnuam ICDS Project<br />

vi) Sihphir, Tlangnuam ICDS Project<br />

vii) Serkhan, Tlangnuam ICDS Project<br />

viii) Falkawn, Tlangnuam ICDS Project<br />

ix) Maulkhnag, Tlangnuam ICDS Project<br />

x) Khamrang, Tlangnuam ICDS Project<br />

xi) Thangpui, Lunglei ICDS Project<br />

xii) Thangte, Lunglei ICDS Project<br />

xiii) Vaisam, Lunglei ICDS Project<br />

xiv) Mualcheng I, Lunglei ICDS Project<br />

xv) Mualcheng II, Lunglei ICDS Project<br />

xvi) Chengpui, Lunglei ICDS Project<br />

xvii) Zotuithiang, Lunglei ICDS Project<br />

xviii) Zotuithiang II, Lunglei ICDS Project<br />

xix) Ralvawng, Lunglei ICDS Project<br />

xx) Vanhne, Lunglei ICDS Project<br />

xxi) Hauruang I, Lunglei ICDS Project<br />

xxii) Hauruang II, Lunglei ICDS Project<br />

xxiii) Chithar (Total Units 101)<br />

14. Construction for development of burial ground at<br />

Bungkawn / Vengthar / Nursery<br />

15. Add 2% for management training, monitoring, evaluation<br />

and administrative expenses<br />

23 locations 25.25<br />

1 unit 8.15<br />

- 5.18<br />

TOTAL : 264.00<br />

9. WOMEN & CHILD DEVELOPMENT<br />

(a) Child Welfare :<br />

(i) Pre-School : The Department of Social Welfare is maintaining 30 nos. of<br />

Pre-Schools. Rs.3.00 lakhs is approved for this purpose during 2004-2005.<br />

(ii) Motherless Babies Homes :<br />

(a) For meeting the establishment and administrative charges of the staff of the<br />

Board for the Supervision & Control of Homes constituted under the <strong>Mizoram</strong><br />

Orphanages and Charitable Homes (Supervision and Control) Rules 2003, for the<br />

meeting expenses of the Board and for the expenses towards travelling allowances<br />

and other remunerations payable to the members of the Board.<br />

(b) For the implementation of Adoption Programme in the State, to regulate<br />

and to promote in-country adoptions.<br />

(c) For the provision of institutional care for care and protection of infants and<br />

children who are either abandoned / orphaned or destitute and their rehabilitation.<br />

(d) For support of the licensed Homes.<br />

Rs.4.00 lakhs is approved for this purpose during 2004-2005.


- 383 -<br />

SOCIAL WELFARE DEPARTMENT<br />

(iii) Crèches / Day Care Centre: The Department of Social Welfare is maintaining<br />

40 Crèches / Day Care Centre in <strong>Mizoram</strong> under Non Plan Budget. Due to<br />

inadequacy of Non Plan Fund, Rs.2.93 lakhs is approved from Non Plan Fund<br />

during 2004-2005.<br />

10. WOMEN WELFARE<br />

(a) Women Commission:<br />

The Constitution guarantees to all its citizens Justice, Liberty, Equality and<br />

Fraternity without any discrimination. But even 45 years after Independence,<br />

women continued to be treated as the single largest group of backward citizens in<br />

India. Parliament in 1990 has passed the National Commission for Women Act..<br />

Subsequently, Women Commission has been established in <strong>Mizoram</strong> during 2000-<br />

2001.<br />

Sl. No. Name of Post No. of Post Scale of Pay (existing)<br />

1. Chairperson 1 3,000 Hon.<br />

2. Member Secretary 1 12000-18000/-<br />

3. Project Officer 1 8000-13500/-<br />

4. U.D.C. 1 5000-8000/-<br />

5. L.D.C. 2 4000-6000/-<br />

6. Driver 2 3050-4590/-<br />

7. Chowkidar 1 2650-4000/-<br />

8. IV Grade 3 2650-4000/-<br />

TOTAL : 12 Posts<br />

Financial requirement for 2005-2006 :<br />

1. Salary - 5.99 lakhs<br />

2. Wages - 1.05 lakhs<br />

3. O.E. - 3.00 lakhs<br />

4. Rent - 0.66 lakh<br />

5. M & S - 0.40 lakh<br />

6. O.C. - 1.00 lakh<br />

TOTAL - 12.10 lakhs<br />

(b) Socio-Economic Programme for Poor & Destitute:<br />

Destitute widows who are desperately in need of care, protection and economic<br />

upliftment are approved to be given Socio-Economic grants. Rs.3.75 lakhs is approved for<br />

the Scheme during 2004-2005.


- 388 -<br />

NUTRITION<br />

NUTRITION<br />

The Annual Plan 2004-05 outlay for Nutrition Programme made within Rs. 682.00<br />

lakhs i.e.,<br />

1. PMGY - Rs. 645.00 lakhs<br />

2. State Plan - Rs. 20.00 lakhs<br />

3. NPAG - Rs. 17.00 lakhs<br />

The Nutrition Programme includes Schemes like: —<br />

1. Supplementary Nutrition Programme<br />

2. Carrying Charges / Transportation of Nutrition foods<br />

3. Foods & Nutrition extension Centres<br />

4. Impact Study / Diet survey<br />

5. Performance Linked Additional Honorarium to Anganwadi Workers & Helpers<br />

6. FNEC<br />

7. Nutrition Programme for Adolescent Girls<br />

As per the Govt. of India, Ministry of Human Resources Development, department<br />

of Women and Child development letter No.F.16-4/2000-MI dt. 12.7.2000 under para 3.4 of<br />

the Guidelines, it is stated that the existing cost norm for the supplementary Nutrition<br />

may be fixed by the respective State Govt. and revised depending on the prices of<br />

commodities and prevalence of Grade-III and IV level mal-nutrition in the are so as to<br />

maintain the recommended levels of minimum calorie/ protein and micro-nutrients.<br />

Hence, the daily ceiling for the different categories of beneficiaries for the ICDS Projects in<br />

<strong>Mizoram</strong> is revised as follows: -<br />

1. Children @ Rs. 2.25 per day per child<br />

2. Severely malnourished children @ Rs. 4.50 per day per child<br />

3. Pregnant and lactating mothers @ Rs. 3.00 per day per beneficiary<br />

4. Adolescent Girls @ Rs. 3.00 per day per beneficiary<br />

The Supplementary Nutrition Programme is implemented in 21 ICDS Projects in<br />

<strong>Mizoram</strong>. Various categories of beneficiaries are as follows based on the survey report of<br />

the Projects during 2003-04.<br />

1. Children 3-6 months - 86337<br />

2. Severely malnourished children<br />

6-36 months - 1069<br />

3. Children 3-6 years - 45390<br />

4. Severely malnourished children 3-6 yrs - 291<br />

5. Pregnant and lactating mothers - 28737<br />

6. Adolescent Girls - 12405<br />

TOTAL - 174229<br />

A. PRADHAN MANTRI GRAMODAYA YOJANA [PMGY]:<br />

With the introduction of a new initiative in the form of Pradhan Mantri Gramodaya<br />

Yojana [PMGY] from 2000-01 in order to achieve the objective of sustainable human<br />

development at the village level, the PMGY envisages allocations for Additional Central<br />

Assistance to States/ Uts for selected basic minimum services in order to focus on certain


- 389 -<br />

NUTRITION<br />

priority area including nutrition. The allocation under Nutrition Components of the PMGY<br />

is to be made under the Supplementary Nutrition Programme component of the Integrated<br />

Child Development Services [ICDS]. The Nutrition component of the PMGY has been<br />

specially outlined with the objective of eradicating malnutrition amongst under 3 years<br />

children by increased nutritional coverage of supplementary feeding of these children<br />

through the ICDS scheme. Further, it is mandatory to allocate 15% of the total allocation<br />

for <strong>Mizoram</strong>. Annual Plan for 2004-05 under PMGY is made within Rs. 709.50 lakhs as per<br />

the instruction of the State Planning Board, Government of <strong>Mizoram</strong> vide their letter<br />

No.G.28014/55/2004-05/SPB dt. 8.10.2003.<br />

[I]<br />

Sl.<br />

no<br />

1. Detailed approved expenditure for 2004-05 under PMGY is as follows :-<br />

2.<br />

Target Group<br />

No. of<br />

benefici<br />

aries<br />

Daily<br />

ceiling<br />

No.of<br />

feeding<br />

Days<br />

Daily<br />

requirement<br />

Total<br />

requirement<br />

for the year<br />

1. Children 6-36 months 86337 Rs. 2.25 250 days Rs. 194,258.25 Rs.485,64,562.50<br />

2. Severely malnourished<br />

Children 6-36 months 1069 Rs. 4.50 250 days Rs. 4,810.50 Rs. 12,02,625.00<br />

Total Requirement for the year is Rs. 497,67,187.50<br />

Further, as per Planning Commission’s letter D.O No. 9[3]/99-H & FW dt.<br />

26.12.2000, it is decided to provide supplementary Nutrition to Severely Malnourished<br />

Children of 3-6 years. [Grade III & IV] and Pregnant and Lactating Mothers during 2004-05<br />

under PMGY as detail below: -<br />

[ii]<br />

Sl.<br />

no<br />

Target Group<br />

No. of<br />

benefici<br />

aries<br />

Daily<br />

ceiling<br />

No. of<br />

feeding<br />

Days<br />

Daily<br />

requirement<br />

Total<br />

requirement<br />

for the year<br />

1. Severely malnourished<br />

children 3-6 years 291 Rs. 4.50 80 days Rs. 1,309.50 Rs. 104,760.00<br />

2. Pregnant & Lactating<br />

mothers 28737 Rs. 3.00 80 days Rs. 86,211.00<br />

Rs. 68,96,880.00<br />

Total requirement for the year is Rs.70,01,640.00<br />

Against the normal norm of 300 feeding days, only 80 feeding days could be<br />

covered during 2004-05 with the available fund.


- 390 -<br />

NUTRITION<br />

Therefore, total fund available for purchase of Nutrition foods under PMGY during<br />

2004-05 is :<br />

[i] Rs. 497,67,187.50<br />

[ii] Rs. 70.01,640.00<br />

Total Rs. 567,68,827.50<br />

2. Unit Cost of Maintenance:<br />

Transportation/ Carrying charges of Nutrition:<br />

Rs. 60,71,972.00 is set aside for transportation/ carrying charges during 2004-05.<br />

3. Impact Studies:<br />

Monitoring, evaluation and Impact Study: For this purpose, an amount of<br />

Rs.50,000.00 is approved during 2004-05.<br />

4. Additional Honorarium of Anganwadi workers and Helpers:<br />

Performance Linked Additional Honorarium may be provided to Anganwadi<br />

Workers and helpers during 2004-05 @ Rs. 50/- per month per head. Requirement for this<br />

purpose is as follows: -<br />

1. Anganwadi Workers 1341x50x12 = Rs. 804,600.00<br />

2. Anganwadi Helpers 1341x50x12 = Rs. 804,600.00<br />

Total = Rs. 16,09,200.00<br />

Grand Total of approved expenditure under PMGY during 2004-05 is<br />

1. Purchase of food = Rs. 567,68,828.00<br />

2. Unit cost of maintenance = Rs. 60,71,972.00<br />

3. Impact Study = Rs. 50,000.00<br />

4. Additional Honorarium of<br />

AWWs & Helpers = Rs. 16,09,200.00<br />

B. STATE PLAN FUND<br />

Unit 1999-2000, this programme is exclusively under the State Plan fund. With the<br />

introduction of PMGY from 2000-01, children under 3 years will now be catered by the<br />

PMGY, while the remaining 3-6 years age group children, pregnant and lactating mothers<br />

and adolescent girls will have to be funded by the State Plan Budget.<br />

Mention may be made that children 3-6 years age group and adolescent girls have<br />

to be catered solely by the State Plan fund. These categories of beneficiaries are deprived<br />

of supplementary nutrition during 2000-01 and 2001-02 due to non-provision of fund<br />

from the State Plan Budget. Non-provisioning of the State Plan Fund could further affect<br />

the allocation of fund under PMGY for the years to come.<br />

The Supplementary Nutrition Programme aims at eradicating the protein, calorie<br />

and micro-nutrient malnutrition / deficiency in the developing States. Number of<br />

beneficiaries under the State Plan fund are shown below: -<br />

Children 3-6 years - 45390


- 391 -<br />

NUTRITION<br />

1. Detailed approved expenditure for 2004-05 under the State Plan Fund is as<br />

follows: -<br />

(i)<br />

Sl.<br />

no<br />

Target Group<br />

No. of<br />

benefici<br />

aries<br />

Daily<br />

ceiling<br />

No.of<br />

feeding<br />

Days<br />

Daily<br />

requirement<br />

Total<br />

requirement<br />

for the year<br />

1. Children 3-6 years 45390 Rs. 2.25 19.5 days Rs. 102,127.50 Rs. 19,91,486.25<br />

Total requirement for the year is - Rs. 19,91,486.25<br />

Against the national norm of 300 feeding days a year, only 19.5 days could be had<br />

during 2004-05 under the State Plan fund with the available fund.<br />

(ii) Community Food & Nutrition Extension Centre:<br />

As the model scheme furnished by the Ministry concerned, Community Food &<br />

Nutrition Extension Centre is implemented and women folks are trained in the line of food<br />

preservation and nutrition education. For this Rs. 8,514.00 only is approved during 2004-<br />

05.<br />

The following posts which are already included in the Annual Plan 2003-04, but<br />

which are not yet created due to ban on creation of posts are now approved for the Annual<br />

Plan 2004-05.<br />

Sl.no. Name of Post Scale of Pay Nos. of Posts<br />

1. Food Demonstrator 5500-9000/- 1<br />

2. Tech.Asst.-cum-Typist 5000-8000/- 1<br />

3. Machine Operator 3050-4500/- 1<br />

4. Chowkidar-cum-Sweeper 2650-4000/- 1<br />

TOTAL 4<br />

Grand Total of approved expenditure under State Plan Fund during 2004-05 is:<br />

i) Community Food & Nutrition Extension Centre Rs. 8,514.00<br />

ii) Purchase of Food Rs. 19,91,486.00<br />

TOTAL Rs. 20,00,000.00<br />

C. NUTRITION PROGRAMME FOR ADOLESCENT GIRLS [NPAG] :<br />

The Adolescent Girls scheme was stated during 1991-1992 in 507 blocks across the<br />

country. For the first time in India, a special intervention has been devised for Adolescent<br />

Girls using the ICDS infrastructure. The intervention focuses on school dropouts, girls in<br />

the age group of 11-18 year. The objective of the scheme is to mobilize and enhance the<br />

potentials of these girls by meeting their needs of self-development, nutrition, health,<br />

education, literacy, recreation and skill formation. The scheme has been implemented only<br />

under Lungdar East ICDS Project since 1991-92, but extended to all the 21 ICDS Projects<br />

from the year 2000-01. These Adolescent Girls are to be provided supplementary nutrition<br />

food at the Anganwadi, on the same scale as pregnant and lactating mothers i.e to provide<br />

500 calories of energy 20 g. of protein for improvement of their nutritional and health


- 392 -<br />

NUTRITION<br />

status. The Annual Plan for Nutrition Programme of Adolescent Girls under Central<br />

Assistance during 2004-05 is made within Rs. 17.00 lakhs. Detail approved expenditure<br />

under the scheme during 2004-05 is as under: -<br />

Sl.<br />

no<br />

Target Group<br />

No. of<br />

benefici<br />

aries<br />

Daily<br />

ceiling<br />

No.of<br />

feeding<br />

Days<br />

Daily<br />

requirement<br />

Total<br />

requirement<br />

for the year<br />

1. Adolescent Girls<br />

11-18 years 12405 Rs. 3.00 46 days Rs. 37,215/- Rs. 17,11,890.00<br />

Calculation :-<br />

i) Daily requirement - Rs. 37,215.00<br />

ii) No. of Feeding Days - 46 days<br />

Therefore, total requirement for the year is 37,215/-x46 days = Rs. 17,11,890.00<br />

Say Rs. 17,00,000.00<br />

The requirement for the year as per the norm of 300 feeding days is<br />

Rs.111,64,500.00. However, only 46 feeding days could be covered with the available fund.<br />

TOTAL OF ‘A’ = Rs. 645,00,000.00<br />

TOTAL OF ‘B’ = Rs. 20,00,000.00<br />

TOTAL OF’C’ = Rs. 17,00,000.00<br />

GRAND TOTAL OF A, B & C = Rs. 682,00,000.00


- 395 -<br />

PRISON DEPARTMENT<br />

PRISON<br />

The administration of Jails in <strong>Mizoram</strong> is mainly concentrated on security custody<br />

and confinement of prisoners. In the past, most of the works taken up by the department<br />

were security oriented with little scope for reformation and education of the jail inmates.<br />

It is now intended to take up the security aspect and reformation of prisoners on equal<br />

footing as recommended by Human Rights Commission and in line with the modern<br />

concepts of Prison.<br />

At present, the following jails are functioning in <strong>Mizoram</strong>: -<br />

1. Central Jail, Aizawl<br />

2. District Jail, Aizawl<br />

3. District Jail, Lunglei<br />

4. District Jail, Saiha<br />

5. District Jail, Kolasib<br />

6. District Jail, Champhai<br />

The Approved Annual Plan for the year 2004-05 is prepared as Rs.188.00 lakh.<br />

1. 001(01) - Direction - Rs. 8.00 lakh<br />

2. 101(02) - District Jails - Rs. 76.00 lakh<br />

3. 102 - Jail Manufacture - Rs. 15.00 lakh<br />

4. 800 - Other Expenditure - Rs. 89.00 lakh<br />

Modernization of jails<br />

TOTAL - Rs.188.00 lakh<br />

SCHEMEWISE WRITE-UP<br />

1. 001(01) - Direction: At present, the department is having 1(one) Junior Engineer<br />

and 1(one) Storekeeper to look after department buildings and stores. The existing<br />

Directorate Office building is in need of repair and renovation. Rs. 8.00 lakh is<br />

provided for maintenance of staff and for repair of the Directorate office building.<br />

Sl.No Item Unit Physical target Financial target<br />

2004-05 2004-05<br />

I. Salary of Junior Engineer No 2 Rs. 2.75 lakh<br />

and Store Keeper<br />

II. TE/OE L.S L.S Rs. 3.25 lakh<br />

III. Improvement/ Repair of P.C 100% Rs. 2.00 lakh<br />

Directorate Office building<br />

TOTAL : Rs. 8.00 lakh<br />

2. 101(02) - District Jails: The existing jail buildings in different places are in need<br />

of repair and renovation. The department is also facing fund problem to meet the<br />

expenses on feeding charges of prisoners. As such, Rs.76.00 lakh is provided for<br />

repair of jail buildings and for feeding charges of prisoners.<br />

Sl.No Item Unit Physical target Financial target<br />

2004-05 2004-05<br />

I. Repair and renovation P.C. 100% Rs. 14.00 lakh<br />

of jail buildings<br />

II. Feeding charges of L.S L.S Rs. 62.00 lakh<br />

prisoners<br />

TOTAL : Rs. 76.00 lakh


- 396 -<br />

PRISON DEPARTMENT<br />

3. 102-Jail Manufacture: Vocational training in a few trades like handloom, carpentry,<br />

knitting and tailoring have been introduced for convict prisoners. For utilizing the<br />

manpower, work connected with gardening and piggery is also introduced. A sum<br />

of Rs.15.00 lakh for salary, wages of working prisoners and for purchase of tools<br />

and machineries is provided.<br />

Sl.No Item Unit Physical target Financial target<br />

2004-05 2004-05<br />

I. Salary of Junior Instructress, No 4 Rs.3.75 lakh<br />

Peon and Chowkidar<br />

II. Wages L.S L.S. Rs. 5.25 lakh<br />

III. M & E L.S L.S Rs. 5.00 lakh<br />

IV. Gardening M & E L.S L.S Rs. 1.00 lakh<br />

V. Piggery M&E L.S L.S Rs. 1.00 lakh<br />

TOTAL : Rs.15.00 lakh<br />

4. 800-Other Expenditure<br />

Modernisation of Jails: Rs. 17.77 crore has been allocated by Government of India<br />

for jail reforms on cost sharing basis of Central Government and State Government<br />

in the ration of 75:25 for a period of five years from 2002 to 2007. Government of<br />

India has already released Rs. 5.325 crore for the years 2002-2003 and 2003-04 and<br />

the allocation for the state for the coming year would be the same as that of the<br />

previous year. As per allocation of fund by Central Government a sum of Rs.3.55<br />

crore is to be spent every year for the five year period. Out of Rs.3.55 crore,<br />

Rs.2.6625 crore would be Central assistance and the balance amount of Rs. 0.8875<br />

crore would be borne by the State Government as 25% matching contribution. A<br />

provision of Rs. 89.00 lakh is made for matching contribution of the Central<br />

assistance.<br />

Sl.No Item Unit Physical target Financial target<br />

2004-05 2004-05<br />

I. Construction of new jails No 3 Rs. 27.50 lakh<br />

II. Expansion and renovation No 6 Rs. 30.00 lakh<br />

of existing jail<br />

III. Construction of staff No 6 Rs. 12.50 lakh<br />

Quarters<br />

IV. Sanitation and water P.C 100% Rs. 19.00 lakh<br />

supply<br />

TOTAL : Rs. 89.00 lakh


- 400 -<br />

PRINTING & STATIONERY DEPARTMENT<br />

PRINTING & STATIONERY<br />

Printing & Stationery Department is being equipped with advanced Printing<br />

equipment in order to execute timely completion of urgent and time-bound Government<br />

Publications. Priorities of the Annual Plan 2004-2005 are purchase of requisite equipments<br />

and accessories and strengthening of Information and Technology. The approved Annual<br />

outlay during 2003-2004 was Rs. 80.00 lakhs and approved sectoral allocation for Annual<br />

Plan 2004-2005 in respect of Printing & Stationery Department is Rs. 125.00 lakhs.<br />

Scheme-wise description of the Annual Plan of Printing & Stationery Department<br />

for the year 2004-05 is as follows:<br />

1. FORMS & STATIONERY:<br />

Rents/Office Accommodation: The Department does not yet have building of its<br />

own at Government Press Champhai and new District headquarters i.e., Lawngtlai, Serchhip<br />

and Mamit. The Department have and accommodate in a rented private building. Hence,<br />

Rs.0.50 lakh is earmarked during 2004-05 to meet the expenditure on House Rent.<br />

Maintenance of Motor Vehicles: For maintenance of Existing Departmental<br />

vehicles (Truck) Rs. 1.00 lakh is earmarked during 2004-05<br />

2. GOVERNMENT PRESS :<br />

Maintenance of existing staff: For maintenance of 3(three) Officers and for<br />

engagement of 4 nos. of Muster Roll Rs. 13.28 lakhs is earmarked as follows:<br />

(a) Salary - Rs. 4.70 lakhs<br />

(b) Wages - Rs. 1.50 lakhs<br />

(c) T.E. - Rs. 0.50 lakh<br />

(d) O.E. - Rs. 5.86 lakhs<br />

(e) O.C - Rs. 0.72 lakhs<br />

Minor Works: For annual repair and maintenance of Department buildings at<br />

Aizawl, Lunglei, Saiha and for construction of Staff quarter Rs.13.22 lakhs is approved<br />

during 2004-05.<br />

Material & Supply: Printing works of Govt. Publications at Govt. Press have greatly<br />

increase hence Rs. 25.00 lakhs is approved for procurement of requisite Press materials<br />

during 2004-05.<br />

Machinery & Equipments: The existing machine at Government Press are old and<br />

required regular repair and procurement of new machines i.e. Image Setter for separation<br />

of colour which is indispensable for running colour printing works Rs.49.30 lakhs is<br />

approved.<br />

Scholarship/Stipend: For imparting necessary training on DTP and to meet the<br />

stipend of trainees Rs.0.20 lakhs is earmarked.<br />

3. GOVERNMENT PUBLICATIONS:<br />

The Government Press is entrusted with Printing of important Govt. documents like<br />

Budget, Plan and Officials Gazette, Electoral Card, etc. Rs.22.50 lakhs is earmarked during<br />

2004-05.<br />

Grand Total - Rs. 125.00 lakhs


- 403 -<br />

PUBLIC WORKS (BUILDING)<br />

PUBLIC WORKS (BUILDING)<br />

INTRODUCTION<br />

The works taken up under this Head of Accounts are mainly construction and<br />

improvement of office building of various Government Department, <strong>Mizoram</strong> House at<br />

various places, Rest House at various places in <strong>Mizoram</strong> and other non-residential<br />

buildings. Rs. 743.20 lakhs is provided during 2004-2005.<br />

DIRECTION & ADMINISTRATION<br />

Rs. 685.00 lakhs is approved during 10 th Five Year Plan. Rs. 243.00 lakhs is<br />

provided during 2004-2005 for salary and establishment of existing staff.<br />

The break-up of Direction & Administration is as follows: —<br />

1) Salary = Rs. 69.00 lakhs<br />

2) T.E. = Rs. 4.00 lakhs<br />

3) Office expenses = Rs. 20.00 lakhs<br />

4) Advertisement = Rs. 1.00 lakhs<br />

5) Professional charge = Rs. 1.00 lakhs<br />

6) Other charges = Rs. 1.00 lakhs<br />

7) Motor vehicles = Rs. 11.00 lakhs<br />

8) Maintenance = Rs. 136.00 lakhs<br />

Total = Rs. 243.00 lakhs<br />

MACHINERY & EQUIPMENT: -<br />

No provision is earmarked for Machinery & Equipment under this Head of Accounts<br />

during 2004-2005.<br />

WORKS: -<br />

Rs. 467.00 lakhs is provided for works under this Head of Accounts during 2004-<br />

2005.<br />

Spill over Schemes:<br />

1. Constn. of New <strong>Mizoram</strong> House at Vasant Vihar New Delhi :<br />

Rs. 200.00 lakhs is provided during 2004-2005.<br />

2. Constn. of DC Office Bldg. at Lunglei Ph-III:<br />

Rs. 6.00 lakhs is provided during 2004-2005.<br />

3. Constn. of SDO Offices, 6 Nos. including full fledged Laboratory at Lunglei :<br />

Rs. 20.00 lakhs is provided during 2004-2005.<br />

4. Constn. of <strong>Mizoram</strong> at Guwahati :<br />

Rs. 24.00 lakhs is provided during 2004-2005.<br />

5. Repair of Vanapa Hall :<br />

Rs. 20.00 lakhs is provided during 2004-2005.<br />

6. Construction of Tourist Lodge at Chaltlang :<br />

Rs. 27.00 lakhs is provided during 2004-2005.


- 404 -<br />

PUBLIC WORKS (BUILDING)<br />

7. Construction of <strong>Mizoram</strong> Legislative Assembly Annexe Building:<br />

Rs. 25.00 lakhs is provided during 2004-2005.<br />

8. Construction of Finance Secretariat Building at Aizawl :<br />

Rs. 38.00 lakhs is provided during 2004 -2005.<br />

9. Construction of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi:<br />

Rs. 10.00 lakhs is provided during 2004 –2005.<br />

10. Construction of boundary fencing for <strong>Mizoram</strong> House at Imphal and<br />

Churachandpur :<br />

Rs. 5.00 lakhs is provided during 2004-2005.<br />

11. Renovation of Damlo Khualbuk at Mumbai i/c hand furnishing:<br />

Rs. 20.00 lakhs is provided during 2004-2005.<br />

12. Improvement and Renovation of State Guest House at Bawngkawn :<br />

Rs. 5.00 lakhs is provided during 2004-2005.<br />

13. Construction of Engineer-in-Chief Office Annexe Building at Aizawl :<br />

Rs. 30.00 lakhs is provided during 2004-2005.<br />

14. Construction of Excise Commissioner Office Building at Aizawl :<br />

Rs. 10.00 lakhs is provided during 2004-2005.<br />

15. Construction of ceiling of Directorate of Accounts & Treasuries Building at<br />

Aizawl:<br />

Rs. 1.00 lakh is provided during 2004-2005.<br />

16. Re-modification of SE (Building) Office at Aizawl :<br />

Rs. 2.00 lakhs is provided during 2004-2005.<br />

17. Re-construction of Retaining wall at Assembly House, Aizawl :<br />

Rs. 7.00 lakh is provided during 2004-2005.<br />

18. Fencing of Secretariat Complex at Aizawl :<br />

Rs. 4.00 lakhs is provided during 2004-2005.<br />

19. Roof treatment of Terminal Building at Lengpui Airport :<br />

Rs. 7.00 lakhs is provided during 2004-2005.<br />

20. Extension of PWD central laboratory, Zuangtui :<br />

Rs. 3.00 lakhs is provided during 2004-2005.<br />

21. Renovation of Langley PWD I.B. for Divisional Office :<br />

Rs. 3.00 lakhs is provided during 2004-2005.


Introduction<br />

- 411 -<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

Training for the purpose of capacity building is essential for improvement of<br />

administration and it is a corner stone for upgradation of the standard of administration.<br />

In <strong>Mizoram</strong>, proper Training Institute is yet to be set up. This Institute, started in 1983, is<br />

the only Institute in the State which makes efforts to impart trainings to the different<br />

levels of employees of the State Government.<br />

1. At present, 8 [eight] Gazetted Officers and 11 [eleven] staff of various categories<br />

are on Institute’s payroll under Plan fund. For this purposes, provision of fund of<br />

Rs.38.80 lakhs under 003[01][01] - Salary is earmarked during 2004-05.<br />

2. Due to shortage of office staff, 4 [four] LDCs and 3[three] Peons on Muster Roll<br />

basis have to been engaged every year. In this regard, approval of Govt. was<br />

obtained and provision of fund of Rs. 3.00 lakhs under 003[01][02] - Wages has<br />

been earmarked.<br />

3. The faculty members are often required to travel to interior stations for conducting<br />

training sponsored by Govt. of India. The Officers in the management of the ATI<br />

also are required to attend meetings and Conference outside <strong>Mizoram</strong>, hence, a<br />

provision of Rs. 0.90 lakh has been set aside under 003[01] [11] as T.E.<br />

4. For purchase of POL, and maintenance of vehicles including purchase of stationery<br />

articles, a provision of fund of Rs. 5.50lakhs under 003[01][13]- Office expenses is<br />

earmarked for the effective conduct of in house training courses and in the<br />

outstations.<br />

5. The Institute is, at present, accommodated in a rented building at Tuikhuatlang,<br />

Aizawl as it has no land and building of its own. Hence, provision of fund of<br />

Rs.4.15 lakhs under 003[01][14]- Rents is earmarked.<br />

6. There are three Training Halls with seating capacity of 30 trainees in 2 Halls each<br />

and one is computer Training Hall with seating capacity of 15 trainees. Due to<br />

shortage of accommodation Refreshment Room cannot be provided to the trainees<br />

during refreshment hour. During 2004-05, this Institute proposes to conduct 35<br />

different training courses including Specific to State Category Programme. The<br />

number of participants likely to undergo the training are: -<br />

Officers - 250 nos.<br />

Staff - 490 nos.<br />

Total - 740 nos.<br />

In order to meet expenses on stationery for trainees, refreshment/working<br />

lunch for all the trainees and for payment of honorarium for guest Faculty,<br />

provision of fund of Rs.3.00 lakhs under 003 [01][28]- Payment of provisional and<br />

Special Services is earmarked.


- 412 -<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

7. For training purpose, the Institute has to procure latest publication of rule books in<br />

different disciplines. Moreover, training for Computer Course has been introduced,<br />

and for maintenance of its accessories and equipment, as well as other office<br />

equipment, it is necessary to have a provision of fund of Rs. 1.50 lakhs under<br />

003[01][21] - Materials and Supply and Rs. 3.00 lakhs under 003[01][28] –<br />

Professional Service, Rs. 1.90 lakhs under 003(01)(50) – Other Charges and Rs. 1.25<br />

lakhs under 003(01)(52) – other charges.<br />

8. In view of the above considerations, the approved outlay of Rs. 60.00 lakhs will be<br />

utilised in the following manners during 2004-2005.<br />

A. – REVENUE :<br />

[01] - Salary -<br />

(Rs. in lakh)<br />

38.80<br />

[02] - Wages - 3.00<br />

[11] - Travelling Expenses - 0.90<br />

[13] - Office expenses - 5.50<br />

[14] - Rents - 4.15<br />

[21] - Material and supply - 1.50<br />

[28] - Payment of Professional & Spl. services - 3.00<br />

[50] - Other charges - 1.90<br />

[52] - Machinery & Equipment - 1.25<br />

TOTAL - 60.00


- 414 -<br />

FORENSIC SCIENCE LABORATORY<br />

FORENSIC SCIENCE LABORATORY<br />

Purchase of New Low cost Crime Lite (Mason Vactron Ltd.), Cotton for bullet<br />

recovery box, Instant Fingerprint Lifting Pad, Fingerprint lifting powder / sheet and<br />

Magnetic Magnifier with ridge counting plate will be purchase with an amount of Rs. 4.00<br />

lakhs for the improvement of Forensic Science Laboratory.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!