Comprehensive action plan on Baffacos - Mizoram

Comprehensive action plan on Baffacos - Mizoram Comprehensive action plan on Baffacos - Mizoram

mizoram.nic.in
from mizoram.nic.in More from this publisher
22.07.2013 Views

GOVERNMENT OF MIZORAM COMPREHENSIVE ACTION PLAN FOR BAMBOO FLOWERING AND FAMINE COMBAT SCHEMES (BAFFACOS) (2004-2005 to 2008-2009) PLANNING & PROGRAMME IMPLEMENTATION DEPARTMENT GOVERNMENT OF MIZORAM

GOVERNMENT OF MIZORAM<br />

COMPREHENSIVE ACTION PLAN<br />

FOR<br />

BAMBOO FLOWERING AND FAMINE<br />

COMBAT SCHEMES<br />

(BAFFACOS)<br />

(2004-2005 to 2008-2009)<br />

PLANNING & PROGRAMME IMPLEMENTATION DEPARTMENT<br />

GOVERNMENT OF MIZORAM


C O N T E N T S<br />

Sl. No. Page No.<br />

1. Preface<br />

2. Introducti<strong>on</strong><br />

3. Food & Civil Supplies 1 – 9<br />

4. Agriculture 10 – 20<br />

5. Industries 21 – 50<br />

6. Rural Development 51 – 57<br />

7. Horticulture 58 – 70<br />

8. Animal Husbandry & Veterinary 71 – 83<br />

9. Envir<strong>on</strong>ment & Forests 84 – 94<br />

10. Fisheries 95 – 112<br />

11. Health & Family Welfare 113 – 133<br />

12. Land Revenue & Settlement 134 – 137<br />

13. Sericulture 138 – 156<br />

14. Soil & Water C<strong>on</strong>servati<strong>on</strong> 157 – 165<br />

15. Informati<strong>on</strong> & Public Relati<strong>on</strong>s 166 – 167<br />

16. Social Welfare 168 – 170


P R E F A C E<br />

Government of <strong>Mizoram</strong> initiated the formulati<strong>on</strong> of a comprehensive<br />

programme of assistance for the farmers to combat bamboo flowering & famine aiming<br />

to increase purchasing power am<strong>on</strong>g the rural poor families. It has been experiencing<br />

bamboo flowering followed by severe famines & plague at the interval of 50 years in<br />

<strong>Mizoram</strong> and a large scale bamboo flowering will take place around 2005-08.<br />

From the past experiences bamboo flowering in <strong>Mizoram</strong> had been<br />

usually accompanied by c<strong>on</strong>siderable increase of rodent populati<strong>on</strong>. Apart from<br />

destructi<strong>on</strong> of crops, the epidemiological imbalance also leads in increased risk of<br />

infecti<strong>on</strong> or outbreak of rodent borne-diseases such as viral, bacterial, rickettsial<br />

parasitic, and others like rabies, ring worm, etc.<br />

C<strong>on</strong>sidering the c<strong>on</strong>sequences and the untold miseries which ensued the<br />

gregarious bamboo flowering (comm<strong>on</strong>ly called Mautam) in <strong>Mizoram</strong> in the past Govt.<br />

of <strong>Mizoram</strong> c<strong>on</strong>stituted a State level High Power Committee under the Chairmanship of<br />

Chief Minister to address all issues relating to the imminent Mautam in <strong>Mizoram</strong>. A<br />

<str<strong>on</strong>g>Comprehensive</str<strong>on</strong>g> Programme of Bamboo Flowering and Famine Combat Scheme<br />

[BAFFACOS] with Acti<strong>on</strong> Plans for the state to deal with the impact of the said natural<br />

phenomen<strong>on</strong> and devised strategies for sourcing funds to put into <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> has thus<br />

formulated to turn the problems of bamboo flowering into <strong>on</strong>e of the way most benefited<br />

by the people.<br />

……<br />

( H.V. LALRINGA )<br />

Chief Secretary,<br />

Govt. of <strong>Mizoram</strong>.


INTRODUCTION:<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Bamboo is an important resource in Indian Ec<strong>on</strong>omy in term of creati<strong>on</strong> of job<br />

opportunities, while addressing the issue of poverty alleviati<strong>on</strong>, shelter, nutriti<strong>on</strong>al security &<br />

envir<strong>on</strong>mental sustainability. Flowering of Bamboo is always followed by famine and<br />

epidemic outbreak as experienced in <strong>Mizoram</strong> during 1862, 1881, 1911 and 1959. However,<br />

for various reas<strong>on</strong>s, a Nati<strong>on</strong>al level <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g> for Bamboo Flowering and Famine Combat<br />

Scheme (BAFFACOS) has not been developed so far.<br />

A kind of famine visits <strong>Mizoram</strong> almost every fifty years. The flowering of<br />

Melocanna baccifera, Bambusa tulda are resp<strong>on</strong>sible for the formidable famine. The<br />

occurrence is followed by plague of rats which devour the Rice crops & cause a famine.<br />

Thus, the Government of <strong>Mizoram</strong> has initiated the formulati<strong>on</strong> of a comprehensive<br />

programme of Assistance for the farmers to Combat Bamboo flowering & famine with a aim<br />

to reduce poverty am<strong>on</strong>g farmers and surveillance of plague during famine period. It is<br />

expected that large scale Bamboo flowering will take place around 2004 – 2007.<br />

The proposals presented in this document in some schemes are based <strong>on</strong> prior<br />

proposals prepared by the Government of <strong>Mizoram</strong>, but have been modified <strong>on</strong> the basis of<br />

further discussi<strong>on</strong>s <strong>on</strong> technical, social, cost, scope and other c<strong>on</strong>siderati<strong>on</strong>s. Lack of detailed<br />

data and informati<strong>on</strong> <strong>on</strong> certain aspects and time c<strong>on</strong>straints have limited the degree of detail<br />

incorporated in the proposals. The document has therefore been prepared as a draft c<strong>on</strong>cept<br />

programme proposal that is c<strong>on</strong>sidered to be sufficient detail to be evaluated by Government<br />

of India.<br />

The linkage of the scheme under various Department like Rural Development,<br />

Horticulture, Forest, Road & Transport, Power, etc. are taken care of for smooth<br />

implementati<strong>on</strong> of the scheme.<br />

An amount of Rs. 566.55 crore is earmarked for implementati<strong>on</strong> of the scheme<br />

covering 5 (five) years period & all work comp<strong>on</strong>ents envisaged in the scheme will be<br />

implemented in the identified locati<strong>on</strong>s. During the current financial year 15% of the total<br />

fund will be required as grant-in-aid for implementati<strong>on</strong> of Bamboo Flowering and Famine<br />

Combat Scheme (BAFFACOS) in <strong>Mizoram</strong>.


Introducti<strong>on</strong>:<br />

1<br />

BAMBOO FLOWERING ANDFAMINE COMBAT SCHEME (BAFFACOS)<br />

FOOD & CIVIL SUPPLIES<br />

COMPREHENSIVE ACTION PLAN<br />

The main task of the Department of Food and Civil Supplies is to ensure food security<br />

in <strong>Mizoram</strong> through efficient Public Distributi<strong>on</strong> System (PDS). The Department procures<br />

foodstuff from FCI and dispatches them to various Principal Distributi<strong>on</strong> Centres, Sub<br />

Distributi<strong>on</strong> Centres and Supplies Centres for equitable distributi<strong>on</strong> to the public by Fair<br />

Price Shop Retailers through Rati<strong>on</strong> Cards.<br />

In order to carry out this task effectively, the basic requirement of the Department is<br />

as follows:<br />

1. Allotment of foodstuff adequate for the Whole State and provisi<strong>on</strong> of<br />

sufficient funds;<br />

2. Storage facilities like Godowns, not <strong>on</strong>ly in main populati<strong>on</strong> Centres but<br />

also in the remotest corners of the state;<br />

3. H<strong>on</strong>orarium.<br />

The above-menti<strong>on</strong>ed requirements become all the more urgent and compelling, as<br />

<strong>Mizoram</strong> is about to face the dreaded Mautam (flowering of Bamboos) sometime during<br />

2005-2008. Most of the bamboos of <strong>Mizoram</strong> have a life cycle of 48/49 years, at the end of<br />

which the bamboos began to flower, bear fruit and die. The field rats when feeding from the<br />

bamboo fruits acquire accelerated fertility, thereby resulting in the explosi<strong>on</strong> of rodent<br />

populati<strong>on</strong>. When the bamboo fruits are exhausted, the rats turned to eating whatever food<br />

grains available whether in the fields or in storage, causing extensive damage to the standing<br />

crops resulting in devastating famine all over the State. The next flowering of bamboo is<br />

forecasted to occur during 2005-2008.<br />

The last Mautam occurred in 1959 with regrettable c<strong>on</strong>sequences. In fact, it was the<br />

failure of the then Assam Government to adequately resp<strong>on</strong>d to the demands of famine relief<br />

requirements which resulted in widespread outrage at what the people regarded as the<br />

indifference of the Central Government to their plight. And, as is widely known today, that<br />

outrage eventually let to insurgency in <strong>Mizoram</strong>, resulting in untold miseries to innocent<br />

people. Indeed, the term ‘Mautam’ has lodged in the Mizo Psyche c<strong>on</strong>noting unmanageable<br />

danger.<br />

COMPREHENSIVE ACTION PLAN ON BAFFACOS<br />

To combat the impending disaster, the Department of Food & Civil<br />

Supplies proposes the following <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g>:


2<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Manpower Requirement:<br />

Due to impositi<strong>on</strong> of ban <strong>on</strong> filling vacant posts by the state Government, unfilled<br />

sancti<strong>on</strong>ed posts in the Department have accumulated to 167. The existing staff strength is far<br />

too inadequate to cope with the large network of operati<strong>on</strong>s of the Department. Shortage of<br />

adequate staff has caused immense problems, particularly, in the effective implementati<strong>on</strong> of<br />

Public Distributi<strong>on</strong> System and maintenance of full security of the Godowns, where huge<br />

amount of foodstuff are stocked.<br />

It is, therefore, imperative to device measures for safeguarding the Godowns from<br />

thefts, fire, etc. by utilising the services of the NGOs in each and every village where the<br />

Department is having supply centres, by paying an h<strong>on</strong>orarium of Rs.3000/-per m<strong>on</strong>th per<br />

centre for a period of 5 years. The total requirement of fund for the h<strong>on</strong>orarium is estimated<br />

at Rs.2.18 crore. Detailed requirement of fund is given in Annexure I.<br />

Foodstuff:<br />

<strong>Mizoram</strong>, being a deficit State, in terms of foodstuff producti<strong>on</strong>, needs to procure<br />

annually three-fourth of its foodstuff requirement from outside. To face the impending<br />

famine (Mautam), the quantum of foodstuff procurement will have to be increased<br />

c<strong>on</strong>siderably. So, the Central Government needs to be requested to enhance the existing<br />

allotment to the State sufficient for distributi<strong>on</strong> at the scale of 3 kg per adult per week, and<br />

half of that for minor for a period of 5 years (2004-2009). The total additi<strong>on</strong>al requirement of<br />

rice for 5 years is estimated at 168392 Metric t<strong>on</strong>es. The cost of procurement of rice for 5<br />

years at the prevailing rate will come to Rs. 139.76 crore. Year-wise requirement of rice and<br />

requirement of fund for procurement for 5 years is given in Annexure II & III.<br />

Transportati<strong>on</strong> Cost:<br />

The department is entrusted the task of transportati<strong>on</strong> of foodstuff from FCI depots to<br />

Principal Distributi<strong>on</strong> Centres for further dispatch to Sub – Distributi<strong>on</strong> Centres and Supply<br />

Centres. However, requirement of transportati<strong>on</strong> cost from the FCI Depots to Principal<br />

Distributi<strong>on</strong> Centres is excluded in the calculati<strong>on</strong>, as it is reimbursable from FCI. The cost of<br />

transportati<strong>on</strong> from the PDCs to SDCs, supply centres and to the last outlets (Fair Price Shop<br />

Retailers) will thus come to Rs. 36.70 crore for five years. Year-wise requirement of funds<br />

for transportati<strong>on</strong> Cost is given in Annexure IV.<br />

Rec<strong>on</strong>structi<strong>on</strong> of Old Godowns and Repair of existing Godowns:<br />

The existing storage facilities are far too inadequate to meet the unprecedented<br />

requirement that will arise from the famine. Provisi<strong>on</strong> may thus be made for rec<strong>on</strong>structi<strong>on</strong> of<br />

54 old Godowns at a cost of Rs. 1.08 crore and 28 existing Godowns need to be<br />

renovated/repaired at the cost of Rs. 0.28 crore. List of Godowns which need rec<strong>on</strong>structi<strong>on</strong><br />

and repair is given in Annexure – V & VI.


3<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

SL. NO. ITEMS<br />

ABSTRACT OF FUND REQUIREMENT<br />

AMOUNT<br />

(Rs in crore)<br />

1. Manpower requirement (H<strong>on</strong>orarium) 2.18<br />

2. Procurement of Rice 139.76<br />

3. Transportati<strong>on</strong> Cost 36.70<br />

4. C<strong>on</strong>structi<strong>on</strong> of New Godown 1.08<br />

5. Repair of Existing Godown 0.28<br />

GRAND TOTAL = Rs. 180.00 Crore<br />

( Rupees One hundred eighty crore ) <strong>on</strong>ly.<br />

YEAR-WISE PHASING OF PROPOSED FUND REGUIREMENT<br />

Sl. No. Year Percent Amount Earmarked Remarks<br />

1. 2004-05 15% 27.00<br />

2. 2005-06 25% 45.00<br />

3. 2006-07 25% 45.00<br />

4. 2007-08 20% 36.00<br />

5. 2008-09 15% 27.00<br />

Grand total 100% 180.00<br />

DETAILED OF WORK SCHEDULES FOR 2004-2005<br />

Sl. No. Unit<br />

1.<br />

2.<br />

3.<br />

Rec<strong>on</strong>structi<strong>on</strong> of old<br />

Godowns<br />

Repair of existing<br />

Godowns<br />

Procurement of<br />

foodstuff<br />

Rate<br />

( Rs. in<br />

thousand)<br />

Amount<br />

(Rs. in Crore)<br />

54 200.00 1.08<br />

28 100.00 0.28<br />

25000<br />

MT<br />

8.30 20.75<br />

4. Transportati<strong>on</strong> cost - - 4.46<br />

5.<br />

Manpower Requirement<br />

(H<strong>on</strong>orarium)<br />

121 3.00 0.43<br />

Total for the first year = 27.00 Crore<br />

Remarks


4<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

DETAILED OF WORK SCHEDULED FOR 2005-2006<br />

Sl. No. Item of Work Unit<br />

Rate<br />

(Rs. in<br />

thousand)<br />

Amount<br />

(Rs.<br />

In Crore)<br />

1. Procurement of foodstuff 40000 MT 8.30 33.20<br />

2. Transportati<strong>on</strong> cost - - 11.37<br />

5.<br />

Manpower Requirement<br />

(H<strong>on</strong>orarium)<br />

121 3.00 0.43<br />

Total for 2 nd Year 45.00 Crore<br />

DETAILED OF WORK SCHEDULED FOR 2006-2007<br />

Sl. No. Item of Work Unit<br />

1.<br />

Manpower requirement<br />

(H<strong>on</strong>orarium)<br />

Rate<br />

(Rs. in<br />

thousand)<br />

Amount<br />

(Rs. In<br />

Crore)<br />

121 3.00 0.43<br />

2. Procurement of foodstuff 45000 MT 8.30 37.35<br />

3. Transportati<strong>on</strong> cost - - 7.22<br />

Total for 3 rd Year 45.00 Crore<br />

DETAILED OF WORK SCHEDULED FOR 2007-2008<br />

Sl. No. Item of Work Unit<br />

1.<br />

Manpower requirement<br />

(H<strong>on</strong>orarium)<br />

Rate<br />

(Rs. in<br />

thousand)<br />

Amount<br />

(Rs. in<br />

Crore)<br />

121 3.00 0.43<br />

2. Procurement of foodstuff 40000 MT 8.30 33.20<br />

Transportati<strong>on</strong> cost - - 2.37<br />

Total for 4 th Year 36.00 Crore<br />

Remarks<br />

Remarks<br />

Remarks


5<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

DETAILED OF WORK SCHEDULED FOR 2008-2009<br />

Sl. No. Item of Work Unit<br />

1.<br />

Manpower requirement<br />

(H<strong>on</strong>orarium)<br />

Rate<br />

(Rs. in<br />

thousand)<br />

Amount<br />

(Rs. In<br />

Crore)<br />

121 3.00 0.46<br />

2. Procurement of foodstuff 18393 MT 8.30 15.26<br />

Transportati<strong>on</strong> cost - - 11.28<br />

ANNEXURE I<br />

Total for 5 th Year 27.00 Crore<br />

FUND REQUIREMENT FOR MANPOWER (HONORARIUM)<br />

Sl. No. Year Unit / Quantity<br />

Rate per m<strong>on</strong>th<br />

Per Unit<br />

Remarks<br />

Amount<br />

1. 2004-2005 121 Centres Rs. 3000 0.43 Crore<br />

2. 2005-2006 121 Centres Rs. 3000 0.43 Crore<br />

3. 2006-2007 121 Centres Rs.3000 0.43 Crore<br />

4. 2007-2008 121 Centres Rs. 3000 0.43 Crore<br />

5. 2008-2009 121 Centres Rs. 3000 0.46 Crore<br />

Total 2.18 Crore<br />

ANNEXURE II<br />

YEARWISE REQUIREMENT OF RICE FOR 5 YEARS<br />

(AT THE SCALE OF 3 KG PER ADULT PER WEEK AND HALF OF THAT FOR MINOR)<br />

Sl.<br />

No.<br />

Year-wise<br />

Break-up & Items<br />

Total<br />

requirement<br />

Additi<strong>on</strong>al<br />

requirement<br />

Remarks<br />

1 2 3 4 5<br />

1 2004 – 2005<br />

Projected Populati<strong>on</strong> (In Adult) 936022 25000 MT<br />

Rice Requirement (In MT) 146024<br />

2 2005 – 2006<br />

Projected Populati<strong>on</strong> (In Adult) 960359 40000 MT<br />

Rice Requirement (In MT) 149813<br />

3 2006 – 2007<br />

Projected Populati<strong>on</strong> (In Adult) 985328 45000 MT<br />

Rice Requirement (In MT) 153710


6<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Sl.<br />

No.<br />

Year-wise<br />

Break-up & Items<br />

Total<br />

requirement<br />

Additi<strong>on</strong>al<br />

requirement<br />

Remarks<br />

1 2 3 4 5<br />

4 2007 – 2008<br />

Projected Populati<strong>on</strong> (In 1010946 40000 MT<br />

Adult.)<br />

Rice Requirement (In MT)<br />

157707<br />

5 2008 – 2009<br />

Projected Populati<strong>on</strong> (In 1034529 18392 MT<br />

Adult.)<br />

Rice Requirement (In MT)<br />

161386<br />

768640 MT 168392<br />

MT<br />

Total additi<strong>on</strong>al requirement of rice 168392 MT<br />

ANNEXURE III<br />

YEARWISE REQUIREMENT OF FUND FOR PROCUREMENT OF RICE<br />

Sl.<br />

Year-wise<br />

No. Break-up & Items<br />

1 2<br />

1 2004 – 2005<br />

Rice Requirement (In MT)<br />

Fund Requirement (Rs in Crore)<br />

2 2005 – 2006<br />

Rice Requirement (In MT)<br />

Fund Requirement (Rs in Crore)<br />

3 2006– 2007<br />

Rice Requirement (In MT)<br />

Fund Requirement (Rs in Crore)<br />

4 2007 – 2008<br />

Rice Requirement (In MT)<br />

Fund Requirement (Rs in Crore)<br />

5 2008 – 2009<br />

Rice Requirement (In MT)<br />

Fund Requirement (Rs in Crore)<br />

Requirement<br />

of Fund<br />

146024 MT<br />

121.19<br />

149813 MT<br />

124.34<br />

153710 MT<br />

127.58<br />

157707 MT<br />

130.90<br />

161386 MT<br />

133.96<br />

Total Rs. 637.97<br />

Crore<br />

Additi<strong>on</strong>al<br />

Requirement<br />

25000 MT<br />

20.75 Crore<br />

40000 MT<br />

33.20 Crore<br />

45000 MT<br />

37.35 Crore<br />

40000 MT<br />

33.20 Crore<br />

18392 MT<br />

15.26 Crore<br />

Rs. 139.76<br />

Crore<br />

Remarks


7<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ANNEXURE IV<br />

REQUIREMENT OF FUND FOR TRANSPORTATION COST OF FOODSTUFF<br />

(Calculated <strong>on</strong> the basis of the existing carriage rate)<br />

Year<br />

Total requirement<br />

for transportati<strong>on</strong><br />

Additi<strong>on</strong>al<br />

requirement<br />

2004-05 20.13 Crore 4.89 Crore<br />

2005-06 20.56 Crore 11.80 Crore<br />

2006-07 20.95 Crore 6.93 Crore<br />

2007-08 21.38 Crore 2.08 Crore<br />

2008-2009 22.16 Crore 11.00 Crore<br />

TOTAL 105.18 Crore 36.70 Crore<br />

Total additi<strong>on</strong>al requirement Rs. 36.70 Crore<br />

Remarks


8<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ANNEXURE V<br />

LIST OF OLD GODOWNS PROPOSED FOR RECONSTRUCTION UNDER BAFFACOS<br />

Sl.<br />

No.<br />

Name of Scheme with<br />

Items of works with<br />

locati<strong>on</strong><br />

Unit/<br />

Quantity<br />

Size<br />

(In feet) Capacity<br />

Unit<br />

Costs<br />

(Rs. lakh)<br />

Total<br />

Amount<br />

(Rs. lakh)<br />

1 2 3 4 5 6 7<br />

1 Rec<strong>on</strong>structi<strong>on</strong> of 11 nos.<br />

Godowns within DCSCO ‘E’<br />

at Darlawn, N.Vervek, Ratu,<br />

Sakawrdai, Phuaibuang,<br />

Vanbawng, Suangpuilawn,<br />

Khawlian, Chhingchhip,<br />

Phullen, Zohmun<br />

11 50×20 200MT 2.00 22<br />

2 Rec<strong>on</strong>structi<strong>on</strong> of 10 nos.<br />

Godowns within DCSCO<br />

‘W’. Hmunpui, Darlung,<br />

Marapara, Saipum, Saiphai,<br />

Reiek Khawrihnim,<br />

Kawrthah, Pukzing, Rengdil.<br />

10 50×20 200MT 2.00 20<br />

3 Rec<strong>on</strong>structi<strong>on</strong> of 5 nos.<br />

Godowns within DCSCO<br />

‘Lawngtlai’. Damdep,<br />

Vaseitlang, Diltlang,<br />

Tuithumhnar, Parva.<br />

5 50×20 200MT 2.00 10<br />

4 Rec<strong>on</strong>structi<strong>on</strong> of 15 nos.<br />

Godowns within DCSCO<br />

‘Saiha’. Chakhang, Siata,<br />

Chhuarlung, Lungpher,<br />

Vawmbuk, Maubawk,<br />

Tuisih, T<strong>on</strong>gkol<strong>on</strong>g, Phura,<br />

Laki, Vahai, Zawngling,<br />

Tuipang, Lungtian, Saiha.<br />

15 50×20 200MT 2.00 30<br />

5 Rec<strong>on</strong>structi<strong>on</strong> of 8 nos.<br />

Godowns within DCSCO<br />

‘Champhai’. Rabung, Khawlian,<br />

Bungzung, Lungpho, Ngopa,<br />

Vaphai, Khuangleng, N.E.<br />

Khawdungsei.<br />

8 50×20 200MT 2.00 16<br />

6 C<strong>on</strong>structi<strong>on</strong> of 5 nos.<br />

Godown within DCSCO<br />

‘LUNGLEI’- At Lunglei,<br />

Lungsen, Bunghmun,<br />

Buarpui, Chhiphir<br />

5 50×20 200MT 2.00 10<br />

Total 54 nos. Grand Total Amount 108.00


9<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ANNEXURE VI<br />

LIST OF GODOWNS REQUIRED FOR REPAIR UNDER BAFFACOS<br />

Sl.<br />

No.<br />

Name of Scheme with<br />

Items of Workers<br />

Locati<strong>on</strong> District Unit<br />

Amount<br />

(Rs. lakhs)<br />

1 2 3 4 5 6<br />

1. Repair of FCS Godown roof,<br />

wall and floor.<br />

Serchhip DCSO E 1 no. 1.00<br />

2. Repair of FCS Godown roof, Saitual DCSO E 2 2.00<br />

Wall and floor.<br />

nos.<br />

3. Repair of FCS Godown roof, N.Vanlaiphai DCSO E 2 2.00<br />

Wall & floor & approach road<br />

nos.<br />

4. Repair of FCS Godown roof, Thenzawl DCSO E 2 2.00<br />

wall and floor. 2 nos.<br />

nos.<br />

5. Repair of FCS Godown roof,<br />

Wall and floor.<br />

Khawlailung DCSO E 1 no. 1.00<br />

6. Repair of FCS Godown roof,<br />

Wall and floor.<br />

Khawruhlian DCSO E 1 no. 1.00<br />

7. Repair of FCS Godown roof,<br />

Wall and floor.<br />

E. Lungdai DCSO E 1 no. 1.00<br />

8. Repair of FCS Godown roof,<br />

Wall and floor.<br />

W. Phaileng DCSO ‘W’ 1 no. 1.00<br />

9. Repair of FCS Godown roof,<br />

Wall and floor.<br />

Kawrthah DCSO ‘W’ 1 no. 1.00<br />

10. Repair of FCS Godown roof, Vairengte DCSO ‘W’ 2 2.00<br />

Wall and floor.2 nos.<br />

nos.<br />

11. Repair of R/Wall (30 mts) Vairengte DCSO ‘W’ 1 no. 1.00<br />

12. Repair of approach road at FCS<br />

Godown.<br />

Tuidam DCSO ‘W’ 1 no. 1.00<br />

13 Repair of FCS Godown roof, Niawhtlang DCSO 1 no. 1.00<br />

Wall and floor.<br />

Saiha<br />

14. Repair of FCS Godown roof, Bualpui NG DCSO 1 no. 1.00<br />

Wall and floor.<br />

Saiha<br />

15. Repair of FCS Godown roof, Chapui DCSO 1 no. 1.00<br />

Wall and floor.<br />

Saiha<br />

16. Repair of FCS Godown roof, S.Vanlaiphai DCSO 1 no. 1.00<br />

Wall and floor.<br />

Lunglei<br />

17. Repair of FCS Godown roof, Tarpho DCSO 1 no. 1.00<br />

Wall and floor.<br />

Lunglei<br />

18. Repair of FCS Godown roof, Borapansuri DCSO 1 no. 1.00<br />

Wall and floor.<br />

Lunglei<br />

19. Repair of FCS Godown roof, Putlungasih DCSO 1 no. 1.00<br />

Wall and floor.<br />

Lunglei<br />

20. Repair of FCS Godown roof, Cherhlun DCSO 1 no. 1.00<br />

Wall and floor.<br />

Lunglei<br />

21 Repair of FCS Godown roof, Lawngtlai DCSO 1 no. 1.00<br />

Wall, floor with loading shed.<br />

Lawngtlai<br />

22. Repair of FCS Godown roof, Vathuampui DCSO 1 no. 1.00<br />

Wall and floor.<br />

Lawngtlai<br />

23. Repair of FCS Godown roof, Farkawn DCSO 1 no. 1.00<br />

Wall and floor.<br />

Champhai<br />

24. Repair of FCS Godown roof, Khawbung DCSO 1 no. 1.00<br />

Wall and floor.<br />

Champhai<br />

Total 28 nos. Rs. 0.28 Crore


INTRODUCTION:<br />

10<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

AGRICULTURE<br />

CHAPTER – 1<br />

Bamboo is an important resource in Indian ec<strong>on</strong>omy in term of creati<strong>on</strong> of job<br />

opportunities while addressing the issue of poverty alleviati<strong>on</strong>, shelter, nutriti<strong>on</strong>al security<br />

and envir<strong>on</strong>mental sustainability. Flowering of bamboo is always followed by famine as<br />

experienced in <strong>Mizoram</strong> during 1862, 1911, 1959 and, again expected during 2005-2008, due<br />

to the expected gregarious flowering of Melocanna baccifera, which occurs at a regular<br />

intervals. However, for various reas<strong>on</strong>s, a Nati<strong>on</strong>al Level Acti<strong>on</strong> Plan for Bamboo Flowering<br />

and Famine Combat Scheme (BAFFACOS) has not been developed so far.<br />

A famine visits <strong>Mizoram</strong> at regular intervals during the flowering of Melocanna<br />

baccifera and Bambusa tulda. The occurrence of the past famines is due to the outbreak of<br />

rats, which devour the fruits/seeds of the flowering bamboos and after finishing the<br />

fruits/seeds of the bamboos, they c<strong>on</strong>tinue to attack the rice crops, thereby causing a famine<br />

in the state.<br />

Thus, the Government of <strong>Mizoram</strong> has initiated the formulati<strong>on</strong> of a comprehensive<br />

programme of assistance for the farmers to combat bamboo flowering and famine, with an<br />

aim to reduce poverty am<strong>on</strong>g farmers during famine period. It is expected that large-scale<br />

bamboo flowering will take place around 2005 – 2008.<br />

This programme would be achieved through adopti<strong>on</strong> of intensified and diversified<br />

cropping system through mechanisati<strong>on</strong> in agriculture, post harvest technology, c<strong>on</strong>nectivity<br />

for market linkage, water harvesting p<strong>on</strong>ds and Rodent C<strong>on</strong>trol Programmes.<br />

The proposals presented in this document are based <strong>on</strong> prior proposals prepared by<br />

the Government of <strong>Mizoram</strong>, but have been modified <strong>on</strong> the basis of further discussi<strong>on</strong>s <strong>on</strong><br />

technical, social, cost, scope and other c<strong>on</strong>siderati<strong>on</strong>s. Lack of detailed data and informati<strong>on</strong><br />

<strong>on</strong> certain aspects and time c<strong>on</strong>strains have limited the degree of details incorporated in the<br />

proposals. The document has therefore been prepared as a draft c<strong>on</strong>cept programmed<br />

proposal that is to be evaluated.<br />

The linkage with the other schemes under various Departments, like Forest &<br />

Envir<strong>on</strong>ment, Industries, Food & Civil Supplies, Health Services, Rural Development, etc.<br />

are <str<strong>on</strong>g>plan</str<strong>on</strong>g>ned for smooth implementati<strong>on</strong> of the scheme.<br />

An amount of Rs 8000.00 lakhs is necessary for implementati<strong>on</strong> of the scheme,<br />

covering 5 (five) years period, i.e. 2004-2005, 2005-2006, 2006 - 2007, 2007 - 2008 and<br />

2008 - 2009 and all work comp<strong>on</strong>ents envisaged in the scheme will be implemented in the<br />

identified villages. During the financial year, (2004-2005) Rs 1189.125 lakhs is required as<br />

grant-in-aid for implementati<strong>on</strong> of Bamboo Flowering and Famine Combat Scheme<br />

(BAFFACOS), under the Department of Agriculture, <strong>Mizoram</strong>.


SCHEME :<br />

11<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

CHAPTER – II<br />

The ultimate objective of the scheme is to combat with bamboo flowering and famine<br />

including c<strong>on</strong>trol of rodent populati<strong>on</strong> through proper means. The scheme will minimise<br />

poverty am<strong>on</strong>g farmers during the upcoming famine period.<br />

The scheme, if implemented will be achieved through adopti<strong>on</strong> of intensified and<br />

diversified cropping system through mechanisati<strong>on</strong>, Post harvest technology, c<strong>on</strong>nectivity of<br />

market linkage, water harvesting p<strong>on</strong>ds, etc. The farmers will be assisted to adopt a more<br />

profitable, sustainable and permanent system of farming.<br />

It is proposed that there would be eight (8) sub-programmes as indicated below: -<br />

I. Promoti<strong>on</strong> of Rodent C<strong>on</strong>trol Measures.<br />

II. Promoti<strong>on</strong> of Crop diversificati<strong>on</strong> for Bamboo shoot producti<strong>on</strong>.<br />

III. Promoti<strong>on</strong> of early maturing rice and maize.<br />

IV. Promoti<strong>on</strong> of alternative crops like ginger, cott<strong>on</strong>, potato, Jatropha, sugarcane,<br />

sweet potato and oilseeds/pulses.<br />

V. Promoti<strong>on</strong> of Agriculture Mechanisati<strong>on</strong> with post harvesting linkage.<br />

VI. Promoti<strong>on</strong> of rain water harvesting p<strong>on</strong>ds.<br />

VII. Promoti<strong>on</strong> of c<strong>on</strong>nectivity for market linkage.<br />

VIII. Promoti<strong>on</strong> of Bamboo Vinegar and Bamboo Charcoal.<br />

Comp<strong>on</strong>ent – I<br />

In order to avoid the Rodent menace in c<strong>on</strong>text with the Bamboo flowering, the <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g><br />

<str<strong>on</strong>g>plan</str<strong>on</strong>g> for c<strong>on</strong>taining the Rodent C<strong>on</strong>trol in the initial stages will be as follows: -<br />

A. RODENT SURVEILLANCE AND CONTROL<br />

1. Survey of Sporadic Flowering Areas :<br />

The survey will be c<strong>on</strong>ducted in Block-wise, ten times during 5 years<br />

by the officers of the Department of Agriculture, associating the officials of the<br />

c<strong>on</strong>cern Department, like Forest and Envir<strong>on</strong>ment Deptt. etc. At this level,<br />

involving the NGOs may not be appropriate, since the purpose is <strong>on</strong>ly to locate<br />

the bamboo flowering pockets and <strong>on</strong>e block survey may be completed in 20<br />

days time by the Departmental Officials.<br />

The financial support for the surveys may be extended to an amount of<br />

Rs.3,000/- per day which will cover hiring of vehicle and engagement of<br />

labours, and the TA/DA of the officials involved in the survey may be paid as<br />

per admissibility under the State Government Norms for the number of days<br />

they are involved in the survey.


12<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

2. Surveillance of Rodent Populati<strong>on</strong>/Incidence in the Jhum/WRC Fields:<br />

Once the pockets of bamboo flowering areas in the different Blocks are<br />

identified, a surveillance team of Technically trained officers may be<br />

c<strong>on</strong>stituted to survey ten times in 5 (five) years. These schedules may be<br />

changed <strong>on</strong> the factual situati<strong>on</strong> of the crop seas<strong>on</strong>s. Each such visit should<br />

have a durati<strong>on</strong> of ten days. Survey routes should be fixed based <strong>on</strong> identified<br />

bamboo flowering areas. This surveillance is l<strong>on</strong>g lasting and as such, n<strong>on</strong>technical<br />

pers<strong>on</strong>s may not be included in these teams.<br />

The financial support for these surveillance visits would be Rs. 3,000/-<br />

per day towards POL and labour charges etc. And as above, the TA/DA of the<br />

officials involved in the survey may be paid, as per admissibility under State<br />

Govt. norms for the number of days they are involved in the survey.<br />

Different survey teams at the Sub-Divisi<strong>on</strong>al Level and State Level<br />

will c<strong>on</strong>duct the survey. The State Level Survey Team will functi<strong>on</strong> as a<br />

M<strong>on</strong>itoring Survey Team.<br />

3. Awareness Campaign :<br />

Human Resource Development should be <str<strong>on</strong>g>plan</str<strong>on</strong>g>ned through Trainers<br />

Training to generate Master Trainers at State Level. These Master Trainers<br />

should impart training to extensi<strong>on</strong> functi<strong>on</strong>aries at Sub-Divisi<strong>on</strong>al Level to<br />

carry out the various identified activities for mobilising the community for<br />

required Rodent Pest Management efforts. Training of Trainers <strong>on</strong> Rodent Pest<br />

Management for 3 days may be organised at State Level in the Directorate of<br />

Agriculture.<br />

Awareness Campaign should be <str<strong>on</strong>g>plan</str<strong>on</strong>g>ned through training of farmers<br />

<strong>on</strong> the effect of bamboo flowering and proper practices for Rodent Pest<br />

Management. Publicity materials in local languages will be distributed am<strong>on</strong>gst<br />

the farmers, preferably during training sessi<strong>on</strong>s.<br />

Producti<strong>on</strong> and supply of literature <strong>on</strong> Rodent Pest Management<br />

through Leaflets for their distributi<strong>on</strong> to the farming communities would be<br />

necessary.<br />

Video producti<strong>on</strong> <strong>on</strong> appropriate Rodent Pest Management strategies<br />

would be of great help in various training programme at different levels.<br />

Awareness campaigns through Radio Talks and Audio-Visual Programme<br />

through Doordarshan and Local Cable Networks may be c<strong>on</strong>ducted for the<br />

public.<br />

Sufficient officials from the Department of Agriculture had been<br />

trained in the surveillance and Rodent C<strong>on</strong>trol Techniques. These Master<br />

trainers will c<strong>on</strong>duct Training Programmes for the Farmers, including for farm<br />

women at the village and Block Level <strong>on</strong> Rodent Management.<br />

4. Pest C<strong>on</strong>trol Management :<br />

a) The local traps are highly effective to kill the migrating rodents from the<br />

forest to the jhum fields, and hence, efforts for popularizing them will be<br />

included in the scheme by including provisi<strong>on</strong> for extending suitable<br />

financial assistance for preparing such traps 25 bamboo traps per hectare


13<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

of jhum areas are approximately required for tackling the rodents from the<br />

forest areas.<br />

b) Safer anticoagulants will be used for Rodent Pest Management in place of<br />

acute rodenticides. Bromodiol<strong>on</strong>e (Ready Bait & C<strong>on</strong>centrated) will be<br />

used at the rate of 600 grams per ha., 10 grams per ha. should be used<br />

respectively, for jhum and WRC areas. The rodenticides will be laid in<br />

bamboo bait stati<strong>on</strong>s, and placed <strong>on</strong> the periphery of the jhum fields. This<br />

will tackle the immigrating rodent pests.<br />

c) Coumatetralyl (25 g. per homestead) is proposed for used in homesteads/<br />

jhum huts in the bamboo flowering areas.<br />

Comp<strong>on</strong>ent -II<br />

Efforts will be made to promote crop diversificati<strong>on</strong> for Bamboo shoot producti<strong>on</strong> to<br />

eliminate micro-nutrient deficiency which is widespread am<strong>on</strong>g the women and children in<br />

<strong>Mizoram</strong>. It is proposed to diversify and cultivate Bamboo covering 2,000 Ha. during the<br />

project period.<br />

To promote organised producti<strong>on</strong> and processing of Bamboo Shoots and its<br />

c<strong>on</strong>sumpti<strong>on</strong> as a part of the nati<strong>on</strong>al efforts to eliminate micro-nutrient deficiency which is<br />

widespread am<strong>on</strong>g the women and children. Popularisati<strong>on</strong> of Bamboo Shoots could also<br />

improve the nutriti<strong>on</strong>al status of Tribal in <strong>Mizoram</strong>. This will be in c<strong>on</strong>formity with the Tenth<br />

Plan Strategy to make a paradigm shift from overall self-sufficiency in food grains to meet<br />

human needs for energy and nutriti<strong>on</strong>.<br />

Comp<strong>on</strong>ent – III<br />

Early maturing varieties of Rice will be introduced in jhum cultivati<strong>on</strong> areas. It will<br />

be c<strong>on</strong>venient to promote early maturing varieties of Rice with Jathropha for early harvest of<br />

crops before the appearance of rodents. It is proposed to cover 10,000 Ha. during the project<br />

period.<br />

Comp<strong>on</strong>ent - IV<br />

Alternative crops like Ginger, Cott<strong>on</strong>, Potato, Sugarcane, Sweet Potato, Maize and<br />

oilseeds/pulses will be promoted by introducing improved varieties through adopti<strong>on</strong> of<br />

improved cultivati<strong>on</strong> practices and farm diversificati<strong>on</strong>. It is proposed to introduce 1,000 Ha.<br />

for Ginger in terraces, 2,000 Ha. for Cott<strong>on</strong> in shifting cultivati<strong>on</strong>, 2,000 Ha. for winter<br />

potato in WRC areas, 1,000 Ha. for sugarcane sweet Potato, 20,000 Ha. for Maize and 2,500<br />

Ha. for Oilseeds/Pulses during the entire project period.<br />

Comp<strong>on</strong>ent – V<br />

The farming system will be mechanised as far as possible for crop producti<strong>on</strong> by<br />

using tractors with its attachments, <str<strong>on</strong>g>plan</str<strong>on</strong>g>ters, power tillers, oil expellers, seed dryers, etc. It is<br />

proposed to purchase 20 Nos. of Tractors, 75 Nos. of Power Tillers, 100 Nos. of Maize<br />

Sheller, 10 Nos. of Seed Dryers, 52 Nos. of Oil Expellers, 175 Nos. of Post Harvesting<br />

Machineries.<br />

Comp<strong>on</strong>ent – VI<br />

Rain Water Harvesting is necessary to irrigate crops in the fields for which Rain<br />

Water Harvesting P<strong>on</strong>ds are proposed to c<strong>on</strong>struct every year with a total of 1,000 Nos.<br />

during the entire period of the project.


14<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Comp<strong>on</strong>ent – VII<br />

It is proposed to c<strong>on</strong>struct c<strong>on</strong>nectivity for market linkage of 300 Kms. during the<br />

entire project period.<br />

Comp<strong>on</strong>ent – VIII<br />

It is proposed to train the villagers in the technologies of Bamboo charcoal and<br />

Bamboo Vinegar. The Bamboo charcoal is of a very high quality, surpassing the comm<strong>on</strong><br />

wood charcoal. The farmers will be train in the technique and through which the farmers will<br />

generate income from the urban people. At the same time, bamboo vinegar, the by-product, is<br />

a good soil improvement material as a carrier of organic manure and micro-organisms in the<br />

soil, as well as insect repellant, etc. The Department will procure 30,020 ltrs. of bamboo<br />

vinegar from the Villagers, which will be utilised in the Agricultural activities.<br />

BREAK UP OF FUND REQUIREMENT FOR RODENT MANAGEMENT.<br />

A Survey of Bamboo Flowering Area (1 Survey)<br />

i) Financial support towards the cost of survey per day Rs 3,000/-<br />

(hiring vehicles, labors, etc)<br />

ii) No. of R.D. Blocks to be surveyed 22 Blocks<br />

iii) No. of days to complete the survey 20 days<br />

(20 X 22 = 440 days = 440X3,000) Rs 13,20,000/-<br />

iv) Requirement of funds for T.A./D.A. for 4 officials<br />

@ Rs 120/- per day/pers<strong>on</strong>.(4X120 =Rs 480 = 440X480) Rs 2,11,200/-<br />

TOTAL Rs 15,31,200/-<br />

B Survey of Rodent Populati<strong>on</strong><br />

1. Sub-Divisi<strong>on</strong>al Level (1 Survey)<br />

i) Financial support towards the cost of survey per day Rs 3,000/-<br />

(hiring vehicles, labors, etc)<br />

ii) No. of Sub-Divisi<strong>on</strong> to be surveyed 24<br />

iii) No. of days to complete the survey 10 days<br />

(10X24 = 240 days = 240 X 3,000) Rs 7,20,000/-<br />

iv) Requirement of funds for T.A./D.A. for 4 officials<br />

@ Rs 120/- per day/pers<strong>on</strong>.(4X120 = Rs 480 = 240X480) Rs 1,15,200/-<br />

TOTAL Rs 8,35,200/-<br />

2. M<strong>on</strong>itoring Survey by State Level Team (1 Survey)<br />

i) Financial support towards the cost of survey per day Rs 3,000/-<br />

(hiring vehicles, labors, etc)<br />

ii) No. of Sub-Divisi<strong>on</strong> to be surveyed 24<br />

iii) No. of days to complete the survey 3 days<br />

(3X24 = 72 days = 72X3,000) Rs 2,16,000/-<br />

iv) Requirement of funds for T.A./D.A. for 4 officials<br />

@ Rs 120/- per day/pers<strong>on</strong>. (4X120 = Rs 480 = 72X480) Rs 34,560/-<br />

TOTAL Rs 2,50,560/-


15<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

C. Cost of Awareness Campaign <strong>on</strong> Rodent Management<br />

1. Training of Trainers<br />

i) No. of participating per training 30 trainees<br />

ii) Durati<strong>on</strong> of training 3 days<br />

iii) Boarding and lodging @ Rs 150/- per head per day Rs 13,500/-<br />

iv) Miscellaneous expenditures (Stati<strong>on</strong>ery, hiring Rs 5,000/-<br />

charge of vehicles for field visits, etc.)<br />

v) H<strong>on</strong>orarium for 4-resource pers<strong>on</strong>s Rs 12,000/-<br />

@ Rs 1,000/- per pers<strong>on</strong> for 3 days.<br />

TOTAL Rs. 30,500/-<br />

2. Training of VLW’s/AEO’s<br />

i) No. of participating per training 50 trainees<br />

ii) Durati<strong>on</strong> of training 3 days<br />

iii) Boarding and lodging @ Rs 150/- per head per day Rs 22,500/-<br />

iv) Miscellaneous expenditures (Stati<strong>on</strong>ery, hiring Rs 5,000/-<br />

charge of vehicles for field visits, etc.)<br />

v) H<strong>on</strong>orarium for 4-resource pers<strong>on</strong>s Rs 12,000/-<br />

@ Rs 1,000/- per pers<strong>on</strong> for 3 days.<br />

TOTAL Rs 39,500/-<br />

3. Training of Farmers<br />

i) No. of participating per training 100 trainees<br />

ii) Durati<strong>on</strong> of training 3 days<br />

iii) Boarding and lodging @ Rs 150/- per head per day Rs 45,000/-<br />

iv) Miscellaneous expenditures (Stati<strong>on</strong>ery, hiring Rs 5,000/-<br />

charge of vehicles for field visits, etc.)<br />

v) H<strong>on</strong>orarium for 4-resource pers<strong>on</strong>s Rs 12,000/-<br />

@ Rs 1,000/- per pers<strong>on</strong> for 3 days.<br />

TOTAL Rs 62,000/-<br />

D. Media and Publicity<br />

1. Supply of literature <strong>on</strong> Rodent Management<br />

i) No. of booklets/ pamphlets, etc 1,50,000 nos<br />

ii) Rate per booklets/pamphlets Rs 10/-<br />

TOTAL Rs 15,00,000/-<br />

2. Audio Visual <strong>on</strong> Rodent Pest Management<br />

i) Video film <strong>on</strong> achievements and strategies (per film) Rs. 30,000/-<br />

10 nos for 5 years. Rs 3,00,000/-<br />

ii) Video film <strong>on</strong> Rodent Training Manual<br />

@ Rs 30,000/- Rs 30,000/-<br />

E. Rodent Pest Management<br />

1. Purchase of Traps<br />

i) Requirement of traps per hectare 25 nos<br />

ii) Rate per trap Rs 20/-<br />

iii) Requirement of traps for 5 years 5,00,000 nos.


16<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

TOTAL Rs 1,00,00,000/-<br />

2. Rodenticides<br />

Bromodiol<strong>on</strong>e (Ready Bait) @ Rs. 16.00 per 100gms<br />

i) Recommended dose per hectare 600gms. per ha<br />

ii) Fund requirement for <strong>on</strong>e hectare Rs 96/-<br />

iii) Total no. of hectare to be covered 2,40,000 ha<br />

TOTAL Rs 2,30,40,000/-<br />

Bromodiol<strong>on</strong>e (C<strong>on</strong>centrated Powder) @ Rs. 16.00 per 100gms<br />

i) Recommended dose per hectare 10gms. per ha<br />

ii) Fund requirement for <strong>on</strong>e hectare Rs 1.60/-<br />

iii) Total no. of hectare to be covered 1,40,000 ha.<br />

TOTAL Rs 2,24,000/-<br />

Coumatetralyl @ Rs 30.00 per 100gms<br />

i) Recommended dose per homestead/jhum huts 25gms<br />

ii) Fund requirement for <strong>on</strong>e homestead/jhum hut Rs 4.00/-<br />

iii) Total no of homestead/jhum hut to be covered 1,40,000 nos.<br />

TOTAL Rs 5,60,000/-<br />

F. C<strong>on</strong>structi<strong>on</strong> of Footpath for Survey works<br />

i) Total Kilometer to be covered 100 Kms.<br />

ii) Fund requirement for 1 km. Rs 15,000/-<br />

TOTAL Rs 15,00,000/-<br />

PROMOTION OF BAMBOO CHARCOAL AND BAMBOO VINEGAR.<br />

1. Training of Trainers (per training)<br />

i) No. of participating 50 trainees<br />

ii) Durati<strong>on</strong> of training 3 days<br />

iii) Boarding and lodging @ Rs 150/- per head per day Rs 13,500/-<br />

iv) Miscellaneous expenditures (c<strong>on</strong>structi<strong>on</strong> of kilns, Rs 6,000/-<br />

material collecti<strong>on</strong>, stati<strong>on</strong>ery, etc.)<br />

v) Supply of literatures @ Rs 10/- per book Rs 500/-<br />

vi) H<strong>on</strong>orarium for 4-resource pers<strong>on</strong>s Rs 12,000/-<br />

@ Rs 1,000/- per pers<strong>on</strong> for 3 days.<br />

TOTAL Rs. 41,200/-<br />

2. Training of Farmers (per training)<br />

i) No. of participating per training 200 trainees<br />

ii) Durati<strong>on</strong> of training 3 days<br />

iii) Boarding and lodging @ Rs 150/- per head per day Rs 90,000/-<br />

iv) Miscellaneous expenditures (c<strong>on</strong>structi<strong>on</strong> of kilns, Rs 6,000/-<br />

material collecti<strong>on</strong>, stati<strong>on</strong>ery, etc.)<br />

v) Supply of literatures @ Rs 10/- per book Rs 2,000/-<br />

vi) H<strong>on</strong>orarium for 4-resource pers<strong>on</strong>s Rs 12,000/-<br />

@ Rs 1,000/- per pers<strong>on</strong> for 3 days.<br />

TOTAL Rs 1,10,000/-


Sl.<br />

No.<br />

A.<br />

1.<br />

2.<br />

3.<br />

4.<br />

6.<br />

Parameters<br />

Promoti<strong>on</strong> of Rodent<br />

C<strong>on</strong>trol means<br />

Survey of Bamboo Flowering<br />

Area<br />

17<br />

Annexure - I<br />

BAMBOO FLOWERING ANDFAMINE COMBAT SCHEME (BAFFACOS)<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME ( BAFFACOS) UNDER AGRICULTURE DEPARTMENT<br />

Physica<br />

l Unit<br />

No. of<br />

Survey<br />

(Physical Target and Financial Outlay) (Rs. in lakh)<br />

Year Total<br />

1 st Year 2 nd Year 3 rd Year 4 th Year 5 th Year Phy. Fin.<br />

Phy.<br />

15.31<br />

Fin. Phy. Fin. Phy. Fin. Phy. Fin.<br />

1<br />

2 30.62 3 45.94 3 45.94 1 15.31 10 153.12<br />

Survey of Rodent surveillance<br />

(a) Sub-Div. Level<br />

-do- 3<br />

25.060<br />

4 33.40 5 41.755 5 41.755 3 25.060 20 167.03<br />

(b) State Level -do- 1 2.50 2 5.00 3 7.53 3 7.53 1 2.50 10 25.06<br />

Awareness Campaign<br />

(a) Training of Trainers<br />

No. of<br />

Trainings 1<br />

0.305<br />

2 0.61 3 0.92 3 0.92 1 0.305 10 3.06<br />

(b) Training of VLW’s -do- 1 0.39 2 0.80 3 1.185 3 1.185 1 0.39 10 3.95<br />

(c) Training of Farmers -do- 15 9.30 20 12.40 25 15.50 25 15.50 15 9.30 100 62.00<br />

Media & Publicity<br />

(a) Supply of Literature<br />

No. 22,500<br />

2.25<br />

30,000 3.00 37,500 3.75 37,500 3.75 22,500 2.25 1,50,000 15.00<br />

(b) Video Film Producti<strong>on</strong><br />

(1) Strategies & Achievement<br />

No. 1<br />

0.30<br />

2 0.60 3 0.90 3 0.90 1 0.30 10 3.00<br />

(2) Training Manual No. 1 0.30 - - - - - - - - 1 0.30<br />

Rodent Pest Management<br />

(a) Purchase of Traps<br />

No. 75,000<br />

15.00<br />

1,00,000 20.00 1,25,000 25.00 1,25,000 25.00 75,000 15.00 5,00,000 100.00<br />

(b) Bromodiol<strong>on</strong>e (RB) Ha. 36,000 34.56 48,000 46.08 60,000 57.60 60,000 57.60 36,000 34.56 2,40,000 230.40<br />

(c) Bromodiol<strong>on</strong>e (C) Ha. 21,000 0.34 28,000 0.44 35,000 0.56 35,000 0.56 21,000 0.34 1,40,000 2.24<br />

(d) Coumatetralyl No. of<br />

Homestead 21,000 0.84 28,000 1.12 35,000 1.40 35,000 1.40 21,000 0.84 1,40,000 5.60<br />

C<strong>on</strong>structi<strong>on</strong> of footpath for<br />

survey works<br />

Km. 15<br />

2.25<br />

20 3.00 25 3.75 25 3.75 15 2.25 100 15.00<br />

SUB-TOTAL 108.705 157.07 205.79 205.79 108.405 785.76


Sl.<br />

No.<br />

18<br />

Annexure - I<br />

BAMBOO FLOWERING ANDFAMINE COMBAT SCHEME (BAFFACOS)<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME ( BAFFACOS) UNDER AGRICULTURE DEPARTMENT<br />

(PHYSICAL AND FINANCIAL OUTLAY)<br />

Item Unit Physical<br />

Target<br />

1 st Year 2 nd Year 3 rd Year 4 th Year 5 th Year TOTAL<br />

Financial<br />

Outlay<br />

(Rupees<br />

in lakh)<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

(Rupees in<br />

lakh)<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

Physi-cal<br />

(Rupees in<br />

lakh)<br />

Target<br />

Financial<br />

Outlay<br />

(Rupees in<br />

lakh)<br />

Physi-cal<br />

Target<br />

Financial<br />

Outlay<br />

(Rupees in<br />

lakh)<br />

Physical<br />

Target<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

B. Crop diversificati<strong>on</strong> for<br />

Bamboo shoot producti<strong>on</strong><br />

@ Rs. 10,000/- per hect.<br />

C. Cultivati<strong>on</strong> of Ginger in<br />

terraces areas @ Rs.<br />

15,000/- per hect.<br />

D. Cultivati<strong>on</strong> of Cott<strong>on</strong> in<br />

Shifting Cultivati<strong>on</strong> areas<br />

@ Rs. 5,000/- per hect.<br />

E. Cultivati<strong>on</strong> of winter<br />

Potato in WRC areas @<br />

Rs. 15,000/- per hect.<br />

F. Cultivati<strong>on</strong> of early<br />

varieties of Rice with<br />

Jatropha in Jhum areas<br />

@ Rs. 5,000/- per hect.<br />

Financial<br />

Outlay<br />

(Rupees<br />

in lakh)<br />

Ha 300 30.00 400 40.00 500 50.00 500.00 50.00 300 30.00 2,000 200.00<br />

Ha 150 22.50 200 30.00 250 37.50 250 37.50 150 22.50 1,000 150.00<br />

Ha 300 15.00 400 20.00 500 25.00 500 25.00 300 15.00 2,000 100.00<br />

Ha 300 45.00 400 60.00 500 75.00 500 75.00 300 45.00 2,000 300.00<br />

Ha 1,500 75.00 2,000 100.00 2,500 125.00 2,500 125.00 1,500 75.00 10,000 500.00<br />

G. Sugarcane & Sweet Potato<br />

development in watershed<br />

areas for reclamati<strong>on</strong> of<br />

wasteland.<br />

Nos 150 15.00 200 20 250 25.00 250 25.00 150 15.00 1,000 100.00<br />

TOTAL 202.50 270.00 337.50 337.50 202.50 1,350.00


19<br />

BAMBOO FLOWERING ANDFAMINE COMBAT SCHEME (BAFFACOS)<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

H. Extensive Maize<br />

cultivati<strong>on</strong> programme @<br />

Rs. 20,000/- in the form of<br />

Zingg terraces c<strong>on</strong>structi<strong>on</strong><br />

Ha 3,000 600.00 4,000 800.00 5000 1000.00 5,000 1,000 3,000 600.00 20,000 4,000.00<br />

and supply of inputs<br />

I. (a) Training of farmers in<br />

Bamboo vinegar &<br />

charcoal technology.<br />

(b) Training of Trainers<br />

J. Purchase of Bamboo<br />

Vinegar @ Rs. 90/- ltr.<br />

K. Mechanizati<strong>on</strong> for Crop<br />

producti<strong>on</strong>:<br />

(a) Purchase of Tractor and<br />

attachment for potato<br />

cultivati<strong>on</strong> like Rotavator,<br />

Potato Planter and potato<br />

digger.@ Rs.5,00,000/-per no.<br />

(b) Power Tiller with<br />

attachment like Rotavator<br />

@.Rs. 1,20,000 per no.<br />

(c) Purchase of Maize<br />

Sheller Engine operated.<br />

@. Rs. 15,000/- per no.<br />

(d) Purchase of Seed<br />

dryer. @. Rs. 2.00 lakh per<br />

no.<br />

No. of<br />

training 15 16.50 20 22.00 25 27.50 25 27.50 15 16.50 100 110.00<br />

No. of<br />

training 1 0.32 2 0.66 3 0.97 3 0.97 1 0.32 10 3.24<br />

Litre 4503 4.05 6004 5.40 7505 6.75 7505 6.75 4503 4.05 30,020 27.00<br />

Nos<br />

Annexure - I<br />

3 15.00 4 20.00 5 25.00 5 25.00 3 15.00 20 100.00<br />

Nos 11 13.20 15 18.00 19 22.80 19 22.80 11 13.20 75 90.00<br />

Nos 15 2.25 20 3 25.00 3.75 25 3.75 15 2.25 100 15.00<br />

Nos 1 2.00 2 4.00 3 6.00 3 6.00 1 2 10 20.00<br />

(e) Purchase of Oil<br />

Expeller. @, 1.50 lakh per<br />

no.<br />

Nos 8 12.00 10 15.00 13 19.50 13 19.50 8 12.00 52 78.00<br />

TOTAL 665.32 888.06 1112.27 1112.27 665.32 4,443.24


20<br />

BAMBOO FLOWERING ANDFAMINE COMBAT SCHEME (BAFFACOS)<br />

1 2<br />

(f) Setting of Post<br />

Harvest machineries :<br />

3 4 5 6 7 8 9 10 11 12 13 14 15<br />

(1) Self propelled<br />

Reaper @ Rs. 60,000/per<br />

no.<br />

Ha 7 4.20 10 6.00 13 7.80 13 7.80 7 4.20 50 30.00<br />

(2) Paddy threshers<br />

@ Rs. 40,000/- per No.<br />

Nos. 4 1.60 5 2.00 6 2.40 6 2.40 4 1.60 25 10.00<br />

(3) Dalmill @ Rs.<br />

30,000/- per no.<br />

Nos. 7 2.10 10 3.00 13 3.90 13 3.90 7 2.10 50 15.00<br />

(4) Flour Mill @ Rs.<br />

Nos. 7 2.80 10 4.00 13 5.20 13 5.20 7 2.80 50 20.00<br />

40,000/- per no.<br />

L. Cultivati<strong>on</strong> of Oil<br />

Seed/Pulse @ Rs.<br />

10,000/- per hect.<br />

M. C<strong>on</strong>nectivity for Market<br />

linkage. @ Rs.<br />

3,00,000/- per km.<br />

N. Installati<strong>on</strong> of Sprinkler<br />

sets for Oilseeds, pulses<br />

& Potato @ Rs.24,000/-<br />

per no.<br />

O. C<strong>on</strong>structi<strong>on</strong> of Rain<br />

Water Harvesting P<strong>on</strong>d<br />

@ Rs. 10,000/- per no.<br />

Ha.<br />

Annexure - I<br />

375 37.50 500 50.00 625 62.50 625 62.50 375 37.50 2,500 250.00<br />

Km 45 135.00 60 180.00 75 225.00 75 225.00 45 135.00 300 900.00<br />

Nos 60 14.40 80 19.20 100 24.00 100 24.00 60 14.40 400 96.00<br />

Nos 150 15.00 200 20.00 250 25.00 250 25.00 150 15.00 1,000 100.00<br />

SUB- TOTAL 212.60 284.20 355.80 355.80 212.60 1421.00<br />

GRAND TOTAL 1189.125 1599.33 2011.36 2011.36 1188.825 8000.00


21<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

INDUSTRIES<br />

SUMMARY<br />

1. Introducti<strong>on</strong> and background:<br />

The State of <strong>Mizoram</strong> in particular and the North Eastern States in general is<br />

backward in industry and industrial related activities. The overall backwardness is<br />

largely due to low entrepreneurship development, lack or inadequate industrial<br />

infrastructure and low investment capacity. Various problems arising in the State are:<br />

- Low GDP<br />

- Limited State’s own resources.<br />

- Alarming unemployment problem<br />

- Large scale migrati<strong>on</strong> of rural populati<strong>on</strong> to urban area.<br />

- Lack of mineral resources.<br />

- Low trading activities.<br />

- Fall in agriculture produce due to low yield.<br />

- Minimal people using veterinary activities for income sources.<br />

Thus, setting up of industries, most preferably agro-based and rich raw<br />

material based need be explored in great earnest. Bamboo, being abundantly available<br />

in <strong>Mizoram</strong> with various prospects of utilisati<strong>on</strong> possesses immense potential for the<br />

ec<strong>on</strong>omic growth of the State.<br />

2. Objectives:<br />

- Mitigati<strong>on</strong> of negative effect flowering of huge bamboo resources.<br />

- Maximisati<strong>on</strong> of bamboo resources utilisati<strong>on</strong> before and during flowering.<br />

- Increase in purchasing powers of the people.<br />

- Sustained income generati<strong>on</strong> of the people using bamboo.<br />

3. Skill upgradati<strong>on</strong>, man-power development and instituti<strong>on</strong>al strengthening:<br />

- Skill upgradati<strong>on</strong> and manpower development will be taken up in two-folds viz. for<br />

the entrepreneurs and for the officials.<br />

- This will be taken up through EDP, seminar / training within the State, outside the<br />

State and <strong>on</strong> selective basis outside the Country.<br />

- These activities will be carried out from existing programs of the Department as well<br />

as funding from NEC, Central Government Agencies and other relevant organisati<strong>on</strong>s.<br />

- Instituti<strong>on</strong>al strengthening of the Bamboo Development Agency and the Industries<br />

Department shall be included in this.<br />

- This will be d<strong>on</strong>e by basic need funding of the Bamboo Development Agency and<br />

engagement of professi<strong>on</strong>als of related fields like technology, management, business,<br />

trade activities, administrati<strong>on</strong> etc. in the Bamboo Development Agency and<br />

Industries Department by means of deploying existing State Government employees<br />

and <strong>on</strong>-c<strong>on</strong>tract <strong>on</strong> need based.<br />

The Estimated Fund Requirement is Rs 129.50 lakhs.


22<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

4. Value-additi<strong>on</strong> / processing activities:<br />

Bamboo can be processed into various end products right from the bamboo shoot to<br />

the bamboo culms. China is now the leading Country in this regard. Of the various<br />

items of value additi<strong>on</strong>s to raw bamboo, the followings are c<strong>on</strong>sidered technically and<br />

ec<strong>on</strong>omically viable for the State of <strong>Mizoram</strong>.<br />

a) Small Scale and Medium Scale bamboo based Industries:<br />

i) Bamboo floor-boards manufacturing industry.<br />

ii) Bamboo mat/c<strong>on</strong>structi<strong>on</strong>/strip boards manufacturing industry.<br />

iii) Bamboo chip boards manufacturing industry.<br />

iv) Bamboo curtain mats manufacturing industry.<br />

v) Bamboo charcoal and vinegar manufacturing industry.<br />

vi) Bamboo chipping <str<strong>on</strong>g>plan</str<strong>on</strong>g>t.<br />

Approach:<br />

For these kinds of industries, investments required is normally more than Rs.130.00<br />

lakhs and can be as high as Rs 800.00 lakhs depending <strong>on</strong> the capacity and machinery<br />

choice. As indigenous machineries are normally not available most of them have to be<br />

imported from Taiwan/Japan/Korea/China/ European countries.<br />

These small and medium scale industries shall be under private or joint venture<br />

system of management. Investment from outside the State and even FDI will be<br />

sought for as permitted by the State Industrial Policy 2000.<br />

Major chunks of the investment are expected from private or outside/foreign<br />

investment. However, with the fact that <strong>Mizoram</strong> being industrially backward, equity<br />

participati<strong>on</strong> or promoti<strong>on</strong>al incentives will be required up to certain percentage.<br />

The Estimated fund requirement to be included in the Scheme is Rs 12.25 crores.<br />

Tiny, cottage and rural bamboo based industries:<br />

i) Agarbatti (incense) sticks industries.<br />

ii) Slat making industries.<br />

iii) Sliver making industries.<br />

iv) Pebble mat industries.<br />

v) Bamboo daily use items.<br />

vi) Bamboo handicrafts.<br />

vii) Bamboo shoots preservati<strong>on</strong>.<br />

viii) Curtain mat manufacturing industries (locally improvised)<br />

The investment required in these types is estimated to be within a limit of Rs 100.00<br />

lakhs. The industrial units will be set up by private entrepreneurs or by groups of<br />

village industrial groups <strong>on</strong> community basis which will later grows manifolds.<br />

The Estimated fund requirement to be included in the Scheme is Rs 6.75 crores


23<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

5. Bamboo Storage and Charcoal producti<strong>on</strong>:<br />

Assistance for incentives for storage of bamboo before and during flowering will be<br />

provided to 26500 families at a rate of Rs. 5,000/- and Local kiln charcoal producti<strong>on</strong><br />

to 100 families at a rate of Rs. 3.00 lakhs each.<br />

The Estimated fund requirement to be included in the Scheme is Rs 15.80 crores.<br />

6. Bamboo for building c<strong>on</strong>structi<strong>on</strong> and infrastructure development:<br />

Due to its advantageous properties, bamboo is a very good material for building<br />

c<strong>on</strong>structi<strong>on</strong> and other infrastructure applicati<strong>on</strong>s like bridge c<strong>on</strong>structi<strong>on</strong>, road<br />

reinforcements, slope protecti<strong>on</strong>, gabi<strong>on</strong>s etc.<br />

The Estimated fund requirement to be included in the Scheme is Rs 72.00 lakhs.<br />

7. Development / upgradati<strong>on</strong> of industrial infrastructures:<br />

Whether bamboo based or not, development or upgradati<strong>on</strong> of infrastructure is<br />

necessary for growth of industries.<br />

The Estimated fund requirement to be included in the Scheme is Rs 22.80 crores.<br />

8. Marketing Arrangement / Market Development:<br />

Participati<strong>on</strong> in various trade expos, fairs, technical seminars, symposium, workshops,<br />

etc. within and outside the Country and holding of such events.<br />

The Estimated fund requirement to be included in the Scheme is Rs 38.50 lakhs.<br />

9. Total Cost-Estimati<strong>on</strong>:<br />

(Rs. in lakhs)<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5 Total<br />

(2004-05) (2005-06) (2006-07) (2007-08) (2008-09)<br />

i) Skill upgradati<strong>on</strong> etc.<br />

ii) Value additi<strong>on</strong>/<br />

processing —<br />

14.80 31.50 31.80 29.20 22.20 129.50<br />

a) SSI & MSI<br />

125.00 575.00 425.00 100.00 0.00 1225.00<br />

b) Tiny/cottage scale<br />

iii) Bamboo Storage and<br />

75.25 192.50 226.50 113.00 67.75 675.00<br />

Charcoal<br />

iv) Bamboo for building<br />

210.00 490.00 520.00 360.00 0.00 1580.00<br />

c<strong>on</strong>structi<strong>on</strong> &<br />

infrastructure<br />

v) Development /<br />

10.00 15.00 18.00 17.00 12.00 72.00<br />

upgradati<strong>on</strong> of<br />

Industrial<br />

Infrastructure<br />

360.00 760.00 760.00 400.00 0.00 2280.00<br />

vi) Market development 4.50 8.50 12.50 8.50 4.50 38.50<br />

Total : 799.55 2072.50 1993.80 1027.70 106.45 6000.00


24<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

DETAILED ACTION PLAN<br />

1. Introducti<strong>on</strong> and background:<br />

The State of <strong>Mizoram</strong> in particular and the North Eastern States in general is<br />

backward in industry and industrial related activities. The overall backwardness is<br />

largely due to low entrepreneurship development, lack or inadequate industrial<br />

infrastructure and low investment capacity. Various problems arising in the State are:<br />

- Low GDP<br />

- Limited State’s own resources.<br />

- Alarming unemployment problem<br />

- Large-scale migrati<strong>on</strong> of rural populati<strong>on</strong> to urban area.<br />

- Lack of mineral resources.<br />

- Low trading activities.<br />

- Fall in agriculture produce due to low yield.<br />

- Minimal people using veterinary activities for income sources.<br />

- Majority of agriculture activities still <strong>on</strong> jhum system of cultivati<strong>on</strong>.<br />

Thus, setting up of industries, most preferably agro-based and rich raw material based<br />

need be explored in great earnest.<br />

Bamboo, being abundantly available in <strong>Mizoram</strong> with various prospects of utilizati<strong>on</strong><br />

possesses immense potential for the ec<strong>on</strong>omic growth of the State.<br />

2. Objectives:<br />

The objectives of this Acti<strong>on</strong> Plan are briefly discussed as below:<br />

i) Mitigati<strong>on</strong> of Bamboo flowering effect:<br />

The previous flowering of Bamboo especially M.baciffera and D.hamilt<strong>on</strong>ii<br />

species in 1911-1912 and 1959-1960 had serious repercussi<strong>on</strong> to the people.<br />

Attributed to the bamboo flowering, dangerous populati<strong>on</strong> explosi<strong>on</strong> of rodents, bats<br />

insects etc. led to devastati<strong>on</strong> of agriculture produce. The results were severe famine<br />

leading to general chaos and social disorders. With the effect of bamboo flowering in<br />

19911-12, many people faced acute food shortage leading to ill-health, malnutriti<strong>on</strong><br />

and death causing migrati<strong>on</strong> of people to Myanmar (the then Burma), Bangladesh (the<br />

then East Pakistan), Manipur, Assam and Tripura. The Bamboo flowering of 1959-60<br />

resulted in creati<strong>on</strong> of feeling of neglect and hatred to Assam State Government and<br />

India Uni<strong>on</strong> leading to the fight for Independent <strong>Mizoram</strong> by Mizo Nati<strong>on</strong>al Famine<br />

Fr<strong>on</strong>t, which later went underground as Mizo Nati<strong>on</strong>al Fr<strong>on</strong>t.<br />

With the huge bamboo resources in the State estimated to be in the scale of<br />

25.26 milli<strong>on</strong> t<strong>on</strong>es, of which M.baciffera accounts for 95%, it is almost certain that<br />

serious repercussi<strong>on</strong> is going to happen. So, it is necessary to mitigate this adverse<br />

effort.


25<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ii) Maximisati<strong>on</strong> of Bamboo resource utilisati<strong>on</strong>:<br />

Bamboo has various utilisati<strong>on</strong> and applicati<strong>on</strong>s. The utilisati<strong>on</strong> and<br />

applicati<strong>on</strong>s can be value-addicti<strong>on</strong> by processing, raw applicati<strong>on</strong>s, and infrastructure<br />

use after treatment. So, this <str<strong>on</strong>g>plan</str<strong>on</strong>g> also aims to ec<strong>on</strong>omically utilise the vast bamboo<br />

resources before and during flowering.<br />

iii) Increase in purchasing power:<br />

In line with the objectives of all Five Year Plans of the Country, increase in<br />

purchasing power of the people is <strong>on</strong>e of the main objectives of this Plan. With the<br />

setting up of processing industries, employment will be generated at various levels<br />

and profits will accrue for the bamboo growers and entrepreneurs. Besides, utilisati<strong>on</strong><br />

of bamboo for infrastructure applicati<strong>on</strong> will substitute materials costly brought from<br />

outside the State.<br />

iv) Sustained income generati<strong>on</strong> from Bamboo:<br />

Bamboo <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> of other species is being taken vigorously and the intensity<br />

is projected to increase. Moreover, the bamboo will regenerate from the flowered<br />

seeds and will resume its bamboo coverage. One of the objectives of this <str<strong>on</strong>g>plan</str<strong>on</strong>g> is to<br />

establish means and facilities for generati<strong>on</strong> of sustained income to the people.<br />

3. Skill upgradati<strong>on</strong>, man-power development and instituti<strong>on</strong>al strengthening:<br />

- Skill upgradati<strong>on</strong> and manpower development will be taken up in two-folds viz. for<br />

the entrepreneurs and for the officials.<br />

- This will be taken up through EDP, seminar / training within the State, outside the<br />

State and <strong>on</strong> selective basis outside the Country.<br />

- These activities will be carried out from existing programs of the Department as well<br />

as funding from NEC, Central Government Agencies and other relevant organisati<strong>on</strong>s.<br />

- Instituti<strong>on</strong>al strengthening of the Bamboo Development Agency and the Industries<br />

Department shall be included in this.<br />

- This will be d<strong>on</strong>e by basic need funding of the Bamboo Development Agency and<br />

engagement of professi<strong>on</strong>als of related fields like technology, management, business,<br />

trade activities, administrati<strong>on</strong> etc. in the Bamboo Development Agency and<br />

Industries Department by means of deploying existing State Government employees<br />

and <strong>on</strong>-c<strong>on</strong>tract <strong>on</strong> need based.<br />

On-going / past initiatives:<br />

- 5 officers underg<strong>on</strong>e 45 / 60 days bamboo training in China during 2000 – 2003 with<br />

State / CBTC funding.<br />

- 2 officers and 3 entrepreneurs underg<strong>on</strong>e bamboo training / workshop of 7 –14 days<br />

in China during 2000 and 2003 with INBAR / CBTC funding.<br />

- 2 officers and 1 entrepreneur had study tour to Taiwan during 1999 with State<br />

funding.


26<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

- Internati<strong>on</strong>al Bamboo Housing Workshop organised in collaborati<strong>on</strong> with<br />

Internati<strong>on</strong>al Network for Bamboo and Rattan (INBAR) and Cane & Bamboo<br />

Technology Centre – United Nati<strong>on</strong>s Industrial Development Organisati<strong>on</strong> (CBTC-<br />

UNIDO) at Aizawl during October – November 2001.<br />

- Bamboo Development Agency established with State’s Chief Secretary at its<br />

Chairman with State Plan funding. Few skelet<strong>on</strong> officer and staffs, drawing pay from<br />

respective State Government Department is manning the Agency as well as Bamboo<br />

Secti<strong>on</strong> of the Industries Department.<br />

- The Bamboo Development Agency organised 2 days seminar for 80 pers<strong>on</strong>s from 40<br />

villages <strong>on</strong> Bamboo utilisati<strong>on</strong> and resource management.<br />

- Proposal for imparting bamboo resources management to rural areas and experimental<br />

captive <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> amounting Rs 45.00 lakhs prepared and submitted to Ministry of<br />

Envir<strong>on</strong>ment & Forest for funding.<br />

- Bamboo web-site launched by the Bamboo Development Agency.<br />

Target and fund requirement:<br />

Training within the State<br />

Entrepreneurship Development Training:<br />

It is projected that 50 numbers (i.e. 10 numbers per annum) of Entrepreneurship<br />

Development Training will be organised in collaborati<strong>on</strong> with SISI, NEDFi, SIDBI<br />

etc. covering 1000 entrepreneurs. Required expenditure is estimated at Rs 10,000.00<br />

per training with a total of Rs 5,00,000.00 for 5 years.<br />

Sensitisati<strong>on</strong> programme for officials:<br />

It is essential to impart required knowledge to officials dealing with the program by way<br />

of sensitisati<strong>on</strong> or otherwise. It is projected to c<strong>on</strong>duct 16 training covering 100 officials<br />

of various courses in collaborati<strong>on</strong> with various institutes totalling Rs 6.00 lakhs.<br />

Training outside the State<br />

Management training for entrepreneurs and officials:<br />

It is necessary for entrepreneurs and officials to have refreshers courses in various<br />

management programs at relevant instituti<strong>on</strong>s as such are not available within the<br />

State. It is proposed that 20 entrepreneurs and 20 officials avail this opportunity at an<br />

estimated expense of Rs 12.00 lakhs.<br />

Participati<strong>on</strong> in seminars and workshops:<br />

Officials and entrepreneurs will have to attend relevant seminars and workshop<br />

organised in this field. It is proposed that c<strong>on</strong>cerned pers<strong>on</strong>s will attend such events<br />

for 20 times at an estimated expense of Rs 6.00 lakhs.


27<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Training abroad<br />

Training <strong>on</strong> bamboo processing:<br />

It is proposed that 14 entrepreneurs and 7 officials will attend training <strong>on</strong> bamboo<br />

processing at China, Taiwan, Japan, Korea, Thailand and Vietnam with an estimated<br />

expense of Rs.16.20 lakhs.<br />

Training <strong>on</strong> bamboo structural applicati<strong>on</strong>s:<br />

Training <strong>on</strong> bamboo structural applicati<strong>on</strong>s will be attended by 4 technical pers<strong>on</strong>s in<br />

Latin America, United Kingdom, Italy etc. with an estimated expense of Rs.9.00<br />

lakhs.<br />

Participati<strong>on</strong> in seminar and workshops:<br />

8 participati<strong>on</strong> in seminar and training outside the State for officials and entrepreneurs<br />

is c<strong>on</strong>sidered necessary so that they are at par with technology development around<br />

the globe and any new trend prevailing at a time with an estimated expenditure of<br />

Rs.3.20 lakhs.<br />

Strengthening of the Bamboo Development Agency’s office:<br />

Bamboo Development Agency, the first dedicated Government Society in the Nati<strong>on</strong><br />

has been established in 2001. The Agency is now working with skelet<strong>on</strong> staffs and is<br />

in great need of strengthening of technical and other workers and providing facilities<br />

to the existing employees including c<strong>on</strong>sultancies, etc. The estimated expenditure is<br />

Rs.72.10 lakhs.<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs lakhs)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

EDT 5 0.5 10 1.0 15 1.50 15 1.50 5 0.50 50 5.00<br />

Sens. 2 0.6 5 1.50 6 1.80 5 1.50 2 0.6 20 6.00<br />

Mngm 5 1.50 10 3.00 10 3.00 10 3.00 5 1.50 40 12.00<br />

S&T(i) 3 0.90 4 1.20 5 1.50 4 1.20 4 1.20 20 6.00<br />

T-BP 3 2.40 6 7.20 6 7.20 5 6.00 2 2.40 22 25.20<br />

S & W 1 0.80 2 1.60 1 0.80 0 0.00 0 0.00 4 3.20<br />

Ins. St. 1 8.10 1 16.00 1 16.00 1 16.00 1 16.00 5 72.10<br />

Total 20 14.80 38 31.50 44 31.80 40 29.20 19 22.20 161 129.50<br />

4. Value-additi<strong>on</strong> / processing activities:<br />

Bamboo can be processed into various end products right from the bamboo shoot to<br />

the bamboo culms. China is now the leading Country in this regard. Of the various<br />

items of value additi<strong>on</strong>s to raw bamboo, the followings are c<strong>on</strong>sidered technically and<br />

ec<strong>on</strong>omically viable for the State of <strong>Mizoram</strong>.<br />

a) Small Scale and Medium Scale bamboo based Industries:<br />

i) Bamboo floorboards manufacturing industry.<br />

ii) Bamboo mat/c<strong>on</strong>structi<strong>on</strong>/strip boards manufacturing industry.<br />

iii) Bamboo chip boards manufacturing industry.<br />

iv) Bamboo curtain mats manufacturing industry.


28<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

v) Bamboo shoots canning industry.<br />

vi) Bamboo charcoal and vinegar manufacturing industry.<br />

vii) Bamboo chipping <str<strong>on</strong>g>plan</str<strong>on</strong>g>t.<br />

Approach:<br />

For these kinds of industries, investments required is normally more than Rs<br />

130 lakhs and can be as high as Rs 800.00 lakhs depending <strong>on</strong> the capacity and<br />

machinery choice. As indigenous machinery are normally not available most of them<br />

have to be imported from Taiwan/Japan/Korea/China/ European countries.<br />

These small and medium scale industries shall be under private or joint<br />

venture system of management. Investment from outside the State and even FDI will<br />

be sought for as permitted by the State Industrial Policy 2000.<br />

A major chunk of the investment is expected from private or outside/foreign<br />

investment. However, with the fact that <strong>Mizoram</strong> being industrially backward, equity<br />

participati<strong>on</strong> or promoti<strong>on</strong>al incentives will be required up to certain percentage.<br />

On-going initiatives:<br />

i) One unit of Bamboo Floor-board factory:<br />

The State Government through the Bamboo Development Agency has<br />

established in joint venture with M/s Venus Bamboo Products (P) Ltd., W.Bengal and<br />

M/s Boarke Machine Co., Taichung, Taichung has established <strong>on</strong>e bamboo floorboard<br />

industry at Sairang, Aizawl District, <strong>Mizoram</strong>. The total expenditure incurred so far in<br />

this project is Rs 980.00 lakhs. The unit, an Export Orient One is expected to start<br />

commercial producti<strong>on</strong> within few m<strong>on</strong>ths.<br />

ii) Establishment of Bamboo Mat board factory:<br />

A private entrepreneur viz. M/s Z<strong>on</strong>un Matply Industry has established <strong>on</strong>e unit<br />

of bamboo mat board industry at Lengpui, Mamit District, <strong>Mizoram</strong>. The total investment<br />

is Rs 248.00 lakhs from own’s c<strong>on</strong>tributi<strong>on</strong>, loan from financial instituti<strong>on</strong> and NEC<br />

Assistance. The Industries Department and Bamboo Development Agency has assisted<br />

the unit, which has started commercial producti<strong>on</strong> in administrative and technical area.<br />

iii) Reopening of Bamboo Mat board factory:<br />

A private entrepreneur viz. M/s BCA Bamboo Products has established a<br />

bamboo mat board industry at Industrial Estate, Zuangtui, Aizawl <strong>Mizoram</strong> and had<br />

commercial operati<strong>on</strong> during 1993-95. However, the unit faced serious problem due<br />

to absence of promoti<strong>on</strong>al package for bamboo-based industries and thus lying<br />

defunct. The Industries Department and the Bamboo Development is assisting for<br />

reopening of this unit and NEC’s assistance is being sought for this.<br />

iv) Project proposal for Bamboo C<strong>on</strong>structi<strong>on</strong>-board Factory:<br />

The Bamboo Development Agency has prepared DPR for setting up of<br />

Bamboo C<strong>on</strong>structi<strong>on</strong>-board Industry at Sairang, <strong>Mizoram</strong> amounting Rs 560.00<br />

lakhs. The DPR proposed to be under JV arrangement and management by private<br />

partner is meant for funding under NLCPR (amounting Rs 490.00 lakhs) and is<br />

sancti<strong>on</strong> is expected within 2004-05 or latest by 2005-06 (Resume of the project<br />

proposal enclosed at Annexure – I).


29<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Target and fund requirement:<br />

China is reported to house 100 bamboo floorboard units, 300 bamboo<br />

c<strong>on</strong>structi<strong>on</strong>-board / mat board / strip board unit and numerous other bamboo based<br />

industries. Based <strong>on</strong> the bamboo availability, locati<strong>on</strong>al advantage/disadvantages etc.<br />

number of respective units expected to come up under projected c<strong>on</strong>diti<strong>on</strong> is as under:<br />

i) Bamboo floor-boards manufacturing industry - 1<br />

ii) Bamboo mat etc. boards manufacturing industry - 7<br />

iii) Bamboo chip boards manufacturing industry - 4<br />

iv) Bamboo curtain mats manufacturing industry - 5<br />

v) Bamboo charcoal / vinegar manufacturing industry - 4<br />

vi) Bamboo chipping <str<strong>on</strong>g>plan</str<strong>on</strong>g>t - 7<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs crore)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Floorboard 0 0.00 1 4.50 0 0.00 0 0.00 0 0.00 1 4.50<br />

Mats etc. 0 0.00 2 4.00 3 6.00 2 4.00 0 0.00 7 14.00<br />

Chips 0 0.00 2 3.00 2 3.00 0 0.00 0 0.00 4 6.00<br />

Char. 1 3.50 2 7.00 1 3.50 0 0.00 0 0.00 4 14.00<br />

Chipping 1 1.50 3 4.50 3 4.50 0 0.00 0 0.00 7 10.50<br />

Total 2 5.00 10 23.00 9 17.00 2 4.00 0 0.00 23 49.00<br />

Benefits and returns:<br />

Setting up of the above industries is expected to generate direct employment<br />

for 1550 pers<strong>on</strong>s and profits to entrepreneurs to the tune of Rs 1760.00 lakhs per<br />

annum with additi<strong>on</strong> of income generati<strong>on</strong> for bamboo growers etc.<br />

Funding sources:<br />

It is estimated that 10 % of the total cost will be borne by the entrepreneurs<br />

(owners), 65 % <strong>on</strong> term loan from financial instituti<strong>on</strong>s and 25 % as incentives by<br />

way of grant or assistance. Respective amount therefore is:<br />

Owners’ C<strong>on</strong>tributi<strong>on</strong> - Rs 4.90 crores<br />

Loan from FIs - Rs 31.85 crores<br />

Assistance / Grant - Rs 12.25 crores.<br />

The amount proposed to be included in this Acti<strong>on</strong> Plan is therefore Rs 12.25 crores.<br />

Tiny, cottage and rural bamboo based industries:<br />

i) Agarbatti (incense) sticks industries.<br />

ii) Slat making industries.<br />

iii) Sliver making industries.<br />

iv) Pebble mat industries.<br />

v) Bamboo daily use items.<br />

vi) Bamboo handicrafts.<br />

vii) Bamboo shoots preservati<strong>on</strong>.<br />

viii) Curtain mat manufacturing industries (locally improvised).<br />

The investment required in these types is estimated to be within a limit of<br />

Rs.100.00 lakhs. The industrial units will be set up by private entrepreneurs or by<br />

groups of village industrial groups <strong>on</strong> community basis which will later grows<br />

manifolds.


30<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

On-going initiatives:<br />

i) Establishment of bamboo stick making industry:<br />

Three units of Bamboo stick producti<strong>on</strong> have been set up at Industrial Estate,<br />

Zuangtui, Aizawl and Zanlawn and 3 more units are being established, all P2 with the<br />

assistance of NEC-SPINE and financial instituti<strong>on</strong>. Other units are also being<br />

established as per list enclosed at Annexure- II.<br />

ii) Project proposal for setting up of bamboo pebble mats industries:<br />

Project proposal for establishment of 1 another unit and 9 rural units for Rural<br />

Industrial Self Help Group amounting Rs. 391.00 lakhs proposed and submitted<br />

Ministry of Rural Development for funding. Resume of the Project enclosed at<br />

Annexure- III.<br />

iii) Project proposal for setting up of 200 tiny units:<br />

Proposal for setting up of tiny bamboo units prepared and submitted to<br />

Government of India for funding, amounting Rs.2000.00 lakhs as per enclosed at<br />

Annexure- IV.<br />

iv) Bamboo Mat Producti<strong>on</strong> Cetres:<br />

With the funding of ministry of Urban Development and Poverty Alleviati<strong>on</strong><br />

the Bamboo Development Agency in collaborati<strong>on</strong> with BMTPC and CBTC is taking<br />

up establishment of 2 bamboo producti<strong>on</strong> centres at Bamboo Industries Complex,<br />

Sairang and Industrial Estate, Kolasib.<br />

Target and fund requirement:<br />

The target for these items spacing 5 years period of the Scheme is as below:<br />

i) Agarbati stick Industry - 70 units @ Rs 10 lakhs/unit.<br />

ii) Slats making Industry - 70 units @ Rs 10 lakhs/unit.<br />

iii) Sliver making - 30 units @ Rs 5 lakhs/unit.<br />

iv) Pebble mats Industry - 50 units @ Rs 15 lakhs/unit.<br />

v) Bamboo daily use items - 50 units @ Rs 3 lakhs/unit.<br />

vi) Bamboo handicrafts - 30 units @ Rs 3 lakhs/unit.<br />

vii) Bamboo shoot preservati<strong>on</strong> - 40 units @ Rs 2 lakhs/unit.<br />

viii) Bamboo curtain making - 40 units @ Rs 2 lakhs/unit.<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs crores)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Agarbatti 10 1.00 20 2.00 25 2.50 10 1.00 5 0.50 70 7.00<br />

Slats 10 1.00 20 2.00 25 2.50 10 1.00 5 0.50 70 7.00<br />

Sliver 3 0.15 7 0.35 11 0.55 5 0.25 4 0.20 30 1.50<br />

P-mats 3 0.45 16 2.40 16 2.40 9 1.35 6 0.90 50 7.50<br />

Daily ite. 5 0.15 12 0.36 15 0.45 12 0.36 6 0.18 50 1.50<br />

Handi. 4 0.12 7 0.21 8 0.24 6 0.18 5 0.15 30 0.90<br />

Shoot 4 0.08 9 0.18 11 0.22 9 0.18 7 0.14 40 0.80<br />

Curtain 3 0.06 10 0.20 10 0.20 10 0.20 7 0.14 40 0.80<br />

Total 42 3.01 101 7.7 121 9.06 71 4.52 45 2.71 380 27.00


31<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Expected funding sources are promoters’ c<strong>on</strong>tributi<strong>on</strong>, term-loan from financial<br />

institutes and incentives / promoti<strong>on</strong>al packages. Respective amount therefore is:<br />

Owners’ C<strong>on</strong>tributi<strong>on</strong> (10 %) - Rs 2.70 crores<br />

Loan from FIs (65 %) - Rs 17.55 crores<br />

Assistance / Grant (25 %) - Rs 6.75 crores.<br />

The amount expected to be covered in this Acti<strong>on</strong> Plan is Rs. 6.75 crores.<br />

5. Bamboo Stocking and Waste Management:<br />

Bamboo die when it however. So, it is desirable to collect and stock for future use<br />

joint before and during flowering and the waste utilised as much as possible.<br />

Bamboo Stocking:<br />

The scheme is to provide assistance by way of incentive to villages of bamboo<br />

growing areas to c<strong>on</strong>struct temporary bamboo storage using bamboo, collecti<strong>on</strong> of<br />

bamboo just before or during flowering for use in the industry etc after flowering and<br />

smoke treatment by burning bamboo. It is purposed to cover 25,600 families at a rate<br />

of Rs. 5,000/- each to store 20 t<strong>on</strong>nes each in round or slat form, The total expenditure<br />

is Rs. 12,80.00 lakhs.<br />

Bamboo Charcoal:<br />

Bamboo charcoal has many applicati<strong>on</strong>s in filtrati<strong>on</strong>, purificati<strong>on</strong>, heating etc. The<br />

scheme is to provide assistance of Rs. 3.00 lakhs for kiln producti<strong>on</strong> of bamboo<br />

charcoal and vinegar to 100 families. All porti<strong>on</strong>s of bamboo not suitable for storage<br />

and small bamboo will be utilised for this. The total expenditure will be Rs. 300.00<br />

lakhs.<br />

Target and fund requirement:<br />

The target is to aim 24,000 families in stocking bamboo and to assist 100 families to<br />

set up local kiln bamboo charcoal producti<strong>on</strong> units.<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs. crores)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Stock 3600 1.80 8000 4.00 8000 4.00 6600 3.00 0 0.00 25,600 12.80<br />

-ing<br />

Charcoal<br />

10 0.30 30 0.90 40 1.20 20 0.60 0 0.00 10.00 3.00<br />

Total 3610 2.10 8030 4.90 8040 5.20 6020 3.60 0 0.00 24,100 15.80<br />

6. Bamboo for building c<strong>on</strong>structi<strong>on</strong> and infrastructure applicati<strong>on</strong>s:<br />

Due to its advantageous properties, bamboo is a very good material for building<br />

c<strong>on</strong>structi<strong>on</strong> and other infrastructure applicati<strong>on</strong>s like bridge c<strong>on</strong>structi<strong>on</strong>, road<br />

reinforcements, slope protecti<strong>on</strong>, gabi<strong>on</strong>s etc.


32<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

On-going initiatives:<br />

i) C<strong>on</strong>structi<strong>on</strong> of dem<strong>on</strong>strati<strong>on</strong> house:<br />

The Bamboo Development Agency is taking up a project of c<strong>on</strong>structi<strong>on</strong> of<br />

dem<strong>on</strong>strati<strong>on</strong> houses in collaborati<strong>on</strong> with Building Materials and Technology<br />

Promoti<strong>on</strong> Council – New Delhi and Indian Plywood Industries Research and<br />

Training Institute, Bangalore. The project is funded by Ministry of Urban<br />

Development and Poverty Alleviati<strong>on</strong> and is for dem<strong>on</strong>strati<strong>on</strong> of bamboo mat<br />

corrugated sheets and bamboo c<strong>on</strong>structi<strong>on</strong> technology.<br />

ii) Development of c<strong>on</strong>ceptualised bamboo c<strong>on</strong>crete technology:<br />

A new technology for using bamboo and cement for building c<strong>on</strong>structi<strong>on</strong> has<br />

been and development by the Bamboo Development Agency. The prospect of<br />

utilizing this technology is c<strong>on</strong>sidered very bright.<br />

Target and fund requirement:<br />

The actual works executi<strong>on</strong> for Bamboo houses, Bamboo bridges, Bamboo<br />

gabi<strong>on</strong>s, Bamboo-slope protecti<strong>on</strong>, etc. will be taken up from respective fund.<br />

However, the amount included in this project is for c<strong>on</strong>structi<strong>on</strong> of dem<strong>on</strong>strati<strong>on</strong><br />

structures, testing, documentati<strong>on</strong>s and technology transfer to the field. The estimated<br />

fund requirements is as under:<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs lakhs)<br />

No. Fund No. Fund No. Fund No. Fund No. Fund No. Fund<br />

Dem<strong>on</strong>s. 2 6.00 3 9.00 4 12.00 4 12.00 3 9.00 16 48.00<br />

Testing 0 0.00 2 1.00 2 1.00 1 0.50 0 0.00 5 2.50<br />

Docu. 1.00 1.50 1.50 1.50 1.00 6.50<br />

T. trans. 3.00 3.50 3.50 3.00 2.00 15.00<br />

Total 2 10.00 5 15.00 6 18.00 5 17.00 3 12.00 21 72.00<br />

Benefits and returns:<br />

Eco-friendly and fast growing bamboo, having advantageous properties will substitute<br />

or decrease use of depleting forest timber, c<strong>on</strong>structi<strong>on</strong> materials that comes from<br />

outside sources.<br />

7. Development / upgradati<strong>on</strong> of industrial infrastructures:<br />

Whether bamboo based or not, development or upgradati<strong>on</strong> of infrastructure is<br />

necessary for growth of industries. Some of this are being or will be taken up from<br />

existing schemes like Growth Canters, Integrated Industrial Development Centre,<br />

Export Promoti<strong>on</strong> Industrial Park, ASIDE, Industrial Infrastructure Upgradati<strong>on</strong><br />

Scheme etc and also from various sources like Bamboo Technology Park, Cluster<br />

Development Schemes, NLCPR etc.<br />

However, it is important to upgrade some existing industrial infrastructures and take<br />

up few new locati<strong>on</strong>s for industrial infrastructure.


33<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

On-going initiatives:<br />

i) Industrial Estates at various locati<strong>on</strong>s:<br />

Industries Department has developed Industrial Estate at Zuangtui, Aizawl and<br />

Industrial Estate at Kolasib is being developed. Other areas have been obtained for<br />

Industrial Estate at Bairabi, Champhai, Lawngtlai, Chawngte and Phaileng.<br />

ii) Bamboo Industries Complex, Sairang:<br />

Bamboo Industries Complex has been set up at Sairang and some porti<strong>on</strong> has<br />

been developed and is now occupied by M/s <strong>Mizoram</strong> Venus Bamboo Products (P)<br />

Ltd., a 100% EOU Industry.<br />

iii) Industrial Growth Centre, Luangmual, Aizawl:<br />

Industrial Growth Centre being developed at Luangmual, Aizawl. Internal<br />

road and few essential building have been taken up but be will require more input of<br />

funds for proper development.<br />

iv) Integrated Industrial Development Centre, Pukpui, Lunglei:<br />

Integrated Industrial Development Centre is being executed at Pukpui,<br />

Lunglei, and is expected to be functi<strong>on</strong> within few years.<br />

v) Export Promoti<strong>on</strong> Industrial Park, Lengte:<br />

Export Promoti<strong>on</strong>al Industrial Park is being developed at Lengte near Aizawl,<br />

Airport under ASIDE. Approach road and internal road is being taken up.<br />

Target and fund requirement:<br />

The target for this field is development of Industrial Estate-Kolasib, Industrial Estate-<br />

Bairabi, Industrial Estate-Chawngte, Industrial Estate – Bairabi, 3 more Industrial areas at<br />

suitable locati<strong>on</strong> within the state. The fund requirement is given as below:<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs crores)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

IE-dev. 1 3.60 1 3.60 1 3.60 0 0.00 0 0.00 3 10.80<br />

New 0 0.00 1 4.00 1 4.00 1 4.00 0 0.00 3 12.00<br />

Total 1 3.60 2 7.60 2 7.60 1 4.00 0 0.00 6 22.80<br />

Benefits and returns:<br />

Development of Industrial infrastructure is pre-requisite for development and growth<br />

of industries and this will be benefited by the whole State and Country.<br />

8. Marketing Arrangement / Market Development:<br />

Participati<strong>on</strong> in various trade expos, fairs, technical seminars, symposium, workshops<br />

etc. within and outside the Country and holding of such events.


34<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

On-going initiatives:<br />

i) Participati<strong>on</strong> in North East Business Summit:<br />

Bamboo, being <strong>on</strong>e of the major subject of N.E Business Summit held at New<br />

Delhi during January 2004, some samples of bamboo based products of the State were<br />

show cased and received an attenti<strong>on</strong> and inquiries from numerous potential customers.<br />

ii) Participati<strong>on</strong> in N.E Trade Expo.:<br />

Some samples of Bamboo products were displayed during N.E Trade Expo.<br />

2004 held at Pragati Maidan, New Delhi during March 2004 and were receive quite<br />

an attenti<strong>on</strong>.<br />

iii) One private entrepreneur viz. Z<strong>on</strong>unsang Handloom & Handicrafts<br />

participated in Industrial Gifts Fair 2004 at New Delhi during Feb-March 2004 and<br />

obtained export order.<br />

iv) One private firm viz. Hnam Chhantu participated in Spring Fare at<br />

Birmingham, UK during February 2004.<br />

Target and fund requirement:<br />

The target is to organise 5 events within the State, participate in 10 events within the<br />

country and 4 events outside the countries. The estimated requirements of funds:<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs lakhs)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Org. of<br />

events<br />

1 0.50 1 0.50 1 0.50 1 0.50 1 0.50 5 2.50<br />

Within 2 4.00 2 4.00 2 4.00 2 4.00 2 4.00 10 20.00<br />

India<br />

Outside<br />

India<br />

0 0.00 1 4.00 2 8.00 1 4.00 0 0.00 4 16.00<br />

2 4.50 4 8.50 5 12.50 4 8.50 3 4.50 19 38.50<br />

9. Detailed Cost Estimati<strong>on</strong>:<br />

i) Skill upgradati<strong>on</strong>, man-power development and instituti<strong>on</strong>al strengthening<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs lakhs)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

EDT 5 0.5 10 1.0 15 1.50 15 1.50 5 0.50 50 5.00<br />

Sens. 2 0.6 5 1.50 6 1.80 5 1.50 2 0.6 20 6.00<br />

Mngm 5 1.50 10 3.00 10 3.00 10 3.00 5 1.50 40 12.00<br />

S&T(i) 3 0.90 4 1.20 5 1.50 4 1.20 4 1.20 20 6.00<br />

T-BP 3 2.40 6 7.20 6 7.20 5 6.00 2 2.40 22 25.20<br />

S & W 1 0.80 2 1.60 1 0.80 0 0.00 0 0.00 4 3.20<br />

Ins. St. 1 8.10 1 16.00 1 16.00 1 16.00 1 16.00 5 72.10<br />

Total 20 14.80 38 31.50 44 31.80 40 29.20 19 22.20 161 129.50


35<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ii) Value-additi<strong>on</strong> / processing activities:<br />

a) Small Scale and Medium Scale bamboo based Industries<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs crore)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Floorboard 0 0.00 1 4.50 0 0.00 0 0.00 0 0.00 1 4.50<br />

Mats etc. 0 0.00 2 4.00 3 6.00 2 4.00 0 0.00 7 14.00<br />

Chips 0 0.00 2 3.00 2 3.00 0 0.00 0 0.00 4 6.00<br />

Char. 1 3.50 2 7.00 1 3.50 0 0.00 0 0.00 4 14.00<br />

Chipping 1 1.50 3 4.50 3 4.50 0 0.00 0 0.00 7 10.50<br />

Total 2 5.00 10 23.00 9 17.00 2 4.00 0 0.00 23 49.00<br />

Amount in<br />

A.P (25%)<br />

2 1.25 10 5.75 9 4.25 2 1.00 0 0.00 23 12.25<br />

b) Tiny, cottage and rural bamboo based industries<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs Crores)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Agarbatti 10 1.00 20 2.00 25 2.50 10 1.00 5 0.50 70 7.00<br />

Slats 10 1.00 20 2.00 25 2.50 10 1.00 5 0.50 70 7.00<br />

Sliver 3 0.15 7 0.35 11 0.55 5 0.25 4 0.20 30 1.50<br />

P-mats 3 0.45 16 2.40 16 2.40 9 1.35 6 0.90 50 7.50<br />

Daily ite. 5 0.15 12 0.36 15 0.45 12 0.36 6 0.18 50 1.50<br />

Handi. 4 0.12 7 0.21 8 0.24 6 0.18 5 0.15 30 0.90<br />

Shoot 4 0.08 9 0.18 11 0.22 9 0.18 7 0.14 40 0.80<br />

Curtain 3 0.06 10 0.20 10 0.20 10 0.20 7 0.14 40 0.80<br />

Total 42 3.01 101 7.7 121 9.06 71 4.52 45 2.71 380 27.00<br />

Amount in<br />

A.P (25%)<br />

42 0.75 101 1.93 121 2.27 71 1.13 45 0.68 380 6.75<br />

iii) Bamboo Waste Management:<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs. crores)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Stocking 3600 1.80 8000 4.00 8000 4.00 6600 3.00 0 0.00 25,600 12.80<br />

Charcoal 10 0.30 30 0.90 40 1.20 20 0.60 0 0.00 10.00 3.00<br />

Total 3610 2.10 8030 4.90 8040 5.20 6020 3.60 0 0.00 24,100 15.80


36<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

iv) Bamboo for building c<strong>on</strong>structi<strong>on</strong> and infrastructure applicati<strong>on</strong>s:<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs Lakhs)<br />

No. Fund No. Fund No. Fund No. Fund No. Fund No. Fund<br />

Dem<strong>on</strong>s. 2 6.00 3 9.00 4 12.00 4 12.00 3 9.00 16 48.00<br />

Testing 0 0.00 2 1.00 2 1.00 1 0.50 0 0.00 5 2.50<br />

Docu. 1.00 1.50 1.50 1.50 1.00 6.50<br />

T. trans. 3.00 3.50 3.50 3.00 2.00 15.00<br />

Total 2 10.00 5 15.00 6 18.00 5 17.00 3 12.00 21 72.00<br />

v) Development / upgradati<strong>on</strong> of industrial infrastructures:<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5 Total<br />

(Rs crores)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

IE-dev 1 3.60 1 3.60 1 3.60 0 0.00 0 0.00 3 10.80<br />

New 0 0.00 1 4.00 1 4.00 1 4.00 0 0.00 3 12.00<br />

Total 1 3.60 2 7.60 2 7.60 1 4.00 0 0.00 6 22.80<br />

vi) Marketing Arrangement / Market Development:<br />

Items Year 1 Year 2 Year 3 Year 4 Year 5<br />

Total<br />

(Rs lakhs)<br />

No Fund No Fund No Fund No Fund No Fund No Fund<br />

Org. of<br />

events<br />

1 0.50 1 0.50 1 0.50 1 0.50 1 0.50 5 2.50<br />

Within 2 4.00 2 4.00 2 4.00 2 4.00 2 4.00 10 20.00<br />

India<br />

Outside<br />

India<br />

0 0.00 1 4.00 2 8.00 1 4.00 0 0.00 4 16.00<br />

2 4.50 4 8.50 5 12.50 4 8.50 3 4.50 19 38.50


37<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

A N N E X U R E S<br />

1. RESUME OF THE PROJECT FOR SETTING UP OF BAMBOO<br />

CONSTRUCTION – BOARD INDUSTRY<br />

2. LIST OF FIRMS SEEKING NEC ASSISTANCE.<br />

3. RESUME OF PEBBLE MAT INDUSTRY SUBMITTED TO MoRD.<br />

4. PROPOSAL SUBMITTED TO GOVERNMENT OF INDIA FOR<br />

ESTABLISHMENT OF 200 SSI UNITS.<br />

ANNEXURE – I<br />

COMPREHENSIVE STATE ACTION PLAN ON BAMBOO FLOWERING AND<br />

FAMINE COMBAT SCHEME IN MIZORAM<br />

RESUME OF THE PROJECT FOR SEETING UP OF BAMBOO CONSTRUCTION –<br />

BOARD INDUSTRY<br />

1. Introducti<strong>on</strong>:<br />

This project is to set up bamboo c<strong>on</strong>structi<strong>on</strong> board manufacturing industry in the<br />

bamboo rich state of <strong>Mizoram</strong>. The main raw material is bamboo of various species, which is<br />

abundantly available in the State to the tune of 25.28 milli<strong>on</strong> t<strong>on</strong>es.<br />

So this project is prepared to tap the ec<strong>on</strong>omic potential of huge bamboo resources<br />

available in the State and all possible care has been taken to frame this Report as per generic<br />

structure of DPR for funding under NLCPR framed and circulated by DONER.<br />

2. The State of <strong>Mizoram</strong>:<br />

The State of <strong>Mizoram</strong>, in the southern most tip of North East India is having positive<br />

characteristics like alround peace, favourable climate, high literacy and educati<strong>on</strong>, rich<br />

bamboo resources etc., it is yet to start development towards self-sufficiency despite<br />

hindrances like:<br />

- Industrially overall backwardness.<br />

- Problems of unemployment<br />

- Decrease in forest coverage<br />

- Limited presence of natural minerals<br />

- High dependency of State <strong>on</strong> Central Government <strong>on</strong> ec<strong>on</strong>omy<br />

- Hilly terrain topography.<br />

3. Uses of bamboo c<strong>on</strong>structi<strong>on</strong> board:<br />

Due to advantageous properties of bamboo, bamboo c<strong>on</strong>crete board is superior to<br />

other boards. The main uses are c<strong>on</strong>crete formwork (paper-laminated), partiti<strong>on</strong> walls, panels,<br />

furniture, truck and other floors etc.


38<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

4. Manufacturing process:<br />

Manufacturing processes of the bamboo c<strong>on</strong>structi<strong>on</strong> board is briefly described in the<br />

following sequences of activities:<br />

- Harvesting and collecti<strong>on</strong> of desirable species of matured bamboo.<br />

- Cross cutting at desired length.<br />

- Splitting for desired dimensi<strong>on</strong>s.<br />

- Slivering (outer retina and inner layer discarded).<br />

- Weaving mats for exterior or weaving with thread for internal layer.<br />

- Drying at proper temperature to moisture c<strong>on</strong>tents.<br />

- Applicati<strong>on</strong> of glue.<br />

- Hot pressing with waterproof epidermal layers.<br />

- Sanding wherever required.<br />

- Edge cutting / sizing.<br />

- Edges / sides treatment.<br />

- Ready for use.<br />

5. Approach and strategy:<br />

With the strength and weakness of the overall situati<strong>on</strong> in the State and opportunities<br />

and threat present, the project is proposed to be funded under NLCPR and limited amount by<br />

private stakeholder.<br />

The project implementati<strong>on</strong> will be two-folds, infrastructure development by the<br />

implementing agency and the equipment part including pre-commercial operati<strong>on</strong> jointly with<br />

the private partner.<br />

6. Estimated cost:<br />

The total estimated cost and fund applied under NLCPR from DONER is given as:<br />

A. Infrastructure development:<br />

i) Approach road: Rs 16.50 lakhs<br />

ii) Water supply: Rs 7.80 lakhs<br />

iii) Factory Buildings: Rs 116.88 lakhs<br />

iv) Workers’ shed: Rs 7.20 lakhs<br />

v) Chowkider’s shed: Rs 2.30 lakhs<br />

vi) Utilities building: Rs 2.10 lakhs<br />

vii) Mat producti<strong>on</strong> building: Rs 13.56 lakhs<br />

viii) Fencing: Rs 1.25 lakhs<br />

ix) Electrificati<strong>on</strong>s: Rs 7.35 lakhs<br />

Sub- Total: Rs 174.94 lakhs<br />

B. Industry set up etc:<br />

i) Mat producti<strong>on</strong> unit: Rs 2.70 lakhs<br />

ii) Press and accessories Rs 251.88 lakhs<br />

iii) Drying lines: Rs 38.50 lakhs<br />

iv) Miscellaneous assets: Rs 32.50 lakhs<br />

v) Pre-operative and<br />

miscellaneous expenses: Rs 9.50 lakhs<br />

vi) Working Capital margin: Rs 50.00 lakhs<br />

Sub- Total: Rs 385.08 lakhs<br />

Total Project Cost: Rs 560.02 lakhs<br />

Say Rs 560.00 lakhs


39<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Of the total amount of Rs 560.00 lakhs, the project is framed such that Rs 65.00 lakhs<br />

will come as equity share from joint venture partner.<br />

Hence, the total amount applied under NLCPR from DONER is<br />

Rs 560.00 lakhs – Rs 65.00 lakhs<br />

i.e. Rs 495.00 lakhs <strong>on</strong>ly<br />

7. Status of readiness, Implementati<strong>on</strong> schedule and phasing of expenditure:<br />

Site proposed is within the Bamboo Industries Complex, Sairang, Aizawl District in<br />

<strong>Mizoram</strong>. The implementing agency is already in possessi<strong>on</strong> of the site and land acquisiti<strong>on</strong><br />

is not necessary. Hence, the site is available already for implementati<strong>on</strong> of the project as so<strong>on</strong><br />

as sancti<strong>on</strong> is accorded.<br />

The project is scheduled to be completed within a period of 2 years (24 m<strong>on</strong>ths) from<br />

the date of sancti<strong>on</strong>. Phasing of expenditure is given below in the table:<br />

Rs Lakhs<br />

Sl.<br />

Year 1 Year 2<br />

No. Items<br />

Qtr 1 Qtrs 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Total<br />

A Infrastructure Dev<br />

1 Approach road 3.5 4 9 16.5<br />

2 Water supply 2 3 2.8 7.8<br />

3 Factory building 26 38 27.9 12 5 8 116.88<br />

4 Workers shed 2.5 4.7 7.2<br />

5 Chowkider shed 1 1.3 2.3<br />

5 Utilities building 1.1 1 2.1<br />

6 Mat prod. Bldg. 3 4 6.56 13.56<br />

7 Fencing 0.25 1 1.25<br />

8 Electrificati<strong>on</strong> 5.8 1.55 7.35<br />

B Industry set up<br />

1 Mat prod. Mach 2 0 0 0.7 2.7<br />

2 Hyd. Hot press 125 10.5 22 70 24.38 251.88<br />

3 Drying lines 9.5 19.25 9.75 38.5<br />

4 Misc. assets 8.2 16 8.3 32.5<br />

5 P.o. exp. & misc. 0.5 1.2 1.3 1.3 1.3 1.2 1.2 1.5 9.5<br />

6 W/C margin 50 50<br />

Total 6.25 37.7 193 59.4 18.6 30.5 113 101.9 560.02<br />

8. Implementing agency:<br />

The proposed implementing Agency is the Bamboo Development Agency, a society<br />

formed by the Government of <strong>Mizoram</strong> for all round development of bamboo sector in the<br />

State. The Agency is chaired by Chief Secretary of the State and draws technically capable<br />

employees from the State Government Departments.<br />

The Agency is undertaking various projects and activities <strong>on</strong> bamboo sector<br />

development and is <strong>on</strong>e of the leading instituti<strong>on</strong>s <strong>on</strong> this field in India.


40<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

9. Objectives of the project:<br />

The project is to utilise huge available bamboo resources which are presently<br />

unexploited for ec<strong>on</strong>omical gains with projected results of:<br />

- Generati<strong>on</strong> of 114 direct employees.<br />

- Creati<strong>on</strong> of indirect employment to the tune of Rs 400.00 lakhs.<br />

- Profit generati<strong>on</strong> of more than Rs 200.00 lakhs per year.<br />

- Providing alternative livelihood to jhum cultivators.<br />

- Check in decrease of forest cover by providing timber substitute.<br />

- Pilot for bamboo sector development.<br />

10. Financial analysis:<br />

Some points regarding financial analysis are:<br />

- Net sales realisati<strong>on</strong> of Rs 1836.00 lakhs at 100 % capacity utilisati<strong>on</strong>.<br />

- Profit generated is estimated at Rs 187.61 lakhs in the first year, Rs 198.30<br />

lakhs in the sec<strong>on</strong>d year and Rs 218.38 lakhs <strong>on</strong> the third year.<br />

- Break even point at 35.39 %<br />

- Pay Back Period is 2 years and 4 m<strong>on</strong>ths.<br />

11. Sustainability of the project:<br />

The project is proposed to be under the management of private partner of the joint<br />

venture and the profit share and lease rent projected to come to the implementing<br />

agency will be applied for furtherance of the purpose of the project. As such, the<br />

project is estimated to be sustainable by itself.<br />

ANNEXURE – II<br />

COMPREHENSIVE STATE ACTION PLAN ON BAMBOO FLOWERING AND<br />

FAMINE COMBAT SCHEME IN MIZORAM<br />

1. M/s Bnei Menashe Industries,<br />

Prop : J.Laltlanmawia, Zuangtui.<br />

2. M/s LMT Bamboo Industry,<br />

Prop : Kaplianzela, Zuangtui.<br />

LIST OF FIRMS SEEKING N.E.C ASSISTANCE<br />

3. M/s Ebenezer Bamboo Industries,<br />

Prop : K.Romawia, Ramhlun North.<br />

4. M/s <strong>Mizoram</strong> Bamboo Industry, Industrial Estate, Zuangtui.<br />

Prop : R.Lalhmingliana<br />

5. M/s C.R.Bamboo Industry, Industrial Estate, Zuangtui,<br />

Prop : C.Lalrampari.


41<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

6. M/s Tetei Bamboo Works,<br />

Prop : Laldingliana Sailo, Ramhlun North, Aizawl.<br />

7. M/s Aar<strong>on</strong> Bamboo Industry,<br />

Prop : A.Lalduhawma, Chanmari, Aizawl.<br />

8. M/s Hlutea Bamboo Works,<br />

Prop : Vankhumi, Aizawl Venglai.<br />

9. M/s T&T Bamboo Products,<br />

Prop : Lalthantluangi, Zarkawt, Aizawl.<br />

10. M/s R.D.Bamboo Industry,<br />

Prop : Rodingliana, Zotlang, Aizawl.<br />

11. M/s Zomau Industry,<br />

Promoters : i) K.Lalthanzuia, Thakthing, Aizawl.<br />

ii) Lalmuanpuia, Bawngkawn, Aizawl.<br />

12. M/s BCA Bamboo Products,<br />

Prop : Biakchunga, Lower Zarkawt, Aizawl.<br />

13. M/s Peter Bamboo Industry,<br />

Prop : Peter Lalhmingmawia, Chawnpui, Aizawl.<br />

14. M/s Hriata Bamboo Industry,<br />

Prop : Ebenezera, Ramhlun North, Aizawl.<br />

15. M/s Azaria Bamboo Industry,<br />

Prop : Laltinkima, Hunthar, Aizawl.<br />

16. M/s Puia Bamboo Industry,<br />

Prop : Malsawmkima, Hunthar, Aizawl.<br />

17. M/s Rina Bamboo Industry,<br />

Prop : R.Lalrinawma, Tlangnuam, Aizawl.<br />

18. M/s H.L Bamboo Industry,<br />

Prop : Lallawmsanga, Zuangtui, Aizawl.<br />

19. M/s L.R.K Bamboo Works,<br />

Prop : Zoremsanga, Chaltlang Dawrkawn, Aizawl.<br />

20. M/s J.K. Bamboo Industry,<br />

Prop : J.Khawsiama, Zuangtui, Aizawl.<br />

21. M/s J.R Bamboo Industry,<br />

Prop : Lalrintluanga, Zuangtui, Aizawl.


42<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

22. M/s R.L. Bamboo Industry,<br />

Prop : R<strong>on</strong>ald Lalnunsanga, Chaltlang, Aizawl.<br />

23. M/s R.D.S Bamboo Industry,<br />

Prop : Ramdinsangi, Sairang.<br />

24. M/s L.C. Bamboo Industry,<br />

Prop : Lalthanliana, Industrial Estate, Zuangtui.<br />

25. M/s Jenny Bamboo Industry,<br />

Prop : Jenny Lalduhawmi Rate, Aizawl Venglai.<br />

ANNEXURE – III<br />

COMPREHENSIVE STATE ACTION PLAN ON BAMBOO FLOWERING AND<br />

FAMINE COMBAT SCHEME IN MIZORAM<br />

RESUME OF PEBBLE MAT INDUSTRY SUBMITTED TO MoRD<br />

Bamboo pebble Mats:<br />

Bamboo pebble mats have been made and produced in China and is very popular in<br />

China, H<strong>on</strong>g K<strong>on</strong>g etc. under the name ‘Bamboo Mahj<strong>on</strong>g Mat’. It has been providing<br />

sustained income for rural people in China from regenerative bamboo resources.<br />

Various uses of Bamboo pebble mat include-<br />

i) Seat of chairs, benches etc.<br />

ii) Cover for seat of chairs, benches etc.<br />

iii) Cover of seats of various vehicles.<br />

iv) Cover for table top and side tables.<br />

v) Sleeping mattresses.<br />

vi) Carrying bags of different sizes and designs.<br />

vii) Partiti<strong>on</strong> walls, curtains and other wall hanging.<br />

Producti<strong>on</strong> method:<br />

i) Bamboo cut at internodes, and internodes porti<strong>on</strong> are <strong>on</strong>ly used with machines.<br />

ii) Bamboo splitting horiz<strong>on</strong>tal into two halves manually.<br />

iii) Bamboo sticks of required cross secti<strong>on</strong>s made with three sides <str<strong>on</strong>g>plan</str<strong>on</strong>g>ning – using<br />

machines.<br />

iv) Bamboo sticks are cut into required length making bamboo pebbles – using machines.<br />

v) Holes drilling d<strong>on</strong>e <strong>on</strong> the bamboo pebbles – using machines<br />

vi) The bamboo pebbles are processed for wet grinding with st<strong>on</strong>e powder and sand -<br />

using machines.<br />

vii) The pebbles are boiled/bleached with Sodium Hydroxide for some minutes and left<br />

for drying – solar drying/kiln drying.<br />

viii) Then grounded again with machines for smooth finishes.


43<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ix). Tied together with nyl<strong>on</strong> threads to produce any required products like car seat<br />

covers, bed covers, pillows, hand bags, chairs, seat covers, table mats etc. and ready<br />

for market.<br />

The success story:<br />

The example of Ingga village in Huan’an county of Fujian Province of PR China<br />

which is a village with a populati<strong>on</strong> of 1296 ( as <strong>on</strong> 2000) is really interesting as below:<br />

In 1990, the inhabitants were very poor without proper income generati<strong>on</strong>. But the<br />

year 2000:<br />

= The village have 100 mahj<strong>on</strong>g mat homestead factory, profit from these tiny<br />

industries results in rapid development.<br />

= The village built a new model village with c<strong>on</strong>crete structures and well managed and<br />

landscaped village centre, which was completed in 1998.<br />

= Value of raw bamboo increased 4-5 times higher.<br />

= Revenue generati<strong>on</strong> of the village in the year 1999 was valued at equivalent of Rs<br />

18.00 crores.<br />

= Already invest Rs 1.80 crore for c<strong>on</strong>structi<strong>on</strong> of new model village and road from the<br />

tax and duties paid from the income of these tiny bamboo industries.<br />

= Of the total 293 households, 280 families have teleph<strong>on</strong>e c<strong>on</strong>necti<strong>on</strong> and 50 % of the<br />

people have mobile teleph<strong>on</strong>es of their own.<br />

= The bamboo reserves around the village are well managed and maintained.<br />

The main objectives of the project:<br />

i) Improve socio-ec<strong>on</strong>omy of the rural poor in Aizawl District, <strong>Mizoram</strong> by providing<br />

sustained income from bamboo resources.<br />

ii) Alternative to ‘jhum system of cultivati<strong>on</strong>’ by rural industrial activities.<br />

iii) Provide self employment for the rural poor.<br />

iv) Impart necessary knowledge and skill to target group.<br />

Project Strategy:<br />

i) Mother Unit -<br />

As this kind of industry is new to India for training, sample producti<strong>on</strong>, product<br />

promoti<strong>on</strong>, pilot project - industry will be set up at Industrial Estate, Zuangtui, Aizawl<br />

using machineries imported from China.<br />

ii) Training -<br />

Necessary skills and knowledge will be imparted to target group through training at<br />

the premise of the pilot project.<br />

iii) Target area -<br />

The target villages are Seling, Sesawng and Keifang within Thingsulthliah RD Block.<br />

iv) 9 numbers of Self Help Rural Industrial Group -<br />

From the target area, Self Help Rural Industrial Group (SHRIG) will be formed. Each<br />

SHRI Group will be formed by 10 ~ 15 families.


44<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

v) Technology adaptati<strong>on</strong> -<br />

Domestic machine manufacturers will be engaged to produce machineries<br />

indigenously using <strong>on</strong>e set of imported machineries as prototype.<br />

vi) The Mother Unit as Revenue Generating <strong>on</strong>e -<br />

The pilot unit, though main focus <strong>on</strong> training will also be used for sample producti<strong>on</strong><br />

and limited producti<strong>on</strong>. The product form this unit will be used for product promoti<strong>on</strong><br />

as well as revenue generati<strong>on</strong>. The unit will be self sustained up to certain level in the<br />

initial 3 years and from the fourth year at the margin of self sustain.<br />

vii) The Rural Industrial units-<br />

Once, necessary training are imparted, Self Help Rural Industrial Groups are formed<br />

and indigenous machines are available at comfortable price, the actual field <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> of<br />

the project will begin. Each Self Help Rural Industrial Group will set up <strong>on</strong>e unit each<br />

jointly from funds of SGSY, State/Bamboo Development Agency, their own<br />

c<strong>on</strong>tributi<strong>on</strong> and credit sources.<br />

Project Period:<br />

The project is scheduled for three years starting from the date of sancti<strong>on</strong> / release of<br />

fund by the authority. The first two years are more <strong>on</strong> the mother unit (m.u.) and later<br />

part of sec<strong>on</strong>d year and third year is for setting up of rural units(r.u.) by the Self Help<br />

Rural Industrial Groups.<br />

Thingsulthliah Rural Development Block:<br />

The Project is prepared based <strong>on</strong> Thingsulthliah Rural Development Block of Aizawl<br />

District in the State of <strong>Mizoram</strong>. Selecti<strong>on</strong> of this RD block is d<strong>on</strong>e <strong>on</strong> criterias like<br />

socio-ec<strong>on</strong>omic c<strong>on</strong>diti<strong>on</strong>, literacy level, potential work force, easy access from the<br />

district headquarters.<br />

The mother unit is proposed however, to be set up within the headquarters of the<br />

District at Industrial Estate, Zuangtui, Aizawl in the vicinity of offices of<br />

implementing agencies - Aizawl DRDA and Bamboo Development Agency -<br />

<strong>Mizoram</strong>.<br />

Implementing Agency:<br />

Bamboo Development Agency, <strong>Mizoram</strong> (Society of Govt. of <strong>Mizoram</strong>)<br />

and the District Rural Development Agency, Aizawl District, Aizawl, <strong>Mizoram</strong>.<br />

Raw Material Supply:<br />

Bamboo:<br />

Bamboo is plentifully available everywhere in the whole of the State naturally<br />

growing wild in the forest.<br />

Nyl<strong>on</strong> Thread & plastic binders:<br />

Nyl<strong>on</strong> thread is used for stitching and binding together the bamboo pebbles produced.<br />

Nyl<strong>on</strong> bands are used in some products for band-binders as intermediates in stitching the<br />

bamboo pebble. These two materials of different sizes and qualities are abundantly available<br />

in local and other domestic market.<br />

The estimated cost is Rs 391.44 lakhs


45<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

PROJECT COST<br />

SHRIGs 9 groups<br />

No. per group 10 ~ 12 families<br />

Training 100 pers<strong>on</strong>s<br />

Mother Unit<br />

Training<br />

CASH OUTFLOWS<br />

Projects Items Sub-amount<br />

Rural Industries 9 nos<br />

Sheds etc 1,12,000.00<br />

Plant & machineries 1,700,000.00<br />

Sample Producti<strong>on</strong> 2,550,000.00<br />

Sales promoti<strong>on</strong> 800,000.00<br />

Miscellaneous 550,000.00<br />

Technology adapt 150,000.00<br />

Sub-total 7,870,000.00<br />

Trainer’s Training 420,000.00<br />

Trainees’ stipend 300,000.00<br />

Training materials 2,300,000.00<br />

Trainers renumerati<strong>on</strong> 624,000.00<br />

Sub-total 3,644,000.00<br />

Sheds etc. 1,520,000.00<br />

Plant & machineries 900,000.00<br />

Pre-op. Expenses 250,000.00<br />

Working cap. Margin 330,000.00<br />

Sub-total 3,000,000.00<br />

Amount in<br />

Rupees<br />

7,870,000.00<br />

3,644,000.00<br />

3,000,000.00<br />

For 9 units 27,000,000.00 27,000,000.00<br />

Cash Reserves after 3 rd year in Mother unit 630,000.00<br />

Total Out Flows 39,144,000.00<br />

CASH IN FLOWS<br />

Sources Amount in Rupees<br />

Fund from SGSY (Special Project) – MoRD 19,101,000.00<br />

State Share & public c<strong>on</strong>tributi<strong>on</strong> 25% 9,786,000.00<br />

Credit comp<strong>on</strong>ents 8,127,000,00<br />

Sale of sample products 2,130,000.00<br />

Total 39,144,000.00<br />

DISTRIBUTION OF ABOVE CASH IN FLOWS<br />

Sources Mother Unit Rural Industries (9Nos) Total<br />

Grant from SGSY 7,671,000.00 11,430,000.00 19,101,000.00<br />

State Sh/c<strong>on</strong>tr. 2,343,000.00 7,443,000.00 9,786,000.00<br />

Credit comp<strong>on</strong>ent - 8,127,000.00 8,127,000.00<br />

Sales 2,130,000.00 - 2,130,000.00<br />

Total 12,144,000.00 27,000,000.00 39,144,000.00


46<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ANNEXTURE – IV<br />

COMPREHENSIVE STATE ACTION PLAN ON BAMBOO FLOWERING AND<br />

FAMINE COMBAT SCHEME IN MIZORAM<br />

PROPOSED PROJECT SUBMITTED TO GOVERNMENT OF INDIA<br />

1. PROJECT NAME : Project for setting up Bamboo Processing SSI<br />

Units in <strong>Mizoram</strong><br />

2. PROJECT COVERAGE : - The entire State of <strong>Mizoram</strong>.<br />

: - Suitable locati<strong>on</strong> for SSI units will be selected <strong>on</strong><br />

the basis of massive presence of Bamboo (of<br />

melocana Baccifera specie) and <strong>on</strong> the basis of<br />

availability of road c<strong>on</strong>nectivity and power.<br />

3. PROJECT OBJECTIVES : - Immediate utilizati<strong>on</strong> of the specie of bamboo<br />

- Providing gainful employment to the people of rural<br />

<strong>Mizoram</strong>.<br />

4. PROJECT BRIEF : - 200 villages, c<strong>on</strong>nected by road and power, will be<br />

identified for setting up 1 (<strong>on</strong>e) SSI unit in each<br />

such Villages.<br />

- Selecti<strong>on</strong> of village will be d<strong>on</strong>e <strong>on</strong> the basis of said<br />

c<strong>on</strong>nectivities.<br />

- Further selecti<strong>on</strong> of 200 entrepreneurs, capable of<br />

investing at least 10% of the project cost will be<br />

made.<br />

- Each selected entrepreneur will be provided with a<br />

set of machines for producing bamboo sticks of 1.00<br />

mm to 3.00 mm thickness.<br />

- Raw material will be sourced by the entrepreneurs from<br />

local workers/ farmers <strong>on</strong>ly from the bamboo forest<br />

areas of their respective Village Councils. No<br />

commercializati<strong>on</strong> of this particular operati<strong>on</strong> will be<br />

permissible.<br />

- Collecti<strong>on</strong> of bamboo will be d<strong>on</strong>e in such a manner that<br />

thicker porti<strong>on</strong> is sold by entrepreneurs to M/s MVBP Ltd.<br />

and thinner porti<strong>on</strong> utilized in their own factory for<br />

stick making.<br />

- Finished sticks will be purchased at the<br />

entrepreneurs’ doorsteps by M/s <strong>Mizoram</strong> Venus<br />

Bamboo Products Ltd., a Joint Venture (JV) unit of<br />

<strong>Mizoram</strong> Bamboo Development Agency and dried<br />

and further processed in its own unit and will be<br />

marketed by this JV Unit.<br />

o This will save the entrepreneurs from the<br />

problem of stocking, packaging, market hunting,<br />

transport etc.


47<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

5. EACH UNIT COST : RS. 10.00 LAKHS.<br />

6. PROPOSED UNITS TO BE : 200 (TWO HUNDRED)<br />

SET UP<br />

o Large market share of such stick (for incense<br />

stick making, flowers pros and decorati<strong>on</strong>,<br />

barbeque sticks, chick – type screen, thin<br />

seethrough screens, bamboo broom stick etc.) is<br />

available in India and abroad. This JV Unit of<br />

BDA has EOU status and marketing in India and<br />

a broad is not expected to pose any problem.<br />

- Each Unit will provide direct employment to 30<br />

pers<strong>on</strong>s. It will also generate indirect employments.<br />

- The entire Project is expected to generate 6000<br />

direct full-time employments.<br />

- The unit is easy to set up, has low investment,<br />

simple technology, low maintenance cost, low<br />

gestati<strong>on</strong> period of 3-4 m<strong>on</strong>ths, and provides high<br />

returns.<br />

7. TOTAL PROJECT COST ; RS. 2000.00 LAKHS<br />

(RS. 10.00 LAKHS X 200 UNITS)<br />

8. GESTATION PERIOD : 3 TO 4 MONTHS<br />

9. FINANCING :1. Loan from NSTFDC - 25% = Rs.500.00 lakhs.<br />

2. GIA of GOI Bamboo -50% = Rs. 1000.00lakhs.<br />

Technology Missi<strong>on</strong> To entrepreneurs through <strong>Mizoram</strong><br />

Industrial Development<br />

Corporati<strong>on</strong> (ZIDCO)<br />

3. Entrepreneurs’ c<strong>on</strong>tributi<strong>on</strong>:<br />

i) Central Capital Investment - 15%<br />

= Rs.300.00 Lakhs<br />

ii) Direct C<strong>on</strong>tributi<strong>on</strong> by Entrepreneurs - 10%<br />

= Rs.200.00 Lakhs<br />

TOTAL - 100% = Rs. 2000.00Lakhs<br />

10. INTEREST : - As all Scheduled Tribe entrepreneurs will be<br />

involved, interest rate applicable may commensurate<br />

with the interest rate applicable to loans issued by<br />

NSTFDC and not higher.<br />

11. REPAYMENT PERIOD OF : 10 years with a grace period of 1 year from<br />

TERM LOAN sancti<strong>on</strong> of the project.<br />

12. SPECIAL ARRANGEMENT: - Bamboo Development Agency of <strong>Mizoram</strong> will<br />

prepare DPR and do the project appraisal.


48<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

- Collateral security for NSTFDC loan will be<br />

provided by the State Government in the form of<br />

State Guarantee.<br />

- Special single-window clearance will be instituted<br />

by the State Government for:<br />

• Selecti<strong>on</strong> of entrepreneurs.<br />

• Power/ water c<strong>on</strong>necti<strong>on</strong>.<br />

• NOC from State Polluti<strong>on</strong> C<strong>on</strong>trol Board.<br />

• Obtaining State Level App-roval Committee’s<br />

recommendati<strong>on</strong> for Central Capital Investment<br />

Subsidy.<br />

13. IMPLEMENTING AGENCY: 1. C<strong>on</strong>cerned Ministries of Government of India.<br />

2. NSTFDC/ZIDCO/Nati<strong>on</strong>alised Bank.<br />

14. EXECUTING AGENCY : 1. BDA<br />

M/s MVBP Ltd. (JV of Gov’t. of <strong>Mizoram</strong>).<br />

15. MONITORING AGENCY : 1. C<strong>on</strong>cerned Ministries / NSTFDC.<br />

2. Industries Department, Gov’t of <strong>Mizoram</strong>.<br />

REQUIREMENT OF MACHINERIES AND TOTAL COST-STRUCTURE<br />

SL. MACHINE AND UNIT NO. OF TOTAL<br />

NO. MODEL NUMBER COST UNITS COST<br />

A. CAPITAL COST:<br />

1. BAMBOO SPLITTING MACHINE 2,07,460.00 200 4,14,92,000.00<br />

2. BAMBOO SEWING MACHINE. 58,190.00 200 1,16,38,000.00<br />

3. PALLING TABLE (4 CUTTER TYPE) 5,74,310.00 200 SETS 11,48,62,000.00<br />

= 2 MACHINES PER UNIT.<br />

4. WORKSHED, ELECTRIFICATION 1,15,540.00 200 2,31,08,000.00<br />

RS.192.00 /SQ.FT. (30’X20’)<br />

B. WORKING CAPITAL:<br />

5. POWER, FOREST, ROYALTY, 39,500.00 200 79,00,000.00<br />

WATER ETC.<br />

6. PREPARATION OF DPR - - 10,00,000.00<br />

TOTAL : 10,00,000.00 = 20,00,00,000.00<br />

NOTES:<br />

1. Electric motors, c<strong>on</strong>trol panels and <strong>on</strong>e set of spare blades will be provided to all the<br />

above machines at no extra cost.<br />

2. The cost are inclusive of freight charges, handling and port charges, insurance and<br />

inland transportati<strong>on</strong>.<br />

3. Delivery schedule : 3-4 m<strong>on</strong>ths from receipt of orders and irrevocable L.C.<br />

4. Rates are subject to exchange rate fluctuati<strong>on</strong>s.


49<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

MODALITIES ACQUIRING MACHINERIES AND PORVIDING MAINTENANCE<br />

ACQUISITION OF MACHINERIES:<br />

<strong>Mizoram</strong> Government has already set up a JV Industrial Unit at Sairang near Aizawl<br />

for processing of Bamboo with product range of Bamboo boards, bamboo doors and shutters,<br />

panel and flooring.<br />

This JV unit has an EOU status with a firm tie-up with ISO-9002 certified machine<br />

manufacturer, namely, M/s Boarke Machine Company of Taiwan.<br />

This JV, as an EOU, has an advantage of sourcing bamboo-processing machineries at<br />

factory price of the manufacturers without employing any agent and without custom duties as<br />

permissible under Exim Policy.<br />

MAINTENANCE OF MACHINERIES:<br />

The JV unit has spare capacity in 2 of their machineries for grinding of cutters and<br />

blades, which need c<strong>on</strong>stant maintenance. 200 SSI units of this Project can utilise this spare<br />

capacity of the JV Unit at minimal service charges.<br />

MARKETING:<br />

As stated briefly in the foregoing paragraph, there is a ready market for bamboo stick<br />

both in domestic and internati<strong>on</strong>al markets.<br />

Maximum demand is for manufacture of Agarbatti (incense/ joystick) and for fire<br />

crackers industry.<br />

Internati<strong>on</strong>al market is for flower props, flower decorati<strong>on</strong>, incense stick, barbecue<br />

sticks etc.<br />

A. RETURN PER UNIT:<br />

ECONOMICAL ASPECT<br />

MONTHLY SALE<br />

A) SALE OF LOWER PORTION = 4” length x 360 nos. x Rs. 3 per day for 23<br />

bamboo unfit for this working days.<br />

Operati<strong>on</strong>.<br />

RS. = 360 NOS. X 3/- X 23 DAYS = RS. 24,830/-<br />

B) SALE OF FINISHED STICKS<br />

M/s MVBP Ltd. @ Rs.20/- per kg.<br />

Rs. = 600 kgs. X 10/- x 23 days = Rs. 1,38,000/-<br />

TOTAL = RS. 1,62,840/-<br />

N.B.: Waste/ By-product not usable till gasificati<strong>on</strong> <str<strong>on</strong>g>plan</str<strong>on</strong>g>t is dovetailed.<br />

GROSS ANNUAL RETURNS<br />

RS. 1,62,840 X 12 = RS. 19,54,800/-


50<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

B. REPAYMENT PER ANNUM:<br />

a) Payment of principal amount Rs. 3,00,000/- = Rs. 30,000/-<br />

within 10 years at the rate Rs. 30,000/- per year.<br />

b) Payment of interest of 5% (Rs. 75,000/-) = Rs. 7,500/-<br />

at the rate of Rs. 7,500/- per annum.<br />

Repayment per annum = Rs. 37,500/-<br />

POLICY ASPECT<br />

This Project c<strong>on</strong>forms to the State New Industrial Policy of 2000 and State Bamboo<br />

policy. There is a vast annual surplus of 32.09 lakhs t<strong>on</strong> of Bamboo in the State and the total<br />

requirement of these 200 units will c<strong>on</strong>sume a total of 79488 MT which is hardly 3%<br />

utilisati<strong>on</strong> of the surplus.<br />

CAPTIVE POWER<br />

This is calculated at 60% capacity utilisati<strong>on</strong>. If this capacity is to be augmented, a<br />

captive power set has to be dovetailed with each unit. Such captive set of 15 KVA at the<br />

additi<strong>on</strong>al cost of Rs. 50,000/- will be adequate.


51<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

RURAL DEVELOPMENT<br />

1. PROJECT TITLE : BAMBOO FLOWERING AND FAMINE<br />

COMBAT SCHEME (BAFFACOS)<br />

2. PROJECT LOCATION : MIZORAM, INDIA<br />

3. OBJECTIVE :<br />

4. PROJECT PERIOD : 5 (Five) years.<br />

5. TOTAL PROJECT COST: Rs. 49.83 Crores<br />

To harvest bamboo before flowering.<br />

To generate income by providing employment.<br />

To enable easy movement of essential<br />

commodities to inaccessible areas.<br />

To create asset in the form of road<br />

communicati<strong>on</strong>.<br />

6. APPLICANT INFORMATION<br />

Applicati<strong>on</strong> Organisati<strong>on</strong> : Rural Development Department represented by<br />

The Director,<br />

Rural Development Department<br />

Government of <strong>Mizoram</strong>,<br />

Aizawl : 796001<br />

<strong>Mizoram</strong>, India.<br />

Teleph<strong>on</strong>e numbers of the : 0389 – 2341275 (O) 0389 – 2316959 (R)<br />

Director 0389 – 2341033 (O)<br />

Fax : 0389 – 2340978 (O)<br />

7. C<strong>on</strong>tact pers<strong>on</strong>s :<br />

1. LALENGMAWIA, Director 2. LALNUNHLUA, Asst. Director,<br />

Rural Development Department Rural Development Department<br />

Govt. of <strong>Mizoram</strong> Govt. of <strong>Mizoram</strong><br />

Ph : 0389-2341257, 2341033 (O) (M) 9436141853<br />

3. LALBIAKSANGI, Deputy Director<br />

Rural Development Department<br />

Govt. of <strong>Mizoram</strong><br />

Ph : 0389 – 2341255 (O)<br />

0389 – 2348575 (R)<br />

9436141462 (M)


52<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

CONCEPT PAPER ON BAFFACOS<br />

C<strong>on</strong>text & Background:<br />

The State of <strong>Mizoram</strong> has some uniqueness in comparis<strong>on</strong> with other States. The<br />

State has abundant natural bamboo resources. Bamboo forest cover 12.54 milli<strong>on</strong> hectares in<br />

the State (i.e. 57.8% of the total area). Their distributi<strong>on</strong> is limited above 1500 m and bamboo<br />

are less comm<strong>on</strong> in the more mountains eastern part of the State. Bamboo grow as<br />

understorey <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts in deciduous and evergreen forests; in pure stand al<strong>on</strong>g river banks; in and<br />

around villages and as dominant sec<strong>on</strong>dary vegetati<strong>on</strong> <strong>on</strong> aband<strong>on</strong>ed jhum lands. Some of the<br />

bamboo in <strong>Mizoram</strong> are clump-forming and some species have spreading rhizomes and<br />

widely spaced culms. The spreading species are more comm<strong>on</strong>ly found in the cooler, higher<br />

parts of the State, with the excepti<strong>on</strong> of Melocanna Baccifera which is a major comp<strong>on</strong>ent of<br />

sec<strong>on</strong>dary vegetati<strong>on</strong> <strong>on</strong> previously jhummed lands in tropical areas. This is due to its<br />

vigorous spreading subterranean rhizome system from which it is able to regenerate rapidly<br />

after cutting and burning. The clump forming bamboo are mostly distributed in the subtropical<br />

regi<strong>on</strong>s, with the excepti<strong>on</strong> of Dendrocalamus Sikkimensis which grows in the Blue<br />

Mountain range with the excepti<strong>on</strong> of Melocanna Baccifera most of the bamboo are limited<br />

to steep gradients and relatively in accessible locati<strong>on</strong>s.<br />

Twenty species of bamboo grow in <strong>Mizoram</strong>. Melocanna Baccifera is the<br />

predominant species and occupies 95% of the bamboo afforested land in the State. In<br />

<strong>Mizoram</strong>, Melecanna Baccifera and Bambusa Tulda both have life cycle of 48 years. The two<br />

species do not flower together at the same time. Bambusa Tulda flowers 18 years with a few<br />

<str<strong>on</strong>g>plan</str<strong>on</strong>g>ts flowering in the first and third years and the vast majority flowering in the sec<strong>on</strong>d<br />

year. Flowering starts from the south of the State and proceeds northwards. This very short<br />

time span present two major problems.<br />

The entire standing stock of culms is eliminated within two to three years. Proceeding<br />

industries and local weavers loose their sources of raw materials very rapidly and must find<br />

alternative sources to remain in business. Envir<strong>on</strong>mental degradati<strong>on</strong> and erosi<strong>on</strong> increases<br />

due to the loss of vegetati<strong>on</strong> cover.<br />

The fruits of bamboo are edible and understood to c<strong>on</strong>tain high grade quality protein<br />

resulting in a rapid explosi<strong>on</strong> of the rodent populati<strong>on</strong>; whose number are related to the<br />

availability of food. The rodent not <strong>on</strong>ly devastate the naturally regenerating seeds and<br />

seedlings and thereby reduce the regenerati<strong>on</strong> rate, but also destroy other crops and stored<br />

grains resulting in severe famine. The famines caused by the flowering of Melocanna<br />

Baccifera are known as “MAUTAM FAMINE”.<br />

These occurred in <strong>Mizoram</strong> in 1862, 1911 and 1959. In the aforesaid famines, lots of<br />

human lives had been lost. Though there are no statistical records to be shown, the severity of<br />

the famine is heard from older generati<strong>on</strong>. The peak flowering of the said bamboo starts in<br />

the south of Bangladesh and proceeds northwards in a wave lasting a couple of years. The<br />

next flowering for this species is forecast during 2005-2008 and it is expected that much of<br />

the entire stock of Melacanna Baccifera in the Northeast of India will be devastated.<br />

As such, immediate steps have to be taken in order to mitigate this foreseeable severe<br />

famine. There is presently no known method of preventing flowering of bamboo. It is known<br />

that heavy fertilisati<strong>on</strong> and intensive management practices can sometimes reduce mortality<br />

of <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts after setting seeds, but these practices would need to be adopted over the whole<br />

area. This is impracticable and carries no guarantee of success.


53<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The Department/Government is in the opini<strong>on</strong> that flowering of bamboo can be<br />

minimised by harvesting most of the bamboo leaving 5% for natural regenerati<strong>on</strong> and sell it<br />

off for earning Government revenue. This will c<strong>on</strong>trol the sudden explosi<strong>on</strong> of populati<strong>on</strong> of<br />

rodent due to flowering of bamboo in terms of thousands and thousands of rodent within a<br />

short span of time which the State has experienced at an interval of every 48 years since 1815<br />

causing a severe famines known as ‘MAUTAM FAMINE’ which cost lots of human lives<br />

and suffering.<br />

Objective:<br />

The practical challenge is not merely to anticipate a famine before it occurs, a<br />

daunting task by itself, but to locate it spatially and socially so as to intervene <strong>on</strong> behalf of the<br />

people who most needed protecti<strong>on</strong>. With this main objective in view, it is propose to<br />

mitigate the expected famine due to the flowering of bamboo. The flowering of bamboo can<br />

be minimised by harvesting most of the bamboo before it flowers. Sec<strong>on</strong>dly, expected famine<br />

can be combated by improvement of existing roads and c<strong>on</strong>structi<strong>on</strong> of new roads for supply<br />

of essential commodities to the most interior places of the State.<br />

Rural Development Department had c<strong>on</strong>structed c<strong>on</strong>nectivity road under schemes<br />

likes EAS, JRY, SGRY and BADP. Due to heavy rain during m<strong>on</strong>so<strong>on</strong> period, most of the<br />

roads which were c<strong>on</strong>structed have been blocked by landslide, subsidence etc. As there is no<br />

proper maintenance, these roads are not fit for plying of vehicles for supplying essential<br />

commodities and harvesting the bamboo. Hence, the aforementi<strong>on</strong>ed roads will be the key<br />

factors for mitigating the expected famine. At some interior villages new c<strong>on</strong>structi<strong>on</strong> of<br />

Jeepable road will be essential for supply of foodgrains as there are no existing road at<br />

present. Such roads will be an asset which will be very useful by the local people for<br />

transportati<strong>on</strong> of their agricultural and horticultural products.<br />

Problem, Issues and Proposed Soluti<strong>on</strong>s<br />

As menti<strong>on</strong>ed before, flowering of bamboo occurs at a periodic interval of 48 – 50<br />

years in <strong>Mizoram</strong>. From the past experience bamboo flowers follows severe famine which is<br />

known as ‘Mautam’ after the flowering of Melocanna Baccifera. As per record, Melocanna<br />

Baccifera flowered in 1815, 1863, 1911, 1959 while the next expected flowering cycle is<br />

during 2005-2008. Gregarious flowering and seeding of bamboo causes an increase in rodent<br />

populati<strong>on</strong>. The massive rodent populati<strong>on</strong> feeds <strong>on</strong> the bamboo flowers and other standing<br />

agricultural crops, causing its destructi<strong>on</strong> followed by acute scarcity of food which results in<br />

lost of lives and sufferings.<br />

Bamboo being a multipurpose, eco-friendly crop abundantly available, yet an underutilised<br />

natural resource, needs to be managed and exploited for sustainable use. Bamboo is<br />

c<strong>on</strong>ceived as a thrust area in the industrial development of <strong>Mizoram</strong> for the ec<strong>on</strong>omic and<br />

ecological security of the people. This precious resources needs to be fully tapped as an<br />

industrial raw materials, as substitute for wood in rural/urban housing, engineering works,<br />

handicrafts, furniture and value additi<strong>on</strong> through export. Undoubtedly bamboo can<br />

revoluti<strong>on</strong>ise the ec<strong>on</strong>omy of the State ensuring employment opportunities to a large number<br />

of people.<br />

It is now proposed to harvest most of the bamboo within <strong>Mizoram</strong> before it flowers.<br />

Harvesting of bamboo could be well achieved by improving the existing roads and<br />

c<strong>on</strong>structing new roads where there are no existing roads.


54<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

As per informati<strong>on</strong> collected from Food & Civil Supplies Department, there are many<br />

routes where foodgrains are carried by head-load under difficult terrain. Hence, these villages<br />

are targeted so that specific food deficit problems does not arise during the five years as a<br />

result of this phenomen<strong>on</strong>.<br />

Project Beneficiaries<br />

The people living in the selected villages where roads are proposed to be c<strong>on</strong>structed<br />

in particular and in general the objective of this project is to minimise the flowering of<br />

bamboo so that the rodent populati<strong>on</strong> explosi<strong>on</strong> is mitigated.<br />

Improvement of existing roads, c<strong>on</strong>structi<strong>on</strong> of new c<strong>on</strong>nectivity roads for harvesting<br />

bamboo at different localities will generate employment avenues for the local people and this<br />

will in turn enhance their buying power in times of distress.<br />

C<strong>on</strong>structi<strong>on</strong> of c<strong>on</strong>nectivity roads for harvesting bamboo will be an assets. After it is<br />

being used for the said purpose, it could well be used for transportati<strong>on</strong> of agricultural,<br />

horticultural products etc. of the villages covered so that they will have more buying power.<br />

Project Strategy and Management Arrangement<br />

The Department have 22 RD Blocks and 1 (<strong>on</strong>e) Additi<strong>on</strong>al RD Blocks. These are<br />

headed by Block Development Officers (BDO) (Group – A) bel<strong>on</strong>ging to the <strong>Mizoram</strong> Civil<br />

Service (MCS). He is assisted by technical pers<strong>on</strong>nel who look after all civil works as well as<br />

clerical staff. All developmental works under various rural development schemes are taken<br />

up through them.<br />

Whereas there is c<strong>on</strong>centrati<strong>on</strong> of bamboo in almost all the areas, it is nil in the eastern<br />

side bordering Myanmar. C<strong>on</strong>sidering the hectares covered in the reported places, the<br />

Department proposes to combat the expected famine by harvesting optimum quantity of bamboo<br />

before it flower by improving/upgrading the existing roads and by c<strong>on</strong>structing new roads.<br />

The Department have therefore propose 2 (two) courses of <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>: -<br />

1) Maintenance and widening of existing roads c<strong>on</strong>structed by the Department<br />

under various schemes so as to facilitate plying of medium vehicles. These selected roads are<br />

important links for harvesting of bamboo and imperative for uninterrupted supply of essential<br />

commodities during famine. List of RD Blocks and proposed length in kilometres of such<br />

roads is given in Annexure-I.<br />

2) C<strong>on</strong>structi<strong>on</strong> of road for plying light vehicles will be essential to cover all the<br />

villages, which are yet to be c<strong>on</strong>nected so that the villagers do not necessarily die of<br />

starvati<strong>on</strong>. These propose roads are outside the purview of PMGSY. At present foodgrains is<br />

carried <strong>on</strong> head-load basis <strong>on</strong> difficult terrain and under all types of weather. List of these<br />

villages with their populati<strong>on</strong> is given in Annexure-II.<br />

The Department also proposes to have a team of selected officers to oversee the<br />

implementati<strong>on</strong> of this particular scheme. This will be headed by Commissi<strong>on</strong>er/Secretary,<br />

Rural Development Department. The team will have a number of field visits to selected sites<br />

and m<strong>on</strong>itor the progress of the project and submit report to the State M<strong>on</strong>itoring Cell of<br />

BAFFACOS.


55<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Issues To Be C<strong>on</strong>sidered<br />

All the areas proposed are community land and there will be no questi<strong>on</strong> of payment<br />

of Compensati<strong>on</strong> nor Acquisiti<strong>on</strong> of land.<br />

As pointed out in the introductory note, this project is <str<strong>on</strong>g>plan</str<strong>on</strong>g>ned so as to mitigate<br />

possible famine as a result of explosi<strong>on</strong> of rodent populati<strong>on</strong> feeding <strong>on</strong> the flowering<br />

bamboo and other standing agricultural crops.<br />

TECHNICAL CONSIDERATION<br />

1) Earthwork estimati<strong>on</strong>:<br />

The estimati<strong>on</strong> of earthwork for new c<strong>on</strong>structi<strong>on</strong> as well as for widening is<br />

calculated using 45° ground slope. As <strong>Mizoram</strong> is a hilly area, almost all the earthwork for<br />

c<strong>on</strong>structi<strong>on</strong> of roads is cutting. Moreover, the ground slope is not uniform, at some places it<br />

is very steep (more than 45°) and less steeper at other places.<br />

2) Classificati<strong>on</strong> of Soil:<br />

The type of soil is divided into 3 categories: -<br />

(a) Hard soil - 70 %<br />

(b) Soft rock - 20 %<br />

(c) Hard rock - 10 %<br />

3) Provisi<strong>on</strong> for retaining wall:<br />

The soil in <strong>Mizoram</strong> is not stable enough and also due to heavy rainfall, a large<br />

number of landslides take place every rainy seas<strong>on</strong>. Hence, provisi<strong>on</strong> for retaining wall is a<br />

must in all estimates for road c<strong>on</strong>structi<strong>on</strong>.<br />

Provisi<strong>on</strong> for two types of retaining walls is included for different cutting height<br />

resulting from n<strong>on</strong>-uniformity of ground slope.<br />

4) Provisi<strong>on</strong> for culvert:<br />

Provisi<strong>on</strong> for 2 – 3 culverts are also made c<strong>on</strong>sidering the ground reality.<br />

Means of Finance, Project Budget & Time Frame<br />

The State Level Committee <strong>on</strong> BAFFACOS c<strong>on</strong>sidered that it will not be practical<br />

nor possible to collect all the bamboo before it flowers. Though the Department have<br />

collected informati<strong>on</strong> <strong>on</strong> all bamboo c<strong>on</strong>centrated areas with their locati<strong>on</strong>, the Department<br />

have prioritized the list of places/locati<strong>on</strong> which will be easily accessible and ec<strong>on</strong>omically<br />

viable to be reached by providing maintenance and widening of the existing roads and<br />

c<strong>on</strong>structi<strong>on</strong> of new Jeepable road for free movement of essential commodities where there<br />

are no existing roads at present.<br />

The estimated project for maintenance, new c<strong>on</strong>structi<strong>on</strong> and widening of 300 Kms.,<br />

164 Kms. and 158 Kms. respectively is Rs. 49.83 crores.<br />

For maintaining of 1 Km. of road, 4719 mandays employment will be generated, for<br />

widening of road 9020 mandays will be generated and for new c<strong>on</strong>structi<strong>on</strong> of Jeepable road<br />

11610 mandays will be created @ Rs. 84/- per day (present rate).


56<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The break-up of the estimate project of Rs. 49.83 crores will be undertaken for 5 years<br />

<strong>on</strong> the following lines.<br />

2004 –2005 = 7.476 crores<br />

2005 – 2006 = 9.966 crores<br />

2006 – 2007 = 12.456 crores<br />

2007 – 2008 = 12.456 crores<br />

2008 – 2009 = 7.476 crores<br />

TOTAL = 49.830 crores<br />

Rural Development has been c<strong>on</strong>structing roads and bridges under different schemes<br />

by employing the villagers especially the BPL category. If sancti<strong>on</strong> is received, the<br />

Department proposes to involve BPL and N<strong>on</strong> – BPL families of the villagers since<br />

employment will be needed by all regardless of his stature. In some cases, mechanisati<strong>on</strong> may<br />

also be required if the proposed road to be c<strong>on</strong>structed is too far from the inhabited village.<br />

There are reported instances that some bamboo have started to bear fruits. As the<br />

flowering of bamboo is expected in 2007, there is hardly any time left to shelve this<br />

important project.<br />

ABSTRACT<br />

( NEW CONSTRUCTION OF JEEPABLE ROAD )<br />

( for 1 km.)<br />

Sl. No. Work Nos. Rate (in Rupees) Amount (in Rupees)<br />

1. Formati<strong>on</strong> cutting 1 km 5,96,000.00 5,96,000.00<br />

2. Retaining wall Type – I 2 Nos. 41,000.00 per nos. 82,000.00<br />

3. Retaining wall Type – II 2 Nos. 66,500.00 1,33,000.00<br />

4. Culvert 3 Nos. 1,36,000.00 4,08,000.00<br />

Total = Rs. 12,19,000.00<br />

Total requirement ( approximate ) per km = Rs. 12.19 lakhs.<br />

For 164 km ( Total proposed length ) = Rs. 12,19,000 × 164<br />

= Rs. 19,99,16,000.00<br />

GRAND TOTAL = Rs. 1,999.16 lakhs.<br />

( SAY ) = Rs. 2000.00 lakhs.<br />

= Rs. 20.00 crores.<br />

( WIDENING OF JEEPABLE ROAD IN TO TRUCKABLE ROAD )<br />

( for 1 km.)<br />

Sl. No. Work Nos. Rate (in Rupees ) Amount (in Rupees)<br />

1. Widening 1 km 5,96,000.00 4,60,000.00<br />

2. Retaining wall, Type – I 2 Nos. 41,000.00 per nos. 82,000.00<br />

3. Retaining wall, Type – II 2 Nos. 66,500.00 1,33,000.00<br />

4. Culvert 2 Nos. 1,36,000.00 2,72,000.00<br />

Total = Rs. 9,47,000.00<br />

Total = Rs. 9.47 lakhs.


57<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Total requirement ( approximate ) per km = Rs. 9.47 lakhs.<br />

For 158 km ( Total proposed length ) = Rs. 9,47,000 x 158<br />

= Rs. 14,96,26,000.00<br />

GRAND TOTAL = Rs. 1496.26 lakhs.<br />

( SAY ) = Rs. 1496.00 lakhs.<br />

= Rs. 14.96 crores.<br />

( Rupees Fourteen Crore and Ninety Six ) <strong>on</strong>ly.<br />

( MAINTENANCE WORKS )<br />

( for 1 km.)<br />

Sl. No. Work Nos. Rate (in Rupees) Amount (in Rupees)<br />

1. Maintenance 1 km 8,500.00 8,500.00<br />

2. Retaining wall Type – I 2 Nos. 41,000.00 per nos. 82,000.00<br />

3. Retaining wall Type – II 2 Nos. 66,500.00 1,33,000.00<br />

4. Culvert 2 Nos. 1,36,000.00 2,72,000.00<br />

Sl.<br />

No.<br />

Total = Rs. 4,95,500.00<br />

Total = Rs. 4.955 lakhs.<br />

Total requirement ( approximate ) per km = Rs. 4.955 lakhs.<br />

For 300 km ( Total proposed length ) = Rs. 4,95,500 x 300<br />

= Rs. 14,86,50,000.00<br />

GRAND TOTAL = Rs. 1486.50 lakhs.<br />

( SAY ) = Rs. 1487.00 lakhs.<br />

= Rs. 14.87 crores.<br />

( Rupees Fourteen Crore and Eighty Seven ) <strong>on</strong>ly.<br />

Work<br />

GENERAL ABSTRACT<br />

Total<br />

required<br />

( kms )<br />

Rate per km<br />

(Rs. in lakhs)<br />

Amount<br />

(Rs. in Crore)<br />

1. Maintenance Works 300 km 4.955 14.87<br />

2. Widening Works 158 km 9.47 14.96<br />

3. New C<strong>on</strong>structi<strong>on</strong> 164 km 12.19 20.00<br />

Total = Rs. 49.83 Crore<br />

( Rupees Forty Nine Crore and Eighty Three Lakhs ) <strong>on</strong>ly.<br />

* * * * * * * * *


58<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

HORTICULTURE<br />

PROJECT AT A GLANCE<br />

1. Name of the Project :- Horticulture Plantati<strong>on</strong> for Bamboo Flowering &<br />

Famine Combat Scheme (BAFFACOS).<br />

2. Implementing Agency :- Department of Horticulture, <strong>Mizoram</strong>.<br />

3. Status :- Government.<br />

4. Project Break - up :- i) Passi<strong>on</strong>fruit cultivati<strong>on</strong><br />

ii) Grape Cultivati<strong>on</strong><br />

iii) Potato Cultivati<strong>on</strong> and<br />

iv) Turmeric Cultivati<strong>on</strong><br />

5. Project Target :-<br />

5.1 Beneficiaries :- i) Passi<strong>on</strong>fruit 4,000 Nos.<br />

ii) Grape 3,000 Nos.<br />

iii) Potato 1,500 Nos.<br />

iv) Turmeric 1,000 Nos.<br />

5.2 Operati<strong>on</strong>al Area :- <strong>Mizoram</strong> State<br />

5.3 Mode of Operati<strong>on</strong> :- R.D. Block wise <strong>on</strong> Potential base.<br />

5.4 Area to be covered :- i) Passi<strong>on</strong>fruit 4,000 Ha.<br />

ii) Grape 3,000 Ha.<br />

iii) Potato 1,500 Ha.<br />

iv) Turmeric 1,000 Ha.<br />

6. Financial Aspect :- i) Govt. c<strong>on</strong>tributi<strong>on</strong> -<br />

Rs. 40.3125 crores<br />

ii) Beneficiary c<strong>on</strong>tributi<strong>on</strong> -<br />

Rs. 12.9375 crores<br />

TOTAL - Rs. 53.25 crores


59<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

1. INTRODUCTION :-<br />

<strong>Mizoram</strong> is an expanse of blue green hills situated at Southern extreme of North East<br />

India. It lies between 20 0 20’ and 24 0 27’ N latitude and 90 0 20’ and 90029’ E l<strong>on</strong>gitudes. It is<br />

bounded by Cachar District of Assam and Manipur to the North, chin hills of Myanmar to the<br />

South and by Tripura and Chittag<strong>on</strong>g hills of Bangladesh to the west. It covers an area of<br />

21,081 Sq.Km with an average height of 920m above sea level.<br />

The Agro-climatic situati<strong>on</strong> of <strong>Mizoram</strong> offers an excellent scope for growing<br />

different kinds of fruits, vegetables, spices etc. The project is prepared with a view to<br />

overcome famine which is expected due to gregarious flowering of bamboo during 2004 -<br />

2007. Priority will be given to crops like Passi<strong>on</strong>fruit, Grape, Potato and Turmeric as this<br />

crops have short gestati<strong>on</strong> period providing good scope for marketing, quick ec<strong>on</strong>omic return<br />

and good prospect for further marketing and export.<br />

The policy of <strong>Mizoram</strong> State Government is also to bring up the socio-ec<strong>on</strong>omic<br />

c<strong>on</strong>diti<strong>on</strong> of the poor farmers through the goals and objectives of <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting ec<strong>on</strong>omical value<br />

crops and enhance its producti<strong>on</strong> and establishment of Agro-Horticulture based Industry<br />

(processing Units) within the state.<br />

2. SCOPE :-<br />

<strong>Mizoram</strong> has got immense potential to grow all types of Horticulture crops by virtue<br />

of possessing different Agro-climatic z<strong>on</strong>es. In fact, it goes without saying that there exist<br />

tremendous scope and potentialities for growing all kinds of fruits, flowers, vegetables,<br />

spices, <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> crops etc. The present area under various horticulture crops is surveyed to<br />

be 40,575 Ha. which is <strong>on</strong>ly 6.44% of the estimated potential area of 6.30% lakhs Ha.<br />

available for cultivati<strong>on</strong> of Horticulture crops. This shows that the growth of Horticulture<br />

crops in the state have to move faster as there is enormous scope. The land, which cannot be<br />

used for cultivati<strong>on</strong> of cereal crops can be profitably utilized for development of horticulture<br />

crops for generating ec<strong>on</strong>omy to the growers and the state as a whole.<br />

Keeping in view the gregarious flowering of bamboo taking place during 2004 -2007<br />

resulting in mass martality and destructi<strong>on</strong> of bamboo forest, incurring rapid increase to the<br />

rodent populati<strong>on</strong> thereby causing famine, the Department selected 4(four) crops i.e.<br />

Passi<strong>on</strong>fruit, Grape, Potato and Turmeric as these crops have short gestati<strong>on</strong> period with good<br />

ec<strong>on</strong>omic return for <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> in Jhumland to provide alternative means of livelihood to the<br />

rural populati<strong>on</strong> dependent <strong>on</strong> Jhum cultivati<strong>on</strong>.<br />

3. SWOT ANALYSIS :-<br />

Strength - Diverse Agro - Climatic c<strong>on</strong>diti<strong>on</strong>s.<br />

- Abundance of suitable fertile land.<br />

- Abundance of rainfall.<br />

Weakness - Inadequate post-harvest infrastructure and marketing<br />

- High cot of input and exorbitant cost of transport.<br />

- Infrastructure bottle necks such as c<strong>on</strong>necting road, cold<br />

storage etc.


60<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Opportunity - Available of fertile surplus land due to gregarious flowering of<br />

bamboo.<br />

- Processing Unit available in the State.<br />

Threat - Rapid depleti<strong>on</strong> of forest and soil erosi<strong>on</strong> by practise of<br />

jhumming and wild fires, low per capita income of the farming<br />

community.<br />

4. OBJECTIVES :<br />

i) To offer avenues in creating employment opportunities to rural populati<strong>on</strong><br />

dependent <strong>on</strong> Jhum cultivati<strong>on</strong>.<br />

ii) To extend financial Assistance to the farmers through available source of fund<br />

in the country.<br />

iii) To increase income per unit area by augmentati<strong>on</strong> of the productivity level of<br />

the <str<strong>on</strong>g>plan</str<strong>on</strong>g>t with introducti<strong>on</strong> of selective varieties and improved technique of<br />

cultivati<strong>on</strong>.<br />

iv) To provide proper utilisati<strong>on</strong> of land to minimise unnecessary destructi<strong>on</strong> of<br />

forest and adopt cultivati<strong>on</strong> of viable crop to increase value producti<strong>on</strong> per<br />

unit area.<br />

v) To transform of destructive shifting cultivati<strong>on</strong> practices into c<strong>on</strong>structive<br />

farming.<br />

5. DEVELOPMENT OF HORTICULTURE PLANTATION :-<br />

The ec<strong>on</strong>omy of over 70% of the populati<strong>on</strong> in <strong>Mizoram</strong> is entirely based <strong>on</strong> land.<br />

Jhumming/Shifting cultivati<strong>on</strong> is the mainstay of the people. This has resulted in steep<br />

decline in soil fertility. Soil erosi<strong>on</strong> and deforestati<strong>on</strong> has risen to alarming extent posing a<br />

serious threat to the fragile Sub - Himalayan eco-system, and with the predicti<strong>on</strong> of<br />

gregarious flowering of bamboo taking place during 2004 - 2007 resulting in mass mortality<br />

and destructi<strong>on</strong> of bamboo forest, rapid increase in rodent populati<strong>on</strong> resulting in heavy<br />

damages to crops causing famine, the Department proposed to combat this famine through<br />

Horticulture <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>. Of the total 21 lakhs Ha. of land estimated, 6.30 lakhs Ha. of land is<br />

available for cultivati<strong>on</strong> of horticulture crops. Moreover, the area under 0-5% slope is <strong>on</strong>ly<br />

31,138 Ha., i.e., <strong>on</strong>ly 1.47% of the total area. Therefore, horticulture is the <strong>on</strong>ly means and<br />

ways to supplement the farmers and help in the ec<strong>on</strong>omy of the state. Since the availability of<br />

flat land is very less, the farmers have no alternative other than to jhum practice, which is<br />

very detrimental from envir<strong>on</strong>mental point of view, besides being a fragile means of<br />

livelihood. So, to change the scenario for permanent cultivati<strong>on</strong> and safeguard the populati<strong>on</strong><br />

against famine due to gregarious flowering of bamboo, Horticulture <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> is the <strong>on</strong>ly<br />

alternative. Therefore, it is proposed to take up the following Horticulture crops <strong>on</strong> potential<br />

base in all 22 R.D. Blocks in <strong>Mizoram</strong> and the area break-up is given at Annexure – I.<br />

5.1 PASSIONFRUIT :-<br />

Passi<strong>on</strong> fruit is a choice of the Sub-Tropical and Semi-Temperate belts and it yields a<br />

sprightly juice rich in Vitamin ‘A’ with sweet fragrance. Passi<strong>on</strong> fruit (Passiflora edulis sims)<br />

is a member of the family Passifloraceace. It is a tough - stemmed, evergreen perenial vine<br />

that climbs by means of l<strong>on</strong>g tendrils which coil around support. The stems are green, angular<br />

when young, becoming round with age, and their centres are hollow. The fruit of P.edulis, a<br />

multi-seeded berry, is round or slightly oval about 2” - 2½” l<strong>on</strong>g. Weight varies from 10g to<br />

about 56g. The fruit hangs <strong>on</strong> stalks 3-4” l<strong>on</strong>g with green bracts about 1” from the fruit. The


61<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

shell is hard and smooth, green at first, ripening to deep purple and finally becomes crinkled<br />

when fully mature. The rind is about 1/8” thick, pinkish and bordered by about ¼” of white<br />

pith. Inside the rind is hollow, filled with tart but pleasantly flavoured aromatic juice orangeyellow<br />

pulp. The small, hard, black seeds are pitted, netted or transversely grooved and<br />

individually embedded in the fleshy aril.<br />

Passi<strong>on</strong> fruit has been growing in the hills of <strong>Mizoram</strong> for several decades especially,<br />

the purple variety which are grown in an elevati<strong>on</strong> of 700 Mtr. and above and has a better<br />

aroma and flavour with higher juice c<strong>on</strong>tent. The ideal climatic c<strong>on</strong>diti<strong>on</strong> with crop<br />

adaptability to the regi<strong>on</strong> makes it c<strong>on</strong>ducive of increasing the areas under passi<strong>on</strong> fruit.<br />

Moreover, the state has a Juice Extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> Plant at Chhingchhip, which has not been utilised<br />

to its full potential due to c<strong>on</strong>straint in availability of raw materials. As such, increasing the<br />

area under passi<strong>on</strong> fruit will help in adequate supply of raw materials to this <str<strong>on</strong>g>plan</str<strong>on</strong>g>t, which will<br />

help the farmers in disposing their produce easily with good ec<strong>on</strong>omic return. Since Passi<strong>on</strong><br />

fruit has been in cultivati<strong>on</strong> in <strong>Mizoram</strong> for a l<strong>on</strong>g time, there does not exist any problem in<br />

procurement of <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting materials for <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>.<br />

It is therefore, proposed to cover an area of 4,000Ha. @ Rs.60,000 per Ha. totalling a<br />

sum of Rs.2,400 lakhs during the project period of 5 years.75% of the project cost will be<br />

Govt. share and 25% will be beneficiary c<strong>on</strong>tributi<strong>on</strong> in the form of labour. Detail cost<br />

estimate and year wise physical and financial break-up is given at Annexure - II & VII-A<br />

respectively.<br />

ECONOMICS OF PASSIONFRUIT CULTIVATION IN 1 HA. AREA<br />

Sl. No. Particulars 1st Year 2nd Year<br />

3rd Year &<br />

above<br />

1 Cost of cultivati<strong>on</strong> Rs. 60,000/- - -<br />

2 Maintenance - Rs.10,000/- Rs. 15,000/-<br />

3 Producti<strong>on</strong> 10 MT 12.5 MT 17.5 MT<br />

4 Minimum sale rate Rs. 5/- per Kg. Rs. 5/- per Kg Rs. 5/- per Kg<br />

5 Gross income (3x4) Rs. 50,000/- Rs. 62,500/- Rs. 87,500/-<br />

6 Net profit ( 5 - 1+2) (-) Rs. 10,000/- Rs. 52,500/- Rs. 72,500/-<br />

5.2 GRAPE :-<br />

Grape (Vitis vinifera) is <strong>on</strong>e of the most important crop grown in the world. Mostly it<br />

is grown for making wines and preparati<strong>on</strong> of raisin and then as a table fresh fruit. Grape<br />

cultivati<strong>on</strong> is believed to have originated near Caspian Sea, however, Indians know grapes<br />

since Roman times. At present, grape is the most important fruit crop grown commercially<br />

with the objectives- for table purpose, export purpose, making wine and making raisins. Fresh<br />

grapes are a fairly good source of minerals like calcium, phosphorus, ir<strong>on</strong> and vitamins.<br />

Famous champagne and other desert wines are prepared from grapes. The ideal climate for<br />

grape is the Mediterranean climate. But it can be successfully grown in sub-tropical regi<strong>on</strong><br />

with proper care and management.


62<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Grape has been successfully cultivated in <strong>Mizoram</strong> for many decades. The cultivated<br />

variety is Bangalore blue which is ideal for making juice and wine. The cultivati<strong>on</strong> of grape<br />

is c<strong>on</strong>fine in small pockets <strong>on</strong>ly, therefore, expansi<strong>on</strong> of area will help in increasing the<br />

ec<strong>on</strong>omic value of the crop. Moreover, setting up of a grape juice extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g>t in the state<br />

has already been proposed for approval by Govt. of India. Thus, increasing the area will help<br />

in higher producti<strong>on</strong> and fulfil the requirement of raw materials of the extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g>t.<br />

It is therefore, proposed to cover an area of .3,000 Ha. @ Rs. 60,000/- per ha. totalling<br />

a sum of Rs.1,800 lakhs during the project period of 5 years. 75% of the project cost will be<br />

Govt. share and 25% will be beneficiary c<strong>on</strong>tributi<strong>on</strong> in the form of labour. Detail cost<br />

estimate and year wise physical and financial break-up is given at Annexure - III & VII-B<br />

respectively.<br />

ECONOMICS OF GRAPE CULTIVATION IN 1 HA. AREA<br />

Sl.<br />

No.<br />

Particulars 1st Year 2nd Year 3rd Year & above<br />

1 Cost of cultivati<strong>on</strong> Rs. 60,000/- - -<br />

2 Maintenance - Rs.25,000/- Rs. 45,000/-<br />

3 Producti<strong>on</strong> Nil 10 MT 40 MT<br />

4 Minimum sale rate Nil Rs. 10/- per Kg Rs. 10/- per Kg<br />

5 Gross income ( 3 x 4) Nil Rs. 1,00,000/- Rs. 4,00,000/-<br />

6 Net profit ( 5 - 1+2) Nil Rs. 15,000/- Rs. 3,55,000/-<br />

5.3 POTATO :-<br />

Potato (Solanum tuberrosum) is believed to have been introduced in India from<br />

Europe in early 17 th Century. Potato is largely grown in cool regi<strong>on</strong>s, where mean<br />

temperature does not normally exceed 18°C. Optimum temperature for Potato growth and<br />

development ranges between 15 and 25°C. Potato is grown as a summer crop in hills and as a<br />

winter crop in tropical and sub - tropical regi<strong>on</strong>s of the country.<br />

Potato enjoys a wide range of seas<strong>on</strong>al adaptability. Potato is grown in <strong>Mizoram</strong> in<br />

the hill slopes during Kharif seas<strong>on</strong> in places above 1300 Mtrs. very successfully. It is grown<br />

<strong>on</strong>ly in few areas, with low producti<strong>on</strong> it cannot meet the demand of the local c<strong>on</strong>sumpti<strong>on</strong>.<br />

Since the crop has great demand in the local market, 80% requirement of the state is imported<br />

from neighbouring state. Thus increasing the area will have tremendous scope in meeting the<br />

demand of the local c<strong>on</strong>sumpti<strong>on</strong> and in uplifting the ec<strong>on</strong>omy of the poor farmers.<br />

It is therefore, proposed to cover an area of 1,500 Ha. @ Rs. 45,000/- per Ha. totalling<br />

a sum of Rs.675 lakhs during the project period of 5 years. 75% of the project cost will be<br />

Govt. share and 25% will be beneficiary c<strong>on</strong>tributi<strong>on</strong> in the form of labour. Detail cost<br />

estimate and year wise physical and financial break-up is given at Annexure - IV & VII-C<br />

respectively.


63<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ECONOMICS OF POTATO CULTIVATION IN 1HA. AREA<br />

1 Cost of cultivati<strong>on</strong> Rs. 45,000/-<br />

2 Producti<strong>on</strong> 20 MT<br />

3 Minimum sale rate Rs. 10/- per Kg.<br />

4 Gross income (2x3) Rs. 2,00,000/-<br />

5 Net profit ( 4-1) Rs. 1,55,000/-<br />

5.4 TURMERIC :-<br />

Turmeric (Curcuma l<strong>on</strong>ga) is used as spice, dye and in cosmetic industry. It is an<br />

erect, perennial herb grown as an annual crop. Turmeric can be grown as a rainfed crop<br />

depending <strong>on</strong> locati<strong>on</strong>. It comes up well under sparse shade also and can be grown as an<br />

intercrop.<br />

The Agro climatic c<strong>on</strong>diti<strong>on</strong> of <strong>Mizoram</strong> is ideal for cultivati<strong>on</strong> of turmeric. The<br />

quality, colour and flavour of turmeric produced in <strong>Mizoram</strong> is <strong>on</strong>e of the best in the country.<br />

Though Turmeric produced in <strong>Mizoram</strong> has great demand in the neighbouring state it has<br />

failed to tap the ec<strong>on</strong>omic potential due to low productivity and cultivati<strong>on</strong> c<strong>on</strong>fine to small<br />

areas <strong>on</strong>ly. As small cottage industries is <strong>on</strong> the increase where drying, processing and<br />

grinding of turmeric can be d<strong>on</strong>e, there is tremendous scope in increasing the area under<br />

Turmeric.<br />

It is therefore, proposed to cover an area of 1,000 Ha. @ Rs. 30,000/- per Ha. totalling<br />

a sum of Rs.300 lakhs during the project period of 5 years. 75% of the project cost<br />

will be Govt. share and 25% will be beneficiary c<strong>on</strong>tributi<strong>on</strong> in the form of labour.<br />

Detail cost estimate and year wise physical and financial break-up is given at<br />

Annexure - V & VII ‘D’ respectively.<br />

ECONOMICS OF TURMERIC CULTIVATION IN 1HA. AREA<br />

1 Cost of cultivati<strong>on</strong> Rs. 30,000/-<br />

2 Producti<strong>on</strong> 25 MT<br />

3 Minimum sale rate Rs. 5/- per Kg.<br />

4 Gross income ( 2x3) Rs. 1,25,000/-<br />

5 Net profit (4-1) Rs. 95,000/-<br />

* Potato and Turmeric are short durati<strong>on</strong> crops, hence the cost of cultivati<strong>on</strong> is same as<br />

the 1 st Year, but in case of turmeric the harvest from the 1st year can be <str<strong>on</strong>g>plan</str<strong>on</strong>g>ted insitu in the<br />

2nd year thus minimising the cost of cultivati<strong>on</strong> and increasing the profit in 2 nd year<br />

<strong>on</strong>wards.


64<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

6. Bamboo Charcoal Kiln :-<br />

Bamboo (Melocanna baccifera) is by far the most abundant natural resources<br />

available in the state and it covers 95% of bamboo forests. Gregarious flowering of bamboo<br />

is a well known phenomen<strong>on</strong> in the state where all the bamboo flowers and dies. The<br />

immediate impact is danger of fire incidence due to huge stockpile of dry bamboo. Sec<strong>on</strong>dary<br />

impact is the out break of famine due to populati<strong>on</strong> explosi<strong>on</strong> of rodents. Rodents feed <strong>on</strong> the<br />

food crops thereby causing heavy loss to the food grain dependent farmers. These present<br />

growing stock of bamboo can be utilised for producti<strong>on</strong> of bamboo charcoal and vinegar.<br />

Bamboo charcoal and vinegar are very useful for soil improvement as it c<strong>on</strong>tains antibacterial<br />

ingredients like benzoquinne, acetic etc. It can also be used for promoting crop growth,<br />

accelerating its sprout, improving its quality and producti<strong>on</strong>. Due to its special tart flavour,<br />

smoke smell, disinfecti<strong>on</strong> ability bamboo vinegar can also be used as insect repellent.<br />

Bamboo charcoal and vinegar can substitute chemical pesticide/insecticide and chemical<br />

fertilizers. The technique of producti<strong>on</strong> of charcoal/vinegar is simple and can be installed at<br />

any locati<strong>on</strong> without much problem. It is proposed to set up charcoal kiln at farmers field<br />

sharing 1 kiln by a group of 10 farmers.<br />

An amount of Rs. 150.00 lakhs is proposed for charcoal kiln @ Rs. 15,000/- per kiln<br />

for a period of 3 years. Detail cost estimate and year- wise financial break up is given at<br />

Annexure - VI & VII ‘E’<br />

7. IMPLEMENTATION OF THE PROJECT :-<br />

The project is to be implemented by the Department of Horticulture, <strong>Mizoram</strong>.<br />

Summary of the modalities of executi<strong>on</strong> of the project is framed up as follows :-<br />

i) The Department of Horticulture, Govt. of <strong>Mizoram</strong> will implement the scheme<br />

to combat famine duely caused by bamboo flowering.<br />

ii) Selecti<strong>on</strong> of suitable sites/locati<strong>on</strong> and final selecti<strong>on</strong> of beneficiaries all will<br />

be d<strong>on</strong>e by the Department of Horticulture.<br />

iii) One unit area per beneficiary will be 1 ha.<br />

iv) The Target group will be from the rural areas whose current occupati<strong>on</strong><br />

depends <strong>on</strong> jhumming.<br />

v) Any disputes will be settled by Department of Horticulture and will be final<br />

and binding.<br />

The Department of Horticulture will give technical guidance to the beneficiaries so as<br />

to achieve desired level of producti<strong>on</strong> and successful implementati<strong>on</strong> of the project.<br />

8. PROJECT COST / FINANCIAL ASPECTS :-<br />

The project is formulated for a period of 5 years i.e. 2004 - 2005, 2005 - 2006, 2006 -<br />

2007, 2007 - 2008 & 2008-2009 for funding from Ministry of Agriculture, Govt. of India or<br />

any other source as decided by Govt. of India from time to time. 75% of the total project cost<br />

is to be funded by Government and remaining 25% will be c<strong>on</strong>tributed by the beneficiaries in<br />

the form of labours etc.


Name of R.D.<br />

Block<br />

65<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Year - Wise break-up of physical and financial target is given in Annexure – VII.<br />

R.D. BLOCK - WISE AREA BREAK-UP ON POTENTIAL BASE<br />

Name of<br />

District<br />

Area (Ha.)<br />

No. of<br />

Househol<br />

d<br />

Annexure - I<br />

Area break-up <strong>on</strong> Potential base (Ha.)<br />

Passi<strong>on</strong>fruit<br />

Grape<br />

Hill<br />

Turmeric<br />

Potato<br />

Total<br />

Aibawk Aizawl 61,688.00 3,039 200 100 100 - 400<br />

Darlawn -do- 1,03,748.00 4,657 200 - - - 200<br />

Phullen -do- 51,515.00 2,020 200 100 - - 300<br />

Thingsulthliah -do- 87,413.00 6,207 500 - - - 500<br />

Tlangnuam -do- 53,267.00 46,315 200 - - - 200<br />

Ngopa Champhai 89,177.00 3,161 200 100 300 - 600<br />

Khawbung -do- 70,598.00 3,621 500 500 300 - 1,300<br />

Khawzawl -do- 1,58,808.00 12,824 500 1,000 300 - 1,800<br />

Reiek Mamit 93,742.00 2,755 200 - - - 200<br />

W. Phaileng -do- 99,957.00 3,633 - - - 200 200<br />

Zawlnuam -do- 10,8,876.00 5,221 - - - 200 100<br />

E. Lungdar Serchhip 63,200.00 3,447 300 200 200 - 700<br />

Serchhip -do- 78,960.00 6,514 400 100 - - 500<br />

Thingdawl Kolasib 1,30,251.00 11,009 100 100 - - 200<br />

Bunghmun Lunglei 1,38,926.00 2,763 - - - 200 200<br />

Hnahthial -do- 98,539.00 4,524 100 200 - - 300<br />

Lungsen -do- 1,04,629.00 5,689 - - - 200 200<br />

Lunglei -do- 1,11,706.00 12,448 200 100 - - 300<br />

Lawngtlai Lawngtlai 1,30,484.00 5,991 100 100 - - 200<br />

Chawngte -do- 68,635.00 5,769 - - - 200 200<br />

Sangau Saiha 56,591.00 2,405 100 200 300 - 600<br />

Tuipang -do- 1,39,991.00 7,935 - 200 - - 200<br />

21,08,700.00 1,61,974 4,000 3,000 1,500 1,000 9,500


Sl.<br />

No.<br />

66<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Annexure – II<br />

COST ESTIMATE OF CULTIVATION OF PASSIONFRUIT<br />

1 Unit =1 Ha.<br />

Particulars Qnty Rate Amount<br />

A. Government C<strong>on</strong>tributi<strong>on</strong> (75%)<br />

1 Passi<strong>on</strong>fruit seedlings 500 Nos. Re. 1/- Rs. 500.00<br />

2 G.I. Wire (125 SWG) for Trailing Support 7 Qtls. Rs. 4575/- Rs. 32,025.00<br />

3 Wooden Post 200 Nos. Rs. 30/- Rs. 6,000.00<br />

4 Organic Manure 4 Qtls. Rs. 1,200/- Rs. 4,800.00<br />

5 Tools & Implements L.S. L.S. Rs. 1,000.00<br />

6 Transportati<strong>on</strong> of G.I. Wire, wooden post,<br />

manure, <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting materials etc. L.S. L.S. Rs. 675.00<br />

SUB - TOTAL Rs. 45,000.00<br />

B. Beneficiary C<strong>on</strong>tributi<strong>on</strong> ( 25%)<br />

1 Land Preparati<strong>on</strong><br />

i) Jungle clearance 20 MD Rs. 84/- Rs. 1680.00<br />

ii) Burning & removal of debris 10 MD Rs. 84/- Rs. 840.00<br />

iii) Layout & Pit digging 20 MD Rs. 84/- Rs. 1680.00<br />

iv) Pit filling with organic manure & soil 20 MD Rs. 84/- Rs. 1680.00<br />

v) C<strong>on</strong>structi<strong>on</strong> of trailing support 30 MD Rs. 84/- Rs. 2520.00<br />

2 Planting of Passi<strong>on</strong>fruit Seedlings 10 MD Rs. 84/- Rs. 840.00<br />

3 Intercultural Operati<strong>on</strong><br />

i) First weeding ( May) 20 MD Rs. 84/- Rs. 1680.00<br />

ii) sec<strong>on</strong>d weeding (July) 15 MD Rs. 84/- Rs. 1260.00<br />

iii) Third weeding ( September) 10 MD Rs. 84/- Rs. 840.00<br />

iv) Fourth Weeding (Nov.) 10 MD Rs. 84/- Rs. 840.00<br />

v) Pruning etc. 14 MD Rs. 84/- Rs. 1176.00<br />

SUB - TOTAL Rs. 15,036.00<br />

Say Rs. 15,000.00<br />

Grand Total (A+B) = Rs. 45,000.00 + Rs. 15,000.00 = Rs. 60,000.00<br />

Total Govt. C<strong>on</strong>tributi<strong>on</strong> (75%) per Ha. = Rs. 45,000.00<br />

( Rupees forty five thousand) <strong>on</strong>ly.


Sl.<br />

No.<br />

67<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Annexure - III<br />

COST ESTIMATE OF CULTIVATION OF GRAPE<br />

1 Unit = 1 Ha.<br />

Particulars Qnty Rate Amount<br />

A. Government C<strong>on</strong>tributi<strong>on</strong> (75%)<br />

1 Grape Rooted Cuttings 400 Nos. Rs. 6/- Rs. 2,400.00<br />

2 G.I. Wire (125 SWG) for Trailing Support 7 Qtls. Rs. 4575/- Rs. 32,025.00<br />

3 Wooden Post 200 Nos. Rs. 30/- Rs. 6,000.00<br />

4 Organic Manure 3 Qtls. Rs. 1,200/- Rs. 3,600.00<br />

5 Tools & Implements L.S. L.S. Rs. 600.00<br />

6 Transportati<strong>on</strong> of G.I. Wire, wooden post,<br />

manure, <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting materials etc. L.S. L.S. Rs. 375.00<br />

SUB - TOTAL Rs. 45,000.00<br />

B. Beneficiary C<strong>on</strong>tributi<strong>on</strong> ( 25%)<br />

1 Land Preparati<strong>on</strong><br />

i) Jungle clearance 20 MD Rs. 84/- Rs. 1680.00<br />

ii) Burning & removal of debris 10 MD Rs. 84/- Rs. 840.00<br />

iii) Layout & Pit digging 20 MD Rs. 84/- Rs. 1680.00<br />

iv) Pit filling with organic manure & soil 20 MD Rs. 84/- Rs. 1680.00<br />

v) C<strong>on</strong>structi<strong>on</strong> of trailing support 30 MD Rs. 84/- Rs. 2520.00<br />

2 Planting of grape rooted cuttings 10 MD Rs. 84/- Rs. 840.00<br />

3 Intercultural Operati<strong>on</strong><br />

i) First weeding ( May) 20 MD Rs. 84/- Rs. 1680.00<br />

ii) sec<strong>on</strong>d weeding (July) 15 MD Rs. 84/- Rs. 1260.00<br />

iii) Third weeding ( September) 10 MD Rs. 84/- Rs. 840.00<br />

iv) Fourth Weeding (Nov.) 10 MD Rs. 84/- Rs. 840.00<br />

v) Pruning etc. 14 MD Rs. 84/- Rs. 1176.00<br />

SUB - TOTAL Rs. 15,036.00<br />

Say Rs. 15,000.00<br />

Grand Total (A+B) = Rs. 45,000.00 + Rs. 15,000.00 = Rs. 60,000.00<br />

Total Govt. C<strong>on</strong>tributi<strong>on</strong> (75%) per Ha. = Rs. 45,000.00<br />

( Rupees forty five thousand) <strong>on</strong>ly.<br />

Sl.<br />

No.<br />

Annexure - IV<br />

COST ESTIMATE OF CULTIVATION OF POTATO<br />

1 Unit = 1 Ha.<br />

Particulars Qnty Rate Amount<br />

A. Government C<strong>on</strong>tributi<strong>on</strong> (75%)<br />

1 Potato seed tubers ( f.o.r Aizawl) 12 Qtls. Rs. 2,200/- Rs. 26,400.00<br />

2 Organic Manure 5 Qtls. Rs. 1,200/- Rs. 6,000.00<br />

3 Tools & Implements L.S. L.S. Rs. 800.00<br />

4 Transportati<strong>on</strong> of seed tubers, organic<br />

manure, handling etc. L.S. L.S. Rs. 550.00<br />

SUB - TOTAL Rs. 33,750.00


68<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Sl.<br />

No.<br />

Particulars Qnty Rate Amount<br />

B. Beneficiary C<strong>on</strong>tributi<strong>on</strong> ( 25%)<br />

1 Land Preparati<strong>on</strong><br />

i) Jungle clearance 15 MD Rs. 84/- Rs. 1,26000<br />

ii) Burning & removal of debris 10 MD Rs. 84/- Rs. 840.00<br />

iii) Layout 10 MD Rs. 84/- Rs. 840.00<br />

iv) Bunding across the slope 15 MD Rs. 84/- Rs. 1,260.00<br />

v) Pulverizati<strong>on</strong> of soil 20 MD Rs. 84/- Rs. 1,680.00<br />

vi) Mixing of organic manure & soil 10 MD Rs. 84/- Rs. 840.00<br />

vii) Furrowing 10 MD Rs. 84/- Rs. 840.00<br />

2 Sowing of seed tubers 15 MD Rs. 84/- Rs. 1,260.00<br />

3 Intercultural Operati<strong>on</strong><br />

i) First weeding & earthing up (April) 15 MD Rs. 84/- Rs. 1,260.00<br />

ii) sec<strong>on</strong>d weeding & earthing up (May) 14 MD Rs. 84/- Rs. 11760.00<br />

SUB - TOTAL Rs. 11,256.00<br />

Say Rs. 11,250.00<br />

Grand Total (A+B) = Rs. 33,750.00 + Rs. 11,250.00 = Rs. 45,000.00<br />

Total Govt. C<strong>on</strong>tributi<strong>on</strong> (75%) per Ha. = Rs. 33,750.00<br />

( Rupees thirty three thousand seven hundred fifty) <strong>on</strong>ly.<br />

Annexure - V<br />

COST ESTIMATE OF CULTIVATION OF TURMERIC<br />

1 Unit = 1 Ha.<br />

Sl.<br />

No.<br />

Particulars Qnty Rate Amount<br />

A. Government C<strong>on</strong>tributi<strong>on</strong> (75%)<br />

1 Turmeric seed rhizomes 20 Qtls. Rs. 600/- Rs. 12,000.00<br />

2 Organic Manure 8 Qtls. Rs. 1,200/- Rs. 9,600.00<br />

3 Tools & Implements L.S. L.S. Rs. 500.00<br />

4 Transportati<strong>on</strong> of seed rhizomes, organic L.S. L.S. Rs. 400.00<br />

SUB - TOTAL Rs. 22,500.00<br />

B. Beneficiary C<strong>on</strong>tributi<strong>on</strong> ( 25%)<br />

1 Land Preparati<strong>on</strong><br />

i) Jungle clearance 15 MD Rs. 84/- Rs. 1,260.00<br />

ii) Burning & removal of debris 5 MD Rs. 84/- Rs. 420.00<br />

iii) Layout 5 MD Rs. 84/- Rs. 420.00<br />

iv) Terracing across the slope 5 MD Rs. 84/- Rs. 420.00<br />

v) Pulverizati<strong>on</strong> of soil 10 MD Rs. 84/- Rs. 840<br />

vi) Mixing of organic manure & soil 5 MD Rs. 84/- Rs. 420.00<br />

vii) Furrowing 5 MD Rs. 84/- Rs. 420.00<br />

2 Cutting of seed rhizomes & sowing 10 MD Rs. 84/- Rs. 840.00<br />

3 Intercultural Operati<strong>on</strong><br />

i) First weeding & earthing up (may-June) 10 MD Rs. 84/- Rs. 840.00<br />

ii) sec<strong>on</strong>d weeding & earthing up (July-Aug.) 10 MD Rs. 84/- Rs. 840.00<br />

iii) Third weeding & earthing up (Oct.Nov.) 10 MD Rs. 84/- Rs. 840.00<br />

SUB - TOTAL Rs. 7,560.00<br />

Say Rs. 7,500.00


69<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Grand Total (A+B) = Rs. 22,500.00 + Rs. 7,500.00 = Rs. 30,000.00<br />

Total Govt. C<strong>on</strong>tributi<strong>on</strong> (75%) per Ha. = Rs. 22,500.00<br />

( Rupees twenty two thousand five hundred) <strong>on</strong>ly.<br />

Annexure - VI<br />

COSTING SHEET FOR ESTABLISHMENT OF SMALL SCALE UNIT FOR CHARCOAL<br />

KILN<br />

Sl. No. Particulars Qnty Rate Amount<br />

I. Input Comp<strong>on</strong>ents :<br />

1 G.C.I Sheet 8 x 4ft. 1 bundle 2,300/- 2,300.00<br />

2 Ir<strong>on</strong> rod (20 mm) 18 Nos. 165/- 2,970.00<br />

3 G.C.I Sheet (Plain) for Chimney 1 No. 600/- 600<br />

4 Bamboo (6" dia.) 20 ft. l<strong>on</strong>g for Vinegar<br />

collecti<strong>on</strong> pipe 1 No. 100/- 100<br />

5 Plastic c<strong>on</strong>tainer (50 lit. Cap.) for stocking<br />

vinegar 4 Nos. 575/- 2,300.00<br />

6 Plastic pot for fitting vinegar 2 Nos. 500/- 1,000.00<br />

7 Funnel 2 Nos. 25/- 50<br />

8 Filtare collecting bucket 2 Nos. 150/- 300<br />

9 Paddy Straw L.S. - 250<br />

10 Cost of Brick, etc. L.S. - 1,110.00<br />

TOTAL 11,000.00<br />

II. Work Comp<strong>on</strong>ents :<br />

1 Pit digging for Kiln 5 MD 84/- 420<br />

2 C<strong>on</strong>structi<strong>on</strong> of Kiln including plastering of<br />

Kiln with and mud mixed with chopped<br />

paddy straw<br />

a) Skilled labour 10 MD 149/- 1,490.00<br />

b) Unskilled 10 MD 84/- 840<br />

3 Trial run for Bamboo 4 MD 84/- 336<br />

4 Trial run for vinegar and charcoal 6 MD 84/- 504<br />

5 Other charges L.S. - 4,000.00<br />

G. TOTAL OF 1 & 11 (11,000+4,000) 15,000.00


70<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Annexure - VII<br />

YEAR - WISE PHYSICAL & FINANCIAL BREAK-UP<br />

( Rs. in lakh)<br />

Sl.<br />

No.<br />

Year<br />

Physical<br />

Target<br />

(Ha.)<br />

Financial<br />

Target<br />

Govt. Beneficiary<br />

c<strong>on</strong>tributi<strong>on</strong> c<strong>on</strong>tributi<strong>on</strong><br />

(75%) (25%)<br />

A. Passi<strong>on</strong>fruit (Rs. 60,000 Per Ha.)<br />

1 2004 - 05 1,500 900.00 675.00 225.00<br />

2 2005 - 06 1,000 600.00 450.00 150.00<br />

3 2006 - 07 500 300.00 225.00 75.00<br />

4 2007 - 08 500 300.00 225.00 75.00<br />

5 2008 - 09 500 300.00 225.00 75.00<br />

TOTAL OF 'A' 4,000 2,400.00 1,800.00 600.00<br />

B. Grape (Rs. 60,000 Per Ha.)<br />

1 2004 - 05 1,000 600.00 450.00 150.00<br />

2 2005 - 06 1,000 600.00 450.00 150.00<br />

3 2006 - 07 500 300.00 225.00 75.00<br />

42007 - 08 250 150.00 112.50 37.50<br />

5 2008 - 09 250 150.00 112.50 37.50<br />

TOTAL OF 'B' 3,000 1,800.00 1,350.00 450.00<br />

C. Potato ( Rs. 45,000 Per Ha.)<br />

1 2004 - 05 500 225.00 168.75 56.25<br />

2 2005 - 06 500 225.00 168.75 56.25<br />

3 2006 - 07 300 135.00 101.25 33.75<br />

4 2007 - 08 100 45.00 33.75 11.25<br />

5 2008 - 09 100 45.00 33.75 11.25<br />

TOTAL OF 'C' 1,500 675.00 506.25 168.75<br />

D. Turmeric ( Rs. 30,000/- per Ha.)<br />

1 2004 - 05 500 150.00 112.50 37.50<br />

2 2005 - 06 200 60.00 45.00 15.00<br />

3 2006 - 07 100 30.00 22.50 7.50<br />

4 2007 - 08 100 30.00 22.50 7.50<br />

5 2008 - 09 100 30.00 22.50 7.50<br />

TOTAL OF 'D' 1,000 300.00 225.00 75.00<br />

E. Charcoal Kiln @ Rs. 15,000/- per<br />

1 2004 - 05 500 Nos. 75.00 75.00 -<br />

2 2005 - 06 300 Nos. 45.00 45.00 -<br />

3 2006 - 07 200 Nos. 30.00 30.00 -<br />

4 2007 - 08 - - - -<br />

5 2008 - 09 - - - -<br />

TOTAL OF 'E' 100 Nos. 150.00 150.00<br />

G.TOTAL (A+B+C+D+E) - 5,325.00 4,031.25 1,293.75


INTRODUCTION:<br />

71<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ANIMAL HUSBANDRY & VETERINARY<br />

The State of <strong>Mizoram</strong> is facing an impending famine predicted to be brought <strong>on</strong> by<br />

the bamboo flowering phenomen<strong>on</strong> which for unexplained reas<strong>on</strong> result in the explosi<strong>on</strong> of<br />

the rodent populati<strong>on</strong>. They in turn feed <strong>on</strong> the food grains and practically any edible thing<br />

which grows, thus causing severe food shortage in <strong>Mizoram</strong>.<br />

The Animal Husbandry and Veterinary Department is gearing up to meet the<br />

challenge by preparing various Schemes at a total cost of Rs 39,99,28,650/-. All these<br />

Schemes are proposed to be taken up by the rural populati<strong>on</strong> as well as the poorer secti<strong>on</strong> of<br />

the urban and semi-urban people. The main aim of the Scheme is to provide a means of<br />

generating income for the poor people who had been dependent <strong>on</strong> agriculture and other<br />

allied occupati<strong>on</strong>, who will face the brunt of the rodent menace as all their crops will be more<br />

or less destroyed. It is expected that the Government of India will be making the food grains<br />

available, however, with their crops destroyed, the farming community would not have any or<br />

very limited purchasing power. Hence, the proposed Schemes are to raise the purchasing<br />

power of the famine-hit populati<strong>on</strong> within the State.<br />

AREA OF OPERATION:<br />

Since the whole State is preparing itself <strong>on</strong> a war footing, this Department <str<strong>on</strong>g>plan</str<strong>on</strong>g> to<br />

cover the whole State. Out of the 2,50,000 households in <strong>Mizoram</strong>, 10200 households are<br />

expected to be covered by the A.H. & Vety. trade. The rati<strong>on</strong>ale of choosing the beneficiary<br />

under the different schemes will be governed by the suitability of terrain, transportati<strong>on</strong> and<br />

availability of market.<br />

IMPLEMENTING AGENCY:<br />

The A.H. & Vety. Department will be the implementing agency for the Schemes here<br />

proposed. The Department has a well set up infrastructure covering all the eight Districts of<br />

<strong>Mizoram</strong> with sufficient technical and n<strong>on</strong> technical pers<strong>on</strong>nel to successfully implement the<br />

Schemes. Since the success of the Schemes depend <strong>on</strong> the c<strong>on</strong>stant m<strong>on</strong>itoring and<br />

supervisi<strong>on</strong>, including animal health care, prophylactic activities and creating marketing<br />

channels, the Schemes need to be integrated with the Animal Husbandry Department’s<br />

activities. Therefore, it is expected that the Department can best handle the Schemes and do<br />

proper justice to it.<br />

JUSTIFICATION:<br />

In combating the Bamboo Flowering Famine, the Government of <strong>Mizoram</strong> has<br />

proposed for Projects to be implemented for a period of 5 years. It is the obvious expectati<strong>on</strong><br />

that the Famine will be over during this period. All the Projects under the A.H. &Vety. trade<br />

will mature within <strong>on</strong>e year from the date of the <strong>on</strong>set of the various schemes. In case of<br />

dairy farming where the animals will <strong>on</strong>ly start their productive live at 2 years of age, the<br />

scheme envisages purchase of animals already in milk, so that they will start producti<strong>on</strong> from<br />

day-<strong>on</strong>e itself.


72<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The schemes can be taken up even in small farm land with limited farm labour, thus<br />

making it most suitable to <strong>Mizoram</strong>, and the different scheme will be taken up in such a<br />

manner that there should be marketing problem, as they will be c<strong>on</strong>sumed directly by the<br />

beneficiaries themselves and the local populati<strong>on</strong>, without having to look for marketing<br />

channel elsewhere.<br />

Feed and fodder will be <strong>on</strong>e of the most prominent c<strong>on</strong>straints in the successful<br />

implementati<strong>on</strong> of the schemes. Therefore, ingredients for the c<strong>on</strong>centrated feeds can be<br />

purchased from outside the State and manufactured at the Feed Plant owned by the<br />

Department, piglets and day-old chicks can be provided to the beneficiaries from the<br />

Departmental hatcheries and Base Pig Breeding Farms.<br />

Even though the Government has envisaged the projects for a period of 5 years, the<br />

schemes under this trade will be self generating and sustainable so that the beneficiaries can<br />

be permanently settled, thus solving the problem of finding alternative livelihood for the<br />

Jhumming families.<br />

TABLE SHOWING SCHEME-WISE REQUIREMENT OF FUND<br />

S.No. Name of Scheme No. of Units Per Unit Cost Total<br />

1 Pig Rearing 6,000 Rs. 36,300/- Rs. 21,78,00,000/-<br />

2 Broiler Bird Farming 2,000 Rs. 41,460/- Rs. 8,29,20,000/-<br />

3 Layer Bird Farming 1763 Rs. 28,320/- Rs. 4,99,28,160/-<br />

4 Dairy Cow Farming 437 Rs. 112770/- Rs. 4,92,80,490/-<br />

TOTAL 10200 Rs. 39,99,28,650/-<br />

STRATEGY FOR IMPLEMENTATION:<br />

The Schemes will be fully implemented in a phased manner in a span of 5(five)<br />

years. The implementati<strong>on</strong> will be d<strong>on</strong>e in such a way that a selected beneficiary will be<br />

given the full benefit at a time so that the chosen unit has a good chance of being financially<br />

feasible and will earn income for the beneficiary to purchase the necessary food grains. The<br />

Year-Wise break up of the fund required is shown in Annexure V.<br />

THE SCHEMES<br />

PIG REARING SCHEME:<br />

Pig rearing is <strong>on</strong>e of the ec<strong>on</strong>omic activities which has been in the Mizo traditi<strong>on</strong><br />

from time immemorial. Thus it is proposed to cover the largest porti<strong>on</strong> under this scheme. Of<br />

the total proposed 10200 households to be covered, 6,000 house holds will be covered under<br />

this trade spread all over the State. Since pigs survive well under <strong>Mizoram</strong> climatic c<strong>on</strong>diti<strong>on</strong><br />

and can thrive well <strong>on</strong> kitchen wastes, roots, herbs and shrubs, it is expected that this will<br />

provide a good source of food both for the c<strong>on</strong>sumpti<strong>on</strong> of the beneficiary as well as for sale<br />

of the animal which will earn them m<strong>on</strong>ey for purchase of food grains.


73<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Under this trade, each beneficiary family will rear an unit of 3(three) fattening pigs to<br />

be sold at market age, and 1(<strong>on</strong>e) sow for breeding purpose which will provide the off springs<br />

for further rearing, thus making the scheme self-generating and sustainable. The unit cost of<br />

the pig rearing scheme is given at Annexure I. The scheme has taken into account, the initial<br />

cost of pig sty c<strong>on</strong>structi<strong>on</strong>, cost of piglets and feeding cost of the pigs till they are marketed<br />

and till the sow farrows. The income and expenditure statement has also been presented in the<br />

Annexure. The Per Unit Cost of the Pig Rearing Scheme is worked out to be Rs 36,300/- and<br />

the Net Income expected to be earned is Rs 30,100/- per year. The Net Income is expected to<br />

be sufficient to meet the financial need of the average Mizo family to meet the expenditures<br />

<strong>on</strong> food grains.<br />

The required amount for the pig rearing scheme for 6000 units at a cost of Rs 36,300/-<br />

is Rs 21,78,00,000/-Details of the project is presented at Annexure I.<br />

BROILER POULTRY FARMING:<br />

Broiler poultry bird farming is <strong>on</strong>e of the farming activities which give the quickest<br />

returns for the investment made, as they are ready for the market in just eight to ten weeks.<br />

Moreover, since it does not demand harsh labour, the women and even children could be<br />

employed to look after the poultry bird, thus making it a truly family oriented scheme. On the<br />

other hand, broilers require proper feeding with balanced computed rati<strong>on</strong> and also require<br />

some degree of scientific management. Therefore, broiler farming cannot be envisaged in the<br />

far flung areas of the State, but need to be implemented in urban and semi-urban areas, where<br />

transportati<strong>on</strong> facilities are available, and where there will be a market for the poultry birds.<br />

2,000 Units of 200 broiler birds is proposed to be implemented at a unit cost of<br />

Rs.41,460/- which totals to Rs.8,29,20,000/- The cost is inclusive of broiler house<br />

c<strong>on</strong>structi<strong>on</strong>, water storage tanks, cost of day old chicks and feed for the first batch of chicks<br />

till they are marketed.<br />

The recurring costs for <strong>on</strong>e year where it is expected that 4 cycles of 200 broilers, that<br />

is 800 broilers works out to Rs 67,600/- The Net profit works out to Rs 44,000/- <strong>on</strong>ly. Income<br />

will be generated from sale of the broiler birds and the manure. The detailed projected Unit<br />

Cost can be seen at Annexure II.<br />

LAYER POULTRY FARMING:<br />

Layer farming is a very good means of earning income for the people during the<br />

famine. Although the investment is quite high, the scheme can be taken up by a<br />

comparatively small family with limited labour and farm land. The products, i.e. eggs can be<br />

sold and c<strong>on</strong>sumed by the families themselves, thus solving the marketing problem to a great<br />

extent.<br />

The c<strong>on</strong>diti<strong>on</strong> for layer poultry farming is similar to the broiler farming. Since it<br />

require a ready market for the eggs and the culled birds, this scheme should be taken up in the<br />

more urbanised areas of <strong>Mizoram</strong>. Electricity, being <strong>on</strong>e of the most important factors the<br />

success of poultry farming, this can <strong>on</strong>ly be taken up where such facility is available. The unit<br />

also needs to be fairly close to the source of day old chicks, therefore they should be located<br />

in areas not too far from the Department Hatcheries.


74<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

For the stated reas<strong>on</strong>, <strong>on</strong>ly 1763 units of 100 layers each is being proposed at a total<br />

cost of Rs 4,99,28,160/-where the cost of each unit is estimated to be Rs 28,320/-The<br />

projected cost include c<strong>on</strong>structi<strong>on</strong> of layer house, cost of equipment including water storage,<br />

cost of chicks and feed for till they are 22 weeks old, when they start laying. The detailed<br />

projected Unit Cost and the technical assumpti<strong>on</strong> can be seen at Annexure-III.<br />

The recurring cost is estimated to be Rs 41,450/- earning a Net Profit of Rs 14,188/-<br />

<strong>on</strong>ly from sale of eggs and manure. Other income may be generated from sale of empty<br />

gunny bags and the culled birds.<br />

DAIRY COW FARMING:<br />

Dairy farming scheme can be taken up in the urban, semi-urban and al<strong>on</strong>g the<br />

Highway routes of <strong>Mizoram</strong>, for the sake <strong>on</strong> transportati<strong>on</strong>, breeding and marketing facilities.<br />

Since milk is an easily perishable item, it is to be immediately c<strong>on</strong>sumed or sold, so the farms<br />

needs to be located in the c<strong>on</strong>suming centre itself. Therefore <strong>on</strong>ly 437 units of 2 Dairy Cows<br />

each is being proposed at a total cost of Rs 4,92,80,490/-The Per Unit Cost is Rs.1,12,770/inclusive<br />

of the capitalised expenditures and the n<strong>on</strong>-recurring expenditures. The scheme<br />

provides for purchase of two milch animals, c<strong>on</strong>structi<strong>on</strong> of byre, feeding equipments and<br />

water tank. Cost of feed for <strong>on</strong>e year and the insurance premium for the first year has also<br />

been capitalised. The recurring expenditures include cost of feed and medicines, water and<br />

electricity charges and insurance fees. The c<strong>on</strong>centrated feeds will be supplemented with<br />

green grasses and fodder tree leaves.<br />

The Net Profit for the first year is estimated at Rs 71,130/- from sale of milk, manure<br />

and empty gunny bags. Other income can be generated from sale of male calves. The details<br />

can be seen at Annexure IV.<br />

ANNEXURE – I<br />

ESTIMATED PROJECT COST FOR PIG REARING<br />

3 FATTENERS AND 1 SOW UNIT<br />

Per Unit project cost Rs. 36,300/-<br />

Rates as per existing local rate in <strong>Mizoram</strong><br />

A. CAPITAL EXPENDITURE :<br />

i) Cost of c<strong>on</strong>structi<strong>on</strong> of 1 farrowing pen<br />

@ Rs. 100/- per Sq.ft ( 12’ x 6’ ) = 72 sq.ft. : Rs. 7,200.00<br />

ii) Cost of c<strong>on</strong>structi<strong>on</strong> of 3 fatterners Pig sty<br />

@ Rs. 100/- per sq.ft. ( 9’ x 6’ ) = 54 sq.ft. : Rs. 5,400.00<br />

iii) Cost of equipments & Utensils<br />

@ Rs. 200/- per kg : Rs. 800.00<br />

----------------------------------------------------------------------------------------------------------------<br />

TOTAL : Rs.13,400.00<br />

----------------------------------------------------------------------------------------------------------------


75<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

B. CAPITALISED EXPENDITURE:<br />

(To raise foundati<strong>on</strong> stock to farrowing or slaughter age)<br />

i) Cost of foundati<strong>on</strong> stock 4 Nos. of piglets<br />

2 m<strong>on</strong>ths old @ Rs. 2,000/- per piglet : Rs. 8,000.00<br />

ii) Boar Service charge @ Rs. 500/- : Rs. 500.00<br />

iii) Veterinary Aids Medicati<strong>on</strong>, Vaccinati<strong>on</strong> etc. L.S : Rs. 1,500.00<br />

iv) Miscellaneous Expenditure ( Electricity, Water overhead<br />

Charges etc . L.S : Rs. 1,380.00<br />

v) Cost of feed for fatterners upto 8 m<strong>on</strong>ths : Rs. 5,760.00<br />

vi) Cost of feed for sow upto 15 m<strong>on</strong>ths : Rs. 5,760.00<br />

----------------------------------------------------------------------------------------------------------------<br />

TOTAL : Rs. 22,900.00<br />

----------------------------------------------------------------------------------------------------------------<br />

( Rupees twenty two thousand nine hundred ) <strong>on</strong>ly.<br />

A. TOTAL INVESTMENT COST :<br />

i.c. A + B = Rs.13,400 + Rs. 22,900.00<br />

= Rs. 36,300.00<br />

( Rupees Thirty six thousand three hundred ) <strong>on</strong>ly<br />

D. GROSS INCOME FOR THE FIRST ONE YEAR :<br />

i) Sale of 3 nos. fatterners 90 Kg / fatterner : Rs. 27,000.00<br />

@ Rs. 100/- per Kg. Og meat.<br />

ii) Sale of 9 piglets @ Rs. 2000/- per piglet : Rs. 18,000.00<br />

-------------------------------------------------------------------------------------------------------<br />

TOTAL : Rs. 45,000.00<br />

-------------------------------------------------------------------------------------------------------<br />

E. COST OF EXPENDITURE FOR ONE YEAR :<br />

1) Cost of Feed<br />

a) 2-4 m<strong>on</strong>ths/ kg/day/head i.e. 60 Kg/ head - Rs. 1920.00<br />

b) 4-8 m<strong>on</strong>ths 1.5 kg/ day/head i.e. 180 Kg./ head - Rs. 5760.00<br />

c) 8-11 m<strong>on</strong>ths 2 Kg./day/head i.e. 180 Kg./ head - Rs. 1440.00<br />

d) 11-15 m<strong>on</strong>ths 2.5 Kg/ day/head i.e. 300 Kg./ head - Rs. 2400.00<br />

2) Boar Service charge @ Rs. 500/- - Rs. 500.00<br />

3) Veterinary aids, medicine, vaccines etc. L.S - Rs. 1500.00<br />

4) Electric and water charges L.S - Rs. 1380.00<br />

------------------------------------<br />

TOTAL - Rs. 14900.00<br />

------------------------------------<br />

F. NET INCOME ( FOR THE FIRST YEAR ) :<br />

i.e. D- E = Rs. 45000.00 – Rs. 14900.00<br />

= Rs. 30,100.00<br />

( Rupees thirty thousand <strong>on</strong>e hundred ) <strong>on</strong>ly


76<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ASSUMPTION AND TECHNICAL NORMS:<br />

1. Gastati<strong>on</strong> period : 114 days.<br />

2. Weaning age : 2 m<strong>on</strong>ths / 60 days.<br />

3. Successive pregnancy : 30 days after weaning of piglets.<br />

4. Average No. of Piglets per furrowing ( litter size ) : 9 piglets/ sow.<br />

5. Sale price of weaned piglets : Rs. 2000/- per piglet.<br />

6. Mortality upto 2 m<strong>on</strong>ths : 15 %<br />

7. Sale price of empty gunny bags : Rs. 5/- per bag.<br />

8. Sale price of manure : Rs. 50 /- per quintal.<br />

9. Cost of Feed : Rs.8 /- per Kg.<br />

10. Feed c<strong>on</strong>sumpti<strong>on</strong> from 2 – 4 m<strong>on</strong>ths : 1 Kg./ head / day.<br />

11. Feed c<strong>on</strong>sumpti<strong>on</strong> from 4- 8 m<strong>on</strong>ths : 1.5 Kg./ head / day.<br />

12. Feed c<strong>on</strong>sumpti<strong>on</strong> from 8 – 11 m<strong>on</strong>ths : 2 Kg./ head/ day<br />

13. Feed c<strong>on</strong>sumpti<strong>on</strong> from 11 m<strong>on</strong>ths <strong>on</strong>ward : 2.5 Kg./ head / day<br />

14. Average body weight of adult sow : 150 Kg.<br />

15. Sale price of Pig meat : Rs. 100 Kg.<br />

16. Cost of insurance : 5% original cost.<br />

17. Productive life : 6 years after attaining sexual maturity<br />

18. Number of furrowing during productive life : 10 Nos. per sow.<br />

19. Boar service charge : Rs. 500/-<br />

20. Age of sexual maturity : 11 m<strong>on</strong>ths.<br />

21. Floor space requirement for Sow : 72 Sq.ft./ sow.<br />

22. Floor space requirement for fatterners : 18 Sq.ft. / <strong>on</strong>e fattenner.<br />

23. C<strong>on</strong>structi<strong>on</strong> cost of pen : Rs. 100/- per Kg. of feed.<br />

24. Cost of feed : Rs. 8.00 per Kg. of feed.<br />

25. Land : C<strong>on</strong>sidered available free of cost.<br />

ANNEXURE – II<br />

ESTIMATED PROJECT COST FOE BROILER POULTRY<br />

BIRDS FARMING OF 200 BROILER UNIT<br />

Per unit project cost Rs. 41,460.00<br />

Rates as per existing local rate in <strong>Mizoram</strong>.<br />

A. CAPITAL EXPENDITURE:<br />

1) C<strong>on</strong>structi<strong>on</strong> of Broiler House of 17’ x 12’ to<br />

accommodate 200 Broilers<br />

@ Rs. 65/- per Sq. ft. : Rs. 13,260.00<br />

2) C<strong>on</strong>structi<strong>on</strong> o water Storage Tank L.S : Rs. 2,000.00<br />

3) Electrificati<strong>on</strong> – wiring with service<br />

C<strong>on</strong>necti<strong>on</strong> L.S : Rs. 2,000.00<br />

4) Cost of equipments – feeding trough, : Rs. 2,000.00<br />

watering trough etc. @ Rs.10/- per bird.<br />

------------------------------------------------<br />

TOTAL : Rs. 19,260.00<br />

------------------------------------------------


77<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

B. CAPITALISED EXPENDITURE :-<br />

( To raise 200 numbers of Broilers to market age / 8 weeks )<br />

1) Cost of Day old chisk 220 chicks due to<br />

Mortality rate @ Rs. 25/- per chick : Rs. 5,500.00<br />

2) Cost of litter @ Rs. 0.50 per bird : Rs. 100.00<br />

3) Veterinary Aids, Medicines, Vaccinati<strong>on</strong>,<br />

Minerals, Vitamins etc . @ Rs. 5/- per bird : Rs. 1,000.00<br />

4) Cost of Feed – 6 Kg/ bird @ Rs. 13 per Kg. : Rs. 15,600.00<br />

---------------------------------------------<br />

TOTAL : Rs. 22,200.00<br />

---------------------------------------------<br />

C. TOTAL INVESTMENT COST ( A+ B) : Rs. 19,260.00 + Rs. 22,200.00<br />

= Rs. 41,460.00<br />

( Rupees forty <strong>on</strong>e thousand four hundred sixty ) <strong>on</strong>ly.<br />

D. GROSS INCOME ( For the first producti<strong>on</strong> cycle at 8 weeks ) :<br />

1) Sale of 200 Broilers ( approx. weight )<br />

1.5 Kg. per bird @ Rs.90/- per Kg. = Rs. 27,000.00<br />

2) Sale of manure 1,000 Kg. 2 Rs. 90/- per Qtl. = Rs. 900.00<br />

-----------------------------------------------<br />

TOTAL = Rs. 27,900.00<br />

------------------------------------------------<br />

For <strong>on</strong>e year i.e., 4 producti<strong>on</strong> cycles<br />

27,900.00 x 4 = Rs. 1,11,600.00<br />

( Rupees One lakh eleven thousand six hundred ) <strong>on</strong>ly.<br />

E. COST OF EXPENDITURE FOR ONE YEAR :<br />

1) Cost of c<strong>on</strong>centrated feed @ Rs. 13/ per Kg.<br />

800 Broilers shall be produced at<br />

4 producti<strong>on</strong> cycles. (800 x 6 x 13) : Rs. 62,400.00<br />

2) Cost of litter for 4 producti<strong>on</strong> cycles<br />

@ Rs. 0.50 per bird (800.0.50 ) : Rs. 400.00<br />

3) Veterinary Aids Medicines, Vaccines etc<br />

@ Rs. 5 per bird for 4 producti<strong>on</strong> cycles : Rs. 4,000.00<br />

4) Water and electricity charges<br />

@ Rs. 1.00 per for 4 producti<strong>on</strong> cycles : Rs. 800.00<br />

-------------------------------------------------<br />

TOTAL : Rs. 67,600.00<br />

-------------------------------------------------<br />

( Rupees sixty seven thousand six hundred ) <strong>on</strong>ly.<br />

F. NET PROFIT FOR FIRST ONE YEAR ( D – E )<br />

i.e. Rs. 1,11,600.00 – Rs. 67,600.00 = Rs. 44,000.00<br />

( Rupees forty four thousand ) <strong>on</strong>ly.


78<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

G. COST OF EXPENDITURE FOR THE SECOND YEAR ( Four producti<strong>on</strong> Cycle )<br />

1) Cost of Day old chicks 80 chicks due to : 22,000.00<br />

mortality rate @ Rs. 25/- per chick.<br />

2) Cost of litter @ Rs. 0.50 per bird<br />

i.e. 200 x 4 x 0.50 : 400.00<br />

3) Veterinary Aids, Medicines, Vaccine etc<br />

@ Rs. 5/- per bird i.e. 200 x 4 x 5 : 4,000.00<br />

4) Water & Electricity Charges @ Rs. 1/- per bird<br />

i.e. 200 x 4 x 1 : 800.00<br />

5) Cost of Feed @ Rs. 61 per bird for four producti<strong>on</strong><br />

cycle i.e. 200 x 4 x 13 x 6 @ Rs. 13/- per Kg. : 62,400.00<br />

-------------------------------------------------------------------------------------------------------<br />

TOTAL : 89,600.00<br />

-------------------------------------------------------------------------------------------------------<br />

H. GROSS INCOME FOR THE SECOND YEAR ( four producti<strong>on</strong> cycle )<br />

1) Sale of 800 nos. of broilers approximate weight<br />

1.5 kg/ bird @ Rs. 90/- per Kg. i.e. 800 x 1.5 x 90 1,08,000.00<br />

2) Sale of Manure 4000 Kg ( 40 Qtl) @ Rs. 90/- per Qtl.<br />

i.e. 40 x 90 : 3,600.00<br />

-------------------------------------------------------------------------------------------------------<br />

TOTAL Rs. 1,11,600.00<br />

-------------------------------------------------------------------------------------------------------<br />

I. NET PROFIT FOR THE SECOND YEAR ( H-G)<br />

i.e., Rs. 1,11,600.00 – 89,600.00 = Rs. 22,000.00<br />

( Rupees twenty two thousand ) <strong>on</strong>ly.<br />

Note: It assume that the account statement for the 3 rd year, 4 th year and 5 th year will<br />

be the same to that of the sec<strong>on</strong>d year, so l<strong>on</strong>g as the strength of bird is kept c<strong>on</strong>stant.<br />

ASSUMPTION AND TECHNICAL NORMS<br />

1) Cost of day Old Chick : Rs. 25 per chick.<br />

2) Mortality rate : 10 percent.<br />

3) Floor space required ; 1 Sq.ft. per bird.<br />

4) Feed c<strong>on</strong>sumpti<strong>on</strong> : 6 Kg. per bird.<br />

5) Average body weight : 1.5 Kg. per bird at 8 weeks.<br />

6) Feed price : Rs. 13 per Kg.<br />

7) Manure producti<strong>on</strong> : 5 Kg. per bird.<br />

8) Sale of Manure : Rs.90 per qtl.<br />

9) Selling price of bird : Rs.90 per Kg.<br />

10) Land : C<strong>on</strong>sidered available free of cost.


79<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ANNEXURE – III<br />

ESTIMATED PROJECT COST FOR LAYER POULTRY FARMING OF<br />

100 LAYERS UNIT<br />

Per Unit project cost Rs. 28,320/-<br />

Rates as per existing local rate in <strong>Mizoram</strong><br />

A. CAPITAL EXPENDITURE:<br />

1) C<strong>on</strong>structi<strong>on</strong> of 1 Nos. of Layer House of<br />

9’ x 12’ to accommodate 100 Layers<br />

@ Rs. 65/- per Sq. ft. : Rs. 7,020.00<br />

2) C<strong>on</strong>structi<strong>on</strong> of Water storage tank L.S : Rs. 3,000.00<br />

3) Electrificati<strong>on</strong> – wiring with service<br />

C<strong>on</strong>necti<strong>on</strong> L.S : Rs. 2,000.00<br />

5) Cost of equipment – Feeding trough, watering<br />

Trough etc. Rs.10/- per bird : Rs. 1,000.00<br />

-------------------------------------------<br />

TOTAL : Rs. 13,020.00<br />

-------------------------------------------<br />

B. CAPITALISED EXPENDITURE :-<br />

( To raise 1000 numbers of Layers to point of lay i.e. 22 weeks of age )<br />

i) Cost of Day chick ( 110 chicks due to<br />

mortality rate 2 Rs.25/- per chick i.e. 110 x 25 : Rs. 2,750.00<br />

ii) Cost of litter @ Rs. 0.50 per bird : Rs. 50.00<br />

iii) Cost of Vaccines, medicine, Vitamins,<br />

Minerals etc. @ Rs. 5/- per bird : Rs. 500.00<br />

iv) Cost of Feed from 0-22 weeks i.e. 10 Kg / bird<br />

@ Rs. 12/- per Kg. L.S : Rs. 12,000.00<br />

---------------------------------------------<br />

TOTAL : Rs. 15,300.00<br />

---------------------------------------------<br />

C. TOTAL INVESTMENT COST ( A + B ); Rs. 13,020.00 + Rs. 15,300.00<br />

= Rs. 28,320.00<br />

( Rupees twenty eight thousand three hundred twenty ) <strong>on</strong>ly.<br />

D. GROSS INCOME THE FIRST YEAR :<br />

a) Sale of eggs 180 eggs per bird @ Rs.3.00 per egg : Rs.54,000.00<br />

b) Sale of 1820 kg. of manure @ Rs. 90 per qtl. : Rs. 1,638.00<br />

--------------------------------------------<br />

TOTAL : Rs. 55,638.00<br />

--------------------------------------------


80<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

E. COST OF EXPENDITURE FOR THE FIRST YEAR:<br />

a) Cost of chick mash @ 2 kg per bird ( 0-8 weeks)<br />

@ Rs. 12 per kg. i.e. 100 x 2 x 12 : Rs. 2,400.00<br />

b) Cost of grower mash @ 5 kg per bird (8-20 weeks )<br />

@ Rs.12/- per Kg. 100 x 5 x 12 : Rs. 6,000.00<br />

c) Cost of layer mash @ 27 kg. per bird : Rs. 32,400.00<br />

( for 224 days ) i.e. 100 x 27 x 12<br />

d) Cost of Minerals, vitamins, medicines etc.<br />

@ Rs. 5/- per bird : Rs. 500.00<br />

e) Cost of litter @ Rs. 0.50 per bird : Rs. 50.00<br />

f) Water and electricity charge @ Re. 1/-<br />

Per bird m<strong>on</strong>th : Rs. 100.00<br />

---------------------------------------------------------<br />

TOTAL : Rs. 41,450.00<br />

---------------------------------------------------------<br />

F. NET INCOME FOR THE FIRST ONE YEAR:<br />

i.e., D – E = Rs.55,638.00 - Rs. 41,450.00<br />

= Rs. 14,188.00<br />

( Rupees fourteen thousand <strong>on</strong>e hundred eighty eight ) <strong>on</strong>ly.<br />

G. COST OF EXPENDITURE FOR THE SECOND YEAR:<br />

1) Cost of replacement stock, 110 chicks<br />

Due to mortality rate @ Rs.25/- per chick. : Rs. 2,750.00<br />

2) Cost of feed from 0-22 weeks @ 10 Kg. per bird<br />

@ Rs.12/- per Kg. i.e. 100 x 10 x 12 : Rs. 12,000.00<br />

3) Cost of litter @ Rs.0.50 per bird .i.e. 100 x 0.50 : Rs. 50.00<br />

4) Cost of vaccine, medecine, vitamin etc.<br />

@ Rs. 5/- per bird i.e. 100 x 5 : Rs. 500.00<br />

5) Cost of layer Mash for 6 m<strong>on</strong>ths @ 120g./layer/ day<br />

@ Rs. 5/- per bird i.e. 100 x 5 : Rs. 25,920.00<br />

6) Water & electricity charge @ Rs. 1/- per bird / m<strong>on</strong>th<br />

i.e. 100 x 1 x 12 : Rs. 1,200.00<br />

----------------------------------------------<br />

TOTAL : Rs. 42,420.00<br />

----------------------------------------------<br />

H. GROSS INCOME FOR THE SECOMD YEAR:<br />

1) Sale of 180 eggs per bird @ Rs.3/- per egg<br />

i.e. 100 x 180 x 3 : Rs. 54,000.00<br />

2) Sale of 1820 Kg. ( 18.20 Qyls.) of Manure<br />

@ Rs. 90/- per quintal i.e. 18.20 x 90 : Rs. 1,638.00<br />

3) Sale of culled bird at the end of laying<br />

i.e. at the end the sec<strong>on</strong>d year approx. weight 2 Kg<br />

@ Rs.80 /- per Kg. i.e. 100 x 2 x 80 : Rs. 16,000.00<br />

-----------------------------------------------------------------------------------------------------<br />

TOTAL : Rs. 29,218.00<br />

-----------------------------------------------------------------------------------------------------


81<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

I. NET PROFIT FOR THE SECOND YEAR ( H- G ):<br />

i.e. Rs. 71,638.00 – Rs. 42,420.00 : Rs. 29,218.00<br />

( Rupees twenty nine thousand two hundred eighteen ) <strong>on</strong>ly.<br />

Note: The account statement of layer for the 3 rd , 4 th , & 5 th year will remain more or<br />

less the same as that of the sec<strong>on</strong>d year, as the producti<strong>on</strong> and procurement of<br />

a new flock of bird will be a regular phenomen<strong>on</strong> in the farm operati<strong>on</strong>.<br />

ASSUMPTION AND TECHNICAL NORMS<br />

1) Cost of Day Old Chicks : Rs. 25/- per bird.<br />

2) Mortality Rate of chick : 10 percent.<br />

3) Floor space required : 1 Sq.ft. per bird.<br />

4) Age flock at when first egg is laid : 160 days.<br />

5) Age flock at 50% hen-day egg producti<strong>on</strong> : 180 days.<br />

6) Age of flock at peak hen – day egg producti<strong>on</strong> : 217 days.<br />

7) Feed price : Rs.12/- per kg.<br />

8) Selling price of eggs : Rs.3/- per egg.<br />

9) Manure producti<strong>on</strong> : 18.20 Kg/ bird.<br />

10) Sale of manure : Rs. 90 /- per quintal.<br />

11) Land : C<strong>on</strong>sidered available.<br />

ANNEXURE – IV<br />

ESTIMATED PROJECT COST FOR<br />

DAIRY COW FARMING OF TWO (2) COWS UNIT<br />

Per Unit Project cost Rs. 1,12,770/-<br />

Rate as per existing local rate in <strong>Mizoram</strong>.<br />

A. NON – RECURRING EXPENDITURE:<br />

1. C<strong>on</strong>structi<strong>on</strong> of Byre ( Cowshed ) and<br />

feed Godown @ 50 Sq.ft. floor / Cow<br />

@ Rs. 200 per Sq.ft. for two cows. : Rs. 20,0000.00<br />

2. Cost of Water Storage Tank L.S. : Rs. 3,000.00<br />

3. Cost of equipments i.e. watering trough, milk can,<br />

Basin etc. @ Rs. 1125/- per cow : Rs. 2250.00<br />

---------------------------------------------------------<br />

TOTAL : Rs. 25,250.00<br />

---------------------------------------------------------


82<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

B. CAPITALISED EXPENDITURE:<br />

1. Cost of two dairy Cows @ Rs. 30,000/- : Rs. 60,000.00<br />

(including transportati<strong>on</strong>)<br />

2. Veterinary Aids, Medicines, Vaccinati<strong>on</strong>,<br />

Breeding charge etc.<br />

@ Rs. 500/- per cow per year : Rs. 1,000.00<br />

3. Cost of Feed for <strong>on</strong>e year @ Rs.3 Kg/ cow/ day,<br />

@ Rs. 10/- per Kg. c<strong>on</strong>c. : Rs. 21,900.00<br />

4. Insurance premium @ 6.5% of original cost<br />

for 2 Nos. of Cow. : Rs. 3,900.00<br />

5. Water & Electricity charges<br />

@ Rs. 30 per cow per m<strong>on</strong>th : Rs. 720.00<br />

---------------------------------------------<br />

TOTAL : Rs. 87,520.00<br />

---------------------------------------------<br />

C. TOTAL INVESTMENT COST:<br />

i.e. A + B = Rs. 25,250.00 + Rs. 87,520.00 = Rs. 1,12,770.00<br />

( Rupees <strong>on</strong>e lakh twelve thousand seven hundred seventy ) <strong>on</strong>ly.<br />

D. GROSS INCOME ( FOR THE FIRST ONE YEAR ):<br />

1. Sale of 5400 lits. Of Milk<br />

Average 10 Lits./ animal / day for 270 days<br />

@ Rs. 18 per lit. of Milk : Rs. 97,200.00<br />

2. Sale of manure ( Cowdung )<br />

@ Rs. 250 per cow per year : Rs. 1,000.00<br />

3. Sale of empty Gunny bags<br />

@ Rs. 10. Per Bag : Rs. 450.00<br />

----------------------------------------------<br />

TOTAL : Rs. 98,650.00<br />

----------------------------------------------<br />

( Rupees ninety eight thousand six hundred fifty ) <strong>on</strong>ly.<br />

E. COST OF EXPENDITURE FOR ONE YEAR : (to be c<strong>on</strong>tinued by the beneficiary)<br />

1) Cost of c<strong>on</strong>centrated feed @ 3 Kg/ cow/ day<br />

@ Rs. 10/0 per Kg. for 365 days for 2 Cows : Rs. 21,900.00<br />

2) Cost of Veterinary Aids, medicines, etc.<br />

@ Rs. 500/- per animal per year : Rs. 1,000.00<br />

3) Water & Electricity charge<br />

@ Rs. 30 per animal per m<strong>on</strong>th : Rs. 720.00<br />

4) Insurance premium @ 6.5 % of original<br />

Cost for two cows : Rs. 3,900.00<br />

-----------------------------------------------------<br />

TOTAL : Rs. 27,520.00<br />

-----------------------------------------------------<br />

( Rupees twenty seven thousand five hundred twenty ) <strong>on</strong>ly.


83<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

F. NET INCOME (FOR FIRST ONE YEAR):<br />

i.e. D – E = Rs. 98,650.00 - Rs. 27,520.00<br />

= Rs. 71,130.00<br />

( Rupees seventy <strong>on</strong>e thousand <strong>on</strong>e hundred thirty ) <strong>on</strong>ly.<br />

Note: Assuming the farmer maintaining the same strength of the herd and at the same<br />

producti<strong>on</strong> trend, the account statement of 2 nd , 3 rd , 4 th and 5 th year will be more or less<br />

the same.<br />

ASSUMPTION AND TECHNICAL NORMS<br />

1. Cost of <strong>on</strong>e Dairy Cow : Rs. 30,000.00<br />

2. Floor space : 50 sq.ft. per cow.<br />

3. Feed c<strong>on</strong>sumpti<strong>on</strong> : 3 Kg. c<strong>on</strong>centrate 25 Kg. fodder per cow per day<br />

4. Feed price : Rs. 10/- per Kg. ( c<strong>on</strong>centrate feed )<br />

5. Selling Price of milk : Rs. 18 per litre.<br />

6. Manure Producti<strong>on</strong> : 5 t<strong>on</strong>nes per animal per year.<br />

7. Sale of Manure : Rs. 250 per t<strong>on</strong>ne.<br />

8. Locati<strong>on</strong> period : 270 days per year.<br />

9. Average dry period : 95 days.<br />

10. Land : C<strong>on</strong>sidered available free of cost.


84<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ENVIRONMENT & FORESTS<br />

Background:<br />

Flowering of bamboo is a botanical enigma. The factors resp<strong>on</strong>sible for flowering are<br />

yet to be understood fully. Nearly all bamboo seems to have their own life history and most<br />

of them flower <strong>on</strong>ce in lifetime and die after flowering; subsequently regenerate from seeds.<br />

When all bamboo clumps flower simultaneously in a vast area, it is known as<br />

gregarious flowering e.g. Melocanna baccifera (Muli), Dendrocalamus l<strong>on</strong>gispathus,<br />

Bambusa tulda etc. and when few clumps in a clump or few clumps in a locality<br />

flower, it is known as sporadic flowering e.g. Bambusa balcooa (Bholuka), Dendrocalamus<br />

hamilt<strong>on</strong>ii (Kako) etc.<br />

Historical evidence:<br />

Extract from: MILITARY REPORT ON THE CHIN-LUSHAI COUNTRY by Col. E.B.<br />

Elly, Asst. Quarter Master General.<br />

“1881….Shortly after this the pressure of famine began to be felt, and three principal chiefs,<br />

Poiboi, Khalkom, and Lalhai, met and agreed to a cessati<strong>on</strong> of hostilities, and at <strong>on</strong>ce sent<br />

men into the Cachar district to obtain supplies of food.<br />

The famine arose from the depredati<strong>on</strong>s of rats, who multiplied exceedingly the<br />

previous year owing to the ample food they obtained from the seeding of the bamboos.<br />

About 18,000 maunds of rice and 2000 maunds of paddy were imported from Cachar, and the<br />

British Government expended about Rs.1240 <strong>on</strong> famine relief of which about 1040 were<br />

recovered from sales to traders.”<br />

Extract from: THE LUSHAI HILLS (culled from History of the Fr<strong>on</strong>tier Areas Bordering <strong>on</strong><br />

Assam from 1883-1941) - Sir Robert Reid, Governor of Assam, 1937-1942.<br />

“The partial failure of crops in 1910-11 as an<br />

indirect result of the flowering of the bamboos was<br />

followed by serious scarcity all over the district.<br />

The effect of this flowering was to cause a<br />

tremendous increase in number of the rats, who<br />

destroyed all crops.”<br />

Bamboo Flowering - North-East Scenario:<br />

The last gregarious flowering of Muli<br />

bamboo (Melocanna baccifera) in <strong>Mizoram</strong>,<br />

Tripura and Barak valley of Assam was recorded in<br />

1959, which was followed by a severe famine in<br />

those areas that left a fear psychosis in the minds of<br />

people. About 26,614 sq. km. Bamboo area spread<br />

over the states of <strong>Mizoram</strong>, Tripura, Manipur and<br />

parts of Assam & Meghalaya are likely to be<br />

affected by this phenomen<strong>on</strong> of gregarious<br />

flowering in the years 2005-2007. The epicenter of<br />

above flowering will be the state of <strong>Mizoram</strong>.<br />

Mautam<br />

(M. baccifera) (B. tulda)<br />

---- 1880-1884<br />

1910-1912 1928-1929<br />

1958-1959 1976-1977<br />

2005-2007* 2024-2025*<br />

* Expected


85<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The records of bamboo flowering in the state of <strong>Mizoram</strong> date back to 1880. In this<br />

state, the flowering is divided into two categories based <strong>on</strong> the bamboo species viz.; Mautam<br />

(Melocanna baccifera) and Thigtam (Bambusa tulda & Dendrocalamus l<strong>on</strong>gispathus). Both<br />

these categories have been found to occur at regular intervals of roughly 47 to 50 years. The<br />

gap between a Thingtam and Mautam is 30 years while that between a Mautam and the<br />

following Thingtam is 18 years.<br />

Introducti<strong>on</strong>:<br />

Bamboo forms an important renewable resource in the State of <strong>Mizoram</strong> covering a<br />

sizeable area of about 31% of the geographical area of the State. The precious resource could<br />

not be commercially tapped till now mainly for want of adequate infrastructure development<br />

and market linkage for export of Bamboo products in the form of handicrafts, building<br />

material and a variety of utility products. In the absence of any Bamboo based industry in the<br />

State a large quantity of Bamboo stock has so far remained unutilized. A small quantity of<br />

Bamboo is harvested through annual Mahals and Permit system for supply to Cachar Paper<br />

M<strong>on</strong>itorable Targets for the Tenth Plan and<br />

Bey<strong>on</strong>d – Planning Commissi<strong>on</strong><br />

• Reducti<strong>on</strong> of poverty ratio by 5<br />

percentage points by 2007 and by 15<br />

percentage points by 2012;<br />

• Providing gainful high-quality<br />

employment to the additi<strong>on</strong> to the<br />

labour force over the Tenth Plan period;<br />

• All children in school by 2003; all<br />

children to complete 5 years of schooling<br />

by 2007;<br />

• Reducti<strong>on</strong> of gender gaps in literacy<br />

and wage rates by at least 50% by 2007.<br />

• Reducti<strong>on</strong> in decadal rate of populati<strong>on</strong><br />

growth between 2001 and 2011 to 16.2%;<br />

• Increase in Literacy rate to 75% within<br />

the Plan period;<br />

• Reducti<strong>on</strong> of infant mortality rate<br />

(IMR) to 2 per 1000 live births by 2007<br />

and to 1 by 2012.<br />

• Increase in forest and tree cover to<br />

25% by 2007 and 33% by 2012.<br />

• All villages to have sustained access to<br />

potable drinking water within the Plan<br />

period;<br />

• Cleaning of major polluted rivers by<br />

2007 and other notified stretches by 2012.<br />

Mill, a unit of Hindustan Paper<br />

Corporati<strong>on</strong>, Government of India,<br />

located at Panchgram in Hailakandi<br />

District of Assam.<br />

About 20 Bamboo species have<br />

been recorded from the State of which<br />

Melocanna baccifera (Hindi: Muli, local<br />

name: Mautak) al<strong>on</strong>e c<strong>on</strong>tributes more<br />

than 90% of the total growing stock as<br />

per the forest inventory carried out by<br />

the Resources Survey Divisi<strong>on</strong> of the<br />

State’s E&F Department. Mautak is a<br />

n<strong>on</strong>-clump forming Bamboo, thin<br />

walled, small in size and hollow while<br />

there<br />

are few thick walled and bigger<br />

Bamboos like Dendrocalamus<br />

hamilt<strong>on</strong>ii (Phulrua), D.giganteus<br />

(Rawpui), D.sikkimensis (Rawmi),<br />

D.strictus (Tursing) and Bambusa tulda<br />

(Rawthing). These thick walled species<br />

are clump-forming, occurring in small<br />

proporti<strong>on</strong>, yet ec<strong>on</strong>omically important<br />

as raw material for specialized value<br />

added products such as Bamboo floor<br />

board, roofing, furniture, toys and<br />

handicrafts and for c<strong>on</strong>structi<strong>on</strong><br />

purposes. In the adjoining States of


86<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Assam and West Bengal, these thick walled bamboos fetch as much as Rs. 40-50 each.<br />

Proper industrial utility of Mautak as also other thick-walled Bamboo species have not been<br />

established in the State.<br />

Bamboo sector development in the State has immense potential in alleviating poverty<br />

in the rural areas as bamboo raw material supports a variety of cottage as well as other agrobased<br />

industries. Bamboo shoot processing units, besides being a substitute to timber, forms a<br />

value added product that is in demand in other countries. In order to promote commercial<br />

cultivati<strong>on</strong> of Bamboo for the benefit of rural poor, high yielding thick walled bamboos need<br />

to be raised both in farm sector and in the Government sector <strong>on</strong> crash basis. Muli / Mautak is<br />

expected to mass seed by 2007 when the entire growth will perish and the next crop of Muli /<br />

Mautak will be available <strong>on</strong>ly after 4-5 years.<br />

Objectives:<br />

2.1 To encourage commercial cultivati<strong>on</strong> of ec<strong>on</strong>omically important Bamboo species in<br />

the farm sector as a source of livelihood.<br />

2.2 To increase productivity of Bamboo to ensure sustained supply of raw material for<br />

cottage industries, Bamboo shoot processing units for value added export items and as<br />

a substitute to wood in-c<strong>on</strong>structi<strong>on</strong> activities.<br />

2.3 To produce large quantity of quality seedlings of high yielding known Bamboo<br />

species through tissue culture (wherever possible) and vegetative propagati<strong>on</strong> for<br />

meeting the <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting material requirement of farmers and forest department.<br />

2.4 To rehabilitate the traditi<strong>on</strong>al jhum cultivators <strong>on</strong> a sustained productive farming<br />

through Bamboo cultivati<strong>on</strong> for improving their socio-ec<strong>on</strong>omic c<strong>on</strong>diti<strong>on</strong>.<br />

2.5 To minimize the pressure <strong>on</strong> natural forests for timber by producing big thick walled<br />

Bamboos for c<strong>on</strong>structi<strong>on</strong> purposes.<br />

2.6 To popularize use of eco-friendly Bamboo for house c<strong>on</strong>structi<strong>on</strong> in the earthquake<br />

pr<strong>on</strong>e regi<strong>on</strong> of Northeast.<br />

2.7 To harvest the Muli bamboo (Melocanna baccifera) before it flowers and perishes so<br />

as to fetch maximum possible revenue for the State’s exchequer.<br />

Bamboo Acti<strong>on</strong> Plan Strategy:<br />

The Acti<strong>on</strong> Plan to combat gregarious flowering of Bamboo is envisaged to prepare<br />

the people especially in the rural areas to tide over the likely socio-ec<strong>on</strong>omic problems and<br />

comprises of the following main comp<strong>on</strong>ents such as infrastructure development, bamboo<br />

extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> & enumerati<strong>on</strong>, rodent c<strong>on</strong>trol, regenerati<strong>on</strong> of flowered areas through farm sector<br />

and Departmental bamboo <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>s and research aspects.<br />

The overall Bamboo Acti<strong>on</strong> Plan Strategy is at Annexure – 1.<br />

3.1 Infrastructure development:


87<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

3.1.1. C<strong>on</strong>structi<strong>on</strong> of bamboo extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>/link road:<br />

A huge growing stock of bamboo is located in areas accessible neither by road nor by<br />

river. However, the bamboo can be harvested and transported to the main road by<br />

c<strong>on</strong>structing makeshift semi-permanent roads and through ropeway trolleys.<br />

3.1.2. Development of river course for transportati<strong>on</strong> of bamboo:<br />

Being characterised by hilly topography, there are numerous streams in the State. In<br />

their natural states, these streams are not perfectly suitable for transportati<strong>on</strong> of bamboo by<br />

floating down the rafts. However, improvements of these river courses by blasting of jutting<br />

rocks, removal of fallen trees etc., could make it suitable as a c<strong>on</strong>venient extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> channel<br />

for bamboo. It is proposed to develop the major rivers of the State for floating of bamboos.<br />

3.1.3. Establishment of bamboo collecti<strong>on</strong> centres:<br />

There are four major outlets in the State for transportati<strong>on</strong> and sale of bamboo.<br />

Kanhmun is located at the north-western border having feeder extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> channel by<br />

Langkaih river and by Serhmun – Kanhmun road. Bairabi lies at the c<strong>on</strong>fluence of Tlawng,<br />

Teirei and Tut rivers. It is also c<strong>on</strong>nected by road from Kolasib and has a major link with the<br />

border district of Cachar in the State of Assam through railroad. Vairengte is another outlet<br />

al<strong>on</strong>g the nati<strong>on</strong>al highway NH54. Another important outlet is located near the Tuirial Hydro<br />

Power Plant al<strong>on</strong>g Tuirial river. Likewise, a comm<strong>on</strong> centre can be established at Tlabung <strong>on</strong><br />

the river Kolodyne to facilitate export of Muli bamboo to Bangladesh.<br />

It is imperative that bamboo collecti<strong>on</strong> centres be established at these locati<strong>on</strong>s so as<br />

to maintain c<strong>on</strong>trol and check <strong>on</strong> the movement of Bamboo outside the State. Bamboo depots<br />

have to be developed and established for stocking and sale and booms will be c<strong>on</strong>structed at<br />

suitable locati<strong>on</strong>s al<strong>on</strong>g the major rivers. Besides, some staff quarters and check gates will<br />

also be c<strong>on</strong>structed at suitable locati<strong>on</strong>s to regulate and m<strong>on</strong>itor movement of bamboo.<br />

An amount of Rs. 520.25 lakhs is proposed for development of infrastructures.<br />

Details at Annexure – 2.<br />

3.2. Bamboo enumerati<strong>on</strong> and extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>:<br />

3.2.1 Inventory of bamboo resource:<br />

Forest Survey of India did bamboo<br />

Resource Survey a decade ago in 1991 & 1992.<br />

However, this report is quite old for<br />

preparati<strong>on</strong> of current Acti<strong>on</strong> Plan. A quick<br />

resource assessment reveals that around 5.83<br />

MT bamboo will be available. Bamboo<br />

resource inventory of the Divisi<strong>on</strong>s have been<br />

prepared. Mapping of Muli bamboo bearing<br />

areas is under way. Past gregarious flowering<br />

areas records are not available. For these<br />

reas<strong>on</strong>s Bamboo resource inventory is very<br />

essential which includes field survey and<br />

compilati<strong>on</strong> of field data, publishing of report,<br />

development of bamboo map and proposal for<br />

road development for exploitati<strong>on</strong>.<br />

State Bamboo Bamboo<br />

growing growing<br />

area stock<br />

(sq km) (mil. t<strong>on</strong>s)<br />

<strong>Mizoram</strong> 6446 25.26<br />

Assam 8213 13.41<br />

Arunachal 4590 9.84<br />

Manipur 3692 11.47<br />

Meghalaya 3102 4.41<br />

Tripura 939 0.86<br />

Nagaland 758 3.66<br />

Total 30504 54.53


88<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

3.2.2 Emergency <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g> for extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> of bamboo:<br />

As already indicated, Melocanna baccifera forms about 90% of the total bamboo<br />

growing stock in <strong>Mizoram</strong>. It covers nearly 31% of the total forest cover in the state. That<br />

much quantity of wealth is now heading for sp<strong>on</strong>taneous decay in the form of gregarious<br />

flowering and death of the whole populati<strong>on</strong>. The need of the hour is large-scale extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>.<br />

The <strong>on</strong>going system of bamboo mahal plays an insignificant role in extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> and sale of<br />

bamboo to the Hindustan Paper Corporati<strong>on</strong> as against the huge growing stock available in<br />

the State. This is due mainly to the difficult terrain and inadequacy of major river system.<br />

Most of the bamboo areas are located in the interior areas posing a big problem of extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>.<br />

It is proposed to take up c<strong>on</strong>structi<strong>on</strong> and development of routes for extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> of bamboo<br />

from such interior places. Semi-permanent roads may be c<strong>on</strong>structed in areas devoid of<br />

navigable streams. Wherever there exist streams, development of the river course for floating<br />

down the bamboo may be taken up. Bamboo collecti<strong>on</strong> centre needs to be established at each<br />

of the outlets for maintaining c<strong>on</strong>trol and supervisi<strong>on</strong>.<br />

Demarcati<strong>on</strong> of annual coupes and enumerati<strong>on</strong> of all Muli bamboo areas will be<br />

d<strong>on</strong>e to facilitate extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <strong>on</strong> scientific lines.<br />

Estimate for Bamboo enumerati<strong>on</strong> and extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> is at Annexure – 3.<br />

3.3. Regenerati<strong>on</strong> of Flowered Bamboo Areas<br />

Sporadic flowering and then gregarious flowering is the characteristic of most of the<br />

bamboo species. It flowers profusely and the bamboo dies after flowering. The mechanism<br />

for the timing of flowering and dying is a phenomen<strong>on</strong> not yet understood. It is <strong>on</strong>e of<br />

nature’s baffling mysteries.<br />

Following mass seeding, there is a huge proliferati<strong>on</strong> of new <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts (seedlings) <strong>on</strong> the<br />

ground and this is highly susceptible to fire and grazing. Besides, while harvesting the dead<br />

and dry bamboos, there is every danger of trampling the young seedlings. It is therefore<br />

necessary to accord maximum protecti<strong>on</strong> to a large chunk of the flowered area. For others,<br />

the flowering provides an opportunity for undertaking <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> of other native bamboo<br />

species which are in greater demand.<br />

In the case of <strong>Mizoram</strong>, the area break-up for regenerati<strong>on</strong> measures would be as<br />

follows: -<br />

Geographical area of the State: 21,087 sq km<br />

Bamboo forests : 6447 sq km (31% of geographical area)<br />

Area expected to be affected<br />

by gregarious flowering : 5100 sq km (80%)<br />

Area accessible for extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> : 1200 sq km (25%)<br />

Area required for <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting : 360 sq km (30% of 1200 sq km)<br />

In Forest area (75%) : 270 Sq.km


89<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

3.4. Departmental bamboo <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>:<br />

During the 9 th Plan, an area of 1500 ha degraded forest was treated under Bamboo<br />

Plantati<strong>on</strong> using the Joint Forest Management principles. In the 10 th Plan, an area of 6430 ha<br />

degraded forest has been earmarked for Bamboo Plantati<strong>on</strong> under the FDA arrangements to<br />

be implemented by the VFDCs at the village level.<br />

In additi<strong>on</strong>, bamboo <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> over an area of 27000 ha flowered area would be taken<br />

up by <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting ec<strong>on</strong>omically valuable species viz. Dendrocalamus hamilt<strong>on</strong>ii,<br />

D.l<strong>on</strong>gispathus, D. strictus, Bambus tulda and B.bambos by the Department of Envir<strong>on</strong>ment<br />

& Forests.<br />

3.5. Bamboo Research:<br />

Very little research has been<br />

d<strong>on</strong>e <strong>on</strong> Bamboo flowering despite<br />

the fact that the phenomen<strong>on</strong> is well<br />

known and much feared in the regi<strong>on</strong><br />

as a harbinger of famine and other<br />

related disaster. Whatever little<br />

research has been d<strong>on</strong>e is c<strong>on</strong>fined to<br />

academics by Universities and do not<br />

really address the enigma associated<br />

with gregarious flowering. Even the<br />

linkage between rodent upsurge and<br />

mass seeding of bamboo is yet to be<br />

fully comprehended. Fundamental<br />

researches <strong>on</strong> bamboo physiology,<br />

biochemistry, anatomy, ecology and<br />

classificati<strong>on</strong> are required. This can<br />

be taken up <strong>on</strong> priority by the coming<br />

up of Advanced Research Centre <strong>on</strong><br />

Bamboo & Cane in Aizawl under the<br />

aegis of Rain Forest Research<br />

Institute, Jorhat, a regi<strong>on</strong>al unit of<br />

Indian Council of Forestry Research<br />

& Educati<strong>on</strong>, Government of India.<br />

Besides, the value additi<strong>on</strong> aspects<br />

including bamboo shoot processing<br />

and the nutriti<strong>on</strong> c<strong>on</strong>tents need to be<br />

analysed. Market studies also need to<br />

be c<strong>on</strong>ducted.<br />

Bamboos of <strong>Mizoram</strong><br />

S/N Scientific name Local name Status<br />

1 Bambusa khasiana Rawte Comm<strong>on</strong><br />

2 B l<strong>on</strong>gispiculata Rawthing Less comm<strong>on</strong><br />

3 B oliveriana Talan Less comm<strong>on</strong><br />

4 B tulda Rawthing Comm<strong>on</strong><br />

5 B vulgaris Vairua Introduced<br />

6 Chim<strong>on</strong>obambusa<br />

collosa<br />

Phar Comm<strong>on</strong><br />

7 Dendrocalamus<br />

hamilt<strong>on</strong>ii<br />

Phulrua Very comm<strong>on</strong><br />

8 Dendrocalamus Rawlak/ Less comm<strong>on</strong><br />

hookeri<br />

Rawkhauh<br />

9 D. l<strong>on</strong>gispathus Rawnal Very comm<strong>on</strong><br />

10 D. sikkimensis Rawmi Comm<strong>on</strong><br />

11 D. strictus Tursing Introduced<br />

12 D. spp Ankuang Endemic to<br />

Mamit<br />

13 Dinochloa<br />

compactiflora<br />

Sairil Very comm<strong>on</strong><br />

14 Gigantochloa Rawthing Comm<strong>on</strong><br />

albociliata tial<br />

15 Melocanna<br />

baccifera<br />

Mautak Very comm<strong>on</strong><br />

16 Pseudostachyum<br />

polymorphum<br />

Chal Rare<br />

17 Racemobamboos<br />

mannii<br />

Saiman Rare<br />

18 Schizostachyum<br />

capitatum<br />

Rawngal Comm<strong>on</strong><br />

19 Schizostachyum Rawthla Comm<strong>on</strong><br />

dulloa<br />

20 Sinarundinaria<br />

intermedia<br />

Lik/<br />

Thothek<br />

Comm<strong>on</strong><br />

3.6. Implementing Agency:<br />

Envir<strong>on</strong>ment and Forest Department will be the Nodal Agency for implementati<strong>on</strong> of<br />

the Acti<strong>on</strong> Plan. All the Territorial DFOs with their field staff shall render necessary<br />

assistance for successful implementati<strong>on</strong> of the programme. At the village level the Village<br />

Council President, NGOs, Social Workers, Women representatives and Foresters will be the<br />

members.


90<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

3.7. Project Cost and Funding:<br />

The project is formulated for a period of five years (with maintenance upto the 4 th<br />

year) and includes overheads to meet exigencies that may arise during implementati<strong>on</strong> of the<br />

programmes. The proposed financial outlay for 2004 – 2005 is Rs.333.30 lakhs, 2005 – 2006<br />

is Rs. 853.97 lakhs, 2006 – 2007 is Rs. 867.97 lakhs and 2007-08 is Rs 644.58 lakhs and<br />

2008-09 is Rs. 548.55. The total physical targets and financial outlays including maintenance<br />

cost in the 5 th , 6 th , 7 th and 8 th year Rs 3756.83 lakhs.<br />

Year-wise details of physical targets and financial outlays under different item of<br />

works are shown in Annexures – 4,5&6.<br />

3.8. Expected Returns:<br />

Under cultivated c<strong>on</strong>diti<strong>on</strong>s<br />

Bamboo is quite remunerative, as<br />

rhizomes will mature in the 4 th year itself,<br />

while seedling origin crop will be ready<br />

for harvesting from 6 th year <strong>on</strong>wards. On<br />

an average 5 culms per clump would be<br />

available <strong>on</strong> maturity. Going by current<br />

rate, it is estimated that <strong>on</strong>e hectare of<br />

<str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> with 500 nos. of clumps will<br />

yield around 2500 nos. of mature culms<br />

from 6 th year <strong>on</strong>wards giving a return of<br />

Rs. 62,500/- per hectare per year for<br />

about 30 to 50 years till flowering.<br />

Plantati<strong>on</strong> of 100 numbers will generate<br />

an income of Rs. 12,500/- per year and<br />

200 numbers will provide Rs.25,000/- per<br />

year. The sale rate of mature bamboo is<br />

estimated at Rs. 25/- per culm after<br />

meeting harvesting and tending expenses.<br />

And the farmers will earn more income<br />

<strong>on</strong>ce the Bamboo based industries are set<br />

up for value additi<strong>on</strong> items like<br />

Joint Forest Management (JFM)<br />

• JFM guidelines first issued in June, 1990<br />

by Govt. of India.<br />

• Today over 63,618 VFCs with 28 lakh<br />

families, covering an area of of 14 mha<br />

forest land in 27 States [as <strong>on</strong> 31.3.2002].<br />

• Revised guidelines issued <strong>on</strong> February<br />

2000 to give legal identity to VFCs,<br />

stipulates more involvement of women.<br />

JFM in <strong>Mizoram</strong><br />

• State government resoluti<strong>on</strong> passed in<br />

1998.<br />

• Forest Development Agency (FDA)<br />

resoluti<strong>on</strong> passed in 2002.<br />

• 19 FDA projects currently under<br />

implementati<strong>on</strong>.<br />

• 270 nos VFDCs in place at present.<br />

manufacture of rec<strong>on</strong>stituted wood, floor board and penal products etc.<br />

During the gestati<strong>on</strong> period of 5-6 years farmers can grow vegetables, fruit crops like<br />

papaya, passi<strong>on</strong> fruit, medicinal <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts, cereals, mulberry and fodder <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts for dairy<br />

development etc. within the inter-spaces. Edible Bamboo Dendrocalamus asper with<br />

potential internati<strong>on</strong>al market for processed shoots could also be cultivated in the inter-spaces<br />

for generating quick returns. Maintenance cost of Bamboo clumps after maturity is<br />

practically negligible except cleaning of unhealthy, broken and damaged culms at the time of<br />

harvesting. Due to the minimum maintenance expenses bamboo cultivati<strong>on</strong> <strong>on</strong> commercial<br />

lines seems quite remunerative.<br />

It is expected that implementati<strong>on</strong> of the proposed Acti<strong>on</strong> Plan will provide large<br />

scale employment to the local people thereby improving their ec<strong>on</strong>omic status, thereby<br />

turning the much dreaded gregarious bamboo flowering into <strong>on</strong>e of an opportunity.


91<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Annexure – 1<br />

OVERALL TARGET FOR BAMBOO DEVELOPMENT<br />

1. Creati<strong>on</strong> of bamboo nursery: Producti<strong>on</strong> of sufficient seedlings every year in<br />

10 Territorial Forest Divisi<strong>on</strong>s, 3 District<br />

Councils and 1 Bamboo Development Cell.<br />

Creati<strong>on</strong> of 14 bamboo nurseries. 80 beds each<br />

in 10 Territorial Forest Divisi<strong>on</strong>s, 50 beds each<br />

in 3 District Councils and 50 beds in 1 Bamboo<br />

Development Cell.<br />

2. Creati<strong>on</strong> of bamboo <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>: Creati<strong>on</strong> of 27,000 ha. of bamboo <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong><br />

distributed over four years project period.<br />

(1,68,75,000 bamboo <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts @ 625 <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts per<br />

hectare) distributed over four years project<br />

period.<br />

3. Infrastructure development: 1. Bamboo extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> link roads – overall length<br />

60 kms @ Rs. 7.00 lakhs per km (SoR PWD).<br />

2. C<strong>on</strong>structi<strong>on</strong> of ropeways at c<strong>on</strong>venient places<br />

for bamboo extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>.<br />

3. Development of 10 navigable river courses for<br />

bamboo extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> by rafting.<br />

4. C<strong>on</strong>structi<strong>on</strong> of booms at 5 major rivers.<br />

5. C<strong>on</strong>structi<strong>on</strong> of check gate cum site office at 5<br />

locati<strong>on</strong>s and two residential quarters each at 5<br />

locati<strong>on</strong>s.<br />

4. Extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> costs Demarcati<strong>on</strong> of annual felling coupes including<br />

enumerati<strong>on</strong> etc.<br />

Annexure – 2<br />

ESTIMATE FOR INFRASTRUCTURE REQUIREMENTS<br />

1. Link road – overall 60 kms length @ Rs. 7.00 lakhs<br />

per km as per SoR PWD(LS) = Rs. 420.00 lakhs<br />

2. Installati<strong>on</strong> of portable ropeways at c<strong>on</strong>venient<br />

places for bamboo extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> (LS) = Rs. 30.00 lakhs<br />

3. Development of 10 navigable major rivers for bamboo<br />

extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> by rafting @ Rs. 3.00 lakhs each. = Rs. 30.00 lakhs<br />

4. C<strong>on</strong>structi<strong>on</strong> of booms at 5 major rivers<br />

@ Rs. 1.00 lakhs each = Rs. 5.00 lakhs<br />

5. C<strong>on</strong>structi<strong>on</strong> of check gate cum site office at<br />

5 locati<strong>on</strong>s @ Rs. 2.05 lakhs each = Rs. 10.25 lakhs<br />

6. C<strong>on</strong>structi<strong>on</strong> of two Staff quarters each at 5 locati<strong>on</strong>s<br />

@ Rs. 2.50 lakhs each. = Rs. 25.00 lakhs<br />

TOTAL: = Rs. 520.25 lakhs


92<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Annexure – 3<br />

ESTIMATE FOR COST OF BAMBOO EXTRACTION<br />

1. Demarcati<strong>on</strong> of annual felling coupes at 10 Forest Divisi<strong>on</strong>s (number of felling<br />

coupes demarcated being variable as per availability<br />

of bamboo growing stock in a divisi<strong>on</strong>) = Rs. 2.50 lakhs<br />

2. Bamboo enumerati<strong>on</strong> in demarcated felling coupes = Rs. 7.50 lakhs<br />

TOTAL: = Rs. 10.00 lakhs<br />

Sl.<br />

No.<br />

1<br />

Annexure – 4<br />

DETAIL ESTIMATE FOR CREATION OF 1 STD BED BAMBOO NURSERY<br />

SITE DEVELOPMENT:<br />

Name of works<br />

Note:<br />

• Expected seedlings to be produced per bed = 700 nos<br />

• Seedlings required for 1 ha. <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> = 625 nos<br />

• Seedlings reserved for casualty replacement per ha. = 75 nos<br />

Annexure -5<br />

DETAIL ESTIMATE FOR CREATION OF 1 HECTARE BAMBOO PLANTATION<br />

A. CREATION OF PLANTATION.<br />

Manday<br />

required<br />

(nos)<br />

Rate per<br />

manday<br />

(Rs)<br />

Amount<br />

required<br />

per ha.<br />

(Rs)<br />

Clearing of nursery site, arranging raised bed,<br />

howeing of beds, filling polypot bags with earth<br />

and manure etc.<br />

10 84 840<br />

2 Cost of seeds and polypot bags.<br />

LS 250<br />

3 Necessary weeding, watering, fencing etc.<br />

LS 310<br />

Sl.<br />

No.<br />

Name of works<br />

TOTAL:<br />

Manday<br />

required<br />

(nos)<br />

Rate per<br />

manday<br />

(Rs)<br />

1400<br />

Amount<br />

required<br />

per ha.<br />

(Rs)<br />

Remarks<br />

Time of<br />

operati<strong>on</strong><br />

1 ADVANCE WORK:<br />

a) Survey and demarcati<strong>on</strong> with mapping LS 196 Jan - Feb<br />

b)<br />

Site development - area clearance, burning,<br />

debris collecti<strong>on</strong> and firelines etc.<br />

Soil & moisture c<strong>on</strong>servati<strong>on</strong> - check dams,<br />

11 84 924 Feb - April<br />

c) c<strong>on</strong>tour trenches, gully plugging, diversi<strong>on</strong><br />

ditches, pallisades, fencing etc.<br />

Creati<strong>on</strong> of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> - linning & stacking, digging<br />

3 84 252 Whole year<br />

d)<br />

pits, preparati<strong>on</strong> of <str<strong>on</strong>g>plan</str<strong>on</strong>g>ting materials,<br />

transportati<strong>on</strong> of seedling to <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> site, camp<br />

shed, signboard etc.<br />

13 84 1092 May - August<br />

2 WEEDING:<br />

a) First weeding. 6 84 504 May - June<br />

b) Sec<strong>on</strong>d weeding. 6 84 504 Aug - Sept<br />

c) Third weeding. 6 84 504 Nov - Dec<br />

d) Fourth weeding. 5 84 420 Jan - Feb<br />

3<br />

FIRE PROTECTION MEASURES:<br />

Fireline cutting, c<strong>on</strong>tolled burning etc. 2 84 168 Jan - Feb<br />

TOTAL:<br />

4564


93<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

B. FIRST YEAR MAINTENANCE.<br />

Sl.<br />

No.<br />

1<br />

2<br />

WEEDING:<br />

Name of works<br />

C. SECOND YEAR MAINTENANCE.<br />

Sl.<br />

No.<br />

D. THIRD YEAR MAINTENANCE.<br />

E. FOURTH YEAR MAINTENANCE.<br />

GRAND TOTAL (A+B+C+D+E): Rs. 9,016.00<br />

……………….<br />

Manday<br />

required<br />

(nos)<br />

Rate per<br />

manday<br />

(Rs)<br />

Amount<br />

required<br />

per ha.<br />

(Rs)<br />

Time of<br />

operati<strong>on</strong><br />

a) First weeding. 8 84 672 May - June<br />

b) Sec<strong>on</strong>d weeding. 8 84 672 Aug - Sept<br />

c) Third weeding. 7 84 588 Nov - Dec<br />

FIRE PROTECTION MEASURES:<br />

Fireline cutting, c<strong>on</strong>tolled burning etc. 3 84 252 Jan - Feb<br />

TOTAL:<br />

2184<br />

1 WEEDING:<br />

Name of works<br />

Manday<br />

required<br />

(nos)<br />

Rate per<br />

manday<br />

(Rs)<br />

Amount<br />

required<br />

per ha.<br />

(Rs)<br />

Time of<br />

operati<strong>on</strong><br />

a) First weeding. 5 84 420 May - June<br />

b) Sec<strong>on</strong>d weeding. 4 84 336 Aug - Sept<br />

c) Third weeding. 4 84 336 Nov - Dec<br />

2 FIRE PROTECTION MEASURES:<br />

Fireline cutting, c<strong>on</strong>tolled burning etc. 3 84 252 Jan - Feb<br />

TOTAL:<br />

1344<br />

Sl.<br />

No.<br />

Name of works<br />

Manday<br />

required<br />

(nos)<br />

Rate per<br />

manday<br />

(Rs)<br />

Amount<br />

required<br />

per ha.<br />

(Rs)<br />

Time of<br />

operati<strong>on</strong><br />

1 WEEDING:<br />

5 84 420 Sept - Oct<br />

2 FIRE PROTECTION MEASURES:<br />

Fireline cutting, c<strong>on</strong>tolled burning etc. 3 84 252 Jan - Feb<br />

TOTAL:<br />

672<br />

Sl.<br />

No.<br />

Name of works<br />

1 FIRE PROTECTION MEASURES:<br />

Manday<br />

required<br />

(nos)<br />

Rate per<br />

manday<br />

(Rs)<br />

Amount<br />

required<br />

per ha.<br />

(Rs)<br />

Time of<br />

operati<strong>on</strong><br />

Fireline cutting, c<strong>on</strong>tolled burning etc. 3 84 252 Jan - Feb<br />

TOTAL:<br />

252


94<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

DETAILED PHYSICAL AND FINANCIAL OUTLAYS<br />

Annexure - VI<br />

Item of work Sub-comp<strong>on</strong>ent 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-2012 2012-2013 Total<br />

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin<br />

Advance work Nursery 10000 140.00 7000 98.00 5000 70.00 5000 70.00 378.00<br />

Creati<strong>on</strong> Planting 10000 456.4 7000 319.48 5000 228.2 5000 228.2 1232.28<br />

1st year maintenance 10000 218.4 7000 152.88 5000 109.2 5000 109.2 589.68<br />

2nd year maintenance 10000 134.40 7000 94.08 5000 67.2 5000 67.2 362.88<br />

3rd year maintenance 10000 67.2 7000 47.04 5000 33.6 5000 33.6 181.44<br />

4th year maintenance 10000 25.2 7000 17.64 5000 12.6 5000 12.6 68.04<br />

Sub-total 140.00 554.40 607.88 585.48 498.68 248.64 118.44 46.20 ### 2812.32<br />

Infrastructure Link Road (in kms) 120.00 150.00 150.00 420.00<br />

Development Ropeway (LS) 10.00 20.00 30.00<br />

Waterways (10 rivers) 10.00 10.00 10.00 30.00<br />

Booms (5 rivers) 5.00 5.00<br />

Checkgate/site office(5nos) 5.00 5.25 10.25<br />

Staff quarters (5nos) 10.00 15.00 25.00<br />

Sub-total 160.00 200.25 160.00 520.25<br />

Bamboo Demarcati<strong>on</strong> of Coupes 0.50 1.00 0.50 0.50 2.50<br />

Extr<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> Enumerati<strong>on</strong> 2.50 2.50 2.50 7.50<br />

Sub-total 3.00 3.50 3.00 0.50 10.00<br />

Total 303.00 758.15 770.88 585.98 498.68 248.64 118.44 46.20 ### 3342.57<br />

Research Research & Training 0.00 10.00 10.00 10.00 10.00 40.00<br />

Capacity building 0.00 10.00 10.00 10.00 10.00 40.00<br />

Overheads (10% of above) 30.30 75.82 77.09 58.60 49.87 24.86 11.84 4.62 1.26 334.26<br />

Grand Total 333.30 853.97 867.97 664.58 568.55 273.50 130.28 50.82 ### 3756.83<br />

TOTAL FUND REQUIREMENT<br />

Total financial outlay of the Project = Rs. 3757.00 lakhs


95<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

FISHERIES<br />

COMPREHENSIVE ACTION PLAN ON BAFFACOS FOR DEVELOPMENT OF<br />

FISHERIES IN MIZORAM<br />

1. Aims &<br />

Objectives:-<br />

CHAPTER – I<br />

PROJECT PROFILES<br />

1) To produce fish flesh for food and earning income by<br />

augmenting table size fish producti<strong>on</strong> so as to substitute and<br />

combat the damage of standing crops etc during the Bamboo<br />

flowering and famine.<br />

2) Thereby generating additi<strong>on</strong>al employment for the villagers<br />

by way of c<strong>on</strong>structi<strong>on</strong> of fish farms in the private sector and<br />

offering permanent employment to about 8,000 families <strong>on</strong><br />

individual family basis and 400 villages (2000 families/<br />

community basis)<br />

3) Finally to reduce financial burden of the Government by way<br />

of generating sources of income to meet the cost of food grain<br />

and cereals by the individual fish farmers.<br />

2. Area of Entire state of <strong>Mizoram</strong><br />

operati<strong>on</strong>:-<br />

3. Physical time 5yrs. Starting from 2004-2005 to 2008-2009<br />

frame:-<br />

4. Project Target:- (a) To renovate and supply inputs viz:- fish seeds, fish feed etc<br />

covering 1200hectare of p<strong>on</strong>d in the private sector for the 1 st<br />

year.<br />

(b) To develop 400 Ha of new community p<strong>on</strong>ds in 400 villages<br />

including supply of inputs for the first year.<br />

(c) To develop 400 Ha of individual new p<strong>on</strong>ds in the private<br />

sector including supply of inputs for the 1 st year.<br />

(d) To train up a cadre of 10,000 fish farmer from both existing and<br />

new fish p<strong>on</strong>ds comprising of community and individual fish<br />

farmers.<br />

(e) To create Marketing assets like installati<strong>on</strong> of Ice Plants/Cold<br />

Storage, introducti<strong>on</strong> of refrigerated/insulated van, providing<br />

insulated boxes/deep freezer to retailer etc in the private sector<br />

by providing 25% subsidy under the scheme to the private<br />

entrepreneurs, dovetailing 25% marginal amount (borrower’s<br />

share) and 50% Bank loan.


96<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

5. Project cost:- Rs.2000.00 lakhs (20.00 crores)<br />

6. Details of<br />

Financial<br />

Target:-<br />

(1) Renovati<strong>on</strong>/reclamati<strong>on</strong> of existing p<strong>on</strong>ds in<br />

the private sector including supply of first<br />

year inputs (2000Ha)<br />

(2) Development of new community p<strong>on</strong>ds in the<br />

private sector including supply of 1 st year<br />

inputs (500Ha)<br />

(3) Development of new individual p<strong>on</strong>ds in the<br />

private sector including supply of 1 st year<br />

inputs (500Ha)<br />

(Note:- Item (1)(2)(3) unit cost are as per approved<br />

unit cost of Govt. of India for Tribal & Hill areas<br />

under Central Sp<strong>on</strong>sored scheme <strong>on</strong> Development<br />

of Fresh Water Aquaculture.<br />

(4) Cost of Training for a cadre of 10,000<br />

farmers as per Govt. of India’s norms under<br />

Extensi<strong>on</strong> & Training<br />

(5) Marketing assets (25% subsidy to the private<br />

entrepreneurs under the scheme.<br />

(6) Administrative cost and c<strong>on</strong>tingency (L.S)<br />

TOTAL:-<br />

6. Estimated existing water area under fish farming at the end of<br />

2003-2004 including anticipated new water area during 2004-<br />

2005:-<br />

7. Targeted water area under Fish farming (p<strong>on</strong>d culture) at the end<br />

of 2008-2009 through BAFFACOS<br />

8. Estimated producti<strong>on</strong> level <strong>on</strong>ly from culture sector at the end of<br />

2003-2004 including anticipated producti<strong>on</strong> level at the end of<br />

2004-2005<br />

9. Targeted producti<strong>on</strong> level at the end of 2009 A.D through<br />

BAFFACOS<br />

10. Present Annual Gross Financial return from p<strong>on</strong>d culture sector at<br />

the end of 2003-2004 including estimated producti<strong>on</strong> of 2004-<br />

2005 @ Rs.70/- per Kg of fish<br />

11. Anticipated Annual Gross Financial return from culture sector at<br />

the end of 2008-2009 through BAFFACOS @ Rs.80/-per Kg of<br />

fish<br />

12. Additi<strong>on</strong>al Gross Financial gain owing to implementati<strong>on</strong> of<br />

BAFFACOS at the end of 2008-2009.<br />

:-Rs.270.00lakhs<br />

:- Rs.660.00lakhs<br />

:- Rs.66.00lakhs<br />

:- Rs.200.00 lakhs<br />

:-Rs.200.00 lakhs<br />

Rs.10.00 lakhs<br />

Rs.2000.00 lakhs<br />

2400 Ha<br />

3200 Ha<br />

2900 M.T<br />

8700 M.T<br />

Rs.2030.00 lakhs<br />

Rs.6960.00 lakhs<br />

Rs.4930.00 lakhs


97<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

CHAPTER – II<br />

2. BACKGROUND:-<br />

2.1 According to the available sources it is believed that the gregarious flowering<br />

of bamboo is synchr<strong>on</strong>ised with the sudden increase of rodent populati<strong>on</strong>,<br />

thereby causing famine in <strong>Mizoram</strong>. The next outbreak of bamboo flowering<br />

is expected during 2005-08 AD, which has opined that the mass flowering<br />

may induce the upsurge in rodent populati<strong>on</strong>, and damage the standing crops.<br />

During such catastrophic period Aquaculture could play a vital role in<br />

providing food and income source to the inhabitants of the regi<strong>on</strong> since<br />

aquaculture is a safe method of growing fishes, crustaceans (Fresh water<br />

Prawn) etc. in water which is c<strong>on</strong>sidered free from rodent’s attack. Fish is also<br />

a reliable source of food during famine to replenish the agricultural products.<br />

Therefore, it is felt imperative to produce sufficient fish flesh for food as well<br />

as earning income for the farmers as an alternative to the damage of standing<br />

crops during such period to bear the cost of food grain and cereals from<br />

outside sources.<br />

2.2 In order to combat impending disaster it is also imperative to train the farmers<br />

adequately to boost per hectare producti<strong>on</strong> by using modern fish farming<br />

technology.<br />

2.3 Also, to get adequate price of the fish produces proper Marketing arrangement<br />

has to be made involving private entrepreneur so that the fish produces reach<br />

the market in hygienic c<strong>on</strong>diti<strong>on</strong> and fetch optimum price.<br />

2.4 Finally to overcome any crop failure due to natural calamity it is also<br />

necessary that each unit of fishery project under the scheme may be insured<br />

under any of the Nati<strong>on</strong>al Insurance Companies.<br />

2.5 AN OVERVIEW OF MARKETING SCENERIO:-<br />

2.5.1 With the present producti<strong>on</strong> of fishes from the states own sources it has been<br />

possible to meet <strong>on</strong> the 3.01kg of fish per capita against 10.22kg when<br />

calculated at the recommended scale of Nutriti<strong>on</strong>al Committee of Govt. of<br />

India.<br />

2.5.2 In fact with the present producti<strong>on</strong> level the export status of fishes from the<br />

state is nil to the bordering/states as per official record. However, as per<br />

statement of certain farmers in Bilkhawthlir, Buhchang, Saiphai, Vairengte,<br />

Kanhmun, Zawlnuam etc villages it appears that sometimes fish traders of<br />

Silchar and Karimganj area(Assam) come to the aforesaid villages and collects<br />

the products by payment of Rs.40-50/- per Kg of fish at the p<strong>on</strong>d site by<br />

engaging the outside traders’ own fishermen. These catches after getting<br />

properly ice-packed at Silchar and Karimganj again come to the markets of<br />

<strong>Mizoram</strong> and sold at the rate of Rs.80-90/-kg of fish. Thereby though<br />

apparently some quantity of locally produced fishes are exported to Silchar<br />

and Karimganj, again they are imported back to the markets of <strong>Mizoram</strong>.


98<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

2.5.3 In respect of import of fishes from outside a survey was c<strong>on</strong>ducted by the<br />

Department of Fisheries in various markets of Aizawl city during various<br />

m<strong>on</strong>ths from January to December 2001. The survey revealed the following<br />

findings in respect of import of fish to Aizawl market <strong>on</strong>ly from outside<br />

sources:-<br />

• Every week 220-280 cases of fishes come from outside source, each case<br />

c<strong>on</strong>taining 80-90kg of fishes (mostly from A.P).<br />

• Thus the weekly import and disposal of fish from Aizawl city al<strong>on</strong>e is<br />

about 11.7 M.T involving a trans<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> of Rs.11.70 lakhs weekly.<br />

2.5.4 Elasticity of Demand:- While discussing about Elasticity of Demand, as per<br />

market survey it could be arrived at that during the circumstances of drastic<br />

fluctuati<strong>on</strong> of price of fishes in the market the resp<strong>on</strong>siveness of demand of<br />

fish fluctuates <strong>on</strong>ly by 15-20% either in positive or negative directi<strong>on</strong>. This<br />

fluctuati<strong>on</strong> in the demand could easily be eliminated when there is a well<br />

established Marketing network as proposed in the scheme.<br />

2.6 AVAILABLE RESOURCES AND PRESENT STATUS:-<br />

<strong>Mizoram</strong> has as good as 24,000 ha which is potential for fishery development.<br />

Though the potentiality is immense, but due to paucity of Plan fund allocati<strong>on</strong><br />

so far 2400 ha has been developed for fish culture (mainly p<strong>on</strong>ds & tanks)<br />

which is managed by around 5000 nos of small and marginal fish farmers<br />

involving in fish farming is about 7500nos of p<strong>on</strong>ds/tanks. Besides the state<br />

has another 6,000 ha of water area in the form of Rivers/Streams spread over<br />

1,750 kms of Riverine stretch. The present level of fish from both culture and<br />

Riverine sector is estimated to be to the tune of 3000 M.T.<br />

For a projected populati<strong>on</strong> of 12.60 lakhs in <strong>Mizoram</strong> by the end of<br />

2008-2009 the fish flesh requirement is estimated at 12,877 M.T per annum<br />

for c<strong>on</strong>sumpti<strong>on</strong> assuming a per capita c<strong>on</strong>sumpti<strong>on</strong> of 10.22kg. However,<br />

c<strong>on</strong>sidering fisheries as ways and means for earning livelihood during the<br />

famine the fish producti<strong>on</strong> in culture sector has to be augmented by increasing<br />

per hectare stocking density of fish seeds @ 15,000 nos of fingerlings and<br />

also by adopting to intensive fish culture method in all available culturable<br />

water areas besides bringing in new water areas under fish farming <strong>on</strong><br />

community/village basis and individual farmer basis.


99<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

CHAPTER – III<br />

3. AIMS AND OBJECTIVES:-<br />

3.1. The project aims at renovati<strong>on</strong>/reclamati<strong>on</strong> of 1200 ha of existing fish p<strong>on</strong>ds and<br />

bring it under fish culture besides creating another 800 ha of new water areas (culture sector)<br />

by c<strong>on</strong>structi<strong>on</strong> and supply of inputs like fish fingerlings, fish feed etc for fish culture<br />

covering about 8,000 families under intensive fish farming over a period of five years (2004-<br />

2005 to 2008-2009) to substitute and combat the damage of standing crops during Bamboo<br />

flowering and famine by augmenting fish flesh producti<strong>on</strong>.<br />

3.2. To train up a cadre of 10,000 farmers in fish culture.<br />

3.3. To create Marketing assets like installati<strong>on</strong> of Ice Plants/Cold Storages(small<br />

capacity) introducti<strong>on</strong> of insulated vans for transportati<strong>on</strong> of fishes, providing<br />

insulated boxes to the retailer etc in the private sector thereby generating direct<br />

employment for another cadre of 2,500 families in the Marketing venture.<br />

3.4. PROJECT PATTERN:-<br />

The project has 5(five) comp<strong>on</strong>ents and pattern of assistance for each comp<strong>on</strong>ent are<br />

discussed below<br />

3.4.1 Renovati<strong>on</strong> and reclamati<strong>on</strong> of existing p<strong>on</strong>ds:-<br />

(a) As has been discussed under Project Profile 1200Ha of water area from the<br />

existing p<strong>on</strong>ds will be taken up under Renovati<strong>on</strong> and reclamati<strong>on</strong> including<br />

supply of 1 st year inputs.<br />

(b) The unit cost for reclamati<strong>on</strong>/renovati<strong>on</strong> of p<strong>on</strong>ds will be Rs.60,000/- per Ha<br />

water area as per approved pattern of assistance under Govt. of India under<br />

Centrally Sp<strong>on</strong>sored Scheme, Development of Fresh Water Aquaculture as<br />

shown under Annexure – I. However, for this purpose <strong>on</strong>ly 25% of the amount<br />

with a maximum ceiling of Rs.15,000/-ha will be given to the farmers in cash<br />

against progress of work.<br />

(c) The unit cost for 1 st year input is proposed to be @ Rs.30,000/- per Ha which<br />

will include cost of lime, fish seed, fish feed etc. The unit cost is as per<br />

approved norm of Govt. of India under Development of Fresh Water<br />

Aquaculture(CSS) as shown under Annexure – I. However, 25% of the unit<br />

cost with a maximum ceiling of Rs.7500/- Ha will be given in kind to the<br />

farmers as inputs.<br />

3.4.2 Development of new Community p<strong>on</strong>d <strong>on</strong> Community/ Village level:-<br />

(a) Under the scheme 400Ha of water area will be brought for community p<strong>on</strong>d/<br />

village p<strong>on</strong>d fish culture.


100<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

(b) The unit cost for c<strong>on</strong>structi<strong>on</strong> of new community p<strong>on</strong>d is proposed at Rs.3.00<br />

lakhs per Ha water area and cost of 1 st year input @ Rs.30,000/- per Ha as per<br />

approved norm of Govt. of India (Annexure – I). For this purpose since the<br />

c<strong>on</strong>structi<strong>on</strong> of p<strong>on</strong>ds will be new the assistance towards c<strong>on</strong>structi<strong>on</strong> shall be<br />

50% of the Unit cost with the maximum limit of Rs.1.50 lakhs per Ha for<br />

c<strong>on</strong>structi<strong>on</strong> and Rs.15,000/- worth in kind in the form of inputs.<br />

(c) The unit cost for development of Community p<strong>on</strong>d i.e. Rs.3.00 lakhs/Ha and<br />

the pattern of assistance is the same as stated under Para 3.4.2(b)<br />

3.4.3 Development of individual new p<strong>on</strong>ds in the private sector:-<br />

(a) 400Ha of water area will be brought under for fish culture by c<strong>on</strong>structing new<br />

individual p<strong>on</strong>d.<br />

(b) The per Hectare Unit cost for c<strong>on</strong>structi<strong>on</strong> of new p<strong>on</strong>d is proposed at Rs.3.00<br />

lakhs per/ha water area and the cost of first year input is Rs.30,000 as per<br />

Govt. of India’s pattern of unit cost for c<strong>on</strong>structi<strong>on</strong> of new p<strong>on</strong>d as shown in<br />

Annexure – I . The pattern of assistance is the same as proposed under Para<br />

3.4.2(b)<br />

3.4.4. Marketing assets:-<br />

(a) The scheme is proposed to be implemented purely <strong>on</strong> entrepreneurs basis in<br />

the private sector. It is proposed to meet 25% of the cost of the individual<br />

marketing unit as per project cost to be submitted by the entrepreneur in due<br />

course. However, the proposed pattern of assistance is 25% subsidy, 25%<br />

borrowers c<strong>on</strong>tributi<strong>on</strong> and 50% Bank loan.<br />

(b) Besides it is also proposed to repair and renovate the existing marketing assets<br />

available with the Department a per details shown below:-<br />

(1) Ice Plant-cum-Cold Storage at Bawngkawn.<br />

(2) Ice Plant-cum-Cold Storage at Kolasib<br />

(3) Ice Plant at Bilkhawthlir<br />

(c) Thus a lump sum provisi<strong>on</strong> of Rs.2.00 crores has been proposed under<br />

Marketing sector.<br />

(d) For entrepreneurship in Marketing scheme the entrepreneur must have<br />

adequate knowledge viz.:- Transport/ warehousing/ wholesale/retail sale etc<br />

respectively.<br />

3.4.5 Training of farmers:-<br />

(a) Each selected fish farmers will be provided stipend @ Rs.100/-per day during<br />

the training period of 15days and actual to and fro transport cost as per Govt.<br />

of India’s norm under Extensi<strong>on</strong> & Training scheme.<br />

(b) For training purpose the farmer must be an active farmer holding fish farmer’s<br />

Identity Card issued by the Fisheries Department, <strong>Mizoram</strong>.


101<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

(c) Therefore, an average of Rs.2000/- per trainee farmer has been c<strong>on</strong>sidered in<br />

the scheme.<br />

3.4.6 Selecti<strong>on</strong> criteria:-<br />

For selecti<strong>on</strong> of fish p<strong>on</strong>ds the maximum ceiling for water areas is 1 hectare<br />

and the minimum is 0.2 ha. P<strong>on</strong>ds/sites incapable of impounding a minimum<br />

of 0.2 ha water spread ware shall not be covered under the project. For<br />

selecti<strong>on</strong> of community p<strong>on</strong>ds the maximum ceiling for water area is 1 hectare<br />

and the minimum is 0.5 ha.<br />

3.5 WORKING PLAN:-<br />

3.5.1 Managing Board and Departmental M<strong>on</strong>itoring Cell:- The Managing Board<br />

for the project will be c<strong>on</strong>stituted as per the guidelines of the State<br />

Government as and when it is instructed. However, the Departmental<br />

M<strong>on</strong>itoring Cell is proposed to be c<strong>on</strong>stituted with the following members for<br />

smooth implementati<strong>on</strong> and successful achievement of the scheme:-<br />

Departmental M<strong>on</strong>itoring Cell:-<br />

(1) Chairman:- Secretary of Fisheries Department,<br />

Govt. of <strong>Mizoram</strong><br />

(2) Vice Chairman:- Director/Joint Director of Fisheries<br />

Govt. of <strong>Mizoram</strong>.<br />

(3) Nodal Officer: - Deputy Director of Fisheries and<br />

Member Secretary,<br />

Govt. of <strong>Mizoram</strong><br />

(4) Nodal Office and Headquarter Staff(Technical):-<br />

Directorate of Fisheries, <strong>Mizoram</strong>, Aizawl:-<br />

1) FEO – 2nos<br />

2) JE – 1no<br />

3) FD – 3nos<br />

(5) Members:- All District Fisheries Dev. Officers/<br />

Asst. Director of Fisheries,<br />

<strong>Mizoram</strong><br />

3.5.2 As stated earlier under Aims & Objectives that the project aims at bringing<br />

2,000 hectare of water area (new and existing) under fish culture covering at<br />

least 8000 families in a phase manner over a period of 5 years, it is proposed<br />

to execute the scheme in line with the following Working Plan.<br />

3.5.3 New technically feasible and ec<strong>on</strong>omically viable sites shall be identified in<br />

cluster through Departmental Technical Staff and Officers involving Village<br />

Councils and NGOs in order to avoid future complicati<strong>on</strong>s.


102<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

3.5.4 Sites capable of impounding water spread area of 0.2 hectares and above shall<br />

<strong>on</strong>ly be c<strong>on</strong>sidered and recorded by the identifying team comprising of<br />

Departmental staff, Village Councils and NGOs after verifying the sites at the<br />

spots.<br />

3.5.5 The identified list of such intending farmers should be submitted to the<br />

District Fisheries Development Officer of the c<strong>on</strong>cerned District by the Circle<br />

Officer within the m<strong>on</strong>th of April for every year till the terminal year i.e.2008-<br />

2009.<br />

3.5.6 Thereby District Fisheries Development Officers shall prepare c<strong>on</strong>solidated<br />

report after thorough scrutiny of the identified list of beneficiaries submitted<br />

by the Circle Officers and forward the same to the Directorate of Fisheries<br />

with recommendati<strong>on</strong> and certificate of genuineness for final selecti<strong>on</strong>.<br />

3.5.7 The Directorate of Fisheries after receiving recommended lists from all<br />

District Fisheries Development Officers shall arrange final selecti<strong>on</strong> in order<br />

of merit through a Board to be c<strong>on</strong>stituted under the guidelines of the State<br />

Government.<br />

3.5.8 After final selecti<strong>on</strong>, selected list of beneficiaries al<strong>on</strong>g with required fund<br />

shall be forwarded and released to the respective District Fisheries<br />

Development Officer for executi<strong>on</strong>.<br />

3.5.9 The entire process of identificati<strong>on</strong> and final selecti<strong>on</strong> of beneficiaries shall be<br />

completed within the m<strong>on</strong>th of September in order to offer ample time to the<br />

selected beneficiaries to complete c<strong>on</strong>structi<strong>on</strong> work during dry seas<strong>on</strong> of the<br />

year i.e. October <strong>on</strong>wards.<br />

3.5.10 The selected farmers shall be given proper training for c<strong>on</strong>structi<strong>on</strong>/renovati<strong>on</strong><br />

of fish p<strong>on</strong>ds as well as modern technology of fish farming before starting the<br />

venture and the technology of intensive composite fish culture shall be<br />

resorted to. For this purpose Fishery Department shall organize the training<br />

and dem<strong>on</strong>strati<strong>on</strong> for the selected farmers. Adequate fund would be provided<br />

under the scheme for the Training purpose.<br />

3.5.11 For release of subsidy in cash for c<strong>on</strong>structi<strong>on</strong>/ renovati<strong>on</strong>/ reclamati<strong>on</strong> of<br />

p<strong>on</strong>d the beneficiaries shall first complete 50% of the work under supervisi<strong>on</strong><br />

of the respective Circle Officer (Fishery Extensi<strong>on</strong> Officer) preferably within<br />

the period of two m<strong>on</strong>ths. After completi<strong>on</strong> of 50% of work and <strong>on</strong> producti<strong>on</strong><br />

of a certificate duly issued by the Circle Officer, 50% of the subsidy<br />

comp<strong>on</strong>ent in cash for c<strong>on</strong>structi<strong>on</strong> (being first instalment) shall be released.<br />

The remaining 50% of subsidy in cash i.e. sec<strong>on</strong>d instalment shall be released<br />

after 100% completi<strong>on</strong> of the work by the beneficiaries under supervisi<strong>on</strong> and<br />

<strong>on</strong> producti<strong>on</strong> of completi<strong>on</strong> certificates from the Circle Officer as stated<br />

above. However, the entire c<strong>on</strong>structi<strong>on</strong> should be completed within a period<br />

of two m<strong>on</strong>ths from the date of release of first instalment.


103<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

3.5.12 After satisfactory and successful completi<strong>on</strong> of the c<strong>on</strong>structi<strong>on</strong>/renovati<strong>on</strong>/<br />

reclamati<strong>on</strong> of the p<strong>on</strong>d, inputs shall be issued to the beneficiaries free of cost<br />

for the first year. Delivery of inputs shall be made cluster-wise at the<br />

respective villages.<br />

3.5.13 While issuing instalment of cash subsidy for c<strong>on</strong>structi<strong>on</strong>/ renovati<strong>on</strong>/<br />

reclamati<strong>on</strong> of p<strong>on</strong>ds and inputs free of cost, separate Agreement B<strong>on</strong>ds<br />

should be executed by the beneficiary to the effect that beneficiary shall utilise<br />

the amount in cash and inputs in kind for the purpose for which it is granted by<br />

the Government. For any breach of such agreements <strong>on</strong> the part of beneficiary,<br />

it shall make him liable to return the entire amount to the Government with an<br />

interest of 12% per annum.<br />

3.5.14 M<strong>on</strong>itoring and evaluati<strong>on</strong> of the programme shall be d<strong>on</strong>e by the respective<br />

District Fisheries Development Officer under the intensive supervisi<strong>on</strong> of the<br />

M<strong>on</strong>itoring Cell at the Headquarter (Directorate of Fisheries, <strong>Mizoram</strong>)<br />

utilising the Circle Officers and other Field Staff available with the Circle<br />

Officer. For this purpose, quarterly report <strong>on</strong> growth checking and<br />

maintenance of farm should be collected by the Circle Officer and forward the<br />

same to the respective District Fisheries Development Officer for further<br />

submissi<strong>on</strong> to the M<strong>on</strong>itoring Cell (HQ) and necessary <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>.<br />

3.5.15 Harvesting of fishes shall be d<strong>on</strong>e <strong>on</strong>ly after completing a rearing period of<br />

minimum 12 m<strong>on</strong>ths. Harvest report/producti<strong>on</strong> report should be submitted by<br />

the individual beneficiary duly certified by respective Village Council<br />

President to the Circle Officer of the c<strong>on</strong>cerned area. The Circle Officer shall,<br />

thereby furnish the c<strong>on</strong>solidated harvest report to the respective District<br />

Fisheries Development Officer for the c<strong>on</strong>cerned Circle for further submissi<strong>on</strong><br />

to the M<strong>on</strong>itoring Cell (HQ).<br />

4. PHYSICAL TARGET:-<br />

CHAPTER – IV<br />

4.1 In line with the aims and objectives of the project, 2000 hectare of water area<br />

has to be brought under fish farming covering at least about 8000 families<br />

over a period of five years (2004-2005 to 2008-2009).<br />

4.2 Accordingly, it is proposed to develop the targeted water area, its<br />

corresp<strong>on</strong>ding beneficiaries and achieve the District-wise Targets etc as per<br />

year-wise details shown below:-


104<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

TABLE – A<br />

YEAR-WISE TARGET OF WATER AREA FOR DEVELOPMENT:-<br />

Water area to be covered under fish No.of Beneficiaries to be<br />

farming<br />

covered<br />

Sl<br />

No.<br />

Year<br />

C<strong>on</strong>structi<br />

<strong>on</strong> of new<br />

fish p<strong>on</strong>ds<br />

(Communi<br />

ty/individu<br />

al)<br />

Existing<br />

Indivi-dual<br />

p<strong>on</strong>ds for<br />

renovati<strong>on</strong>/<br />

reclamati<strong>on</strong><br />

Total<br />

New<br />

p<strong>on</strong>ds<br />

Existin<br />

g p<strong>on</strong>d Total<br />

1 2 3 4 5 6 7 8<br />

1. 2004-2005 120 Ha 180 Ha 300 Ha 480 720 1200<br />

2. 2005-2006 160 Ha 240 Ha 400 Ha 640 960 1600<br />

3. 2006-2007 200 Ha 300 Ha 500 Ha 800 1200 2000<br />

4. 2007-2008 200 Ha 300 Ha 500 Ha 800 1200 2000<br />

5. 2008-2009 120 Ha 180 Ha 300 Ha 480 720 1200<br />

TOTAL:- 800 Ha 1200 Ha 2000 Ha 3200 4800 8000<br />

4.3 TARGET OF DISTRICT-WISE DISTRIBUTION OF WATER AREA FOR<br />

DEVELOPMENT:-<br />

Water area for development:<br />

TABLE – B<br />

Renovati<strong>on</strong>/reclamati<strong>on</strong> of existing New Community / village p<strong>on</strong>ds<br />

water area (in Ha)<br />

(in Ha)<br />

Year Districts Districts<br />

Aizawl LungleiChhimtuipui<br />

Total *AizawlLunglei*Chhimtuipui<br />

Total<br />

1 2 3 4 5 6 7 8 9<br />

2004-05 108 36 36 180 36 12 12 60<br />

2005-06 144 48 48 240 48 16 16 80<br />

2006-07 180 60 60 300 60 20 20 100<br />

2007-08 180 60 60 300 60 20 20 100<br />

2008-09 108 36 36 180 36 12 12 60<br />

TOTAL 720 240 240 1200 240 80 80 400<br />

(* Note:- Aizawl District means undivided Aizawl District & Chhimtuipui District means<br />

undivided Chhimtuipui District


TABLE – B C<strong>on</strong>td.:-<br />

105<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

New individual p<strong>on</strong>ds (in Ha) Total water area (in Ha)<br />

Year<br />

Aizawl<br />

Districts Districts<br />

LungleiChhimtuipui<br />

Total *AizawlLung*Chhimlei<br />

tuipui<br />

Grand<br />

Total<br />

10 11 12 13 14 15 16 17 18<br />

2004-05 36 12 12 60 180 60 60 300<br />

2005-06 48 16 16 80 240 80 80 400<br />

2006-07 60 20 20 120 300 100 100 500<br />

2007-08 60 20 20 120 300 100 100 500<br />

2008-09 36 12 12 60 180 60 60 300<br />

TOTAL 240 80 80 400 1200 400 400 2000<br />

4.4 DISTRICT-WISE TARGET FOR TRAINING OF FARMERS<br />

Training of Farmers:-<br />

TABLE – C<br />

No. of farmers to be trained up<br />

Year Aizawl Lunglei Chhimtuipui Total<br />

District District District<br />

1 2 3 4 5<br />

2004-2005 900 300 300 1500<br />

2005-2006 1200 400 400 2000<br />

2006-2007 1500 500 500 2500<br />

2007-2008 1500 500 500 2500<br />

2008-2009 900 300 300 1500<br />

TOTAL:- 6000 2000 2000 10,000<br />

4.5 DISTRICT-WISE TARGET FOR DEVELOPMENT OF MARKETING<br />

ASSETS.<br />

As the Marketing sector is purely an entrepreneurship based involving<br />

subsidy comp<strong>on</strong>ent, marginal m<strong>on</strong>ey and Bank loan the physical target and the<br />

financial target will solely depend <strong>on</strong> involvement of the individual<br />

entrepreneur. Also since the assets has to created corresp<strong>on</strong>ding to the<br />

producti<strong>on</strong>, the entire physical and financial target is shown below under Table<br />

– D in percentage basis. Thus a lump sum of Rs.200.00 lakhs has been taken<br />

into account for which a separate D.P.R may be submitted in due course after<br />

completing the remaining field study in the sector.


106<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

TABLE – D<br />

Physical & Financial targets in Marketing sector in percentage basis:-<br />

Year Aizawl<br />

District<br />

Physical (in percentage) Financial (Rs.in lakhs)<br />

Lunglei<br />

District<br />

Chhimtuipui<br />

District<br />

Total Aizawl<br />

District<br />

Lunglei<br />

District<br />

Chhimtuipui<br />

District<br />

Total<br />

1 2 3 4 5 6 7 8 9<br />

2004-05 6% 2% 2% 10% 24.00 8.00 8.00 40.00<br />

2005-06 10% 3% 3% 16% 40.00 12.00 12.00 64.00<br />

2006-07 12% 4% 4% 20% 48.00 16.00 16.00 80.00<br />

2007-08 14% 5% 5% 24% 56.00 20.00 20.00 96.00<br />

2008-09 18% 6% 6% 30% 72.00 24.00 24.00 120.00<br />

TOTAL 60% 20% 20% 100% 240.00 80.00 80.00 400.00<br />

4.6 With the increase of new additi<strong>on</strong>al water area under fish farming, the year<br />

wise estimated producti<strong>on</strong> level including the present producti<strong>on</strong> of table size<br />

fish from culture sector is targeted as per details shown below under Table-E.<br />

For this purpose the anticipated average producti<strong>on</strong> per Hectare is c<strong>on</strong>sidered<br />

at 2700-3000kg/ha/yr. Besides, since the water area under the BAFFACOS<br />

project will come under producti<strong>on</strong> after <strong>on</strong>e year of renovati<strong>on</strong>/ reclamati<strong>on</strong>/<br />

c<strong>on</strong>structi<strong>on</strong>, the additi<strong>on</strong>al fish flesh producti<strong>on</strong> will effect from 2005 – 2006.<br />

TABLE – E<br />

Year-wise estimated producti<strong>on</strong> of fish (culture sector):-<br />

Sl<br />

No.<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

G. CHAPTER - V<br />

Year<br />

2004-2005<br />

2005-2006<br />

2006-2007<br />

2007-2008<br />

2008-2009<br />

5. FINANCIAL REQUIREMENT:-<br />

5.1 COST STRUCTURE:-<br />

Estimated yearly producti<strong>on</strong> (Level)<br />

including the present producti<strong>on</strong> (culture<br />

sector)<br />

6800 M.T<br />

7000 M.T<br />

7500 M.T<br />

8200 M.T<br />

8700 M.T<br />

5.1.1 The cost structure for various activities are shown as follows.


107<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

5.1.2 Renovati<strong>on</strong>/reclamati<strong>on</strong> of existing p<strong>on</strong>ds including cost of 1 st year input:-<br />

(a) Renovati<strong>on</strong>/reclamati<strong>on</strong><br />

@ Rs.60,000/-per Hectare<br />

25% of Unit cost (1000Ha) Rs.180.00lakhs<br />

(b) 1 st year input viz:- fish seed, fish<br />

feed etc @ Rs.30,000/-per Ha,<br />

25% of Unit cost (1000Ha) Rs.90.00lakhs<br />

5.1.3 Development of new community<br />

p<strong>on</strong>ds in private sector including<br />

supply of 1 st year inputs:-<br />

(a) C<strong>on</strong>structi<strong>on</strong> of new community<br />

P<strong>on</strong>ds @ Rs.3.00 lakhs/Ha,<br />

50% of Unit cost (400Ha) Rs.600.00lakhs<br />

(b) 1 st year inputs @ Rs.30,000/-Ha<br />

50% of Unit cost (400Ha) Rs.60.00lakhs<br />

5.1.4 Development of new individual p<strong>on</strong>ds<br />

in the private sector including supply<br />

of 1 st year inputs:-<br />

(a) C<strong>on</strong>structi<strong>on</strong> of new individual p<strong>on</strong>ds<br />

@ Rs.3.00lakhs/Ha,<br />

50% of Unit cost (400Ha) Rs.600.00lakhs<br />

(b) 1 st year inputs @ Rs.30,000/-Ha,<br />

50% of Unit cost (400Ha) Rs.60.00lakhs<br />

5.1.5 Training cost of farmers<br />

@ Rs.2,000/-per Farmer trainee<br />

(10,000 farmers) Rs.200.00lakhs<br />

5.1.6 Cost of providing Marketing assets<br />

(25% subsidy to the private<br />

entrepreneurs under the scheme.<br />

A lump sum provisi<strong>on</strong> has been reflected). Rs.200.00lakhs<br />

5.1.7 Administrative and c<strong>on</strong>tingency cost<br />

5% (Rounded to L.S) Rs.10.00 lakhs<br />

TOTAL:- Rs.2000.00lakhs<br />

5.1 YEAR-WISE TARGET OF FINANCIAL INVOLVEMENT<br />

The year-wise details of the financial involvement is shown below under<br />

Table – F. (Details of Financial Investment Schedule is shown separately<br />

under Chapter VIII).


108<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Year-wise target of Financial involvement:-<br />

Year<br />

Renovati<strong>on</strong>/<br />

reclamati<strong>on</strong><br />

of existing<br />

water area<br />

C<strong>on</strong>structi<strong>on</strong><br />

of<br />

new<br />

community<br />

p<strong>on</strong>ds<br />

TABLE – F<br />

FINANCIAL TARGET<br />

C<strong>on</strong>structi<strong>on</strong><br />

of<br />

new<br />

individual<br />

p<strong>on</strong>ds<br />

Farmer’s<br />

Training<br />

cost<br />

Cost of<br />

Marketing<br />

assets<br />

Administrative<br />

and<br />

c<strong>on</strong>tingency<br />

cost<br />

(Rs.in lakhs)<br />

Total<br />

1 2 3 4 6 7 8<br />

2004-<br />

2005<br />

40.50 99.00 99.00 30.00 30.00 1.50 300.00<br />

2005-<br />

2006<br />

54.00 132.00 132.00 40.00 40.00 2.00 400.00<br />

2006-<br />

2007<br />

67.50 165.00 165.00 50.00 50.00 2.50 500.00<br />

2007-<br />

2008<br />

67.50 165.00 165.00 50.00 50.00 2.50 500.00<br />

2008-<br />

2009<br />

40.50 99.00 99.00 30.00 30.00 1.50 300.00<br />

T.T. 270.00 660.00 660.00 200.00 200.00 10.00 2000.00<br />

CHAPTER – VI<br />

6. FINANCIAL RETURN: -<br />

6.1 The scheme will start its implementati<strong>on</strong> during 2004 – 2005 and the<br />

producti<strong>on</strong> of fish will start its impact after <strong>on</strong>e year of rearing period i.e. from<br />

2005 – 2006 <strong>on</strong>wards. Before introducti<strong>on</strong> of the scheme the fish producti<strong>on</strong><br />

level from culture sector al<strong>on</strong>e is estimated at 2900 M.T at the end of 2003-<br />

2004 with 5,000 farmers engaged in this venture. The gross income per family<br />

comes to Rs.40,000/- per annum from their fish p<strong>on</strong>ds when calculated @<br />

Rs.70/- kg of fish.<br />

6.2 With launching of this special scheme under BAFFACOS it is expected that<br />

the per Hectare producti<strong>on</strong> of fish flesh will increase at least upto 2.5 – 3 M.T<br />

per Ha/year against the presently estimated producti<strong>on</strong> of 1.4 M.T per Hectare.<br />

6.3 The details of financial return and gross earning depicting the increasing trend<br />

owing to the implementati<strong>on</strong> of BAFFACOS is shown under TABLE – G. For<br />

this purpose the producti<strong>on</strong> target has been calculated at the minimum rate of<br />

2.7M.T per Hectare of p<strong>on</strong>d water area which could be augmented to even<br />

4M.T per Hectare if the farmers strictly adhere to the scientific method of<br />

farming technique disseminated to them through training programme under<br />

the scheme. Besides the fish selling rate has been calculated at minimum of<br />

Rs.80/- per kg during 2004-2005 to 2008-2009 which is expected increased<br />

with pace of time during the above period.


109<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

6.4 While the Gross income is plotted against the total family engaged in the<br />

venture the family wise gross income increases to Rs.87,000/-per annum at the<br />

end of 2008-2009 against the estimated per family income of Rs.40,000/- per<br />

annum at the end of 2003-2004.<br />

6.5 The details of the year wise gross financial return is shown below under Table<br />

– G. For this purpose, the future producti<strong>on</strong> potentiality from 2005 – 2006 is<br />

calculated at 2.5 M.T per Hectare and the fish selling rate is calculated at<br />

Rs.80/- per Kg. Here, <strong>on</strong>ly the producti<strong>on</strong> from p<strong>on</strong>d culture sector is<br />

reflected.<br />

Sl<br />

No<br />

.<br />

Year<br />

TABLE – G<br />

YEAR WISE FINANCIAL RETURN: -<br />

Estimated Water<br />

area under fish<br />

farming (cumulative)<br />

Ha<br />

Estimated producti<strong>on</strong><br />

level (culture<br />

sector)<br />

at the end of 1yr<br />

rearing period of fish<br />

Gross Financial<br />

return<br />

(Rs.in<br />

lakhs)<br />

1 2 3 4 5<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

2004-2005<br />

2005-2006<br />

2006-2007<br />

2007-2008<br />

2008-2009<br />

2600<br />

2800<br />

3000<br />

3200<br />

3400<br />

6.5 MARKETING LINKAGE: -<br />

6800<br />

7000<br />

7500<br />

8200<br />

8700<br />

5440.00<br />

5600.00<br />

6000.00<br />

6560.00<br />

6960.00<br />

6.5.1 As discussed earlier the producti<strong>on</strong> of fish at the end of 2008 - 2009 is<br />

estimated to be 8,700 M.T. With the implementati<strong>on</strong> of the scheme there<br />

should be sufficient outlet for marketing inside/outside the state.<br />

6.5.2 Therefore, in order to develop an organized marketing system/chain within the<br />

state as well as outside the state a cadre of ware-house owner, transporter and<br />

retailers has to be created with required facilities like Ice Plant, Cold Storage,<br />

Insulated/Refrigerated vehicle, retail market shed comprising deep freezer and<br />

insulated boxes etc in the private sector.<br />

6.5.3 Thus a token provisi<strong>on</strong> of Rs.200.00 lakhs is proposed as 25% subsidy for the<br />

private entrepreneurs who would like to involve in the marketing sector of the<br />

venture.<br />

6.5.4 However, a separate project report for this purpose will be prepared by the<br />

Fisheries Department after primary clearance from the BAFFACOS<br />

authorities.


110<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

7. PROJECT ANALYSIS: -<br />

CHAPTER – VII<br />

7.1 On analysis of the estimated producti<strong>on</strong> level, from Table-G, it appears that<br />

producti<strong>on</strong> al<strong>on</strong>e from p<strong>on</strong>d culture sector can meet the fish requirement of<br />

8,700 M.T at the end of 2009 A.D offering a viable scope for earning a<br />

sustainable income by the farmers besides generating c<strong>on</strong>siderable<br />

employment opportunity to the unemployed youths in the rural sector.<br />

7.2 Further, it also reveals that at the end of 2009 A.D, about 8000 families can<br />

earn a gross annual income of Rs.87,000/- per family from this venture al<strong>on</strong>e.<br />

7.3 When this entire gross income of Rs.6960.00 lakhs is c<strong>on</strong>verted into per capita<br />

gross income against the projected populati<strong>on</strong> of 12.6lakhs at the end of 2008-<br />

2009 the per capita gross income comes to Rs.552/-<br />

7.4 Also, since the progamme is targeted to establish 400Ha of p<strong>on</strong>ds under<br />

community/village fish p<strong>on</strong>ds the gross revenue of Rs.864.00lakhs are likely<br />

to go to those villages/communities provided with such fish p<strong>on</strong>ds under<br />

BAFFACOS.<br />

7.5 The scheme is quite suitable for eliminating famine and poverty during the<br />

Bamboo flowering episode as well it will remain as a permanent assets for fish<br />

producti<strong>on</strong> in the state for the future.<br />

7.6 CONCLUSION: -<br />

• The scheme is based <strong>on</strong> development of 3400 Hectare of culturable<br />

water areas during the period of 5yrs (2004-2005 to 2008-2009). It will<br />

attain a producti<strong>on</strong> of around 8700 M.T of fish flesh by 2008 – 2009,<br />

which offers a gross financial return of Rs.6960.00 lakhs in the<br />

venture. It will act as an instrument in combating Bamboo flowering<br />

and famine by providing fish flesh as a source of fish protein as well as<br />

a sustainable income to the people.<br />

• It is suggested that more water areas should be covered for fish<br />

producti<strong>on</strong> by providing sufficient fund by the Government to utilize<br />

the vast potential water areas in culture sector in the state which will<br />

not <strong>on</strong>ly offer surplus fish producti<strong>on</strong> and income to the farmers for<br />

ec<strong>on</strong>omic upliftment of the rural mass but also, it will certainly<br />

generate ample scope for self employment for the youths especially<br />

during the famine and hardship which could be tackled under the<br />

BAFFACOS programme.


111<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

CHAPTER – VIII<br />

8. INVESTMENT SCHEDULE:-<br />

8.1 In view of what has been stated in the foregoing chapters an aggregate<br />

investment of about Rs.2000.00 lakhs will be required for successful<br />

implementati<strong>on</strong> of the scheme.<br />

8.2 It is proposed that the entire estimated aggregate be infused in a phased<br />

manner over a period of 5 years from 2004-2005 to 2008-2009.<br />

8.3 The proposed investment schedule is projected below under Table H.<br />

TABLE – H<br />

INVESTMENT SCHEDULE<br />

(Rs.in lakhs)<br />

Year-wise investment<br />

District-wise activities 2004- 2005- 2006- 2007- 2008- Total<br />

2005 2006 2007 2008 2009<br />

1<br />

A. Old Aizawl District<br />

(comprising Aizawl ‘E’,<br />

Champhai, Serchhip, Mamit<br />

& Kolasib)<br />

2 3 4 5 6 7<br />

(i) Renovati<strong>on</strong>/ Reclamati<strong>on</strong> of<br />

existing p<strong>on</strong>ds including<br />

supply of 1 st year inputs<br />

(ii) Development of new<br />

community<br />

(iii) Development of Individual<br />

new p<strong>on</strong>ds in the private<br />

sector including supply of 1 st<br />

year input<br />

(iv) Farmer’s Training (creati<strong>on</strong> of<br />

cadre of trained fish farmers)<br />

(v) Marketing<br />

24.30<br />

59.40<br />

59.40<br />

18.00<br />

18.00<br />

32.40<br />

79.20<br />

79.20<br />

24.00<br />

24.00<br />

40.50<br />

99.00<br />

99.00<br />

30.00<br />

30.00<br />

40.50<br />

99.00<br />

99.00<br />

30.00<br />

30.00<br />

24.30<br />

59.40<br />

59.40<br />

18.00<br />

18.00<br />

162.10<br />

396.00<br />

396.00<br />

120.00<br />

120.00<br />

(vi) Administrative & C<strong>on</strong>tingency 0.90 1.20 1.50 1.50 0.90 6.00<br />

Sub-Total of ‘A’ 180.00 240.00 300.00 300.00 180.00 1200.00


112<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

1<br />

B. Lunglei District:-<br />

2 3 4 5 6 7<br />

(i) Renovati<strong>on</strong>/ Reclamati<strong>on</strong> of<br />

existing p<strong>on</strong>ds including<br />

supply of 1 st year inputs<br />

8.10 10.80 13.50 13.50 8.10 54.00<br />

(ii) Development of new<br />

community<br />

(iii) Development of Individual<br />

new p<strong>on</strong>ds in the private<br />

sector including supply of 1 st<br />

year input<br />

(iv) Farmer’s Training (creati<strong>on</strong><br />

of cadre of trained fish<br />

farmers)<br />

(v) Marketing<br />

19.80<br />

19.80<br />

6.00<br />

6.00<br />

26.40<br />

26.40<br />

8.00<br />

8.00<br />

33.00<br />

33.00<br />

10.00<br />

10.00<br />

33.00<br />

33.00<br />

10.00<br />

10.00<br />

19.80<br />

19.80<br />

6.00<br />

6.00<br />

132.00<br />

132.00<br />

40.00<br />

40.00<br />

(vi) Administrative &<br />

C<strong>on</strong>tingency<br />

0.30 0.40 0.50 0.50 0.30 2.00<br />

Sub-Total of ‘B’<br />

C. Chhimtuipui District<br />

(comprising Saiha &<br />

Lawngtlai)<br />

60.00 80.00 100.00 100.00 60.00 400.00<br />

(i) Renovati<strong>on</strong>/ Reclamati<strong>on</strong> of<br />

existing p<strong>on</strong>ds including<br />

supply of 1 st year inputs<br />

(ii) Development of new<br />

community<br />

(iii) Development of Individual<br />

new p<strong>on</strong>ds in the private<br />

sector including supply of 1 st<br />

8.10 10.80 13.50 13.50 8.10 54.00<br />

19.80 26.40 33.00 33.00 19.80 132.00<br />

year input<br />

19.80 26.40 33.00 33.00 19.80 132.00<br />

(iv) Farmer’s Training (creati<strong>on</strong><br />

of cadre of trained fish<br />

farmers)<br />

6.00 8.00 10.00 10.00 6.00 40.00<br />

(v) Marketing<br />

6.00 8.00 10.00 10.00 6.00 40.00<br />

(vi) Administrative &<br />

C<strong>on</strong>tingency<br />

0.30 0.40 0.50 0.50 0.30 2.00<br />

Sub-Total of ‘B’ 60.00 80.00 100.00 100.00 60.00 400.00<br />

Grand Total (A+B+C):- 300.00 400.00 500.00 500.00 300.00 2000.00


INTRODUCTION<br />

113<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

HEALTH & FAMILY WELFARE<br />

The Government of <strong>Mizoram</strong> is gearing up to prepare a comprehensive multi sectoral<br />

<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g> to meet the requirements of all aspects of the bamboo flowering phenomen<strong>on</strong> in<br />

the State.<br />

From past experiences, bamboo flowering in <strong>Mizoram</strong> is usually accompanied by<br />

c<strong>on</strong>siderable increase of rodent populati<strong>on</strong>. The destructi<strong>on</strong> of food crops results in food<br />

scarcity and famine. The epidemiological imbalance also leads to increased risk of infecti<strong>on</strong><br />

or outbreaks of rodent borne diseases. Health Department has prepared an <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g> to<br />

address the most critical aspect of the whole issue, that is, to prevent, manage or c<strong>on</strong>trol the<br />

corresp<strong>on</strong>ding rodent borne diseases, malnutriti<strong>on</strong> and its related diseases.<br />

Diseases associated with rodents may be broadly classified as follows:-<br />

1. Bacterial - Plague, Tularaemia, Salm<strong>on</strong>ellosis<br />

2. Viral - Lassa fever, Haemorrhaghic fever, Encephalitis<br />

3. Rickettsial - Scrub typhus, Murine typhus, Ric`kettsial pox<br />

4. Parasitic - Leishmaniasis, Amoebiasis, Trichinosis, Chaga’s disease<br />

5. Others - Leptospirosis, histoplasmosis, ring worm, rat bite fever, rabies<br />

The modes of transmissi<strong>on</strong> of these diseases are through rat bite, fleas and other<br />

ecto-parasites or c<strong>on</strong>taminati<strong>on</strong> of food, water and air by rodent urine or excreta. It is a<br />

cause for c<strong>on</strong>cern that gastroenteritis is still the sec<strong>on</strong>d leading cause of morbidity despite<br />

other high socio-ec<strong>on</strong>omic indicators indicating the unsafe eating and drinking practices. The<br />

risk of infecti<strong>on</strong> by these diseases is very high since people in <strong>Mizoram</strong> come in close<br />

c<strong>on</strong>tact with rodents including handling or c<strong>on</strong>sumpti<strong>on</strong> of their flesh. Some of these diseases<br />

are epidemic pr<strong>on</strong>e requiring immediate c<strong>on</strong>trol and some are highly fatal. Rabies is 100%<br />

fatal.<br />

An outbreak of plague can be disastrous to the nati<strong>on</strong>al ec<strong>on</strong>omy. This grim<br />

less<strong>on</strong> was learnt in the Surat outbreak (1994), the ec<strong>on</strong>omic loss for which was estimated to<br />

be 1.7 billi<strong>on</strong> US dollars and should not be overlooked in the present c<strong>on</strong>text. Our country<br />

was boycotted internati<strong>on</strong>ally disrupting internati<strong>on</strong>al trade. Mass panic re<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> was also<br />

observed all over the country, including the nati<strong>on</strong>al capital of Delhi. Plague, transmitted by<br />

rodent fleas, is an internati<strong>on</strong>ally notifiable disease with foci of the disease still suspected<br />

to be present in the bordering country of Myanmar. Internati<strong>on</strong>al travel informati<strong>on</strong> currently<br />

includes plague as <strong>on</strong>e of the risks against travel to Myanmar. The adverse effect of plague<br />

outbreak, therefore, cannot be, over emphasised in the local, nati<strong>on</strong>al or internati<strong>on</strong>al c<strong>on</strong>text.<br />

The nati<strong>on</strong>al plague expert, Dr Shyamal Biswas of the Plague Surveillance Unit,<br />

Nati<strong>on</strong>al Institute of Communicable Diseases, Bangalore expressed his c<strong>on</strong>cern over the lack<br />

of plague surveillance infrastructure in the State during his recent visit to <strong>Mizoram</strong><br />

regarding the impending bamboo flowering. His report stated that foci of plague infecti<strong>on</strong>s<br />

were detected in Myanmar till recently and there is potential for plague outbreak in the<br />

neighbouring state of <strong>Mizoram</strong> for which appropriate preventive measures need to be taken.


114<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

What would be the situati<strong>on</strong> if all supplies coming from outside the State were to<br />

suddenly cease due to such an epidemic, especially when all our efforts are directed<br />

towards preventing famine?<br />

A Government of India report stated that plague outbreak was reported in Himachal<br />

Pradesh (2002) but was c<strong>on</strong>tained following immediate appropriate <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>s which were<br />

efficient surveillance, chemoprophylaxis, case investigati<strong>on</strong> and management.<br />

Leptospirosis epidemics have been reported in many parts of our country. Though<br />

more prevalent in water logged plains, cases have been reported in hilly regi<strong>on</strong>s within the<br />

country (Kottayam). The impending increase in rat populati<strong>on</strong> will increase manifold the risk<br />

of epidemics of the dreadful disease. The disease is transmitted in the urine of rodents and<br />

hence the risk of transmissi<strong>on</strong> through food and water is very high in <strong>Mizoram</strong> due to poor<br />

storage, transport and retail facilities. Scarcity of water has compelled the majority of people<br />

in <strong>Mizoram</strong> to depend largely <strong>on</strong> stored water and open spring water sources and thus has a<br />

very high risk of c<strong>on</strong>taminati<strong>on</strong> by rodents.<br />

The other diseases are equally important. The recent findings at All India Institute of<br />

Medical & Sciences of the multi-drug resistant Salm<strong>on</strong>ella Typhi is equally relevant for<br />

<strong>Mizoram</strong> where it is endemic coupled with the indiscriminate use of antibiotics. Two<br />

deaths allegedly due to rabies were reported at Sialsuk and Kolasib this year.<br />

The role of immunisati<strong>on</strong> is limited to <strong>on</strong>ly a few of these diseases like rabies. Plague<br />

vaccine is advised to be given <strong>on</strong>ly to those who are in close c<strong>on</strong>tact or very high risk<br />

individuals and not at the community level. Anti-rabies vaccine may be procured and kept at<br />

CHC/PHC level and anti-plague vaccine procured for those immediately involved in rodent<br />

& flea c<strong>on</strong>trol.<br />

Diagnostic facilities for the majority of these diseases are currently absent in<br />

<strong>Mizoram</strong> and need to be set up. Reagents, field test kits and medicine for treatment will need<br />

to be procured. It may thus be emphasized that appropriate preventive <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>s, immediate<br />

investigati<strong>on</strong>, diagnosis and management, capacity building and awareness generati<strong>on</strong>, etc are<br />

the key strategies to the successful c<strong>on</strong>trol of diseases.<br />

SWOT ANALYSIS<br />

STRENGTHS<br />

• <strong>Mizoram</strong> is am<strong>on</strong>g the best performers in India shown by good health indicators<br />

• Rural doctors maintain their stati<strong>on</strong>s better than doctors of any other State in<br />

India.<br />

• Populati<strong>on</strong> coverage by health instituti<strong>on</strong> is small<br />

• Well trained surveillance pers<strong>on</strong>nel available, though not adequate<br />

• Committed policy makers, administrators and health pers<strong>on</strong>nel<br />

• <str<strong>on</strong>g>Comprehensive</str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g>ning and preventive measures


115<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

WEAKNESSES<br />

• Poor general health infrastructures<br />

• Disease surveillance organizati<strong>on</strong> is still rudimentary<br />

• Difficulty in utilizing existing general and specific communicable disease<br />

surveillance systems which are governed by funding guidelines and limited<br />

resources<br />

• Literature of past health experiences unavailable<br />

• Shortage of staff, numerous vacant posts and increase in number of districts from<br />

3 to 8 without corresp<strong>on</strong>ding increase in number of crucial health posts<br />

• Absence of specific posts for pers<strong>on</strong>nel qualified and trained in surveillance,<br />

epidemiology, entomology, etc.<br />

• Poor diagnostic facilities for rodent borne diseases<br />

• Coordinati<strong>on</strong> with other departments unsatisfactory<br />

• Poor communicati<strong>on</strong> facilities in difficult terrains<br />

OPPORTUNITIES<br />

• Highly literate, homogenous, c<strong>on</strong>tained, close knit and small populati<strong>on</strong> for<br />

targeting IEC activities<br />

• Presence of well organized NGOs/CBOs<br />

• Plague, being a nati<strong>on</strong>al and internati<strong>on</strong>ally notifiable disease, external assistance<br />

expected in terms of resources and expertise<br />

• Government level commitment and good leadership<br />

THREATS<br />

• Myanmar being an internati<strong>on</strong>ally declared high risk area for plague<br />

• Leptospirosis epidemics regularly reported in other parts of the country<br />

• Salm<strong>on</strong>ellosis being endemic in <strong>Mizoram</strong> with frequent food pois<strong>on</strong>ing outbreaks<br />

• Gastroenteritis being sec<strong>on</strong>d leading health problem indicates unsafe food and<br />

drinking practices<br />

• Documented c<strong>on</strong>taminati<strong>on</strong> of spring water in Aizawl<br />

• Attitudes and practices of people towards rodents including c<strong>on</strong>sumpti<strong>on</strong> of their<br />

flesh<br />

• Difficult terrains and presence of remote or interior villages with poor health<br />

facilities which are difficult to reach<br />

• General ignorance and hence less priority given to associated health hazards of<br />

bamboo flowering- includes the policy making bodies at the central level, GOI<br />

• Disrupti<strong>on</strong> of supplies to the State<br />

• Poor implementati<strong>on</strong> due to denial of project comp<strong>on</strong>ents and deviati<strong>on</strong> from<br />

technicality


116<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

GENERAL OBJECTIVES<br />

1. To prevent, manage and c<strong>on</strong>trol rodent associated diseases in <strong>Mizoram</strong>.<br />

2. To prevent and manage malnutriti<strong>on</strong> due to food scarcity during bamboo flowering.<br />

3. To develop the capacity of health services and community.<br />

4. To prevent ec<strong>on</strong>omic loss of India and disrupti<strong>on</strong> of local and internati<strong>on</strong>al trade by<br />

preventing or c<strong>on</strong>trolling plague epidemic.<br />

SPECIFIC OBJECTIVES<br />

1. To set up an organized surveillance system for rodent borne diseases.<br />

2. To organize efficient State and District Rapid Resp<strong>on</strong>se Teams for managing<br />

outbreaks of rodent borne diseases<br />

3. Improve diagnostic and clinical management facilities of rodent borne diseases<br />

4. To c<strong>on</strong>duct training in surveillance, investigati<strong>on</strong>, diagnosis and management of<br />

rodent borne diseases<br />

5. To increase public awareness regarding risk factors, preventi<strong>on</strong> and pers<strong>on</strong>al<br />

protecti<strong>on</strong>, signs and symptoms and management of rodent borne diseases.<br />

6. To prevent and manage any associated malnutriti<strong>on</strong> cases.<br />

7. To evaluate the effectiveness and efficiency of Health BAFFACOS Acti<strong>on</strong> Plan.<br />

STRATEGIES AND COMPONENTS OF ACTION PLAN<br />

To meet the above objectives, the strategies adopted will be divided into the following<br />

11 (eleven) comp<strong>on</strong>ents: -<br />

A. Rodent C<strong>on</strong>trol<br />

This is a l<strong>on</strong>g term measure and may be undertaken before and after epidemics.<br />

Killing of rodents during epidemics is not advised since it will result in fleas leaving the dead<br />

bodies infecting human beings directly or through other animals. These indicate the need for<br />

close coordinati<strong>on</strong> am<strong>on</strong>g all sectors the following methods may be used:-<br />

1. Envir<strong>on</strong>mental Sanitati<strong>on</strong> in the house, around the house and in the community.<br />

2. Physical methods like trapping.<br />

3. Chemical methods using rodenticides.<br />

Flea c<strong>on</strong>trol measures should be immediately undertaken during and after rat falls or<br />

killing of rodents. Regular dissecti<strong>on</strong> and examinati<strong>on</strong> of rodents for presence of infecti<strong>on</strong> is<br />

essential. Therefore, establishment of animal laboratory, recruitment of appropriate staff and<br />

their training, facilities for catching rodents, close coordinati<strong>on</strong> with Agriculture Department<br />

(active in rodent c<strong>on</strong>trol but without any health related surveillance), community<br />

participati<strong>on</strong>, health educati<strong>on</strong> are the key activities <str<strong>on</strong>g>plan</str<strong>on</strong>g>ned for this comp<strong>on</strong>ent.<br />

1. Flea c<strong>on</strong>trol measures during<br />

a. Rat fall<br />

b. Increase in flea Index.<br />

B. Vector C<strong>on</strong>trol<br />

It is proposed to strengthen Entomology services, which are currently n<strong>on</strong>existent, during<br />

the project period. The detailed requirements are given below in the secti<strong>on</strong> of Entomology<br />

Cell.


117<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

2. Pers<strong>on</strong>al Prophylaxis - This is necessary for those in close c<strong>on</strong>tact with rodents and<br />

having increased risks of infecti<strong>on</strong>.<br />

The following are proposed :-<br />

a. Use of repellants<br />

b. Proper clothing<br />

c. Immunizati<strong>on</strong><br />

3. Residual Insecticide Spray using Malathi<strong>on</strong>, Deltamethrin and other insecticides.<br />

C. Capacity building<br />

Training is identified as a major comp<strong>on</strong>ent in the project. All the health pers<strong>on</strong>nel<br />

involved in surveillance, investigati<strong>on</strong> and management of rodent borne diseases will need to<br />

be trained. For this purpose, core trainers at State and district levels will be identified and<br />

trained. They will, in turn, train all c<strong>on</strong>cerned including health workers and other grass root<br />

level staff and also the community.<br />

D. Surveillance<br />

The following surveillance activities are to be undertaken: -<br />

I. Rodent Surveillance<br />

a. Collecting and examining death of rodents<br />

b. M<strong>on</strong>itoring rodent activity<br />

c. Trapping rodents for populati<strong>on</strong> data, serum, tissue samples and ecto-parasite<br />

collecti<strong>on</strong><br />

II. Vector Surveillance(Rat Flea)<br />

a. Calculati<strong>on</strong> of flea index.<br />

b. Determinati<strong>on</strong> of species<br />

III. Carnivore(cats, dogs, foxes, etc.) Surveillance<br />

a. Dogs develop antibodies which may be detected in case of plague.<br />

b. Surveillance of cats, foxes in similar manner<br />

IV. Human (Clinical) Surveillance<br />

a. Health functi<strong>on</strong>aries and community to be alert<br />

b. Case definiti<strong>on</strong>s to be made in local language<br />

c. Case investigati<strong>on</strong> in suspected cases.<br />

d. Notificati<strong>on</strong> to health authority by health pers<strong>on</strong>nel and the community.<br />

e. Regular reporting and analysis of surveillance data<br />

V. Laboratory Surveillance & Diagnosis<br />

a. Strengthening in terms of equipments and capacity building<br />

b. Diagnosis and regular reporting of rodent borne diseases<br />

c. Culture & sensitivity


118<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

COMPONENTS OF HEALTH DEPARTMENT BAFFACOS ACTION PLAN<br />

RESEARH<br />

CLINICAL<br />

MANAGE-<br />

MENT<br />

COMMUNI<br />

TY<br />

PARTICI-<br />

PATION<br />

HEALTH<br />

EDUCATION<br />

TRAINING<br />

HUMAN<br />

SURVEIL<br />

LANCE<br />

BAFFACOS<br />

HEALTH<br />

DEPT.<br />

INTER<br />

SECTORAL<br />

COORDIN<br />

ATION<br />

E. Case Investigati<strong>on</strong><br />

RODENT<br />

SURVEIL<br />

LANCE<br />

RAPID<br />

RESPONSE<br />

TEAMS<br />

FLEA<br />

SURVEIL<br />

LANCE<br />

LABORA-<br />

TORY<br />

STRENGT<br />

HENING<br />

CAT/DOGS<br />

URVEIL-<br />

LANCE<br />

i. Immediate investigati<strong>on</strong> of epidemic pr<strong>on</strong>e rodent borne diseases by trained Rapid<br />

Resp<strong>on</strong>se Teams, to be formed in all districts<br />

ii. Identificati<strong>on</strong> of cause and source of epidemic, risk factors, numbers affected etc.<br />

using scientific methods and rapid diagnostic kits.<br />

iii. Mobility is to be ensured<br />

iv. Initiati<strong>on</strong> of c<strong>on</strong>trol measures & c<strong>on</strong>trol room to be set up in epidemics<br />

v. Incentives to be given to pers<strong>on</strong>s reporting any incident to the Government officials.


119<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

OUTBREAK INVESTIGATION FLOW CHART<br />

Report<br />

Suspected case<br />

Immediate notificati<strong>on</strong> Immediate C<strong>on</strong>tainment<br />

to DHBC Measures<br />

Notify State & Nati<strong>on</strong>al<br />

Authorities if plague<br />

Positive<br />

• Government of<br />

India<br />

• Intensify<br />

c<strong>on</strong>tainment measures<br />

Immediate investigati<strong>on</strong> by MO / BHO<br />

1. Send RRT- epidemiological,<br />

clinical, lab investigati<strong>on</strong><br />

2. Activate DHBTC<br />

3. Set up c<strong>on</strong>trol room<br />

4. Mobilize drugs, vehicles<br />

manpower, finances<br />

5. Send Lab. Specimen<br />

Laboratory Reports<br />

Laboratory Reports<br />

F. Clinical Case Management<br />

1. Case management<br />

2. Hospitalizati<strong>on</strong><br />

3. Active surveillance for new<br />

cases<br />

4. Preventive measures<br />

5. Flea & sanitary c<strong>on</strong>trol<br />

measures<br />

Negative<br />

Investigate & find cause of<br />

outbreak<br />

i. Isolati<strong>on</strong> and treatment of cases.<br />

ii. In epidemics<br />

a. Hospital Disaster Management <str<strong>on</strong>g>plan</str<strong>on</strong>g> to be activated at district hospitals in case<br />

of epidemics (biological disasters), which can not be managed routinely with<br />

existing resources.<br />

b. Standard treatment protocol development<br />

c. Documentati<strong>on</strong>


120<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

G. Recruitment of c<strong>on</strong>tractual staff<br />

Intensive fieldwork is the key to any successful disease surveillance<br />

programme. Active and passive surveillance is proposed for the rodent borne diseases.<br />

At the district level, the Chief Medical Officer (CMO) is usually supported by<br />

3-4 Senior Medical Officers (SMO). Currently, <strong>on</strong>ly <strong>on</strong>e (Aizawl ‘W’) has 3 SMOs, 2<br />

districts have 1 SMO each and the others are without supporting SMOs. Districts are<br />

burdened with various health programmes are already short staffed. This may be due<br />

to the increase in the number of districts from 3 to 8 without the corresp<strong>on</strong>ding<br />

increase in staff strength. Hence it is c<strong>on</strong>cluded that the existing overburdened staff<br />

will not be able to cope with the additi<strong>on</strong>al requirements of anticipated health<br />

problems of bamboo flowering, especially in the districts and rural areas. It is<br />

proposed to recruit BAFFACOS staff purely <strong>on</strong> a yearly c<strong>on</strong>tract basis.<br />

BAFFACOS HEALTH OFFICERS (BHOs) will be posted in all the districts<br />

as well as in the State BAFFACOS Cell, Entomology Cell and State Laboratory. They<br />

will be resp<strong>on</strong>sible for all BAFFACOS related activities. BHOs will be selected from<br />

am<strong>on</strong>g medical doctors, microbiologists, epidemiologists, veterinarians, post<br />

graduates in Zoology or similar fields and from am<strong>on</strong>g experienced retired pers<strong>on</strong>nel<br />

Similarly, BAFFACOS FIELD WORKERS (BFWs) will be posted at all the<br />

57 PHCs and 12 CHCs.<br />

It is also proposed to set up 10(ten) BAFFACOS BORDER SURVEILLANCE<br />

UNITS (BBSUs) in strategic locati<strong>on</strong>s al<strong>on</strong>g the borders of <strong>Mizoram</strong>. These will<br />

serve the dual purposes of screening high risk cases entering or exiting the State.<br />

These units will be manned by 1 BHO, 1 BFW, 1 BAFFACOS Technician and a<br />

Group D staff.<br />

.<br />

H. Intersectoral Coordinati<strong>on</strong><br />

The following examples are few of the areas anticipated as requiring close<br />

coordinati<strong>on</strong> am<strong>on</strong>g all sectors involved in BAFFACOS:-<br />

i. Rodent c<strong>on</strong>trol may be undertaken by Agriculture Department while examinati<strong>on</strong> of<br />

dead rodents or fleas, flea surveillance and c<strong>on</strong>trol will be d<strong>on</strong>e by Entomology cell of<br />

Health Department.<br />

ii. Passive surveillance of dogs may be d<strong>on</strong>e by Animal & Husbandry Department while<br />

active surveillance or survey may be undertaken by Health Department<br />

iii. Water Surveillance for c<strong>on</strong>taminati<strong>on</strong> may be d<strong>on</strong>e by PHE and Microbiology<br />

Department of Health Department.<br />

iv. Food Safety measures especially for rodent c<strong>on</strong>taminati<strong>on</strong> to be jointly undertaken by<br />

Health and Food and Civil Supplies Departments.<br />

v. Public educati<strong>on</strong> by Health Department and Department of Informati<strong>on</strong> and Public<br />

Relati<strong>on</strong>s<br />

vi. Reporting of rat falls and cases of rodent borne diseases can be d<strong>on</strong>e by existing<br />

Health Department surveillance network as well as by community members


121<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

I. Community Participati<strong>on</strong><br />

The community will be involved in almost all the comp<strong>on</strong>ents for they will be<br />

exposed to the rodents, fleas, rodent borne diseases while handling and killing of rodents or<br />

through food and water c<strong>on</strong>taminati<strong>on</strong>, report disease and rodent informati<strong>on</strong>, adopt pers<strong>on</strong>al<br />

protecti<strong>on</strong> measures, be beneficiaries of BAFFACOS <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g>s of different sectors and be<br />

audience as well instruments of IEC activities. They need to be involved in almost all stages<br />

of the <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>plan</str<strong>on</strong>g>s prepared by all sectors involved in BAFFACOS.<br />

Incentives and h<strong>on</strong>orarium will be provided for reporting cases and other informati<strong>on</strong><br />

requiring attenti<strong>on</strong> of BAFFACOS organizati<strong>on</strong>.<br />

J. Informati<strong>on</strong>, Educati<strong>on</strong> and Communicati<strong>on</strong> (IEC)<br />

This is a critical comp<strong>on</strong>ent <strong>on</strong> which rests the success of all BAFFACOS related<br />

strategies of not <strong>on</strong>ly Health Department but for other sectors. The community need to be<br />

educated <strong>on</strong> the following areas:-<br />

1. Signs, symptoms, risk factors, pers<strong>on</strong>al protective measures, management etc.,<br />

regarding rodent borne diseases<br />

2. Reporting of suspected cases and rat falls<br />

Different media and communicati<strong>on</strong> strategies will be employed such as:-<br />

i. Electr<strong>on</strong>ic & print media, interpers<strong>on</strong>al communicati<strong>on</strong><br />

ii. Advocacy meetings, workshops, awareness campaigns<br />

iii. Involvement of nati<strong>on</strong>al and internati<strong>on</strong>al agencies and individuals, etc.<br />

K. Research<br />

Apart from the studies required for immediate local requirements, this will be a good<br />

and unique opportunity for research <strong>on</strong> rodent behavior and rodent borne diseases for<br />

replicati<strong>on</strong> or utilizati<strong>on</strong> in other parts of the world. Documentati<strong>on</strong> or literature regarding the<br />

health implicati<strong>on</strong>s of the unique bamboo flowering phenomena are practically unavailable<br />

and is a c<strong>on</strong>straint in <str<strong>on</strong>g>plan</str<strong>on</strong>g>ning for the same. Studies <strong>on</strong> the different aspects of health related<br />

events during this bamboo flowering will provide valuable informati<strong>on</strong> <strong>on</strong> the current<br />

episode. It will be a good learning experience for facing future episodes of bamboo flowering<br />

not <strong>on</strong>ly in the state, but also elsewhere in the world.


122<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ORGANIZATION OF HEALTH DEPARTMENT BAFFACOS<br />

State Entomology<br />

Cell-cum-Animal<br />

BAFFACOS Field<br />

Laboratory<br />

Units<br />

57 PHCs& 12 CHCs<br />

(69 Nos.)<br />

District BAFFACOS<br />

Coordinati<strong>on</strong> Committee<br />

STATE BAFFACOS COMMITTEE<br />

Health Department BAFFACOS District Committee Health<br />

BAFFACOS Technical<br />

State level<br />

Committee<br />

CIVIL HOSPITAL,<br />

Health BAFFACOS Technical Committee AIZAWL<br />

District Health BAFFACOS Cell District Rapid<br />

Resp<strong>on</strong>se Teams<br />

State Health BAFFACOS Cell<br />

Clinicians<br />

Microbiology<br />

Laboratory etc.<br />

District Level<br />

(9 Nos).<br />

Peripheral Level<br />

(79 Nos.)<br />

+<br />

State Rapid<br />

BAFFACOS<br />

Resp<strong>on</strong>se<br />

Border<br />

Teams<br />

Surveillance Units<br />

(10 Nos.)<br />

DISTRICT<br />

HOSPITAL<br />

* Note – There are 9 districts under the Department of Health & Family Welfare to<br />

facilitate proper implementati<strong>on</strong> of Programmes.


123<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

A. STATE LEVEL<br />

HEALTH DEPARTMENT BAFFACOS COMMITTEE (HDBC)<br />

1. Chairman - Health Minister<br />

2. Member Secretary - Principal Secretary, Health<br />

3. Members<br />

a. Director of Health Services<br />

b. Director of Hospital & Medical Educati<strong>on</strong><br />

c. Director, RIPAN<br />

d. Director, Synod Hospital, Durtlang<br />

e. State Surveillance Officer<br />

f. Nodal Officer, BAFFACOS(Health)<br />

g. Nodal Officer, Emergency Preparedness & Resp<strong>on</strong>se (WHO)<br />

h. SMEMO<br />

i. President, Central YMA<br />

HEALTH BAFFACOS TECHNICAL COMMITTEE (HBTC)<br />

1. Chairman - Director of Health Services<br />

2. Co-Chairman - Director of Hospital & Medical Educati<strong>on</strong><br />

3. Member Secretary - Nodal Officer, BAFFACOS (Health)<br />

4. Members<br />

1. State Surveillance Officer<br />

2. Medical Superintendent, Civil Hospital Aizawl<br />

3. Joint Director, NVDCP<br />

4. Nodal Officer, Emergency Preparedness & Resp<strong>on</strong>se (WHO)<br />

5. Entomologist<br />

6. Physician, State RRT<br />

7. Microbiologist, State RRT<br />

8. SMEMO<br />

9. BAFFACOS Medical Officer/ Entomologist/ Technical Officer<br />

10. NGO Representatives<br />

STATE HEALTH BAFFACOS CELL(SHBC)<br />

This will be located at the Public Health Divisi<strong>on</strong>, Directorate of Health Services. It<br />

will be headed by the Nodal Officer, BAFFACOS, Health Department. Its functi<strong>on</strong>s will be<br />

as follows:-<br />

1. Plan, Coordinate & m<strong>on</strong>itor all health aspects of BAFFACOS<br />

2. Collect, compile, analyse and interpret all surveillance data and disseminate to<br />

c<strong>on</strong>cerned authority for necessary <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>s.<br />

3. Establish rapid resp<strong>on</strong>se and management mechanisms in BAFFCOS related disease<br />

outbreak through the State and district RRTs, and recommend or initiate immediate<br />

c<strong>on</strong>trol measures.<br />

4. Network and coordinate activities with all public & private health institutes,<br />

BAFFACOS related departments NGOs and CBOs in the State.<br />

5. Networking and liaising with related agencies, institutes and individuals related to<br />

health aspects of BAFFACOS outside the State.<br />

6. Undertake and coordinate all BAFFACOS training activities in the State<br />

7. Coordinate and give necessary support to all DISTRICT BAFFACOS CELLs


8. IEC<br />

9. Research<br />

124<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The cell will have to be strengthened with the following:-<br />

1. Manpower<br />

a. BAFFACOS Healthl Officer (BHO)<br />

b. Data Entry Operator<br />

c. Driver<br />

2. Vehicle<br />

3. Furnitures<br />

4. Communicati<strong>on</strong> equipments<br />

a. Computer with accessories and necessary software<br />

b. Ph<strong>on</strong>e( Satellite, land line, mobile.,etc) with STD & Internet facilities<br />

c. Fax machine<br />

d. Scanner<br />

e. Photocopier<br />

ENTOMOLOGY CELL- CUM-ANIMAL LABORATORY<br />

Entomological services (vector surveillance) and study of live and dead rodents for<br />

signs of disease and infecti<strong>on</strong>s are critical comp<strong>on</strong>ents for the preventi<strong>on</strong> of rodent borne<br />

diseases. These facilities are currently absent in <strong>Mizoram</strong> and have also not been projected by<br />

any other sector for BAFFACOS.<br />

The following are the basic requirements:-<br />

1. Establishment of Entomology –cum-Animal Laboratory<br />

2. Vehicle for field work like rodent & flea surveillance, coordinati<strong>on</strong> with Agriculture<br />

Department involved in rodent c<strong>on</strong>trol<br />

3. Laboratory equipments & reagents for the Laboratory.<br />

4. Computer & accessories for compilati<strong>on</strong> and analysis of field and laboratory work to<br />

recommend <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>s to appropriate agency.<br />

5. Manpower<br />

a. Entomologist<br />

b. Technicians<br />

c. Insect Collectors cum animal handlers<br />

d. Data Entry Operator<br />

e. Driver<br />

f. Grade IV staff<br />

The functi<strong>on</strong>s of this cell may be as follows:-<br />

1. Rodent surveillance - Health aspect<br />

2. Postmortem & microscopical examinati<strong>on</strong> of rodents<br />

3. Microscopic & culture examinati<strong>on</strong><br />

4. Animal inoculati<strong>on</strong><br />

5. Vector surveillance e.g., flea. Flea index( specific & absolute) is<br />

essential for plague surveillance


125<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

6. Carnivore surveillance to detect plague antibodies in dogs<br />

7. Provide informati<strong>on</strong> to State BAFFACOS Cell<br />

Meeting will be held m<strong>on</strong>thly and whenever required.<br />

IV. BAFFACOS RAPID RESPONSE TEAMS(BRRT)<br />

Immediate resp<strong>on</strong>se and appropriate <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>s are usually life saving and essential for<br />

further spread of diseases Prompt mobility, good communicati<strong>on</strong> facilities and electr<strong>on</strong>ic or<br />

scientific situati<strong>on</strong>al analysis will be given priority.<br />

A multi-disciplinary team c<strong>on</strong>sisting of Public Health Specialist, Physician /<br />

Paediatrician, Microbiologist/ Pathologist, Entomologist/Malaria Officer (identified from<br />

existing man power) and BAFFACOS Medical Officer (to be recruited <strong>on</strong> c<strong>on</strong>tract basis for<br />

the project period) will be formed at State and district levels to immediately resp<strong>on</strong>d to<br />

reports of rodent borne diseases or to warning signs detected <strong>on</strong> analysis of surveillance data.<br />

The RRTs will have to be strengthened with field equipments like Still & Video<br />

Cameras, Torch, Laptop computer for Rapid Health Assessment and data analysis softwares,<br />

Emergency lamp, LCD Projector, Satellite teleph<strong>on</strong>e, Public Address system, rapid test kits,<br />

emergency medicines and increased capacity for mobility e.g., vehicle, adequate POL or<br />

funds for hiring necessary vehicles.<br />

B. DISTRICT LEVEL<br />

I. DISTRICT BAFFACOS COORDINATION COMMITTEE(DBCC)<br />

1. Chairman - Deputy Commissi<strong>on</strong>er<br />

2. Member Secretary - CMO<br />

3. Members<br />

a. SMO/MO, PH/TB/BHO<br />

b. DAO<br />

c. DHO<br />

d. BHO<br />

e. NGO representatives<br />

f. Media pers<strong>on</strong>s<br />

They will meet m<strong>on</strong>thly and whenever there is need for coordinati<strong>on</strong> am<strong>on</strong>g the<br />

different sectors.


126<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

II. DISTRICT HEALTH BAFFACOS TECHNICAL COMMITTEE (DHBTC)<br />

1. Chairman - CMO<br />

2. Co-Chairman - Medical Superintendent<br />

3. Member Secretary - Nodal Officer, BAFFACOS<br />

4. Members<br />

i) Members of District RRT<br />

1. Public Health Specialist<br />

2. Physician/Paediatrician<br />

3. Microbiologist/Pathologist<br />

4. Entomologist/District Malaria Officer<br />

ii) <strong>Baffacos</strong> Health Officer<br />

iii) Nursing Superintendent<br />

iv) DEMO<br />

v) Any other member deemed necessary .<br />

III. DISTRICT HEALTH BAFFACOS CELL(DHBC)<br />

It will be headed by the Nodal Officer, BAFFACOS supported by the following staff:-<br />

1. BHO<br />

2. Data Entry Operator<br />

Functi<strong>on</strong>s:-<br />

1. To collect and compile data regarding rodent borne diseases (based <strong>on</strong> simple case<br />

definiti<strong>on</strong>s) from<br />

a. Hospitals records<br />

b. From BFW at BFU (CHC/PHC)<br />

c. Private Health Instituti<strong>on</strong>s/ Practiti<strong>on</strong>ers/Informers<br />

2. Regular reporting to the State BAFFACOS Cell<br />

a. Weekly<br />

b. Hourly/daily as per requirement in times of epidemics<br />

3. Coordinate with district Agriculture Office regarding rat fall and other rodent<br />

activities and c<strong>on</strong>vey relevant informati<strong>on</strong> to State/District Entomologists<br />

4. Immediately relay RRT investigati<strong>on</strong> reports<br />

5. Informati<strong>on</strong>, Educati<strong>on</strong> & Communicati<strong>on</strong>(IEC)<br />

Communicati<strong>on</strong> equipments like computer & accessories, teleph<strong>on</strong>e, fax and internet<br />

facilities will be provided.


127<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

I. BAFFACOS FIELD UNITS( BFU)<br />

C. PERIPHERAL LEVEL<br />

This will include all 57 PHCs and 12 CHCs where 69 BAFFACOS Field Worker<br />

(BFW) will be posted.<br />

Functi<strong>on</strong>s:-<br />

1. Weekly (even ‘NIL’) reports <strong>on</strong> rodent borne diseases based <strong>on</strong> verificati<strong>on</strong> from all<br />

sub-centres, private practiti<strong>on</strong>ers or health instituti<strong>on</strong>s and others (faith healers,<br />

quacks, other systems of medicine, community members, etc) in the area.<br />

2. Immediate report by any means in any suspected epidemic pr<strong>on</strong>e rodent borne disease<br />

or rat fall or increased rodent activities<br />

3. Active & passive surveillance of rodent borne diseases<br />

4. Regular meeting with farmers, cultivators, community based organizati<strong>on</strong>s and other<br />

grassroot level workers of other related sectors<br />

5. IEC<br />

II BAFFACOS BORDER SURVEILLANCE UNITS (BBSU)<br />

It is proposed to set up 10 BBSUs at various villages al<strong>on</strong>g the borders of <strong>Mizoram</strong><br />

based <strong>on</strong> this strategic locati<strong>on</strong>s.<br />

Functi<strong>on</strong> will be similar to BFUS


128<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

DETAILED BUDGET ESTIMATE FOR 5 YEARS<br />

A. RECURRING EXPENSES<br />

S.No Comp<strong>on</strong>ents Rate<br />

Total<br />

(Rs. in (Rs. in lakhs)<br />

Lakhs) Annual 5 yrs<br />

A M<strong>on</strong>thly Meetings 11.18 55.9<br />

A.1 State level 0.01/mth 0.12 0.6<br />

A.2 District level (9) 0.01/mth 1.08 5.4<br />

A.3 BFU + BBSU (79) 0.01/mth 9.48 47.4<br />

A.4 Epidemic/C<strong>on</strong>tingency<br />

Fund<br />

0.5/year 0.5 2.5<br />

Remarks<br />

A.4 -Frequent<br />

meetings(daily &<br />

even more<br />

frequently) & other<br />

expenses necessary<br />

during<br />

epidemics<br />

B Salary 92.4 462.0<br />

B.1 BHO(22) 0.15/mth 39.6 198.0 For State & Ento.<br />

Cells, Lab. & districts<br />

B.2 Technicians(2) 0.05/mth 1.2 6.0 For Lab. & Ento. Cell<br />

B.3 Insect Collector-cum- 0.04/mth 0.96 4.8<br />

B.6<br />

animal handlers(2)<br />

Drivers (3) 0.04/mth 1.44 7.2<br />

B.7 Data Entry<br />

0.05/mth 1.8 9.0 For State &<br />

Operators(3)<br />

Entomology<br />

Laboratory<br />

Cells,<br />

B.8 BFW for BFUs & 0.05/mth 47.4 237.0 Posted at BFUs for<br />

BBSUs (79)<br />

field work & data<br />

collecti<strong>on</strong><br />

C Laboratory<br />

0.1 7.8 39.0 Reagents, Syringes,<br />

C<strong>on</strong>sumables<br />

Gloves, etc<br />

C.1 State Laboratory 0.1/mth 1.2 6.0<br />

C.2 District Labs (9) 0.05/mth 5.4 27.0<br />

C.3 Entomology Cell 0.1/mth 1.2 6.0<br />

D IEC 16.08 80.4 Electr<strong>on</strong>ic & Printed<br />

D.1 State Level 0.1/mth 1.2 6.0 Media, Interpers<strong>on</strong>al<br />

D.2 District level (9) 0.05/mth 5.4 27.0 communicati<strong>on</strong><br />

D.3 BFUs + BBSUs (79) 0.01/mth 9.48 47.4 strategies<br />

used<br />

will be<br />

E Training 11.7 58.5<br />

E.1 Outside State 2.0/yr 2.0 10.0 • Core trainers<br />

E.2 State Level 1.25/yr 1.25 6.25 • District<br />

E.3 District (9) 0.5/district/yr 4.5 22.5<br />

trainers<br />

E.4 BFUs + BBSU (79) 0.5/BFU/yr 3.95 19.75 • BFUs &<br />

Community Training


129<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

F Operati<strong>on</strong>al Costs 134.64 673.2<br />

F.1 State level Mobility<br />

(POL, Vehicle hiring,<br />

maintenance, etc)<br />

F.2 District Level Mobility<br />

(POL, Vehicle hiring)<br />

F.3 Communicati<strong>on</strong> Costs<br />

at state level<br />

3/yr 3.0 15.0 3 Vehicles- State<br />

Cell, RRT &<br />

Entomology – cum-<br />

Animal Lab.<br />

0.6/district/yr 5.4 27.0 Govt. vehicle or hired<br />

for case/epidemic<br />

investigati<strong>on</strong><br />

0.1/mth 1.2 6.0 Teleph<strong>on</strong>e, fax,<br />

Internet, courier,<br />

P&T etc.<br />

F.4 Communicati<strong>on</strong> cost at 0.02/district/ 2.16 10.8 Weekly & m<strong>on</strong>thly<br />

district level<br />

mth<br />

reports, hourly/daily<br />

F.5 Communicati<strong>on</strong> cost at 0.01/BFU/mth 9.48 47.4 in epidemics,<br />

BFU + BBSU<br />

Timeliness will save<br />

lives<br />

F.6 Stati<strong>on</strong>aries<br />

/c<strong>on</strong>sumables<br />

0.05/Unit/yr 0.6 3.0<br />

F.7 Incentive to promote 0.1/unit/mth 106.8 534.0<br />

community reporting<br />

for 1 state and 9<br />

F.8<br />

districts+79 peripherals<br />

(89)<br />

TA/DA 3.0/yr 3.0 15.0<br />

F.9 C<strong>on</strong>tingencies 3.0/yr 3.0 15.0<br />

G Medicines &Vaccines 5/yr 5.0 25.0<br />

H Research, evaluati<strong>on</strong> 3/yr 3.0 15.0 For future<br />

& Documentati<strong>on</strong><br />

generati<strong>on</strong>s<br />

evaluati<strong>on</strong><br />

and<br />

Total 281.8 1409.0


130<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

B.NON-RECURRING EXPENSES<br />

Sl.<br />

No.<br />

Comp<strong>on</strong>ents / Items Rate<br />

(Rs in<br />

Lakhs)<br />

Qty Cost<br />

(Rs in<br />

lakhs)<br />

Remarks /<br />

Justificati<strong>on</strong>s<br />

A State <strong>Baffacos</strong> Cell 12.53<br />

A.1 Establishment, Renovati<strong>on</strong>s & repair 2.0 2.0<br />

A.2 Computer & acessories 0.6 1 0.6<br />

A.3 Teleph<strong>on</strong>e & Internet c<strong>on</strong>necti<strong>on</strong> 0.03 1 0.03<br />

A.4 Fax machine 0.2 1 0.2<br />

A.5 Photocopier 1.5 1 1.5<br />

A.6 LCD Projector for Training 1.5 1 1.5<br />

A.7 Refrigerator 0.2 1 0.2 Storage of reagents,<br />

vaccines & Samples<br />

(blood, stool, urine,<br />

tissues etc<br />

A.8 Vehicle – 4 wheel drive 5.5 1 5.5 For overall<br />

supervisi<strong>on</strong> and ,<br />

m<strong>on</strong>itoring of project<br />

implementati<strong>on</strong><br />

A.9 Laptop Computer 1.0 1 1.0<br />

B. Entomology Cell–cum-Animal<br />

8.53<br />

Laboratory<br />

B.1 Establishment, Renovati<strong>on</strong>s & repair 2.0 2.0<br />

B.2 Computer & acessories 0.6 1 0.6<br />

B.3 Teleph<strong>on</strong>e & Internet c<strong>on</strong>necti<strong>on</strong> 0.03 1 0.03<br />

B.4 Fax machine 0.2 1 0.2<br />

B.5 Refrigerator 0.2 1 0.2 Storage of reagents,<br />

animal organs &<br />

tissues<br />

B.6 Vehicle – 4 wheel drive 5.5 1 5.5 For field work, rodent<br />

& carnivore (dog)<br />

surveillance, etc.<br />

C State Rapid Resp<strong>on</strong>se Team 32.95<br />

C.1 Vehicle – 4 wheel drive 5.5 1 5.5 Case/Epidemic<br />

Investigati<strong>on</strong><br />

C.2 Laptop Computer 1.0 1 1.0 Rapid field<br />

assessment data entry<br />

& analysis using<br />

WHO softwares<br />

C.3 LCD Projector 1.5 1 1.5 For IEC, Training<br />

C.4 Video camera 0.5 1 0.5 Documentati<strong>on</strong><br />

C.5 Still Camera 0.15 1 0.15<br />

C.6 B.P. Instrument, stethoscope, 0.3 1 0.3<br />

thermometers, torch, emergency<br />

lamp,calculators & other essential<br />

field equipments & materials<br />

each


C.7<br />

131<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Satellite teleph<strong>on</strong>e with dedicated<br />

lines<br />

16.0 1 16.0<br />

Lives have been lost<br />

<strong>on</strong> many occasi<strong>on</strong>s<br />

due to poor<br />

communicability in<br />

remote areas.<br />

C.8 Statistical Analysis Software(SAS) 8.0 1 8.0 Surveillance means<br />

data for <str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> &<br />

require rapid analysis<br />

particularly in the<br />

field situati<strong>on</strong> to save<br />

lives or to c<strong>on</strong>trol<br />

spread of disease<br />

D Laboratory Strengthening 45.7<br />

D.1 PCR & PCR Work Stati<strong>on</strong> 15.0 1<br />

unit<br />

15.0 For diagnosis of<br />

rodent borne and also<br />

other communicable<br />

diseases<br />

D.2 Fluorescent Microscope 5.0 1 5.0 Diagnosis of Rabies<br />

D.3 ELISA Reader with Washer and<br />

Printer.<br />

4.0 1 4 .0 Serological Diagnosis<br />

of Arboviral,<br />

Ricketsial diseases<br />

D.4 Table top Centrifuge 0.2 2 0.2<br />

D.5 Bio-safety Cabinet Class II-A 0.2 1 0.2 For Processing<br />

Highly infectious<br />

diseases<br />

D.5 Electr<strong>on</strong>ic Balance 0.25 1 0.25 For preparati<strong>on</strong> of<br />

D.6 Double Distil Water Plan<br />

( Automatic)<br />

Reagents<br />

1.5 1 1.5 Distil water is<br />

required for<br />

serological testing<br />

D.7 BacT/ALERT 3D 8.0 1 8.0 Automated<br />

Bacterial/Mycobacter<br />

D.8 Dark Ground Microscope with<br />

Mounting Camera and Softwares.<br />

3.0 1 3.0<br />

ial Culture System<br />

For Leptospirosis<br />

D..9 Air C<strong>on</strong>diti<strong>on</strong>er 0.6 2 1.2 Essential for<br />

expensive laboratory<br />

equipments<br />

D.10 Refrigerator 0.25 1 0.25 Storing of reagents<br />

and samples<br />

D.11 Autoclave 1.0 1 1.0<br />

D.12 Computer with Printer ,UPS and 0.6 1 0.6 Lab data analysis,<br />

External Modem<br />

reporting to State cell<br />

D.13 Hot Air Oven 0.5 1 0.5<br />

D.14 Incubator 0.5 1 0.5<br />

D.15 Xerox Photocopier 1.5 1 1.5 Photo copying of<br />

reporting formats and<br />

lab reports


132<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

D.16 Renovati<strong>on</strong> to accommodate new<br />

equipments<br />

3.0 1 3.0<br />

E. Furnitures & Fixtures 0.5/unit 79 39.5 For all units and for<br />

new staff<br />

F. Printing of reporting formats 5.0 5.0 From Sub Centres to<br />

PHC to CHC to<br />

districts to State<br />

G Training Materials 8.0 8.0<br />

Total 152.21<br />

TOTAL<br />

I. NON RECURRING - Rs. 152.21<br />

II. RECURRING - Rs. 1409.00<br />

GRAND TOTAL - Rs. 1561.21 lakhs<br />

GRAND TOTAL - Rs. 15.61 crores<br />

(Rupees fifteen crores sixty <strong>on</strong>e lakhs <strong>on</strong>ly)<br />

Proposed year-wise budgetary break-up<br />

1 st Year 2004-2005 - Rs. 234.00 lakhs<br />

2 nd Year 2005-2006 - Rs.312.00 lakhs<br />

3 rd Year 2006-2007 - Rs.390.00 lakhs<br />

4 th Year 2007-2008 - Rs.390.00 lakhs<br />

5 th Year 2008-2009 - Rs.235.21 lakhs<br />

Total - Rs.1561.00 lakhs<br />

Or, Total - Rs. 15.61 crores


133<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ABBREVIATIONS USED<br />

1. BBSU - BAFFACOS Border Surveillance Unit<br />

2. BFU - BAFFACOS Field Unit<br />

3. BFW - BAFFACOS Field Worker<br />

4. BHO - BAFFACOS Health Officer<br />

5. BRRT - BAFFACOS Rapid Resp<strong>on</strong>se team<br />

6. CHC - Community Health Centre<br />

7. CMO - Chief Medical Officer<br />

8. DBCC - District BAFFACOS Coordinati<strong>on</strong> Committee<br />

9. DEO - Data Entry Operator<br />

10. DHBC - District Health BAFFACOS Cell<br />

11. DHBTC - District Health BAFFACOS Technical Committee<br />

12. DHO - District Health Officer<br />

13. HBTC - Health BAFFACOS Technical Committee<br />

14. HDBC - Health Department BAFFACOS Committee<br />

15. IEC - Informati<strong>on</strong> Educati<strong>on</strong> Communicati<strong>on</strong><br />

16. MO - Medical Officer<br />

17. PHC - Primary Health Centre<br />

18. RRT - Rapid Resp<strong>on</strong>se Team<br />

19. SHBC - State Health BAFFACOS Cell<br />

20. SMO - Senior Medical Officer


134<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

LAND REVENUE & SETTLEMENT<br />

PROJECT PROPOSAL FOR MULTIPURPOSE CADASTRE DEVELOPMENT<br />

PROJECT SURVEY FOR ALLOTMENT OF BAMBOO PLANTATION LAND<br />

TO FAMINE EFFECTED FAMILIES IN MIZORAM DURING 2004-2009<br />

INTRODUCTION:<br />

Estimated Cost : Rs. 8,00,00,000.00<br />

<strong>Mizoram</strong> covers geographical area measuring 21,087.00 Sq.Kms where jhumming is<br />

widely practised. As such jhum c<strong>on</strong>trol measure has been adopted and at the same time the<br />

land reform programme envisages to wean off such primitive type of cultivati<strong>on</strong> by means of<br />

modern land use <str<strong>on</strong>g>plan</str<strong>on</strong>g>ning, allotment and settlement of land to the famine effected and needy<br />

families. The whole activities of the Land Reforms Department are therefore, closely linked<br />

with the New Land Reforms Programme of the State. Under the New Land Reforms<br />

Programme, Summary Land Survey of villages are c<strong>on</strong>ducted since 1999 and now 18 R.D.<br />

Blocks are already surveyed and recorded. Under this programme the Development Project<br />

Survey for the allotment of Agricultural Land for Bamboo Plantati<strong>on</strong> had also been taken up<br />

since 2001-2002 in the river valley of R. Tlawng and R. Tuirial valleys in scatter areas.<br />

1.2 The Government of <strong>Mizoram</strong> had therefore proposed to take up the scheme in large<br />

scale during 2004-2009 keeping in view of ensuing Mautam during 2005-2008 (Bamboo<br />

flowering). It is estimated that Bamboo grown area in <strong>Mizoram</strong> covers about 10,333.00 Sq.<br />

Kms c<strong>on</strong>sisting of about 20 species of bamboo. <strong>Mizoram</strong> is having about 14 % of India's<br />

bamboo products. It is therefore proposed to c<strong>on</strong>duct multipurpose cadastre Development<br />

Project Survey covering 10,333.00 Sq. Kms. during 2004-2009. Out of the above area, 86000<br />

Hactares is proposed to be covered by this estimated amount i.e. Rs. 8.00 crores.<br />

2. SCOPE OF THE PROJECT:<br />

The scope of the project is to c<strong>on</strong>duct multipurpose Cadastre Development Project<br />

Survey and allotment and settlement of Agricultural Land to famine effected families for<br />

allotment of Bamboo Plantati<strong>on</strong> and to wean off shifting cultivati<strong>on</strong>. So that the famine<br />

effected people will get labour employment to earn m<strong>on</strong>ey by jungle clearance in the survey<br />

work and to sell the natural bamboo without paying royalty before bamboo flowering. Better<br />

quality of Bamboo may be <str<strong>on</strong>g>plan</str<strong>on</strong>g>ted in the land after bamboo flowering year.<br />

3. PHASING ACTIVITIES:<br />

The sequences of activities will be as follows: -<br />

(i) Rec<strong>on</strong>naissance Survey<br />

(ii) C<strong>on</strong>trol Survey<br />

(iii) Detail Survey<br />

(iv) Procurement of Survey, Drawing, printing/ Computer Hardwares<br />

(v) Generati<strong>on</strong> and Producti<strong>on</strong> of Village cadastral map/ Parcel Map<br />

(vi) Selecti<strong>on</strong> and Allotment of land to individual families<br />

(vii) Identificati<strong>on</strong> of plots and c<strong>on</strong>structi<strong>on</strong> of survey line marks.


135<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

4. COST OF FIELD SURVEY WORKS:<br />

(a) Rec<strong>on</strong>naissance Survey<br />

It is proposed that preliminary survey of existing bamboo growing areas<br />

locating in various pockets of <strong>Mizoram</strong> will be c<strong>on</strong>ducted base <strong>on</strong> Topo Maps 1:50,000<br />

Scales.<br />

(b) C<strong>on</strong>trol Survey<br />

As so<strong>on</strong> as the project areas are identified and selected the C<strong>on</strong>trol Survey<br />

with the help of GPS or Total Stati<strong>on</strong> will be c<strong>on</strong>ducted in order to provide a network of Coordinates<br />

for Geo-references of the locati<strong>on</strong>s.<br />

(c) As and when the C<strong>on</strong>trol Plot Sheets are ready detail survey by means Total<br />

Stati<strong>on</strong> and Plane -Table will be c<strong>on</strong>ducted so as to provide individual plot/parcel maps.<br />

(d) The estimate is therefore prepared as per Schedule of Rate of <strong>Mizoram</strong> for<br />

cadastral Survey as given below :-<br />

(i) Rec<strong>on</strong>naissance Survey for 10,333.00 Sq.Kms = Rs. 11,10,000.00<br />

(ii) C<strong>on</strong>trol Survey for 60,000.00 Hectares = Rs. 3,60,34,000.00<br />

(iii) Detail Survey for 50,000.00 Hectares = Rs. 3,42,40,000.00<br />

TOTAL = Rs. 7,13,84,000.00<br />

DETAIL ESTIMATES FOR CADASTRAL SURVEY<br />

Sl. Name of Work Unit Survey Cost Total Area Amount<br />

No. Rate in Hectare (Rs.) (Rs.)<br />

A. CONTROL SURVEY: Labour for —<br />

i) Carriage of Survey equipment, tent,<br />

store record etc. to the field and from<br />

place to place in the field. Hectare Rs. 67/-<br />

ii) Ground preparati<strong>on</strong> for survey stati<strong>on</strong><br />

and survey line preparati<strong>on</strong> etc. Hectare<br />

iii) C<strong>on</strong>structi<strong>on</strong> of survey stati<strong>on</strong> and<br />

pillars for —<br />

a) 8 (eight) Triangulati<strong>on</strong> stati<strong>on</strong> Sq. Km Rs. 40/-<br />

b) 36 (Thirty six) Traverse Stati<strong>on</strong> Sq. Km Rs. 54/- 86,000 360,34,000<br />

c) St<strong>on</strong>e embedding for 400 (four<br />

hundred) traverse stati<strong>on</strong>s Sq. Km Rs. 60/-<br />

d) Petty repair of instrument, tent,<br />

store and miscellaneous works. Hectare Rs. 8/-<br />

TOTAL OVER HEAD COST/<br />

CHARGE Hectare Rs. 419/- 86,000 360,34,000


136<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

B. DETAILED SURVEY<br />

Labour for —<br />

i) Carriage of Survey equipment, tent,<br />

store, record, etc. to the field and from<br />

place to place in the field. Hectare Rs. 110/-<br />

ii) Ground preparati<strong>on</strong> for survey stati<strong>on</strong><br />

and survey line preparati<strong>on</strong> etc. Hectare Rs. 210/-<br />

iii) Embedding boundary pillars Hectare Rs. 100/- 80,000 3,42,40,000<br />

iv) Petty repairs of Instruments tent store<br />

and miscellaneous works. Hectare Rs. 8/-<br />

TOTAL OVER HEAD<br />

COST/ CHARGE Hectare Rs. 428/- 80,000 3,42,40,000<br />

GRAND TOTAL OVER<br />

HEAD/ CHARGE Hectare Rs. 847/- 82,968 7,02,74,000<br />

(Rupees seven hundred and two lakhs seventy four thousand) <strong>on</strong>ly<br />

5. PURCHASE OF SURVEY, DRAWING, PRINTING / EQUIPMENT /<br />

TECHNICAL STATIONERIES = Rs. 18,10,000.00<br />

The lack of Survey and Drawing etc. equipment hampered the progress work in land<br />

survey. It is therefore an urgent need to equip survey pers<strong>on</strong>nel with modern survey and<br />

drawing etc. equipment. Hence, the following equipment with total cost of Rs. 18,10,000.00<br />

are proposed to be purchase for the same Project as: -<br />

6. PURCHASE OF SURVEY, DRAWING, PRINTING / COMPUTER HARDWARE<br />

/ EQUIPMENT/ TECHNICAL STATIONERIES = Rs. 18,10,000.00<br />

(a) LIST OF SURVEY, DRAWING & PRINTING EQUIPMENT<br />

Sl. Item Quantity Rate Amount<br />

No. (in Rs.) (in Rs.)<br />

01 TOPCON-GTS-223 Total Stati<strong>on</strong> 1 Set 10,10,000.00 10,10,000.00<br />

02 Plane Table Survey Instrument with<br />

Sight Rule 60 Sets 5,500.00 3,30,000.00<br />

03 Survey Tent<br />

(i) 9' x 8' 15 Nos. 19,500.00 2,97,500.00<br />

05 Measuring Tape (30m) 600 Nos. 250.00 1,50,000.00<br />

06 Calculator (Ordy) 130 Nos. 250.00 32,500.00<br />

TOTAL = Rs.18,10,000.00


137<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

7. HIRING OF VEHICLES = Rs. 30,00,000.00<br />

Survey Operati<strong>on</strong> has required transportati<strong>on</strong> of Survey Party in the interior areas of<br />

rural areas. Due to lack of Departmental vehicle it is required to engage private vehicles <strong>on</strong> hire<br />

bases during the field seas<strong>on</strong>. Hence, Rs. 30,00,000.00 is provided to meet such expenses.<br />

8. CONSTRUCTION OF SURVEY WORK CAMP = Rs. 25,00,000.00<br />

The Survey Party will be provided with Survey Tents and whereas the labours<br />

engaged for the survey works are to encamp in the temporary Survey Camps in the jungle. It<br />

is therefore required to c<strong>on</strong>struct survey work camps is about 500 Nos. Hence,<br />

Rs.25,00,000.00 is provided herewith to meet such expenses.<br />

9. CONSTRUCTION OF RECORD ROOMS AND FIXTURES = Rs. 13,06,000.00<br />

Field Records as well as Land Records are required for permanent retrieval for current<br />

and future uses. Hence, Rs. 13,06,000.00 is provided for c<strong>on</strong>structi<strong>on</strong> of Record Rooms and<br />

Fixtures at District Offices at Six District Offices and Directorate Offices.<br />

10. YEARWISE PHYSICAL/ FINANCIAL TARGETS<br />

Year Physical target Financial target Remarks<br />

in Sq. Km (Rs. in lakhs)<br />

2004-2005 129.00 120.00<br />

2005-2006 172.00 160.00<br />

2006-2007 215.00 200.00<br />

2007-2008 215.00 200.00<br />

2008-2009 129.00 120.00<br />

TOTAL 860.00 800.00<br />

(Rupees eight hundred lakhs) <strong>on</strong>ly.


Introducti<strong>on</strong>:<br />

138<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

SERICULTURE<br />

MULBERRY SILK DEVELOPMENT PROJECT<br />

UNDER BAMBOO FLOWERING & FAMINE CAMBAT SCHEME<br />

The tiny State <strong>Mizoram</strong> known as land of Bamboo flower c<strong>on</strong>sisting 8 districts<br />

(Aizawl, Champhai, Serchhip, Lunglei, Saiha, Kolasib, Mamit, Lawngtlai) has a total area of<br />

21,081 sq. Km with a populati<strong>on</strong> of about 8,91,058 as per 2001 Census. The State share its<br />

boundaries with Assam, Tripura and Manipur in the North and West respectively and<br />

internati<strong>on</strong>al boundaries covering about 722 Km with Myanmar in the East and South by<br />

Bangladesh. The climatic c<strong>on</strong>diti<strong>on</strong> of the State is mixture of tropical and temperate based <strong>on</strong><br />

the altitude of the hills. The temperature of the State varies from 31-10 degree Celsius due to<br />

vast variati<strong>on</strong> in the altitude of hills. The average rainfall of the State is 2584 mm. The<br />

rainfall starts by 3 rd week of March and c<strong>on</strong>tinues up to October. About 65 % of the total area<br />

of the State is covered by Forest, which are under Protected Reserved, River Line Reserved,<br />

Inner Line Reserved, Road Side Reserved, Wildlife Reserved, Tiawger Reserved, Stati<strong>on</strong><br />

Reserved and Un classified categories. The State is endowed with numerous flora and fauna,<br />

which include varieties of sericigenous insects and their food <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts. The climatic c<strong>on</strong>diti<strong>on</strong><br />

of the State is suitable for commercial exploitati<strong>on</strong> of Mulberry, Muga, Eri and Oak Tasar<br />

silks.<br />

Agriculture is the primary occupati<strong>on</strong> of the rural people of <strong>Mizoram</strong>. Although<br />

sericulture was introduced in the then Mizo district of Assam during 1949, due to<br />

communicati<strong>on</strong> bottleneck, insurgency etc. Sericulture activities could not flourished nicely.<br />

However, <strong>Mizoram</strong> had made an excellent breakthrough in the field of sericulture in the last<br />

decade. Besides, agriculture and horticulture, sericulture provides subsidiary income to about<br />

5000 families in the State. The Mulberry is practised in the districts of Aizawl, Kolasib,<br />

Champhai etc. The art of weaving of cott<strong>on</strong> and silk fabric has l<strong>on</strong>g been closely associated<br />

with culture and traditi<strong>on</strong> am<strong>on</strong>gst the women folk of <strong>Mizoram</strong>.<br />

Topography<br />

The <strong>Mizoram</strong> is a hilly State having varied topography with high and low terrain<br />

excepting a few stretches of plain areas already utilized for paddy cultivati<strong>on</strong> (wet). The hill<br />

slopes of State are steep and covered by low productive forests (65%) or remain fallow. Thus<br />

is available in abundance.<br />

Soil<br />

The soil profile of the State is varies between hills and plains. In the plains, it is<br />

mostly alluvial and laterite, acidic in nature while in hills is largely residual. The soil type of<br />

the State is sandy loam to clayey fine loamy in nature and also rich with humus. The pH of<br />

the soil ranges from 4.5 to 5.9 with high to medium organic carb<strong>on</strong>s with Carb<strong>on</strong> index of<br />

1.69 to 3.00, available phosphorus of 10 Kg to 280 Kg per hectare with 0.96 to 2.00 P index.<br />

The soil have low zinc. Bor<strong>on</strong> & Molybdenum c<strong>on</strong>tent and high Ir<strong>on</strong> c<strong>on</strong>centrati<strong>on</strong>s.


139<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Climate<br />

The State is having both tropical and temperate with moderate summer in plains<br />

where as in hilly areas the temperature remains cool throughout the year. The annual<br />

precipitati<strong>on</strong> in the State ranges from 218 cm to 269 cm.<br />

The relative humidity in the State remain c<strong>on</strong>siderably high being 85.95 % owing to<br />

the heavy precipitati<strong>on</strong> ; it ranges between 80-85 % during spring & winter and<br />

85-95 % during summer and rainy seas<strong>on</strong>s. The temperature ranges between 31 to 10 degrees<br />

Celsius.<br />

The m<strong>on</strong>th wise details <strong>on</strong> Temperature and Relative humidity (1996) are indicated<br />

below: -<br />

Sl. M<strong>on</strong>th Temperature (degree Celsius) Humidity (%)<br />

No.<br />

Max. Min. Average Max. Min. Average<br />

1 January 20.40 10.00 17.20 88 51 69.50<br />

2 February 27.80 11.10 19.50 94 60 77.00<br />

3 March 28.90 13.30 21.10 94 60 77.00<br />

4 April 28.90 15.60 22.30 88 35 61.50<br />

5 May 30.60 16.70 23.70 89 61 75.00<br />

6 June 30.00 13.30 21.70 89 68 78.50<br />

7 July 31.10 18.90 25.00 89 69 79.00<br />

8 August 28.90 16.70 22.80 94 71 82.50<br />

9 September 28.90 18.90 23.90 94 74 84.00<br />

10 October 28.30 13.30 20.80 95 71 83.00<br />

11 November 26.60 11.10 18.90 94 77 85.50<br />

12 December 25.60 10.00 17.80 94 62 73.00<br />

People<br />

The State is primarily an agrarian inhabited by people of diverse Ethnic, Linguistic<br />

origin. About 99.9 % populati<strong>on</strong> bel<strong>on</strong>gs to different tribes<br />

Present status of Mulberry Culture<br />

Physical Progress: Table indicates producti<strong>on</strong> of Mulberry coco<strong>on</strong> and raw silk in the<br />

State for the last 7 years.<br />

Year Mulberry Area Coco<strong>on</strong> Producti<strong>on</strong> Raw Silk Producti<strong>on</strong><br />

(Hectarage)<br />

(MT)<br />

(MT)<br />

1997-1998 550 19.00 0.38<br />

1998-1999 550 24.00 0.50<br />

1999-2000 1200 26.00 1.60<br />

2000-2001 870 41.00 2.00<br />

2001-2002 300 42.5 2.06<br />

2002-2003 1418 45.00 2.20<br />

2003-2004 1630 45.00 2.50


140<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Financial achievement<br />

Year Allocati<strong>on</strong> of Plan<br />

Actual Expenditure<br />

(Rs. in lakh)<br />

(Rs. in lakh)<br />

1997-1998 175.00 175.14<br />

1998-1999 200.00 223.98<br />

1999-2000 235.00 254.00<br />

2000-2001 220.00 218.00<br />

2001-2002 220.00 220.00<br />

2002-2003 220.00 220.00<br />

2003-2004 243.00 243.00<br />

Infrastructure<br />

<strong>Mizoram</strong> has an Independent Department of Sericulture headed by a Director<br />

of Sericulture. The table given below indicates the details of infrastructure facilities available<br />

under Mulberry sector both under State and central sector for developmental of mulberry silk<br />

industry in the state :<br />

Particular Unit under State Unit under Central<br />

Research extensi<strong>on</strong> Centre 0 01<br />

Mulberry Farms 12 0<br />

Chowki Rearing Centres 6 0<br />

Technical Service Central 02 0<br />

Weaving Centres 01 0<br />

Dyeing Centre 01 0<br />

Sericulture training Institute &<br />

01 0<br />

Dem<strong>on</strong>strati<strong>on</strong> Farm<br />

Seed Preservati<strong>on</strong> Centre 01 0<br />

Reeling & Spinning Centres 01 0<br />

Silk Reeling & Twisting Factory 01 0<br />

Technical Staff<br />

186<br />

Manpower<br />

Ministerial Staff<br />

97<br />

PROJECT RATIONALE<br />

Total<br />

283<br />

Importance of mulberry culture in sustaining a sizable rural populati<strong>on</strong> of North<br />

Eastern State is well known. At present, around 3 MT of mulberry coco<strong>on</strong> are produced in the<br />

<strong>Mizoram</strong> state. The trend of producti<strong>on</strong> of mulberry raw silk shows an incremental trend<br />

during last few years. It seems that various schemes launched during VIII & IX Plan period<br />

had given impetus in the development of mulberry silk industry. Further the topography and<br />

climate prevail in the state supplement potential to produce Bivoltine silk and sustain the seed<br />

producti<strong>on</strong> activity to cater the need of the neighboring States. However, adherence to ageold<br />

traditi<strong>on</strong>al practices and use the primitive reeling & spinning devices in most of the areas<br />

are the limiting factors for slow growth of silk producti<strong>on</strong> and utilizati<strong>on</strong>. Besides n<strong>on</strong>adopti<strong>on</strong><br />

of improved technologies, absence of market infrastructure and supporting linkages


141<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

are major c<strong>on</strong>straints for the development of the silk industry. Major quantity of coco<strong>on</strong>s is<br />

flowing out of the state due to lack of adequate marketing & reeling facilities and traditi<strong>on</strong>al<br />

practices of value additi<strong>on</strong>. The n<strong>on</strong>-c<strong>on</strong>versi<strong>on</strong> of huge quantity of mulberry coco<strong>on</strong> into silk<br />

is depriving the state from employment and sustenance of the Industry. Thus there is urgent<br />

need to organize the above sector to augment the producti<strong>on</strong> of yarn/fabric for additi<strong>on</strong>al<br />

income generati<strong>on</strong> and employment for the reas<strong>on</strong>s stated below:<br />

Upliftment of rural poverty through promoti<strong>on</strong> of employment generating ec<strong>on</strong>omic<br />

activities for both skilled and n<strong>on</strong>-skilled pers<strong>on</strong>s.<br />

To popularize improved techniques of raising of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> & silkworm rearing in the<br />

private sector by providing adequate assistance and training.<br />

Scope of value additi<strong>on</strong> through regulated market support & c<strong>on</strong>versi<strong>on</strong> of coco<strong>on</strong>s,<br />

silk waste and cut coco<strong>on</strong>s to yarn and utilizati<strong>on</strong> of the same to produce finished<br />

product indigenously.<br />

Use of Waste-land for propagating high yielding mulberry <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>.<br />

Qualitative and quantitative improvement in silk reeling, spinning & twisting<br />

activities through introducti<strong>on</strong> of improved devices and training to fulfill the domestic<br />

requirement in the state as well as outside the State.<br />

C<strong>on</strong>servati<strong>on</strong> of Bio-diversity and sustainable ec<strong>on</strong>omic activities.<br />

Project Genesis<br />

C<strong>on</strong>sidering the potential of using Sericulture as a tool to wean away devastating<br />

Jhum Cultivati<strong>on</strong> together with the role it plays towards rec<strong>on</strong>structi<strong>on</strong> of rural ec<strong>on</strong>omy in<br />

the state and after realising the success of various shames implemented during the VII and IX<br />

Plan period, the State Level Committee <strong>on</strong> preparati<strong>on</strong> for Impending Gregarious Bamboo<br />

Flowering in 2006-07 has selected/included Sericulture as <strong>on</strong>e of the items/trades to<br />

effectively combat with the possible occurrence of catastrophic famine due to sudden and<br />

large scale destructi<strong>on</strong> of paddy crop by rodents.<br />

Accordingly a Project <strong>on</strong> Mulberry Silk Development in <strong>Mizoram</strong> has been prepared<br />

with the following comp<strong>on</strong>ents :-<br />

Durati<strong>on</strong> of the project - Five Years ( 2004-05 to 2008-2009)<br />

Area to be covered - 1300 hectares<br />

Districts to be covered - Aizawl, Mamit, Kolasib, Champhai, Serchhip<br />

and Lunglei<br />

No. of Beneficiaries - 1300 Nos.


142<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The broad objectives of the project are :<br />

PROJECT OBJECTIVES<br />

To combat the possible catastrophic famine due to bamboo flowering.<br />

To enhance annual Mulberry Silk Producti<strong>on</strong> from 3:00 MT to 50 MT.<br />

To enhance employment by way of developing entrepreneurs for various activities like<br />

reeling, spinning, dyeing, weaving, processing and garment producti<strong>on</strong>.<br />

Creating awareness am<strong>on</strong>g the rural populace particularly women folk about silk<br />

activities and its potential to remove poverty.<br />

To bring technology up-gradati<strong>on</strong> am<strong>on</strong>g the users group through training and input<br />

support for taking up coco<strong>on</strong> and silk producti<strong>on</strong> activities.<br />

Improving managerial ability for ensuring management of group activities like<br />

reeling and weaving in an ec<strong>on</strong>omically viable manner.<br />

To promote gainful utilisati<strong>on</strong> of the coco<strong>on</strong>s produced in the State for value additi<strong>on</strong><br />

and forward linkages.<br />

Identify thrust areas, and bridge the gaps for comprehensive development of Mulberry<br />

Culture in <strong>Mizoram</strong> during the X th <str<strong>on</strong>g>plan</str<strong>on</strong>g> period.<br />

To upgrade and create infrastructural facilities under the State sector for supporting<br />

the Sericulture development in the State in more effective way.<br />

IMPLEMENTATION STRATEGY<br />

The project emphasizes to privatize all sericulture and silk processing activities<br />

except multiplicati<strong>on</strong> and producti<strong>on</strong> of silkworm seed, which would be carried out<br />

and managed by the Directorate of Sericulture, Govt. of <strong>Mizoram</strong>.<br />

Beneficiaries in the target areas would be motivated to adopt mulberry silk activities<br />

to enhance their income for sustenance of livelihood.<br />

The Beneficiaries would be organized in cluster al village level, which would be<br />

coordinated in the Block, and District level through District Sericulture Offices, Govt.<br />

of <strong>Mizoram</strong> under the c<strong>on</strong>trol of Directorate of Sericulture.<br />

The beneficiaries would be trained <strong>on</strong> latest technologies related to Mulberry silk<br />

producti<strong>on</strong> activities and also for acquisiti<strong>on</strong> of managerial and technical skill for<br />

taking up producti<strong>on</strong> activities.


143<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The beneficiaries would be guided and assisted for raising of Mulberry <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> at<br />

minimum of 1.00 hact. per farmer and taking Mulberry silkworm rearing in a viable<br />

manner by giving stress <strong>on</strong> quality and productivity of coco<strong>on</strong>s for better returns.<br />

The Directorate of Sericulture, Govt. of <strong>Mizoram</strong> will be assisted to create facilities<br />

for multiplicati<strong>on</strong> of Parental Seed and producti<strong>on</strong> of commercial Mulberry Silkworm<br />

Seed.<br />

The DOS, <strong>Mizoram</strong> would be adequately assisted for providing marketing linkages for<br />

coco<strong>on</strong> growers, reelers and weavers by organizing the reelers and weavers groups<br />

and entrepreneurs for producing raw materials and finished products as per the<br />

demand for Nati<strong>on</strong>al/Internati<strong>on</strong>al markets.<br />

Effort would be made to develop Self-reliance am<strong>on</strong>g the beneficiaries and ensure<br />

management by local initiatives thereby reducing extent of dependence <strong>on</strong><br />

Government Agencies.<br />

PROJECT DESCRIPTION<br />

The Project envisaged to assist individual farmers groups for raising of mulberry<br />

<str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> both for commercial and seed coco<strong>on</strong> producti<strong>on</strong> activities.<br />

The cooperative/Self Help Groups will be provided with improved Multi end /Cottage<br />

reeling facilities to utilize the coco<strong>on</strong> produced in the project <strong>on</strong> <strong>on</strong>e hand and to<br />

enhance the productivity and quality of the silk <strong>on</strong> the other, besides facilitating<br />

market avenues at different levels.<br />

Establishment of marketing linkages am<strong>on</strong>gst coco<strong>on</strong> growers, reelers & weavers.<br />

Imparting training to farmers/entrepreneurs and officials <strong>on</strong> different technical<br />

aspects, project implementati<strong>on</strong> and management.<br />

The linkage between different comp<strong>on</strong>ents proposed under the project are<br />

highlighted below:<br />

Linkage from Dfls to Silk Producti<strong>on</strong><br />

Particulars Target<br />

Estimated Raw silk (MT) 50<br />

Producti<strong>on</strong> of Reeling Coco<strong>on</strong>s (MT) 500<br />

Total acreage to be covered (hectares) 1300<br />

Producti<strong>on</strong> of Commercial Dfls (Lakh Nos.) 13<br />

Commercial Rearers (Nos.) 1300


144<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Sl.<br />

No<br />

Comp<strong>on</strong>ents<br />

Physical<br />

Target<br />

Financial<br />

Target<br />

1 Assistance to commercial rearer 1300 1014.12<br />

2 C<strong>on</strong>structi<strong>on</strong> of Chowki Rearing Houses 10 25.00<br />

3 Rasing of basic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> under Governments sector (hact.) 20 7.23<br />

4 Establishment of Marketing facilities 3 68.00<br />

5 Human Resource Development 4.63<br />

Total 1128.98<br />

Project Locati<strong>on</strong><br />

The Project will cover the six Districts of <strong>Mizoram</strong> namely - Aizawl, Mamit, Kolasib,<br />

Champhai, Serchhip and Lunglei. The Lai and Mara Districts are excluded since there are<br />

<strong>on</strong>going special SGSY Projects in these Districts.<br />

Project comp<strong>on</strong>ents<br />

The Mulberry Silk Development Project will comprise of the following comp<strong>on</strong>ent as<br />

follows:<br />

A. Raising of Basic Mulberry Plantati<strong>on</strong><br />

The Project envisage to cover 1300 hactares ( @ 1 hact/farmer ) of land for<br />

commercial rearers under high yielding mulberry varieties like S-1365; TR10; V1 etc. During<br />

the 1 st year of the Project supply of Mulberry Cuttings shall be arranged by the Department of<br />

Sericulture from its available sources. From the 2 nd and 3 rd year <strong>on</strong>wards cuttings shall be<br />

arranged from the basic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> raised by the Government during the first year of the<br />

project. It is proposed to cover 1300 hectares during the 5 years project @ 260 hact. per year.<br />

The cuttings/saplings required per year is 26 lakhs nos. The basic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> of the<br />

Government sector will supplement the cuttings requirements from the sec<strong>on</strong>d year <strong>on</strong>wards.<br />

The total requirement of cuttings for the whole project is 130 lakhs nos.<br />

The Physical and Financial Targets are appended at Annexure-I, II & III and Unit<br />

Cost at Annexure-V.<br />

B. Assistance to Commercial Rearer<br />

Under the comp<strong>on</strong>ent, it is proposed to assist the individual commercial rearer by<br />

raising 3000 hact. of systematic mulberry <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> at ‘3x’3 spacing @ 1 hact. by each<br />

rearer. A minimum unit area of 1.0 hact, per commercial rearer will be raised by<br />

accommodating 10000 <str<strong>on</strong>g>plan</str<strong>on</strong>g>ts//hact. The Directorate of Sericulture, Govt. of <strong>Mizoram</strong> will<br />

supply the required 10000 cuttings. Each beneficiary will be assisted with land development<br />

cost of Rs. 12700/- and Plantati<strong>on</strong> development cost of Rs. 21780/-. Besides, rearing<br />

appliances, disinfectants and silkworm seed cost worth Rs. 23460/- will be provided to<br />

c<strong>on</strong>duct silkworm rearing. The DOS, <strong>Mizoram</strong> (IA) would arrange 2000/- dfls/year @ 400<br />

dfls/crop per beneficiary (per 1.0 hact. <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>) from Government seed Producti<strong>on</strong> Centres<br />

against payment @ Rs. 2.00 per dfls.<br />

Apart from the above, each commercial rearer (CR) will be assisted for c<strong>on</strong>structi<strong>on</strong><br />

of low cost rearing house worth Rs. 20000/- each. The assistance will be Rs. 10,000/- each<br />

i.e. 50% of the estimated cost.


145<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

i) Development of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong><br />

The low bush type systematic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> will be initially raised at 3’x3’ spacing<br />

adopting the package of practices recommended by Central Silk Board. The <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> raised<br />

with nearly 8-12 m<strong>on</strong>ths old cuttings will be ready for harvesting of leaves for feeding to<br />

silkworm. The rearing capacity of the <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> will be 2000 dfls per 1.0 hact. in third year<br />

<strong>on</strong>wards.<br />

Once the <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> is settled, the commercial rearer may uproot <strong>on</strong>e alternate row<br />

after 3 years of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> and the <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> may be maintained as Low tree type <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong><br />

with a canopy height at 6 feet above the ground level to avoid grazing and regular<br />

maintenance problems.<br />

ii) Commercial Rearing<br />

Each beneficiary will be provided rearing equipments and working capital for<br />

c<strong>on</strong>ducting commercial rearing @ Rs. 43507.00 after 8 to twelve m<strong>on</strong>ths of the <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> in<br />

the year itself. The assistance is 75% of the estimated cost and the beneficiaries has to bear<br />

Rs. 14503.00 each i.e. 25%.<br />

The total financial outlay proposed under the comp<strong>on</strong>ent is Rs. 754.13 lakhs.<br />

The year-wise phasing of Physical and Financial Outlays is appended at<br />

Annexure – I, II & III and unit cost at Annexure – VI.<br />

C. Assistance for Rearing House facility<br />

Unlike other variety of silkworms, Mulberry silkworm is more sensitive to climatic<br />

variati<strong>on</strong>s and food quality. Their rearing and culture requires more hygienic c<strong>on</strong>diti<strong>on</strong>s and<br />

minimum variati<strong>on</strong>s in temperature and humidity. Most of the rearer in <strong>Mizoram</strong> are not<br />

having separate rearing house for c<strong>on</strong>ducting rearing of silkworm. By and large rearers in<br />

<strong>Mizoram</strong> are c<strong>on</strong>ducting silkworm rearing in their dwelling house.<br />

Therefore, the project envisage to assist all the selected beneficiaries for c<strong>on</strong>structi<strong>on</strong><br />

of low cost rearing house worth Rs. 20,000/- each rearer. The assistance will be Rs. 10,000/-<br />

each i.e. 50% of the estimated cost.<br />

D. Assistance for Community Chowki Rearing Centres (CCRC)<br />

As envisaged in the project about 13.00 lakhs dfls. will be reared every<br />

Year from fourth year <strong>on</strong>wards by covering 1300 commercial rerers @ 2.60 lakh dfls. in each<br />

crop/seas<strong>on</strong>. Since Bivoltine rearing requires utmost care during early instars hence, to ensure<br />

the good harvest it is proposed to assist Chowki Rearing Centres <strong>on</strong> community basis. Under<br />

the comp<strong>on</strong>ent commercial rearers will be organized as self help group/cooperative Society to<br />

c<strong>on</strong>duct chowki rearing for the beneficiaries available in a cluster.<br />

Each Community Chowki Rearing Centre would be assisted to rear 26000 Mulberry<br />

dfls. each crop. To rear the 26000 dfls., assistance will be provided for c<strong>on</strong>structi<strong>on</strong> of <strong>on</strong>e<br />

Rearing House worth Rs. 250000/- in each Community Chowki Rearing Centre, beside, the<br />

required quantity of rearing appliances viz. Dallas, Rearing Stand and Disinfectant will also<br />

provided. The Community Chowki Rearing Centre will be manned by the Self Help<br />

Group/Society under patr<strong>on</strong>age of Directorate of Sericulture, Govt. of <strong>Mizoram</strong>. The<br />

activities of the CCRC will be supervised and m<strong>on</strong>itored by the Technical officials of the


146<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

department of Sericulture. The required quantity of mulberry leaves & labour inputs etc.<br />

would be made available by the rearers themselves from their own mulberry garden<br />

developed under the project. A nominal amount may be charged from each rearers which can<br />

be utilized for maintenance of the building and appliances of CCRC.<br />

It is proposed to establish 10 nos. of Community Chowki Rearing Centres with a<br />

financial provisi<strong>on</strong> of Rs. 25.00 lakhs.<br />

E. Assistance for Marketing Facilities<br />

There are no organized marketing facilities in <strong>Mizoram</strong> for disposal of the silk<br />

products. Marketing, as <strong>on</strong> today, is the weakest link in the silk industry in <strong>Mizoram</strong>. The<br />

traders and govt. are purchasing the mulberry coco<strong>on</strong>s from the growers’ doorstep at n<strong>on</strong>remunerative<br />

price. To realize a rati<strong>on</strong>al marketing system in the project area, there is a need<br />

to create adequate infrastructure for marketing of coco<strong>on</strong>, raw silk, fabric and finished<br />

products with str<strong>on</strong>g backward and forward linkages with user groups inside and outside the<br />

State under the project. To undertake this resp<strong>on</strong>sibility, it is proposed to provide suitable<br />

equipments and infrastructure for storage of silk commodities, coco<strong>on</strong> drying, storage,<br />

aucti<strong>on</strong> and trading facilities, besides revolving capital and training to the department. The<br />

DOS, <strong>Mizoram</strong> will coordinate the whole activity by organizing following societies :<br />

1. Organizati<strong>on</strong> of Coco<strong>on</strong> Growers Cooperative Society.<br />

2. Organizati<strong>on</strong> of Marketing facilities inside and outside the State.<br />

3. Organize awareness campaign for formati<strong>on</strong> of Self Help Groups to take up<br />

silk reeling and weaving activities.<br />

The DOS will procure the coco<strong>on</strong>s from the Market Yard and supply it to the Govt.<br />

Reeling units for c<strong>on</strong>versi<strong>on</strong> of coco<strong>on</strong> into yarn. The trans<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> will be made as per price<br />

fixed by the Price Fixati<strong>on</strong> Committee. Besides this the Department will Coordinate Training<br />

and extensi<strong>on</strong> publicity for reeling/weaving and marketing of silk commodities in and outside<br />

the State.<br />

Establishment of Coco<strong>on</strong> Market Yard<br />

In order to provide better Market opportunities to the rearer it is proposed to establish<br />

<strong>on</strong>e Market Yard in three of the Project districts, which will be manned by DOS, <strong>Mizoram</strong><br />

initially. The proposed Market Yards will functi<strong>on</strong> as a c<strong>on</strong>tact point between buyers &<br />

sellers and will also help the rearers in getting better price. The required infrastructure, such<br />

as Building with storage facilities, Stifling Chamber, Coco<strong>on</strong> Grading Equipments, Balance,<br />

etc. will be provided under the Project. The Market Yard will also have facilities like<br />

dormitory for lodging, toilet, etc. The trans<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> of coco<strong>on</strong>s will be held as per bidding over<br />

the floor prices if there are more buyers to purchase the coco<strong>on</strong>s.<br />

The Market Yard will charge 1% of the total sale proceed from each farmer as service<br />

charge for maintenance of building and equipments. A total provisi<strong>on</strong> of Rs. 68.00 lakh is<br />

earmarked under the comp<strong>on</strong>ent.<br />

The year wise Physical and Financial details are appended at Annexure – I, II & III<br />

and Unit cost of Coco<strong>on</strong> Market Yard at Annexure – VII.


147<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

F. Human Resource Development<br />

The Human Resource Development comp<strong>on</strong>ent comprises the following training<br />

comp<strong>on</strong>ents :<br />

(i) Beneficiaries Training Programme<br />

Since, Bivoltine sericulture is a new to the farmers of <strong>Mizoram</strong> State and needs lots of<br />

care during the rearing, all the 1300 commercial rearers covered under the project will be<br />

extended training for a period of <strong>on</strong>e m<strong>on</strong>th <strong>on</strong> raising a <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong>, maintenance and<br />

silkworm rearing. Necessary provisi<strong>on</strong> has been earmarked for hiring training hall,<br />

accommodati<strong>on</strong>, TA/DA, c<strong>on</strong>tingencies, h<strong>on</strong>orarium for trainers, etc. A lump sum of<br />

Rs. 1,000 per farmer has been earmarked.<br />

(ii) Trainers Training Programme<br />

The trainers Training for a period of 15 days will be provided to different level<br />

officers covering District Level Technical Officers and Field Level Technical Officers. A<br />

total of 25 officials will be trained under trainers training programme in 1 (<strong>on</strong>e) batch. Each<br />

Trainers training programme comprising of 25 pers<strong>on</strong>s will be arranged with a budget of Rs.<br />

1.625 lakh. The training may be organized drawing Resource Pers<strong>on</strong>s from Central Silk<br />

Board. A total provisi<strong>on</strong> of Rs. 1.63 lakh has been earmarked under the comp<strong>on</strong>ent.<br />

The unit cost for Trainers Training Programme is appended at Annexure – VIII.<br />

The year-wise phasing for Physical and Financial details is appended at Annexure – I,<br />

II & III. Total provisi<strong>on</strong> made under the comp<strong>on</strong>ent is Rs. 14.63 lakh that will be entirely<br />

born by the Government.<br />

Funding<br />

The Govt. of India (D<strong>on</strong>er) would make the entire required fund for the project.<br />

Cost Sharing<br />

The comp<strong>on</strong>ent-wise Physical and Financial Outlays, year-wise proposed costs and its<br />

sharing pattern are indicated in Annexure – I, II, III & IV.<br />

The proposed costs are be shared by the Govt. of India and the beneficiaries.<br />

(Rs. in lakh)<br />

Total Outlay Govt. of India (GOI) Beneficiary<br />

Project Cost Govt. of share (GOI) Beneficiaries share<br />

1128.98 800.46 318.53<br />

The beneficiary’s c<strong>on</strong>tributi<strong>on</strong> of Rs. 318.53 lakh is mainly towards labour<br />

involvement for land development, <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> and c<strong>on</strong>structi<strong>on</strong> of rearing houses. The Govt.<br />

of India will bear the expenditure towards assistance <strong>on</strong> Project comp<strong>on</strong>ents under Prime<br />

Minister Ec<strong>on</strong>omic Package for North Eastern States/N<strong>on</strong> Lapsable pool Fund towards<br />

investment <strong>on</strong> infrastructure at beneficiary level, strengthening of existing infrastructures to<br />

fill gaps, skill upgradati<strong>on</strong>, extensi<strong>on</strong> & publicity, market development and project<br />

administrati<strong>on</strong> and m<strong>on</strong>itoring.


148<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Release of Funds<br />

The Govt. of India, Delhi will release the proposed share/fund to the Department of<br />

Sericulture, Govt. of <strong>Mizoram</strong> directly which in turn would release the required fund based<br />

<strong>on</strong> Acti<strong>on</strong> Plan to the District Sericulture Officers, of the c<strong>on</strong>cerned districts.<br />

Project Benefits/Outputs<br />

Silk industry c<strong>on</strong>tributes to the State ec<strong>on</strong>omy in a significant way. The Mulberry<br />

Silk Development Programme is expected to provide better income generati<strong>on</strong> and<br />

employment opportunities to the women folk, Self Help Groups, Societies and other weaker<br />

secti<strong>on</strong> of the society leading to a better standard of living. With the implementati<strong>on</strong> of the<br />

project, it is expected that both <strong>on</strong> farm and n<strong>on</strong>-farm sectors will get necessary fillip and<br />

Bivoltine Silk Industry will get sound footing.<br />

I. Employment<br />

Sericulture is a labour intensive avocati<strong>on</strong> and has great potential to create more<br />

employment opportunities per unit area. It is estimated that <strong>on</strong>e kg of mulberry silk<br />

producti<strong>on</strong> and processing will provide employment 13 man-year per acre. At the 3 rd year<br />

level, the employment generati<strong>on</strong> will be to the tune of 16900 man-years in both <strong>on</strong>-farm and<br />

n<strong>on</strong>-farm sectors.<br />

II. Producti<strong>on</strong><br />

As a result of implementing the project, the following quantities of Bivoltine P1 Dfls,<br />

Seed Coco<strong>on</strong>s, Commercial Raw Silk, Spun Silk, Commercial coco<strong>on</strong>s, Seed coco<strong>on</strong>s and<br />

Seed producti<strong>on</strong> will be produced during the project period at the level of 3 rd year of the<br />

project.<br />

OUTPUT UNIT QUANTITY<br />

P1 dfls Nos. 32,000<br />

Commercial dfls Nos. 13,00,000<br />

Commercial coco<strong>on</strong>s MT 500<br />

Raw silk MT 50<br />

Spun silk MT 20<br />

III. Income<br />

The Project aims to individual Rearer/Self Help Group/Society to generate sustainable<br />

income through expanding his/her asset and skill base from the Bivoltine Rearing, Reeling<br />

and weaving activities.<br />

The project envisages an assured income of Rs. 96,000-12,000 to a commercial rearer<br />

per annum.<br />

The year-wise producti<strong>on</strong> ec<strong>on</strong>omics are indicated in ANNEXURE – IX.


149<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

ECONOMIC ANALYSIS<br />

The project aims at bringing about quantitative improvement in the Bivoltine<br />

Mulberry silk industry through the State interventi<strong>on</strong> and rural populace participati<strong>on</strong>. The<br />

incremental project investments are proposed mainly in building up an effective seed<br />

organizati<strong>on</strong>, investments in improved post coco<strong>on</strong> activities, and skill upgradati<strong>on</strong> through<br />

training and finally development of better marketing system. Besides this, the participati<strong>on</strong><br />

by individual as rearer, seed producer, reeler and weaver through investment is also<br />

envisaged. Thus, integrati<strong>on</strong> of all activities from <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> development to yarn producti<strong>on</strong>,<br />

private investment is required and hence, it becomes imperative to assess the ec<strong>on</strong>omic<br />

viability of the activities. The ec<strong>on</strong>omic analysis has revealed appreciable rate of return and<br />

established its ec<strong>on</strong>omic viability.<br />

REPORTING FORMAT<br />

The Director of Sericulture, Govt. of <strong>Mizoram</strong> will collect the M<strong>on</strong>thly/Quarterly<br />

progress report from the field units (FIA) and compile it. The Joint Project Committee will<br />

review the m<strong>on</strong>thly progress report regularly. The DOS, <strong>Mizoram</strong> to the State Level Steering<br />

Committee to review the progress of the Project, will place the quarterly progress report.<br />

Sl.<br />

No.<br />

Sl.<br />

No.<br />

FORMAT FOR REPORTING<br />

Physical<br />

Item Target Achievement Cumulative<br />

Progress since<br />

incepti<strong>on</strong> of the<br />

Project<br />

For the For the year During Up to end<br />

Project<br />

period<br />

quarter of quarter<br />

Financial<br />

Item Target Achievement Cumulative<br />

Progress since<br />

incepti<strong>on</strong> of the<br />

Project<br />

For the For the year During Up to end<br />

Project<br />

period<br />

quarter of quarter


Date :<br />

Place :<br />

150<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

EVALUATION OF THE PROJECT<br />

Signature of DOS/District Sericulture Officer<br />

A Committee may be c<strong>on</strong>stituted comprising the following members for yearly<br />

evaluati<strong>on</strong> of the Project:<br />

01 The Director of Sericulture, Govt. of <strong>Mizoram</strong> Chairman<br />

02 Representative from RDO, CSB, Guwahati Member<br />

03 Deputy Director of Sericulture & Weaving, Govt. of <strong>Mizoram</strong> C<strong>on</strong>vener<br />

04 C<strong>on</strong>cerned District Sericulture Officers Member<br />

The final evaluati<strong>on</strong> may be carried out in the year 2009 i.e. after completi<strong>on</strong> of the<br />

Project. An External Agency may be involved to carry out the evaluati<strong>on</strong> of the Project, if<br />

needed. A provisi<strong>on</strong> of Rs. 1.00 lakh has been kept under the evaluati<strong>on</strong> head.<br />

MIZORAM MULBERRY SILK DEVELOPMENT PROJECT<br />

PHYSICAL & FINANCIAL TARGETS<br />

Annexure – I<br />

Sl.<br />

Comp<strong>on</strong>ents Unit<br />

(Rs. in lakhs)<br />

Targets<br />

No.<br />

Physical Financial<br />

1 Assistance to Commercial Rearers<br />

Raising of basic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> (Govt. Sector) Hact. 20 7.23<br />

Land Development Hact. 1300 165.10<br />

Raising of Plantati<strong>on</strong> Hact. 1300 304.98<br />

C<strong>on</strong>structi<strong>on</strong> of Chowki Rearing houses No. 10 25.00<br />

C<strong>on</strong>structi<strong>on</strong> of Rearing Houses No. 1300 260.00<br />

Supply of Rearing equipments No. 1300 284.05<br />

Sub-Total - 1046.36<br />

2 Establishment of Marketing Facilities<br />

Coco<strong>on</strong> Market Yard No. 2 28.00<br />

Assistance for Marketing (Coco<strong>on</strong> price) No. 1 40.00<br />

Sub – Total - 68.00<br />

3 Human Resource Development<br />

Trainers’ Training Programme No. 25 1.63<br />

Commercial Farmers’ Training Programme No. 1300 13.00<br />

Sub – Total - 14.63<br />

GRAND TOTAL 1128.99


Sl.<br />

No<br />

1<br />

151<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

MULBERRY SILK DEVELOPMENTPROJECT IN MIZORAM<br />

YEAR-WISE FINANCIAL PHASING<br />

Comp<strong>on</strong>ents Total<br />

Outlay 2004-<br />

2005<br />

Assistance to Commercial Rearers<br />

Raising of basic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong><br />

(Govt. Sector)<br />

Annexure – II<br />

(Rs. in lakhs)<br />

Year-wise Break-up<br />

2005- 2006- 2007- 2008-<br />

2006 2007 2008 2009<br />

7.23 - 7.23 - - -<br />

Land Development 165.10 24.76 33.02 41.28 41.28 24.76<br />

Raising of Plantati<strong>on</strong><br />

(Private)<br />

304.98 45.75 60.99 76.24 76.24 45.75<br />

C<strong>on</strong>structi<strong>on</strong> of Chowki<br />

Rearing houses<br />

25.00 - 12.50 12.50 - -<br />

C<strong>on</strong>structi<strong>on</strong> of Rearing<br />

houses<br />

260.00 39.00 52.00 65.00 65.00 39.00<br />

Supply of Rearing<br />

equipments<br />

284.05 42.61 56.81 71.01 71.01 42.61<br />

Sub-Total 1046.36 152.12 222.55 266.03 253.53 152.12<br />

2 Establishment of Marketing Facilities<br />

Coco<strong>on</strong> Market Yard 28.00 - 14.00 14.00 - -<br />

Assistance for Marketing<br />

(Coco<strong>on</strong> price)<br />

40.00 - 25.00 15.00 - -<br />

Sub – Total 68.00 - 39.00 29.00 - -<br />

3 Human Resource Development<br />

Trainers’ Training Prog. 1.63 - 1.63 - - -<br />

Commercial Farmers’<br />

Training Programme<br />

13.00 1.00 3.00 3.00 3.00 3.00<br />

Sub – Total 14.63 1.00 4.63 3.00 3.00 3.00<br />

GRAND TOTAL 1128.98 153.12 266.18 298.03 256.53 155.12


Sl.<br />

No<br />

1<br />

152<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

MULBERRY SILK DEVELOPMENTPROJECT IN MIZORAM<br />

YEAR-WISE PHYSICAL TARGETS<br />

Comp<strong>on</strong>ents<br />

Total<br />

target<br />

Assistance to Commercial Rearers<br />

Raising of basic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong><br />

(Govt. (Hact.)<br />

2004-<br />

2005<br />

Year-wise Target<br />

2005-<br />

2006<br />

2006-<br />

2007<br />

Annexure – III<br />

2007-<br />

2008<br />

2008-<br />

2009<br />

20 - 20 - - -<br />

Land Development (Nos.) 1300 195 260 325 325 195<br />

Raising of Plantati<strong>on</strong> (Private) 1300 195 260 325 325 195<br />

C<strong>on</strong>structi<strong>on</strong> of Chowki<br />

Rearing houses (Nos.)<br />

10 - 5 - - -<br />

C<strong>on</strong>structi<strong>on</strong> of Rearing<br />

houses (Nos.)<br />

1300 195 260 325 325 195<br />

Supply of Rearing<br />

equipments (Nos.)<br />

Establishment of<br />

Marketing Facilities<br />

1300 195 260 325 325 195<br />

2 Coco<strong>on</strong> Market Yard 2 - 1 1 - -<br />

Assistance for Marketing<br />

(Coco<strong>on</strong> price)<br />

Human Resource<br />

Development<br />

1 - 1 - - -<br />

3 Trainers’ Training<br />

Programme<br />

25 - - - - -<br />

Commercial Farmers’<br />

Training Programme<br />

1300 100 300 300 300 300<br />

Sl.<br />

No<br />

1<br />

MULBERRY SILK DEVELOPMENT PROJECT IN MIZORAM<br />

FUNDING PATTERN<br />

Comp<strong>on</strong>ents<br />

Govt.’s<br />

Share<br />

Beneficiaries<br />

Annexure – IV<br />

(Rs. in lakhs)<br />

Total<br />

Assistance to Commercial Rearers<br />

Raising of basic <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> (Govt. Sector) 7.23 - 7.23<br />

Land Development 123.82 41.28 165.10<br />

Raising of Plantati<strong>on</strong> (Pvt.) 228.74 76.24 304.98<br />

C<strong>on</strong>structi<strong>on</strong> of Chowki Rearing houses 25.00 - 25.00<br />

C<strong>on</strong>structi<strong>on</strong> of Rearing houses 130.00 130.00 260.00<br />

Supply of Rearing equipments 213.04 71.01 284.05<br />

Sub-Total 717.83 318.53 1046.36


Sl.<br />

No<br />

153<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Comp<strong>on</strong>ents<br />

Govt.’s<br />

Share<br />

(Rs. in lakhs)<br />

Beneficia-<br />

Total<br />

ries<br />

2 Establishment of Marketing Facilities<br />

Coco<strong>on</strong> Market Yard 28.00 - 28.00<br />

Assistance for Marketing (Coco<strong>on</strong> price) 40.00 - 40.00<br />

Sub – Total 68.00 - 68.00<br />

3<br />

Human Resource Development<br />

Trainers’ Training Programme 1.63 - 1.63<br />

Commercial Farmers’ Training Programme 13.00 - 13.00<br />

Sub – Total 14.63 - 14.63<br />

GRAND TOTAL 800.46 318.53 1128.98<br />

Unit Cost for development of 1.0 hact. Basic Mulberry Plantati<strong>on</strong><br />

Under Govt. Sector<br />

Sl.No Particulars Qty. Rate<br />

(Rs.)<br />

A.<br />

1.<br />

2.<br />

Land Development<br />

Cleaning & Land development<br />

Labour wages for 50 mandays (Family)<br />

Annexure – V<br />

Total<br />

Amount<br />

(Rs.)<br />

50 84.00 4200.00<br />

Green fencing with bamboo (lump sum) - - 8500.00<br />

Sub-Total 12700.00<br />

B. Raising of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong><br />

1. Raising of cuttings cost for 10000 saplings/hact.<br />

Cost of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> development<br />

10000 0.25 2500.00<br />

2. (a) Pit digging - 70 mandays 70 84 5880.00<br />

(b) Planting the saplings – 50 mandays 50 84 4200.00<br />

© Agri. Implements cost (lump sum) 2500.00<br />

(d) cost of manure (lump sum) 2500.00<br />

(e) Applicati<strong>on</strong> of manure 10 84 840.00<br />

(f) Weeding 3 times 60 84 5040.00<br />

Sub - Total 23460.00<br />

GRAND TOTAL 36160.00


154<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Annexure – VI<br />

Unit Cost for Assistance to Commercial Rearers for development of 1 hact. systematic<br />

Silkworm Rearing<br />

Sl.<br />

No.<br />

A.<br />

1<br />

2<br />

B.<br />

1<br />

2<br />

C.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

Particulars Qty Rate Total Amount<br />

Land development<br />

(Rs.) (Rs.)<br />

Cleaning & Land development Labour Wages<br />

for 50 mandays (Family)<br />

50 84.00 4200.00<br />

Green fencing with bamboo (lump-sum)<br />

8500.00<br />

Sub-total 12700.00<br />

Raising of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong><br />

Cost of cuttings 3’x3’ spacing @ 10000<br />

sapling/hact.<br />

Cost of <str<strong>on</strong>g>plan</str<strong>on</strong>g>tati<strong>on</strong> development<br />

10000 0.25 2500.00<br />

(a) Pit digging – 70 mandays<br />

70 84 5880.00<br />

(b) Planting the sapling – 50 mandays<br />

50 84 4200.00<br />

(c) Agri. Implement cost<br />

2500.00<br />

(d) Cost of manure (Lump-sum)<br />

2500.00<br />

(e) Applicati<strong>on</strong> of manure<br />

10 84 840.00<br />

(f) Weeding – 3 times<br />

60 84 5040.00<br />

Sub-total 23460.00<br />

C<strong>on</strong>structi<strong>on</strong> of Rearing House (Assam<br />

type) 24’x15’<br />

Rearing Tray 200 Nos. @ Rs. 20/-<br />

Rearing nets. 200 Nos. @ Rs. 25/-<br />

Plastic Mountage 50 Nos. @ Rs. 120/-<br />

Rearing racks (wooden) 6’x4’x2’<br />

Leaf chamber<br />

1<br />

200<br />

200<br />

50<br />

5<br />

1<br />

20000<br />

20<br />

25<br />

120<br />

1250<br />

600<br />

20000.00<br />

4000.00<br />

5000.00<br />

6000.00<br />

6250.00<br />

600.00<br />

Total 41850.00<br />

Grand total 78010.00<br />

The beneficiary will be assisted @ Rs. 53510/- each and the remaining has be borne<br />

by the beneficiary (Family manpower). The assistance in the case of Rearing House will be<br />

50% and for all other items the beneficiaries have to bear 25%.


Sl.<br />

No.<br />

A<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Sl.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

155<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Unit Cost for Coco<strong>on</strong> Market Yard<br />

Annexure-VII<br />

Particulars Quantity Rate Amount<br />

(Rs)<br />

Fixed cost<br />

Functi<strong>on</strong>al Building with the provisi<strong>on</strong> of office<br />

rooms, coco<strong>on</strong> storage and dormitory al<strong>on</strong>gwith<br />

toilet facility (sq.mtr.)<br />

Hot air Stifling Chamber<br />

Coco<strong>on</strong> Storage Rack<br />

Weighing Balance<br />

Coco<strong>on</strong> Assessment Balance<br />

Office furniture<br />

Steel Almirah<br />

Chairs<br />

Tables<br />

Stools<br />

Tube Well with drinking water supply system<br />

160<br />

1<br />

30<br />

1<br />

1<br />

5500<br />

80000<br />

10000<br />

10000<br />

10000<br />

880000<br />

80000<br />

300000<br />

10000<br />

10000<br />

2 4000 8000<br />

20 500 10000<br />

2 1000 2000<br />

10 300 3000<br />

60000<br />

Generator<br />

1 37000 37000<br />

Total 1400000<br />

Unit Cost of Organisati<strong>on</strong> of Trainers Training Programme<br />

(for 15 days 25 trainees per batch)<br />

Annexure-VIII<br />

Particulars Quantity Rate Amount (Rs)<br />

Hotel Accommodati<strong>on</strong> (per day per trainee)<br />

and dormitory al<strong>on</strong>gwith toilet facility (sq.mtr.)<br />

26 150 58500<br />

Tea/Snacks/Working Lunch etc.<br />

26 100 39000<br />

Dinner / Breakfast<br />

60 26 39000<br />

H<strong>on</strong>orarium to Resource Pers<strong>on</strong><br />

30 200 6000<br />

H<strong>on</strong>orarium to Coordinator Pers<strong>on</strong><br />

15 200 3000<br />

Expenditure <strong>on</strong> Stati<strong>on</strong>ary etc. (per day)<br />

15 300 4500<br />

Hiring of Bus for field visit<br />

1 3000 3000<br />

Miscellaneous<br />

3000<br />

Hiring of C<strong>on</strong>ference Hall<br />

13 500 6500<br />

Total 162500


Sl.<br />

No<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

156<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Annexure – IX<br />

YEAR-WISE PRODUCTION OF RAW SILK AND ECONOMIC VALUE<br />

Particulars<br />

Acreage covered during the year<br />

Cumulative Acreage<br />

Dfls. reared<br />

Average yield/100 dfls. (Kg)<br />

Quantity of coco<strong>on</strong>s produced (MT)<br />

Average reditta<br />

Raw silk producti<strong>on</strong> (MT)<br />

Cost of 1 Kg Raw silk (Rs.)<br />

Total Value of Reeled silk (in lakh<br />

Rs.)<br />

2004-<br />

2005<br />

195<br />

195<br />

-<br />

40<br />

2005-<br />

2006<br />

260<br />

455<br />

195000<br />

40<br />

78.00<br />

10<br />

7.80<br />

1200<br />

93.60<br />

2006-<br />

2007<br />

325<br />

780<br />

455000<br />

40<br />

182.00<br />

10<br />

18.20<br />

1200<br />

218.40<br />

2007-<br />

2008<br />

325<br />

1105<br />

925000<br />

40<br />

370.00<br />

10<br />

37.00<br />

1200<br />

444.00<br />

2008-<br />

2009<br />

195<br />

1300<br />

1235000<br />

40<br />

494.00<br />

10<br />

49.00<br />

1200<br />

592.80<br />

Total value of silk (in lakh Rs.) 93.60 218.40 444.00 592.80<br />

PROJECT AT A GLANCE<br />

Name of the Project Mulberry Silk Development Project in<br />

<strong>Mizoram</strong><br />

Operati<strong>on</strong>al Districts Aizawl, Champhai, Serchhip, Kolasib,<br />

Mamit, Lunglei<br />

Implementing Agency Department of Sericulture, Govt. of <strong>Mizoram</strong><br />

Total Project Cost (Rs. in Lakh) 1128.98<br />

Period 2004-05 to 2008-2009 (5 years)<br />

Basic Plantati<strong>on</strong> (Hact.) 20<br />

Number of Commercial Rearers 1300<br />

Number of Community Chowki Rearing 10<br />

Centres<br />

Project Output<br />

(i) Total Quantity Reeling Coco<strong>on</strong> 494.00<br />

(MT)<br />

(ii) Total Quantity of Raw Silk<br />

49.40<br />

Produced (MT)<br />

Total Project Output from Fourth years 592.80<br />

<strong>on</strong>wards (Rs. in Lakh)<br />

Employment Generati<strong>on</strong> 16900 man-year


157<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

SOIL & WATER CONSERVATION<br />

INTRODUCTION:<br />

Bamboo Flowering and Famine Combating Scheme (BAFACOS) for Soil<br />

C<strong>on</strong>servati<strong>on</strong> Engineering Measures has been formulated to generate employment<br />

opportunity of the rural village people so that all operati<strong>on</strong>al activities to be carried out by<br />

manual labourer for ec<strong>on</strong>omic benefit to combat famine situati<strong>on</strong>.<br />

<strong>Mizoram</strong> has been experiencing Bamboo Flowering and subsequent famine at interval<br />

of 48-50 years. The famine was observed in 1881 and the last famine occurred in the state of<br />

<strong>Mizoram</strong> in 1959. Based up<strong>on</strong> the experience of local people and relevant facts gathered<br />

there <strong>on</strong>, experts at I.C.AR. New Delhi warned gregarious flowering of bamboos in <strong>Mizoram</strong><br />

during 2005-2008. This can be taken as precursor of famine in the state.<br />

Therefore, Soil C<strong>on</strong>servati<strong>on</strong> Engineering Measures comprising erosi<strong>on</strong> hazards viz.<br />

Gully C<strong>on</strong>trol, Stream Bank Erosi<strong>on</strong> C<strong>on</strong>trol and as well as Land Development programme<br />

has been worked out for l<strong>on</strong>g term benefit in existing pddy grown flat areas in <strong>Mizoram</strong>.<br />

The most important factors causing erosi<strong>on</strong> in <strong>Mizoram</strong> is hydrologic factor. Water<br />

seeps through disturbed slopes, toe cutting by rivers and torrents and pore water pressure in<br />

the soil z<strong>on</strong>e are major agents resp<strong>on</strong>sible for landslides. Torrents, especially in their<br />

m<strong>on</strong>so<strong>on</strong> stages because of excessive velocities of flow and turbulence, carry out quick<br />

removal of debris and cutting of sides. The landslides mostly take place after heavy rainfall<br />

which has been felt by the people of <strong>Mizoram</strong>. The rain water has mainly two effects namely,<br />

(i) It increases the effective weight of the material due to saturati<strong>on</strong>, lubricates any sliding<br />

places, especially of shale’s and (ii) causes weakening of strata e.g. if this is a clayey<br />

structure, it will swell because of moisture intake. It is also a comm<strong>on</strong> observati<strong>on</strong> that<br />

generally in mountainous areas of tertiary age groups, rocks are relatively younger where<br />

seismic activity is comm<strong>on</strong>. In case of fine sand, silt and losses deposits, shocks due to<br />

blasting reduce the shear strength due to liquef<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g> and intake sand and mud flows.<br />

Erosi<strong>on</strong> may also be caused by single or combinati<strong>on</strong>s of activities, unscientific<br />

removal of land cover and fire, adaptati<strong>on</strong> of improper agricultural <strong>on</strong> steep slopes, under<br />

cutting of the base of existing slope by torrents or for road making, improper alignment of<br />

roads <strong>on</strong> weaker and unstable rock formati<strong>on</strong>. Also initiati<strong>on</strong> of sliding may be caused by<br />

gradual disintegrati<strong>on</strong> of soil starting with hair width cracks which subdivide the soil into<br />

angular fragments.<br />

The differing geological history, the varying character of the geological formati<strong>on</strong>s<br />

and the c<strong>on</strong>trasted physiographic make up of three geomorphic divisi<strong>on</strong>s also define the<br />

pattern and the quantum of incidence of erosi<strong>on</strong> hazards.<br />

The combinati<strong>on</strong> of adverse factors of high relief topography, complexity folded and<br />

faulted and highly jointed rock formati<strong>on</strong> and high rainfall, besides the actively eroding<br />

hydraulic regime of the river systems, make the extra. Peninsular terrain are most vulnerable<br />

to large scale land slides. Further more, the inherently erosi<strong>on</strong> pr<strong>on</strong>e slope in the<br />

geotopographic and hydro climatic setup of <strong>Mizoram</strong> are rendered into active erosi<strong>on</strong><br />

problem by human development activities.


158<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

The following Soil C<strong>on</strong>servati<strong>on</strong> Engineering Works has been included in this<br />

Scheme for employment generati<strong>on</strong> which will inturn benifit for agricultural sustained<br />

productivity in the l<strong>on</strong>g run other than combating famine situati<strong>on</strong>.<br />

A. Gully C<strong>on</strong>trol Measures.<br />

B. Stream Bank Erosi<strong>on</strong> C<strong>on</strong>trol Measures.<br />

C. Land Development.<br />

GENERAL DESCRIPTION<br />

Physiography : <strong>Mizoram</strong> has total geographical area of 21081 Sq.km. and has c<strong>on</strong>tour<br />

variati<strong>on</strong> of 100 to 2100 m. The physical feature of the area are dominated by a series of<br />

parallel hill regi<strong>on</strong>. The steep hill and narrow valley are associated with complex drainage<br />

basis. The rugged topography is expressed by the dissecti<strong>on</strong> of several l<strong>on</strong>gitudinal, valleys<br />

between the North-South trending l<strong>on</strong>g parallel to sub-parallel ranges, which tend to be<br />

higher in the middle and tapering to North and South.<br />

Hydrology : <strong>Mizoram</strong> has an abundant rainfall and number of hill streams but run-off is<br />

instantaneous and most of the water is quickly drained off. The m<strong>on</strong>ths of January, February,<br />

March, April and December is almost dry and there is acute water shortage during these<br />

periods due to surface run off drained put quickly through the various streamlets and rivers.<br />

Climate : The climate is humid subtropical having a mean annual humidity 71.83% The<br />

winter temperature varies from 12.34°C to 22.41°C and in summer it varies from 20.11°C to<br />

34.21°C. The minimum annual mean temperature is 16.65°C and the maximum annual mean<br />

temperature is 27.74°C. The m<strong>on</strong>thly temperature data with respect of maximum, mean<br />

minimum temperature is given with tables and annexed in this chapter .<br />

The average annual rainfall is 2740 and is influenced by impact of South West<br />

m<strong>on</strong>so<strong>on</strong> which commences from May to October and 60-70% of the precipitati<strong>on</strong> is<br />

obtained from June to September.<br />

CLIMATOLOGICAL DATA OF AIZAWL<br />

M<strong>on</strong>th Rainfall Humidity Temperature<br />

(in mm) (in %) Max Mean Min<br />

January’03 12.04 58 21.79 17.06 12.34<br />

February’03 32.42 63 23.98 19.79 15.62<br />

March’03 129.04 66 26.86 22.15 17.45<br />

April’03 176.17 70 28.18 24.25 20.33<br />

May’03 312.96 78 32.54 27.21 21.89<br />

June’03 687.70 81 34.21 27.74 21.27<br />

July’03 495.22 83 29.46 25.93 22.41<br />

August’03 349.00 83 29.35 25.49 21.63<br />

September’03 310.86 84 29.31 25.43 21.55<br />

October’03 183.69 73 28.97 24.84 20.72<br />

November’03 - 68 27.46 22.71 17.96<br />

December’03 51.84 55 20.11 16.65 13.20


159<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Land and Soil : The soil associati<strong>on</strong> are typical Hapludults and Umbric Dystrochrepts<br />

for higher altitude and Typical Undorthens and Fluventic Dytrochrepts are at z<strong>on</strong>e between<br />

500m to 1000m mean sea level. At lower than 500m the soil associati<strong>on</strong> are Unbric<br />

Dystrochrepts.<br />

Slope and Aspect : Slope and Aspect of the regi<strong>on</strong> are vital parameters as the degree and<br />

directi<strong>on</strong> of the slope decide the land use that it can support. Slope is also very important<br />

while evaluating the land capability and has a direct bearing of runoff. Slope and aspects are<br />

helpful in priotising areas for development measures and in deciding site for roads<br />

alignments, afforestati<strong>on</strong> programmes, etc.<br />

Industries : The industrial activities are centered around small scale household<br />

works. Weaving, Bamboo and cane works, wood carving are the traditi<strong>on</strong>al cottage<br />

industries. Efforts are made to encourage small scale household industries and their<br />

diversificati<strong>on</strong>. The main small scale industries registered are Tailoring Carpentry, Bakery,<br />

Furniture Works, Motor Works, Hotel Industries, Saw Mills, Blacksmith, Goldsmith,<br />

Weaving, etc. other them cold storage and fruit processing.<br />

DETAILED ESTIMATE FOR CONSTRUCTION OF<br />

ROCK FILLED GABIONIC BOX UNIT RATE FOR 10 R/METRE<br />

(Rate as per Schedule of rate PWD - 2003 for Northern <strong>Mizoram</strong>)<br />

1/17(a) Earthwork in excavati<strong>on</strong> in foundati<strong>on</strong> trenches, drains,<br />

etc. not exceeding 2 meters depth including dressing of<br />

sides and returning of bottom lift upto 1.50m including<br />

getting out excavated soil as directed within a lead of<br />

3m.<br />

Foundati<strong>on</strong>:<br />

1 x 10.69 x 5.00 x 0.60 + 1.20 = 47.70 m 3<br />

2<br />

@ Rs.68.00 per m 3 ......................................... Rs.3,244.00<br />

2/PMR Supply of 12 SWC galvanised wire of approved brand<br />

and manufactures.<br />

Quantity of galvanised wire for <strong>on</strong>e block per layer :<br />

(a) 1st Layer :<br />

Lengthwise : Nos. of lines = 41 lines<br />

= 41x (6.00 + 0.50 + 0.50) = 287.00m<br />

Quantity = 287.00 x 5 blocks = 1435.00m<br />

Shortwise : Nos. of lines - (6.00 0.10) + 1 = 61 lines<br />

= 61 x 4.00 = 244.00m<br />

Quantity = 244.00 x 5 blocks = 1220.00m<br />

TOTAL (a) : = 2655.00m<br />

(b) 2nd Layer :<br />

Lengthwise : Nos. of lines c<strong>on</strong>stant = 41 lines<br />

= 41 x 7.00 x 50 x 0.50 = 328.00m<br />

Quantity : 328.00 x 4 blocks = 1312.00m


160<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Shortwise : Nos. of lines - (7.00 0.10) + 1 = 71 lines<br />

= 71 x 4.00 = 284.00m<br />

Quantity : 284.00 x blocks = 1136.00m<br />

TOTAL (b) : = 2448.00m<br />

(c) 3rd Layer :<br />

Lengthwise : nos. of lines c<strong>on</strong>stant = 41 lines<br />

= 41 x (8.00 + 0.50 + 0.50) = 309.00m<br />

Quantity : 369.00 x 3 blocks = 1107.00m<br />

Shortwise : nos. of lines - (9.00 0.10) + 1 = 91 lines<br />

= 81 x 4.00 = 324.00m<br />

Quantity = 324.00 x 3 blocks = 972.00m<br />

TOTAL (c) : = 2079.00m<br />

(d) 4th Layer :<br />

Lengthwise : Nos. of lines c<strong>on</strong>stant = 41 lines<br />

= 41 x (9.00 + 0.50 + 0.50) = 410.00m<br />

Quantity = 410 x 3 blocks = 1230.00m<br />

Shortwise : Nos. of lines - (9.00 0.10) + 1 = 91 lines<br />

= 91 x 4.00 = 364.00m<br />

Quantity = 364.00 x 3 blocks = 1092.00m<br />

TOTAL (d) : = 2322.00m<br />

TOTAL of (a) to (d) = 9504.00m<br />

Add 5% wastage for knots & bunding = 475.20m<br />

GRAND TOTAL = 9979.20<br />

Weight in quintal = 9979.20 x 65 gm/m = 6.48 qtls<br />

1000 x 100<br />

@ Rs. 3500 per Qtls ............................................................. Rs. 22,703.00<br />

3/DR Weaving of galvanised wire of whole size 10cm x 10cm<br />

as per design/knots including fitting and fixing into its<br />

proper shape and positi<strong>on</strong>.<br />

47 D/LS @ Rs. 100.00 (ordinary) ......................................... Rs. 4700.00<br />

4/221 Filling st<strong>on</strong>es behind walls into woven galvanised nets<br />

hand packed including supplies of st<strong>on</strong>es into motorable<br />

road size of st<strong>on</strong>es (15cm to 20 cm).<br />

1st layer : 1 x 6.00 x 5.00 = 30.00m 2<br />

2nd layer : 1 x 7.00 x 4.00 = 28.00m 2<br />

3rd layer : 1 x 8.00 x 3.00 = 24.00m 2<br />

4th layer : 1 x 9.00 x 2.00 = 18.00m 2<br />

5th layer : 1 x 9.00 x 1.00 = 9.00m 2<br />

TOTAL : 110.00m 2 x 1.00 = 109.00m 3<br />

@ Rs.880.70 per m 3 ................................................ Rs. 95,996.00


161<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

5/A(4) Carriage of st<strong>on</strong>es from motorable road to worksite by<br />

head load.<br />

St<strong>on</strong>e 110.00 m 3 @ Rs. 121.79 per m 3 ......................... Rs. 13,397.00<br />

GRAND TOTAL = Rs.1,40,040.00<br />

Unit rate per R/meter = 1,40,040 10 = Rs. 14,000.00 (Say)<br />

DETAILED ESTIMATE FOR CONSTRUCTION OF STONE<br />

RIVETMENT ON RIVER BANK OF AIZAWL EAST<br />

(Rate Based <strong>on</strong> <strong>Mizoram</strong> PWD schedule of rate 2003 for Northern <strong>Mizoram</strong>)<br />

1/128 Earthwork in excavati<strong>on</strong> in foundati<strong>on</strong> trenches etc. not<br />

exceeding 2 meters depth including dressing of bottom<br />

and sides of trenches and subsequent filling as in<br />

column foundati<strong>on</strong>s, fence posts, etc. and disposal of all<br />

surplus soil as directed within a lead of 30 metres.<br />

(a) Ordinary soil<br />

Unit of length for Bank rivetment 10.00 metres<br />

10.00 x (1.50 + 2.10) x 0.30 = 5.40m 3<br />

2<br />

@ Rs. 85.00 per m 3 .............................................. Rs. 459.00<br />

2/141 Providing and laying cement c<strong>on</strong>crete 1:4:8 ( 1 cement :<br />

4 coarse sand : 8 graded st<strong>on</strong>e aggregate 40mm nominal<br />

size) excluding cost of centering and shuttering in -<br />

All work upto foundati<strong>on</strong> & pith level.<br />

Base Foundati<strong>on</strong> at river bank edge:-<br />

10.00 x 2.00 x 0.20 = 4.00m 3<br />

@ Rs.2,545.90 per m 3 ........................................... Rs. 10.184.00<br />

3/207 Regular coursed rubble mas<strong>on</strong>ry with hard st<strong>on</strong>e in<br />

cement mortar 1:3 (1 cement : 3 fine sand) including<br />

curing, etc. complete.<br />

(a) Base Foundati<strong>on</strong><br />

10.00 x 1.50 x 0.30 = 4.50m 3<br />

@ Rs. 3431.10 per m 3 ................................. Rs. 15,440.00<br />

(b) In superstructure for stream bank<br />

10.00 x (1.50 + 2.10) x 0.15 = 2.70 m 3<br />

2<br />

@ Rs. 3,712.00 per m 3 ................................ Rs. 10,022.00<br />

4/79 Providing and filling at the back of abutments, wing<br />

walls, retaining walls etc. and below pipe bed in layers<br />

not exceeding 150mm thick including watering and<br />

comp<str<strong>on</strong>g>acti<strong>on</strong></str<strong>on</strong>g>.<br />

10.00 x 1.80 x 0.92 = 16.56m 3<br />

@ Rs. 843.10 per m 3 ............................................ Rs. 13962.00<br />

GRAND TOTAL = Rs. 50,067.00<br />

Unit Rate per R/meter is 50,067 10 = Rs. 5000.00 (Say)


162<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

Detailed Estimate for C<strong>on</strong>structi<strong>on</strong> of Hand packed St<strong>on</strong>e mas<strong>on</strong>ry Check Dam<br />

(Based <strong>on</strong> P.W.D. SOR, 2000, approved for Northern <strong>Mizoram</strong>)<br />

1/LS Site preparati<strong>on</strong> etc. - LS Rs. 100.00<br />

2/128(C) Earthwork in excavati<strong>on</strong> in foundati<strong>on</strong> trenches or drains including dressing of<br />

sides and ramming of bottom, lift up to 1.50m including getting out excavated soil as<br />

directed.<br />

(C) Ordinary rock foundati<strong>on</strong><br />

Foundati<strong>on</strong> - 1x1.80 x 1.00x3.90 = 7.02m 3<br />

@ Rs. 77.00/m 3 ....................................................... Rs. 541.00<br />

3/187 C<strong>on</strong>structi<strong>on</strong> hand packed st<strong>on</strong>e walls including excavati<strong>on</strong> in foundati<strong>on</strong> and filling<br />

in trenches etc. including supply of st<strong>on</strong>e, labour etc. complete.<br />

i) Foundati<strong>on</strong> - 1x1.80 x 0.60x3.90 = 4.21m 3<br />

ii) S/Structure 1x(0.90+1.50) (6.10+3.90) = 12.00m 3<br />

2 2<br />

TOTAL = 16.21m 3<br />

@Rs.581.10m 3 ................................................................ Rs. 9420.00<br />

GRAND TOTAL = Rs.10,061.00<br />

Say = Rs.10,000.00<br />

(Rupees ten thousand) <strong>on</strong>ly.<br />

DETAILED ESTIMATE FOR THE CONSTRUCTION OF GABIONIC CHECK DAM<br />

(Rates based as per <strong>Mizoram</strong> PWD Schedule of Rates-2000 and prevailing Market rates for<br />

other Items not included in PWD SOR)<br />

ONE UNIT COST - Rs. 25,000.00<br />

1/L.S Site preparati<strong>on</strong>................................................... Rs.300.00<br />

2/27(b) Eartwork in excavati<strong>on</strong> in foundati<strong>on</strong> trenches or<br />

drains including dressing of sides and ramming<br />

of bottom lift upto 1.50m including getting out<br />

excavated soil as directed within a lead of 30m.<br />

Foundati<strong>on</strong> :<br />

1x3.00+5.00 1.80+1.50 - 19.80m 3<br />

2 2<br />

@ Rs. 84.20/m 3 .................................................. Rs. 1667.00<br />

3/PMR Supplying of 12 S : W : G : galvanised wire of<br />

approved brand and manufactures.<br />

Quantity of Galvanised for <strong>on</strong>e block per Layer :-


163<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

(a) 1st Layer :-<br />

Length wise : Nos of lines - (4 0.10) + 1 - 41 lines.<br />

- 41x ( 3.00+0.50+0.50) - 164.00m<br />

Quantity - 164.00 x 3 blocks - 492.00m<br />

Short wise - Nos of lines-(3.00 0.10)+1 - 31 lines<br />

- 31 x 4 - 124.00<br />

Quantity - 124.00x3 blocks - 372.00m<br />

Total (a) - 864.00m.<br />

(b) 2nd Layer :-<br />

Length wise : Nos of lines C<strong>on</strong>stant - 41 lines<br />

- 41 (4.00+0.50+0.50) - 205.00m<br />

Quantity - 205.00 x 2 blocks - 410.00m<br />

Short wise - Nos. of lines - (4.00 0.10)+1 -41 lines<br />

- 41 x 4 - 164.00m<br />

Quantity - 164.00 x 2 blocks - 328.00m<br />

Total (b) - 738.00m<br />

(c) 3rd Layer :-<br />

Length wise : Nos of lines c<strong>on</strong>stant - 41 lines<br />

- 41 (5.00 + 0.50 + 0.50) - 246.00m<br />

Quantity - 245.00 x 1 block - 246.00m<br />

Short wise - Nos.of lines - (5.00 0.10) + 1 - 51 lines<br />

- 51 x 4 - 205.00m<br />

Quantity - 205.00 x 1 block - 205.00m<br />

Total (c) - 451.00m<br />

Total of (a) to (c) - 2053.00m<br />

Add 10% wastage for<br />

knots & dinding - 205.30m<br />

Grand Total - 2258.30m<br />

Weight in quintal - 2256.30m x 65 gm/m<br />

- 1.469 Qtls<br />

@ Rs.3500/Qtls ...................................................... Rs. 4830.00<br />

4/L.S. Weaving of galvanised wire of whole size<br />

10cmx10cm as per design/knots including fitting<br />

and fixing into its proper shape and positi<strong>on</strong>.<br />

................................................................................. Rs. 1800.00<br />

5/188 Filling st<strong>on</strong>e behind walls into woven galvenised<br />

nets by head packed including supply of st<strong>on</strong>es<br />

upto motorable road.<br />

(Size of st<strong>on</strong>e minimum - 15cm, Max.20cm)<br />

1st Layer : 1x3.00x3.00 - 9.00m 2<br />

2nd Layer : 1x4.00x2.00 - 8.00m 2<br />

3rd Layer : 1x5.00x1.00 - 5.00m 2<br />

Total - 22.00x1.00 - 22.00m 3<br />

@ Rs. 616.00/m 3 ............................................ Rs. 13,552.00


164<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

6/PMR Carriage of galvanised wire from motorable road<br />

to worksite by head load for 1.46 qtls.<br />

............................................................................... Rs. 300.00<br />

7/L.S Carriage of st<strong>on</strong>es from motorable road to<br />

worksite by head load for 22.00m.<br />

............................................................................ Rs. 2,5000.00<br />

Total - Rs.24,499.00<br />

Add 3% C<strong>on</strong>tingency ........................................ Rs. 735.00<br />

Grand Total - Rs. 25,234.00<br />

Say - Rs. 25,000.00<br />

(Rupees Twenty five thousand) <strong>on</strong>ly<br />

DETAILED ESTIMATE FOR CONSTRUCTION OF SILT DETENSION STRUCTURE<br />

(Rate Based <strong>on</strong> <strong>Mizoram</strong> PWD Schedule of rate for 1996)<br />

1/DR Sit Preparati<strong>on</strong> including clearing jungle, debris etc.<br />

2 D/Ls @ Rs. 70/- per Daily labour............................... Rs. 140.00<br />

2/8 Earthwork in excavati<strong>on</strong> in foundati<strong>on</strong> trenches<br />

including dressing of sides and ramming of bottom, lift<br />

up to 1.50 m including getting out excavated soil as<br />

directed within a lead of 30 m (b) Hard soil or soil<br />

(mixed with moorun etc.)<br />

E/Work in foundati<strong>on</strong> -<br />

14.60 x 2.00 x 1.50 = 43.80m 3<br />

@ Rs. 30.85 per m 3 ............................................................ Rs. 1,351.00<br />

3/21 Providing and laying cement c<strong>on</strong>crete 1 : 2 : 4 (1<br />

cement : 2 course sand : 4 graded st<strong>on</strong>e aggregate<br />

20mm nominal size) excluding cost of centering and<br />

shuttering (a) Foundati<strong>on</strong> and plinth.<br />

C.C.Base = 14.60 x 1.50 x 0.20 = 4.38m 3<br />

Core Wall = 14.60 x 0.30 x 1.50 = 6.57m 3<br />

Total = 10.95m 3<br />

@ Rs. 2,368.50 per m 3 ....................................................... Rs. 25,935.00<br />

4/6 Earthwork in rough excavati<strong>on</strong> banking excavated earth<br />

in layer not exceeding 20cm in depth, breaking clods,<br />

watering, rolling each layer with 1/2 t<strong>on</strong> roller or<br />

wooden or steel rammers and dressing up in<br />

embankment and lead upto 30m and lift upto 1.50m.<br />

Dam = 14.60 x x 3.50 = 383.25 m 3<br />

@ Rs. 21.10 per m 3 ............................................................ Rs. 8,087.00


165<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

5/8 Earthwork in excavati<strong>on</strong> in foundati<strong>on</strong> trenches or drain<br />

including dressing of sides and ramming of bottom, lift<br />

up to 1.50 m including getting at excavated soil as<br />

directed within lead of 30 m (a) ordinary soil.<br />

Excess Water outlet :-<br />

42.00 x 1.80+3.60x 1.80 (Arg) 204.12 m 3<br />

2<br />

@ Rs.24.20 per m 3 ......................................................... Rs. 4,940.00<br />

Total Rs. 40,453.00<br />

Say Rs. 40,000.00<br />

(Rupees forty thousand) <strong>on</strong>ly


166<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

INFORMATION & PUBLIC RELATIONS<br />

DETAILED SCHEME FOR COMBATTING<br />

BAMBOO FLOWERING AND FAMINE<br />

<strong>Mizoram</strong> has been experiencing bamboo flowering followed by severe famines at<br />

regular interval of 48-50 years. Last time <strong>Mizoram</strong> experienced a very severe famine in 1959<br />

in which many people died. Rats and bats multiplied in thousands and finished rice before<br />

harvest overnight. There was nothing left for the people, and no worthy relief was d<strong>on</strong>e by<br />

the then Assam Government under which <strong>Mizoram</strong> (Mizo District) was a district.<br />

Many people died of starvati<strong>on</strong> which instilled the feeling of neglect and<br />

discriminati<strong>on</strong>. This gave rise to the birth of a new political party, the Mizo Nati<strong>on</strong>al Fr<strong>on</strong>t.<br />

Due to c<strong>on</strong>tinued neglect from the Government the new political party quickly gained ground<br />

and resulted in the declarati<strong>on</strong> of Independence of <strong>Mizoram</strong> from the Republic of India. After<br />

l<strong>on</strong>g 20 years of insurgency, the Mizo Nati<strong>on</strong>al Fr<strong>on</strong>t, under the leadership of Pu Laldenga<br />

came to the negotiating table with the Government of India and the Memorandum of<br />

Settlement or the Mizo Accord was signed <strong>on</strong> 30.6.1986. According to the terms of the<br />

Agreement, <strong>Mizoram</strong> went to the polls in February, 1987 in which the Mizo Nati<strong>on</strong>al Fr<strong>on</strong>t<br />

came out victorious. The First <strong>Mizoram</strong> State Legislative Assembly was formed and<br />

<strong>Mizoram</strong> became a State <strong>on</strong> 20 th February, 1987.<br />

Now, with the status of statehood, <strong>Mizoram</strong> is about to face the coming Mautam<br />

Famine. But the necessary funds for combating the rat and bat menace cannot be incorporated<br />

in the normal <str<strong>on</strong>g>plan</str<strong>on</strong>g> budget of the State. Hence the Central Government is approached to<br />

provide funds for combating the impending famine in <strong>Mizoram</strong> by extending necessary<br />

assistance as per the following schemes worked out in respect of the Department of<br />

Informati<strong>on</strong> & Public Relati<strong>on</strong>s, Government of <strong>Mizoram</strong>, Aizawl so that this time Bamboo<br />

Flowering may not be seen as an omen of death and ag<strong>on</strong>y, but harbinger of prosperity and<br />

benefits for the people.<br />

It will be highly necessary to create awareness am<strong>on</strong>g the public about the coming<br />

famine and how to tackle the problem. Hence Multimedia Publicity Campaigns may be<br />

launched in co-ordinati<strong>on</strong> with the c<strong>on</strong>cerned Departments in all the eight District<br />

Headquarters, Block Headquarters and big towns. For this the Department of Informati<strong>on</strong> &<br />

Public Relati<strong>on</strong>s has to be strengthened in the following ways.<br />

(i) The general public throughout the State have to be educated <strong>on</strong> how to tackle the<br />

impending famine. For this the Department of Informati<strong>on</strong> & Public Relati<strong>on</strong>s has to coordinate<br />

with all the c<strong>on</strong>cerned Department and publish brochures and leaflets to be<br />

distributed to the people to create awareness in the whole State. For publicati<strong>on</strong> of leaflets<br />

and brochures an amount of Rs. 70.00 lakh is required.<br />

(ii) For creating awareness am<strong>on</strong>g the general public, Multi-media Publicity Campaign<br />

comprising of different c<strong>on</strong>cerned Departments under the coordinati<strong>on</strong> of Informati<strong>on</strong> &<br />

Public Relati<strong>on</strong>s Department may be held in all the District Headquarters, Sub-Divisi<strong>on</strong> and<br />

Block Headquarters and big towns in the whole State. For this Rs. 100.00 lakh is required.


167<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

(iii) Documentary Films may be produced and screened in towns and villages to create<br />

awareness am<strong>on</strong>g the people about the famine, rat and bat menace and how to tackle the<br />

problem. For this an amount of Rs. 40.00 lakh @ Rs. 5.00 lakhs per Documentary Film for 8<br />

Districts.<br />

(iv) Wide publicity through advertisements may be made to create awareness not <strong>on</strong>ly<br />

nati<strong>on</strong>al but also internati<strong>on</strong>al. For this an amount of Rs. 50.00 lakh will be required.<br />

(v) To create awareness nati<strong>on</strong>wide and the Central leadership, c<strong>on</strong>ducted tours of media<br />

pers<strong>on</strong>s and Travel Writers from other parts of the country may be organised to visit<br />

<strong>Mizoram</strong> and see for themselves the ground reality <strong>on</strong> the spot and know the steps taken by<br />

the State Government. For this an amount of Rs. 25.00 lakh will be required.<br />

(vi) Taking advantage of the India Internati<strong>on</strong>al Trade Fair to be held in November, 2004<br />

at Pragati Maidan, New Delhi, a Seminar may be organised in the Nati<strong>on</strong>al Capital in the<br />

subject of Bamboo Flowering and combatting the impending famine. For this an amount of<br />

Rs. 15.00 lakh will be required.<br />

Summing up: -<br />

(i) Publicati<strong>on</strong> of leaflets and brochures<br />

(Distributin gratis) - Rs. 70.00 lakh<br />

(ii) Multimedia Publicity <strong>on</strong> Bamboo Flowering and - Rs. 100.00 lakh<br />

how to combat Famine @ Rs. 3.00 lakh per centre etc.<br />

(iii) Producti<strong>on</strong> of Documentary Films in - Rs. 40.00 lakh<br />

8 Districts @ Rs. 5.00 lakh<br />

(iv) Publicity and Internati<strong>on</strong>al advertisements - Rs. 50.00 lakh<br />

(v) Seminar <strong>on</strong> Bamboo Flowering and Famine - Rs. 15.00 lakh<br />

in New Delhi<br />

(vi) C<strong>on</strong>ducted tour of Media pers<strong>on</strong>s and Travel - Rs. 25.00 lakh<br />

Writers to <strong>Mizoram</strong> from other parts of the country<br />

T O T A L - Rs. 300.00 lakh<br />

or Rs. 3.00 crores<br />

( Rupees thirty hundred lakh) <strong>on</strong>ly<br />

Schedule of year-wise implementati<strong>on</strong> :-<br />

2004 - 2005 = 15 % = Rs. 45.00 lakh<br />

2005 - 2006 = 25 % = Rs. 75.00 lakh<br />

2006 - 2007 = 25 % = Rs. 75.00 lakh<br />

2007 - 2008 = 25 % = Rs. 75.00 lakh<br />

2008 - 2009 = 10 % = Rs. 30.00 lakh<br />

T O T A L = Rs. 300.00 lakh


168<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

SOCIAL WELFARE<br />

‘VILLAGE GRAIN BANK SCHEME:<br />

THE GRAIN BANK : (a) ‘The Objectives of the Scheme’ is to provide safeguard against<br />

starvati<strong>on</strong> during the period of natural calamity or during the lean seas<strong>on</strong> when the rural<br />

people do not have purchasing power. Such people in need of food grains will be able to<br />

borrow food grains from Grain Banks within the village till they are able to reply the grains<br />

back to the Grain Banks during the next harvest or after ‘food for work’ is started in the area.<br />

The scheme is applicable in areas which are endemic drought pr<strong>on</strong>e areas having large scale<br />

migrati<strong>on</strong> and Calamity oriented particularly tribal areas. The Grain Banks is meant for BPL<br />

families. This means the focus is kept <strong>on</strong> the needy target group, without spreading it thin.<br />

(b) The executi<strong>on</strong> of the scheme : Grain Bank will be set up based <strong>on</strong> demand. The grain<br />

will be stored in the village itself and will act like a share capital provided by the government<br />

as a ‘<strong>on</strong>e time grant’. The grain bank in each such village will be operated by a Committee<br />

elected am<strong>on</strong>g themselves by the members.<br />

A minimum of 20 BPL families in a village or hamlet or any self help group can<br />

decide to set up Grain Bank in their village and make an applicati<strong>on</strong> to the BDO (in<br />

prescribed proforma). Grain Bank would be run by an elected Village Committee/Self Help<br />

Group. The District collector will then c<strong>on</strong>solidate the proposal for the State and send it to the<br />

Ministry of Tribal Affairs.<br />

The Ministry of Tribal Affairs will then compile the requirement of food grains Statewise<br />

and District-wise and place orders <strong>on</strong> the FCI for supply of the intended food grains.<br />

The FCI will therefore supply the intended food grains to the District Collectors<br />

without insisting <strong>on</strong> payment, but obtain receipts for such supply. The FCI will therefore<br />

submit bills to the Central Government for making direct payment to them.<br />

Once grain bank is sancti<strong>on</strong>ed, the District Collector will inform the BDO c<strong>on</strong>cerned.<br />

The members proposing such grain bank in their Village will have to pass a resoluti<strong>on</strong><br />

accepting the grain bank.<br />

(c) M<strong>on</strong>itoring & Training : Project Officer/District Officer with the help of BDO or<br />

any other Officer/reputed NGO as decided by the State Govt. will m<strong>on</strong>itors and supervise the<br />

progress of functi<strong>on</strong>ing of Tribal Affairs in a format (to be prescribed) would be submitted by<br />

the State Government.<br />

The Training for functi<strong>on</strong>aries is necessary for the proper implementati<strong>on</strong> of the<br />

scheme. There is provisi<strong>on</strong> for the m<strong>on</strong>itoring training comp<strong>on</strong>ents.<br />

(d) C<strong>on</strong>vergence of Other Scheme : Once the Grain Bank start operating and are<br />

found functi<strong>on</strong>ing satisfactorily it can be used as focal point for c<strong>on</strong>versi<strong>on</strong> of all food and<br />

nutriti<strong>on</strong> related schemes of Govt. of India and State Government. It can be used for storage<br />

and distributi<strong>on</strong> of grains etc. to ICDS Scheme for pre-school children and lactating mothers,<br />

mid-day meals etc.


169<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

(e) Funding of the Scheme : The Grain Bank will store maximum two quintals per<br />

member family which will be granted as <strong>on</strong>e time grant by the Government at the BPL rate.<br />

As of today BPL rate of rice is Rs. 5.65 per Kg. and wheat is Rs. 4.10 per kg. Hence BPL rate<br />

grain can be calculated at Rs. 5.00 per kg per member. In additi<strong>on</strong> to this, transportati<strong>on</strong> cost<br />

and other unforeseen expenditure i.e. Rs. 90.00 per quintal for 80 quintal for 40 families for<br />

<strong>on</strong>e grain bank and cost of weights, measures and bin @ Rs. 5,000/- per grain bank may be<br />

kept as cash comp<strong>on</strong>ent.<br />

DETAILS OF ONE UNIT COST OF GRAIN BANK<br />

Sl. No. Particulars Amount in Rupees<br />

1. Cost of 80 quintals of rice @ Rs.10/- per<br />

Kg (i.e.)Rs. 10x8,000kgs.)<br />

Rs. 80,000.00<br />

2. Transportati<strong>on</strong> charges and other<br />

Unforeseen expenses for 80 Quintals at<br />

Rs. 90/- per quintal<br />

Rs. 7,200.00<br />

3. Weights, measure and storage bins Rs. 5,000.00<br />

4. Training Comp<strong>on</strong>ent Rs. 500.00<br />

TOTAL EXPENDITURE Rs. 92,700.00<br />

Less 50% of Transportati<strong>on</strong> charge to be<br />

borne by State Government<br />

Rs. 3,600.00<br />

TOTAL COST REQUIREMENT Rs.89,100x224 villages<br />

= Rs. 2.00 crores<br />

Phasing of the Scheme will be as below :<br />

2004-05 Rs. 0.30 crores<br />

2005-06 Rs. 0.40 crores<br />

2006-07 Rs. 0.50 crores<br />

2007-08 Rs. 0.50 crores<br />

2008-09 Rs. 0.30 crores<br />

TOTAL Rs. 2.00 crores<br />

Acti<strong>on</strong> Plan of the Social Welfare Department<br />

1. Mechanism : C<strong>on</strong>sidering the mechanism set up of the ICDS under the Social Welfare<br />

Department, it is found preferable to entrust CDPO at the Block Level due to the following<br />

c<strong>on</strong>veniences :-<br />

(a) A little improvement of the existing storage facilities of Anganwadi Centres of<br />

each village will be able to provide enough space for the storage of grains.<br />

(Fund available for the c<strong>on</strong>structi<strong>on</strong> of storage is <strong>on</strong>ly Rs. 5,000/- per Grain<br />

Bank).


170<br />

BAMBOO FLOWERING AND FAMINE COMBAT SCHEME (BAFFACOS)<br />

(b) Co-ordinati<strong>on</strong> Committee of the Anganwadi Centres could be designated as<br />

the Village Level Committee.<br />

(c) The identificati<strong>on</strong> of Village, m<strong>on</strong>itoring and supervisi<strong>on</strong> of grain banks will<br />

be carried out by the CDPO through Circle Officers.<br />

(d) Having in mind the c<strong>on</strong>vergence of the scheme, it is found suitable to have the<br />

Grain Bank attached to Anganwadi Centre.<br />

It is therefore proposed to fit in the Grain Bank scheme within the ICDS mechanism<br />

for the reas<strong>on</strong>s given above.<br />

II. It is suggested that a discussi<strong>on</strong> <strong>on</strong> the ‘Grain Bank Scheme’ be kindly arranged under<br />

the Chairmanship of the Chief Secretary, <strong>Mizoram</strong> where Development Commissi<strong>on</strong>er,<br />

Commissi<strong>on</strong>er of RD, Secretary of Food & Civil Supplies Dept, Secretary, Social Welfare<br />

Department, All Deputy Commissi<strong>on</strong>ers and Planning Adviser will participate to work out<br />

detailed modalities.<br />

1<br />

The Scheme, Grain Bank is an existence scheme with the Ministry of Tribal Affairs,<br />

Government of India. However, the scheme will fall within the BAFFACO’s operati<strong>on</strong>.


Sl.<br />

No.<br />

The <str<strong>on</strong>g>Comprehensive</str<strong>on</strong>g> Acti<strong>on</strong> Plan c<strong>on</strong>sists of the following schemes<br />

Name of Scheme<br />

Estimated<br />

cost<br />

Phasing of Expenditure<br />

2004-05 2005-06 2006-07 2007-08 2008-09<br />

1 2 3 4 5 6 7 8<br />

1 Food & Civil Supplies 18000.00 2700.00 4500.00 4500.00 3600.00 2700.00<br />

2 Agriculture 8000.00 1189.12 1599.33 2011.36 2011.36 1188.82<br />

3 Industries 6000.00 799.55 2072.50 1993.80 1027.70 106.45<br />

4 Rural Development 4983.00 747.60 996.60 1245.60 1245.60 747.60<br />

5 Horticulture 5325.00 1950.00 1530.00 795.00 525.00 525.00<br />

6 A.H. & Vety. 4000.00 599.89 799.85 999.82 999.82 599.89<br />

7 Envir<strong>on</strong>ment & Forest<br />

(Incl. maintenance cost<br />

upto 2012-13 amounting<br />

to Rs.468.46 lakh)<br />

3756.83 333.30 853.97 867.97 664.58 568.55<br />

8 Fishery 2000.00 300.00 400.00 500.00 500.00 300.00<br />

9 Health & Family<br />

Welfare<br />

1561.00 234.15 312.20 390.25 390.25 234.15<br />

10 Land Revenue 800.00 120.00 160.00 200.00 200.00 120.00<br />

11 Sericulture 1128.98 153.12 266.18 298.03 256.53 155.12<br />

12 Soil & Water<br />

C<strong>on</strong>servati<strong>on</strong><br />

600.00 89.65 120.00 148.95 148.95 92.45<br />

13 Informati<strong>on</strong> & Public<br />

Relati<strong>on</strong>s<br />

300.00 45.00 75.00 75.00 75.00 30.00<br />

14 Social Welfare (Grain<br />

Bank)<br />

200.00 30.00 40.00 50.00 50.00 30.00<br />

GRAND TOTAL - 56654.81 9291.38 13725.63 14075.78 11694.79 7398.03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!