- 1 - APPROVED ANNUAL PLAN 2006-2007 - Mizoram
- 1 - APPROVED ANNUAL PLAN 2006-2007 - Mizoram
- 1 - APPROVED ANNUAL PLAN 2006-2007 - Mizoram
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
INTRODUCTION:<br />
- 1 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
CROP HUSBANDRY (AGRICULTURE)<br />
The Annual Plan <strong>2006</strong> - <strong>2007</strong> is prepared by keeping the policy of increased food<br />
production in view but within the limitation of fund constraints.<br />
Under Crop Husbandry priorities are land development, construction of rural market<br />
linkage, replacement of local seeds such as, paddy, pulses, oilseeds etc. with high yielding<br />
varieties. Farm Mechanization is given due importance for increased crop production. The<br />
other schemes are in line with the major schemes, supporting each other.<br />
Watershed Development Projects in Shifting Cultivation Area (WDPSCA) under a<br />
special Central assistance to State Plan Fund Programme for the benefit of the jhumias<br />
families being implemented in the 42 nos. of micro watershed projects during 10 th Plan<br />
period with a total target area of 20,000 Ha. During this financial year, it is targeted to treat<br />
5,500 Ha.<br />
The Government of <strong>Mizoram</strong> have launched a special Scheme known as <strong>Mizoram</strong><br />
Intodelhna Programme (MIP) during 2002-2003. The programme will be continued during<br />
<strong>2006</strong> - <strong>2007</strong> with an outlay of Rs. 2,000.00 lakh.<br />
The Oil Palm Development Programme under ISOPOM will be implemented in<br />
<strong>Mizoram</strong> as CSS on 75:25 sharing basis between Government of India & Government of<br />
<strong>Mizoram</strong> except for the component of drip irrigation where entire cost on drip irrigation in<br />
Oil palm Plantation would be met by the Government of India including training component.<br />
The scheme is expected to generate a self sustain economy with the help of Central<br />
Government. The scheme will be a development model for <strong>Mizoram</strong> State.<br />
Famine visits <strong>Mizoram</strong> at regular intervals during the flowering of Melocanna<br />
baccifera and Bambusa tulda. The occurrence of the past famines is due to the outbreak of<br />
rats, thereby causing a famine in the state. Thus, the Government of <strong>Mizoram</strong> has<br />
formulated a comprehensive programme of Bamboo Flowering and Famine Combat Scheme<br />
(BAFFACOS). This programme would be implemented through Rodent Control Programmes,<br />
adoption of alternative and diversified cropping system, establishment of processing unit at<br />
village level and rural market connectivity.<br />
The total approved outlay for the Annual Plan <strong>2006</strong>-07 is Rs. 3,300.00 lakh for Crop<br />
Husbandry including the new programme of <strong>Mizoram</strong> Intodelhna Programme (of which<br />
Rs.1,000.00 lakh under State Plan fund, Rs. 500.00 lakh NABARD loan for cold storage and<br />
Rs. 500.00 lakh under Additional Central Assistance) and Rs 200.00 lakh under Bamboo<br />
Flowering and Famine Combat Scheme (BAFFACOS).
- 2 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 298.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 276.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />
SCHEME NO. 1<br />
In order to create infrastructures at Districts, Sub-Divisions and Circle level, it is<br />
proposed to construct 4 (four) nos. of Departmental buildings (DAO's Office (Saiha) - 1 no.,<br />
AEO Quarter-cum-Office at Hnahlan - 1 nos.) and Soil Testing Laboratory at Lunglei and<br />
maintenance of existing buildings/ Rest Houses etc..<br />
A. DIRECTION<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
Salary of Officers & Staff No. 11 15.00<br />
T.E. No. LS 3.00<br />
Maintenance of existing buildings No. 20 10.00<br />
Maintenance of heavy vehicles No. 6 10.00<br />
Office Expenses No. LS 15.00<br />
Repair and maintenance of light vehicles and<br />
purchase of parts, POL, etc.<br />
No. 17 15.00<br />
Sub-Total 68.00<br />
B. ADMINISTRATION<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
1. Salary of Officers & Staff at District and Sub-<br />
Division<br />
No. 59 82.00<br />
2. T.E. No. L.S 25.00<br />
3. Wages No. 38 22.00<br />
4. Office Expenses No. LS 20.00<br />
5. Repairing & maintenance of light vehicles No. 17 20.00<br />
6.<br />
7.<br />
Maintenance of existing Staff Quarters/Rest<br />
House in the Districts<br />
Construction of Deptt. Buildings :<br />
a) DAO’s Office, Saiha for completion<br />
b) Soil testing laboratory at Lunglei<br />
c) AEO Office cum Quarter at Hnahlan<br />
d) AEO Office-cum-Quarters at Bairabi<br />
No.<br />
No.<br />
No.<br />
No.<br />
No.<br />
27<br />
21.00<br />
30.00<br />
4.00<br />
3.00<br />
3.00<br />
Sub-Total : 230.00<br />
Total : 298.00
- 3 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : FOODGRAIN DEVELOPMENT<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> – <strong>2007</strong> : Rs. 175.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs 136.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />
SCHEME NO. 2<br />
Land Development for WRC by hiring private Bulldozers and potential area<br />
connectivity are the major item of the work under this scheme. while maintenance of<br />
existing Agril link road is also given importance along with distribution of high yielding<br />
Certified Seeds in order to replace low yielding local varieties of seeds.<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Target<br />
(Rs. In lakh)<br />
Financial<br />
Outlay<br />
1. Salary of Officers & Staff No. 112 19.00<br />
2. T.E No. LS 2.00<br />
3. a) Land Development for WRC by Machineries Ha. 50 25.00<br />
b) Maintenance of existing Agril. link road Km LS 27.00<br />
4. Potential area connectivity Km 25 75.00<br />
5.<br />
Repairing & maintenance of :-<br />
a) Bulldozer<br />
b) Tractor<br />
c) Power Tiller<br />
No.<br />
No.<br />
No.<br />
5<br />
20<br />
10<br />
10.00<br />
6. Purchase & distribution of seeds, HDPE pipe<br />
including transportation charge<br />
Qtl. LS 15.00<br />
7. Baseline Survey No. 8 2.00<br />
Total 175.00<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : MANURES & FERTILIZERS<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 11.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 22.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />
SCHEME NO. 3<br />
Under the scheme, thrust will be given towards the promotion of organic manures,<br />
green manure crops and bio-fertilizers to encourage the farmers to take up organic farming.<br />
The Bio-fertilizer Production Unit which was established at Sihphir will be maintained along<br />
with the Static Soil and Seed Testing Laboratories.
- 4 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
A. MANURES & FERTILIZES:<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
1. Maintenance of Bio-fertilizer production unit. No. 1 2.00<br />
2. Purchase of Neem cake, other organic manures<br />
& Green manure seeds<br />
MT. 5 MT 2.00<br />
Sub-Total : 4.00<br />
B. SOIL AND SEED TESTING LABORATORY:<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
1. Operational cost and maintenance of<br />
Laboratories.<br />
No. 3<br />
4.50<br />
2. Office expenditure & other contingencies No. LS 2.50<br />
Sub-Total : 7.00<br />
Total : 11.00<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : <strong>PLAN</strong>T PROTECTION<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 10.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 8.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />
SCHEME NO. 4<br />
<strong>Mizoram</strong> receives high rainfall during Monsoon, humid climate results in outbreak of<br />
insect pests and diseases and excessive weeds problems. To meet the requirement of the<br />
farmers various insecticides and Plant Protection equipments is proposed to procure for<br />
50% subsidy sale and for maintenance to IPM Laboratory at Neihbawi Farm.<br />
Sl.<br />
No.<br />
Items Unit<br />
1. PP chemicals for distribution to the farmers at<br />
50 % subsidy<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
M.T LS 7.00<br />
2. Operational cost of IPM Laboratory No. 1 2.00<br />
3. Maintenance of IPM Laboratory building No. 1 1.00<br />
Total : 10.00
- 5 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : COMMERCIAL CROP DEVELOPMENT<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 13.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs 9.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />
SCHEME NO. 5<br />
The commercial crop grown in the state is sugarcane crops, of which many farmers<br />
cultivate and prepared Jaggery (Gur) and sold in the local market to support their livelihood.<br />
In order to alleviate the economic status of the farmers, the cultivation of sugarcane will be<br />
taken up. This programme will be achieved through distribution of High sucrose content<br />
quality planting materials.<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
1. Sugar cane development Sett 8,00,000 8.00<br />
2. Transportation charges of Agril. Inputs and<br />
seeds<br />
LS LS 5.00<br />
Sub Total 13.00<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : EXTENSION & FARMERS TRAINING<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 4.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 3.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />
SCHEME NO. 6<br />
This scheme is to impart knowledge and skill to the farmers through Agril. Extension<br />
for which print media are the most important tools and therefore, priority will be given for<br />
publications of Zoram Loneitu and other printed materials.<br />
Sl.<br />
No.<br />
1.<br />
Items Units<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
Agril. Information -<br />
a) Publication of Periodicals such as Zoram<br />
Loneitu, Loneitu Kantu, Agril. News letters etc. No. LS 2.00<br />
b) Operational cost of Video Production Unit No. 1 1.00<br />
c) 10% State Matching Share 1.00<br />
Total 4.00
- 6 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : AGRIL. MACHINERIES & IMPLEMENTS<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 10.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 26.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />
SCHEME NO. 7<br />
For promotion of mechanization of farming, a Subsidy of Rs 60,000/- is offered to<br />
the needy farmers for purchase of Power Tiller. Small farm tools and implements will also<br />
be procured for 50 % subsidy sale.<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Unit<br />
1. Subsidy for purchase of Power Tiller @ 50%<br />
subject to the limit of Rs. 60,000/-per power<br />
tiller (Rs. 30,000/- State and Rs. 30,000/-CSS)<br />
2. Small tools and implements for sale @ 50%<br />
subsidy.<br />
Physical<br />
Target<br />
Financial<br />
Outlay<br />
No. 30 9.00<br />
No. LS 1.00<br />
Total 10.00<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : STATE SOIL SURVEY ORGANISATION<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> – <strong>2007</strong> : Rs. 29.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 28.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />
SCHEME NO. 8<br />
Soils are our most precious natural resource. As such, knowledge of soils in respect<br />
of their extent, distribution, characteristics and potential use is extremely important for<br />
optimizing land use. Areas to be put under intensive use and management or other priority<br />
areas call for Detail or High Intensity Survey for accurate and sound planning, to prevent<br />
further deterioration and to avoid risk of failure. As such a Detailed Soil Survey of potential<br />
areas for Agriculture, Horticulture etc. is imperative and it is proposed to conduct detail<br />
survey of potential areas.<br />
The assistance for the functioning of the State Land Use Board (SLUB) will be<br />
continue in order to achieve the above objective.<br />
(Rs. In lakh)<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Target<br />
Financial<br />
Outlay<br />
1. Salary/TE of Officers & Staff, JD(LUB)-1, (ASSO-3,<br />
UDC-2, LDC-4,Investigator-1, Driver II-2, Tracer-<br />
1, OSA-I, Steno-1, IV Grade-3), Assistant-1<br />
No. 20 27.00<br />
2. T.E. No. LS 1.00<br />
3. Office Expenses - LS 1.00<br />
Total 29.00<br />
Total of Un-Earmarked Schemes 550.00
- 7 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : CONTROL OF SHIFTING CULTIVATION<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs 550.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 550.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />
SCHEME NO. 9<br />
During the 10 th Five Year Plan 42 projects under WDPSCA that is Control of Shifting<br />
Cultivation have been identified with the total area of 20,000 ha. During <strong>2006</strong>-<strong>2007</strong>, it is<br />
proposed to treat 5,500 ha. of land under the projects with the following components with<br />
an objective of Control of Shifting Cultivation in the watersheds.<br />
(Rs. in lakh)<br />
Sl.<br />
No<br />
Components Unit<br />
Physical<br />
Outlay<br />
Financial<br />
Outlay<br />
1. Management Component<br />
1.1 Administrative costa)<br />
Salary of project functionaries, Office<br />
expenses etc.<br />
LS LS 25.00<br />
b) Maintenance of vehicle LS LS 20.00<br />
1.2 Training programme<br />
a) Training of PIAs, UGs, SHGs. and Farmers. No 30 10.00<br />
b) Publication of leaflets, Manual etc. LS LS 5.00<br />
c) Purchase of Training Equipment LS LS 5.00<br />
2 Development component<br />
a) Land Development for terraces, WRC etc.for<br />
settlement of jhumias families.<br />
Ha 320 160.00<br />
b) Project area connectivity Km 20 62.00<br />
c) Drainage line treatment<br />
Treatment of upper, middle and lower reaches<br />
construction of Gabion structures<br />
No. 300 18.00<br />
d) Rain Water harvesting structure- Individual<br />
and Community<br />
No 214 74.00<br />
e) Purchase of different agril. inputs like, seeds,<br />
PP chemicals, fertilizers , Manures and HDPE<br />
pipes etc.<br />
LS LS 110.00<br />
f) Crop diversification like cultivation of<br />
Medicinal and Aromatic plants, as an alternative<br />
to jhuming.<br />
Ha 200 24.00<br />
g) Transportation charge of Agril. Inputs etc. LS LS 10.00<br />
h)Seed money for Self Help Group under the<br />
project.<br />
Nos 42 10.00<br />
i)Innovative management practices of Integrated<br />
Nutrient Managements<br />
Ha 1000 17.00<br />
Total 550.00
- 8 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. 10<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : MIZORAM INTODELHNA PROGRAMME (M.I.P.)<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 2,000.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 2,000.00 lakh<br />
PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />
The main purpose of this project if upliftment of the rural poor especially the<br />
shifting cultivators. Its main concern is attainment of self-sufficiency, food security and<br />
better livelihood for the cultivators.<br />
This programme will minimise the undesirable consequences of Shifting Cultivation<br />
such as destruction of forests, removal of top soils, landslides and degradation of land. The<br />
farmers will be assigned to adopt a more profitable, sustainable, permanent system of<br />
farming through Agro-horticulture and Soil Conservation.<br />
Oil Palm Development in this Scheme will be implemented in <strong>Mizoram</strong> as CSS on<br />
75:25 sharing basis between Government of India and Government of <strong>Mizoram</strong> State except<br />
for the component of drip irrigation where entire cost on drip irrigation in Oil Palm<br />
Plantation would be made by the Government of India including training component. The<br />
scheme is expected to generate a self sustain economy with the help of Central Government.<br />
The scheme will be a development model for <strong>Mizoram</strong> State.<br />
The development of Aromatic plant - Patchouli, Biofuel - Jatropha, Passion fruits and<br />
Grape cultivation are proposed to be included in the on-going programmes of MIP during<br />
<strong>2006</strong>-<strong>2007</strong>. The farmers are introduced into contract farming where assured market is<br />
available for the produces from these selected crops.<br />
Land development by machineries is proposed to promote Agriculture Production<br />
through on-farm land development and terraces. The Agriculture production component<br />
has been designed to provide support necessary for farmers to make the best use of land<br />
available to them under various eco-system.<br />
Marketing of any farm produce at a reasonable prices is an important criteria. It is a<br />
very important to strengthen the marketing facilities/infrastructures. It is proposed to<br />
construct one unit multi-purpose Cold Storage at Vairengte having a capacity of 3500 MT for<br />
storing the perishable farm produces.<br />
A. Normal Central Assistance (NCA) :<br />
Sl.<br />
No.<br />
Items/Particulars Unit<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlays<br />
1. State matching share for Oil Palm Development<br />
Programme under ISOPOM<br />
Ha. 3,500 190.00<br />
2. Management Component :<br />
a) Project Management<br />
L.S. L.S. 50.00<br />
3. Purchase of inputs, viz., G.I. Wires, PVC Pipes,<br />
Organic Manures, Biopesticides, Sprayers, etc.<br />
L.S. L.S. 30.00
Sl.<br />
No.<br />
4.<br />
- 9 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Items/Particulars Unit<br />
Agriculture Activities :<br />
a) Development of Aromatic Plant – Patchouli<br />
Cultivation @ Rs.20,000/- per Ha.<br />
b) Development of Bio-fuel – Jatropha<br />
Cultivation @ Rs.12,000/- per Ha.<br />
c) Assistance to Red Oil Palm Cultivators land<br />
preparation, seedlings, other inputs, etc. @<br />
Rs.15,000/- per Ha.<br />
d) Assistance to Passion Fruits Cultivators for<br />
land preparation, seedlings, other inputs,<br />
etc. @ Rs.15,000/- per Ha.<br />
e) Assistance to Grape Cultivators for land<br />
preparation, seedlings, other inputs, etc. @<br />
Rs.15,000/- per Ha.<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlays<br />
Ha. 500 100.00<br />
Ha. 1,500 180.00<br />
Ha. 1,500 225.00<br />
Ha. 800 120.00<br />
Ha. 700 105.00<br />
TOTAL 1,000.00<br />
B. Additional Central Assistance (One Time Grant) :<br />
(Rupees in lakh)<br />
Sl.<br />
No.<br />
Items/Particulars Unit<br />
Physical<br />
Target<br />
Financial<br />
Outlays<br />
1. Construction of Connectivity/Link Road :<br />
a) Potential Area Connectivity @ Rs.3,00,000/per<br />
Km.<br />
Km. 35 105.00<br />
b) Oil Palm Dev. @ Rs.3,00,000/- per Km. Km. 40 120.00<br />
b) Jatropha Dev. @ Rs. 3,00,000/- per Km. Km. 40 120.00<br />
2. Land Development by Machineries :<br />
a) 5 – 8% Slopes @ Rs.40,820/- per Ha.<br />
Ha. 100 40.82<br />
b) 8 – 10% Slopes @ Rs.50,804/- per Ha. Ha. 100 50.80<br />
c) 10 – 15% Slopes @ Rs.59,000/- per Ha. Ha. 100 59.00<br />
3. Purchase of inputs – Organic Manures,<br />
Biopesticides, Sprayers, PVC Pipes, etc.<br />
L.S. L.S. 4.38<br />
C. NABARD LOAN :<br />
TOTAL 500.00<br />
Sl.<br />
No.<br />
Items/Particulars Unit<br />
1. Construction of Multipurpose Cold Storage at<br />
Vairengte :<br />
a) Capacity – 3500 MT<br />
b) Estimate Cost – Rs. 575.00 lakh<br />
c) Promoter Contibution – Rs. 75.00 lakh<br />
No.<br />
Physical<br />
Target<br />
1<br />
(Rupees in lakh)<br />
Financial<br />
Outlays<br />
500.00<br />
TOTAL 500.00
- 10 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. 11<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : BAMBOO FLOWERING & FAMINE COMBAT SCHEME<br />
(EARMARKED)<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs 200.00 lakh<br />
2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 240.00 lakh<br />
PHYSICAL AND FINANCIAL TARGET DURING <strong>2006</strong>-<strong>2007</strong><br />
Famine visit <strong>Mizoram</strong> at regular intervals during the flowering of Melocanna<br />
baccifera and Bambusa tulda. The occurrence of the past famines is due to the outbreak of<br />
rats, thereby causing a famine in the state. Thus, the government of <strong>Mizoram</strong> has<br />
formulated a comprehensive programme of Bamboo flowering and Famine Combat Scheme<br />
(BAFFACOS), with an aim to reduce poverty among farmers during famine period.<br />
This programme would be achieved through Rodent Control, cultivation of early<br />
maturing variety of rice in jhum, and construction of rural market connectivity .<br />
Sl.<br />
No.<br />
PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong><br />
Items Units<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
1. Promotion of Rodent Control Measures :<br />
1.1 Survey of sporadic bamboo flowering areas No. 24 2.40<br />
1.2 Survey of rodent surveillance at State and Sub-<br />
Divisional and Agril. Circle level<br />
No. 2,544 12.70<br />
1.3 Rodent pest management :<br />
a) Incentive for local rat traps @ Rs 100/<br />
Ha./50 nos.<br />
Ha. 5,900 5.90<br />
c) Purchase of pesticides & Rodenticides Ha. 20,000 26.00<br />
1.4 Publicity — awareness campaign and<br />
documentation etc.<br />
No. 30 10.00<br />
Sub-Total 57.00<br />
2. Incentive for cultivation of early maturing rice<br />
in jhum areas @ Rs 250/- per ha.<br />
Ha. 40,000 100.00<br />
3. Construction of rural market connectivity Km. 20 43.00<br />
Sub Total 143.00<br />
Grand Total 200.00
- 11 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
AGRICULTURE RESEARCH & EDUCATION<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : DIRECTION<br />
1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-<strong>2007</strong> :<br />
2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : NIL<br />
SCHEME NO. 1<br />
Directorate of Agriculture was bifurcated into two Directorates, i.e. Directorate of<br />
Agriculture Crop Husbandry and Minor Irrigation and Directorate of Agriculture (Research &<br />
Education). It is proposed to maintenance the Directorate during <strong>2006</strong>-<strong>2007</strong>.<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Units<br />
Physical<br />
Target<br />
Financial<br />
Outlay<br />
1. Contingency No. L.S 5.00<br />
2. Maintenance of Building No. L.S. 2.50<br />
TOTAL 7.50<br />
SCHEME NO. 2<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : AGRIL. FARM & QUALITY SEED PRODUCTION<br />
1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-<strong>2007</strong> : Rs. 15.00 lakh<br />
2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 10.00 lakh<br />
Department has established 3 nos. of Departmental farms at Thingdawl, Chemphai<br />
and Rotlang for production of seed and demonstration purposes. It is proposed to maintain<br />
above farms for production of certified seeds and demonstration of new farming system.<br />
Sl.<br />
No.<br />
Items Units<br />
1. Operation cost and maintenance of existing<br />
departmental farms.<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
No. 3 15.00<br />
TOTAL 15.00<br />
HEAD OF DEVELOPMENT : RESEARCH & EDUCATION<br />
NAME OF THE SCHEME : INTEGRATED TRAINING CENTRE<br />
1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong> – <strong>2007</strong> : Rs. 7.50 lakh<br />
2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 4.50 lakh<br />
SCHEME NO. 3<br />
One Integrated Training Centre has been established during 1980 for conducting<br />
Basic Agriculture Training to in-service Gramsevaks, AAI and demonstrator of Agriculture,<br />
Horticulture and Rural Development Department. Beside this, 25 fresh students have been
- 12 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
admitted during 2005-<strong>2006</strong> for Pre-Service Agriculture training for 2 year course period. Pre-<br />
Service Basic Agriculture trainees will be provided Rs. 1000/- per month stipend and<br />
Rs.1000/- per year as book grand. Total fund requirement for functioning of ITC will be<br />
Rs.7.50 lakh as per following.<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Units<br />
Physical<br />
Target<br />
Financial<br />
Outlay<br />
1. Contingencies L.S. 1.00<br />
2. Repair of buildings (Staff qtrs. – 1, Hostel – 2,<br />
Auditorium – 1, Class room – 1, Principal qtrs. –<br />
1, Office – 1, Staff lodge – 1, Canteen – 1)<br />
No. 14 2.75<br />
3. Purchase of furniture and books for Library L.S 0.25<br />
4. Stipend to pre-basic and book grand No. 25 2.75<br />
5. Demonstration unit for trainees L.S. - 0.75<br />
Total 25 7.50<br />
HEAD OF DEVELOPMENT : RESEARCH & EDUCATION<br />
NAME OF THE SCHEME : EXTENSION AND FARMERS TRAINING<br />
1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong> – <strong>2007</strong> : Rs. 5.00 lakh<br />
2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 0.50 lakh<br />
SCHEME NO. 4<br />
ICAR, Government of India has sanctioned for establishment of 5 new KVK at<br />
Champhai, Serchhip, Lawngtlai, Saiha and Mamit District in addition to KVK at Kolasib and<br />
Hnahthial. As per the MoU signed by the Government of <strong>Mizoram</strong> and ICAR state<br />
Government has to provide Basic infrastructure like land, road (Internal Road and<br />
connectivity from main Road to KVK Complex), Water, Electricity, Communication, Sewer<br />
and other appropriate facilities. It is proposed to provide these basic facilities during <strong>2006</strong>-<br />
<strong>2007</strong> as state share.<br />
Sl.<br />
No.<br />
Items Units<br />
1. Electricity connection, Telephone connection,<br />
Development of drain for Sewer of complex and<br />
connectivity at 5 KVK sites at Saiha, Lawngtlai,<br />
Serchhip, Mamit and Khawzawl<br />
Physical<br />
Target<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
No L.S 5.00<br />
Total 5.00
- 13 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2415 – AGRIL. RESEARCH & EDUCATION<br />
HEAD OF DEVELOPMENT : AGRIL. RESEARCH & EDUCATION<br />
NAME OF THE SCHEME : RESEARCH<br />
1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07 : Rs. 7.00 lakh<br />
2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 7.00 lakh<br />
Sl.<br />
No.<br />
1.<br />
1.<br />
Items Units<br />
Physical<br />
Target<br />
SCHEME NO. 5<br />
(Rs. in lakh)<br />
Financial<br />
Outlay<br />
RESEARCH<br />
Research work on sustainable farming system in<br />
different elevations<br />
- L.S.<br />
3.00<br />
SUB-TOTAL 3.00<br />
EDUCATION<br />
Stipend, Book grant for B.Sc.(Agri.) students /<br />
Pre-service trainees<br />
L.S.<br />
4.00<br />
SUB-TOTAL 8.00<br />
TOTAL 43.00<br />
GRAND TOTAL 43.00
- 21 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HORTICULTURE<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />
SCHEME NO. I<br />
The Department of Horticulture is functioning with 1 (one) Directorate, 8(eight)<br />
Divisions, 3(three) Sub-Divisions and 37 (thirty seven) Circles. A post of Director, 2(two)<br />
posts of Joint Director, 6 (six) posts of Deputy Director, 5(five) posts of Divisional Officers<br />
with supporting Officers and Staff will be maintained during the year.<br />
Sl.<br />
No.<br />
DHOs quarters at Serchhip is approved to be constructed during the year.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> = Rs. 245.50 lakh<br />
<strong>APPROVED</strong> OUTLAY DURING 2005-<strong>2006</strong> = Rs. 273.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
A. DIRECTION<br />
1. Salary/T.E. of Officers and Staff. No. 30 43.00<br />
2. Wages No. 20 6.00<br />
3. Maintenance of existing buildings No. 1 2.00<br />
4. Maintenance of Vehicles including POL<br />
(a) Heavy (Truck/Tractor/ Bulldozer) No. 1 2.00<br />
(b) Light No. 2 3.00<br />
5. Office Stationery No. 30 5.00<br />
TOTAL OF ‘A’ : 61.00<br />
Sl.<br />
No.<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
B. ADMINISTRATION<br />
1. Salary/T.E. of Officers and Staff No. 84 135.00<br />
2. Wages No. 57 12.00<br />
3. Maintenance of existing buildings at Divisions, No. 10 5.00<br />
Sub-Divisions and Circles.<br />
4. (a) Construction of DHO Quarter at Serchhip No. 1 5.00<br />
5. Maintenance of Vehicles including POL<br />
(a) Light No. 11 14.50<br />
6. Office Stationery. No. - 13.00<br />
TOTAL OF ‘B’ : 184.50<br />
CAPITAL : 5.00<br />
REVENUE : 240.50<br />
G. TOTAL : 245.50
- 22 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. II<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : HORTICULTURE FARM AND SEED PRODUCTION<br />
Maintenance of Departmental farms at Tuitlawk, Rihte, Champhai, Khanpui,<br />
Vairengte, Thingdawl & Zawlnuam will be continued during <strong>2006</strong>-<strong>2007</strong>. Stress will be given<br />
on raising of seeds and seedlings in the Departmental farms. Improved varieties of seeds<br />
and seedlings are intended to be produced through vegetative propagation like budding,<br />
grafting, layering etc. Demonstration and trials of different crops will also be taken up in<br />
the farms.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 2.80 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 11.00 lakh<br />
( Rs. in lakh)<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1.<br />
SEED PRODUCTION<br />
Field contingencies for raising of seedlings etc.<br />
and normal maintenance of farms<br />
No. 7 2.50<br />
2. Office stationeries No. 7 0.30<br />
TOTAL : 2.80<br />
CAPITAL : -<br />
REVENUE : 2.80<br />
G. TOTAL : 2.80<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : MANURES AND FERTILIZERS<br />
SCHEME NO. III<br />
Organic and Bio-fertilizers including soil amendment materials as well as Micronutrients<br />
and plant hormones etc. will be made available to the farmers at subsidized rate<br />
during the year. Transportation of these materials will be arranged by the Department upto<br />
Horticulture Division Headquarters.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> - Rs. 1.20 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005 - <strong>2006</strong> - Rs. 5.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Purchase of organic manures and soil<br />
amendments and plant nutrients etc. for<br />
distribution at 50% subsidy. Ton. 10 1.00<br />
2. Transportation and handling charges Ton. 10 0.20<br />
TOTAL : 1.20<br />
CAPITAL : 1.00<br />
REVENUE : 0.20<br />
G. TOTAL : 1.20
- 23 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : <strong>PLAN</strong>T PROTECTION<br />
SCHEME NO. IV<br />
Incedence of pests and diseases reduce production drastically thus reducing the<br />
income of the farmers. To combat the problem of pests and diseases on Horticulture crops,<br />
the Department proposes to distribute the required plant protection materials to the<br />
farmers at 50% subsidy.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 1.70 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 6.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. P.P.Measures for distribution at 50% subsidy. Litre 200 1.00<br />
2. Maintenance of Plant Health Clinic No. 1 0.50<br />
3. Transportation and handling charges Litre 200 0.20<br />
TOTAL : 1.70<br />
CAPITAL : 1.00<br />
REVENUE : 0.70<br />
G. TOTAL : 1.70<br />
SCHEME NO. V<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : EXTENSION AND FARMERS TRAINING<br />
For effective and efficient extension services, it is necessary to provide traning to<br />
farmers and exchange programme within the state, arrange exhibitions and seminars at<br />
Division level. Publication and subscription of papers, booklets, magazine including ‘HUAN<br />
ENKAWLTU’ will be continued.<br />
Demonstration of newly developed tools and implements, seeds, recent agrotechniques<br />
materials will be taken up to update the farmers on the recent developments.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 10.50 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 23.00 lakh<br />
( Rs. in lakh)<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
HORTICULTURE INFORMATION<br />
1. Exhibition/Seminar at state level. No. 2 3.00<br />
2. Publication of magazine. No. 25,000 3.00<br />
3. Purchase/Subscription of books, journals, diaries etc. No. 1,000 1.50<br />
4. Office expenses including advertisement, IT etc. LS 3.00<br />
TOTAL : 10.50<br />
CAPITAL : -<br />
REVENUE : 10.50<br />
GRAND TOTAL : 10.50
- 24 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
HEAD OF THE SCHEME : HORTICULTURE ENGINEERING<br />
SCHEME NO. VI<br />
By use of improved tools and implements, farmers could minimize their working<br />
time and improve efficiency in their works. Therefore, provision of different Horticultural<br />
tools and implements at 50% subsidy to the poor farmers will be continued during <strong>2006</strong>–07.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 2.50 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 6.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Horticulture tools and implements for No. 400 2.00<br />
distribution at 50% subsidy<br />
2. Miscellaneous expenses and Transportation charge No. 400 0.50<br />
TOTAL : 2.50<br />
CAPITAL : 2.00<br />
REVENUE : 0.50<br />
G. TOTAL : 2.50<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE<br />
DEVELOPMENT<br />
SCHEME NO. VII<br />
A. FRUIT DEVELOPMENT:<br />
The geo-climatic condition of <strong>Mizoram</strong> favours. the growth of various fruit crops.<br />
The department of Horticulture will take up emphasis expansion of area under Assam<br />
Lemon only during the year.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 1.20 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 16.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Area Expansion Scheme on fruit crops<br />
a) Assam Lemon Ha. 10 1.00<br />
2. Transportation charges etc. Qtl. LS 0.20<br />
TOTAL : 1.20<br />
CAPITAL : 1.00<br />
REVENUE : 0.20<br />
G. TOTAL : 1.20
- 25 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. VII<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />
B. VEGETABLE DEVELOPMENT :<br />
In order to increase vegetable production in the State, quality vegetable seeds that<br />
are not easily affordable to the farmers will be made available to vegetable growers.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 1.20 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 5.50 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Area Expansion Scheme on vegetable . Ha. 10 1.00<br />
2. Transportation etc. LS 0.20<br />
TOTAL : 1.20<br />
CAPITAL : 1.00<br />
REVENUE : 0.20<br />
G. TOTAL : 1.20<br />
SCHEME NO. VII<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />
C. FLORICULTURE AND LANDSCAPING :<br />
Floriculture in <strong>Mizoram</strong> has been flourishing during the past few years as a result of<br />
the Department undertaking. Provision is also made for beautification of tourist<br />
Complexes, Parks, etc. and maintenance of VIP complexes will be continued.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 9.00 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 23.00 lakh<br />
( Rs. in lakh)<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Maintenance of flower gardens -<br />
a) Tourist Complex at Berawtlang No. 1 0.50<br />
b) District Park at Lunglei No. 1 0.50<br />
c) Mualkawi (Hawilopar Garden) No. 1 0.30<br />
d) Horticulture Tourist Spot, Reiek No. 1 0.50<br />
2. Maintenance of VIP Complexes including<br />
Directorate Top Floor No. 4 6.00<br />
3. Maintenance of Horti. Centre, Chite No. 1 1.00<br />
4. Transportation etc. LS 0.20<br />
TOTAL : 9.00<br />
CAPITAL : -<br />
REVENUE : 9.00<br />
G. TOTAL : 9.00
- 26 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. VII<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />
D. MUSHROOM DEVELOPMENT:<br />
Due to unavailability of Spawn Production Unit at private sector in <strong>Mizoram</strong>, the<br />
Department will continue to maintain the existing Mushroom Laboratories at Chite,<br />
Champhai and Lunglei. Integrated Mushroom Units established under Government of India’s<br />
assistance for Button Mushroom cultivation at Chite, Champhai, Lunglei, Tuidam and<br />
Thingdawl will be maintained during <strong>2006</strong> – <strong>2007</strong>.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 2.20 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 7.50 lakh<br />
( Rs. in lakh)<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Maintenance of Mushroom laboratories<br />
including supply of different materials for<br />
production of Spawn at -<br />
a) Chite No. 1 0.50<br />
b) Lunglei No. 1 0.30<br />
c) Champhai No. 1 0.30<br />
d) Tuidam No. 1 0.30<br />
e) Thingdawl No. 1 0.30<br />
2. Training expenses No. of 100 0.20<br />
farmers<br />
3. Other Charges L.S. 0.30<br />
TOTAL : 2.20<br />
CAPITAL : NIL<br />
REVENUE : 2.20<br />
G. TOTAL : 2.20<br />
SCHEME NO. VII<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />
E. BEE KEEPING :<br />
Gardeners will be encouraged to take up Bee Keeping by giving Bee-Colonies and<br />
accessories for Bee Keeping in order to increase the productivity of crops through cross<br />
pollination.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 0.20 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 2.50 lakh<br />
( Rs. in lakh)<br />
Sl.<br />
No.<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Bee-hive boxes for distribution to Gardeners No. 13 0.20<br />
TOTAL : 0.20<br />
CAPITAL : -<br />
REVENUE : 0.20<br />
G. TOTAL : 0.20
Sl<br />
No<br />
- 27 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. VII<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />
F. HORTICULTURE POTENTIAL AREA CONNECTIVITY<br />
Maintenance of the existing Potential Area Connectivity will be continued so as to<br />
help farmers in bringing their farm produces to the market with mechanical system of<br />
transport etc.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 2.00 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 50.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Maintenance of existing area connectivity Km. LS 2.00<br />
TOTAL : 2.00<br />
CAPITAL : -<br />
REVENUE : 2.00<br />
G. TOTAL : 2.00<br />
HEAD OF DEVELOPMENT<br />
NAME OF THE SCHEME : BAFFACOS<br />
SCHEME NO. VIII<br />
The Department keeping in view the gregarious flowering of bamboo taking place<br />
during 2004 -<strong>2007</strong> resulting in mass mortality and destruction of bamboo forest, incurring<br />
rapid increase in rodent population thereby causing famine the department selected 4(four)<br />
crops i.e. Passion fruit, Grape, Potato and Turmeric as there crops have short gestation<br />
period with good academic return for plantation to provide alternative means of livelihood<br />
to the rural population dependent on jhum and bamboo forest.<br />
Moreover to utilized the bamboo before flowering establishment of charcoal kiln for<br />
production of charcoal vinegar etc. which can be utilized for nutrient in the form of soil<br />
supplement and as insect repellant.<br />
Name of the<br />
Scheme<br />
1. AES on Passion<br />
Fruit @<br />
Rs. 45,000/- per<br />
Ha.<br />
2. AES on Grape @<br />
Rs. 45,000/- per<br />
Ha.<br />
YEAR WISE TARGET FOR 5 YEARS<br />
(Rs. in lakh)<br />
2004–05 2005–06<br />
TARGET DURING<br />
<strong>2006</strong>–07 <strong>2007</strong>–08 2008-09<br />
Phy Fin. Phy Fin. Phy. Fin. Phy. Fin. Phy. Fin.<br />
200 90.00 200 90.00 1025 400.00 1700 765.00 1700 765.00<br />
150 67.50 150 67.50 - - 1275 573.75 1275 573.75
Sl<br />
No<br />
Name of the<br />
Scheme<br />
3. AES on Potato @<br />
Rs.33,750/- per<br />
Ha.<br />
4. AES on<br />
Turmeric @<br />
Rs.22,500/- per<br />
Ha.<br />
5. Charcoal Kiln<br />
Rs.15,000/- per<br />
No.<br />
- 28 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2004–05 2005–06<br />
TARGET DURING<br />
<strong>2006</strong>–07 <strong>2007</strong>–08 2008-09<br />
Phy Fin. Phy Fin. Phy. Fin. Phy. Fin. Phy. Fin.<br />
150 50.60 200 67.50 - - 475 161.00 475 161.00<br />
100 22.50 66 14.85 - - 292 65.70 292 65.70<br />
196 29.40 1 0.15 - - 339 50.85 339 50.85<br />
TOTAL 796 260 617 240 1025 - 4081 1616.30 4081 1616.30<br />
SCHEME. VIII<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : AREA EXPANSION SCHEME ON PASSION FRUIT<br />
(BAFFACOS)<br />
Passion fruit has been successfully growing in the hills of <strong>Mizoram</strong> for several years.<br />
The purple variety is suitable for higher elevation i.e. eastern side of <strong>Mizoram</strong> while the<br />
yellow variety is suitable for lower elevation i.e. western side of <strong>Mizoram</strong>. Fruit Juice<br />
Concentration Plant at Chhingchhip for passion fruit is being established for which large<br />
quantity of passion fruit is required. Due to above mentioned facts, there is vast scope for<br />
Area Expansion Programme on Passion Fruit in <strong>Mizoram</strong>.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 400.00 lakh<br />
<strong>APPROVED</strong> OUTLAY FOR 2005 - <strong>2006</strong> : Rs. 90.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Procurement of seedlings @ 600 seedlings per Acre No. 11,02,200 11.022<br />
2. Procurement of G.I. wire (12 SWG)<br />
for Trailing @ 4 Qtls. per Acre Qtl. 7,348 363.726<br />
3. Secatuer No. 1,837 6.86<br />
4. 5% transportation & handling for G.I. wire from - LS 18.18<br />
Aizawl to destination<br />
5. Awareness campaign, etc. - LS 0.212<br />
TOTAL : 400.00<br />
CAPITAL : Nil<br />
REVENUE : 400.00<br />
G. TOTAL : 400.00
- 29 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. IX<br />
HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />
NAME OF THE SCHEME : HORTICULTURE RESEARCH AND EDUCATION<br />
The scheme aims at providing technical studies at the level of Post Graduation,<br />
Doctorate of the inservice person. It is also proposed to sponsor candidates for B.Sc. (Horti)<br />
course wherein stipend, book grant, T.E. will be given to the selected candidates during the<br />
normal course of studies.<br />
Sl.<br />
No.<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong> – <strong>2007</strong> : Rs. 4.00 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005 – <strong>2006</strong> : Rs. 3.00 lakh<br />
Item Unit<br />
Physical<br />
target for<br />
<strong>2006</strong>-07<br />
( Rs. in lakh)<br />
Financial<br />
outlay for<br />
<strong>2006</strong>-07<br />
1. Stipend & book grant / TE / OE, etc. No. 15 4.00<br />
TOTAL : 4.00<br />
CAPITAL : -<br />
REVENUE : 4.00<br />
G. TOTAL : 4.00
INTRODUCTION:<br />
- 36 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SOIL & WATER CONSERVATION<br />
Food, fibre and shelter are the basic needs of mankind. All these are obtained from<br />
the soil. Water is a life giver. Water remains in soil moisture, liquid and gas forms. Moisture<br />
or liquid water in soil keeps the plant food in soluble forms available to plant intake. To<br />
ensure healthy vegetation, it is imperative that soil should be rich in nutrients and water.<br />
Nature in its own scheme of eco-conservation maintains soil in healthy condition.<br />
Unfortunately, man and animal in their living and working environment disturb the soil<br />
cover, accelerating the erosion of soil and depletion of water. With enhanced erosion, soil<br />
fertility deteriorates and vegetation growth capacity reduces. Soil erosion also leads to<br />
depletion of water content and results in desertification of land.<br />
1.10: Soil erosion in rainfed areas is mainly caused by surface run off/flood. When the<br />
flow of water is free of any obstruction, it starts eroding the soil surface bed. Under<br />
excessive rainfall condition, as exist in <strong>Mizoram</strong>, enormous-volumes of water generates<br />
velocities and hydraulic dynamics causing heavy erosion. This results in formation of<br />
gulleys and ravines. The impact is tremendous and the volume of soil loss is very high.<br />
1.20: The terrain of <strong>Mizoram</strong> is hilly and the entire landscape varies from mild to very<br />
steep gradients.. The intensity of rainfall is also very high and mean annual rainfall is<br />
2500 mm. “Jhum” or shifting cultivation has been the traditional mode of livelihood for the<br />
tribal people in the State. Present statistics reveals that around 40,000 hacs is covered by<br />
this primitive system of land management. Burning of the soil along with the dried<br />
vegetation during jhum preparation leads to soil fragmentation and increases land<br />
vulnerability to easy erosion during the monsoons.<br />
1.30: The monsoon that the state receives is both intensive and extensive. Torrential<br />
rainwaters rush down descending gradients at high velocity in undefined directions. The<br />
resulting floods cause excessive bank erosion and removal of debris over long distances.<br />
The low lying areas which are cultivable lands, thus get avoidable silt cover, apart from<br />
causing damage to standing crops. Another inevitable impact of such erosion is decrease<br />
infiltration of water towards sub soil layers reducing soil moisture content.<br />
1.40: The excessive rainfall in habited locales and environments, along roadsides, where<br />
subsisting unregulated drainage systems are ineffective causes substantial dislodging of soil<br />
mass with frequent havoc causing landslides, landslips., area sinking etc. These are the<br />
visible signs of soil erosion that can cause immediate distruption to human and other forms<br />
of activity. However, the loss of fertile top soil is not visible.<br />
1.50: Jhum cultivation, by virtue of its shifting nature, is a low productivity technology.<br />
That is why a “Jhumia family” migrates from one location to another ever so often. Arising<br />
out of this age old practice, abandoned jhum lands serve poorly for agro-horti-forest crops<br />
cultivation.<br />
1.60: On the hilly terrain such as ours, human settlement are traditionally located on the<br />
upper hill ridges. Notwithstanding the abundant rainfall that the state receives annually, yet<br />
these settlements suffer inadequate water supply especially during the dry season. That<br />
apart, depleted moisture content in the soil layers, because of speedy runoff and cumulative<br />
soil erosion, dries up even otherwise flourishing vegetation. The spectre of fire and forest<br />
fires looms large all over the State.
- 37 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1.70: Off season agriculture typically tends to take place in remote and undulating areas,<br />
access to which is tough, time and labour consuming. This adversely affects the health of<br />
the agriculture labour rendering it vulnerable to disease and pestilence. Premature aging is<br />
often the result. Labour costs thus become prohibitive. It is essential to connect cultivable<br />
and potentially cultivable areas with main and arterial roads- which although expensive is<br />
inescapable for the speedy economic development in the state.<br />
1.80: The absolute need for soil and water conservation measures in the state is a prerequisite<br />
for effective socio-economic development. Public awareness, education, association and<br />
participation in soil and water conservation is a matter of public concern and priority.<br />
1.90: The Agro-climatic conditions prevalent in <strong>Mizoram</strong> are entirely conducive to<br />
successful agriculture practices through soil and water conservation measures and objectives.<br />
2.00: Keeping in view of the above stated strategy, the Soil & Water Conservation<br />
Department proposes the following schemes to implement during the year <strong>2006</strong>-<strong>2007</strong>.<br />
3.00: ORGANISATION:<br />
I. Direction & Administration.<br />
II. Soil & Land Use Survey.<br />
III. Conservation Plantation.<br />
IV. Cash Crop & Spices Development.<br />
V. Quality Planting Material Production.<br />
VI. Water Resource Development<br />
VII. Research, Education & Training (Capacity Building)<br />
VIII. Commercial Cash Crop Plantation (For Rural economy building programme)<br />
IX. Run-off Retarding Scheme (For conservation farming)<br />
X. Soil Conservation Engineering Programmes (for restoration, protection and<br />
improvement of erosion effected and erosion endangered agri-potential)<br />
XII. Micro-Watershed Management.<br />
XIII. Other Expenditures (Building & Road sector)<br />
XIV. Input Supply.<br />
XV. Central Sponsored Programmes.<br />
1) RVP/FPR<br />
2) Mat Catchment Treatment Project.<br />
3) Tuirial Hydel Catchment Project.<br />
4) I.W.D.P.<br />
2.01: All the schemes from I - XIV are State Sector Schemes and these are continuing ones.<br />
These scheme characters are that these are implemented as a new schemes at new locations<br />
with fresh group of beneficiaries.<br />
2.:02: The Schemes at XV above under CSS programmes.<br />
1) River Valley Project/Flood Prone River (RVP/FPR) is a spill over programme from 9 th<br />
Plan. Total oulay proposed is Rs. 419.30 lakh plus Rs. 163.14 lakh i.e. Rs. 582.44 lakh during<br />
10 th Plan Rs.197.03 lakh is being spent. The proposed outlay for 10 th Five Year Plan is<br />
Rs.600.00 lakh and during 2005-06 proposal outlay is Rs. 2.46.00 lakh as Technical approval<br />
received from NRM Ministry of Agriculture N. Delhi.<br />
2) The Mat Catchment Treatment Project that was earlier posed for EAP take off will be<br />
proposed again during 10 th Five Plan. Total cost was Rs. 40.00 crores. This was prepared by<br />
engaging consultancy of CSWR & TI, Dehradun under the sponsoreship of Planning<br />
Commission. This scheme is submitted through the State Planning Department to Planning<br />
Commission.
- 38 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3) In the Catchment of Tuirial, Serlui ‘B’, Tuivai and Bairabi Hydel Projects, there is Soil<br />
& Water Conservation shares of activities. Tuirial HEP catchment area treatment plan outlay<br />
is Rs. 3.19 crores. But due to constraint of fund released from Forest Nodal Deptt. Rs.25.00<br />
lakh only in the 10 th Plan achieved and balance amount not yet finalised. Outlay during<br />
<strong>2006</strong>-07 is Rs.41.80 lakh.<br />
4) Integrated Wasteland Development Project (IWDP). There are 4 (four) IWDP scheme<br />
location at Champhai - Rs.329.40 lakh, Mamit - Rs.72.00 lakh, Lawngtlai - Rs.260.00 lakh,<br />
Lunglei - Rs. 480.00 lakh. These schemes are now implemented by Agriculture Department.<br />
3.00: The Annual Plan <strong>2006</strong>-<strong>2007</strong> approved outlay is 400.00 lakh under State Plan Sector.<br />
SCHEME DESCRIPTION:<br />
4.00: DIRECTION:<br />
For maintenance of vehicles, machineries, purchase of office contingencies including<br />
machineries & equipments etc. in the Directorate, Rs. 37.00 lakh is approved for Annual Plan<br />
<strong>2006</strong>-07.<br />
5.00: ADMINISTRATION:<br />
There are 8 functional and one Engineering Divisions in the Department for<br />
implementation of the Projects/Scheme. Further, there is one Training Institute for training<br />
of field staff upto Demonstrators level. These functional units are under staff at Officers<br />
level. Some extension unit of Ranges and Soil & Water Conservation Centres are also under<br />
staff. Besides, there is pressures from public to open some centres and Ranges at some<br />
potential areas as Saitual, North Hlimen, Mamit etc. which cannot be afforded to open at the<br />
existing staff strength. There is also instruction from Government to post ASCO(SDO)<br />
ranked officers in newly opened civil sub-divisions. For that, it is unavoidable to create some<br />
new posts. Rs. 117.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
5.01: The present post of Principal is required to be upgraded. This is essential for his<br />
higher responsibilities to entrust in the Institute. Also this is essential when it is seen for<br />
the future of the Department. So, viewing from these points, it is proposed to upgrade the<br />
Principal post to Joint Director post during <strong>2006</strong>-07.<br />
5.02: Publicity & Advertisement, Monitoring and Evaluation, Planning Cell, Engineering<br />
Division, Plan Formation Cell are part of administration. Reasonable fund provision is made<br />
to run these wings efficiently and effectively. Provision for Rs. 24.52 lakh is approved for<br />
Annual Plan <strong>2006</strong>-07.<br />
6.00: SOIL & LAND USE SURVEY:<br />
Project survey, investigation and project preparation. An area of 400 ha. in <strong>2006</strong>-07<br />
Annual Plan will be undertaken. To conduct these works Rs. 2.00 lakh is approved during<br />
Annual Plan <strong>2006</strong>-07.<br />
7.00: CONSERVATION <strong>PLAN</strong>TATION:<br />
For stabilisation of sliding zone along the lifeline National Highway and State<br />
Highways, there is hardly any other alternative than tree planting and deep rooting grass<br />
planting. Further, vegetation roots and leaf litters allows, in situ, water retension over longer<br />
period and that reduces the chances of run-off causing landslides and reduces threat to life<br />
and property in human dwelling zone. To such a situation, soil conservation plantation is<br />
the only effective preventive remedy.
- 39 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
8.00: CASH CROP SPICES DEVELOPMENT:<br />
The Department has demonstration plantation of Coffee, Rubber and Large<br />
Cardamom in various locations of the State. The purpose of this plantation is to support<br />
demonstration and training to the farmers and data formation. Particularly from Coffee<br />
plantation a good amount of return is received every year. Rubber plantation also pays<br />
return but due to lack of fund during the past few years maintenance part could not be<br />
attended properly. Similarly, the Black Pepper cultivation in Coffee plantation is required to<br />
be introduced and therefore, from 10 th Five Year Plan, it is proposed to intensify<br />
management of these plantations for profitable return in addition to other goal. The Coffee<br />
plantation requires replacement planting or rejuvination. For this purpose, provision is<br />
made for rejuvination and maintenance for Rs. 8.00 lakh in the Annual Plan <strong>2006</strong>-07.<br />
9.00: PRODUCTION OF QUALITY <strong>PLAN</strong>TING MATERIAL:<br />
From 2001-2002 Annual Plan of 9 th Five Plan, priority importance has been given on<br />
Expansion of Coffee and Large Cardamom in the marginal farmers sector. For a meaningful<br />
production of yield of this crop, it is essential that the planting material is to be of good<br />
quality from known seed origin. The reliable planting material production, it is experienced<br />
to be had from Departmental nursery and therefore, the Department has proposed<br />
establishment of these nurseries near the planting areas and their maintenance <strong>2006</strong>-<strong>2007</strong><br />
Annual Plan projection is Rs. 30.00 lakh.<br />
10.00: WATER RESOURCE DEVELOPMENT:<br />
To overcome the water difficulties in nursery growing, it is essential to construct<br />
water harvesting device near living spring close to the nurseries. Also in plantation water<br />
need is unignorable. Above all needs the water resource development near the plantations<br />
gets the priority for its water use by the plantations in clusters. Besides plantation it is<br />
necessary to improve the water condition in the rural areas. In villages, it is proposed to<br />
construct and improve water points. During <strong>2006</strong>-07 Annual Plan, Rs. 10.00 lakh will be<br />
spent.<br />
11.00: RESEARCH, EDUCATION AND TRAINING:<br />
For conducting training and education of the grass-root level staff of the Department<br />
it is essential to continue this Training Institute at Durtlang. The training in Departmental<br />
technical activities which are up-dated due to technical updation. The training course is<br />
also being arranged for farmers in the plantation technology and other soil conservation<br />
activities in the 10 th Five Year Plan.<br />
The salary of teaching staff is committed to Non-Plan during 10 th Plan onward. But<br />
the training expenditure and maintenance expenditure on infrastructures including office<br />
expenses are proposed to be provided under Plan sector. Rs. 13.50 lakh is approved for<br />
Annual Plan <strong>2006</strong>-07.<br />
12.00: RURAL ECONOMY INCENTIVE COMMERCIAL <strong>PLAN</strong>TATION (R.A.D.):<br />
Under this scheme expansion of Coffee, Large Cardamom and Rubber has been given<br />
high priority since the year ending 9 th Five Year Plan. Under the existing agro-climatic and<br />
edaphic condition these crops are found growing jubilantly under the virgin forest of the<br />
State. Coffee per ha. yield is recorded 13 quintals from Bualpui experimental and<br />
demonstration Coffee plantation of Coffee Board during 2000. The crop yield is found to be<br />
higher than national average. The Cardamom also shows encouraging yield in the recent<br />
past that preludes for the plantation in jhumia sector. It is necessary to keep the farmer<br />
attentive to his plantation during his peak jhum working season. For expansion of this<br />
cultivation, Rs. 10.00 lakh has been provided in Annual Plan <strong>2006</strong>-07.
- 40 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
13.00: RUN-OFF RETARDING SCHEME:<br />
On a slope surface rain water moves faster with high erosive velocity downwards<br />
diving intensive rain. The surface run-off is a mobile flood and this causes intensive erosion<br />
damage. The damage is in terms of soil volume that includes Plan nutrients and soil.<br />
An open area cultivation is not productive and therefore, management of soil surface<br />
is required. This method of management of slope land is terracing, contouring and any<br />
other type of land use across the slope is a safety measure for protection of soil and<br />
moisture.<br />
Soil & Water Conservation Department recommends this terrace construction on<br />
moderate slope land for its use in agriculture, horticulture or forest plantation development.<br />
This conserve the its and soil fertility. The terracing programme provides a scope for<br />
developing agri, horticultural platform near the residential area of a farmer and agriculture<br />
practices nearer the residential areas experiences high scope of success as the farmer is<br />
able to pay close attention to his farming. Under the present nature of habitation, the<br />
agricultural potential areas had been placed at a considerable long distance from the<br />
habitation areas. To remove this gap it is compelling that the agricultural land which are<br />
stable and can be used year after year for vegetables and other crops should be developed<br />
nearer to the habitation areas. Even a small plot of 0.25 ha. in the kitchen garden of a<br />
farmer should be encouraged so that self-sufficiency for a particular family is assured.<br />
Thus, this scheme is envisaged.<br />
Terracing above 5-25% slope is proposed as it is the safe limit for conservation of<br />
soil and moisture. The terrace shall be constructed with all technique parameters so that the<br />
terrace does not get damage with the annual rain impact. These terraces will be constructed<br />
in the near habitation area only. Rs. 12.00 lakh is provided in the Annual Plan <strong>2006</strong>-07.<br />
14.00: SOIL CONSERVATION ENGINEERING:<br />
The Soil Conservation Engineering Works provides facility for protection of land<br />
damage by run off flood during peak monsoon. The agricultural land in the plateau, river<br />
banks and foot hills are ravaged by such kind of damages. The farmers who holds land in<br />
this areas are very much in need of such kind of assistance to engineering works. The main<br />
works of long term permanent are rock fill, wire boxes, spurs and stream course<br />
straightening. Rs. 8.00 lakh is proposed under Annual Plan <strong>2006</strong>-07.<br />
15.00: MICRO-WATERSHED MANAGEMENT:<br />
Micro-Watershed Management is given a priority importance by the Government of<br />
India under Central sector programmes. These programmes are supported on detail project<br />
report preparation. Therefore, for survey and preparation of detail project reports of such<br />
programmes in the State sector a token fund of Rs. 3.00 lakh is provided in Annual Plan,<br />
<strong>2006</strong>-07. Within this amount, it is also targetted to take up one sample micro-watershed<br />
project near Aizawl capital.<br />
16.00: OTHER EXPENDITURE:<br />
The expenditure on construction and maintenance of buildings and roads and<br />
machinery and equipments are placed under this head of expenditure. The Department has<br />
as many as 240 buildings which are quite old and needs maintenance badly. The Divisional<br />
and Range headquarters are connected with approach road. These approach roads required<br />
annual maintenance and improvement. Provision is made for taking care of these approach<br />
roads. Rs. 11.50 lakh is approved in the Annual Plan <strong>2006</strong> - 07.
- 41 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
17.00: INPUT SUPPLY:<br />
To meet the various needs for essential tools and implements, fertilizers and<br />
chemicals and time spelling requirements for plantation development and maintenance of<br />
the various sectors, Rs. 3.48 lakh is approved for the Annual Plan <strong>2006</strong>-07.<br />
14.00: BAFACOS:<br />
Bamboo Flowering and Famine Combating Scheme (BAFACOS) for Soil Consevration<br />
Engineering works consisting of Land development, Water Harvesting Pond, Gully control<br />
and Stream Bank Erosion Control for maximum mandays generation provision is made<br />
Rs.110.00 lakh in the Annual Plan during <strong>2006</strong>-07.
- 48 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ANIMAL HUSBANDRY & VETERINARY<br />
INTRODUCTION:<br />
The Department is having two major Heads of Development namely Animal<br />
Husbandry & Veterinary Services and Dairy Development. The main works during <strong>2006</strong>-07<br />
will focused on the combat of the impending Bamboo Flowering under the Government<br />
policy BAFFACOS for which sustainable income generating schemes of animal and livestock<br />
farming will be executed to keep the rural farmers. The Annual Plan also comprises the<br />
improvement and upgradation of the existing infrastructure in order to upkeep livestock<br />
health, prevention and animal and poultry diseases. Management of different Departmental<br />
Livestock Farms for demonstration purposes and for making foundation stock available to<br />
the farmers will also be continued. Grant-in-Aid/Subsidy for the local farming families as<br />
incentive are also included. The outlay for the year <strong>2006</strong>-07 is Rs. 778.00 lakh under Animal<br />
Husbandry and Rs. 40.00 lakh only for Dairy Development. The total outlay for <strong>2006</strong>-07 is<br />
approved at Rs. 818.00 lakh.<br />
I. ANIMAL HUSBANDRY<br />
A&B. DIRECTION & ADMINISTRATION: With a total outlay of Rs. 107.00 lakh only, it is<br />
approved to construct D.V.O and Sub-ordinate offices at Kolasib, IV Grade Quarter<br />
at Khawruhlian, Sub-Centre at Republic, Aizawl besides the maintenance of the<br />
existing infrastructure and the administrative costs.<br />
C. VETERINARY SCIENCE & ANIMAL HEALTH: In order to cover animal health care and<br />
prevention of animal diseases and for maintenance of 5 Nos. Hospitals, 35 Nos. Vety.<br />
Dispensaries and 103 Nos. Rural Animal Health Centres. A total amount of Rs.102.00<br />
lakh is provided. Construction of Vety. Dispensary at Khawbung, RAH Centre at<br />
Hmunhmeltha and Khawzawl will be completed during the year.<br />
D. CATTLE DEVELOPMENT: For maintenance of 7 Nos. existing Departmental Cattle<br />
Farms a total amount of Rs. 3 4.00 lakh is approved during <strong>2006</strong>-07.<br />
E. POULTRY DEVELOPMENT: Provision is made for replacement of old stock and<br />
procurement of hatching eggs and also 50% chick subsidy to the local farmers in<br />
addition to maintenance of 7 nos. existing Departmental Poultry Farms. The total<br />
outlay under Poultry Development is Rs. 39.00 lakh only.<br />
F. PIGGERY DEVLOPMENT: 50% Young Breeding Boar subsidy to 40 local farmers is<br />
provided during <strong>2006</strong>-07. The total outlay under Piggery Development is Rs. 33.00<br />
lakh only.<br />
G. OTHER LIVESTOCK DEVELOPMENT: Provision of Grant-in-Aid to Sheep and Goat<br />
rearing families and Hill Cattle rearing families to 25 families and maintenance of<br />
existing Goat Farm shall be carried out with an outlay of Rs. 6.00 lakh.<br />
H. FEED & FODDER DEVELOPMENT: Procurement of Feed Ingredients for different<br />
livestock and poultry farms and maintenance of Animal Grazing Ground will be the<br />
main task. The total outlay during <strong>2006</strong>-07 is Rs. 115.00 lakh only.<br />
I. VETERINARY EDUCATION RESEARCH AND TRAINING: A total amount of Rs. 44.00<br />
lakh is approved during <strong>2006</strong>-07 for continuation of School of Vety. Science at<br />
Lungpher, Lunglei. Scholarship/Stipend for B.V.Sc & A.H., M.V.Sc. and V.F.A. students<br />
and Prorata contribution are also included.
- 49 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
J. VETERINARY INFORMATION: For collection of information data, publication of Magazines,<br />
Leaflets and for extension work, a total amount of Rs. 12.00 lakh is approved during<br />
<strong>2006</strong>-07.<br />
K. OTHER EXPENDITURE: For continuation of Regulation of Animal Movement in the<br />
State a total amount of Rs. 6.00 lakh is approved during <strong>2006</strong>-07.<br />
L. CENTRALLY SPONSORED SCHEME: The Department is operating different Centrally<br />
Sponsored Scheme of which a number of the Schemes are matching scheme in<br />
nature. In order to match the Central Share the Department had earmarked a total of<br />
Rs. 80.00 lakh as a State Matching Share.<br />
M. BAFFACOS: In continuation of Combating the impending Bamboo Flowering in the<br />
State which may cause increase of rats population resulting Famine, the State<br />
Government had formed Bamboo Flowering and Famine Control Schemes<br />
(BAFFACOS) for which the Department had earmarked a total amount of Rs. 200.00<br />
lakh only which will be utilized for various animal rearing schemes for the local<br />
farmers and rural families.<br />
N. DAIRY DEVELOPMENT: For construction of 2 Nos. Labour Barrack at IDDP, Kolasib<br />
and for maintenance of Dairy Plant at Lunglei & Kolasib, a total amount of Rs. 40.00<br />
lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
A : DIRECTION<br />
Sl. No. I T E M S<br />
PHYSICAL<br />
TARGET<br />
( Rupees in lakh )<br />
FINANCIAL<br />
TARGET<br />
1 2 3 4<br />
1 Salary<br />
a) Salary of existing Officers and Staff 4 5.00<br />
2 Wages :<br />
Skilled Labour ( Typist ) 4 2.00<br />
3 Travelling Expenses L.S. 2.00<br />
4 Office Expenses<br />
a) Maintenance of Light Vehicle and purchase of spare<br />
parts, etc.<br />
15 Nos. 3.00<br />
b) Purchase of Stationeries etc. L.S. 2.00<br />
5 Minor Works :<br />
Maintenance and improvement of subordinate offices 2 Nos. 2.00<br />
6 Machinery/Equipments :<br />
Purchase of Office Equipments, etc. L.S. 2.00<br />
T O T A L OF 'A' 18.00<br />
B - I Joint Director Office, Lunglei :<br />
1 Salary of Officer and Staff 11 Nos. 10.50<br />
2 Wages :<br />
Unskilled 1 No. 0.40<br />
3 Travelling Expenses L.S. 1.00<br />
4 Office Expenses L.S. 3.00<br />
5 Minor Works :<br />
Maintenace of existing Quarter 2.10<br />
T O T A L OF B-1 : 17.00
B : ADMINISTRATION<br />
Sl. No. I T E M S<br />
- 50 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHYSICAL<br />
TARGET<br />
( Rupees in lakh )<br />
FINANCIAL<br />
TARGET<br />
1 2 3 4<br />
B-II DISTRICT OFFICES :<br />
1 a) Salary of Officers 8 Nos. 21.00<br />
2 Wages :<br />
a) Skilled - II 5 Nos. 2.50<br />
b) Unskilled 6 Nos. 2.00<br />
3 Travelling Expenses L.S. 2.00<br />
4 Office Expenses :<br />
a) Maintenance of Light Vehicles, POL, Parts, etc. 8 Nos. 4.00<br />
b) Purchase of Stationeries, etc. L.S. 4.00<br />
5 Minor Works :<br />
Maintenance of existing buildings 25 Nos. 3.50<br />
T O T A L OF B-II : 39.00<br />
C.O :<br />
1. Construction of DVO Office at Kolasib.<br />
2. Construction of Sub-ordinate Office at Kolasib.<br />
TOTAL OF C.O :<br />
1 No.<br />
1 No.<br />
2 Nos.<br />
5.00<br />
5.00<br />
10.00<br />
TOTAL OF B-II : 49.00<br />
B-III SUB-DIVISIONAL OFFICES :<br />
1 Salary of existing Officers and Staff 8 Nos. 10.00<br />
2 Wages : Unskilled 1 No. 0.50<br />
3 Travelling Expenses L.S. 2.00<br />
4 Office Expenses L.S. 2.50<br />
5 Minor Works : Maintenance of existing buildings 14 Nos. 2.00<br />
TOTAL OF B-III :<br />
C.O :<br />
17.00<br />
Construction of IV Grade Quarter at<br />
Khawruhlian and VFA Quarters at Saitual<br />
2 Nos.<br />
6.00<br />
T O T A L OF B - III : 23.00<br />
T O T A L O F ‘B ‘ : 79.00<br />
C : VETY. SERVICES & ANIMAL HEALTH :<br />
( Rupees in lakh )<br />
C-I Vety. Services/Hospitals<br />
1 Salary of existing Officers and Staff 13 Nos. 20.00<br />
2 Wages : Unskilled Labour 2 Nos. 0.80<br />
3 Travelling Expenses L.S. 2.20<br />
4 Office Expenses L.S. 4.00<br />
5 Minor Works : Maintenance of existing buildings 20 Nos. 3.00<br />
6 Motor Vehicles :<br />
Maintenance of existing vehicles L.S. 4.00<br />
T O T A L OF C - I : 34.00
Sl. No. I T E M S<br />
- 51 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHYSICAL<br />
TARGET<br />
( Rupees in lakh )<br />
FINANCIAL<br />
TARGET<br />
1 2 3 4<br />
C-II VETY. DISPENSARIES :<br />
1 Salary of existing Officers and Staff 13 Nos. 21.00<br />
2 Wages :<br />
Unskilled Labours 37 nos. 12.50<br />
3 Travelling Expenses L.S. 2.00<br />
4 Office Expenses L.S. 2.50<br />
5 Minor Works :<br />
Improvement & repair of existing buildings 22 Nos. 3.00<br />
T O T A L 41.00<br />
C.O. :<br />
Construction of V.F.A. Quarter-cum-RAH Centre at<br />
Hmunhmeltha, Khawzawl and Vety. Dispensary at<br />
Ngopa.<br />
T O T A L OF C - II :<br />
3 Nos.<br />
13.00<br />
C-III RURAL ANIMAL HEALTH CENTRES :<br />
1 Salary of existing Staff 4 Nos. 4.00<br />
2 Wages : Unskilled 2 Nos. 0.80<br />
3 Travelling Expenses L.S. 1.00<br />
4 Office Expenses L.S. 2.20<br />
5 Minor Works : Maintenance of Existing buildings 35 Nos. 2.00<br />
T O T A L OF C - III : 10.00<br />
C-IV CENTRAL MEDICINE, VACCINE AND EQUIPMENT DEPOT :<br />
1 Machinery/Equipments :<br />
Purchase of essential instruments appliances for Vety.<br />
Services.<br />
L.S. 2.00<br />
2 Material/Supply : Procurement of chemicals and<br />
medicines<br />
L.S. 2.00<br />
T O T A L OF C-IV : 4.00<br />
T O T A L OF 'C' : 102.00<br />
D : CATTLE DEVELOPMENT :<br />
1 Salary of existing Officers & Staff 18 Nos. 15.00<br />
2 Wages :<br />
a) Skilled - II 1 No. 0.50<br />
b) Unskilled Labour 8 Nos. 2.70<br />
3 Travelling Expenses L.S. 1.80<br />
4 Office Expenses : Electric Charges etc. L.S. 6.00<br />
5 Minor Works :<br />
Maintenance and repair of existing quarters and Farms 12 Nos. 3.00<br />
6 Motor Vehicles : Maintenance of existing Vehicles L.S. 3.00<br />
7 Material & Supply L.S. 2.00<br />
T O T A L O F 'D' 34.00
Sl. No. I T E M S<br />
- 52 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHYSICAL<br />
TARGET<br />
( Rupees in lakh )<br />
FINANCIAL<br />
TARGET<br />
1 2 3 4<br />
E : POULTRY DEVELOPMENT :<br />
1 Salary of existing Officers and Staff 13 Nos. 13.00<br />
2 Wages :<br />
a) Skilled - II 2 Nos. 1.00<br />
b) Unskilled Labour 27 Nos. 9.00<br />
3 Travelling Expenses L.S. 1.50<br />
4 Office Expenses :<br />
Stationery, Bulk energy charge of Poultry Farms L.S. 7.00<br />
5 Minor Works :<br />
Improvement and Poultry Farms 10 Nos. 3.50<br />
6 Machinery/Equipments, Waterer, Feeder, Brooder etc. L.S. 2.00<br />
7. G.I.A. to farmers on 50% chick subsidy L.S. 2.00<br />
T O T A L OF ' E ' : 39.00<br />
1<br />
F : PIGGERY DEVELOPMENT :<br />
Salary of existing Officers and Staff 12 Nos. 13.00<br />
2 Wages :<br />
Unskilled Labour for Pig Attendant 18 nos. 6.00<br />
3 Travelling Expenses L.S. 2.00<br />
4 Office Expenses :<br />
For Stationeries & maintenance of Light Vehicles L.S. 4.00<br />
5. Minor Works L.S. 2.00<br />
6 Motor Vehicles :<br />
Body Repair, P.O.L., spare parts etc. 2 Nos. 3.00<br />
7 Material & supply :<br />
Replacement of old stock and A.I. Materials. L.S. 1.00<br />
8 Grand-in-Aid :<br />
a) GIA to PIGFED and Co-op. Societies AND 50% Boar<br />
Subsidy @ Rs.2500/- per young Boar as Govt.<br />
Contribution for 40 Nos.<br />
L.S. 2.00<br />
T O T A L OF 'F' : 33.00<br />
I<br />
G : OTHER LIVESTOCK DEVELOPMENT :<br />
GOAT PRODUCTION FARM :<br />
1 Minor Works :<br />
Improvement of Goat Production Farm 2 Nos. 1.00<br />
2. Grant-in-Aid to Ship & Goad rearing families @Rs.4000/per<br />
family for 25 families.<br />
25 families 1.00<br />
3. Rabbit Production Farm :<br />
a) Wages :<br />
Unskilled Labour<br />
b) Minor Works :<br />
11 nos. 3.70<br />
Maintenance of existing Rabbit House, etc. 5 Nos. 0.30<br />
T O T A L OF G : 6.00
Sl. No. I T E M S<br />
- 53 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHYSICAL<br />
TARGET<br />
( Rupees in lakh )<br />
FINANCIAL<br />
TARGET<br />
1 2 3 4<br />
H - 1<br />
H : FEED AND FODDER DEVELOPMENT :<br />
Salary of existing Staff 3 Nos. 2.50<br />
2 Wages :<br />
Unskilled Labour 39 Nos. 13.00<br />
3 Travelling Expenses L.S. 1.50<br />
4 Office Expenses L.S. 4.00<br />
5 Minor Works :<br />
Improvement of Feed Godown etc. L.S. 5.00<br />
6 Machinery/Equipments :<br />
Purchase of Chaff cutters, Baling Machine etc. L.S. 3.00<br />
7 Motor Vehicles :<br />
Maintenance of Heavy Vehicles 3 Nos. 6.00<br />
8 Material & Supply :<br />
Purchase of Feed Ingredients & ready mixed feed for<br />
Departmental farms<br />
L.S. 75.00<br />
T O T A L OF H-I : 110.00<br />
H-II ANIMAL GRAZING GROUND :<br />
1 Minor Works<br />
Renovation and construction of Animal Shelter Shed,<br />
fencing etc.<br />
L.S. 5.00<br />
T O T A L OF H - II : 5.00<br />
T O T A L OF ' H ' : 115.00<br />
1<br />
I : VETY. EDUCATION RESEARCH & TRAINING :<br />
Salary of existing Officers and Staff 11 Nos. 22.00<br />
2 Wages :<br />
a) Semi - Skilled 2 Nos. 2.00<br />
b) Unskilled 3 Nos.<br />
3 Travelling Expenses L.S. 1.00<br />
4 Office Expenses L.S. 2.00<br />
5 Professional Charges :<br />
Study Tour for Vety. Field Assistant and B.V.Sc. Students<br />
and inservice personnels and orentation programmes<br />
and training<br />
L.S. 1.00<br />
6 Minor Works : L.S. 2.00<br />
7 Material & Supply :<br />
Purchase of study materials, etc. L.S. 0.50<br />
8 Stipend and Book Grant, Prorata etc. for<br />
MVSc, BVSc. and VFA Students L.S. 13.50<br />
T O T A L OF ' I ' : 44.00
Sl. No. I T E M S<br />
- 54 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHYSICAL<br />
TARGET<br />
( Rupees in lakh )<br />
FINANCIAL<br />
TARGET<br />
1 2 3 4<br />
J : VETERINARY INFORMATION WING :<br />
1 Salary of existing Staff 1 No. 3.50<br />
2 Travelling Expenses L.S. 1.00<br />
3 Office Expenses L.S. 3.00<br />
4 Publication :<br />
Magazine, Leaflets, Periodicals, etc. L.S 3.00<br />
5 Advertisement L.S. 1.00<br />
6 Materials & Supply :<br />
Purchase of Roll Films, Video Films, etc. L.S. 0.50<br />
T O T A L OF 'J ' : 12.00<br />
K : OTHER EXPENDITURE :<br />
K ANIMAL MOVEMENT<br />
1 Wages:<br />
Unskilled Labour 6.00<br />
T O T A L OF K 6.00<br />
L : CENTRALLY SPONSORED SCHEMES :<br />
L-I National Project On Rinderpest Eradication:<br />
1 Salary of existing Officers and Staff 21 Nos. 18.00<br />
2 Travelling Expenses L.S. 1.00<br />
3 Office Expenses : L.S. 1.00<br />
T O T A L OF L - I : 20.00<br />
L-II ASCAD (Assistance to State for Control of Animal Disease :<br />
1 Salary of Existing Staff 3 Nos. 4.50<br />
2 Travelling expenses L.S. 2.00<br />
3 Office Expenses L.S. 2.50<br />
4 Machinery/Equipments L.S. 6.00<br />
5 Material & Supply L.S. 15.00<br />
T O T A L OF L - II : 30.00<br />
L-III PROFESSIONAL EFFICIENCY DEVELOPMENT :<br />
STATE VETERINARY COUNCIL :<br />
1 Office Expenses<br />
Office Stationeries, etc. L.S. 1.00<br />
T O T A L OF L - III : 1.00<br />
L-IV ANIMAL HUSBANDRY AND STATISTICS :<br />
SAMPLE SURVEY & STATISTICS :<br />
1 Salary of Existing Staff 6 Nos. 6.00<br />
2 Travelling Expenses L.S. 0.25<br />
3 Office Expenses : L.S. 0.50<br />
4 Publication :<br />
Sample Survey and Statistical Hand Book, etc. L.S. 0.25<br />
T O T A L OF L-IV : 7.00
Sl. No. I T E M S<br />
- 55 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHYSICAL<br />
TARGET<br />
( Rupees in lakh )<br />
FINANCIAL<br />
TARGET<br />
1 2 3 4<br />
L-V NATIONAL PROGRAMME ON BIOGAS DEVELOPMENT :<br />
1 Salary of existing Staff 10 Nos. 13.00<br />
2 Travelling Expenses L.S. 2.00<br />
3 Office expenses :<br />
Propultion of Vehicles L.S. 1.10<br />
4 G.I.A./Subsidy :<br />
Government contribution for installation of Biogas Plant<br />
@ Rs. 5850/- per unit<br />
100 units 5.90<br />
T O T A L OF L - V : 22.00<br />
T O T A L OF L : 80.00<br />
M. BAMBOO FLOWERING & FAMINE COMBAT SCHEME (BAFFACOS)<br />
1 Office Expenses :<br />
For procurement of litters, electers, electrification, water<br />
charges, medicines, utensils etc. for Poultry, Piggery &<br />
Dairy<br />
L.S. 15.00<br />
2 Material Supply:<br />
Purchase of animals and feeds L.S. 135.00<br />
3 Minor Works :<br />
For construction of Broiler House, Layer house, Pig Sty<br />
and Dairy Shed<br />
L.S.<br />
50.00<br />
TOTAL : 200.00<br />
M-1<br />
N : DAIRY DEVELOPMENT<br />
Salary of existing Staff 3 Nos. 4.50<br />
2 Wages :<br />
a) Skilled - II 7 Nos.<br />
b) Unskilled Labour for Milkman, Dairy Farm Attendant,<br />
etc.<br />
57 Nos. 25.40<br />
3 Travelling Expenses L.S. 0.50<br />
4 Office Expenses :<br />
Bulk Energy charges, Stationary etc. Light Vehicles L.S. 2.00<br />
5 Minor Works :<br />
Maintenance of existing Farm buildings 10 Nos. 1.00<br />
6 Machinery/Equipments :<br />
Procurement of Equipments/Milking Machine, Milking<br />
Machineries, etc.<br />
L.S. 0.10<br />
7 Motor Vehicles :<br />
Population of Heavy/Medium Vehicles 5 Nos. 2.00<br />
8 Material and Supply :<br />
Purchase of materials for Dairying Farms etc. L.S. 0.50<br />
T O T A L OF 'N' 36.00<br />
C.O. :<br />
Construction of Labour Barrack @ Rs.2.00 lakh at<br />
IDDP Kolasib<br />
2 Nos. 4.00<br />
TOTAL OF ‘N’ : 40.00
- 60 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
FISHERIES<br />
The main thrust during Annual Plan <strong>2006</strong>-<strong>2007</strong> is to bring in more additional water<br />
areas under culture sector as well as to develop the riverine fisheries in the capture sector<br />
so as to boost up the fish production level in the state and generate employment and<br />
income to the rural areas which would combat the impending famine due to Bamboo<br />
Flowering in the region.<br />
To increase the fish production Department of Fisheries proposed to implement the<br />
following CSS programme during <strong>2006</strong>-<strong>2007</strong> beside annual plan scheme i.e., Fish Seed<br />
Production-cum-Farming at different established Fish Seed Farms.<br />
1) Development of Fresh Water Aquaculture through Fish Farms Development<br />
Agency(FFDA).<br />
2) Development of waterlogged area of Integrated Fish Farming.<br />
3) Development of Riverine Fisheries through Integrated Development of Inland<br />
Capture Resources(Reservoirs/ Rivers etc).<br />
4) Cold water Fisheries and Aquaculture.<br />
5) Information, Extension & Training.<br />
The funding pattern of scheme under Sl.1-4 are 75:25 (75 percent Central share and<br />
25 percent State share) and scheme under Sl.5 is 80:20(80% Central and 20% State). The State<br />
matching share partly proposed to be shared from the BAFFACOS as the item proposed are<br />
similar to CSS programme and for remaining items of works/subsidy will be provided from<br />
State annual plan during <strong>2006</strong>-<strong>2007</strong>.<br />
Besides above, Department of Fisheries also aims at implementing BAFFACOS during<br />
<strong>2006</strong>-<strong>2007</strong> to create more new water areas, providing Fish Farming inputs and Farmers<br />
training to boost fish production in the rural area.<br />
Therefore, the Annual Plan <strong>2006</strong>-<strong>2007</strong> envisages to bring in an additional 510 Ha<br />
water area for fish culture by constructing new ponds and renovating/improvement of<br />
existing fish ponds and establishing fresh water fish hatchery through FFDA & BAFFACOS<br />
and by implementing other CSS programs mentioned above. It is also targeted to produce<br />
additional fish production of 35% from the present level of 2500M.T in the culture sector.<br />
In order to avail the District wise approach of Central assistance for Fish Farmers<br />
Development Agency under Fresh Water Aquaculture (CSS) and for ensuring fisheries<br />
development faster in each District it is also proposed to create 3(three) new Fish Farmers<br />
Development Agency (CS) Units for Champhai, Serchhip and Lawngtlai Distrit during the<br />
Annual Plan, <strong>2006</strong>-<strong>2007</strong>.
- 61 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Highlights of Scheme-wise break-up of approved outlays for Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
are shown below: -<br />
(Rs. in lakh)<br />
Sl.<br />
Annual Plan<br />
Scheme<br />
No.<br />
<strong>2006</strong>-07<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
9.<br />
Direction & Administration<br />
Fish Seed Production-cum-Farming<br />
Fresh Water Aquaculture & Development of waterlogged area<br />
Development of Riverine Fisheries (Inland capture Fisheries)<br />
Development of Cold Water Fisheries (CSS)<br />
Information, Extension & Training<br />
Marketing<br />
Inland Fisheries Statistics (Database)<br />
BAFFACOS<br />
91.00<br />
10.00<br />
42.90<br />
0.50<br />
2.50<br />
14.00<br />
4.00<br />
0.10<br />
115.00<br />
TOTAL:- 280.00<br />
DETAILS OF THE SCHEMES<br />
SCHEME NO. 1<br />
1. DIRECTION AND ADMINISTRATION:<br />
The scheme provides for maintenance of the existing staff, under plan scheme<br />
including TA and other Administrative Cost during <strong>2006</strong>-<strong>2007</strong>. The scheme also provides<br />
for strengthening of Directorate and District level organization from existing staff which is<br />
extremely necessary in view of the growth of activities and resources besides stagnancy of<br />
posts since the last decade.<br />
Strengthening of Directorate and District level organization from existing staff:<br />
Department of Fisheries is implementing different Centrally Sponsored Scheme of<br />
which the major scheme is Fish Farmers Development Agency. So far 5 Fish Farmers<br />
Development Agencies Units have been sanctioned by the Govt. of India and implementing<br />
at Aizawl, Lunglei, Saiha, Kolasib and Aizawl West. Out of 5 FFDA Units only 3 Units i.e,<br />
Aizawl, Lunglei and Saiha could be provided District level establishment with necessary staff<br />
which are functioning at present. Remaining 2 Units i.e., Kolasib and Aizawl West are<br />
operated from Directorate staff as there is no District organization in the above 2 places. It<br />
is further planned to avail another 3 Units of Fish Farmers Development Agency for the<br />
remaining 3 Districts as a CSS programme. Therefore, it is necessary to strengthen the<br />
Fisheries organization to cater a smooth functioning and implementation of the programme.<br />
(1) Directorate level: It is proposed to upgrade the present post of Asst. Director of<br />
Fisheries to the post of Dy. Director of Fisheries in-charge CSS, NEC & Planning<br />
Programme. Besides the present post of J.E. to the rank of A.E. for better execution of<br />
civil works. While doing so 1(one) post of Fishery Extension Officer is also required to<br />
upgraded to Asst. Director of Fisheries. The above proposed Officer will assist the<br />
Director of Fisheries for close supervision and monitoring of the programme.<br />
(2) District level: It is further proposed to upgrade 5 posts of Fishery Extension Officer to<br />
the rank of District Fisheries Dev. Officer for implementation of FFDA programme, Fresh<br />
water Aquaculture schemes, Capture Fisheries and Cold water Fisheries at the District<br />
level under CSS programme.
- 62 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The Annual Plan outlay for <strong>2006</strong>-07 under Direction and Administration is Rs. 91.00<br />
lakh as per details shown below: -<br />
A. DIRECTION<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs.26.60 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.30.00 lakh<br />
Sl.<br />
No<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
Items Unit<br />
(Rs. in lakh)<br />
Target for Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
1 2 3 4 5<br />
Maintenance of existing staff<br />
Medical<br />
Wages<br />
T.E.<br />
O.E.<br />
Rents<br />
M.V. (Maintenance)<br />
Other charges<br />
No.<br />
No.<br />
No.<br />
No.<br />
No.<br />
No.<br />
No.<br />
No.<br />
4<br />
L.S<br />
L.S<br />
L.S<br />
L.S<br />
L.S<br />
L.S<br />
L.S<br />
8.50<br />
1.50<br />
4.00<br />
2.00<br />
6.00<br />
3.00<br />
3.00<br />
2.00<br />
Sub-Total ‘A’ 30.00<br />
B. ADMINISTRATION:-<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs.53.00 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.61.00 lakh<br />
Sl.<br />
No.<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
Items Unit<br />
(Rs. in lakh)<br />
Target for Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
1 2 3 4 5<br />
Maintenance of existing staff<br />
Medical<br />
Wages<br />
T.E.<br />
O.E.<br />
Maintenance/Minor Works<br />
No.<br />
No.<br />
No.<br />
No.<br />
No.<br />
No.<br />
32<br />
L.S<br />
L.S<br />
L.S<br />
L.S<br />
L.S<br />
45.00<br />
3.00<br />
1.00<br />
5.00<br />
6.00<br />
1.00<br />
Sub-Total ‘B’ 61.00<br />
TOTAL (Direction &Administration) 91.00<br />
INLAND FISHERIES<br />
SCHEME NO. 2<br />
2. FISH SEED PRODUCTION-CUM-FARMING:<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 3.00 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.10.00 lakh<br />
In order to meet the fish seed demand in the State 7nos of Fish Seed Farms have<br />
been constructed at Zawlnuam, Lengpui, Zobawk, Tamdil, Thenzawl, Ngengpui and<br />
Saikhawthlir under the Non-Lapsable Pool of Resources. It is therefore, targeted to produce<br />
about 50 lakh of fish seeds from the aforesaid Departmental Fish Seed Farms during <strong>2006</strong>-<br />
<strong>2007</strong>. Therefore, a provision has been made for maintenance and operational cost for<br />
production of Fish Seed from above Fish Seed Farms.
- 63 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
It is further proposed to give remaining Fish Seed Farm established earlier on lease<br />
basis to Private Interpriners for production of fish and fish seeds.<br />
Details of the scheme with an approved outlay of Rs. 10.00 lakh in the Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong> is shown below: -<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Unit<br />
Target for Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
1 2 3 4 5<br />
1. Maintenance of existing Fish Seed Farms<br />
at Zawlnuam, Lengpui, Zobawk, Tamdil,<br />
Thenzawl, Ngengpui and Saikhawthlir<br />
for fish seed production:i)<br />
Cost of inputs viz:- Lime, RCD/organic<br />
manures, fish feed, seed for raising<br />
brood stock etc.<br />
No.of farms 7<br />
ii) Labour charges<br />
No.of farms 7<br />
8.00<br />
iii) Nets & gears<br />
No.of farms 7<br />
2. Purchase of machineries and<br />
equipments, glasswares, chemicals etc.<br />
No.of farms 7<br />
2.00<br />
TOTAL 10.00<br />
SCHEME NO. 3<br />
3. FRESH WATER AQUACULTURE AND DEVELOPMENT OF WATERLOGGED AREA:<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 4.80 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.42.90 lakh<br />
(A) FRESH WATER AQUACULTURE:-<br />
Government of India has sanctioned 5(five) FFDA (Fish Farmers Development<br />
Agency) to be implemented sharing the fund on approved item of works by Central<br />
Government and State Government on 75:25 basis at Aizawl, Kolasib, Mamit, Lunglei and<br />
Saiha Districts. The scheme will continue during <strong>2006</strong>-<strong>2007</strong>. The item of work under<br />
BAFFACOS like construction of new fresh ponds, renovation/reclamation of existing ponds,<br />
providing inputs for fish farming and imparting training programme to the fish farmers are<br />
similar under FFDA programme. To avail the share of Government of India it is proposed to<br />
avail the subsidy for farmers for above works from Government of India for increasing more<br />
water areas as well as for establishment of Laboratory at state level for testing water quality<br />
and fish health investigation. Under the scheme there is provision for availing subsidy to<br />
individual farmers for integrated fish farming, aerator/pumps, setting up fresh water fish<br />
seed Hatchery and for establishment of fish feed unit on private sector. It is targeted to<br />
boost up the level of fish production to the tune of 4,000 M.T during <strong>2006</strong>-07.<br />
Further, the Annual Plan <strong>2006</strong>-07 also envisages creation of 2(two) new Fish Farmers<br />
Development Agency Units for Champhai and Serchhip Districst as per the Govt.of India’s<br />
district wise approach of Fish Farmers Development Agency (CSS). The potentiality and<br />
resources for fish farming is high in every District of <strong>Mizoram</strong>. Therefore functioning of<br />
Fish Farmers Development Agency Units in every District is necessary for proper<br />
exploitation of resource towards boosting up fish yield by availing the District-wise Central<br />
assistance under Fresh Water Aquaculture. This will ensure the fisheries development much
- 64 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
more faster in the individual districts in achieving the targets of self sufficiency in <strong>Mizoram</strong>.<br />
Therefore, it is targeted to create 2 nos. of new Fish Farmers Development Agency Units, 1<br />
each for Champhai and Serchhip Districts during <strong>2006</strong>-<strong>2007</strong>.<br />
It is further proposed to replace 3 old vehicles of the Department by purchasing<br />
three new vehicles under FFDA programme by availing Central Assistance. The following<br />
item of works is proposed under the programme during <strong>2006</strong>-<strong>2007</strong>.<br />
An outlay of Rs. 37.30 lakh has been provided in the Annual Plan <strong>2006</strong>-07 as State<br />
share under Fresh Water Aquaculture as per details shown below in the following paras.<br />
(B) DEVELOPMENT OF WATERLOGGED AREA:-<br />
Under Macro Management Programme of CSS in Fisheries sector Govt.of India has<br />
approved a Scheme for Development of Waterlogged area at 75:25 (75 percent Central share<br />
and 25 percent State Govt. share) funding pattern under the scheme there is provision of<br />
subsidy for Development of waterlogged area, supply of inputs (Fish/Prawn) seed, feed, etc.,<br />
training stipend. In <strong>Mizoram</strong>, about 50% of WRC area available are waterlogged where only<br />
one crop of Rice is harvested. If these lands can be reclaimed integrated fish farming –<br />
Paddy cum fish culture can be done and farmers can harvest two crops per year with high<br />
income generation. During <strong>2006</strong>-<strong>2007</strong>, it is targetted to develop 50 Ha. of waterlogged area<br />
for integrated fish farming.<br />
Details of the aforesaid schemes viz. — Fresh Water Aquaculture Scheme and<br />
Development of Waterlogged Area with an approved total outlay of Rs. 42.90 lakh for the<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong> are shown below: -<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Unit Physical<br />
Target for <strong>2006</strong>-07<br />
Financial<br />
Total<br />
GOM GOI<br />
1 2 3 4 5 6 7<br />
(A) FRESH WATER AQUACULTURE<br />
FFDA (CSS) (Copy of approved<br />
norms of GOI’s assistance is<br />
enclosed under ANNEXURE-A-I<br />
for ready reference): -<br />
1. Construction of new pond,<br />
subsidy @ Rs.75,000/ha.<br />
Ha. 20 3.75 11.25 15.00<br />
2. a) Renovation/reclamation of<br />
existing ponds, subsidy @<br />
Rs.15,000/ha.<br />
Ha. 248 9.30 27.90 37.20<br />
b) Cost of inputs viz:- Fish<br />
Seed/fish feed etc subsidy @<br />
Rs.7,500/ha.<br />
Ha. 248 4.65 13.95 18.60<br />
3. Integrated Fish Farming, subsidy<br />
@ Rs.20,000/ha.<br />
Ha. 54 2.70 8.10 10.80<br />
4. Aerator/pumps, subsidy @<br />
Rs.12,500/-for each set<br />
Unit 20 0.625 1.875 2.50<br />
5. Setting up of Fresh water Fish<br />
Seed Hatchery, subsidy @ Rs.1.20<br />
lakh/unit<br />
Unit 2 0.60 1.80 2.40<br />
6. Fish feed unit, subsidy @ Rs.1.00<br />
lakh per unit<br />
Unit 3 0.75 2.25 3.00
Sl.<br />
No.<br />
- 65 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Items Unit Physical<br />
(Rs. in lakh)<br />
Target for <strong>2006</strong>-07<br />
Financial<br />
Total<br />
GOM GOI<br />
1 2 3 4 5 6 7<br />
7. Training of fish farmers, stipend<br />
@ Rs.100/- per day for 10 days<br />
and T.A. @ Rs.100/- per trainee<br />
No. 1500 4.125 12.375 16.50<br />
8.<br />
9.<br />
(B)<br />
10.<br />
(C)<br />
11.<br />
Establishment of Laboratory at<br />
State level for water quality and<br />
fish health investigation<br />
Unit<br />
Purchase of vehicles<br />
No. 3 3.30 9.90 13.20<br />
Total of CSS<br />
DEVELOPMENT OF<br />
WATERLOGGED AREA (CSS):-<br />
37.30 111.90 149.20<br />
a) Development of Waterlogged<br />
areas, subsidy @ Rs.25,000/ha.<br />
Ha. 50 3.125 9.375 12.50<br />
b) Inputs (fish/prawn) seed, feed,<br />
etc., subsidy @ Rs.15,000/ha.<br />
Ha.<br />
1<br />
7.50<br />
22.50<br />
30.00<br />
c) Training stipend @ Rs.100/per<br />
day for 10 days and T.A @<br />
Rs.100/-per trainee<br />
No. 170 0.45 1.35 1.80<br />
Sub-Total II 5.45 16.35 21.80<br />
Total of CSS (A+B):-<br />
<strong>PLAN</strong> SCHEME:-<br />
42.75 128.25 171.00<br />
Creation of 2 Units of FFDA for<br />
Champhai and Serchhip Districts<br />
No. 2 0.15 - 0.15<br />
Grand Total A+B+C 42.90 128.25 171.15<br />
SCHEME NO. 4<br />
50<br />
1.875<br />
5.625<br />
4. DEVELOPMENT OF RIVERINE FISHERIES UNDER INLAND CAPTURE FISHERIES<br />
(RESERVOIRS/RIVERS, ETC.)<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 0.50 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 0.50 lakh<br />
Inland Capture Fisheries (Reservoirs/Rivers, etc.) is a approved scheme under CSS<br />
programme of Government of India on Development of Inland Fisheries and Aquaculture<br />
under Macro Management approach in stated during 2005-<strong>2006</strong> and will continue upto 10 th<br />
Plan period. Government of India also recommended the implementation of schemes<br />
through the Fisheries Department of State Government on 75:25 central and state share<br />
financing pattern. During <strong>2006</strong>-<strong>2007</strong>, it is proposed to implement the scheme under CSS<br />
programme by availing 75% scheme cost from Central Government and providing 25% State<br />
annual plan fund taking a view for conservation and protection of Rivers/Reservoirs<br />
fisheries. Conservation and protection of Riverine Fisheries is quite essential to enhance the<br />
fish yield from the Rivers/Reservoirs etc. (Capture sector). The Department has taken up<br />
ranching programme in the rivers by the stocking fish seeds to propagate the Riverine and<br />
Reservoirs stocks. More efforts are required to study and survey the major riverine system<br />
towards conservation and propagation of economic varieties of fishes.<br />
7.50
- 66 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
With the existence of the <strong>Mizoram</strong> Fisheries Act which has been passed by the<br />
<strong>Mizoram</strong> Legislative Assembly on 27.9.2005, its implementation will call for intensive study<br />
and survey of riverine system, fauna and habitats of economically important varieties of<br />
fishes, declaration of fish sanctuary etc for development of Riverine Fisheries in the State.<br />
Details of the scheme with an approved outlay of Rs. 0.50 lakh as State share for the<br />
Annual Plan <strong>2006</strong>-07 is shown below: -<br />
Sl.<br />
No.<br />
Items Unit Physical<br />
(Rs. in lakh)<br />
Target for <strong>2006</strong>-07<br />
Financial<br />
Total<br />
GOM GOI<br />
1 2<br />
A. INLAND CAPTURE FISHERIES<br />
(CSS):<br />
3 4 5 6 7<br />
1. Riverine Fisheries Conservation<br />
and Awareness Programme: -<br />
Preparation of feasibility report/<br />
Implementation of the <strong>Mizoram</strong><br />
Fisheries Act/Rules, Awareness<br />
programmes, etc.<br />
No. LS 0.50 1.50 2.00<br />
TOTAL:- 0.50 1.50 2.00<br />
5. COLD WATER FISHERIES(CSS):<br />
SCHEME NO. 5<br />
Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 2.50 lakh<br />
The Annual Plan <strong>2006</strong>-07 envisages to develop cold water fisheries in the state by<br />
initiating with Resource survey works and experimentation for rearing/breeding of cold<br />
water fishes viz. - Mahseer sp. etc. in the Departmental fish farms as well as on fish farmers<br />
fish pond situated at higher elevation in <strong>Mizoram</strong> by availing 75% of Central assistance from<br />
Government of India under Cold Water Fisheries (CSS).<br />
Details of the scheme with an approved outlay of Rs. 2.50 lakh for the Annual Plan<br />
<strong>2006</strong>-07 is shown below: -<br />
Sl.<br />
No.<br />
Items Unit Physical<br />
(Rs. in lakh)<br />
Target for <strong>2006</strong>-07<br />
Financial<br />
Total<br />
GOM GOI<br />
1 2 3 4 5 6 7<br />
1. Resource survey<br />
No. of<br />
survey<br />
1 1.25 3.75 5.00<br />
2. Investigation/Experimentation<br />
of culture/ breeding of cold<br />
water fishes<br />
No. 1 1.25 3.75 5.00<br />
TOTAL 2.50 7.50 10.00
- 67 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. 6<br />
6. INFORMATION, EXTENSION & TRAINING:<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 3.80 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.14.00 lakh<br />
The scheme proposes for extension of technology to the fish farmers in modern<br />
methods of fish culture through Extension and Training, publication and demonstration<br />
activities. The Annual Plan <strong>2006</strong>-<strong>2007</strong> also provides fund for meeting the cost of organizing<br />
training of the fish farmers and deputing In-service/fresh personnels for training in various<br />
courses of fisheries science.<br />
The ongoing State sector scheme of Information, Extension & Training in Fisheries<br />
Department will be strengthened with the CSS scheme in Fisheries Training and Extension<br />
(CSS) to be implemented on 80:20 Central and State funding pattern. Since the items of the<br />
scheme are similar it is proposed to combine both the schemes together for availing Central<br />
share for better co-ordination and implementation of the scheme during <strong>2006</strong>-<strong>2007</strong>.<br />
Details of the scheme with an approved outlay of Rs. 14.00 lakh for the Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong> is shown below: -<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Unit<br />
Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
1 2 3 4 5<br />
Information, Extension & Training:-<br />
A. Normal Scheme:<br />
(GOM)<br />
1. Publication of Departmental Magazine,<br />
Booklets, advertisement, etc.<br />
No. LS 1.50<br />
2. Training of in-service personnel/fresh<br />
personnel for various courses in fisheries<br />
science, stipend, etc.<br />
No. 10 0.50<br />
Sub-Total of ‘A’ 2.00<br />
Sl.<br />
No.<br />
B. CSS: (Rs. in lakh)<br />
Target for <strong>2006</strong>-07<br />
Items Unit Physical<br />
Financial<br />
GOM GOI Total<br />
20% 80%<br />
1 2 3 4 5 6 7<br />
1. Human Resource Development<br />
Stipend @ Rs.1500/-per participant<br />
during the period of 15day training<br />
+ actual to and fro Bus fair (L/S) @<br />
Rs.250/-per head (in 4 Batch)<br />
No. 500 1.64 6.56 8.20<br />
2. Establishment of Fish Farmers<br />
training center<br />
No. 3 9.00 36.00 45.00<br />
3. Publication of handbook:<br />
a) Honorarium to Authors<br />
No. 1 0.03 0.12 0.15<br />
b) Publication by Government No. 500 0.10 0.40 0.50
Sl.<br />
No.<br />
- 68 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Items Unit Physical<br />
(Rs. in lakh)<br />
Target for <strong>2006</strong>-07<br />
Financial<br />
GOM GOI Total<br />
20% 80%<br />
1 2 3 4 5 6 7<br />
4. Publication of Training/Extension<br />
manuals:a)<br />
Honorarium to the expert<br />
No. 3 0.03 0.12 0.15<br />
b) Publication by Government No. 500×3 0.12 0.48 0.60<br />
5. Organising workshop/Seminars etc. No. 1 0.08 0.32 0.40<br />
6. Production of documentary films<br />
on Fisheries and aquaculture<br />
No. 1 1.00 4.00 5.00<br />
Sub-Total of ‘B’ 12.00 48.00 60.00<br />
TOTAL(A+B) 14.00 48.00 60.00<br />
Grand total fund required for implementation of ongoing State sector scheme is<br />
Rs.2.00 lakh and 20% State share for implementation of CSS scheme is Rs. 12.00 lakh<br />
totaling to Rs. 14.00 lakh.<br />
SCHEME NO. 7<br />
7. INLAND FISH MARKETING:-<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs.18.00 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 4.00 lakh<br />
In order to improve the fish marketing system in the State and to provide ice and<br />
Cold Storage facilities (post harvest) to the fish farmers/sellers 3 nos. of Ice Plants and 2nos.<br />
of Cold Storages have been set up at Bawngkawn, Kolasib and Bilkhawthlir. These assets are<br />
functioning and providing requirement of ice blocks and Cold Storage facilities to the fish<br />
producers/sellers and consumers regularly at subsidized rates.<br />
An outlay of Rs. 4.00 lakh has been provided in the Annual Plan, <strong>2006</strong>-<strong>2007</strong> for the<br />
maintenance of 2 nos. of Ice Plant-cum-Cold Storages Units at Bawngkawn and Kolasib and<br />
1no. Ice Plant Unit at Bilkhawthlir. Besides, electricity and water charges of these plants and<br />
cost of labour charges are also required for regular operation of these plants and for<br />
providing cold chain facilities to the fish farmers/fish sellers.<br />
Details of the scheme and fund proposed under the Marketing scheme for the<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong> with an outlay of Rs. 4.00 lakh is as shown below: -<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Unit<br />
Annual Plan 2005-<strong>2006</strong><br />
Physical Financial<br />
1 2 3 4 5<br />
1.<br />
2.<br />
3.<br />
Maintenance of Ice Plants and Cold Storages:-<br />
Maintenance of Power and water supply for<br />
Ice Plants-cum-Cold Storages at Bawngkawn &<br />
Kolasib<br />
Ice Plant maintenance at Bilkhawthlir<br />
Maintenance of labours in the Ice Plant/ Cold<br />
Storage<br />
No.<br />
No.<br />
No.<br />
2<br />
1<br />
4<br />
2.00<br />
1.50<br />
0.50<br />
TOTAL 4.00
- 69 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. 8<br />
7. DEVELOPMENT OF INLAND FISHERIES STATISTICS (DATABASE):<br />
The scheme provides for maintenance of the on-going Centrally Sponsored Scheme<br />
for Development of Inland Fisheries Statistics through information, networking, survey etc.<br />
The Scheme is functioning with 100% grant-in-aid from the Central Government towards<br />
Salary of staff, Machineries & Equipments etc. Therefore, a token provision of Rs. 0.10 lakh<br />
has been kept towards meeting the incidental charges under the scheme during Annual Plan<br />
<strong>2006</strong>-07 as follows: -<br />
Sl.<br />
No.<br />
Items Unit<br />
(Rs. in lakh)<br />
Annual Plan 2005-<strong>2006</strong><br />
Physical Financial<br />
1 2 3 4 5<br />
1. Development of Inland Fisheries Statistics:-<br />
Incidentals/other charges<br />
No. LS 0.10<br />
TOTAL 0.10<br />
SCHEME NO. 9<br />
9. BAFFACOS:-<br />
(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 120.00 lakh<br />
(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 115.00 lakh<br />
With an earmarked outlay of Rs. 115.00 lakh for BAFFACOS during Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong>, it is envisaged to create more new water areas for achieving sustained fish<br />
production to combat the impending famine due to bamboo flowering in <strong>Mizoram</strong>.<br />
Therefore, a larger chunk of the proposed fund in the tune of Rs. 104.10 lakh has been<br />
targeted for construction of new ponds comprising of 60 Ha. including training of 255 nos.<br />
of fish farmers (beneficiaries) in modern technology of fish farming and supply of inputs<br />
free of cost.<br />
Besides, in order to bring in more water areas for boosting up fish production, it is<br />
also envisaged to take up renovation/ reclamation of 78.4 Ha. of existing ponds under FFDA<br />
(CSS) through BAFAFCOS with an outlay of Rs.4.90 lakh during <strong>2006</strong>-<strong>2007</strong> in which the<br />
Govt.of India’s assistance against the State matching share would be in the tune of Rs.14.70<br />
lakh. Besides, it is also targeted to train up a cadre of 400 fish farmers through FFDA(CSS)<br />
under Baffacos during <strong>2006</strong>-<strong>2007</strong>.
- 70 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Details of the scheme showing physical and financial targets with an approved<br />
outlay of Rs. 115.00 lakh for Annual Plan <strong>2006</strong>-<strong>2007</strong> is stated below: -<br />
(Rs. in lakh)<br />
Sl.<br />
No.<br />
Items Unit<br />
Annual Plan 2005-<strong>2006</strong><br />
Physical Financial<br />
1 2 3 4 5<br />
1.<br />
BAFFACOS:-<br />
Water area to be covered for fish<br />
farming:a)<br />
Construction of new fish ponds<br />
(individuals/Fishery Society) supply of<br />
inputs and Training of fish farmers: -<br />
i) Construction of pond @ Rs.1.50<br />
lakh/Ha.<br />
Ha. 60<br />
90.00<br />
ii) Cost of inputs for new ponds viz:-<br />
Lime, fish seed, fish feed etc @<br />
Rs.0.15 lakh/Ha.<br />
Ha. 60<br />
9.00<br />
iii) Training of fish farmers @ Rs.0.02<br />
lakh per trainee<br />
No. 255<br />
5.10<br />
Sub-Total: 104.10<br />
b) Renovation/reclamation of existing<br />
ponds including supply of inputs and<br />
Training of farmers under FFDA (CSS)<br />
through Baffacos: -<br />
i) Renovation/improvement<br />
GOM GOI Total<br />
@ Rs.0.15 lakh/Ha.<br />
ii) Cost of inputs for renovated/<br />
Ha. 78.4 2.94 8.82 11.76<br />
improved ponds viz:- Lime, fish<br />
seed, fish feed etc @ Rs.0.075<br />
lakh/Ha.<br />
iii) Training of fish farmers @<br />
Ha. 78.4 1.47 4.41 5.88<br />
Rs.100/Stipend per day for 3 days<br />
and lump sum cost towards travel<br />
expenses<br />
No. 400 0.49 1.47 1.96<br />
Sub-Total:- 4.90 14.70 19.60<br />
c) Administrative and contingency cost<br />
viz. - O.E. & T.E.<br />
No. LS 6.00<br />
TOTAL 115.00 14.70 19.60
1. BACKGROUND AND STRATEGY:<br />
- 76 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ENVIRONMENTS & FORESTS<br />
<strong>Mizoram</strong> State with hilly terrain and primarily agricultural economy is inhabited by<br />
tribal population. Soil and Water are two important resources on which growth and<br />
productivity of agricultural economy depends. Forests play important role in production<br />
and conservation of soil and water. Forests also provide many important day-to-day needs<br />
of local population such as fuel, fodder, timber, food in form of wild fruits and vegetables<br />
and other non-wood forests produce. Forests play a vital role in environment stability,<br />
ecological balance and over all economic development of the state like <strong>Mizoram</strong><br />
undoubtedly revolves around the Forests.<br />
National Forest Policy 1988 stipulate that hilly and mountainous regions like<br />
<strong>Mizoram</strong> need to maintain at least 2/3 of the total geographical area under tree cover in<br />
order to prevent soil erosion, land degradation and protection of the fragile eco-system. As<br />
against this goal, at present notified forests (reserved/protected forests) constitute about<br />
38% of the geographical area and even most of these are open, degraded and subjected to<br />
pressure of shifting cultivation, forest fire and other forms of biotic pressures.<br />
Shifting cultivation is still widely practiced in <strong>Mizoram</strong>. These practices not only<br />
affect ecology of the area but also decrease natural regeneration of tree species to a<br />
considerable extent. The destruction of habitat of plants and animals has not only led to the<br />
reduction in population of wild animals in the forest, but also rendering many species of<br />
rare plants and animals to the extent of becoming endangered/extinction.<br />
The survey, demarcation, mapping and settlement of land including forest lands is a<br />
pre-requisite for evolving proper integrated land use system. This task is yet to be<br />
completed in the state. Hence for proper control and scientific management of forests on a<br />
sustainable basis, consolidation of notified forests/reserved forests will be necessary.<br />
The productivity of forests is already very low in <strong>Mizoram</strong>. There has been very little<br />
silvicultural research to evolve technologies and practices suiting to local conditions to<br />
increase productivity. Destruction of forests by illicit fellings and removal of forest produce<br />
to meet domestic need of Timber and Firewood, besides, forest fire, encroachments and<br />
grazing are common. Protection of forests from such detrimental factors is inevitable for<br />
ecological and environmental security.<br />
There is a wide gap between supplies from existing forests and the ever increasing<br />
demands. Hence to increase production of timber and non-timber forest produce to meet<br />
local needs and to reduce the gap between demands and the supply, undertaking massive<br />
afforestation programme through plantation of utility tree species and aided natural<br />
regeneration would be necessary. Plantations created earlier need periodic tending for<br />
improving wood production. It would be necessary to provide sufficient funds for managing<br />
the forest to scientifically achieve maximum biomass and non-timber forest produce from<br />
the forests. To meet increasing demand of forest produce and at the same time reduce<br />
pressure on existing shrinking forest resources, extension of tree cover beyond conventional<br />
forest areas would be necessary. For this purpose, tree growing and protecting forests with<br />
active involvement and participation of private individuals need to be promoted on massive<br />
scale through proper extension programmes to cope up with the increased work<br />
programme.
- 77 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
North-East India is considered to be a mega-bio-diversity region. Wildlife are<br />
important resources which play vital role in ensuring ecological stability. In recent years<br />
poaching of animals for the purpose of earning money has become a big challenge to the<br />
Forest Department is Protection capabilities in terms of mobility, equipments and trained<br />
manpower to keep this undesirable activity under proper check.<br />
To cope up with the increased work programmes, and to ensure better preservation,<br />
and management of forests and wildlife for sustainable use of forest resources<br />
strengthening of forest organisation with respect to manpower and human resource<br />
development through training is necessary. Equipments technology and facilities are also<br />
extremely necessary.<br />
<strong>APPROVED</strong> OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />
Sl.No. Name of Scheme<br />
Approved Outlay<br />
(Rs. In lakh)<br />
1. Direction and Administration<br />
i) – Direction 146.66<br />
ii) – Administration 161.95<br />
2. Survey of Forest Resources<br />
i) – Forest Research 27.50<br />
ii) – Consolidation of Forests and Working Plans 6.40<br />
3. Forest Conservation and Development<br />
i) – Forest Protection 43.41<br />
4. Extension and Training<br />
i) – Forestry Training 6.75<br />
ii) – Forest Extension 14.00<br />
5. Preservation of Wildlife 97.966<br />
6. Other Expenditure 9.364<br />
7. Maintenance of Forest under TFC 500.00<br />
8. BAFFACOS under TFC 225.00<br />
9. State Share under I.F.P. 81.00<br />
10. <strong>Mizoram</strong> State Pollution Control Board 15.00<br />
GRAND TOTAL : 1335.00<br />
DESCRIPTION OF SCHEMES <strong>APPROVED</strong> FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. DIRECTION AND ADMINISTRATION<br />
(i) DIRECTION<br />
This scheme is to provide for expenditure towards salary/allowances of the existing<br />
staff (46 nos.) and establishment cost of PCCF & Circle Offices. Approved financial outlay<br />
are as follows: -<br />
Approved Outlay<br />
Item of Expenditure<br />
(Rs. in lakh)<br />
001(01) – Direction:<br />
(01) – Salary 66.90<br />
(02) – Wages 13.71
- 78 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Item of Expenditure<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(06) – Medical Treatment 2.00<br />
(11) – Traveling Expenses 15.00<br />
(13) – Office Expenses 20.00<br />
(14) – Rent -<br />
(26) – Advertisement 4.00<br />
(28) – Professional Service 0.32<br />
(34) – Scholarship/Stipend 1.00<br />
(50) – Other Charges (including Green <strong>Mizoram</strong>) 23.73<br />
(51) – Motor Vehicles -<br />
(52) – Machineries & Equipment -<br />
TOTAL OF 001(01): 146.66<br />
(ii) ADMINISTRATION :<br />
This scheme is to provide for expenditure towards salary/allowances of the existing<br />
staff (90 nos.) and establishment cost of 11 Territorial Divisions besides the normal<br />
expenses to run these establishments. Financial proposals are as follows:-<br />
Item of Expenditure<br />
001(02) – Administration:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(01) – Salary 68.20<br />
(02) – Wages 36.25<br />
(06) – Medical Treatment 5.00<br />
(11) – Traveling Expenses 28.00<br />
(13) – Office Expenses 22.00<br />
(14) – Rents 2.50<br />
(26) – Advertisement -<br />
(51) – Motor Vehicles -<br />
TOTAL OF 001(02): 161.95<br />
2. SURVEY OF FOREST RESOURCES:<br />
The main object of the scheme is to carry out Forestry Research for improving the<br />
productivity of forest resources and to under take status survey of forest produce besides,<br />
consolidation of forest including preparation of management plans (working plans) for<br />
forest resources of the State.<br />
(i) RESOURCES SURVEY & SILVICULTURE RESEARCH :<br />
The need has been felt to conduct forestry research on various aspects such as<br />
(i) Phenological studies of important local tree species.<br />
(ii) Standardization of nursery technique of important indigenous species to be<br />
used for afforestation programmes.<br />
(iii) Under taking experimental plantations of new species (local as well as exotic)<br />
to standardize their Silviculture practice for adoption in our afforestation<br />
programmes.<br />
(iv) Survey of Minor Forest Produce like Cane, Medicinal plants, etc. and their<br />
development for better utility and value addition.
- 79 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Approved financial outlays are as follows: -<br />
Item of Expenditure<br />
005(01) – Forest Resources Survey:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(01) – Salary 21.00<br />
(06) – Medical Treatment 1.00<br />
(11) – Traveling Expenses 3.00<br />
(13) – Office Expenses 1.50<br />
(27) – Minor Works/Maintenance 1.00<br />
TOTAL OF 005(01): 27.50<br />
(ii) CONSOLIDATION OF FOREST & WORKING <strong>PLAN</strong> :<br />
Forest survey, demarcation, consolidation of forests, collection, compilation &<br />
analysis of various data on Forest Resources are required to be taken up before<br />
management plans for managing forests on scientific lines could be prepared. Hon’ble<br />
Supreme Court has directed that Working Plans should be completed within a period of two<br />
years. This direction could not be complied with mainly due to financial constraints.<br />
Financial outlays approved are: -<br />
Item of Expenditure<br />
Approved Outlay<br />
(Rs. in lakh)<br />
005(02) – W.P.O.:<br />
(01) – Salary 2.90<br />
(06) – Medical Treatment 0.50<br />
(11) – Traveling Expenses 2.00<br />
(13) – Office Expenses 1.00<br />
(27) – Minor Works/Maintenance -<br />
TOTAL OF 005(02): 6.40<br />
3. FOREST CONSERVATION AND DEVELOPMENT<br />
(i) FOREST PROTECTION :<br />
Forest is a biological entity and a renewable resource subject to damages from<br />
various factors namely fire, encroachment, illicit cutting/removal of forest produce, faulty<br />
land use practices (shifting cultivation) etc. These factors are prevalent in the State with the<br />
significant extent thereby degrading and depleting the forest resources much to the<br />
detriment to its fragile ecology, environmental stability and ecological balance which<br />
ultimately reduce the productivity of land. With the increasing population of both human &<br />
livestock and demand for wood and other forest produce which is far beyond the<br />
sustainable supplies of the shrinking forest cover, protection of forest is becoming more<br />
challenging. Protection of forest from Forest Fire is very important in the context of<br />
<strong>Mizoram</strong>. The approved financial outlay for meeting the salary/allowances of staff (67 nos.)<br />
and other establishment cost during <strong>2006</strong> - <strong>2007</strong> are given below: -<br />
Item of Expenditure<br />
101(01) – Forest Protection:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(01) – Salary 36.91<br />
(06) – Medical Treatment 1.50<br />
(11) – Traveling Expenses 3.00<br />
(13) – Office Expenses 2.00<br />
(51) – Motor Vehicles -<br />
TOTAL OF 101(01): 43.41
- 80 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. EXTENSION AND TRAINING:<br />
(i) FORESTRY TRAINING (HUMAN RESOURCES DEVELOPMENT) :<br />
The objective here is to import training in Forestry subject to the field-staff and<br />
officers and of this Department and to make them per take periodic training in other State<br />
so as to update their skills/knowledge and thus enable them to discharge their<br />
responsibilities more efficiently. Approved outlay is as follows:-<br />
Item of Expenditure<br />
003(01) – Training of Forest Personnel:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(01) – Salary 3.00<br />
(06) – Medical Treatment 0.50<br />
(11) – Traveling Expenses 2.75<br />
(13) – Office Expenses 0.50<br />
TOTAL OF 003(01): 6.75<br />
(ii) EXTENSION :<br />
The objective here is to promote, motivate & seek co-operation of the public to<br />
protect existing forests & wildlife through suitable programmes and awareness campaign<br />
alongwith observation of events and festivals likes Vanamahotsava, Wildlife Week. Raising<br />
of seedlings for distribution for planting by individuals & organisations on their lands, etc.<br />
Approved financial outlays are as follows:-<br />
Item of Expenditure<br />
003(02) – Forest Extension:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(01) – Salary 1.50<br />
(06) – Medical Treatment 0.50<br />
(11) – Traveling Expenses 2.50<br />
(13) – Office Expenses 1.50<br />
(16) – Publications 5.00<br />
(27) – Minor Works/Maintenance 1.00<br />
(50) – Other Charges 2.00<br />
TOTAL OF 003(02): 14.00<br />
5. PRESERVATION OF WILDLIFE:<br />
Conservation and management of Wildlife & Bio-diversity in the protected areas of<br />
the State are done through protection measures by way of engaging Wildlife Guards. The<br />
provision of feeds and sanitation to Mini Zoo at Aizawl and Deer Park at Thenzawl are also<br />
necessary. Payment of salary and allowances of staff (16 nos.) and maintenance/<br />
development of zoo. Government of India has also approved the re-location of zoo from<br />
present location at Bethlehem veng to a new site at Aizawl- Sairang road. It is also necessary<br />
to provide matching share for availing financial assistance from Central Zoo authority and<br />
Project Tiger Scheme of Government of India. As such, an amount of Rs. 93.33 lakh is<br />
included as Sate Matching Share.
- 81 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Item of Expenditure<br />
02 – Environmental Forestry & Wildlife:<br />
110(01) – Preservation of Wildlife:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(01) – Salary 16.64<br />
(02) – Wages 10.46<br />
(06) – Medical Treatment 1.00<br />
(11) – Traveling Expenses 2.50<br />
(13) – Office Expenses 2.50<br />
(14) – Rents 2.13<br />
(27) – Minor Works (State matching) 46.50<br />
(50) – Other Charges (including zoo feed) 16.236<br />
(51) – Motor Vehicles -<br />
TOTAL OF 110(01): 93.33<br />
6. OTHER EXPENDITURES :<br />
Environment & Forest Deptt. has more than 800 staff of uniform cadre. Due to fund<br />
constraint uniforms were not provided to staff during the past 4-5 years. This situation has<br />
led to serious erosion in discipline as well as morale of the staff. Wearing of proper uniform<br />
is essential for enforcement of rules and disciplines. Though not sufficient, Rs. 10.00 lakh is<br />
earmarked for staff uniforms during <strong>2006</strong> – <strong>2007</strong>.<br />
Item of Expenditure<br />
Approved Outlay<br />
(Rs. in lakh)<br />
800(01) – Uniforms:<br />
(13) – Office Expenses 9.364<br />
TOTAL OF 800(01): 9.364<br />
7. MAINTENANCE OF FOREST UNDER T.C.F. :<br />
During the year <strong>2006</strong>-07 an amount of Rs. 500.00 lakh is earmarked for Preservation<br />
and Maintenance of Forests in the state of <strong>Mizoram</strong> as follows.<br />
Item of Expenditure<br />
800(02) – Maintenance of Forest under T.F.C.:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(02) – Wages 43.60<br />
(13) – Office Expenses 10.00<br />
(27) – Minor works/Maintenance 381.73<br />
(50) – Other Charges 37.02<br />
(51) – Machinery & Equipment 27.65<br />
TOTAL OF 800(02): 500.00<br />
8. BAFFACOS UNDER T.F.C. :<br />
The state has sought and assistance of Rs. 566 crore to meet its project cost for<br />
tacking the problem of rodents arising out of impending bamboo flowering, which leads to<br />
large scale losses in Agriculture and Forestry. As such an amount of Rs. 225.00 lakh is<br />
earmarked for this purpose for commencing the project as follows:
- 82 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Item of Expenditure<br />
800(03) – BAFFACOS under T.F.C.:<br />
Approved Outlay<br />
(Rs. in lakh)<br />
(13) – Office Expenses 12.50<br />
(27) – Minor works/Maintenance 200.00<br />
(50) – Other Charges 12.50<br />
TOTAL OF 800(03): 225.00<br />
9. The Ministry has formulated a new scheme titled “Integrated Forest Protection<br />
Scheme” for implementation during the 10 th Plan. The scheme has since been approved by<br />
the Cabinet Committee on Economic Affairs. The main components of the scheme are: -<br />
A. Forest Fire Control Management.<br />
B. Infrastructure development which has two sub components as –<br />
(i) Working Plan Preparation/Survey Demarcation.<br />
(ii) Strengthening of Infrastructure for Forest Protection.<br />
The Scheme was proposed to be 100% Centrally Sponsored but as per the decision of<br />
the CCEA there has been a change in the pattern of funding. The Scheme will no longer be<br />
100% Centrally Sponsored instead the Central Assistant would be 90% of the Project cost<br />
with the State and UTs sharing the balance. As such, an amount Rs. 81.00 lakh is provided<br />
during this Annual Plan <strong>2006</strong>-07.<br />
Item of Expenditure<br />
Approved Outlay<br />
(Rs. in lakh)<br />
State Matching Share: 81.00<br />
10. MIZORAM STATE POLLUTION CONTROL BOARD<br />
200(01) - Assistance to MPCB - Due to limited budget, Forest Department will not be<br />
in position to accommodate all the requirement of MPCB during <strong>2006</strong> – <strong>2007</strong>.<br />
Approved Outlay<br />
Item of Expenditure<br />
(Rs. in lakh)<br />
3435 – Ecology & Environment<br />
800(01) – <strong>Mizoram</strong> State Pollution Control Board:<br />
(31) – Grand-in-aid 15.00<br />
TOTAL OF 800(01): 15.00<br />
GRAND TOTAL: 1335.00
- 86 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
COOPERATION<br />
The 10 th Plan covers the period from 2002 – 03 to <strong>2006</strong> – 07. The present <strong>2006</strong> –<br />
<strong>2007</strong> Annual Plan is the final year plan of 10 th Plan. The strategy of the 10 th Plan of the<br />
Cooperative Department is to strengthen and enhance the progress of Cooperative<br />
Movement already launched in the 9 th Plan with broad objectives of Socio-Economic<br />
Development of the people of <strong>Mizoram</strong> with special emphasis on the following activities.<br />
(a) Development of Cooperative Farming in Agriculture, Horticulture and Allied<br />
activities like Piggery, Dairy, Fishery, Sericulture, Poultry etc.<br />
(b) Strengthening of Cooperative Credit Structure for obtaining credit facilities from<br />
financial institutions.<br />
(c) Establishment of appropriate linkages to ensure remunerative prices to member<br />
farmers of Cooperative Societies.<br />
(d) Providing Cooperative Education for inculcating the Cooperative Principles,<br />
Ideologies and Movement as a whole among the Cooperative members by conducting<br />
suitable programmes for education, training and publicity.<br />
(e) Strengthening the organizational set up of the department as would<br />
boost up restructuring the Cooperative Movement.<br />
(f) Giving boost to the Consumer Movement of the State.<br />
The Annual Plan of <strong>2006</strong> – <strong>2007</strong> is prepared in the light of 10 th Plan strategies above.<br />
Special attention will be made on :-<br />
(a) Better performances in the department as well as in the Cooperative Institutions.<br />
(b) Cooperative Farming in the Agriculture and Allied Activities.<br />
(c) Strengthening of Cooperative Credit Structure.<br />
(d) Propagation of Cooperative Education, Training and Publicity.<br />
(e) Boost up the Consumer Movement of the State.<br />
Sl.<br />
No.<br />
Break-up of the Plan outlay of <strong>2006</strong> – <strong>2007</strong>.<br />
Name of Schemes<br />
(Rs. in lakh)<br />
Annual Plan Outlay for<br />
<strong>2006</strong> - <strong>2007</strong><br />
Revenue Capital Total<br />
1 2 3 4 5<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
Direction & Administration<br />
Training & Education<br />
Audit of Cooperative Societies<br />
Assistance to Credit Banking<br />
Asst. to Public Sector & other undertaking<br />
Cooperative Training & Education<br />
Asst. to other types of Cooperative Societies<br />
162.00<br />
3.00<br />
11.00<br />
55.00<br />
70.50<br />
49.50<br />
10.00<br />
-<br />
-<br />
169.00<br />
-<br />
-<br />
-<br />
172.00<br />
3.00<br />
11.00<br />
169.00<br />
55.00<br />
70.50<br />
49.50<br />
TOTAL 351.00 179.00 530.00
- 87 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. DIRECTION & ADMINISTRATION:<br />
(a) Direction - Achieving better performance by all the employees is one of the objects<br />
in this Directorate. It performs the works of overall Supervision, Registration, Assistance,<br />
Liquidation, Arbitration and Control of registered Cooperative Societies etc. There are eight<br />
(8) Officers and 21 other Staff under this head. The proposal to up-grade one post of JRCS<br />
to the Addl. RCS Post during 2004 – 2005 will be carried on <strong>2006</strong> – <strong>2007</strong> in case the same is<br />
not done during 2005 – <strong>2006</strong>.<br />
The following is the break-up of Plan Outlay under Direction.<br />
Sl.<br />
No.<br />
Name of Schemes<br />
(Rs. in lakh)<br />
Annual Plan Outlay for<br />
<strong>2006</strong> - <strong>2007</strong><br />
Revenue Capital Total<br />
1 2 3 4 5<br />
1. Salary<br />
45.00 - 45.00<br />
2. Wages<br />
0.50 -<br />
0.50<br />
3. M.R<br />
4.00 -<br />
4.00<br />
4. T.E<br />
2.00 -<br />
2.00<br />
5. O.E<br />
15.00 - 15.00<br />
6. Publication<br />
2.00 -<br />
2.00<br />
7. Minor Works<br />
5.50 -<br />
5.50<br />
8. Other charges<br />
3.00 -<br />
3.00<br />
TOTAL 77.00 - 77.00<br />
(b) Administration - There are 6 Districts Offices at present under this head. Two more<br />
Districts Offices proposed to be opened at Serchhip and Mamit during 2005 – <strong>2006</strong> will be<br />
carried on during this year if not open during 2005 – <strong>2006</strong> and will be manned from the<br />
existing staff of the department. The District Offices perform the works of Audit,<br />
Inspection, Supervision, Organisation, Verification etc. There are 2 Officers and 46 Staff<br />
under the head of Administration.<br />
Sl.<br />
No.<br />
The following is the break-up of the Plan Outlay of the Districts during <strong>2006</strong> – <strong>2007</strong>.<br />
Name of Schemes<br />
(Rs. in lakh)<br />
Annual Plan Outlay for<br />
<strong>2006</strong> - <strong>2007</strong><br />
Revenue Capital Total<br />
1 2 3 4 5<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
Salary<br />
Wages<br />
M.R<br />
T.E<br />
O.E<br />
Rent<br />
Minor Works<br />
Major Works<br />
52.00<br />
1.00<br />
6.00<br />
7.00<br />
16.00<br />
1.00<br />
2.00<br />
-<br />
-<br />
-<br />
-<br />
-<br />
-<br />
-<br />
-<br />
10.00<br />
52.00<br />
1.00<br />
6.00<br />
7.00<br />
16.00<br />
1.00<br />
2.00<br />
10.00<br />
TOTAL 85.00 10.00 95.00<br />
2. TRAINING & EDUCATION: Training is the requisite ingredients for the effective<br />
management of the Cooperative Societies and for conducting the Audit, Inspection and<br />
Supervision efficiently. Officers are regularly sent to undergo training in the course of<br />
PGDCBM at VAIKUNTH MEHTA, PUNE and H.D.C. at Cooperative College, Guwahati. It is also
- 88 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
obligatory to celebrate the All India Cooperative Week from 14 th to 20 th November every year.<br />
Requirement of fund for Training and Cooperative Week Celebration are included here..<br />
Break-Up of the Plan Outlay under this Head for <strong>2006</strong> – <strong>2007</strong> :-<br />
Sl.<br />
No.<br />
Name of Schemes<br />
(Rs. in lakh)<br />
Annual Plan Outlay for<br />
<strong>2006</strong> - <strong>2007</strong><br />
Revenue Capital Total<br />
1 2 3 4 5<br />
1 T.E 1.00 1.00<br />
2 O.E 2.00 2.00<br />
TOTAL 3.00 3.00<br />
3. AUDIT OF COOPERATIVE SOCIETIES: The Department is looking after 1354<br />
functioning Area, District, Block and Primary Level Cooperative Societies. Scrutinisation and<br />
approval of Audited Report, decision on cancellations, liquidations etc., have been done<br />
after careful examination from this section. Chief Audit Officer, Accountant, UDC and LDC<br />
manned this section.<br />
Sl.<br />
No.<br />
The following is the Plan Outlay for <strong>2006</strong> – <strong>2007</strong> under this Head :-<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - <strong>2007</strong><br />
Particulars<br />
Revenue<br />
1 2 3<br />
1 Salary 8.00<br />
2 M.R. 0.50<br />
3 T.E. 1.00<br />
4 O.E. 1.00<br />
5 O.C. 0.50<br />
TOTAL 11.00<br />
4. ASSISTANCE TO CREDIT AND BANKING: Under this Head, the following Banking<br />
Institutions are included :-<br />
(a) <strong>Mizoram</strong> Cooperative Apex Bank Ltd. (MCAB).<br />
(b) <strong>Mizoram</strong> Cooperative Urban Development Bank Ltd (MUCO).<br />
(a) MCAB Ltd.: This is the single State Level Cooperative Bank in the State established<br />
during the year 1981. The <strong>Mizoram</strong> Cooperative Apex Bank (MCAB) Ltd., is functioning with<br />
11 Branches in different places in the State. It caters to the requirement of Agri. Loan and<br />
Non-Agri. Loan to the member Cooperative Societies as well as Non-Member individual and<br />
private farms. Due to the introduction of Non-Performing Asset/Prudential Norms by R.B.I.,<br />
and the poor repayment of loan, the erosion of assets increased significantly and the Bank is<br />
booked under section 11 of the Banking Regulation Act, 1949. The management of the Bank<br />
tried their best to improve the position of the Bank. Larger recovery drives have been<br />
launched along with other steps. A Memorandum of Understanding (MOU) was signed<br />
between State Govt. and MCAB Ltd. on 29.11.2004 in which State Government agreed to<br />
contribute at least 355 lakh as Share Capital during 2004 - <strong>2007</strong>. Out of which, Rs. 100.00<br />
lakh only was paid during 2005 – <strong>2006</strong> and Rs. 100.00 lakh may be provided during <strong>2006</strong> –<br />
<strong>2007</strong> as Share Capital Contribution to the Bank.
- 89 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The following is the fund provision for <strong>2006</strong> - <strong>2007</strong> :-<br />
i) Share Capital Contribution - Rs. 100.00 lakh<br />
(b) MUCO Bank Ltd.: <strong>Mizoram</strong> Urban Cooperative Development Bank (MUCO) Ltd. was<br />
established during the year 1986–87. This is the only Urban Cooperative in the State<br />
providing credit to the people for Socio-Economic Development. It provided HUDCO Loan<br />
and NSFDC Loan to the people as a channelising agency of such loan. Due to the<br />
introduction of prudential norms/Non-Performing Assets and poor repayment of loan, the<br />
losses of the Bank increased rapidly resulting heavy erosion of Assets. The Bank has been<br />
booked under Section 11 by the R.B.I under Banking Regulation Act. At present Show Cause<br />
Notice has been issued to the Bank by the R.B.I and the Banking activities have been<br />
restricted by the R.B.I. The Bank took up an Action Plan to improve the recovery position<br />
and the overall performance with a view to overcome the present position and to bail it out<br />
from such situation. The State Govt. agreed to contribute Rs. 369.00 lakh Share Capital<br />
Contribution to bail the Bank out from Section 11(1). Out of which Rs. 100.00 lakh was<br />
sanctioned during the year 2005–06 and Rs. 69.00 lakh is earmarked for the year <strong>2006</strong>–07.<br />
Allocation of fund to MUCO Bank Ltd. during the year <strong>2006</strong>–07 is as follows:<br />
i) Share Capital Contribution - Rs. 69.00 lakh<br />
5. ASSISTANCE TO PUBLIC SECTOR AND OTHER UNDERTAKING: Under this head<br />
the following Federations are included :-<br />
(a) MIZOFED<br />
(b) Consumer Cooperative<br />
(a) MIZOFED: MIZOFED is set up during 1982. It is the largest Marketing State Level<br />
Organisation existing in the State.<br />
MIZOFED Ltd. undertook the distribution of Petroleum Product (POL) and LPG in the<br />
State as an Agent of both IOC (AOD) and IOC (MD). For the successful operation with<br />
efficient management the Govt. deputed departmental Officers to MIZOFED. To meet the<br />
part of the establishment costs and enhance the lifting and distribution POL and LPG to<br />
meet the demand of public, infusion of more fund is required. The following is the proposed<br />
fund for MIZOFED during <strong>2006</strong> – <strong>2007</strong>.<br />
a) GIA/Managerial Subsidy - Rs. 25.02 lakh<br />
b) Procurement of POL - Rs. 20.00 lakh<br />
c) Procurement of LPG - Rs. 5.00 lakh<br />
TOTAL - Rs. 50.00 lakh<br />
(b) Consumer Cooperative: Primary Consumer Cooperative is playing a significant role<br />
in the rural economy. They run Consumer Stores and sold daily essential commodities at a<br />
considerably reasonable rates by preventing exploitation by the powerful middlemen and<br />
check the high prices in open market in the rural areas. They maintain full time paid<br />
Secretary and the Manager and procured the essential items from the authorized<br />
Distributors and Transport to the very location of the societies through a rough road. For<br />
the above purposes they need more assistances for smooth running of the societies.<br />
Therefore, the following assistance is proposed during the year <strong>2006</strong>-<strong>2007</strong>.<br />
a) GIA/Managerial - Rs. 2.50 lakh<br />
b) Transport Subsidy - Rs. 2.50 lakh<br />
TOTAL - Rs. 5.00 lakh
- 90 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
6. COOPERATIVE TRAINING AND EDUCATION :<br />
The followings are the Cooperative Union included under this head :-<br />
1) <strong>Mizoram</strong> State Cooperative Union (MSCU) Ltd.<br />
2) Lunglei District Cooperative Union (LDCU) Ltd.<br />
3) Chhimtuipui District Cooperative Union (CDCU) Ltd.<br />
1) <strong>Mizoram</strong> State Cooperative Union (MSCU) Ltd.: Started in the year 1975. This State<br />
Cooperative Union is engaged in activities like Publicity, Publication of Journal, holding of<br />
Seminars/Conference, Celebration of Cooperative Week besides imparting Cooperative<br />
Education and Training to all management members of the different Cooperative Societies<br />
in the State. The Junior Cooperative Training Centre (JCTC) is placed under MSCU with the<br />
aim of better Cooperative Education and Training.<br />
In order to have effective training & education, Cooperation Department badly needs<br />
a suitable corpus in one complex as already had by other Departments. The various<br />
committees constituted by the Govt. of India and National Council for Cooperative Training<br />
(NCCT) make a strong recommendation for establishment of Cooperative Campus for 14<br />
Cooperative Training Institutes with the financial help of Central Govt. and the NCUI, New<br />
Delhi. The NCUI had taken a step to set up a Corpus Fund of Rs.200 crore as 50:50 matching<br />
fund basis from Govt. of India and the NCUI to implement the scheme during 10 th Five Year<br />
Plan. All the States are to provide Corpus Fund to NCUI to raise at least 100 crore. Therefore<br />
Rs.2.00 lakh is provided in the Plan Fund.<br />
The following is the fund proposal for MSCU Ltd during the year <strong>2006</strong> – <strong>2007</strong>:-<br />
a) GIA/Training and Managerial - Rs. 44.50 lakh<br />
b) GIA/JCTC - Rs. 3.00 lakh<br />
c) Corpus Fund - Rs. 2.00 lakh<br />
TOTAL - Rs. 49.50 lakh<br />
2) Lunglei District Cooperative Union (LDCU) Ltd.: Registered during the year 1993.<br />
Its impart Cooperative Education/Training to members of Cooperative Societies of Lunglei<br />
District. The Cooperative Officers of the rank of ARCS is deputed to head management.<br />
The provision of fund allocation to LDCU for the year <strong>2006</strong>–07 is as follows :<br />
a) GIA/Training and Managerial - Rs. 11.00 lakh<br />
3) Chhimtuipui District Cooperative Union (CDCU) Ltd.: Registered during the year<br />
1993. It took the responsibility of providing Cooperative Education and Training to<br />
members of Cooperative Societies in the Chhimtuipui District.<br />
The following is the fund allocation to CDCU Ltd. for the year <strong>2006</strong> – <strong>2007</strong> :<br />
a) GIA/Training and Managerial - Rs. 10.00 lakh<br />
7. ASSISTANT TO OTHER COOPERATIVE SOCIETIES:<br />
1) Diary and Livestock Cooperative Societies: Under this head, MULCO is the leading<br />
State Level Cooperative Society. It is the federation of Primary Multi-Commodity Cooperative<br />
Societies. It procure milk from member Primary Multi-Commodity Societies and processed in<br />
the Chilling Machine and packed in half litre pocket and distribute them in Aizawl Town<br />
and its surrounding areas. Further, it distribute cow feed to the member Societies. One<br />
Cooperative Officer of the rank of ARCS Officer. To meet the salary etc. the following fund<br />
allocation is made for the year <strong>2006</strong> – <strong>2007</strong>.<br />
a) GIA/Managerial - Rs. 2.50 lakh
- 91 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(2) (a) Handloom and Weaving Cooperative Societies: Under this head MAHCO Ltd., is<br />
the leading Cooperative Societies in the State. It provides raw-materials to the member<br />
Primary Handloom and Weaving Cooperative Societies at a lower price and buy back their<br />
finished products and sold out to the public. Further, it distribute loom parts to the<br />
Societies at a lower prices. The top post is manned by a Cooperative Officer of the rank of<br />
DRCS.<br />
The fund proposed for the MAHCO Ltd., during <strong>2006</strong> – <strong>2007</strong> is as follows.<br />
a) GIA/Managerial - Rs. 4.00 lakh<br />
b) Raw Materials - Rs. 6.00 lakh<br />
c) C.S.S. Machinery - Rs. 5.00 lakh<br />
TOTAL - Rs. 15.00 lakh<br />
(b) Primary Handloom Society: In order to increase Handloom products in<br />
<strong>Mizoram</strong>, and feed the Apex Level Institution with a surplus products, the feeder Primary<br />
Handloom Cooperatives are to be strengthened first. Therefore Rs.5.00 lakh is provided in<br />
the Plan Fund for purchase of raw-materials and loom parts during this year.<br />
(a) G.I.A./Managerial - Rs. 5.00 lakh<br />
TOTAL - Rs. 5.00 lakh<br />
(3) Fruits and Vegetables Cooperative Societies: (a) Under this head <strong>Mizoram</strong> State<br />
Cooperative Fruit, Forestry and Vegetable Federation (MAFF) Ltd. at the Apex plays an<br />
important role. The Primary Cooperative Societies pertaining to fruits and vegetables<br />
growers, farmers and gardeners in all potentials areas have been organized and registered.<br />
The MAFF Ltd. supply them the required Agricultural input and procure their surplus<br />
produces whenever available and dispose off to the market.<br />
Govt. of <strong>Mizoram</strong> selected MAFF Ltd. as one of the dealers of the Agricultural Inputs.<br />
MAFF is lifting the fertilizers and sell it to the publics at reasonably cheaper rate. It may be<br />
mentioned that due to apprehension of famine in the year <strong>2007</strong> in <strong>Mizoram</strong> the farmers in<br />
the State are determined to undertake farming/cultivation at a larger scale during the year<br />
<strong>2006</strong>. This will require supply of more fertilizer to the farmers which needs more funds<br />
during this year of <strong>2006</strong> – <strong>2007</strong>. Further, one Assistant Registrar of Cooperative Societies is<br />
deputed to MAFF as Manager-cum-Account Officer. The following is the fund allocation to<br />
MAFF during <strong>2006</strong> – <strong>2007</strong>.<br />
a) GIA/Managerial Subsidy - Rs. 3.00 lakh<br />
b) Procurement of Fertilizers - Rs. 12.00 lakh<br />
TOTAL - Rs. 15.00 lakh<br />
(b) Primary Agriculture Coop. Society: In order to increase Farming Production<br />
Capacity in <strong>Mizoram</strong> and to fight against the onslaught of the coming femine, Primary<br />
Agriculture Cooperative Societies are to be strengthened first. At present there are 246<br />
Primary Farming Cooperative Societies in <strong>Mizoram</strong>. Therefore Rs.5.00 lakh is provided for<br />
Primary Agriculture Cooperative Societies in the form of GIA.<br />
(a) GIA/Managerial - Rs. 5.00 lakh<br />
TOTAL - Rs. 5.00 lakh
- 92 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(4) Pig Producers Cooperative Societies: Under this head <strong>Mizoram</strong> Pig Producers’<br />
Cooperative Federation (PIGFED) Ltd., is in apex level in State. Registered during the year<br />
1988–89 and engaged in the activities for the development of Piggery Cooperative Societies.<br />
The federation established one (1) Pig Breeding Farm and producing better type of pigs. It<br />
provides good quality of piglets to Primary Pig Farming Cooperative Societies at subsidized<br />
rate. Further, PIGFED Ltd, render technical and Medical Support to the pig farmers. For the<br />
construction of approach road in the Pig Breeding Farm, it needs financial assistance. The<br />
allocation during <strong>2006</strong> – <strong>2007</strong> is as follows.<br />
a) GIA/Farmer Development - Rs. 1.00 lakh<br />
TOTAL - Rs. 1.00 lakh<br />
(5) Fishery Cooperative Societies: Under this head, there are 71 nos. of Primary Fishery<br />
Cooperative Societies which are all affiliated to ZOFISFED. The State Level Federation, this<br />
federation procure fish directly from the Primary Fishery Cooperative Societies and sold it<br />
to the markets, fund allocation for the ZOFISFED during <strong>2006</strong> – <strong>2007</strong> is as under:<br />
a) GIA/Procurement of fishes - Rs. 1.00 lakh<br />
TOTAL - Rs. 1.00 lakh<br />
(6) Women Cooperative Societies: This WOMENFED Ltd., is the apex Women<br />
Cooperative Federation Ltd., plays a significant role in women upliftment by imparting<br />
affective training in different types of trades. Such as Tailoring, Knitting and Weaving etc.,<br />
to boost up income of women of the concern families. The following is the fund allocation<br />
for WOMENFED during <strong>2006</strong> – <strong>2007</strong>.<br />
a) GIA/Managerial - Rs. 1.00 lakh<br />
b) Raw Materials - Rs. 1.00 lakh<br />
TOTAL - Rs. 2.00 lakh<br />
(7) (a) Sericulture Farming Cooperative Societies: This is the apex Sericulture<br />
Cooperative Society in the State. Its main activity is to procure cocoons from its members<br />
Societies as well as from individual farmers and sold out the same through the department<br />
of Sericulture and thus boost up the Sericulture Farming in the State. It is registered in the<br />
year 1999 and member of affiliating Societies stands 24 Societies. The fund allocation<br />
during <strong>2006</strong> – <strong>2007</strong> as follows :<br />
a) GIA/Procurement of cocoon - Rs. 2.00 lakh<br />
TOTAL - Rs. 2.00 lakh<br />
(b) Primary Coop. Sericulture Societies: To foster the activity and working of<br />
Primary Cooperative, Sericulture Societies which are the backbone of the affiliating society<br />
to attain self sufficiency and upliftment of the rural people. Therefore, Rs.1.00 lakh is<br />
provided in the Plan Fund for Primary Sericulture Farming during <strong>2006</strong>-<strong>2007</strong> in the form of<br />
GIA to increase their production capacity.<br />
(a) GIA/Managerial - Rs. 1.00 lakh<br />
TOTAL - Rs. 1.00 lakh
INTRODUCTION:<br />
- 97 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
TRADE & COMMERCE<br />
The Department of Trade & Commerce is allotted the following business by the<br />
Government of <strong>Mizoram</strong> (Allocation of Business) Rules, 1987.<br />
1) Promotion and regulation of trading in <strong>Mizoram</strong>,<br />
2) Agricultural Marketing,<br />
3) Regulated Markets,<br />
4) Establishment of Market Yards and Trade Centres,<br />
5) Border Trades,<br />
6) Trading by Non-Tribal and<br />
7) Inter-State trades.<br />
Administration and management of agricultural marketing was handed over by<br />
Central Government to the State Government from 1.4.1992. Hence, all the expenditure<br />
incurred for implementation of the agricultural marketing have to be borne by the State<br />
Government.<br />
In pursuance of the State Government Allocation of Business Rules, management and<br />
administration of Markets have been transfered from Land Revenue & Settlement<br />
Department and LAD to Trade & Commerce Department. As such additional fund is much<br />
required for construction of Garbage Bins, Dumping Grounds and other infrastructural<br />
facilities.<br />
As 5 (five) new Districts have been created by the Government of <strong>Mizoram</strong> in<br />
addition to three existing Districts, creation of additional Offices with new post will be<br />
necessary for the District Head-quarters, and additional fund is required.<br />
The Central and the State Governments have been taking all possible steps for<br />
operationalisation of Indo-Myanmar Border Trade at Champhai-Rih Sector. Hence, it is<br />
required to provide fund for operation of Indo-Myanmar Border Trade. Moreover, the State<br />
Government is taking every possible step for operation of Indo-Bangladesh Border Trade at<br />
Kawrpuichhuah, Tlabung, hence it is required to provide sufficient fund for this.<br />
SCHEME-WISE DESCRIPTION<br />
I. AGRICULTURE MARKETING:<br />
Due to recent enactment of the <strong>Mizoram</strong> State Agricultural Produce Marketing<br />
(Regulation) Act, 1996 and the Rules, 1996 thereunder, Indo-Myanmar Border Trade<br />
(Champhai Rih-Sector) which is already Inaugurated in 2004. State Master Plan prepared by<br />
Directorate of Marketing and Inspection, Government of India, already approved by the State<br />
Government, transfer of administration and management of Markets from Land Revenue &<br />
Settlement Department and LAD to Trade & Commerce Department, creation of additional<br />
Districts Offices and for giving priority to market, Agricultural Marketing for the upliftment<br />
of the mass rural farmers, the Department is required to be strengthened.<br />
1. Marketing Officer:- The Department of Trade & Commerce being a developing<br />
Department is having more and more heavy work loads especially Management &<br />
Administration of all markets in <strong>Mizoram</strong>. Moreover, District Market Offices have been<br />
opened at Lunglei w.e.f. 22.2.2002 and at Champhai w.e.f. 28.2.2003. Two Marketing Officers
- 98 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
have been posted as District Marketing Officer (DMO) at the two newly created District<br />
Offices. Hence, the Department is having only one Marketing Officer in the Directorate to<br />
look after Management of all the Markets within Aizawl District. As market is deeply as well<br />
as openly concerned with the public, frequent visits of markets to solve the day to day<br />
problems faced by public is absolutely necessary. Besides, there are many duties like<br />
allotment of seats in the markets, petty complaints from sellers as well as customers which<br />
requires intervention of Department Officer especially Marketing Officers.<br />
Secondly, the Department of Trade & Commerce is responsible for Marketing of<br />
surplus agricultural products of <strong>Mizoram</strong>. For this purpose the Department used to detail<br />
officers especially Marketing Officers to various parts of <strong>Mizoram</strong> to conduct survey and<br />
verification and to make a better scope for marketing of these products.<br />
In this regard it may be mentioned that it has become a heavy burden for the<br />
Department with a handful of officers to carry on the task of Marketing of Agricultural<br />
Products of <strong>Mizoram</strong>.<br />
In view of the above, creation of at least 2 (two) posts of Marketing Officers is<br />
absolutely required in the scale of pay of Rs. 6500 - 10500 p.m. and hence proposed.<br />
2. Computer Operator:- As introduction of modern technology like Computer is fast<br />
catching up, even now several Departments in <strong>Mizoram</strong> have Computers. This Department<br />
also has installed Computers to facilitate official works. As such, creation of 1 (one) post of<br />
Computer Operator in the scale of pay Rs. 5000 - 8000/- p.m. is urgently required and hence<br />
proposed.<br />
Proposal for new posts<br />
Sl. Name of Post & Scale No. of Posts Fund Requirement in<br />
No. of Pay Proposed a token provision<br />
1. Marketing Officer (Rs. 6500 – 10500/-) 2 Rs. 0.80 lakh<br />
2. Computer Operator (Rs. 5000 – 8000/-) 1 Rs. 0.70 lakh<br />
TOTAL 3 Rs. 1.50 lakh<br />
Existing Posts under Plan<br />
Sl. Name of Post & Scale No. of Existing Fund Requirement<br />
No. of Pay Posts<br />
1. Marketing Officer (Rs. 6500 – 10500/-) 2 Rs. 4.00 lakh<br />
2. Assistant (Rs. 5500 – 9000/-) 1 Rs. 2.00 lakh<br />
3. UDC (Rs. 5000 – 8000/-) 2 Rs. 2.50 lakh<br />
4. LDC (Rs. 4000 – 6000/-) 2 Rs. 2.70 lakh<br />
5. Driver (Rs. 3040 – 4590/-) 1 Rs. 1.30 lakh<br />
6. Grade IV (Rs. 2650 – 4000/-) 2 Rs. 1.00 lakh<br />
TOTAL 10 Rs. 13.50 lakh<br />
GRAND TOTAL 13 Rs. 15.00 lakh<br />
Note : The Scale of pay mentioned above are as per the 5 th Pay Commission<br />
Recomendation.
- 99 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The financial outlay under Agriculture Marketing is as follows :<br />
1) Salary and T.E.: A sum of Rs. 15.00 lakh is approved for Salary and Rs. 2.50 lakh is<br />
approved for Travelling Expenses and Rs. 3.00 lakh for Medical Treatment with total amount<br />
of Rs. 20.50 lakh during <strong>2006</strong> - <strong>2007</strong>.<br />
2) Office Expenses: A sum of Rs. 18.00 lakh is approved for Office Expenses.<br />
3) Motor Vehicle: A sum of Rs. 2.30 lakh is approved for maintenance of 3(three)<br />
Departmental Trucks during 2005 - <strong>2006</strong>.<br />
4) Promotion & Regulation of Markets: Before the legislation of the <strong>Mizoram</strong> State<br />
Agricultural Produce Marketing (Regulation) Act, 1996 and the Rules thereunder,<br />
management of Markets and its administration are done by different Departments and<br />
Institution like Land Revenue & Settlement Department, Lacal Administration Department<br />
and the Village Councils in their respective jurisdictions. In the meantime, Agricultural<br />
Department constructed markketsheds along the roadside of the National Highway. To<br />
remove this duplicacy, management and administration of markets have now been placed<br />
under one Department i.e. Trade & Commerce Department as per the Government of<br />
<strong>Mizoram</strong> (Allocation of Business) Rules, 1987.<br />
5) Minor Works and Establishment and Operationalisation of Border Trades: The 2 nd<br />
Indo-Myanmar Border Trade Point at Zokhawthar - Rih Sector was opened on 31.1.2003 by<br />
Brig. Gen. Pye Sone. The Composite Land Customs Station at Zokhawthar is under<br />
construction by BRO. Trade & Commerce Deparrtment has also acquired 129 acres of land<br />
at Khawnuam (Melbuk) which is 8 km from Zokhawthar, for establishment of Indo-Myanmar<br />
Border Trade Township. Government of India & Union of Myanmar is also actively<br />
considering construction of Zokhawthar – Rih, Falam - Kalemyo road construction. These<br />
developments shall promote the ‘Look East’ policy of the Government of India and it is<br />
expected that the traders of Moreh - Tamu Border Trade Sector may shift their business<br />
operation to Zokhawthar - Rih Sector due to the Law & Order problems in Manipur.<br />
The Government is also setting up Border Trade Center at Kawrpuichhuah, Tlabung<br />
and the funds have been transferred to PWD for construction of infrastructures. <strong>Mizoram</strong> is<br />
promoting export of Bamboo, Ginger, Chillies and other products to Bangladesh through<br />
this route. There has been Exchange of Trade Delegations between <strong>Mizoram</strong> and Bangladesh.<br />
The economy of the state shall be boost up once these Border Trade between<br />
Myanmar & Bangladesh is put in active operation. However, these projects are still<br />
handicapped due to absence of certain infrastructures which are proposed below for taking<br />
up during <strong>2006</strong> - <strong>2007</strong>. Besides, this Department looks after various markets of the State. As<br />
such, the following works are proposed to be taken up during <strong>2006</strong> - <strong>2007</strong>.<br />
PRIORITY WISE SCHEDULE OF WORKS (WITH JUSTIFICATION)<br />
<strong>APPROVED</strong> TO BE TAKEN UP DURING <strong>2006</strong> - <strong>2007</strong><br />
1. Construction of garbage bins for various markets transferred from LAD and MAMCO<br />
Ltd.<br />
2. Electrification of market buildings.<br />
(For most cases there are no provisions for garbage bins and internal electrifications<br />
of the market buildings constructed by LAD under NLCPR and IDSMT Schemes and<br />
in those markets constructed by MAMCO Ltd. under MM-III of Technology Mission.<br />
Recently, 11 (eleven) markets transferred to this Department viz. Lengpui, Kolasib
- 100 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Diakkawn, Ramhlun North, Bungkawn, Bethel Veng, Champhai, Zotlang, Champhai,<br />
Serkawn, Ngaizel, Chanmari, Lungdai, Kanhmun do not have garbage bins and<br />
internal electrifications. It is also anticipated that another 7 (seven) markets viz.<br />
Mamit, Zemabawk, Zemabawk North, Serchhip, Mission Vengthlang, Kolasib Venglai<br />
and Tlabung which are near completion would be transferred shorthly.<br />
3. Construction of market boundary walls - (All departmental markets are located in<br />
prime locations and hence, due to their commercial importance and high land<br />
valuation, market lands are prone to encroachment. Therefore, for protection against<br />
encroachments, market lands of Lunglei, Bawngkawn, Champhai, Kolasib Venglai and<br />
Mission Veng are proposed to be provided with boundary walls.<br />
4. Construction of market Staff Quarters, (all market staff quarters presently under<br />
occupation are in dilapidated state, unsafe and unfit for human habitation. Market<br />
Staff Quarters of New Market, Bawngkawn, Lunglei and Vairengte are proposed for<br />
construction).<br />
5. Repair and renovations of market buildings. (Revenue collected from markets in the<br />
form of rents and fees constitute a major portion of the departmental income. As<br />
such, due importance have been given for their maintenance. New Market at Aizawl,<br />
Vairente Market, Lunglei Super Market, Bawngkawn Market and Mission Veng Market<br />
requires to be renovated).<br />
6. Construction of DMO Quarters and Staff Quarters at Kolasib. ( Kolasib District is the<br />
economic lifetime of the State. This department which deals in marketing of<br />
Agricultural produces have therefore to play important roles. DMO Office had been<br />
constructed during 2004-2005 and it is ready for inauguration and subsequent<br />
operationalisation. DMO Quarters and Staff Quarters have to be provided merely as<br />
an incentive but for actual promotion of the subjects of Trade & Commerce).<br />
7. Repair and renovation of departmental buildings at Aizawl, Lunglei and Champhai.<br />
8. Extension of Market building at Bilkhawthlir.<br />
9. Widening, metalling and black topping of approach road to Vairengte Market.<br />
(Vairengte Market is the most important terminal market of the State. Traders turn<br />
out in large numbers practically flooding the market with men and materials. But<br />
due to bad approach road and inadequated internal road, there is great difficulty of<br />
movement. Hence, it has been approved that the approach road be upgraded).<br />
10. Metalling and black topping of apprach road to Garbage Dumping ground at Sihhmui<br />
(A garbage dumping ground has been constructed at Sihhmui but the approach road<br />
to it is impossible to be negotiated by heavy laden trucks due to its bad condition.<br />
Hence, for actual utilization, a good road have to be provided).<br />
11. Provision of piped water supply with storage facilities for various markets - (Due to<br />
the pressing need and requirement of the public, it has become inevitable to provide<br />
piped water supply with adequate storage facilities in the markets. The need to<br />
provide safe drinking water and to adequately meet the requirement for sanitary and<br />
hygenic maintenance to public urinals and toilets cannot be underminded. To start<br />
with, proposal has been made for New Market, Bawngkawn, Ngaizel, Vaivakawn and<br />
Lunglei Super Market and Bawngkawn Market).<br />
Hence, Rs. 56.00 lakh is approved under Minor Works during <strong>2006</strong> - <strong>2007</strong>.<br />
6) Wages: There are 19 nos. of M.R. employees and Rs. 12.20 lakh is approved during<br />
<strong>2006</strong> - <strong>2007</strong>.
- 101 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
7) Other Charges: During <strong>2006</strong>–07, a sum of Rs. 30.50 lakh is approved for disposal of<br />
markets garbages and other miscelleneous expenditure. As always required in public place<br />
such as markets, the Department has proposed for provision of safe drinking water in all<br />
major markets, maintenance of sanitary latrines and public urinals. Due to transfer of<br />
recently constructed markets from LAD and MAMCO Ltd. the work and responsibility has<br />
increased considerably. For efficient management and administration of these markets, a<br />
substantial increase in budget provision has been approved.<br />
Thus the total approved financial outlays under Direction and Administration is as<br />
follows: -<br />
II. ADMINISTRATION:<br />
Sl. No. Particulars Fund Requirement<br />
during <strong>2006</strong> - <strong>2007</strong><br />
1. Salary Rs. 15.00 lakh<br />
2. Wages Rs. 12.20 lakh<br />
3. M.R. Rs. 3.00 lakh<br />
4. T.E. Rs. 2.50 lakh<br />
5. Office Expenses Rs. 18.00 lakh<br />
6. Minor Works / Maintenance Rs. 56.00 lakh<br />
7. Motor Vehicle Rs. 2.30 lakh<br />
8. Other Charges Rs. 30.50 lakh<br />
TOTAL Rs. 140.50 lakh<br />
1) Setting up of District Offices: The function of Trade & Commerce Department like,<br />
Promotion and Regulation of Trading in <strong>Mizoram</strong> and improvement of Agricultural<br />
Marketing and its infrastructure cannot be confined in the State Capital alone. It may also be<br />
difficult and ineffective to administer from Headquarters i.e. Directorate. For smooth,<br />
efficient and effective administration and management, District Offices are opened at the<br />
following centres: -<br />
1) Champhai 2) Lunglei<br />
Also steps have been taken to open another DMO Office at Kolasib for which Office<br />
building has been constructed.<br />
The approved break-up of expenditure to be incurred under District Offices is as<br />
follows: -<br />
a) Office Expenses: A sum of Rs. 6.00 lakh is approved for Office Expenses (O.E.) for<br />
Annual Plan <strong>2006</strong> - <strong>2007</strong>.<br />
b) Advertisement: For meeting Advertisement charges of market auction, garbage<br />
disposal etc., a sum of Rs. 0.50 lakh is approved during <strong>2006</strong> - <strong>2007</strong>.<br />
Sl. No. Particulars Fund Requirement for <strong>2006</strong> - <strong>2007</strong><br />
a) Office Expenses Rs. 6.00 lakh<br />
b) Advertisement Rs. 0.50 lakh<br />
TOTAL Rs. 6.50 lakh
III. GRADING AND QUALITY CONTROL:<br />
- 102 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1) Grading and Standardisation: The importance of Grading and Standardisation has<br />
not received so much attention in <strong>Mizoram</strong>. The importance of Grading and Standardisation<br />
are summarised as follows: -<br />
a) Protection of the interest of the sellers and buyers by introducing some<br />
quality in grade and standards.<br />
b) Facilitation of quoting the quality of the products with uniform grades and<br />
standards between distant places.<br />
c) To give better chance for those who produce better quality and for those who<br />
can produce more in future.<br />
The benefits of standardisation and Grading are as follows: -<br />
a) It facilitates uniformity in fixation of prices of the commodities.<br />
b) It facilitates collection of the same quality of products.<br />
c) It facilitates management of stocking or storage facilities.<br />
d) It facilitates arrangement of fund for procurements and it makes the dealers<br />
more reliable.<br />
e) The intended sellers and interested purchasers can contact each other from<br />
distant places through letters, wireless, telegraphs, telephone or Fax.<br />
For purchase of Grading Laboratory and standards weight and measure<br />
Instruments and to educate and motivate the producers, a sum of 1.00 lakh is<br />
approved.<br />
2) Quality Control: The need of Quality control has no deep root in the mind of<br />
producers in <strong>Mizoram</strong>. For this reason, the Agricultural Produces in <strong>Mizoram</strong> are regarded<br />
as inferior in quality. As such, the producer cannot fetch better prices from their produces<br />
due to lack of Quality Control. Some of the producers may think Quality Control is meant<br />
for the consumers only, but this is not so. Quality Control is also beneficial to the producers<br />
and consumers both. Thus, it is necessary to educate and motivate the producers in respect<br />
of Quality Control.<br />
A sum of Rs. 1.00 lakh is approved for imparting awareness of Quality Control.<br />
Hence, the approved financial outlay under Grading & Quality Control is as<br />
follows: -<br />
Sl. No. Particulars Fund Requirement for <strong>2006</strong>-07<br />
1. O.E. Rs. 1.00 lakh<br />
Total Rs. 1.00 lakh
- 103 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
IV. SHARE CAPITAL AND ASSISTANCE TO PUBLIC SECTOR AND OTHER<br />
UNDERTAKINGS:<br />
1) Share Capital and Assistance to MAMCO Ltd.: The Government of <strong>Mizoram</strong><br />
constituted “The <strong>Mizoram</strong> Agricultural Marketing Corporation Limited (MAMCO)” in 1993<br />
with share capital of Rs. 10.00 crore to take up marketing of marketable surpluses of<br />
<strong>Mizoram</strong> Agricultural products outside the State. Trade & Commerce Department is nodal<br />
Department of this Corporation. An amount to the tune of Rs. 52.00 lakh is approved during<br />
<strong>2006</strong> - <strong>2007</strong> to be disbursed as share capital and assistance to MAMCO Ltd.<br />
The approved financial break-up under Share Capital and Assistance to Public Sector<br />
undertaking is as follows: -<br />
Sl. No. Particulars Fund Requirement for <strong>2006</strong> - <strong>2007</strong><br />
1. Share capital to Public Rs. 52.00 lakh<br />
Sector Undertaking<br />
2. Assistance to PSU<br />
TOTAL : Rs. 52.00 lakh<br />
<strong>APPROVED</strong> FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />
Sl. No. Particulars Fund Requirement for <strong>2006</strong> - <strong>2007</strong><br />
1. Agril. Marketing Rs. 140.50 lakh<br />
2. Administration Rs. 6.50 lakh<br />
3. Grading & Quality Control Rs. 1.00 lakh<br />
4. Share Capital and Assistance Rs. 52.00 lakh<br />
to MAMCO Ltd.<br />
TOTAL Rs. 200.00 lakh
- 106 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
RURAL DEVELOPMENT<br />
A. Approved Tenth Five Year Plan Outlay 2002 - 07 : Rs. 8441.80 lakh<br />
B. Approved Annual Plan outlay for 2005 - 06 : Rs. 1990.00 lakh<br />
C. Approved Annual Plan Outlay for <strong>2006</strong> - 07 : Rs. 2080.00 lakh<br />
The following schemes are approved to be taken up during the Annual Plan <strong>2006</strong> –<br />
<strong>2007</strong>: -<br />
2501 - Special Programme for Rural Development<br />
06 - Self Employment Programme<br />
800 - Other Expenditure<br />
1. SLMC : Rs. 38.85 lakh<br />
2. DWCRA : Rs. 73.27 lakh<br />
3. SIRD : Rs. 26.00 lakh<br />
4. DRDA(Admn) : Rs. 95.00 lakh<br />
5. SGSY : Rs. 100.12 lakh<br />
6. IT : Rs. 3.55 lakh<br />
7. IWDP : Rs. 0.21 lakh<br />
-----------------------<br />
Total : Rs.337.00 lakh<br />
============<br />
2505 - Rural Employment<br />
8. IAY : Rs. 105.00 lakh<br />
9. SGRY : Rs. 261.00 lakh<br />
------------------------<br />
Total : Rs. 366.00 lakh<br />
=============<br />
2515 - Other Rural Development Programme<br />
10. Direction & Admn : Rs. 102.26 lakh<br />
11. Block Level Admn : Rs. 454.60 lakh<br />
12. PMGY(GA) : Rs. 626.00 lakh<br />
4515 - Co. on ORDP<br />
13. Rural Communication : Rs. 0.10 lakh<br />
14. Housing for Project Staff : Rs 29.04 lakh<br />
15. Social Education : Rs. 165.00 lakh<br />
--------------------------<br />
Total : Rs. 1377.00 lakh<br />
-----------------------------<br />
GRAND TOTAL : Rs. 2080.00 lakh<br />
=============<br />
BRIEF DESCRIPTION OF THE SCHEME<br />
1. Direction, SLMC & IAC: The total fund earmarked for maintenance of 13 Officers<br />
and Staff during the Tenth Five Year Plan 2002–07 is Rs. 140.00 lakh. Approved outlay for<br />
2005–06 was Rs. 38.85 lakh and the proposed outlay for maintenance of Officers and Staff<br />
under SLMC & IAC in the approved Annual Plan during <strong>2006</strong>–07 is Rs.38.85 lakh.
- 107 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. Direction & Administration DWCRA (Development of Women and Children in Rural<br />
Areas): Maintenance of 50 existing staff under DWCRA is fully borned by the State<br />
Government and Rs. 73.27 lakh was approved outlay in the Annual Plan 2005-06. Tentative<br />
outlay for maintenance of DWCRA staff during the 10 th Five Year Plan Period is Rs. 290.00 lakh<br />
and Rs. 73.27 lakh is approved for maintenance of DWCRA staff in the Annual Plan <strong>2006</strong>-07.<br />
3. Direction and Administration, State Institute of Rural Development (SIRD):<br />
Maintenance of (5)five Core Faculties under SIRD is fully borne by Government of India<br />
while maintenance of other Officers and Staff is borne by Government of India and the State<br />
Government in the ratio of 50:50. During the Annual Plan 2005 – 06, Rs. 21.24 lakh for<br />
operation of SIRD and Rs. 5.00 lakh for operation of Extension Training Centre (ETC) at<br />
Pukpui, which comes to a total of Rs. 26.24 lakh was approved under Plan Fund for<br />
maintenance of Staff under SIRD and ETC as State Matching Share. Rs. 80.00 lakh is<br />
earmarked during the Tenth Five Year Plan period. Rs.21.23. lakh for operation of SIRD and<br />
Rs. 5.00 lakh for operation of Extension Training Centre (ETC) at Pukpui, Lunglei District<br />
totaling Rs. 26.00 lakh is approved in the Annual Plan <strong>2006</strong> – 07 as State Matching Share.<br />
4. DRDA Administration: There are 8 (eight) numbers of DRDA in <strong>Mizoram</strong> and the<br />
Government of India has allocated separate fund for DRDA Administration on a cost sharing<br />
basis between the Central and State in the ratio of 75:25. Rs. 400.00 lakh is earmarked for<br />
DRDA Administration during the Tenth Five Year Plan. During the Financial Year 2005 - 06<br />
Rs.84.00 lakh was approved under Plan Fund for DRDA Administration as State matching<br />
share and Rs. 95.00 lakh is approved for DRDA Administration under Plan Fund as State<br />
Matching Share during Annual Plan <strong>2006</strong> - 07.<br />
5. Swarnajayanti Gram Swarozgar Yojana (SGSY): With the launching of SGSY, several<br />
Centrally Sponsored Schemes like IRDP, TRYSEM, SITRA and GKY were amalgamated in<br />
SGSY. SGSY Scheme is funded by the Central and State Government in the ratio of 75:25.<br />
Rs.100.10 lakh was approved outlay in the Annual Plan 2005 - 06 as State Matching Share<br />
for the Scheme. Rs. 150.00 lakh is earmarked during the Tenth Five Year Plan period and<br />
Rs. 100.12 lakh is approved for State Matching Share under SGSY in the Annual Plan <strong>2006</strong>-07.<br />
6. Information Technology (IT): In pursuance of the recommendation of National Task<br />
Force, Rs. 20.00 lakh is earmarked during the Tenth Five Year Plan for effective monitoring and<br />
internal audit of Centrally sponsored Schemes in <strong>Mizoram</strong>. During the financial year 2005–06, Rs.<br />
3.55 lakh was approved outlay in the Annual Plan for Information Technology and Rs. 3.55 lakh<br />
is earmarked in the approved Annual Plan <strong>2006</strong>-07.<br />
7. Integrated Wasteland Development Programme: The Integrated Wasteland<br />
Development Programme (IWDP) has been implemented with the objective of developing<br />
wasteland/degraded land keeping in view the capability of land, site - condition and local needs<br />
as well as promoting the overall economic development and improving the socio-economic<br />
condition of the people living in the project areas. Under IWDP, The State has to meet 10% of<br />
Central Share. To meet these, a token provision of Rs. 0.21 lakh is approved during <strong>2006</strong>-07.<br />
8. Indira Awaas Yojana (IAY): The objective of IAY is to provide assistance for<br />
construction of houses / dwelling units for rural poor below the poverty line. The fund for<br />
construction of houses under IAY is shared by Central and State at the ratio of 75:25. Under<br />
the scheme, 20 % of the total funds available may be utilized for upgradation of the existing<br />
houses. Out of the total outlay of the Tenth Five Year Plan i.e. Rs. 371.00 lakh, an outlay of<br />
Rs.76.00 lakh was approved under IAY in the Annual Plan 2005-06 and Rs.105. 00 lakh is<br />
approved for the Scheme as State Matching Share in the Annual Plan <strong>2006</strong>-07.
- 108 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
9. Sampoorna Gramin Rozgar Yojana (SGRY): With a view to ensure development of<br />
village infrastructure in a planned manner, the Government of India have decided to merge<br />
the two Rural Employment Schemes viz. Employment Assurance Schemes (EAS) and Jawahar<br />
Gram Swarozgar Yojana (JGSY) into a single scheme viz. Sampoorna Gramin Rozgar Yojana<br />
(SGRY) with the objective of providing additional wage employment in the rural areas along<br />
with creation of durable community, social and economic assets and infrastructure<br />
development in these areas in a planned manner. The fund for implementation of the<br />
Scheme is shared between Central and State at the ratio of 75:25. The total fund earmarked<br />
during the Tenth Five Year Plan is Rs. 1150.00 lakh. The approved outlay under SGRY in the<br />
Annual Plan 2005-06 was Rs. 261.00 lakh and Rs. 261.00 lakh is approved in the Annual<br />
Plan <strong>2006</strong>-07 under SGRY as State Matching Share.<br />
10. Direction & Administration: Under this scheme, there are as many as 36 numbers of<br />
posts, out of which 31 numbers are presently filled up. An Engineering Wing has been created<br />
in the Directorate to solve the ever increasing technical complexity of Rural Development<br />
schemes. The Wing has been made functional from 2004-05 and is being manned by one<br />
Executive Rural Engineer (ERE), 2 Assistant Rural Engineers (ARE) and other Technicians.<br />
Out of the total outlay of Rs. 394.00 lakh earmarked during the Tenth Five Year Plan<br />
(2002 – 07), the total outlay approved during 2005 – 06 was Rs. 83.20 lakh and the total<br />
outlay approved under Direction & Administration for the Annual Plan <strong>2006</strong>–07 is Rs.102.26<br />
lakh as indicated in the table below: -<br />
Sl. No. Detailed Head Amount (Rs. in lakh)<br />
1. Salary 51.25<br />
2. Wages 7.51<br />
3. Medical Treatment 8.00<br />
4. Traveling Expenses 8.00<br />
5. Office Expenses 20.00<br />
6. Publication 3.00<br />
7. O.C. 2.50<br />
8. Advertising 1.00<br />
9. Motor Vehicles 1.00<br />
TOTAL 102.26<br />
11. Block Level Administration: There are at present 404 numbers of posts under the<br />
Block Level Administration scheme, out of which 234 posts are being filled up.<br />
The total outlay during the Tenth Plan Period is Rs. 2278.20 lakh. During the<br />
Annual Plan 2005–06, an outlay of Rs. 337.20 lakh was approved and the total outlay of<br />
Rs. 337.20 lakh is earmarked for the approved Annual Plan <strong>2006</strong>-<strong>2007</strong> as the break-up<br />
indicated below: -<br />
Sl. No. Detailed Head Amount (Rs. in lakh)<br />
1. Salary 355.60<br />
2. Wages 8.40<br />
3. Travelling Expenses 30.00<br />
4. Office Expenses 40.00<br />
5. Medical Treatment 15.00<br />
6. Minor Works 3.10<br />
7. Other Charges 2.60<br />
TOTAL 455.60
- 109 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
12. Rural Housing: This scheme provides shelters for rural poor families and also<br />
assists in the healthy development of their habitat. There are two types of assistance,<br />
namely - (i) New Construction of houses; and (ii) Upgradation of Kutcha houses into<br />
pucca/semi pucca houses. Besides these, this scheme also provides assistance for the<br />
development of their habitat in the form of construction of internal roads, drainage system,<br />
sanitary latrines, good drinking water facilities and development of plantation. For new<br />
construction of houses, each beneficiary is assisted with an amount of Rs. 27,500/- and with<br />
Rs. 12,500/- for upgradation.<br />
The total outlay for the Tenth Plan period is Rs. 2828.00 lakh. The approved outlay<br />
for the Annual Plan 2005 – 06 was Rs. 626.00 lakh and Rs. 626.00 lakh is approved for the<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong> as indicated below: -<br />
Sl.<br />
No.<br />
Items<br />
Financial<br />
(Rs. in lakh)<br />
Physical<br />
(In No.)<br />
1. New Construction 440.00 1600<br />
2. Upgradation 125.00 1000<br />
3. Infrastructure 61.00 150<br />
TOTAL 626.00 2750<br />
13. Rural Communication: Due to the inability of State Public Works Department to<br />
cover the whole of the state, the Department had constructed a number of roads in the rural<br />
areas. Due to constraint of fund, the work has been discontinued for some years. A token of<br />
Rs. 0.10 lakh was provided during the Annual Plan 2005 – 06 and Rs. 0.10 lakh is earmarked<br />
for the approved Annual Plan <strong>2006</strong>-07.<br />
14. Housing for Project Staff: Under this scheme, construction and repair of office and<br />
staff quarters in the R.D. Blocks are mainly done. An outlay of Rs. 2.50 lakh was approved<br />
for carrying out repair and renovation works of offices and staff quarters during the Annual<br />
Plan 2005 – 06 and a total outlay of Rs. 29.04 lakh is earmarked in the approved Annual<br />
Plan <strong>2006</strong>-07 for the scheme.<br />
15. Social Education: Under this scheme, construction of Community Halls and<br />
Playgrounds are mainly undertaken. The life of the people of <strong>Mizoram</strong> revolves around the<br />
Community. Public meeting places play an integral and important part in the life of the Mizo<br />
Community. Construction of Playgrounds also form a catalyst in shaping the socio-moral<br />
fibre of the youth. Hence, this scheme assumes importance.<br />
During the 9 th Plan period, 38 numbers of Community Halls were left unfinished due<br />
to paucity of funds. For completion of the unfinished Halls, the total outlay of Rs. 100.00<br />
lakh was approved for Annual Plan 2005–06 and Rs. 50.00 lakh is earmarked for the<br />
approved Annual Plan <strong>2006</strong>–07. Further, an outlay of Rs. 115.00 lakh is also earmarked for<br />
implementation of BAFFACOS during the approved Annual Plan <strong>2006</strong>–07.
Introduction:<br />
- 113 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
LAND REFORMS<br />
Since <strong>Mizoram</strong> is non-land recorded State where jhuming is widely practiced, it is<br />
vitally important to take measures for allotment of lands to the inhabitants for permanent<br />
cultivation and ownership of land. As such, jhum control measure has been adopted and at<br />
the same time house sites are also planed at various locations for allotment to the poor and<br />
needy families. The whole activities of the Department are, therefore, closely linked with<br />
Land Reforms Programme.<br />
Meanwhile, the Department, due to inadequate administrative infrastructure, cannot<br />
cope with the phenomenal increase in the range and volume of work in the pattern of land<br />
management particularly in rural areas.<br />
The Centrally Sponsored Scheme for Strengthening of Revenue Administration and<br />
Updating of Land Records at 50:50 (Central : State) sharing basis is being implemented, and<br />
the Annual Plan is also prepared in conformity with this Scheme.<br />
Scheme–wise break–up<br />
The Scheme-wise break-ups within the Plan outlay of Rs. 420.00 lakh for Annual Plan<br />
<strong>2006</strong>-07, is summarized as follows: —<br />
(Rupees in lakh)<br />
Sl.<br />
No.<br />
Name of Scheme Outlay<br />
Of which capital<br />
content<br />
1. Direction & Administration 79.91 -<br />
2. Statistics & Evaluation 17.60 -<br />
3. Maintenance of Land Records 181.49 -<br />
4. Other Charges (Survey Training) 2.00 -<br />
5. Regulation of Land Holdings & Tenancy 24.00 -<br />
6. Baffacos 115.00 -<br />
Total 420.00 -<br />
DETAILS OF THE SCHEME<br />
I. DIRECTION & ADMINISTRATION (Rs. 79.91 lakh):<br />
1. Construction of Building (Rs. 6.00 lakh): Lack of village level Record Room-cum-staff<br />
Quarters creates problem of Revenue Administration at primary unit level. The Department<br />
urgently needs buildings for Record Room-cum-Residential accommodation for Staff posted<br />
at such centres. Hence, Rs. 6.00 lakh is earmarked for construction of four Record Roomscum-Staff<br />
Quarters at Aizawl, Champhai, Mamit & Serchhip Districts. The fund will be<br />
utilised with matching contribution of C.S.S.<br />
2. House Site Plan (Rs. 2.00 lakh): The Department has been taking up the scheme of<br />
house site planning at various convenient locations within town areas. The house sites so<br />
planned are meant for allotment to the poor and needy families. During the year <strong>2006</strong>-07, it<br />
is proposed to give house sites to 1,000 families. Rs. 2.00 lakh is provided for house site<br />
plan and the fund will be utilised with matching contribution of C.S.S.
- 114 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. Purchase of Machinery & Equipments (Rs. 2.00 lakh): In order to carry on Survey<br />
works and preparation of Land Records and to maintain and issue certificates and<br />
connected documents for earning more and more revenues, purchase of survey, drawing<br />
and printing equipment/ materials is required every year. For this purpose, Rs. 2.00 lakh is<br />
provided and the same fund will be utilised with a matching share of C.S.S.<br />
4. Creation of Posts & Salary (Rs. 35.00 lakh): Lack of manpower, both technical and<br />
non-technical is the main problem constantly faced by the Department. The present staff<br />
strength is too inadequate to deal with the increasing volume of works. A provision of<br />
Rs.35.00 lakh is provided for maintenance of the existing posts and newly created posts. In<br />
addition, the salary for 33 nos. of trained Surveyors engaged on contract basis is also<br />
included in the provision.<br />
The following post which has already been approved during 2005-06 is proposed for<br />
creation during <strong>2006</strong>-07.<br />
Sl. No. Name of Posts<br />
(1) Group ‘C’<br />
Stenographer (Grade-III) (Rs.4500-7000) 1<br />
Total 1<br />
No. of post<br />
already approved<br />
5. Medical Treatment (Rs. 3.00 lakh): Rs. 3.00 lakh is earmarked for meeting Medical<br />
Expenses of Officers & Staff.<br />
6. Office Expenses (Rs. 12.00 lakh): A provision of Rs. 12.00 lakh is earmarked for<br />
Office Expenses which includes purchase of 1(one) Light Vehicle for replacement of the old<br />
one allotted to the Director, Land Revenue & Settlement, <strong>Mizoram</strong>.<br />
7. Travelling Expenses (Rs. 6.00 lakh): Rs. 6.00 lakh is earmarked for Travelling<br />
Expenses and the fund will be utilised with a matching share of C.S.S.<br />
8. I.T. Development (Rs. 5.00 lakh): Government of <strong>Mizoram</strong> has felt the need to work<br />
out a practical modality for improving management of land records on a statewide scale<br />
utilising tools of Information Technology. The Government of India, Ministry of Rural<br />
Development, Department of Land Resources had provided Central Assistance for<br />
Computerization of Land Records, especially for purchase of Computer Hardware/ Software<br />
and Data Entry works. It is the responsibility of the State Government to provide<br />
infrastructure, manpower, maintenance of computers and consumable items and to expand<br />
the network system. The focus to this scheme is to design a multi-functional support for<br />
creation of reliable Data Bank for generation of Land Information System to provide<br />
information about the land, the resources upon it and the improvements made to it. Rs. 5.00<br />
lakh is provided herewith to meet such expenses and the fund will be utilised with matching<br />
contribution of C.S.S. for Computerizations of Land Records.<br />
9. Other Charges/ Compensation (Rs. 0.10 lakh): The Land Reforms measures requires<br />
payment of compensation for acquisition of private land for public interest. Hence, Rs. 0.10<br />
lakh is provided as a token for meeting such expenses and other charges. This fund will be<br />
utilised with matching contribution of C.S.S.
- 115 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
10. Engagement of Contingent Khalasis (Rs. 8.81 lakh): In order to carry out the works<br />
relating to verification and demarcation of the Inter-State, Inter-District, Inter-Sub-Division<br />
and Inter-Village boundary assigned by the Government of <strong>Mizoram</strong>, it is required to<br />
engaged Contingent Khalasis who are to encamp in the forest of remote areas from time to<br />
time. As such, a provision of Rs. 8.81 lakh is earmarked for wages, and the fund will be<br />
utilised with a matching contribution of C.S.S.<br />
II. STATISTICS & EVALUATION (Rs. 16.60 lakh):<br />
1. Salary (Rs. 2.50 lakh): Due to increasing volume of work, the Department requires<br />
the service of two Joint Directors, one to look after Technical Work and another one for<br />
Administration. Recently, the post of Joint Director (Survey) was created and filled up. The<br />
following three posts already approved are proposed for creation and necessary fund of<br />
Rs.2.50 lakh is also provided herewith to meet such expenses.<br />
Sl. No. Name of Posts<br />
No. of posts<br />
already approved<br />
(1) Group ‘A’<br />
Research Officer 1<br />
(2) Group ‘C’<br />
Inspector 1<br />
(3) Electronic Technician 1<br />
Total 3<br />
2. Office Expenses (Rs. 7.00 lakh): Rs. 7.00 lakh is earmarked for Office Stationery,<br />
printing of maps, forms and Certificates etc. and the fund will be utilised with matching<br />
contribution of C.S.S.<br />
3. Medical Treatment (Rs. 3.00 lakh): Rs. 3.00 lakh is provided herewith for Medical<br />
expenses of Officers & Staff.<br />
4. Traveling Expenses, etc. (Rs. 5.00 lakh): The reliability and accuracy of works relating<br />
to collection and preparation of land datas or statistics mainly depend on the performance<br />
of Field Officers and Staff at various centres. Hence, Rs. 5.00 lakh is provided for travelling<br />
expenses and other charges and this fund will be utilised for matching contribution of C.S.S.<br />
5. Other charges / Compensation (Rs. 0.10 lakh): The implementation of Land Reforms<br />
Programme requires payment of compensation for acquisition of land for public interest.<br />
Hence, Rs. 0.10 lakh is provided in token for such purposes and other charges. The fund will<br />
be utilised for matching contribution of C.S.S.<br />
III. MAINTENANCE OF LAND RECORDS (Rs. 181.49 lakh):<br />
1. Cadastral Survey (Rs. 16.00 lakh): Comprehensive Cadastral Survey is considered<br />
necessary for preparation of Cadastral maps and Land Information System. Sixty six (66)<br />
notified towns / sub-towns have already been cadastrally surveyed. It is proposed to cover<br />
at least 14 nos. of notified towns / villages covering 250.00 hectares. During 2005 – 06,<br />
Rs.16.00 lakh is earmarked to meet the expenses of Cadastral Survey including survey<br />
station marks of the Notified areas/ Sub-towns and W.R.C., which will be utilised with a<br />
matching share of C.S.S.
- 116 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. Engagement of Trained Surveyors (Rs. 6.00 lakh): The existing technical staff is too<br />
inadequate for successful and progressive implementation of various Schemes especially<br />
Cadastral Survey which is one of the foremost important measures for land reforms. Due to<br />
ban on creation of posts, a number of persons, who had already completed a two-year<br />
course in Survey training at the Survey Training Institute, Hyderabad, have to be engaged on<br />
Contract / Muster Roll basis as their service is required by the Department for Survey,<br />
Settlement and preparation of land record operations. Thus, Rs. 6.00 lakh is earmarked for<br />
engagement of 33 trained personnel. The fund will be utilised with a matching contribution<br />
of C.S.S.<br />
3. Strengthening of Survey Organization and Salary (Rs. 80.19 lakh): With the reorganization<br />
of Civil Districts and the increasing volume of Works in Land Reforms<br />
Programme, the services of more technical staff are urgently required by the Department.<br />
Therefore, the following posts have already been approved during 2005-06 and the same<br />
posts are again proposed for creation during <strong>2006</strong>-07. The new proposal for creation of<br />
Head Clerk, UDC and LDC for District Offices are found quite necessary as the District<br />
Offices cannot be functioned effectively without such clerical staff. Hence, minimum<br />
requirement is proposed for Directorate and District Offices of Champhai, Kolasib, Mamit &<br />
Serchhip.<br />
Sl.<br />
No.<br />
Name of Posts<br />
Group ‘A’<br />
1. Survey Officer 1<br />
(Rs. 10000-15200)<br />
Group ‘B’<br />
2. Head Surveyor 3<br />
Rs. 6500-10500)<br />
3. Surveyor - I 1<br />
(Rs. 5500-9000)<br />
Group ‘C’<br />
4. Surveyor – II 5<br />
Rs.4500-7000)<br />
5. Surveyor – III 4<br />
(Rs.4500-7000)<br />
6. Cartographer – II 1<br />
(Rs.4500-7000)<br />
7. Cartographer – III<br />
(Rs.4500-7000) 1<br />
Total 16<br />
No. of posts<br />
already approved<br />
A provision of Rs. 74.49 lakh is earmarked for salary of the existing and the newly<br />
created posts for <strong>2006</strong>-07.<br />
4. Purchase of Machinery and Equipment (Rs. 1.00 lakh): In order to achieve a high<br />
standard of accuracy in land survey, new and better quality of various modern Survey,<br />
Drawing and Printing equipments/ materials have to be procured this year. It is, therefore,<br />
proposed that Rs. 1.00 lakh be provided for purchase of machineries and equipments<br />
during <strong>2006</strong>-07 which will be utilised with a matching share of C.S.S. fund.
- 117 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
5. Medical Expenses (Rs. 4.00 lakh): Rs. 4.00 lakh is provided for Medical Expenses of<br />
Officers & Staff.<br />
6. Office Expenses (Rs. 6.00 lakh): The Department recently introduced new Land<br />
Settlement Certificates which is more durable and exhaustive by using computerised and<br />
laminated materials with plastic channel for the cover. With this end in view, a provision of<br />
Rs. 6.00 lakh is provided to meet the Office Expenses during <strong>2006</strong>-07. The fund will be<br />
utilised with a matching share of Central Assistance.<br />
7. Travelling Expenses (Rs. 5.00 lakh): Rs. 5.00 lakh is earmarked for travelling<br />
expenses of the Officers and Staff during <strong>2006</strong>-07 and the fund will be utilised with a<br />
matching contribution of C.S.S. fund.<br />
8. Aerial Cadastral Survey (Rs. 69.00 lakh):<br />
8.1 The Pilot Project on Aerial Cadastral Survey was taken up by Survey of India in the<br />
District of Aizawl (undivided Aizawl) during 1996-98. The area covering 3737.00 Sq. kms.<br />
was initially photographed at the scale of 1:10,000. The photographs are now readily<br />
available for further processing through photogrammetric instruments for preparation of<br />
line maps and the work has to be taken up by the Department through Government of India<br />
approved agency.<br />
8.2 It is also proposed to take up Pilot Project on combined Satellite Imaginary with GPS<br />
supported Cadastral Survey with the technical assistance of Government of India approved<br />
Company / Agency to speed up the work on Survey and Settlement Operation with the<br />
physical target of 1000.00 Sq.km.<br />
Hence, Rs. 69.00 lakh is provided to meet expenses for further processing of Aerial<br />
Photographs with ground Control Survey works and for Satellite Imaginary combined with<br />
Cadastral Survey work. The fund will be utilised for matching contribution of C.S.S. already<br />
released during 2005-06.<br />
IV. SURVEY TRAINING (OTHER CHARGES) (Rs. 2.00 lakh):<br />
It is proposed to send two in-service personnel at S.T.I., Hyderabad for Short Term<br />
Course in Cadastral Survey & Cartography and also to conduct refresher course for technical<br />
personnel during <strong>2006</strong>-07. Rs. 2.00 lakh is earmarked for this purpose which will be utilised<br />
for matching share of C.S.S.<br />
V. REGULATION OF LAND HOLDINGS & TENANCY (Rs. 24.00 lakh):<br />
Summary Survey and Records Operation:<br />
The Government of <strong>Mizoram</strong> has formulated the New Land Reforms Policy<br />
envisaging Regulation of land holdings and tenancy. The first phase of the programme<br />
covers Summary Survey and Records Operation consisting of verification, measurement of<br />
areas and demarcation of boundaries of land holdings under Permit/ Periodic Patta/ Pass as<br />
well as all lands for which ownership are claimed without Government Permit/ Periodic<br />
Patta by the individuals in rural areas. The area covering 18 R.D. Blocks had already been<br />
covered. In order to confer ownership rights to land holders, it is required to conduct<br />
Revision Survey of 10 R.D. Block during <strong>2006</strong>-07.<br />
01) Field Summary Survey Works (Rs. 10.00 lakh): It is proposed to conduct Summary<br />
Survey Operation viz. — (a) Control Survey and (b) Detail Survey. Hence, Rs. 10.00 lakh is<br />
earmarked for engagement of Casual Labours for the said works and fund will be utilised<br />
with matching contribution of C.S.S.
- 118 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
02) Purchase of Machinery & Equipments (Rs. 1.00 lakh): For conducting the Summary<br />
Survey and Record Operation, it is required to purchase some minor Survey and Drawing<br />
instruments. Hence, Rs. 1.00 lakh has been provided and this fund will be utilised as<br />
matching share of C.S.S.<br />
03) Office Expenses (Rs. 8.00 lakh): The preparation of Record-of-Rights for issuance of<br />
Periodic Patta to land holders and preparation of Land Records at Directorate and District<br />
Office has require purchase of office stationeries. Hence, Rs. 8.00 lakh has been provided to<br />
meet such expenses and the same fund will be utilised as matching share of C.S.S.<br />
04) Travelling Expenses (Rs. 5.00 lakh): A provision of Rs. 5.00 lakh is earmarked for<br />
traveling expenses of Field Staff.<br />
VI. BAFFACOS (Rs. 115.00 lakh):<br />
MULTI-PURPOSE CADASTRE DEVELOPMENT PROLJECT SURVEY FOR ALLOTMENT OF<br />
BAMBOO <strong>PLAN</strong>TATION AND TO FAMINE AFFECTED FAMILIES (Rs. 115.00 lakh)<br />
(BAFFACOS)<br />
(a) <strong>Mizoram</strong> covers geographical area measuring 21,087.00 Sq. Kms. where jhumming is<br />
widely practised. As such, jhum control measure has been adopted and at the same time,<br />
the land reform programme envisages wean off such primitive type of cultivation by means<br />
of modern land use planning, allotment and settlement of land to the famine affected and<br />
needy families. The whole activities of the Land Reforms Department are therefore, closely<br />
linked with the New Land Reforms Programme of the State. Under the New Land Reforms<br />
Programme, Summary Land Survey of villages are conducted since 1999 and now 18 R.D.<br />
Blocks are already surveyed and recorded. Under this programme, the Development Project<br />
Survey for the allotment of Agricultural Land for Bamboo Plantation had also been taken up<br />
since 2001-02 in the river valley of R.Tlawng and R.Tuirial valleys in scattered areas.<br />
The Government of <strong>Mizoram</strong> had therefore proposed to take up the scheme in large<br />
scale during 2004-05 keeping in view of ensuring Mautam, <strong>2007</strong> (Bamboo Flowering). It is<br />
estimated that bamboo grown area in <strong>Mizoram</strong> covers about 10,333.00 Sq. Kms. consisting<br />
of about 20 species of bamboo. <strong>Mizoram</strong> is having about 14% of India’s bamboo products. It<br />
is therefore proposed to conduct multipurpose cadastre Development Project Survey<br />
covering 10,333 Sq. Kms. during 2004-2009. Out of the above area, 20,000 Hectares is<br />
proposed to be covered by this estimated amount, i.e. Rs. 115.00 lakh.<br />
(b) Scope of the Project: The scope of the project is to conduct multipurpose Cadastre<br />
Development Project Survey and allotment and settlement of Agricultural Land to famine<br />
affected families for development of bamboo plantation and to wean off shifting cultivation.<br />
So that the famine affected people will get labour employment to earn money by jungle<br />
clearance in the survey work and to sell the natural bamboo without payment royalty before<br />
bamboo flowering. Better quality of bamboo may be planted in the land after bamboo<br />
flowering year.<br />
(c) Phasing Activities: The sequences of activities will be as follows: -<br />
(i) Reconnaissance Survey<br />
(ii) Control Survey<br />
(iii) Detail Survey<br />
(iv) Procurement of Survey, Drawing, Printing/ Computer Hardwares<br />
(v) Generation and Production of Village Cadastral Map/ Parcel Map<br />
(vi) Selection and Allotment of land to individual families<br />
(vii) Identification of plots and construction of survey line marks
- 119 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(d) Scheme-wise break-up:<br />
Sl. No. Items<br />
(Rupees in lakh)<br />
Outlay<br />
1. Cadastral Survey<br />
(a) Control Survey 100.00<br />
(b) Detail Survey<br />
2. Purchase of Survey, Drawing & Printing<br />
Equipment and Technical stationeries 3.00<br />
3. Office Expenses 6.00<br />
4. Traveling Expenses 6.00<br />
Total 115.00<br />
The fund will be utilised as a matching share of C.S.S.
- 126 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SINLUNG HILLS DEVELOPMENT COUNCIL<br />
Story of Sinlung Hills Development Council<br />
1. The Hmar people’s convention (HPC) Party started their political movement for<br />
creation of Hmar Autonomous District Council in 1986. Since the Government of <strong>Mizoram</strong><br />
did not give satisfactory response to the cause, the HPC Party callled a non-violence peaceful<br />
bandh in March, 1988. In protest against the first bandh, the State Government started<br />
violence and blood shedding on the HPC people that HPC volunteers were forced to<br />
underground. As a result, Arms confrontation between the Govt. of <strong>Mizoram</strong> & HPC started<br />
on 16.7.1989. As such escalation of violence between the two took place for quite<br />
sometimes. Finally, at the kind initiative of the then Governor of <strong>Mizoram</strong>, His excellency<br />
Mr. Swaraj Kaushal, negotiation has inplemented and Memorandum of Settlement between<br />
the Governor and HPC Party was signed on 27.7.1994.<br />
2. As per para 5.4 of the Memorandum of Settlement thereof the Sinlung Hills<br />
Development Council (SHDC) has been constituted since 1997. The main objective of the<br />
accord is to give edequate autonomy to the Sinlung Hills Development Council, as per para 3<br />
of the Memorandum of Settlement.<br />
3. Para 5.4 of the Memorandum of Settlement states that separate fund will be<br />
earmarked for schemes which may specified for implementation within the area of the<br />
Council. AS per para 5.4 of the Memorandum of Settlement a provision of Rs. 107.00 lakh<br />
had been provided for Budget estimate 2005-<strong>2006</strong> due to insufficiency of this year’s budget<br />
as well as increase of execution of different developmental works Rs. 125.00 lakh is<br />
approved for Annual Plan <strong>2006</strong>-<strong>2007</strong> as below: —<br />
(01) - Salary - Rs. 4.00 lakh<br />
(02) - Wages - Rs. 4.10 lakh<br />
(06) - Medical Treat - Rs. 0.50 lakh<br />
(11) - Domestic Travelling expenses - Rs. 0.50 lakh<br />
(13) - Office expenses - Rs. 17.40 lakh<br />
(14) - Rent - Rs. 1.00 lakh<br />
(16) - Publication - Rs. 0.50 lakh<br />
(27) - Minor Works - Rs. 68.00 lakh<br />
(50) - Other Charges - Rs. 29.00 lakh<br />
Total - Rs. 125.00 lakh<br />
1. Salary: The Government has created 6(six) temporary posts under Sinlung Hills<br />
Development Council, but unfortunately due to ban on filling up of vacant posts, these<br />
posts had not been filled up till date, In anticipation, a sum of Rs. 4.00 lakh is earmarked in<br />
the Annual Plan <strong>2006</strong>-<strong>2007</strong> for retention of these temporary post as well as Honorarium of<br />
Chairman and Council members.<br />
2. Wages: As per approval of the Government of <strong>Mizoram</strong>, Sinlung Hills Development<br />
Council is engaging 9(nine) Muster Roll employees, Rs. 4.10 lakh is earmarked for wages of<br />
these casual employees for the year <strong>2006</strong>-<strong>2007</strong>.
- 127 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. Medical Treatment & T.E.: Rs. 0.50 lakh each is earmarked for Medical Treatment<br />
and Traveling Expenses of Chairman & Members of the Council.<br />
4. Office Expenses: Rs. 17.40 lakh is earmarked for expenditure towards Office<br />
expenses such as stationary, POL, etc.<br />
5. Rent: Chairman and Office of SHDC, Aizawl are accomodated in a rented private<br />
house, for this purpose Rs. 1.00 lakh is earmarked for Office rent and Chairman residence.<br />
6. Minor Works: SHDC had been undertaking various developmental works within the<br />
area covering more than 38 villages. During the last year also several works have been taken<br />
up and most of them are nearing its completion. For its completions and to take up new<br />
works (as at Annexure-II), a sum of Rs. 68.00 lakh is earmarked for the Annual Plan <strong>2006</strong>-07.<br />
7. Other Charges: The Office of the Sinlung Hills Development Council is/have been<br />
catering the needs of the HPC / MAIDA returnees. During the last year 2005-06 a sum of<br />
Rs.21.00 lakh was set aside for rehabilitation, which was rather in sufficient to meet the<br />
requirement for rehabilitation and for discretionary fund of Chairman, SHDC. For this,<br />
purpose a sum of Rs. 29.00 lakh is earmarked for <strong>2006</strong>-<strong>2007</strong>.
- 130 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
BORDER AREA DEVELOPMENT PROGRAMME<br />
Government of India have included the Border Area Development Programme under<br />
Plan Scheme since the Annual Plan 1997-1998 of 9 th Five Year Plan. The year-wise allocation<br />
of outlays are as below: —<br />
Original Revised<br />
1. 1997-1998 - Rs. 3.00 Crore Rs. 6.73 Crore<br />
2. 1998-1999 - Rs. 6.82 Crore Rs. 6.82 Crore<br />
3. 1999-2000 - Rs. 8.00 Crore Rs. 8.00 Crore<br />
4. 2000-2001 - Rs. 8.00 Crore Rs. 12.32 Crore<br />
5. 2001-2002 - Rs. 8.32 Crore Rs. 13.32 Crore<br />
6. 2002-2003 - Rs. 8.00 Crore Rs. 16.32 Crore<br />
7. 2003-2004 - Rs. 8.32 Crore Rs. 12.48 Crore<br />
8. 2004-2005 - Rs. 8.32 Crore Rs. 15.56 Crore<br />
9. 2005-<strong>2006</strong> - Rs. 9.02 Crore<br />
Total : Rs. 67.80 Crore Rs. 91.55 Crore<br />
In <strong>Mizoram</strong>, there are 5(five) R.D. Blocks located along the Indo-Bangladesh border<br />
and 8(eight) R.D. Blocks located along Indo-Myanmar border as below: —<br />
Indo-Bangladesh Border<br />
1. W.Phaileng R.D. Block<br />
2. Bunghmun R.D. Block<br />
3. Lungsen R.D. Block<br />
4. Chawngte R.D. Block<br />
5. Zawlnuam R.D. Block<br />
Indo-Myanmar Border<br />
1. Ngopa R.D. Block<br />
2. Khawzawl R.D. Block<br />
3. Khawbung R.D. Block<br />
4. Lungdar ‘E’ R.D. Block<br />
5. Hnahthial R.D. Block<br />
6. Sangau R.D. Block<br />
7. Lawngtlai R.D. Block<br />
8. Tuipang R.D. Block
- 131 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
During 10 th Five Year Plan Period, 9 th Plan Schemes will be continued giving priority<br />
on roads, buildings and sports infrastructures. The approved outlays for Annual Plan <strong>2006</strong>-<br />
<strong>2007</strong> is Rs. 902.00 lakh and schemes / works to be taken up are as follows: —<br />
Sl.<br />
No.<br />
Name of Schemes / Works<br />
Annual Plan<br />
Approved Projected<br />
1 2 3<br />
1. Truckable road 39 Kms.<br />
2. Jeepable road 50 Kms.<br />
3. Other road (Approach road/ internal/<br />
widening/ Maintenance/bouldering)<br />
74 Kms.<br />
4. Community Hall 18 Nos.<br />
5. Other Administrative Building 15 Nos.<br />
6. Bus waitingshed/Bazarshed/Pavillion 5 Nos.<br />
7. Bridges / Culverts / Side drain 13 Nos.<br />
8. Playground 15 Nos.<br />
9. Retaining Wall 16 Nos.<br />
10. Water Tank / Water Reservoir / Water Supply<br />
Scheme<br />
15 Nos.<br />
11. Urinal / VIP Latrine 16 Nos.<br />
12. School Buildings 3 Nos.<br />
13. Rest House 5 Nos.<br />
14. Clearance of Sea Way / Water Way 10 Kms.<br />
15. Model Villages<br />
16. Sports Infrastructure<br />
17. Solar Household Light
INTRODUCTION:<br />
- 134 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
MEDIUM IRRIGATION (PWD)<br />
<strong>Mizoram</strong> is having a hilly topography. Shifting cultivation is the main method of<br />
cultivation of food grains and vegetables. The method causes vast destruction of natural<br />
resources in the form of deforestation and heavy soil erosion. However, at a few scattered<br />
pockets in plain areas of major river banks, wet rice cultivation is also carried out.<br />
The scope of Medium Irrigation in <strong>Mizoram</strong> is therefore very limited, but protection<br />
of riverbanks from overflowing to the existing cultivable plain is very much required. It is<br />
therefore, approved to take up this work with a provision of Rs. 1.00 lakh during <strong>2006</strong>-<br />
<strong>2007</strong>.<br />
DIRECTION AND ADMINISTRATION:<br />
No provision is made for Direction and Administration during <strong>2006</strong>-<strong>2007</strong> under<br />
this Head of Accounts.<br />
MACHINERY AND EQUIPMENT:<br />
WORKS:<br />
No provision is kept for Machinery and Equipment during <strong>2006</strong>-<strong>2007</strong>.<br />
Rs. 1.00 lakh is kept under this Head of Account during <strong>2006</strong>-<strong>2007</strong> for bank<br />
protection of R.Teirei under Mamit Division.
- 138 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
MINOR IRRIGATION, COMMAND AREA DEVELOPMENT & FLOOD CONTROL<br />
The anticipated expenditure under Minor Irrigation and Command Area Development<br />
Schemes during the year 2005-06 is Rs.1,905.00 lakh. Till end of 2004-05, 145 Minor Irrigation<br />
projects covering 6,646 ha. have been completed. Another 49 spill-over projects covering<br />
1,693 ha are scheduled to be completed during 2005-06. Therefore, by end of 2005-06, 194<br />
Minor Irrigation Projects covering 8,339 ha. of culturable command area will be completed.<br />
In view of the Bharat Nirman initiative launched by Government of India, a new<br />
scheme of ‘Extension, Renovation and Modernization (ERM) of Minor Irrigation Schemes’<br />
have been introduced in the Annual Plan of Minor Irrigation during <strong>2006</strong>-07 to increase<br />
created potential and enhance utilization in completed Minor Irrigation Projects. Additional<br />
500 ha. of irrigation potential is targeted with an outlay of Rs. 500.00 lakh for ERM of Minor<br />
Irrigation Schemes during <strong>2006</strong>-07.<br />
As it was in previous years, the main sources of funding for execution of Minor<br />
Irrigation Projects during <strong>2006</strong>-07 will be Central Loan Assistance (CLA) under Accelerated<br />
Irrigation Benefits Programme (AIBP) and Rural Infrastructure Development Fund (RIDF)<br />
under NABARD Schemes.<br />
Since all the spill-over projects from 2004-05 are scheduled for completion during<br />
2005-06, only new projects will be taken up under Accelerated Irrigation Benefits<br />
Programme (AIBP) during <strong>2006</strong>-07 with the total annual outlay of Rs. 1,627.07 lakh.<br />
During <strong>2006</strong>-07, 3 spill-over projects under RIDF-X will be completed with Rs. 82.00<br />
lakh, and 12 new schemes/projects will be taken up under RIDF-XI with the annual outlay of<br />
Rs. 205.93 lakh. All the three projects under RIDF-X will be completed during <strong>2006</strong>-07 and<br />
12(twelve) new projects are scheduled to be completed within 31.3.2008.<br />
During the year <strong>2006</strong>-07, the total outlays for Minor Irrigation Schemes and<br />
Command Area Development Scheme is Rs. 3153.00 lakh as briefly stated below:<br />
1 Direction & Administration : 142.00<br />
2 River Lift Irrigation : 0.10<br />
3 River Diversion :<br />
AIBP (Accelerated Irrigation Benefits Programme)<br />
(i) Execution of Minor Irrigation Projects under AIBP :<br />
(ii) Extension, Renovation and Modernization (ERM) of completed<br />
2,000.00<br />
Minor Irrigation Projects : 500.00<br />
(iii) One-time ACA for State matching share : 300.00<br />
Total - AIBP : 2,800.00<br />
NABARD Scheme<br />
(i) NABARD Loan 200.00<br />
(ii) State Matching Share 5.93<br />
Total of NABARD Scheme : 205.93<br />
Execution of Minor Irrigation Projects with State Plan Fund<br />
Repair and re-construction of Monsoon Damages on completed Minor<br />
1.00<br />
Irrigation Projects. 2.97<br />
Maintenance 1.00<br />
Total - River Diversion : 3,010.90<br />
TOTAL - MINOR IRRIGATION:<br />
3,153.00<br />
To maximize utilization potential created in completed Minor Irrigation Projects,<br />
various works on Command Area Development have been taken up. Rs. 15.00 lakh is<br />
envisaged for implementation of Command Area Development Schemes.
- 139 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : MINOR IRRIGATION (CENTRAL)<br />
NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />
1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07 : Rs. 142.00 lakh<br />
2. ANTICIPATED EXPENDITURED DURING 2005-06 : Rs. 163.00 lakh<br />
SCHEME NO. 1<br />
There are 140 no. of created posts under Minor Irrigation Schemes, out of which 87<br />
posts are under Plan Scheme. There are four Irrigation Divisions at Aizawl, Champhai,<br />
Kolasib and Lunglei, with nine Sub-Divisions. Minor Irrigation Wing in the Headquarters is<br />
manned by Joint Director (Minor Irrigation) with supporting staff to assist Director of<br />
Agriculture & Minor Irrigation in planning and monitoring of Minor Irrigation Schemes<br />
including Command Area Development and Flood Control Schemes.<br />
The outlay for Direction & Administration under Minor Irrigation Schemes is as<br />
detailed below: —<br />
Sl.<br />
No<br />
PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />
Items Unit Physical<br />
Targets<br />
HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE WATER)<br />
NAME OF THE SCHEME : RIVER LIFT IRRIGATION<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong>-07 : Rs. 0.10 lakh<br />
2. ANTICIPATED EXPENDITURE DURING 2005-06 : Rs. 0.10 lakh<br />
SCHEME NO. 2<br />
Under River Lift Irrigation Scheme, it is approved to purchase light-weight kerosenepetrol<br />
engine pump sets for sale at 50 % subsidy to cultivators.<br />
PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />
Financial Outlay<br />
(in lakh of Rs.)<br />
ESTABLISHMENTS :<br />
1 Salary of Officers & Staff No. 87 125.00<br />
2 Travelling Expenses No. 87 1.00<br />
3 Wages L.S. - 10.00<br />
4 Office Expenses No. 14 4.00<br />
5 Maintenance of buildings No. 10 1.00<br />
6 Repairing of vehicle L.S. - 1.00<br />
Sub-total : Direction & Administration :<br />
- - 142.00<br />
Sl.<br />
No.<br />
Items Unit<br />
Physical<br />
Targets<br />
Financial Outlay<br />
(in lakh of Rs.)<br />
1. Purchase of light-weight kerosene-petrol<br />
engine pump sets for sale at 50 % subsidy<br />
No. 1 0.10<br />
Sub-total: River Lift Irrigation - - 0.10
- 140 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE WATER)<br />
NAME OF THE SCHEME : DIVERSION SCHEME.<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong>-07 : Rs. 3,010.90 lakh<br />
2. ANTICIPATED EXPENDITURE DURING 2005-06 : Rs. 1,716.90 lakh<br />
SCHEME NO. 3<br />
Sources of funding for implementation of Diversion Schemes are Central Loan<br />
Assistance (CLA) under Accelerated Irrigation Benefits Programme (AIBP) and Rural<br />
Infrastructure Development Fund (RIDF) under NABARD Schemes.<br />
AIBP (Accelerated Irrigation Benefits Programme): So far, 77 Minor Irrigation Projects have<br />
been taken up under AIBP, of which, 34 projects covering Cultural Command Area of 1,605<br />
ha had been completed and 43 projects (total Culturable Command Area=1,541 ha) are<br />
scheduled to be completed during 2005-06. By the end of 2005-06, it is anticipated that 77<br />
Minor Irrigation Projects covering 3,146 ha of culturable command area will be completed.<br />
During <strong>2006</strong>-07, Rs. 2300.00 lakh (Central Loan Assistance under AIBP - Rs. 2,000.00<br />
lakh + State matching share - Rs. 300.00 lakh) is earmarked for execution of new Minor<br />
Irrigation Projects under AIBP.<br />
In view of the Bharat Nirman initiative launched by Government of India, a new<br />
scheme of ‘Extension, Renovation and Modernization (ERM) of Minor Irrigation Schemes’<br />
under AIBP have been introduced in the Annual Plan of Minor Irrigation during <strong>2006</strong>-07 to<br />
increase created potential and enhance utilization of created irrigation potentials in<br />
completed Minor Irrigation Projects. Gross irrigated area in 2004 is 15,749 ha and the area<br />
covered by Minor Irrigation Projects completed under Minor Irrigation Schemes is 6,646 ha.<br />
During <strong>2006</strong>-07, Rs.500.00 lakh is earmarked for Extension, Renovation and Modernization<br />
of Minor Irrigation Schemes under AIBP.<br />
The total outlay for AIBP during <strong>2006</strong>-07 is Rs. 2800.00 lakh (Central Share –<br />
Rs.2500.00 lakh + one time ACA for matching share - Rs. 300.00)<br />
RIDF (Rural Infrastructural Development Fund) under NABARD: During <strong>2006</strong>-07, 3 spillover<br />
projects under RIDF-X will be completed with Rs. 81.43 lakh, and 12 new schemes/<br />
projects will be taken up under RIDF-XI with the annual outlay of Rs. 124.50 lakh (NABARD<br />
Loan = 95% = Rs. 118.57 lakh and State matching share = 5% = Rs. 5.93 lakh). All the 12 new<br />
projects are scheduled to be completed within 31.3.2008.<br />
While Operation & Maintenance of completed Minor Irrigation Projects is under the<br />
joint responsibilities of the project beneficiaries and the Department, frequent repairs and<br />
reconstruction of monsoon damages are required due to torrential rains during monsoon. A<br />
provision of Rs. 2.97 lakh is made for repair and reconstruction of monsoon damages<br />
during <strong>2006</strong>-07.
- 141 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />
Sl.<br />
No<br />
Items Unit<br />
1 Accelerated Irrigation Benefits Programme (AIBP)<br />
Physical<br />
Targets<br />
SCHEME NO. 4<br />
HEAD OF DEVELOPMENT : COMMAND AREA DEVELOPMENT PROGRAMME<br />
NAME OF THE SCHEME : COMMAND AREA DEVELOPMENT PROGRAMME<br />
1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong>-07 : Rs. 15.00 lakh<br />
2. ANTICIPATED EXPENDITURE DURING 2005-06 : Rs. 15.00 lakh<br />
Financial<br />
Outlay<br />
A Execution of Minor Irrigation Projects with Central Loan Assistance under AIBP<br />
(i) Central Loan Assistance<br />
(a) Grant component - - 1,750.00<br />
(b) Loan component - - 250.00<br />
Sub-total : CLA under AIBP: - - 2,000.00<br />
(ii) State Matching Share (one-time ACA) - - 300.00<br />
Total of A - Minor Irrigation Projects under AIBP : No. 45 2,300.00<br />
B Extension, Renovation and Modernization (ERM) of existing<br />
Minor Irrigation Schemes with Central Loan Assistance (CLA) under AIBP<br />
(i) Central Loan Assistance<br />
(a) Grant component - - 450.00<br />
(b) Loan component - - 50.00<br />
Sub-total : CLA under AIBP: - - 500.00<br />
(ii) State Matching Share (one-time ACA) - - 0.00<br />
Total of A - ERM of completed Projects under AIBP : Ha 500 500.00<br />
Total (A+B) of AIBP (Accelerated Irrigation Benefits Programme) : 2,800.00<br />
2 Execution of Minor Irrigation Projects with Loan Assistance under NABARD<br />
(i) NABARD Loan<br />
(a) Completion of Spill-over projects under RIDF-X No 3 81.43<br />
(b) Execution of new Minor Irrigation Projects No 12 118.57<br />
Sub-total NABARD Loan: No 15 200.00<br />
(ii) State Matching Share for new projects only No 15 5.93<br />
Total of NABARD Scheme : No. 15 205.93<br />
3 Execution of Minor Irrigation Projects with State Plan Fund No. 1 1.00<br />
4 Repair and re-construction of Monsoon Damages on completed<br />
Minor Irrigation Projects.<br />
L.S. 120 2.97<br />
5 Maintenance L.S. 120 1.00<br />
TOTAL - DIVERSION SCHEMES 3,010.90<br />
A study of several completed irrigation projects has revealed hardly 50% of the<br />
potentials created by completed minor irrigation projects is being utilized and the<br />
productivity is low. Absence of distribution channels, lining of water channels to save water,<br />
land levelling and other activities has not been taken up. Under Command Area<br />
Development Programmes like adoptive trials, supply of inputs, extension service and other<br />
activities as mentioned above will be taken up.
- 142 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
As such cluster of 28 completed Minor Irrigation projects in Aizawl, 4 clusters in<br />
Lunglei and 8 clusters in Chhimtuipui covering gross command area of 1361 have been<br />
sanctioned by Government of India to be taken under Command Area Development<br />
Programme w.e.f. 2001-2002. The same projects are approved to be continued in 2005-06.<br />
Detail Physical and Financial target proposed for 2005-06 are as follows:-<br />
Sl.<br />
No<br />
PHYSICAL TARGET & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />
Items Unit Physical<br />
Targets<br />
Financial Outlay<br />
(in lakh of Rs.)<br />
1 A. Establishment<br />
(i) Misc. Contingencies<br />
(ii) Maintenance and repair of Machineries<br />
L.S. L.S. 0.30<br />
Vehicle including Pol charges<br />
B. Survey<br />
L.S. L.S. 0.50<br />
(i) Soil Survey Ha. 150 0.01<br />
(ii) Topological Survey Ha. 150 0.01<br />
(iii) Planning & Design<br />
C. Construction of Field Channels including<br />
Ha. 150 0.50<br />
control structure Ha. 200 8.00<br />
D. Construction of Field drains Ha. 200 4.00<br />
E. Land Levelling & Shaping Ha. 150 1.50<br />
F. Warabandi<br />
G. Demonstration of Crop Production<br />
Ha. 150 0.15<br />
Technology. Nos. 3 0.03<br />
TOTAL OF COMMAND AREA DEVELOPMENT SCHEMES :<br />
GRAND TOTAL : MINOR IRRIGATION & COMMAND<br />
15.00<br />
AREA DEVELOPMENT<br />
700.00
Introduction:<br />
- 145 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
POWER & ELECTRICITY<br />
In order to have substantial economic development availability of energy (Power) to<br />
the required level play an important role. The progress of power development can be<br />
assessed from the budgetary provision for the last 4 - 5 years as highlighted below: -<br />
Sl.<br />
No.<br />
Year<br />
<strong>ANNUAL</strong> <strong>PLAN</strong>S AT A GLANCE<br />
Non-<br />
Earmarked Earmarked<br />
NCSE /<br />
IREP<br />
(Rs. in lakh)<br />
TOTAL<br />
1. 2001 - 02 2947.00 1196.00 55.00 4198.00<br />
2. 2002 - 03 1089.00 3111.00 142.22 4342.87<br />
3. 2003 - 04 1076.00 3464.00 61.00 4601.00<br />
4. 2004 - 05 1226.00 5560.00 61.00 6847.00<br />
5. 2005 - 06 2692.00 6363.00 61.00 9116.00<br />
6. <strong>2006</strong> – 07 3442.000 3758.00 61.00 7261.00<br />
There are 643 nos of work charge staff and 2362 nos of Muster Roll labours and<br />
1098 Regular Staff to maintain existing Power Systems under plan fund.<br />
Item-wise provision of fund are as follows: —<br />
1. Direction & Administration: There are 1098 nos. of plan posts which had not been<br />
converted into non-plan posts. The establishment of these 1098 posts had to be met from<br />
plan fund. In addition to the above posts there are many infrastructural assets created since<br />
7 th Five year Plan. The maintenance of these assets are still met from plan fund as the same<br />
are not yet committed to non-plan. The total requirement, including salary of ZEDA Staff,<br />
for maintenance of Direction & Administration, as on today is Rs. 2890.00 lakh which has<br />
been increased from last year due to increase of dearness allowance and labour cost<br />
The agreed outlay of the Department during 2005–06 is Rs. 9116.00 lakh out of<br />
which Rs. 6363.00 lakh was earmarked. Hence, Non-Earmarked fund is only Rs. 2692.00 lakh<br />
which was not sufficient to meet only Direction and Administration. In <strong>2006</strong>-07, nonearmarked<br />
fund over and above Direction and Administration, we have Rs. 762.00 lakh to<br />
execute the plan works. But, some amount needs to be pulled out to meet additional<br />
requirement of Direction and Administration.<br />
2. State Normal Assistance (SNA): From State Normal Assistance (SNA), we have<br />
Rs.3992.00 lakh during <strong>2006</strong>-07. Some of which are earmarked to meet D&A and liabilities<br />
of Thermal Plant, Bairabi. Fund will be utilized as stated below :<br />
1) Direction & Administration - Rs. 2890.00<br />
2) For various improvement works - Rs. 552.00<br />
3) Thermal Generation, Bairabi - Rs. 550.00<br />
Total - Rs. 3992.00
- 146 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. Rural Electrification Corporation Ltd. Negotiated Loan: This is Negotiated Loan to<br />
be availed from Rural Electrification Corporation Ltd, Government of India against approved<br />
schemes. Normally the loan amount is Rs. 658.00 lakh meant for Improvement of<br />
Transmission and Distribution Network in <strong>Mizoram</strong>.<br />
1) Construction of Transmission lines - Rs. 658.00 lakh<br />
TOTAL - Rs. 658.00 lakh<br />
4. Accelerated Power Development & Reform Programe (APDRP): This scheme is<br />
under earmarked sector of which Rs. 1900.00 lakh (Capital content) is earmarked for <strong>2006</strong>-<br />
<strong>2007</strong> for improvement of sub-transmission & Distribution networks within <strong>Mizoram</strong>.<br />
5. A.C.A. (One-time Additional Central Assistance): This is one-time Additional<br />
Central Assistance (ACA) earmarked for Power Development during <strong>2006</strong> – 07 and the<br />
budget provision is Rs. 650.00 Fund will be utilized for :-<br />
1) Liabilities for Thermal Plant, Bairabi - Rs. 650.00 lakh<br />
TOTAL - Rs. 650.00 lakh<br />
6. Non-Conventional Source of Energy (NCSE): For Non-Conventional Source of<br />
Energy, Rs. 50.00 lakh is set aside during 2005 - <strong>2006</strong> for taking up non-conventional<br />
system of energy sources. This fund will be transferred to ZEDA as grant-in-aid, as this<br />
organisation is nodal agency for such works.<br />
7. Integrated Rural Electric Programme (IREP): Under this scheme, Rs. 11.00 lakh is<br />
made available from Rural Development Ministry and Rs. 11.00 lakh is earmarked for 2005-<br />
<strong>2006</strong>. The fund will be transferred to ZEDA as grant-in-aid as ZEDA is the nodal agency for<br />
non-conventional source of energy.<br />
8. District-wise sharing of fund: The function and organisation set-up of the<br />
Department is not based on administrative district of the state. Most of the projects are<br />
inter-related each other as power system is interconnected throughout the state. As such the<br />
project in one district is also benefited to the people in other districts. Hence, sharing of<br />
fund in district wise cannot be properly differentiated<br />
9. Conclusion: Annual Plan <strong>2006</strong> – <strong>2007</strong> is framed based on the Sectoral Allocation<br />
given by State Planning Board, Government of <strong>Mizoram</strong>.
A. LARGE & MEDIUM INDUSTRIES :<br />
Scheme No. A – 1<br />
- 155 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
INDUSTRIES<br />
Name of the Scheme : Development of Food & Allied Industries :<br />
<strong>Mizoram</strong> Food & Allied Industries Corporation Ltd. (MIFCO) :<br />
(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />
The on-going projects under MIFCO , in addition to the project of Pork & Poultry<br />
Processing Plant at Zemabawk nearing commissioning, are –<br />
(1) Upgradation and expansion of Fruit Juice Concentrate Plant, Chhingchhip.<br />
(2) Upgradation and expansion of Food Processing Plant, Sairang.<br />
(3) Setting up of Food Park, Chhingchhip.<br />
(4) Setting up of Mobile Food Processing Unit.<br />
(5) Contract Farming.<br />
The authorized share capital of MIFCO has been enhanced from Rs. 10.00 crore to<br />
Rs. 20.00 crore and the paid-up capital up to 2004-05 is Rs. 1641.72 lakh and provision<br />
during 2005-06 is Rs. 100.00 lakh. As such, it is proposed to contribute Rs. 100.00 lakh as<br />
share capital to the Corporation during <strong>2006</strong>-07 considering the requirement for<br />
establishment maintenance.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below :<br />
Programme of work (Rs. in Lakh)<br />
Contribution of share capital 100.00<br />
B. VILLAGE & SMALL INDUSTRIES :<br />
Scheme No. B – 1<br />
Total : 100.00<br />
Name of the Scheme: Direction & Administration<br />
(Strengthening of Administration)<br />
(Budget Head : 2851 – Village & Small Industries, 001(02) –Direction)<br />
This is an ongoing scheme under which most of the liabilities of posts and<br />
establishment created during the 7 th Five Year Plan are required to be maintained till date.<br />
These liabilities cannot be passed on to Non-Plan side, and these liabilities have to be<br />
continued during the 10 th Five Year Plan also. Apart from that during the year 1999-2000, 5<br />
(five) Sub-Divisional Offices have become functional in Kolasib, Serchhip, Champhai, West<br />
Phaileng, Lawngtlai and have been upgraded to District Industries Centres with the existing<br />
manpowers and the Sub-Divisional Industries Offices at Chawngte and Tlabung will be made<br />
functional during the 10 th Plan. However, these will be done without creation of new posts<br />
by way of deployment of the existing staff available with the Department.
- 156 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Since this Department is executing cost of civil construction works for infrastructure<br />
development etc. and maintenance thereof, provision of fund for construction works and<br />
maintenance of existing ones and newly constructed buildings, roads, fences etc. are given<br />
as follows :-<br />
Sl.<br />
No.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below:<br />
Description of works (Rs. in lakh)<br />
1. Salary of :<br />
Existing staff – 14 nos. 26.50<br />
2. Wages for muster roll workers :<br />
a) Directorate – 7 nos. 2.55<br />
b) R.M. Depots at Aizawl, Kolasib, West Phaileng, Serchhip, Champhai,<br />
Lunglei, Lawngtlai & Saiha, Central Godown, GDF – 17 nos.<br />
7.08<br />
3. Medical Treatment 0.50<br />
4. Travelling Expenses 4.50<br />
5. Office Expenses 30.00<br />
6. Rent for R.M.Depots at Kolasib, West Phaileng, Serchhip, Champhai,<br />
Lunglei, Lawngtlai, Saiha and Gems Cutting & Polishing Centre.<br />
4.70<br />
7. Minor Works/Maintenance :<br />
a) Horizontal extension of Directorate building 27.36<br />
b) Renovation of Directorate building 3.00<br />
c) Maintenance of Directorate building & staff quarters 2.00<br />
8. Other charges/compensation including liabilities to P & E Deptt. 8.50<br />
9. Write-off 0.35<br />
Total : 117.04<br />
Scheme No. B – 2<br />
Name of the Scheme: Research, Design & Development :<br />
1. Development of Tea Industries :<br />
(Budget Head : 2851 – Village & Small Industries, 004(02) – Dev. of Tea Industries)<br />
During 2005-<strong>2006</strong>, 250 Units of tea seed and 4700 Kgs. of Polythene Sleeves are<br />
procured for making tea nurseries in Ngopa, Khawdungsei and Biate. Tea seedlings planted<br />
in the previous year are as under :-<br />
Village No. of Families Number of Tea seedlings planted<br />
Ngopa 122 families 4,36,300 nos.<br />
Biate 133 families 3,29,110 nos.<br />
During <strong>2006</strong>-<strong>2007</strong>, the same quantities of tea seed will be procured to rapidly<br />
enhance tea bushes in Ngopa areas. Provision is accordingly prepared accordingly to meet<br />
the financial requirements.<br />
2. Development of Aromatic Oil Processing as Pilot Project :<br />
Perfumes and flavours have been known to mankind since time immemorial,<br />
Sandalwood, Comphor, etc. have been mentioned in VEDAS. In the beginning natural<br />
Aromatic Essential Oil & Oleoresins were used in perfumery. Demand for natural Aromatic<br />
Essential Oil is increasing rapidly, the world over with increasing population and growing<br />
awareness.
- 157 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Hence, it is proposed to set up a Aromatic Oil Processing unit as a pilot project in<br />
<strong>Mizoram</strong>. For this, engagement of expert consultants will be required and for this<br />
consultancy charge will be required and provision is proposed accordingly.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below :<br />
Sl.No. Programme of work (Rs. in lakh)<br />
1 Wages – 2 nos. 0.66<br />
2 Travelling Expenses 1.20<br />
3 Office expenses 2.50<br />
4 Materials & Supply – cost of tea seeds, polythene, etc. 30.00<br />
5 Advertising/Publicity 0.50<br />
6 Minor Works / Maintenance : 2.00<br />
a) Tea house road metaling<br />
b) Drilling of ground water with fitting of tube well<br />
7 Grant-in-aid :<br />
Financial assistance to tea planters 10.00<br />
8 Other Charges :<br />
a) Plant protection, etc. 2.00<br />
b) Consultancy charge for aromatic oil processing, etc. 5.10<br />
9 Motor Vehicle 2.00<br />
Total : 55.96<br />
Scheme No.B-3<br />
Name of Scheme: Export Promotion Industrial Park (EPIP)<br />
(Budget Head : 2851-Village & Small Industries 101(01)-Export Promotion Industrial Park)<br />
The Ministry of Commerce, Government of India has approved a scheme of Export<br />
Promotion Industrial Park at Lengte with a projected cost of Rs. 2753.26 lakh. The<br />
Government of <strong>Mizoram</strong> has to contribute Rs. 584.42 lakh as matching grants with a loan of<br />
Rs. 1168.24 lakh from financial institution. Land measuring 144.48 hectares is being<br />
acquired for which compensation for standing crops have been paid to the land owners.<br />
Export Promotion Industrial Park Agency (EPIPA) has been constituted to implement<br />
the project. So, it is proposed to give grant-in-aid to the Export Promotion Industrial Park<br />
Agency (EPIPA) for taking up the project during <strong>2006</strong>-07.<br />
Therefore, provision for the year <strong>2006</strong>-07 is made as follows :<br />
Sl.No. Description of works (Rs. in Lakh)<br />
1. Other charges 5.00<br />
Total : 5.00<br />
Scheme No. B. 4<br />
Name of the Scheme: Development of Industrial Infrastructure :<br />
(Industrial Estates)<br />
(Budget Head : 2851 – Village & Small Industries, 101(02)–Industrial Estate)<br />
This is an on-going scheme and to be continued during the 10 th Five Year Plan also.<br />
Development of Industrial Infrastructure is on the priority list on the agenda of New
- 158 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Industrial Policy of the Govt. of India and therefore, the scheme cannot be dispensed with.<br />
Under the scheme the following projects were taken up.<br />
a) Industrial Growth Centre at Luangmual, Aizawl.<br />
b) Industrial Estate at Zuangtui<br />
c) Industrial Estate at Kolasib<br />
d) Industrial Estate at Chawngte<br />
e) Integrated Infrastructure Development Centre at Pukpui, Lunglei under the<br />
Centrally Sponsored Scheme of Integrated Infrastructure Development<br />
Centre (IIDC)<br />
It is required to continue these projects with improvement and upgradation and for<br />
these, provisions are required to be made. Accordingly, proposed provisions are made as<br />
follows :<br />
Sl. No. Programme of works (Rs. in lakh)<br />
1. Salary of existing staff – 5 nos. 6.08<br />
2. Wages for Muster roll workers at IGC, Luangmual and Industrial<br />
Estates at Zuangtui, Kolasib - 16 nos.<br />
6.25<br />
3. Medical Treatment 0.70<br />
4. Travelling Expenses 1.00<br />
5. Office Expenses 1.00<br />
6. Minor Works/Maintenance :<br />
a) Token provision for IGC, Luangmual uinder CSS 0.00<br />
b) Constn. of new internal road in Industrial Estates 15.00<br />
c) Matching Grant to CSS for IIDC, Pukpui, Lunglei (transfer of fund<br />
to implementing agency )<br />
20.00<br />
d) Maintenance & improvement of existing roads, buildings, steps<br />
and fencing at Industrial Estate<br />
5.36<br />
7. Grant-in-aid to Infrastructure Development Agency (IDA) 5.00<br />
8. Other Charges 2.00<br />
9. Motor vehicle - maintenance 2.00<br />
Total of B-3 : 64.39<br />
Scheme No. B - 5<br />
Name of the Scheme: Promotion of Village, Cottage & Tiny Industries :<br />
(Supervision of Small Scale Industries)<br />
(Budget Head : 2851 – Village & Small Industries, 102(01)– Supervision of SSI)<br />
This is an on-going scheme under which grants-in-aid are provided to the rural<br />
artisans for setting up of village and cottage industries. The target group of this scheme is<br />
the poorer section of the society. This is a promotional scheme and need to be continued<br />
during the 10 th Five Year Plan.<br />
The following provision is made for the year <strong>2006</strong>-07 :<br />
Sl. Description of works Physical Targets Financial Target<br />
No<br />
(in No.) (Rs. in lakh)<br />
1. GIA to rural artisans 320 8.00<br />
Total : 320 8.00
Scheme No. B - 6<br />
- 159 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of the Scheme: Entrepreneurial Development & Training<br />
(Supervision of Small Scale Industries)<br />
(Budget Head : 2851 – Village & Small Industries, 102(01) – Supervision of SSI)<br />
This scheme is meant for human resource development in industrial sector. One of<br />
the most important inhibiting factors for industrial development in <strong>Mizoram</strong> is lack of<br />
skilled manpower resources both at the level of official and entrepreneurs. This scheme is<br />
purely promotional in nature and targets to educate and train both industrial workers and<br />
entrepreneurs. The Officers and staff of the Department also need exposure to acquire upto-date<br />
knowledge of industrial development and therefore, need on the spot study and tour<br />
to different parts of the country.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below :<br />
Sl.<br />
No.<br />
Description of works<br />
Physical Targets<br />
(in No.)<br />
Financial Target<br />
(Rs. in lakh)<br />
1. Scholarship/Stipend :<br />
a) EDP Training and domestic study tour for<br />
entrepreneurs<br />
100 8.00<br />
b) Training & industrial exposure and capacity<br />
building for departmental Officers and<br />
employees<br />
15 8.00<br />
Total : 115 16.00<br />
Scheme No. B - 7<br />
Name of the Scheme: Industrial Information<br />
(Supervision of Small Scale Industries)<br />
(Budget Head : 2851 – Village & Small Industries, 102(01) – Supervision of SSI)<br />
Under this scheme, the Department dessiminates information by means of publicity,<br />
advertisement, etc. Under this scheme, the Department conducts exhibition, etc. and also<br />
participates in International and National Exhibitions. This is a promotional scheme and<br />
therefore need to be continued during the 10 th Five Year Plan.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below :<br />
Sl. No. Description of works (Rs. in lakh)<br />
1. Office Expenses – collection of industrial data 3.00<br />
2. Rent - Annual Ground Rent/License Fee for <strong>Mizoram</strong> Pavilion 7.00<br />
3. Advertising :<br />
a) Interior decoration of <strong>Mizoram</strong> Pavilion for IITF 8.00<br />
b) Participation expense for IITF 18.00<br />
c) Participation / Organising of Expos/Fair 10.00<br />
d) Publication of Industry Meichher 1.00<br />
e) Dessimination of information, publicity & production of<br />
documentary film and display advertisement<br />
5.00<br />
4. Machinery & Equipment :<br />
Purchase of electronic media equipments 1.05<br />
Total : 53.05
Scheme No. B - 8<br />
- 160 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of the Scheme: Incentive/ Subsidy to Industries<br />
(Promotion & Development of Small Scale Industries)<br />
(Budget Head : 2851 – Village & Small Industries, 102(02) –Pro. & Development of SSI)<br />
Under this ongoing scheme incentives/subsidies like Interest Subsidy, Power<br />
Subsidy, Land Subsidy, State Transport Subsidy on Plant & Machinery, Factory Rent Subsidy,<br />
Subsidy on Man Power Development, Subsidy on Drawal of Powerline, Subsidy on Power<br />
Generating Set and Subsidy on Re-Imbursement of the Cost of Project Report are provided<br />
to the Small Scale Industries of <strong>Mizoram</strong> as announced in the Industrial Policy of <strong>Mizoram</strong><br />
State, 2000. Equity participation by the Government in the assisted is also entertained. This<br />
is a promotional scheme to encourage investment in industrial sector and therefore to be<br />
continued during the 10 th Five Year Plan. The following subsidies are given under this<br />
scheme.<br />
Apart from the above subsidy, it is also expedient to match Central Grants for<br />
projects implemented through MIFCO and promoting entrepreneurs in accordance with the<br />
guidelines of such schemes of Central Government.<br />
Sl.<br />
No.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below :<br />
Description of works<br />
Physical Targets<br />
(Nos.)<br />
Financial Target<br />
(Rs. in lakh)<br />
1. Grant-in-aid/Subsidy :<br />
a) Providing State Incentive Subsidies to SSI Unit 75.00 20.00<br />
b) Matching Grant and Promotional Grant to<br />
MIFCO and entrepreneurs<br />
10.00 110.00<br />
Total : 85.00 130.00<br />
Scheme No. B – 9<br />
Name of the Scheme: District Industries Centre :<br />
(Budget Head : 2851 – Village & Small Industries, 102(03) – District Industries Centre)<br />
3 District Industries Centres of <strong>Mizoram</strong> were created and were functioning under<br />
the Centrally Sponsored Scheme of the Government of India which stood transferred to the<br />
State Plan w.e.f. 1994-95. Hence all the liabilities are met from the State Plan funds.<br />
The Cabinet of the State Government had decided and notified it’s decision for<br />
upgradation of the existing Sub-Divisional Industries Offices at Kolasib, Serchhip, Champhai<br />
and Lawngtlai to District Industries Centres. Presently these Offices are under the control of<br />
the respective existing DICs. Even though these new DICs might not have started<br />
functioning in full strength within <strong>2006</strong>-07, some provisions are required to be earmarked<br />
for them for creating necessary infrasturctures.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below :<br />
Sl.No. Description of works (Rs. in lakh)<br />
1. Salary :<br />
a) DIC, Aizawl – 13 nos. 21.70<br />
b) DIC, Lunglei – 14 nos 42.80
- 161 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl.No. Description of works (Rs. in lakh)<br />
c) DIC, Saiha – 22 nos. 45.86<br />
d) DIC, Kolasib – 4 nos. 6.26<br />
e) DIC, Champhai – 3 nos. 5.69<br />
f) DIC, Serchhip – 4 nos. 6.04<br />
g) ) DIC, Lawngtlai – 4 nos. 5.96<br />
h) SDIO, W.Phaileng – 4 nos. 7.79<br />
Sub total : 142.10<br />
2. Wages :<br />
a) DIC, Aizawl – 2 nos. 0.91<br />
b) DIC, Lunglei – 3 nos. 1.36<br />
c) DIC, Saiha – 6 nos. 2.47<br />
d) DIC, Lawngtlai – 1 no. 0.45<br />
e) SDIO, West Phaileng – 1 no. 0.45<br />
Sub total : 5.64<br />
3. Medical Treatment :<br />
a) DIC, Aizawl 1.10<br />
b) DIC, Lunglei 1.30<br />
c) DIC, Saiha 1.55<br />
d) DIC, Kolasib 0.20<br />
e) DIC, Champhai 0.20<br />
f) DIC, Serchhip 0.20<br />
g) DIC, Lawngtlai 0.20<br />
h) SDIO, W.Phaileng 0.25<br />
Sub total : 5.00<br />
4. Travelling expenses :<br />
a) DIC, Aizawl 4.00<br />
b) DIC, Lunglei 2.00<br />
c) DIC, Saiha 2.00<br />
d) DIC, Kolasib 0.45<br />
e) DIC, Champhai 0.45<br />
f) DIC, Serchhip 0.45<br />
g) DIC, Lawngtlai 0.45<br />
h) SDIO, W.Phaileng 0.45<br />
Sub total : 10.25<br />
5 Office Expenses :<br />
a) DIC, Aizawl 7.00<br />
b) DIC, Lunglei 5.00<br />
c) DIC, Saiha 4.00<br />
d) DIC, Kolasib 0.50<br />
e) DIC, Champhai 0.50<br />
f) DIC, Serchhip 0.50<br />
g) DIC, Lawngtlai 0.50<br />
h) SDIO, W.Phaileng 0.50<br />
Sub total : 18.50<br />
6 Minor Works/Maintenance :<br />
a) DIC Aizawl – construction of new office building – phase II 14.00<br />
b) DIC, Aizawl – maintenance of office building & staff Qtrs. 4.00<br />
c) DIC, Lunglei – maintenance of office building & staff Qtrs. 4.00<br />
d) DIC, Saiha – maintenance of office building & staff Qtrs. 4.00<br />
Sl.No. Description of works (Rs. in lakh)
- 162 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
e) DIC, Kolasib – constn. of new office building & staff quarters for<br />
new DIC<br />
14.00<br />
f) DIC, Champhai - constn. of new office building & staff quarters<br />
for new DIC<br />
14.00<br />
g) DIC, Serchhip - constn. of new office building & staff quarters<br />
for new DIC<br />
12.52<br />
h) DIC, Lawngtlai – renovation of existing buildings / constn. Of<br />
new building<br />
12.73<br />
i) SDIO, West Phaileng - maintenance of existing buildings 3.00<br />
j) Demarcation of site & erection of boundary pillars of new DIC<br />
complex at Mamit<br />
1.00<br />
k) Site development for new DIC complex at Mamit 5.00<br />
Sub total : 88.25<br />
7. GIA to rural artisans :<br />
a) DIC, Aizawl - 100 nos. 2.50<br />
b) DIC, Lunglei – 75 nos 1.88<br />
c) DIC, Saiha - 50 nos. 1.25<br />
d) DIC, Kolasib - 25 nos. 0.63<br />
e) DIC, Champhai – 25 nos. 0.63<br />
f) DIC, Serchhip - 25 nos. 0.63<br />
g) DIC, Lawngtlai - 25 nos. 0.63<br />
h) SDIO, W.Phaileng – 25 nos. 0.63<br />
Sub total : 8.78<br />
8. Machinery & Equipments – Maintenance of 14.00<br />
Sub-total : 14.00<br />
Total : 292.52<br />
Scheme No. B – 10<br />
Name of the Scheme: Common Facility Centre(CFC)<br />
(Development of Rural Industries)<br />
(Budget Head : 2851 – Village & Small Industries, 102(05) – Dev. of Rural Industries)<br />
These schemes were taken up during 8 th Five Year Plan for setting up of Multidisciplinary<br />
Workshop cum Training Centre for upgradation of the local skilled artisans and<br />
service facilities to the local SSI units. Out of 8 districts, 3 nos. of CFC are already set up and<br />
another five of this type is proposed. Every year about 35 nos. of trainees are undergoing<br />
training in different engineering trades at RIDC Aizawl and it is proposed to start this type<br />
of training at CFC Lunglei and Saiha for 15 nos. each of artisans w.e.f. 2003-04 financial year<br />
which cannot be accomplished for want of fund. It is also proposed to set up atleast one<br />
multidisciplinary workshop during 10 th Five Year Plan which again could not be materialised.<br />
Provision for the year <strong>2006</strong>-07 is tabulated below :<br />
Sl. No. Description of works (Rs. in lakh)<br />
1. Wages of casual employees :<br />
a) RIDC Aizawl - 26 nos. 12.35<br />
b) Common Facility Centre, Lunglei – 1 no.. 0.33<br />
c) Common Facility Centre, Saiha – 1 no. 0.33<br />
Sub-Total 13.01<br />
2. Office Expenses :<br />
a) RIDC, Aizawl 0.90
- 163 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl. No. Description of works (Rs. in lakh)<br />
b) CFC Lunglei 0.60<br />
c) CFC Saiha 0.50<br />
Sub-Total 2.00<br />
3. Materials & Supply :<br />
a) Procurement of Training materials for RIDC,Aizawl 3.50<br />
b) Procurement of Training materials for CFC,Lunglei 0.00<br />
c) Procurement of Training materials for CFC, Saiha 0.00<br />
Sub-total 3.50<br />
4. Minor Works/Maintenance :<br />
a) Maintenance of building under RIDC, Aizawl, 2.00<br />
b) Maintenance of building under CFC, Lunglei 1.50<br />
c) Maintenance of building under CFC, Saiha 1.50<br />
d) Maintenance of plants and machineries under RIDC Aizawl 2.00<br />
e) Maintenance of plants and machineries under CFC, Lunglei 0.90<br />
f) Maintenance of plants and machineries CFC, Saiha 0.54<br />
Sub-Total 8.44<br />
5. Scholarship/Stipend :<br />
a) Stipend & Book grant for trainees under RIDC Aizawl 1.50<br />
b) Industrial Study Tour for trainees under RIDC, Aizawl 1.50<br />
Sub-Total 3.00<br />
6. Machineries & Equipment :<br />
a) Procurement of tools & equipment under RIDC Aizawl 3.00<br />
b) Procurement of tools & equipment under CFC Lunglei 2.50<br />
c) Procurement of tools & equipment under CFC Saiha 2.04<br />
Sub-Total 7.54<br />
Total of B-10 37.49<br />
Scheme No. B – 11<br />
Name of Scheme: Development of Electronics<br />
A. Electronics & IT Wing in Directorate :<br />
(Budget Head : 2851 – Village & Small Industries, 102(06) – Development of Electronics)<br />
Development of Electronics Scheme is an on-going scheme which includes matters<br />
related to Electronics and Information Technology. Apart from promotion of the industries,<br />
the department is initiating various projects for computerization and its related matters.<br />
Keeping these in view, the dept. formulates and implements the policy of the Government in<br />
respect of Electronics and Information Technology, and guides various Departments<br />
regarding the steps to be taken for computerization, and co-ordinates these efforts.<br />
Proposed Plan during <strong>2006</strong>-<strong>2007</strong> is as below:-<br />
1. To implement various e-governance Projects such as;<br />
(a) Departmental Networking upto sub-divisional offices.<br />
(b) Creation and maintenance of web-based Citizen Centric Services.<br />
(c) Maintenance and better utilization of CICs established in the whole of <strong>Mizoram</strong>.<br />
(d) Development of customized application software for computerization of various<br />
office procedures.
- 164 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. To organize Seminar, Exhibition, Workshop, Training, Awareness Campaign,<br />
Publicity, etc.<br />
3. Manpower development and computer literacy:<br />
The Department set up two training Institutions namely, Golden Republic<br />
Information Technology Centre, Directorate of Industries, Aizawl, and Academy of<br />
Computer and Electronic Centre, District Industries Centre, Lunglei. Various<br />
DOEACC recognized courses, computer courses and electronic courses are<br />
conducted for local people, officers/staff of Government Departments, NGOs, etc. It<br />
is also planned to conduct computer literacy programme for government servants<br />
throughout the year in these institutions.<br />
4. To sponsor graduate and post graduate students pursuing various electronic and<br />
computer courses.<br />
5. To motivate students for their interest in IT subject, it is proposed to give cash<br />
award as below:<br />
Sl.<br />
Particulars<br />
No.<br />
1. Class X students securing highest mark in<br />
computer science subject at MBSE examination,<br />
2005<br />
2. Class XII students securing highest mark in<br />
computer science subject at MBSE examination,<br />
2005<br />
First Second Third<br />
Prize prize prize<br />
Rs.30,000 Rs.20,000 Rs.10,000<br />
Rs.30,000 Rs.20,000 Rs.10,000<br />
The scheme is prepared for implementation within the allocation of Rs. 70.76 lakh as<br />
detail head given below.<br />
Sl.<br />
No.<br />
1<br />
Head (Rs. in lakh)<br />
Salary<br />
a) For existing staff – 1 no.<br />
b) For 1(one) Asst. Software Engineer<br />
c) For 2 (two) Senior Technicians<br />
d) For 6 (six) Teaching Faculties at GRITC, Aizawl and AC & EC, Lunglei<br />
2 Wages for muster roll workers – 10 nos. 5.82<br />
3 Medical Treatment 0.50<br />
4 Traveling Expenses 2.00<br />
5 Office Expenses 7.20<br />
6 Rent 0.00<br />
7 Materials and Supply :<br />
a) Procurement of training materials for GRITC, Aizawl and AC & EC,<br />
Lungle<br />
5.00<br />
8 Advertisement 2.00<br />
9 Minor Works/Maintenance :<br />
a) Maintenance of GRITC, Aizawl and AC & EC, Lunglei 3.00<br />
b) Maintenance of CICs. 2.00<br />
10 GIA/Subsidy :<br />
a) Grant-in-aid to electronic artisans 1.20<br />
b) Cash incentive to outstanding students at Board Exam 1.20<br />
8.60
- 165 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl.<br />
No.<br />
Head (Rs. in lakh)<br />
11 Scholarship/Stipend :<br />
a) Stipend and book grant for Diploma, Graduate and Post-Graduate<br />
students in Electronics & IT fields studying outside State<br />
4.00<br />
b) Training for Departmental officials 2.00<br />
c) Study tour 2.00<br />
12 Other Charges :<br />
a) Development of customized application software<br />
b) Connectivity charges for <strong>Mizoram</strong> Education Network (MEDNET)<br />
0.10<br />
13 Machinery and Equipment :<br />
Procurement of Computer and accessories for Directorate, DICs,<br />
SDIOs & CICs<br />
0.14<br />
TOTAL 46.76<br />
B. Zoram Electronics Development Corporation Ltd. (ZENICS) :<br />
(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />
During the 10 th Five Year Plan 2002-07, ZENICS Ltd. proposed to take up the<br />
following projects in addition to continuing the on-going projects of Computer Academy<br />
and Consumer Electronics Training Centre :-<br />
1. Preparation of Electors’ Photo Identity Card for <strong>Mizoram</strong> State under Election<br />
Department<br />
2. Preparation of <strong>Mizoram</strong> Portal in the Internet<br />
3. Preparation of separate Tourism Portal for Tourism Department<br />
4. Multi-Media Content Creation Centre<br />
5. Training of Unemployed Engineers and Science Degree Holders in collaboration with<br />
M/s Informatics<br />
6. Restructuring of the Corporation<br />
7. Human Resource Development Project to make <strong>Mizoram</strong> State IT literate<br />
8. Connectivity to Education Research Network<br />
The authorized share capital of the Corporation is Rs. 5.00 crore which has been<br />
proposed to be enhanced to Rs. 20.00 crore. Out of this, the paid up capital up to 2004-05 is<br />
Rs. 507.40 lakh.<br />
Proposal for <strong>2006</strong>-07:<br />
Sl. No. Particulars (Rs. in lakh)<br />
1 Share Capital contribution 40.00<br />
Scheme No. B – 12.<br />
Name of the Scheme : Handloom & Handicraft Industries<br />
In order to accomplish the objectives of national and state level agenda announced<br />
in various policy resolutions, the following works shall be undertaken for the development<br />
of Handloom & Handicrafts sectors in the state during <strong>2006</strong>-07.
- 166 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
A. Handloom Industry :<br />
1. Handloom Industry<br />
(Budget Head : 2851 – Village & Small Industries, 103(01) – Handloom Industry)<br />
Sl.<br />
No.<br />
Programmes of Works (Rs. in lakh)<br />
1. Salary of existing staff – 7 nos. 13.29<br />
2. Wages for MR workers – 8 nos. 3.00<br />
3. Medical Treatment 1.00<br />
4. Travelling Expenses 4.00<br />
5. Office Expenses 4.12<br />
Total of 1 : 25.41<br />
2. Promotion & Development of Handloom Industry<br />
(Budget Head : 2851 – Village & Small Industries, 103(02) – Pro. & Dev. of Handloom<br />
Industry)<br />
Sl.<br />
No.<br />
Programmes of Works (Rs. in lakh)<br />
1. Material & Supply :<br />
a) Procurement of building materials for temporary sheds for<br />
Decentralised Training Programme<br />
1.50<br />
b) Purchase of training materials for departmental training and<br />
decentralized training programme<br />
6.00<br />
Sub-total 7.50<br />
2. Advertising: (publication & dessimination of information) 2.56<br />
Sub-total 2.56<br />
3. Minor Works/Maintenance :<br />
a) Construction of W.T.C Building at Lunglei (token provision) 0.10<br />
b) Repairs and maintenance of Training Centres at various places 6.00<br />
c) Shifting & construction of HRDC building at Luangmual 2.90<br />
d) Purchase and maintenance of computer and its peripherals 3.50<br />
Sub-total 12.50<br />
4. Grant-in-Aid/Subsidy :<br />
a) Rebate on sale of handloom & handicraft products through exhibition 5.00<br />
b) Grants to Departmentally trained weavers in the form of looms<br />
& accessories<br />
7.00<br />
c) Gandhi Jayanti rebate and grants to Bee-Keepers. 1.50<br />
d) Working Capital to weavers @ Rs. 2500/- for 80 weavers. 2.00<br />
e) Matching contribution to CSS. 15.00<br />
Sub-total 30.50<br />
5. Scholarship/Stipend :<br />
a) Stipend for 50 Trainees under De-centralised Training<br />
Programme @ Rs. 500/- per month for 6 months.<br />
1.50<br />
b) Stipend for 50 Trainees @ Rs.500/- p.m. for one year. 3.00<br />
c) Exposition tour for officials 1.00<br />
Sub-total 5.50<br />
6. Machinery & Equipment :<br />
a) Purchase of loom, warping drum & accessories for Departmental<br />
Training & Decentralised Training Programme<br />
3.00<br />
b) Technology upgradation – purchase of improve looms with<br />
Jacquard and Dobby attachments<br />
1.54<br />
Sub-total : 4.54<br />
7. Other Charges/compensation - (production of cloth sample) 1.00<br />
Total of 2 : 64.10
- 167 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. Tribal Handloom Development Project<br />
(Budget Head : 2851 – Village & Small Industries, 103(03)– Tribal Handloom Dev. Project)<br />
Sl.<br />
No.<br />
Programmes of Works (Rs. in lakh)<br />
1. Establishment grant for Tribal Handloom Development Project 20.00<br />
Total of ‘A’ (1 + 2 + 3): 109.51<br />
B. Handicraft Industry :<br />
(Promotion & Development of Handicraft Industry)<br />
(Budget Head : 2851 – Village & Small Industries, 104(01) – Pro. & Dev. of Handicraft Industry)<br />
Sl.<br />
No.<br />
Programmes of Works (Rs. in lakh)<br />
1. Salary of existing staff – 3 nos. 3.44<br />
2. Wages for Muster Roll Workers – 7 nos. 2.58<br />
3. Medical Treatment 1.96<br />
4 Travelling expenses 2.00<br />
5. Office Expenses 2.00<br />
6. Rent 0.80<br />
7. Material & Supply – purchase of training materials for knitting,<br />
tailoring, embroidery, cane & bamboo<br />
5.00<br />
8. Minor Works – repair & maintenance of Craft Centre buildings 4.00<br />
9. Grant-in-aid/Subsidy – for Departmentally trained artisans and<br />
trained by Industrial Units numbering 380 artisans.<br />
9.50<br />
10. Scholarship/Stipend :<br />
a) Stipend for Trainees in Departmental Training Centres –<br />
250×250×12<br />
7.45<br />
b) Sponsoring of officials/artisans for bamboo craft training in<br />
China<br />
0.05<br />
11. Other charges – Institution of state award 0.50<br />
Total of ‘B’ : 39.28<br />
C. <strong>Mizoram</strong> Handloom & Handicrafts Development Corporation Ltd. (ZOHANDCO) :<br />
(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />
The <strong>Mizoram</strong> Handloom and Handicrafts Development Corporation Ltd. was duly<br />
incorporated under the Companies Act, 1956 on the 20.12.1988 and the main objectives<br />
were to develop Handloom & Handicraft units in the state of <strong>Mizoram</strong>.<br />
The authorized share capital of the Corporation is Rs. 7.00 crore and proposed to be<br />
enhanced to Rs. 12.00 crore and the paid-up capital up to 2004-05 is Rs. 754.70 lakh. In<br />
anticipation of enhancement of the authorized share capital, the Department proposed to<br />
contribute share capital to the Corporation as follows: -<br />
Sl.No. Programme of work (Rs. in lakh)<br />
1 Share capital contribution 45.00
Scheme No. B – 13 :<br />
- 168 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of the Scheme: <strong>Mizoram</strong> Khadi & Village Industries Board<br />
(Promotion & Development of Khadi & Village Indusatries)<br />
(Budget Head : 2851 – Village & Small Industries, 105(01) –Pro. & Dev. of KVI)<br />
The Board was established in 1986. As it is a statutory Board, it is the responsibility<br />
of State Government to bear the establishment charges [vide chapter V 28(1)].<br />
The existing establishment which require to be maintained consists of 173 nos. of<br />
employees of the following categories.<br />
Group A - 12<br />
Group B - 7<br />
Group C - 114<br />
Group D - 40<br />
Total - 173<br />
However, due to financial constraints, the Department proposed to contribute<br />
establishment grants to the MKVI Board as follows :-<br />
Particulars (Rs. in lakh)<br />
Grant-in-aid :<br />
Establishment Grant to the Board 240.00<br />
Scheme No. B – 14<br />
Name of the Scheme: Development of Bamboo Based Industries :<br />
(Budget Head : 2851 – Village & Small Industries, 800(01) – Dev. of Bamboo Industry)<br />
The State Government, in its endeavor to tap the economic potential of vast bamboo<br />
resources available in the state, has placed bamboo as a thrust sector which is reflected in<br />
the Industrial Policy of <strong>Mizoram</strong> 2000 and separate Bamboo Policy of <strong>Mizoram</strong> 2002 has<br />
also been announced.<br />
1. Grant to Bamboo Development Agency :<br />
Bamboo Development Agency (BDA) has been established by State Government for<br />
effective implementation of bamboo utilization activities. The Agency has now enter into<br />
Joint-Venture agreement with M/s Venus Bamboo Products (P) Limited. A Joint -Venture<br />
Company in the name and style of M/S <strong>Mizoram</strong> Venus Bamboo Products (P) Ltd.. was<br />
formed. The Agency is entrusted with the tusk of Development of Bamboo Concrete<br />
Technology, Construction of Bamboo Demonstration Houses, Bamboo Shoot Preservation by<br />
Vacuum Packing, Hardening Units for Tissue Cultured Plants etc., besides project proposal<br />
awaiting sanction within a short period. It is felt necessary to provide GIA to the BDA for<br />
running the establishment.<br />
Sl.<br />
No.<br />
Programmes of Works (Rs. in lakh)<br />
1. Grant in Aid :<br />
Grant in Aid to Bamboo Development Agency 9.00<br />
Total : 9.00
- 169 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. BAFFACOS :<br />
The Agency, as well as the Department, is entrusted to implement BAFFACOS<br />
scheme for which Additional Central Assistance under the Twelfth Finance Commission has<br />
been received and is expected for <strong>2006</strong>-07.<br />
It is, therefore, proposed to give fund as follows during <strong>2006</strong>-07: -<br />
Sl.<br />
No.<br />
Programmes of Works (Rs. in lakh)<br />
1. Other charges/Compensation :<br />
For BAFFACOS 365.00<br />
Total : 365.00<br />
Scheme No. B - 15<br />
Name of the Scheme: Zoram Industrial Development Corporation Ltd. (ZIDCO)<br />
(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />
Zoram Industrial Development Corporation Ltd. (ZIDCO) was set up in 1978 having<br />
twin functions of Industrial Development and Finance. However, its activities are more or<br />
less limited to Industrial financing.<br />
The Main sources of funds are :<br />
1) Share Capital.<br />
2) Loan/Refinance from IDBI/SIDBI, NMDFC, HUDCO and any other financing body.<br />
3) Recovery of loans.<br />
4) Interest on saving A/C.<br />
The authorized share capital of the Corporation is Rs. 20.00 crore and the paid-up<br />
capital up to 2004-05 is Rs. 1507.60 lakh. It is proposed to continue contributing share<br />
capital to the Corporation in <strong>2006</strong>-07 also.<br />
As such, proposal for <strong>2006</strong>-07 is indicated below :<br />
Particular (Rs. in lakh)<br />
Share Capital contribution 30.00<br />
TOTAL OF ‘B’ : Rs. 1704.00 lakh
- 174 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SERICULTURE<br />
Introduction:<br />
Sericulture Industry is family-oriented, labour intensive, ideally suited to countries in<br />
the tropical region where unemployment continues to be a serious problem. It has also been<br />
said to be a meeting place of Agriculture, Arts and Industries as it involves in cultivation of<br />
Silkworm food plants, Seed production and rearing of silkworms are an Art requiring skilled<br />
hands and the post cocoon technology upto its marketing are purely Industries.<br />
Sericulture practices can rightly fit into the Socio-economic structure of the rural<br />
areas and play significant role for reconstruction of rural economy benefiting mostly the<br />
weaker section of the society. The most important consideration is the effective utilization<br />
of family manpower, indiscriminately, the old aged, handicapped, illiterate and women folk.<br />
It is also the most important tool to fill up the gap between the rich and the poor<br />
distributing wealth among the farmers, reelers, weavers and traders where the lion share<br />
goes to the poor farmers.<br />
In fact, Sericulture is practised as a viable rural Industry as it gives remunerative<br />
employment to family labour throughout the year and ensures periodic income even from<br />
small land holding with low financial investment. It has a ready market and is export<br />
oriented.<br />
Objectives:<br />
(i) To uplift the rural economy in the State.<br />
(ii) To generate direct and indirect gainful employment.<br />
(iii) In the context of <strong>Mizoram</strong>, it aims at weaning away the devastating Jhum Cultivation<br />
by establishing Sericulture farming in the private sector, which will be permanent<br />
and sustainable occupation for the rural poor.<br />
(iv) To produce more cocoons and raw silks for the benefit of the farmer in particular<br />
and to increase the State’s revenue in general.<br />
Uniqueness:<br />
(i) The wealth is transferred from the rich to the poor where maximum share goes to<br />
the poor.<br />
(ii) Indiscriminate utilization of family manpowers. In other words, in Sericulture<br />
activities all kinds of people can equally involved.<br />
(iii) Nothing is practically a waste in Sericulture. Mulberry twigs are used as firewood, the<br />
litters a manure, the pupae for oil extraction, poultry/fish/human feed, the Mulberry<br />
trunk for making cricket bat, hockey stick, etc.<br />
The State of <strong>Mizoram</strong> has been proved to be an ideal place for the development of<br />
Sericulture Industry. The climatic condition, rainfall and fertility of the soil are congenial for<br />
cultivation of Silkworm food plants and rearing of Silkworms of all varieties like Mulberry,<br />
Eri, Muga and Oak Tasar. A team of experts from the Central Silk Board had visited <strong>Mizoram</strong><br />
in November, 1976 to conduct feasibility survey. The team had visited many parts of the<br />
State and their finding was reproduced as follows: —<br />
The State of <strong>Mizoram</strong> has all the prerequisites for the development of all kind of<br />
Silkworm varieties.
- 175 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The Sericulture experts from JICA who have visited <strong>Mizoram</strong> in March, 2000 have<br />
also realised with much surprise the fact that without application of fertilizer/manure for<br />
years together the Mulberry trees thrive well and put forth leaf almost throughout the year.<br />
The four sectors of Sericulture Industry which are being exploited on commercial<br />
basis are: —<br />
(a) Mulberry: Mulberry can successfully be propagated through cuttings or saplings<br />
anywhere in the State.<br />
(b) Eri: The food plants of Eri Silkworm like Kesseru, Castor, Tapioca, etc. etc. can be<br />
grown anywhere in the State.<br />
(c) Muga: The main food plants of Muga Silkworm like Som and Soalu are sparcely<br />
scattered almost everywhere in <strong>Mizoram</strong> which can easily be systematised through<br />
block plantation.<br />
(d) Oak Tasar: It has been estimated that over 30000 hectares of natural grown Oak<br />
trees are available in the north eastern part of the State. The Oak trees are the main<br />
food plant of Oak Tasar Silkworm.<br />
In spite of all the aforesaid advantages that the State of <strong>Mizoram</strong> has for the<br />
development of Sericulture Industry, the growth of Sericulture Department in the State has<br />
been at a very slow pace and the reasons to this are attributed to lack of the required<br />
infrastructural facilities, paucity of fund, inadequate number of staff, etc.<br />
During the 10 th Plan period (2002-<strong>2007</strong>), Sericulture Department will intensify its<br />
Plan and implementation Programmes towards production of Bivoltine Mulberry Silk and<br />
also Eri and Muga Sectors shall be given importance simultaneously. To meet these ends<br />
maximum quantity of high yielding Mulberry variety, som/soalu and kesseru/castor shall be<br />
introduced in the private sectors. In the meantime seed Grainages, rearing and post cocoon<br />
Technologies shall be upgraded/improved as far as practicable.<br />
Since various Catalytic Programmes under Silk Board are proposed to be<br />
implemented during the tenth Plan period, necessary provision as matching contributions<br />
have been made during <strong>2006</strong>-<strong>2007</strong> under promotion Scheme.<br />
THE SCHEMES:<br />
There are 8 (eight) on going schemes implemented by the Department during the<br />
tenth Plan period and these schemes have satisfactorily been implemented during the first<br />
three years of the Tenth Plan. As in the previous year, priority shall be given to the following<br />
work components during <strong>2006</strong>-<strong>2007</strong> which are mentioned below.<br />
(1) During 2005-<strong>2006</strong>, 1630 acres have been covered with new Mulberry Plantation as<br />
against the target of 500 acres. Another 1500 acres of land shall be covered under<br />
improved variety of mulberry during <strong>2006</strong>-<strong>2007</strong>.<br />
(2) One Staff quarter is proposed to be constructed at Sericulture complex, Chaltlang<br />
and the existing buildings at different farms shall be renovated/ repaired as per<br />
availability of fund.<br />
(3) Silk Reeling Factory shall be improved as far as possible in order to produce quality<br />
Raw Silk. Meanwhile the Silk Weaving Unit may be revived if need arise for<br />
production quality silk fabric.
- 176 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(4) Seed production shall be increased to cater the demand of the farmers far and wide<br />
in the State.<br />
Scheme-wise outlays approved for the year <strong>2006</strong> - 07 are :-<br />
1. Direction - Rs. 56.50 lakh<br />
2. Administration - Rs. 147.00 lakh<br />
3. Promotion - Rs. 33.00 lakh<br />
4. Marketing - Rs. 17.50 lakh<br />
5. Research & Training - Rs. 12.00 lakh<br />
6. Silk Processing - Rs. 13.00 lakh<br />
7. Seed Organisation - Rs. 6.00 lakh<br />
8. Baffacos - Rs. 115.00 lakh<br />
Total - Rs. 400.00 lakh<br />
DETAILS OF THE SCHEMES<br />
SCHEME NO. I : DIRECTION<br />
This scheme aims at improvement and upkeep of Directorate Office Establishment,<br />
Strengthening of Planning Cell, Information Cell, Publicity through different media,<br />
organisation of Seminars, participation of Industrial fairs. Planning, monitoring of all plan<br />
implementation Programmes, overall control of financial expenditures, etc etc.<br />
The main components of the scheme are : -<br />
1) Purchase of required stationery items.<br />
2) Maintenance of 2 heavy vehicles and 4 Light Vehicles.<br />
3) Up keep of staff and office administration.<br />
4) Monitoring/control of all work implementation.<br />
5) Construction / repairs of Staff Quarter at Sericulture Complex, Chaltlang.<br />
Sl.<br />
No.<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
Name of Post Scale of Pay<br />
Director of Seri.<br />
Jt. Director<br />
D.D.S (Planning)<br />
F.A.O<br />
Office Supdt.<br />
Assistant<br />
Accountant<br />
J.E<br />
Steno-III<br />
U.D.C<br />
L.D.C<br />
Mechanic<br />
Duftry<br />
IV-Grade<br />
14,300-18,300<br />
12,000-16,500<br />
10,000-15,200<br />
8,000-13,500<br />
8,000-13,500<br />
5,500 - 9,000<br />
5,500 - 9,000<br />
5,500- 9,000<br />
5,000- 8,000<br />
5,000- 8,000<br />
4,000- 6,000<br />
5,000- 8,000<br />
3,050- 4,590<br />
2,650- 4,000<br />
Existing<br />
(No.)<br />
-<br />
1<br />
-<br />
-<br />
1<br />
2<br />
1<br />
1<br />
1<br />
1<br />
2<br />
1<br />
1<br />
5<br />
Approved<br />
Outlay<br />
(Rs. in lakh)<br />
21.00<br />
Total 17 21.00
- 177 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl. No.<br />
Item-wise financial break-up<br />
Item<br />
Approved Outlay<br />
(Rs. in lakh)<br />
1. Salary of Staff & Medical treatment<br />
21.00<br />
2. Wages of M/R<br />
5.00<br />
3. Medical Treatment<br />
3.00<br />
4. Traveling Expenses<br />
3.00<br />
5. Office Expenses<br />
9.00<br />
6. Publicity/Advertisement<br />
1.50<br />
7. Minor Works<br />
5.00<br />
8. Maintenance of Vehicle<br />
9.00<br />
Total 56.50<br />
SCHEME NO. II : ADMINISTRATION<br />
All District level Office Establishments, maintenance and upkeep of these<br />
establishments, farms/centres come under this scheme.<br />
Brief Components of the scheme during <strong>2006</strong>-<strong>2007</strong> are :-<br />
1) Construction of District Sericulture Office buildings at Serchhip, Construction of<br />
Staff quarters at different places depending on availability of fund.<br />
2) Maintenance of Farms/Centres for Silkworm rearing and seed cocoon production.<br />
3) Repair of Buildings shall also be taken up at various Sericulture Farm.<br />
4) Purchase of all kind of appliances, equipments, fertilizers manure etc.etc.<br />
Sl.<br />
No.<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
9.<br />
10.<br />
11.<br />
Position of staff and requirement on salary.<br />
Name of Post Scale of Pay<br />
D.S.O<br />
S.P.O<br />
Head Asstt.<br />
U.D.C<br />
L.D.C<br />
Driver<br />
E.O<br />
Farm Manager<br />
Reeling Foreman<br />
Rearer<br />
IV-Grade<br />
8,000 -13,500<br />
6,500 -10,500<br />
5,500 - 9,000<br />
5,000 - 8,000<br />
4,000 - 6,000<br />
3,050 - 4,590<br />
5,500 - 9,000<br />
5,000 - 8,000<br />
5,000 - 8,000<br />
2,750 - 4,400<br />
2,650 - 4,000<br />
Existing<br />
No.<br />
4<br />
10<br />
4<br />
2<br />
3<br />
2<br />
9<br />
3<br />
1<br />
10<br />
4<br />
Total<br />
required<br />
7<br />
10<br />
7<br />
5<br />
9<br />
2<br />
9<br />
3<br />
1<br />
10<br />
7<br />
Approved<br />
Outlay<br />
(Rs. in lakh)<br />
70.00<br />
Total 52 70 70.00<br />
Financial Targets (Rs. in lakh)<br />
Sl.<br />
No.<br />
Item Approved Outlay<br />
1. Salary of Staff<br />
60.00<br />
2. Wages<br />
35.00<br />
3. Medical Treatment<br />
5.00<br />
4. Traveling Expenses<br />
8.00<br />
5. Office Expenses<br />
15.00<br />
6. Rent<br />
1.00<br />
7. Minor Works / Maintenance<br />
13.00<br />
Total 147.00
- 178 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO. III : PROMOTION<br />
This scheme mainly concern with extension and promotional activities benefiting<br />
mostly the private farmers. It provides technical assistance and gives subsidy/GIA to the<br />
registered farmers from time to time.<br />
Various Catalytic Development Projects (CSB) had been incorporated under this<br />
scheme for upgradation of Mulberry, Eri, Muga and Oak Tasar development in the state.<br />
Tentative provision to match the CDP schemes have made under this scheme.<br />
Main components of the scheme are : -<br />
1) Purchase of fencing materials which includes Angle post, Goat-proof wire mess, etc.<br />
2) Distribution of Mulberry Cuttings to 1500 families.<br />
3) Upgradation of farms and Augmentation of Silkworm food plants at different<br />
varieties to match the CDP schemes.<br />
Position of staff and posts proposed<br />
Sl.<br />
No.<br />
Name of Post<br />
Scale of Pay<br />
(Rs.)<br />
Existing<br />
No.<br />
Fund required<br />
(Rs. in lakh)<br />
1 Seri. Demonstrator 4,000-6,000 9 10.50<br />
Total 9 10.50<br />
Financial Targets<br />
Sl.<br />
No<br />
1<br />
2<br />
3<br />
Item<br />
Financial Target<br />
(Rs. in lakh)<br />
Salary of Staff<br />
10.50<br />
Supplies & Materials/CDP<br />
13.00<br />
Machinery & Equipment/CDP<br />
9.50<br />
Total 33.00<br />
SCHEME NO. IV : MARKETING<br />
Since a separate marketing cell has not yet been created, the marketing activity is<br />
directly controlled by the Directorate through the District Officers. Generally marketing<br />
activities should not come within the purview of the Department in case there exists Master<br />
Reelers and Weavers in the private sector in the State. In the absence of Reelers and Weavers<br />
in the State the marketing activities are bound to be looked after by the Department alone.<br />
In this circumstance, the Department is compelled to continue to purchase cocoons<br />
produced by the farmers and reel them in the reeling factory for producing raw silk.<br />
Since a provision for purchase of Cocoons has been made under Baffacos a provision<br />
of Rs. 10.00 lakh under material supplies shall be utilised for purchase of fencing materials.<br />
Position of Staff and requirement of Salary<br />
Sl.<br />
No.<br />
Name of Post<br />
Scale of Pay Existing<br />
No.<br />
Fund required<br />
(Rs. in lakh)<br />
1. L.D.C/Sales Asstt. 4,000-6,000 1 1.50<br />
Total 1 1.50
Financial Targets<br />
- 179 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl. No. Item Financial Outlay (Rs. in lakh)<br />
1<br />
2<br />
Salary of Staff<br />
1.50<br />
Supplies & Materials /CDP<br />
16.00<br />
Total 17.50<br />
SCHEME NO. V : RESEARCH & TRAINING<br />
As already mentioned in the aforesaid para, Sericulture Industry is an Agro-based<br />
which requires wide range of Scientific technologies with different financial investments.<br />
Therefore, proper studies on silkworm metamorphose, pathology, Agronomy, Arboriculture<br />
and ecology are indispensable to make Sericulture Industry flourish economically viable.<br />
The success of Sericulture Industry largely depend on the availability of required Scientific<br />
knowledge and its application in the field at the right time and at the right place.<br />
This can be achieved through realisation of the importance of Research and Training<br />
activities based on well-organised scientific lines, equipped with the most advanced<br />
scientific instruments to evolve new concepts of scientific methodology for application to<br />
field activities with minimum financial investment.<br />
At this end, the Department of Sericulture had established one Research and<br />
Training Institute at Zemabawk with the following objectives.<br />
1. To depute B.Sc. graduates for training in post Graduate Diploma in Sericulture to<br />
various Sericulture Institutes in India.<br />
2. To Impart training to matriculates for one year certificate course training.<br />
3. To Impart short-term training to the in-service personnel and the private farmers.<br />
4. To conduct study tours for trainees from time to time.<br />
5. To conduct mobile training to farmers of far flung areas. During <strong>2006</strong>-<strong>2007</strong>, it is<br />
proposed to train 1000 farmers and 50 in-service persons.<br />
6. Repairs of buildings/quarters.<br />
Position of Staff and requirement of Salary<br />
Sl.<br />
No.<br />
Name of Post Scale of Pay<br />
Existing<br />
No.<br />
Fund<br />
required<br />
(Rs. in lakh)<br />
1 Principal 10,000-15,200 1 4.00<br />
Total 1 4.00<br />
Financial target<br />
Sl.<br />
No.<br />
1<br />
2<br />
3<br />
4<br />
Item<br />
Financial Outlay<br />
(Rs. in lakh)<br />
Salary of Staff<br />
3.00<br />
Wages<br />
2.00<br />
Office Expenses<br />
2.00<br />
M.W/Maintenance<br />
5.00<br />
Total 12.00
- 180 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHEME NO.VI : SILK PROCESSING<br />
The main theme of Sericulture Industry is to make earnings through Sales of various<br />
Sericulture products to individuals, societies in the State.<br />
Unless the cocoons so produced are processed to produce raw silk and silk fabrics,<br />
Sericulture activities are said to be incomplete. The cocoons produced are subjected to<br />
various post Cocoon technologies in order to produce quality raw silk and silk goods for<br />
sale in the market.<br />
The cocoon processing comprises of selection of quality cocoons, stifling, cooking,<br />
degumming, reeling/spinning, twisting, weaving and so on. Cocoon processing required<br />
highly skilled hands in order to produce quality raw silk and silk fabrics to catch viable<br />
markets.<br />
At this objective, the Sericulture Department is having one Reeling Factory at<br />
Zemabawk. Apart from producing raw silk and silk fabrics these units have also been<br />
producing silk quilts in abundance which has marketing potential everywhere in the<br />
country. Since the production of reeling cocoons is increasing year after year, it has become<br />
a necessity to have one more Reeling machine like the existing ones. Under this scheme<br />
there is one silk weaving and dyeing unit at Aizawl where silk fabrics of various designs are<br />
produced.<br />
Therefore the main aim of this scheme is to create & encourage private reelers/<br />
weavers so as to sustain their livelihood through sales of their products.<br />
However, to make the Department capable of increasing the revenue through Sales of<br />
Sericultural products, the reeling factory has to be strengthened by providing necessary<br />
infrastructures.<br />
Sl. No. Item Financial target (Rs. in lakh)<br />
1 Wages 11.00<br />
2 O.E. 2.00<br />
Total 13.00<br />
SCHEME NO. VII : SEED ORGANISATION<br />
Common Occurrence of crop failure is exclusively attributed to bad quality of<br />
silkworm seeds. Therefore production of quality seed is a vital aspect for the success of<br />
Sericulture Industry. Quality seed may be defined as seed which is completely free from<br />
diseases.<br />
The whole gamut of seed production comprises of seed organisation for systematic<br />
and methodical multiplication of basic seed and Industrial seed on Scientific line and its<br />
proper and efficient management of breeders stock and its multiplication for the ultimate<br />
production of Industrial hybrid seed. Seed production involved in maintenance of breeder’s<br />
stock, basic seed and industrial seed and maintaining the purity, its vigour and vitality.<br />
Although three distinct phases for seed production are involved in systematic seed<br />
organisation in normal case, the seed organisation designed to be operative in <strong>Mizoram</strong><br />
consists of a simple three-tiers system namely — (a) Basic seed centre, (b) Multiplication<br />
Centre and (c) Industrial Grainage.
- 181 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The basic seed centre, Rangvamual is acting as Breeder`s stock which will produce<br />
only pure bred silkworm races of not less than four varieties. The seeds produced are then<br />
distributed equally to the selected Multiplication centres.<br />
The distinctive characteristic of the multiplication centres in seed organisation in<br />
<strong>Mizoram</strong> is that they only produce quality seed cocoons whereas in other states they are<br />
producing seed cocoons and silkworm seeds (eggs). The seed cocoons produced by these<br />
centres are then brought to the Industrial Grainage, Zemabawk for production of hybrid<br />
eggs to feed the private farmers.<br />
Maintenance of all the Multiplication Centres like Vairengte, Kolasib, Serchhip,<br />
Thenzawl, Baktawng, Lunglei, Champhai, Phullen, Rangvamual and Zemabawk will<br />
henceforth be looked after under this scheme.<br />
Depending on the actual requirement of hybrid seeds in the States, the industrial<br />
Grainage is expected to produce as much seeds as possible from season to season.<br />
Main components of the scheme are :-<br />
(1) Purchase of equipment/appliances, etc., etc.<br />
(2) To produce as much seeds as possible as per the requirements and the targets<br />
made for the concerned year.<br />
Financial Targets<br />
Sl. No. Item Financial target (Rs. in lakh)<br />
1 Wages 3.00<br />
2 O.E. 3.00<br />
Total 6.00<br />
ACTION <strong>PLAN</strong> FOR MULBERRY <strong>PLAN</strong>TATION AND SILKWORM REARING<br />
UNDER BAFFACOS, <strong>2006</strong> - <strong>2007</strong><br />
During 2005-06, the Department has taken up Mulberry Sericulture covering 250<br />
Nos. of farmers under various components like Land Development, Mulberry Cultivation,<br />
Construction of Rearing Houses and Supply of Rearing appliances. The Department is<br />
allotted 100.00 lakh which is expected will be utilised fully.<br />
The Scheme will be continued during <strong>2006</strong>-07 for the 3 rd year covering 350 Nos. of<br />
farmers under the similar components. The fund allotted under BAFFACOS during <strong>2006</strong>-07<br />
is Rs. 115.00 lakh.<br />
Apart from implementing the same components, fund will be provided for purchase<br />
of Cocoons for the farmers who had planted Mulberry during 2005-06 are going to start<br />
silkworm rearing and thereby producing Cocoons. During April <strong>2006</strong>, the farmers are<br />
expected to produce Cocoons and earning handsome income regularly.
- 182 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The components to be taken up during <strong>2006</strong>-07 are as follows :-<br />
A. LAND DEVELOPMENT<br />
Land Development includes clearing of Jungles, burning and land preparation, pit<br />
digging and plantation of the inputs. The individual farmers will be assisted for land<br />
development as per the norm.<br />
B. SUPPLY OF MULBERRY CUTTINGS<br />
The farmers will be supplied with improved high yielding varieties of Mulberry @<br />
Rs.20,000/- each to cover 1 hactare of land. The cuttings has to be planted @ 2 Nos. cuttings<br />
per pit.<br />
C. PURCHASE OF COCOONS<br />
Fund has to be earmarked to purchase the Cocoons to the tune of<br />
Rs. 35.00 lakh in order to make immediate payment of the Cocoons form the farmers. The<br />
Department has to collect the Cocoons from the farmers.<br />
The components of the scheme may be summed up as follows :<br />
Sl. No. Components Physical Financial (Rs. in lakh)<br />
1 Land Developments like clearing, pit<br />
digging, plantation etc.<br />
350 52.50<br />
2 Supply of Mulberry Cuttings containing 3<br />
lives buds, 2 cutting per pit @ Rs. 0.25 per<br />
cutting 20,000 cutting each.<br />
350 17.50<br />
3 Purchase of Cocoons: Purchase of Cocoons<br />
depending upon the grades.<br />
N.A 45.00<br />
Total = Rs. 115.00<br />
IMPLEMENTATION STRATEGY<br />
The selected farmers will be assisted by supply of Mulberry Cuttings @ 20,000 Nos.<br />
each at free of cost during May–June, <strong>2006</strong>. Assistance will be given for Land Development,<br />
Plantation etc. as per the norms prescribed by the Department. Contribution of the<br />
beneficiaries will be in form of family manpower. Fund will also be provided for purchase of<br />
Cocoons produced by the farmers.<br />
It is, therefore, expected that the farmers will earn regular income through Silkworm<br />
rearing and Cocoon production within a year. Once Mulberry plantation is matured, it will<br />
last about 20 years, and the farmer has to look after the garden and conduct Silkworm<br />
rearing 5-6 times in a year.<br />
SCHEME AT A GLANCE<br />
Sl.No. Name of District<br />
Target No. of<br />
Beneficiaries<br />
1 Aizawl District 90 Nos.<br />
2 Serchhip District 50 Nos.<br />
3 Champhai District 60 Nos.<br />
4 Kolasib District 100 Nos.<br />
5 Lunglei District 50 Nos.<br />
Total 350 Nos.<br />
Location<br />
Location will be decided in due<br />
course.
- 183 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
UNIT COST FOR MULBERRY CULTIVATION OF 1 HECTARE OF LAND<br />
A. (1) Land development cost 55 mandays @ Rs. 91 - Rs. 5005/-<br />
(2) Pit digging 1’×1’×1’ 50 mandays @ Rs. 91 - Rs. 5005/-<br />
(3) Planting of Mulberry Cuttings 55 mandays<br />
@ Rs. 91 - Rs. 5005/-<br />
-------------------------------------------------------------------------------------------------------------<br />
Total - Rs. 150,15/-<br />
Say - Rs. 15,000/-<br />
---------------------------------------------------------------------------------------------------------------------------<br />
B. Purchase of Mulberry Cuttings, 16,000 nos.<br />
@ Rs. 0.25/- cutting - Rs. 4,000/-<br />
---------------------------------------------------------------------------------------------------------------------------<br />
C. Supply of rearing appliances @ Rs.2067/- - Rs. 2067/-<br />
-----------------------------------------------------------------------------------------------------------------------------<br />
GRAND TOTAL - Rs. 21,067.00<br />
-----------------------------------------------------------------------------------------------------------------------------<br />
N.B.: In case of ‘A’ above, the assistance to each farmer will be in cash for ‘B’ & ‘C’<br />
the assistance will be in kind.
- 187 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
MINES & MINERALS<br />
Scheme No. C – 1<br />
Name of the Scheme : Mines & Minerals<br />
Geology & Mining Wing (under Directorate of Industries) proposes to undertake<br />
various projects and works as highlighted below under the following Schemes/Sub head)<br />
during this Annual Plan.<br />
1. Direction<br />
2. Ground Water Investigation<br />
3. Geo-technical Investigation<br />
4. Minor Mineral Investigation<br />
Geology & Mining Wing had been declared as the Nodal Agency for Ground Water<br />
Investigation, development and monitoring in the State. Developmental works, Investigation<br />
and Monitoring of ground water will be taken up during this year.<br />
The department proposes to continue undertaking investigation works relating to<br />
landslides with preventive measures and treatment thereof. The department is also<br />
entrusted with foundation and slope stability investigation. In this connection, risk/hazards<br />
zonation (Classification) of various localities along with geological and geophysical survey<br />
will be conducted in continuation of the ongoing works. Hazard Management and Mitigation<br />
Centre is proposed to be set up in the department. Geo-technical Laboratory with the<br />
assistant from NEC is being set up by the department. Further, Indian Meteorological<br />
Department (IMD), Govt. of India has assented to set up two Seismic Observatory Centers at<br />
Aizawl and Saiha as a joint venture with the Government of <strong>Mizoram</strong>.<br />
In the field of Minor Mineral Investigation, investigation work at various sites (shell<br />
Limestone, hard sandstone and other minor minerals) is proposed to be continued during<br />
this Annual Plan. At the same time, contour survey, geological mapping and Geophysical<br />
surveys will also be conducted in association with organisations like GSI, IBM, AMD etc,.<br />
The <strong>Mizoram</strong> Minor Mineral Concession Rules, 2000 is being enforced by the<br />
department. In this connection, investigation of mapping of stone quarries will be<br />
continued, in order to guide mining and for monitoring the operation.<br />
During this Annual Plan, it is proposed to conduct training in various technical fields<br />
under organizations like GSI, CGWB, NGRI etc. for technical officers and staff of this<br />
department. Moreover, training in computer courses is also proposed to be conducted for<br />
Ministerial as well as technical staff.<br />
I. Direction & Administration :<br />
(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries , 02 – Regulation &<br />
Development of Mines, 001 – Direction & Administration)<br />
Sl. No. Particulars (Rs. in lakh)<br />
1. Salary for 1 officer and 10 staff 12.00<br />
2. Wages for 6 MR workers 3.90<br />
3. Travelling Expenses 2.50<br />
4. Office Expenses – for POL, stationeries, contingent, workshop tools 9.00<br />
5. Publication 0.10
- 188 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl. No. Particulars (Rs. in lakh)<br />
6. Advertising 0.50<br />
7. Minor Works/Maintenance - Repair/maintenance/construction of<br />
G&M Quarters, workshop, office Building, Pump shed, black<br />
topping of approach road to G&M office at Luangmual, computers,<br />
printers Xerox machine, blue printing machine etc.<br />
6.00<br />
Sub-total : 34.00<br />
II. Ground Water Investigation :<br />
(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries, 02 – Regulation &<br />
Development of Mines, 101 – Survey & Mapping, (01) Ground Water Investigation)<br />
Sl. No. Particulars (Rs. in lakh)<br />
1. Minor Works/Maintenance –<br />
a) Hydrogeological/Geophysical Mapping of 2 district capital Viz.<br />
Lawngtlai / Saiha.<br />
b) Detail Hydrogeological Mapping of Kolasib District.<br />
c) Seasonal Data collection and monitoring of ground water in all 8<br />
districts capital for 3 season (i.e. Aizawl, Lunglei, Kolasib,<br />
Champhai, Mamit, Serchhip, Lawngtlai, Saiha)<br />
10.00<br />
2. Motor Vehicles – maintenance of Departmental truck 1.00<br />
3. Machinery & Equipment –<br />
a) Purchase of Geochemical Laboratory Instruments, Glass wares<br />
and chemicals/analytical kits.<br />
b) Procurement of survey instruments, field camera/GPS etc.<br />
3.00<br />
Sub-total : 14.00<br />
III. Geo-Technical Investigation :<br />
(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries, 02 – Regulation &<br />
Development of Mines, 101 – Survey & Mapping, (02) Geo-Technical Investigation.)<br />
Sl. No. Particulars (Rs. in lakh)<br />
1. Minor Works/Maintenance –<br />
a) Disaster Investigation during monsoon period covering 8<br />
districts<br />
23.50<br />
b) Geological mapping and sustainable Zonation. 5 towns<br />
2.<br />
(Champhai, Mamit, Khawzawl, Kawnpui and Thenzawl)<br />
c) Micro-landslide hazard zonation of Lawngtlai town.<br />
d) Disaster awareness campaign & seminar.<br />
e) Minor work for slide stabilization and corrective measures.<br />
Machinery & Equipments –<br />
a) Spare parts and maintenance of drilling rigs.<br />
b) Seismic monitoring instruments and analyzing softwares.<br />
2.50<br />
Sub-total : 26.00
- 189 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
IV. Minor Mineral Investigation :<br />
(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries, 02 – Regulation &<br />
Development of Mines, 101 – Survey & Mapping, (03) Minor Mineral Investigation)<br />
Sl. No. Particulars (Rs. in lakh)<br />
1. Travelling Expenses 5.00<br />
2. Office Expenses – Purchase of POL for payment of bills pertaining<br />
to stationeries, telephone and other contingent expenditures.<br />
3.00<br />
3. Minor Works / Maintenance –<br />
(i) Investigation of minor minerals like – Shell Limestone, Hard<br />
rock, Clay, Sand, Coal etc. along with Physical and contour<br />
surveys.<br />
(ii) Specific investigations on reports of mineral occurrences and<br />
works to be undertaken with organization like GSI, IBM, AMD<br />
etc.<br />
(iii) Mapping of quarries and minor mineral deposits including<br />
Mine Planning in <strong>Mizoram</strong>.<br />
14.00<br />
4. Professional Services 1.00<br />
5. Other Charges / Compensation - Operational charges for Shell<br />
Limestone/sandstone factory at Zuangtui.<br />
1.00<br />
6. Machinery & Equipment – Machinery & Equipment : Procurement of<br />
survey, Petrological and field instrument etc.<br />
2.00<br />
Sub-total : 26.00<br />
TOTAL OF MINES & MINERALS : 100.00
- 191 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ROADS & BRIDGES (P.W.D.)<br />
INTRODUCTION:<br />
Roads construction activities in <strong>Mizoram</strong> started from the 5 th Five Year Plan. The<br />
main target of the Annual Plan under 5054 C.O. on Roads and Bridges (P) is to continue the<br />
9 th Plan scheme and to improve the existing pavement. During <strong>2006</strong>-<strong>2007</strong>, Rs. 10893.00 lakh<br />
is approved under 5054 C.O. on Roads and Bridges (P).<br />
Direction and Administration:<br />
Rs. 5490.00 lakh is provided during 10 th Five Year Plan. Rs. 615.00 lakh is approved<br />
for salary and establishment of the existing staffs during <strong>2006</strong>-<strong>2007</strong>.<br />
The break up of Direction & Administration is as below :<br />
1) Salary = 309.00 lakh<br />
2) T.E. = 28.00 lakh<br />
3) Office expenses = 50.00 lakh<br />
4) Rent = 2.00 lakh<br />
5) Advertisement = 6.00 lakh<br />
6) Stipend = 5.00 lakh<br />
7) Motor Vehicle = 35.00 lakh<br />
8) Professional charge = 2.00 lakh<br />
9) Other charges = 10.00 lakh<br />
10) Maintenance = 168.00 lakh<br />
Total = 615.00 lakh<br />
Machinery And Equipment: -<br />
Rs. 24.00 lakh is approved for Machinery and equipment during <strong>2006</strong>-<strong>2007</strong>.<br />
Planning And Research: -<br />
No provision is kept for Planning and Research during <strong>2006</strong>-<strong>2007</strong>.<br />
Works: -<br />
i) Rs. 700.00 lakh is approved for ongoing works of NABARD during <strong>2006</strong>-<strong>2007</strong>.<br />
ii) Rs. 7500.00 lakh is approved for works under <strong>Mizoram</strong> State Road Project (E.A.P.)<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
iii) Rs. 1000.00 lakh is approved as counterpart funding of World Bank Aided Project<br />
(M.S.R.P.) under ACA during <strong>2006</strong>-<strong>2007</strong>.<br />
iv) Rs. 595.00 lakh is approved under TFC for BAFFACOS during <strong>2006</strong>-<strong>2007</strong>.<br />
v) Rs. 459.00 lakh is approved for improvement of State Core Road Network and<br />
Improvement of Aizawl city roads, District town roads and Satellite town and<br />
villages roads at various places in <strong>Mizoram</strong> during <strong>2006</strong>-<strong>2007</strong>.<br />
STATE HIGHWAYS<br />
1. Kolasib – Bairabi – Zamuang Road (6Km).<br />
During 10 th Five Year Plan Rs. 187.00 lakh is the approved outlay. During <strong>2006</strong>-<strong>2007</strong>,<br />
no provision is kept for the road.<br />
2. Champhai – Tiau Road (18.50Km).<br />
During 10 th Five Year Plan Rs.115.00 lakh is the approved outlay. During <strong>2006</strong>-<strong>2007</strong>,<br />
Rs 25.00 lakh is approved for this road .
- 192 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Major District Roads<br />
1. Lungsen – Chawngte Road (53.25 Km)<br />
Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is made<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
2. Lawngtlai – Nalkawn – Chamdur Road (45Km).<br />
Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. Rs 10.00 lakh is<br />
approved for the road during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Champhai – N.Vanlaiphai Road (92.50Km).<br />
Rs. 124.00 lakh is approved outlay during 10 th Five Year Plan. Rs 20.00 lakh is<br />
approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Ngopa – Mimbung Road ( 52.73Km).<br />
Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. Rs 10.00 lakh is<br />
approved during <strong>2006</strong>-<strong>2007</strong>.<br />
5. Kawnpui – Hortoki Road (21Km).<br />
Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. No provision is<br />
earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />
6. Zemabawk – Selesih Road (14Km).<br />
Rs. 118.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
7. Thenzawl – Buarpui Road (45Km).<br />
Rs. 124.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
8. Phairuang – Bunghmun Road (69Km).<br />
Rs. 155.00 lakh is approved outlay during 10 th Five Year Plan. Rs 20.00 lakh<br />
provision is kept during <strong>2006</strong>-<strong>2007</strong>.<br />
9. Khawzawl – Ngopa Road.<br />
Rs. 155.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
10. Serkhan – Bagha Road (30Km).<br />
Rs. 68.00 lakh is approved outlay during 10 th Five Year Plan. Rs 20.00 lakh is<br />
approved during <strong>2006</strong>-<strong>2007</strong>.<br />
11. Kanhmun – Tuidam – Tuilutkawn Road (96Km).<br />
Rs. 124.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
12. Thenzawl – Bunghmun Road :-<br />
Rs. 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
Other District Roads<br />
1. Keitum – N.Vanlaiphai Road (48Km).<br />
Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.
- 193 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. Phullen – Suangpuilawn Road (28Km).<br />
Rs. 44.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Khawzawl – E.Lungdar Road (73Km).<br />
Rs. 80.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Bilkhawthlir – Chemphai – Saiphai Road (20Km).<br />
Rs. 18.00 lakh is approved outlay during 10 th Five Year Plan. Rs 16.00 lakh is<br />
approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
5. S.Hlimen – Samtlang – Lungleng Road (4Km).<br />
Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
6. Approach road to Kolodyne – R.Ngengpui (9Km).<br />
Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
7. Tlabung – Borapansury Road.<br />
Rs.62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
Village Roads<br />
1. Vairengte – Saiphai via Phainuam (16Km).<br />
Rs. 105.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
2. E.Lungdar – Chekawn Road (8Km).<br />
Rs. 102.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Zobawk – Haulawng Road (31.70Km).<br />
Rs. 59.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Tamdil approach Road (7.50Km).<br />
Rs. 31.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
5. Lunglei – Nghasih road.<br />
Rs. 59.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
6. Khawzawl – Phaisen Road (5Km).<br />
Rs. 50.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
7. Approach road to Maumual (4Km).<br />
Rs. 55.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
8. Lawngtlai – Saisihchhuah – Sangau Road (45Km).<br />
Rs. 146.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.
- 194 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
9. Champhai – Sazaiphai – Farkawn Road (20Km).<br />
Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
10. Tuisumpui – Lungpher Road.<br />
Rs. 37.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
11. Saiha – Lawngtlai feeder Road (28Km).<br />
Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
12. Chemphai – Phainuam via Burchep Road.<br />
Rs. 77.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
13. Baktawng – Hmawngkawn – Chawilung Road (15Km).<br />
Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
14. Lailak – Buhban Road (5Km).<br />
Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
15. Builum – N.Hlimen Road (14Km).<br />
Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
16. Sertlangpui – Serte Road (4Km).<br />
Rs. 18.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />
during <strong>2006</strong> – <strong>2007</strong>.<br />
17. R.Mat – Lungmawi Road (12Km).<br />
Rs. 18.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kepting<br />
<strong>2006</strong>-<strong>2007</strong>.<br />
18. Tuipuibari – W . Kawnpui Road :-<br />
No provision is kept for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
19. Kawlchaw – Tongkolong Road :-<br />
Rs. 10.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
Satellite Towns & Villages:<br />
A sum of Rs. 852.00 lakh is approved during 10 th Five Year Plan. Rs 92.00 lakh is<br />
approved for Improvement of Satellite Town and Village roads during <strong>2006</strong>-<strong>2007</strong> as below: -<br />
1. Improvement of Saitual internal road :-<br />
Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
2. Improvement of Hnahthial internal road :-<br />
Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Improvement of Sakawrdai internal road :-<br />
Rs 6.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Improvement of Khawzawl internal road :-<br />
Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.
- 195 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
5. Improvement of Tuidam internal road :-<br />
Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
6. Improvement of Kanhmun internal road :-<br />
Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
7. Improvement of W.Phaileng internal road :-<br />
Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
8. Improvement of Kawrthah internal road :-<br />
Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
9. Improvement of Thenzawl internal road :-<br />
Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
10. Improvement of Ngopa internal road :-<br />
Rs 5.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
11. Improvement of Sialsuk internal road :-<br />
Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
12. Improvement of Bualpui (Ng) internal road :-<br />
Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
13. Improvement of Vairengte internal road :-<br />
Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
14. Improvement of Kawnpui internal road :-<br />
Rs 6.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
15. Improvement of Bilkhawthlir internal road :-<br />
Rs 4.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
16. Improvement of Tlabung internal road :-<br />
Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
17. Improvement of Darlawn internal road :-<br />
Rs 4.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
18. Improvement of approach road to High School at Tlungvel :-<br />
Rs 2.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
Roads within Towns:<br />
A sum of Rs. 990.00 lakh is approved during 10 th Five Year Plan for eight Disricts.<br />
Rs.216.00 lakh is approved for Improvement of Aizawl City Roads and District town roads<br />
during <strong>2006</strong>-<strong>2007</strong> as below: -<br />
1. Improvement of Lunglei town roads :-<br />
Rs 30.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
2. Improvement of Saiha town roads :-<br />
Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Improvement of Champhai town roads :-<br />
Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.
- 196 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. Improvement of Serchhip town roads :-<br />
Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong><br />
5. Improvement of Mamit town roads :-<br />
Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
6. Improvement of Kolasib town roads :-<br />
Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
7. Improvement of Lawngtlai town roads :-<br />
Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
8. Improvement of Aizawl city roads :-<br />
i) Roads within Aizawl Road ‘N’ Division :-<br />
Rs. 34. 00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
ii) Roads within Aizawl Road ‘S’ Division :-<br />
Rs. 32. 00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
Bridges :<br />
Rs. 328.00 lakh is approved during 10 th Five Year Plan. No provision is kept for<br />
Bridges during <strong>2006</strong>-<strong>2007</strong>.<br />
NABARD :<br />
Rs. 700.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong> for Hnahthial-Tarpho, Tumtukawn –<br />
Tarpho road and Lawipu – Tlawng roads. The financial targets for the projects are :<br />
1. Construction of Hnahthial – Tarpho road :-<br />
Rs. 300.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
2. Construction of Tumtukawn – Tarpho road :-<br />
Rs. 300.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Construction of Lawipu – Tlawng road :-<br />
Rs. 100.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />
Counterpart Funding of World Bank Aided Project:<br />
A sum of Rs. 5250.00 lakh is approved during 10 th Five Year Plan and Rs. 1000.00<br />
lakh is approved for Counterpart funding of World Bank Aided Project during <strong>2006</strong>-<strong>2007</strong>.<br />
EAP (<strong>Mizoram</strong> State Road Project):<br />
A sum of Rs. 29750.00 lakh is approved during 10 th Five Year Plan and Rs. 7500.00<br />
lakh is approved for this project during <strong>2006</strong>-<strong>2007</strong> .<br />
BAFFACOS:<br />
A sum of Rs. 8000.00 lakh is approved during 10 th Five Year Plan and Rs. 595.00 lakh<br />
is approved for this project during <strong>2006</strong>-<strong>2007</strong> as below :<br />
1) Bamboo Link Road: Rs. 570.00 lakh is approved for this project during <strong>2006</strong>-<strong>2007</strong>.<br />
2) Village Connectivity: Rs. 25.00 lakh is approved for this project during <strong>2006</strong>-<strong>2007</strong>.
- 208 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ROAD TRANSPORT<br />
Road Transport continues to be important means of transportation system in<br />
<strong>Mizoram</strong> for easy movement of passengers and goods from one place to another at<br />
minimum rates of fare. The Government of <strong>Mizoram</strong>, with its blanket policy of Privatization<br />
of Government Vehicles, decided to phase out the M.S.T. Wing of the Transport Department.<br />
However, due to peculiar nature of public transportation service it delivers to the general<br />
public at low cost fare and freights, the M.S.T. service will also continue to play a vital role<br />
for some years ahead while this privatization programme is gradually implemented. It will<br />
also take time to gradually minimize the need of MST service for rural people.<br />
Simultaneously, the Transport Department, with its existing technical manpower<br />
resource, can conveniently act as a centralized nodal Department for maintenance of the<br />
remaining fleet of Government Vehicles. Declaring the Department as nodal Department will<br />
prove to ensure economy in Government expenditures as well as speedy mechanical service<br />
for various departments of the Government avoiding cumbersome procedures of engaging<br />
private workshops. This regulated practice will also prevent the Departments from incurring<br />
heavy liabilities to private firms for maintenance of their vehicles.<br />
The Annual Plan <strong>2006</strong>-07, therefore, aims to carry out this two-prong programme.<br />
On one hand, it was continue to function as important public transportation system<br />
delivering passengers and goods to various locations, and on the other hand, upgradation of<br />
its Central Workshop, to equip it with infrastructural needs of modernized machinery and<br />
tools. It also envisages for providing up gradation of the Central Workshop revamping its<br />
technical and mechanical skill and service to be able to cater the need for maintenance of all<br />
vehicles under the Government by promoting security, efficiency, economy and properly<br />
coordinated system of management. Thus, these schemes have been made for inclusion<br />
within the limited approved outlay of Rs. 500.00 lakh for the Annual Plan <strong>2006</strong>-07.<br />
The following are the schemes approved to be taken up during the Annual Plan<br />
<strong>2006</strong>-07.<br />
CODE<br />
NO.<br />
MAJOR /<br />
MINOR HEAD<br />
NAME OF SCHEME<br />
PROPOSED OUTLAY<br />
(Rs. in lakh)<br />
1 2 3 4<br />
07 3055 004 REVENUE SECTION<br />
3055 - ROAD TRANSPORT<br />
001 (01) - DIRECTION<br />
(01) Salary - 50.00<br />
(11) Travelling Expenses - 5.00<br />
(13) Office Expenses - 11.00<br />
(16) Publication - 5.00<br />
(34) Scholarship/stipend - 3.00<br />
(50) Other charges (MACT) - 20.00<br />
(51) Motor Vehicle - 119.00<br />
(52) Machinery & equipment - 4.00<br />
Sub-Total of Direction - 217.00<br />
800 (02) - BOOKING STATION<br />
(27) Minor works/Maintenance - 15.00<br />
Sub-Total - 15.00
CODE<br />
NO.<br />
MAJOR /<br />
MINOR HEAD<br />
- 209 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
NAME OF SCHEME<br />
PROPOSED OUTLAY<br />
(Rs. in lakh)<br />
1 2 3 4<br />
800 (03) CENTRAL WORKSHOP<br />
(01) Salary - 30.00<br />
(02) Wages - 0.50<br />
(11) Travelling Expenses - 2.00<br />
(13) Office Expenses - 5.00<br />
(50) Other Charges - 0.50<br />
(52) Machinery & Equipments - 14.00<br />
Sub-Total of Central Workshop - 52.50<br />
TOTAL OF 3055 - 284.00<br />
5055 – C.O. ON ROAD TRANSPORT<br />
CAPITAL SECTION<br />
103 (01) - Direction<br />
(53) Major Works – Constn. of Directorate Bdlg - 50.00<br />
103 (02) - Central Workshop<br />
(53) Major works - upgradation of Central Workshop - 2.00<br />
102 (01) - Acquisition of Fleet<br />
(51) Motor Vehicles - 54.00<br />
(24) POL for - 110.00<br />
Total of Capital Section - 216.00<br />
GRAND TOTAL OF ROAD TRANSPORT - 500.00<br />
ITEM-WISE BREAK UP OF THE SCHEME<br />
NAME OF SCHEME<br />
001 (01) - Direction<br />
Annual Plan <strong>2006</strong>-07<br />
Outlay<br />
(Rs. in lakh)<br />
(01) - For entertainment of existing 37 nos. of posts<br />
(11) - Traveling Expenses : To meet travelling<br />
- 50.00<br />
expenses of officers and staff<br />
(13) - Office Expenses :<br />
1) Stationeries & Advertisement<br />
- 5.00<br />
2) Purchase of uniform for entitled staff<br />
3) Normal Office expenses<br />
4) Purchase of furniture<br />
- 11.00<br />
(16) - Publication : For Printing of Forms & Tickets<br />
for MST buses, publication of Statistical<br />
Data and other booklets<br />
(34) - Scholarship/Stipend :<br />
- 5.00<br />
For imparting training of officers & staff<br />
(50) - Other Charges :<br />
- 3.00<br />
(a) Liabilities to be paid on compensation to<br />
Accident victims<br />
(51) – Motor Vehicle :<br />
- 20.00<br />
For maintenance of existing vehicles and purchase - 119.00<br />
of 1(one) two-wheeler for checking staff of MST Lunglei
- 210 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
NAME OF SCHEME<br />
(52) - Machinery & Equipments :<br />
1) Purchase of 2 Computers for initializing<br />
Annual Plan <strong>2006</strong>-07<br />
Outlay<br />
(Rs. in lakh)<br />
Computerization of Statistical data<br />
2) Annual maintenance etc. of existing<br />
computers / E-Governance<br />
- 4.00<br />
SUB TOTAL (DIRECTION) - 217.00<br />
800(02) - Booking Station :<br />
(27) - Minor Works :<br />
1) Construction of MST Booking office at Kanhmun<br />
2) Construction of quarters for MST Station - 15.00<br />
Superintendent at Saiha<br />
3) Constn. of Training-cum-Lecture hall at Chaltlang<br />
4) Improvement of various MST offices<br />
Sub-Total (Booking Station) - 15.00<br />
800(03) - Central Workshop :<br />
(01) For maintenance of existing 44 nos. of posts - 30.00<br />
(02) Wages : Wages for 2 nos. of casual labourer . 0.50<br />
(11) Traveling Expenses:<br />
For Traveling expenses of officers & staff - 2.00<br />
(13) Office Expenses :<br />
1) Stationeries<br />
2) Maintenance of 1(one) Light Vehicle - 5.00<br />
3) Normal Office expenses<br />
(50) Other Charges : Fees for Govt. Advocate - 0.50<br />
(52) Machinery & Equipments :<br />
For purchase of 1 no. of Crank shaft grinder, - 14.00<br />
special tools and accessories for workshop<br />
SUB TOTAL : (Central Workshop) - 52.00<br />
TOTAL OF 3055 - 284.00<br />
CAPITAL SECTION<br />
5055 – C.O. on Road Transport<br />
103(01) - Direction<br />
(53) Major Works : Constn. of Directorate Bldg. - 50.00<br />
103(02) - Central Workshop<br />
(53) Major works : Upgradation of Central Workshop - 2.00<br />
102(01) - Acquisition of Fleet :<br />
(51) - Motor Vehicles: Purchase of 5(five) Buses<br />
including 2(two) mini Buses for Lunglei - 54.00<br />
(24) - POL :<br />
1) Purchase of POL for CPP Aizawl 110.00<br />
2) Renovation of CCP Lunglei as a token<br />
TOTAL OF 5055 - 216.00<br />
GRAND TOTAL OF ROAD TRANSPORT - 500.00
INTRODUCTION:<br />
- 214 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
INLAND WATER TRANSPORT (I.W.T.)<br />
Due to the absence of good navigable waterways in <strong>Mizoram</strong>, less work is<br />
undertaken under Inland Water Transport. Presently, there is hardly any Inland Water<br />
Transport in use. This may be partly attributed to the discharge of rivers in <strong>Mizoram</strong> which<br />
varies very widely. During rainy season, the discharge of water become very high carrying<br />
large quantities of debris, logs, boulders etc. making navigation difficult whereas during dry<br />
period, water level is low and the debris, etc. deposited during rainy season becomes<br />
obstructions.<br />
The road network in <strong>Mizoram</strong> is such that in remote and interior areas, roads have to<br />
cross rivers. Bridges could not be constructed due to fund constraints. Marboat and Country<br />
boats have to be utilized for carrying vehicles and men across the rivers.<br />
Therefore, the fund provided under this head is approved to be utilized for<br />
improving river crossing facilities. Rs. 5.00 lakh is approved under this Head of Accounts<br />
during <strong>2006</strong> -<strong>2007</strong>.<br />
DIRECTION AND ADMINISTRATION:<br />
No provision is made for Direction and Administration during <strong>2006</strong> -<strong>2007</strong> under this<br />
Head of Account.<br />
MACHINERY AND EQUIPMENT:<br />
WORKS:<br />
No provision is kept for Machinery and Equipment during <strong>2006</strong>-<strong>2007</strong>.<br />
The following works will be taken up during <strong>2006</strong>-<strong>2007</strong> under this Head of Accounts.<br />
i) Improvement of Ferry and Marboat at Tuipui on Lawngtlai – Saiha Feeder roads:<br />
Rs.1.50 lakh is approved during <strong>2006</strong> - <strong>2007</strong> for improvement of existing Marboat at<br />
R.Tuipui.<br />
ii) Improvement of Ferry and Marboat at Bairabi: Rs.3.50 lakh is approved during<br />
<strong>2006</strong>-<strong>2007</strong> for improvement of ferry & Marboat at Bairabi.
- 218 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
MOTOR VEHICLE WING<br />
The Motor Vehicle Wing under Transport Department functions with its subordinate<br />
offices at District headquarters enforcing MV Acts and Rules and also looked after all<br />
matters relating to State Transport Authority (STA).<br />
Recently, the duties and responsibilities of MV Wing have considerably increased due<br />
to the enormously increasing vehicle population in the State. To cope with the future<br />
expansion, it is felt necessary to upgrade its standard with modern technology such as<br />
introduction of I.T. and computerization, strengthening and widening its functions.<br />
As a result, the State Government had already opened new Districts offices such as<br />
at Champhai, Kolasib and Serchhip and are functioning with no full-fledged establishment.<br />
Besides, two new DTO offices are proposed for opening at Lawngtlai and Mamit during this<br />
Annual Plan <strong>2006</strong>-07. Thus, entertainment of posts for these newly opened DTO offices is<br />
inevitable. Keeping in view the need for entertaining of posts and upgradation of newly<br />
establishments, the Annual Plan approved outlay for M.V. Wing for the year <strong>2006</strong>-07 comes<br />
to Rs. 100.00 lakh.<br />
The following are the schemes approved to be taken up during the Annual Plan<br />
<strong>2006</strong>-07.<br />
CODE NO. / MAJOR-MINOR HEAD /<br />
NAME OF SCHEME<br />
<strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07<br />
(Rs. in lakh)<br />
2041 - Taxes on Vehicles<br />
001(01) - Direction :<br />
(01) Salary - 9.25<br />
(02) Wages - 2.00<br />
(11) Travelling Expenses - 0.50<br />
(13) Office Expenses - 10.00<br />
(16) Publication - 3.00<br />
(27) Minor Works/Maintenance - 12.00<br />
(34) Scholarship/Stipend - 0.50<br />
(50) Other charges - 10.00<br />
(51) Motor vehicles - 2.50<br />
(52) Machinery & Equipments - 20.00<br />
Sub-Total : - 69.75<br />
001(02) - Administration<br />
(01) Salary - 16.00<br />
(02) Wages - 3.00<br />
(11) Travelling Expenses - 3.00<br />
(13) Office Expenses - 5.00<br />
(14) Rent - 0.25<br />
(51) Motor Vehicles - 3.00<br />
Sub-Total : - 30.25<br />
GRAND TOTAL : M.V. WING - 100.00
- 219 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ITEM-WISE BREAK-UP OF THE SCHEME :<br />
CODE NO. / MAJOR-MINOR HEAD /<br />
NAME OF SCHEME<br />
<strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07<br />
(Rs. in lakh)<br />
001 (01) - DIRECTION<br />
(01) Entertainment of posts : For entertainment of existing 3 nos.<br />
of posts and as a token for already approved 4 nos. of posts —<br />
a) Sr. Research Officer - 1 no.<br />
b) Deputy Commissioner of Transport - 1 no. - 9.25<br />
c) Inspector of Statistics - 2 nos.<br />
(02) Wages : Wages to be paid to casual labourer - 2.00<br />
(11) T.E. : To meet traveling expenses of STA/MV Wing - 0.50<br />
(13) O.E. : For office expenses including expenses from of DTO<br />
Offices such as Champhai, Kolasib and Serchhip -<br />
(a) Stationeries and advertisement<br />
(b) Maintenance of motor vehicle - 10.00<br />
(c) Purchase of uniforms for uniformed<br />
staff and IV Grade<br />
(d) Normal office expenses<br />
(16) Publication :<br />
(a) Printing of pre-printed Receipt memos,<br />
Registration Certificate, Fitness Certificate - 3.00<br />
(b) Publication of Passenger and Goods<br />
Taxation Acts & Rules<br />
(27) Minor Works/Maintenance:<br />
(a) Constr.of DTO Staff Qtrs at Champhai - 5.00<br />
(b) Constr.of DTO Staff Qtrs at Serchhip - 4.00 - 12.00<br />
(c) Maintenance of existing buildings - 3.00<br />
(34) Scholarship/Stipend :<br />
(a) For imparting training to enforcement staff - 0.50<br />
(b) Expenses for officers & staff who undergo training<br />
(50) Other Charges :<br />
1) Observation of Road Safety Week - 7.00<br />
2) Opening of DTO offices at Lawngtlai&Mamit - 2.00 - 10.00<br />
3) Annual maintenance of existing computers - 1.00<br />
(51) Motor Vehicle : Maintenance of existing vehicles - 2.50<br />
(52) Machineries and Equipments :<br />
(1) For purchase of weighbridge for DTO office,<br />
Aizawl – 1 no. - 20.00<br />
(2) For induction of e-governance in MV wing<br />
Sub-Total : 001 (01) - DIRECTION - 69.75
- 220 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
CODE NO. / MAJOR-MINOR HEAD /<br />
NAME OF SCHEME<br />
2041 - Taxes on Vehicles<br />
<strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07<br />
(Rs. in lakh)<br />
001(02) - ADMINISTRATION<br />
(01) Entertainment of Posts :<br />
For entertainment of existing 16 nos. of posts and<br />
as a token for already approved 13 nos. of posts of —<br />
(a) D.T.O - 1 post for Serchhip<br />
(b) M.V.I - 3 posts for Serchhip, Champhai & Kolasib - 16.00<br />
(c) Enforcement Inspector - 3 posts<br />
(d) Enforcement Sub Inspector - 6 posts<br />
Wages : Wages to be paid to casual labour – 2 Nos. of skilled - 3.00<br />
and 6 Nos. of unskilled<br />
(11) T.E. : For meeting traveling expenses of officers and staff - 3.00<br />
under DTO's offices<br />
(13) Office Expenses :<br />
(a) Stationeries and advertisement<br />
(b) Maintenance of vehicles - 5.00<br />
(c) Purchase of uniform for uniformed staff and IV Grade<br />
(d) Normal Office expenses<br />
(14) Rent :<br />
Rent for Site Office of DTO Aizawl and DTO Lunglei - 0.25<br />
(51) Motor Vehicles :<br />
For maintenance of existing vehicle - 3.00<br />
Total of ADMINISTRATION : - 30.25<br />
GRAND TOTAL : (M.V. WING) - 100.00
- 224 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCIENCE, TECHNOLOGY & ENVIRONMENT<br />
At the start of the 10 th Plan, various Schemes/Projects were initiated and undertaken<br />
under Science, Technology & Environment. The Schemes/Projects approved to be<br />
undertaken during the Annual Plan <strong>2006</strong>-<strong>2007</strong> were continuation of the ones already<br />
started. No new scheme is approved.<br />
1. Direction and Administration: The following statement indicates both physical and<br />
financial targets for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Salary of existing Staff 22 29.00<br />
2. Accomodation (Rental) - 2.20<br />
3. Travelling Expenses - 2.00<br />
4. Office Expenses - 8.30<br />
5. Wages - 4.50<br />
6. Maintenance of Vehicle - 3.00<br />
T O T A L : 22 49.00<br />
2. Satellite Remote Sensing Centre: The State Satellite Remote Sensing Centre had<br />
carried out various projects and the data generated from the project had been utilised by<br />
concerned development Departments. It is proposed that Remote Sensing Projects will be<br />
carried out on a larger scale to provide more accurate database.<br />
The following statement indicates the approved physical and financial targets for the<br />
Annual Plan for <strong>2006</strong>-<strong>2007</strong>.<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Sl. No. Item of Expenditure<br />
Physical Financial<br />
1. Augmentation of Remote Sensing 3 12.00<br />
Laboratory Equipment<br />
T O T A L : 3 12.00<br />
3. Training of Scientific Manpower: This is an ongoing Scheme. Under this Scheme, a<br />
Post Matric Merit Science Scholarship Programme was introduced for students who are<br />
taking up basic science subjects in the College & University level to solve the problem of<br />
Scientific Manpower requirement of the State. The Scheme is approved to be continued.<br />
The following statement indicates the approved physical and financial targets for the<br />
Annual Plan for <strong>2006</strong>-<strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Post Matric Merit Science Scholarship 120 12.00<br />
T O T A L : 120 12.00
- 225 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. Assistance to Scientific Research Projects: Under this Scheme, Scientific Research<br />
Project which have direct relevance to the problems of the State were given financial<br />
assistance. The Scheme is approved to be continued.<br />
The following statement indicates the approved physical and financial targets for<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Assistance to Scientific Research Project 2 2.00<br />
T O T A L : 2 2.00<br />
5. Computer Centres: Being a coordinating Department for NIC, Government of India,<br />
we have established one State Unit of NIC at Aizawl and 3 District Units at Aizawl, Lunglei<br />
and Saiha. It is necessary to maintain the Centres. It is also approved to establish NIC<br />
Centres in the 5 newly created Districts in a phase manner.<br />
The following statement indicates the approved physical and financial targets for<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Maintenance of NIC Centres LS 3.00<br />
T O T A L : - 3.00<br />
6. Science Popularisation Programme: Under this Scheme, various activities such as<br />
publication of <strong>Mizoram</strong> Science Journal, holding of Science Exhibitions, Seminars, Science<br />
Fairs & Science Congress are taken up in collaboration with STAM, SCERT, MSS etc. The<br />
activities are approved to be continued.<br />
The following statement indicates the approved physical and financial targets for<br />
Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Sl. No. Item of Expenditure<br />
Physical Financial<br />
1. Publication of Science Journal 4000 cpm 5.00<br />
2. Science Exhibitions, Seminars,Science Congress - 3.00<br />
T O T A L : - 8.00
- 226 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
7. Low-Head Microturbine Project: Using Cross-flow turbine designed by DST,<br />
Government of India, a 50 KW Microturbine Project was proposed to be taken up at Sihmit<br />
river near Bulfekzawl within Champhai District. Out of the total estimate of Rs. 59.26 lakh,<br />
DST, Government of India had agreed to provide 90% of the cost and the State will have to<br />
bear 10% as matching share. The Project will be of 3 years duration.<br />
The following statement indicates the approved physical and financial targets for<br />
Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Expenditure for State Share - 3.00<br />
T O T A L : - 3.00<br />
8. Meteorological Centre: The following statement indicates the approved physical<br />
and financial targets for Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Maintenance of Equipments - 0.50<br />
T O T A L : - 0.50<br />
9. <strong>Mizoram</strong> Science Centre: The <strong>Mizoram</strong> Science Centre at Berawtlang, Aizawl was<br />
inaugurated on 26 th July, 2003 which is well appreciated by all sections of the people.<br />
However, some developmental works are still necessary to be carried out for smooth<br />
functioning of the Centre.<br />
The following statement indicates the approved physical and financial targets for<br />
Annual Plan <strong>2006</strong>-07.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Construction of Office bulding - 30.00<br />
2. Repairing / modification and development - 5.00<br />
of Exhibits<br />
3. Astronomical Telescope - 1.50<br />
4. Library - 1.00<br />
5. Plantation - 1.00<br />
6. Development / Maintenance of the Centre - 10.00<br />
7. Purchase of tools and machineries - 2.00<br />
T O T A L : - 50.50
- 227 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ECOLOGY & ENVIRONMENT<br />
1. Biotechnological Research: <strong>Mizoram</strong> is rich in natural resources which are yet to be<br />
tapped for economic growth. It is known that some of the valuable medicinal plants and<br />
orchids are on the brink of extinction due to deforestation through jhumming. It is<br />
proposed that extensive survey and documentation of these valuable plants be carried out.<br />
The germ-plasm of the rare species may be conserved and propagated through tissue<br />
culture.<br />
The following statement indicates the approved physical and financial targets for<br />
Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Purchase of Chemical Reagents - 1.00<br />
T O T A L : - 1.00<br />
2. Environment Awareness: Environment issue is a global one. It is felt necessary to<br />
educate the students and public on the importance of clean & healthy environment through<br />
seminars/exhibitions in and outside the state.<br />
The following statement indicates the approved physical and financial targets for<br />
Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />
Sl. No. Item of Expenditure<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong>-07<br />
Physical Financial<br />
1. Expenditure for seminars / exhibitions 2 3.00<br />
T O T A L : 2 3.00
- 230 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
<strong>PLAN</strong>NING<br />
Planning Department is coordinating and also Nodal Department for all the<br />
Development Departments in the State. The main functions of the Department are as<br />
follows:<br />
1. Formulation of Five Year Plan and Annual Plan.<br />
2. Monitoring & Evaluation of Plan Schemes.<br />
3. District Planning Machinery.<br />
4. Monitoring & Evaluation of CSS, NLCPR and NEC Schemes.<br />
Due to inadequacy of Technical Manpower in the Department, only Plan<br />
Formulation has been taken up satisfactorily whereas Monitoring and Evaluation could not<br />
be taken up meaningfully during 9 th Plan period. During the 10 th Five Year Plan (2002–07),<br />
more emphasis will be given on District Planning Machinery, NLCPR, Centrally Sponsored<br />
Schemes and NEC schemes at the State level as well as in the District level and also on<br />
Evaluation and Monitoring. The approved outlay for 10 th Five Year Plan (2002–<strong>2007</strong>) is<br />
Rs.5473.00 lakh and the approved Annual Plan outlay during <strong>2006</strong>–07 is Rs. 3,496.00 lakh.<br />
I. Plan Formulation: This is the main function of the State Planning Board (State<br />
Planning Commission). Owing to inadequacy of technical manpower in the Department,<br />
Formulation of Annual Plan is being done by manual up to the end of 9 th Plan period. During<br />
the 10 th Five Year Plan, Formulation of Annual Plan will be computerized and 4 nos. of<br />
Computers and its accessories will be procured during <strong>2006</strong>–07. Detailed approved financial<br />
outlay under the Plan Formulation during <strong>2006</strong>–07 is given below: -<br />
(Rupees in lakh)<br />
1) Salary - 6.00<br />
2) Wages - 10.00<br />
3) TA/DA - 3.50<br />
4) Office Expenses - 44.50<br />
5) Other Charges - -<br />
6) Medical - 0.50<br />
TOTAL - 64.50<br />
II. (a) Monitoring & Evaluation: More emphasis will be given to Monitoring and Evaluation<br />
during 10 th Five Year Plan. A Monitoring Team under the Chairmanship of Vice Chairman,<br />
State Planning Board had already been set up by the State Government with four Members to<br />
make on the spot verification of all important schemes/projects implemented in the State.<br />
Besides, four Monitoring Team of officials have been engaged for physical verification of the<br />
Projects being implemented and they submit the report to the Government of India as well<br />
as Minister i/c Planning and all Heads of Department concerned for follow-up action where<br />
necessary. Special emphasis will be given to Monitoring & Evaluation of Plan Schemes, CSS<br />
and NEC Schemes during the 10 th Plan period 2002-07. All Monitoring and Evaluation will be<br />
computerised during the 10 th Five Year Plan and Rs. 1122.20 lakh is approved for<br />
maintenance of existing Officers/staff, purchase of computers and other materials during<br />
<strong>2006</strong>-07.
- 231 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Detail financial provision is given below: - (Rupees in lakh)<br />
1) Salary - 22.80<br />
2) TA/DA - 4.90<br />
3) Office Expenses - 99.90<br />
4) Other Charges - 2813.90<br />
5 Medical - 1.50<br />
TOTAL - 2943.00<br />
(b) Establishment of Monitoring & Evaluation Cell: Special emphasis will be given on<br />
Monitoring & Evaluation of all Plan Schemes/NEC/CSS/NLCPR/ BAFFACOS during the 10 th<br />
Five Year Plan period. But due to inadequacy of Technical Manpower the Department is<br />
unable to do Monitoring & Evaluation fruitfully. Such being the case, it is felt necessary to<br />
setting up a Monitoring & Evaluation Cell in the State Planning Board to do monitoring of all<br />
schemes, projects and programmes being implemented in the State. In order to<br />
strengthening the Monitoring and Evaluation, the Department is proposed for creation of<br />
the following bare minimum posts to Man Monitoring & Evaluation Cell in the State Planning<br />
Board and for this, a token provision of Rs. 0.50 lakh is approved during <strong>2006</strong>–<strong>2007</strong>.<br />
Sl. No. Name of post Scale of pay No. of post<br />
1. Deputy Adviser, Monitoring Rs.12000-16500/- 1 no.<br />
2. Sr. Research Officer (M) Rs.10000-15200/- 1 no.<br />
3. Research Officer (M) Rs. 8000-13500/- 2 nos.<br />
(Rupees in lakh)<br />
1) Salary - 0.20<br />
2) Other Charges - 0.10<br />
3) Office Expenses - 0.10<br />
4) TA/DA - 0.10<br />
TOTAL - 0.50<br />
TOTAL OF M & E - 2943.50<br />
III. District Planning Machinery: District Planning Machinery had been set up at the<br />
District level since the early part of 7 th Five Year Plan period. During 10 th Five Year Plan,<br />
District Planning Machinery will be set up in the District level for which the following posts<br />
have already been approved by Planning Commission (MLD), Government of India vide<br />
No.PC(P)/35/Mizo/97-MLD dated 28 th January 1998 for the 3(three) Districts, viz. — Aizawl,<br />
Lunglei and Chhimtuipui as shown against each: —<br />
1) Chief Planning Officer - 3 posts<br />
2) Project Experts/R.O. - 3 posts<br />
3) Asst. Research Officer - 3 posts<br />
4) L.D.C. - 3 posts<br />
5) Grade IV Staff - 3 posts<br />
Detailed financial provisions for establishment of District Planning Machinery during<br />
<strong>2006</strong>-<strong>2007</strong> are given here under: —<br />
(Rupees in lakh)<br />
1) Salary - 12.00<br />
2) TA/DA - 1.00<br />
3) Office Expenses - 10.00<br />
4) Minor Works - 50.00<br />
5) Other Charges - 1.00<br />
6) Medical Treatment - 1.00<br />
TOTAL - 75.00
- 232 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
IV. Pilot Project (Lunglei): The State Government has already been set District Planning<br />
Machinery at Lunglei District as a Pilot Project. Detailed financial provision for Pilot Project,<br />
Lunglei District during <strong>2006</strong>-07 is as follows: —<br />
(Rupees in lakh)<br />
1) Salary - 3.20<br />
2) Wages - 2.40<br />
3) Medical Treatment - 0.20<br />
4) Travelling Expenses - 1.00<br />
5) Office Expenses - 4.80<br />
6) Rent - 0.90<br />
7) Other Charges - 0.50<br />
TOTAL - 13.00<br />
V. Local Area Development Scheme: The Department provided Rs. 400.00 lakh for<br />
MLAs Area Development Scheme during <strong>2006</strong>-07.<br />
DISTRICT <strong>PLAN</strong>NING<br />
District Planning Committee:<br />
As mandated by Article 243ZD of the Constitution, District Planning Committee has<br />
not yet been enacted by the State Legislature. However, the 3 Autonomous District Councils<br />
viz. — Lai Auto. District Council, Mara Auto. District Council & Chakma Auto. District<br />
Council, which had been established under the Sixth Schedule of the Constitution prepare<br />
their own Plan under the jurisdiction.<br />
As desired by the MLP Division of the Planning Commission, District Planning<br />
Machinery was established in Lunglei District as a pilot project in 2002 by creating one post<br />
of Chief Planning Officer. District Planning Board in this Lunglei District has been<br />
established under the chairmanship of Deputy Commissioner / District Collector and the<br />
Chief Planning Officer is the Member Secretary. This Lunglei District Planning Board has<br />
initiated preparation of District Plan. However, this District Planning Board could not yet be<br />
functioned as it should be as supporting Officers and Staff under Chief Planning Officer<br />
could not be created due to ban on creation of new posts.<br />
In <strong>Mizoram</strong>, the system of Panchayats and Municipalities have not yet been<br />
introduced.<br />
Hence, the required information relating to resource envelope, devolution of powers<br />
and devolution of finance could not be furnished.<br />
INFORMATION & COMMUNICATION TECHNOLOGY<br />
Government of <strong>Mizoram</strong> established Information & Communication Technology Cell<br />
in Planning Department at the allocation of fund during the Annual Plan <strong>2006</strong>-07 as below: -<br />
(Rs. in lakh)<br />
1. Capacity Building under E-Governance - 505.00<br />
2. State normal Plan - 25.00<br />
Total - 530.00
- 235 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
TOURISM<br />
Tourism Department is established as a full-fledged Directorate in 1987, bifurcating<br />
from IPR & T Department. The Department is one of the fastest growing Departments in<br />
<strong>Mizoram</strong>. The Department has concentrated its main thrust in creation and establishment of<br />
tourist infrastructure for providing accommodation and catering facilities in the District<br />
Headquarters, important places of tourist destination and also along the National and State<br />
highway in the state. Most of the projects are funded by the Ministry of Tourism, Govt. of<br />
India, under Centrally Sponsored Schemes, sanctioned liberally to promote Tourism in<br />
<strong>Mizoram</strong>. The approved outlay for Annual Plan <strong>2006</strong>-<strong>2007</strong>is Rs. 290.00 lakh during.<br />
The scheme-wise allocation and write-up are as follows: —<br />
1. TOURIST CENTRE:<br />
A. Reiek Tourist Recreational Centre: Reiek, is a small village situated a about 30 kms.<br />
Southwest of Aizawl and its hillocks are covered by green forest. Reiek hillock above the<br />
village is being developed for tourist recreational centre. A cafetaria and 6 nos. of Tourist<br />
Cottages under CSS have been constructed and already commissioned . Besides, Typical<br />
Mizo Village has been established in the adjacent area by constructing various types of Mizo<br />
Typical houses. For further improvement and maintenance of the compound such as<br />
improvement of internal roads, jungle clearance, etc., the approved outlay is Rs. 1.00 lakh<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
Non-Recurring : Rs. 1.00 lakh<br />
B. Tamdil Lake (Picnic Spot): A natural beautiful lake 87 kms East of Aizawl near<br />
Saitual town is being developed as a lake resort, providing water sports facilities. Cafeteria<br />
and 6(six) nos. of Tourist Cottages have already been commissioned. For further<br />
improvement and maintenance of the compound and internal road repairing, the approved<br />
outlay is Rs. 1.00 lakh during <strong>2006</strong> – <strong>2007</strong>.<br />
Non-Recurring : Rs. 1.00 lakh<br />
TOTAL OF ‘A’ & ‘B’ : Rs. 2.00 lakh<br />
2. TOURIST ACCOMODATION:<br />
Maintenance of Existing Staff: For meeting expenditure on salary and maintenance<br />
of existing regular staff (31 nos.) and other expenditures under Tourist Lodges at Chaltlang,<br />
Berawtlang, Kolasib, Vairengte, Lunglei, Saiha, Bairabi, Thenzawl, Champhai, Chhiahtlang<br />
and Luangmual, Rs. 143.75 lakh is approved. This includes Rs. 40.85 lakh provided for<br />
meeting expenditure for wages of 110 nos. Muster Roll employees engaged in various<br />
Tourist Establishments run by the Department.<br />
Salary : Rs. 28.00 lakh<br />
Wages for MR : Rs 40.85 lakh<br />
Medical Re-imbursement : Rs 4.00 lakh<br />
Travelling Expenses : Rs. 2.50 lakh<br />
Office Expenses : Rs. 26.90 lakh<br />
Materials & Supplies : Rs. 10.00 lakh<br />
Minor Works : Rs 1.50 lakh<br />
Other charges : Rs. 30.00 lakh<br />
TOTAL OF RECURRING : Rs.143.75 lakh
- 236 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. OTHER EXPENDITURE (TOURISM & REST HOUSE) :<br />
Maintenance of Existing Staff: For maintenance and continuation of the existing<br />
staff’s (12 nos.) Salary and Medical Re-imbursement, Rs. 9.90 lakh is approved for <strong>2006</strong>–07.<br />
Salary : Rs. 8.90 lakh<br />
Medical Re-imbursement : Rs. 1.00 lakh<br />
Recurring : Rs. 9.90 lakh<br />
4. DIRECTION AND ADMINISTRATION:<br />
Maintenance of Existing Staff: For maintenance and salary of 6 nos. of Officers and<br />
24 nos. of existing staff under the head, Direction & Administration, an amount of Rs.111.00<br />
lakh is approved during Annual Plan <strong>2006</strong> – <strong>2007</strong>.<br />
Salary : Rs. 45.50 lakh<br />
Medical Re-imbursement : Rs. 4.00 lakh<br />
Travelling Expenses : Rs. 4.00 lakh<br />
Office Expenses : Rs. 28.00 lakh<br />
Minor Works : Rs. 1.50 lakh<br />
Other charges : Rs. 28.00 lakh<br />
Recurring : Rs.111.00 lakh<br />
5. TRAINING:<br />
Stipend: The Department is sending trainees to undergo training in various courses<br />
of Travel Management, Hotel Management and Food Craft in various National Institute for<br />
which Rs. 1.90 lakh is approved for stipend, book grant, etc. during <strong>2006</strong> – <strong>2007</strong>.<br />
Recurring : Rs. 1.90 lakh<br />
6. PROMOTION & PUBLICITY:<br />
A. Promotion of Fairs and Festivals: Important festival in <strong>Mizoram</strong> like Chapchar Kut,<br />
Thalfavang Kut, Christmas will be continued to be celebrated regularly to attract tourist and<br />
the department will as well participate in National and International Travel and Tourism<br />
Fairs and Festivals for which Rs. 15.00 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
Recurring : Rs. 15.00 lakh<br />
B. Publication of Tourist Information & Literature: The Department earmarked a sum<br />
of Rs. 4.00 lakh for publication of Tourist Information & literature such as guide maps and<br />
different folders for wide circulation to promote Tourism in the State which was approved.<br />
Recurring : Rs. 4.00 lakh<br />
RECURRING ‘A’ & ‘B’ : Rs. 19.00 lakh<br />
TOTAL OF A & B : Rs. 19.00 lakh<br />
7. SURVEY & STATISTICS (OTHER EXPENDITURE) :<br />
For maintenance and salary of one staff, an expenditures amounting of Rs.2.45 lakh<br />
is provided during <strong>2006</strong> – <strong>2007</strong>.<br />
Salary : Rs. 2.45 lakh<br />
Total Recurring : Rs. 2.45 lakh<br />
TOTAL OF RECURRING : Rs. 288.00 lakh<br />
TOTAL OF NON-RECURRING : Rs. 2.00 lakh<br />
GRAND TOTAL : Rs. 290.00 lakh
- 237 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SUMMARY OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
OF TOURISM DEPARTMENT<br />
Sl. No. Major Head / Sub-Head of Development Rs. in lakh<br />
03452002 – TOURISM<br />
1. 01 – Tourist Infrastructure - NIL<br />
2. 101 – Tourist Centre - 2.00<br />
3. 102 – Tourist Accommodation - 143.75<br />
4. 103 – Tourist Transport Services - NIL<br />
5. 800 – Other Expenditure (Tourism & Rest House) - 9.90<br />
6. 80 – GENERAL<br />
001 – Direction & Administration - 111.00<br />
003 – Training - 1.90<br />
7. 800 – PROMOTION & PUBLICITY<br />
a) Fairs & Festivals - 15.00<br />
b) Publication of Tourist Information and - 4.00<br />
Literature<br />
c) Study Tour to Israel / Far East Asia/ - -<br />
Travelling abroad.<br />
8. 800 – Other Expenditure (Survey & Statistics) - 2.45<br />
9. 5452 – (Co.on Tourism) – Creation of - -<br />
Tourist Information Centres (EFC) at<br />
New Delhi, Kolkata & Guwahati<br />
G R A N D T O T A L - 290.00
- 244 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ECONOMICS & STATISTICS<br />
The main function of Economics & Statistics Department is to under take various<br />
kinds of Census and Surveys, collect up-to-date reliable Statistical data, and further to<br />
analyses, tabulate, published and disseminate them for use by Government planners,<br />
researchers, etc.<br />
Economics and Statistics Department has not been well equipped even today in<br />
terms of personnel and modern scientific equipments. Meanwhile the scope and coverage<br />
activity has been considerably increasing. In the coming Annual Plan, the Department is<br />
planning to streamline and re-vitalize the Statistical system to generate a more<br />
comprehensive data pertaining to every aspects of the economy of the State so as to<br />
facilitate all other Departments to formulate a sound data-base planning in the years to<br />
come. An amount of Rs. 155.00 lakh is approved during <strong>2006</strong>-07 for Economics & Statistics<br />
Department.<br />
Sl.<br />
ABSTRACT (FINANCIAL OUTLAY)<br />
Name of Scheme/Major Head/<br />
Outlay <strong>2006</strong>-<strong>2007</strong><br />
No.<br />
Minor head<br />
(Rs. in lakh)<br />
1 2 3<br />
1 Direction<br />
28.41<br />
2 Administration<br />
32.40<br />
3 Vital Statistics<br />
(1) State Plan<br />
42.10<br />
(2) State Matching Share<br />
-<br />
4 National Sample Survey (NSS)<br />
8.19<br />
5 Economic Advise & Statistics<br />
(1) State Income Estimation<br />
(2) Price Statistics<br />
(3) Public Finance<br />
(4) Socio-Economic Survey<br />
(5) Industrial Statistics<br />
7.00<br />
6 Computer Service<br />
3.00<br />
7 Other Expenditure: (1) Mini Press<br />
8.00<br />
8 Training of Statistical Personnel<br />
0.90<br />
9 Building<br />
25.00<br />
TOTAL: 155.00<br />
The Scheme-wise descriptions are as follows: —<br />
1. DIRECTION: The existing staff in the office of Economics & Statistics are maintained<br />
under Direction and Rs. 28.41 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
Sl.<br />
No.<br />
Name of Item/Scheme<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
Existing New (Rs. in lakh)<br />
1 2 3 4 5<br />
1. Deputy Director<br />
1 -<br />
2. Research Officer<br />
1 -<br />
3. Assistant Research Officer<br />
1 - 11.50<br />
4. Computer Operator<br />
1 -<br />
5. Stenographer – II<br />
1 -<br />
6. Driver<br />
2 -<br />
7. Travelling Expenses<br />
- -<br />
8. Wages<br />
- - 1.18
- 245 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1 2 3 4 5<br />
9.<br />
10.<br />
11.<br />
Office Expenses<br />
Publication<br />
House rent<br />
-<br />
-<br />
-<br />
11.50<br />
1.00<br />
3.23<br />
TOTAL: 7 28.41<br />
2. ADMINISTRATION: At present, the Department has only three District Offices at<br />
Aizawl, Lunglei and Saiha. It is proposed to establish three new Districts Offices at<br />
Champhai, Kolasib and Mamit during <strong>2006</strong>-<strong>2007</strong>. However, as there is no scope for creation<br />
of new posts, these new Districts Offices will be manned by existing Officers and Staff. An<br />
amount of Rs. 32.40 lakh is approved for maintenance of District Office for the year <strong>2006</strong>-<br />
07.<br />
Sl.<br />
No.<br />
Name of Item/Scheme<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
Existing New (Rs. in lakh)<br />
1 2 3 4 5<br />
1. Research Officer<br />
3 -<br />
2. Assistant<br />
3 -<br />
3. Driver<br />
3 - 21.80<br />
4. Grade – IV<br />
2 -<br />
5. Wages<br />
- - 0.10<br />
6. Travelling Expenses<br />
- - 4.50<br />
7. Office Expenses<br />
- - 6.00<br />
8. Opening of New Districts at<br />
- 3<br />
(1) Champhai, (2) Kolasib (3) Mamit<br />
-<br />
Total 32.40<br />
Under this Scheme, raw as well as tabulated, analysed and developed data<br />
temperature, rainfall and humidity in every district of <strong>Mizoram</strong> are needed to be stored in<br />
book form or CD/Floppy.<br />
3. VITAL STATISTICS: Under this scheme, data of vital events, births and deaths are<br />
collected through 700 local Registrars. Births and Deaths (RBD) Wing is functioning under<br />
this scheme. To strengthen this Wing and to achieve 100% registration as desired by<br />
Government of India, it is intended to undertake more effective inspection, conducting<br />
annual training for Registrars and monitoring, to ensure regular flow of reports and returns<br />
and to check irregularities in the registration system, an outlay of Rs. 42.10 lakh is provided<br />
for the year <strong>2006</strong>-07.<br />
Details of the scheme are as follows:<br />
Sl.<br />
No.<br />
Name of Item/Scheme<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
Existing New (Rs. in lakh)<br />
1 2 3 4 5<br />
1 Inspector of Statistics<br />
1 -<br />
2 L.D.C<br />
1 -<br />
-<br />
3 Driver<br />
1 -<br />
4 Group ‘D’<br />
2 -<br />
5 Wages (Honorarium of RBD)<br />
- - 26.60<br />
6 Travelling Expenses<br />
- - 5.50<br />
7 Office Expenses<br />
- - 10.00<br />
TOTAL : 5 42.10
- 246 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. NATIONAL SAMPLE SURVEY (NSS): National Sample Survey is conducted at National<br />
Level sponsored by Government of India. Surveys are taken up by State Government for<br />
both Central and State Samples. The Central share is 75% while the State Share is 25%.<br />
The following posts are to be maintained under the State Plan :<br />
Sl.<br />
No.<br />
Name of Item/Scheme<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
Physical Financial<br />
Existing New (Rs. in lakh)<br />
1 2 3 4 5<br />
1 Inspector of Statistics<br />
2 -<br />
2 Sub-Inspector of Statistics<br />
7 - 4.00<br />
3 Travelling Expenses<br />
- - 1.19<br />
4 Office Expenses<br />
- - 3.00<br />
TOTAL: 9 8.19<br />
5. ECONOMIC ADVICE & STATISTICS:<br />
(1) State Income Estimation: Earlier this Scheme is integrated with Public Finance. Due<br />
to increase in workload, this scheme is bifurcated. Under this scheme, various baseline<br />
survey are to be undertaken, such as, Kitchen Garden production Survey, Computer<br />
software, transport and communication for the purpose of estimating State Domestic<br />
Products which is one of the most important indicators of the Economy of <strong>Mizoram</strong>. An<br />
outlay of Rs. 0.10 lakh is approved for the Annual Plan <strong>2006</strong>-07.<br />
(2) Price Statistics: Activities under this scheme is concerned mainly with Survey on –<br />
(1) Retail Price<br />
(2) Wholesale Price<br />
(3) Farm Harvest Price.<br />
Price situation, data on current price level and prices over a period of time largely<br />
effect the general masses, employers, employees and the administration as such observation<br />
of price situation is important. The department collects retail prices of essential<br />
commodities from every district headquarters and regularly published the Quarterly Price<br />
Bulletin. Besides, Survey on Farm Harvest price is periodically undertaken.<br />
But this Wing is still handicapped in the sense that uptil now Consumer Price Index<br />
(CPI) of <strong>Mizoram</strong> for Urban Non-Manual Employees (UNME) could not be constructed. The<br />
Department proposed to undertake FBE Survey for construction of CPI of <strong>Mizoram</strong> under<br />
the guidance of CSO, New Delhi. Detail physical and financial targets under this scheme are<br />
as follow :<br />
Sl.<br />
Name of Item/Scheme<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
No.<br />
Physical Financial<br />
Existing New (Rs. in lakh)<br />
1 2 3 4 5<br />
1 A.R.O/Statistical Officer<br />
1 -<br />
2 Inspector of Statistics<br />
1 -<br />
3 Sub-Inspector of Statistics<br />
1 - 3.60<br />
4 Travelling Expenses<br />
- - 1.00<br />
5 Office Expenses<br />
- - 2.00<br />
TOTAL: 3 - 6.60
- 247 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(3) Public Finance: This Scheme covers a wide range of Statistics such as sources of<br />
revenue and expenditure of the government, plan outlay and investment, public debt and<br />
budget financing, domestic savings and capital formation. The Statistical data pertaining to<br />
these sectors are necessary for plan formulation and also for monitoring the plan and for<br />
assessment of the achievements. An outlay of Rs. 0.10 lakh is approved for Annual Plan<br />
<strong>2006</strong>-07.<br />
The Statistical analyses under this scheme mainly relates to:<br />
(i) Budget classification and analyses.<br />
(ii) Five Year Plan Analysis and reports, study of resource mobilization, etc.<br />
(iii) Census of Government Employees.<br />
(4) Socio-Economic Survey: Socio-Economic data is a true indicators of the economic<br />
condition of any State. Periodical Survey on Socio-economic Review for the official uses by<br />
the government and planners is a part and parcel of the activities of this Department.<br />
Besides, other activities to be taken under this scheme are:<br />
(i) Block Statistics (ii) Building and Housing Statistics<br />
An outlay of Rs. 0.10 lakh is approved for the coming financial year <strong>2006</strong>-07.<br />
(5) Industrial Statistics: Survey on trade, Annual Survey of Industries are pooled<br />
together and categories as Industrial Statistics. The study of this scheme will be concerned<br />
with the activities mainly :<br />
(i) Survey of Industries<br />
(ii) Trade Survey including distributive trade (tax)<br />
(iii) Man-power and labour Statistics.<br />
(iv) Mining and Quarrying<br />
(v) Electricity, Gas and water supply<br />
(vi) Construction.<br />
An outlay of Rs. 0.10 lakh is approved for <strong>2006</strong>-07.<br />
6. COMPUTER SERVICES /INFORMATION TECHNOLOGY: As this Department is dealing<br />
with all kinds of Statistical data, full computerization of work is necessary. Manual<br />
tabulation and processing of data could no longer sustain thework load, as such, it is<br />
emphasized to strengthen the computer wing.<br />
The Department proposed to purchase software and hardware i.e dot matrix printer<br />
and to improve and upgrade the existing Computers. Details are as given below:<br />
Sl.<br />
Name of Item/Scheme<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
No.<br />
Physical Financial<br />
Existing New (Rs. in lakh)<br />
1 2 3 4 5<br />
1. Computer Operator<br />
- 1 0.50<br />
2. Purchase Dot Matrix Printer &<br />
accessories<br />
- 2 2.00<br />
3. Office Expenses<br />
- - 1.00<br />
TOTAL : - - 3.00
- 248 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
7. MINI PRESS AND PUBLICATION: The Department is running a small Printing Press<br />
for printing booklets, leaflets, various type of forms, covers of different publication. The<br />
physical and Financial targets for the year <strong>2006</strong>-07 are as below:<br />
Sl.<br />
Name of Item/Scheme<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
No.<br />
Physical Financial<br />
Existing New (Rs. in lakh)<br />
1 2 3 4 5<br />
1. Machine man<br />
1 -<br />
2. Compositor<br />
2 -<br />
3. Proof puller<br />
1 - 4.00<br />
4. Travelling Expenses<br />
- - 1.00<br />
5. O.E. / Purchase of Mini Offset &<br />
accessories<br />
- 1 3.00<br />
TOTAL : 4 - 8.00<br />
8. TRAINING OF STATISTICAL PERSONNEL: This scheme mainly emphasized to<br />
improve and augment the skill of Statistical personnel through training, especially primary<br />
and intermediate level of functionaries which is essential from time to time to effect<br />
improvement in their field of works.<br />
It is necessary to organize training in and outside <strong>Mizoram</strong> for primary and<br />
intermediate level and functionaries that will aim at widening their horizon by providing<br />
them with some useful Statistical tools and familiarize them with the latest development in<br />
various Statistical methodology. An amount of Rs. 0.90 lakh is approved for year <strong>2006</strong>-07.<br />
9. BUILDING: Economics and Statistics Department is not self-sufficient in office<br />
buildings and quarters. Even the Directorate office accomodates in a rented house. District<br />
Research Office-cum-Quarters at Saiha is likely to be completed during <strong>2006</strong>-<strong>2007</strong> and<br />
Rs.15.00 lakh is provided for completion. During <strong>2006</strong>-<strong>2007</strong>, Rs. 10.00 lakh is approved for<br />
contruction of Lunglei District office-Cum Quarter.
- 253 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />
The main task of the Department of Food, Civil Supplies & Consumer Affairs is to<br />
ensure food security in <strong>Mizoram</strong> through efficient Public Distribution System. The<br />
Department procures foodstuff from Food Corporation of India Depots and despatches<br />
them to various Supply Centres for equitable distribution to the public by Fair Price Shop<br />
retailers through Ration Cards. The Department is now functioning with 6 (six) District<br />
Offices, 4 (four) Sub-Divisional Offices, 9 (nine) Principal Distribution Centres, 18 Sub-<br />
Distribution Centres and 94 Supply Centres. The Department is having one of the largest<br />
network of operations among the various Departments in <strong>Mizoram</strong>.<br />
As per Government of <strong>Mizoram</strong> Notification No.A.46013/1/95-GAD/Loose,<br />
dt.17.11.04 Consumer Affairs which includes Consumer Protection, Management of State<br />
Commission and District Forum is allocated to the Department of Food & Civil Supplies and<br />
re-named as Food, Civil Supplies & Consumer Affairs Department.<br />
The approved outlay for the 10 th Five Year Plan 2002 - <strong>2007</strong> in respect of the<br />
Department of Food, Civil Supplies & Consumer Affairs is Rs 826.00 lakh. This will be<br />
utilised for maintenance of existing 27 posts of various categories of Officers & Staff under<br />
Plan, maintenance of 11 nos. of heavy vehicles and 20 nos. light vehicles under Plan<br />
Schemes. Besides, it is intended to repair and reconstruct approach roads of Godowns and<br />
also to provide funds for maintenance of the existing 188 nos. of Godowns and 250 nos. of<br />
Staff Quarters at various Supply Centres.<br />
The break-up of total approved outlay of Rs. 560.00 lakh for the Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong> under Food, Civil Supplies & Consumer Affairs Department are as follows :-<br />
1. CIVIL SUPPLIES<br />
A. Direction: An amount of Rs. 176.50 lakh is approved for maintenance of the<br />
existing 14 nos. of Staff, maintenance of heavy & light departmental vehicles, office<br />
expenses, materials & supply, travelling expenses, advertisement, other charges etc. under<br />
Plan Scheme and Rs. 70.00 lakh is specifically earmarked for clearing of department<br />
liabilities which are already incurred for maintenance of departmental vehicles and<br />
purchase of supply and materials.<br />
Sl. No. Particulars Amount approved<br />
(Rupees in lakh)<br />
1. Salary of existing 14 Staff - 22.50<br />
2. Medical treatment - 1.50<br />
3. Travelling expenses - 3.50<br />
4. Office expenses - 15.00<br />
5. Material & Supply - 50.00<br />
6. Advertisement - 2.00<br />
7. Other charges - 2.00<br />
8. Maintenance of vehicles - 80.00<br />
TOTAL - 176.50
- 254 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. STORAGE & WAREHOUSE :<br />
A. Administration: A sum of Rs. 22.50 lakh is approved during Annual Plan <strong>2006</strong> -<br />
<strong>2007</strong> for maintenance of the existing 13 nos. of Staff under Plan, Office Expenses and<br />
Travelling Expenses as given below :-<br />
Sl. No. Particulars Amount (Rs. in lakh)<br />
1. Salary of existing 13 Staff - 13.00<br />
2. Medical treatment - 1.00<br />
3. Travelling expenses - 2.00<br />
4. Office expenses - 6.50<br />
TOTAL - 22.50<br />
B. Food Subsidies: The Department of Food, Civil Supplies & Consumer Affairs is now<br />
having as much as 188 nos. of Godowns and 250 Staff Quarters. Some of these Godowns<br />
and Quarters were constructed more than 15 years ago, as such, repair works need to be<br />
done for these buildings. It is also proposed for repair of side drains, retaining walls and<br />
approach road to Godowns. For which an amount of Rs. 15.00 lakh is earmarked during<br />
Annual Plan 2005 - <strong>2006</strong>.<br />
3. CONSUMER AFFAIRS :<br />
A sum of Rs. 35.00 lakh is approved for maintenance of existing 13 nos. of Staff,<br />
Muster Rolls, O.E., T.E., etc. under Plan of State Commission & District Forum. There are<br />
7(seven) District Forums at Lunglei, Saiha, Champhai, Lawngtlai, Serchhip, Kolasib and<br />
Mamit now functioning on part time basis with 2(two) members each and their respective<br />
Deputy Commissioner as the President of the District Forum. The members are entitled<br />
consolidated Honorarium while they are sitting.<br />
A. STATE COMMISSION :<br />
An amount of Rs. 18.00 lakh is approved for O.E., T.E., and maintenance of existing<br />
7 nos. regular Staff and Muster Roll under State Commission.<br />
Sl. No. Particulars Amount (Rs. in lakh)<br />
1. Salary of existing 6 Staff - 10.10<br />
2. Wages of 1(one) M/R - 0.45<br />
3. Medical treatment - 0.70<br />
4. Domestic T.E. - 4.00<br />
5. Office Expenses - 2.00<br />
6. Other Charges - 0.85<br />
TOTAL - 18.00<br />
B. DISTRICT FORUM :<br />
An amount of Rs.17.00 lakh is approved for O.E., T.E. and maintenance of 6 nos. of<br />
regular Staff and one Muster Roll under District Forum.<br />
Sl. No. Particulars Amount (Rs. in lakh)<br />
1. Salary of existing 5 Staff - 8.00<br />
2. Wages of 1(one) M/R - 0.45<br />
3. Medical treatment - 0.50<br />
4. Domestic T.E. - 1.50<br />
5. Office Expenses - 3.55<br />
6. Other Charges - 3.00<br />
TOTAL - 17.00
- 255 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
FOOD STORAGE AND WAREHOUSING : RURAL GODOWN etc.<br />
1. MAJOR WORKS: Under this head, Rs. 20.00 lakh is earmarked during Annual Plan<br />
2005 - <strong>2006</strong> for installation of 10 (ten) passengers capacity lift (Elevator) at the Directorate<br />
building at Aizawl; the work is being started and the required fund is included in the<br />
earmarked outlay.<br />
2. BAFFACOS/ANNAPURNA: For implementation of these Schemes, Rs. 291.00 lakh is<br />
approved during Annual Plan 2005-<strong>2006</strong> and out of which Rs. 260.00 lakh is approved for<br />
BAFFACOS and TFC (earmarked scheme) and the remaining amount of Rs. 31.00 lakh is<br />
specifically earmarked for implementation of ANNAPURNA Scheme.<br />
A. BAFFACOS: Though the dreaded Mautam (flowering of Bamboos) is forecast to<br />
occur in <strong>2007</strong>, the Department of Food, Civil Supplies & Consumer Affairs is required to<br />
make advance preparation to adequately respond to the impending disaster in various<br />
aspects. As such, fund provision is made to undertake the following works:-<br />
(1) PROCUREMENT OF RICE: Rs. 124.50 lakh is earmarked for procurement of<br />
15000 quintals of Rice for stocking to the supply main Centres of the eight Districts for<br />
immidiate relief to the famine victims. Procurement of additional Quantity of foodstuff is<br />
required as the existing allotment is far too inadequate to meet the actual requirement.<br />
(2) TRANSPORTATION COST: Rs. 41.50 lakh is earmarked for payment of<br />
carriage of foodstuff from the main centres to the last outlets - the retailers during Annual<br />
Plan <strong>2006</strong>-<strong>2007</strong>. Normally, carriage charges of foodstuff from PDS to the last outlets are<br />
borned by the State under Non-Plan Fund but due to financial constraint, the Government is<br />
not in a position to provide adequate fund to meet the requirement.<br />
(3) PURCHASE OF COMPUTERS: Department of Food, Civil Supplies &<br />
Consumer Affairs is the implementing agencies of Public Distribution System in <strong>Mizoram</strong><br />
and it has one of the largest network of operations among the various Department in the<br />
State. In order to adequately respond to the impending famine due to MAUTAM, it is felt<br />
necessary to devise a system for more effective and efficient monitoring and regulating of<br />
the movement of Essential Commodities from the Despatching Centres to the Fed Centres. It<br />
is, therefore, proposed to arrange installation of Computers in the 6(six) District Offices,<br />
4(four) Sub-Division Offices and 9 (nine) Principal Distribution Centres in the State. And for<br />
which an amount of Rs. 14.00 lakh is earmarked for purchase of 19 (nineteen) Computers<br />
with Laser printers during the Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
(4) ANNAPURNA: Rs. 31.00 lakh is earmarked under Annapurna Scheme during<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong> and the fund will be utilised for procurement of Rice and payment<br />
of carriage charge. Under the Scheme, 2587 beneficiaries are identified from senior citizens<br />
above 65 years of age. To each beneficiary, 10 kgs. of Rice per month will be issued free of<br />
cost.<br />
(5) TFC: Under the 12 th Finance Commission, the Department proposes to take<br />
up various works under Food, Civil Supplies & Consumer Affairs Department such as,<br />
Construction of Godowns, Quarters, renovation of Office and Godowns within the amount<br />
of Rs. 80.00 lakh during the Financial Year of <strong>2006</strong>-<strong>2007</strong>.
Sl.<br />
No.<br />
- 256 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Detailed work schedules for the above scheme are as follows :-<br />
Name of Scheme with items of works<br />
and location<br />
Name of<br />
District<br />
Unit /<br />
Quantity<br />
Amount<br />
(in lakh)<br />
1. Construction of Godown at Saiphai DCSO ‘W’ 1 No. Rs. 3.00<br />
2. Construction of Staff quarter at Hortoki<br />
Supply Centre<br />
DCSO ‘W’ 1 No. Rs. 3.00<br />
3. Construction of Staff Quarter at<br />
Kawrtethawveng S. Centre<br />
DCSO ‘W’ 1 No. Rs. 3.00<br />
4. Construction of Staff Quarter at Bairabi<br />
Supply Centre<br />
DCSO ‘W’ 1 No. Rs. 3.00<br />
5. Construction of Godown at E. Lungdar<br />
Supply Centre<br />
DCSO ‘E’ 1 No. Rs. 3.00<br />
6. Construction of Godown at Khawhai<br />
Centre<br />
DCSO (CPI) 1 No. Rs. 3.00<br />
7. Construction of IF&CS Quarter at Kolasib DCSO ‘W’ 1 No. Rs. 3.00<br />
8. Construction of Godown at Sangau S.D.<br />
Centre<br />
DCSO (LLI) 1 No. Rs. 3.00<br />
9. Construction of Godown at Hnahthial<br />
S.D. Centre<br />
DCSO (LLI) 1 No. Rs. 3.00<br />
10. Construction of Staff Quarter at<br />
Khawzawl S.D. Centre<br />
DCSO (CPI) 1 No. Rs. 3.00<br />
11. Construction & repair of Approach roads<br />
to Chawngtlai Godown.<br />
DCSO (CPI) 1 No. Rs. 1.00<br />
12. Construction & repair of Approach roads<br />
to Darlung Godown.<br />
DCSO ‘W’ 1 No. Rs. 1.00<br />
13. Construction & repair of Approach roads<br />
to Hmuifang Godown<br />
DCSO ‘W’ 1 No. Rs. 1.00<br />
14. Construction & repair of Approach roads<br />
to E. Lungdar Godown<br />
DCSO ‘E’ 1 No. Rs. 1.00<br />
15. Construction & repair of Approach roads<br />
to Vanbawng Godown<br />
DCSO ‘E’ 1 No. Rs. 1.00<br />
16. Construction & repair of Approach roads<br />
to N. Vanlaiphai Godown<br />
DCSO ‘E’ 1 No. Rs. 1.00<br />
17. Repair of Godown at Champhai DCSO (CPI) 1 No. Rs. 1.00<br />
18. Repair of Godown at Hnahthial DCSO (LLI) 1 No. Rs. 1.00<br />
19. Repair of Godown No. III at Zuangtui Dte. of<br />
FCS&CA<br />
1 No. Rs. 1.00<br />
20. Construction of Staff quarter at<br />
Khawrihnim<br />
DCSO ‘W’ 1 No. Rs. 3.00<br />
21. Construction of Staff Quarter at<br />
Kanhmun<br />
DCSO ‘W’ 1 No. Rs. 3.00<br />
22. Construction of Approach Road at<br />
Khawrihnim<br />
DCSO ‘W’ 1 No. Rs. 1.00<br />
23. Construction of Godown at Kawlkulh DCSO (CPI) 1 No. Rs. 3.00<br />
24. Construction of Godown at Tawipui DCSO (LLI) 1 No. Rs. 3.00<br />
25. Construction of Godown at Serkawr DCSO (SHA) 1 No. Rs. 3.00<br />
26. Construction of Godown at Kawlchaw DCSO (SHA) 1 No. Rs. 3.00
Sl.<br />
No.<br />
- 257 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme with items of works<br />
and location<br />
Name of<br />
District<br />
Unit /<br />
Quantity<br />
Amount<br />
(in lakh)<br />
27. Construction of Approach Road at<br />
Kanhmun<br />
DCSO ‘W’ 1 No. Rs. 1.00<br />
28. Construction of Staff Quarter at<br />
Phuldungsei<br />
DCSO ‘W’ 1 No. Rs. 3.00<br />
29. Construction of Godown at Putlungasih DCSO (LLI) 1 No. Rs. 3.00<br />
30 Construction of Godown at Cherhlun DCSO (LLI) 1 No. Rs. 3.00<br />
31. Construction of Godown at Tuichawng DCSO (LLI) 1 No. Rs. 3.00<br />
32. Construction of Godown at Bungtlang (S) DCSO (LLI) 1 No. Rs. 3.00<br />
33. Construction & repair of Approach roads<br />
to Phullen Godown<br />
DCSO ‘E’ 1 No. Rs. 1.00<br />
34. Construction & repair of Approach roads<br />
to Khawzawl Godown<br />
DCSO (CPI) 1 No. Rs. 1.00<br />
35. Construction & repair of Approach roads<br />
to Vairengte Godown<br />
DCSO ‘W’ 1 No. Rs. 1.00<br />
36. Construction & repair of Approach roads Dte. of 1 No. Rs. 1.00<br />
to Zuangtui Godown<br />
FCS&CA<br />
37. Construction & repair of Approach Road<br />
to Pukzing Godown<br />
DCSO ‘W’ 1 No. Rs. 1.00<br />
38. Renovation of Godown at Bukpui DCSO’W’ 1 No. Rs. 1.00<br />
TOTAL Rs. 80.00
INTRODUCTION<br />
- 261 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
LAI AUTONOMOUS DISTRICT COUNCIL<br />
The Lai Autonomous District Council is located in the Southern part of<br />
<strong>Mizoram</strong> State and is 296 kms away from the State Capital, Aizawl. It is well-connected by<br />
the National Highway No. 54, having International Boundary with Myanmar and Mara<br />
Autonomous District Council in the East, Lunglei District in the North. And also Chakma<br />
Autonomous District Council in the West and again Myanmar and Mara District in the South.<br />
It is the largest District Council in area and in population in <strong>Mizoram</strong> State. It covered an<br />
area of 1870.75 Sq kms with a population of 58700. The State Government allocated an<br />
outlay of Annual Plan <strong>2006</strong>-<strong>2007</strong> for Rs. 875.00 lakh. Hence, the sectoral-wise allocation of<br />
approved Annual Plan <strong>2006</strong>-<strong>2007</strong> are as under :<br />
Sl. No. Name of Department<br />
10 th Plan<br />
Outlay<br />
Approved<br />
Outlay<br />
2005-06<br />
Approved<br />
Outlay<br />
<strong>2006</strong>-07<br />
I Agriculture & Horticulture 260.00 44.00 49.00<br />
II Fisheries Department 40.00 17.00 19.00<br />
III Public Health Engineering Department 120.00 30.00 32.00<br />
IV Industries Department 62.00 26.00 27.00<br />
V Sericulture Department 38.00 8.00 9.00<br />
VI AH & Vety Department 50.00 14.00 16.00<br />
VII Art & Culture Department 130.00 33.00 35.00<br />
VIII Social Welfare Department 100.00 29.00 30.00<br />
IX Soil Conservation Department 70.00 18.00 20.00<br />
X Local Administration Department 240.00 50.00 52.00<br />
XI Forest Department 190.00 37.00 38.00<br />
XII Transport Department 40.00 20.00 24.00<br />
XIII Sport & Youth Services Department 74.00 20.00 22.00<br />
XIV Co-operation Department 30.00 10.00 10.00<br />
XV Public Work Department 730.00 156.00 145.00<br />
XVI Education Department 952.00 285.00 285.00<br />
XVII Rural Development Department 180.00 49.00 55.00<br />
XVIII Water Ways Department 30.00 4.00 7.00<br />
Total = 3336.00 850.00 875.00
- 262 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
A BRIEF WRITE-UP OF SECTORE–WISE AND SCHEMES FOR<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong>, LAI AUTONOMOUS DISTRICT COUNCIL.<br />
1. AGRICULTURE & HORTICULTURE :<br />
‘A’ AGRICULTURE :<br />
This Sector is the economical backbone for the people of Lai in particular and also<br />
for the people of the whole country as a whole . Since, the Annual Plan Outlay is so limited,<br />
sufficient amount could not be allocated in this particular sector so as to solve the basic<br />
needs of the people . As such, the Executive Committee of Lai Autonomous District Council<br />
given priority in this particular sector. It is however, an idea to seek / pull-out a Central<br />
Fund (C.S.S ) a matching share so as to attaining self-sufficiency in food production within<br />
Lai Autonomous District Council Area. Hence, Rs. 29.20 lakh is approved for this sector, out<br />
of which, the following schemes are included :-<br />
1. Matching share for Land Development and Minor Irrigation - 15.30<br />
2. Financial Assistant to Cultivator - 5.70<br />
3. Purchase/Maint.of Bike - 0.20<br />
4. Administrative Costs :- (a) Office Expenses - 0.50<br />
(b) TA/DA - 0.50<br />
(c) Salary - 7.00<br />
Total of ‘A’ - 29.20<br />
‘B’ HORTICULTURE :<br />
The main object of the sector is to develop the Horticultural Plantation in the<br />
District Council in the Area. His Excellency, the Governor of <strong>Mizoram</strong> had given a priority to<br />
Agriculture and allied (i.e. Horticulture).The District Council also had given priority for the<br />
upliftment of the day-to-day economic life of the people and slightly increase the sectoral<br />
allocation for this sector. The total amount allocated for the Annual Plan <strong>2006</strong>-07 is<br />
Rs.19.80 lakh. The Scheme–wise description are as under :-<br />
1. Financial Assistant to Horticulturist in every villages who are<br />
Interested in this field of Trade. - 6.80<br />
2. Purchase of Seed / Seedling for distribution of Horticulture<br />
Farmer. - 4.00<br />
3. Maintenance of Mampui Seed Farm existing Farm - 0.80<br />
4. Purchase/Maintenance of Vehicle - 1.80<br />
5. Administrative Costs :- (a) Training Expenses - 0.60<br />
(b) Office Expenses - 0.40<br />
(c) TA/DA - 0.40<br />
(d) Salary - 5.00<br />
Total of ‘B’ - 19.80<br />
Grand Total - 49.00<br />
II. FISHERIES DEPARTMENT:-<br />
Though, this sector is not a major sector District Council given priority as per<br />
advised by his Excellency, the Governor of <strong>Mizoram</strong>, so as to increase fish production in the<br />
area. As such, Rs. 19.00 lakh is allocated for the Annual Plan <strong>2006</strong>-<strong>2007</strong> Schemes-wise<br />
allocation of fund in this sector are the following :-<br />
1. Purchase and supply of fish seed for distribution to<br />
Fish farmers - 3.00
- 263 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. Construction of fish pond for the enlightentment of the<br />
People - 9.00<br />
3 Administrative Costs : (a) Office Expenses - 0.40<br />
(b) TA/DA - 0.80<br />
(c) Salary - 5.80<br />
Total - 19.00<br />
III. P.H.E. DEPARTMENT :-<br />
The main aims and objects of this sector is to provide clean drinking water to the<br />
Public to achieve the policy of this sector, sufficient amount could not be allocated due to<br />
financial constrains. However, Rs. 32.00 lakh is approved for Annual Plan <strong>2006</strong>-07, out of<br />
which, the following schemes are provided to achieve the minimum needs of the people.<br />
1. Construction of R.C.C. Water Tank at different Villages<br />
so as to have clean drinking water for the Villagers - 5.00<br />
2. Construction of Water Tank - 2.00<br />
3. Harvesting of Rain Water for the needy persons - 6.00<br />
4. Repair of existing Water tank - 2.00<br />
5. Purchase of Polygon to be provided Executive Members<br />
and important Officials & LADC Rest House - 5.20<br />
6. Maintenance of Vehicle - 1.10<br />
7. Administrative Costs : (a) Office Expenses - 1.50<br />
(b) TA/DA - 0.50<br />
(c) Salary - 8.70<br />
Total - 32.00<br />
IV. INDUSTRY DEPARTMENT :-<br />
The Lai Autonomous District Council could not carry out the basic needs of the<br />
people in respect of Industrial purposes due to constrains of fund allocated to the Council.<br />
It is however, try to develop to the people in a small scale Industrial Units, and Rs. 27.00<br />
lakh is approved for Annual Plan <strong>2006</strong>-07 as given below: -<br />
1. (a) Production cum-Training Centre at Lawngtlai, which is<br />
existing/on going Schemes - 2.00<br />
(b) Procurement of raw materials for the above Training<br />
Centre - 1.50<br />
2. Installation of I.T. with Maintenance / Furnishing - 3.70<br />
3. Administrative Costs : (a) Office Expenses - 0.40<br />
(b) TA/DA - 0.60<br />
(c) Salary - 18.00<br />
Total - 27.00<br />
V. SERICULTURE DEPARTMENT :-<br />
The Lai Autonomous District Council area is quite suitable for rearing of Silk-Worm.<br />
Mulberry Plantation for selected Villages was operated from Central Sponsored Schemes<br />
executed by <strong>Mizoram</strong> Sericulture Department in collaboration with LADC Sericulture<br />
Department. The People living in this area interested in this field of Trade to a great extent.<br />
As such, Rs. 9.00 lakh only is approved for Annual Plan <strong>2006</strong>-07.<br />
The item-wise schemes are as under :-<br />
1. Maintenance of Sericulture Farm at Saikah - 0.60<br />
2. Purchase of DFLS ( Eggs ) - 1.00<br />
3. Purchase of Cocoon - 1.30
- 264 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. GIA to Silk-Worm rearer creations of Mulberry Farm - 3.50<br />
5. Purchase of rearing Tools and Equipment - 0.18<br />
6. Administrative Costs : (a) Office Expenses - 0.20<br />
(b) TA/DA - 0.22<br />
(c) Salary - 2.00<br />
Total - 9.00<br />
VI. AH & VETY. DEPARTMENT:-<br />
Priority has been given to this sector as desired by his Excellency, the Governor of<br />
<strong>Mizoram</strong>, for the upliftment of the People in respect of rearing domestic animals. Hence,<br />
Rs.16.00 lakh is approved for Annual Plan <strong>2006</strong>-07. The item–wise allocation are as follows:-<br />
1. Purchase of Medicine with Accessories - 1.50<br />
2. GIA to Cattle Rearer - 3.00<br />
3. Purchase of Chicks including feed for distribution to<br />
Poultry farmers - 4.00<br />
4. Maintenance of Scooter - 0.10<br />
5. Maintenance of Vehicle - 1.10<br />
6. Administrative Costs : (a) Office Expenses - 0.90<br />
(b) TA/DA - 0.40<br />
(c) Salary - 5.00<br />
Total - 16.00<br />
VII. ART & CULTURE DEPARTMENT :-<br />
‘A’ PROMOTION OF ART & CULTURE :-<br />
The main aims and objects of this Department is to preserve the Lai Culture and<br />
Tradition and also to collect the Historical Documentary of the Lai Tribe. As such, Rs. 18.60<br />
lakh is approved for Annual Plan <strong>2006</strong>-07. The item-wise allocation are as given below: -<br />
1. Preservation of Ancient Monument - 0.50<br />
2. Improvement of Music and Fine Arts/Training of<br />
Cultural Dance/Holding of Singing Competition etc - 2.50<br />
3. Collection of Cultural Dress - 1.00<br />
4. Printing of Books/Publication of Books - 2.00<br />
5. Renumeration of Casual Artist - 1.50<br />
6. House Rent and Law requisition for LSA Hostel - 3.00<br />
7. Improvement of Council Library - 0.50<br />
8. Maintenance of Video Camera - 0.20<br />
9. Maintenance of Vehicle - 1.00<br />
10. Administrative Costs : (a) Office Expenses - 0.50<br />
(b) TA/DA - 0.50<br />
(c) Salary - 5.30<br />
Total of ‘A’ - 18.60<br />
‘B’ INFORMATION :-<br />
This sector is the sub-sector of Art & Culture Department and this sub-sector is the<br />
main source of informatics event as well as publicity of the new event within Lai<br />
Autonomous District Council and abroad. However, sufficient amount could not be provided<br />
so far and only Rs. 16.40 lakh is approved for Annual Plan <strong>2006</strong>–07 with the following<br />
items: -<br />
1. Printing of Calendar - 1.00<br />
2. Advertisement Charge - 2.30<br />
3. Hospitality fund - 1.50
- 265 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. Subscription of News Paper - 1.50<br />
5. Subscription of Council ‘AW’ - 0.40<br />
6. Preparation and Maintenance of Reading Room - 1.00<br />
7. Purchase/Maintenance of Facimile - 0.10<br />
8. Purchase/Maintenance of PA Set - 0.30<br />
9. Maintenance of Steel Camera - 0.20<br />
10. Maintenance of Video camera - 0.20<br />
11. Purchase/Maintenance of Computer - 1.00<br />
12. Administrative Costs : (a) Office Expenses - 0.40<br />
(b) TA/DA - 0.30<br />
(c) Salary - 6.30<br />
Total of ‘B’ - 16.40<br />
Total of VII - 35.00<br />
VIII. SOCIAL WELFARE DEPARTMENT :-<br />
This Department targeted the upliftment of Social life of the people living in Lai<br />
District Council area.Hence, schemes in connection with social wings as well as grant-in-aid<br />
to NGO’s, Widows, Poor Patients, Physically Handicapped, Motherless Babies are provided<br />
assistance in this sector. The total approved allocation of outlay is Rs. 30.00 lakh for the<br />
Annual Plan <strong>2006</strong>-07. The item-wise allocation are as under :-<br />
1. Wages of old aged Pensioners - 10.10<br />
2. Financial Assistant to Widow - 1.00<br />
3. Financial Assistant to Physically Handicapped - 1.00<br />
4. Financial Assistant to Motherless Babies Home - 1.00<br />
5. Financial Assistant to Poor patient Leprosy - 2.45<br />
6. Financial Assistant to Motherless Babies - 1.00<br />
7. Financial Assistant to NGO - 2.50<br />
8. Financial Assistant to YLA Conference - 0.70<br />
9. Purchase/Supply of Cup - 2.00<br />
10. Construction of Grave-Yard Hut - 1.00<br />
11. Maintenance of Vehicle - 1.00<br />
12. Administrative Costs : (a) Office Expenses - 0.40<br />
(b) TA/DA - 0.30<br />
(c) Salary - 6.00<br />
Total of VIII - 30.00<br />
IX. SOIL CONSERVATION DEPARTMENT :-<br />
The Lai Autonomous District Council submitted Detail Project Report (DPR) for<br />
Watershed Development Project to DoNER and is being processed and also awaited for<br />
sanction. As such, some items/schemes has been provided to meet the minimum needs of<br />
the Department existing plantation and some new items have been provided in this sector.<br />
The total outlay for the scheme is Rs.20.00 lakh only as follows: -<br />
1. Hill Terracing - 2.00<br />
2. Creation of Avacoda plantation at Thingkah/Construction<br />
of RO Quarters at Hruitezawl - 1.95<br />
3. Fire line cutting - 0.20<br />
4. Creation of Plantation at Hruitezawl - 1.00<br />
5. Maintenance of existing Plantation - 1.20<br />
6. Creation/Maintenance of Nursery Beds - 0.80<br />
7. Maintenance of Vehicle - 0.05
- 266 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
8. Maintenance of Bike - 0.10<br />
9. Administrative Costs : (a) Office Expenses - 0.50<br />
(b) TA/DA - 0.50<br />
(c) Salary - 9.70<br />
Total of IX - 20.00<br />
X. LOCAL ADMINISTRATION DEPARTMENT :<br />
The main aims and objects of this sector is to be developed urban and rural areas of<br />
Lai Autonomous District Council. This sector is sub-divided into three sub-sectors viz.:<br />
‘A’ – Urban Development<br />
‘B’ – Minor Works<br />
‘C’ – Sanitation<br />
It has to ensure the safety of Towns and Villages and also to ensure the healthyness<br />
of general public which can be caused by Landslide, Erosion, Epidemic and diseases (like<br />
Malaria, Dysentry, Typhoid, etc.) respectively, schemes in connection with the above are<br />
provided in this sector.Moreover, the protection of Town and villages and other endangered<br />
area due to landslides and erosion have to be look in to by this sector. The total approved<br />
allocation of outlays for the scheme during Annual Plan <strong>2006</strong>-07 is Rs. 52.00 lakh only.<br />
‘A’ URBAN DEVELOPMENT :-<br />
1. Financial Assistant to Low-Income group<br />
for construction of Houses - 2.90<br />
2. TA/DA for Town Planning Committee Chairman - 0.20<br />
3. Office Expenses for Town Planning Committee - 0.20<br />
Total of ‘A’ - 3.30<br />
‘B’ MINOR WORKS :-<br />
1. Construction of M/Step at Lawngtlai town, and other division<br />
and sub-division of LADC etc. - 4.50<br />
2. Construction of M/Side Drain at Lawngtlai Town and other<br />
division and sub-division of LADC etc. - 4.00<br />
3. Construction of R./Wall at Lawngtlai Town and other division<br />
and sub-division of LADC etc. - 3.00<br />
4. Construction of Culvert/Stone Laying at Lawngtlai town - 1.00<br />
5. Repair of existing Step and Drainage - 1.00<br />
6. Purchase/Maintenance of Vehicle - 1.80<br />
7. Administrative Costs : (a) Office Expenses - 0.50<br />
(b) TA/DA - 0.50<br />
(c) Salary - 6.30<br />
Total of ‘B’ - 22.60<br />
‘C’ SANITATION :-<br />
1. Construction of Pucca Urinals for 20 nos. of different Villages<br />
School/Public places - 2.00<br />
2. Purchase of Sweeping Materials - 0.50<br />
3. Maintenance of Truck/Tripper - 3.00<br />
4. Construction of Slaughter House at Lawngtlai - 1.00<br />
5. Construction of Bazar Shed at Ngengpui kai - 1.00<br />
6. Purchase/Maintenance of Vehicle - 1.70<br />
7. Existing Bazar Shed
- 267 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(a) Lawngtlai - 0.40<br />
(b) Purchase of PA set for the use of Super Market at Lawngtlai - 0.30<br />
8. Administrative Costs : (a) TA/DA - 0.50<br />
(b) Office Expenses - 0.40<br />
(c) Salary - 15.30<br />
Total of ‘C’ - 26.10<br />
Total of X - 52.00<br />
XI. FOREST DEPARTMENT :-<br />
Fortunately, the Lai Autonomous District Council got a sanction for Forest<br />
Development Agency from Central Government and is being implemented in Lai<br />
Autonomous District Council area. For which a problem faced by the department have been<br />
solved to a great extend. As such, certain item of works/schemes are deliberately neglected<br />
from the District Council Budget. However, Rs. 37.00 lakh only is approved for the Annual<br />
Plan <strong>2006</strong>-07 with the following items: -<br />
1. Maintenance of previous Plantation - 2.30<br />
2. Construction of Forest Quarter/Office Check gate<br />
Rs.2.00 lakh per no. for 2 nos. - 4.00<br />
3. Construction of Sand Quarry Road at Kawlchaw - 5.00<br />
4. Repair of Department Gun - 0.20<br />
5. Purchase of Staff Uniform - 1.50<br />
6. Purchase of Boat for Official Duty purpose - 0.20<br />
7. Survey of Forest boundary - 0.60<br />
8. Training Expenses - 1.00<br />
9. Purchase of Bike with Maintenance - 0.20<br />
10.Maintenance of Vehicle - 1.00<br />
11.Administrative Costs : (a) Office Expenses - 1.00<br />
(b) TA/DA - 0.80<br />
(c) Salary - 20.20<br />
Total of XI - 38.00<br />
XII. TRANSPORT DEPARTMENT :-<br />
The Transport Department is solely responsible over the matter of vehicle owned by<br />
the Lai Autonomous District Council. The Officer concerned of the department is held<br />
responsible for controlling driver’s attendants, detailment of driver’s duty over all<br />
administration. Whatsoever, schemes is connected with the subject above are provided. The<br />
total approved outlay during Annual Plan <strong>2006</strong>-07 is Rs. 24.00 lakh only.<br />
1. Maintenance of Bike - 0.10<br />
2. Purchase/Maintenance of Vehicle - 15.60<br />
3. Purchase/Maintenance of Driver’s Uniform - 0.80<br />
4. Administrative Costs : (a) Office Expenses - 0.60<br />
(b) TA/DA - 0.60<br />
(c) Salary - 6.30<br />
Total of XII - 24.00<br />
XIII. SPORT & YOUTH SERVICES DEPARTMENT :-<br />
Promotions of every sport discipline within Lai Autonomous District Council area are<br />
the aims and objects of this Department. To achieve the policy of the Department, effort has<br />
been taken to various fields of sports among the sport lovers of youth. But sufficient fund<br />
could not be provided due to constrains of Budgetary Fund. During Annual Plan <strong>2006</strong>-07,<br />
Rs. 22.00 lakh only is approved under Sports & Youth Services as under: -
- 268 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. Construction of Volley Ball Court at Bungtlang - 1.00<br />
2. Purchase of Sport goods for distribution to Sporting Club - 4.50<br />
3. Promotion of Zonal Sport (conduct of Tournament) - 1.00<br />
4. (a) Conduct of Sport within District - 0.50<br />
(b) Conduct of Sport outside District - 1.00<br />
5. Maintenance of Vehicle - 1.80<br />
6. (a) Financial Assistant to Sporting Club - 1.50<br />
(b) Intensive Cash Award to the Player participating<br />
outside the District - 1.30<br />
7. Maintenance of Bike - 0.10<br />
8. Administrative Costs : (a) Office Expenses - 0.40<br />
(b) TA/DA - 0.40<br />
(c) Salary - 8.50<br />
Total of XIII - 22.00<br />
XIV. CO-OPERATION DEPARTMENT :-<br />
The Lai Autonomous District Council does have sufficient outlay of fund in plan<br />
sector, as such, Co-operation movement in the area is hardly taken up in a successful a<br />
standard of the Societies. Within the limited outlay of fund, several effort has been taken for<br />
the awareness of the Co-operative Societies in each and every Villages.There are numerous<br />
hindrances to carry out the awareness and the smooth functioning of every Societies.<br />
Rs.10.00 lakh only is approved for Cooperation as under: -<br />
1. Financial Assistant to various Co-operative Societies - 4.30<br />
2. Compilation by Law - 0.10<br />
3. Administrative Costs : (a) Training Expenses - 0.30<br />
(b) Office Expenses - 0.30<br />
(c) TA/DA - 0.30<br />
(d) Salary - 4.70<br />
Total of XIV - 10.00<br />
XV. PUBLIC WORKS DEPARTMENT :<br />
This Department is the major sector of developmental Department in Lai<br />
Autonomous District Council. The Lai Autonomous District council entrusted this<br />
Department for execution of all major works like Construction of Building, Road<br />
Construction and Maintenance of completed schemes. It had been constructed Main Office<br />
Building, Lai Autonomous District Council House, Dokulha Hall, Session Hall and other<br />
major works by this Department. To execute, monitor and supervise the works taken up by<br />
Lai Autonomous District Council, Officers and Technical Staff are provided in this sector.<br />
But on the eve of the preparation of Annual Plan <strong>2006</strong>-07, sufficient amount of fund<br />
could not be provided for such major works. Rs. 145.00 lakh is approved for the Annual<br />
Plan <strong>2006</strong>-07 with the following schemes: -<br />
1. (a) Furnishing of Dokulha’s Hall - 0.70<br />
(b) Maintenance/White Washing of Dokulha’s Hall - 3.00<br />
2. Maintenance of Lai House at Aizawl - 6.10<br />
3. Maintenance of Rest House at Chawngte, Vathuampui,<br />
Bungtlang’S’,Vawmbuk,Siachangkawn - 4.00<br />
4. Maintenance of EPABX, Xerox etc. - 2.00<br />
5. Construction of Session Hall - 20.00<br />
6. (a) Construction/Maintenance of RO/ARO Office at<br />
Diltlang, Chawngte, Vathuampui, Bualpui ‘NG’ & Sangau - 4.00
- 269 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(b) Constn. of ARO Office at Lungtian with Chowkider Quarters - 3.00<br />
7. Maintenance of District Council Quarter at Lawngtlai - 1.00<br />
8. Furnishing of RO/ARO Office at Diltlang, Chawngte,<br />
Vathuampui, Bualpui, Sangau, Lungtian - 2.00<br />
9. Construction of Jeep Road - 10.00<br />
10. Constn. of Stone Laying approach to Chandmary-II Rest House - 6.00<br />
11. Construction of R/Wall, Culvert, Side Drain at Lawngtlai<br />
Town Road AOC, Chandmary, College Veng, L-I , L-III - 6.00<br />
12. Maintenance of Truck/Jeep Road approach to District<br />
Council Quarry near Thingkah - 20.00<br />
13. Survey of Road Allignment - 1.00<br />
14. Purchase of Survey Materials - 0.50<br />
15. Purchase/Maintenance of Bike - 0.50<br />
16. Maintenance of Vehicle purchased - 7.20<br />
17. Maintenance of Main Office Bldg. i/c Repair of Step/Corridor - 4.00<br />
18. Administrative Costs: (a) Contingencies Telephone Charge - 3.00<br />
(b) Office Expenses - 3.00<br />
(c) TA/DA - 2.00<br />
(d) Training Expenses - 1.00<br />
(e) Salary - 35.00<br />
Total of XV - 145.00<br />
XVI. EDUCATION DEPARTMENT:-<br />
The Lai Autonomous District Council took School education in its areas. It is,<br />
therefore divided into three Administrative Heads for controlling the administration as well<br />
as smooth and better functioning of School Education. Such Head of Institutions are as<br />
follows: -<br />
(i) ADMINISTRATION: Headed by two Education Officers both Middle Schools and<br />
Primary Schools respectively with some Subordinate Officers and Staff.<br />
(ii) EXAMINATION BOARD: Headed by Board President with Secretary and Officers and<br />
Staff, for both Middle School and Primary School.<br />
(iii) CONTROLLER OF EXAMINATION: Headed by Controller of Examination both Primary<br />
School and Middle School respectively.<br />
In this Department, there are so many teaching Staff, for which a huge amount of<br />
money has to be spent for their Salary. It is however, constructed some of the School<br />
Buildings, both Primary and Middle Schools from Sarva Shiksha Abhiyan (SSA) and solved<br />
the problem faced by the Council. So, Rs. 285.00 lakh only is approved for the Annual Plan<br />
<strong>2006</strong>-07 under Education as under: -<br />
‘A’ MIDDLE SCHOOL (RECURRING)<br />
1. Salary - 62.70<br />
NON-RECURRING :<br />
1. Furniture - 2.50<br />
2. Board of School Education :<br />
(a) Office Expenses - 2.50<br />
(b) TA/DA - 1.00<br />
(c) Free Text Book - 4.00<br />
3. Office Expenses - 2.00<br />
4. TA/DA - 2.00<br />
5. TA/DA for DIET Training - 2.00
- 270 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
6. School Stationary - 2.00<br />
7. Conduct of Seminar - 0.60<br />
8. Orientation Training - 0.50<br />
9. Conduct of Games and Sport - 1.50<br />
‘B’ ADULT EDUCATION :<br />
10. Observation for International Literacy Day - 0.50<br />
11. Honorarium to 100 nos. of Inspector under (MPFL) - 1.50<br />
12. Honorarium to Animators under ( RFLP ) - 0.60<br />
13. Supply of Free Text Book to Adult Illiterate - 0.50<br />
14. Office Expenses - 0.50<br />
15. TA/DA - 0.30<br />
Total of ‘A’ - 87.20<br />
‘C’ PRIMARY SCHOOL (RECURRING)<br />
1. Salary - 181.30<br />
NON - RECURRING<br />
1. School Furniture - 3.00<br />
2. TA/DA - 2.50<br />
3. Orientation Training - 0.50<br />
4. Office Expenses - 2.00<br />
5. TA/DA for DIET Training - 2.50<br />
6. Teachers Seminer - 1.00<br />
7. Conduct of Games and Sport for Primary School - 1.50<br />
8. School Stationary - 3.50<br />
Total of ‘B’ - 197.80<br />
Total of XVI - 285.00<br />
XVII. RURAL DEVELOPMENT DEPARTMENT :<br />
The policy of this Department is to uplift the people inhabitant of rural areas. But<br />
sufficient fund could not be allocated for the upliftment of the people living in rural areas.<br />
It is, however, allocated some schemes like Rural Housing, Community Hall and Inter-Village<br />
Path are provided. The construction of Village Jeep Road is omitted this year since this has<br />
been undertaken by <strong>Mizoram</strong> PWD as well as Rural Development Department. The total<br />
outlay approved is Rs. 55.00 lakh during Annual Plan <strong>2006</strong>-07, the item-wise allocation are<br />
as follows: -<br />
1. Rural Housing Scheme - 16.00<br />
2. Repair of Community Hall at Rulkual, Diltlang, Lungtian,<br />
Bualpui and Rawlbuk - 2.40<br />
3. Furnishing of Community Hall at Chawngte’P’, Bungtlang,<br />
Rulkual, Lungtian, Rawlbuk, Bualpui - 2.20<br />
4. Maintenance of Inter-Village path within LADC Rural areas - 3.50<br />
5. Maint. of Vehicle/Maint. of Internal Jeep Road within LADC area - 9.10<br />
6. Implementation of Work Scheme etc:<br />
(a) TA/DA for Member - 1.50<br />
(b) Planning Programme Implementation - 1.00<br />
7. Purchase of Solar Lamp for Rural Area - 2.00<br />
8. Administrative Costs : (a) Office Expenses - 0.50<br />
(b) TA/DA - 0.60<br />
(c) Salary - 16.20<br />
Total of XVII - 55.00
- 271 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
XVIII. WATER WAY DEPARTMENT :<br />
This sector is a minor sector in Development Department. Hence, much effort could<br />
hardly be taken so far under this sector. A very few amount had been provided for<br />
construction and purchase of Speed Boat, Dugout Boat and other Administration Costs.<br />
Item-wise allocation of outlays are as under: -<br />
‘A’<br />
1. Purchase of Dugout Boat @ Rs. 10,000/- per Nos. - 0.50<br />
2. Purchase of Speed Boat 2 Nos @ Rs. 70,000/- per Nos - 1.40<br />
3. Administrative Costs : (a) Office Expenses - 0.20<br />
(b) TA/DA - 0.20<br />
(c) Salary - 4.70<br />
Total of XVIII - 7.00<br />
Grand Total - 875.00<br />
ABSTRACT STATEMENT OF COMPONENT BREAK-UP OF <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-07<br />
Sl. No. Name of Break-up Items Amount Percentage Remarks<br />
1 2 3 4 5<br />
1 Salary Component 440.80 50.00%<br />
2 Other Expenditure Costs -<br />
a) Office Expenses 26.70 3.05%<br />
b) Office Contingencies 3.00 0.35%<br />
c) TA/DA 18.42 2.10%<br />
d) Training Expenses 12.50 1.42%<br />
e) Maintenance of Vehicle 50.55 5.77%<br />
f) Wages 12.20 1.39%<br />
g) Minor Works 310.80 35.52%<br />
Sub-total of 2 (a) to (g) 434.20 50.00%<br />
Total (1 & 2) 875.00 100.00%<br />
‘B’ NO. OF POSTS MAINTAINED<br />
3. REGULAR POST:<br />
(a) Group ‘A’ - 3<br />
(b) Group ‘B’ - 24<br />
(c) Group ‘C’ - 259<br />
(d) Group ‘D’ - 75<br />
4. Total No. of Fixed Pay Employee - 33<br />
Total - 394
Introduction:<br />
- 292 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
MARA AUTONOMOUS DISTRICT COUNCIL<br />
By the provisions of paragraph 20-B of the Sixth Schedule to the CONSTITUTION OF<br />
INDIA, LAKHER REGIONAL COUNCIL along with PAWI AND CHAKMA REGIONAL COUNCIL<br />
were elevated to the status of District Council with effect from the 29 th April, 1972 under the<br />
MIZORAM DISTRICT COUNCIL (miscellaneous Provision) Order 1972. Thus, the LAKHER<br />
AUTONOMOUS DISTRICT COUNCIL came into existence and was re-named as the MARA<br />
AUTONOMOUS DISTRICT COUNCIL from 1 st May 1989. The area of the Council is 1445 Sq.<br />
Kms. with a population of 51,073 as per latest Census. It is lying on the South-eastern corner<br />
of <strong>Mizoram</strong>, contiguous by MYANMAR on the east and south and Lai District Council on the<br />
west.<br />
There are many rivers in the District, but only a few of them are worth mentioning.<br />
The most important and useful rivers are the KOLODYNE (Chhimtuipui), SALYU, TISI and<br />
PALA. There is one of the largest Lake in <strong>Mizoram</strong> called PALA LAKE in the District. This Lake<br />
has now being developed from the Centrally Sponsored Schemes.<br />
Agriculture is the main stay in this District. The people of this area live on jhuming<br />
and wet rice cultivation. They also grow cash crops like cotton, millet, maize, potatoes,<br />
groundnut, coffee, pepper, ginger, etc. in their jhum lands. They also reared all kinds of<br />
domestics’ animals.<br />
BRIEF SECTOR-WISE DESCRIPTION<br />
1. ENVIRONMENT & FOREST: The approved outlay is Rs. 33.00 lakh only. The Objective<br />
of the Schemes is for maintenance of existing Staff, Office Expenses, TA/DA, Maintenance of<br />
Vehicle, Purchase of Uniforms, Maintenance of Rest House, purchase of Arms & Ammunition,<br />
collection of seed, maintenance of previous year Plantation, maintenance of Forest buildings<br />
and creation of nursery beds.<br />
2. ARTS & CULTURE: The approved outlay for the scheme is Rs. 16.50 lakh only. Under<br />
the schemes, maintenance of staff, Office Expenses, TA/DA, research investigation,<br />
maintenance of Museum, Organisation of Cultural Meet, and musical articles, maintenance of<br />
Video and still Camera, Grant-in-aid to Local Artists, Drama, Essay, etc. competitions and<br />
organisation of cultural troupe will be taken up.<br />
3. RURAL DEVELOPMENT: The approved outlay under the schemes for the year 2005-06<br />
is Rs. 130.00 lakh only which would be utilised on the following schemes — Maintenance of<br />
existing staff, Office Expenses, TA/DA, maintenance of Vehicles, furniture for Quarters &<br />
Office, Maintenance of Mara House at Aizawl, Rural Communication, Community<br />
Development, Rural Housing and Information and Publicity.<br />
4. AGRI & HORTICULTURE: The approved outlay for the scheme is Rs. 49.00 lakh only.<br />
The following schemes will be taken up during the year. Such as, maintenance of Agri. Seedcum-demonstration<br />
farm, construction of Agriculture Link Road, Maize plantation schemes,<br />
land development by manual & purchase of plough animal for WRC, development of<br />
Horticulture Garden and Minor Irrigation.
- 293 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
5. SOIL & WATER CONSERVATION: The approved outlay for the schemes is Rs.22.00<br />
lakh. This Scheme provides maintenance of Coffee, Rubber and Passion fruit plantation, and<br />
maintenance of permanent nursery at Thosai etc.<br />
6. SOCIAL WELFARE: Under this programme, various schemes will be taken up during<br />
<strong>2006</strong>-07 such as — Assistance to Motherless Babies, handicapped persons, poor patients, Old<br />
aged pension, and procurement of socially needed materials for distribution. The approved<br />
outlay for the schemes is Rs. 17.00 lakh only.<br />
7. A.H. & VETY.: The approved outlay for the scheme is Rs. 21.00 lakh only. Under this<br />
programme, the following schemes are proposed to be implemented during the year — (a)<br />
Direction & Administration, (b) Cattle development, (c) Poultry development and d) Piggery<br />
Development<br />
8. INDUSTRY: The Rural Industry is purely a promotional scheme and is meant for<br />
upgrading skill of artisans by imparting necessary training in different trades in addition to<br />
rendering service facilities to small-scale Industry units. The following programmes are<br />
proposed to take up during <strong>2006</strong>-07. Such schemes are — Procurement of Equipment, grantin-aid<br />
to artisans & Carpentry tools. The approved outlay is Rs. 13.50 lakh only.<br />
9. FISHERY: The Annual Plan of Fisheries for the year <strong>2006</strong>-07 envisages procuring of<br />
Fish seeds for the Departmental Fish Pond and private farm as well. To encourage production<br />
of fish seeds in the private sector steps have been taken to select 5 private farms at Saiha in<br />
M.A.D.C area, which will be assisted by the department both financially and technically<br />
during the current, year and the approved outlay for the scheme is Rs. 10.00 lakh only.<br />
10. P.H.E.: The Proposed outlay for the scheme is Rs. 16.50 lakh only. Under this<br />
programme, the following schemes are proposed to be implemented during the year:<br />
Construction of RCC Water tanks, procurement of plumbing tools and repairing of Water<br />
Points /tanks.<br />
11. SERICULTURE: The scheme includes procurement of equipment, maintenance of seed<br />
farm and existing staff. Rs. 9.50 lakh is approved for the scheme during the year.<br />
12. L.A.D: The approved outlay for the scheme is Rs. 56.50 lakh only. Under this<br />
programme, the following schemes are earmarked to implement during the current year.<br />
Such schemes are construction of Bazar Shed, stone steps, pit latrines, dustbins, maintenance<br />
of slaughterhouses, and maintenance of existing staff.<br />
13. ROAD & TRANSPORT: An outlay of Rs. 12.50 lakh only is approved for the scheme.<br />
Under this programme Pay & Allowances of Drivers, handyman and other staff, management,<br />
operation, repairs and maintenance and other expenditure is provided.<br />
14. SPORTS & YOUTH SERVICES: This scheme includes procurement of Sports materials<br />
for free distribution, organisation of competition, construction of playfield and pavilion and<br />
maintenance of existing staff. The proposed outlay for the scheme is Rs. 14.00 lakh only.<br />
15. CO-OPERATION: This sector includes seminar / training for awareness and<br />
encouragement of Co-Operative Societies and maintenance of existing staff. The approved<br />
outlay for this sector is Rs. 3.50 lakh only.
- 294 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
16. P.W.D.: The approved outlay for the scheme is Rs. 104.00 lakh only. This sector<br />
includes construction of — (a) Revenue Office at Tipa/Phura (b) EM Quarters (c) Fresh Jeep<br />
able roads and (d) Stone steps, culverts & Side drain, maintenance of - a) Jeep roads b) Offices<br />
& Quarters and c) Existing staff & labours.<br />
17. WATERWAY (INLAND): The approved outlay for the scheme is Rs. 7.50 lakh only for<br />
employment of boatmen, purchase & maintenance of Boats are includes in the scheme.<br />
18. EDUCATION & HUMAN RESOURCES: This scheme includes organisation of Zonal<br />
Sports, Seminar, training, Adult Education programmes, maintenance of BSE, and other minor<br />
works to be implemented under this sector. The approved outlay for the scheme is Rs.210.00<br />
lakh only.<br />
Hence, total approved outlay for 18 Departments during the year <strong>2006</strong>-<strong>2007</strong> is<br />
Rs. 746.00 lakh only.<br />
AN ABSTRACT OF <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />
<strong>APPROVED</strong> OUTLAY<br />
'A' HEAD OF EXPENDITURES :<br />
Approved<br />
(Rs. In Lakh)<br />
Approved<br />
Sl. No. Head of Accounts<br />
outlay for outlay for<br />
2005-06 <strong>2006</strong>-07<br />
1 2 3 4<br />
1. Salary 442.62 442.70<br />
2. Wages 37.78 39.20<br />
3. Travelling Expenses 9.80 10.35<br />
4. Office Expenses 20.85 21.62<br />
5. Maintenance of Vehicle 20.10 20.20<br />
Total of Sl. No. 1 - 7 531.15 534.07<br />
6. Works (including maintenance) 189.85 211.93<br />
Grand Total 721.00 746.00<br />
'B' NUMBER OF POSTS MAINTAINED<br />
1. Regular Posts :<br />
a) Group 'A' 12 12<br />
b) Group 'B' 20 20<br />
c) Group 'C' 189 189<br />
d) Group 'D' 100 100<br />
Total of regular posts 321 321<br />
2. Total No. of Work Charge post - -<br />
3. Total No. of Muster Roll Labourers 84 84
- 312 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />
Introduction:<br />
The Chakma Autonounous District Council was created in 1972 comprising of a<br />
portion of Chakma inhabited areas in the South-Western part of <strong>Mizoram</strong>. It has an area of<br />
about 1500 Sq.Km (approx). As per 2001 census the population of the areas was 34, 528<br />
souls and 6,900 (approx) number of families with 41.22% of literacy.<br />
The Chakma Community of Indian origin is having a long historical background and<br />
a rich cultural heritage. Chakmas are accused to settled cultivation i.e. wet rice cultivation.<br />
They are honest, hard working and peace loving.<br />
The topography, climatic condition, and quality of soil of the area is suitable for wet<br />
rice cultivation, and other cash crops like oilseed, ginger, chilies, seas am, turmeric, black<br />
pepper and various other horticulture plants. The vast fertile land available in the valleys of<br />
two major rivers. Thega and Tuichawng, if harnessed properly, self sufficiency in food grain<br />
can be attained. In spite of such potentiality and conducive condition, the area still remain<br />
tragically backward as road communication facility is not built up in the area and no such<br />
well planned schemes/project has so far been completed especially on road communication,<br />
administrative infrastructure like office buildings, survey instruments, computers, office<br />
furniture and fixtures which are inevitable for smooth functioning of any establishment,<br />
could not be built up yet.<br />
An outlay of Rs. 545.00 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong>. The sectorwise<br />
break up on priority basis is given below :<br />
Sl.<br />
No<br />
Name of Sector<br />
Amount approved<br />
for <strong>2006</strong> – <strong>2007</strong><br />
1 Agriculture & Horticulture Rs. 27.52 lakh<br />
2 Fishery Rs. 4.37 lakh<br />
3 Public Health Engineering Rs. 14.21 lakh<br />
4 Industry Rs. 11.30 lakh<br />
5 Sericulture Rs. 2.46 lakh<br />
6 Animal & Vety. Rs. 12.45 lakh<br />
7 Art & Culture Rs. 13.81 lakh<br />
8 Social Welfare Rs. 2.30 lakh<br />
9 Soil Conservation Rs. 9.55 lakh<br />
10 Local Administration Rs. 12.60 lakh<br />
11 Forest & Environment Rs. 14.11 lakh<br />
12 Road and Transport Rs. 46.29 lakh<br />
13 Sport & Youth Services Rs. 11.62 lakh<br />
14 Co-operation Rs. 0.03 lakh<br />
15 Public works Rs. 41.51 lakh<br />
16 Education Rs. 246.32 lakh<br />
17 District School Education Board Rs. 5.00 lakh<br />
18 Rural Development Rs. 20.90 lakh<br />
19 Water Ways Rs. 4.41 lakh<br />
20 Planning Rs. 30.60 lakh<br />
21 Information & Public Relation Rs. 12.84 lakh<br />
22 Land Revenue & Settlement Rs. 0.80 lakh<br />
TOTAL Rs. 545.00 lakh
- 313 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
WRITE-UP DESCRIPTION OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. Agriculture & Horticulture: The Department was divided into two sectors i.e.<br />
Agriculture and Horticulture. The main items of schemes are land development by<br />
manual @ Rs. 30,000/- per Hectares and financial assistance to Orange gardeners of<br />
Rajmandal for weeding the garding. Under Horticulture purchase of spade for<br />
distribution 90% subsidy, Salary and other administrative charges. A total of Rs. 27.52<br />
lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong> under this sector.<br />
2. Fishery: Under this sector Rs. 4.37 lakh is approved during during Annual Plan <strong>2006</strong>-<br />
<strong>2007</strong> for salary only.<br />
3. Public Health Engineering: Rs. 14.21 lakh is approved for Annual Plan <strong>2006</strong>-07. The<br />
main items are only improvement of village spring souces (IVSS), salary and wages and<br />
other administrative charges.<br />
4. Industry: Under this sector, Rs. 11.30 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
for salary and other administrative charges.<br />
5. Sericulture: Rs. 2.46 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong> under this sector<br />
for salary and office expenses only.<br />
6. Animal Husbandary & Veterinary: Under this sector, Rs. 12.45 lakh is approved for<br />
Annual Plan <strong>2006</strong>-<strong>2007</strong>. The main items in this sector are Financial assistance for<br />
Cattle farming, Piggery, Duckery, Poultry, Goat rearing etc.@ Rs. 5,000/- per family,<br />
salary and other administrative charges.<br />
7. Arts and Culture: Rs. 13.81 lakh is approved during Annual Plan <strong>2006</strong>-07 under this<br />
sector. The main items are production audio cassette, salary and other administrative<br />
charges.<br />
8. Social Welfare: Under this sector, Rs. 2.45 lakh is approved during Annual Plan <strong>2006</strong>-<br />
<strong>2007</strong> for salary only.<br />
9. Soil Conservation: Rs. 9.40 lakh is approved for Annual Plan <strong>2006</strong>-07 for salary only.<br />
10. Local Administrative: Under this sector, Rs. 12.60 lakh is approved during Annual<br />
Plan <strong>2006</strong>-<strong>2007</strong>. The main items of works are renovation supermarket building at<br />
K/nagar, construction of garbage bins, conduct of village council conference and salary<br />
and other administrative charges.<br />
11. Forest: Rs. 11.62 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong> under this sector. The<br />
main items included are maintenance of Children Park at K/nagar, construction of<br />
boundary wall at proposed Botanical garden at CHADARASORA, creation of road side<br />
plantation, salary and other administrative charges.<br />
12. Road Transport: Under this sector, Rs. 46.29 lakh is approved during Annual Plan<br />
during <strong>2006</strong>-<strong>2007</strong> for maintenance of vehicle, salary and other administrative charges.<br />
13. Sports and Youth Services: Rs. 11.62 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
The main items included are purchase of sports goods and books sport for<br />
departmental use and distribution, salary and other administrative charge.<br />
14. Co-operation: Under this sector, Rs. 0.03 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
for office expenses only.
- 314 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
15. Public Works Department: Rs. 41.51 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
The main items included are Hospitality/Discretionary, grants, construction of Guardwall<br />
/ boundary wall at CADC rest house, Lunglei, renovation of Chakma House, Annex<br />
at Aizawl, Vertical extension of Council guest house including furnishing at K/nagar,<br />
renovation of CADC rest house at NJS, black topping of CADC guest house courtyard<br />
at K/nagar, salary and other administrative charges.<br />
16. Education: Under this sector, Rs. 246.52 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
The items included are school stationeries, inter school sports meet, purchase of text<br />
books, scholarship for girls students, salary and other administrative charges.<br />
17. District School Education Board: Rs. 5.00 lakh is approved for Annual Plan <strong>2006</strong>-07.<br />
The main items included are grant-in-aid to D.S.E.B.<br />
18. Rural Development: Under this sector, Rs. 20.90 lakh is approved for Annual Plan<br />
<strong>2006</strong>-<strong>2007</strong>. The main items included are maintenance of IVP, salary and other<br />
administrative charges.<br />
19. Water ways: Rs. 4.41 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong> for salary only.<br />
20. Planning & Development: Under this sector, Rs. 30.60 lakh is approved for Annual<br />
Plan <strong>2006</strong>-07. The main items included are Maintenance of computers, Contingency<br />
charges, TA/DA purchase of Furniture, computers etc.<br />
21. Information & Public Relation: Under this sector, Rs.12.84 lakh is approved for<br />
Annual Plan <strong>2006</strong>-07. The main items included are celebration of festivals / National /<br />
important days, Publication of Calendars/diary, conduct of International Seminar on<br />
Chakma customary law scripts & language etc.<br />
22. Land Revenue & Settlement: Rs. 0.80 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
for office expenses only.<br />
‘A’ Head of Expenditure:<br />
Sl.<br />
No.<br />
ABSTRACT OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-07<br />
Head of Accounts<br />
Approved<br />
outlay for<br />
2005-06<br />
(Rs. in lakh)<br />
Approved<br />
outlay for<br />
<strong>2006</strong>-07<br />
1 2<br />
1. Salary 347.68 362.45<br />
2. Wages 0.51<br />
3. Travelling Expenses 6.91 15.00<br />
4. Office Expenses 4.26 4.51<br />
5. Maintenance of Vehicle 16.00 30.00<br />
6. Training Expenses 1.50<br />
Sub-total of Sl. No. 1 – 6 375.36 413.46<br />
7. Works (including maintenance) 144.64 131.54<br />
TOTAL 520.00 545.00
‘B’ Number of Posts Maintained:<br />
- 315 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. Regular Posts<br />
a) Group ‘A’ 12 12<br />
b) Group ‘B’ 8 8<br />
c) Group ‘C’ 242 242<br />
d) Group ‘D’ 51 51<br />
Total of Regular Posts 313 313<br />
2. Total No. of Work-Charge posts<br />
3. Total No. of Muster Roll labourers 2<br />
Major, Sub-Major, Minor Head,<br />
Detailed Head and Object Head<br />
of Account<br />
Budget<br />
Estimates<br />
per Demand<br />
for Grants<br />
<strong>2006</strong>-07<br />
Additional,<br />
if any, as<br />
per sectoral<br />
allocation of<br />
Planning<br />
Department<br />
Reduction,<br />
if any, as<br />
per sectoral<br />
allocation of<br />
Planning<br />
Department<br />
ANNEXURE ‘A’<br />
Total (2+3)<br />
or 2–4)<br />
1 2 3 4 5<br />
2225 - Welfare of SC/ST & Other Backward Classes<br />
800 - General<br />
800 - Other Expenditure<br />
800(03) - CADC (Plan)<br />
(31) - Grant-in-aid<br />
a) Salary 337.45 25.00 362.45<br />
b) Wages<br />
c) Office Expenses 4.51 4.51<br />
d) Travelling Expenses 15.00 15.00<br />
e) Others 163.04 163.04<br />
Grand Total 520.00 25.00 545.00
Sl.<br />
No.<br />
- 316 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ABSTRACT OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />
Name of Department Salary O.E. TA/DA Vehicle Furniture Training<br />
Contingency/<br />
Hospitality/<br />
Maint. /<br />
Rents, etc.<br />
Other<br />
Schemes<br />
1. Agriculture 10.82 0.30 16.40 27.52<br />
2. Fishery 4.34 0.03 4.37<br />
3. Public Health Engineering 12.15 0.06 2.00 14.21<br />
4. Industry 10.20 0.10 1.00 11.30<br />
5. Sericulture 2.38 0.03 0.05 2.46<br />
6. Animal & Veterinary 2.42 0.03 10.00 12.45<br />
7. Art & Culture 12.96 0.15 0.70 13.81<br />
8. Social Welfare 2.20 0.10 2.30<br />
9. Soil Conservation 9.33 0.07 0.15 9.55<br />
10. Local Administration Department 3.00 0.30 9.30 12.60<br />
11. Forest & Environment 6.46 0.35 7.30 14.11<br />
12. Road Transport 16.19 0.10 30.00 46.29<br />
13. Sports & Youth Services 3.47 0.15 8.00 11.62<br />
14. Co-operation 0.03 0.03<br />
15. Public Works Department 15.66 0.35 1.50 24.00 41.51<br />
16. Education & HRD 231.72 0.50 1.50 12.60 246.32<br />
17. District Education Board 5.00 5.00<br />
18. Rural Development 14.80 0.10 6.00 20.90<br />
19. Waterways 4.35 0.06 4.41<br />
20. Planning 0.70 15.00 5.00 4.90 5.00 30.60<br />
21. Information & Public Relations 0.20 12.64 12.84<br />
22. Land Revenue & Settlement 0.80 0.80<br />
Grand Total 362.45 4.51 15.00 30.00 5.00 1.50 6.40 120.14 545.00<br />
Grand<br />
Total
- 320 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
LEGAL METROLOGY<br />
The approved Annual Plan <strong>2006</strong>-<strong>2007</strong> is Rs. 80.00 lakh. The Plan mainly aims for<br />
continuation of the existing establishment and strengthening thereof with a view to achieve<br />
better and more effective enforcement of Weights & Measures Act & Rules throughout the<br />
State.<br />
The break-up of the Plan outlays are as follows: -<br />
1. Administration : Rs. 72.00 lakh<br />
2. Supply & Materials : Rs. 3.00 lakh<br />
3. Minor Work : Rs. 5.00 lakh<br />
TOTAL : Rs. 80.00 lakh<br />
1. ADMINISTRATION: Rs. 72.00 lakh is earmark for administration during the year<br />
<strong>2006</strong>-07, and the break up are as follows: -<br />
a) Salary: Rs. 47.30 lakh is earmarked for salary of Officers and Staff under Plan.<br />
b) Wages: Due to shortage of manpower especially Manual Assistant to assist the<br />
Inspector on Enforcement duties, enforcement works hampered a lot causing inefficiency in<br />
our day today works. There are 17 Inspectors of Legal Metrology and only 13 Manual<br />
Assistants to assist them. It is therefore proposed to engage at least 5 (five) Manual Assistants<br />
on Muster Roll/Casual basis for which an amount of Rs. 2.00 lakh is earmarked for Wages.<br />
c) Medical Treatment: Besides, unforeseen medical expenses among the Staff, one<br />
Officer and 2 (two) other Staff required to undergo periodical treatment outside <strong>Mizoram</strong>.<br />
Therefore Rs. 3.20 lakh is earmarked for Medical Treatment.<br />
d) Traveling Expenses: The Enforcement Staff are required to visit different places,<br />
trading premises, Government godowns in towns and interior villages for effective<br />
enforcement of Weights and Measures Act & Rules in the interest of public services to<br />
protect consumers interest. Rs. 3.00 lakh is earmarked for Traveling Expenses.<br />
e) Office Expenses: Rs. 15.00 lakh is earmarked for Office Expenses for the following<br />
Offices viz. — Aizawl, Lunglei, Saiha, Kolasib and Champhai including for purchase of POL.<br />
f) Rent: The Department has got no Office building of its own at Aizawl, Lunglei and<br />
Saiha, the Department required to hired private building for which Rs. 1.50 lakh is<br />
earmarked for Rent.<br />
2. SUPPLY AND MATERIAL: Date Stamp and Date Plugs are statutory requirements of<br />
each Inspector of Legal Metrology every year. Besides other statutory verification tools of<br />
Weights and Measures are required to purchase for which Rs. 3.00 lakh is earmarked for<br />
Supply and Material.<br />
3. MINOR WORKS:<br />
It is proposed to construct Assistant Controller of Legal Metrology Office-cum-<br />
Laboratory building at Saiha for which Rs. 5.00 lakh is earmarked.<br />
Therefore, the total approved outlay comes Rs. 80.00 lakh.
- 324 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
LAW & JUDICIAL<br />
Approved Sectoral Allocation ofOutlays for Annual Plan <strong>2006</strong>-<strong>2007</strong><br />
B. Judiciary Building:<br />
For the development of infrastructural facilities for the judiciary, construction of<br />
District Court buildings and residential quarters for Judicial Officers in all District<br />
Headquarters of <strong>Mizoram</strong> including High Court have been taken up on 50:50 sharing basis<br />
between Central and State Government since 1993-1994.<br />
During 2005-06, the Department continued the ongoing projects on construction of<br />
residential quarters for Judicial Officers at Aizawl and Lunglei and District Court buildings<br />
at Saiha and Kolasib.<br />
During the Annual Plan <strong>2006</strong>-07, the Department proposes to continue the projects<br />
which were not completed during 2005-06 as follows: —<br />
1. Construction of Junior Judges’ quarters at Aizawl - Rs. 20.00 lakh<br />
2. Construction of Senior Judges’ quarters at Aizawl - Rs. 26.00 lakh<br />
3. Construction of District Court building at Kolasib - Rs. 11.00 lakh<br />
Total - Rs. 57.00 lakh<br />
The Head of Account under Judiciary buildings is —<br />
4059 - C.O. on P.W.<br />
01 - Office Buildings<br />
051 - Construction<br />
(01) - Judiciary Building (Plan)<br />
(51) - Major Works - Rs. 57.00 lakh<br />
C. Publication of Mizo Customary Law:<br />
The compilation of the Mizo Customary Law has completed and ready for<br />
publication. For the publication of Mizo Customary Law, Rs. 20.00 lakh is approved for the<br />
Annual Plan <strong>2006</strong>-07.<br />
The Head of Account for publication of Mizo Customary Law is —<br />
2014 - Admn. of Justice<br />
800 - Other Expenditure<br />
(05) - Customary Law / Plan<br />
(16) - Publication - Rs. 20.00 lakh<br />
D. I.T. in Courts:<br />
Law & Judicial Department have taken up computerisation of Courts on 50:50<br />
sharing between the Central and State Government since 2000-01 and all Courts are partly<br />
computerised. At present, computerisation of Courts is being taken up by the Government<br />
of India, Department of Justice in consultation with NIC.<br />
For the maintenance of computerisation of Courts, etc., Rs. 3.00 lakh is approved for<br />
the Annual Plan <strong>2006</strong>-07.
- 325 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The Head of Account under I.T. in Courts is shown below —<br />
2014 - Admn. of Justice<br />
800 - Other Expenditure<br />
(02) - I.T. in Courts<br />
(13) - Office Expenses - Rs. 3.00 lakh<br />
ABSTRACTION OF THE <strong>APPROVED</strong> OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. Judiciary Building - Rs. 57.00 lakh<br />
2. Publication of Mizo Customary Law - Rs. 20.00 lakh<br />
3. I.T. in Courts - Rs. 3.00 lakh<br />
TOTAL - Rs. 80.00 lakh
Sl.<br />
No.<br />
- 328 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SCHOOL EDUCATION<br />
Abstract for provision of different Heads of Account<br />
in the approved Annual Plan <strong>2006</strong>-07<br />
Name of Items<br />
Financial<br />
(Rs. in lakh)<br />
% to the<br />
Outlay<br />
1 2 3 4<br />
1 Salary 5764.50 75.35<br />
2 Wages 54.10 0.71<br />
3 Medical Treatment 24.80 0.32<br />
3 T.E. 35.90 0.47<br />
4 O.E. 116.00 1.52<br />
5 Scholarship 92.00 1.20<br />
6 Rent 0.40 0.01<br />
7 Publication 7.00 0.10<br />
8 PP & SS (Prof. Charges) 0.10 0.001<br />
9 M & S 5.00 0.07<br />
10 Minor Works 85.50 1.12<br />
11<br />
Other Charges - including Rs 350 lakhs for<br />
Cambridge (English Training)<br />
445.30 5.82<br />
12 GIA for Continuing Education 59.40 0.78<br />
13<br />
Matching Contribution (SSA, Computer<br />
Operator and Mid-day meal etc.)<br />
960.00 12.55<br />
Sl.<br />
No.<br />
GRAND TOTAL OF SCHOOL EDUCATION 7650.00<br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
(Rs. in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Outlay Physical Financial<br />
1 2 3 4 5<br />
I. ELEMENTARY EDUCATION<br />
1 DIRECTION AND ADMINISTRATION<br />
A Maintenance of Existing Staff 1 4.50<br />
B Wages 17 19.00<br />
C Medical Treatment 5.00<br />
D Office Expenses LS 15.00<br />
E Travelling Expenses LS 3.00<br />
F Other Charges<br />
Implementation of Mid-day Meal Programme in<br />
<strong>Mizoram</strong> 350.00<br />
TOTAL of Direction and Administration 45.00 396.50
Sl.<br />
No.<br />
- 329 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
Outlay<br />
(Rs. in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Physical Financial<br />
1 2 3 4 5<br />
2 INSPECTION<br />
A Maintenance of existing Staff 27 30.00<br />
B Wages 28 15.00<br />
D Medical Treatment 10.00<br />
C Office Expenses LS 10.00<br />
D Travelling Expenses LS 5.00<br />
TOTAL of Inspection 222.00 70.00<br />
3 GOVT. PRIMARY SCHOOLS<br />
A Maintenance of existing Staff 299 499.00<br />
Regularisation of Fixed Pay Teachers 20 1.00<br />
B Office Expenses LS 10.00<br />
C Tralvelling Expenses LS 8.00<br />
D Grant-in-Aid for matching Share of SSA 600.00<br />
TOTAL of Govt. Primary Schools 1745.00 1118.00<br />
4 NON-GOVT. PRIMARY SCHOOL<br />
A Maintenance of existing staff 89 38.00<br />
TOTAL of Non-Govt. Primary School 38.00<br />
5 GOVT. MIDDLE SCHOOL<br />
A 1) Maintenance of existing staff 1402 2196.00<br />
2) Salary for Officiating / Substitute Teacher LS 1.00<br />
3) Condonation of educational qualification<br />
deficiencyof under graduate teachers LS 1.00<br />
B Office expenses LS 10.00<br />
C Travelling expenses LS 4.00<br />
Total of Govt. Middle Schools 658.00 2212.00<br />
6 OERATION BLACKBOARD<br />
A Maintenance of existing staff 89 30.00<br />
TOTAL of Operation Blackboard 30.00<br />
7 NON - GOVT. MIDDLE SCHOOL<br />
A Grant - in - aid for:<br />
1) Salary of Teaching and non-Teaching Staff 90<br />
66<br />
558.00<br />
2) G.I.A for Govt. Aided M/S<br />
Schools 81.00<br />
3) DCRG LS 10.00<br />
4) CPF LS 1.00<br />
TOTAL of Non- Govt. Middle School 5695.00 650.00
Sl.<br />
No.<br />
- 330 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
Outlay<br />
(Rs. in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Physical Financial<br />
1 2 3 4 5<br />
8 GOVERNMENT ELEMENTARY (PMGY) -<br />
TOTAL of PMGY 500.00 -<br />
TOTAL OF ELEMENTARY EDUCATION 8865.00 4514.50<br />
II. SECONDARY EDUCATION<br />
9<br />
A<br />
DISTRICT INSTITUTE OF EDUCATION &<br />
TRAINING<br />
Maintenance of existing Post 9 20.00<br />
B Office Expenses LS 0.50<br />
C Traveling Expenses LS 1.00<br />
D Minor Works<br />
Restructuring of DIET Building<br />
Scholarship/Stipend/Book Grant for DIET<br />
LS 0.50<br />
E Trainees LS 10.00<br />
TOTAL OF DIET 85.00 32.00<br />
10 SCHOLARSHIP<br />
A Other Charges<br />
1. Merit Scholarship :<br />
(a) Middle School @ Rs 100/- pm 717 8.60<br />
(b) High School @ Rs 150/- pm 500 9.00<br />
2. Special Scholarship:<br />
(a) Middle School @ Rs 60/- pm 2750 19.80<br />
(b) High School @ Rs 80/- pm 2300 22.08<br />
3. Hostel Stipend @ Rs 1000/-p.a 202 2.02<br />
4. Sainik School Imphal 28 13.00<br />
5. Annual token Grant to Banasthali 20 1.00<br />
6. Armed Force Children LS 2.50<br />
7. RIMC Dehradun LS 1.00<br />
8. National Talent Search 200 1.00<br />
TOTAL OF SCHOLARSHIP 343.70 80.00
Sl.<br />
No.<br />
- 331 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
Outlay<br />
(Rs. in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Physical Financial<br />
1 2 3 4 5<br />
11 S.C.E.R.T.<br />
A Maintenance of existing staff 28 50.00<br />
B Office expenses LS 3.00<br />
C Travelling expenses Ls 1.50<br />
D Publication LS 1.00<br />
E Award of stipend/Scholarship 5 -<br />
F Rents 1 0.40<br />
G Prof. Charges LS 0.10<br />
H Other Charges<br />
1) For Implemenation of Ed. Technology<br />
Programme (ICT) 2.50<br />
2) For Organising of Key Resources person<br />
training and revision of SBEC under ECE 2.00<br />
3) For conducting of Training & Career Conf.<br />
under Edn. & Voc. Guidance 2.00<br />
4) For implementation prog. of Minimum Level<br />
of Learning (MLL) 1.00<br />
5) For purchase of Library Books 1.00<br />
6) For training of Primary Schools under CCE 1.00<br />
7) For conducting of NTR exam 1.00<br />
8) Matching share of ICT 6.00<br />
9) Black topping of SCERT Complex 0.50<br />
10) Forr implementation of EOSE programme 0.70<br />
11) For organisation of AIEP<br />
training/programme 0.50<br />
12) For Teachers Training under Cambridge 350.00<br />
TOTAL OF SCERT 580.00 424.20<br />
12 SCIENCE PROMOTION :<br />
A Maintenance of existing staff 13 20.00<br />
B Office Expenses LS 1.00<br />
C Travelling expenses LS 0.80<br />
D Awrad/scholarship 300 stds 2.00<br />
E Other Charges<br />
1) For organisation of Science Seminar 1.50<br />
2) Workshop/Training of Teachers upto HSS<br />
level 5.00<br />
3) Science Fair 1.50<br />
Supply of Sc. Equipments to Schools 4.50<br />
TOTAL OF SCIENCE PROMOTION 299.50 36.30
Sl.<br />
No.<br />
- 332 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
Outlay<br />
(Rs. in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Physical Financial<br />
1 2 3 4 5<br />
13 GOVT. HIGH SCHOOL<br />
A 1) Maintenance of existing staff 459 795.00<br />
2) Salary of Officiating/Subtitute Teachers LS 5.00<br />
B Wages 20 15.00<br />
C Office Expense LS 15.00<br />
D Travelling Expense<br />
Minor Works for Reconstruction of DEO's<br />
LS 5.00<br />
E Offices, Repair of School Buildings etc. LS 50.00<br />
TOTAL OF GOVT HIGH SCHOOL 1501.00 885.00<br />
14 NON-GOVT. HIGH SCHOOL<br />
A Grant-in-aid for<br />
1) Maintenance of existing staff 185<br />
132<br />
285.00<br />
2) G.I.A for Govt. Aided H/S<br />
Schools 160.00<br />
3) Matching contribution of CPF LS 1.00<br />
4) DCRG LS 4.00<br />
TOTAL OF NON-GOVT HIGH SCHOOL 3158.00 450.00<br />
15 GOVT. HIGHER SECONDARY SCHOOL :<br />
A 1) Maintenance of existing staff 274 367.00<br />
2) Leave/Training officiating salary LS 4.00<br />
3) Salary of PGT Teacher on fixed pay LS 3.00<br />
4) Opening of Science Streams in HSS LS 46.00<br />
B Office Expense LS 15.00<br />
C Travelling expense<br />
Minor Works - Repair/Rennovation and<br />
LS 5.00<br />
D Extension of H.S.S LS 30.00<br />
E Other Charges<br />
TOTAL OF GOVT. HIGHER SECONDARY<br />
LS 0.50<br />
SCHOOL 1668.80 470.50<br />
16 NON-GOVT. HIGHER SECONDARY SCHOOL<br />
A Grant-in-aid for:<br />
1) Maintenance of existing staff 134<br />
15<br />
252.80<br />
2) G.I.A for Govt. Aided H.S.S<br />
Schools 21.00<br />
3) Contribution of CPF LS 1.00<br />
4) DCRG<br />
TOTAL OF NON-GOVT. HIGHER SECONDARY<br />
LS 3.00<br />
SCHOOL 1009.00 277.80
Sl.<br />
No.<br />
- 333 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
Outlay<br />
(Rs. in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Physical Financial<br />
1 2 3 4 5<br />
17 Voctionalisation of Secondary Education<br />
A Salary<br />
Grant-in-aid for matching contribution of VSE<br />
28 50.00<br />
B (CSS) staff LS 10.00<br />
Total of Vocationalisation of Sec. Education 60.00<br />
TOTAL OF SECONDARY EDUCATION 8645.00 2715.80<br />
III. ADULT EDUCATION<br />
18 DIRECTION & ADMINISTRATION<br />
A Maintenance of existing staff 1 0.20<br />
B Wages LS 0.10<br />
B Office expense LS 2.50<br />
C Publication of Meichher 12 issues 6.00<br />
D Matching Contrtibution of Continuing Education LS 59.40<br />
E Other charges<br />
1) EOTOS 3000 4.50<br />
2) Incentive award LS 0.50<br />
3) Teaching Learning Materials LS 1.00<br />
4) Celebration of ILD LS 1.50<br />
5) VAEC Contingency LS 0.50<br />
TOTAL OF DIRECTION & ADMN 152.50 76.20<br />
TOTAL OF ADULT EDUCATION 152.50 76.20<br />
IV. LANGUAGE DEVELOPMENT<br />
19 Propagation of Hindi<br />
A Maintenance of existing staff 67 125.00<br />
TOTAL OF PROMOTION OF MIL 390.00 125.00<br />
20 SPECIAL HINDI SCHOOL (MICE)<br />
A Salary 14 22.00<br />
B Office Expenses LS 0.50<br />
C Trevelling Expenses LS 0.10<br />
D Advertisement LS -<br />
E Minor Works: -<br />
Repair of School Buildings LS -<br />
F Machinery & Equipment LS -<br />
G Other Charges LS 0.20<br />
100.00 22.80<br />
TOTAL OF LANGUAGE DEVELOPMENT 490.00 147.80
Sl.<br />
No.<br />
- 334 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
Outlay<br />
(Rs in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Physical Financial<br />
1 2 3 4 5<br />
V. GENERAL<br />
21 DIRECTION & ADMINISTRATION<br />
A 1) Maintenance of existing staff 6 12.00<br />
B Wages 10 5.00<br />
C Medical Treatment 5.00<br />
B Office expenses LS 25.00<br />
C Travelling expenses<br />
Maintenance/ Re-painting of Office Buildings<br />
Ls 2.00<br />
D etc. LS 5.00<br />
E Other Charges<br />
1) Award to Teachers LS 1.40<br />
2) Advertisement LS 3.00<br />
2) Hospitality of State Guest etc. LS 2.50<br />
TOTAL OF 447.00 60.90<br />
22 STATISTICAL & EDUCATIONAL SURVEY<br />
A Maintenance of existing staff 9 18.00<br />
B Medical Treatment 2.80<br />
C Office expenses LS 5.00<br />
D Other Charges<br />
Implementation of IT, purchase of Computer &<br />
pheripherals etc.. LS 10.00<br />
TOTAL OF STATISTICAL & EDUCATIONAL<br />
SURVEY 115.00 35.80<br />
23 MIZORAM BOARD OF SCHOOL EDUCATION<br />
A Grant-in-aid for<br />
1) Salary of Staff 5 13.00<br />
2) Travelling expenses LS 2.00<br />
3) Repair & renovation LS 1.00<br />
4) Workshop /Seminar LS 4.50<br />
5) Contribution to Pension Fund LS 4.00<br />
6) DCRG LS 6.00<br />
7) Other charges/OE LS 6.00<br />
8) Medical Reimbursment LS 1.50<br />
9) Purchase of Computer with Installation of<br />
Computer network 2.00<br />
9) Purchase of Vehicle -<br />
TOTAL OF MIZORAM BOARD OF SCHOOL<br />
EDUCATION 226.00 40.00
Sl.<br />
No.<br />
- 335 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Name of Scheme<br />
Tenth<br />
Plan<br />
Agreed<br />
Outlay<br />
(Rs. in lakh)<br />
Annual Plan<br />
<strong>2006</strong>-07<br />
Physical Financial<br />
1 2 3 4 5<br />
24 PHYSICAL EDUCATION<br />
A Maintenance of existing staff 5 9.00<br />
B Medical treatment 2.00<br />
B Office expense LS 3.00<br />
C Travelling expense LS 1.00<br />
D Material Supply LS 5.00<br />
E Scholarship/Stipend - -<br />
F Other Charges<br />
Organisation of School Sports<br />
i) Organisation of Zonal Sport<br />
1) Primary School Zonal Sports<br />
185<br />
zones<br />
123<br />
5.55<br />
2) Middle School Zonal Sport<br />
zones 4.92<br />
3) District Sport for H.S<br />
<strong>Mizoram</strong> School Games Group A (High School<br />
8 District 3.50<br />
ii) Section)<br />
<strong>Mizoram</strong> School Games Group B (Higher Sec.<br />
LS 10.00<br />
iii) School Section) LS 9.00<br />
iv) Orientation of Training LS 2.00<br />
iv) National School Games LS 5.03<br />
TOTAL of PHYSICAL EDUCATION 442.50 60.00<br />
TOTAL OF GENERAL 788.00 196.70<br />
TOTAL OF SCHOOL EDUCATION 19383.00 7651.00
- 341 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HIGHER & TECHNICAL EDUCATION<br />
INDEX<br />
2202 – General Education / 03 – University & Higher Education<br />
Scheme Name of Schemes<br />
Annual Plan <strong>2006</strong> - <strong>2007</strong><br />
Revenue Capital Total<br />
(Rs. in lakh)<br />
Remarks<br />
1 2 3 4 5 6<br />
I Direction & Administration 18.40 18.40<br />
II Govt. Colleges 163.00 163.00<br />
III C.T.E. 15.10 15.10<br />
IV Collegiate Hostel 19.50 19.50<br />
V Asst. to Non-Govt. College 1,017.85 1,017.85<br />
VI Residential Science College 75.30 75.30<br />
VII MSB 12.00 12.00<br />
05 – Language Development<br />
VIII Miz. Hindi Trg. College 31.85 31.85<br />
Total of 2202 - Gen. Edn. 1,353.00 - 1,353.00<br />
2203 – Technical Education<br />
A Direction & Admn. 20.50 20.50<br />
B M.S.C.T.E. 4.00 4.00<br />
C M.P.L. 66.50 66.50<br />
D W.P.(A) 89.00 89.00<br />
Total of 2203 - Tech. Edn.<br />
(Plan)<br />
180.00 - 180.00
- 342 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-07 : HIGHER & TECHNICAL EDUCATION<br />
Scheme – I: Direction and Administration<br />
1. Maintenance of existing Post:<br />
Sl.<br />
No.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Salary 1 1.50<br />
2. Establishment of Engineering Cell: The Department is badly in need of<br />
Technical hands to look after the existing buildings which are departmentally<br />
constructed and maintained and also for execution of work under Non-<br />
Lapsable Pool fund, CSS, etc. The existing post of Junior Engineer may be<br />
upgraded to the post of one Asstt. Engineer and, therefore, an Asstt. Engineer<br />
may be deputed to this Department during <strong>2006</strong>-07. For maintenance of the<br />
deputed Asst. Engineer, a provision of Rs. 0.10 lakh during the Annual Plan<br />
<strong>2006</strong>-07 is approved.<br />
3. Establishment of Statistical Cell: It is essential to collect and maintain the<br />
Statistical Data of the Department which is required by Govt. of India for the<br />
purpose of framing Plans and Programmes through Ministry of Human<br />
Resources Development. to prepare precise, concrete, factual and latest data,<br />
the existing one Inspector of Statistics is far from adequate, the post of<br />
Research Officer, sub-Inspector of Statistic and IV Grade are proposed to be<br />
created to which Research Officer and Sub-Inspector of Statistic may be<br />
deputed to this Department during the Annual Plan <strong>2006</strong>-07.<br />
Sl.<br />
No.<br />
Particulars<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
a] Research Officer [ 8000 – 13500] 1 0.10<br />
b] Sub-Inspector of Statistic [5000 – 8000] 1<br />
c] IV Grade [ 2650 – 4000] 1<br />
Sub-Total 0.10<br />
4. Medical Treatment LS 0.30<br />
5. Wages LS 0.50<br />
6. Office expenses LS 6.00<br />
7. Travelling expenses LS 0.20<br />
8. Maintenance/Minor works LS 1.00<br />
9. Advertisement LS 0.70<br />
10. Refresher Course/ Seminar/ O.C., etc. LS 6.00<br />
11. Motor vehicle LS 2.00<br />
TOTAL OF DIRECTION & ADMINISTRATION 18.40
Scheme – II: Government Colleges<br />
1. Maintenance of existing Post:<br />
- 343 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
Salary 82 117.70<br />
2. Guest Lecturers: Since the Government has banned appointment of<br />
substitute teachers against those teachers who were on study leave/<br />
maternity leave etc. and as per UGC Norms it is extremely essential to engage<br />
Lecturers on Contract basis @ Rs. 8000/- PM. And also when new subjects are<br />
introduced engagement of Contract Lecturers for a considerable period of<br />
time is required before regular Lecturers are appointed and a token provision<br />
is earmarked.<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Particulars<br />
Physical Financial<br />
a) Lecturer on contract basis 127 0.10<br />
3. Provincialisation of Deficit College: During <strong>2006</strong>-07, 12(twelve) Colleges<br />
are proposed to provincialise. A token provision of Rs. 0.20 lakh is<br />
earmarked for provincialisation of 12(twelve) Deficit Colleges during <strong>2006</strong>-07.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
i) Recurring expenditure LS 0.10<br />
ii) Non-recurring expenditure LS 0.10<br />
Sub-total 0.20<br />
4. Opening of Geology Subject: <strong>Mizoram</strong> University has started P.G. Course in<br />
Geology Subjects since 2002 - 2003. The No. of Students in P.G. Deptt. at MZU<br />
is less than intake capacity due to the degree level course is only in<br />
P.U.College. Introduction of Geology at degree level in Science College will<br />
help the youths in investigating and exploring our natural resources which<br />
will enhance the economic growth of the State. Further the P.G. Course<br />
available at MZU may be utilised for higher studies. It is, therefore, proposed<br />
new course viz. Geology may be introduced at Govt. Colleges where Science<br />
subjects are introduced.<br />
5. Medical Treatment LS 8.00<br />
6. Minor works LS 5.00<br />
7. O.E. LS 8.00<br />
8. T.E. LS 4.00<br />
9. Advertisement LS 1.00<br />
10. M.V. LS 5.00<br />
11. O.C. (includes incentive for Accredited Colleges) LS 14.00<br />
Total of Government Colleges 163.00
Scheme – III: College of Teacher Education<br />
Sl.<br />
No.<br />
- 344 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Salary 4 9.00<br />
2 Medical Treatment LS 1.50<br />
3 T.E. LS 0.30<br />
4 O.E. LS 2.00<br />
5 Advertisement LS 0.30<br />
6 O.C. LS 2.00<br />
Total of CTE 15.10<br />
Scheme – IV: Hostel for Post Matric Students<br />
Sl.<br />
No.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Wages LS 5.50<br />
2 Rent 4 9.00<br />
3 Other Charges LS 3.00<br />
4 Maintenance / Minor Works LS 2.00<br />
Total of Hostel 19.50<br />
Scheme – V: Assistance to Non-Govt. Colleges<br />
Grants-in-aid for Maintenance of existing posts in Deficit Colleges<br />
1. Maintenance of existing posts:<br />
Sl.<br />
No.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Salary 412 917.65<br />
2. Guest Lecturer: Since the Government has banned appointment of substitute<br />
teachers against those teachers who were on study leave/ Maternity leave<br />
etc., it is extremely essential to engage Guest Lecturers when classes are in<br />
full swing. And also for fulfillment of UGC Norms engagement of Lecturers<br />
on contract basis for a considerable period of time is required before regular<br />
Lecturers are appointed, a provision of Rs. 67.20 lakh is earmarked during<br />
<strong>2006</strong> - <strong>2007</strong> for 70 nos. of Lecturers on contract basis @ Rs. 8000/- pm.<br />
3. Matching contribution of CPF LS 10.00<br />
4. Gratuity/ pension fund etc. LS 1.00<br />
5.<br />
Non-recurring grants for existing Deficit Colleges<br />
and Private Colleges<br />
LS 2.00<br />
6.<br />
Grants-in-aid to Law College, upgradation to<br />
Deficit Status etc.<br />
LS 20.00<br />
Total of Assistance to Non-Govt. Colleges 1,017.85
- 345 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Scheme – VI: Zirtiri Residential Science College<br />
Sl.<br />
No.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Salary 23 57.90<br />
2 Medical Treatment LS 4.00<br />
3 T.E. LS 0.80<br />
4 O.E. LS 3.00<br />
5 Advertisement LS 0.50<br />
6 Material & Supply LS 1.00<br />
7 M.V. LS 1.00<br />
8 O.C. LS 3.00<br />
9 Minor Works LS 4.00<br />
10<br />
Creation of new post for Lecturers in BCA<br />
& B.Sc. Computer Science<br />
4 0.10<br />
Total of ZRSC 75.30<br />
Scheme – VII: <strong>Mizoram</strong> Scholarship Board<br />
Sl.<br />
No.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 O.E. LS 1.50<br />
2 Advertisement LS 0.50<br />
3 Stipend / Scholarship LS 7.00<br />
4 O.C. LS 3.00<br />
Total of <strong>Mizoram</strong> Scholarship Board 12.00<br />
Scheme – VIII: Language Development<br />
<strong>Mizoram</strong> Hindi Training College: (Rs. in lakh)<br />
Sl.<br />
No.<br />
Particulars<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Salary 7 15.50<br />
2 Medical Treatment LS 2.00<br />
3 Wages LS 0.85<br />
4 Office Expenses LS 2.00<br />
5 Travelling Expenses LS 0.50<br />
6 Other Charges LS 2.00<br />
7 Stipend / Book Grant LS 9.00<br />
Total of <strong>Mizoram</strong> Hindi Training College 31.85<br />
GRAND TOTAL OF 2202 – HIGHER<br />
EDUCATION (<strong>PLAN</strong>)<br />
1,353.00
Scheme – A: Direction & Administration<br />
Sl.<br />
No.<br />
- 346 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2203 – Technical Education<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Salary 1 4.00<br />
2 Medical Treatment LS 0.50<br />
3 Wages LS 2.00<br />
4 Travelling Expenses LS 1.00<br />
5 Office Expenses LS 3.00<br />
6 Advertisement LS 2.00<br />
7 Scho. to NERIST/ Stipend LS 5.00<br />
8<br />
Misc. expenditure for IT Development /<br />
O.C.<br />
LS 3.00<br />
Total of Direction & Administration 20.50<br />
Scheme – B: <strong>Mizoram</strong> State Council for Technical Education<br />
Sl.<br />
No.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Travelling Expenses LS -<br />
2 Office Expenses LS 2.00<br />
3 Advertisement LS 1.00<br />
4 Other Charges LS 1.00<br />
Total of MSCTE 4.00<br />
Scheme – C: <strong>Mizoram</strong> Polytechnic, Lunglei<br />
Sl.<br />
No.<br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 Salary 14 21.00<br />
2 Medical Treatment LS 2.00<br />
3 Travelling Expenses LS 0.50<br />
4 Office Expenses LS 0.50<br />
5 Scholarship/ Stipend/ Book grant LS 42.00<br />
6 Materials & Supply<br />
7 Other Charges LS 0.50<br />
8 Maint/ Minor Works<br />
Total of <strong>Mizoram</strong> Polytechnic 66.50
Scheme – D: Women Polytechnic, Aizawl<br />
Sl.<br />
No.<br />
- 347 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Particulars<br />
(Rs. in lakh)<br />
Annual Plan <strong>2006</strong> - 07<br />
Physical Financial<br />
1 a) Salary 25 34.30<br />
b) Engagement of Lecturer on contract<br />
basis @ Rs. 8000/- pm<br />
10 9.60<br />
c) Lab. Technician on contract basis @<br />
Rs.5000/- pm<br />
6 3.60<br />
2 Medical Treatment LS 3.00<br />
3 Wages LS 0.70<br />
4 Travelling Expenses LS 0.50<br />
5 Office Expenses LS 1.96<br />
6 Advertisement<br />
7 Machinery & Equipment<br />
8 Purchase of Library Books/ M & S<br />
9 M.V.<br />
10 Scholarship/ Stipend/Book grants LS 33.74<br />
11 Other Charges LS 1.60<br />
Total of Women Polytechnic 89.00<br />
GRAND TOTAL OF TECHNICAL<br />
EDUCATION (<strong>PLAN</strong>)<br />
180.00
- 351 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SPORTS & YOUTH SERVICES<br />
The Department of Sports & Youth Services, <strong>Mizoram</strong> was established and bifurcated<br />
from Education Department on 8 th December, 1986 into a full-fledged Department with the<br />
sole purpose of promoting Sports of different disciplines and youth activities including<br />
Adventure Sports, Scouts & Guides, National Cadet Corp and National Service Scheme<br />
amongst the youths in <strong>Mizoram</strong>.<br />
Besides promotional of various Sports disciplines and other Youth activities<br />
programmes, construction of Sports infrastructures like Indoor Stadia, Open Stadia,<br />
Playground at city and towns is an important feature of the Department programme.<br />
Inspite of limited Officers and Ministerial staff as well as a handful of Coaches and<br />
other Field Staff of the Department, the Department within a short span of two decades,<br />
achieved a commendable records. The name <strong>Mizoram</strong> has been brought to the Notice of the<br />
Sports arena not only at the National Level but also at the International Level.<br />
The Department proposed to upgrade the existing Schemes and new establishment<br />
of NCC Units/Company and District Administrations - District Sports & Youth Offices,<br />
Kolasib and Champhai.<br />
The Scheme-wise financial break-up of the proposed Outlay are given below.<br />
(A) DIRECTION: The approved outlay under the direction in item-wise expenditure is as<br />
enumerated under: -<br />
1) Salaries - Rs. 8.00 lakh<br />
2) Wages - Rs. 10.00 lakh<br />
3) Medical Treatment - Rs. 2.60 lakh<br />
4) Foreign Travel Expenses - Rs. 1.50 lakh<br />
5) Domestic Travel expenses - Rs. 1.50 lakh<br />
6) Office expenses - Rs. 3.00 lakh<br />
7) Rents, Rates, Taxes - Rs. 0.90 lakh<br />
8) Supplies & Materials/Office Equipments - Rs. 8.00 lakh<br />
9) Advertising & Publicity - Rs. 1.50 lakh<br />
10) Minor Works/Maintenance - Rs. 3.00 lakh<br />
11) Other Charges/Trg./Participation Meeting/ - Rs. 10.00 lakh<br />
Conference, etc.<br />
TOTAL : - Rs. 70.00 lakh<br />
(B) DISTRICT ADMINISTRATION: There are 3 (three) District Offices under Sports &<br />
Youth Services Department at present (i) District Sports & Youth Office,Lunglei (ii) District<br />
Sports & Youth Office, Kolasib and (iii) District Sports & Youth Office Champhai.<br />
(1) District Sports & Youth Office, Lunglei:<br />
a) Salaries - Rs. 15.00 lakh<br />
b) Medical treatment - Rs. 1.00 lakh<br />
c) Domestic Travel Expenses - Rs. 1.00 lakh<br />
d) Office Expenses - Rs. 4.00 lakh<br />
e) Supplies and materials - Rs. 3.00 lakh<br />
f) Advertising and Publicity - Rs. 1.00 lakh<br />
g) Minor works - Rs. 4.00 lakh
- 352 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
h) Other Charges/Participations/coaching etc. - Rs. 6.00 lakh<br />
for implementation of the following Programmes :-<br />
i) Residential Athletic Coaching at Lunglei,<br />
Saiha and Lawngtlai - Rs. 0.90 lakh<br />
ii) Conduct of Rersidential Boxing Coaching<br />
at Lunglei, Saiha and Lawngtlai -Rs.0.90 lakh/-<br />
iii) Inter-District Football Tournament at Lawngtlai - Rs. 1.00 lakh<br />
iv) Orgn. of Inter-District Boxing Championship<br />
at Lunglei - Rs. 0.80 lakh<br />
v) Conduct of Basic Course for S & G and<br />
Refresher Course at Lunglei - Rs. 0.40 lakh<br />
vi) Conduct of Non-Residential Coaching of<br />
Table Tennis and organisation of Tournament - Rs. 0.40 lakh<br />
vii) Residential Coaching in Volleyball at Lunglei - Rs. 0.50 lakh<br />
viii) Orgn. of volleyball tournamenr (Men & Women)<br />
at Lunglei - Rs. 0.40 lakh<br />
ix) Orgn. of residential women Hockey coaching<br />
and conduct of Inter-District women Hockey<br />
championship at Lunglei - Rs. 0.70 lakh<br />
TOTAL - Rs. 35.00 lakh<br />
(2) District Sports & Youth Office, Kolasib:<br />
Since the District Sports & Youth Office, Kolasib is opened, the ministerial staff have<br />
not been filled up and posted to this District till date the requirement of fund have been<br />
approved for filling the vacant posts for promotion of Sports .<br />
The proposed expenditure is as below :<br />
(a) Salaries - Rs. 3.20 lakh<br />
(b) Wages - Rs. 1.00 lakh<br />
(c) Office expenses - Rs. 1.00 lakh<br />
(d) Rents, Rates, Taxes - Rs. 0.80 lakh<br />
(e) Supplies & materials - Rs. 1.50 lakh<br />
(f) Other charges/Participations/Tournaments/ - Rs. 2.50 lakh<br />
Coaching etc. for implementation of the<br />
following programmes :-<br />
i) Independence Day Tournament for Football/<br />
Volleyball/Tug of War at Kolasib - Rs. 0.55 lakh<br />
ii) Republic Day Celebration Tournament<br />
for Football/Basketball/Badmenton and<br />
Hockey at Kolasib - Rs. 0.55 lakh<br />
iii) Non-Residential Coaching in Hockey/<br />
Football/Volleyball/Badminton at Kolasib - Rs. 0.50 lakh<br />
iv) District Adventure Programme at Kolasib - Rs. 0.40 lakh<br />
v) Scouts & Guides Trg. Programme at Kolasib - Rs. 0.50 lakh<br />
TOTAL : - Rs. 10.00 lakh<br />
(3) District Sports & Youth Office, Champhai:<br />
Since the Government created this District Office, the posts for this District Office<br />
has not been created till date due to ban on creation under the State Government of<br />
<strong>Mizoram</strong>. It is proposed to establish to function in full-fledged District Office. The<br />
requirement of fund has to be incorporated in the Plan Scheme for <strong>2006</strong>-07.
- 353 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The approved expenditure in as below :<br />
(a) Wages - Rs. 1.50 lakh<br />
(b) Office expenses - Rs. 1.50 lakh<br />
(c) Rents, Rates, Taxes - Rs. 0.80 lakh<br />
(d) Supplies & materials - Rs. 0.60 lakh<br />
(e) Other Charges/Participation/Tournaments/ - Rs. 2.60 lakh<br />
Coaching, etc. for the following Programmes :-<br />
i) Conduct of Independence Day Tournament<br />
at Champhai in Aug, 06 - Rs. 0.40 lakh<br />
ii) Conduct of Republic Day Tournament<br />
at Champhai during January, 07 - Rs. 0.40 lakh<br />
iii) Conduct of various Adventure Programmes<br />
at Champhai - Rs. 0.60 lakh<br />
iv) Conduct of various Scouts 7 Guides Trg.<br />
Programmes at Champhai - Rs. 0.60 lakh<br />
v) Conduct of coaching for various Sports<br />
disciplines at Champhai - Rs. 0.60 lakh<br />
TOTAL : - Rs. 7.00 lakh<br />
(C) N.C.C.:<br />
Besides the existing NCC Units/Company (i.e. 20-MZ Indep Coy NCC and 1-MZ Bn.<br />
NCC/ Girl Cadet Coy), the High Level NCC Meeting held recently in New Delhi on 15.09.2005,<br />
the <strong>Mizoram</strong> State is advised to establish the two other Unit, Air Squadron NCC and Navy<br />
Wing NCC. Hence, the Department of Sports & Youth Services, <strong>Mizoram</strong> proposed to<br />
establish Air Squadron & Navy Wing of NCC during <strong>2006</strong>-07.<br />
The approved outlay in Scheme-wise are enumerated as below :-<br />
(1) 20- <strong>Mizoram</strong> NCC Indep Coy. :<br />
(a) Salaries - Rs. 4.00 lakh<br />
(b) Wages - Rs. 0.50 lakh<br />
(c) Medical Treatment - Rs. 0.50 lakh<br />
(d) Domestic Travel Expenses - Rs. 0.80 lakh<br />
(e) Office Expenses - Rs. 1.00 lakh<br />
(f) Supplies & materials - Rs. 0.50 lakh<br />
(g) Maintenance - Rs. 3.00 lakh<br />
(h) Coaching / Participation Training Camps etc. - Rs. 5.70 lakh<br />
for the following Targets of the programmes :-<br />
i) Nationation Integration Camp - Rs. 0.50 lakh<br />
ii) Basic Leadership Camp - Rs. 0.28 lakh<br />
iii) Advance Leadership Camp - Rs. 0.27 lakh<br />
iv) Indian Military Academy - Rs. 0.30 lakh<br />
v) Advance Course - Rs. 0.10 lakh<br />
vi) Pre-Republic Day Camps-I - III ; (20 Cadets) - Rs. 1.20 lakh<br />
vii) Pre-Republic Day Camp 5 Cadets - Rs. 1.50 lakh<br />
viii) Pre-Thal Sainik Camp (Boys) - Rs. 0.10 lakh<br />
ix) Pre-Thal Sainik Camp (Girls) - Rs. 0.10 lakh<br />
x) Thal Sainik Camp at Delhi - Rs. 0.25 lakh<br />
xi) Army atttachment - Rs. 0.28 lakh<br />
xii) Rock Climbing Training - Rs. 0.10 lakh<br />
xiii) Trekking - Rs. 0.15 lakh<br />
xiv) Mountainering - Rs. 0.10 lakh<br />
xv) Spl. Nation Integn. Camp. - Rs. 0.20 lakh<br />
x) Pre-Commission Course for caretaker - Rs. 0.27 lakh<br />
Total :- - Rs. 16.00 lakh
- 354 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(2) 1 <strong>Mizoram</strong> NCC Bn.<br />
(a) Wages - Rs. 3.80 lakh<br />
(b) Domestic Travel Expenses - Rs. 1.00 lakh<br />
(c) Office Expenses - Rs. 3.00 lakh<br />
(d) Rent - Rs. 2.50 lakh<br />
(e) Supplies & Materials - Rs. 1.00 lakh<br />
(f) Training, Participations/Other charges, etc. - Rs. 5.50 lakh<br />
for the following Programmes :-<br />
i) Nationation Integration Camp - Rs. 0.50 lakh<br />
ii) Basic Leadership Camp - Rs. 0.28 lakh<br />
iii) Advance Leadership Camp - Rs. 0.27 lakh<br />
iv) Indian Military Academy - Rs. 0.30 lakh<br />
v) Advance Course - Rs. 0.10 lakh<br />
vi) Pre-Republic Day Camps-I - III ; - Rs. 1.20 lakh<br />
( 20 Cadets ).<br />
vii) Pre-Republic Day Camp 5 Cadets - Rs. 1.50 lakh<br />
viii) Pre-Thal Sainik Camp (Boys) - Rs. 0.10 lakh<br />
ix) Pre-Thal Sainik Camp (Girls) - Rs. 0.10 lakh<br />
x) Thal Sainik Camp at Delhi - Rs. 0.25 lakh<br />
xi) Army atttachment - Rs. 0.28 lakh<br />
xii) Rock Climbing Training - Rs. 0.10 lakh<br />
xiii) Trekking - Rs. 0.15 lakh<br />
xiv) Mountainering - Rs. 0.17 lakh<br />
xv) Spl. Nation Integn. Camp. - Rs. 0.20 lakh<br />
TOTAL - Rs. 16.80 lakh<br />
(3) NCC Girls Cadet Coy. :<br />
(a) Office expenses - Rs. 0.05 lakh<br />
(b) Training/participations etc. - Rs. 0.05 lakh<br />
TOTAL : - Rs. 0.10 lakh<br />
(4) NCC Air Wing :<br />
(a) Office Expenses - Rs. 2.00 lakh<br />
(b) Training/Participation/Other Charges - Rs. 3.00 lakh<br />
TOTAL :- - Rs. 5.00 lakh<br />
(5) NCC Navy Wing :<br />
(a) Office Expenses: - Rs. 0.05 lakh<br />
(b) Training/Participation/Other charges - Rs. 0.05 lakh<br />
TOTAL - Rs. 0.10 lakh<br />
(D) SCOUTS & GUIDES:<br />
The Scouts & Guides movement in the State of <strong>Mizoram</strong> is run by the Department of<br />
Sports & Youth Services. During <strong>2006</strong>-07, the Department proposed conduct of various<br />
Training Camps and Courses and participations at the National/International Programmes.<br />
The approved outlay in item-wise expenditure are as below :<br />
(a) Salaries - Rs. 1.50 lakh<br />
(b) Wages - Rs. 1.00 lakh<br />
(c) Medical Treatment - Rs. 0.30 lakh<br />
(d) Domestic Travel expenses - Rs. 1.00 lakh<br />
(e) Office expenses - Rs. 3.00 lakh<br />
(f) Supplies & Materials - Rs. 2.00 lakh
- 355 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(g) Advertising & Publicity - Rs. 1.00 lakh<br />
(h) Other Charges/Diffirent Scouts Programmes :<br />
i) Conducting Basic Course for Scouters & Guiders - Rs. 0.80 lakh<br />
ii) Conducting Advanced Course for Scouters - Rs. 1.00 lakh<br />
& Guiders<br />
iii) Conducting Refresher Course for Unit Leaders - Rs. 0.80 lakh<br />
in districts<br />
iv) Organising State Rally - Rs. 2.30 lakh<br />
v) Organising Cub & Bulbul utsav in 8 district - Rs. 0.80 lakh<br />
vi) Conducting Advancement Courses for Scouts - Rs. 1.70 lakh<br />
& Guides, Rovers & Rangers Cubs & Bulbuls<br />
vii) Day, Earth Day, Cleanliness etc. - Rs. 1.10 lakh<br />
viii) Conducting competition for Rovers & Rangers, - Rs. 0.20 lakh<br />
Scouts & Guides, Cubs & Bulbuls<br />
ix) Development of State Training Centre,Tanhril - Rs. 3.00 lakh<br />
x) 5 th N.E. Mini Jamboree - Rs. 0.50 lakh<br />
xi) Participation in Youth Forum Patrol Leader - Rs. 0.50 lakh<br />
Jamboree Youth Leader Course, Adven. prog.<br />
xii) Participation in Sangam for Rovers & Rangers - Rs. 0.50 lakh<br />
Participation in Cub & Bulbul utsav (National) - Rs. 0.50 lakh<br />
TOTAL : - Rs. 25.00 lakh<br />
(E) YOUTH ADVENTURES:<br />
Promotion of all forms of Adventure activities in the State of <strong>Mizoram</strong> is the<br />
responsibility of Adventure Wing of Sports & Youth Services Department. The Adventure<br />
Wing of the Department proposed conducting Trekking, Watermanship, Mountaineering and<br />
Refresher Course etc. at Regional & National and International level.<br />
The approved outlay is as below :<br />
(a) Salaries - Rs. 8.05 lakh<br />
(b) Medical Treatment - Rs. 0.70 lakh<br />
(c) Domestic Travel Expenses - Rs. 1.00 lakh<br />
(d) Office Expenses - Rs. 2.00 lakh<br />
(e) Supplies and Materials - Rs. 2.30 lakh<br />
(f) Other Charges/Implementation of Adventure Programmes (Rs. 5.95 lakh) –<br />
Adventures Programmes:<br />
i) Basic Mountaineering course of HMI Darjeeling - Rs. 0.50 lakh<br />
ii) Advance Mountainering course at HMI Darjeeling - Rs. 0.50 lakh<br />
iii) Method of Instruction course at HMI Darjeeling - Rs. 0.15 lakh<br />
iv) Sports Climbing at Luangmual Sports Complex - Rs. 0.52 lakh<br />
v) Sending of competitors for N.E. Sports Climbing - Rs. 0.54 lakh<br />
Competition at Imphal, Manipur<br />
vi) Sending of participants for National Adventure Festival - Rs. 0.85 lakh<br />
at Chandigarh<br />
vii) Sending of participants for National Sports Climbing - Rs. 0.40 lakh<br />
competition at New Delhi<br />
viii) Rafting Expedition at River Chhimtuipui - Rs. 0.61 lakh<br />
ix) Sending of participants for National Adventure - Rs. 0.75 lakh<br />
Festival at Chandigarh<br />
x) 9 th Adventure Course at Hmuifang Trg. Centre - Rs. 0.78 lakh<br />
xi) 10 th Para Sailing Course at Multi-Trg. entre, Tuirial - Rs. 0.35 lakh<br />
Total - Rs. 20.00 lakh
- 356 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(F) NATIONAL SERVICE SCHEMES (NSS):<br />
The movement of NSS is based on the Central Grants-in-Aid Scheme under the<br />
Ministry of Youth Affairs & Sports, Govt.of India since so far in the College level of<br />
Educational Institutions co-ordinated by the Sports & Youth Services Department as a Nodal<br />
Department. The approved funding pattern of such Scheme is 75:25. The approved Estimate<br />
for <strong>2006</strong>-07 is Rs. 112.00 lakh, out of which the 70% Cenral Share is Rs. 84.00 lakh and 25%<br />
State Matching Share will be Rs. 28.00 lakh. The State Government requires to match the<br />
Central Grant on the basis of such approved funding pattern.<br />
Grants-in-Aid/Matching Share - Rs. 27.00 lakh<br />
(G) YOUTH WELFARE ACTIVITIES (GENERAL YOUTH):<br />
Youth Welfare activities basically covered all the activities of the programmes under<br />
Youth Hostel Assocition of India and general Youth programmes such as conduct of Blood<br />
Donation Camp, Tree Planting includes Seminar / Workshop and participation at various<br />
YHAI-National Trekking programmes like Himalayan Trekking, Desert Trekking and other<br />
National and International Programmes.<br />
(a) Office Expenses - Rs. 2.00 lakh<br />
(b) Supplies & Materials - Rs. 2.00 lakh<br />
(c) Maintenance of Youth Hostel, Luangmual, etc. - Rs. 5.00 lakh<br />
(d) Other Charges/Implementation of the following<br />
different YHAI National & State Programmes: -<br />
i) National Western Ghats & Goa Hill Trekking Expedition - Rs. 1.50 lakh<br />
ii) National or Inter-State Trekking Expeditions - Rs. 1.50 lakh<br />
iii) National Executive/Council Meeting, New Delhi, etc. - Rs. 1.00 lakh<br />
iv) Adventure Promotion Committee/Meetings - Rs. 1.50 lakh<br />
v) National Himalayan Trekking Expeditions - Rs. 1.50 lakh<br />
vi) Trekking Programme, Reiek - Rs. 1.00 lakh<br />
vii) National/State Trekking Expeditions - Rs. 1.50 lakh<br />
viii) Observance of YHAI State Tree Planting Prog. - Rs. 0.50 lakh<br />
ix) Observance/Celebration of Founder’s Day - Rs. 0.50 lakh<br />
x) Blood Donation Camp. - Rs. 0.50 lakh<br />
TOTAL : - Rs. 20.00 lakh<br />
(H) SPORTS & GAMES :<br />
(1) Sports & Games :<br />
The Coaching Wing of Sports & Youth Services Department is responsible for<br />
conduct of various Sports Coaching and participations at National Level, International Level<br />
Tournament. The <strong>Mizoram</strong> Team U-14, U-17 and NCC participated annually and won<br />
championship always.<br />
The approved outlay in Scheme-wise is as follows :-<br />
(a) Salaries - Rs. 15.00 lakh<br />
(b) Medical Treatment - Rs. 1.50 lakh<br />
(c) Domestic Travel Expenses - Rs. 1.50 lakh<br />
(d) Office expenses - Rs. 4.50 lakh<br />
(e) Supplies & Materials - Rs. 10.00 lakh<br />
(f) Scholarship/Stipend/ - Rs. 1.00 lakh<br />
(g) Other Charge/Conduct of Sports Tournaments/<br />
Coaching/Participation Programmes (Rs. 27.50 lakh):-<br />
i) Selection, Coaching k& pariticipation of Subroto Cup - Rs. 2.50 lakh<br />
Football U-17 at New Delhi.
- 357 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ii) Selection, Coaching & Participation of Subroto Cup - Rs. 2.50 lakh<br />
Football Tournament U-14, New Delhi.<br />
iii) Junior Nehru Hockey Tournament at New Delhi - Rs. 2.50 lakh<br />
(Girls) U-17.<br />
iv) Junior Nehru Hockey (Boys) at New Delhi (U-17) - Rs. 2.50 lakh<br />
v) Sub-Junior Nehru Hockey (Boys) U-14 at N.Delhi - Rs. 2.50 lakh<br />
vi) Selection, Coaching and participation in All India Rural - Rs. 2.00 lakh<br />
Sport Sports Meet (Group 1 - 3) Different Disciplines.<br />
vii) Selection, Coaching and participation in All India - Rs. 2.00 lakh<br />
Women Sports Ferstival (Group 1 - 3) Diff. Disciplines.<br />
viii) Coaching/Training in different Sports disciplines within - Rs. 2.00 lakh<br />
the State for development of Sports.<br />
ix) Incentive Cash Award/Sports Kit Allowances - Rs. 9.00 lakh<br />
TOTAL - Rs. 61.00 lakh<br />
(2) <strong>Mizoram</strong> State Sports Council :<br />
<strong>Mizoram</strong> State Sports Council is responsible for promotion of different disciplines<br />
through State Level Association and development of Sports Infrastructures in the State. It is<br />
also responsible for creation of Sports Infrastructure in the State. Less than the 50% of State<br />
Matching Share under Plan Fund was utilized during 2005-06 as per norms of the Govt. of<br />
India against their approved Schemes for construction of Sports Complex at Aizawl and<br />
other Districts, i.e, Mamit, Saiha, Lunglei, Champhai, Kolasib, Lawngtlai. The remaining<br />
balance of such State Matching Share is proposed for <strong>2006</strong>-07.<br />
The approved outlay in Scheme-wise is as follows :-<br />
(a) State Matching Share of CSS - Rs. 200.00 lakh<br />
(b) Promotional of Sport/Coaching/Participation etc. - Rs. 125.50 lakh<br />
(c) Payment of Liability of YMA Field on Court Order - Rs. 14.50 lakh<br />
(d) Maintenance of Sports Infrastructure including - Rs. 60.00 lakh<br />
Mini Hall at Bungkawn Damveng<br />
TOTAL : - Rs. 400.00 lakh<br />
(3) <strong>Mizoram</strong> Olympic Association :-<br />
(a) Establishment for <strong>Mizoram</strong> Olympic Association - Rs. 5.00 lakh<br />
(b) Assistance to different State Level Sports Assn. - Rs. 5.00 lakh<br />
(c) Organisation of <strong>Mizoram</strong> State Games (<strong>2006</strong>) - Rs. 5.00 lakh<br />
(d) Preliminary Selection State level (Dist. level) - Rs. 5.00 lakh<br />
Total - Rs. 20.00 lakh<br />
(4) State Hockey Academy, Thenzawl :<br />
The Department eastablished Women Residential Hockey Training Centre at<br />
Thenzawl in 2004. During 2004-05 <strong>Mizoram</strong> Women Hockey Team participated in the<br />
Eastern Zone Senior Women Hockey Championship and stood Runner-up. <strong>Mizoram</strong> Women<br />
Team now qualified for National Senior Women Hockey Championship and participated<br />
during 2005-06. This is the immediate result of the Women Residential Hockey Training at<br />
Thenzawl. The State Hockey Academy, Thenzawl may kindly be provided fund for <strong>2006</strong>-07.<br />
(a) Office Expenses - Rs. 2.00 lakh<br />
(b) Supplies & Materials - Rs. 4.00 lakh<br />
(c) Other Charges (Rs. 15.00 lakh) :-<br />
(i) Food for trainees - Rs. 9.00 lakh<br />
(ii) School fee for trainees - Rs. 1.00 lakh<br />
(iii) Uniform for trainees - Rs. 5.00 lakh<br />
TOTAL : - Rs. 22.00 lakh
- 358 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(5) State Sports Coaching Centre, Luangmual:<br />
(a) Office Expenses - Rs. 2.00 lakh<br />
(b) Other charges/Coaching/participation etc. - Rs. 8.00 lakh<br />
TOTAL - Rs. 10.00 lakh<br />
(6) Sports Museum:<br />
To boost up the morale of the Youth and to preserve their pictures, uniforms and<br />
their old sports gears, it is proposed to establish Sports Museum in the Department by<br />
hiring a private building at the initial stage.<br />
To start with a sum of Rs. 10.00 lakh is earmarked for the purpose.<br />
(a) Office Expenses - Rs. 3.00 lakh<br />
(b) Supplies & Materials/Equipments - Rs. 4.00 lakh<br />
(c) Other charges/Collection of old sports gears/ - Rs. 3.00 lakh<br />
photographs/Materials<br />
TOTAL - Rs. 10.00 lakh<br />
(7) Aizawl Sports Complex under 12 th Finance Commission:<br />
The 12 th Finance Commission provided Rs. 25.00 crore for construction of Aizawl<br />
Sports Complex (AR Ground) for the period from <strong>2006</strong>-07 to 2009-2010 in Rs. 6.25 crore<br />
each for four years. The High Level Monitoring Committee, <strong>Mizoram</strong> in its meeting the<br />
Department of Sports & Youth Services, <strong>Mizoram</strong> is entrusted the initiative and to utilise<br />
Rs.6.25 crore during <strong>2006</strong>-07 and to obtain the required amount for preparation of the<br />
Detailed Project Reports so as to enable to commence the construction works of Aizawl<br />
Sports Complex (A.R. Ground) from the financial year of <strong>2006</strong>-07.<br />
1) Major Works – Contruction of full-fledged - Rs. 625.00 lakh<br />
Sports Complex, Aizawl (Now A.R.Ground)<br />
TOTAL - Rs. 625.00 lakh<br />
GRAND TOTAL OF <strong>PLAN</strong> SCHEME - Rs.1400.00 lakh
- 364 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ART & CULTURE<br />
(ABSTRACT)<br />
1. Direction -<br />
(Rs. in lakh)<br />
40.11<br />
2. Administration - 2.22<br />
3. Publication Board - 10.40<br />
4. District Administration - 3.60<br />
5. Institute of Music & Fine Arts - 7.37<br />
6. Cultural Programme - 102.75<br />
7. Improvement of Vanapa Hall - 4.07<br />
8. Archaeology - 1.71<br />
9. Archaeological Survey - 1.00<br />
10. Archives - 3.46<br />
11. State Library - 12.89<br />
12. District Library - 7.66<br />
13. Museum & Art Gallery - 68.23<br />
14. District Museum - 1.38<br />
15. Anthropological Survey - 1.05<br />
16. District Gazetteer - 2.10<br />
17. Twelfth Finance Commission - 125.00<br />
GRAND TOTAL - 395.00<br />
XI - SOCIAL SERVICES 2205 - ART & CULTURE<br />
The Art & Culture Department is undertaking the task of promotion and<br />
preservation of Mizo culture in general. Survey of Archaeological, Anthropological and<br />
vanishing cultural heritage of <strong>Mizoram</strong> is being given importance. Promotion of Literature<br />
and Public Library Services are also becoming a big task of the Department. The Department<br />
is consisting of the following Wings :-<br />
1. Direction<br />
2. Administration<br />
3. Publication Board<br />
4. District Administration<br />
5. Institute of Music & Fine Arts<br />
6. Cultural Programme<br />
7. Improvement of Vanapa Hall<br />
8. Tribal Research Institute<br />
9. Archaeology<br />
10. Archaeological Survey<br />
11. Archives<br />
12. Public Library (State, District Libraries)<br />
13. Museum (State & District Museum)<br />
14. Anthropological Survey<br />
15. District Gazetteer.<br />
THE DIRECTORATE OF ART & CULTURE :<br />
Direction and supervision of all activities under the Department is under the<br />
Directorate. Various activities pertaining to Mizo culture have been undertaken through the<br />
Directorate. Sending cultural troupes outside <strong>Mizoram</strong>, receiving cultural troupes from<br />
outside <strong>Mizoram</strong> and giving cultural programmes at the reception functions for VIPs, VVIPs
- 365 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
and high dignitaries from outside <strong>Mizoram</strong> are some of the most important and unavoidable<br />
functions and duties of this Department.<br />
The Annual Plan provision is approved as under : -<br />
(Rs. in lakh)<br />
(1) Appointment (Salary)<br />
Existing -<br />
(a) Driver – 1 (Rs.3050-4590) - 1.14<br />
(2) M.R. - 0.10<br />
(3) Wages (Driver 4 nos,2 Art Instructor & 1<br />
Anthropological Survey Wing - Skilled I) - 3.31<br />
(4) Traveling Expenses - 2.00<br />
(5) Office Expenses - 5.00<br />
(6) Publication - -<br />
(7) Advertisement - 0.50<br />
(8) (a) G.I.A. to Voluntary Organizations - 7.00<br />
(9) Minor Works/Maintenance - 1.00<br />
(10) Motor Vehicle - 3.00<br />
(11) Other Charges (Participation in Inter State<br />
Cultural Programme, Local Cultural Programmes,<br />
Celebration of Important Days, Cultural<br />
Competition and Chapchar Kut etc.) - 17.00<br />
TOTAL - 40.11<br />
2. ADMINISTRATION<br />
CULTURAL CENTRE: The Cultural Centre aims at preservation of cultural heritage<br />
and protection of vanishing arts by way of setting up Traditional Mizo Village with all its<br />
activities around it. The Mizo houses are now deteriorating which need replacement for<br />
which Rs. 1.00 lakh is earmarked during the Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />
(Rs. in lakh)<br />
(1) Wages (Casual IV Grade Staff -1 no ) - 0.66<br />
(2) Minor Works for construction & maintenance<br />
of Traditional Mizo Village and<br />
erection of traditional monument - 1.00<br />
(3) Other Charges for purchase of<br />
Cultural implements materials,<br />
Hospitality, etc. - 0.56<br />
TOTAL - 2.22<br />
3. PUBLICATION BOARD: The <strong>Mizoram</strong> Publication Board Act of 1993 was passed and<br />
the Board has been constituted by the Govt. of <strong>Mizoram</strong>. At initial stage it is functioning as a<br />
cell under the supervision of Directorate of Art & Culture. Fund is provided in the form of<br />
Grants-in-Aid for which a provision is earmarked with Mizo Academy of Leters as follows:<br />
(Rs. in lakh)<br />
(1) Wages - -<br />
(2) Traveling Expenses - -<br />
(3) Office Expenses - -<br />
(4) Grant-in-Aid - 0.40<br />
(5) G.I.A. to Mizo Academy of Letters - 10.00<br />
TOTAL - 10.40
- 366 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. DISTRICT ADMINISTRATION: For better Administration and speedy discharge of<br />
works, District Office at Lunglei had been started since 1998 with existing staff of District<br />
Library Office and a few officers and staff drawn from other offices and attached<br />
temporarily as stop gap arrangement. This District Office is to cater the need of the whole<br />
of southern region. The Annual Plan aims at gradual improvement and expansion of the<br />
establishment construction of District Office is projected. The Annual Budget Provision is<br />
approved as follows: -<br />
(Rs. in lakh)<br />
(1) Wages (LDC-Cum-Typist, Driver & IV Grade Staff) - 1.70<br />
(2) Traveling Expenses - 0.20<br />
(3) Office Expenses - 0.50<br />
(4) Rents - 0.60<br />
(5) Other Charges - 0.60<br />
TOTAL - 3.60<br />
5. INSTITUTE OF MUSIC & FINE ARTS: The Institute of Music & Fine Arts consists<br />
mainly four trades like traditional music & dances, modern music, drama and fine arts. It<br />
conducts training in cultural dances and modern music regularly. Drama and fine arts have<br />
not been taken up much due to the fund constraints. Small beginning will be made for<br />
opening fine arts classes by engaging professionals when needed. Sophisticated Musical<br />
Instruments which have been purchased ten years back are now needed replacement for<br />
which a sum of Rs. 1.00 lakh is earmarked. The Annual Plan is worked out as follows.<br />
(1) Appointment (Salary) (Rs. in lakh)<br />
Existing Staff<br />
(a) Dance Instructor - 3 (Rs. 4000-6000) - 3.49<br />
(2) Medical Treatment - 0.80<br />
(3) Wages ( Professional Technician - 1 no.<br />
Skilled - I ) - 0.58<br />
(4) Traveling Expenses - 0.50<br />
(5) Office Expenses - 1.00<br />
(6) Publication of Leaflets folders, etc. - -<br />
(7) O.C. (Purchase of Costumes, Sounds,<br />
Musical Instruments, Engagement of<br />
Trained Artists, etc.) - 1.00<br />
TOTAL - 7.37<br />
6. CULTURAL PROGRAMME: <strong>Mizoram</strong> now has involved herself more and more in<br />
national level cultural activities. The Inter State Cultural Exchange Programme is an annual<br />
feature while the local programme is increasing rapidly. The minimum requirement of fund<br />
as earmarked is as follows: -<br />
(Rs. in lakh)<br />
(1) Wages - -<br />
(2) Traveling Expenses - 0.25<br />
(3) Office Expenses - 0.50<br />
(4) Professional Charges - -<br />
(5) O.C.(Art Workshop, Drama, Music Training,<br />
Inter State and State Cultural Exchange<br />
Programme, Organization of Cultural<br />
Competitions, Documentation,etc.)<br />
Corpus fund for NEZCC Rs.100 lakh - 102.00<br />
TOTAL - 102.75
- 367 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
7. IMPROVEMENT OF VANAPA HALL: The only standard auditorium Vanapa Hall is<br />
equipped with costly sophisticated sound and light systems for general public utility as well<br />
as for the Government. It is very necessary that it is manned efficiently and properly<br />
maintained. Now over all repair of the Building urgently needed. The following provision is<br />
approved.<br />
(Rs. in lakh)<br />
(1) Existing Post (Salary)<br />
(a) Programme Coordinator - 1 (Rs. 6500-10500) - 1.82<br />
(2) Medical Treatment - 0.20<br />
(3) Traveling Expenses - 0.05<br />
(4) Office Expenses - 0.50<br />
(5) Minor Works/Maintenance<br />
(Repair & Maintenance of Vanapa Hall) - 1.00<br />
(6) Other Charges - 0.50<br />
TOTAL - 4.07<br />
8. ARCHAEOLOGY: Proper survey of Archaeological wealth of <strong>Mizoram</strong> is being<br />
carried out in collaboration with Archaeological Survey of India. To execute the<br />
programmes, the following provision is approved.<br />
(Rs. in lakh)<br />
(1) Wages - 0.66<br />
(2) Traveling Expenses - 0.05<br />
(3) Office Expenses - 0.50<br />
(4) Other Charges 0.50<br />
TOTAL - 1.71<br />
9. ARCHAEOLOGICAL SURVEY: It is felt imperative to undertake the survey and<br />
documentation of the Archaeological Wealth of <strong>Mizoram</strong>. A token provision is approved as<br />
under: -<br />
(1) Office Expenses - 0.50<br />
(2) Other Charges - 0.50<br />
TOTAL - 1.00<br />
10. STATE ARCHIVES: The main function of State Archives is to concentrate in a single<br />
repository of all the non current records. All these records are being preserved in a<br />
Scientific manner. It may be mentioned here that this year a provision of Rs. 1.00 lakh has<br />
been earmarked under Minor Works for maintenance of Archives building. The financial<br />
implication for the approved Annual Plan <strong>2006</strong> - <strong>2007</strong> for this Wing are as follows: -<br />
(1) Approved post (Rs. in lakh)<br />
(a) Dark Room Attendant - 1 (Rs. 2650-4000)<br />
(2) Wages - 0.46<br />
(3) Traveling Expenses - 0.30<br />
(4) Office Expenses<br />
(including I.T. Programme) - 1.10<br />
(5) Advertisement - 0.10<br />
(6) Publication - -<br />
(7) Grants-in-Aid - -<br />
(8) Minor Works - 0.50<br />
(9) Other Charges<br />
(Including I.T.Programme) - 1.00<br />
TOTAL - 3.46
- 368 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
11. PUBLIC LIBRARY:<br />
STATE LIBRARY: Since the <strong>Mizoram</strong> Public Libraries Act 1993 has been passed by<br />
the <strong>Mizoram</strong> Legislative Assembly, gradual implementation of the act under the head State<br />
Library is proposed. In case additional fund is available the Department desired that this<br />
scheme be given priority and also proposed Casual Driver and Casual Computer Operator<br />
for this Wing. The financial implication for the approved Annual Plan of <strong>2006</strong>-<strong>2007</strong> as<br />
follows: -<br />
(1) Appointment Existing (Salary) (Rs. in lakh)<br />
(a) Assistant Librarian - 1 (Rs.6500-10500) - 1.96<br />
(2) Medical Treatment - 0.20<br />
(3) Wages - 0.61<br />
(4) Traveling Expenses - 0.20<br />
(5) Office Expenses - 1.00<br />
(6) Rents - 2.52<br />
(7) Publication - -<br />
(8) Grants-in-Aid for contribution fund to RRRLF - 5.00<br />
(9) Other Charges (including I.T. programme) - 1.40<br />
TOTAL - 12.89<br />
12. DISTRICT LIBRARY: Under the supervision of State Library, the four District<br />
Libraries are functioning with the following approved provision.<br />
(1) Salary of Existing Post (Rs. in lakh)<br />
IV Grade – 1 (Rs. 2650 - 4000) - 1.00<br />
(2) Medical Treatment - 0.20<br />
(3) Traveling Expenses - 0.50<br />
(4) Offices Expenses - 2.00<br />
(5) Rents - 1.76<br />
(6) Other Charges - 2.20<br />
TOTAL - 7.66<br />
13. MUSEUM & ART GALLERIES:<br />
STATE MUSEUM: The <strong>Mizoram</strong> State Museum started functioning in 1977. The main<br />
function is preservation, upkeep of Museum records, collection of Museum objects and<br />
display. The fund during the Annual Plan 2005-<strong>2006</strong> is concentrated for collection of<br />
Museum objects and for installation of internal equipments. Budget provision for the year<br />
<strong>2006</strong>-<strong>2007</strong> is approved as follows: -<br />
(1) Existing Posts (Salary) (Rs. in lakh)<br />
(a) Checker - 1 (Rs. 2650-4000)<br />
(b) Receptionist - 1 (Rs. 4000-6000) - 4.04<br />
(c) Museum Guide - 1 (Rs. 5500-9000)<br />
(2) Medical Treatment - 0.50<br />
(3) Wages (Gallery Attendant 3 Nos. Unskilled) - 0.99<br />
(4) Travelling Expenses - 0.10<br />
(5) Office Expenses - 1.00<br />
(6) Advertisement - 0.10<br />
(7) Maintenance - 0.50<br />
(8) Other Charges (Purchase of Museum Objects,<br />
Organisation of Seminars and Symposium, Art<br />
Exhibition, Purchase & Maintenance of Showcase) - 1.00<br />
(9) Major Works (Matching Share to Museum) - 60.00<br />
TOTAL - 68.23
- 369 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
14. DISTRICT MUSEUM: The National Policy is to extend Museum facility in the rural<br />
areas and as rural development has been given priority it is comperative to set up District<br />
Museum in the Southern District of Lunglei and Chhimtuipui.<br />
(Rs. in lakh)<br />
(1) Wages (Casual IV Grade Unskilled - 1 no ) - 0.33<br />
(2) Travelling Expenses - 0.05<br />
(3) Office Expenses - 0.50<br />
(4) Publication - -<br />
(5) Advertisement - -<br />
(6) Other Charges (Purchase of Museum Objects,<br />
Organisation of Seminars and Symposium,<br />
Art Exhibition, etc. at District Level) - 0.50<br />
TOTAL - 1.38<br />
15. ANTHROPOLOGICAL SURVEY: The Anthropological Survey has been part and<br />
parcel of this Department. The extreme South and South Eastern belt of <strong>Mizoram</strong> have to be<br />
surveyed where there are various ethnic groups of tribal.<br />
(Rs. in lakh)<br />
(1) Travelling Expenses - 0.05<br />
(2) Office Expenses - 0.50<br />
(3) Advertisement - -<br />
(4) Other Charges - 0.50<br />
TOTAL - 1.05<br />
16. DISTRICT GAZETTEER: The main assignment of District Gazetteer is to prepare<br />
<strong>Mizoram</strong> District Gazetteer. With <strong>Mizoram</strong> becoming a State, more Districts are coming up<br />
which enlarge the work of the unit.<br />
(Rs. in lakh)<br />
(1) Travelling Expenses - 0.10<br />
(2) Office Expenses - 0.50<br />
(3) Publication<br />
(reprint & rare books) - 1.00<br />
(4) Other Charges - 0.50<br />
TOTAL - 2.10<br />
SUB - TOTAL - 270.00<br />
Twelfth Finance Commission - 125.00<br />
GRAND TOTAL - 395.00
Head of Development<br />
A. Rural Health Services<br />
- 372 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HEALTH & FAMILY WELFARE<br />
Works<br />
PWD Deptt.<br />
(Rs. in lakh)<br />
Salary Others Total<br />
PHC (a) DHS 20.00 33.70 650.00 167.10 870.80<br />
(b) DHME - - 318.00 50.50 368.50<br />
B. (1) Hospital & Dispensary (a) DHS - - 300.00 27.99 327.99<br />
(b) DHME - 22.44 388.00 191.56 602.00<br />
(2) Referrral Hospital/NLPF(DHME) - - - 0.10 0.10<br />
(3) I.C.U. at C.H. Aizawl (DHME) - 0.05 - 0.05 0.10<br />
(4) State Hospital (DHME) - 0.01 0.02 0.07 0.10<br />
(5) Tele-medicine (DHME) - - - 1.00 1.00<br />
C. MER & T<br />
(1) Medical Education (DHME) - - - 147.00 147.00<br />
(2) Research (DHME) - - - 5.00 5.00<br />
(3) Training: (a) DHS - - - 10.00 10.00<br />
(b) DHME - - - 2.00 2.00<br />
(4) Nursing School, Lunglei (DHME) 0.50 - 32.00 28.10 60.60<br />
(5) College of Nursing (DHME) - - - 1.00 1.00<br />
D. ISM & H : (1) DHS - - 0.50 3.00 3.50<br />
(2) DHME - - 4.00 - 4.00<br />
E. Control of communicable diseases<br />
(1) NMEP (a) DHS - - 230.00 35.81 265.81<br />
(b) DHME - - 9.00 2.00 11.00<br />
(2) T.B. Control Prog.: (a) DHS - - 30.50 5.50 36.00<br />
(b) DHME - - 8.00 1.00 9.00<br />
(3) STD: (a) DHS - - 2.00 2.00 4.00<br />
(b) DHME - - 6.00 2.00 8.00<br />
(4) Epidemic Control: (DHS) - - 0.10 7.00 7.10<br />
(5) NLCP (a) DHS - - 45.00 20.10 65.10<br />
(b) DHME - - 7.00 2.00 9.00<br />
F. Non-Communicable Diseases<br />
(1) Cancer Research & Trg. Prog<br />
(a) DHS - - 12.00 12.00 24.00<br />
(b) DHME - 1.00 30.00 31.00 62.00<br />
(2) Cobalt Therapy Unit: (a) DHS - - 5.00 5.10 10.10<br />
(b) DHME - 1.00 15.00 14.00 30.00<br />
(3) Non-communicable Disease: (DHME) - - - 1.00 1.00<br />
(4) Disaster Management: (DHME) - - - 1.00 1.00<br />
(5) Bio-Medical waste: (DHME) - - - 3.00 3.00
- 373 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
G. Other Programmes:<br />
(1) Direction: (a) DHS - 16.00 32.00 78.00 126.00<br />
(b) DHME - 2.50 0.01 11.49 14.00<br />
(2) Administration: (a) DHS - 8.00 99.50 45.00 152.50<br />
(b) DHME - 5.00 15.20 24.30 44.50<br />
(3) Public Health Edn.: (DHS) - - 7.80 14.20 22.00<br />
(4) School Health Prog.: (DHS) - - 7.20 10.30 17.50<br />
(5) Drug Control Prog.: (DHS) - - 31.00 9.00 40.00<br />
(6) Medical Store Depot: (a) DHS - 10.00 20.00 148.80 178.80<br />
(b) DHME - - 1.00 158.00 159.00<br />
(7) Mental Health Prog.: (DHME) 0.01 - 0.02 0.07 0.10<br />
(8) NGCP: (DHS) - - 0.01 3.49 3.50<br />
(9) P.H. Laboratory (DHS) - - - 1.00 1.00<br />
(10) NPCB: (a) DHS - - 9.00 2.00 11.00<br />
(b) DHME - - 5.00 1.00 6.00<br />
(11) Baffacos: (DHS) - - - 115.00 115.00<br />
(12) IDSP: (DHS)<br />
(13) Grant-in-aid:<br />
- - - 6.30 6.30<br />
(a) Nursing Council (DHS) - - - 6.00 6.00<br />
(b) Pharmacy Council (DHS) - - - 3.00 3.00<br />
(c) Blood Transfusion Council (DHS) - - - 2.00<br />
H. Family Welfare Programme:<br />
(1) Rural Family Welfare Services<br />
2.00<br />
(a) DHS - - 43.00 7.00 50.00<br />
(b) DHME - - 25.00 7.00 32.00<br />
(2) P.P. Unit (Sub-Div.): (a) DHS - - 21.00 3.00 24.00<br />
(b) DHME - - 7.00 2.00 9.00<br />
(3) P.P. Unit (District): (a) DHS - - 14.00 3.00 17.00<br />
(b) DHME - - 8.00 2.00 10.00<br />
TOTAL (A-H) 20.51 9.70 2,437.86 1,441.93 4,000.00<br />
N.B. Revenue outlay: 3,879.79<br />
Capital outlay: 120.21<br />
TOTAL 4,000.00
- 374 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ITEMWISE DESCRIPTIONS OF THE SCHEMES :<br />
A. Rural Health Schemes :<br />
Rs. 870.80 lakh is provided for the following –<br />
1) PHC (a) DHS (Rs. in lakh)<br />
i) Salary - 650.00<br />
ii) Wages -<br />
iii) Medical Treatment - 20.00<br />
iv) T.E. - 20.50<br />
v) O.E. - 36.60<br />
vi) O.C. - 30.00<br />
vii) M & E - 20.00<br />
viii) M & S - 40.00<br />
ix) Minor Work/Maint. (Deptt.) - 33.70<br />
x) Major Work (PWD) - 20.00<br />
Sub-Total (a) - 870.80<br />
2) Break-up of Minor Works and Major Works:<br />
Minor Works (Deptt.): (Rs. in lakh)<br />
i) Reconstruction Staff Quarters at Ralvawng Sub- - 4.94<br />
Centres 2 nos. (for Male & Female Health Worker)<br />
ii) Reconstruction of M.O. Qtrs. at Lungsen PHC - 5.76<br />
iii) Reconstruction of Staff Quarters at Phairuangkai - 4.94<br />
Sub-Centres 2 nos. (for Male & Female Health Worker)<br />
iv) Reconstruction of Sub-Centre building and 1 no. - 4.94<br />
Staff Quarters at Thingsai<br />
v) Reconstruction / Repair of Departmental buildings/ - 13.12<br />
quarters at different places<br />
Total - 33.70<br />
Major Works (PWD): (Rs. in lakh)<br />
i) Reconstruction of PHC building at Buarpui - 15.00<br />
ii) Clearing liabilities for construction of - 0.70<br />
Phuldungsei PHC<br />
iii) Repair / Maintenance of existing / PHC (PWD) - 4.30<br />
Total - 20.00<br />
3) Staff : Entertainment of post already created ad creation of other essential posts<br />
during <strong>2006</strong>-07 are as follows: –<br />
Sl.<br />
No.<br />
Name of posts Scale of pay<br />
No. of post<br />
already created<br />
No. of posts<br />
already approved<br />
1 2 3 4 5<br />
1 Specialist (Surgeon) 10000-16500 3<br />
2 Specialist (Gynea.) -do- 3<br />
3 Specialist (Paed.) -do- 3<br />
4. Physician -do- 3<br />
5. M & HO 8000-13500 23 5<br />
6 Dental Surgeon -do- 12 2<br />
7 Asstt. Nursing Supdt. 6500-10500 1<br />
8 Com. Health Officer 5000-8000 32<br />
9 Health Super (M) -do- 28
- 375 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl.<br />
No.<br />
Name of posts Scale of pay<br />
No. of post<br />
already created<br />
No. of posts<br />
already approved<br />
1 2 3 4 5<br />
10 Health Super (F) -do- 25<br />
11 Sister 6500-10500 3<br />
12 Staff Nurse 5500-9000 119<br />
13 Lab. Technician 4500-7000 20<br />
14 X-ray Technician -do- 30<br />
15 Pharmacist -do- 34<br />
16 LDC 4000-6000 15<br />
17 Health Worker (M) 4500-7000 36<br />
18 Health Worker (F) -do- 45<br />
19 Microscopist 3050-4000 24<br />
20 Driver -do- 34<br />
21 Female Attendant 2650-4000 40<br />
22 Wardboy -do- 42<br />
23 Sweeper -do- 45<br />
24 Mali -do- 28<br />
25 Bhisty -do- 33<br />
26 Peon -do- 33<br />
27 Cook -do- 38<br />
28 A.C. Operator 4000-6000 2<br />
Total 738 19<br />
B. Hospital & Dispensaries :<br />
Rs. 327.99 lakh is provided under this programmes for the following –<br />
(a) Hospitals (DHS): (Rs. in lakh)<br />
i) Salary - 300.00<br />
ii) Wages - 1.00<br />
iii) Medical Treatment - 10.00<br />
iv) T.E. - 5.00<br />
v) O.E. - 10.00<br />
vi) O.C. - 1.99<br />
vii) Hospital expenses -<br />
viii) M & S -<br />
ix) M & E -<br />
x) Minor Work (Deptt) -<br />
xi) Major works (PWD) -<br />
Total (1) - 327.99<br />
(b) Staff : Rs. 300.00 lakh is approved for entertainment of post already created and<br />
other essential posts to be created.<br />
Sl. No. Name of Posts Scale of Pay<br />
No. of Posts<br />
already created<br />
No. of Posts<br />
already approved<br />
1 Consultant 12000-16500 2 4<br />
2 Dy. Medl. Supdt. -do- 1<br />
3 Sr. Specialist (Ortho.) 10000-15200 1<br />
4 Sr. Specialist (Surgery) -do- 1<br />
5 Sr. Specialist (Medicine) -do- 1
- 376 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl. No. Name of Posts Scale of Pay<br />
No. of Posts<br />
already created<br />
No. of Posts<br />
already approved<br />
6 Sr. Specialist (Eye) -do- 1<br />
7 Sr. Specialist (Psychiatrist -do- 1 -<br />
8 -do- Dermotologist -do- 1<br />
9 '-do- Pathologist -do- 1<br />
10 '-do- ENT -do- 1<br />
11 '-do- Cardiologist -do-<br />
12 -do- Gynae. -do- 1<br />
13. -do- Microbiologist -do-<br />
13 Cyto Technologist -do- 1<br />
14 Spl. Gyneacologist -do- 1<br />
15 Spl. Radiotherapist -do- 1<br />
16 Spl. Dermatologist -do- 1 1<br />
17 Spl. Psychiatrist -do- 1 1<br />
18 Spl. Pathologist -do- 3 1<br />
19 Spl. Bio-Chemist -do- 1<br />
20 Spl. Aneasthetist -do- 2<br />
21 Spl. Microbilogist -do- 1 1<br />
22 Spl. Orthosurgeon -do- 1<br />
23 Spl. General Surgeon -do- 1<br />
24 Spl. Forensic Specialist -do- 1<br />
25 Spl. ENT -do- 1<br />
26 Spl. Opthalmologist -do- 1<br />
27 Blood Bank Officer -do- 1<br />
28 Sr. Casualty Officer -do- 1<br />
29 Sr. B.D.S -do- 1 1<br />
30 Sr. Med. Recod Officer -do- 1<br />
31 MRO 8000-13500<br />
32 Dental Surgeon -do- 10 2<br />
33 M & HO -do- 6 5<br />
34 Nursing Supdt. -do- 1<br />
35 X-ray Technologist -do- 1 1<br />
36 Asstt. Nursing Supdt. 6500-10500 6<br />
37 Ward Supdt. -do- 12<br />
38 Dy.Med.Record Officer 5500-9000 1 1<br />
39 Staff Nurse -do- 94 30<br />
40 Staff Nurse (Contract) 4000/- Fixed. 65<br />
41 Sr. X-ray Tech. 5500-9000 2 1<br />
42 Sr. Lab. Tech. -do- 2 1<br />
43 Sr. CSSD Tech. -do- 1<br />
44 Sr. Cyto. Tech. -do- 1<br />
45 Sr. ECG Tech. -do- 1<br />
46 Sr. Orthotist/Prosth.Tech. -do- 1<br />
47 Sr. Ophth. Tech. -do- 1<br />
48 Computer Operator -do- 3<br />
49 U.D.C. 5000-8000 3<br />
50 X-ray Tech. 4500-7000 6<br />
51 Lab. Tech. -do- 8<br />
52 Cyto. Technician -do- 1 1<br />
53 Electrician -do- 3
- 377 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl. No. Name of Posts Scale of Pay<br />
No. of Posts<br />
already created<br />
No. of Posts<br />
already approved<br />
54 S.I. of Stats. -do- 4 1<br />
55 Pharmacist -do- 5 1<br />
56 Receptionist -do- 1<br />
57 A.C. Technician -do- 2 1<br />
58 Medl.Record Tech. -do- 6<br />
59 Pros /Ortho Tech -do- 2<br />
60 Medl. Record Asstt. 4000-6000 3<br />
61 Occupuncturist -do- 6<br />
62 LDC -do- 6<br />
63 Driver, Gr. II -do- 6<br />
64 Multi. Rehab Tech. -do-<br />
65 ECG Technician -do- 2<br />
66 Driver, 3050-5000 12<br />
67 Carpenter -do- 1<br />
68 Dark Room Asstt. -do- 3<br />
69 Barber -do- 4<br />
70 Tailor -do- 3<br />
71 Female Attendant -do- 51<br />
72 Ward boy -do- 52<br />
73 Sweeper -do- 50<br />
74 Mali -do- 18<br />
75 Cook -do- 20<br />
76 Bhisty -do- 18<br />
77 Peon -do- 20<br />
78 Guard -do- -<br />
79 CSSD Technician 4500-7000 1<br />
80 Laundry Supervisor -do- 1<br />
81 Laundry Operator 4000-6000 1<br />
Total 546 81<br />
C. MER & T:<br />
Training (DHS): (Rs. in lakh)<br />
i) T.E. - 5.00<br />
ii) O.E. - 5.00<br />
Total - 10.00<br />
1. Indian System of Medicine & Homeopathy (ISM & H) :<br />
Rs. 3.50 lakh is approved under this programme for the following –<br />
(a) Homeopathy (DHS):<br />
i) Salary - 0.50<br />
ii) T.E. - 1.00<br />
iii) O.E. - 1.00<br />
iv) M & S - 1.00<br />
Total - 3.50
- 378 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Post already created to be continue –<br />
Sl. No. Name of posts Scale of pay<br />
No. post of<br />
already created<br />
Post to be<br />
created<br />
1 B.H.M.S. / B.A.M.S. 8000-12500 5<br />
2 IV-Grade 2650-4000 2<br />
Sl.<br />
No.<br />
2. Control of Communicable Disases :<br />
i) National Malaria Eradication Programme (NMEP) - DHS :<br />
Rs. 265.81 lakh is provided for the following – (Rs. in lakh)<br />
i) Salary - 230.00<br />
ii) Wages - 0.01<br />
iii) T.E. - 20.00<br />
iv) M & E. - 5.60<br />
v) M & S - 0.10<br />
vi) O.E. - 10.00<br />
Total - 265.81<br />
Entertainment of posts already created to be continued are :<br />
Name of Posts Scales of pay<br />
No. of posts No. of post<br />
Already created Already approved<br />
1 Jt. Director ( Malaria) 12000-16500<br />
2 Dy. Director ( Malaria) 10000-15200 1<br />
3 Entomologist 8000-13500 1<br />
4 (Special Officer) -do- 1<br />
5 DMO 5000-8000 3 8<br />
6 Lab. Technician 4500-7000 2 10<br />
7 UDC -do- 3 5<br />
8 Health Worker (M) -do- 124<br />
9 Driver Gr. I -do- 2<br />
10 LDC 4000-6000 3 5<br />
11 Store Keeper -do- 1<br />
12 Microscopist -do- 16<br />
13 Sr. Malaria Inspector -do- 3<br />
14 Malaria Inspector -do- 6 2<br />
15 M.T. Mechanic -do- 1 1<br />
16 Insect Collector -do- 2<br />
17 Driver Gr. II -do- 3<br />
18 Driver 3050-4590 5<br />
19 Van Cleaner 2650-4000 4<br />
20 Sweeper -do- 1<br />
21 Peon -do- 5 4<br />
22 Chowkider -do- 4 4<br />
TOTAL 185 46<br />
ii) T.B. Control Programme:<br />
DHS i) Salary Rs. 30.50 lakh<br />
ii) Medical Treatment Rs. 3.00 lakh<br />
iii) T.E. Rs. 0.50 lakh<br />
iv) O.E. Rs. 1.00 lakh<br />
v) M & S Rs. 1.00 lakh<br />
Total Rs. 36.00 lakh
- 379 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Entertainment of posts already created to be continued are :-<br />
Sl.<br />
No.<br />
Name of Posts Scale of Pay<br />
Already<br />
created<br />
Already<br />
approved<br />
1 2 3 4 5<br />
1 State. T.B. Officer 12000-16500<br />
2 Dist. T.B. Officer 10000-15200 2<br />
3 M & HO 8000-13500 2<br />
4 I.E.C. Officer 8000-13500<br />
5 Sr. Accountant 6500-10500<br />
6 Assistant 5500-9000<br />
7 Data Entry Operator 5000-8000<br />
8 Staff Nurse 5500-9000 2 1<br />
9 U.D.C. 5000-8000 2<br />
10 Treatment Organise 5000-8000 2<br />
11 Lab. Technician 4500-7000 3 1<br />
12 X-Ray Technician -do- 2 1<br />
13 ECG Technician -do- 2<br />
14 LDC 4000-6000 2<br />
15 Driver Gr. II 4000-6000 2<br />
16 Lab. Assistant 3200-4900 1 1<br />
17 Technical Asstt. 4500-7000 2<br />
18 Peon 2650-4000 2<br />
TOTAL 26 4<br />
As per letter of understanding maintenance for the state TB Cell with staffing and<br />
resources as per the guidelines issued by the Govt. of India and assigned an officer of State<br />
Health System in the rank of Joint Director or above as full time State TB Officer to head of<br />
the State TB Cell.<br />
Therefore, to ensure that adequate staffing support in the State TB Cell, creation of<br />
various posts are proposed. Sufficient funds are to be made available in the Plan.<br />
iii) SEXUALY TRANSMITED DISEASE (STD) :<br />
Rs. 11.00 lakh is approved for the following:-<br />
DHS:<br />
i) Salary of Staff Rs. 2.00 Lakh<br />
ii) T.E. Rs. 1.00 Lakh<br />
iii) O.E. Rs. 0.50 Lakh<br />
iv) O.C. Rs. 0.50 Lakh<br />
Total of (a): Rs. 4.00 Lakh<br />
Entertainment of posts already created to be continued are :-<br />
Sl. No. Name of Posts Scale of Pay<br />
No. of Posts<br />
already created<br />
1. M & HO 8000-13500 1<br />
2. Staff Nurse 5500-9000 2<br />
3. L.D.C. 4000-6000 1<br />
4. Peon 2650-4000 1<br />
5. Sweeper -do- 1<br />
TOTAL : 6
- 380 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
iv) Epidemic Control (DHS) :<br />
Rs. 7.10 lakh is approved for the following –<br />
i) Salary Rs. 0.10 Lakh<br />
ii) Medicines & Supplies Rs. 2.00 Lakh<br />
iii) Office Expenses Rs. 5.00 Lakh<br />
Total : Rs. 7.10 Lakh<br />
v) National Leprosy Control Programme (a) DHS:<br />
i) Salary Rs. 45.00 Lakh<br />
ii) Medical Treatment Rs. 26.10 Lakh<br />
ii) Traveling Expenses Rs. 2.00 Lakh<br />
iii) Office Expenses Rs. 2.00 Lakh<br />
Total : Rs. 65.10 Lakh<br />
Sl. No. Name of posts Scale of pay No. of post<br />
1 DLO 10000-15200 1<br />
2 SMO -do- 1<br />
3 M & HO 8000-13500 2<br />
4 I .S. 5500-9000 2<br />
5 UDC 5000-8000 3<br />
6 Sr. Lab Tech. 5000-9000 2<br />
7 Sr, NMS -do- 1<br />
8 Sr. H.E. -do- 1<br />
9 Sr. PMO -do- 4<br />
10 PMO 4500-7000 10<br />
11 NMS 5000-8000 2<br />
12 Lab. Tech. 4500-7000 1<br />
13 S.I.S. 4000-6000 1<br />
14 LDC -do- 3<br />
15 Driver 2650-4000 4<br />
16 Sweeper -do- 1<br />
17 IV Grade -do- 3<br />
18 Peon -do- 2<br />
19 Helper -do- 2<br />
Total 46<br />
3. NON-COMMUNICABLE DISEASES :<br />
1) Cancer Research & Treatment Programme (a) DHS:<br />
i) Salary Rs. 12.00 lakh<br />
ii) Medical Treatment Rs. 2.00 lakh<br />
iii) T.E. Rs. 1.00 lakh<br />
iv) O.E. Rs. 2.00 lakh<br />
v) M & E Rs. 1.00 lakh<br />
vi) M & S Rs. 5.00 lakh<br />
vii) O.C. Rs. 1.00 lakh<br />
TOTAL Rs. 24.00 lakh
- 381 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Entertainment of Posts already created are :-<br />
Sl. No. Name of posts Scale of pay<br />
Already<br />
created<br />
Already<br />
approved<br />
1. Physician 10000-15200 1<br />
2. Surgeon -do- 1<br />
3. ENT Specialist -do- - 1<br />
4. Paediatrician -do- 1<br />
5. Dermatologist -do- 1<br />
6. Pathologist -do- 1<br />
7. Gynaecologist -do- 1<br />
8. M & HO 8000-15200 5<br />
9. Staff Nurse 5500-9000 10<br />
10. Assistant -do-<br />
11 Comp. Operator -do- 2<br />
12. Sweeper 2650-4000 2<br />
Total 18 3<br />
2) Cobalt Therapy Unit, Zemabawk (DHS):<br />
i) Salary Rs. 5.00 lakh<br />
ii) Medical Treatment Rs. 5.02 lakh<br />
iii) Wages Rs. 0.02 lakh<br />
iv) T.E. Rs. 0.02 lakh<br />
v) O.E.<br />
vi) M & E<br />
Rs. 0.02 lakh<br />
vii) M & S<br />
viii) Minor Works (deptt.)<br />
Rs. 0.02 lakh<br />
Total Rs. 10.10 lakh<br />
Entertainment of post already created are<br />
Sl.<br />
No.<br />
Name of posts Scale of pay<br />
Already<br />
created<br />
Already<br />
approved<br />
1 Radiotherapist 10000-15200 1<br />
2 Medl.Physicist 8000-13500 1<br />
3 Medical Officer -do- 2<br />
4 Radiotherapist Tech. 5500-9000 3<br />
5 X-ray Tech. 4500-7000 1<br />
6 Lab.Technician -do- - 1<br />
7 Driver 3050-5000 2<br />
8 Sweeper/Ward boy 2650-4000 -<br />
9 Guard -do- -<br />
10 Female Attendant -do- 2<br />
11 IV Grade -do- 2<br />
TOTAL 14 1
- 382 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
4. OTHER PROGRAMME:<br />
1) Directions (DHS): (Rs. in lakh)<br />
i) Salary - 32.00<br />
ii) Wages - 1.00<br />
iii) Medical Treatment - 3.00<br />
iv) T.E. - 15.00<br />
v) O.E. (Including I.T.) - 20.00<br />
vi) O.C. - 34.00<br />
vii) H.E. - 5.00<br />
viii) Minor Work (Deptt.) - 16.00<br />
Total - 126.00<br />
Entertainment of posts already created to be continued and to be created are: -<br />
Sl. No. Name of Posts Scale of pay already<br />
created<br />
1 Principal Director 16400-20900<br />
2 Jt.DHS (Plan) 12000-16500 1<br />
No. of posts<br />
Already<br />
approved<br />
3 Jt. Director (N) -do- 1<br />
4 Dy. DHS (SH) 10000-15200<br />
5 DD (Admn) -do- 1<br />
6 Executive Engineer -do- 1<br />
7 Sr. Research Officer -do- 1<br />
8 Assistant Engineer 8000-13500<br />
9 Junior Engineer 5500-9000 1<br />
10 Inspector of Stats. -do- 2<br />
11 Computer Operator -do- 1<br />
12 Vehicle Supervisor -do-<br />
13 Steno Grade III 5000-8000 4<br />
14 Motor Mechanic 4000-6000 1<br />
15 Despatch Rider 3050-4590<br />
16 Duftry -do- 2<br />
17 Driver -do-<br />
Total 14 2<br />
2) District & Sub-Division Administration :-<br />
Rs. 152.50 lakh is approved for the following :-<br />
i) Salary Rs. 99.50 Lakh<br />
ii) Medical Treatment Rs. 5.00 Lakh<br />
iii) T.E Rs. 10.00 Lakh<br />
iv) O.E (including I.T.) Rs. 20.00 Lakh<br />
v) O.C Rs. 10.00 Lakh<br />
vi) Minor works (deptt.) Rs. 8.00 Lakh<br />
TOTAL Rs.152.50 Lakh
Sl. No.<br />
- 383 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Entertainment of posts already created to be continue and to be created are –<br />
Name of Posts<br />
Scale of Pay<br />
No. of Posts<br />
already created<br />
No. of Posts<br />
already approved<br />
1 C.M.O. 10000-15200 6 4<br />
2 S.M.O. -do- 2 7<br />
3 Supdt.Pharmacist 6500-10500 4<br />
4 Head Assistant 5500-9000 1<br />
5 Inspector of Stats. -do- 2<br />
6 U.D.C. 5000-8000 17<br />
7 Steno G. III -do- 2<br />
8 Driver Gr. I -do- 1<br />
9 S.I. of Stats. 4500-7000 2<br />
10 LDC 4000-6000 17<br />
11 Driver Gr. II -do- 3<br />
12 Peon 2650-4000 4<br />
13 Chowkider -do- 5<br />
14 Sweeper -do- 9<br />
15 SPHNO -do- -<br />
16 Driver -do- -<br />
TOTAL 75 11<br />
3) Public Health Education (DHS) :<br />
Rs. 22.00 lakh is approved for the following :-<br />
i) Salary Rs. 7.80 Lakh<br />
ii) T.E. Rs. 3.00 Lakh<br />
iii) O.E. Rs. 3.00 Lakh<br />
iv) M & E Rs. 0.50 Lakh<br />
v) Advertisement Rs. 2.70 Lakh<br />
vi) Public Rs. 5.00 Lakh<br />
TOTAL Rs. 22.00 Lakh<br />
Entertainment of post already created to be continued are :-<br />
Sl. No. Name of Posts Scale of Pay No. of Posts<br />
1 U.D.C. 5000-8000 1<br />
2 L.D.C. 4000-6000 1<br />
3 Projectionist -do- 4<br />
4 Peon 2650-4000 2<br />
4) School Health Programme (DHS) :<br />
Rs. 17.50 lakh is provided for the following :-<br />
TOTAL 8<br />
i) Salary Rs. 7.20 lakh<br />
ii) T.E. Rs. 0.01 lakh<br />
iii) O.E. Rs. 4.00 lakh<br />
iv) M & E Rs. 1.29 lakh<br />
iv) M & S Rs. 5.00 lakh<br />
TOTAL Rs. 17.50 lakh
- 384 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Entertainment of posts already created to be continued under School Health<br />
Programme :<br />
Sl. No. Name of Posts Scale of pay No. of post<br />
1 Assistant 5500-9000 1<br />
2 U.D.C 5000-8000 1<br />
3 L.D.C 4000-6000 1<br />
4 Driver 3050-4500 1<br />
5 IV Grade 2650-4000 1<br />
5) Drugs Control (DHS):<br />
Rs. 40.00 lakh is provided for the following :-<br />
TOTAL 5<br />
i) Salary Rs. 31.0 Lakh<br />
ii) Medical Treatment Rs. 4.00 Lakh<br />
iii) T.E. Rs. 0.10 Lakh<br />
iv) O.E. Rs. 2.00 Lakh<br />
v) O.C. Rs. 2.00 Lakh<br />
TOTAL Rs. 40.00 Lakh<br />
Entertainment of posts already created to be continued and to be created are :-<br />
Sl. No. Name of posts Scale of pay<br />
No. of Post<br />
already created<br />
No. of post<br />
already approved<br />
1. Dy. Drugs Controller 12000-16500 - 1<br />
2. Asstt. Drugs Controller 10000-15200 1<br />
3. Drugs Inspector 8000-13200 11<br />
4. Grade IV 2650-4000 -<br />
TOTAL 12 1<br />
6) Medical Store Depot :<br />
Rs. 178.80 lakh is approved for the following :-<br />
i) Salary Rs. 20.00 Lakh<br />
ii) Medical Treatment Rs. 2.80 Lakh<br />
iii) T.E. Rs. 2.00 Lakh<br />
iv) O.E. Rs. 2.00 Lakh<br />
v) O.C. Rs. 2.00 Lakh<br />
vi) M & E Rs. 20.00 Lakh<br />
vii) M & S Rs. 120.00 Lakh<br />
viii) Minor Work (deptt.) Rs. 10.00 Lakh<br />
TOTAL Rs. 178.80 Lakh
- 385 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Entertainment of posts already created are :-<br />
Sl. No. Name of posts Scale of pay<br />
No. of post<br />
already created<br />
1 2 3 4<br />
1 Supdt. Pharmacist 6500-10500 1<br />
2 Pharmacist 5000-8000 2<br />
3 L.D.C. 4000-6000 3<br />
4 Packer 2650-4000 10<br />
5 IV Grade -do- 7<br />
TOTAL 23<br />
7) Mental Health Programme (DHME): Rs. 0.10 lakh is approved for the following :<br />
i) Salary Rs. 0.02 Lakh<br />
ii) T.E. Rs. 0.01 Lakh<br />
iii) O.E. Rs. 0.01 Lakh<br />
iv) O.C. Rs. 0.01 Lakh<br />
v) M & S Rs. 0.01 Lakh<br />
vi) MV Rs. 0.01 Lakh<br />
vii) M & E Rs. 0.01 Lakh<br />
viii) Rent Rs. 0.01 Lakh<br />
ix) Major Works (PWD) Rs. 0.01 Lakh<br />
Total Rs. 0.10 Lakh<br />
For implementation of Mental Health Programme, the following posts were approved<br />
to be created:<br />
Sl. No. Name of posts Scale of pay To be created<br />
1 Medl. Supdt. (INHUBAS) 12000-16500<br />
2 Psychiatrist 10000-15200<br />
3 M & HO 8000-12500<br />
4 Clinical Psychologist -do-<br />
5 Asstt. Nursing Supdt. 6500-10500<br />
6 Ward Sudpt. -do-<br />
7 Staff Nurse 5500-9000<br />
8 Medical Record Tech. 4500-7000<br />
9 Lab. Tech. -do-<br />
10 LDC cum Typist 4000-6000<br />
11 Driver 3050-5000<br />
12 Female Attandant 2650-4000<br />
13 Male Attandant 2650-4000<br />
14 Guard -do-<br />
15 Sweeper -do-<br />
16 Guard -do-<br />
Total<br />
8) National Goitre Control Programme (NGCP) DHS :<br />
Rs. 3.50 lakh is approved for the following :-<br />
i) Salary Rs. 0.01 Lakh<br />
ii) O.E. Rs. 2.00 lakh<br />
iii) T.E. Rs. 1.49 lakh<br />
Total Rs. 3.50 lakh
- 386 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Entertainment of one post of Lab. Tech. already created and to be continued.<br />
9) Public Health Laboratory (DHS):<br />
Rs. 1.00 lakh is provided for the following :-<br />
i) O.E. Rs. 0.50 lakh<br />
ii) O.C. Rs. 0.50 lakh<br />
Total Rs. 1.00 lakh<br />
10) National Programme for Control of Blindness (NPCB):<br />
i) Salary Rs. 9.00 lakh<br />
ii) T.E. Rs. 1.00 lakh<br />
iii) O.E. Rs. 1.00 lakh<br />
Total Rs. 11.00 lakh<br />
Entertainment of posts already created are as listed below –<br />
Sl. No. Name of post Scale of pay No. of post<br />
1 Dy. Director (BLN) 10000-15200 1<br />
2 Inpsector of Stat. 5500-9000 1<br />
3 Ophth. Asstt. 4500-7000 3<br />
4 LDC 4000-6000 1<br />
5 IV Grade 2650-4000 1<br />
Total 7<br />
11) Baffacos (DHS):<br />
Rs. 115.00 lakh is approved for the following: – (Rs. in lakh)<br />
i) Wages - 0.10<br />
ii) T.E. - 5.00<br />
iii) O.E. - 36.90<br />
iv) M & S - 25.00<br />
v) M & E - 15.00<br />
vi) O.C. - 30.00<br />
vii) Adv. - 3.00<br />
Total - 115.00<br />
12) I.D.S.P.: (Rs. in lakh)<br />
i) O.C. - 6.30<br />
13) Nursing Council (DHS) Rs. 6.00 lakh is approved in the form of G.I.A.<br />
14) Pharmacy Council (DHS): Rs. 3.00 lakh is approved in the form of G.I.A.<br />
15) Blood Transfusion Council (DHS)<br />
16) <strong>Mizoram</strong> Medical Council<br />
Rs. 2.00 lakh is approved in the form of G.I.A.
- 387 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
H. Family Welfare Programme :<br />
This programme has been taken up under Central Sponsored Scheme (C.S.S.) and<br />
discontinued by the Government of India wherefore it was directed that the following<br />
programmes should be taken up by State Government. As such amount of Rs. 1205.80 lakh<br />
is approved for continuation under Plan as follows –<br />
1) Rural Family Welfare Services (RFWS) –<br />
(a) DHS:<br />
i) Salary - Rs. 43.00 lakh<br />
ii) MT - Rs. 2.00 lakh<br />
iii) T.E. - Rs. 3.00 lakh<br />
iv) O.E. - Rs. 2.00 lakh<br />
Total - Rs. 50.00 lakh<br />
Entertainment of post already created to be continued are –<br />
Sl. No. Name of post Scale of pay No. of post<br />
1 M & HO 8000-13500 14<br />
2 Health Supervisor (F) 5000-8000 14<br />
3 U.D.C. -do- 7<br />
4 Extension Educator. 4500-7000 14<br />
5 V.W. -do- 14<br />
6 S.I.S. -do- 7<br />
Total 70<br />
2) P.P. Unit (Sub-Division) :<br />
(a) DHS<br />
i) Salary - Rs. 21.00 lakh<br />
ii) M.T. - Rs. 1.00 lakh<br />
iii) T.E. - Rs. 0.50 lakh<br />
iv) O.E. - Rs. 1.50 lakh<br />
Total - Rs. 24.00 lakh<br />
Entertainment of posts to be continued are -<br />
Sl. No. Name of post Scale of pay No. of post<br />
1 Spl. Paed. 10000-15200 1<br />
2 Spl. Gynea. -do- 3<br />
3 Paediatrician -do- 2<br />
4 O.T. Nurse 5500-9000 3<br />
5 LHV (H/S) 5000-8000 3<br />
6 Lab Tech. 4500-7000 3<br />
7 H.W. (M) -do- 3<br />
8 U.D.C. 5000-8000 3<br />
9 Driver 3050-4950 3<br />
10 O.T. Attendant 2650-4000 3<br />
Total 27
- 388 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3) P.P. Unit (District ) :<br />
(a) DHS:<br />
i) Salary - Rs. 14.00 lakh<br />
ii) M.T. - Rs. 1.00 lakh<br />
ii) T.E. - Rs. 1.00 lakh<br />
iii) O.E. - Rs. 1.00 lakh<br />
Total - Rs. 17.00 lakh<br />
Entertainment of posts to be continued are -<br />
Sl. No. Name of post Scale of pay No. of post<br />
1 M & HO 8000-13500 4<br />
2 Sister 6500-10500 2<br />
3 P.H.N. 5500-9000 2<br />
4 UDC 5000-8000 2<br />
5 H/W (M) 4500-7000 2<br />
Total 12
Head of Development<br />
A. Rural Health Services<br />
- 393 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HOSPITAL & MEDICAL EDUCATION<br />
Works<br />
PWD Deptt.<br />
(Rs. in lakh)<br />
Salary Others Total<br />
PHC (b) DHME - - 318.00 50.50 368.50<br />
B. (1) Hospital & Dispensary (b) DHME - 22.44 388.00 191.56 602.00<br />
(2) Referrral Hospital/NLPF(DHME) - - - 0.10 0.10<br />
(3) I.C.U. at C.H. Aizawl (DHME) - 0.05 - 0.05 0.10<br />
(4) State Hospital (DHME) - 0.01 0.02 0.07 0.10<br />
(5) Tele-medicine (DHME) - - - 1.00 1.00<br />
C. MER & T<br />
(1) Medical Education (DHME) - - - 147.00 147.00<br />
(2) Research (DHME) - - - 5.00 5.00<br />
(3) Training DHME - - - 2.00 2.00<br />
(4) Nursing School, Lunglei (DHME) 0.50 - 32.00 28.10 60.60<br />
(5) College of Nursing (DHME) - - - 1.00 1.00<br />
D. ISM & H : DHME - - 4.00 - 4.00<br />
E. Control of communicable diseases<br />
(1) NMEP DHME - - 9.00 2.00 11.00<br />
(2) T.B. Control Prog.: DHME - - 8.00 1.00 9.00<br />
(3) STD: DHME - - 6.00 2.00 8.00<br />
(5) NLCP DHME - - 7.00 2.00 9.00<br />
F. Non-Communicable Diseases<br />
(1) Cancer Research & Trg. Prog (DHME) - 1.00 30.00 31.00 62.00<br />
(2) Cobalt Therapy Unit (DHME) - 1.00 15.00 14.00 30.00<br />
(3) Non-communicable disease: (DHME) - - - 1.00 1.00<br />
(4) Disaster Management: (DHME) - - - 1.00 1.00<br />
(5) Bio-Medical waste: (DHME) - - - 3.00 3.00<br />
G. Other Programmes:<br />
(1) Direction: DHME - 2.50 0.01 11.49 14.00<br />
(2) Administration: DHME - 5.00 15.20 24.30 44.50<br />
(3) Medical Store Depot: DHME - - 1.00 158.00 159.00<br />
(4) Mental Health Prog.: DHME 0.01 - 0.02 0.07 0.10<br />
(5) NPCB: (a) DHME - - 5.00 1.00 6.00<br />
H. Family Welfare Programme:<br />
(1) Rural Family Welfare Services - - 25.00 7.00 32.00<br />
(2) P.P. Unit (Sub-Div.): DHME - - 7.00 2.00 9.00<br />
(3) P.P. Unit (District): DHME - - 8.00 2.00 10.00<br />
TOTAL (A-H) 0.51 32.00 878.25 689.24 1600.00<br />
N.B. Revenue outlay: 1,567.49<br />
Capital outlay: 32.51<br />
TOTAL 1,600.00
- 394 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ITEMWISE DESCRIPTIONS OF THE SCHEMES<br />
A. Rural Health Schemes:<br />
Rs. 368.50 lakh is provided for the following: –<br />
PHC : DHME (Rs. in lakh)<br />
i) Salary - 318.00<br />
ii) Wages - 0.50<br />
iii) Medical Treatment - 25.00<br />
iii) T.E. - 10.00<br />
iv) O.E. - 10.00<br />
v) O.C. - 5.00<br />
Total - 368.50<br />
Entertainment of post already created ad creation of other essential posts during<br />
2005-06 are as follows: –<br />
Sl. No. Name of posts Scale of pay<br />
No. of<br />
post<br />
already<br />
created<br />
No. of<br />
posts<br />
already<br />
approved<br />
No. of<br />
posts to<br />
be<br />
created<br />
1 2 3 4 5<br />
1 Specialist 10000-16500 3 17<br />
2 M & HO 8000-13500 22<br />
3 Dental Surgeon -do- 3<br />
4. Asstt. Nursing Supdt. 6500-10500 1<br />
5. Ward Supdt. -do- 1<br />
6 Staff Nurse 5500-9000 47 65<br />
7 C.H.O. 5000-8000 1<br />
8 Health Supervisor (M) -do- 1<br />
9 Pharmacist 4500-7000 2<br />
10 Health Worker (F) -do- 1<br />
11 LDC 4500-7000 3 10<br />
12 Lab. Technician -do- 6 4<br />
13 X-Ray Technician -do- 11<br />
14 A.C. Operator 4000-6000 2<br />
15 Microscopist 3050-5000 4<br />
16 Peon 2650-4000 24 10<br />
17 Ward Boy -do- 3 4<br />
18 Mali -do- 4 4<br />
19 Bhisty -do- 3 4<br />
20 Sweeper -do- 5 4<br />
21 F.A. -do- 10 4<br />
22 Cook -do- 1 4<br />
23 Driver -do- 7 4<br />
Total 165 134
- 395 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
B. 1) Hospital & Dispensaries:<br />
Rs. 602.00 lakh is provided under this programme for the following: –<br />
Hospitals (DHME): (Rs. in lakh)<br />
i) Salary - 388.00<br />
ii) Wages - 12.00<br />
iii) Medical Treatment - 30.00<br />
iv) T.E. - 20.00<br />
v) O.E. - 30.00<br />
vi) Publication - 5.00<br />
vii) Hospital expenses - 1.00<br />
viii) M & S - 11.00<br />
ix) M & E - 30.00<br />
x) O.C. - 50.00<br />
xi) Advertisement - 0.56<br />
xii) Major works (PWD) -<br />
xiii) Minor works (Deptt.) - 22.4<br />
xiv) M.V. - 2.00<br />
Total (1) - 602.00<br />
(b) Continuing Schemes :<br />
i) Construction / Repair/ Renovation etc. of - 22.44<br />
Hospitals / Staff Quarters (Deptt.)<br />
(c) Staff: Rs. 388.00 lakh is approved for entertainment of post already created<br />
and other essential posts to be created.<br />
Sl. No. Name of posts Scale of pay<br />
No. of post<br />
already created<br />
No. of posts to<br />
be created<br />
1 2 3 4 5<br />
1 Sr. Specialist 10000-16500 4 -<br />
2 Specialist -do- 5 30<br />
3 Sr. BDS -do- 1 -<br />
4. Medical Officer 8000-13500 7 8<br />
5. Dental Surgeon -do- 11 5<br />
6 Nursing Supdt. -do- 1 6<br />
7 Asstt. Nursing Supdt. 6500-10500 2 1<br />
8 Ward Supdt. -do- 4 12<br />
9 Staff Nurse 5500-9000 50 90<br />
10 Sr. X-Ray Technician -do- 1 -<br />
11 Pharmacist 5000-8000 3 4<br />
12 X-Ray Technician 4500-7000 2 9<br />
13 Lab. Technician -do- 3 10<br />
14 Electrician -do- 1 -<br />
15 S.I. of Statistic -do- 3 -<br />
16 Receptionist -do- 1 -<br />
17 M.R.T. -do- 5 6<br />
18 Pros/Ortho Tech. -do- 2 -<br />
19 Dietician -do- - 6<br />
20 Ophthalmic Assistant -do- - 6<br />
21 CSSD Technician -do- - 6<br />
22 ECG Technician -do- 2 6<br />
23 Health Educator -do- - 2
- 396 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
24 Projectionist 5000-8000 - 3<br />
25 Occupuncturist 4500-7000 2 -<br />
26 MRA 4000-7000 3 -<br />
27 Driver 4000-7000 6 4<br />
28 Lab. Assistant 3200-4900 - 11<br />
29. Tailor 3050-5000 2 -<br />
30. Barber -do- 3 -<br />
31. Dark room Asst. -do- 2 -<br />
32. IV Grade 2650-4000 18 10<br />
33. F.A. -do- 16 15<br />
34. Ward Boy -do- 3 15<br />
35. Sweeper -do- 25 15<br />
36. Cook -do- 7 15<br />
37. LDC 4000-7000 1 7<br />
38. UDC 5000-8000 - 7<br />
TOTAL 196 309<br />
2) Referral Hospital / NLPF (DHME): (Rs. in lakh)<br />
i) M & S - 0.05<br />
ii) M & E - 0.05<br />
Total - 0.10<br />
3) I.C.U. at Civil Hospital, Aizawl (DHME): (Rs. in lakh)<br />
i) M & E - 0.05<br />
ii) Minor works - 0.05<br />
Total - 0.10<br />
4) State Hospitals :<br />
i) Salary - 0.02<br />
ii) Wages - 0.01<br />
iii) T.E. - 0.01<br />
iv) O.E. - 0.01<br />
v) O.C. - 0.01<br />
vi) M & S - 0.01<br />
vii) M & E - 0.01<br />
viii Minor Work (Deptt) - 0.01<br />
ix) Major works (PWD) - 0.01<br />
Total - 0.10<br />
5) Tele-Medicine: (Rs. in lakh)<br />
i) O.E. - 1.00<br />
Total - 1.00<br />
C. MER & T:<br />
Under this programme, Rs. 21.60 lakh is approved for the followings: –<br />
1) Medical Education (DHME): (Rs. in lakh)<br />
i) O.E. - 1.00<br />
ii) O.C. - 1.00<br />
iii) Scho/Stipend/Pro-rata - 145.00<br />
Total - 147.00
- 397 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2) Research (DHME): (Rs. in lakh)<br />
i) T.E. - 1.00<br />
ii) O.E. - 1.00<br />
iii) O.C. - 0.50<br />
iv) M.V. - 2.50<br />
Total - 5.00<br />
3) Training (DHME): (Rs. in lakh)<br />
i) T.E. - 1.00<br />
ii) O.C. - 1.00<br />
Total - 2.00<br />
4) Nursing School, Lunglei (DHME): (Rs. in lakh)<br />
i) Salary - 32.00<br />
ii) Medical Treatment - 5.00<br />
iii) T.E. - 3.00<br />
iv) O.E. - 5.00<br />
v) Rent - 2.60<br />
vi) Stipend - 9.50<br />
vii) O.C. - 2.00<br />
viii) M & E - 1.00<br />
ix) Major Work (PWD) Constn. of Nursing School & Hostel - 0.50<br />
Total - 60.60<br />
Sl. No. Name of posts Scale of pay No. of existing posts<br />
1 Principal 8000-13500 1<br />
2 Tutor 6500-10500 5<br />
3 Librarian 5500-9000 1<br />
4 UDC 5000-8000 1<br />
5 Steno Gr. III -do- 1<br />
6 LDC 4500-7000 1<br />
7 Drivers 3000-4590 2<br />
8 IV Grade 2650-4000 11<br />
Total 23<br />
5) College of Nursing (DHME): (Rs. in lakh)<br />
i) Salary - 0.20<br />
ii) O.E. - 0.30<br />
iii) S/S - 0.50<br />
Total - 1.00<br />
Posts to be created:<br />
Sl. No. Name of post Scale of pay To be created<br />
1. Principal 12000-16500 1<br />
2. Professor 10000-15200 5<br />
3. Lecturer 8000-13500 8<br />
4. Demonstrator 6500-10500 16<br />
5. Librarian 5500-9000 1<br />
6. Lab. Attendant 2650-4000 1<br />
7. Warden 5500-9000 1<br />
8. House Keeper 5000-8000 1<br />
9. Cook 2650-4000 2
- 398 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
10. Peon 2650-4000 2<br />
11. Sweeper 2650-4000 2<br />
12. Chowkidar 2650-4000 2<br />
13. Superintendent 8000-13500 1<br />
14. Assistant 5500-9000 2<br />
15. UDC 5000-8000 3<br />
16. LDC 4000-6000 5<br />
17. PA to Principal 5000-8000 1<br />
18. Computer Operator 5500-9000 1<br />
19. Peon 2650-4000 6<br />
20. Sweeper 2650-4000 3<br />
21. Chowkidar 2650-4000 2<br />
22. Driver 3050-4590 4<br />
23. Lab. Attendant 2650-4000 3<br />
TOTAL 73<br />
D. Indian System of Medicine & Homeopathy (ISM & H):<br />
Rs. 4.00 lakh is approved under this programme for the following: –<br />
Homeopathy (DHME): (Rs. in lakh)<br />
i) Salary - 4.00<br />
Total - 4.00<br />
Post already created to be continue: –<br />
Sl. No. Name of posts Scale of pay<br />
No. post of already<br />
created<br />
1 M.O. 8000-13500 1<br />
E. Control of Communicable Diseases:<br />
1) National Malaria Eradication Programme (NMEP) - DHME: (Rs. in lakh)<br />
i) Salary - 9.00<br />
ii) T.E. - 1.00<br />
iii) O.E. - 1.00<br />
Total - 11.00<br />
Entertainment of posts already created to be continued are: -<br />
Sl. No. Name of Posts Scales of pay<br />
No. of posts<br />
already created<br />
1 UDC 5000-8000 1<br />
2 LDC 4500-7000 1<br />
3 Driver Gr. I -do- 1<br />
4 Microscopist 4000-6000 1<br />
5 Driver 3050-5000 2<br />
TOTAL 6<br />
2) T.B. Control Programme: (Rs. in lakh)<br />
i) Salary - 8.00<br />
ii) T.E. - 0.50<br />
iii) O.E. - 0.50<br />
Total - 9.00
- 399 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3) Sexually Transmitted Disease (STD):<br />
Rs. 8.00 lakh is approved for the following: - (Rs. in lakh)<br />
i) Salary - 6.00<br />
ii) T.E. - 1.00<br />
iii) O.E. - 1.00<br />
Total - 8.00<br />
Entertainment of posts already created to be continued are: -<br />
Sl.<br />
No.<br />
Name of Posts Scale of Pay<br />
No. of Posts<br />
already created<br />
1. Staff Nurse 5500-9000 2<br />
2. IV Grade 2650-4000 1<br />
TOTAL : 3<br />
4) National Leprosy Control Programme - DHME: (Rs. in lakh)<br />
i) Salary - 7.00<br />
ii) T.E. - 1.00<br />
iii) O.E. - 1.00<br />
Total - 9.00<br />
Sl. No. Name of posts Scale of pay No. of post<br />
1 M.O. 8000-13500 1<br />
2 UDC 5000-8000 1<br />
3 LDC 4500-7000 1<br />
4 Driver 3050-4590 1<br />
5 IV Grade 2650-4000 1<br />
6 Sweeper -do- 1<br />
Total 6<br />
F. NON-COMMUNICABLE DISEASES :<br />
1) Cancer Research & Treatment Programme - DHME: (Rs. in lakh)<br />
i) Salary - 30.00<br />
ii) Medical Treatment - 5.00<br />
iii) T.E. - 1.00<br />
iv) O.E. - 2.00<br />
v) M & S - 5.00<br />
vi) M & E - 18.00<br />
vii) Minor Works - 1.00<br />
TOTAL - 62.00<br />
Entertainment of Posts already created are :-<br />
Sl. No. Name of posts Scale of pay Already created<br />
1 Specialist 10000-15200 2<br />
2 M.O. 8000-13500 2<br />
3 Staff Nurse 5500-9000 2<br />
4 Computer Operator -do- 2<br />
5 F.A. 2650-4000 1<br />
6 Sweeper -do- 2<br />
Total 11
- 400 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2) Cobalt Therapy Unit, Zemabawk - DHME: (Rs. in lakh)<br />
i) Salary - 15.00<br />
ii) Wages - 1.00<br />
iii) Medical Treatment - 5.00<br />
iv) T.E. - 1.00<br />
v) O.E. - 1.00<br />
vi) M & E - 1.00<br />
vii) M & S - 5.00<br />
viii) Minor Works (deptt.) - 1.00<br />
Total - 30.00<br />
Entertainment of post already created are: -<br />
Sl. No. Name of posts Scale of pay Already created<br />
1 Medical Physicist 8000-13500 1<br />
2 X-Ray Technician 4500-7000 1<br />
3 F.A. 2650-4000 2<br />
4 Dark Room Assistant -do- 1<br />
5 Van Cleaner -do- 1<br />
TOTAL 6<br />
3) Non-Communicable Diseases (DHME): (Rs. in lakh)<br />
i) O.E. - 0.50<br />
ii) O.C. - 0.50<br />
Total - 1.00<br />
4) Disaster Management (DHME): (Rs. in lakh)<br />
i) O.C. - 0.50<br />
ii) M & E - 0.50<br />
Total - 1.00<br />
5) Bio-Medical Waste (DHME): (Rs. in lakh)<br />
i) O.C. - 1.00<br />
ii) M & E - 2.00<br />
Total - 3.00<br />
G. OTHER PROGRAMMES:<br />
1) Direction: Hospital & Medical Education<br />
For proper administration in the Deptt., creation of Principal Director is imperative.<br />
(Rs. in lakh)<br />
i) Salary - 0.01<br />
ii) Wages - 0.50<br />
iii) T.E. - 4.00<br />
iv) O.E. - 4.00<br />
v) O.C. - 1.99<br />
vi) H.E. - 1.00<br />
vi) Minor Works (deptt.) - 2.50<br />
Total - 14.00
- 401 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
For implementation of Directorate of Hospital & Medical Education, the following<br />
posts are approved to be created: –<br />
Sl. No. Name of Posts Scale of pay<br />
No. of post to be<br />
created<br />
1 Dy. Director (Admn.) 10000-15200 1<br />
2 Asst. Engineer 8000-13500 1<br />
3 Finance & Accounts Officer -do- 1<br />
4 Research Officer -do- 1<br />
5 Health Education Officer -do- 1<br />
6 Superintendent -do- 1<br />
7 Assistant 5500-9000 6<br />
8 Junior Engineer -do- 3<br />
9 Inspector of Statistics -do- 2<br />
10 Computer Operator -do- 4<br />
11 UDC 5000-8000 8<br />
12 LDC 4000-7000 9<br />
13 Steno Grade III 5000-8000 3<br />
14 IV Grade 2650-3000 20<br />
15 Driver 4000-7000 3<br />
Total 64<br />
2) District & Sub-Division Administration:<br />
Rs. 44.50 lakh is approved for the following: - (Rs. in lakh)<br />
i) Salary - 15.20<br />
ii) Medical Treatment - 7.30<br />
iii) T.E. - 2.00<br />
iv) O.E. (including I.T.) - 5.00<br />
v) O.C. - 5.00<br />
vi) Minor Works (deptt.) - 10.00<br />
Total - 44.50<br />
Entertainment of posts already created to be continue and to be created are –<br />
Sl. No. Name of Posts Scale of Pay<br />
No. of Posts<br />
already created<br />
No. of Posts<br />
already approved<br />
1 Supdt. Pharmacist 6500-10500 1 -<br />
2 Assistant 5500-9000 - 7<br />
3 Inspector of Statistics -do- - 7<br />
4 Computer Operator -do- - 7<br />
5 UDC 5000-8000 5 7<br />
6 LDC 4000-7000 7 7<br />
7 Driver 3050-4590 2 6<br />
8 IV Grade 2650-4000 1 6<br />
TOTAL 69<br />
3) Medical Store Depot:<br />
Rs. 159.00 lakh is approved for the following :- (Rs. in lakh)<br />
i) Salary - 1.00<br />
ii) T.E. - 1.00<br />
iii) O.E. - 1.00<br />
iv) O.C. - 1.00<br />
v) M & S - 135.00<br />
vi) M & E - 20.00<br />
Total - 159.00
- 402 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Entertainment of posts already created are: -<br />
Sl. No. Name of Posts Scale of pay<br />
No. of post<br />
already created<br />
1 2 3 4<br />
1 IV Grade 2650-4000 2<br />
Total 2<br />
4) Mental Health Programme (DHME):<br />
Rs. 0.10 lakh is approved for the following: - (Rs. in lakh)<br />
i) Salary - 0.02<br />
ii) T.E. - 0.01<br />
iii) O.E. - 0.01<br />
iv) O.C. - 0.01<br />
v) M & S - 0.01<br />
vi) MV - 0.01<br />
vii) M & E - 0.01<br />
viii) Rent - 0.01<br />
ix) Major Works (PWD) - 0.01<br />
Total - 0.10<br />
For implementation of Mental Health Programme, the following posts were approved<br />
to be created: -<br />
Sl. No. Name of Posts Scale of pay<br />
No. of post<br />
already created<br />
1 Medl. Supdt. (INHUBAS) 12000-16500 1<br />
2 Psychiatrist 10000-15200 2<br />
3 M & HO 8000-12500 3<br />
4 Clinical Psychologist -do- 1<br />
5 Asstt. Nursing Supdt. 6500-10500 1<br />
6 Ward Sudpt. -do- 2<br />
7 Staff Nurse 5500-9000 16<br />
8 Social Worker (Psy.) 5500-9000 1<br />
9 Medical Record Tech. 4500-7000 2<br />
10 Lab. Tech. -do- 1<br />
11 LDC-cum-Typist 4000-6000 1<br />
12 Driver 3050-5000 2<br />
13 Female Attandant 2650-4000 8<br />
14 Male Attandant 2650-4000- 8<br />
15 Guard -do- 8<br />
16 Sweeper -do- 8<br />
17 Guard -do- 4<br />
Total 69<br />
5) National Programme for Control of Blindness (NPCB): (Rs. in lakh)<br />
i) Salary - 5.00<br />
ii) T.E. - 0.50<br />
iii) O.E. - 0.50<br />
Total - 6.00<br />
Entertainment of posts already created are as listed below –<br />
Sl. No. Name of post Scale of pay No. of post<br />
1. Ophth. Asstt. 4500-7000 2<br />
Total 2
- 403 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
H. FAMILY WELFARE PROGRAMME:<br />
This programme has been taken up under Central Sponsored Scheme (C.S.S.) and<br />
discontinued by the Government of India wherefore it was directed that the following<br />
programmes should be taken up by State Government. As such fund is provided for<br />
continuation under Plan as follows: –<br />
1) Rural Family Welfare Services (RFWS): (Rs. in lakh)<br />
i) Salary - 25.00<br />
ii) MT - 5.00<br />
iii) T.E. - 1.00<br />
iv) O.E. - 1.00<br />
Total - 32.00<br />
Entertainment of post already created to be continued are –<br />
Sl. No. Name of post Scale of pay No. of post<br />
1. M.O. 8000-13500 7<br />
2. UDC 5000-8000 1<br />
Total 8<br />
2) P.P. Unit (Sub-Division): (Rs. in lakh)<br />
i) Salary - 7.00<br />
ii) M.T. - 1.00<br />
iii) T.E. - 0.50<br />
iv) O.E. - 0.50<br />
Total - 9.00<br />
Entertainment of posts to be continued are: -<br />
Sl. No. Name of post Scale of pay No. of post<br />
1. Specialist 10000-15200 2<br />
2. Staff Nurse 5500-9000 3<br />
3. IV Grade 2650-4000 1<br />
Total 6<br />
3) P.P. Unit (District):<br />
i) Salary - 8.00 lakh<br />
ii) M.T. - 1.00 lakh<br />
ii) T.E. - 0.50 lakh<br />
iii) O.E. - 0.50 lakh<br />
Total - 10.00 lakh<br />
Entertainment of posts to be continued are -<br />
Sl. No. Name of post Scale of pay No. of post<br />
1. M.O. 8000-13500 1<br />
2. Sister 6500-10500 2<br />
3. Staff Nurse 5500-9000 3<br />
Total 6
- 406 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
WATER SUPPLY & SANITATION<br />
The approved outlay during the 10 th Five Year Plan 2002-<strong>2007</strong> for Water Supply and<br />
Sanitation is Rs. 12,333.00 lakh. Out of which Rs. 7772.00 lakh is for Rural Sector,<br />
Rs.3373.00 lakh for Urban Sector and Rs. 1188.00 lakh for Other Sector. The detailed breakup<br />
is as below: —<br />
Sl. Head of Scheme 10 th Five Year Plan 2002-<strong>2007</strong><br />
No. State Plan Central Assistance<br />
A. RURAL SECTOR :<br />
1. Rural Water Supply :<br />
(a) Water Supply Scheme PWS, 5,000.00 8590.00<br />
IVSS, HPTW, RWHS etc.<br />
(b) Direction & Administration 2,590.00<br />
Wages/Salaries<br />
(c) Water Quality Testing / Monitoring 10.00<br />
(d) Emergency Water Supply 150.00<br />
(c) Survey & Investigation 2.00<br />
2. Rural Sanitation : 20.00 250.00<br />
SUB-TOTAL OF 'A' 7,772.00 8,840.00<br />
B. URBAN SECTOR :<br />
1. Urban Water Supply 3,373.00 2,000.00<br />
(UWS, AUWSP, NLPF etc.)<br />
2. Integrated Project of Aizawl (I.P.A.) - 30,000.00<br />
SUB-TOTAL OF 'B' 3,373.00 32,000.00<br />
C. OTHER SECTORS :<br />
1. Direction & Administration 1,026.00 -<br />
2. Research 2.00 -<br />
3. Training 10.00 -<br />
4. Machineries & Equipments 100.00 -<br />
5. Building 50.00 -<br />
6. Motor Vehicles - -<br />
SUB-TOTAL OF 'C' 1,188.00 -<br />
GRAND TOTAL 12,333.00 40,840.00<br />
There was joint survey conducted by representative of Government of India and<br />
Pachhunga University College, Aizawl during 1996 and 911 villages / habitations were<br />
identified in <strong>Mizoram</strong>. This is the main database for planning of Rural Water Supply<br />
Programme.<br />
After making much head way in rural water supply programme, the status of rural<br />
water supply as on 1.4.2005 had become as indicated below :<br />
Non- Covered Partially Covered Fully Covered Total<br />
(NC) (PC) (FC)<br />
112 799 911 Nil
- 407 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
There has been continuous depletion of capacity of water sources, rapid growth of<br />
population resulting in continuous change in the status of water supply. On the direction of<br />
Government of India, RGNDWM, Department of Drinking Water Supply, Ministry of Rural<br />
Development, New Delhi, habitation survey 2003 was conducted for assessing factual status<br />
of water supply in <strong>Mizoram</strong>. The habitation survey in 2003, after its validation by Indian<br />
Institute of Public Administration (IIPA), New Delhi has resulted in the status of water<br />
supply as indicated below and the same is under consideration of the Government of India<br />
for approval.<br />
Non-Covered Partially Covered Fully Covered Total<br />
(NC) (PC) (FC)<br />
187 430 159 776<br />
In addition, there are 110 habitations declared as uninhabited by the census 2001<br />
due to large scale of migration of Riang/Bru Community to neighbouring State which need<br />
to be covered with drinking water supply and sanitation following the Memorandum of<br />
Understanding (MoU) between Govt. of <strong>Mizoram</strong> and the Bru National Liberation Front (<br />
BNLF ) signed on 26.4.2005.<br />
After incorporation of the above said 110 habitations the final status will be as<br />
under :<br />
Non-Covered Partially Covered Fully Covered Total<br />
(NC) (PC) (FC)<br />
297 430 159 886<br />
Note: The Non-Covered (NC) habitations have increased drastically because -<br />
(i) Some water supply sources dry up or existing water supply system become<br />
defunct and non-serviceable due to activities of soil erosion, landslide and<br />
deforestation etc.<br />
(ii) Govt. of India advised that water supply level below 10 lpcd may be treated<br />
as NC due to which those habitations having water supply level below 10<br />
lpcd, which were earlier categorised as PC habitations are grouped under NC<br />
habitations.<br />
(iii) Lowering of ground water table resulting in depletion of ground water.<br />
(iv) 110 Rural Habitations declared as un-in habitat by Government of India,<br />
Census 2001 need to be covered with Drinking Water Supply and Sanitation<br />
facilities for the reason stated in the preceding paragraph for which<br />
Government of India, Department of Drinking Water Supply, Ministry of Rural<br />
Development has already been requested and is also being taken up with the<br />
Registrar General of India and Census Commissioner, New Delhi.<br />
In respect of urban water supply, there are 22 (twenty two) notified towns in<br />
<strong>Mizoram</strong>. However, Lawngtlai town, the capital of Lai District Council, though not notified<br />
town is considered as town by Public Health Engineering Department. The status of water<br />
supply in Urban Towns as on 1.4.2005 are as indicated below.
- 408 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl. No. Name of Town Status in Lpcd<br />
1. Aizawl 45<br />
2. Kolasib 70<br />
3. Bairabi 10<br />
4. Khawzawl 60<br />
5. Serchhip 70<br />
6. Tlabung 35<br />
7. Saiha 20<br />
8. Lunglei 70<br />
9. Sairang 70<br />
10. Darlawn 70<br />
11. Zawlnuam 40<br />
12. Hnahthial 30<br />
13. Vairengte 70<br />
14. Champhai -<br />
15. N.Kawnpui -<br />
16. Mamit -<br />
17. Saitual 60<br />
18. Thenzawl 70<br />
19. Lengpui 70<br />
20. Khawhai -<br />
21. N. Vanlaiphai -<br />
22. Biate -<br />
23. Lawngtlai -<br />
(Rupees in lakh)<br />
Sl. No. SECTOR DETAILS Budget Provision Remarks<br />
during <strong>2006</strong>-07<br />
A. RURAL SECTOR<br />
1. Rural Water Supply Rs 1,291.38 481.09 LIC, 607 CA<br />
2. Direction & Administration Rs 1,050.00 815 Salaries<br />
3. Emergency Water Supply Scheme by Truck Rs. 40.00<br />
4. Rural Sanitation(TSC) Rs 100.00<br />
5. Operation &Maintenance Rs 1000.00<br />
TOTAL Rs 3,481.38<br />
B. URBAN SECTOR<br />
1. Water Supply for New AR Complex<br />
at Zokhawsang Rs. 100.00 ACA<br />
2. Composite N.Kawnpui WSS Rs. 32.00<br />
3. Improvement of distribution lines and<br />
Zonal Tanks at various localities of Aizawl Rs. 112.91 40.91 LIC<br />
4. Improvement of gravity source of<br />
Aizawl Water Supply Scheme Phase-I Rs. 65.00<br />
5. Construction of Zonal Tank near Synod<br />
Conference Hall Rs. 28.00 ACA<br />
6. Zuangtui Water Supply Scheme(Aug) Rs. 17.00<br />
7. Greater Lunglei Water Supply Scheme Rs. 835.71 Liabilities<br />
8. O & M of Water Supply Schemes (<strong>2006</strong>-<strong>2007</strong>) Rs. 1,078.00<br />
TOTAL : Rs. 2,268.62<br />
GRAND TOTAL : Rs. 5,750.00
- 409 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
DETAILED DESCRIPTION OF <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PHE Department operates two sectors viz., Rural Sector and Urban Sector in which<br />
the following are the tentative fund allocation and work programmes.<br />
A. RURAL SECTOR<br />
1. Rural Water Supply:<br />
During <strong>2006</strong>-<strong>2007</strong>, water supply level in 110 numbers of Partially Covered (PC)<br />
habitations will be enhanced to Fully Covered (FC) category for which an amount of<br />
Rs.1291.38 lakh has been earmarked as the detailed break up shown below :<br />
4215 - Rural Water Supply ( LIC) = Rs. 481.09 lakh<br />
4215 - Rural Water Supply (ACA) = Rs 607.00 lakh<br />
4215 - Rural Water Supply = Rs. 69.30 lakh<br />
2215 - Rural Water Supply = Rs 5.40 lakh<br />
2215 - Sub-Mission ( State Share ) = Rs 128.59 lakh<br />
T O T A L = Rs 1291.38 lakh<br />
2. Direction and Administration:<br />
The approved outlay for Direction and Administration during <strong>2006</strong>-07 is Rs. 1050.00<br />
lakh and the detailed break up are as below :<br />
(1) Direction CE - Rs. 180.00<br />
(2) Direction SE - Rs. 145.00<br />
(3) Administration - Rs. 490.00<br />
(4) Medical - Rs. 50.00<br />
(5) O.E. - Rs. 85.00<br />
(6) T.E. - Rs. 30.00<br />
(7) M.V - Rs. 56.00<br />
(8) Scholarship & Stipend - Rs. 4.00<br />
(9) O.C (Other charges ) - Rs. 10.00<br />
T O T A L = Rs. 1050.00<br />
3. Emergency Water Supply:<br />
Emergency Water Supply by Truck has to be carried out in some towns during dry<br />
period for which an amount of Rs. 40.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Rural Sanitation:<br />
During <strong>2006</strong>-<strong>2007</strong> Total Sanitation Campaign (TSC) will be launched in all 8 (eight)<br />
Districts of <strong>Mizoram</strong> which is the new Rural Sanitation Programme introduced by<br />
Government of India. The total State Matching Share will be approximately Rs. 660.00 lakh<br />
out of which an amount of Rs. 100.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />
5. Operation and Maintenance (O&M):<br />
Proper Operation and Maintenance is very much essential for regular and sustainable<br />
water supply. An amount of Rs. 1000.00 lakh has been earmarked under Rural Sector during<br />
<strong>2006</strong>-<strong>2007</strong>.
B. URBAN SECTOR<br />
- 410 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. Water Supply for new AR Complex at Zokhawsang:<br />
As per the commitment of the State Government water supply has to be provided by<br />
State Government at the proposed new AR Complex at Zokhawsang. An amount of<br />
Rs.100.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong> under ACA.<br />
2. Composite N. Kawnpui Water Supply Scheme:<br />
Composite N. Kawnpui Water Supply Scheme is an on-going project, an amount of<br />
Rs. 32.00 lakh is provided during <strong>2006</strong>-<strong>2007</strong> for completion.<br />
3. Improvement of Distribution System of Aizawl:<br />
This project is an on-going scheme executed since 2004-2005. An amount of<br />
Rs.112.91 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong> out of which Rs. 40.91 lakh will be met from<br />
LIC loan.<br />
4. Improvement of Gravity source of Aizawl Water Supply Scheme Phase-I:<br />
This project is an on-going project executed since 2004-2005. An amount of Rs 65.00<br />
lakh is earmarked for continuation of the project during <strong>2006</strong>-<strong>2007</strong>.<br />
5. Construction of Zonal Tank near Synod Conference Hall:<br />
The existing P.S. Tank near Synod Confence Hall is very old, rusted now under under<br />
the condition of collapsing. So, construction of R.C.C. Zonal Tank is to be done immediately<br />
so an amount of Rs. 28.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong> under ACA.<br />
6. Zuangtui Water Supply Scheme (Aug) :<br />
Zuangtui Water Supply Scheme (Augmentation) by tapping gravity source from<br />
Zuangtui intake including construction reservoir for Zuangtui and Thuampui area to<br />
supplement the coverage by Aizawl Water Supply Scheme Phase-I is proposed. An amount of<br />
Rs. 17.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />
7. Greater lunglei Water Supply Scheme :<br />
An amount of Rs. 835.71 lakh for clearing pending liabilities is to set aside for<br />
payment to M/S Subash Projects and Marketing Limited (SPML) as per agreement singed by<br />
SPML and the Government of <strong>Mizoram</strong>.<br />
8. Operation & Maintenance of Urban Water Supply Scheme :<br />
The PHE Department require approximately Rs 3500.00 lakh for O & M of various<br />
water supply project in <strong>Mizoram</strong>. The require fund cannot be made available due to fund<br />
constraint. An amount of Rs 2893.00 lakh is earmarked for salary, wages including<br />
operation and maintenance cost of Water Supply Scheme by Planning Department out of<br />
which Rs. 1000.00 lakh has already been earmarked for O&M under Rural Sector, Rs. 815.00<br />
lakh for salaries and Rs. 1078.00 lakh is earmarked under urban sector.
- 416 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
HOUSING (L.A.D.)<br />
A. Proposed Tenth Five Year Plan Outlay 2002 – <strong>2007</strong> - Rs. 20,060.00 lakh<br />
B. Revised App. Annual Plan Outlay for 2005 – <strong>2006</strong> - Rs. 3,742.00 lakh<br />
C. Approved Annual Plan Outlay for <strong>2006</strong> - <strong>2007</strong> - Rs. 3,692.00 lakh<br />
Following Schemes are approved to be taken up during <strong>2006</strong> - <strong>2007</strong>.<br />
A. 02 - URBAN HOUSING<br />
190 - INVESTMENT<br />
1. LIG Housing Loan - Rs. 80.00 lakh<br />
2. MIG Housing Loan - Rs. 120.00 lakh<br />
3. Composite Cash Loan to Govt. Servant (HBA) - Rs. 3,054.00 lakh<br />
TOTAL - Rs 3,254.00 lakh<br />
050 - LAND<br />
4. Common Cemetery - Rs NIL<br />
5 Housing for Staff - Rs 200.00 lakh<br />
6. Sites & Services - Rs 5.00 lakh<br />
7. Land Acquisition & Development - Rs. 152.00 lakh<br />
800 - OTHER EXPENDITURE<br />
8. E.W.S Housing - Rs. 3.00 lakh<br />
B. 03 - RURAL HOUSING<br />
80 - GENERAL<br />
13. Building Technology Extension - Rs. 20.00 lakh<br />
14. 01-Direction & Administration - Rs. 58.00 lakh<br />
Total - Rs. 3,692.00 lakh<br />
BRIEF DESCRIPTION OF THE SCHEME<br />
1. LOW INCOME GROUP HOUSING LOAN: During the 9 th Five Year Plan, many<br />
households were given LIG loans at the rate of Rs.0.30 lakh which was increased to Rs. 0.50<br />
lakh. This is an important scheme for developing dwelling houses in Urban Centres and is<br />
proposed to be continued in the 10 th Plan at the same rate. Each and every annual plan<br />
target has to be taken up as new items while the Scheme itself is a continuing one. The 10 th<br />
Plan Scheme is to grant LIG loan to 1800 households each @ Rs. 50,000/- within an outlay of<br />
Rs. 900.00 lakh and the Annual Plan for <strong>2006</strong> - <strong>2007</strong> is to provided 160 households within<br />
an outlay of Rs. 80.00 lakh.<br />
2. MIDDLE INCOME GROUP HOUSING LOAN: The 10 th Plan scheme is to benefit 1500<br />
households at the rate of Rs. 80,000 per one within an outlay of Rs. 1200.00 lakh. Target for<br />
Annual Plan <strong>2006</strong> - <strong>2007</strong> is to be provided 150 households within Rs. 120.00 lakh.
- 417 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. COMPOSITE CASH LOAN (HBA) TO GOVERNMENT EMPLOYEES: During the 9 th Plan<br />
period Rs. 106.10 crores were given to Government Employees in the form of HBA for house<br />
construction under this composite cash loan scheme. As many as 8910 Government<br />
Employees were benefited under the scheme. Loan recoveries and interest payments are<br />
effected from pay bills through Treasuries. The Scheme has been found to be very beneficial<br />
and fruitful and a proposal is made to continue the scheme during the 10 th Plan, Rs.<br />
3,054.00 lakh is provided during <strong>2006</strong> - <strong>2007</strong>.<br />
Physical Targets for the year 2005 - <strong>2006</strong> is as follows :<br />
(a) MIG I for 452 Nos. = Rs. 904.00 lakh @ 2.00 lakh<br />
(b) MIG II for 700 Nos. = Rs. 1050.00 lakh @ 1.50 lakh<br />
(c) LIG for 880 Nos = Rs. 1100.00 lakh @ 1.25 lakh<br />
TOTAL for 2032 Nos = Rs. 3054.00 lakh<br />
4. COMMON CEMETERY: No earmarked for <strong>2006</strong> - <strong>2007</strong>.<br />
5. HOUSING FOR STAFF: The District Offices at the District headquarters viz. — Lunglei,<br />
Champhai, Kolasib, Serchhip and Mamit have been functioning with out proper staff<br />
quarters. This led to acute problems in transfer and posting as most of the staff to have to<br />
put up themselves in a rented house. Hence, Rs 200.00 lakh is earmarked for Construction<br />
staff quarters in the Districts headquarters during <strong>2006</strong> – <strong>2007</strong> as under :-<br />
(a) Construction of DLAOs Office at Serchhip = Rs 65.00 lakh<br />
(b) Construction of DLAOs Staff quarters = Rs 135.00 lakh<br />
6. SITE AND SERVICES: The programme is to make house site plan, roads, parks etc. for<br />
developing land for house sites in cluster of dwelling houses in urban areas at a nominal rate of<br />
Rs. 1000/- per house-sites. The 10 th Five Year Plan scheme is to develop 5000 house sites in<br />
urban area within Rs. 50.00 lakh and it is proposed in the Annual plan <strong>2006</strong> - <strong>2007</strong> is to develop<br />
500 houses sites within Rs. 5.00 lakh which will be utilised in the District Headquarters.<br />
7. LAND AQUISITION AND DEVELOPMENT: With rapid expansion of Aizawl and Lunglei<br />
Towns as a result of mass migration of the people from villages, it becomes imperative to<br />
develop lands for human settlement in the Sub-Towns to attract persons to settle in subtowns<br />
with a view to checking further mass migration to Aizawl and Lunglei. The<br />
programme of land developments to make plans for houses sites, roads steps, etc. within<br />
the District Headquarters like Aizawl, Lunglei, Champhai, Kolasib, Mamit, Serchhip, Saiha<br />
and Lawngtlai areas. The scheme of 10 th Five Year Plan is to develop 322 hectares of land<br />
within Rs. 665.00 lakh and it is approved to develop in the Annual Plan <strong>2006</strong> - <strong>2007</strong> is 76.5<br />
hectares within Rs. 152.00 lakh.<br />
8. E.W.S. HOUSING: During the 9 th Plan, EWS Housing was introduced in the form of<br />
grant for giving Construction Assistance of Rs. 2500/- each per family in urban areas as has<br />
been done in rural areas under the scheme of construction Assistance. The scheme of the<br />
10 th Plan is to benefit 2000 families within Rs. 50.00 lakh, and Rs. 3.00 lakh is allocated for<br />
providing assistance to 120 families during <strong>2006</strong> – <strong>2007</strong>.<br />
9. PROVISION OF HOUSE SITE (MNP): No earmarked for 2005 - <strong>2006</strong>.<br />
10. CONSTRUCTION ASSISTANCE (MNP): No earmarked for 2005 - <strong>2006</strong>.<br />
11. INTERNAL IMPROVEMENT OF VILLAGES: No earmarked for 2005 - <strong>2006</strong>.<br />
12. RESETTLEMENT OF VILLAGES: No earmarked during 2005 – <strong>2006</strong>.
- 418 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
13. BUILDING TECHNOLOGY EXTENSION: This is new scheme started in 1995 - 96 with a<br />
meagre fund. <strong>Mizoram</strong> depends on building materials, mostly procured from neighboring<br />
states such as iron rods, GCI Sheets, Tiles, Brick, Cements etc. and the cost of house<br />
construction is very high. It is necessary to identify materials, which are locally available and<br />
technologically and economically sound for used in building construction for the purpose of<br />
reducing materials coming from neighbouring States as well as reducing the construction<br />
cost. Attempts shall be made to identify such materials and in collaboration with HUDCO.<br />
Aizawl Building Centre has been set up and Seminar and practical training on House<br />
Construction has been started. Rs. 50.00 lakh is proposed for the whole 10 th Plan. It is not<br />
readily possible to fix physical targets which will come to light after research, physical<br />
training etc., Rs. 20.00 lakh is provided during <strong>2006</strong> - <strong>2007</strong>.<br />
12. DIRECTION AND ADMINISTRATION: During the 8 th Plan, the following posts have<br />
been created and filled up to implement the housing plan. It is necessary to provide certain<br />
outlay for continuance and retention of the posts during the 10 th Plan. It is to be mentioned<br />
that just 137% of the whole outlay is required for such retention of posts, i.e., Rs. 250.00<br />
lakh for the whole 10 th Plan and it is provided amounting to Rs. 58.00 lakh for <strong>2006</strong> - <strong>2007</strong><br />
for retention of the following posts and other expenditures.<br />
1. 1 (one) Assistant Engineer - 8000 - 135000<br />
2. 3 (three) Assistant - 5500 - 9000<br />
3. 2 (two) Junior Engineer - 5500 - 9000<br />
4. 1 (one) U.D.C. - 5000 - 8000<br />
5. 6 (six) L.D.C. - 4000 - 6000<br />
6. 1 (one) Driver - 3050 - 4590<br />
7. 2 (two) IV Grade - 2650 - 4000<br />
Break-up of <strong>2006</strong> - <strong>2007</strong><br />
(a) Salary - Rs. 28.00 lakh<br />
(b) Wages - Rs. 4.50 lakh<br />
(c) Medical Treatment - Rs. 1.00 lakh<br />
(d) T.E - Rs. 1.50 lakh<br />
(e) Office Expenses - Rs. 13.50 lakh<br />
(f) Motor Vehicles - Rs. 8.00 lakh<br />
(f) Publication - Rs. 1.00 lakh<br />
(g) Advertising & Publicity - Rs. 0.50 lakh<br />
TOTAL - Rs. 58.00 lakh
- 422 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
GOVERNMENT HOUSING (P.W.D.)<br />
INTRODUCTION:<br />
The works falling under this Head of Accounts are mainly construction and<br />
improvement of Government Residential quarters at various places in and outside <strong>Mizoram</strong>.<br />
During <strong>2006</strong>-<strong>2007</strong>, Rs. 320.00 lakh is approved under this Head of Account.<br />
DIRECTION AND ADMINISTRATION:<br />
Rs.211.00 lakh is approved during 10 th Five Year Plan.<br />
Rs. 89.00 lakh is approved for salary and establishment of the existing staff during<br />
<strong>2006</strong>-<strong>2007</strong>.<br />
The breakup of Direction and Administration is as follows:<br />
1) Salary = Rs. 69.00 lakh<br />
2) T.E. = Rs. 5.00 lakh<br />
3) Office Expenses = Rs. 5.00 lakh<br />
4) Maintenance = Rs. 10.00 lakh<br />
Total = Rs. 89.00 lakh<br />
MACHINERY AND EQUIPMENT:<br />
No provision is kept for procurement of Machinery & Equipments during <strong>2006</strong>-07.<br />
WORKS:<br />
Rs. 231.00 lakh is approved for works under this Head of Account during <strong>2006</strong>-<strong>2007</strong>.<br />
Spill over Schemes<br />
Constn. of functional quarters for Engineer–in–Chief, PWD Office :<br />
Rs. 16.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
New Schemes<br />
1. Renovation of IE of various Govt. Buildings:<br />
Rs. 20.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>..<br />
2. Renovation, retrofitting of various Govt. quarters, septic tanks at Aizawl and<br />
Preparation of Raj Bhavan for Independence day, Republic Day :<br />
Rs. 39.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
3. Furnishing of VIP Bungalow :<br />
Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
4. Constn. of additional Staff Quarters at Bualpui (Ng).<br />
Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />
5. Construction of additional staff Quarters at Lawngtlai :<br />
Rs. 25.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>
- 423 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
6. Improvement and Renovation of Govt. Quarters at Lunglei :<br />
Rs. 25.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
7. Improvement and Renovation of Govt. Quarters at Saiha :<br />
Rs. 20.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
8. Improvement and Renovation of Govt. Quarters at Kolasib :<br />
Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
9. Improvement and Renovation of Govt. Quarters at Champhai :<br />
Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
10. Improvement and Renovation of Govt. Quarters at Mamit :<br />
Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
11. Improvement and Renovation of Govt. Quarters at Serchhip :<br />
Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
12. Construction of Treasury Officer’s Quarters at Saiha :<br />
Rs. 6.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>
- 429 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
POLICE HOUSING<br />
The fund provided under Police Housing plan is the main financial source for<br />
construction of office and residential quarters of Police Officers. Under this scheme, various<br />
types of residential quarters and administrative buildings such as office buildings, Police<br />
Station buildings and Out Post buildings, etc. had been constructed at various places in<br />
<strong>Mizoram</strong> since 1980. As a result of this, the condition of <strong>Mizoram</strong> Police is upgraded to<br />
some extend. As such, the introduction of Police Housing Schemes under Plan is very<br />
helpful for <strong>Mizoram</strong> Police.<br />
However, the State Government is unable to provide sufficient amount of fund for<br />
construction of more houses/buildings yearly as per requirement where sufficient lands are<br />
available, mainly due to financial constraint. The satisfaction level as targeted by BPR&D in<br />
respect of lower subordinate and upper subordinate is far from the present satisfaction<br />
level of <strong>Mizoram</strong> Police Housing.<br />
The State Government had fortunately increased the total annual outlay for 2005-06<br />
to Rs. 435.00 lakh. In addition to this, a sum of Rs. 130.00 lakh is further re-allocated under<br />
Police Housing (Plan) for clearing liabilities of fencing materials.<br />
The approved Annual Plan for the year <strong>2006</strong>-07 for construction of various types of<br />
residential and administrative buildings etc is prepared within the amount of Rs. 545.00<br />
lakh in accordance with Commissioner, Planning & Programme Implementation Department,<br />
Govt. of <strong>Mizoram</strong> letter No. G. 28014/55/<strong>2006</strong>-07/SPB dt. 02.02.06.<br />
As there is no other relevant Scheme / head of account, construction of approach<br />
roads to BOP N.E. Khawdungsei, OP Thenzawl, SP’s Office Serchhip, Kolasib, 2 nd IR Bn.<br />
Khawzawl and repair of Internal motorable road of PTC Lungverh, which was damaged by<br />
heavy rains this year are also included and proposed in this Annual Plan <strong>2006</strong>-07. These<br />
proposals are required to be taken up urgently.<br />
The detail item-wise of plan proposal for Annual Plan <strong>2006</strong>-07 is enclosed herewith<br />
for favour of consideration and approval of the Government.
- 430 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
WORKS TO BE TAKEN UP UNDER <strong>PLAN</strong> DURING <strong>2006</strong>-07<br />
(Amount in Rupees)<br />
Sl/N Location Type of buildings No. Rate Amount<br />
1 Aizawl IGP Residence 1 Token provision 10,00,000.00<br />
2 Serchhip S.P. Residence 1 Token provision 10,00,000.00<br />
3 Mamit S.P. Residence 1 Token provision 10,00,000.00<br />
4<br />
Lunglei, 2nd Bn.<br />
MAP<br />
Commandant<br />
Residence<br />
1 Token provision 10,00,000.00<br />
5 Lunglei S.P. Office 1 Token provision 10,00,000.00<br />
6 Aizawl S.P. Security Office 1 Token provision 10,00,000.00<br />
7<br />
Lunglei, 2nd Bn.<br />
MAP<br />
Type-IV 1 8,75,000.00 8,75,000.00<br />
8 Lungsen Type-III (Semi) 1 6,73,700.00 6,73,700.00<br />
9 Mamit Type-II, 2 Units (RCC) 1 10,92,000.00 10,92,000.00<br />
10 Saron Veng, Aizawl Type-II 6 Units (RCC) 1 26,12,000.00 26,12,000.00<br />
11 2nd IR Khawzawl Type-II, 2 Units 'B' 2 4,20,000.00 8,40,000.00<br />
12 2nd IR Khawzawl Type-II 2 3,50,000.00 7,00,000.00<br />
13 1st IR Bn. Mualvum Type-II (Semi) 2 5,46,000.00 10,92,000.00<br />
14<br />
Armed Veng,<br />
Aizawl<br />
Type-II 'B' 6 3,50,000.00 21,00,000.00<br />
15 Mimbung 15 Men Barrack 1 6,53,000.00 6,53,000.00<br />
16 Mimbung Kitchen-cum-Dining 1 2,82,000.00 2,82,000.00<br />
17 NE Khawdungsei Appr. road to BOP 1 6,00,000.00 6,00,000.00<br />
18 Thenzawl Appr. road to OP 1 6,00,000.00 6,00,000.00<br />
19 Serchhip<br />
Appr. road to SP<br />
Office & residence<br />
1 5,00,000.00 5,00,000.00<br />
20 Kolasib<br />
Approach road to SP<br />
Office Kolasib<br />
1 2,00,000.00 2,00,000.00<br />
21<br />
2nd IR Bn.<br />
Khawzawl<br />
Appr. Road to 2nd IR<br />
Bn. Khawzawl<br />
1 17,00,000.00 17,00,000.00<br />
22 PTC Lungverh Internal jeepable road 1 3,65,700.00<br />
23 Renovation 16,14,600.00<br />
24 Fencing material 150,00,000.00<br />
ON-GOING WORKS<br />
25 Kolasib<br />
26 Mamit<br />
27<br />
28<br />
2nd IR Bn.<br />
Khawzawl<br />
2nd Bn. MAP<br />
Lunglei<br />
29 Lawngtlai<br />
Administrative<br />
Building<br />
Administrative<br />
Building<br />
Administrative<br />
Building<br />
Administrative<br />
Building<br />
Administrative<br />
Building<br />
1 109,97,000.00 30,00,000.00<br />
1 109,97,000.00 30,00,000.00<br />
1 109,97,000.00 30,00,000.00<br />
1 122,37,000.00 30,00,000.00<br />
1 122,37,000.00 30,00,000.00<br />
30 Aizawl FSL Building 1 269,63,200.00 20,00,000.00<br />
TOTAL :<br />
36 nos. (i.e.<br />
44 units)<br />
545,00,000.00
- 433 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
URBAN DEVELOPMENT (L.A.D.)<br />
A. Proposed Tenth Five Year Plan 2002 – <strong>2007</strong> - Rs. 3,988.00 lakh<br />
B. Revised App. Annual Plan Outlay 2005-<strong>2006</strong> - Rs. 1727.00 lakh<br />
C. Approved Annual Plan Outlay1 <strong>2006</strong> – <strong>2007</strong> - Rs. 1358.00 lakh<br />
Following schemes are approved to be taken up during <strong>2006</strong> – <strong>2007</strong>: —<br />
050 - LAND<br />
1. Construction of Minor Roads - Rs. 5.00 lakh<br />
2. Construction of Parks - Rs. 40.53 lakh<br />
3. Construction of Steps - Rs. 150.00 lakh<br />
4. Dumping Ground - Rs. 10.00 lakh<br />
5. Monsoon Damage Scheme - Rs. 70.00 lakh<br />
051 - CONSTRUCTION<br />
6. RCC Footpath/Pedestrian Pavement - Rs. 30.00 lakh<br />
7. Office Building - Rs. 20.00 lakh<br />
8. Cleanliness Week /Beautification of City - Rs. 20.00 lakh<br />
052 - MACHINERY & EQUIPMENT<br />
9. Sanitation - Rs. 55.30 lakh<br />
800 - OTHER EXPENDITURE<br />
10. Clean <strong>Mizoram</strong> - Rs. 20.00 lakh<br />
11. Matching Share of SJSRY - Rs. 158.00 lakh<br />
12. Environmental Improvement of Urban Slum (EIUS) - Rs. 28.00 lakh<br />
13. 01-Direction & Adminstration - Rs. 76.17 lakh<br />
14. JN-NURM - Rs. 675.00 lakh<br />
TOTAL - Rs. 1358.00 lakh<br />
BRIEF DESCRIPTION OF THE SCHEME<br />
1. CONSTRUCTION OF MINOR ROADS: The programmed is to maintain approach road<br />
to Dumping Grounds and also for approach road to Departmental areas etc. and Rs. 5.00<br />
lakh is allocated for <strong>2006</strong> - <strong>2007</strong>.<br />
2. CONSTRUCTION OF PARKS: Busy and unrest lives in the congested Towns and Cities<br />
are in need of some recreational places, where people could enjoy their leisure time.<br />
Without such places, lives in Towns and Cities could be frustrated and vain. During the 9 th<br />
Plan, 2(two) such recreational places were created, one at Aizawl called Public Recreational<br />
Centres, at Lawibual and the other at Lunglei called District Park, at Zobawk. Within an<br />
expenditure of Rs. 60.00 lakh, many works have been done with very useful achievements.<br />
But there are many scopes of further improvement and the two places are again proposed to<br />
be continued in the 10 th Plan as continuing schemes. Apart from this, the Department is<br />
starting establishment of Recreation Centre & Public Park at Kolasib and at near Lengpui<br />
Airport. Fund amounting to Rs. 100.00 lakh is proposed for the 10 th Plan and Rs. 40.53 lakh<br />
is provided for <strong>2006</strong> - <strong>2007</strong> to continue the schemes.
- 434 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. CONSTRUCTIONS OF STEPS/RETAINING WALLS: Towns in <strong>Mizoram</strong> are situated on<br />
spur of Hills which steep down to the gorges of streams below between the spurs. Roads<br />
and residential lines go on the spurs in horizontal lines,. The only possible vertical link<br />
between the adjacent rows could be provided by construction of public foot steps just like<br />
staircases in multi-stories buildings. Due to irregular topography each and every spur in the<br />
Towns requires a number of foot steps. During the 9 th Plan, Rs. 275.00 lakh was utilised for<br />
construction of 39840 running metres of public steps at may places in the various Towns.<br />
Still much has to be done and the scheme is proposed to be continued in the 10 th Plan as<br />
new schemes in view of the fact that every item of works shall be taken up as new works.<br />
Rs. 950.00 lakh is proposed for the 10 th Plan for target of 103900 running meters Rs. 150.00<br />
lakh is provided for <strong>2006</strong> - <strong>2007</strong>. The allocation is for distribution to District Headquarters<br />
as necessary.<br />
4. DUMPING GROUND: The existing two dumping grounds in Aizawl City are in need of<br />
Improvement. Similarly, Dumping Ground in other towns viz. Lunglei, Champhai and<br />
Kolasib are in need of expansion and improvement. A need has been felt to construct<br />
another dumping ground in the other direction route in order that town garbages could be<br />
disposed off all through the seasons. For these purposes, Rs. 80.00 lakh is proposed for the<br />
10 th Plan Rs. 10.00 lakh is allocated for <strong>2006</strong>-<strong>2007</strong>. The main work shall be road<br />
construction for some distance from the main road, digging of dumping pits, construction<br />
of dumping platform as well as protection walls and vehicle turning points. etc.<br />
5 MONSOON DAMAGE SCHEME :<br />
Damage caused to roads, lanes, houses, properties and even lives due to heavy rains<br />
during rainy season are almost annual phenomenon in <strong>Mizoram</strong>.Here annual rainfall is<br />
mostly 250cm to 350cm, and the approximate intensity of rainfall is 70m per hour. Due to<br />
steep topography, the concentration flow of rain water is short and rapid. The very high<br />
peak flow of rain water causes landslides, thereby damaging roads, lanes, houses and<br />
properties. Hence restoration and repair works have to be taken up every year. A need is<br />
there to set apart certain outlay for such purposes as Monsoon damage fund. The proposed<br />
outlay for the 10 th Plan 2002 - <strong>2007</strong> is Rs. 300.00 lakh. Rs. 70.00 lakh is allocated for <strong>2006</strong> -<br />
<strong>2007</strong>.<br />
6. RCC FOOTPATH/PEDESTRIAN PAVEMENT: Rs. 30.00 lakh is earmarked for the<br />
construction and also for the maintenance of the existing Pedestrian pavements for the<br />
year <strong>2006</strong> - <strong>2007</strong><br />
7. HIGH MAST LIGHTING: No earmarked during <strong>2006</strong> – <strong>2007</strong>.<br />
8. FLY-OVER BRIDGE: No earmarked during <strong>2006</strong> – <strong>2007</strong>.<br />
9. OFFICE BUILDING: During the 9 th Plan, two District Level Offices were constructed in<br />
Aizawl and it is badly required the expansion of the size as well as activities of the<br />
department. There is an urgent need of extending the Directorate Office, the Circle Offices<br />
at Champhai, Kolasib and the DLAO Office at Aizawl and Lunglei. It is therefore proposed<br />
to provided Rs. 70.00 lakh during the 10 th Plan for Office building. During <strong>2006</strong> – <strong>2007</strong>, Rs.<br />
20.00 lakh is earmarked for the maintenance of Office Buildings.<br />
10. SOLID WASTE MANAGEMENT: No earmarked during 2005 – <strong>2006</strong>.<br />
11 GARBAGE TRUCK TERMINAL: No earmarked during 2005 – <strong>2006</strong>.
- 435 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
12. CLEANLINESS / BEAUTIFICATION OF CITY: Cleanliness Drive has been carried out in<br />
<strong>Mizoram</strong> since 1977 without break. Awareness campaign as well as physical works of<br />
cleanliness have been done every year. The local authorities, the NGO’s, the Church leaders<br />
and the students of various levels have been involved in such important drives. It has long<br />
been felt necessary to make plan provision for such kind of important public activities.<br />
Besides this, the Department is intending to take steps towards beautification of Aizawl City<br />
for the 10 th Plan. Rs. 80.00 lakh is proposed, Rs. 20.00 lakh is earmarked for implementation<br />
of the programme like observance of cleanliness week and also for the beautification of<br />
Aizawl City during <strong>2006</strong> – <strong>2007</strong>.<br />
13. SANITATION: The term Sanitation is hereby used to express the problems of<br />
garbage in the towns with clearance and disposal there of with all the required devices such<br />
as man powers, vehicles and other implements, maintenance of dumping grounds, public<br />
urinals and many other urban problems of the like nature. A seperate establishment to deal<br />
with this kind of problems has been set up in Aizawl mostly paid and run from Non-Plan<br />
provisions. A need has long been felt to expand the Sanitation establishment by creating few<br />
more posts like the Joint Director (Sanitation) field staff including Sweepers. The reasons is<br />
that the problems are numerous and the existing level of the one Sanitation Officer, two<br />
Assistant Sanitation Officers and Supporting Offices Staff and Field Staff could not cope<br />
with the problems. It is proposed to take up this expansion scheme in the plan side during<br />
the 10 th Plan. A need is also felt to open new Sanitation Establishments in Lunglei, Champhai<br />
and Kolasib. However, the details of the requirement for the expansion is shown against<br />
point No. 16 - Direction & Administrations. Exclusively for management of collection and<br />
disposal of garbage, daily cleaning of important public places, public urinals, etc. Rs. 200.00<br />
lakh is proposed for the 10 th Plan. Recently collection of garbage two times a day was<br />
introduced at Aizawl and for which Rs. 55.30 lakh is earmarked for maintenance and keep<br />
up of garbage trucks and other expenditures to run the sanitation function at Aizawl and<br />
other District Headquarters.<br />
Break up of Rs. 55.30 lakh.<br />
(13) O.E - Maintenance of Light Vehicle & Office expenditure - Rs. 7.00 lakh<br />
(3 Nos. of LMV & 8 Two wheeler)<br />
(50) O.C - Other charges - Rs. 9.00 lakh<br />
(51) M.V. - (a) P.O.L.<br />
(b) For repairing of Vehicle<br />
(c) For Purchase of Tyres<br />
(There are 19 Heavy Vehicles for Sanitation)<br />
- Rs. 39.30 lakh<br />
TOTAL - Rs. 55.30 lakh<br />
14. SHOPS AND MARKETING CENTRES: No provision during 2004 - 2005.<br />
15. CLEAN MIZORAM: CLEAN MIZORAM SOCIETY has been formed by the Government<br />
of <strong>Mizoram</strong> to propagate the gospel of cleanliness in the whole of the state since the last<br />
part of 2005 – <strong>2006</strong> and Rs. 20.00 lakh was provided during the year for the initial<br />
establishment.<br />
Since the Local Administration Department is a Nodal Department, fund provision is<br />
made against the Urban Development (LAD) and the provision is to be given to the society as<br />
Grants-in-Aid. Rs. 20.00 lakh is earmarked for the year <strong>2006</strong> – <strong>2007</strong>.
- 436 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
16. MATCHING SHARE OF SJSRY: During the 9 th Plan, the annual central grant for SJSRY<br />
in <strong>Mizoram</strong> is mostly Rs.128.00 lakh per year. It is expected to receive more grants every<br />
year and the proposed matching share is slightly higher for during the 10 th Plan than those<br />
during the 9 th Plan period. Hence, Rs. 158.00 lakh is earmarked during <strong>2006</strong> – <strong>2007</strong>.<br />
17. ENVIRONMENTAL IMPROVEMENT OF URBAN SLUM: Although any part or portion of<br />
towns in <strong>Mizoram</strong> has not been identified a Slum area, yet any parts there of, mostly in the<br />
lower reaches, are obviously in the condition of slums. Link road is a problem, scarcity of<br />
drinking water is there, electricity is a problem and above all drainage problems have<br />
assumed proportion that is more serious. With rapid urbanisation during the last 20 years,<br />
the towns are rapidly expanding and the larger parts of the towns now occupy the lower<br />
reaches of the hill slopes where drainage problems are very serious due to uncontrolled<br />
flow of storm water. In short, cluster of dwelling houses are without basic amenities. For<br />
the 10 th Plan, Rs. 175.00 lakh is proposed for EIUS. During <strong>2006</strong> - <strong>2007</strong>, Rs. 28.00 lakh is<br />
allocated for the schemes.<br />
18. DIRECTION AND ADMINISTRATION: During the 8 th Plan, the following post have<br />
been created and filled up, and were continued during the 9 th Plan. Obviously the posts are<br />
required to implement the 10 th Plan schemes as well as to carry on the Administrative<br />
aspects connected with the plans. In addition to the existing posts, certain new posts are<br />
also urgently required as briefly explained against point No. 12 (Sanitation). For the 10 th<br />
Plan, Rs. 400.00 lakh is proposed. Rs. 76.17 is earmarked during <strong>2006</strong> - <strong>2007</strong>.<br />
Break - up of 2004 - 2005 will be as follows :-<br />
(i) Salary : Rs. 33.67 lakh<br />
(ii) Wages : Rs. 8.00 lakh<br />
(iii) Medical Treatment : Rs 2.00 lakh<br />
(iii) T.E : Rs. 1.50 lakh<br />
(iv) O.E : Rs. 13.00 lakh<br />
(v) Motor Vehicles : Rs. 10.00 lakh<br />
(vi) Other Charges : Rs. 8.00 lakh<br />
Total : Rs. 75.00 lakh<br />
LIST OF EXISTING POSTS<br />
1. 1 (One) Joint Director - 12000 - 18000<br />
2. 2 (two) Deputy Director - 10000 - 15200<br />
3. 1 (one) Circle Officer - 6500 - 10500<br />
4. 1 (one) Assistant Engineer - 8000 - 13500<br />
5. 1 (one) Junior Engineer - 5500 - 9000<br />
6. 2 (two) Assistants - 5500 - 9000<br />
7. 3 (three) UDC’s - 5500 - 9000<br />
8. 5 (five) LDC’s - 4000 - 6000<br />
9. 2 (two) Town Supervisors - 4500 - 7000<br />
10. 1 (one) Steno Gr. III - 5000 - 8000<br />
11. 7 (seven) Drivers - 3050 - 4590<br />
12. 4 (four) Handyman - 2650 - 4000<br />
13. 7 (seven) Sweepers - 2650 - 4000
- 437 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PROPOSED NEW POSTS<br />
1. 1 (one) Jt Director or its equivalent post (Sanitation) - 12000 - 80000<br />
2. 1 (one) Steno Gr. III - 5000 - 8000<br />
3. 1 (one) Office Superintendent - 8000 - 13500<br />
4. 1 (one) Driver - 3050 - 4590<br />
5. 1 (one) Sanitation Officer (Lunglei) - 8000 - 13500<br />
6. 1 (one) Assistant (Lunglei) - 5500 - 9000<br />
7. 2(two) LDC (Lunglei) - 4000 - 6000<br />
8. 1 (one) Drive (Lunglei) - 3050 - 4590<br />
9. 40 (forty) Sweepers - 2650 - 4000<br />
10. 10 (ten) Lorry Attendants - 2650 - 4000<br />
19. Jawaharlal Nehru National Urban Renewal Mission (JN-NURM): A new scheme known<br />
as Jawaharlal Nehru National Urban Renewal Mission (JN-NURM) during the later part of<br />
2005-06. The Government of <strong>Mizoram</strong> has allocated / Earmarked amounting to Rs. 675.00<br />
lakh for the year <strong>2006</strong> – <strong>2007</strong>.
- 441 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
URBAN DEVELOPMENT<br />
(Incl. State Capital Project & Upgradation of Standard of Administration)<br />
1. Direction And Administration:<br />
A sum of Rs. 230.00 lakh is provided for Direction & Administration during 10 th Five<br />
Year Plan and Rs. 100.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
The break-up of Direction & Administration is as below: —<br />
1) Salary - Rs. 85.00 lakh<br />
2) T.E. - Rs. 2.00 lakh<br />
3) Office Expenses - Rs. 5.00 lakh<br />
4) Motor Vehicles - Rs. 4.00 lakh<br />
Total - Rs. 96.00 lakh<br />
2. Machinery and Equipment:<br />
No provision is kept for Machinery and Equipment during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Planning and Research:<br />
No provision is kept for Planning and Research during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Works (Urban Development):<br />
Rs. 2.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong> for improvement of road side<br />
drains within Aizawl City.<br />
Rs 2.00 lakh is approved during <strong>2006</strong> – <strong>2007</strong> for improvement of road side<br />
drains within Lunglei town.
- 445 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
TOWN & COUNTRY <strong>PLAN</strong>NING<br />
(Rs. in lakh)<br />
A. 2217 - 03 IDSMT (REVENUE SECTION): AIZAWL LUNGLEI TOTAL<br />
1. Land Planning & Development, Master<br />
Plan/Action Plan Project preparation : 3.00 1.00 4.00<br />
2. M & E – cum – I.T. : 6.00 - 6.00<br />
3. D & A : 42.00 12.50 55.00<br />
TOTAL OF 2217 : 51.50 13.50 65.00<br />
B. 4217 - 03 IDSMT (CAPITAL SECTION):<br />
1. Implementation of approved Master Plans Schemes,: Rs. 11.00 lakh<br />
viz. - Landuse Development Regulation & Control through<br />
Layout Plan/Sub.Division, Building Regulation & Control,<br />
Construction (formation cutting) of lane roads, construction<br />
of storm drains etc.<br />
2. State Matching Share for approved Projects, viz. -<br />
1) Hnahthial Action Plan Project : Rs. 20.00 lakh<br />
2) Lunglei Action Plan Project : Rs. 8.00 lakh<br />
3) Lengpui Action Plan Project : Rs. 2.00 lakh<br />
4) Mamit Action Plan Project : Rs. 2.00 lakh<br />
5) Bairabi Action Plan Project : Rs. 12.00 lakh<br />
6) Tlabung Action Plan Project : Rs. 12.00 lakh<br />
7) N. Kawnpui Action Plan Project : Rs. 12.00 lakh<br />
TOTAL OF 4217 : Rs. 79.00 lakh<br />
GRAND TOTAL (A+B) : Rs. 144.00 lakh<br />
C. ABSTRACT IN BRIEF:<br />
1. Land Planning & Development, Master<br />
1) WORK COMPONENT Rs. 83.00 lakh : 57.64 %<br />
2) PROCUREMENT OF TOOLS & <strong>PLAN</strong>TS Rs. 6.00 lakh : 4.16 %<br />
3) DIRECTION & ADMINISTRATION, ETC. Rs. 55.00 lakh : 38.20 %<br />
TOTAL Rs.144.00 lakh 100.00 %<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />
NAME OF OFFICE/DEPT. : Town & Country Planning Wing, L.A.D.<br />
SUBJECT : Integrated Deevelopment of Small & Medium Towns<br />
Town & Country Planning has a multifarious function. It deals with the problems of<br />
Urban Planning and Development in the state. It prepares Master Plan Development Scheme<br />
etc., for Cities and Towns in <strong>Mizoram</strong>. It prepared detail development schemes, projects and<br />
executes works under centrally sponsored schemes of Integrated Development of Small &<br />
Medium Towns (now Urban Infrastructure Development Schemes for Small & Medium<br />
Towns (UIDSSMT) and Schemes under Non-Lapsable Central Pool of Resources(NLCPR). In<br />
addition to this, landuse/development and construction of building has been regulated<br />
within the approved Master Plan areas by enforcing <strong>Mizoram</strong> Urban & Regional Development<br />
Act, 1990 amended in 1996 & 2004 and Rules, 1998.<br />
During <strong>2006</strong>–07, the department proposed to continue preparation Master Plan for<br />
district headquarter and implementation of approved Master Plan schemes, such as —<br />
regulation & control of land use/development, regulation & control of building construction,
- 446 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
construction (formation cutting) of lane roads, construction of storm water drains/retaining<br />
wall etc. and construcion of ongoing market etc. projects.<br />
It also proposed to continue the projects which are not completed during 2005–06<br />
and takes up under the new schemes of Urban Infrastructure Development Schemes for<br />
Small and Medium Towns (UIDSSMT) which is being introduced by Govt. of India, Ministry<br />
of Urban Development replacing the present centrally sponsored scheme of IDSMT.<br />
The approved financial outlay during <strong>2006</strong> – <strong>2007</strong> is as follow :-<br />
Annual Plan 2005 – <strong>2006</strong> ——————- Rs. 124.00 lakh<br />
Annual Plan <strong>2006</strong> – <strong>2007</strong> ——————- Rs. 144.00 lakh<br />
Details are as follows :-<br />
A. 2217 - INTEGRATED DEVELOPMENT OF SMALL & MEDIUM TOWNS (REV.)<br />
: AIZAWL LUNGLEI TOTAL<br />
1. D & A : 42.50 12.50 55.00<br />
2. M & E-cum-I.T. : 6.00 - 6.00<br />
3. Land Planning & Development, : 3.00 1.00 4.00<br />
Master Plan/Action Plan Project preparation<br />
TOTAL OF 2217 : 51.50 13.50 65.00<br />
DETAILS OF 2217 of IDSMT (Rev.)<br />
(Rs. in lakh)<br />
Sl. Aizawl Lunglei<br />
No. Detail Description Hq. Branch Office Total<br />
1. Salary 18.00 5.40 23.40<br />
2. Medical Treatment 2.00 0.60 2.60<br />
3. Wages 3.76 1.30 5.06<br />
4. Traveling Expenses 1.00 0.60 1.60<br />
5. Office Expenses 6.50 2.00 8.50<br />
6. Rent 1.94 - 1.94<br />
7. Land Planning & Development / 3.00 1.00 4.00<br />
Master Plan/Action Plan Project preparation<br />
8. Workshop/Seminar/Stipend 0.30 - 0.30<br />
9. Motor Vehicles 8.00 2.00 10.00<br />
10. Other Charges 1.00 0.60 1.60<br />
11. M & E 6.00 - 6.00<br />
TOTAL OF D & A : 51.50 13.50 65.00<br />
B. 4217 - INTEGRATED DEVELOPMENT OF SMALL & MEDIUM TOWNS<br />
(Now URBAN INFRASTRUCTURE DEVELOPMENT SCHEMES FOR SMALL & MEDIUM<br />
TOWNS)<br />
(CAPITAL SECTION)<br />
1. Land Planning & Development - - NIL-<br />
2. Construction - Rs. 79.00 lakh<br />
TOTAL - Rs. 79.00 lakh
- 447 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Detail of schemes proposed to be taken up during <strong>2006</strong> - <strong>2007</strong> under 4217 IDSMT<br />
(Capital) are as follows :<br />
A. IMPLEMENTATION OF <strong>APPROVED</strong> MASTER <strong>PLAN</strong> SCHEMES<br />
1) Aizawl Master Plan Schemes/Land/Building regulation & - Rs. 4.00 lakh<br />
Control/MC Hall Western slopes stability measures<br />
2) Hnahthial Master Plan Schemes/Land/Building regulation - Rs. 4.00 lakh<br />
Construction of Lane roads/storm drains/demarcation of plots<br />
3) Kolasib Master Plan Schemes/Land/Building regulation - Rs. 2.50 lakh<br />
Control/construciton of Lane roads<br />
4) Lunglei Master Plan Schemes/Land/Building Regulation & Control - Rs. 0.50 lakh<br />
TOTAL - Rs. 11.00 lakh<br />
B. DETAIL OF CONSTRUCTION (STATE MATCHING SHARE)<br />
Sl.No. Name of On-going Schemes Allocation of Funds<br />
1. LUNGLEI ACTION <strong>PLAN</strong>/PROJECT:<br />
1) Construction of Office Building/Vehicle Parking - Rs. 8.00 lakh<br />
2. HNAHTHIAL ACTION <strong>PLAN</strong>/PROJECT:<br />
1) Construction of C. Hall at Hnahthial - Rs. 20.00 lakh<br />
3. LENGPUI ACTION <strong>PLAN</strong>/PROJECT:<br />
1) Construction of Car/Vehicle Parking - Rs. 2.00 lakh<br />
4. MAMIT ACTION <strong>PLAN</strong>/PROJECT:<br />
1) Construction of Market buildings/Vehicle Parking/<br />
Playground - Rs. 2.00 lakh<br />
5. BAIRABI ACTION <strong>PLAN</strong>/PROJECT:<br />
1) Construction of Market Building/Vehicle Parking/<br />
Playground etc. - Rs. 12.00 lakh<br />
6. TLABUNG ACTION <strong>PLAN</strong>/PROJECT:<br />
1) Construction of Market Building, Side/<br />
Storm drains etc. - Rs. 12.00 lakh<br />
7. N. KAWNPUI ACTION <strong>PLAN</strong>/PROJECT:<br />
1) Construction of Market Building, side/ - Rs. 12.00 lakh<br />
storm drains/Pavement etc.<br />
TOTAL - Rs. 68.00 lakh<br />
TOTAL OF 4217 - Construction (A+B) - Rs. 79.00 lakh<br />
GRAND TOTAL OF ( 2217 + 4217 ) - Rs.144.00 lakh
- 448 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
A. SCHEME-WISE DESCRIPTION OF 2217 [REVENUE]<br />
1. LAND <strong>PLAN</strong>NING & DEVELOPMENT:<br />
Preparation of Development Plan/Master Plan: Rapid increase in urban population<br />
of the state has led to haphazard growth of towns which call for proper planning<br />
and regulated devleopment. Out of the total 22 nos. of statutory towns in <strong>Mizoram</strong><br />
only half a dozen of the towns have so far been planned. This indicated the need<br />
for preparation of Master Plan/Development Plan under relevant Act for<br />
meaningful planned growth and regulated development of these towns. Moreover,<br />
enforcement of the <strong>Mizoram</strong> Urban & Regional Development Act 1990 amended in<br />
1996 & 2004 and Rules 1998 necessitated all the towns in <strong>Mizoram</strong> to be planned for<br />
regulated development under the said Act & Rules. It is, however, understood that all<br />
the towns cannot be covered at a time and hence a provision of Rs. 3.00 lakh is<br />
envisaged during <strong>2006</strong> - <strong>2007</strong> for preparation of Master Plan/Development Plan viz. -<br />
Kawnpui, Mamit and Rawpuichhip.<br />
Besides, Rs. 1.00 lakh is envisaged for preparation of Master Plan of Tlabung.<br />
2. MACHINERY & EQUIPMENT INCLUDING INFORMATION TECHNOLOGY:<br />
The rapid urbanisation process in <strong>Mizoram</strong> coupled with tremendous urban<br />
problem necessitates Modern Equipments & Scientific Instruments like Computers/<br />
Laptop Computers with large format colour Scanner and ploter for degitising Maps,<br />
Drawings, Designs etc. These unstument are also required for protecting important<br />
department documents. In order to augment the technical capabilities of officers and<br />
staffs purchase of above stated machines (tools & plants) is necessary to procure<br />
during <strong>2006</strong> - <strong>2007</strong>. Hence, a token provision of Rs. 6.00 lakh is earmarked for<br />
purchase of instruments and maintenance of existing instruments.<br />
3. DIRECTION & ADMINISTRATION (D & A):<br />
i) Entertainment of Existing Staff / Salary & Creation of essential New Post etc.:<br />
There are 14 posts which have been maintained and continue to be maintained<br />
under Plan Scheme. Such posts are ——<br />
Sl.No. Name of Post No. of Post Scale of pay<br />
1. Sr. Town & Country Planner 1 Rs. 12000 - 375 - 165<br />
2. Town & Country Planner 2 Rs. 10000 - 325 - 15200<br />
3. Asst. Town & Country Planner 4 Rs. 8000 - 275 - 13500<br />
4. Planning Assistant/JE 3 Rs. 5500 - 175 - 9000<br />
5. Urban Surveyor I 1 Rs. 5500 - 175 - 9000<br />
6. Urban Surveyor II 1 Rs. 4500 - 125 - 7000<br />
7. Draft man II 1 Rs. 4500 - 125 - 7000<br />
8. U.D.C. 1 Rs. 5000 - 150 - 8000<br />
TOTAL 14<br />
Besides, the Town & Country Planning is facing serious problem in the execution of<br />
important schemes owing to inadequacy of technical man-power. Due to un-planned<br />
and un-regulated growth there is lot of problems in the urban areas such as natural<br />
and man-made disaster like landslides, un-scientific land development/cutting, undesigned<br />
building construction etc. It is, therefore, absolutely necessary to<br />
strengthen Town & Country Planning Administration by creating additional technical<br />
post such as Chief Town Planner and Stenographer Grade III to effectively deal with
- 449 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
land development and building regulation & control activities which come up rapidly<br />
on unsafe slope and undesigned High rise R.C.C. building construction and other<br />
urban problems.<br />
Hence, Rs. 23.40 lakh is earmarked for entertainment of existing staff.<br />
ii) Medical Treatment: Rs. 2.6 lakh is earmarked for the treatment of existing staff.<br />
iii) Wages: Due to ban on creation of post the Town & Country Planning Wing is<br />
facing tremendous problem both in fields and offices thereby resulting delay in<br />
preparation of Master Plan, Action Plan/Project/Schemes and execution of project<br />
works. So, a sum of Rs. 5.06 lakh is earmarked for engagement of existing Muster<br />
Roll employees like LDC/Typist etc. for the year <strong>2006</strong> - <strong>2007</strong>.<br />
iv) Travelling Expenses (T.E.): Apart from the ongoing works under NLCPR and<br />
IDSMT/UIDSSMT programmes, conduct of physical survey, traffic survey, building<br />
survey, identification of unsafe buildings and landslide prone areas, socio-economic<br />
survey, environment survey, etc. of various towns are part and parel of Master Plan<br />
preparation and implementation. Hence, a provision of Rs. 1.60 lakh i.e. Rs. 0.60 lakh<br />
for Lunglei and Rs. 1.00 lakh for Aizawl is earmarked during <strong>2006</strong>-07 to meet the<br />
Travelling Expenses and for inspection of building onstruction by the city dwellers<br />
and supervision of construction works under NLCPR and IDSMT/UIDSSMT which are<br />
scattered throughout the State and also for survey and investigation of the towns<br />
and growth centres.<br />
v) Office Expense (O.E.): A token provision of Rs. 8.50 lakh, of which Rs. 6.50 lakh<br />
for Aizawl Hq. & Rs. 2.00 lakh for Town & Country Plannng Branch Office Lunglei is<br />
earmarked to meet expenditure for stationery, furniture, maintenance of tools &<br />
plants and other miscellaneous articles during <strong>2006</strong> - <strong>2007</strong>.<br />
vi) Rent/Office Accommodation: Since the Office has no building of its own,<br />
private building is occupied for office on rent. Therefore, to meet the expenditure of<br />
rent for the whole year <strong>2006</strong> - <strong>2007</strong>, Rs. 1.94 lakh is earmarked.<br />
vii) Maintenance of Vehicle (M.V.): Projects undertaken by the Office are located far<br />
from Headquarters, hence good condition of Vehicle is absolutely necessary for<br />
supervision of Planning, land & building regulation & control, Development and<br />
Construction of Works. Therefore, a provision of Rs. 10.00 lakh, of which Rs. 8.00<br />
lakh for Aizawl Headquarters & Rs. 2.00 lakh for Town & Country Planning Branch<br />
Office Lunglei is earmarked for the year <strong>2006</strong> - <strong>2007</strong>.<br />
viii) Workshop/Seminar/Stipend: As per National Norms formulated by the<br />
Ministry of Urban Development, Government of India, One census/ notified town<br />
required 4 (four) number of qualified Town Planners, whereas, there are only 4<br />
(four) number of qualified Town Planners in the State to deal with 22 number of<br />
Town planning, development/land/building regulation & control, urbanisation<br />
problems in the State of <strong>Mizoram</strong>. Therefore, to send students to various Technical<br />
Institutes outside <strong>Mizoram</strong> and also to conduct Public Awareness Programme and<br />
organise Workshop/Seminar, a sum of Rs. 0.30 lakh is earmarked for the year <strong>2006</strong>-07.<br />
ix) Other Charges (OC): A provision of Rs.1.60 lakh is for other excharges, of which<br />
Rs. 1.00 lakh for Aizawl and Rs. 0.60 lakh for Lunglei.
B. 4217 - IDSMT - CAPITAL SECTION<br />
- 450 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. Implementation of Approved Master Plan Schemes: To arrest undesirable<br />
development and construction of buildings and for creation infrastructure &<br />
management of Towns/City, Master Plans has been prepared and approved by the<br />
State Government, Such as - Aizawl City (State Capital), Lunglei (Dist. Hq.), Champhai<br />
(Dist. Hq.), Kolasib (Dist. Hq.), Serchhip (Dist. Hq.), Hnahthial, Thenzawl etc. Hence<br />
for the implementation/execution of Master Plans schemes such as Landuse/<br />
Development regulation & control through Layout Plan/Land Sub-division, Building<br />
regulation & control, roads, parks, drains, slope stability measures, reconstituted of<br />
plots etc., a sum of Rs. 11.00 lakh is earmarked.<br />
2. State Maching Share of C.S.S.: In order to create urban infrastructures and to<br />
strengthen the economic base of towns and to generate employment opportunities,<br />
Integrated Action Plan Projects have been prepared and approved by the<br />
Government of India. Out of 22 census towns, 11 (eleven) priority towns have been<br />
approved by the Central Government under Centrally Sponsored Schemes for which<br />
State matching contribution is absolutely required to be provided. In fact, the<br />
required amount of State matching Share cannot be met in one financial year due to<br />
meage allocation of plan fund which necessitates provision of State share to be in a<br />
phase manner. During <strong>2006</strong> - <strong>2007</strong>, a provision of Rs. 68.00 lakh is earmarked for<br />
State matching contribution for the approved Action Plan Projects.<br />
3. Urban Infrastructure Development Scheme For Small & Medium Towns (UIDSSMT)<br />
Replace Previous IDSMT Scheme: The Government of India, Ministry of Urban<br />
Development has proposed to launch Urban Infrastructure Development Schemes for<br />
Small & Medium Towns (UIDSSMT). The Scheme aims at improvement in urban<br />
infrastructure in towns other than AIzawl City in a planned manner. This Scheme<br />
seeing replace IDSMT. The project under UIDSSMT is to be a big project which will<br />
involve large amount of fund.<br />
It is, therefore, extremely necessary for the State Govenment to provide more<br />
fund to match the Central grant so as to avail UIDSSMT scheme for other 21 towns in the<br />
State.
- 453 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
INFORMATION & PUBLIC RELATIONS<br />
Introduction:<br />
With the ushering in of an era of Peace in <strong>Mizoram</strong>, the role of Information & Public<br />
Relations has shifted from propaganda machine to publicity for public education of the<br />
various departmental schemes of the Government an added important role which is known<br />
as Public Relations has to be taken up in order that public confidence may be earned so that<br />
all the developmental schemes and plans may be translated into people’s movement.<br />
The Department is functioning with a Directorate at the Headquarters and Districts<br />
and Sub-Divisions in their respective areas. There are 6 (six) Rural Information Centers in<br />
the whole State manned by Technicians Grade III who function in the Centers in rented<br />
houses. With the rapid progress of development in various fields, it is felt inadequate to<br />
remit the functioning of the Department from these 6 (six) Rural Centers only as the<br />
majority of the people in the interior are deprived of their rights to information.<br />
With the advancement of Technology, it is indispensable for the Department to equip<br />
itself with modern techniques of communication such as Television / Video, Radio,<br />
Computers and all kinds of electronic media in order that the people of the State may be<br />
exposed to the rest of the country and vice-versa thus cementing National Integration to<br />
bring the people closer to the mainstream of National life. Cultural & Social Exchanges with<br />
other States must also be carried out.<br />
For combating the impending Famine due to Bamboo Flowering in the State, it is<br />
proposed to extend necessary assistance by executing various schemes during the year.<br />
Therefore, the following items are approved to be taken up during this year and<br />
Rs.270.00 lakh is earmarked during <strong>2006</strong> - <strong>2007</strong>.<br />
1. DIRECTION & ADMINISTRATION: During this year, we intended to carry out the<br />
following works as our place of work have to be strengthened and improved. And Rs. 30.00<br />
lakh is earmarked for these purposes: -<br />
1. Maintenance of our existing Directorate Building and<br />
completion of Conference Hall<br />
- Rs. 10.00 lakh<br />
2. Construction of Office building-cum-quarter at Mamit - Rs. 10.00 lakh<br />
3. Fencing of Departmental lands at various Districts - Rs. 10.00 lakh<br />
TOTAL - Rs. 30.00 lakh<br />
2. PRODUCTION OF FILMS: During the 9 th Five Year Plan, a few documentary video<br />
films are produced mainly for telecast over Doordarshan, New Delhi. Since it has not been<br />
possible for Doordarshan to make sufficient coverage on <strong>Mizoram</strong>, it has become necessary<br />
for the Government to produce a true image of <strong>Mizoram</strong> an its people so that the Mizos will<br />
be known to the rest of the country in a correct perspective and thereby removing<br />
misinformation about <strong>Mizoram</strong> and its people. The local transmission-cum-production<br />
centre of Doordarshan which came up recently is expected to open up more opportunities<br />
to participate in this powerful media. In addition to this, the Department produces <strong>Mizoram</strong><br />
Today, a video monthly news capsules which is included in the local programme of Cable<br />
T.V. Networks. To intensify production and improve standard and quality, better<br />
equipments and technical knowhow are required. Also we will continue Live Telecast of the<br />
Session of the State Legislative Assembly through local Cable T.V. Network. For these<br />
purposes, Rs. 8.00 lakh is earmarked for <strong>2006</strong>-<strong>2007</strong>.
- 454 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. PUBLIC EXHIBITION OF FILMS: With the growing menace of drug abuse and social<br />
evils it has become necessary to intensify public exhibition of films shows to educate the<br />
mass of people. For procurement and purchase of films on National Integration, Family<br />
Planning, Drug Abuse and other education films in the interior villages, an amount of<br />
Rs.6.00 lakh is provided during the year <strong>2006</strong>-<strong>2007</strong>.<br />
4. OTHERS:<br />
(a) TRAINING IN MASS COMMUNICATION: With the introduction of new techniques in<br />
Mass Communication, it is necessary for the Officers of this Department to undergo training<br />
courses to catch up with modern techniques and skills.<br />
(b) RESEARCH AND REFERENCE: Research and Reference Wing will have to be<br />
strengthened at the Directorate as well as in the Districts and Sub-Divisions.<br />
(c) Due to reallocation of the subject, the Right to Information Act, 2005 to the<br />
Department of Information & Public Relations. Intensive training will have to be conducted<br />
by this Department for State Public Information Officer, A.P.I.O. and Department Heads, etc.<br />
Hence, additional fund of Rs. 10.00 lakh is provided for the purpose of training in<br />
collaboration with Administrative Training Institute, Aizawl. With this additional proposal,<br />
the total amount of Rs. 16.00 lakh is set aside for training in Mass Communication, etc.<br />
during <strong>2006</strong>-07.<br />
5. ADVERTISING & VISUAL PUBLICITY: Advertising and Visual Publicity being the core<br />
of publicity for building the image of the Government in Government Public Relations<br />
works, it is proposed to intensify support of the developmental activities in the form of<br />
Advertising and Visual Publicity. Hence, an amount of Rs. 8.00 lakh is provided for the year<br />
<strong>2006</strong>-<strong>2007</strong>. In addition to this, due to the introduction of the Right to Information Act,<br />
Information, Research & Communication (IRC) has to be imparted to various functionaries of<br />
the Government in the State Capital as well as District and Sub-Divisional Headquarters.<br />
Hence, an additional amount of Rs. 10.00 lakh is provided for the year <strong>2006</strong>-07, thus making<br />
a total of Rs. 18.00 lakh.<br />
6. INFORMATION CENTRES: Information Centres in rural areas presently is<br />
operational and are housed in rented buildings and are inadequately staffed with minimum<br />
Audio visual equipments. To improve the conditions of this Information Centres and for<br />
renting of House for Information Centre at Delhi, an amount of Rs. 21.00 lakh is provided<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
7. PRESS INFORMATION SERVICES: Presently we are subscribing 3 (three) P.T.I.<br />
Services at Raj Bhawan, Chief Minister's Office and the Directorate and 3 (three) U.N.I.<br />
Services at Raj Bhawan, Chief Minister's Secretariat and the Directorate. During this year we<br />
proposed to continue subscription of PTI/UNI services. With price escalation and the<br />
subscription rate almost trebled, it has become necessary to increase the financial target to<br />
cover the expenditure for the services. Also the main function of the Departmental issue of<br />
Press Releases. For improving our press releases we proposed to purchase one high quality<br />
Xerox machine. Hence, Rs. 15.00 lakh is provided during 2005-<strong>2006</strong>.<br />
8. FIELD PUBLICITY: With the Government emphasis on rural development and<br />
bringing democracy at the grassroot level, it is necessary that field publicity is strengthened<br />
in all Districts, Sub-Division and wherever we have Information Centres, maximum mobility<br />
is necessary to reach the people at the grassroot level. For the functioning and maintenance<br />
of above, Rs. 21.00 lakh is provided during the year <strong>2006</strong>-<strong>2007</strong>.
- 455 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
9. SONGS AND DRAMA: To promote National Integration we have been receiving and<br />
sending cultural troupes from various states and to various states during the previous<br />
years. We propose to send more cultural troupes to different parts of the country. VVIPs/<br />
VIPs and officials from Central and other states visiting the state are gifted with traditional<br />
presentation items. An amount of Rs. 8.00 lakh is provided for taking up activities<br />
mentioned during <strong>2006</strong>-<strong>2007</strong>.<br />
10. PHOTO SERVICES: To record various development activities for publications as well<br />
as for release to the National papers, it has become necessary to enlarge and strengthen our<br />
Photo Service Section. As already mentioned earlier, with the commissioning of local T.V.<br />
Transmission-cum-Production Centre at Aizawl, it has become necessary to support this<br />
centre. We have to continue Photo coverages of important function within the State and the<br />
visit of VVIP/VIP and tours of our State VIPs. For this, an amount of Rs. 15.00 lakh is<br />
provided for the year <strong>2006</strong>-<strong>2007</strong>.<br />
11. PUBLICATION: Publication of developmental activities and facts about <strong>Mizoram</strong> will<br />
be intensified for both National as well as local consumption. It is also purposed to continue<br />
publication of Calendar and Diaries in the coming year. For this, an amount of Rs. 24.00<br />
lakh is provided during <strong>2006</strong>-<strong>2007</strong>.<br />
12. COMMUNITY RADIO AND TELEVISION: During the previous plans we have installed<br />
quite a number of Community Listening Sets as well as Community Viewing sets in rural<br />
areas. During this year, we propose to continue this scheme and Rs. 2.00 lakh is provided.<br />
13. CULTURAL AND SOCIAL ACTIVITIES: This Department is organising teams for<br />
performance both in <strong>Mizoram</strong> and outside. It has been the responsibility of this Department<br />
to receive visiting Cultural Troupes from outside <strong>Mizoram</strong>. Besides, the Department has also<br />
been sending Cultural Troupes to participate in the Republic Day Celebration in New Delhi.<br />
Also. At least 2 tribal representatives & escorting officers are proposed to be sent to New<br />
Delhi to witness Republic Day celebration of <strong>2006</strong>. For this, an amount of Rs. 14.00 lakh is<br />
earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />
1. For sending of Tribal Representative and<br />
escorting officer in the Republic Day celebration<br />
2. Republic Day Celebration in State Capital / District Capital - Rs. 14.00 lakh<br />
3. Bharat Darshan Tour / Press Tour , etc.<br />
4. Aizawl Darshan<br />
14. BAFFACOS: For combating the impending Famine due to Bamboo Flowering by<br />
extending necessary assistance under various schemes worked out by the Department under<br />
the Baffacos Scheme, it is intended to execute the following schemes during the year a total<br />
amount of Rs. 70.00 lakh is provided as per break-up below: -<br />
1 Publication - Rs. 18.00 lakh<br />
2. Production of Documentary Films - Rs. 10.00 lakh<br />
3. Multi-Media Publicity Campaign - Rs. 17.00 lakh<br />
4. Conducted Tour of Media Persons and Travel Writers - Rs. 9.00 lakh<br />
5. Publicity and Advertisement within & outside the<br />
State<br />
- Rs. 16.00 lakh<br />
TOTAL - Rs. 70.00 lakh<br />
TOTAL OF NORMAL <strong>PLAN</strong> PROPOSAL - Rs. 270.00 lakh
- 459 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
LABOUR & EMPLOYMENT<br />
The Directorate of Labour & Employment came into being during the middle of 1980,<br />
while an Employment Exchange was established at Aizawl in 1958 and Industrial Training<br />
Institute existed since 1964 while <strong>Mizoram</strong> was a part of the erstwhile Assam. During the<br />
period of Union Territory two District Employment Exchanges were established at Lunglei<br />
and Saiha along with the opening of two Sub-Divisional Employment Exchanges at Champhai<br />
and Chawngte. After <strong>Mizoram</strong> attained full statehood, the Sub-Divisional Employment<br />
Exchange at Champhai had been upgraded to a full-fledged District Employment Exchange.<br />
With the creation of new Districts in <strong>Mizoram</strong>, the Council of Ministers in its meeting<br />
decided to open District Employment Exchange at Kolasib and Lawngtlai District<br />
Headquarters, and new functioning as full-fledged District Employment Exchange.<br />
Under the Centrally Sponsored Scheme, three new Special Employment Exchanges<br />
are being set up at Aizawl, Lunglei and Saiha exclusively for the benefit of the Physically<br />
Handicapped Persons at the Central-State share of 80:20 ratio.<br />
Similarly, under the Prime Minister’s Special Economic Package for North-Eastern<br />
States for Vocational Training Programme (Craftsmen Training Scheme) Government of<br />
India approved to strengthen/modernise the existing ITI at Aizawl and establish two new<br />
ITIs at Lunglei and Saiha with Central assistance to the tune of Rs.635.12 lakh. The scheme<br />
is to be financed from the Plan funds provided during FYs 2000-2003 Govt. of India.<br />
Ministry of Labour, DGET agreed to extend the Scheme upto <strong>2007</strong> with cent percent Central<br />
funds for salary and stipend. Accordingly new ITIs at Lunglei and Saiha are opened and ITI<br />
Aizawl is also strengthened simultaneously.<br />
There are three wings under the department namely :-<br />
1. LABOUR WELFARE<br />
2. EMPLOYMENT SERVICE<br />
3. CRAFTSMAN TRAINING<br />
The approved financial outlay for <strong>2006</strong>-07 for Labour & Employment Department is<br />
as under: -<br />
1. Direction - Rs. 25.90 lakh<br />
2. Labour Administration - Rs. 12.20 lakh<br />
3. Employment Service - Rs. 43.00 lakh<br />
4. Craftsmen Training - Rs. 64.40 lakh<br />
5. Matching share for the establishment - Rs. 4.50 lakh<br />
of Special Employment Exchange<br />
TOTAL :- - Rs. 251.30 lakh<br />
DESCRIPTION OF HEAD-WISE SUB SECTOR WISE ALLOTMENT OF FUND AND THE OUTLINE<br />
OF PHYSICAL TARGET<br />
1. DIRECTION:<br />
The Directorate of Labour & Employment has been run by just two Officers - one<br />
Director and one Deputy Director to look after Labour Administration, Employment Service<br />
and Craftsman Training. The main functions of the Directorate are :-
- 460 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(a) Labour Welfare: A considerable number of Central Acts are adapted under the State<br />
of <strong>Mizoram</strong>. Adaption of Laws order (No. 2) 1987 may be classified as Labour Laws. Certain<br />
Labour Acts promulgated after <strong>Mizoram</strong> became State on 20.2.1987 are also applicable to<br />
<strong>Mizoram</strong>. Framing regulations and rules and to implement in <strong>Mizoram</strong> as per statutory<br />
requirements of these Central Acts are the functions of the Directorate of Labour &<br />
Employment. A few number of such Acts which have been implemented and which still<br />
requires immediate implementation in <strong>Mizoram</strong> are given here under: -<br />
i) Minimum Wages Act<br />
ii) Payment of Wages Act<br />
iii) Workmen Compensation Act<br />
iv) Contract Labour (Abolition and Regulation) Act<br />
v) Trade Union Act<br />
vi) Shops and Establishment Act<br />
vii) Factories Act<br />
viii) Inter-State Migrant Workers’ Act<br />
ix) Payment of Bonus Act<br />
x) The Child Labour (Prohibition and Regulation) Act<br />
xi) Compulsory Notification of Vacancies Act<br />
xii) The Persons with Disabilities (Equal Opportunities, Protection of Rights and<br />
Full Participation) Act<br />
(b) Employment Service: The State Directorate of Labour & Employment functions as a<br />
man power organisation and planning agency for the state. It provides leadership, guidance<br />
and expertise in such technical fields as: -<br />
i) Surveys and studies relating to employment and un-employment<br />
ii) Manpower planning and forecasting<br />
iii) Enforcement of Employment Exchange compulsory Notification of Vacancies<br />
Act.<br />
iv) Collection of Employment Market Information and Public Relation in the<br />
matter of self- employment programmes.<br />
v) Vocational Training, Vocational Guidance and Career Advice.<br />
vi) Occupational Research and Information<br />
vii) Supervision of Employment Exchanges Coaching-cum-Guidance Centres in<br />
the State.<br />
viii) Staff Training.<br />
(c) Craftsmen Training Scheme: The Directorate exercises full control over Industrial<br />
Training Institute operating under the Craftsman Training Scheme. The scheme, the most<br />
important in the field of Vocational training, has been introduced to ensure a steady flow of<br />
skilled workers in different trades for industries as also for self-employment ventures to<br />
reduce un-employment among the educated youths by providing their employable training<br />
and to cultivate a technical and industrial attitude in the minds of the younger generation<br />
Supervision, evaluation, yearly conduct of tests and final trade tests for the intakes of these<br />
Industrial Training Institutes are the responsibilities of the Directorate.<br />
Strengthening of the Directorate<br />
The strength of the Directorate in terms of Officers and technical staff has remained<br />
unchanged for the last 23 years since its inception in 1980. It requires to be strengthened<br />
with at least one Joint Director to enable authoritative and decisive disposal of matters at<br />
high level and some essential additional inspectorial functionaries. It also requires to be<br />
strengthened to cope with variety of its functions, to be more relevant and responsive to<br />
changing scenario in industrial relations, labour employment market, day to day
- 461 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
administration of ITIs and to cater the needs of the physically handicapped persons along<br />
with the unemployed youths. Yet, in order to maintain maximum austerity in realisation of<br />
the adverse fiscal situation prevailing in <strong>Mizoram</strong>, only one post of Joint Director for<br />
Labour, Employment Services and Craftsman Training is proposed instead of separate<br />
incumbencies.<br />
In the light of above, it becomes vitally necessary to create and fill up the barest<br />
minimum posts in the Directorate. The proposed creation of posts may be summed up thus:<br />
1. Joint Director-cum-Deputy Labour Commissioner - 1(one) Post<br />
( Rs.12,000-15,200/- )<br />
2. District Employment Officer - 3(three) post<br />
( Rs 8,000-13,500/- )<br />
The Department of Labour & Employment has a suitable site for construction of<br />
Directorate Office. Plan and Estimate costing Rs. 100.00 lakh for construction of Directorate<br />
Building capable of providing accommodation for the Directorate Office, State Employment<br />
Exchange with Labour clearing and career counselling or Information Centre or Rooms,<br />
District Employment Exchange, Sub-Regional Office of the Coaching-cum-Guidance Centre<br />
has been prepared with the approval of Finance Department. Hence the proposal as per<br />
estimate prepared by Technocrats Ltd. It is approved to allocate Rs. 3.00 lakh for site plan,<br />
etc. during this year.<br />
The break-up of financial implication for Direction is as under: -<br />
i) Salary - Rs. 0.50 lakh<br />
ii) Wages - Rs. 0.50 lakh<br />
iii) Medical Treatment - Rs 0.20 lakh<br />
iv) Domestic Travel Expenses - Rs. 1.00 lakh<br />
v) O.E. - Rs. 8.00 lakh<br />
vi) Minor Works - Rs. 3.00 lakh<br />
vii) O.C. - Rs. 7.30 lakh<br />
viii) Grant-in-Aid to NGO - Rs. 2.00 lakh<br />
ix) Advertisement - Rs. 0.40 lakh<br />
x) Major Works Rs. 3.00 lakh<br />
TOTAL i.e. Directions - Rs. 25.90 lakh<br />
2. ADMINISTRATION:<br />
Administration of Labour & Labour Welfare involving enforcement of Labour Acts,<br />
Rules and Regulations is the responsibility of Labour & Employment Department. The<br />
activities also cover registration, inspection, authentication & issue of standing orders,<br />
conciliation adjudication of claims, etc.<br />
Under this head, the following posts had already been approved and created but not<br />
yet filled up: -<br />
a) Labour Officer (Rs.8000-13500) - 1(one) Post<br />
b) Inspector of Factories (Rs.8000-13500) - 1(one) Post<br />
c) Assistant Labour Officer (Rs.6500-10500) - 1(one) Post
- 462 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The following posts had already been filled up: -<br />
a) Assistant (Rs.5500-9000) - 1(one) Post<br />
b) U.D.C. (Rs.5000-8000) - 1(one) Post<br />
c) L.D.C. (Rs.4000-6000) - 1(one) Post<br />
d) Group ‘D’ (Rs.2650-4090) - 1(one) Post<br />
The break-up of financial implication for Administration is as under: -<br />
(a) Salary - Rs. 4.20 lakh<br />
(b) Domestic Travel Expenses - Rs. 0.30 lakh<br />
(c) O.E. - Rs. 4.00 lakh<br />
(d) O.C. - Rs. 3.50 lakh<br />
(e) Advertisement - Rs 0.20 lakh<br />
TOTAL - Rs.12.20 lakh<br />
3. EMPLOYMENT SERVICE :-<br />
As of today, there are 6(six) District Employment Exchanges, one each at Aizawl,<br />
Lunglei, Saiha, Champhai, Kolasib and Lawngtlai and 1(one) Sub Divisional Employment<br />
Exchange at Chawngte. The Exchanges constitute the basic unit for implementing and<br />
coordinating all programmes of employment assistance, career advice, collection, survey<br />
and studies of employment market information in the area.<br />
A. Provision is also made for maintenance of existing staff under Planned Schemes.<br />
B. Further, there is another Centrally Sponsored Scheme at the instance of Government<br />
of India, Ministry of Social Justice and Empowerment to set up three new and separate<br />
Special Employment Exchanges one each at Aizawl, Lunglei and Saiha exclusively for the<br />
benefit of the Physically Handicapped Persons at the Central-State share of 80:20 ratio.<br />
A. Staff for Three Special Employment Exchanges<br />
Recurring Expenditure (C.S.S)<br />
Sl. No. Designation & Pay Scale No. of Salary for one month for all<br />
Posts the three exchanges<br />
1. Assistant Director 3<br />
(Rs.8000-13500)<br />
2. Technical Officer(Placement) 3<br />
(Rs.6500-10500)<br />
3. UDC 3<br />
(Rs.5000-8000)<br />
4. LDC 6 2,04,416.66<br />
(Rs.4000-6000)<br />
5. Steno-Typist 3<br />
(Rs.5000-8000)<br />
6. Driver 3<br />
(Rs.3050-4590)<br />
7. Group ‘D’ Staff 9<br />
(Rs.2650-4000)<br />
(For each exchange) Total - 7 2,04,416.66<br />
(i.e. 2,04,417/-) x 12 Months<br />
24,53,004.00<br />
B. Rent, Expenses on POL and Other Contingent Expenditure = Nil.
C. Non-recurring Expenditure (C.S.S.)<br />
- 463 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
i) Purchase of Vehicle - Gypsy - 3 Nos (Soft Top 450000×3) Rs.13,50,000<br />
ii) Furniture -<br />
1) Such as Officer/Staff Table Chair<br />
2) Benches and Chairs for candidates @ 50000/- Rs. 1,50,000<br />
3) Cabinets, racks etc. for each exchange<br />
4) Almirah<br />
5) Other special equipments<br />
iii) Typewriter - 2 Nos. each 2 12500×5 Nos. Rs. 1,50,000<br />
Cyclostyling/Duplicating Machine @ 15800×3 Rs. 47,000<br />
TOTAL - Rs.16,97,000/-<br />
iv) Total approved expenditure i.e. (A+B+C) = Rs.41,50,000.00<br />
(Rs.2,04,417+16,97,000) as 100% share)<br />
v) Share of State Govt. (already sanctioned during 2005-06) = (-) Rs. 8,30,000.00<br />
(State share during <strong>2006</strong>-07)<br />
vi) 80% share of Govt. of India i.e. Grant to be released = Rs.33,20,000.00<br />
to State Government<br />
C. The Government of <strong>Mizoram</strong> have allotted a suitable land for District Employment<br />
Exchange, Champhai free of cost. In order to have drain on rent, it is approved to construct<br />
Office building for District Employment Exchange, Champhai during <strong>2006</strong>-07 at the<br />
minimum cost of Rs. 10.00 lakh.<br />
The break-up of financial implication for Employment Services is as under: -<br />
i) Salary - Rs. 1.00 lakh<br />
ii) Wages - Rs. 1.00 lakh<br />
iii) Medical Treatment - Rs 3.00 lakh<br />
iv) Domestic Travel Expenses - Rs. 2.00 lakh<br />
v) O.E. - Rs. 15.00 lakh<br />
vi) Rents - Rs. 1.00 lakh<br />
vii) Advertisement - Rs. 1.00 lakh<br />
viii) O.C. - Rs. 11.00 lakh<br />
ix) Minor works/Maintenance - Rs. 8.00 lakh<br />
x) Matching share (CSS) - Rs. 4.50 lakh<br />
GRAND TOTAL - Rs. 47.50 lakh<br />
4. CRAFTSMEN TRAINING SCHEME :-<br />
Till 2001, the pioneer ITI, Aizawl has been imparting training in 14 Vocational<br />
Trades of which 7 trades are under State Planned Scheme. As cited in the introductory note,<br />
existing ITI of Aizawl is strengthened with 9 (nine) additional trades and new ITIs at Lunglei<br />
and Saiha are also started with the following trades as approved by the Central and State<br />
Governments.
- 464 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
AIZAWL UNITS SEATING CAPACITY<br />
1. IT&ESM (Information Technology &<br />
Electronic System Maintenance) 2 32<br />
2. Surveyor 1 16<br />
3. Mechanic (Refrigerator & Air Conditioning) 2 32<br />
4. Mason (Building Constructor) 2 32<br />
5. COPA (Computer Operator & Programming<br />
Assistant) 1 16<br />
6. Cutting & Tailoring 1 16<br />
7. Hair & Skin Care 1 16<br />
8. Mechanic (Radio & T.V.) 1 16<br />
9. Draughtsman (Civil) 1 16<br />
TOTAL :- 12 196<br />
LUNGLEI<br />
1. Carpentry 1 16<br />
2. Mechanic (Motor Vehicle) 2 32<br />
3. Dress Making 1 16<br />
4. COPA 1 20<br />
TOTAL :- 5 84<br />
SAIHA<br />
1. Electrician 1 16<br />
2. Mechanic (Motor Vehicle) 2 32<br />
3. IT&ESM 2 32<br />
4. Hair & Skin Care 1 16<br />
TOTAL :- 6 96<br />
GRAND TOTAL :- 23 376<br />
With the opening of new ITIs, the following posts have also been created and filled<br />
on contract basis: -<br />
Designation AIZAWL LUNGLEI SAIHA TOTAL<br />
1. Principal/Superintendent - 1 1 2<br />
Non-Gazetted grade)<br />
2. Group Instructor 1 - - 1<br />
3. Vocational Instructor 12 5 6 23<br />
4. V.I.s for Engg. Drawing/ - 1 1 2<br />
Workshop calculation<br />
5. Workshop Attendant 1 2 2 5<br />
6. U.D.C. - 1 1 2<br />
7. L.D.C. - 1 1 2<br />
8. Chowkidar - 1 1 2<br />
9. Sweeper 1 1 1 3<br />
TOTAL :- 15 13 14 42
- 465 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
The existing posts under State Planned Scheme are as below: -<br />
1. INSTRUCTORS - 9 POSTS<br />
i) Stenography - 1(one) Post<br />
ii) Confectionery - 1(one) Post<br />
iii) Carpentry - 1(one) Post<br />
iv) Plumber - 1(one) Post<br />
v) Draughtsman - 1(one) Post<br />
vi) Diesel Mechanic - 1(one) Post<br />
vii) T.V. & Radio Mechanic - 1(one) Post<br />
viii) Electronic - 2(two) Posts<br />
2. Driver - 1(one) Post<br />
3. Workshop Attendant - 2(two) Posts<br />
4. Conductor - 1(one) Post<br />
Altogether, there are now 3 (three) ITIs in the State which impart Vocational Training<br />
Courses in 31 (thirty one) trades consisting of 44 Units with total seat capacity of 708.<br />
Trainees in these institutes are awarded a monthly stipend @ Rs. 500/- per head and book<br />
grant @ Rs. 1,000/- per annum.<br />
Government of India provides fund for the full cost of civil constructions,<br />
procurements of machineries including furniture at initial stage and salary and stipend/<br />
book grant for a period upto the end of 10 th Plan on March, <strong>2007</strong>. The rest of the operational<br />
cost viz. O.E., O.C. etc. required for maintenance and upkeep of machine tools etc. have to<br />
be borne by Government of <strong>Mizoram</strong> as per the procedure laid down for the Centrally<br />
Sponsored Scheme. An additional requirement of Rs. 11.30 lakh is worked out for the year<br />
<strong>2006</strong>-<strong>2007</strong> for such maintenance and upkeep etc. Hence, the total minimum requirement of<br />
Rs. 64.40 lakh for Craftsmen Training programmes is approved for the year <strong>2006</strong>-<strong>2007</strong>.<br />
The break-up of financial implication is as under: -<br />
i) Salary - Rs.15.00 lakh<br />
ii) Wages - Rs. 1.95 lakh<br />
iii) Medical Treatment - Rs. 1.00 lakh<br />
iv) Domestic Travel Expenses - Rs. 0.70 lakh<br />
v) Advertisement - Rs. 0.50 lakh<br />
vi) O.E. - Rs. 9.00 lakh<br />
vii) PP & SS - Rs. 0.25 lakh<br />
viii) Stipend/Book grant - Rs.20.00 lakh<br />
ix) Minor Works - Rs. 4.00 lakh<br />
x) O.C. - Rs. 3.00 lakh<br />
xii) Machinery & Equipment - Rs. 9.00 lakh<br />
TOTAL - Rs.64.40 lakh
Introduction:<br />
- 469 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
SOCIAL WELFARE<br />
The activities of the Department extends to formulation and endorsement of Social<br />
Legislation like Juvenile Justice Act; Immoral Traffic in Person etc.; Welfare of Handicapped<br />
Persons, Aged and Destitute Persons; Welfare of Women & Children; Social Defense against<br />
Drug Addicts & Alcoholism and strengthening of Non-Governmental Organizations by<br />
rendering Grants-in-aid to them. The Department also implements ICDS Scheme and Special<br />
Nutrition Programme.<br />
The approved Annual Plan <strong>2006</strong>-<strong>2007</strong> is Rs. 894.00 lakh including Scheme under<br />
Article 275(1) of the Constitution.<br />
The Abstract of Scheme-wise requirement of fund for Annual Plan during <strong>2006</strong>-07 is<br />
given below:-<br />
1. Direction & Administration - Rs. 39.21 lakh<br />
2. District Administration - Rs. 12.00 lakh<br />
3. Welfare of Handicapped - Rs. 22.03 lakh<br />
4. S.I.T. Act:<br />
(a) Protective Home - Rs. 21.84 lakh<br />
(b) Reception Centre - Rs. 18.10 lakh<br />
5. Welfare of Poor & Destitute:<br />
(a) National Old Age Pension Scheme (N.O.A.P.S.) - Rs. 249.60 lakh<br />
(b) National Family Benefit Scheme (N.F.B.S.) - Rs. 20.80 lakh<br />
(c) Old Age Home - Rs. 0.50 lakh<br />
6. Prohibition:<br />
(a) De-Addiction Centre - Rs. 85.54 lakh<br />
(b) M.S.D. & R.B. - Rs. 15.00 lakh<br />
7. Correctional Sevices:<br />
(a) Remand Home - Rs. 44.35 lakh<br />
(b) Special Approved School - Rs. 13.61 lakh<br />
(c) Children’s Court - Rs. 8.44 lakh<br />
(d) Social Service in Jails - Rs. 10.98 lakh<br />
8. Grants-in-aid to Voluntary Organizations - Rs. 17.00 lakh<br />
9. Schemes under Article 275(1) - Rs. 264.00 lakh<br />
10. Women & Child Development:<br />
(a) Child Welfare - Rs. 22.00 lakh<br />
11. Women Welfare:<br />
(a) Women Commission - Rs. 15.00 lakh<br />
(b) Socio Economic / I.W.E.P. etc. - Rs. 10.00 lakh<br />
(c) R.I.T.C. - Rs. 4.00 lakh<br />
TOTAL - Rs. 894.00 lakh
1. DIRECTION & ADMINISTRATION<br />
- 470 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(a) Direction :-<br />
For the maintenance of the existing post of Stenographer Gr. – III, an outlay of<br />
Rs.1.71 lakh is approved during <strong>2006</strong>-07.<br />
(b) Construction, repair and maintenance of Departmental buildings :-<br />
Department buildings, numbering more than 200, constructed under Plan, C.S.S. and<br />
B.D.A.P. Schemes are required to be maintained. As some of the buildings are now old and<br />
depleted, they require certain renovations and repairs. Rs. 10.00 lakh is approved for this<br />
purpose during <strong>2006</strong>-07.<br />
(c) Information Technology and Software Development :-<br />
Fund of Rs. 15.00 lakh only out of the total Annual Plan Outlay is required for the<br />
implementation of the Information Technology and Software Development vide letter<br />
No.G.28014/99-SPB dated 30.3.2000.<br />
As per direction from Government of India and Government of <strong>Mizoram</strong>, the<br />
Information Technology is planned to promote as shown below during <strong>2006</strong>-<strong>2007</strong>.<br />
Computers be installed in all Officer’s rooms.<br />
All Computers be connected together by means of net working.<br />
Bare minimum Printers be provided at each room except in the main Computer room where<br />
three types of Printers – Laser, Dot and Ink Jet Printers shall be installed.<br />
Internet connection be subscribed at the main Computer room.<br />
(d) Persons with disability / Senior Citizens :-<br />
As per Govt. of <strong>Mizoram</strong>, State Transport Authority, special concession in fare for<br />
traveling in Aizawl and Lunglei town buses be given to persons with disability and senior<br />
citizens (65 yrs. and above) an production of Identity Cards issued by the Department of<br />
Social Welfare. To enable these disabled persons / senior citizens to avail this benefit, it is<br />
proposed to issue ID Cards to persons with disabilities and senior citizens.<br />
Details of financial requirement is given below: -<br />
(i) Salary - Rs. 1.71 lakh<br />
(ii) Medical Treatment - Rs. 0.50 lakh<br />
(iii) Office Expenses - Rs. 15.00 lakh<br />
(iv) Minor Works - Rs. 10.00 lakh<br />
(v) O.C. - Rs. 12.00 lakh<br />
Total - Rs. 39.21 lakh<br />
2. DISTRICT ADMINISTRATION<br />
For strengthening and smooth functioning of the 4 (four) existing Offices of the<br />
District Social Welfare Officers, Rs. 12.00 lakh only is approved in addition to Rs. 50.42 lakh<br />
provided under Non-Plan Budget.<br />
Details of financial requirement is as below:-<br />
(i) T.E. - Rs. 4.00 lakh<br />
(ii) O.E. - Rs. 8.00 lakh<br />
Total - Rs. 12.00 lakh
- 471 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
3. WELFARE OF HANDICAPPED<br />
(a) Persons with Disabilities (Equal Opportunities, Protection of Rights and Full<br />
Participation) Act, 1995:-<br />
Parliament has passed the Persons with Disabilities (Equal Opportunities, Protection<br />
of Rights and Full Participation) Act, 1995. All States Governments except Jammu & Kashmir<br />
are instructed to implement this Act, 1995 immediately.<br />
As envisaged in the Act, ‘Disability’ includes –<br />
(i) Blindness; (ii) Low Vision; (iii) Leprosy cured; (iv) Hearing Impairment;<br />
(v) Mental Retardation and (vi) Mental Illness.<br />
It is approved to implement the following Schemes during <strong>2006</strong>-<strong>2007</strong>: -<br />
(i) Disability Pension<br />
(ii) G.I.A. to Handicapped Persons<br />
(iii) G.I.A. to Handicapped Educated Unemployed Allowances<br />
(i) Disability Pension: As many as 200 Disability Pensions are given to those<br />
handicapped persons who are totally blind and bedridden @ Rs. 100/- per month per head<br />
during 2005-06. It is approved to provide Disability Pension to 200 handicapped persons<br />
during <strong>2006</strong>-07. Financial requirement comes to Rs. 2.40 lakh.<br />
(ii) G.I.A. to Handicapped Persons: It is also proposed to give special appliances and<br />
Grants-in-aid to handicapped persons as per the individual needs like Artificial Limb Fittings<br />
and Plastic Surgery etc. Rs. 7.30 lakh is approved during <strong>2006</strong>-07.<br />
(iii) G.I.A. to Handicapped Educated Unemployed Allowances: All handicapped educated<br />
unemployed are proposed to be given financial assistance @ Rs.100/- per month per head<br />
during <strong>2006</strong>-07 and Rs. 0.30 lakh is approved.<br />
Financial requirement is as follows:-<br />
1. Grants-in-aid - Rs. 10.00 lakh<br />
Total - Rs. 10.00 lakh<br />
(b) Hostel for Handicapped Persons:-<br />
Male and female handicapped persons are given training in vocational trades like<br />
knitting, tailoring and shoemaking at Aizawl. Hostel facility is provided for these<br />
handicapped persons who have no relatives at Aizawl and to look after the Hostel, a post of<br />
Warden is created and Rs. 2.03 lakh is approved for salary and medical treatment during<br />
<strong>2006</strong>-07.<br />
Sl. No. Name of Post Scale of Pay Existing New Total<br />
1. Warden Rs. 5000-8000/- 1 - 1<br />
Financial requirement for <strong>2006</strong>-07 :-<br />
1. Salary - Rs. 1.53 lakh<br />
2. Medical Treatment - Rs. 0.50 lakh<br />
Total - Rs. 2.03 lakh
- 472 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(c) National Programme for Rehabilitation of Persons with Disabilities (N.P.R.P.D.) :-<br />
The N.P.R.P.D. is a new State Sector Scheme launched in the country during 1999-<br />
2000 with the basic objective of providing comprehensive rehabilitation services to persons<br />
with disabilities (PWDs). The Government of India released fund for the programme upto<br />
2001-02 and the State Government should continue the programme from its own resources<br />
for which the Secretary, Ministry of Social Justice & Empowerment (D.O. No.16-24/2000-<br />
NPRPD dt.14.5.2002) and the Planning Commission (D.O. No.PC(P)2/11/2001-SPC(Vol.III)<br />
dt.19.4.2002) wrote to the Chief Secretary to the Govt. of <strong>Mizoram</strong> to ensure adequate<br />
provision for rehabilitation services to the PWDs.<br />
It is proposed to maintain the existing two State Referral centres (separately for<br />
Mentally Retarded and Other Disabilities) and the District Referral Centre exclusively set up<br />
for the PWDs, training of persons in disabilities and manpower development for which<br />
Rs.10.00 lakh is earmarked during <strong>2006</strong>-07 as below:-<br />
(i) Maintenance of State and District Referral Centres - Rs. 6.00 lakh<br />
(ii) Training, Manpower Development - Rs. 4.00 lakh<br />
Total - Rs. 10.00 lakh<br />
4. S.I.T. ACT<br />
Immoral Traffic (Prevention) Act, 1986 :<br />
As envisaged in the Act, two kinds of institution are established viz. - the Reception<br />
Centre, where women arrested under the Act are remanded, and Protective Home, where<br />
persons convicted by the Court are institutionalized. Trainings of different trades are<br />
imparted for their economic rehabilitation and counseling and guidance for their moral<br />
rehabilitation. These institutions started since 1995-96 and will be continued during <strong>2006</strong>-07.<br />
(a) Protective Home:-<br />
Sl. No. Name of Post Scale of Pay Existing Total<br />
1. Superintendent Rs. 8000-13500/- 1 1<br />
2. Warden Rs. 5000-8000/- 1 1<br />
3. Instructor Rs. 4000-6000/- 1 1<br />
4. L.D.C. Rs. 4000-6000/- 1 1<br />
5. IV Grade Rs. 2650-4000/- 1 1<br />
Total 9 9<br />
Financial requirement during <strong>2006</strong>-07 is as below —<br />
1. Salary - Rs. 10.41 lakh<br />
2. Medical Treatment - Rs. 3.00 lakh<br />
3. T.E. - Rs. 0.10 lakh<br />
4. O.E. - Rs. 1.83 lakh<br />
5. M & S - Rs. 5.00 lakh<br />
6. Minor Works - Rs. 1.00 lakh<br />
7. Other Charges - Rs. 0.50 lakh<br />
Total - Rs. 21.84 lakh<br />
(b) Reception Centre :-<br />
Financial requirement for Reception Centre during <strong>2006</strong>-07 is given below :-<br />
1. Salary - Rs. 15.80 lakh<br />
2. Medical Treatment - Rs. 2.00 lakh<br />
3. Other Charges - Rs. 0.30 lakh<br />
Total - Rs. 18.10 lakh<br />
Sl. No. Name of Post Scale of Pay Existing New Total<br />
1. IV Grade Rs. 2650-4000/- 18 - 18
- 473 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
5. WELFARE OF POOR AND DESTITUTE<br />
(a) National Social Assistance Programme (N.S.A.P.) :-<br />
The N.S.A.P. is a Centrally Sponsored Programme to extend 100% Central Assistance<br />
to the States / U.T.s to provide the benefits under it in accordance with the norms,<br />
guidelines and conditions laid down by the Central Govt. The N.S.A.P. introduces a National<br />
Policy for Social Assistance to poor households. The Programme represents a significant<br />
step towards the fulfillment of the Directive Principles in Article 41 and 42 of the<br />
Constitution recognizing the concurrent responsibility of the Central and State Govt. in the<br />
matter.<br />
The N.S.A.P. Scheme includes —<br />
(i) National Old Age Pension Scheme (N.O.A.P.S.)<br />
(ii) National Family Benefit Scheme (N.F.B.S.)<br />
(i) National Old Age Pension Scheme (N.O.A.P.S.) :<br />
Beneficiaries under the State Plan were given Old Age Pension @ Rs. 100/- per month<br />
in the previous years. Those beneficiaries under the State Plan are now transferred to<br />
NOAPS due to paucity of fund under the State Plan. As the rate of Government of India (i.e.<br />
Rs. 75/- per month per head) is short of Rs. 25/- it was felt necessary to enhance the rate by<br />
Rs. 25/- per month per head so as to bring the rate to Rs. 100/- per month as was given to<br />
the beneficiaries under State Plan during 2001-2002. As mentioned earlier, the Central<br />
Government grants only Rs. 75/- per month per beneficiary and the State Govt. has to bear<br />
Rs. 25/- per month per head in order to bring the pension amount to Rs.100/- per month.<br />
From the year 2002-03, due to insufficient fund, the State’s contribution towards Old Age<br />
Pension had been stopped but the beneficiaries are still paid Rs. 100/- per month per<br />
beneficiary out of Central fund which is in violation to the Central norm, i.e. Rs. 75/- per<br />
month per beneficiary throughout the country.<br />
It is, therefore, decided to implement the scheme as per Central norm from <strong>2006</strong>-07.<br />
Besides, the existing beneficiaries i.e. 10525, additional beneficiaries numbering 10275<br />
persons could be accommodated. The State Government, therefore, needs to contribute fund<br />
amounting to Rs. 62.40 lakh as State’s Share (i.e. 20800×25×12) to enable the Department to<br />
implement the Scheme as per Central norms.<br />
(ii) National Family Benefit Scheme (N.F.B.S.):<br />
Under this Scheme the family of a household below the poverty line shall get an<br />
assistance of Rs. 10,000/- on the death of its primary breadwinner whose age is between<br />
18yrs. and 65 yrs. During the previous year, 400 persons were given this benefit and it is<br />
approved to continue the scheme during <strong>2006</strong>-<strong>2007</strong>. 208 persons are approved to be given<br />
this benefit during <strong>2006</strong>-<strong>2007</strong> and an amount of Rs. 20.80 lakh is approved for the scheme.<br />
Details of financial approval are as follows: -<br />
Total outlay for Annual Plan <strong>2006</strong>-07 in respect of N.S.A.P. - Rs. 208.00 lakh<br />
N.O.A.P.<br />
No. of existing beneficiaries - 10525 × 75 × 12 - Rs. 94,72,500.00<br />
No. of additional beneficiaries - 10275 × 75 × 12 - Rs. 92,47,500.00<br />
N.F.B.S. - 208 × 10,000 - Rs. 20,80,000.00<br />
Total of N.O.A.P. & N.F.B.S. - Rs. 208,00,000.00<br />
State Share for existing beneficiaries under NOAP - 10525 × 25 × 12 - Rs. 31,57,500.00<br />
State Share for additional beneficiaries under NOAP - 10725 × 25 × 12 - Rs. 30,82,500.00<br />
Total requirement to be contributed by the State - Rs. 62,40,000.00
- 474 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
(iii) Old Age Home:<br />
For the better maintenance of the Home, Rs. 0.50 lakh is approved in addition to<br />
Rs.8.75 lakh provided under Non Plan Budget.<br />
6. PROHIBITION<br />
(a) De-Addiction Centre / Aftercare Centre :-<br />
Aftercare Centre has been added to the existing De-addiction-cum-Rehabilitation<br />
Centre, Sethawn as an innovative approach in the field of drug abuse and alcoholism for<br />
recovering addicts in the State. The main aim of the Aftercare Unit is to provide skill and<br />
inputs to the youth so that once they leave the Centre, they are equipped with skills for<br />
survival and economic growth. In order to provide skills to the recovering addicts, trades<br />
like — (i) Mechanical (motor vehicles) (ii) Mechanical (Radio, TV, Tapes) (iii) Poultry (iv)<br />
Piggery have already been started in the Centre. The expected outcome for the Aftercare<br />
Unit is to reduce the high rate of relapse cases in the field of drug abuse and alcoholism.<br />
The requirement of fund during <strong>2006</strong>-07 is earmarked as under :<br />
Sl. No. Name of Post Scale of Pay Existing Post<br />
1. Centre Director Rs. 10000-15200/- 1<br />
2. Assistant project Director Rs. 8000-13500/- 1<br />
3. Case Worker Rs. 6500-10500/- 2<br />
4. Psychologist Rs. 6500-10500/- 1<br />
5. Staff Nurse Rs. 5500-9000/- 4<br />
6. Warden Rs. 5000-8000/- 1<br />
7. Vocational Instructor Rs. 4500-7000/- 4<br />
8. Security Officer Rs. 4500-7000/- 2<br />
9. Physical Instructor Rs. 4500-7000/- 2<br />
10. Counselor Rs. 4500-7000/- 3<br />
11. Mechanic Rs. 3050-3950/- 2<br />
12. Driver Grade – I Rs. 5000-8000/- 1<br />
13. Driver Grade – II Rs. 4000-6000/- 1<br />
14. IV Grade Rs. 2650-4000/- 5<br />
TOTAL - 30<br />
(+) 12<br />
Financial requirement is as follows :-<br />
1. Salary - Rs. 35.34 lakh<br />
2. Wages - Rs. 6.00 lakh<br />
3. Medical Treament - Rs. 2.00 lakh<br />
4. T.E. - Rs. 0.70 lakh<br />
5. O.E. - Rs. 15.50 lakh<br />
6. Minor Works - Rs. 10.00 lakh<br />
7. M & S (incl. Mess) - Rs. 15.00 lakh<br />
8. O.C. (incl. Purchase of medicines etc.) - Rs. 1.00 lakh<br />
Total - Rs. 85.54 lakh<br />
(b) <strong>Mizoram</strong> Social Defense & Rehabilitation Board (M.S.D.& R.B.) :<br />
As per the decision to the Minutes of the Meeting of Advisory Board on De-addiction<br />
Centre and Allied Institutions under the Chairmanship of Hon’ble Minister on the 17 th April<br />
1999, Rs. 1.00 crore should be allocated for the immediate successful implementation of the<br />
functioning of the Board on De-addiction Centre and Allied Institution, Rs. 15.00 lakh is<br />
approved during <strong>2006</strong>-07.
- 475 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
7. CORRECTIONAL SERVICES / JUVENILE JUSTICE ACT<br />
(a) Remand Home, Aizawl and Lunglei :-<br />
This Act primarily aims at prevention of crime committed by and against children<br />
upto the age of 16 yrs. in the case of boys and 18 yrs. in the case of girls. The Act also<br />
provides care and protection to children subjected to abuse and exploitation.<br />
Under the Act, a well-rounded Juvenile Justice System had been incorporated in<br />
conformity with the United Nations Standard Rules for the administration of the Juvenile<br />
Justice with a view of fulfilling the statutory responsibility of the State as laid down under<br />
this law. The Scheme strength of staff which will be continued during <strong>2006</strong>-<strong>2007</strong> is as table<br />
given below: -<br />
Remand Home, Aizawl :<br />
Sl. No. Name of Post Scale of Pay Existing Total<br />
1. Superintendent Rs. 8,000-13,500/- 1 1<br />
2. Probation Officer / Rs. 6,500-10,500/- 1 1<br />
Case Worker<br />
3. Warden Rs. 5,000-8,000/- 1 1<br />
4. Craft Instructor Rs. 4,000-6,000/- 1 1<br />
5. L.D.C. Rs. 4,000-6,000/- 1 1<br />
6. Driver Rs. 3,050-4,590/- 1 1<br />
7. IV Grade Rs. 2,650-4,000/- 3 3<br />
Total - 9 9<br />
Remand Home, Lunglei :<br />
Sl. No. Name of Post Scale of Pay Existing Total<br />
1. Superintendent Rs. 8,000-13,500/- 1 1<br />
2. Case Worker Rs. 6,500-10,500/- 1 1<br />
3. Instructor Rs. 4,000-6000/- 1 1<br />
4. Edn. Instructor Rs. 4,000-6000/- 1 1<br />
5. L.D.C. Rs. 4,000-6000/- 1 1<br />
6. IV Grade Rs. 4,000-6000/- 4 4<br />
Total - 9 9<br />
Financial requirement during <strong>2006</strong>-<strong>2007</strong> :-<br />
1. Salary - Rs. 22.79 lakh<br />
2. Medical Treatment - Rs. 4.00 lakh<br />
3. T.E. - Rs. 0.56 lakh<br />
4. O.E. - Rs. 3.00 lakh<br />
5. M & S - Rs. 8.00 lakh<br />
6. Minor Works - Rs. 5.00 lakh<br />
7. M & E - Rs. 1.00 lakh<br />
Total - Rs. 44.35 lakh<br />
(b) Juvenile Home / Certified School :<br />
Sl. No. Name of Post Scale of Pay Existing<br />
1. Superintendent Rs. 8,000-13,500/- 1<br />
2. Psychologist / Case Worker Rs. 6,500-10,500/- 1<br />
3. Warden Rs. 5,000-8,000/- 1<br />
4. Craft Instructor Rs. 4,000-6,000/- 1<br />
5. Driver Rs. 3,050-4,590/- 1<br />
6. IV Grade Rs. 2,650-4,000/- 6<br />
Total - 11
- 476 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Financial requirement of Juvenile Home / Certified School, Aizawl during <strong>2006</strong>-<strong>2007</strong><br />
is given below :<br />
1. Salary - Rs. 8.11 lakh<br />
2. Medical Treatment - Rs. 2.00 lakh<br />
3. T.E. - Rs. 0.50 lakh<br />
4. O.E. - Rs. 2.00 lakh<br />
5. O.C. - Rs. 1.00 lakh<br />
Total - Rs. 13.61 lakh<br />
(c) Children’s Court :<br />
Sl. No. Name of Post Scale of Pay No. of Post Existing<br />
1. Assistant 5,500-9,000/- 1 1<br />
2. U.D.C. 5,000-8,000/- 1 1<br />
3. L.D.C. 4,000-6,000/- 1 1<br />
4. IV Grade 2,650-4,000/- 2 2<br />
Total - 5 Posts 5<br />
Financial requirement for the year <strong>2006</strong>-<strong>2007</strong> is given below :-<br />
1. Salary - Rs. 6.44 lakh<br />
2. Medical Treatment - Rs. 2.00 lakh<br />
Total - Rs. 8.44 lakh<br />
(d) Social Services in Jail :<br />
Sl. No. Name of Post Scale of Pay No. of Post (existing)<br />
1. Vocational Instructor 4,000-6,000/- 2<br />
2. Educational Instructor 5,500-9,000/- 2<br />
3. L.D.C. 4,000-6,000/- 1<br />
Total - 5 Posts<br />
Financial requirement during <strong>2006</strong>-<strong>2007</strong> is given below :-<br />
1. Salary - Rs. 6.98 lakh<br />
2. Medical Treatment - Rs. 2.00 lakh<br />
3. O.E. - Rs. 2.00 lakh<br />
Total - Rs. 10.98 lakh<br />
8. GRANTS-IN-AID TO VOLUNTARY ORGANIZATIONS<br />
(a) For the purpose of strengthening and promoting voluntary organizations rendering<br />
welfare services, grants-in-aid, either in cash or in kind, are given. The bare minimum<br />
financial requirement during <strong>2006</strong>-<strong>2007</strong> in this account is Rs. 14.00 lakh.<br />
(b) Grants-in-aid to Rehabilitation Centre, de-addiction Centres and Counseling Centres<br />
run by NGOs: For the prevention of drug addicts, alcoholism and diseases relating to Aids<br />
etc, certain Centres have been established in <strong>Mizoram</strong> by NGOs. Rs. 3.00 lakh is approved<br />
during <strong>2006</strong>-07.<br />
9. CONSTRUCTION WORKS UNDER ARTICLE 275(1) OF THE CONSTITUTION<br />
Under Article 275(1), the Department proposes to undertake various construction<br />
works like construction of village steps with drains, small bridges, agriculture link roads<br />
type to facilitate MFP / SAP Collection, infrastructure for Community-cum-Sports /<br />
Recreation Centres etc.
- 477 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Rs. 264.00 lakh is, therefore, approved during <strong>2006</strong>-<strong>2007</strong> for execution of<br />
infrastructural development of rural areas as permissible under Article 275(1) of the<br />
Constitution.<br />
10. WOMEN & CHILD DEVELOPMENT<br />
(a) Child Welfare :<br />
(i) Motherless Babies Home:<br />
(a) For meeting the establishment and administrative charges of the staff of the<br />
Board for the Supervision & Control of Homes constituted under the <strong>Mizoram</strong><br />
Orphanages and Charitable Homes (Supervision and Control) Rules 2003 for<br />
the meeting expenses of the Board and for the expenses towards traveling<br />
allowances and other remunerations payable to the members of the Board.<br />
(b) For the implementation of Adoption Programme in the State, to regulate and<br />
to promote in-country adoptions.<br />
(c) For the provision of institutional care and protection of infants and children<br />
who are either abandoned / orphaned or destitute and their rehabilitation.<br />
(d) For support of the licensed Homes, Rs. 8.00 lakh is approved for this purpose<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
(ii) Juvenile Justice (Care & Protection of Children): In order to implement the <strong>Mizoram</strong><br />
Juvenile Justice Rules 2003, the Government of India has formed Juvenile Justice Act, Child<br />
Welfare Committee, State Advisory Board, Inspection Committee and Selection Committee.<br />
These various Boards and Committees have now functioned. To perform their various duties<br />
and functions, for sitting allowances, honorarium and remuneration, for traveling expenses<br />
and Office contingencies, certain amount of budget needs to be set aside for the<br />
implementation of Juvenile Justice Act. For this purpose, an amount of Rs. 5.00 lakh is<br />
approved during <strong>2006</strong>-07.<br />
11. WOMEN WELFARE<br />
(a) Women Commission :<br />
The Constitution guarantees to all its citizens Justice, Liberty, Equality and Fraternity<br />
without any discrimination. But even 45 yrs. after Independence, women continued to be<br />
treated as the single largest group of backward citizens in India. Parliament in 1990 has<br />
passed the National Commission for Women Act.<br />
Subsequently, Women Commission has been established in <strong>Mizoram</strong> during 2000-<br />
2001 and is proposed to continue during <strong>2006</strong>-<strong>2007</strong>.<br />
Sl. No. Name of Post No. of Post Scale of Pay (existing)<br />
1. Chairperson 1 Rs. 3,000/- Hon.<br />
2. Member Secretary 1 Rs. 12,000-18,000/-<br />
3. Project Officer 1 Rs. 8,000-13,500/-<br />
4. U.D.C. 1 Rs. 5,000-8,000/-<br />
5. L.D.C. 2 Rs. 4,000-6,000/-<br />
6. Driver 2 Rs. 3,050-4,590/-<br />
7. Chowkidar 1 Rs. 2,650-4,000/-<br />
8. IV Grade 3 Rs. 2,650-4,000/-<br />
Total 12 Posts
Financial requirement for <strong>2006</strong>-<strong>2007</strong>: -<br />
- 478 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
1. Salary - Rs. 3.32 lakh<br />
2. Medical Treatment - Rs. 1.50 lakh<br />
3. Wages - Rs. 1.20 lakh<br />
4. O.E. - Rs. 6.00 lakh<br />
5. Rent - Rs. 0.66 lakh<br />
6. M & S - Rs. 1.32 lakh<br />
7. O.C. - Rs. 1.00 lakh<br />
Total - Rs. 15.00 lakh<br />
(b) Socio Economic Programme for Poor & Destitute :<br />
Destitute widow who are desperately in need of care, protection and economic<br />
upliftment are proposed to be given socio economic grants. Rs. 9.00 lakh is approved for the<br />
Scheme during <strong>2006</strong>-<strong>2007</strong>.<br />
(c) Platform for Action Strategies for Women / I.W.E.P. :<br />
The 4 th U.N. World Conference on Women held in Beijing in 1995 resolved to<br />
establish ‘Platform for Action Strategies for Women’ towards gender justice for women and<br />
their empowerment. In view of this, Rs. 1.00 lakh is approved.<br />
(d) R.I.T.C. :<br />
As many as 40 destitute and distressed women are given training in tailoring,<br />
knitting and embroidery under this scheme every year. Since most of the trainees are from<br />
rural areas and have no relatives in Aizawl to stay with, they are required to be provided<br />
with hostel facilities. Rs. 1.86 lakh is approved during <strong>2006</strong>-<strong>2007</strong> in addition to Rs. 21.05<br />
lakh provided under Non-Plan Budget.<br />
Details of financial requirement is as below :-<br />
1. M & S - Rs. 3.00 lakh<br />
2. O.C. - Rs. 1.00 lakh<br />
Total - Rs. 4.00 lakh
- 483 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
NUTRITION<br />
The approved Annual Plan <strong>2006</strong>-07 Outlay for Nutrition Programme is made within<br />
Rs. 682.00 lakh, i.e. —<br />
1. Supplementary Nutrition Programme - Rs. 665.00 lakh<br />
2. Nutrition Programme for Adolescent Girls - Rs. 17.00 lakh<br />
The Nutrition Programme includes Schemes like: -<br />
1. Supplementary Nutrition Programme<br />
2. Carrying Charges / Transportation of Nutrition Foods.<br />
3. Food and Nutrition Extension Centre<br />
4. Analysis of Food & Monitoring<br />
5. Nutrition Programme for Adolescent Girls<br />
As per the Government of India, Ministry of Human Resource Development,<br />
Department of Women & Child Development’s letter F.No.19-5/2003-CD-I(Pt.) dt.19.10.04,<br />
the Central Government has revised the financial norms for Supplementary Nutrition under<br />
the I.C.D.S. Scheme as under: -<br />
1. Children (6 months to 72 months) @ Rs.2/- per day per child.<br />
2. Severely Malnourished Children (6 to 72 months) @ Rs.2.70 per day per child.<br />
3. Pregnant and Lactating Mothers @ Rs.2.30 per day per beneficiary.<br />
4. Adolescent Girls @ Rs.2.30 per day per beneficiary.<br />
The Supplementary Nutrition Programme is implemented in 23 I.C.D.S. Projects in<br />
<strong>Mizoram</strong>. Various categories of beneficiaries are as follows based on the survey report of<br />
the Projects during 2005-06.<br />
1. Children 6 – 36 months - 82620<br />
2. Severely Malnourished Children 6 – 36 months - 800<br />
3. Children 3 – 6 months - 42782<br />
4. Severely Malnourished Children 3 – 6 months - 187<br />
5. Pregnant and Lactating Mothers - 27752<br />
6. Adolescent Girls - 12631<br />
Total - 166772<br />
A. SUPPLEMENTARY NUTRITION PROGRAMME<br />
The Supplementary Nutrition Programme aims at eradicating the protein-calorie and<br />
micronutrient malnutrition / deficiency prevalence in the developing States.<br />
The approved expenditure for <strong>2006</strong>-07 under Supplementary Nutrition Programme is<br />
as follows :-<br />
Sl.<br />
No.<br />
1. Estimated Expenditure for Procurement of Foods :<br />
Target Group<br />
No. of<br />
Beneficiaries<br />
Daily<br />
Ceiling<br />
Daily<br />
Requirement<br />
(in Rs.)<br />
No. of<br />
Feeding<br />
Days<br />
Total Requirement<br />
for the<br />
Year (in Rs.)<br />
1. Children 6 – 72 months 125402 Rs.2.00 250,804.00 187 469,00,348.00<br />
2. Severely Malnourished<br />
Children 6-72 months<br />
987 Rs.2.70 2,664.90 187 498,336.30<br />
3. Pregnant & Lactating Mothers 27752 Rs.2.30 63,829.60 187 119,36,135.20<br />
TOTAL : 154141 317,298.50 187 593,34,819.50<br />
Against the national norm of 300 feeding days a year, only 187 feeding days could<br />
be had during <strong>2006</strong>-07 with the available fund.
- 484 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
2. Unit Cost of Maintenance :<br />
Transportation / Carrying Charges of Nutrition –<br />
Rs. 66,65,180/- only is set aside for transportation / carrying charges of nutrition<br />
food during <strong>2006</strong>-07.<br />
3. Food and Nutrition Extension Centre :<br />
As the model scheme furnished by the Ministry concerned, Community Food and<br />
Extension Centre is implemented and womenfolk are trained in the line of food preservation<br />
and nutrition education. For this, Rs. 100,000/- only is approved during <strong>2006</strong>-07.<br />
4. Analysis of Food & Monitoring:<br />
For this purpose, an amount of Rs. 400,000/- only is approved during <strong>2006</strong>-07.<br />
Grand Total of approved expenditure under Supplementary Nutrition Programme<br />
during <strong>2006</strong>-07 is :-<br />
1. Purchase of Food - Rs. 593,34,820.00<br />
2. Unit cost of Maintenance - Rs. 66,65,180.00<br />
3. F.N.E.C. - Rs. 100,000.00<br />
4. Analysis of Food & Monitoring - Rs. 400,000.00<br />
TOTAL - Rs. 665,00,000.00<br />
B. NUTRITION PROGRAMME FOR ADOLESCENT GIRLS (N.P.A.G.)<br />
The Adolescent Girls Scheme was started during 1991-1992 in 507 Blocks across the<br />
country. For the first time in India, a special intervention has been devised for Adolescent<br />
Girls using the ICDS infrastructure. The intervention focuses on school dropouts, girls in the<br />
age group of 11-18 yrs. The objective of the Scheme is to mobilize and enhance to potentials<br />
of these girls by meeting their needs of self-development, nutrition, health, education,<br />
literacy, recreation and skill formation. The scheme has been implemented only under<br />
Lungdar ‘E’ ICDS Project since 1991-1992, but extended to all the 21 ICDS Projects from the<br />
year 2000-2001. These adolescent girls are to be provided supplementary nutrition food at<br />
the Anganwadi, on the same scale as the pregnant and lactating mothers, i.e. to provide 500<br />
calories of energy and 20g. of protein for improvement of their nutritional and health<br />
status. Detail approved expenditure under the scheme during <strong>2006</strong>-07 is as under:-<br />
Sl.<br />
No.<br />
Target Group<br />
No. of<br />
Beneficiaries<br />
Daily<br />
Ceiling<br />
Nos. of<br />
Feeding<br />
Days<br />
Daily<br />
Requirement<br />
(in Rs.)<br />
Total Requirement<br />
for the<br />
Year (in Rs.)<br />
1. Adolescent Girls 11–18 yrs. 12631 Rs.2.30 59 29,051.30 17,14,026.70<br />
Calculation :<br />
Daily Requirement - 29,051.30<br />
No. of Feeding Days - 59 days<br />
Therefore, the total requirement for the year - Rs.17,14,026.70<br />
Say Rs.17,00,000.00<br />
The requirement for the year as per the norm of 300 feeding days is Rs. 87,15,390.00<br />
However, only 59 feeding days could be covered with the available fund.<br />
TOTAL OF A & B (Rs. 665,00,000.00 + 17,00,000.00) = Rs. 682,00,000.00
- 487 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PRISONS<br />
The administration of Jails in <strong>Mizoram</strong> in the past was mainly concentrated on<br />
security custody and confinement of prisioners. Most of the works taken up by the<br />
Department were security oriented with little scope for reformation and education of the jail<br />
inmates. It is now intended to take up the security aspect and reformation of prisoners on<br />
equal footing as recommended by Human Rights Commission and in line with the modern<br />
concepts of Prisons.<br />
At present, the following Jails are functioning in <strong>Mizoram</strong> —<br />
1) Central Jail, Aizawl<br />
2) District Jail, Aizawl<br />
3) District Jail, Lunglei<br />
4) District Jail, Saiha<br />
5) District Jail, Kolasib<br />
6) District Jail, Champhai<br />
The Annual Plan is prepared in line with the allocated outlay of Rs. 288.00 lakh for<br />
<strong>2006</strong>-07.<br />
1) 001(01) – Direction - Rs. 19.00 lakh<br />
2) 101(02) – District Jails - Rs. 167.00 lakh<br />
3) 102(01) – Jail Manufacture - Rs. 13.00 lakh<br />
800 – Other Expenditure<br />
4) Modernisation of Jails - Rs. 89.00 lakh<br />
Total - Rs. 288.00 lakh<br />
Scheme-wise Write-up<br />
1. 001(01) – Direction: At present, the Department is having 1(one) Junior Engineer and<br />
1(one) Store Keeper to look after Department buildings and stores. The existing<br />
Directorate Office building is in need of repair and renovation. Rs. 19.00 lakh is<br />
provided for maintenance of the exiting staff and for repair of Directorate Office<br />
building.<br />
Sl.<br />
No.<br />
Item Unit<br />
Physical<br />
target<br />
Financial<br />
target<br />
1. Salary of Junior Engineer and<br />
Store Keeper<br />
No. 2 Rs. 3.50 lakh<br />
2. TE / OE LS LS Rs. 10.50 lakh<br />
3. Improvement / repair of<br />
Directorate Office building<br />
PC 100% Rs. 5.00 lakh<br />
Total Rs. 19.00 lakh<br />
2. 101(02) – District Jails: The existing Jail buildings is different palces are in need of<br />
repair and renovation. The Department is also facing fund problem to meet the<br />
expenses on feeding charges of prisoners. As such, Rs. 167.00 lakh is provided for<br />
repair of Jail buildings and for feeding charges of prisoners.
- 488 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Sl.<br />
No.<br />
Item Unit<br />
Physical<br />
target<br />
Financial<br />
target<br />
1. Repair and renovation of Jail<br />
buildings<br />
PC 100% Rs. 50.00 lakh<br />
2. Feeding charges of prisoners LS LS Rs. 117.00 lakh<br />
Total Rs. 167.00 lakh<br />
3. 102(01) – Jails Manufacture: Vocational training in s few trades like handloom,<br />
carpentry, knitting and tailoring have been introduced for convict prisoners. For<br />
utilising the manpower, work connected with gardening is also introduced. A sum of<br />
Rs. 13.00 lakh for salary, wages of working prisoners and for purchase of tools and<br />
machineries is provided.<br />
Sl.<br />
No.<br />
Item Unit<br />
Physical<br />
target<br />
Financial<br />
target<br />
1. Salary of Junior Instructress,<br />
Peon and Chowkider<br />
No. 4 Rs. 4.00 lakh<br />
2. Wages LS LS Rs. 3.00 lakh<br />
3. M & E LS LS Rs. 5.00 lakh<br />
4. Gardening M & E LS LS Rs. 1.00 lakh<br />
Total Rs. 13.00 lakh<br />
4. 800 – Other Expenditure<br />
Modernisation of Jails: Rs. 17.77 crore has been allocated by Government of India.<br />
Ministry of Home Affairs for Jail reforms on cost sharing basis of Central<br />
Government and State Government in the ratio of 75:25 for a period of five years<br />
from 2002 to <strong>2007</strong>. Government of India has already released Rs. 7.9875 crore for<br />
the years 2002-03, 2003-04 and 2004-05, and the allocation for the State for the<br />
coming year would be the same as that of the previous year. As per the fund<br />
allocation made by Central Government, a sum of Rs. 3.55 crore is to be spent every<br />
year for the five year period of 2002-03 to <strong>2006</strong>-07. Out of Rs. 3.55 crore, Rs. 2.6625<br />
crore would be Central Assistance and the balance amount of Rs. 0.8875 crore would<br />
be borne by the State Government as 25% matching contribution. A provision of<br />
Rs.89.00 lakh is thus made for matching contribution of the Central Assistance.<br />
Sl.<br />
No.<br />
Item Unit<br />
Physical<br />
target<br />
Financial<br />
target<br />
1. Construction of new Jails No. 3 Rs. 41.25 lakh<br />
2. Expansion and renovation of<br />
existing Jails<br />
No. 6 Rs. 22.50 lakh<br />
3. Construction of staff quarters No. 6 Rs. 10.00 lakh<br />
4. Sanitation and water supply No. 6 Rs. 15.25 lakh<br />
Total Rs. 89.00 lakh
- 494 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PRINTING & STATIONERIES<br />
Printing & Stationery Department is being equipped with advanced printing<br />
equipment in order to execute timely completion of urgent & time-bound Govt. Publication.<br />
The approved Annual Outlay during 2005-06 was Rs. 100.00 lakh which is insufficient for<br />
purchase of Printing materials etc. The sectoral allocation for the approved Annual Plan<br />
<strong>2006</strong> - 07 in respect of Printing & Stationery Department is Rs. 180.00 lakh.<br />
Scheme-wise description of the Annual Plan of Printing & Stationery Department for<br />
the year <strong>2006</strong>-07 is as follows: -<br />
1. FORMS & STATIONERY:<br />
A. Rents/Office Accomodation: The Department does not yet have Building of its own<br />
at Government Press Champhai. Hence, Rs. 0.39 lakh is approved during <strong>2006</strong>-07 for<br />
accommodating office in rented house.<br />
B. Maintenance of Motor Vehicle: For maintenance of Departmental trucks, Rs.1.50<br />
lakh is approved during <strong>2006</strong>-07.<br />
2. GOVERNMENT PRESS:<br />
A. Maintenance of Staff: For maintenance of 2 Officers and engagement of Muster Roll,<br />
Rs. 14.67 lakh is approved as follows :-<br />
(a) Salary - Rs. 4.80 lakh<br />
(b) Wages - Rs. 1.67 lakh<br />
(a) T.E - Rs. 0.20 lakh<br />
(a) O.E - Rs. 7.00 lakh<br />
(a) O.C - Rs. 1.00 lakh<br />
TOTAL - Rs. 14.67 lakh<br />
B. Scholarship/Stipend: For imparting necessary training on D.T.P. (Desk Top<br />
Publishing) and to meet the stipend of trainee, Rs. 0.30 lakh is approved.<br />
C. Minor Works: For Annual repair and maintenance of Departmental Buildings at<br />
Aizawl, Lunglei & Saiha, Rs. 15.00 lakh is approved during <strong>2006</strong>-07.<br />
D. Machinery & Equipment: The existing machines at Government are old and<br />
required regular repair and for procurement of Binding Machine & Colour Offset Press,<br />
Rs.93.00 lakh is approved.<br />
E. Material & Supply: Since the Department can execute Colour printing works,<br />
requirement of the Printing materials increases. For procurement of Press materials,<br />
Rs.30.00 lakh is approved.<br />
3. GOVERNMENT PUBLICATION: The Government Press is entrusted with printing of<br />
important documents like Budget & Official Gazette etc. and purchase of materials for<br />
Colour printing works, Rs. 25.14 lakh is approved during <strong>2006</strong> - 07.<br />
GRAND TOTAL : Rs. 180.00
- 498 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
PUBLIC WORKS BUILDING<br />
Introduction:<br />
The works taken up under this Head of Accounts are mainly Construction and<br />
Improvement of office buildings of various Government Departments, <strong>Mizoram</strong> Houses at<br />
various places, Rest Houses at various places in <strong>Mizoram</strong> and other non-residential<br />
buildings. Rs. 1285.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
Direction and Administration:<br />
Rs. 685.00 lakh is approved during 10 th Five Year Plan. Rs. 302.00 lakh is approved<br />
during <strong>2006</strong> -<strong>2007</strong> for salary and establishment of existing staff..<br />
The breakup of Direction & Administration is as follows :<br />
1) Salary = Rs. 152.00 lakh<br />
2) T.E. = Rs. 4.00 lakh<br />
3) Office Expenses = Rs. 20.00 lakh<br />
4) Advertisement = Rs. 1.00 lakh<br />
5) Professional Charge = Rs. 1.00 lakh<br />
6) Other Charges = Rs. 1.00 lakh<br />
7) Motor Vehicles = Rs. 11.00 lakh<br />
8) Maintenance = Rs. 112.00 lakh<br />
Total = Rs. 302.00 lakh<br />
Machinery and Equipment:<br />
No provision is kept for Machinery and Equipment under this Head of Accounts<br />
during <strong>2006</strong>-<strong>2007</strong>.<br />
Works:<br />
Rs. 983.00 lakh is approved for works under this Head of Accounts during <strong>2006</strong>-07.<br />
Spill over Schemes: -<br />
1. Construction of <strong>Mizoram</strong> Legislative Assembly Annexe Building :<br />
Rs. 250.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
2. Construction of Excise Commisioner Office Building at Aizawl :<br />
Rs. 56.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />
3. Re-construction of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi:<br />
Rs. 100.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Construction of Treasury Office Building at 5 (five) new Districts:<br />
Rs. 80.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />
5. Construction of D.C. Office Building at Lunglei :<br />
Rs. 4.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />
6. Construction of 6 Nos SDOs office including full-fledged laboratory at Lunglei<br />
Phase-II:<br />
Rs. 21.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.
- 499 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
7. Construction of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi (SH: Architectural<br />
consultancy for design of building) :<br />
Rs. 10.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />
8. Construction of Finance Secratariat building at Aizawl :<br />
Rs. 10.50 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />
9. Vertical Extension of CM Secratariat building at Aizawl :<br />
Rs. 100.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />
10. Improvement of <strong>Mizoram</strong> House and staff quarters at Guwahati :<br />
Rs. 29.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />
11. Construction of <strong>Mizoram</strong> House at Vasant Vihar, New Delhi :<br />
Rs. 17.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
New Schemes: -<br />
1. Construction of <strong>Mizoram</strong> House at Shillong :<br />
Rs. 80.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
2. Construction of Circuit Houses at various district headquarters :<br />
Rs. 100.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
3. Construction of PWD Divisional Office at Lawngtlai :<br />
Rs. 25.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />
4. Improvement and Renovation of I/E to Govt. buildings at various districts:<br />
Rs. 20.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong><br />
5. Improvement of E-in-C, PWD office flooring:<br />
Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />
6. Installation of Sound System at <strong>Mizoram</strong> Assembly House, Aizawl :<br />
Rs. 43.50 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
7. Construction of Taxation Directorate Office building at Aizawl :<br />
Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />
8. Installation of Submersible pump and enhancement of Power Transformer<br />
capacity at <strong>Mizoram</strong> House, Guwahati :<br />
Rs. 17.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>
Introduction:<br />
- 506 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
ADMINISTRATIVE TRAINING INSTITUTE<br />
Training for the purpose of capacity building os essential for improvement of<br />
administration and it is a corner stone for upgradation of the standard of administration. In<br />
<strong>Mizoram</strong>, proper Training Institute is yet to be set up. This Institute, started in 1983, is the<br />
only institute in the State which makes efforts to impart trainings to the different levels of<br />
employees of the State Government.<br />
1. Salary: At present, 8(eight) Gazetted Officers and 10(ten) Staff of various categories<br />
are on Institute’s payroll under Plan fund. For this purpose, a provision of Rs. 38.00<br />
lakh under 003(01)(01) - Salary is earmarked and provision for this is kept within<br />
this figure.<br />
2. Wages: Due to shortage of Office staff, 4(four) LDCs and 3(three) Peons on Muster<br />
Roll basis have to be engaged every year. In this regard, approval of Government was<br />
obtained and provision of fund of Rs. 3.50 lakh under 003(01)(02) - Wages has been<br />
earmarked.<br />
3. Domestic Travelling Expenses: The ATI has to develop a strong teaching ase. The<br />
faculty members are often required to travel to interior stations for conducting<br />
training sponsored by Government of India. Hence, a provision of Rs. 1.35 lakh has<br />
been set aside under 003(01)(11) as D.T.E.<br />
4. Office Expenses: For purchase of POL and maintenance of vehicles including<br />
purchase of stationsery articles, a provision of fund of Rs. 6.00 lakh under<br />
003(01)(13) – Office Expenses is earmarked for the effective conduct of in-house<br />
training courses and in the outstations.<br />
5. Rents: The Institute is, at present, accommodated in a rented building at<br />
Tuikhuahtlang, Aizawl. Although the building of its own is under construction in the<br />
New Capital Complex, actual occupation cannot be ascertained at present. Hence,<br />
provision of fund of Rs. 4.15 lakh under 003(01)(14) - Rents is earmarked.<br />
6. Supplies & Materials: For training purpose, ATI has to procure rule boks and other<br />
publications for its library. Moreover, training for Computer Course and Pitman Mizo<br />
Shorthand have been introduced. Maintenance of its accessories and equipments, as<br />
well as other office equipments, is necessary. Therefore, a provision of fund of<br />
Rs.1.00 lakh under 003(01)(21) - Supplies & Materials is kept for these purposes.<br />
7. Professional Service: In the existing ATI, there are three Training Halls with seating<br />
capacity of 30 trainees in 2 Halls each and one is Computer Training Hall with a<br />
seating capacity of 15 trainees. Due to shortage of accommodation, Refreshment<br />
Room cannot be provided to the trainees during refreshment hour. During <strong>2006</strong>-07,<br />
this Institute proposes to conduct 40 different training courses including Training<br />
for All – Support to State Training Activities. The number of participants likely to<br />
undergo the training are —
- 507 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
Officers - 250 nos.<br />
Staff - 490 nos.<br />
Total - 740 nos.<br />
In order to meet expenses on stationery for trainees, refreshment / working lunch<br />
for all the trainees and for payment of honorarium for Guest Faculty, a provision of<br />
fund of Rs. 2.00 lakh under 003(01)(28) - Professional Services is earmarked.<br />
8. Other Charges and Machinery & Equipment: The ATI will have a requirement of<br />
furnishing and fittings and of machineries and equipments. These provisions also<br />
take care of our requirement at existing level. As such, Rs. 3.00 lakh have been kept<br />
under 003(01)(50) - Machinery & Equipments to meet out time requirement.<br />
9. In view of the above considerations, the outlay of Rs. 60.00 lakh will be appropriated<br />
in the following manner during <strong>2006</strong>-07.<br />
A – REVENUE<br />
(01) - Salary - Rs. 38.00 lakh<br />
(02) - Wages - Rs. 3.50 lakh<br />
(11) - Domestic Travelling Expenses - Rs. 1.35 lakh<br />
(13) - Office Expenses - Rs. 6.00 lakh<br />
(14) - Rents, Rates & Taxes - Rs. 4.15 lakh<br />
(21) - Supplies & Materials - Rs. 1.00 lakh<br />
(28) - Professional Services - Rs. 2.00 lakh<br />
(50) - Other Charges - Rs. 3.00 lakh<br />
(52) - Machinery & Equipment - Rs. 1.00 lakh<br />
TOTAL - Rs. 60.00 lakh
- 510 -<br />
<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />
FORENSIC SCIENCE LABORATORY<br />
The <strong>Mizoram</strong> State Forensic Science Laboratory was established in 2000 to cater to<br />
the need of the ever increasing demand of Law Enforcing Agencies for the Scientific analysis<br />
of Crime Cases. To upgrade and modernize the <strong>Mizoram</strong> State Forensic Science Laboratory,<br />
it is necessary to procure different types of materials and sophisticated equipments.<br />
However, all the required items could not be procured due to shortage of fund provided in<br />
the Plan. The approved Annual Plan <strong>2006</strong>-07 is prepared only within the amount of Rs. 4.00<br />
lakh as per Commissioner, Planning & Programme Implementation Department, Government<br />
of <strong>Mizoram</strong> letter No. G.28014/55/<strong>2006</strong>-07/SPB dt. 02.02.06.<br />
Detail item-wise proposal for Annual Plan <strong>2006</strong>-07 is enclosed herewith.<br />
LIST OF ITEMS TO BE PURCHASED UNDER <strong>PLAN</strong> FOR FSL<br />
DURING <strong>2006</strong>-07<br />
(Amount in Rs.)<br />
Sl. No. Name of Items Amount<br />
1 Chemical & Glassware 2,00,000.00<br />
2 Muffle Furnace YSPL-532 50,000.00<br />
3 Hot Air Oven 20,000.00<br />
4 Hot Water Bath 10,000.00<br />
5 Bullet recovery Water Tank 20,000.00<br />
6 Model of Human Figure 20,000.00<br />
7 Lajer Jet Colour Printer 80,000.00<br />
TOTAL 4,00,000.00