22.07.2013 Views

- 1 - APPROVED ANNUAL PLAN 2006-2007 - Mizoram

- 1 - APPROVED ANNUAL PLAN 2006-2007 - Mizoram

- 1 - APPROVED ANNUAL PLAN 2006-2007 - Mizoram

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INTRODUCTION:<br />

- 1 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

CROP HUSBANDRY (AGRICULTURE)<br />

The Annual Plan <strong>2006</strong> - <strong>2007</strong> is prepared by keeping the policy of increased food<br />

production in view but within the limitation of fund constraints.<br />

Under Crop Husbandry priorities are land development, construction of rural market<br />

linkage, replacement of local seeds such as, paddy, pulses, oilseeds etc. with high yielding<br />

varieties. Farm Mechanization is given due importance for increased crop production. The<br />

other schemes are in line with the major schemes, supporting each other.<br />

Watershed Development Projects in Shifting Cultivation Area (WDPSCA) under a<br />

special Central assistance to State Plan Fund Programme for the benefit of the jhumias<br />

families being implemented in the 42 nos. of micro watershed projects during 10 th Plan<br />

period with a total target area of 20,000 Ha. During this financial year, it is targeted to treat<br />

5,500 Ha.<br />

The Government of <strong>Mizoram</strong> have launched a special Scheme known as <strong>Mizoram</strong><br />

Intodelhna Programme (MIP) during 2002-2003. The programme will be continued during<br />

<strong>2006</strong> - <strong>2007</strong> with an outlay of Rs. 2,000.00 lakh.<br />

The Oil Palm Development Programme under ISOPOM will be implemented in<br />

<strong>Mizoram</strong> as CSS on 75:25 sharing basis between Government of India & Government of<br />

<strong>Mizoram</strong> except for the component of drip irrigation where entire cost on drip irrigation in<br />

Oil palm Plantation would be met by the Government of India including training component.<br />

The scheme is expected to generate a self sustain economy with the help of Central<br />

Government. The scheme will be a development model for <strong>Mizoram</strong> State.<br />

Famine visits <strong>Mizoram</strong> at regular intervals during the flowering of Melocanna<br />

baccifera and Bambusa tulda. The occurrence of the past famines is due to the outbreak of<br />

rats, thereby causing a famine in the state. Thus, the Government of <strong>Mizoram</strong> has<br />

formulated a comprehensive programme of Bamboo Flowering and Famine Combat Scheme<br />

(BAFFACOS). This programme would be implemented through Rodent Control Programmes,<br />

adoption of alternative and diversified cropping system, establishment of processing unit at<br />

village level and rural market connectivity.<br />

The total approved outlay for the Annual Plan <strong>2006</strong>-07 is Rs. 3,300.00 lakh for Crop<br />

Husbandry including the new programme of <strong>Mizoram</strong> Intodelhna Programme (of which<br />

Rs.1,000.00 lakh under State Plan fund, Rs. 500.00 lakh NABARD loan for cold storage and<br />

Rs. 500.00 lakh under Additional Central Assistance) and Rs 200.00 lakh under Bamboo<br />

Flowering and Famine Combat Scheme (BAFFACOS).


- 2 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 298.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 276.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />

SCHEME NO. 1<br />

In order to create infrastructures at Districts, Sub-Divisions and Circle level, it is<br />

proposed to construct 4 (four) nos. of Departmental buildings (DAO's Office (Saiha) - 1 no.,<br />

AEO Quarter-cum-Office at Hnahlan - 1 nos.) and Soil Testing Laboratory at Lunglei and<br />

maintenance of existing buildings/ Rest Houses etc..<br />

A. DIRECTION<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

Salary of Officers & Staff No. 11 15.00<br />

T.E. No. LS 3.00<br />

Maintenance of existing buildings No. 20 10.00<br />

Maintenance of heavy vehicles No. 6 10.00<br />

Office Expenses No. LS 15.00<br />

Repair and maintenance of light vehicles and<br />

purchase of parts, POL, etc.<br />

No. 17 15.00<br />

Sub-Total 68.00<br />

B. ADMINISTRATION<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

1. Salary of Officers & Staff at District and Sub-<br />

Division<br />

No. 59 82.00<br />

2. T.E. No. L.S 25.00<br />

3. Wages No. 38 22.00<br />

4. Office Expenses No. LS 20.00<br />

5. Repairing & maintenance of light vehicles No. 17 20.00<br />

6.<br />

7.<br />

Maintenance of existing Staff Quarters/Rest<br />

House in the Districts<br />

Construction of Deptt. Buildings :<br />

a) DAO’s Office, Saiha for completion<br />

b) Soil testing laboratory at Lunglei<br />

c) AEO Office cum Quarter at Hnahlan<br />

d) AEO Office-cum-Quarters at Bairabi<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

27<br />

21.00<br />

30.00<br />

4.00<br />

3.00<br />

3.00<br />

Sub-Total : 230.00<br />

Total : 298.00


- 3 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : FOODGRAIN DEVELOPMENT<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> – <strong>2007</strong> : Rs. 175.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs 136.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />

SCHEME NO. 2<br />

Land Development for WRC by hiring private Bulldozers and potential area<br />

connectivity are the major item of the work under this scheme. while maintenance of<br />

existing Agril link road is also given importance along with distribution of high yielding<br />

Certified Seeds in order to replace low yielding local varieties of seeds.<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. In lakh)<br />

Financial<br />

Outlay<br />

1. Salary of Officers & Staff No. 112 19.00<br />

2. T.E No. LS 2.00<br />

3. a) Land Development for WRC by Machineries Ha. 50 25.00<br />

b) Maintenance of existing Agril. link road Km LS 27.00<br />

4. Potential area connectivity Km 25 75.00<br />

5.<br />

Repairing & maintenance of :-<br />

a) Bulldozer<br />

b) Tractor<br />

c) Power Tiller<br />

No.<br />

No.<br />

No.<br />

5<br />

20<br />

10<br />

10.00<br />

6. Purchase & distribution of seeds, HDPE pipe<br />

including transportation charge<br />

Qtl. LS 15.00<br />

7. Baseline Survey No. 8 2.00<br />

Total 175.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MANURES & FERTILIZERS<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 11.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 22.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />

SCHEME NO. 3<br />

Under the scheme, thrust will be given towards the promotion of organic manures,<br />

green manure crops and bio-fertilizers to encourage the farmers to take up organic farming.<br />

The Bio-fertilizer Production Unit which was established at Sihphir will be maintained along<br />

with the Static Soil and Seed Testing Laboratories.


- 4 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

A. MANURES & FERTILIZES:<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

1. Maintenance of Bio-fertilizer production unit. No. 1 2.00<br />

2. Purchase of Neem cake, other organic manures<br />

& Green manure seeds<br />

MT. 5 MT 2.00<br />

Sub-Total : 4.00<br />

B. SOIL AND SEED TESTING LABORATORY:<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

1. Operational cost and maintenance of<br />

Laboratories.<br />

No. 3<br />

4.50<br />

2. Office expenditure & other contingencies No. LS 2.50<br />

Sub-Total : 7.00<br />

Total : 11.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : <strong>PLAN</strong>T PROTECTION<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 10.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 8.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />

SCHEME NO. 4<br />

<strong>Mizoram</strong> receives high rainfall during Monsoon, humid climate results in outbreak of<br />

insect pests and diseases and excessive weeds problems. To meet the requirement of the<br />

farmers various insecticides and Plant Protection equipments is proposed to procure for<br />

50% subsidy sale and for maintenance to IPM Laboratory at Neihbawi Farm.<br />

Sl.<br />

No.<br />

Items Unit<br />

1. PP chemicals for distribution to the farmers at<br />

50 % subsidy<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

M.T LS 7.00<br />

2. Operational cost of IPM Laboratory No. 1 2.00<br />

3. Maintenance of IPM Laboratory building No. 1 1.00<br />

Total : 10.00


- 5 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : COMMERCIAL CROP DEVELOPMENT<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 13.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs 9.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />

SCHEME NO. 5<br />

The commercial crop grown in the state is sugarcane crops, of which many farmers<br />

cultivate and prepared Jaggery (Gur) and sold in the local market to support their livelihood.<br />

In order to alleviate the economic status of the farmers, the cultivation of sugarcane will be<br />

taken up. This programme will be achieved through distribution of High sucrose content<br />

quality planting materials.<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

1. Sugar cane development Sett 8,00,000 8.00<br />

2. Transportation charges of Agril. Inputs and<br />

seeds<br />

LS LS 5.00<br />

Sub Total 13.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : EXTENSION & FARMERS TRAINING<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 4.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 3.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />

SCHEME NO. 6<br />

This scheme is to impart knowledge and skill to the farmers through Agril. Extension<br />

for which print media are the most important tools and therefore, priority will be given for<br />

publications of Zoram Loneitu and other printed materials.<br />

Sl.<br />

No.<br />

1.<br />

Items Units<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

Agril. Information -<br />

a) Publication of Periodicals such as Zoram<br />

Loneitu, Loneitu Kantu, Agril. News letters etc. No. LS 2.00<br />

b) Operational cost of Video Production Unit No. 1 1.00<br />

c) 10% State Matching Share 1.00<br />

Total 4.00


- 6 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : AGRIL. MACHINERIES & IMPLEMENTS<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 10.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 26.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />

SCHEME NO. 7<br />

For promotion of mechanization of farming, a Subsidy of Rs 60,000/- is offered to<br />

the needy farmers for purchase of Power Tiller. Small farm tools and implements will also<br />

be procured for 50 % subsidy sale.<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

1. Subsidy for purchase of Power Tiller @ 50%<br />

subject to the limit of Rs. 60,000/-per power<br />

tiller (Rs. 30,000/- State and Rs. 30,000/-CSS)<br />

2. Small tools and implements for sale @ 50%<br />

subsidy.<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

No. 30 9.00<br />

No. LS 1.00<br />

Total 10.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : STATE SOIL SURVEY ORGANISATION<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> – <strong>2007</strong> : Rs. 29.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 28.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />

SCHEME NO. 8<br />

Soils are our most precious natural resource. As such, knowledge of soils in respect<br />

of their extent, distribution, characteristics and potential use is extremely important for<br />

optimizing land use. Areas to be put under intensive use and management or other priority<br />

areas call for Detail or High Intensity Survey for accurate and sound planning, to prevent<br />

further deterioration and to avoid risk of failure. As such a Detailed Soil Survey of potential<br />

areas for Agriculture, Horticulture etc. is imperative and it is proposed to conduct detail<br />

survey of potential areas.<br />

The assistance for the functioning of the State Land Use Board (SLUB) will be<br />

continue in order to achieve the above objective.<br />

(Rs. In lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1. Salary/TE of Officers & Staff, JD(LUB)-1, (ASSO-3,<br />

UDC-2, LDC-4,Investigator-1, Driver II-2, Tracer-<br />

1, OSA-I, Steno-1, IV Grade-3), Assistant-1<br />

No. 20 27.00<br />

2. T.E. No. LS 1.00<br />

3. Office Expenses - LS 1.00<br />

Total 29.00<br />

Total of Un-Earmarked Schemes 550.00


- 7 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : CONTROL OF SHIFTING CULTIVATION<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs 550.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 - <strong>2006</strong> : Rs. 550.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />

SCHEME NO. 9<br />

During the 10 th Five Year Plan 42 projects under WDPSCA that is Control of Shifting<br />

Cultivation have been identified with the total area of 20,000 ha. During <strong>2006</strong>-<strong>2007</strong>, it is<br />

proposed to treat 5,500 ha. of land under the projects with the following components with<br />

an objective of Control of Shifting Cultivation in the watersheds.<br />

(Rs. in lakh)<br />

Sl.<br />

No<br />

Components Unit<br />

Physical<br />

Outlay<br />

Financial<br />

Outlay<br />

1. Management Component<br />

1.1 Administrative costa)<br />

Salary of project functionaries, Office<br />

expenses etc.<br />

LS LS 25.00<br />

b) Maintenance of vehicle LS LS 20.00<br />

1.2 Training programme<br />

a) Training of PIAs, UGs, SHGs. and Farmers. No 30 10.00<br />

b) Publication of leaflets, Manual etc. LS LS 5.00<br />

c) Purchase of Training Equipment LS LS 5.00<br />

2 Development component<br />

a) Land Development for terraces, WRC etc.for<br />

settlement of jhumias families.<br />

Ha 320 160.00<br />

b) Project area connectivity Km 20 62.00<br />

c) Drainage line treatment<br />

Treatment of upper, middle and lower reaches<br />

construction of Gabion structures<br />

No. 300 18.00<br />

d) Rain Water harvesting structure- Individual<br />

and Community<br />

No 214 74.00<br />

e) Purchase of different agril. inputs like, seeds,<br />

PP chemicals, fertilizers , Manures and HDPE<br />

pipes etc.<br />

LS LS 110.00<br />

f) Crop diversification like cultivation of<br />

Medicinal and Aromatic plants, as an alternative<br />

to jhuming.<br />

Ha 200 24.00<br />

g) Transportation charge of Agril. Inputs etc. LS LS 10.00<br />

h)Seed money for Self Help Group under the<br />

project.<br />

Nos 42 10.00<br />

i)Innovative management practices of Integrated<br />

Nutrient Managements<br />

Ha 1000 17.00<br />

Total 550.00


- 8 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. 10<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MIZORAM INTODELHNA PROGRAMME (M.I.P.)<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 2,000.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 2,000.00 lakh<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2006</strong> – <strong>2007</strong><br />

The main purpose of this project if upliftment of the rural poor especially the<br />

shifting cultivators. Its main concern is attainment of self-sufficiency, food security and<br />

better livelihood for the cultivators.<br />

This programme will minimise the undesirable consequences of Shifting Cultivation<br />

such as destruction of forests, removal of top soils, landslides and degradation of land. The<br />

farmers will be assigned to adopt a more profitable, sustainable, permanent system of<br />

farming through Agro-horticulture and Soil Conservation.<br />

Oil Palm Development in this Scheme will be implemented in <strong>Mizoram</strong> as CSS on<br />

75:25 sharing basis between Government of India and Government of <strong>Mizoram</strong> State except<br />

for the component of drip irrigation where entire cost on drip irrigation in Oil Palm<br />

Plantation would be made by the Government of India including training component. The<br />

scheme is expected to generate a self sustain economy with the help of Central Government.<br />

The scheme will be a development model for <strong>Mizoram</strong> State.<br />

The development of Aromatic plant - Patchouli, Biofuel - Jatropha, Passion fruits and<br />

Grape cultivation are proposed to be included in the on-going programmes of MIP during<br />

<strong>2006</strong>-<strong>2007</strong>. The farmers are introduced into contract farming where assured market is<br />

available for the produces from these selected crops.<br />

Land development by machineries is proposed to promote Agriculture Production<br />

through on-farm land development and terraces. The Agriculture production component<br />

has been designed to provide support necessary for farmers to make the best use of land<br />

available to them under various eco-system.<br />

Marketing of any farm produce at a reasonable prices is an important criteria. It is a<br />

very important to strengthen the marketing facilities/infrastructures. It is proposed to<br />

construct one unit multi-purpose Cold Storage at Vairengte having a capacity of 3500 MT for<br />

storing the perishable farm produces.<br />

A. Normal Central Assistance (NCA) :<br />

Sl.<br />

No.<br />

Items/Particulars Unit<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlays<br />

1. State matching share for Oil Palm Development<br />

Programme under ISOPOM<br />

Ha. 3,500 190.00<br />

2. Management Component :<br />

a) Project Management<br />

L.S. L.S. 50.00<br />

3. Purchase of inputs, viz., G.I. Wires, PVC Pipes,<br />

Organic Manures, Biopesticides, Sprayers, etc.<br />

L.S. L.S. 30.00


Sl.<br />

No.<br />

4.<br />

- 9 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Items/Particulars Unit<br />

Agriculture Activities :<br />

a) Development of Aromatic Plant – Patchouli<br />

Cultivation @ Rs.20,000/- per Ha.<br />

b) Development of Bio-fuel – Jatropha<br />

Cultivation @ Rs.12,000/- per Ha.<br />

c) Assistance to Red Oil Palm Cultivators land<br />

preparation, seedlings, other inputs, etc. @<br />

Rs.15,000/- per Ha.<br />

d) Assistance to Passion Fruits Cultivators for<br />

land preparation, seedlings, other inputs,<br />

etc. @ Rs.15,000/- per Ha.<br />

e) Assistance to Grape Cultivators for land<br />

preparation, seedlings, other inputs, etc. @<br />

Rs.15,000/- per Ha.<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlays<br />

Ha. 500 100.00<br />

Ha. 1,500 180.00<br />

Ha. 1,500 225.00<br />

Ha. 800 120.00<br />

Ha. 700 105.00<br />

TOTAL 1,000.00<br />

B. Additional Central Assistance (One Time Grant) :<br />

(Rupees in lakh)<br />

Sl.<br />

No.<br />

Items/Particulars Unit<br />

Physical<br />

Target<br />

Financial<br />

Outlays<br />

1. Construction of Connectivity/Link Road :<br />

a) Potential Area Connectivity @ Rs.3,00,000/per<br />

Km.<br />

Km. 35 105.00<br />

b) Oil Palm Dev. @ Rs.3,00,000/- per Km. Km. 40 120.00<br />

b) Jatropha Dev. @ Rs. 3,00,000/- per Km. Km. 40 120.00<br />

2. Land Development by Machineries :<br />

a) 5 – 8% Slopes @ Rs.40,820/- per Ha.<br />

Ha. 100 40.82<br />

b) 8 – 10% Slopes @ Rs.50,804/- per Ha. Ha. 100 50.80<br />

c) 10 – 15% Slopes @ Rs.59,000/- per Ha. Ha. 100 59.00<br />

3. Purchase of inputs – Organic Manures,<br />

Biopesticides, Sprayers, PVC Pipes, etc.<br />

L.S. L.S. 4.38<br />

C. NABARD LOAN :<br />

TOTAL 500.00<br />

Sl.<br />

No.<br />

Items/Particulars Unit<br />

1. Construction of Multipurpose Cold Storage at<br />

Vairengte :<br />

a) Capacity – 3500 MT<br />

b) Estimate Cost – Rs. 575.00 lakh<br />

c) Promoter Contibution – Rs. 75.00 lakh<br />

No.<br />

Physical<br />

Target<br />

1<br />

(Rupees in lakh)<br />

Financial<br />

Outlays<br />

500.00<br />

TOTAL 500.00


- 10 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. 11<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : BAMBOO FLOWERING & FAMINE COMBAT SCHEME<br />

(EARMARKED)<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs 200.00 lakh<br />

2. ANTICIPATED EXPENDITURE FOR 2005 – <strong>2006</strong> : Rs. 240.00 lakh<br />

PHYSICAL AND FINANCIAL TARGET DURING <strong>2006</strong>-<strong>2007</strong><br />

Famine visit <strong>Mizoram</strong> at regular intervals during the flowering of Melocanna<br />

baccifera and Bambusa tulda. The occurrence of the past famines is due to the outbreak of<br />

rats, thereby causing a famine in the state. Thus, the government of <strong>Mizoram</strong> has<br />

formulated a comprehensive programme of Bamboo flowering and Famine Combat Scheme<br />

(BAFFACOS), with an aim to reduce poverty among farmers during famine period.<br />

This programme would be achieved through Rodent Control, cultivation of early<br />

maturing variety of rice in jhum, and construction of rural market connectivity .<br />

Sl.<br />

No.<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong><br />

Items Units<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

1. Promotion of Rodent Control Measures :<br />

1.1 Survey of sporadic bamboo flowering areas No. 24 2.40<br />

1.2 Survey of rodent surveillance at State and Sub-<br />

Divisional and Agril. Circle level<br />

No. 2,544 12.70<br />

1.3 Rodent pest management :<br />

a) Incentive for local rat traps @ Rs 100/<br />

Ha./50 nos.<br />

Ha. 5,900 5.90<br />

c) Purchase of pesticides & Rodenticides Ha. 20,000 26.00<br />

1.4 Publicity — awareness campaign and<br />

documentation etc.<br />

No. 30 10.00<br />

Sub-Total 57.00<br />

2. Incentive for cultivation of early maturing rice<br />

in jhum areas @ Rs 250/- per ha.<br />

Ha. 40,000 100.00<br />

3. Construction of rural market connectivity Km. 20 43.00<br />

Sub Total 143.00<br />

Grand Total 200.00


- 11 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

AGRICULTURE RESEARCH & EDUCATION<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION<br />

1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-<strong>2007</strong> :<br />

2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : NIL<br />

SCHEME NO. 1<br />

Directorate of Agriculture was bifurcated into two Directorates, i.e. Directorate of<br />

Agriculture Crop Husbandry and Minor Irrigation and Directorate of Agriculture (Research &<br />

Education). It is proposed to maintenance the Directorate during <strong>2006</strong>-<strong>2007</strong>.<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Units<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1. Contingency No. L.S 5.00<br />

2. Maintenance of Building No. L.S. 2.50<br />

TOTAL 7.50<br />

SCHEME NO. 2<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : AGRIL. FARM & QUALITY SEED PRODUCTION<br />

1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-<strong>2007</strong> : Rs. 15.00 lakh<br />

2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 10.00 lakh<br />

Department has established 3 nos. of Departmental farms at Thingdawl, Chemphai<br />

and Rotlang for production of seed and demonstration purposes. It is proposed to maintain<br />

above farms for production of certified seeds and demonstration of new farming system.<br />

Sl.<br />

No.<br />

Items Units<br />

1. Operation cost and maintenance of existing<br />

departmental farms.<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

No. 3 15.00<br />

TOTAL 15.00<br />

HEAD OF DEVELOPMENT : RESEARCH & EDUCATION<br />

NAME OF THE SCHEME : INTEGRATED TRAINING CENTRE<br />

1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong> – <strong>2007</strong> : Rs. 7.50 lakh<br />

2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 4.50 lakh<br />

SCHEME NO. 3<br />

One Integrated Training Centre has been established during 1980 for conducting<br />

Basic Agriculture Training to in-service Gramsevaks, AAI and demonstrator of Agriculture,<br />

Horticulture and Rural Development Department. Beside this, 25 fresh students have been


- 12 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

admitted during 2005-<strong>2006</strong> for Pre-Service Agriculture training for 2 year course period. Pre-<br />

Service Basic Agriculture trainees will be provided Rs. 1000/- per month stipend and<br />

Rs.1000/- per year as book grand. Total fund requirement for functioning of ITC will be<br />

Rs.7.50 lakh as per following.<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Units<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1. Contingencies L.S. 1.00<br />

2. Repair of buildings (Staff qtrs. – 1, Hostel – 2,<br />

Auditorium – 1, Class room – 1, Principal qtrs. –<br />

1, Office – 1, Staff lodge – 1, Canteen – 1)<br />

No. 14 2.75<br />

3. Purchase of furniture and books for Library L.S 0.25<br />

4. Stipend to pre-basic and book grand No. 25 2.75<br />

5. Demonstration unit for trainees L.S. - 0.75<br />

Total 25 7.50<br />

HEAD OF DEVELOPMENT : RESEARCH & EDUCATION<br />

NAME OF THE SCHEME : EXTENSION AND FARMERS TRAINING<br />

1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong> – <strong>2007</strong> : Rs. 5.00 lakh<br />

2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 0.50 lakh<br />

SCHEME NO. 4<br />

ICAR, Government of India has sanctioned for establishment of 5 new KVK at<br />

Champhai, Serchhip, Lawngtlai, Saiha and Mamit District in addition to KVK at Kolasib and<br />

Hnahthial. As per the MoU signed by the Government of <strong>Mizoram</strong> and ICAR state<br />

Government has to provide Basic infrastructure like land, road (Internal Road and<br />

connectivity from main Road to KVK Complex), Water, Electricity, Communication, Sewer<br />

and other appropriate facilities. It is proposed to provide these basic facilities during <strong>2006</strong>-<br />

<strong>2007</strong> as state share.<br />

Sl.<br />

No.<br />

Items Units<br />

1. Electricity connection, Telephone connection,<br />

Development of drain for Sewer of complex and<br />

connectivity at 5 KVK sites at Saiha, Lawngtlai,<br />

Serchhip, Mamit and Khawzawl<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

No L.S 5.00<br />

Total 5.00


- 13 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2415 – AGRIL. RESEARCH & EDUCATION<br />

HEAD OF DEVELOPMENT : AGRIL. RESEARCH & EDUCATION<br />

NAME OF THE SCHEME : RESEARCH<br />

1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07 : Rs. 7.00 lakh<br />

2. ANTICIPATED EXPENDITURE 2005-<strong>2006</strong> : Rs. 7.00 lakh<br />

Sl.<br />

No.<br />

1.<br />

1.<br />

Items Units<br />

Physical<br />

Target<br />

SCHEME NO. 5<br />

(Rs. in lakh)<br />

Financial<br />

Outlay<br />

RESEARCH<br />

Research work on sustainable farming system in<br />

different elevations<br />

- L.S.<br />

3.00<br />

SUB-TOTAL 3.00<br />

EDUCATION<br />

Stipend, Book grant for B.Sc.(Agri.) students /<br />

Pre-service trainees<br />

L.S.<br />

4.00<br />

SUB-TOTAL 8.00<br />

TOTAL 43.00<br />

GRAND TOTAL 43.00


- 21 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HORTICULTURE<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />

SCHEME NO. I<br />

The Department of Horticulture is functioning with 1 (one) Directorate, 8(eight)<br />

Divisions, 3(three) Sub-Divisions and 37 (thirty seven) Circles. A post of Director, 2(two)<br />

posts of Joint Director, 6 (six) posts of Deputy Director, 5(five) posts of Divisional Officers<br />

with supporting Officers and Staff will be maintained during the year.<br />

Sl.<br />

No.<br />

DHOs quarters at Serchhip is approved to be constructed during the year.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> = Rs. 245.50 lakh<br />

<strong>APPROVED</strong> OUTLAY DURING 2005-<strong>2006</strong> = Rs. 273.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

A. DIRECTION<br />

1. Salary/T.E. of Officers and Staff. No. 30 43.00<br />

2. Wages No. 20 6.00<br />

3. Maintenance of existing buildings No. 1 2.00<br />

4. Maintenance of Vehicles including POL<br />

(a) Heavy (Truck/Tractor/ Bulldozer) No. 1 2.00<br />

(b) Light No. 2 3.00<br />

5. Office Stationery No. 30 5.00<br />

TOTAL OF ‘A’ : 61.00<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

B. ADMINISTRATION<br />

1. Salary/T.E. of Officers and Staff No. 84 135.00<br />

2. Wages No. 57 12.00<br />

3. Maintenance of existing buildings at Divisions, No. 10 5.00<br />

Sub-Divisions and Circles.<br />

4. (a) Construction of DHO Quarter at Serchhip No. 1 5.00<br />

5. Maintenance of Vehicles including POL<br />

(a) Light No. 11 14.50<br />

6. Office Stationery. No. - 13.00<br />

TOTAL OF ‘B’ : 184.50<br />

CAPITAL : 5.00<br />

REVENUE : 240.50<br />

G. TOTAL : 245.50


- 22 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. II<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : HORTICULTURE FARM AND SEED PRODUCTION<br />

Maintenance of Departmental farms at Tuitlawk, Rihte, Champhai, Khanpui,<br />

Vairengte, Thingdawl & Zawlnuam will be continued during <strong>2006</strong>-<strong>2007</strong>. Stress will be given<br />

on raising of seeds and seedlings in the Departmental farms. Improved varieties of seeds<br />

and seedlings are intended to be produced through vegetative propagation like budding,<br />

grafting, layering etc. Demonstration and trials of different crops will also be taken up in<br />

the farms.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 2.80 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 11.00 lakh<br />

( Rs. in lakh)<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1.<br />

SEED PRODUCTION<br />

Field contingencies for raising of seedlings etc.<br />

and normal maintenance of farms<br />

No. 7 2.50<br />

2. Office stationeries No. 7 0.30<br />

TOTAL : 2.80<br />

CAPITAL : -<br />

REVENUE : 2.80<br />

G. TOTAL : 2.80<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MANURES AND FERTILIZERS<br />

SCHEME NO. III<br />

Organic and Bio-fertilizers including soil amendment materials as well as Micronutrients<br />

and plant hormones etc. will be made available to the farmers at subsidized rate<br />

during the year. Transportation of these materials will be arranged by the Department upto<br />

Horticulture Division Headquarters.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> - Rs. 1.20 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005 - <strong>2006</strong> - Rs. 5.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Purchase of organic manures and soil<br />

amendments and plant nutrients etc. for<br />

distribution at 50% subsidy. Ton. 10 1.00<br />

2. Transportation and handling charges Ton. 10 0.20<br />

TOTAL : 1.20<br />

CAPITAL : 1.00<br />

REVENUE : 0.20<br />

G. TOTAL : 1.20


- 23 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : <strong>PLAN</strong>T PROTECTION<br />

SCHEME NO. IV<br />

Incedence of pests and diseases reduce production drastically thus reducing the<br />

income of the farmers. To combat the problem of pests and diseases on Horticulture crops,<br />

the Department proposes to distribute the required plant protection materials to the<br />

farmers at 50% subsidy.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 1.70 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 6.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. P.P.Measures for distribution at 50% subsidy. Litre 200 1.00<br />

2. Maintenance of Plant Health Clinic No. 1 0.50<br />

3. Transportation and handling charges Litre 200 0.20<br />

TOTAL : 1.70<br />

CAPITAL : 1.00<br />

REVENUE : 0.70<br />

G. TOTAL : 1.70<br />

SCHEME NO. V<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : EXTENSION AND FARMERS TRAINING<br />

For effective and efficient extension services, it is necessary to provide traning to<br />

farmers and exchange programme within the state, arrange exhibitions and seminars at<br />

Division level. Publication and subscription of papers, booklets, magazine including ‘HUAN<br />

ENKAWLTU’ will be continued.<br />

Demonstration of newly developed tools and implements, seeds, recent agrotechniques<br />

materials will be taken up to update the farmers on the recent developments.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 10.50 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 23.00 lakh<br />

( Rs. in lakh)<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

HORTICULTURE INFORMATION<br />

1. Exhibition/Seminar at state level. No. 2 3.00<br />

2. Publication of magazine. No. 25,000 3.00<br />

3. Purchase/Subscription of books, journals, diaries etc. No. 1,000 1.50<br />

4. Office expenses including advertisement, IT etc. LS 3.00<br />

TOTAL : 10.50<br />

CAPITAL : -<br />

REVENUE : 10.50<br />

GRAND TOTAL : 10.50


- 24 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE ENGINEERING<br />

SCHEME NO. VI<br />

By use of improved tools and implements, farmers could minimize their working<br />

time and improve efficiency in their works. Therefore, provision of different Horticultural<br />

tools and implements at 50% subsidy to the poor farmers will be continued during <strong>2006</strong>–07.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 2.50 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 6.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Horticulture tools and implements for No. 400 2.00<br />

distribution at 50% subsidy<br />

2. Miscellaneous expenses and Transportation charge No. 400 0.50<br />

TOTAL : 2.50<br />

CAPITAL : 2.00<br />

REVENUE : 0.50<br />

G. TOTAL : 2.50<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE<br />

DEVELOPMENT<br />

SCHEME NO. VII<br />

A. FRUIT DEVELOPMENT:<br />

The geo-climatic condition of <strong>Mizoram</strong> favours. the growth of various fruit crops.<br />

The department of Horticulture will take up emphasis expansion of area under Assam<br />

Lemon only during the year.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 1.20 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 16.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Area Expansion Scheme on fruit crops<br />

a) Assam Lemon Ha. 10 1.00<br />

2. Transportation charges etc. Qtl. LS 0.20<br />

TOTAL : 1.20<br />

CAPITAL : 1.00<br />

REVENUE : 0.20<br />

G. TOTAL : 1.20


- 25 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />

B. VEGETABLE DEVELOPMENT :<br />

In order to increase vegetable production in the State, quality vegetable seeds that<br />

are not easily affordable to the farmers will be made available to vegetable growers.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 1.20 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 5.50 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Area Expansion Scheme on vegetable . Ha. 10 1.00<br />

2. Transportation etc. LS 0.20<br />

TOTAL : 1.20<br />

CAPITAL : 1.00<br />

REVENUE : 0.20<br />

G. TOTAL : 1.20<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />

C. FLORICULTURE AND LANDSCAPING :<br />

Floriculture in <strong>Mizoram</strong> has been flourishing during the past few years as a result of<br />

the Department undertaking. Provision is also made for beautification of tourist<br />

Complexes, Parks, etc. and maintenance of VIP complexes will be continued.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> - Rs. 9.00 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> - Rs. 23.00 lakh<br />

( Rs. in lakh)<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Maintenance of flower gardens -<br />

a) Tourist Complex at Berawtlang No. 1 0.50<br />

b) District Park at Lunglei No. 1 0.50<br />

c) Mualkawi (Hawilopar Garden) No. 1 0.30<br />

d) Horticulture Tourist Spot, Reiek No. 1 0.50<br />

2. Maintenance of VIP Complexes including<br />

Directorate Top Floor No. 4 6.00<br />

3. Maintenance of Horti. Centre, Chite No. 1 1.00<br />

4. Transportation etc. LS 0.20<br />

TOTAL : 9.00<br />

CAPITAL : -<br />

REVENUE : 9.00<br />

G. TOTAL : 9.00


- 26 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />

D. MUSHROOM DEVELOPMENT:<br />

Due to unavailability of Spawn Production Unit at private sector in <strong>Mizoram</strong>, the<br />

Department will continue to maintain the existing Mushroom Laboratories at Chite,<br />

Champhai and Lunglei. Integrated Mushroom Units established under Government of India’s<br />

assistance for Button Mushroom cultivation at Chite, Champhai, Lunglei, Tuidam and<br />

Thingdawl will be maintained during <strong>2006</strong> – <strong>2007</strong>.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 2.20 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 7.50 lakh<br />

( Rs. in lakh)<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Maintenance of Mushroom laboratories<br />

including supply of different materials for<br />

production of Spawn at -<br />

a) Chite No. 1 0.50<br />

b) Lunglei No. 1 0.30<br />

c) Champhai No. 1 0.30<br />

d) Tuidam No. 1 0.30<br />

e) Thingdawl No. 1 0.30<br />

2. Training expenses No. of 100 0.20<br />

farmers<br />

3. Other Charges L.S. 0.30<br />

TOTAL : 2.20<br />

CAPITAL : NIL<br />

REVENUE : 2.20<br />

G. TOTAL : 2.20<br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />

E. BEE KEEPING :<br />

Gardeners will be encouraged to take up Bee Keeping by giving Bee-Colonies and<br />

accessories for Bee Keeping in order to increase the productivity of crops through cross<br />

pollination.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 0.20 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 2.50 lakh<br />

( Rs. in lakh)<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Bee-hive boxes for distribution to Gardeners No. 13 0.20<br />

TOTAL : 0.20<br />

CAPITAL : -<br />

REVENUE : 0.20<br />

G. TOTAL : 0.20


Sl<br />

No<br />

- 27 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

HEAD OF THE SCHEME : HORTICULTURE AND VEGETABLE DEVELOPMENT<br />

F. HORTICULTURE POTENTIAL AREA CONNECTIVITY<br />

Maintenance of the existing Potential Area Connectivity will be continued so as to<br />

help farmers in bringing their farm produces to the market with mechanical system of<br />

transport etc.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong>-<strong>2007</strong> : Rs. 2.00 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005-<strong>2006</strong> : Rs. 50.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Maintenance of existing area connectivity Km. LS 2.00<br />

TOTAL : 2.00<br />

CAPITAL : -<br />

REVENUE : 2.00<br />

G. TOTAL : 2.00<br />

HEAD OF DEVELOPMENT<br />

NAME OF THE SCHEME : BAFFACOS<br />

SCHEME NO. VIII<br />

The Department keeping in view the gregarious flowering of bamboo taking place<br />

during 2004 -<strong>2007</strong> resulting in mass mortality and destruction of bamboo forest, incurring<br />

rapid increase in rodent population thereby causing famine the department selected 4(four)<br />

crops i.e. Passion fruit, Grape, Potato and Turmeric as there crops have short gestation<br />

period with good academic return for plantation to provide alternative means of livelihood<br />

to the rural population dependent on jhum and bamboo forest.<br />

Moreover to utilized the bamboo before flowering establishment of charcoal kiln for<br />

production of charcoal vinegar etc. which can be utilized for nutrient in the form of soil<br />

supplement and as insect repellant.<br />

Name of the<br />

Scheme<br />

1. AES on Passion<br />

Fruit @<br />

Rs. 45,000/- per<br />

Ha.<br />

2. AES on Grape @<br />

Rs. 45,000/- per<br />

Ha.<br />

YEAR WISE TARGET FOR 5 YEARS<br />

(Rs. in lakh)<br />

2004–05 2005–06<br />

TARGET DURING<br />

<strong>2006</strong>–07 <strong>2007</strong>–08 2008-09<br />

Phy Fin. Phy Fin. Phy. Fin. Phy. Fin. Phy. Fin.<br />

200 90.00 200 90.00 1025 400.00 1700 765.00 1700 765.00<br />

150 67.50 150 67.50 - - 1275 573.75 1275 573.75


Sl<br />

No<br />

Name of the<br />

Scheme<br />

3. AES on Potato @<br />

Rs.33,750/- per<br />

Ha.<br />

4. AES on<br />

Turmeric @<br />

Rs.22,500/- per<br />

Ha.<br />

5. Charcoal Kiln<br />

Rs.15,000/- per<br />

No.<br />

- 28 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2004–05 2005–06<br />

TARGET DURING<br />

<strong>2006</strong>–07 <strong>2007</strong>–08 2008-09<br />

Phy Fin. Phy Fin. Phy. Fin. Phy. Fin. Phy. Fin.<br />

150 50.60 200 67.50 - - 475 161.00 475 161.00<br />

100 22.50 66 14.85 - - 292 65.70 292 65.70<br />

196 29.40 1 0.15 - - 339 50.85 339 50.85<br />

TOTAL 796 260 617 240 1025 - 4081 1616.30 4081 1616.30<br />

SCHEME. VIII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : AREA EXPANSION SCHEME ON PASSION FRUIT<br />

(BAFFACOS)<br />

Passion fruit has been successfully growing in the hills of <strong>Mizoram</strong> for several years.<br />

The purple variety is suitable for higher elevation i.e. eastern side of <strong>Mizoram</strong> while the<br />

yellow variety is suitable for lower elevation i.e. western side of <strong>Mizoram</strong>. Fruit Juice<br />

Concentration Plant at Chhingchhip for passion fruit is being established for which large<br />

quantity of passion fruit is required. Due to above mentioned facts, there is vast scope for<br />

Area Expansion Programme on Passion Fruit in <strong>Mizoram</strong>.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong> - <strong>2007</strong> : Rs. 400.00 lakh<br />

<strong>APPROVED</strong> OUTLAY FOR 2005 - <strong>2006</strong> : Rs. 90.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Procurement of seedlings @ 600 seedlings per Acre No. 11,02,200 11.022<br />

2. Procurement of G.I. wire (12 SWG)<br />

for Trailing @ 4 Qtls. per Acre Qtl. 7,348 363.726<br />

3. Secatuer No. 1,837 6.86<br />

4. 5% transportation & handling for G.I. wire from - LS 18.18<br />

Aizawl to destination<br />

5. Awareness campaign, etc. - LS 0.212<br />

TOTAL : 400.00<br />

CAPITAL : Nil<br />

REVENUE : 400.00<br />

G. TOTAL : 400.00


- 29 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. IX<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : HORTICULTURE RESEARCH AND EDUCATION<br />

The scheme aims at providing technical studies at the level of Post Graduation,<br />

Doctorate of the inservice person. It is also proposed to sponsor candidates for B.Sc. (Horti)<br />

course wherein stipend, book grant, T.E. will be given to the selected candidates during the<br />

normal course of studies.<br />

Sl.<br />

No.<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR <strong>2006</strong> – <strong>2007</strong> : Rs. 4.00 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY FOR 2005 – <strong>2006</strong> : Rs. 3.00 lakh<br />

Item Unit<br />

Physical<br />

target for<br />

<strong>2006</strong>-07<br />

( Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2006</strong>-07<br />

1. Stipend & book grant / TE / OE, etc. No. 15 4.00<br />

TOTAL : 4.00<br />

CAPITAL : -<br />

REVENUE : 4.00<br />

G. TOTAL : 4.00


INTRODUCTION:<br />

- 36 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SOIL & WATER CONSERVATION<br />

Food, fibre and shelter are the basic needs of mankind. All these are obtained from<br />

the soil. Water is a life giver. Water remains in soil moisture, liquid and gas forms. Moisture<br />

or liquid water in soil keeps the plant food in soluble forms available to plant intake. To<br />

ensure healthy vegetation, it is imperative that soil should be rich in nutrients and water.<br />

Nature in its own scheme of eco-conservation maintains soil in healthy condition.<br />

Unfortunately, man and animal in their living and working environment disturb the soil<br />

cover, accelerating the erosion of soil and depletion of water. With enhanced erosion, soil<br />

fertility deteriorates and vegetation growth capacity reduces. Soil erosion also leads to<br />

depletion of water content and results in desertification of land.<br />

1.10: Soil erosion in rainfed areas is mainly caused by surface run off/flood. When the<br />

flow of water is free of any obstruction, it starts eroding the soil surface bed. Under<br />

excessive rainfall condition, as exist in <strong>Mizoram</strong>, enormous-volumes of water generates<br />

velocities and hydraulic dynamics causing heavy erosion. This results in formation of<br />

gulleys and ravines. The impact is tremendous and the volume of soil loss is very high.<br />

1.20: The terrain of <strong>Mizoram</strong> is hilly and the entire landscape varies from mild to very<br />

steep gradients.. The intensity of rainfall is also very high and mean annual rainfall is<br />

2500 mm. “Jhum” or shifting cultivation has been the traditional mode of livelihood for the<br />

tribal people in the State. Present statistics reveals that around 40,000 hacs is covered by<br />

this primitive system of land management. Burning of the soil along with the dried<br />

vegetation during jhum preparation leads to soil fragmentation and increases land<br />

vulnerability to easy erosion during the monsoons.<br />

1.30: The monsoon that the state receives is both intensive and extensive. Torrential<br />

rainwaters rush down descending gradients at high velocity in undefined directions. The<br />

resulting floods cause excessive bank erosion and removal of debris over long distances.<br />

The low lying areas which are cultivable lands, thus get avoidable silt cover, apart from<br />

causing damage to standing crops. Another inevitable impact of such erosion is decrease<br />

infiltration of water towards sub soil layers reducing soil moisture content.<br />

1.40: The excessive rainfall in habited locales and environments, along roadsides, where<br />

subsisting unregulated drainage systems are ineffective causes substantial dislodging of soil<br />

mass with frequent havoc causing landslides, landslips., area sinking etc. These are the<br />

visible signs of soil erosion that can cause immediate distruption to human and other forms<br />

of activity. However, the loss of fertile top soil is not visible.<br />

1.50: Jhum cultivation, by virtue of its shifting nature, is a low productivity technology.<br />

That is why a “Jhumia family” migrates from one location to another ever so often. Arising<br />

out of this age old practice, abandoned jhum lands serve poorly for agro-horti-forest crops<br />

cultivation.<br />

1.60: On the hilly terrain such as ours, human settlement are traditionally located on the<br />

upper hill ridges. Notwithstanding the abundant rainfall that the state receives annually, yet<br />

these settlements suffer inadequate water supply especially during the dry season. That<br />

apart, depleted moisture content in the soil layers, because of speedy runoff and cumulative<br />

soil erosion, dries up even otherwise flourishing vegetation. The spectre of fire and forest<br />

fires looms large all over the State.


- 37 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1.70: Off season agriculture typically tends to take place in remote and undulating areas,<br />

access to which is tough, time and labour consuming. This adversely affects the health of<br />

the agriculture labour rendering it vulnerable to disease and pestilence. Premature aging is<br />

often the result. Labour costs thus become prohibitive. It is essential to connect cultivable<br />

and potentially cultivable areas with main and arterial roads- which although expensive is<br />

inescapable for the speedy economic development in the state.<br />

1.80: The absolute need for soil and water conservation measures in the state is a prerequisite<br />

for effective socio-economic development. Public awareness, education, association and<br />

participation in soil and water conservation is a matter of public concern and priority.<br />

1.90: The Agro-climatic conditions prevalent in <strong>Mizoram</strong> are entirely conducive to<br />

successful agriculture practices through soil and water conservation measures and objectives.<br />

2.00: Keeping in view of the above stated strategy, the Soil & Water Conservation<br />

Department proposes the following schemes to implement during the year <strong>2006</strong>-<strong>2007</strong>.<br />

3.00: ORGANISATION:<br />

I. Direction & Administration.<br />

II. Soil & Land Use Survey.<br />

III. Conservation Plantation.<br />

IV. Cash Crop & Spices Development.<br />

V. Quality Planting Material Production.<br />

VI. Water Resource Development<br />

VII. Research, Education & Training (Capacity Building)<br />

VIII. Commercial Cash Crop Plantation (For Rural economy building programme)<br />

IX. Run-off Retarding Scheme (For conservation farming)<br />

X. Soil Conservation Engineering Programmes (for restoration, protection and<br />

improvement of erosion effected and erosion endangered agri-potential)<br />

XII. Micro-Watershed Management.<br />

XIII. Other Expenditures (Building & Road sector)<br />

XIV. Input Supply.<br />

XV. Central Sponsored Programmes.<br />

1) RVP/FPR<br />

2) Mat Catchment Treatment Project.<br />

3) Tuirial Hydel Catchment Project.<br />

4) I.W.D.P.<br />

2.01: All the schemes from I - XIV are State Sector Schemes and these are continuing ones.<br />

These scheme characters are that these are implemented as a new schemes at new locations<br />

with fresh group of beneficiaries.<br />

2.:02: The Schemes at XV above under CSS programmes.<br />

1) River Valley Project/Flood Prone River (RVP/FPR) is a spill over programme from 9 th<br />

Plan. Total oulay proposed is Rs. 419.30 lakh plus Rs. 163.14 lakh i.e. Rs. 582.44 lakh during<br />

10 th Plan Rs.197.03 lakh is being spent. The proposed outlay for 10 th Five Year Plan is<br />

Rs.600.00 lakh and during 2005-06 proposal outlay is Rs. 2.46.00 lakh as Technical approval<br />

received from NRM Ministry of Agriculture N. Delhi.<br />

2) The Mat Catchment Treatment Project that was earlier posed for EAP take off will be<br />

proposed again during 10 th Five Plan. Total cost was Rs. 40.00 crores. This was prepared by<br />

engaging consultancy of CSWR & TI, Dehradun under the sponsoreship of Planning<br />

Commission. This scheme is submitted through the State Planning Department to Planning<br />

Commission.


- 38 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3) In the Catchment of Tuirial, Serlui ‘B’, Tuivai and Bairabi Hydel Projects, there is Soil<br />

& Water Conservation shares of activities. Tuirial HEP catchment area treatment plan outlay<br />

is Rs. 3.19 crores. But due to constraint of fund released from Forest Nodal Deptt. Rs.25.00<br />

lakh only in the 10 th Plan achieved and balance amount not yet finalised. Outlay during<br />

<strong>2006</strong>-07 is Rs.41.80 lakh.<br />

4) Integrated Wasteland Development Project (IWDP). There are 4 (four) IWDP scheme<br />

location at Champhai - Rs.329.40 lakh, Mamit - Rs.72.00 lakh, Lawngtlai - Rs.260.00 lakh,<br />

Lunglei - Rs. 480.00 lakh. These schemes are now implemented by Agriculture Department.<br />

3.00: The Annual Plan <strong>2006</strong>-<strong>2007</strong> approved outlay is 400.00 lakh under State Plan Sector.<br />

SCHEME DESCRIPTION:<br />

4.00: DIRECTION:<br />

For maintenance of vehicles, machineries, purchase of office contingencies including<br />

machineries & equipments etc. in the Directorate, Rs. 37.00 lakh is approved for Annual Plan<br />

<strong>2006</strong>-07.<br />

5.00: ADMINISTRATION:<br />

There are 8 functional and one Engineering Divisions in the Department for<br />

implementation of the Projects/Scheme. Further, there is one Training Institute for training<br />

of field staff upto Demonstrators level. These functional units are under staff at Officers<br />

level. Some extension unit of Ranges and Soil & Water Conservation Centres are also under<br />

staff. Besides, there is pressures from public to open some centres and Ranges at some<br />

potential areas as Saitual, North Hlimen, Mamit etc. which cannot be afforded to open at the<br />

existing staff strength. There is also instruction from Government to post ASCO(SDO)<br />

ranked officers in newly opened civil sub-divisions. For that, it is unavoidable to create some<br />

new posts. Rs. 117.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

5.01: The present post of Principal is required to be upgraded. This is essential for his<br />

higher responsibilities to entrust in the Institute. Also this is essential when it is seen for<br />

the future of the Department. So, viewing from these points, it is proposed to upgrade the<br />

Principal post to Joint Director post during <strong>2006</strong>-07.<br />

5.02: Publicity & Advertisement, Monitoring and Evaluation, Planning Cell, Engineering<br />

Division, Plan Formation Cell are part of administration. Reasonable fund provision is made<br />

to run these wings efficiently and effectively. Provision for Rs. 24.52 lakh is approved for<br />

Annual Plan <strong>2006</strong>-07.<br />

6.00: SOIL & LAND USE SURVEY:<br />

Project survey, investigation and project preparation. An area of 400 ha. in <strong>2006</strong>-07<br />

Annual Plan will be undertaken. To conduct these works Rs. 2.00 lakh is approved during<br />

Annual Plan <strong>2006</strong>-07.<br />

7.00: CONSERVATION <strong>PLAN</strong>TATION:<br />

For stabilisation of sliding zone along the lifeline National Highway and State<br />

Highways, there is hardly any other alternative than tree planting and deep rooting grass<br />

planting. Further, vegetation roots and leaf litters allows, in situ, water retension over longer<br />

period and that reduces the chances of run-off causing landslides and reduces threat to life<br />

and property in human dwelling zone. To such a situation, soil conservation plantation is<br />

the only effective preventive remedy.


- 39 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

8.00: CASH CROP SPICES DEVELOPMENT:<br />

The Department has demonstration plantation of Coffee, Rubber and Large<br />

Cardamom in various locations of the State. The purpose of this plantation is to support<br />

demonstration and training to the farmers and data formation. Particularly from Coffee<br />

plantation a good amount of return is received every year. Rubber plantation also pays<br />

return but due to lack of fund during the past few years maintenance part could not be<br />

attended properly. Similarly, the Black Pepper cultivation in Coffee plantation is required to<br />

be introduced and therefore, from 10 th Five Year Plan, it is proposed to intensify<br />

management of these plantations for profitable return in addition to other goal. The Coffee<br />

plantation requires replacement planting or rejuvination. For this purpose, provision is<br />

made for rejuvination and maintenance for Rs. 8.00 lakh in the Annual Plan <strong>2006</strong>-07.<br />

9.00: PRODUCTION OF QUALITY <strong>PLAN</strong>TING MATERIAL:<br />

From 2001-2002 Annual Plan of 9 th Five Plan, priority importance has been given on<br />

Expansion of Coffee and Large Cardamom in the marginal farmers sector. For a meaningful<br />

production of yield of this crop, it is essential that the planting material is to be of good<br />

quality from known seed origin. The reliable planting material production, it is experienced<br />

to be had from Departmental nursery and therefore, the Department has proposed<br />

establishment of these nurseries near the planting areas and their maintenance <strong>2006</strong>-<strong>2007</strong><br />

Annual Plan projection is Rs. 30.00 lakh.<br />

10.00: WATER RESOURCE DEVELOPMENT:<br />

To overcome the water difficulties in nursery growing, it is essential to construct<br />

water harvesting device near living spring close to the nurseries. Also in plantation water<br />

need is unignorable. Above all needs the water resource development near the plantations<br />

gets the priority for its water use by the plantations in clusters. Besides plantation it is<br />

necessary to improve the water condition in the rural areas. In villages, it is proposed to<br />

construct and improve water points. During <strong>2006</strong>-07 Annual Plan, Rs. 10.00 lakh will be<br />

spent.<br />

11.00: RESEARCH, EDUCATION AND TRAINING:<br />

For conducting training and education of the grass-root level staff of the Department<br />

it is essential to continue this Training Institute at Durtlang. The training in Departmental<br />

technical activities which are up-dated due to technical updation. The training course is<br />

also being arranged for farmers in the plantation technology and other soil conservation<br />

activities in the 10 th Five Year Plan.<br />

The salary of teaching staff is committed to Non-Plan during 10 th Plan onward. But<br />

the training expenditure and maintenance expenditure on infrastructures including office<br />

expenses are proposed to be provided under Plan sector. Rs. 13.50 lakh is approved for<br />

Annual Plan <strong>2006</strong>-07.<br />

12.00: RURAL ECONOMY INCENTIVE COMMERCIAL <strong>PLAN</strong>TATION (R.A.D.):<br />

Under this scheme expansion of Coffee, Large Cardamom and Rubber has been given<br />

high priority since the year ending 9 th Five Year Plan. Under the existing agro-climatic and<br />

edaphic condition these crops are found growing jubilantly under the virgin forest of the<br />

State. Coffee per ha. yield is recorded 13 quintals from Bualpui experimental and<br />

demonstration Coffee plantation of Coffee Board during 2000. The crop yield is found to be<br />

higher than national average. The Cardamom also shows encouraging yield in the recent<br />

past that preludes for the plantation in jhumia sector. It is necessary to keep the farmer<br />

attentive to his plantation during his peak jhum working season. For expansion of this<br />

cultivation, Rs. 10.00 lakh has been provided in Annual Plan <strong>2006</strong>-07.


- 40 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

13.00: RUN-OFF RETARDING SCHEME:<br />

On a slope surface rain water moves faster with high erosive velocity downwards<br />

diving intensive rain. The surface run-off is a mobile flood and this causes intensive erosion<br />

damage. The damage is in terms of soil volume that includes Plan nutrients and soil.<br />

An open area cultivation is not productive and therefore, management of soil surface<br />

is required. This method of management of slope land is terracing, contouring and any<br />

other type of land use across the slope is a safety measure for protection of soil and<br />

moisture.<br />

Soil & Water Conservation Department recommends this terrace construction on<br />

moderate slope land for its use in agriculture, horticulture or forest plantation development.<br />

This conserve the its and soil fertility. The terracing programme provides a scope for<br />

developing agri, horticultural platform near the residential area of a farmer and agriculture<br />

practices nearer the residential areas experiences high scope of success as the farmer is<br />

able to pay close attention to his farming. Under the present nature of habitation, the<br />

agricultural potential areas had been placed at a considerable long distance from the<br />

habitation areas. To remove this gap it is compelling that the agricultural land which are<br />

stable and can be used year after year for vegetables and other crops should be developed<br />

nearer to the habitation areas. Even a small plot of 0.25 ha. in the kitchen garden of a<br />

farmer should be encouraged so that self-sufficiency for a particular family is assured.<br />

Thus, this scheme is envisaged.<br />

Terracing above 5-25% slope is proposed as it is the safe limit for conservation of<br />

soil and moisture. The terrace shall be constructed with all technique parameters so that the<br />

terrace does not get damage with the annual rain impact. These terraces will be constructed<br />

in the near habitation area only. Rs. 12.00 lakh is provided in the Annual Plan <strong>2006</strong>-07.<br />

14.00: SOIL CONSERVATION ENGINEERING:<br />

The Soil Conservation Engineering Works provides facility for protection of land<br />

damage by run off flood during peak monsoon. The agricultural land in the plateau, river<br />

banks and foot hills are ravaged by such kind of damages. The farmers who holds land in<br />

this areas are very much in need of such kind of assistance to engineering works. The main<br />

works of long term permanent are rock fill, wire boxes, spurs and stream course<br />

straightening. Rs. 8.00 lakh is proposed under Annual Plan <strong>2006</strong>-07.<br />

15.00: MICRO-WATERSHED MANAGEMENT:<br />

Micro-Watershed Management is given a priority importance by the Government of<br />

India under Central sector programmes. These programmes are supported on detail project<br />

report preparation. Therefore, for survey and preparation of detail project reports of such<br />

programmes in the State sector a token fund of Rs. 3.00 lakh is provided in Annual Plan,<br />

<strong>2006</strong>-07. Within this amount, it is also targetted to take up one sample micro-watershed<br />

project near Aizawl capital.<br />

16.00: OTHER EXPENDITURE:<br />

The expenditure on construction and maintenance of buildings and roads and<br />

machinery and equipments are placed under this head of expenditure. The Department has<br />

as many as 240 buildings which are quite old and needs maintenance badly. The Divisional<br />

and Range headquarters are connected with approach road. These approach roads required<br />

annual maintenance and improvement. Provision is made for taking care of these approach<br />

roads. Rs. 11.50 lakh is approved in the Annual Plan <strong>2006</strong> - 07.


- 41 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

17.00: INPUT SUPPLY:<br />

To meet the various needs for essential tools and implements, fertilizers and<br />

chemicals and time spelling requirements for plantation development and maintenance of<br />

the various sectors, Rs. 3.48 lakh is approved for the Annual Plan <strong>2006</strong>-07.<br />

14.00: BAFACOS:<br />

Bamboo Flowering and Famine Combating Scheme (BAFACOS) for Soil Consevration<br />

Engineering works consisting of Land development, Water Harvesting Pond, Gully control<br />

and Stream Bank Erosion Control for maximum mandays generation provision is made<br />

Rs.110.00 lakh in the Annual Plan during <strong>2006</strong>-07.


- 48 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ANIMAL HUSBANDRY & VETERINARY<br />

INTRODUCTION:<br />

The Department is having two major Heads of Development namely Animal<br />

Husbandry & Veterinary Services and Dairy Development. The main works during <strong>2006</strong>-07<br />

will focused on the combat of the impending Bamboo Flowering under the Government<br />

policy BAFFACOS for which sustainable income generating schemes of animal and livestock<br />

farming will be executed to keep the rural farmers. The Annual Plan also comprises the<br />

improvement and upgradation of the existing infrastructure in order to upkeep livestock<br />

health, prevention and animal and poultry diseases. Management of different Departmental<br />

Livestock Farms for demonstration purposes and for making foundation stock available to<br />

the farmers will also be continued. Grant-in-Aid/Subsidy for the local farming families as<br />

incentive are also included. The outlay for the year <strong>2006</strong>-07 is Rs. 778.00 lakh under Animal<br />

Husbandry and Rs. 40.00 lakh only for Dairy Development. The total outlay for <strong>2006</strong>-07 is<br />

approved at Rs. 818.00 lakh.<br />

I. ANIMAL HUSBANDRY<br />

A&B. DIRECTION & ADMINISTRATION: With a total outlay of Rs. 107.00 lakh only, it is<br />

approved to construct D.V.O and Sub-ordinate offices at Kolasib, IV Grade Quarter<br />

at Khawruhlian, Sub-Centre at Republic, Aizawl besides the maintenance of the<br />

existing infrastructure and the administrative costs.<br />

C. VETERINARY SCIENCE & ANIMAL HEALTH: In order to cover animal health care and<br />

prevention of animal diseases and for maintenance of 5 Nos. Hospitals, 35 Nos. Vety.<br />

Dispensaries and 103 Nos. Rural Animal Health Centres. A total amount of Rs.102.00<br />

lakh is provided. Construction of Vety. Dispensary at Khawbung, RAH Centre at<br />

Hmunhmeltha and Khawzawl will be completed during the year.<br />

D. CATTLE DEVELOPMENT: For maintenance of 7 Nos. existing Departmental Cattle<br />

Farms a total amount of Rs. 3 4.00 lakh is approved during <strong>2006</strong>-07.<br />

E. POULTRY DEVELOPMENT: Provision is made for replacement of old stock and<br />

procurement of hatching eggs and also 50% chick subsidy to the local farmers in<br />

addition to maintenance of 7 nos. existing Departmental Poultry Farms. The total<br />

outlay under Poultry Development is Rs. 39.00 lakh only.<br />

F. PIGGERY DEVLOPMENT: 50% Young Breeding Boar subsidy to 40 local farmers is<br />

provided during <strong>2006</strong>-07. The total outlay under Piggery Development is Rs. 33.00<br />

lakh only.<br />

G. OTHER LIVESTOCK DEVELOPMENT: Provision of Grant-in-Aid to Sheep and Goat<br />

rearing families and Hill Cattle rearing families to 25 families and maintenance of<br />

existing Goat Farm shall be carried out with an outlay of Rs. 6.00 lakh.<br />

H. FEED & FODDER DEVELOPMENT: Procurement of Feed Ingredients for different<br />

livestock and poultry farms and maintenance of Animal Grazing Ground will be the<br />

main task. The total outlay during <strong>2006</strong>-07 is Rs. 115.00 lakh only.<br />

I. VETERINARY EDUCATION RESEARCH AND TRAINING: A total amount of Rs. 44.00<br />

lakh is approved during <strong>2006</strong>-07 for continuation of School of Vety. Science at<br />

Lungpher, Lunglei. Scholarship/Stipend for B.V.Sc & A.H., M.V.Sc. and V.F.A. students<br />

and Prorata contribution are also included.


- 49 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

J. VETERINARY INFORMATION: For collection of information data, publication of Magazines,<br />

Leaflets and for extension work, a total amount of Rs. 12.00 lakh is approved during<br />

<strong>2006</strong>-07.<br />

K. OTHER EXPENDITURE: For continuation of Regulation of Animal Movement in the<br />

State a total amount of Rs. 6.00 lakh is approved during <strong>2006</strong>-07.<br />

L. CENTRALLY SPONSORED SCHEME: The Department is operating different Centrally<br />

Sponsored Scheme of which a number of the Schemes are matching scheme in<br />

nature. In order to match the Central Share the Department had earmarked a total of<br />

Rs. 80.00 lakh as a State Matching Share.<br />

M. BAFFACOS: In continuation of Combating the impending Bamboo Flowering in the<br />

State which may cause increase of rats population resulting Famine, the State<br />

Government had formed Bamboo Flowering and Famine Control Schemes<br />

(BAFFACOS) for which the Department had earmarked a total amount of Rs. 200.00<br />

lakh only which will be utilized for various animal rearing schemes for the local<br />

farmers and rural families.<br />

N. DAIRY DEVELOPMENT: For construction of 2 Nos. Labour Barrack at IDDP, Kolasib<br />

and for maintenance of Dairy Plant at Lunglei & Kolasib, a total amount of Rs. 40.00<br />

lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

A : DIRECTION<br />

Sl. No. I T E M S<br />

PHYSICAL<br />

TARGET<br />

( Rupees in lakh )<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

1 Salary<br />

a) Salary of existing Officers and Staff 4 5.00<br />

2 Wages :<br />

Skilled Labour ( Typist ) 4 2.00<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses<br />

a) Maintenance of Light Vehicle and purchase of spare<br />

parts, etc.<br />

15 Nos. 3.00<br />

b) Purchase of Stationeries etc. L.S. 2.00<br />

5 Minor Works :<br />

Maintenance and improvement of subordinate offices 2 Nos. 2.00<br />

6 Machinery/Equipments :<br />

Purchase of Office Equipments, etc. L.S. 2.00<br />

T O T A L OF 'A' 18.00<br />

B - I Joint Director Office, Lunglei :<br />

1 Salary of Officer and Staff 11 Nos. 10.50<br />

2 Wages :<br />

Unskilled 1 No. 0.40<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 3.00<br />

5 Minor Works :<br />

Maintenace of existing Quarter 2.10<br />

T O T A L OF B-1 : 17.00


B : ADMINISTRATION<br />

Sl. No. I T E M S<br />

- 50 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHYSICAL<br />

TARGET<br />

( Rupees in lakh )<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

B-II DISTRICT OFFICES :<br />

1 a) Salary of Officers 8 Nos. 21.00<br />

2 Wages :<br />

a) Skilled - II 5 Nos. 2.50<br />

b) Unskilled 6 Nos. 2.00<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses :<br />

a) Maintenance of Light Vehicles, POL, Parts, etc. 8 Nos. 4.00<br />

b) Purchase of Stationeries, etc. L.S. 4.00<br />

5 Minor Works :<br />

Maintenance of existing buildings 25 Nos. 3.50<br />

T O T A L OF B-II : 39.00<br />

C.O :<br />

1. Construction of DVO Office at Kolasib.<br />

2. Construction of Sub-ordinate Office at Kolasib.<br />

TOTAL OF C.O :<br />

1 No.<br />

1 No.<br />

2 Nos.<br />

5.00<br />

5.00<br />

10.00<br />

TOTAL OF B-II : 49.00<br />

B-III SUB-DIVISIONAL OFFICES :<br />

1 Salary of existing Officers and Staff 8 Nos. 10.00<br />

2 Wages : Unskilled 1 No. 0.50<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses L.S. 2.50<br />

5 Minor Works : Maintenance of existing buildings 14 Nos. 2.00<br />

TOTAL OF B-III :<br />

C.O :<br />

17.00<br />

Construction of IV Grade Quarter at<br />

Khawruhlian and VFA Quarters at Saitual<br />

2 Nos.<br />

6.00<br />

T O T A L OF B - III : 23.00<br />

T O T A L O F ‘B ‘ : 79.00<br />

C : VETY. SERVICES & ANIMAL HEALTH :<br />

( Rupees in lakh )<br />

C-I Vety. Services/Hospitals<br />

1 Salary of existing Officers and Staff 13 Nos. 20.00<br />

2 Wages : Unskilled Labour 2 Nos. 0.80<br />

3 Travelling Expenses L.S. 2.20<br />

4 Office Expenses L.S. 4.00<br />

5 Minor Works : Maintenance of existing buildings 20 Nos. 3.00<br />

6 Motor Vehicles :<br />

Maintenance of existing vehicles L.S. 4.00<br />

T O T A L OF C - I : 34.00


Sl. No. I T E M S<br />

- 51 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHYSICAL<br />

TARGET<br />

( Rupees in lakh )<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

C-II VETY. DISPENSARIES :<br />

1 Salary of existing Officers and Staff 13 Nos. 21.00<br />

2 Wages :<br />

Unskilled Labours 37 nos. 12.50<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses L.S. 2.50<br />

5 Minor Works :<br />

Improvement & repair of existing buildings 22 Nos. 3.00<br />

T O T A L 41.00<br />

C.O. :<br />

Construction of V.F.A. Quarter-cum-RAH Centre at<br />

Hmunhmeltha, Khawzawl and Vety. Dispensary at<br />

Ngopa.<br />

T O T A L OF C - II :<br />

3 Nos.<br />

13.00<br />

C-III RURAL ANIMAL HEALTH CENTRES :<br />

1 Salary of existing Staff 4 Nos. 4.00<br />

2 Wages : Unskilled 2 Nos. 0.80<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 2.20<br />

5 Minor Works : Maintenance of Existing buildings 35 Nos. 2.00<br />

T O T A L OF C - III : 10.00<br />

C-IV CENTRAL MEDICINE, VACCINE AND EQUIPMENT DEPOT :<br />

1 Machinery/Equipments :<br />

Purchase of essential instruments appliances for Vety.<br />

Services.<br />

L.S. 2.00<br />

2 Material/Supply : Procurement of chemicals and<br />

medicines<br />

L.S. 2.00<br />

T O T A L OF C-IV : 4.00<br />

T O T A L OF 'C' : 102.00<br />

D : CATTLE DEVELOPMENT :<br />

1 Salary of existing Officers & Staff 18 Nos. 15.00<br />

2 Wages :<br />

a) Skilled - II 1 No. 0.50<br />

b) Unskilled Labour 8 Nos. 2.70<br />

3 Travelling Expenses L.S. 1.80<br />

4 Office Expenses : Electric Charges etc. L.S. 6.00<br />

5 Minor Works :<br />

Maintenance and repair of existing quarters and Farms 12 Nos. 3.00<br />

6 Motor Vehicles : Maintenance of existing Vehicles L.S. 3.00<br />

7 Material & Supply L.S. 2.00<br />

T O T A L O F 'D' 34.00


Sl. No. I T E M S<br />

- 52 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHYSICAL<br />

TARGET<br />

( Rupees in lakh )<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

E : POULTRY DEVELOPMENT :<br />

1 Salary of existing Officers and Staff 13 Nos. 13.00<br />

2 Wages :<br />

a) Skilled - II 2 Nos. 1.00<br />

b) Unskilled Labour 27 Nos. 9.00<br />

3 Travelling Expenses L.S. 1.50<br />

4 Office Expenses :<br />

Stationery, Bulk energy charge of Poultry Farms L.S. 7.00<br />

5 Minor Works :<br />

Improvement and Poultry Farms 10 Nos. 3.50<br />

6 Machinery/Equipments, Waterer, Feeder, Brooder etc. L.S. 2.00<br />

7. G.I.A. to farmers on 50% chick subsidy L.S. 2.00<br />

T O T A L OF ' E ' : 39.00<br />

1<br />

F : PIGGERY DEVELOPMENT :<br />

Salary of existing Officers and Staff 12 Nos. 13.00<br />

2 Wages :<br />

Unskilled Labour for Pig Attendant 18 nos. 6.00<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses :<br />

For Stationeries & maintenance of Light Vehicles L.S. 4.00<br />

5. Minor Works L.S. 2.00<br />

6 Motor Vehicles :<br />

Body Repair, P.O.L., spare parts etc. 2 Nos. 3.00<br />

7 Material & supply :<br />

Replacement of old stock and A.I. Materials. L.S. 1.00<br />

8 Grand-in-Aid :<br />

a) GIA to PIGFED and Co-op. Societies AND 50% Boar<br />

Subsidy @ Rs.2500/- per young Boar as Govt.<br />

Contribution for 40 Nos.<br />

L.S. 2.00<br />

T O T A L OF 'F' : 33.00<br />

I<br />

G : OTHER LIVESTOCK DEVELOPMENT :<br />

GOAT PRODUCTION FARM :<br />

1 Minor Works :<br />

Improvement of Goat Production Farm 2 Nos. 1.00<br />

2. Grant-in-Aid to Ship & Goad rearing families @Rs.4000/per<br />

family for 25 families.<br />

25 families 1.00<br />

3. Rabbit Production Farm :<br />

a) Wages :<br />

Unskilled Labour<br />

b) Minor Works :<br />

11 nos. 3.70<br />

Maintenance of existing Rabbit House, etc. 5 Nos. 0.30<br />

T O T A L OF G : 6.00


Sl. No. I T E M S<br />

- 53 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHYSICAL<br />

TARGET<br />

( Rupees in lakh )<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

H - 1<br />

H : FEED AND FODDER DEVELOPMENT :<br />

Salary of existing Staff 3 Nos. 2.50<br />

2 Wages :<br />

Unskilled Labour 39 Nos. 13.00<br />

3 Travelling Expenses L.S. 1.50<br />

4 Office Expenses L.S. 4.00<br />

5 Minor Works :<br />

Improvement of Feed Godown etc. L.S. 5.00<br />

6 Machinery/Equipments :<br />

Purchase of Chaff cutters, Baling Machine etc. L.S. 3.00<br />

7 Motor Vehicles :<br />

Maintenance of Heavy Vehicles 3 Nos. 6.00<br />

8 Material & Supply :<br />

Purchase of Feed Ingredients & ready mixed feed for<br />

Departmental farms<br />

L.S. 75.00<br />

T O T A L OF H-I : 110.00<br />

H-II ANIMAL GRAZING GROUND :<br />

1 Minor Works<br />

Renovation and construction of Animal Shelter Shed,<br />

fencing etc.<br />

L.S. 5.00<br />

T O T A L OF H - II : 5.00<br />

T O T A L OF ' H ' : 115.00<br />

1<br />

I : VETY. EDUCATION RESEARCH & TRAINING :<br />

Salary of existing Officers and Staff 11 Nos. 22.00<br />

2 Wages :<br />

a) Semi - Skilled 2 Nos. 2.00<br />

b) Unskilled 3 Nos.<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 2.00<br />

5 Professional Charges :<br />

Study Tour for Vety. Field Assistant and B.V.Sc. Students<br />

and inservice personnels and orentation programmes<br />

and training<br />

L.S. 1.00<br />

6 Minor Works : L.S. 2.00<br />

7 Material & Supply :<br />

Purchase of study materials, etc. L.S. 0.50<br />

8 Stipend and Book Grant, Prorata etc. for<br />

MVSc, BVSc. and VFA Students L.S. 13.50<br />

T O T A L OF ' I ' : 44.00


Sl. No. I T E M S<br />

- 54 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHYSICAL<br />

TARGET<br />

( Rupees in lakh )<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

J : VETERINARY INFORMATION WING :<br />

1 Salary of existing Staff 1 No. 3.50<br />

2 Travelling Expenses L.S. 1.00<br />

3 Office Expenses L.S. 3.00<br />

4 Publication :<br />

Magazine, Leaflets, Periodicals, etc. L.S 3.00<br />

5 Advertisement L.S. 1.00<br />

6 Materials & Supply :<br />

Purchase of Roll Films, Video Films, etc. L.S. 0.50<br />

T O T A L OF 'J ' : 12.00<br />

K : OTHER EXPENDITURE :<br />

K ANIMAL MOVEMENT<br />

1 Wages:<br />

Unskilled Labour 6.00<br />

T O T A L OF K 6.00<br />

L : CENTRALLY SPONSORED SCHEMES :<br />

L-I National Project On Rinderpest Eradication:<br />

1 Salary of existing Officers and Staff 21 Nos. 18.00<br />

2 Travelling Expenses L.S. 1.00<br />

3 Office Expenses : L.S. 1.00<br />

T O T A L OF L - I : 20.00<br />

L-II ASCAD (Assistance to State for Control of Animal Disease :<br />

1 Salary of Existing Staff 3 Nos. 4.50<br />

2 Travelling expenses L.S. 2.00<br />

3 Office Expenses L.S. 2.50<br />

4 Machinery/Equipments L.S. 6.00<br />

5 Material & Supply L.S. 15.00<br />

T O T A L OF L - II : 30.00<br />

L-III PROFESSIONAL EFFICIENCY DEVELOPMENT :<br />

STATE VETERINARY COUNCIL :<br />

1 Office Expenses<br />

Office Stationeries, etc. L.S. 1.00<br />

T O T A L OF L - III : 1.00<br />

L-IV ANIMAL HUSBANDRY AND STATISTICS :<br />

SAMPLE SURVEY & STATISTICS :<br />

1 Salary of Existing Staff 6 Nos. 6.00<br />

2 Travelling Expenses L.S. 0.25<br />

3 Office Expenses : L.S. 0.50<br />

4 Publication :<br />

Sample Survey and Statistical Hand Book, etc. L.S. 0.25<br />

T O T A L OF L-IV : 7.00


Sl. No. I T E M S<br />

- 55 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHYSICAL<br />

TARGET<br />

( Rupees in lakh )<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

L-V NATIONAL PROGRAMME ON BIOGAS DEVELOPMENT :<br />

1 Salary of existing Staff 10 Nos. 13.00<br />

2 Travelling Expenses L.S. 2.00<br />

3 Office expenses :<br />

Propultion of Vehicles L.S. 1.10<br />

4 G.I.A./Subsidy :<br />

Government contribution for installation of Biogas Plant<br />

@ Rs. 5850/- per unit<br />

100 units 5.90<br />

T O T A L OF L - V : 22.00<br />

T O T A L OF L : 80.00<br />

M. BAMBOO FLOWERING & FAMINE COMBAT SCHEME (BAFFACOS)<br />

1 Office Expenses :<br />

For procurement of litters, electers, electrification, water<br />

charges, medicines, utensils etc. for Poultry, Piggery &<br />

Dairy<br />

L.S. 15.00<br />

2 Material Supply:<br />

Purchase of animals and feeds L.S. 135.00<br />

3 Minor Works :<br />

For construction of Broiler House, Layer house, Pig Sty<br />

and Dairy Shed<br />

L.S.<br />

50.00<br />

TOTAL : 200.00<br />

M-1<br />

N : DAIRY DEVELOPMENT<br />

Salary of existing Staff 3 Nos. 4.50<br />

2 Wages :<br />

a) Skilled - II 7 Nos.<br />

b) Unskilled Labour for Milkman, Dairy Farm Attendant,<br />

etc.<br />

57 Nos. 25.40<br />

3 Travelling Expenses L.S. 0.50<br />

4 Office Expenses :<br />

Bulk Energy charges, Stationary etc. Light Vehicles L.S. 2.00<br />

5 Minor Works :<br />

Maintenance of existing Farm buildings 10 Nos. 1.00<br />

6 Machinery/Equipments :<br />

Procurement of Equipments/Milking Machine, Milking<br />

Machineries, etc.<br />

L.S. 0.10<br />

7 Motor Vehicles :<br />

Population of Heavy/Medium Vehicles 5 Nos. 2.00<br />

8 Material and Supply :<br />

Purchase of materials for Dairying Farms etc. L.S. 0.50<br />

T O T A L OF 'N' 36.00<br />

C.O. :<br />

Construction of Labour Barrack @ Rs.2.00 lakh at<br />

IDDP Kolasib<br />

2 Nos. 4.00<br />

TOTAL OF ‘N’ : 40.00


- 60 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

FISHERIES<br />

The main thrust during Annual Plan <strong>2006</strong>-<strong>2007</strong> is to bring in more additional water<br />

areas under culture sector as well as to develop the riverine fisheries in the capture sector<br />

so as to boost up the fish production level in the state and generate employment and<br />

income to the rural areas which would combat the impending famine due to Bamboo<br />

Flowering in the region.<br />

To increase the fish production Department of Fisheries proposed to implement the<br />

following CSS programme during <strong>2006</strong>-<strong>2007</strong> beside annual plan scheme i.e., Fish Seed<br />

Production-cum-Farming at different established Fish Seed Farms.<br />

1) Development of Fresh Water Aquaculture through Fish Farms Development<br />

Agency(FFDA).<br />

2) Development of waterlogged area of Integrated Fish Farming.<br />

3) Development of Riverine Fisheries through Integrated Development of Inland<br />

Capture Resources(Reservoirs/ Rivers etc).<br />

4) Cold water Fisheries and Aquaculture.<br />

5) Information, Extension & Training.<br />

The funding pattern of scheme under Sl.1-4 are 75:25 (75 percent Central share and<br />

25 percent State share) and scheme under Sl.5 is 80:20(80% Central and 20% State). The State<br />

matching share partly proposed to be shared from the BAFFACOS as the item proposed are<br />

similar to CSS programme and for remaining items of works/subsidy will be provided from<br />

State annual plan during <strong>2006</strong>-<strong>2007</strong>.<br />

Besides above, Department of Fisheries also aims at implementing BAFFACOS during<br />

<strong>2006</strong>-<strong>2007</strong> to create more new water areas, providing Fish Farming inputs and Farmers<br />

training to boost fish production in the rural area.<br />

Therefore, the Annual Plan <strong>2006</strong>-<strong>2007</strong> envisages to bring in an additional 510 Ha<br />

water area for fish culture by constructing new ponds and renovating/improvement of<br />

existing fish ponds and establishing fresh water fish hatchery through FFDA & BAFFACOS<br />

and by implementing other CSS programs mentioned above. It is also targeted to produce<br />

additional fish production of 35% from the present level of 2500M.T in the culture sector.<br />

In order to avail the District wise approach of Central assistance for Fish Farmers<br />

Development Agency under Fresh Water Aquaculture (CSS) and for ensuring fisheries<br />

development faster in each District it is also proposed to create 3(three) new Fish Farmers<br />

Development Agency (CS) Units for Champhai, Serchhip and Lawngtlai Distrit during the<br />

Annual Plan, <strong>2006</strong>-<strong>2007</strong>.


- 61 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Highlights of Scheme-wise break-up of approved outlays for Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

are shown below: -<br />

(Rs. in lakh)<br />

Sl.<br />

Annual Plan<br />

Scheme<br />

No.<br />

<strong>2006</strong>-07<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

Direction & Administration<br />

Fish Seed Production-cum-Farming<br />

Fresh Water Aquaculture & Development of waterlogged area<br />

Development of Riverine Fisheries (Inland capture Fisheries)<br />

Development of Cold Water Fisheries (CSS)<br />

Information, Extension & Training<br />

Marketing<br />

Inland Fisheries Statistics (Database)<br />

BAFFACOS<br />

91.00<br />

10.00<br />

42.90<br />

0.50<br />

2.50<br />

14.00<br />

4.00<br />

0.10<br />

115.00<br />

TOTAL:- 280.00<br />

DETAILS OF THE SCHEMES<br />

SCHEME NO. 1<br />

1. DIRECTION AND ADMINISTRATION:<br />

The scheme provides for maintenance of the existing staff, under plan scheme<br />

including TA and other Administrative Cost during <strong>2006</strong>-<strong>2007</strong>. The scheme also provides<br />

for strengthening of Directorate and District level organization from existing staff which is<br />

extremely necessary in view of the growth of activities and resources besides stagnancy of<br />

posts since the last decade.<br />

Strengthening of Directorate and District level organization from existing staff:<br />

Department of Fisheries is implementing different Centrally Sponsored Scheme of<br />

which the major scheme is Fish Farmers Development Agency. So far 5 Fish Farmers<br />

Development Agencies Units have been sanctioned by the Govt. of India and implementing<br />

at Aizawl, Lunglei, Saiha, Kolasib and Aizawl West. Out of 5 FFDA Units only 3 Units i.e,<br />

Aizawl, Lunglei and Saiha could be provided District level establishment with necessary staff<br />

which are functioning at present. Remaining 2 Units i.e., Kolasib and Aizawl West are<br />

operated from Directorate staff as there is no District organization in the above 2 places. It<br />

is further planned to avail another 3 Units of Fish Farmers Development Agency for the<br />

remaining 3 Districts as a CSS programme. Therefore, it is necessary to strengthen the<br />

Fisheries organization to cater a smooth functioning and implementation of the programme.<br />

(1) Directorate level: It is proposed to upgrade the present post of Asst. Director of<br />

Fisheries to the post of Dy. Director of Fisheries in-charge CSS, NEC & Planning<br />

Programme. Besides the present post of J.E. to the rank of A.E. for better execution of<br />

civil works. While doing so 1(one) post of Fishery Extension Officer is also required to<br />

upgraded to Asst. Director of Fisheries. The above proposed Officer will assist the<br />

Director of Fisheries for close supervision and monitoring of the programme.<br />

(2) District level: It is further proposed to upgrade 5 posts of Fishery Extension Officer to<br />

the rank of District Fisheries Dev. Officer for implementation of FFDA programme, Fresh<br />

water Aquaculture schemes, Capture Fisheries and Cold water Fisheries at the District<br />

level under CSS programme.


- 62 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The Annual Plan outlay for <strong>2006</strong>-07 under Direction and Administration is Rs. 91.00<br />

lakh as per details shown below: -<br />

A. DIRECTION<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs.26.60 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.30.00 lakh<br />

Sl.<br />

No<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

Items Unit<br />

(Rs. in lakh)<br />

Target for Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

1 2 3 4 5<br />

Maintenance of existing staff<br />

Medical<br />

Wages<br />

T.E.<br />

O.E.<br />

Rents<br />

M.V. (Maintenance)<br />

Other charges<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

4<br />

L.S<br />

L.S<br />

L.S<br />

L.S<br />

L.S<br />

L.S<br />

L.S<br />

8.50<br />

1.50<br />

4.00<br />

2.00<br />

6.00<br />

3.00<br />

3.00<br />

2.00<br />

Sub-Total ‘A’ 30.00<br />

B. ADMINISTRATION:-<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs.53.00 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.61.00 lakh<br />

Sl.<br />

No.<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

Items Unit<br />

(Rs. in lakh)<br />

Target for Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

1 2 3 4 5<br />

Maintenance of existing staff<br />

Medical<br />

Wages<br />

T.E.<br />

O.E.<br />

Maintenance/Minor Works<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

No.<br />

32<br />

L.S<br />

L.S<br />

L.S<br />

L.S<br />

L.S<br />

45.00<br />

3.00<br />

1.00<br />

5.00<br />

6.00<br />

1.00<br />

Sub-Total ‘B’ 61.00<br />

TOTAL (Direction &Administration) 91.00<br />

INLAND FISHERIES<br />

SCHEME NO. 2<br />

2. FISH SEED PRODUCTION-CUM-FARMING:<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 3.00 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.10.00 lakh<br />

In order to meet the fish seed demand in the State 7nos of Fish Seed Farms have<br />

been constructed at Zawlnuam, Lengpui, Zobawk, Tamdil, Thenzawl, Ngengpui and<br />

Saikhawthlir under the Non-Lapsable Pool of Resources. It is therefore, targeted to produce<br />

about 50 lakh of fish seeds from the aforesaid Departmental Fish Seed Farms during <strong>2006</strong>-<br />

<strong>2007</strong>. Therefore, a provision has been made for maintenance and operational cost for<br />

production of Fish Seed from above Fish Seed Farms.


- 63 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

It is further proposed to give remaining Fish Seed Farm established earlier on lease<br />

basis to Private Interpriners for production of fish and fish seeds.<br />

Details of the scheme with an approved outlay of Rs. 10.00 lakh in the Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong> is shown below: -<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Target for Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

1 2 3 4 5<br />

1. Maintenance of existing Fish Seed Farms<br />

at Zawlnuam, Lengpui, Zobawk, Tamdil,<br />

Thenzawl, Ngengpui and Saikhawthlir<br />

for fish seed production:i)<br />

Cost of inputs viz:- Lime, RCD/organic<br />

manures, fish feed, seed for raising<br />

brood stock etc.<br />

No.of farms 7<br />

ii) Labour charges<br />

No.of farms 7<br />

8.00<br />

iii) Nets & gears<br />

No.of farms 7<br />

2. Purchase of machineries and<br />

equipments, glasswares, chemicals etc.<br />

No.of farms 7<br />

2.00<br />

TOTAL 10.00<br />

SCHEME NO. 3<br />

3. FRESH WATER AQUACULTURE AND DEVELOPMENT OF WATERLOGGED AREA:<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 4.80 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.42.90 lakh<br />

(A) FRESH WATER AQUACULTURE:-<br />

Government of India has sanctioned 5(five) FFDA (Fish Farmers Development<br />

Agency) to be implemented sharing the fund on approved item of works by Central<br />

Government and State Government on 75:25 basis at Aizawl, Kolasib, Mamit, Lunglei and<br />

Saiha Districts. The scheme will continue during <strong>2006</strong>-<strong>2007</strong>. The item of work under<br />

BAFFACOS like construction of new fresh ponds, renovation/reclamation of existing ponds,<br />

providing inputs for fish farming and imparting training programme to the fish farmers are<br />

similar under FFDA programme. To avail the share of Government of India it is proposed to<br />

avail the subsidy for farmers for above works from Government of India for increasing more<br />

water areas as well as for establishment of Laboratory at state level for testing water quality<br />

and fish health investigation. Under the scheme there is provision for availing subsidy to<br />

individual farmers for integrated fish farming, aerator/pumps, setting up fresh water fish<br />

seed Hatchery and for establishment of fish feed unit on private sector. It is targeted to<br />

boost up the level of fish production to the tune of 4,000 M.T during <strong>2006</strong>-07.<br />

Further, the Annual Plan <strong>2006</strong>-07 also envisages creation of 2(two) new Fish Farmers<br />

Development Agency Units for Champhai and Serchhip Districst as per the Govt.of India’s<br />

district wise approach of Fish Farmers Development Agency (CSS). The potentiality and<br />

resources for fish farming is high in every District of <strong>Mizoram</strong>. Therefore functioning of<br />

Fish Farmers Development Agency Units in every District is necessary for proper<br />

exploitation of resource towards boosting up fish yield by availing the District-wise Central<br />

assistance under Fresh Water Aquaculture. This will ensure the fisheries development much


- 64 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

more faster in the individual districts in achieving the targets of self sufficiency in <strong>Mizoram</strong>.<br />

Therefore, it is targeted to create 2 nos. of new Fish Farmers Development Agency Units, 1<br />

each for Champhai and Serchhip Districts during <strong>2006</strong>-<strong>2007</strong>.<br />

It is further proposed to replace 3 old vehicles of the Department by purchasing<br />

three new vehicles under FFDA programme by availing Central Assistance. The following<br />

item of works is proposed under the programme during <strong>2006</strong>-<strong>2007</strong>.<br />

An outlay of Rs. 37.30 lakh has been provided in the Annual Plan <strong>2006</strong>-07 as State<br />

share under Fresh Water Aquaculture as per details shown below in the following paras.<br />

(B) DEVELOPMENT OF WATERLOGGED AREA:-<br />

Under Macro Management Programme of CSS in Fisheries sector Govt.of India has<br />

approved a Scheme for Development of Waterlogged area at 75:25 (75 percent Central share<br />

and 25 percent State Govt. share) funding pattern under the scheme there is provision of<br />

subsidy for Development of waterlogged area, supply of inputs (Fish/Prawn) seed, feed, etc.,<br />

training stipend. In <strong>Mizoram</strong>, about 50% of WRC area available are waterlogged where only<br />

one crop of Rice is harvested. If these lands can be reclaimed integrated fish farming –<br />

Paddy cum fish culture can be done and farmers can harvest two crops per year with high<br />

income generation. During <strong>2006</strong>-<strong>2007</strong>, it is targetted to develop 50 Ha. of waterlogged area<br />

for integrated fish farming.<br />

Details of the aforesaid schemes viz. — Fresh Water Aquaculture Scheme and<br />

Development of Waterlogged Area with an approved total outlay of Rs. 42.90 lakh for the<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong> are shown below: -<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit Physical<br />

Target for <strong>2006</strong>-07<br />

Financial<br />

Total<br />

GOM GOI<br />

1 2 3 4 5 6 7<br />

(A) FRESH WATER AQUACULTURE<br />

FFDA (CSS) (Copy of approved<br />

norms of GOI’s assistance is<br />

enclosed under ANNEXURE-A-I<br />

for ready reference): -<br />

1. Construction of new pond,<br />

subsidy @ Rs.75,000/ha.<br />

Ha. 20 3.75 11.25 15.00<br />

2. a) Renovation/reclamation of<br />

existing ponds, subsidy @<br />

Rs.15,000/ha.<br />

Ha. 248 9.30 27.90 37.20<br />

b) Cost of inputs viz:- Fish<br />

Seed/fish feed etc subsidy @<br />

Rs.7,500/ha.<br />

Ha. 248 4.65 13.95 18.60<br />

3. Integrated Fish Farming, subsidy<br />

@ Rs.20,000/ha.<br />

Ha. 54 2.70 8.10 10.80<br />

4. Aerator/pumps, subsidy @<br />

Rs.12,500/-for each set<br />

Unit 20 0.625 1.875 2.50<br />

5. Setting up of Fresh water Fish<br />

Seed Hatchery, subsidy @ Rs.1.20<br />

lakh/unit<br />

Unit 2 0.60 1.80 2.40<br />

6. Fish feed unit, subsidy @ Rs.1.00<br />

lakh per unit<br />

Unit 3 0.75 2.25 3.00


Sl.<br />

No.<br />

- 65 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Items Unit Physical<br />

(Rs. in lakh)<br />

Target for <strong>2006</strong>-07<br />

Financial<br />

Total<br />

GOM GOI<br />

1 2 3 4 5 6 7<br />

7. Training of fish farmers, stipend<br />

@ Rs.100/- per day for 10 days<br />

and T.A. @ Rs.100/- per trainee<br />

No. 1500 4.125 12.375 16.50<br />

8.<br />

9.<br />

(B)<br />

10.<br />

(C)<br />

11.<br />

Establishment of Laboratory at<br />

State level for water quality and<br />

fish health investigation<br />

Unit<br />

Purchase of vehicles<br />

No. 3 3.30 9.90 13.20<br />

Total of CSS<br />

DEVELOPMENT OF<br />

WATERLOGGED AREA (CSS):-<br />

37.30 111.90 149.20<br />

a) Development of Waterlogged<br />

areas, subsidy @ Rs.25,000/ha.<br />

Ha. 50 3.125 9.375 12.50<br />

b) Inputs (fish/prawn) seed, feed,<br />

etc., subsidy @ Rs.15,000/ha.<br />

Ha.<br />

1<br />

7.50<br />

22.50<br />

30.00<br />

c) Training stipend @ Rs.100/per<br />

day for 10 days and T.A @<br />

Rs.100/-per trainee<br />

No. 170 0.45 1.35 1.80<br />

Sub-Total II 5.45 16.35 21.80<br />

Total of CSS (A+B):-<br />

<strong>PLAN</strong> SCHEME:-<br />

42.75 128.25 171.00<br />

Creation of 2 Units of FFDA for<br />

Champhai and Serchhip Districts<br />

No. 2 0.15 - 0.15<br />

Grand Total A+B+C 42.90 128.25 171.15<br />

SCHEME NO. 4<br />

50<br />

1.875<br />

5.625<br />

4. DEVELOPMENT OF RIVERINE FISHERIES UNDER INLAND CAPTURE FISHERIES<br />

(RESERVOIRS/RIVERS, ETC.)<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 0.50 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 0.50 lakh<br />

Inland Capture Fisheries (Reservoirs/Rivers, etc.) is a approved scheme under CSS<br />

programme of Government of India on Development of Inland Fisheries and Aquaculture<br />

under Macro Management approach in stated during 2005-<strong>2006</strong> and will continue upto 10 th<br />

Plan period. Government of India also recommended the implementation of schemes<br />

through the Fisheries Department of State Government on 75:25 central and state share<br />

financing pattern. During <strong>2006</strong>-<strong>2007</strong>, it is proposed to implement the scheme under CSS<br />

programme by availing 75% scheme cost from Central Government and providing 25% State<br />

annual plan fund taking a view for conservation and protection of Rivers/Reservoirs<br />

fisheries. Conservation and protection of Riverine Fisheries is quite essential to enhance the<br />

fish yield from the Rivers/Reservoirs etc. (Capture sector). The Department has taken up<br />

ranching programme in the rivers by the stocking fish seeds to propagate the Riverine and<br />

Reservoirs stocks. More efforts are required to study and survey the major riverine system<br />

towards conservation and propagation of economic varieties of fishes.<br />

7.50


- 66 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

With the existence of the <strong>Mizoram</strong> Fisheries Act which has been passed by the<br />

<strong>Mizoram</strong> Legislative Assembly on 27.9.2005, its implementation will call for intensive study<br />

and survey of riverine system, fauna and habitats of economically important varieties of<br />

fishes, declaration of fish sanctuary etc for development of Riverine Fisheries in the State.<br />

Details of the scheme with an approved outlay of Rs. 0.50 lakh as State share for the<br />

Annual Plan <strong>2006</strong>-07 is shown below: -<br />

Sl.<br />

No.<br />

Items Unit Physical<br />

(Rs. in lakh)<br />

Target for <strong>2006</strong>-07<br />

Financial<br />

Total<br />

GOM GOI<br />

1 2<br />

A. INLAND CAPTURE FISHERIES<br />

(CSS):<br />

3 4 5 6 7<br />

1. Riverine Fisheries Conservation<br />

and Awareness Programme: -<br />

Preparation of feasibility report/<br />

Implementation of the <strong>Mizoram</strong><br />

Fisheries Act/Rules, Awareness<br />

programmes, etc.<br />

No. LS 0.50 1.50 2.00<br />

TOTAL:- 0.50 1.50 2.00<br />

5. COLD WATER FISHERIES(CSS):<br />

SCHEME NO. 5<br />

Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 2.50 lakh<br />

The Annual Plan <strong>2006</strong>-07 envisages to develop cold water fisheries in the state by<br />

initiating with Resource survey works and experimentation for rearing/breeding of cold<br />

water fishes viz. - Mahseer sp. etc. in the Departmental fish farms as well as on fish farmers<br />

fish pond situated at higher elevation in <strong>Mizoram</strong> by availing 75% of Central assistance from<br />

Government of India under Cold Water Fisheries (CSS).<br />

Details of the scheme with an approved outlay of Rs. 2.50 lakh for the Annual Plan<br />

<strong>2006</strong>-07 is shown below: -<br />

Sl.<br />

No.<br />

Items Unit Physical<br />

(Rs. in lakh)<br />

Target for <strong>2006</strong>-07<br />

Financial<br />

Total<br />

GOM GOI<br />

1 2 3 4 5 6 7<br />

1. Resource survey<br />

No. of<br />

survey<br />

1 1.25 3.75 5.00<br />

2. Investigation/Experimentation<br />

of culture/ breeding of cold<br />

water fishes<br />

No. 1 1.25 3.75 5.00<br />

TOTAL 2.50 7.50 10.00


- 67 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. 6<br />

6. INFORMATION, EXTENSION & TRAINING:<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 3.80 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs.14.00 lakh<br />

The scheme proposes for extension of technology to the fish farmers in modern<br />

methods of fish culture through Extension and Training, publication and demonstration<br />

activities. The Annual Plan <strong>2006</strong>-<strong>2007</strong> also provides fund for meeting the cost of organizing<br />

training of the fish farmers and deputing In-service/fresh personnels for training in various<br />

courses of fisheries science.<br />

The ongoing State sector scheme of Information, Extension & Training in Fisheries<br />

Department will be strengthened with the CSS scheme in Fisheries Training and Extension<br />

(CSS) to be implemented on 80:20 Central and State funding pattern. Since the items of the<br />

scheme are similar it is proposed to combine both the schemes together for availing Central<br />

share for better co-ordination and implementation of the scheme during <strong>2006</strong>-<strong>2007</strong>.<br />

Details of the scheme with an approved outlay of Rs. 14.00 lakh for the Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong> is shown below: -<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

1 2 3 4 5<br />

Information, Extension & Training:-<br />

A. Normal Scheme:<br />

(GOM)<br />

1. Publication of Departmental Magazine,<br />

Booklets, advertisement, etc.<br />

No. LS 1.50<br />

2. Training of in-service personnel/fresh<br />

personnel for various courses in fisheries<br />

science, stipend, etc.<br />

No. 10 0.50<br />

Sub-Total of ‘A’ 2.00<br />

Sl.<br />

No.<br />

B. CSS: (Rs. in lakh)<br />

Target for <strong>2006</strong>-07<br />

Items Unit Physical<br />

Financial<br />

GOM GOI Total<br />

20% 80%<br />

1 2 3 4 5 6 7<br />

1. Human Resource Development<br />

Stipend @ Rs.1500/-per participant<br />

during the period of 15day training<br />

+ actual to and fro Bus fair (L/S) @<br />

Rs.250/-per head (in 4 Batch)<br />

No. 500 1.64 6.56 8.20<br />

2. Establishment of Fish Farmers<br />

training center<br />

No. 3 9.00 36.00 45.00<br />

3. Publication of handbook:<br />

a) Honorarium to Authors<br />

No. 1 0.03 0.12 0.15<br />

b) Publication by Government No. 500 0.10 0.40 0.50


Sl.<br />

No.<br />

- 68 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Items Unit Physical<br />

(Rs. in lakh)<br />

Target for <strong>2006</strong>-07<br />

Financial<br />

GOM GOI Total<br />

20% 80%<br />

1 2 3 4 5 6 7<br />

4. Publication of Training/Extension<br />

manuals:a)<br />

Honorarium to the expert<br />

No. 3 0.03 0.12 0.15<br />

b) Publication by Government No. 500×3 0.12 0.48 0.60<br />

5. Organising workshop/Seminars etc. No. 1 0.08 0.32 0.40<br />

6. Production of documentary films<br />

on Fisheries and aquaculture<br />

No. 1 1.00 4.00 5.00<br />

Sub-Total of ‘B’ 12.00 48.00 60.00<br />

TOTAL(A+B) 14.00 48.00 60.00<br />

Grand total fund required for implementation of ongoing State sector scheme is<br />

Rs.2.00 lakh and 20% State share for implementation of CSS scheme is Rs. 12.00 lakh<br />

totaling to Rs. 14.00 lakh.<br />

SCHEME NO. 7<br />

7. INLAND FISH MARKETING:-<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs.18.00 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 4.00 lakh<br />

In order to improve the fish marketing system in the State and to provide ice and<br />

Cold Storage facilities (post harvest) to the fish farmers/sellers 3 nos. of Ice Plants and 2nos.<br />

of Cold Storages have been set up at Bawngkawn, Kolasib and Bilkhawthlir. These assets are<br />

functioning and providing requirement of ice blocks and Cold Storage facilities to the fish<br />

producers/sellers and consumers regularly at subsidized rates.<br />

An outlay of Rs. 4.00 lakh has been provided in the Annual Plan, <strong>2006</strong>-<strong>2007</strong> for the<br />

maintenance of 2 nos. of Ice Plant-cum-Cold Storages Units at Bawngkawn and Kolasib and<br />

1no. Ice Plant Unit at Bilkhawthlir. Besides, electricity and water charges of these plants and<br />

cost of labour charges are also required for regular operation of these plants and for<br />

providing cold chain facilities to the fish farmers/fish sellers.<br />

Details of the scheme and fund proposed under the Marketing scheme for the<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong> with an outlay of Rs. 4.00 lakh is as shown below: -<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan 2005-<strong>2006</strong><br />

Physical Financial<br />

1 2 3 4 5<br />

1.<br />

2.<br />

3.<br />

Maintenance of Ice Plants and Cold Storages:-<br />

Maintenance of Power and water supply for<br />

Ice Plants-cum-Cold Storages at Bawngkawn &<br />

Kolasib<br />

Ice Plant maintenance at Bilkhawthlir<br />

Maintenance of labours in the Ice Plant/ Cold<br />

Storage<br />

No.<br />

No.<br />

No.<br />

2<br />

1<br />

4<br />

2.00<br />

1.50<br />

0.50<br />

TOTAL 4.00


- 69 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. 8<br />

7. DEVELOPMENT OF INLAND FISHERIES STATISTICS (DATABASE):<br />

The scheme provides for maintenance of the on-going Centrally Sponsored Scheme<br />

for Development of Inland Fisheries Statistics through information, networking, survey etc.<br />

The Scheme is functioning with 100% grant-in-aid from the Central Government towards<br />

Salary of staff, Machineries & Equipments etc. Therefore, a token provision of Rs. 0.10 lakh<br />

has been kept towards meeting the incidental charges under the scheme during Annual Plan<br />

<strong>2006</strong>-07 as follows: -<br />

Sl.<br />

No.<br />

Items Unit<br />

(Rs. in lakh)<br />

Annual Plan 2005-<strong>2006</strong><br />

Physical Financial<br />

1 2 3 4 5<br />

1. Development of Inland Fisheries Statistics:-<br />

Incidentals/other charges<br />

No. LS 0.10<br />

TOTAL 0.10<br />

SCHEME NO. 9<br />

9. BAFFACOS:-<br />

(i) Anticipated Expenditure 2005-<strong>2006</strong> = Rs. 120.00 lakh<br />

(ii) Approved Annual Plan Outlay <strong>2006</strong>-<strong>2007</strong> = Rs. 115.00 lakh<br />

With an earmarked outlay of Rs. 115.00 lakh for BAFFACOS during Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong>, it is envisaged to create more new water areas for achieving sustained fish<br />

production to combat the impending famine due to bamboo flowering in <strong>Mizoram</strong>.<br />

Therefore, a larger chunk of the proposed fund in the tune of Rs. 104.10 lakh has been<br />

targeted for construction of new ponds comprising of 60 Ha. including training of 255 nos.<br />

of fish farmers (beneficiaries) in modern technology of fish farming and supply of inputs<br />

free of cost.<br />

Besides, in order to bring in more water areas for boosting up fish production, it is<br />

also envisaged to take up renovation/ reclamation of 78.4 Ha. of existing ponds under FFDA<br />

(CSS) through BAFAFCOS with an outlay of Rs.4.90 lakh during <strong>2006</strong>-<strong>2007</strong> in which the<br />

Govt.of India’s assistance against the State matching share would be in the tune of Rs.14.70<br />

lakh. Besides, it is also targeted to train up a cadre of 400 fish farmers through FFDA(CSS)<br />

under Baffacos during <strong>2006</strong>-<strong>2007</strong>.


- 70 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Details of the scheme showing physical and financial targets with an approved<br />

outlay of Rs. 115.00 lakh for Annual Plan <strong>2006</strong>-<strong>2007</strong> is stated below: -<br />

(Rs. in lakh)<br />

Sl.<br />

No.<br />

Items Unit<br />

Annual Plan 2005-<strong>2006</strong><br />

Physical Financial<br />

1 2 3 4 5<br />

1.<br />

BAFFACOS:-<br />

Water area to be covered for fish<br />

farming:a)<br />

Construction of new fish ponds<br />

(individuals/Fishery Society) supply of<br />

inputs and Training of fish farmers: -<br />

i) Construction of pond @ Rs.1.50<br />

lakh/Ha.<br />

Ha. 60<br />

90.00<br />

ii) Cost of inputs for new ponds viz:-<br />

Lime, fish seed, fish feed etc @<br />

Rs.0.15 lakh/Ha.<br />

Ha. 60<br />

9.00<br />

iii) Training of fish farmers @ Rs.0.02<br />

lakh per trainee<br />

No. 255<br />

5.10<br />

Sub-Total: 104.10<br />

b) Renovation/reclamation of existing<br />

ponds including supply of inputs and<br />

Training of farmers under FFDA (CSS)<br />

through Baffacos: -<br />

i) Renovation/improvement<br />

GOM GOI Total<br />

@ Rs.0.15 lakh/Ha.<br />

ii) Cost of inputs for renovated/<br />

Ha. 78.4 2.94 8.82 11.76<br />

improved ponds viz:- Lime, fish<br />

seed, fish feed etc @ Rs.0.075<br />

lakh/Ha.<br />

iii) Training of fish farmers @<br />

Ha. 78.4 1.47 4.41 5.88<br />

Rs.100/Stipend per day for 3 days<br />

and lump sum cost towards travel<br />

expenses<br />

No. 400 0.49 1.47 1.96<br />

Sub-Total:- 4.90 14.70 19.60<br />

c) Administrative and contingency cost<br />

viz. - O.E. & T.E.<br />

No. LS 6.00<br />

TOTAL 115.00 14.70 19.60


1. BACKGROUND AND STRATEGY:<br />

- 76 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ENVIRONMENTS & FORESTS<br />

<strong>Mizoram</strong> State with hilly terrain and primarily agricultural economy is inhabited by<br />

tribal population. Soil and Water are two important resources on which growth and<br />

productivity of agricultural economy depends. Forests play important role in production<br />

and conservation of soil and water. Forests also provide many important day-to-day needs<br />

of local population such as fuel, fodder, timber, food in form of wild fruits and vegetables<br />

and other non-wood forests produce. Forests play a vital role in environment stability,<br />

ecological balance and over all economic development of the state like <strong>Mizoram</strong><br />

undoubtedly revolves around the Forests.<br />

National Forest Policy 1988 stipulate that hilly and mountainous regions like<br />

<strong>Mizoram</strong> need to maintain at least 2/3 of the total geographical area under tree cover in<br />

order to prevent soil erosion, land degradation and protection of the fragile eco-system. As<br />

against this goal, at present notified forests (reserved/protected forests) constitute about<br />

38% of the geographical area and even most of these are open, degraded and subjected to<br />

pressure of shifting cultivation, forest fire and other forms of biotic pressures.<br />

Shifting cultivation is still widely practiced in <strong>Mizoram</strong>. These practices not only<br />

affect ecology of the area but also decrease natural regeneration of tree species to a<br />

considerable extent. The destruction of habitat of plants and animals has not only led to the<br />

reduction in population of wild animals in the forest, but also rendering many species of<br />

rare plants and animals to the extent of becoming endangered/extinction.<br />

The survey, demarcation, mapping and settlement of land including forest lands is a<br />

pre-requisite for evolving proper integrated land use system. This task is yet to be<br />

completed in the state. Hence for proper control and scientific management of forests on a<br />

sustainable basis, consolidation of notified forests/reserved forests will be necessary.<br />

The productivity of forests is already very low in <strong>Mizoram</strong>. There has been very little<br />

silvicultural research to evolve technologies and practices suiting to local conditions to<br />

increase productivity. Destruction of forests by illicit fellings and removal of forest produce<br />

to meet domestic need of Timber and Firewood, besides, forest fire, encroachments and<br />

grazing are common. Protection of forests from such detrimental factors is inevitable for<br />

ecological and environmental security.<br />

There is a wide gap between supplies from existing forests and the ever increasing<br />

demands. Hence to increase production of timber and non-timber forest produce to meet<br />

local needs and to reduce the gap between demands and the supply, undertaking massive<br />

afforestation programme through plantation of utility tree species and aided natural<br />

regeneration would be necessary. Plantations created earlier need periodic tending for<br />

improving wood production. It would be necessary to provide sufficient funds for managing<br />

the forest to scientifically achieve maximum biomass and non-timber forest produce from<br />

the forests. To meet increasing demand of forest produce and at the same time reduce<br />

pressure on existing shrinking forest resources, extension of tree cover beyond conventional<br />

forest areas would be necessary. For this purpose, tree growing and protecting forests with<br />

active involvement and participation of private individuals need to be promoted on massive<br />

scale through proper extension programmes to cope up with the increased work<br />

programme.


- 77 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

North-East India is considered to be a mega-bio-diversity region. Wildlife are<br />

important resources which play vital role in ensuring ecological stability. In recent years<br />

poaching of animals for the purpose of earning money has become a big challenge to the<br />

Forest Department is Protection capabilities in terms of mobility, equipments and trained<br />

manpower to keep this undesirable activity under proper check.<br />

To cope up with the increased work programmes, and to ensure better preservation,<br />

and management of forests and wildlife for sustainable use of forest resources<br />

strengthening of forest organisation with respect to manpower and human resource<br />

development through training is necessary. Equipments technology and facilities are also<br />

extremely necessary.<br />

<strong>APPROVED</strong> OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />

Sl.No. Name of Scheme<br />

Approved Outlay<br />

(Rs. In lakh)<br />

1. Direction and Administration<br />

i) – Direction 146.66<br />

ii) – Administration 161.95<br />

2. Survey of Forest Resources<br />

i) – Forest Research 27.50<br />

ii) – Consolidation of Forests and Working Plans 6.40<br />

3. Forest Conservation and Development<br />

i) – Forest Protection 43.41<br />

4. Extension and Training<br />

i) – Forestry Training 6.75<br />

ii) – Forest Extension 14.00<br />

5. Preservation of Wildlife 97.966<br />

6. Other Expenditure 9.364<br />

7. Maintenance of Forest under TFC 500.00<br />

8. BAFFACOS under TFC 225.00<br />

9. State Share under I.F.P. 81.00<br />

10. <strong>Mizoram</strong> State Pollution Control Board 15.00<br />

GRAND TOTAL : 1335.00<br />

DESCRIPTION OF SCHEMES <strong>APPROVED</strong> FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. DIRECTION AND ADMINISTRATION<br />

(i) DIRECTION<br />

This scheme is to provide for expenditure towards salary/allowances of the existing<br />

staff (46 nos.) and establishment cost of PCCF & Circle Offices. Approved financial outlay<br />

are as follows: -<br />

Approved Outlay<br />

Item of Expenditure<br />

(Rs. in lakh)<br />

001(01) – Direction:<br />

(01) – Salary 66.90<br />

(02) – Wages 13.71


- 78 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Item of Expenditure<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(06) – Medical Treatment 2.00<br />

(11) – Traveling Expenses 15.00<br />

(13) – Office Expenses 20.00<br />

(14) – Rent -<br />

(26) – Advertisement 4.00<br />

(28) – Professional Service 0.32<br />

(34) – Scholarship/Stipend 1.00<br />

(50) – Other Charges (including Green <strong>Mizoram</strong>) 23.73<br />

(51) – Motor Vehicles -<br />

(52) – Machineries & Equipment -<br />

TOTAL OF 001(01): 146.66<br />

(ii) ADMINISTRATION :<br />

This scheme is to provide for expenditure towards salary/allowances of the existing<br />

staff (90 nos.) and establishment cost of 11 Territorial Divisions besides the normal<br />

expenses to run these establishments. Financial proposals are as follows:-<br />

Item of Expenditure<br />

001(02) – Administration:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(01) – Salary 68.20<br />

(02) – Wages 36.25<br />

(06) – Medical Treatment 5.00<br />

(11) – Traveling Expenses 28.00<br />

(13) – Office Expenses 22.00<br />

(14) – Rents 2.50<br />

(26) – Advertisement -<br />

(51) – Motor Vehicles -<br />

TOTAL OF 001(02): 161.95<br />

2. SURVEY OF FOREST RESOURCES:<br />

The main object of the scheme is to carry out Forestry Research for improving the<br />

productivity of forest resources and to under take status survey of forest produce besides,<br />

consolidation of forest including preparation of management plans (working plans) for<br />

forest resources of the State.<br />

(i) RESOURCES SURVEY & SILVICULTURE RESEARCH :<br />

The need has been felt to conduct forestry research on various aspects such as<br />

(i) Phenological studies of important local tree species.<br />

(ii) Standardization of nursery technique of important indigenous species to be<br />

used for afforestation programmes.<br />

(iii) Under taking experimental plantations of new species (local as well as exotic)<br />

to standardize their Silviculture practice for adoption in our afforestation<br />

programmes.<br />

(iv) Survey of Minor Forest Produce like Cane, Medicinal plants, etc. and their<br />

development for better utility and value addition.


- 79 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Approved financial outlays are as follows: -<br />

Item of Expenditure<br />

005(01) – Forest Resources Survey:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(01) – Salary 21.00<br />

(06) – Medical Treatment 1.00<br />

(11) – Traveling Expenses 3.00<br />

(13) – Office Expenses 1.50<br />

(27) – Minor Works/Maintenance 1.00<br />

TOTAL OF 005(01): 27.50<br />

(ii) CONSOLIDATION OF FOREST & WORKING <strong>PLAN</strong> :<br />

Forest survey, demarcation, consolidation of forests, collection, compilation &<br />

analysis of various data on Forest Resources are required to be taken up before<br />

management plans for managing forests on scientific lines could be prepared. Hon’ble<br />

Supreme Court has directed that Working Plans should be completed within a period of two<br />

years. This direction could not be complied with mainly due to financial constraints.<br />

Financial outlays approved are: -<br />

Item of Expenditure<br />

Approved Outlay<br />

(Rs. in lakh)<br />

005(02) – W.P.O.:<br />

(01) – Salary 2.90<br />

(06) – Medical Treatment 0.50<br />

(11) – Traveling Expenses 2.00<br />

(13) – Office Expenses 1.00<br />

(27) – Minor Works/Maintenance -<br />

TOTAL OF 005(02): 6.40<br />

3. FOREST CONSERVATION AND DEVELOPMENT<br />

(i) FOREST PROTECTION :<br />

Forest is a biological entity and a renewable resource subject to damages from<br />

various factors namely fire, encroachment, illicit cutting/removal of forest produce, faulty<br />

land use practices (shifting cultivation) etc. These factors are prevalent in the State with the<br />

significant extent thereby degrading and depleting the forest resources much to the<br />

detriment to its fragile ecology, environmental stability and ecological balance which<br />

ultimately reduce the productivity of land. With the increasing population of both human &<br />

livestock and demand for wood and other forest produce which is far beyond the<br />

sustainable supplies of the shrinking forest cover, protection of forest is becoming more<br />

challenging. Protection of forest from Forest Fire is very important in the context of<br />

<strong>Mizoram</strong>. The approved financial outlay for meeting the salary/allowances of staff (67 nos.)<br />

and other establishment cost during <strong>2006</strong> - <strong>2007</strong> are given below: -<br />

Item of Expenditure<br />

101(01) – Forest Protection:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(01) – Salary 36.91<br />

(06) – Medical Treatment 1.50<br />

(11) – Traveling Expenses 3.00<br />

(13) – Office Expenses 2.00<br />

(51) – Motor Vehicles -<br />

TOTAL OF 101(01): 43.41


- 80 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. EXTENSION AND TRAINING:<br />

(i) FORESTRY TRAINING (HUMAN RESOURCES DEVELOPMENT) :<br />

The objective here is to import training in Forestry subject to the field-staff and<br />

officers and of this Department and to make them per take periodic training in other State<br />

so as to update their skills/knowledge and thus enable them to discharge their<br />

responsibilities more efficiently. Approved outlay is as follows:-<br />

Item of Expenditure<br />

003(01) – Training of Forest Personnel:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(01) – Salary 3.00<br />

(06) – Medical Treatment 0.50<br />

(11) – Traveling Expenses 2.75<br />

(13) – Office Expenses 0.50<br />

TOTAL OF 003(01): 6.75<br />

(ii) EXTENSION :<br />

The objective here is to promote, motivate & seek co-operation of the public to<br />

protect existing forests & wildlife through suitable programmes and awareness campaign<br />

alongwith observation of events and festivals likes Vanamahotsava, Wildlife Week. Raising<br />

of seedlings for distribution for planting by individuals & organisations on their lands, etc.<br />

Approved financial outlays are as follows:-<br />

Item of Expenditure<br />

003(02) – Forest Extension:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(01) – Salary 1.50<br />

(06) – Medical Treatment 0.50<br />

(11) – Traveling Expenses 2.50<br />

(13) – Office Expenses 1.50<br />

(16) – Publications 5.00<br />

(27) – Minor Works/Maintenance 1.00<br />

(50) – Other Charges 2.00<br />

TOTAL OF 003(02): 14.00<br />

5. PRESERVATION OF WILDLIFE:<br />

Conservation and management of Wildlife & Bio-diversity in the protected areas of<br />

the State are done through protection measures by way of engaging Wildlife Guards. The<br />

provision of feeds and sanitation to Mini Zoo at Aizawl and Deer Park at Thenzawl are also<br />

necessary. Payment of salary and allowances of staff (16 nos.) and maintenance/<br />

development of zoo. Government of India has also approved the re-location of zoo from<br />

present location at Bethlehem veng to a new site at Aizawl- Sairang road. It is also necessary<br />

to provide matching share for availing financial assistance from Central Zoo authority and<br />

Project Tiger Scheme of Government of India. As such, an amount of Rs. 93.33 lakh is<br />

included as Sate Matching Share.


- 81 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Item of Expenditure<br />

02 – Environmental Forestry & Wildlife:<br />

110(01) – Preservation of Wildlife:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(01) – Salary 16.64<br />

(02) – Wages 10.46<br />

(06) – Medical Treatment 1.00<br />

(11) – Traveling Expenses 2.50<br />

(13) – Office Expenses 2.50<br />

(14) – Rents 2.13<br />

(27) – Minor Works (State matching) 46.50<br />

(50) – Other Charges (including zoo feed) 16.236<br />

(51) – Motor Vehicles -<br />

TOTAL OF 110(01): 93.33<br />

6. OTHER EXPENDITURES :<br />

Environment & Forest Deptt. has more than 800 staff of uniform cadre. Due to fund<br />

constraint uniforms were not provided to staff during the past 4-5 years. This situation has<br />

led to serious erosion in discipline as well as morale of the staff. Wearing of proper uniform<br />

is essential for enforcement of rules and disciplines. Though not sufficient, Rs. 10.00 lakh is<br />

earmarked for staff uniforms during <strong>2006</strong> – <strong>2007</strong>.<br />

Item of Expenditure<br />

Approved Outlay<br />

(Rs. in lakh)<br />

800(01) – Uniforms:<br />

(13) – Office Expenses 9.364<br />

TOTAL OF 800(01): 9.364<br />

7. MAINTENANCE OF FOREST UNDER T.C.F. :<br />

During the year <strong>2006</strong>-07 an amount of Rs. 500.00 lakh is earmarked for Preservation<br />

and Maintenance of Forests in the state of <strong>Mizoram</strong> as follows.<br />

Item of Expenditure<br />

800(02) – Maintenance of Forest under T.F.C.:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(02) – Wages 43.60<br />

(13) – Office Expenses 10.00<br />

(27) – Minor works/Maintenance 381.73<br />

(50) – Other Charges 37.02<br />

(51) – Machinery & Equipment 27.65<br />

TOTAL OF 800(02): 500.00<br />

8. BAFFACOS UNDER T.F.C. :<br />

The state has sought and assistance of Rs. 566 crore to meet its project cost for<br />

tacking the problem of rodents arising out of impending bamboo flowering, which leads to<br />

large scale losses in Agriculture and Forestry. As such an amount of Rs. 225.00 lakh is<br />

earmarked for this purpose for commencing the project as follows:


- 82 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Item of Expenditure<br />

800(03) – BAFFACOS under T.F.C.:<br />

Approved Outlay<br />

(Rs. in lakh)<br />

(13) – Office Expenses 12.50<br />

(27) – Minor works/Maintenance 200.00<br />

(50) – Other Charges 12.50<br />

TOTAL OF 800(03): 225.00<br />

9. The Ministry has formulated a new scheme titled “Integrated Forest Protection<br />

Scheme” for implementation during the 10 th Plan. The scheme has since been approved by<br />

the Cabinet Committee on Economic Affairs. The main components of the scheme are: -<br />

A. Forest Fire Control Management.<br />

B. Infrastructure development which has two sub components as –<br />

(i) Working Plan Preparation/Survey Demarcation.<br />

(ii) Strengthening of Infrastructure for Forest Protection.<br />

The Scheme was proposed to be 100% Centrally Sponsored but as per the decision of<br />

the CCEA there has been a change in the pattern of funding. The Scheme will no longer be<br />

100% Centrally Sponsored instead the Central Assistant would be 90% of the Project cost<br />

with the State and UTs sharing the balance. As such, an amount Rs. 81.00 lakh is provided<br />

during this Annual Plan <strong>2006</strong>-07.<br />

Item of Expenditure<br />

Approved Outlay<br />

(Rs. in lakh)<br />

State Matching Share: 81.00<br />

10. MIZORAM STATE POLLUTION CONTROL BOARD<br />

200(01) - Assistance to MPCB - Due to limited budget, Forest Department will not be<br />

in position to accommodate all the requirement of MPCB during <strong>2006</strong> – <strong>2007</strong>.<br />

Approved Outlay<br />

Item of Expenditure<br />

(Rs. in lakh)<br />

3435 – Ecology & Environment<br />

800(01) – <strong>Mizoram</strong> State Pollution Control Board:<br />

(31) – Grand-in-aid 15.00<br />

TOTAL OF 800(01): 15.00<br />

GRAND TOTAL: 1335.00


- 86 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

COOPERATION<br />

The 10 th Plan covers the period from 2002 – 03 to <strong>2006</strong> – 07. The present <strong>2006</strong> –<br />

<strong>2007</strong> Annual Plan is the final year plan of 10 th Plan. The strategy of the 10 th Plan of the<br />

Cooperative Department is to strengthen and enhance the progress of Cooperative<br />

Movement already launched in the 9 th Plan with broad objectives of Socio-Economic<br />

Development of the people of <strong>Mizoram</strong> with special emphasis on the following activities.<br />

(a) Development of Cooperative Farming in Agriculture, Horticulture and Allied<br />

activities like Piggery, Dairy, Fishery, Sericulture, Poultry etc.<br />

(b) Strengthening of Cooperative Credit Structure for obtaining credit facilities from<br />

financial institutions.<br />

(c) Establishment of appropriate linkages to ensure remunerative prices to member<br />

farmers of Cooperative Societies.<br />

(d) Providing Cooperative Education for inculcating the Cooperative Principles,<br />

Ideologies and Movement as a whole among the Cooperative members by conducting<br />

suitable programmes for education, training and publicity.<br />

(e) Strengthening the organizational set up of the department as would<br />

boost up restructuring the Cooperative Movement.<br />

(f) Giving boost to the Consumer Movement of the State.<br />

The Annual Plan of <strong>2006</strong> – <strong>2007</strong> is prepared in the light of 10 th Plan strategies above.<br />

Special attention will be made on :-<br />

(a) Better performances in the department as well as in the Cooperative Institutions.<br />

(b) Cooperative Farming in the Agriculture and Allied Activities.<br />

(c) Strengthening of Cooperative Credit Structure.<br />

(d) Propagation of Cooperative Education, Training and Publicity.<br />

(e) Boost up the Consumer Movement of the State.<br />

Sl.<br />

No.<br />

Break-up of the Plan outlay of <strong>2006</strong> – <strong>2007</strong>.<br />

Name of Schemes<br />

(Rs. in lakh)<br />

Annual Plan Outlay for<br />

<strong>2006</strong> - <strong>2007</strong><br />

Revenue Capital Total<br />

1 2 3 4 5<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

Direction & Administration<br />

Training & Education<br />

Audit of Cooperative Societies<br />

Assistance to Credit Banking<br />

Asst. to Public Sector & other undertaking<br />

Cooperative Training & Education<br />

Asst. to other types of Cooperative Societies<br />

162.00<br />

3.00<br />

11.00<br />

55.00<br />

70.50<br />

49.50<br />

10.00<br />

-<br />

-<br />

169.00<br />

-<br />

-<br />

-<br />

172.00<br />

3.00<br />

11.00<br />

169.00<br />

55.00<br />

70.50<br />

49.50<br />

TOTAL 351.00 179.00 530.00


- 87 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. DIRECTION & ADMINISTRATION:<br />

(a) Direction - Achieving better performance by all the employees is one of the objects<br />

in this Directorate. It performs the works of overall Supervision, Registration, Assistance,<br />

Liquidation, Arbitration and Control of registered Cooperative Societies etc. There are eight<br />

(8) Officers and 21 other Staff under this head. The proposal to up-grade one post of JRCS<br />

to the Addl. RCS Post during 2004 – 2005 will be carried on <strong>2006</strong> – <strong>2007</strong> in case the same is<br />

not done during 2005 – <strong>2006</strong>.<br />

The following is the break-up of Plan Outlay under Direction.<br />

Sl.<br />

No.<br />

Name of Schemes<br />

(Rs. in lakh)<br />

Annual Plan Outlay for<br />

<strong>2006</strong> - <strong>2007</strong><br />

Revenue Capital Total<br />

1 2 3 4 5<br />

1. Salary<br />

45.00 - 45.00<br />

2. Wages<br />

0.50 -<br />

0.50<br />

3. M.R<br />

4.00 -<br />

4.00<br />

4. T.E<br />

2.00 -<br />

2.00<br />

5. O.E<br />

15.00 - 15.00<br />

6. Publication<br />

2.00 -<br />

2.00<br />

7. Minor Works<br />

5.50 -<br />

5.50<br />

8. Other charges<br />

3.00 -<br />

3.00<br />

TOTAL 77.00 - 77.00<br />

(b) Administration - There are 6 Districts Offices at present under this head. Two more<br />

Districts Offices proposed to be opened at Serchhip and Mamit during 2005 – <strong>2006</strong> will be<br />

carried on during this year if not open during 2005 – <strong>2006</strong> and will be manned from the<br />

existing staff of the department. The District Offices perform the works of Audit,<br />

Inspection, Supervision, Organisation, Verification etc. There are 2 Officers and 46 Staff<br />

under the head of Administration.<br />

Sl.<br />

No.<br />

The following is the break-up of the Plan Outlay of the Districts during <strong>2006</strong> – <strong>2007</strong>.<br />

Name of Schemes<br />

(Rs. in lakh)<br />

Annual Plan Outlay for<br />

<strong>2006</strong> - <strong>2007</strong><br />

Revenue Capital Total<br />

1 2 3 4 5<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

Salary<br />

Wages<br />

M.R<br />

T.E<br />

O.E<br />

Rent<br />

Minor Works<br />

Major Works<br />

52.00<br />

1.00<br />

6.00<br />

7.00<br />

16.00<br />

1.00<br />

2.00<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

10.00<br />

52.00<br />

1.00<br />

6.00<br />

7.00<br />

16.00<br />

1.00<br />

2.00<br />

10.00<br />

TOTAL 85.00 10.00 95.00<br />

2. TRAINING & EDUCATION: Training is the requisite ingredients for the effective<br />

management of the Cooperative Societies and for conducting the Audit, Inspection and<br />

Supervision efficiently. Officers are regularly sent to undergo training in the course of<br />

PGDCBM at VAIKUNTH MEHTA, PUNE and H.D.C. at Cooperative College, Guwahati. It is also


- 88 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

obligatory to celebrate the All India Cooperative Week from 14 th to 20 th November every year.<br />

Requirement of fund for Training and Cooperative Week Celebration are included here..<br />

Break-Up of the Plan Outlay under this Head for <strong>2006</strong> – <strong>2007</strong> :-<br />

Sl.<br />

No.<br />

Name of Schemes<br />

(Rs. in lakh)<br />

Annual Plan Outlay for<br />

<strong>2006</strong> - <strong>2007</strong><br />

Revenue Capital Total<br />

1 2 3 4 5<br />

1 T.E 1.00 1.00<br />

2 O.E 2.00 2.00<br />

TOTAL 3.00 3.00<br />

3. AUDIT OF COOPERATIVE SOCIETIES: The Department is looking after 1354<br />

functioning Area, District, Block and Primary Level Cooperative Societies. Scrutinisation and<br />

approval of Audited Report, decision on cancellations, liquidations etc., have been done<br />

after careful examination from this section. Chief Audit Officer, Accountant, UDC and LDC<br />

manned this section.<br />

Sl.<br />

No.<br />

The following is the Plan Outlay for <strong>2006</strong> – <strong>2007</strong> under this Head :-<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - <strong>2007</strong><br />

Particulars<br />

Revenue<br />

1 2 3<br />

1 Salary 8.00<br />

2 M.R. 0.50<br />

3 T.E. 1.00<br />

4 O.E. 1.00<br />

5 O.C. 0.50<br />

TOTAL 11.00<br />

4. ASSISTANCE TO CREDIT AND BANKING: Under this Head, the following Banking<br />

Institutions are included :-<br />

(a) <strong>Mizoram</strong> Cooperative Apex Bank Ltd. (MCAB).<br />

(b) <strong>Mizoram</strong> Cooperative Urban Development Bank Ltd (MUCO).<br />

(a) MCAB Ltd.: This is the single State Level Cooperative Bank in the State established<br />

during the year 1981. The <strong>Mizoram</strong> Cooperative Apex Bank (MCAB) Ltd., is functioning with<br />

11 Branches in different places in the State. It caters to the requirement of Agri. Loan and<br />

Non-Agri. Loan to the member Cooperative Societies as well as Non-Member individual and<br />

private farms. Due to the introduction of Non-Performing Asset/Prudential Norms by R.B.I.,<br />

and the poor repayment of loan, the erosion of assets increased significantly and the Bank is<br />

booked under section 11 of the Banking Regulation Act, 1949. The management of the Bank<br />

tried their best to improve the position of the Bank. Larger recovery drives have been<br />

launched along with other steps. A Memorandum of Understanding (MOU) was signed<br />

between State Govt. and MCAB Ltd. on 29.11.2004 in which State Government agreed to<br />

contribute at least 355 lakh as Share Capital during 2004 - <strong>2007</strong>. Out of which, Rs. 100.00<br />

lakh only was paid during 2005 – <strong>2006</strong> and Rs. 100.00 lakh may be provided during <strong>2006</strong> –<br />

<strong>2007</strong> as Share Capital Contribution to the Bank.


- 89 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The following is the fund provision for <strong>2006</strong> - <strong>2007</strong> :-<br />

i) Share Capital Contribution - Rs. 100.00 lakh<br />

(b) MUCO Bank Ltd.: <strong>Mizoram</strong> Urban Cooperative Development Bank (MUCO) Ltd. was<br />

established during the year 1986–87. This is the only Urban Cooperative in the State<br />

providing credit to the people for Socio-Economic Development. It provided HUDCO Loan<br />

and NSFDC Loan to the people as a channelising agency of such loan. Due to the<br />

introduction of prudential norms/Non-Performing Assets and poor repayment of loan, the<br />

losses of the Bank increased rapidly resulting heavy erosion of Assets. The Bank has been<br />

booked under Section 11 by the R.B.I under Banking Regulation Act. At present Show Cause<br />

Notice has been issued to the Bank by the R.B.I and the Banking activities have been<br />

restricted by the R.B.I. The Bank took up an Action Plan to improve the recovery position<br />

and the overall performance with a view to overcome the present position and to bail it out<br />

from such situation. The State Govt. agreed to contribute Rs. 369.00 lakh Share Capital<br />

Contribution to bail the Bank out from Section 11(1). Out of which Rs. 100.00 lakh was<br />

sanctioned during the year 2005–06 and Rs. 69.00 lakh is earmarked for the year <strong>2006</strong>–07.<br />

Allocation of fund to MUCO Bank Ltd. during the year <strong>2006</strong>–07 is as follows:<br />

i) Share Capital Contribution - Rs. 69.00 lakh<br />

5. ASSISTANCE TO PUBLIC SECTOR AND OTHER UNDERTAKING: Under this head<br />

the following Federations are included :-<br />

(a) MIZOFED<br />

(b) Consumer Cooperative<br />

(a) MIZOFED: MIZOFED is set up during 1982. It is the largest Marketing State Level<br />

Organisation existing in the State.<br />

MIZOFED Ltd. undertook the distribution of Petroleum Product (POL) and LPG in the<br />

State as an Agent of both IOC (AOD) and IOC (MD). For the successful operation with<br />

efficient management the Govt. deputed departmental Officers to MIZOFED. To meet the<br />

part of the establishment costs and enhance the lifting and distribution POL and LPG to<br />

meet the demand of public, infusion of more fund is required. The following is the proposed<br />

fund for MIZOFED during <strong>2006</strong> – <strong>2007</strong>.<br />

a) GIA/Managerial Subsidy - Rs. 25.02 lakh<br />

b) Procurement of POL - Rs. 20.00 lakh<br />

c) Procurement of LPG - Rs. 5.00 lakh<br />

TOTAL - Rs. 50.00 lakh<br />

(b) Consumer Cooperative: Primary Consumer Cooperative is playing a significant role<br />

in the rural economy. They run Consumer Stores and sold daily essential commodities at a<br />

considerably reasonable rates by preventing exploitation by the powerful middlemen and<br />

check the high prices in open market in the rural areas. They maintain full time paid<br />

Secretary and the Manager and procured the essential items from the authorized<br />

Distributors and Transport to the very location of the societies through a rough road. For<br />

the above purposes they need more assistances for smooth running of the societies.<br />

Therefore, the following assistance is proposed during the year <strong>2006</strong>-<strong>2007</strong>.<br />

a) GIA/Managerial - Rs. 2.50 lakh<br />

b) Transport Subsidy - Rs. 2.50 lakh<br />

TOTAL - Rs. 5.00 lakh


- 90 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

6. COOPERATIVE TRAINING AND EDUCATION :<br />

The followings are the Cooperative Union included under this head :-<br />

1) <strong>Mizoram</strong> State Cooperative Union (MSCU) Ltd.<br />

2) Lunglei District Cooperative Union (LDCU) Ltd.<br />

3) Chhimtuipui District Cooperative Union (CDCU) Ltd.<br />

1) <strong>Mizoram</strong> State Cooperative Union (MSCU) Ltd.: Started in the year 1975. This State<br />

Cooperative Union is engaged in activities like Publicity, Publication of Journal, holding of<br />

Seminars/Conference, Celebration of Cooperative Week besides imparting Cooperative<br />

Education and Training to all management members of the different Cooperative Societies<br />

in the State. The Junior Cooperative Training Centre (JCTC) is placed under MSCU with the<br />

aim of better Cooperative Education and Training.<br />

In order to have effective training & education, Cooperation Department badly needs<br />

a suitable corpus in one complex as already had by other Departments. The various<br />

committees constituted by the Govt. of India and National Council for Cooperative Training<br />

(NCCT) make a strong recommendation for establishment of Cooperative Campus for 14<br />

Cooperative Training Institutes with the financial help of Central Govt. and the NCUI, New<br />

Delhi. The NCUI had taken a step to set up a Corpus Fund of Rs.200 crore as 50:50 matching<br />

fund basis from Govt. of India and the NCUI to implement the scheme during 10 th Five Year<br />

Plan. All the States are to provide Corpus Fund to NCUI to raise at least 100 crore. Therefore<br />

Rs.2.00 lakh is provided in the Plan Fund.<br />

The following is the fund proposal for MSCU Ltd during the year <strong>2006</strong> – <strong>2007</strong>:-<br />

a) GIA/Training and Managerial - Rs. 44.50 lakh<br />

b) GIA/JCTC - Rs. 3.00 lakh<br />

c) Corpus Fund - Rs. 2.00 lakh<br />

TOTAL - Rs. 49.50 lakh<br />

2) Lunglei District Cooperative Union (LDCU) Ltd.: Registered during the year 1993.<br />

Its impart Cooperative Education/Training to members of Cooperative Societies of Lunglei<br />

District. The Cooperative Officers of the rank of ARCS is deputed to head management.<br />

The provision of fund allocation to LDCU for the year <strong>2006</strong>–07 is as follows :<br />

a) GIA/Training and Managerial - Rs. 11.00 lakh<br />

3) Chhimtuipui District Cooperative Union (CDCU) Ltd.: Registered during the year<br />

1993. It took the responsibility of providing Cooperative Education and Training to<br />

members of Cooperative Societies in the Chhimtuipui District.<br />

The following is the fund allocation to CDCU Ltd. for the year <strong>2006</strong> – <strong>2007</strong> :<br />

a) GIA/Training and Managerial - Rs. 10.00 lakh<br />

7. ASSISTANT TO OTHER COOPERATIVE SOCIETIES:<br />

1) Diary and Livestock Cooperative Societies: Under this head, MULCO is the leading<br />

State Level Cooperative Society. It is the federation of Primary Multi-Commodity Cooperative<br />

Societies. It procure milk from member Primary Multi-Commodity Societies and processed in<br />

the Chilling Machine and packed in half litre pocket and distribute them in Aizawl Town<br />

and its surrounding areas. Further, it distribute cow feed to the member Societies. One<br />

Cooperative Officer of the rank of ARCS Officer. To meet the salary etc. the following fund<br />

allocation is made for the year <strong>2006</strong> – <strong>2007</strong>.<br />

a) GIA/Managerial - Rs. 2.50 lakh


- 91 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(2) (a) Handloom and Weaving Cooperative Societies: Under this head MAHCO Ltd., is<br />

the leading Cooperative Societies in the State. It provides raw-materials to the member<br />

Primary Handloom and Weaving Cooperative Societies at a lower price and buy back their<br />

finished products and sold out to the public. Further, it distribute loom parts to the<br />

Societies at a lower prices. The top post is manned by a Cooperative Officer of the rank of<br />

DRCS.<br />

The fund proposed for the MAHCO Ltd., during <strong>2006</strong> – <strong>2007</strong> is as follows.<br />

a) GIA/Managerial - Rs. 4.00 lakh<br />

b) Raw Materials - Rs. 6.00 lakh<br />

c) C.S.S. Machinery - Rs. 5.00 lakh<br />

TOTAL - Rs. 15.00 lakh<br />

(b) Primary Handloom Society: In order to increase Handloom products in<br />

<strong>Mizoram</strong>, and feed the Apex Level Institution with a surplus products, the feeder Primary<br />

Handloom Cooperatives are to be strengthened first. Therefore Rs.5.00 lakh is provided in<br />

the Plan Fund for purchase of raw-materials and loom parts during this year.<br />

(a) G.I.A./Managerial - Rs. 5.00 lakh<br />

TOTAL - Rs. 5.00 lakh<br />

(3) Fruits and Vegetables Cooperative Societies: (a) Under this head <strong>Mizoram</strong> State<br />

Cooperative Fruit, Forestry and Vegetable Federation (MAFF) Ltd. at the Apex plays an<br />

important role. The Primary Cooperative Societies pertaining to fruits and vegetables<br />

growers, farmers and gardeners in all potentials areas have been organized and registered.<br />

The MAFF Ltd. supply them the required Agricultural input and procure their surplus<br />

produces whenever available and dispose off to the market.<br />

Govt. of <strong>Mizoram</strong> selected MAFF Ltd. as one of the dealers of the Agricultural Inputs.<br />

MAFF is lifting the fertilizers and sell it to the publics at reasonably cheaper rate. It may be<br />

mentioned that due to apprehension of famine in the year <strong>2007</strong> in <strong>Mizoram</strong> the farmers in<br />

the State are determined to undertake farming/cultivation at a larger scale during the year<br />

<strong>2006</strong>. This will require supply of more fertilizer to the farmers which needs more funds<br />

during this year of <strong>2006</strong> – <strong>2007</strong>. Further, one Assistant Registrar of Cooperative Societies is<br />

deputed to MAFF as Manager-cum-Account Officer. The following is the fund allocation to<br />

MAFF during <strong>2006</strong> – <strong>2007</strong>.<br />

a) GIA/Managerial Subsidy - Rs. 3.00 lakh<br />

b) Procurement of Fertilizers - Rs. 12.00 lakh<br />

TOTAL - Rs. 15.00 lakh<br />

(b) Primary Agriculture Coop. Society: In order to increase Farming Production<br />

Capacity in <strong>Mizoram</strong> and to fight against the onslaught of the coming femine, Primary<br />

Agriculture Cooperative Societies are to be strengthened first. At present there are 246<br />

Primary Farming Cooperative Societies in <strong>Mizoram</strong>. Therefore Rs.5.00 lakh is provided for<br />

Primary Agriculture Cooperative Societies in the form of GIA.<br />

(a) GIA/Managerial - Rs. 5.00 lakh<br />

TOTAL - Rs. 5.00 lakh


- 92 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(4) Pig Producers Cooperative Societies: Under this head <strong>Mizoram</strong> Pig Producers’<br />

Cooperative Federation (PIGFED) Ltd., is in apex level in State. Registered during the year<br />

1988–89 and engaged in the activities for the development of Piggery Cooperative Societies.<br />

The federation established one (1) Pig Breeding Farm and producing better type of pigs. It<br />

provides good quality of piglets to Primary Pig Farming Cooperative Societies at subsidized<br />

rate. Further, PIGFED Ltd, render technical and Medical Support to the pig farmers. For the<br />

construction of approach road in the Pig Breeding Farm, it needs financial assistance. The<br />

allocation during <strong>2006</strong> – <strong>2007</strong> is as follows.<br />

a) GIA/Farmer Development - Rs. 1.00 lakh<br />

TOTAL - Rs. 1.00 lakh<br />

(5) Fishery Cooperative Societies: Under this head, there are 71 nos. of Primary Fishery<br />

Cooperative Societies which are all affiliated to ZOFISFED. The State Level Federation, this<br />

federation procure fish directly from the Primary Fishery Cooperative Societies and sold it<br />

to the markets, fund allocation for the ZOFISFED during <strong>2006</strong> – <strong>2007</strong> is as under:<br />

a) GIA/Procurement of fishes - Rs. 1.00 lakh<br />

TOTAL - Rs. 1.00 lakh<br />

(6) Women Cooperative Societies: This WOMENFED Ltd., is the apex Women<br />

Cooperative Federation Ltd., plays a significant role in women upliftment by imparting<br />

affective training in different types of trades. Such as Tailoring, Knitting and Weaving etc.,<br />

to boost up income of women of the concern families. The following is the fund allocation<br />

for WOMENFED during <strong>2006</strong> – <strong>2007</strong>.<br />

a) GIA/Managerial - Rs. 1.00 lakh<br />

b) Raw Materials - Rs. 1.00 lakh<br />

TOTAL - Rs. 2.00 lakh<br />

(7) (a) Sericulture Farming Cooperative Societies: This is the apex Sericulture<br />

Cooperative Society in the State. Its main activity is to procure cocoons from its members<br />

Societies as well as from individual farmers and sold out the same through the department<br />

of Sericulture and thus boost up the Sericulture Farming in the State. It is registered in the<br />

year 1999 and member of affiliating Societies stands 24 Societies. The fund allocation<br />

during <strong>2006</strong> – <strong>2007</strong> as follows :<br />

a) GIA/Procurement of cocoon - Rs. 2.00 lakh<br />

TOTAL - Rs. 2.00 lakh<br />

(b) Primary Coop. Sericulture Societies: To foster the activity and working of<br />

Primary Cooperative, Sericulture Societies which are the backbone of the affiliating society<br />

to attain self sufficiency and upliftment of the rural people. Therefore, Rs.1.00 lakh is<br />

provided in the Plan Fund for Primary Sericulture Farming during <strong>2006</strong>-<strong>2007</strong> in the form of<br />

GIA to increase their production capacity.<br />

(a) GIA/Managerial - Rs. 1.00 lakh<br />

TOTAL - Rs. 1.00 lakh


INTRODUCTION:<br />

- 97 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

TRADE & COMMERCE<br />

The Department of Trade & Commerce is allotted the following business by the<br />

Government of <strong>Mizoram</strong> (Allocation of Business) Rules, 1987.<br />

1) Promotion and regulation of trading in <strong>Mizoram</strong>,<br />

2) Agricultural Marketing,<br />

3) Regulated Markets,<br />

4) Establishment of Market Yards and Trade Centres,<br />

5) Border Trades,<br />

6) Trading by Non-Tribal and<br />

7) Inter-State trades.<br />

Administration and management of agricultural marketing was handed over by<br />

Central Government to the State Government from 1.4.1992. Hence, all the expenditure<br />

incurred for implementation of the agricultural marketing have to be borne by the State<br />

Government.<br />

In pursuance of the State Government Allocation of Business Rules, management and<br />

administration of Markets have been transfered from Land Revenue & Settlement<br />

Department and LAD to Trade & Commerce Department. As such additional fund is much<br />

required for construction of Garbage Bins, Dumping Grounds and other infrastructural<br />

facilities.<br />

As 5 (five) new Districts have been created by the Government of <strong>Mizoram</strong> in<br />

addition to three existing Districts, creation of additional Offices with new post will be<br />

necessary for the District Head-quarters, and additional fund is required.<br />

The Central and the State Governments have been taking all possible steps for<br />

operationalisation of Indo-Myanmar Border Trade at Champhai-Rih Sector. Hence, it is<br />

required to provide fund for operation of Indo-Myanmar Border Trade. Moreover, the State<br />

Government is taking every possible step for operation of Indo-Bangladesh Border Trade at<br />

Kawrpuichhuah, Tlabung, hence it is required to provide sufficient fund for this.<br />

SCHEME-WISE DESCRIPTION<br />

I. AGRICULTURE MARKETING:<br />

Due to recent enactment of the <strong>Mizoram</strong> State Agricultural Produce Marketing<br />

(Regulation) Act, 1996 and the Rules, 1996 thereunder, Indo-Myanmar Border Trade<br />

(Champhai Rih-Sector) which is already Inaugurated in 2004. State Master Plan prepared by<br />

Directorate of Marketing and Inspection, Government of India, already approved by the State<br />

Government, transfer of administration and management of Markets from Land Revenue &<br />

Settlement Department and LAD to Trade & Commerce Department, creation of additional<br />

Districts Offices and for giving priority to market, Agricultural Marketing for the upliftment<br />

of the mass rural farmers, the Department is required to be strengthened.<br />

1. Marketing Officer:- The Department of Trade & Commerce being a developing<br />

Department is having more and more heavy work loads especially Management &<br />

Administration of all markets in <strong>Mizoram</strong>. Moreover, District Market Offices have been<br />

opened at Lunglei w.e.f. 22.2.2002 and at Champhai w.e.f. 28.2.2003. Two Marketing Officers


- 98 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

have been posted as District Marketing Officer (DMO) at the two newly created District<br />

Offices. Hence, the Department is having only one Marketing Officer in the Directorate to<br />

look after Management of all the Markets within Aizawl District. As market is deeply as well<br />

as openly concerned with the public, frequent visits of markets to solve the day to day<br />

problems faced by public is absolutely necessary. Besides, there are many duties like<br />

allotment of seats in the markets, petty complaints from sellers as well as customers which<br />

requires intervention of Department Officer especially Marketing Officers.<br />

Secondly, the Department of Trade & Commerce is responsible for Marketing of<br />

surplus agricultural products of <strong>Mizoram</strong>. For this purpose the Department used to detail<br />

officers especially Marketing Officers to various parts of <strong>Mizoram</strong> to conduct survey and<br />

verification and to make a better scope for marketing of these products.<br />

In this regard it may be mentioned that it has become a heavy burden for the<br />

Department with a handful of officers to carry on the task of Marketing of Agricultural<br />

Products of <strong>Mizoram</strong>.<br />

In view of the above, creation of at least 2 (two) posts of Marketing Officers is<br />

absolutely required in the scale of pay of Rs. 6500 - 10500 p.m. and hence proposed.<br />

2. Computer Operator:- As introduction of modern technology like Computer is fast<br />

catching up, even now several Departments in <strong>Mizoram</strong> have Computers. This Department<br />

also has installed Computers to facilitate official works. As such, creation of 1 (one) post of<br />

Computer Operator in the scale of pay Rs. 5000 - 8000/- p.m. is urgently required and hence<br />

proposed.<br />

Proposal for new posts<br />

Sl. Name of Post & Scale No. of Posts Fund Requirement in<br />

No. of Pay Proposed a token provision<br />

1. Marketing Officer (Rs. 6500 – 10500/-) 2 Rs. 0.80 lakh<br />

2. Computer Operator (Rs. 5000 – 8000/-) 1 Rs. 0.70 lakh<br />

TOTAL 3 Rs. 1.50 lakh<br />

Existing Posts under Plan<br />

Sl. Name of Post & Scale No. of Existing Fund Requirement<br />

No. of Pay Posts<br />

1. Marketing Officer (Rs. 6500 – 10500/-) 2 Rs. 4.00 lakh<br />

2. Assistant (Rs. 5500 – 9000/-) 1 Rs. 2.00 lakh<br />

3. UDC (Rs. 5000 – 8000/-) 2 Rs. 2.50 lakh<br />

4. LDC (Rs. 4000 – 6000/-) 2 Rs. 2.70 lakh<br />

5. Driver (Rs. 3040 – 4590/-) 1 Rs. 1.30 lakh<br />

6. Grade IV (Rs. 2650 – 4000/-) 2 Rs. 1.00 lakh<br />

TOTAL 10 Rs. 13.50 lakh<br />

GRAND TOTAL 13 Rs. 15.00 lakh<br />

Note : The Scale of pay mentioned above are as per the 5 th Pay Commission<br />

Recomendation.


- 99 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The financial outlay under Agriculture Marketing is as follows :<br />

1) Salary and T.E.: A sum of Rs. 15.00 lakh is approved for Salary and Rs. 2.50 lakh is<br />

approved for Travelling Expenses and Rs. 3.00 lakh for Medical Treatment with total amount<br />

of Rs. 20.50 lakh during <strong>2006</strong> - <strong>2007</strong>.<br />

2) Office Expenses: A sum of Rs. 18.00 lakh is approved for Office Expenses.<br />

3) Motor Vehicle: A sum of Rs. 2.30 lakh is approved for maintenance of 3(three)<br />

Departmental Trucks during 2005 - <strong>2006</strong>.<br />

4) Promotion & Regulation of Markets: Before the legislation of the <strong>Mizoram</strong> State<br />

Agricultural Produce Marketing (Regulation) Act, 1996 and the Rules thereunder,<br />

management of Markets and its administration are done by different Departments and<br />

Institution like Land Revenue & Settlement Department, Lacal Administration Department<br />

and the Village Councils in their respective jurisdictions. In the meantime, Agricultural<br />

Department constructed markketsheds along the roadside of the National Highway. To<br />

remove this duplicacy, management and administration of markets have now been placed<br />

under one Department i.e. Trade & Commerce Department as per the Government of<br />

<strong>Mizoram</strong> (Allocation of Business) Rules, 1987.<br />

5) Minor Works and Establishment and Operationalisation of Border Trades: The 2 nd<br />

Indo-Myanmar Border Trade Point at Zokhawthar - Rih Sector was opened on 31.1.2003 by<br />

Brig. Gen. Pye Sone. The Composite Land Customs Station at Zokhawthar is under<br />

construction by BRO. Trade & Commerce Deparrtment has also acquired 129 acres of land<br />

at Khawnuam (Melbuk) which is 8 km from Zokhawthar, for establishment of Indo-Myanmar<br />

Border Trade Township. Government of India & Union of Myanmar is also actively<br />

considering construction of Zokhawthar – Rih, Falam - Kalemyo road construction. These<br />

developments shall promote the ‘Look East’ policy of the Government of India and it is<br />

expected that the traders of Moreh - Tamu Border Trade Sector may shift their business<br />

operation to Zokhawthar - Rih Sector due to the Law & Order problems in Manipur.<br />

The Government is also setting up Border Trade Center at Kawrpuichhuah, Tlabung<br />

and the funds have been transferred to PWD for construction of infrastructures. <strong>Mizoram</strong> is<br />

promoting export of Bamboo, Ginger, Chillies and other products to Bangladesh through<br />

this route. There has been Exchange of Trade Delegations between <strong>Mizoram</strong> and Bangladesh.<br />

The economy of the state shall be boost up once these Border Trade between<br />

Myanmar & Bangladesh is put in active operation. However, these projects are still<br />

handicapped due to absence of certain infrastructures which are proposed below for taking<br />

up during <strong>2006</strong> - <strong>2007</strong>. Besides, this Department looks after various markets of the State. As<br />

such, the following works are proposed to be taken up during <strong>2006</strong> - <strong>2007</strong>.<br />

PRIORITY WISE SCHEDULE OF WORKS (WITH JUSTIFICATION)<br />

<strong>APPROVED</strong> TO BE TAKEN UP DURING <strong>2006</strong> - <strong>2007</strong><br />

1. Construction of garbage bins for various markets transferred from LAD and MAMCO<br />

Ltd.<br />

2. Electrification of market buildings.<br />

(For most cases there are no provisions for garbage bins and internal electrifications<br />

of the market buildings constructed by LAD under NLCPR and IDSMT Schemes and<br />

in those markets constructed by MAMCO Ltd. under MM-III of Technology Mission.<br />

Recently, 11 (eleven) markets transferred to this Department viz. Lengpui, Kolasib


- 100 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Diakkawn, Ramhlun North, Bungkawn, Bethel Veng, Champhai, Zotlang, Champhai,<br />

Serkawn, Ngaizel, Chanmari, Lungdai, Kanhmun do not have garbage bins and<br />

internal electrifications. It is also anticipated that another 7 (seven) markets viz.<br />

Mamit, Zemabawk, Zemabawk North, Serchhip, Mission Vengthlang, Kolasib Venglai<br />

and Tlabung which are near completion would be transferred shorthly.<br />

3. Construction of market boundary walls - (All departmental markets are located in<br />

prime locations and hence, due to their commercial importance and high land<br />

valuation, market lands are prone to encroachment. Therefore, for protection against<br />

encroachments, market lands of Lunglei, Bawngkawn, Champhai, Kolasib Venglai and<br />

Mission Veng are proposed to be provided with boundary walls.<br />

4. Construction of market Staff Quarters, (all market staff quarters presently under<br />

occupation are in dilapidated state, unsafe and unfit for human habitation. Market<br />

Staff Quarters of New Market, Bawngkawn, Lunglei and Vairengte are proposed for<br />

construction).<br />

5. Repair and renovations of market buildings. (Revenue collected from markets in the<br />

form of rents and fees constitute a major portion of the departmental income. As<br />

such, due importance have been given for their maintenance. New Market at Aizawl,<br />

Vairente Market, Lunglei Super Market, Bawngkawn Market and Mission Veng Market<br />

requires to be renovated).<br />

6. Construction of DMO Quarters and Staff Quarters at Kolasib. ( Kolasib District is the<br />

economic lifetime of the State. This department which deals in marketing of<br />

Agricultural produces have therefore to play important roles. DMO Office had been<br />

constructed during 2004-2005 and it is ready for inauguration and subsequent<br />

operationalisation. DMO Quarters and Staff Quarters have to be provided merely as<br />

an incentive but for actual promotion of the subjects of Trade & Commerce).<br />

7. Repair and renovation of departmental buildings at Aizawl, Lunglei and Champhai.<br />

8. Extension of Market building at Bilkhawthlir.<br />

9. Widening, metalling and black topping of approach road to Vairengte Market.<br />

(Vairengte Market is the most important terminal market of the State. Traders turn<br />

out in large numbers practically flooding the market with men and materials. But<br />

due to bad approach road and inadequated internal road, there is great difficulty of<br />

movement. Hence, it has been approved that the approach road be upgraded).<br />

10. Metalling and black topping of apprach road to Garbage Dumping ground at Sihhmui<br />

(A garbage dumping ground has been constructed at Sihhmui but the approach road<br />

to it is impossible to be negotiated by heavy laden trucks due to its bad condition.<br />

Hence, for actual utilization, a good road have to be provided).<br />

11. Provision of piped water supply with storage facilities for various markets - (Due to<br />

the pressing need and requirement of the public, it has become inevitable to provide<br />

piped water supply with adequate storage facilities in the markets. The need to<br />

provide safe drinking water and to adequately meet the requirement for sanitary and<br />

hygenic maintenance to public urinals and toilets cannot be underminded. To start<br />

with, proposal has been made for New Market, Bawngkawn, Ngaizel, Vaivakawn and<br />

Lunglei Super Market and Bawngkawn Market).<br />

Hence, Rs. 56.00 lakh is approved under Minor Works during <strong>2006</strong> - <strong>2007</strong>.<br />

6) Wages: There are 19 nos. of M.R. employees and Rs. 12.20 lakh is approved during<br />

<strong>2006</strong> - <strong>2007</strong>.


- 101 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

7) Other Charges: During <strong>2006</strong>–07, a sum of Rs. 30.50 lakh is approved for disposal of<br />

markets garbages and other miscelleneous expenditure. As always required in public place<br />

such as markets, the Department has proposed for provision of safe drinking water in all<br />

major markets, maintenance of sanitary latrines and public urinals. Due to transfer of<br />

recently constructed markets from LAD and MAMCO Ltd. the work and responsibility has<br />

increased considerably. For efficient management and administration of these markets, a<br />

substantial increase in budget provision has been approved.<br />

Thus the total approved financial outlays under Direction and Administration is as<br />

follows: -<br />

II. ADMINISTRATION:<br />

Sl. No. Particulars Fund Requirement<br />

during <strong>2006</strong> - <strong>2007</strong><br />

1. Salary Rs. 15.00 lakh<br />

2. Wages Rs. 12.20 lakh<br />

3. M.R. Rs. 3.00 lakh<br />

4. T.E. Rs. 2.50 lakh<br />

5. Office Expenses Rs. 18.00 lakh<br />

6. Minor Works / Maintenance Rs. 56.00 lakh<br />

7. Motor Vehicle Rs. 2.30 lakh<br />

8. Other Charges Rs. 30.50 lakh<br />

TOTAL Rs. 140.50 lakh<br />

1) Setting up of District Offices: The function of Trade & Commerce Department like,<br />

Promotion and Regulation of Trading in <strong>Mizoram</strong> and improvement of Agricultural<br />

Marketing and its infrastructure cannot be confined in the State Capital alone. It may also be<br />

difficult and ineffective to administer from Headquarters i.e. Directorate. For smooth,<br />

efficient and effective administration and management, District Offices are opened at the<br />

following centres: -<br />

1) Champhai 2) Lunglei<br />

Also steps have been taken to open another DMO Office at Kolasib for which Office<br />

building has been constructed.<br />

The approved break-up of expenditure to be incurred under District Offices is as<br />

follows: -<br />

a) Office Expenses: A sum of Rs. 6.00 lakh is approved for Office Expenses (O.E.) for<br />

Annual Plan <strong>2006</strong> - <strong>2007</strong>.<br />

b) Advertisement: For meeting Advertisement charges of market auction, garbage<br />

disposal etc., a sum of Rs. 0.50 lakh is approved during <strong>2006</strong> - <strong>2007</strong>.<br />

Sl. No. Particulars Fund Requirement for <strong>2006</strong> - <strong>2007</strong><br />

a) Office Expenses Rs. 6.00 lakh<br />

b) Advertisement Rs. 0.50 lakh<br />

TOTAL Rs. 6.50 lakh


III. GRADING AND QUALITY CONTROL:<br />

- 102 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1) Grading and Standardisation: The importance of Grading and Standardisation has<br />

not received so much attention in <strong>Mizoram</strong>. The importance of Grading and Standardisation<br />

are summarised as follows: -<br />

a) Protection of the interest of the sellers and buyers by introducing some<br />

quality in grade and standards.<br />

b) Facilitation of quoting the quality of the products with uniform grades and<br />

standards between distant places.<br />

c) To give better chance for those who produce better quality and for those who<br />

can produce more in future.<br />

The benefits of standardisation and Grading are as follows: -<br />

a) It facilitates uniformity in fixation of prices of the commodities.<br />

b) It facilitates collection of the same quality of products.<br />

c) It facilitates management of stocking or storage facilities.<br />

d) It facilitates arrangement of fund for procurements and it makes the dealers<br />

more reliable.<br />

e) The intended sellers and interested purchasers can contact each other from<br />

distant places through letters, wireless, telegraphs, telephone or Fax.<br />

For purchase of Grading Laboratory and standards weight and measure<br />

Instruments and to educate and motivate the producers, a sum of 1.00 lakh is<br />

approved.<br />

2) Quality Control: The need of Quality control has no deep root in the mind of<br />

producers in <strong>Mizoram</strong>. For this reason, the Agricultural Produces in <strong>Mizoram</strong> are regarded<br />

as inferior in quality. As such, the producer cannot fetch better prices from their produces<br />

due to lack of Quality Control. Some of the producers may think Quality Control is meant<br />

for the consumers only, but this is not so. Quality Control is also beneficial to the producers<br />

and consumers both. Thus, it is necessary to educate and motivate the producers in respect<br />

of Quality Control.<br />

A sum of Rs. 1.00 lakh is approved for imparting awareness of Quality Control.<br />

Hence, the approved financial outlay under Grading & Quality Control is as<br />

follows: -<br />

Sl. No. Particulars Fund Requirement for <strong>2006</strong>-07<br />

1. O.E. Rs. 1.00 lakh<br />

Total Rs. 1.00 lakh


- 103 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

IV. SHARE CAPITAL AND ASSISTANCE TO PUBLIC SECTOR AND OTHER<br />

UNDERTAKINGS:<br />

1) Share Capital and Assistance to MAMCO Ltd.: The Government of <strong>Mizoram</strong><br />

constituted “The <strong>Mizoram</strong> Agricultural Marketing Corporation Limited (MAMCO)” in 1993<br />

with share capital of Rs. 10.00 crore to take up marketing of marketable surpluses of<br />

<strong>Mizoram</strong> Agricultural products outside the State. Trade & Commerce Department is nodal<br />

Department of this Corporation. An amount to the tune of Rs. 52.00 lakh is approved during<br />

<strong>2006</strong> - <strong>2007</strong> to be disbursed as share capital and assistance to MAMCO Ltd.<br />

The approved financial break-up under Share Capital and Assistance to Public Sector<br />

undertaking is as follows: -<br />

Sl. No. Particulars Fund Requirement for <strong>2006</strong> - <strong>2007</strong><br />

1. Share capital to Public Rs. 52.00 lakh<br />

Sector Undertaking<br />

2. Assistance to PSU<br />

TOTAL : Rs. 52.00 lakh<br />

<strong>APPROVED</strong> FINANCIAL OUTLAY <strong>2006</strong> - <strong>2007</strong><br />

Sl. No. Particulars Fund Requirement for <strong>2006</strong> - <strong>2007</strong><br />

1. Agril. Marketing Rs. 140.50 lakh<br />

2. Administration Rs. 6.50 lakh<br />

3. Grading & Quality Control Rs. 1.00 lakh<br />

4. Share Capital and Assistance Rs. 52.00 lakh<br />

to MAMCO Ltd.<br />

TOTAL Rs. 200.00 lakh


- 106 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

RURAL DEVELOPMENT<br />

A. Approved Tenth Five Year Plan Outlay 2002 - 07 : Rs. 8441.80 lakh<br />

B. Approved Annual Plan outlay for 2005 - 06 : Rs. 1990.00 lakh<br />

C. Approved Annual Plan Outlay for <strong>2006</strong> - 07 : Rs. 2080.00 lakh<br />

The following schemes are approved to be taken up during the Annual Plan <strong>2006</strong> –<br />

<strong>2007</strong>: -<br />

2501 - Special Programme for Rural Development<br />

06 - Self Employment Programme<br />

800 - Other Expenditure<br />

1. SLMC : Rs. 38.85 lakh<br />

2. DWCRA : Rs. 73.27 lakh<br />

3. SIRD : Rs. 26.00 lakh<br />

4. DRDA(Admn) : Rs. 95.00 lakh<br />

5. SGSY : Rs. 100.12 lakh<br />

6. IT : Rs. 3.55 lakh<br />

7. IWDP : Rs. 0.21 lakh<br />

-----------------------<br />

Total : Rs.337.00 lakh<br />

============<br />

2505 - Rural Employment<br />

8. IAY : Rs. 105.00 lakh<br />

9. SGRY : Rs. 261.00 lakh<br />

------------------------<br />

Total : Rs. 366.00 lakh<br />

=============<br />

2515 - Other Rural Development Programme<br />

10. Direction & Admn : Rs. 102.26 lakh<br />

11. Block Level Admn : Rs. 454.60 lakh<br />

12. PMGY(GA) : Rs. 626.00 lakh<br />

4515 - Co. on ORDP<br />

13. Rural Communication : Rs. 0.10 lakh<br />

14. Housing for Project Staff : Rs 29.04 lakh<br />

15. Social Education : Rs. 165.00 lakh<br />

--------------------------<br />

Total : Rs. 1377.00 lakh<br />

-----------------------------<br />

GRAND TOTAL : Rs. 2080.00 lakh<br />

=============<br />

BRIEF DESCRIPTION OF THE SCHEME<br />

1. Direction, SLMC & IAC: The total fund earmarked for maintenance of 13 Officers<br />

and Staff during the Tenth Five Year Plan 2002–07 is Rs. 140.00 lakh. Approved outlay for<br />

2005–06 was Rs. 38.85 lakh and the proposed outlay for maintenance of Officers and Staff<br />

under SLMC & IAC in the approved Annual Plan during <strong>2006</strong>–07 is Rs.38.85 lakh.


- 107 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. Direction & Administration DWCRA (Development of Women and Children in Rural<br />

Areas): Maintenance of 50 existing staff under DWCRA is fully borned by the State<br />

Government and Rs. 73.27 lakh was approved outlay in the Annual Plan 2005-06. Tentative<br />

outlay for maintenance of DWCRA staff during the 10 th Five Year Plan Period is Rs. 290.00 lakh<br />

and Rs. 73.27 lakh is approved for maintenance of DWCRA staff in the Annual Plan <strong>2006</strong>-07.<br />

3. Direction and Administration, State Institute of Rural Development (SIRD):<br />

Maintenance of (5)five Core Faculties under SIRD is fully borne by Government of India<br />

while maintenance of other Officers and Staff is borne by Government of India and the State<br />

Government in the ratio of 50:50. During the Annual Plan 2005 – 06, Rs. 21.24 lakh for<br />

operation of SIRD and Rs. 5.00 lakh for operation of Extension Training Centre (ETC) at<br />

Pukpui, which comes to a total of Rs. 26.24 lakh was approved under Plan Fund for<br />

maintenance of Staff under SIRD and ETC as State Matching Share. Rs. 80.00 lakh is<br />

earmarked during the Tenth Five Year Plan period. Rs.21.23. lakh for operation of SIRD and<br />

Rs. 5.00 lakh for operation of Extension Training Centre (ETC) at Pukpui, Lunglei District<br />

totaling Rs. 26.00 lakh is approved in the Annual Plan <strong>2006</strong> – 07 as State Matching Share.<br />

4. DRDA Administration: There are 8 (eight) numbers of DRDA in <strong>Mizoram</strong> and the<br />

Government of India has allocated separate fund for DRDA Administration on a cost sharing<br />

basis between the Central and State in the ratio of 75:25. Rs. 400.00 lakh is earmarked for<br />

DRDA Administration during the Tenth Five Year Plan. During the Financial Year 2005 - 06<br />

Rs.84.00 lakh was approved under Plan Fund for DRDA Administration as State matching<br />

share and Rs. 95.00 lakh is approved for DRDA Administration under Plan Fund as State<br />

Matching Share during Annual Plan <strong>2006</strong> - 07.<br />

5. Swarnajayanti Gram Swarozgar Yojana (SGSY): With the launching of SGSY, several<br />

Centrally Sponsored Schemes like IRDP, TRYSEM, SITRA and GKY were amalgamated in<br />

SGSY. SGSY Scheme is funded by the Central and State Government in the ratio of 75:25.<br />

Rs.100.10 lakh was approved outlay in the Annual Plan 2005 - 06 as State Matching Share<br />

for the Scheme. Rs. 150.00 lakh is earmarked during the Tenth Five Year Plan period and<br />

Rs. 100.12 lakh is approved for State Matching Share under SGSY in the Annual Plan <strong>2006</strong>-07.<br />

6. Information Technology (IT): In pursuance of the recommendation of National Task<br />

Force, Rs. 20.00 lakh is earmarked during the Tenth Five Year Plan for effective monitoring and<br />

internal audit of Centrally sponsored Schemes in <strong>Mizoram</strong>. During the financial year 2005–06, Rs.<br />

3.55 lakh was approved outlay in the Annual Plan for Information Technology and Rs. 3.55 lakh<br />

is earmarked in the approved Annual Plan <strong>2006</strong>-07.<br />

7. Integrated Wasteland Development Programme: The Integrated Wasteland<br />

Development Programme (IWDP) has been implemented with the objective of developing<br />

wasteland/degraded land keeping in view the capability of land, site - condition and local needs<br />

as well as promoting the overall economic development and improving the socio-economic<br />

condition of the people living in the project areas. Under IWDP, The State has to meet 10% of<br />

Central Share. To meet these, a token provision of Rs. 0.21 lakh is approved during <strong>2006</strong>-07.<br />

8. Indira Awaas Yojana (IAY): The objective of IAY is to provide assistance for<br />

construction of houses / dwelling units for rural poor below the poverty line. The fund for<br />

construction of houses under IAY is shared by Central and State at the ratio of 75:25. Under<br />

the scheme, 20 % of the total funds available may be utilized for upgradation of the existing<br />

houses. Out of the total outlay of the Tenth Five Year Plan i.e. Rs. 371.00 lakh, an outlay of<br />

Rs.76.00 lakh was approved under IAY in the Annual Plan 2005-06 and Rs.105. 00 lakh is<br />

approved for the Scheme as State Matching Share in the Annual Plan <strong>2006</strong>-07.


- 108 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

9. Sampoorna Gramin Rozgar Yojana (SGRY): With a view to ensure development of<br />

village infrastructure in a planned manner, the Government of India have decided to merge<br />

the two Rural Employment Schemes viz. Employment Assurance Schemes (EAS) and Jawahar<br />

Gram Swarozgar Yojana (JGSY) into a single scheme viz. Sampoorna Gramin Rozgar Yojana<br />

(SGRY) with the objective of providing additional wage employment in the rural areas along<br />

with creation of durable community, social and economic assets and infrastructure<br />

development in these areas in a planned manner. The fund for implementation of the<br />

Scheme is shared between Central and State at the ratio of 75:25. The total fund earmarked<br />

during the Tenth Five Year Plan is Rs. 1150.00 lakh. The approved outlay under SGRY in the<br />

Annual Plan 2005-06 was Rs. 261.00 lakh and Rs. 261.00 lakh is approved in the Annual<br />

Plan <strong>2006</strong>-07 under SGRY as State Matching Share.<br />

10. Direction & Administration: Under this scheme, there are as many as 36 numbers of<br />

posts, out of which 31 numbers are presently filled up. An Engineering Wing has been created<br />

in the Directorate to solve the ever increasing technical complexity of Rural Development<br />

schemes. The Wing has been made functional from 2004-05 and is being manned by one<br />

Executive Rural Engineer (ERE), 2 Assistant Rural Engineers (ARE) and other Technicians.<br />

Out of the total outlay of Rs. 394.00 lakh earmarked during the Tenth Five Year Plan<br />

(2002 – 07), the total outlay approved during 2005 – 06 was Rs. 83.20 lakh and the total<br />

outlay approved under Direction & Administration for the Annual Plan <strong>2006</strong>–07 is Rs.102.26<br />

lakh as indicated in the table below: -<br />

Sl. No. Detailed Head Amount (Rs. in lakh)<br />

1. Salary 51.25<br />

2. Wages 7.51<br />

3. Medical Treatment 8.00<br />

4. Traveling Expenses 8.00<br />

5. Office Expenses 20.00<br />

6. Publication 3.00<br />

7. O.C. 2.50<br />

8. Advertising 1.00<br />

9. Motor Vehicles 1.00<br />

TOTAL 102.26<br />

11. Block Level Administration: There are at present 404 numbers of posts under the<br />

Block Level Administration scheme, out of which 234 posts are being filled up.<br />

The total outlay during the Tenth Plan Period is Rs. 2278.20 lakh. During the<br />

Annual Plan 2005–06, an outlay of Rs. 337.20 lakh was approved and the total outlay of<br />

Rs. 337.20 lakh is earmarked for the approved Annual Plan <strong>2006</strong>-<strong>2007</strong> as the break-up<br />

indicated below: -<br />

Sl. No. Detailed Head Amount (Rs. in lakh)<br />

1. Salary 355.60<br />

2. Wages 8.40<br />

3. Travelling Expenses 30.00<br />

4. Office Expenses 40.00<br />

5. Medical Treatment 15.00<br />

6. Minor Works 3.10<br />

7. Other Charges 2.60<br />

TOTAL 455.60


- 109 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

12. Rural Housing: This scheme provides shelters for rural poor families and also<br />

assists in the healthy development of their habitat. There are two types of assistance,<br />

namely - (i) New Construction of houses; and (ii) Upgradation of Kutcha houses into<br />

pucca/semi pucca houses. Besides these, this scheme also provides assistance for the<br />

development of their habitat in the form of construction of internal roads, drainage system,<br />

sanitary latrines, good drinking water facilities and development of plantation. For new<br />

construction of houses, each beneficiary is assisted with an amount of Rs. 27,500/- and with<br />

Rs. 12,500/- for upgradation.<br />

The total outlay for the Tenth Plan period is Rs. 2828.00 lakh. The approved outlay<br />

for the Annual Plan 2005 – 06 was Rs. 626.00 lakh and Rs. 626.00 lakh is approved for the<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong> as indicated below: -<br />

Sl.<br />

No.<br />

Items<br />

Financial<br />

(Rs. in lakh)<br />

Physical<br />

(In No.)<br />

1. New Construction 440.00 1600<br />

2. Upgradation 125.00 1000<br />

3. Infrastructure 61.00 150<br />

TOTAL 626.00 2750<br />

13. Rural Communication: Due to the inability of State Public Works Department to<br />

cover the whole of the state, the Department had constructed a number of roads in the rural<br />

areas. Due to constraint of fund, the work has been discontinued for some years. A token of<br />

Rs. 0.10 lakh was provided during the Annual Plan 2005 – 06 and Rs. 0.10 lakh is earmarked<br />

for the approved Annual Plan <strong>2006</strong>-07.<br />

14. Housing for Project Staff: Under this scheme, construction and repair of office and<br />

staff quarters in the R.D. Blocks are mainly done. An outlay of Rs. 2.50 lakh was approved<br />

for carrying out repair and renovation works of offices and staff quarters during the Annual<br />

Plan 2005 – 06 and a total outlay of Rs. 29.04 lakh is earmarked in the approved Annual<br />

Plan <strong>2006</strong>-07 for the scheme.<br />

15. Social Education: Under this scheme, construction of Community Halls and<br />

Playgrounds are mainly undertaken. The life of the people of <strong>Mizoram</strong> revolves around the<br />

Community. Public meeting places play an integral and important part in the life of the Mizo<br />

Community. Construction of Playgrounds also form a catalyst in shaping the socio-moral<br />

fibre of the youth. Hence, this scheme assumes importance.<br />

During the 9 th Plan period, 38 numbers of Community Halls were left unfinished due<br />

to paucity of funds. For completion of the unfinished Halls, the total outlay of Rs. 100.00<br />

lakh was approved for Annual Plan 2005–06 and Rs. 50.00 lakh is earmarked for the<br />

approved Annual Plan <strong>2006</strong>–07. Further, an outlay of Rs. 115.00 lakh is also earmarked for<br />

implementation of BAFFACOS during the approved Annual Plan <strong>2006</strong>–07.


Introduction:<br />

- 113 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

LAND REFORMS<br />

Since <strong>Mizoram</strong> is non-land recorded State where jhuming is widely practiced, it is<br />

vitally important to take measures for allotment of lands to the inhabitants for permanent<br />

cultivation and ownership of land. As such, jhum control measure has been adopted and at<br />

the same time house sites are also planed at various locations for allotment to the poor and<br />

needy families. The whole activities of the Department are, therefore, closely linked with<br />

Land Reforms Programme.<br />

Meanwhile, the Department, due to inadequate administrative infrastructure, cannot<br />

cope with the phenomenal increase in the range and volume of work in the pattern of land<br />

management particularly in rural areas.<br />

The Centrally Sponsored Scheme for Strengthening of Revenue Administration and<br />

Updating of Land Records at 50:50 (Central : State) sharing basis is being implemented, and<br />

the Annual Plan is also prepared in conformity with this Scheme.<br />

Scheme–wise break–up<br />

The Scheme-wise break-ups within the Plan outlay of Rs. 420.00 lakh for Annual Plan<br />

<strong>2006</strong>-07, is summarized as follows: —<br />

(Rupees in lakh)<br />

Sl.<br />

No.<br />

Name of Scheme Outlay<br />

Of which capital<br />

content<br />

1. Direction & Administration 79.91 -<br />

2. Statistics & Evaluation 17.60 -<br />

3. Maintenance of Land Records 181.49 -<br />

4. Other Charges (Survey Training) 2.00 -<br />

5. Regulation of Land Holdings & Tenancy 24.00 -<br />

6. Baffacos 115.00 -<br />

Total 420.00 -<br />

DETAILS OF THE SCHEME<br />

I. DIRECTION & ADMINISTRATION (Rs. 79.91 lakh):<br />

1. Construction of Building (Rs. 6.00 lakh): Lack of village level Record Room-cum-staff<br />

Quarters creates problem of Revenue Administration at primary unit level. The Department<br />

urgently needs buildings for Record Room-cum-Residential accommodation for Staff posted<br />

at such centres. Hence, Rs. 6.00 lakh is earmarked for construction of four Record Roomscum-Staff<br />

Quarters at Aizawl, Champhai, Mamit & Serchhip Districts. The fund will be<br />

utilised with matching contribution of C.S.S.<br />

2. House Site Plan (Rs. 2.00 lakh): The Department has been taking up the scheme of<br />

house site planning at various convenient locations within town areas. The house sites so<br />

planned are meant for allotment to the poor and needy families. During the year <strong>2006</strong>-07, it<br />

is proposed to give house sites to 1,000 families. Rs. 2.00 lakh is provided for house site<br />

plan and the fund will be utilised with matching contribution of C.S.S.


- 114 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. Purchase of Machinery & Equipments (Rs. 2.00 lakh): In order to carry on Survey<br />

works and preparation of Land Records and to maintain and issue certificates and<br />

connected documents for earning more and more revenues, purchase of survey, drawing<br />

and printing equipment/ materials is required every year. For this purpose, Rs. 2.00 lakh is<br />

provided and the same fund will be utilised with a matching share of C.S.S.<br />

4. Creation of Posts & Salary (Rs. 35.00 lakh): Lack of manpower, both technical and<br />

non-technical is the main problem constantly faced by the Department. The present staff<br />

strength is too inadequate to deal with the increasing volume of works. A provision of<br />

Rs.35.00 lakh is provided for maintenance of the existing posts and newly created posts. In<br />

addition, the salary for 33 nos. of trained Surveyors engaged on contract basis is also<br />

included in the provision.<br />

The following post which has already been approved during 2005-06 is proposed for<br />

creation during <strong>2006</strong>-07.<br />

Sl. No. Name of Posts<br />

(1) Group ‘C’<br />

Stenographer (Grade-III) (Rs.4500-7000) 1<br />

Total 1<br />

No. of post<br />

already approved<br />

5. Medical Treatment (Rs. 3.00 lakh): Rs. 3.00 lakh is earmarked for meeting Medical<br />

Expenses of Officers & Staff.<br />

6. Office Expenses (Rs. 12.00 lakh): A provision of Rs. 12.00 lakh is earmarked for<br />

Office Expenses which includes purchase of 1(one) Light Vehicle for replacement of the old<br />

one allotted to the Director, Land Revenue & Settlement, <strong>Mizoram</strong>.<br />

7. Travelling Expenses (Rs. 6.00 lakh): Rs. 6.00 lakh is earmarked for Travelling<br />

Expenses and the fund will be utilised with a matching share of C.S.S.<br />

8. I.T. Development (Rs. 5.00 lakh): Government of <strong>Mizoram</strong> has felt the need to work<br />

out a practical modality for improving management of land records on a statewide scale<br />

utilising tools of Information Technology. The Government of India, Ministry of Rural<br />

Development, Department of Land Resources had provided Central Assistance for<br />

Computerization of Land Records, especially for purchase of Computer Hardware/ Software<br />

and Data Entry works. It is the responsibility of the State Government to provide<br />

infrastructure, manpower, maintenance of computers and consumable items and to expand<br />

the network system. The focus to this scheme is to design a multi-functional support for<br />

creation of reliable Data Bank for generation of Land Information System to provide<br />

information about the land, the resources upon it and the improvements made to it. Rs. 5.00<br />

lakh is provided herewith to meet such expenses and the fund will be utilised with matching<br />

contribution of C.S.S. for Computerizations of Land Records.<br />

9. Other Charges/ Compensation (Rs. 0.10 lakh): The Land Reforms measures requires<br />

payment of compensation for acquisition of private land for public interest. Hence, Rs. 0.10<br />

lakh is provided as a token for meeting such expenses and other charges. This fund will be<br />

utilised with matching contribution of C.S.S.


- 115 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

10. Engagement of Contingent Khalasis (Rs. 8.81 lakh): In order to carry out the works<br />

relating to verification and demarcation of the Inter-State, Inter-District, Inter-Sub-Division<br />

and Inter-Village boundary assigned by the Government of <strong>Mizoram</strong>, it is required to<br />

engaged Contingent Khalasis who are to encamp in the forest of remote areas from time to<br />

time. As such, a provision of Rs. 8.81 lakh is earmarked for wages, and the fund will be<br />

utilised with a matching contribution of C.S.S.<br />

II. STATISTICS & EVALUATION (Rs. 16.60 lakh):<br />

1. Salary (Rs. 2.50 lakh): Due to increasing volume of work, the Department requires<br />

the service of two Joint Directors, one to look after Technical Work and another one for<br />

Administration. Recently, the post of Joint Director (Survey) was created and filled up. The<br />

following three posts already approved are proposed for creation and necessary fund of<br />

Rs.2.50 lakh is also provided herewith to meet such expenses.<br />

Sl. No. Name of Posts<br />

No. of posts<br />

already approved<br />

(1) Group ‘A’<br />

Research Officer 1<br />

(2) Group ‘C’<br />

Inspector 1<br />

(3) Electronic Technician 1<br />

Total 3<br />

2. Office Expenses (Rs. 7.00 lakh): Rs. 7.00 lakh is earmarked for Office Stationery,<br />

printing of maps, forms and Certificates etc. and the fund will be utilised with matching<br />

contribution of C.S.S.<br />

3. Medical Treatment (Rs. 3.00 lakh): Rs. 3.00 lakh is provided herewith for Medical<br />

expenses of Officers & Staff.<br />

4. Traveling Expenses, etc. (Rs. 5.00 lakh): The reliability and accuracy of works relating<br />

to collection and preparation of land datas or statistics mainly depend on the performance<br />

of Field Officers and Staff at various centres. Hence, Rs. 5.00 lakh is provided for travelling<br />

expenses and other charges and this fund will be utilised for matching contribution of C.S.S.<br />

5. Other charges / Compensation (Rs. 0.10 lakh): The implementation of Land Reforms<br />

Programme requires payment of compensation for acquisition of land for public interest.<br />

Hence, Rs. 0.10 lakh is provided in token for such purposes and other charges. The fund will<br />

be utilised for matching contribution of C.S.S.<br />

III. MAINTENANCE OF LAND RECORDS (Rs. 181.49 lakh):<br />

1. Cadastral Survey (Rs. 16.00 lakh): Comprehensive Cadastral Survey is considered<br />

necessary for preparation of Cadastral maps and Land Information System. Sixty six (66)<br />

notified towns / sub-towns have already been cadastrally surveyed. It is proposed to cover<br />

at least 14 nos. of notified towns / villages covering 250.00 hectares. During 2005 – 06,<br />

Rs.16.00 lakh is earmarked to meet the expenses of Cadastral Survey including survey<br />

station marks of the Notified areas/ Sub-towns and W.R.C., which will be utilised with a<br />

matching share of C.S.S.


- 116 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. Engagement of Trained Surveyors (Rs. 6.00 lakh): The existing technical staff is too<br />

inadequate for successful and progressive implementation of various Schemes especially<br />

Cadastral Survey which is one of the foremost important measures for land reforms. Due to<br />

ban on creation of posts, a number of persons, who had already completed a two-year<br />

course in Survey training at the Survey Training Institute, Hyderabad, have to be engaged on<br />

Contract / Muster Roll basis as their service is required by the Department for Survey,<br />

Settlement and preparation of land record operations. Thus, Rs. 6.00 lakh is earmarked for<br />

engagement of 33 trained personnel. The fund will be utilised with a matching contribution<br />

of C.S.S.<br />

3. Strengthening of Survey Organization and Salary (Rs. 80.19 lakh): With the reorganization<br />

of Civil Districts and the increasing volume of Works in Land Reforms<br />

Programme, the services of more technical staff are urgently required by the Department.<br />

Therefore, the following posts have already been approved during 2005-06 and the same<br />

posts are again proposed for creation during <strong>2006</strong>-07. The new proposal for creation of<br />

Head Clerk, UDC and LDC for District Offices are found quite necessary as the District<br />

Offices cannot be functioned effectively without such clerical staff. Hence, minimum<br />

requirement is proposed for Directorate and District Offices of Champhai, Kolasib, Mamit &<br />

Serchhip.<br />

Sl.<br />

No.<br />

Name of Posts<br />

Group ‘A’<br />

1. Survey Officer 1<br />

(Rs. 10000-15200)<br />

Group ‘B’<br />

2. Head Surveyor 3<br />

Rs. 6500-10500)<br />

3. Surveyor - I 1<br />

(Rs. 5500-9000)<br />

Group ‘C’<br />

4. Surveyor – II 5<br />

Rs.4500-7000)<br />

5. Surveyor – III 4<br />

(Rs.4500-7000)<br />

6. Cartographer – II 1<br />

(Rs.4500-7000)<br />

7. Cartographer – III<br />

(Rs.4500-7000) 1<br />

Total 16<br />

No. of posts<br />

already approved<br />

A provision of Rs. 74.49 lakh is earmarked for salary of the existing and the newly<br />

created posts for <strong>2006</strong>-07.<br />

4. Purchase of Machinery and Equipment (Rs. 1.00 lakh): In order to achieve a high<br />

standard of accuracy in land survey, new and better quality of various modern Survey,<br />

Drawing and Printing equipments/ materials have to be procured this year. It is, therefore,<br />

proposed that Rs. 1.00 lakh be provided for purchase of machineries and equipments<br />

during <strong>2006</strong>-07 which will be utilised with a matching share of C.S.S. fund.


- 117 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

5. Medical Expenses (Rs. 4.00 lakh): Rs. 4.00 lakh is provided for Medical Expenses of<br />

Officers & Staff.<br />

6. Office Expenses (Rs. 6.00 lakh): The Department recently introduced new Land<br />

Settlement Certificates which is more durable and exhaustive by using computerised and<br />

laminated materials with plastic channel for the cover. With this end in view, a provision of<br />

Rs. 6.00 lakh is provided to meet the Office Expenses during <strong>2006</strong>-07. The fund will be<br />

utilised with a matching share of Central Assistance.<br />

7. Travelling Expenses (Rs. 5.00 lakh): Rs. 5.00 lakh is earmarked for travelling<br />

expenses of the Officers and Staff during <strong>2006</strong>-07 and the fund will be utilised with a<br />

matching contribution of C.S.S. fund.<br />

8. Aerial Cadastral Survey (Rs. 69.00 lakh):<br />

8.1 The Pilot Project on Aerial Cadastral Survey was taken up by Survey of India in the<br />

District of Aizawl (undivided Aizawl) during 1996-98. The area covering 3737.00 Sq. kms.<br />

was initially photographed at the scale of 1:10,000. The photographs are now readily<br />

available for further processing through photogrammetric instruments for preparation of<br />

line maps and the work has to be taken up by the Department through Government of India<br />

approved agency.<br />

8.2 It is also proposed to take up Pilot Project on combined Satellite Imaginary with GPS<br />

supported Cadastral Survey with the technical assistance of Government of India approved<br />

Company / Agency to speed up the work on Survey and Settlement Operation with the<br />

physical target of 1000.00 Sq.km.<br />

Hence, Rs. 69.00 lakh is provided to meet expenses for further processing of Aerial<br />

Photographs with ground Control Survey works and for Satellite Imaginary combined with<br />

Cadastral Survey work. The fund will be utilised for matching contribution of C.S.S. already<br />

released during 2005-06.<br />

IV. SURVEY TRAINING (OTHER CHARGES) (Rs. 2.00 lakh):<br />

It is proposed to send two in-service personnel at S.T.I., Hyderabad for Short Term<br />

Course in Cadastral Survey & Cartography and also to conduct refresher course for technical<br />

personnel during <strong>2006</strong>-07. Rs. 2.00 lakh is earmarked for this purpose which will be utilised<br />

for matching share of C.S.S.<br />

V. REGULATION OF LAND HOLDINGS & TENANCY (Rs. 24.00 lakh):<br />

Summary Survey and Records Operation:<br />

The Government of <strong>Mizoram</strong> has formulated the New Land Reforms Policy<br />

envisaging Regulation of land holdings and tenancy. The first phase of the programme<br />

covers Summary Survey and Records Operation consisting of verification, measurement of<br />

areas and demarcation of boundaries of land holdings under Permit/ Periodic Patta/ Pass as<br />

well as all lands for which ownership are claimed without Government Permit/ Periodic<br />

Patta by the individuals in rural areas. The area covering 18 R.D. Blocks had already been<br />

covered. In order to confer ownership rights to land holders, it is required to conduct<br />

Revision Survey of 10 R.D. Block during <strong>2006</strong>-07.<br />

01) Field Summary Survey Works (Rs. 10.00 lakh): It is proposed to conduct Summary<br />

Survey Operation viz. — (a) Control Survey and (b) Detail Survey. Hence, Rs. 10.00 lakh is<br />

earmarked for engagement of Casual Labours for the said works and fund will be utilised<br />

with matching contribution of C.S.S.


- 118 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

02) Purchase of Machinery & Equipments (Rs. 1.00 lakh): For conducting the Summary<br />

Survey and Record Operation, it is required to purchase some minor Survey and Drawing<br />

instruments. Hence, Rs. 1.00 lakh has been provided and this fund will be utilised as<br />

matching share of C.S.S.<br />

03) Office Expenses (Rs. 8.00 lakh): The preparation of Record-of-Rights for issuance of<br />

Periodic Patta to land holders and preparation of Land Records at Directorate and District<br />

Office has require purchase of office stationeries. Hence, Rs. 8.00 lakh has been provided to<br />

meet such expenses and the same fund will be utilised as matching share of C.S.S.<br />

04) Travelling Expenses (Rs. 5.00 lakh): A provision of Rs. 5.00 lakh is earmarked for<br />

traveling expenses of Field Staff.<br />

VI. BAFFACOS (Rs. 115.00 lakh):<br />

MULTI-PURPOSE CADASTRE DEVELOPMENT PROLJECT SURVEY FOR ALLOTMENT OF<br />

BAMBOO <strong>PLAN</strong>TATION AND TO FAMINE AFFECTED FAMILIES (Rs. 115.00 lakh)<br />

(BAFFACOS)<br />

(a) <strong>Mizoram</strong> covers geographical area measuring 21,087.00 Sq. Kms. where jhumming is<br />

widely practised. As such, jhum control measure has been adopted and at the same time,<br />

the land reform programme envisages wean off such primitive type of cultivation by means<br />

of modern land use planning, allotment and settlement of land to the famine affected and<br />

needy families. The whole activities of the Land Reforms Department are therefore, closely<br />

linked with the New Land Reforms Programme of the State. Under the New Land Reforms<br />

Programme, Summary Land Survey of villages are conducted since 1999 and now 18 R.D.<br />

Blocks are already surveyed and recorded. Under this programme, the Development Project<br />

Survey for the allotment of Agricultural Land for Bamboo Plantation had also been taken up<br />

since 2001-02 in the river valley of R.Tlawng and R.Tuirial valleys in scattered areas.<br />

The Government of <strong>Mizoram</strong> had therefore proposed to take up the scheme in large<br />

scale during 2004-05 keeping in view of ensuring Mautam, <strong>2007</strong> (Bamboo Flowering). It is<br />

estimated that bamboo grown area in <strong>Mizoram</strong> covers about 10,333.00 Sq. Kms. consisting<br />

of about 20 species of bamboo. <strong>Mizoram</strong> is having about 14% of India’s bamboo products. It<br />

is therefore proposed to conduct multipurpose cadastre Development Project Survey<br />

covering 10,333 Sq. Kms. during 2004-2009. Out of the above area, 20,000 Hectares is<br />

proposed to be covered by this estimated amount, i.e. Rs. 115.00 lakh.<br />

(b) Scope of the Project: The scope of the project is to conduct multipurpose Cadastre<br />

Development Project Survey and allotment and settlement of Agricultural Land to famine<br />

affected families for development of bamboo plantation and to wean off shifting cultivation.<br />

So that the famine affected people will get labour employment to earn money by jungle<br />

clearance in the survey work and to sell the natural bamboo without payment royalty before<br />

bamboo flowering. Better quality of bamboo may be planted in the land after bamboo<br />

flowering year.<br />

(c) Phasing Activities: The sequences of activities will be as follows: -<br />

(i) Reconnaissance Survey<br />

(ii) Control Survey<br />

(iii) Detail Survey<br />

(iv) Procurement of Survey, Drawing, Printing/ Computer Hardwares<br />

(v) Generation and Production of Village Cadastral Map/ Parcel Map<br />

(vi) Selection and Allotment of land to individual families<br />

(vii) Identification of plots and construction of survey line marks


- 119 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(d) Scheme-wise break-up:<br />

Sl. No. Items<br />

(Rupees in lakh)<br />

Outlay<br />

1. Cadastral Survey<br />

(a) Control Survey 100.00<br />

(b) Detail Survey<br />

2. Purchase of Survey, Drawing & Printing<br />

Equipment and Technical stationeries 3.00<br />

3. Office Expenses 6.00<br />

4. Traveling Expenses 6.00<br />

Total 115.00<br />

The fund will be utilised as a matching share of C.S.S.


- 126 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

Story of Sinlung Hills Development Council<br />

1. The Hmar people’s convention (HPC) Party started their political movement for<br />

creation of Hmar Autonomous District Council in 1986. Since the Government of <strong>Mizoram</strong><br />

did not give satisfactory response to the cause, the HPC Party callled a non-violence peaceful<br />

bandh in March, 1988. In protest against the first bandh, the State Government started<br />

violence and blood shedding on the HPC people that HPC volunteers were forced to<br />

underground. As a result, Arms confrontation between the Govt. of <strong>Mizoram</strong> & HPC started<br />

on 16.7.1989. As such escalation of violence between the two took place for quite<br />

sometimes. Finally, at the kind initiative of the then Governor of <strong>Mizoram</strong>, His excellency<br />

Mr. Swaraj Kaushal, negotiation has inplemented and Memorandum of Settlement between<br />

the Governor and HPC Party was signed on 27.7.1994.<br />

2. As per para 5.4 of the Memorandum of Settlement thereof the Sinlung Hills<br />

Development Council (SHDC) has been constituted since 1997. The main objective of the<br />

accord is to give edequate autonomy to the Sinlung Hills Development Council, as per para 3<br />

of the Memorandum of Settlement.<br />

3. Para 5.4 of the Memorandum of Settlement states that separate fund will be<br />

earmarked for schemes which may specified for implementation within the area of the<br />

Council. AS per para 5.4 of the Memorandum of Settlement a provision of Rs. 107.00 lakh<br />

had been provided for Budget estimate 2005-<strong>2006</strong> due to insufficiency of this year’s budget<br />

as well as increase of execution of different developmental works Rs. 125.00 lakh is<br />

approved for Annual Plan <strong>2006</strong>-<strong>2007</strong> as below: —<br />

(01) - Salary - Rs. 4.00 lakh<br />

(02) - Wages - Rs. 4.10 lakh<br />

(06) - Medical Treat - Rs. 0.50 lakh<br />

(11) - Domestic Travelling expenses - Rs. 0.50 lakh<br />

(13) - Office expenses - Rs. 17.40 lakh<br />

(14) - Rent - Rs. 1.00 lakh<br />

(16) - Publication - Rs. 0.50 lakh<br />

(27) - Minor Works - Rs. 68.00 lakh<br />

(50) - Other Charges - Rs. 29.00 lakh<br />

Total - Rs. 125.00 lakh<br />

1. Salary: The Government has created 6(six) temporary posts under Sinlung Hills<br />

Development Council, but unfortunately due to ban on filling up of vacant posts, these<br />

posts had not been filled up till date, In anticipation, a sum of Rs. 4.00 lakh is earmarked in<br />

the Annual Plan <strong>2006</strong>-<strong>2007</strong> for retention of these temporary post as well as Honorarium of<br />

Chairman and Council members.<br />

2. Wages: As per approval of the Government of <strong>Mizoram</strong>, Sinlung Hills Development<br />

Council is engaging 9(nine) Muster Roll employees, Rs. 4.10 lakh is earmarked for wages of<br />

these casual employees for the year <strong>2006</strong>-<strong>2007</strong>.


- 127 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. Medical Treatment & T.E.: Rs. 0.50 lakh each is earmarked for Medical Treatment<br />

and Traveling Expenses of Chairman & Members of the Council.<br />

4. Office Expenses: Rs. 17.40 lakh is earmarked for expenditure towards Office<br />

expenses such as stationary, POL, etc.<br />

5. Rent: Chairman and Office of SHDC, Aizawl are accomodated in a rented private<br />

house, for this purpose Rs. 1.00 lakh is earmarked for Office rent and Chairman residence.<br />

6. Minor Works: SHDC had been undertaking various developmental works within the<br />

area covering more than 38 villages. During the last year also several works have been taken<br />

up and most of them are nearing its completion. For its completions and to take up new<br />

works (as at Annexure-II), a sum of Rs. 68.00 lakh is earmarked for the Annual Plan <strong>2006</strong>-07.<br />

7. Other Charges: The Office of the Sinlung Hills Development Council is/have been<br />

catering the needs of the HPC / MAIDA returnees. During the last year 2005-06 a sum of<br />

Rs.21.00 lakh was set aside for rehabilitation, which was rather in sufficient to meet the<br />

requirement for rehabilitation and for discretionary fund of Chairman, SHDC. For this,<br />

purpose a sum of Rs. 29.00 lakh is earmarked for <strong>2006</strong>-<strong>2007</strong>.


- 130 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

BORDER AREA DEVELOPMENT PROGRAMME<br />

Government of India have included the Border Area Development Programme under<br />

Plan Scheme since the Annual Plan 1997-1998 of 9 th Five Year Plan. The year-wise allocation<br />

of outlays are as below: —<br />

Original Revised<br />

1. 1997-1998 - Rs. 3.00 Crore Rs. 6.73 Crore<br />

2. 1998-1999 - Rs. 6.82 Crore Rs. 6.82 Crore<br />

3. 1999-2000 - Rs. 8.00 Crore Rs. 8.00 Crore<br />

4. 2000-2001 - Rs. 8.00 Crore Rs. 12.32 Crore<br />

5. 2001-2002 - Rs. 8.32 Crore Rs. 13.32 Crore<br />

6. 2002-2003 - Rs. 8.00 Crore Rs. 16.32 Crore<br />

7. 2003-2004 - Rs. 8.32 Crore Rs. 12.48 Crore<br />

8. 2004-2005 - Rs. 8.32 Crore Rs. 15.56 Crore<br />

9. 2005-<strong>2006</strong> - Rs. 9.02 Crore<br />

Total : Rs. 67.80 Crore Rs. 91.55 Crore<br />

In <strong>Mizoram</strong>, there are 5(five) R.D. Blocks located along the Indo-Bangladesh border<br />

and 8(eight) R.D. Blocks located along Indo-Myanmar border as below: —<br />

Indo-Bangladesh Border<br />

1. W.Phaileng R.D. Block<br />

2. Bunghmun R.D. Block<br />

3. Lungsen R.D. Block<br />

4. Chawngte R.D. Block<br />

5. Zawlnuam R.D. Block<br />

Indo-Myanmar Border<br />

1. Ngopa R.D. Block<br />

2. Khawzawl R.D. Block<br />

3. Khawbung R.D. Block<br />

4. Lungdar ‘E’ R.D. Block<br />

5. Hnahthial R.D. Block<br />

6. Sangau R.D. Block<br />

7. Lawngtlai R.D. Block<br />

8. Tuipang R.D. Block


- 131 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

During 10 th Five Year Plan Period, 9 th Plan Schemes will be continued giving priority<br />

on roads, buildings and sports infrastructures. The approved outlays for Annual Plan <strong>2006</strong>-<br />

<strong>2007</strong> is Rs. 902.00 lakh and schemes / works to be taken up are as follows: —<br />

Sl.<br />

No.<br />

Name of Schemes / Works<br />

Annual Plan<br />

Approved Projected<br />

1 2 3<br />

1. Truckable road 39 Kms.<br />

2. Jeepable road 50 Kms.<br />

3. Other road (Approach road/ internal/<br />

widening/ Maintenance/bouldering)<br />

74 Kms.<br />

4. Community Hall 18 Nos.<br />

5. Other Administrative Building 15 Nos.<br />

6. Bus waitingshed/Bazarshed/Pavillion 5 Nos.<br />

7. Bridges / Culverts / Side drain 13 Nos.<br />

8. Playground 15 Nos.<br />

9. Retaining Wall 16 Nos.<br />

10. Water Tank / Water Reservoir / Water Supply<br />

Scheme<br />

15 Nos.<br />

11. Urinal / VIP Latrine 16 Nos.<br />

12. School Buildings 3 Nos.<br />

13. Rest House 5 Nos.<br />

14. Clearance of Sea Way / Water Way 10 Kms.<br />

15. Model Villages<br />

16. Sports Infrastructure<br />

17. Solar Household Light


INTRODUCTION:<br />

- 134 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

MEDIUM IRRIGATION (PWD)<br />

<strong>Mizoram</strong> is having a hilly topography. Shifting cultivation is the main method of<br />

cultivation of food grains and vegetables. The method causes vast destruction of natural<br />

resources in the form of deforestation and heavy soil erosion. However, at a few scattered<br />

pockets in plain areas of major river banks, wet rice cultivation is also carried out.<br />

The scope of Medium Irrigation in <strong>Mizoram</strong> is therefore very limited, but protection<br />

of riverbanks from overflowing to the existing cultivable plain is very much required. It is<br />

therefore, approved to take up this work with a provision of Rs. 1.00 lakh during <strong>2006</strong>-<br />

<strong>2007</strong>.<br />

DIRECTION AND ADMINISTRATION:<br />

No provision is made for Direction and Administration during <strong>2006</strong>-<strong>2007</strong> under<br />

this Head of Accounts.<br />

MACHINERY AND EQUIPMENT:<br />

WORKS:<br />

No provision is kept for Machinery and Equipment during <strong>2006</strong>-<strong>2007</strong>.<br />

Rs. 1.00 lakh is kept under this Head of Account during <strong>2006</strong>-<strong>2007</strong> for bank<br />

protection of R.Teirei under Mamit Division.


- 138 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

MINOR IRRIGATION, COMMAND AREA DEVELOPMENT & FLOOD CONTROL<br />

The anticipated expenditure under Minor Irrigation and Command Area Development<br />

Schemes during the year 2005-06 is Rs.1,905.00 lakh. Till end of 2004-05, 145 Minor Irrigation<br />

projects covering 6,646 ha. have been completed. Another 49 spill-over projects covering<br />

1,693 ha are scheduled to be completed during 2005-06. Therefore, by end of 2005-06, 194<br />

Minor Irrigation Projects covering 8,339 ha. of culturable command area will be completed.<br />

In view of the Bharat Nirman initiative launched by Government of India, a new<br />

scheme of ‘Extension, Renovation and Modernization (ERM) of Minor Irrigation Schemes’<br />

have been introduced in the Annual Plan of Minor Irrigation during <strong>2006</strong>-07 to increase<br />

created potential and enhance utilization in completed Minor Irrigation Projects. Additional<br />

500 ha. of irrigation potential is targeted with an outlay of Rs. 500.00 lakh for ERM of Minor<br />

Irrigation Schemes during <strong>2006</strong>-07.<br />

As it was in previous years, the main sources of funding for execution of Minor<br />

Irrigation Projects during <strong>2006</strong>-07 will be Central Loan Assistance (CLA) under Accelerated<br />

Irrigation Benefits Programme (AIBP) and Rural Infrastructure Development Fund (RIDF)<br />

under NABARD Schemes.<br />

Since all the spill-over projects from 2004-05 are scheduled for completion during<br />

2005-06, only new projects will be taken up under Accelerated Irrigation Benefits<br />

Programme (AIBP) during <strong>2006</strong>-07 with the total annual outlay of Rs. 1,627.07 lakh.<br />

During <strong>2006</strong>-07, 3 spill-over projects under RIDF-X will be completed with Rs. 82.00<br />

lakh, and 12 new schemes/projects will be taken up under RIDF-XI with the annual outlay of<br />

Rs. 205.93 lakh. All the three projects under RIDF-X will be completed during <strong>2006</strong>-07 and<br />

12(twelve) new projects are scheduled to be completed within 31.3.2008.<br />

During the year <strong>2006</strong>-07, the total outlays for Minor Irrigation Schemes and<br />

Command Area Development Scheme is Rs. 3153.00 lakh as briefly stated below:<br />

1 Direction & Administration : 142.00<br />

2 River Lift Irrigation : 0.10<br />

3 River Diversion :<br />

AIBP (Accelerated Irrigation Benefits Programme)<br />

(i) Execution of Minor Irrigation Projects under AIBP :<br />

(ii) Extension, Renovation and Modernization (ERM) of completed<br />

2,000.00<br />

Minor Irrigation Projects : 500.00<br />

(iii) One-time ACA for State matching share : 300.00<br />

Total - AIBP : 2,800.00<br />

NABARD Scheme<br />

(i) NABARD Loan 200.00<br />

(ii) State Matching Share 5.93<br />

Total of NABARD Scheme : 205.93<br />

Execution of Minor Irrigation Projects with State Plan Fund<br />

Repair and re-construction of Monsoon Damages on completed Minor<br />

1.00<br />

Irrigation Projects. 2.97<br />

Maintenance 1.00<br />

Total - River Diversion : 3,010.90<br />

TOTAL - MINOR IRRIGATION:<br />

3,153.00<br />

To maximize utilization potential created in completed Minor Irrigation Projects,<br />

various works on Command Area Development have been taken up. Rs. 15.00 lakh is<br />

envisaged for implementation of Command Area Development Schemes.


- 139 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (CENTRAL)<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />

1. <strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07 : Rs. 142.00 lakh<br />

2. ANTICIPATED EXPENDITURED DURING 2005-06 : Rs. 163.00 lakh<br />

SCHEME NO. 1<br />

There are 140 no. of created posts under Minor Irrigation Schemes, out of which 87<br />

posts are under Plan Scheme. There are four Irrigation Divisions at Aizawl, Champhai,<br />

Kolasib and Lunglei, with nine Sub-Divisions. Minor Irrigation Wing in the Headquarters is<br />

manned by Joint Director (Minor Irrigation) with supporting staff to assist Director of<br />

Agriculture & Minor Irrigation in planning and monitoring of Minor Irrigation Schemes<br />

including Command Area Development and Flood Control Schemes.<br />

The outlay for Direction & Administration under Minor Irrigation Schemes is as<br />

detailed below: —<br />

Sl.<br />

No<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />

Items Unit Physical<br />

Targets<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE WATER)<br />

NAME OF THE SCHEME : RIVER LIFT IRRIGATION<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong>-07 : Rs. 0.10 lakh<br />

2. ANTICIPATED EXPENDITURE DURING 2005-06 : Rs. 0.10 lakh<br />

SCHEME NO. 2<br />

Under River Lift Irrigation Scheme, it is approved to purchase light-weight kerosenepetrol<br />

engine pump sets for sale at 50 % subsidy to cultivators.<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />

Financial Outlay<br />

(in lakh of Rs.)<br />

ESTABLISHMENTS :<br />

1 Salary of Officers & Staff No. 87 125.00<br />

2 Travelling Expenses No. 87 1.00<br />

3 Wages L.S. - 10.00<br />

4 Office Expenses No. 14 4.00<br />

5 Maintenance of buildings No. 10 1.00<br />

6 Repairing of vehicle L.S. - 1.00<br />

Sub-total : Direction & Administration :<br />

- - 142.00<br />

Sl.<br />

No.<br />

Items Unit<br />

Physical<br />

Targets<br />

Financial Outlay<br />

(in lakh of Rs.)<br />

1. Purchase of light-weight kerosene-petrol<br />

engine pump sets for sale at 50 % subsidy<br />

No. 1 0.10<br />

Sub-total: River Lift Irrigation - - 0.10


- 140 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE WATER)<br />

NAME OF THE SCHEME : DIVERSION SCHEME.<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong>-07 : Rs. 3,010.90 lakh<br />

2. ANTICIPATED EXPENDITURE DURING 2005-06 : Rs. 1,716.90 lakh<br />

SCHEME NO. 3<br />

Sources of funding for implementation of Diversion Schemes are Central Loan<br />

Assistance (CLA) under Accelerated Irrigation Benefits Programme (AIBP) and Rural<br />

Infrastructure Development Fund (RIDF) under NABARD Schemes.<br />

AIBP (Accelerated Irrigation Benefits Programme): So far, 77 Minor Irrigation Projects have<br />

been taken up under AIBP, of which, 34 projects covering Cultural Command Area of 1,605<br />

ha had been completed and 43 projects (total Culturable Command Area=1,541 ha) are<br />

scheduled to be completed during 2005-06. By the end of 2005-06, it is anticipated that 77<br />

Minor Irrigation Projects covering 3,146 ha of culturable command area will be completed.<br />

During <strong>2006</strong>-07, Rs. 2300.00 lakh (Central Loan Assistance under AIBP - Rs. 2,000.00<br />

lakh + State matching share - Rs. 300.00 lakh) is earmarked for execution of new Minor<br />

Irrigation Projects under AIBP.<br />

In view of the Bharat Nirman initiative launched by Government of India, a new<br />

scheme of ‘Extension, Renovation and Modernization (ERM) of Minor Irrigation Schemes’<br />

under AIBP have been introduced in the Annual Plan of Minor Irrigation during <strong>2006</strong>-07 to<br />

increase created potential and enhance utilization of created irrigation potentials in<br />

completed Minor Irrigation Projects. Gross irrigated area in 2004 is 15,749 ha and the area<br />

covered by Minor Irrigation Projects completed under Minor Irrigation Schemes is 6,646 ha.<br />

During <strong>2006</strong>-07, Rs.500.00 lakh is earmarked for Extension, Renovation and Modernization<br />

of Minor Irrigation Schemes under AIBP.<br />

The total outlay for AIBP during <strong>2006</strong>-07 is Rs. 2800.00 lakh (Central Share –<br />

Rs.2500.00 lakh + one time ACA for matching share - Rs. 300.00)<br />

RIDF (Rural Infrastructural Development Fund) under NABARD: During <strong>2006</strong>-07, 3 spillover<br />

projects under RIDF-X will be completed with Rs. 81.43 lakh, and 12 new schemes/<br />

projects will be taken up under RIDF-XI with the annual outlay of Rs. 124.50 lakh (NABARD<br />

Loan = 95% = Rs. 118.57 lakh and State matching share = 5% = Rs. 5.93 lakh). All the 12 new<br />

projects are scheduled to be completed within 31.3.2008.<br />

While Operation & Maintenance of completed Minor Irrigation Projects is under the<br />

joint responsibilities of the project beneficiaries and the Department, frequent repairs and<br />

reconstruction of monsoon damages are required due to torrential rains during monsoon. A<br />

provision of Rs. 2.97 lakh is made for repair and reconstruction of monsoon damages<br />

during <strong>2006</strong>-07.


- 141 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />

Sl.<br />

No<br />

Items Unit<br />

1 Accelerated Irrigation Benefits Programme (AIBP)<br />

Physical<br />

Targets<br />

SCHEME NO. 4<br />

HEAD OF DEVELOPMENT : COMMAND AREA DEVELOPMENT PROGRAMME<br />

NAME OF THE SCHEME : COMMAND AREA DEVELOPMENT PROGRAMME<br />

1. <strong>APPROVED</strong> OUTLAY FOR <strong>2006</strong>-07 : Rs. 15.00 lakh<br />

2. ANTICIPATED EXPENDITURE DURING 2005-06 : Rs. 15.00 lakh<br />

Financial<br />

Outlay<br />

A Execution of Minor Irrigation Projects with Central Loan Assistance under AIBP<br />

(i) Central Loan Assistance<br />

(a) Grant component - - 1,750.00<br />

(b) Loan component - - 250.00<br />

Sub-total : CLA under AIBP: - - 2,000.00<br />

(ii) State Matching Share (one-time ACA) - - 300.00<br />

Total of A - Minor Irrigation Projects under AIBP : No. 45 2,300.00<br />

B Extension, Renovation and Modernization (ERM) of existing<br />

Minor Irrigation Schemes with Central Loan Assistance (CLA) under AIBP<br />

(i) Central Loan Assistance<br />

(a) Grant component - - 450.00<br />

(b) Loan component - - 50.00<br />

Sub-total : CLA under AIBP: - - 500.00<br />

(ii) State Matching Share (one-time ACA) - - 0.00<br />

Total of A - ERM of completed Projects under AIBP : Ha 500 500.00<br />

Total (A+B) of AIBP (Accelerated Irrigation Benefits Programme) : 2,800.00<br />

2 Execution of Minor Irrigation Projects with Loan Assistance under NABARD<br />

(i) NABARD Loan<br />

(a) Completion of Spill-over projects under RIDF-X No 3 81.43<br />

(b) Execution of new Minor Irrigation Projects No 12 118.57<br />

Sub-total NABARD Loan: No 15 200.00<br />

(ii) State Matching Share for new projects only No 15 5.93<br />

Total of NABARD Scheme : No. 15 205.93<br />

3 Execution of Minor Irrigation Projects with State Plan Fund No. 1 1.00<br />

4 Repair and re-construction of Monsoon Damages on completed<br />

Minor Irrigation Projects.<br />

L.S. 120 2.97<br />

5 Maintenance L.S. 120 1.00<br />

TOTAL - DIVERSION SCHEMES 3,010.90<br />

A study of several completed irrigation projects has revealed hardly 50% of the<br />

potentials created by completed minor irrigation projects is being utilized and the<br />

productivity is low. Absence of distribution channels, lining of water channels to save water,<br />

land levelling and other activities has not been taken up. Under Command Area<br />

Development Programmes like adoptive trials, supply of inputs, extension service and other<br />

activities as mentioned above will be taken up.


- 142 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

As such cluster of 28 completed Minor Irrigation projects in Aizawl, 4 clusters in<br />

Lunglei and 8 clusters in Chhimtuipui covering gross command area of 1361 have been<br />

sanctioned by Government of India to be taken under Command Area Development<br />

Programme w.e.f. 2001-2002. The same projects are approved to be continued in 2005-06.<br />

Detail Physical and Financial target proposed for 2005-06 are as follows:-<br />

Sl.<br />

No<br />

PHYSICAL TARGET & FINANCIAL OUTLAY FOR <strong>2006</strong>-07<br />

Items Unit Physical<br />

Targets<br />

Financial Outlay<br />

(in lakh of Rs.)<br />

1 A. Establishment<br />

(i) Misc. Contingencies<br />

(ii) Maintenance and repair of Machineries<br />

L.S. L.S. 0.30<br />

Vehicle including Pol charges<br />

B. Survey<br />

L.S. L.S. 0.50<br />

(i) Soil Survey Ha. 150 0.01<br />

(ii) Topological Survey Ha. 150 0.01<br />

(iii) Planning & Design<br />

C. Construction of Field Channels including<br />

Ha. 150 0.50<br />

control structure Ha. 200 8.00<br />

D. Construction of Field drains Ha. 200 4.00<br />

E. Land Levelling & Shaping Ha. 150 1.50<br />

F. Warabandi<br />

G. Demonstration of Crop Production<br />

Ha. 150 0.15<br />

Technology. Nos. 3 0.03<br />

TOTAL OF COMMAND AREA DEVELOPMENT SCHEMES :<br />

GRAND TOTAL : MINOR IRRIGATION & COMMAND<br />

15.00<br />

AREA DEVELOPMENT<br />

700.00


Introduction:<br />

- 145 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

POWER & ELECTRICITY<br />

In order to have substantial economic development availability of energy (Power) to<br />

the required level play an important role. The progress of power development can be<br />

assessed from the budgetary provision for the last 4 - 5 years as highlighted below: -<br />

Sl.<br />

No.<br />

Year<br />

<strong>ANNUAL</strong> <strong>PLAN</strong>S AT A GLANCE<br />

Non-<br />

Earmarked Earmarked<br />

NCSE /<br />

IREP<br />

(Rs. in lakh)<br />

TOTAL<br />

1. 2001 - 02 2947.00 1196.00 55.00 4198.00<br />

2. 2002 - 03 1089.00 3111.00 142.22 4342.87<br />

3. 2003 - 04 1076.00 3464.00 61.00 4601.00<br />

4. 2004 - 05 1226.00 5560.00 61.00 6847.00<br />

5. 2005 - 06 2692.00 6363.00 61.00 9116.00<br />

6. <strong>2006</strong> – 07 3442.000 3758.00 61.00 7261.00<br />

There are 643 nos of work charge staff and 2362 nos of Muster Roll labours and<br />

1098 Regular Staff to maintain existing Power Systems under plan fund.<br />

Item-wise provision of fund are as follows: —<br />

1. Direction & Administration: There are 1098 nos. of plan posts which had not been<br />

converted into non-plan posts. The establishment of these 1098 posts had to be met from<br />

plan fund. In addition to the above posts there are many infrastructural assets created since<br />

7 th Five year Plan. The maintenance of these assets are still met from plan fund as the same<br />

are not yet committed to non-plan. The total requirement, including salary of ZEDA Staff,<br />

for maintenance of Direction & Administration, as on today is Rs. 2890.00 lakh which has<br />

been increased from last year due to increase of dearness allowance and labour cost<br />

The agreed outlay of the Department during 2005–06 is Rs. 9116.00 lakh out of<br />

which Rs. 6363.00 lakh was earmarked. Hence, Non-Earmarked fund is only Rs. 2692.00 lakh<br />

which was not sufficient to meet only Direction and Administration. In <strong>2006</strong>-07, nonearmarked<br />

fund over and above Direction and Administration, we have Rs. 762.00 lakh to<br />

execute the plan works. But, some amount needs to be pulled out to meet additional<br />

requirement of Direction and Administration.<br />

2. State Normal Assistance (SNA): From State Normal Assistance (SNA), we have<br />

Rs.3992.00 lakh during <strong>2006</strong>-07. Some of which are earmarked to meet D&A and liabilities<br />

of Thermal Plant, Bairabi. Fund will be utilized as stated below :<br />

1) Direction & Administration - Rs. 2890.00<br />

2) For various improvement works - Rs. 552.00<br />

3) Thermal Generation, Bairabi - Rs. 550.00<br />

Total - Rs. 3992.00


- 146 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. Rural Electrification Corporation Ltd. Negotiated Loan: This is Negotiated Loan to<br />

be availed from Rural Electrification Corporation Ltd, Government of India against approved<br />

schemes. Normally the loan amount is Rs. 658.00 lakh meant for Improvement of<br />

Transmission and Distribution Network in <strong>Mizoram</strong>.<br />

1) Construction of Transmission lines - Rs. 658.00 lakh<br />

TOTAL - Rs. 658.00 lakh<br />

4. Accelerated Power Development & Reform Programe (APDRP): This scheme is<br />

under earmarked sector of which Rs. 1900.00 lakh (Capital content) is earmarked for <strong>2006</strong>-<br />

<strong>2007</strong> for improvement of sub-transmission & Distribution networks within <strong>Mizoram</strong>.<br />

5. A.C.A. (One-time Additional Central Assistance): This is one-time Additional<br />

Central Assistance (ACA) earmarked for Power Development during <strong>2006</strong> – 07 and the<br />

budget provision is Rs. 650.00 Fund will be utilized for :-<br />

1) Liabilities for Thermal Plant, Bairabi - Rs. 650.00 lakh<br />

TOTAL - Rs. 650.00 lakh<br />

6. Non-Conventional Source of Energy (NCSE): For Non-Conventional Source of<br />

Energy, Rs. 50.00 lakh is set aside during 2005 - <strong>2006</strong> for taking up non-conventional<br />

system of energy sources. This fund will be transferred to ZEDA as grant-in-aid, as this<br />

organisation is nodal agency for such works.<br />

7. Integrated Rural Electric Programme (IREP): Under this scheme, Rs. 11.00 lakh is<br />

made available from Rural Development Ministry and Rs. 11.00 lakh is earmarked for 2005-<br />

<strong>2006</strong>. The fund will be transferred to ZEDA as grant-in-aid as ZEDA is the nodal agency for<br />

non-conventional source of energy.<br />

8. District-wise sharing of fund: The function and organisation set-up of the<br />

Department is not based on administrative district of the state. Most of the projects are<br />

inter-related each other as power system is interconnected throughout the state. As such the<br />

project in one district is also benefited to the people in other districts. Hence, sharing of<br />

fund in district wise cannot be properly differentiated<br />

9. Conclusion: Annual Plan <strong>2006</strong> – <strong>2007</strong> is framed based on the Sectoral Allocation<br />

given by State Planning Board, Government of <strong>Mizoram</strong>.


A. LARGE & MEDIUM INDUSTRIES :<br />

Scheme No. A – 1<br />

- 155 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

INDUSTRIES<br />

Name of the Scheme : Development of Food & Allied Industries :<br />

<strong>Mizoram</strong> Food & Allied Industries Corporation Ltd. (MIFCO) :<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

The on-going projects under MIFCO , in addition to the project of Pork & Poultry<br />

Processing Plant at Zemabawk nearing commissioning, are –<br />

(1) Upgradation and expansion of Fruit Juice Concentrate Plant, Chhingchhip.<br />

(2) Upgradation and expansion of Food Processing Plant, Sairang.<br />

(3) Setting up of Food Park, Chhingchhip.<br />

(4) Setting up of Mobile Food Processing Unit.<br />

(5) Contract Farming.<br />

The authorized share capital of MIFCO has been enhanced from Rs. 10.00 crore to<br />

Rs. 20.00 crore and the paid-up capital up to 2004-05 is Rs. 1641.72 lakh and provision<br />

during 2005-06 is Rs. 100.00 lakh. As such, it is proposed to contribute Rs. 100.00 lakh as<br />

share capital to the Corporation during <strong>2006</strong>-07 considering the requirement for<br />

establishment maintenance.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below :<br />

Programme of work (Rs. in Lakh)<br />

Contribution of share capital 100.00<br />

B. VILLAGE & SMALL INDUSTRIES :<br />

Scheme No. B – 1<br />

Total : 100.00<br />

Name of the Scheme: Direction & Administration<br />

(Strengthening of Administration)<br />

(Budget Head : 2851 – Village & Small Industries, 001(02) –Direction)<br />

This is an ongoing scheme under which most of the liabilities of posts and<br />

establishment created during the 7 th Five Year Plan are required to be maintained till date.<br />

These liabilities cannot be passed on to Non-Plan side, and these liabilities have to be<br />

continued during the 10 th Five Year Plan also. Apart from that during the year 1999-2000, 5<br />

(five) Sub-Divisional Offices have become functional in Kolasib, Serchhip, Champhai, West<br />

Phaileng, Lawngtlai and have been upgraded to District Industries Centres with the existing<br />

manpowers and the Sub-Divisional Industries Offices at Chawngte and Tlabung will be made<br />

functional during the 10 th Plan. However, these will be done without creation of new posts<br />

by way of deployment of the existing staff available with the Department.


- 156 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Since this Department is executing cost of civil construction works for infrastructure<br />

development etc. and maintenance thereof, provision of fund for construction works and<br />

maintenance of existing ones and newly constructed buildings, roads, fences etc. are given<br />

as follows :-<br />

Sl.<br />

No.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below:<br />

Description of works (Rs. in lakh)<br />

1. Salary of :<br />

Existing staff – 14 nos. 26.50<br />

2. Wages for muster roll workers :<br />

a) Directorate – 7 nos. 2.55<br />

b) R.M. Depots at Aizawl, Kolasib, West Phaileng, Serchhip, Champhai,<br />

Lunglei, Lawngtlai & Saiha, Central Godown, GDF – 17 nos.<br />

7.08<br />

3. Medical Treatment 0.50<br />

4. Travelling Expenses 4.50<br />

5. Office Expenses 30.00<br />

6. Rent for R.M.Depots at Kolasib, West Phaileng, Serchhip, Champhai,<br />

Lunglei, Lawngtlai, Saiha and Gems Cutting & Polishing Centre.<br />

4.70<br />

7. Minor Works/Maintenance :<br />

a) Horizontal extension of Directorate building 27.36<br />

b) Renovation of Directorate building 3.00<br />

c) Maintenance of Directorate building & staff quarters 2.00<br />

8. Other charges/compensation including liabilities to P & E Deptt. 8.50<br />

9. Write-off 0.35<br />

Total : 117.04<br />

Scheme No. B – 2<br />

Name of the Scheme: Research, Design & Development :<br />

1. Development of Tea Industries :<br />

(Budget Head : 2851 – Village & Small Industries, 004(02) – Dev. of Tea Industries)<br />

During 2005-<strong>2006</strong>, 250 Units of tea seed and 4700 Kgs. of Polythene Sleeves are<br />

procured for making tea nurseries in Ngopa, Khawdungsei and Biate. Tea seedlings planted<br />

in the previous year are as under :-<br />

Village No. of Families Number of Tea seedlings planted<br />

Ngopa 122 families 4,36,300 nos.<br />

Biate 133 families 3,29,110 nos.<br />

During <strong>2006</strong>-<strong>2007</strong>, the same quantities of tea seed will be procured to rapidly<br />

enhance tea bushes in Ngopa areas. Provision is accordingly prepared accordingly to meet<br />

the financial requirements.<br />

2. Development of Aromatic Oil Processing as Pilot Project :<br />

Perfumes and flavours have been known to mankind since time immemorial,<br />

Sandalwood, Comphor, etc. have been mentioned in VEDAS. In the beginning natural<br />

Aromatic Essential Oil & Oleoresins were used in perfumery. Demand for natural Aromatic<br />

Essential Oil is increasing rapidly, the world over with increasing population and growing<br />

awareness.


- 157 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Hence, it is proposed to set up a Aromatic Oil Processing unit as a pilot project in<br />

<strong>Mizoram</strong>. For this, engagement of expert consultants will be required and for this<br />

consultancy charge will be required and provision is proposed accordingly.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below :<br />

Sl.No. Programme of work (Rs. in lakh)<br />

1 Wages – 2 nos. 0.66<br />

2 Travelling Expenses 1.20<br />

3 Office expenses 2.50<br />

4 Materials & Supply – cost of tea seeds, polythene, etc. 30.00<br />

5 Advertising/Publicity 0.50<br />

6 Minor Works / Maintenance : 2.00<br />

a) Tea house road metaling<br />

b) Drilling of ground water with fitting of tube well<br />

7 Grant-in-aid :<br />

Financial assistance to tea planters 10.00<br />

8 Other Charges :<br />

a) Plant protection, etc. 2.00<br />

b) Consultancy charge for aromatic oil processing, etc. 5.10<br />

9 Motor Vehicle 2.00<br />

Total : 55.96<br />

Scheme No.B-3<br />

Name of Scheme: Export Promotion Industrial Park (EPIP)<br />

(Budget Head : 2851-Village & Small Industries 101(01)-Export Promotion Industrial Park)<br />

The Ministry of Commerce, Government of India has approved a scheme of Export<br />

Promotion Industrial Park at Lengte with a projected cost of Rs. 2753.26 lakh. The<br />

Government of <strong>Mizoram</strong> has to contribute Rs. 584.42 lakh as matching grants with a loan of<br />

Rs. 1168.24 lakh from financial institution. Land measuring 144.48 hectares is being<br />

acquired for which compensation for standing crops have been paid to the land owners.<br />

Export Promotion Industrial Park Agency (EPIPA) has been constituted to implement<br />

the project. So, it is proposed to give grant-in-aid to the Export Promotion Industrial Park<br />

Agency (EPIPA) for taking up the project during <strong>2006</strong>-07.<br />

Therefore, provision for the year <strong>2006</strong>-07 is made as follows :<br />

Sl.No. Description of works (Rs. in Lakh)<br />

1. Other charges 5.00<br />

Total : 5.00<br />

Scheme No. B. 4<br />

Name of the Scheme: Development of Industrial Infrastructure :<br />

(Industrial Estates)<br />

(Budget Head : 2851 – Village & Small Industries, 101(02)–Industrial Estate)<br />

This is an on-going scheme and to be continued during the 10 th Five Year Plan also.<br />

Development of Industrial Infrastructure is on the priority list on the agenda of New


- 158 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Industrial Policy of the Govt. of India and therefore, the scheme cannot be dispensed with.<br />

Under the scheme the following projects were taken up.<br />

a) Industrial Growth Centre at Luangmual, Aizawl.<br />

b) Industrial Estate at Zuangtui<br />

c) Industrial Estate at Kolasib<br />

d) Industrial Estate at Chawngte<br />

e) Integrated Infrastructure Development Centre at Pukpui, Lunglei under the<br />

Centrally Sponsored Scheme of Integrated Infrastructure Development<br />

Centre (IIDC)<br />

It is required to continue these projects with improvement and upgradation and for<br />

these, provisions are required to be made. Accordingly, proposed provisions are made as<br />

follows :<br />

Sl. No. Programme of works (Rs. in lakh)<br />

1. Salary of existing staff – 5 nos. 6.08<br />

2. Wages for Muster roll workers at IGC, Luangmual and Industrial<br />

Estates at Zuangtui, Kolasib - 16 nos.<br />

6.25<br />

3. Medical Treatment 0.70<br />

4. Travelling Expenses 1.00<br />

5. Office Expenses 1.00<br />

6. Minor Works/Maintenance :<br />

a) Token provision for IGC, Luangmual uinder CSS 0.00<br />

b) Constn. of new internal road in Industrial Estates 15.00<br />

c) Matching Grant to CSS for IIDC, Pukpui, Lunglei (transfer of fund<br />

to implementing agency )<br />

20.00<br />

d) Maintenance & improvement of existing roads, buildings, steps<br />

and fencing at Industrial Estate<br />

5.36<br />

7. Grant-in-aid to Infrastructure Development Agency (IDA) 5.00<br />

8. Other Charges 2.00<br />

9. Motor vehicle - maintenance 2.00<br />

Total of B-3 : 64.39<br />

Scheme No. B - 5<br />

Name of the Scheme: Promotion of Village, Cottage & Tiny Industries :<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01)– Supervision of SSI)<br />

This is an on-going scheme under which grants-in-aid are provided to the rural<br />

artisans for setting up of village and cottage industries. The target group of this scheme is<br />

the poorer section of the society. This is a promotional scheme and need to be continued<br />

during the 10 th Five Year Plan.<br />

The following provision is made for the year <strong>2006</strong>-07 :<br />

Sl. Description of works Physical Targets Financial Target<br />

No<br />

(in No.) (Rs. in lakh)<br />

1. GIA to rural artisans 320 8.00<br />

Total : 320 8.00


Scheme No. B - 6<br />

- 159 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of the Scheme: Entrepreneurial Development & Training<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01) – Supervision of SSI)<br />

This scheme is meant for human resource development in industrial sector. One of<br />

the most important inhibiting factors for industrial development in <strong>Mizoram</strong> is lack of<br />

skilled manpower resources both at the level of official and entrepreneurs. This scheme is<br />

purely promotional in nature and targets to educate and train both industrial workers and<br />

entrepreneurs. The Officers and staff of the Department also need exposure to acquire upto-date<br />

knowledge of industrial development and therefore, need on the spot study and tour<br />

to different parts of the country.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below :<br />

Sl.<br />

No.<br />

Description of works<br />

Physical Targets<br />

(in No.)<br />

Financial Target<br />

(Rs. in lakh)<br />

1. Scholarship/Stipend :<br />

a) EDP Training and domestic study tour for<br />

entrepreneurs<br />

100 8.00<br />

b) Training & industrial exposure and capacity<br />

building for departmental Officers and<br />

employees<br />

15 8.00<br />

Total : 115 16.00<br />

Scheme No. B - 7<br />

Name of the Scheme: Industrial Information<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01) – Supervision of SSI)<br />

Under this scheme, the Department dessiminates information by means of publicity,<br />

advertisement, etc. Under this scheme, the Department conducts exhibition, etc. and also<br />

participates in International and National Exhibitions. This is a promotional scheme and<br />

therefore need to be continued during the 10 th Five Year Plan.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below :<br />

Sl. No. Description of works (Rs. in lakh)<br />

1. Office Expenses – collection of industrial data 3.00<br />

2. Rent - Annual Ground Rent/License Fee for <strong>Mizoram</strong> Pavilion 7.00<br />

3. Advertising :<br />

a) Interior decoration of <strong>Mizoram</strong> Pavilion for IITF 8.00<br />

b) Participation expense for IITF 18.00<br />

c) Participation / Organising of Expos/Fair 10.00<br />

d) Publication of Industry Meichher 1.00<br />

e) Dessimination of information, publicity & production of<br />

documentary film and display advertisement<br />

5.00<br />

4. Machinery & Equipment :<br />

Purchase of electronic media equipments 1.05<br />

Total : 53.05


Scheme No. B - 8<br />

- 160 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of the Scheme: Incentive/ Subsidy to Industries<br />

(Promotion & Development of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(02) –Pro. & Development of SSI)<br />

Under this ongoing scheme incentives/subsidies like Interest Subsidy, Power<br />

Subsidy, Land Subsidy, State Transport Subsidy on Plant & Machinery, Factory Rent Subsidy,<br />

Subsidy on Man Power Development, Subsidy on Drawal of Powerline, Subsidy on Power<br />

Generating Set and Subsidy on Re-Imbursement of the Cost of Project Report are provided<br />

to the Small Scale Industries of <strong>Mizoram</strong> as announced in the Industrial Policy of <strong>Mizoram</strong><br />

State, 2000. Equity participation by the Government in the assisted is also entertained. This<br />

is a promotional scheme to encourage investment in industrial sector and therefore to be<br />

continued during the 10 th Five Year Plan. The following subsidies are given under this<br />

scheme.<br />

Apart from the above subsidy, it is also expedient to match Central Grants for<br />

projects implemented through MIFCO and promoting entrepreneurs in accordance with the<br />

guidelines of such schemes of Central Government.<br />

Sl.<br />

No.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below :<br />

Description of works<br />

Physical Targets<br />

(Nos.)<br />

Financial Target<br />

(Rs. in lakh)<br />

1. Grant-in-aid/Subsidy :<br />

a) Providing State Incentive Subsidies to SSI Unit 75.00 20.00<br />

b) Matching Grant and Promotional Grant to<br />

MIFCO and entrepreneurs<br />

10.00 110.00<br />

Total : 85.00 130.00<br />

Scheme No. B – 9<br />

Name of the Scheme: District Industries Centre :<br />

(Budget Head : 2851 – Village & Small Industries, 102(03) – District Industries Centre)<br />

3 District Industries Centres of <strong>Mizoram</strong> were created and were functioning under<br />

the Centrally Sponsored Scheme of the Government of India which stood transferred to the<br />

State Plan w.e.f. 1994-95. Hence all the liabilities are met from the State Plan funds.<br />

The Cabinet of the State Government had decided and notified it’s decision for<br />

upgradation of the existing Sub-Divisional Industries Offices at Kolasib, Serchhip, Champhai<br />

and Lawngtlai to District Industries Centres. Presently these Offices are under the control of<br />

the respective existing DICs. Even though these new DICs might not have started<br />

functioning in full strength within <strong>2006</strong>-07, some provisions are required to be earmarked<br />

for them for creating necessary infrasturctures.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below :<br />

Sl.No. Description of works (Rs. in lakh)<br />

1. Salary :<br />

a) DIC, Aizawl – 13 nos. 21.70<br />

b) DIC, Lunglei – 14 nos 42.80


- 161 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl.No. Description of works (Rs. in lakh)<br />

c) DIC, Saiha – 22 nos. 45.86<br />

d) DIC, Kolasib – 4 nos. 6.26<br />

e) DIC, Champhai – 3 nos. 5.69<br />

f) DIC, Serchhip – 4 nos. 6.04<br />

g) ) DIC, Lawngtlai – 4 nos. 5.96<br />

h) SDIO, W.Phaileng – 4 nos. 7.79<br />

Sub total : 142.10<br />

2. Wages :<br />

a) DIC, Aizawl – 2 nos. 0.91<br />

b) DIC, Lunglei – 3 nos. 1.36<br />

c) DIC, Saiha – 6 nos. 2.47<br />

d) DIC, Lawngtlai – 1 no. 0.45<br />

e) SDIO, West Phaileng – 1 no. 0.45<br />

Sub total : 5.64<br />

3. Medical Treatment :<br />

a) DIC, Aizawl 1.10<br />

b) DIC, Lunglei 1.30<br />

c) DIC, Saiha 1.55<br />

d) DIC, Kolasib 0.20<br />

e) DIC, Champhai 0.20<br />

f) DIC, Serchhip 0.20<br />

g) DIC, Lawngtlai 0.20<br />

h) SDIO, W.Phaileng 0.25<br />

Sub total : 5.00<br />

4. Travelling expenses :<br />

a) DIC, Aizawl 4.00<br />

b) DIC, Lunglei 2.00<br />

c) DIC, Saiha 2.00<br />

d) DIC, Kolasib 0.45<br />

e) DIC, Champhai 0.45<br />

f) DIC, Serchhip 0.45<br />

g) DIC, Lawngtlai 0.45<br />

h) SDIO, W.Phaileng 0.45<br />

Sub total : 10.25<br />

5 Office Expenses :<br />

a) DIC, Aizawl 7.00<br />

b) DIC, Lunglei 5.00<br />

c) DIC, Saiha 4.00<br />

d) DIC, Kolasib 0.50<br />

e) DIC, Champhai 0.50<br />

f) DIC, Serchhip 0.50<br />

g) DIC, Lawngtlai 0.50<br />

h) SDIO, W.Phaileng 0.50<br />

Sub total : 18.50<br />

6 Minor Works/Maintenance :<br />

a) DIC Aizawl – construction of new office building – phase II 14.00<br />

b) DIC, Aizawl – maintenance of office building & staff Qtrs. 4.00<br />

c) DIC, Lunglei – maintenance of office building & staff Qtrs. 4.00<br />

d) DIC, Saiha – maintenance of office building & staff Qtrs. 4.00<br />

Sl.No. Description of works (Rs. in lakh)


- 162 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

e) DIC, Kolasib – constn. of new office building & staff quarters for<br />

new DIC<br />

14.00<br />

f) DIC, Champhai - constn. of new office building & staff quarters<br />

for new DIC<br />

14.00<br />

g) DIC, Serchhip - constn. of new office building & staff quarters<br />

for new DIC<br />

12.52<br />

h) DIC, Lawngtlai – renovation of existing buildings / constn. Of<br />

new building<br />

12.73<br />

i) SDIO, West Phaileng - maintenance of existing buildings 3.00<br />

j) Demarcation of site & erection of boundary pillars of new DIC<br />

complex at Mamit<br />

1.00<br />

k) Site development for new DIC complex at Mamit 5.00<br />

Sub total : 88.25<br />

7. GIA to rural artisans :<br />

a) DIC, Aizawl - 100 nos. 2.50<br />

b) DIC, Lunglei – 75 nos 1.88<br />

c) DIC, Saiha - 50 nos. 1.25<br />

d) DIC, Kolasib - 25 nos. 0.63<br />

e) DIC, Champhai – 25 nos. 0.63<br />

f) DIC, Serchhip - 25 nos. 0.63<br />

g) DIC, Lawngtlai - 25 nos. 0.63<br />

h) SDIO, W.Phaileng – 25 nos. 0.63<br />

Sub total : 8.78<br />

8. Machinery & Equipments – Maintenance of 14.00<br />

Sub-total : 14.00<br />

Total : 292.52<br />

Scheme No. B – 10<br />

Name of the Scheme: Common Facility Centre(CFC)<br />

(Development of Rural Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(05) – Dev. of Rural Industries)<br />

These schemes were taken up during 8 th Five Year Plan for setting up of Multidisciplinary<br />

Workshop cum Training Centre for upgradation of the local skilled artisans and<br />

service facilities to the local SSI units. Out of 8 districts, 3 nos. of CFC are already set up and<br />

another five of this type is proposed. Every year about 35 nos. of trainees are undergoing<br />

training in different engineering trades at RIDC Aizawl and it is proposed to start this type<br />

of training at CFC Lunglei and Saiha for 15 nos. each of artisans w.e.f. 2003-04 financial year<br />

which cannot be accomplished for want of fund. It is also proposed to set up atleast one<br />

multidisciplinary workshop during 10 th Five Year Plan which again could not be materialised.<br />

Provision for the year <strong>2006</strong>-07 is tabulated below :<br />

Sl. No. Description of works (Rs. in lakh)<br />

1. Wages of casual employees :<br />

a) RIDC Aizawl - 26 nos. 12.35<br />

b) Common Facility Centre, Lunglei – 1 no.. 0.33<br />

c) Common Facility Centre, Saiha – 1 no. 0.33<br />

Sub-Total 13.01<br />

2. Office Expenses :<br />

a) RIDC, Aizawl 0.90


- 163 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl. No. Description of works (Rs. in lakh)<br />

b) CFC Lunglei 0.60<br />

c) CFC Saiha 0.50<br />

Sub-Total 2.00<br />

3. Materials & Supply :<br />

a) Procurement of Training materials for RIDC,Aizawl 3.50<br />

b) Procurement of Training materials for CFC,Lunglei 0.00<br />

c) Procurement of Training materials for CFC, Saiha 0.00<br />

Sub-total 3.50<br />

4. Minor Works/Maintenance :<br />

a) Maintenance of building under RIDC, Aizawl, 2.00<br />

b) Maintenance of building under CFC, Lunglei 1.50<br />

c) Maintenance of building under CFC, Saiha 1.50<br />

d) Maintenance of plants and machineries under RIDC Aizawl 2.00<br />

e) Maintenance of plants and machineries under CFC, Lunglei 0.90<br />

f) Maintenance of plants and machineries CFC, Saiha 0.54<br />

Sub-Total 8.44<br />

5. Scholarship/Stipend :<br />

a) Stipend & Book grant for trainees under RIDC Aizawl 1.50<br />

b) Industrial Study Tour for trainees under RIDC, Aizawl 1.50<br />

Sub-Total 3.00<br />

6. Machineries & Equipment :<br />

a) Procurement of tools & equipment under RIDC Aizawl 3.00<br />

b) Procurement of tools & equipment under CFC Lunglei 2.50<br />

c) Procurement of tools & equipment under CFC Saiha 2.04<br />

Sub-Total 7.54<br />

Total of B-10 37.49<br />

Scheme No. B – 11<br />

Name of Scheme: Development of Electronics<br />

A. Electronics & IT Wing in Directorate :<br />

(Budget Head : 2851 – Village & Small Industries, 102(06) – Development of Electronics)<br />

Development of Electronics Scheme is an on-going scheme which includes matters<br />

related to Electronics and Information Technology. Apart from promotion of the industries,<br />

the department is initiating various projects for computerization and its related matters.<br />

Keeping these in view, the dept. formulates and implements the policy of the Government in<br />

respect of Electronics and Information Technology, and guides various Departments<br />

regarding the steps to be taken for computerization, and co-ordinates these efforts.<br />

Proposed Plan during <strong>2006</strong>-<strong>2007</strong> is as below:-<br />

1. To implement various e-governance Projects such as;<br />

(a) Departmental Networking upto sub-divisional offices.<br />

(b) Creation and maintenance of web-based Citizen Centric Services.<br />

(c) Maintenance and better utilization of CICs established in the whole of <strong>Mizoram</strong>.<br />

(d) Development of customized application software for computerization of various<br />

office procedures.


- 164 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. To organize Seminar, Exhibition, Workshop, Training, Awareness Campaign,<br />

Publicity, etc.<br />

3. Manpower development and computer literacy:<br />

The Department set up two training Institutions namely, Golden Republic<br />

Information Technology Centre, Directorate of Industries, Aizawl, and Academy of<br />

Computer and Electronic Centre, District Industries Centre, Lunglei. Various<br />

DOEACC recognized courses, computer courses and electronic courses are<br />

conducted for local people, officers/staff of Government Departments, NGOs, etc. It<br />

is also planned to conduct computer literacy programme for government servants<br />

throughout the year in these institutions.<br />

4. To sponsor graduate and post graduate students pursuing various electronic and<br />

computer courses.<br />

5. To motivate students for their interest in IT subject, it is proposed to give cash<br />

award as below:<br />

Sl.<br />

Particulars<br />

No.<br />

1. Class X students securing highest mark in<br />

computer science subject at MBSE examination,<br />

2005<br />

2. Class XII students securing highest mark in<br />

computer science subject at MBSE examination,<br />

2005<br />

First Second Third<br />

Prize prize prize<br />

Rs.30,000 Rs.20,000 Rs.10,000<br />

Rs.30,000 Rs.20,000 Rs.10,000<br />

The scheme is prepared for implementation within the allocation of Rs. 70.76 lakh as<br />

detail head given below.<br />

Sl.<br />

No.<br />

1<br />

Head (Rs. in lakh)<br />

Salary<br />

a) For existing staff – 1 no.<br />

b) For 1(one) Asst. Software Engineer<br />

c) For 2 (two) Senior Technicians<br />

d) For 6 (six) Teaching Faculties at GRITC, Aizawl and AC & EC, Lunglei<br />

2 Wages for muster roll workers – 10 nos. 5.82<br />

3 Medical Treatment 0.50<br />

4 Traveling Expenses 2.00<br />

5 Office Expenses 7.20<br />

6 Rent 0.00<br />

7 Materials and Supply :<br />

a) Procurement of training materials for GRITC, Aizawl and AC & EC,<br />

Lungle<br />

5.00<br />

8 Advertisement 2.00<br />

9 Minor Works/Maintenance :<br />

a) Maintenance of GRITC, Aizawl and AC & EC, Lunglei 3.00<br />

b) Maintenance of CICs. 2.00<br />

10 GIA/Subsidy :<br />

a) Grant-in-aid to electronic artisans 1.20<br />

b) Cash incentive to outstanding students at Board Exam 1.20<br />

8.60


- 165 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl.<br />

No.<br />

Head (Rs. in lakh)<br />

11 Scholarship/Stipend :<br />

a) Stipend and book grant for Diploma, Graduate and Post-Graduate<br />

students in Electronics & IT fields studying outside State<br />

4.00<br />

b) Training for Departmental officials 2.00<br />

c) Study tour 2.00<br />

12 Other Charges :<br />

a) Development of customized application software<br />

b) Connectivity charges for <strong>Mizoram</strong> Education Network (MEDNET)<br />

0.10<br />

13 Machinery and Equipment :<br />

Procurement of Computer and accessories for Directorate, DICs,<br />

SDIOs & CICs<br />

0.14<br />

TOTAL 46.76<br />

B. Zoram Electronics Development Corporation Ltd. (ZENICS) :<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

During the 10 th Five Year Plan 2002-07, ZENICS Ltd. proposed to take up the<br />

following projects in addition to continuing the on-going projects of Computer Academy<br />

and Consumer Electronics Training Centre :-<br />

1. Preparation of Electors’ Photo Identity Card for <strong>Mizoram</strong> State under Election<br />

Department<br />

2. Preparation of <strong>Mizoram</strong> Portal in the Internet<br />

3. Preparation of separate Tourism Portal for Tourism Department<br />

4. Multi-Media Content Creation Centre<br />

5. Training of Unemployed Engineers and Science Degree Holders in collaboration with<br />

M/s Informatics<br />

6. Restructuring of the Corporation<br />

7. Human Resource Development Project to make <strong>Mizoram</strong> State IT literate<br />

8. Connectivity to Education Research Network<br />

The authorized share capital of the Corporation is Rs. 5.00 crore which has been<br />

proposed to be enhanced to Rs. 20.00 crore. Out of this, the paid up capital up to 2004-05 is<br />

Rs. 507.40 lakh.<br />

Proposal for <strong>2006</strong>-07:<br />

Sl. No. Particulars (Rs. in lakh)<br />

1 Share Capital contribution 40.00<br />

Scheme No. B – 12.<br />

Name of the Scheme : Handloom & Handicraft Industries<br />

In order to accomplish the objectives of national and state level agenda announced<br />

in various policy resolutions, the following works shall be undertaken for the development<br />

of Handloom & Handicrafts sectors in the state during <strong>2006</strong>-07.


- 166 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

A. Handloom Industry :<br />

1. Handloom Industry<br />

(Budget Head : 2851 – Village & Small Industries, 103(01) – Handloom Industry)<br />

Sl.<br />

No.<br />

Programmes of Works (Rs. in lakh)<br />

1. Salary of existing staff – 7 nos. 13.29<br />

2. Wages for MR workers – 8 nos. 3.00<br />

3. Medical Treatment 1.00<br />

4. Travelling Expenses 4.00<br />

5. Office Expenses 4.12<br />

Total of 1 : 25.41<br />

2. Promotion & Development of Handloom Industry<br />

(Budget Head : 2851 – Village & Small Industries, 103(02) – Pro. & Dev. of Handloom<br />

Industry)<br />

Sl.<br />

No.<br />

Programmes of Works (Rs. in lakh)<br />

1. Material & Supply :<br />

a) Procurement of building materials for temporary sheds for<br />

Decentralised Training Programme<br />

1.50<br />

b) Purchase of training materials for departmental training and<br />

decentralized training programme<br />

6.00<br />

Sub-total 7.50<br />

2. Advertising: (publication & dessimination of information) 2.56<br />

Sub-total 2.56<br />

3. Minor Works/Maintenance :<br />

a) Construction of W.T.C Building at Lunglei (token provision) 0.10<br />

b) Repairs and maintenance of Training Centres at various places 6.00<br />

c) Shifting & construction of HRDC building at Luangmual 2.90<br />

d) Purchase and maintenance of computer and its peripherals 3.50<br />

Sub-total 12.50<br />

4. Grant-in-Aid/Subsidy :<br />

a) Rebate on sale of handloom & handicraft products through exhibition 5.00<br />

b) Grants to Departmentally trained weavers in the form of looms<br />

& accessories<br />

7.00<br />

c) Gandhi Jayanti rebate and grants to Bee-Keepers. 1.50<br />

d) Working Capital to weavers @ Rs. 2500/- for 80 weavers. 2.00<br />

e) Matching contribution to CSS. 15.00<br />

Sub-total 30.50<br />

5. Scholarship/Stipend :<br />

a) Stipend for 50 Trainees under De-centralised Training<br />

Programme @ Rs. 500/- per month for 6 months.<br />

1.50<br />

b) Stipend for 50 Trainees @ Rs.500/- p.m. for one year. 3.00<br />

c) Exposition tour for officials 1.00<br />

Sub-total 5.50<br />

6. Machinery & Equipment :<br />

a) Purchase of loom, warping drum & accessories for Departmental<br />

Training & Decentralised Training Programme<br />

3.00<br />

b) Technology upgradation – purchase of improve looms with<br />

Jacquard and Dobby attachments<br />

1.54<br />

Sub-total : 4.54<br />

7. Other Charges/compensation - (production of cloth sample) 1.00<br />

Total of 2 : 64.10


- 167 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. Tribal Handloom Development Project<br />

(Budget Head : 2851 – Village & Small Industries, 103(03)– Tribal Handloom Dev. Project)<br />

Sl.<br />

No.<br />

Programmes of Works (Rs. in lakh)<br />

1. Establishment grant for Tribal Handloom Development Project 20.00<br />

Total of ‘A’ (1 + 2 + 3): 109.51<br />

B. Handicraft Industry :<br />

(Promotion & Development of Handicraft Industry)<br />

(Budget Head : 2851 – Village & Small Industries, 104(01) – Pro. & Dev. of Handicraft Industry)<br />

Sl.<br />

No.<br />

Programmes of Works (Rs. in lakh)<br />

1. Salary of existing staff – 3 nos. 3.44<br />

2. Wages for Muster Roll Workers – 7 nos. 2.58<br />

3. Medical Treatment 1.96<br />

4 Travelling expenses 2.00<br />

5. Office Expenses 2.00<br />

6. Rent 0.80<br />

7. Material & Supply – purchase of training materials for knitting,<br />

tailoring, embroidery, cane & bamboo<br />

5.00<br />

8. Minor Works – repair & maintenance of Craft Centre buildings 4.00<br />

9. Grant-in-aid/Subsidy – for Departmentally trained artisans and<br />

trained by Industrial Units numbering 380 artisans.<br />

9.50<br />

10. Scholarship/Stipend :<br />

a) Stipend for Trainees in Departmental Training Centres –<br />

250×250×12<br />

7.45<br />

b) Sponsoring of officials/artisans for bamboo craft training in<br />

China<br />

0.05<br />

11. Other charges – Institution of state award 0.50<br />

Total of ‘B’ : 39.28<br />

C. <strong>Mizoram</strong> Handloom & Handicrafts Development Corporation Ltd. (ZOHANDCO) :<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

The <strong>Mizoram</strong> Handloom and Handicrafts Development Corporation Ltd. was duly<br />

incorporated under the Companies Act, 1956 on the 20.12.1988 and the main objectives<br />

were to develop Handloom & Handicraft units in the state of <strong>Mizoram</strong>.<br />

The authorized share capital of the Corporation is Rs. 7.00 crore and proposed to be<br />

enhanced to Rs. 12.00 crore and the paid-up capital up to 2004-05 is Rs. 754.70 lakh. In<br />

anticipation of enhancement of the authorized share capital, the Department proposed to<br />

contribute share capital to the Corporation as follows: -<br />

Sl.No. Programme of work (Rs. in lakh)<br />

1 Share capital contribution 45.00


Scheme No. B – 13 :<br />

- 168 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of the Scheme: <strong>Mizoram</strong> Khadi & Village Industries Board<br />

(Promotion & Development of Khadi & Village Indusatries)<br />

(Budget Head : 2851 – Village & Small Industries, 105(01) –Pro. & Dev. of KVI)<br />

The Board was established in 1986. As it is a statutory Board, it is the responsibility<br />

of State Government to bear the establishment charges [vide chapter V 28(1)].<br />

The existing establishment which require to be maintained consists of 173 nos. of<br />

employees of the following categories.<br />

Group A - 12<br />

Group B - 7<br />

Group C - 114<br />

Group D - 40<br />

Total - 173<br />

However, due to financial constraints, the Department proposed to contribute<br />

establishment grants to the MKVI Board as follows :-<br />

Particulars (Rs. in lakh)<br />

Grant-in-aid :<br />

Establishment Grant to the Board 240.00<br />

Scheme No. B – 14<br />

Name of the Scheme: Development of Bamboo Based Industries :<br />

(Budget Head : 2851 – Village & Small Industries, 800(01) – Dev. of Bamboo Industry)<br />

The State Government, in its endeavor to tap the economic potential of vast bamboo<br />

resources available in the state, has placed bamboo as a thrust sector which is reflected in<br />

the Industrial Policy of <strong>Mizoram</strong> 2000 and separate Bamboo Policy of <strong>Mizoram</strong> 2002 has<br />

also been announced.<br />

1. Grant to Bamboo Development Agency :<br />

Bamboo Development Agency (BDA) has been established by State Government for<br />

effective implementation of bamboo utilization activities. The Agency has now enter into<br />

Joint-Venture agreement with M/s Venus Bamboo Products (P) Limited. A Joint -Venture<br />

Company in the name and style of M/S <strong>Mizoram</strong> Venus Bamboo Products (P) Ltd.. was<br />

formed. The Agency is entrusted with the tusk of Development of Bamboo Concrete<br />

Technology, Construction of Bamboo Demonstration Houses, Bamboo Shoot Preservation by<br />

Vacuum Packing, Hardening Units for Tissue Cultured Plants etc., besides project proposal<br />

awaiting sanction within a short period. It is felt necessary to provide GIA to the BDA for<br />

running the establishment.<br />

Sl.<br />

No.<br />

Programmes of Works (Rs. in lakh)<br />

1. Grant in Aid :<br />

Grant in Aid to Bamboo Development Agency 9.00<br />

Total : 9.00


- 169 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. BAFFACOS :<br />

The Agency, as well as the Department, is entrusted to implement BAFFACOS<br />

scheme for which Additional Central Assistance under the Twelfth Finance Commission has<br />

been received and is expected for <strong>2006</strong>-07.<br />

It is, therefore, proposed to give fund as follows during <strong>2006</strong>-07: -<br />

Sl.<br />

No.<br />

Programmes of Works (Rs. in lakh)<br />

1. Other charges/Compensation :<br />

For BAFFACOS 365.00<br />

Total : 365.00<br />

Scheme No. B - 15<br />

Name of the Scheme: Zoram Industrial Development Corporation Ltd. (ZIDCO)<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

Zoram Industrial Development Corporation Ltd. (ZIDCO) was set up in 1978 having<br />

twin functions of Industrial Development and Finance. However, its activities are more or<br />

less limited to Industrial financing.<br />

The Main sources of funds are :<br />

1) Share Capital.<br />

2) Loan/Refinance from IDBI/SIDBI, NMDFC, HUDCO and any other financing body.<br />

3) Recovery of loans.<br />

4) Interest on saving A/C.<br />

The authorized share capital of the Corporation is Rs. 20.00 crore and the paid-up<br />

capital up to 2004-05 is Rs. 1507.60 lakh. It is proposed to continue contributing share<br />

capital to the Corporation in <strong>2006</strong>-07 also.<br />

As such, proposal for <strong>2006</strong>-07 is indicated below :<br />

Particular (Rs. in lakh)<br />

Share Capital contribution 30.00<br />

TOTAL OF ‘B’ : Rs. 1704.00 lakh


- 174 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SERICULTURE<br />

Introduction:<br />

Sericulture Industry is family-oriented, labour intensive, ideally suited to countries in<br />

the tropical region where unemployment continues to be a serious problem. It has also been<br />

said to be a meeting place of Agriculture, Arts and Industries as it involves in cultivation of<br />

Silkworm food plants, Seed production and rearing of silkworms are an Art requiring skilled<br />

hands and the post cocoon technology upto its marketing are purely Industries.<br />

Sericulture practices can rightly fit into the Socio-economic structure of the rural<br />

areas and play significant role for reconstruction of rural economy benefiting mostly the<br />

weaker section of the society. The most important consideration is the effective utilization<br />

of family manpower, indiscriminately, the old aged, handicapped, illiterate and women folk.<br />

It is also the most important tool to fill up the gap between the rich and the poor<br />

distributing wealth among the farmers, reelers, weavers and traders where the lion share<br />

goes to the poor farmers.<br />

In fact, Sericulture is practised as a viable rural Industry as it gives remunerative<br />

employment to family labour throughout the year and ensures periodic income even from<br />

small land holding with low financial investment. It has a ready market and is export<br />

oriented.<br />

Objectives:<br />

(i) To uplift the rural economy in the State.<br />

(ii) To generate direct and indirect gainful employment.<br />

(iii) In the context of <strong>Mizoram</strong>, it aims at weaning away the devastating Jhum Cultivation<br />

by establishing Sericulture farming in the private sector, which will be permanent<br />

and sustainable occupation for the rural poor.<br />

(iv) To produce more cocoons and raw silks for the benefit of the farmer in particular<br />

and to increase the State’s revenue in general.<br />

Uniqueness:<br />

(i) The wealth is transferred from the rich to the poor where maximum share goes to<br />

the poor.<br />

(ii) Indiscriminate utilization of family manpowers. In other words, in Sericulture<br />

activities all kinds of people can equally involved.<br />

(iii) Nothing is practically a waste in Sericulture. Mulberry twigs are used as firewood, the<br />

litters a manure, the pupae for oil extraction, poultry/fish/human feed, the Mulberry<br />

trunk for making cricket bat, hockey stick, etc.<br />

The State of <strong>Mizoram</strong> has been proved to be an ideal place for the development of<br />

Sericulture Industry. The climatic condition, rainfall and fertility of the soil are congenial for<br />

cultivation of Silkworm food plants and rearing of Silkworms of all varieties like Mulberry,<br />

Eri, Muga and Oak Tasar. A team of experts from the Central Silk Board had visited <strong>Mizoram</strong><br />

in November, 1976 to conduct feasibility survey. The team had visited many parts of the<br />

State and their finding was reproduced as follows: —<br />

The State of <strong>Mizoram</strong> has all the prerequisites for the development of all kind of<br />

Silkworm varieties.


- 175 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The Sericulture experts from JICA who have visited <strong>Mizoram</strong> in March, 2000 have<br />

also realised with much surprise the fact that without application of fertilizer/manure for<br />

years together the Mulberry trees thrive well and put forth leaf almost throughout the year.<br />

The four sectors of Sericulture Industry which are being exploited on commercial<br />

basis are: —<br />

(a) Mulberry: Mulberry can successfully be propagated through cuttings or saplings<br />

anywhere in the State.<br />

(b) Eri: The food plants of Eri Silkworm like Kesseru, Castor, Tapioca, etc. etc. can be<br />

grown anywhere in the State.<br />

(c) Muga: The main food plants of Muga Silkworm like Som and Soalu are sparcely<br />

scattered almost everywhere in <strong>Mizoram</strong> which can easily be systematised through<br />

block plantation.<br />

(d) Oak Tasar: It has been estimated that over 30000 hectares of natural grown Oak<br />

trees are available in the north eastern part of the State. The Oak trees are the main<br />

food plant of Oak Tasar Silkworm.<br />

In spite of all the aforesaid advantages that the State of <strong>Mizoram</strong> has for the<br />

development of Sericulture Industry, the growth of Sericulture Department in the State has<br />

been at a very slow pace and the reasons to this are attributed to lack of the required<br />

infrastructural facilities, paucity of fund, inadequate number of staff, etc.<br />

During the 10 th Plan period (2002-<strong>2007</strong>), Sericulture Department will intensify its<br />

Plan and implementation Programmes towards production of Bivoltine Mulberry Silk and<br />

also Eri and Muga Sectors shall be given importance simultaneously. To meet these ends<br />

maximum quantity of high yielding Mulberry variety, som/soalu and kesseru/castor shall be<br />

introduced in the private sectors. In the meantime seed Grainages, rearing and post cocoon<br />

Technologies shall be upgraded/improved as far as practicable.<br />

Since various Catalytic Programmes under Silk Board are proposed to be<br />

implemented during the tenth Plan period, necessary provision as matching contributions<br />

have been made during <strong>2006</strong>-<strong>2007</strong> under promotion Scheme.<br />

THE SCHEMES:<br />

There are 8 (eight) on going schemes implemented by the Department during the<br />

tenth Plan period and these schemes have satisfactorily been implemented during the first<br />

three years of the Tenth Plan. As in the previous year, priority shall be given to the following<br />

work components during <strong>2006</strong>-<strong>2007</strong> which are mentioned below.<br />

(1) During 2005-<strong>2006</strong>, 1630 acres have been covered with new Mulberry Plantation as<br />

against the target of 500 acres. Another 1500 acres of land shall be covered under<br />

improved variety of mulberry during <strong>2006</strong>-<strong>2007</strong>.<br />

(2) One Staff quarter is proposed to be constructed at Sericulture complex, Chaltlang<br />

and the existing buildings at different farms shall be renovated/ repaired as per<br />

availability of fund.<br />

(3) Silk Reeling Factory shall be improved as far as possible in order to produce quality<br />

Raw Silk. Meanwhile the Silk Weaving Unit may be revived if need arise for<br />

production quality silk fabric.


- 176 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(4) Seed production shall be increased to cater the demand of the farmers far and wide<br />

in the State.<br />

Scheme-wise outlays approved for the year <strong>2006</strong> - 07 are :-<br />

1. Direction - Rs. 56.50 lakh<br />

2. Administration - Rs. 147.00 lakh<br />

3. Promotion - Rs. 33.00 lakh<br />

4. Marketing - Rs. 17.50 lakh<br />

5. Research & Training - Rs. 12.00 lakh<br />

6. Silk Processing - Rs. 13.00 lakh<br />

7. Seed Organisation - Rs. 6.00 lakh<br />

8. Baffacos - Rs. 115.00 lakh<br />

Total - Rs. 400.00 lakh<br />

DETAILS OF THE SCHEMES<br />

SCHEME NO. I : DIRECTION<br />

This scheme aims at improvement and upkeep of Directorate Office Establishment,<br />

Strengthening of Planning Cell, Information Cell, Publicity through different media,<br />

organisation of Seminars, participation of Industrial fairs. Planning, monitoring of all plan<br />

implementation Programmes, overall control of financial expenditures, etc etc.<br />

The main components of the scheme are : -<br />

1) Purchase of required stationery items.<br />

2) Maintenance of 2 heavy vehicles and 4 Light Vehicles.<br />

3) Up keep of staff and office administration.<br />

4) Monitoring/control of all work implementation.<br />

5) Construction / repairs of Staff Quarter at Sericulture Complex, Chaltlang.<br />

Sl.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

Name of Post Scale of Pay<br />

Director of Seri.<br />

Jt. Director<br />

D.D.S (Planning)<br />

F.A.O<br />

Office Supdt.<br />

Assistant<br />

Accountant<br />

J.E<br />

Steno-III<br />

U.D.C<br />

L.D.C<br />

Mechanic<br />

Duftry<br />

IV-Grade<br />

14,300-18,300<br />

12,000-16,500<br />

10,000-15,200<br />

8,000-13,500<br />

8,000-13,500<br />

5,500 - 9,000<br />

5,500 - 9,000<br />

5,500- 9,000<br />

5,000- 8,000<br />

5,000- 8,000<br />

4,000- 6,000<br />

5,000- 8,000<br />

3,050- 4,590<br />

2,650- 4,000<br />

Existing<br />

(No.)<br />

-<br />

1<br />

-<br />

-<br />

1<br />

2<br />

1<br />

1<br />

1<br />

1<br />

2<br />

1<br />

1<br />

5<br />

Approved<br />

Outlay<br />

(Rs. in lakh)<br />

21.00<br />

Total 17 21.00


- 177 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl. No.<br />

Item-wise financial break-up<br />

Item<br />

Approved Outlay<br />

(Rs. in lakh)<br />

1. Salary of Staff & Medical treatment<br />

21.00<br />

2. Wages of M/R<br />

5.00<br />

3. Medical Treatment<br />

3.00<br />

4. Traveling Expenses<br />

3.00<br />

5. Office Expenses<br />

9.00<br />

6. Publicity/Advertisement<br />

1.50<br />

7. Minor Works<br />

5.00<br />

8. Maintenance of Vehicle<br />

9.00<br />

Total 56.50<br />

SCHEME NO. II : ADMINISTRATION<br />

All District level Office Establishments, maintenance and upkeep of these<br />

establishments, farms/centres come under this scheme.<br />

Brief Components of the scheme during <strong>2006</strong>-<strong>2007</strong> are :-<br />

1) Construction of District Sericulture Office buildings at Serchhip, Construction of<br />

Staff quarters at different places depending on availability of fund.<br />

2) Maintenance of Farms/Centres for Silkworm rearing and seed cocoon production.<br />

3) Repair of Buildings shall also be taken up at various Sericulture Farm.<br />

4) Purchase of all kind of appliances, equipments, fertilizers manure etc.etc.<br />

Sl.<br />

No.<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

11.<br />

Position of staff and requirement on salary.<br />

Name of Post Scale of Pay<br />

D.S.O<br />

S.P.O<br />

Head Asstt.<br />

U.D.C<br />

L.D.C<br />

Driver<br />

E.O<br />

Farm Manager<br />

Reeling Foreman<br />

Rearer<br />

IV-Grade<br />

8,000 -13,500<br />

6,500 -10,500<br />

5,500 - 9,000<br />

5,000 - 8,000<br />

4,000 - 6,000<br />

3,050 - 4,590<br />

5,500 - 9,000<br />

5,000 - 8,000<br />

5,000 - 8,000<br />

2,750 - 4,400<br />

2,650 - 4,000<br />

Existing<br />

No.<br />

4<br />

10<br />

4<br />

2<br />

3<br />

2<br />

9<br />

3<br />

1<br />

10<br />

4<br />

Total<br />

required<br />

7<br />

10<br />

7<br />

5<br />

9<br />

2<br />

9<br />

3<br />

1<br />

10<br />

7<br />

Approved<br />

Outlay<br />

(Rs. in lakh)<br />

70.00<br />

Total 52 70 70.00<br />

Financial Targets (Rs. in lakh)<br />

Sl.<br />

No.<br />

Item Approved Outlay<br />

1. Salary of Staff<br />

60.00<br />

2. Wages<br />

35.00<br />

3. Medical Treatment<br />

5.00<br />

4. Traveling Expenses<br />

8.00<br />

5. Office Expenses<br />

15.00<br />

6. Rent<br />

1.00<br />

7. Minor Works / Maintenance<br />

13.00<br />

Total 147.00


- 178 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO. III : PROMOTION<br />

This scheme mainly concern with extension and promotional activities benefiting<br />

mostly the private farmers. It provides technical assistance and gives subsidy/GIA to the<br />

registered farmers from time to time.<br />

Various Catalytic Development Projects (CSB) had been incorporated under this<br />

scheme for upgradation of Mulberry, Eri, Muga and Oak Tasar development in the state.<br />

Tentative provision to match the CDP schemes have made under this scheme.<br />

Main components of the scheme are : -<br />

1) Purchase of fencing materials which includes Angle post, Goat-proof wire mess, etc.<br />

2) Distribution of Mulberry Cuttings to 1500 families.<br />

3) Upgradation of farms and Augmentation of Silkworm food plants at different<br />

varieties to match the CDP schemes.<br />

Position of staff and posts proposed<br />

Sl.<br />

No.<br />

Name of Post<br />

Scale of Pay<br />

(Rs.)<br />

Existing<br />

No.<br />

Fund required<br />

(Rs. in lakh)<br />

1 Seri. Demonstrator 4,000-6,000 9 10.50<br />

Total 9 10.50<br />

Financial Targets<br />

Sl.<br />

No<br />

1<br />

2<br />

3<br />

Item<br />

Financial Target<br />

(Rs. in lakh)<br />

Salary of Staff<br />

10.50<br />

Supplies & Materials/CDP<br />

13.00<br />

Machinery & Equipment/CDP<br />

9.50<br />

Total 33.00<br />

SCHEME NO. IV : MARKETING<br />

Since a separate marketing cell has not yet been created, the marketing activity is<br />

directly controlled by the Directorate through the District Officers. Generally marketing<br />

activities should not come within the purview of the Department in case there exists Master<br />

Reelers and Weavers in the private sector in the State. In the absence of Reelers and Weavers<br />

in the State the marketing activities are bound to be looked after by the Department alone.<br />

In this circumstance, the Department is compelled to continue to purchase cocoons<br />

produced by the farmers and reel them in the reeling factory for producing raw silk.<br />

Since a provision for purchase of Cocoons has been made under Baffacos a provision<br />

of Rs. 10.00 lakh under material supplies shall be utilised for purchase of fencing materials.<br />

Position of Staff and requirement of Salary<br />

Sl.<br />

No.<br />

Name of Post<br />

Scale of Pay Existing<br />

No.<br />

Fund required<br />

(Rs. in lakh)<br />

1. L.D.C/Sales Asstt. 4,000-6,000 1 1.50<br />

Total 1 1.50


Financial Targets<br />

- 179 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl. No. Item Financial Outlay (Rs. in lakh)<br />

1<br />

2<br />

Salary of Staff<br />

1.50<br />

Supplies & Materials /CDP<br />

16.00<br />

Total 17.50<br />

SCHEME NO. V : RESEARCH & TRAINING<br />

As already mentioned in the aforesaid para, Sericulture Industry is an Agro-based<br />

which requires wide range of Scientific technologies with different financial investments.<br />

Therefore, proper studies on silkworm metamorphose, pathology, Agronomy, Arboriculture<br />

and ecology are indispensable to make Sericulture Industry flourish economically viable.<br />

The success of Sericulture Industry largely depend on the availability of required Scientific<br />

knowledge and its application in the field at the right time and at the right place.<br />

This can be achieved through realisation of the importance of Research and Training<br />

activities based on well-organised scientific lines, equipped with the most advanced<br />

scientific instruments to evolve new concepts of scientific methodology for application to<br />

field activities with minimum financial investment.<br />

At this end, the Department of Sericulture had established one Research and<br />

Training Institute at Zemabawk with the following objectives.<br />

1. To depute B.Sc. graduates for training in post Graduate Diploma in Sericulture to<br />

various Sericulture Institutes in India.<br />

2. To Impart training to matriculates for one year certificate course training.<br />

3. To Impart short-term training to the in-service personnel and the private farmers.<br />

4. To conduct study tours for trainees from time to time.<br />

5. To conduct mobile training to farmers of far flung areas. During <strong>2006</strong>-<strong>2007</strong>, it is<br />

proposed to train 1000 farmers and 50 in-service persons.<br />

6. Repairs of buildings/quarters.<br />

Position of Staff and requirement of Salary<br />

Sl.<br />

No.<br />

Name of Post Scale of Pay<br />

Existing<br />

No.<br />

Fund<br />

required<br />

(Rs. in lakh)<br />

1 Principal 10,000-15,200 1 4.00<br />

Total 1 4.00<br />

Financial target<br />

Sl.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

Item<br />

Financial Outlay<br />

(Rs. in lakh)<br />

Salary of Staff<br />

3.00<br />

Wages<br />

2.00<br />

Office Expenses<br />

2.00<br />

M.W/Maintenance<br />

5.00<br />

Total 12.00


- 180 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHEME NO.VI : SILK PROCESSING<br />

The main theme of Sericulture Industry is to make earnings through Sales of various<br />

Sericulture products to individuals, societies in the State.<br />

Unless the cocoons so produced are processed to produce raw silk and silk fabrics,<br />

Sericulture activities are said to be incomplete. The cocoons produced are subjected to<br />

various post Cocoon technologies in order to produce quality raw silk and silk goods for<br />

sale in the market.<br />

The cocoon processing comprises of selection of quality cocoons, stifling, cooking,<br />

degumming, reeling/spinning, twisting, weaving and so on. Cocoon processing required<br />

highly skilled hands in order to produce quality raw silk and silk fabrics to catch viable<br />

markets.<br />

At this objective, the Sericulture Department is having one Reeling Factory at<br />

Zemabawk. Apart from producing raw silk and silk fabrics these units have also been<br />

producing silk quilts in abundance which has marketing potential everywhere in the<br />

country. Since the production of reeling cocoons is increasing year after year, it has become<br />

a necessity to have one more Reeling machine like the existing ones. Under this scheme<br />

there is one silk weaving and dyeing unit at Aizawl where silk fabrics of various designs are<br />

produced.<br />

Therefore the main aim of this scheme is to create & encourage private reelers/<br />

weavers so as to sustain their livelihood through sales of their products.<br />

However, to make the Department capable of increasing the revenue through Sales of<br />

Sericultural products, the reeling factory has to be strengthened by providing necessary<br />

infrastructures.<br />

Sl. No. Item Financial target (Rs. in lakh)<br />

1 Wages 11.00<br />

2 O.E. 2.00<br />

Total 13.00<br />

SCHEME NO. VII : SEED ORGANISATION<br />

Common Occurrence of crop failure is exclusively attributed to bad quality of<br />

silkworm seeds. Therefore production of quality seed is a vital aspect for the success of<br />

Sericulture Industry. Quality seed may be defined as seed which is completely free from<br />

diseases.<br />

The whole gamut of seed production comprises of seed organisation for systematic<br />

and methodical multiplication of basic seed and Industrial seed on Scientific line and its<br />

proper and efficient management of breeders stock and its multiplication for the ultimate<br />

production of Industrial hybrid seed. Seed production involved in maintenance of breeder’s<br />

stock, basic seed and industrial seed and maintaining the purity, its vigour and vitality.<br />

Although three distinct phases for seed production are involved in systematic seed<br />

organisation in normal case, the seed organisation designed to be operative in <strong>Mizoram</strong><br />

consists of a simple three-tiers system namely — (a) Basic seed centre, (b) Multiplication<br />

Centre and (c) Industrial Grainage.


- 181 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The basic seed centre, Rangvamual is acting as Breeder`s stock which will produce<br />

only pure bred silkworm races of not less than four varieties. The seeds produced are then<br />

distributed equally to the selected Multiplication centres.<br />

The distinctive characteristic of the multiplication centres in seed organisation in<br />

<strong>Mizoram</strong> is that they only produce quality seed cocoons whereas in other states they are<br />

producing seed cocoons and silkworm seeds (eggs). The seed cocoons produced by these<br />

centres are then brought to the Industrial Grainage, Zemabawk for production of hybrid<br />

eggs to feed the private farmers.<br />

Maintenance of all the Multiplication Centres like Vairengte, Kolasib, Serchhip,<br />

Thenzawl, Baktawng, Lunglei, Champhai, Phullen, Rangvamual and Zemabawk will<br />

henceforth be looked after under this scheme.<br />

Depending on the actual requirement of hybrid seeds in the States, the industrial<br />

Grainage is expected to produce as much seeds as possible from season to season.<br />

Main components of the scheme are :-<br />

(1) Purchase of equipment/appliances, etc., etc.<br />

(2) To produce as much seeds as possible as per the requirements and the targets<br />

made for the concerned year.<br />

Financial Targets<br />

Sl. No. Item Financial target (Rs. in lakh)<br />

1 Wages 3.00<br />

2 O.E. 3.00<br />

Total 6.00<br />

ACTION <strong>PLAN</strong> FOR MULBERRY <strong>PLAN</strong>TATION AND SILKWORM REARING<br />

UNDER BAFFACOS, <strong>2006</strong> - <strong>2007</strong><br />

During 2005-06, the Department has taken up Mulberry Sericulture covering 250<br />

Nos. of farmers under various components like Land Development, Mulberry Cultivation,<br />

Construction of Rearing Houses and Supply of Rearing appliances. The Department is<br />

allotted 100.00 lakh which is expected will be utilised fully.<br />

The Scheme will be continued during <strong>2006</strong>-07 for the 3 rd year covering 350 Nos. of<br />

farmers under the similar components. The fund allotted under BAFFACOS during <strong>2006</strong>-07<br />

is Rs. 115.00 lakh.<br />

Apart from implementing the same components, fund will be provided for purchase<br />

of Cocoons for the farmers who had planted Mulberry during 2005-06 are going to start<br />

silkworm rearing and thereby producing Cocoons. During April <strong>2006</strong>, the farmers are<br />

expected to produce Cocoons and earning handsome income regularly.


- 182 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The components to be taken up during <strong>2006</strong>-07 are as follows :-<br />

A. LAND DEVELOPMENT<br />

Land Development includes clearing of Jungles, burning and land preparation, pit<br />

digging and plantation of the inputs. The individual farmers will be assisted for land<br />

development as per the norm.<br />

B. SUPPLY OF MULBERRY CUTTINGS<br />

The farmers will be supplied with improved high yielding varieties of Mulberry @<br />

Rs.20,000/- each to cover 1 hactare of land. The cuttings has to be planted @ 2 Nos. cuttings<br />

per pit.<br />

C. PURCHASE OF COCOONS<br />

Fund has to be earmarked to purchase the Cocoons to the tune of<br />

Rs. 35.00 lakh in order to make immediate payment of the Cocoons form the farmers. The<br />

Department has to collect the Cocoons from the farmers.<br />

The components of the scheme may be summed up as follows :<br />

Sl. No. Components Physical Financial (Rs. in lakh)<br />

1 Land Developments like clearing, pit<br />

digging, plantation etc.<br />

350 52.50<br />

2 Supply of Mulberry Cuttings containing 3<br />

lives buds, 2 cutting per pit @ Rs. 0.25 per<br />

cutting 20,000 cutting each.<br />

350 17.50<br />

3 Purchase of Cocoons: Purchase of Cocoons<br />

depending upon the grades.<br />

N.A 45.00<br />

Total = Rs. 115.00<br />

IMPLEMENTATION STRATEGY<br />

The selected farmers will be assisted by supply of Mulberry Cuttings @ 20,000 Nos.<br />

each at free of cost during May–June, <strong>2006</strong>. Assistance will be given for Land Development,<br />

Plantation etc. as per the norms prescribed by the Department. Contribution of the<br />

beneficiaries will be in form of family manpower. Fund will also be provided for purchase of<br />

Cocoons produced by the farmers.<br />

It is, therefore, expected that the farmers will earn regular income through Silkworm<br />

rearing and Cocoon production within a year. Once Mulberry plantation is matured, it will<br />

last about 20 years, and the farmer has to look after the garden and conduct Silkworm<br />

rearing 5-6 times in a year.<br />

SCHEME AT A GLANCE<br />

Sl.No. Name of District<br />

Target No. of<br />

Beneficiaries<br />

1 Aizawl District 90 Nos.<br />

2 Serchhip District 50 Nos.<br />

3 Champhai District 60 Nos.<br />

4 Kolasib District 100 Nos.<br />

5 Lunglei District 50 Nos.<br />

Total 350 Nos.<br />

Location<br />

Location will be decided in due<br />

course.


- 183 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

UNIT COST FOR MULBERRY CULTIVATION OF 1 HECTARE OF LAND<br />

A. (1) Land development cost 55 mandays @ Rs. 91 - Rs. 5005/-<br />

(2) Pit digging 1’×1’×1’ 50 mandays @ Rs. 91 - Rs. 5005/-<br />

(3) Planting of Mulberry Cuttings 55 mandays<br />

@ Rs. 91 - Rs. 5005/-<br />

-------------------------------------------------------------------------------------------------------------<br />

Total - Rs. 150,15/-<br />

Say - Rs. 15,000/-<br />

---------------------------------------------------------------------------------------------------------------------------<br />

B. Purchase of Mulberry Cuttings, 16,000 nos.<br />

@ Rs. 0.25/- cutting - Rs. 4,000/-<br />

---------------------------------------------------------------------------------------------------------------------------<br />

C. Supply of rearing appliances @ Rs.2067/- - Rs. 2067/-<br />

-----------------------------------------------------------------------------------------------------------------------------<br />

GRAND TOTAL - Rs. 21,067.00<br />

-----------------------------------------------------------------------------------------------------------------------------<br />

N.B.: In case of ‘A’ above, the assistance to each farmer will be in cash for ‘B’ & ‘C’<br />

the assistance will be in kind.


- 187 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

MINES & MINERALS<br />

Scheme No. C – 1<br />

Name of the Scheme : Mines & Minerals<br />

Geology & Mining Wing (under Directorate of Industries) proposes to undertake<br />

various projects and works as highlighted below under the following Schemes/Sub head)<br />

during this Annual Plan.<br />

1. Direction<br />

2. Ground Water Investigation<br />

3. Geo-technical Investigation<br />

4. Minor Mineral Investigation<br />

Geology & Mining Wing had been declared as the Nodal Agency for Ground Water<br />

Investigation, development and monitoring in the State. Developmental works, Investigation<br />

and Monitoring of ground water will be taken up during this year.<br />

The department proposes to continue undertaking investigation works relating to<br />

landslides with preventive measures and treatment thereof. The department is also<br />

entrusted with foundation and slope stability investigation. In this connection, risk/hazards<br />

zonation (Classification) of various localities along with geological and geophysical survey<br />

will be conducted in continuation of the ongoing works. Hazard Management and Mitigation<br />

Centre is proposed to be set up in the department. Geo-technical Laboratory with the<br />

assistant from NEC is being set up by the department. Further, Indian Meteorological<br />

Department (IMD), Govt. of India has assented to set up two Seismic Observatory Centers at<br />

Aizawl and Saiha as a joint venture with the Government of <strong>Mizoram</strong>.<br />

In the field of Minor Mineral Investigation, investigation work at various sites (shell<br />

Limestone, hard sandstone and other minor minerals) is proposed to be continued during<br />

this Annual Plan. At the same time, contour survey, geological mapping and Geophysical<br />

surveys will also be conducted in association with organisations like GSI, IBM, AMD etc,.<br />

The <strong>Mizoram</strong> Minor Mineral Concession Rules, 2000 is being enforced by the<br />

department. In this connection, investigation of mapping of stone quarries will be<br />

continued, in order to guide mining and for monitoring the operation.<br />

During this Annual Plan, it is proposed to conduct training in various technical fields<br />

under organizations like GSI, CGWB, NGRI etc. for technical officers and staff of this<br />

department. Moreover, training in computer courses is also proposed to be conducted for<br />

Ministerial as well as technical staff.<br />

I. Direction & Administration :<br />

(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries , 02 – Regulation &<br />

Development of Mines, 001 – Direction & Administration)<br />

Sl. No. Particulars (Rs. in lakh)<br />

1. Salary for 1 officer and 10 staff 12.00<br />

2. Wages for 6 MR workers 3.90<br />

3. Travelling Expenses 2.50<br />

4. Office Expenses – for POL, stationeries, contingent, workshop tools 9.00<br />

5. Publication 0.10


- 188 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl. No. Particulars (Rs. in lakh)<br />

6. Advertising 0.50<br />

7. Minor Works/Maintenance - Repair/maintenance/construction of<br />

G&M Quarters, workshop, office Building, Pump shed, black<br />

topping of approach road to G&M office at Luangmual, computers,<br />

printers Xerox machine, blue printing machine etc.<br />

6.00<br />

Sub-total : 34.00<br />

II. Ground Water Investigation :<br />

(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries, 02 – Regulation &<br />

Development of Mines, 101 – Survey & Mapping, (01) Ground Water Investigation)<br />

Sl. No. Particulars (Rs. in lakh)<br />

1. Minor Works/Maintenance –<br />

a) Hydrogeological/Geophysical Mapping of 2 district capital Viz.<br />

Lawngtlai / Saiha.<br />

b) Detail Hydrogeological Mapping of Kolasib District.<br />

c) Seasonal Data collection and monitoring of ground water in all 8<br />

districts capital for 3 season (i.e. Aizawl, Lunglei, Kolasib,<br />

Champhai, Mamit, Serchhip, Lawngtlai, Saiha)<br />

10.00<br />

2. Motor Vehicles – maintenance of Departmental truck 1.00<br />

3. Machinery & Equipment –<br />

a) Purchase of Geochemical Laboratory Instruments, Glass wares<br />

and chemicals/analytical kits.<br />

b) Procurement of survey instruments, field camera/GPS etc.<br />

3.00<br />

Sub-total : 14.00<br />

III. Geo-Technical Investigation :<br />

(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries, 02 – Regulation &<br />

Development of Mines, 101 – Survey & Mapping, (02) Geo-Technical Investigation.)<br />

Sl. No. Particulars (Rs. in lakh)<br />

1. Minor Works/Maintenance –<br />

a) Disaster Investigation during monsoon period covering 8<br />

districts<br />

23.50<br />

b) Geological mapping and sustainable Zonation. 5 towns<br />

2.<br />

(Champhai, Mamit, Khawzawl, Kawnpui and Thenzawl)<br />

c) Micro-landslide hazard zonation of Lawngtlai town.<br />

d) Disaster awareness campaign & seminar.<br />

e) Minor work for slide stabilization and corrective measures.<br />

Machinery & Equipments –<br />

a) Spare parts and maintenance of drilling rigs.<br />

b) Seismic monitoring instruments and analyzing softwares.<br />

2.50<br />

Sub-total : 26.00


- 189 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

IV. Minor Mineral Investigation :<br />

(Budget Head : 2853 – Non-Ferrous Mining & Metallurgical Industries, 02 – Regulation &<br />

Development of Mines, 101 – Survey & Mapping, (03) Minor Mineral Investigation)<br />

Sl. No. Particulars (Rs. in lakh)<br />

1. Travelling Expenses 5.00<br />

2. Office Expenses – Purchase of POL for payment of bills pertaining<br />

to stationeries, telephone and other contingent expenditures.<br />

3.00<br />

3. Minor Works / Maintenance –<br />

(i) Investigation of minor minerals like – Shell Limestone, Hard<br />

rock, Clay, Sand, Coal etc. along with Physical and contour<br />

surveys.<br />

(ii) Specific investigations on reports of mineral occurrences and<br />

works to be undertaken with organization like GSI, IBM, AMD<br />

etc.<br />

(iii) Mapping of quarries and minor mineral deposits including<br />

Mine Planning in <strong>Mizoram</strong>.<br />

14.00<br />

4. Professional Services 1.00<br />

5. Other Charges / Compensation - Operational charges for Shell<br />

Limestone/sandstone factory at Zuangtui.<br />

1.00<br />

6. Machinery & Equipment – Machinery & Equipment : Procurement of<br />

survey, Petrological and field instrument etc.<br />

2.00<br />

Sub-total : 26.00<br />

TOTAL OF MINES & MINERALS : 100.00


- 191 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ROADS & BRIDGES (P.W.D.)<br />

INTRODUCTION:<br />

Roads construction activities in <strong>Mizoram</strong> started from the 5 th Five Year Plan. The<br />

main target of the Annual Plan under 5054 C.O. on Roads and Bridges (P) is to continue the<br />

9 th Plan scheme and to improve the existing pavement. During <strong>2006</strong>-<strong>2007</strong>, Rs. 10893.00 lakh<br />

is approved under 5054 C.O. on Roads and Bridges (P).<br />

Direction and Administration:<br />

Rs. 5490.00 lakh is provided during 10 th Five Year Plan. Rs. 615.00 lakh is approved<br />

for salary and establishment of the existing staffs during <strong>2006</strong>-<strong>2007</strong>.<br />

The break up of Direction & Administration is as below :<br />

1) Salary = 309.00 lakh<br />

2) T.E. = 28.00 lakh<br />

3) Office expenses = 50.00 lakh<br />

4) Rent = 2.00 lakh<br />

5) Advertisement = 6.00 lakh<br />

6) Stipend = 5.00 lakh<br />

7) Motor Vehicle = 35.00 lakh<br />

8) Professional charge = 2.00 lakh<br />

9) Other charges = 10.00 lakh<br />

10) Maintenance = 168.00 lakh<br />

Total = 615.00 lakh<br />

Machinery And Equipment: -<br />

Rs. 24.00 lakh is approved for Machinery and equipment during <strong>2006</strong>-<strong>2007</strong>.<br />

Planning And Research: -<br />

No provision is kept for Planning and Research during <strong>2006</strong>-<strong>2007</strong>.<br />

Works: -<br />

i) Rs. 700.00 lakh is approved for ongoing works of NABARD during <strong>2006</strong>-<strong>2007</strong>.<br />

ii) Rs. 7500.00 lakh is approved for works under <strong>Mizoram</strong> State Road Project (E.A.P.)<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

iii) Rs. 1000.00 lakh is approved as counterpart funding of World Bank Aided Project<br />

(M.S.R.P.) under ACA during <strong>2006</strong>-<strong>2007</strong>.<br />

iv) Rs. 595.00 lakh is approved under TFC for BAFFACOS during <strong>2006</strong>-<strong>2007</strong>.<br />

v) Rs. 459.00 lakh is approved for improvement of State Core Road Network and<br />

Improvement of Aizawl city roads, District town roads and Satellite town and<br />

villages roads at various places in <strong>Mizoram</strong> during <strong>2006</strong>-<strong>2007</strong>.<br />

STATE HIGHWAYS<br />

1. Kolasib – Bairabi – Zamuang Road (6Km).<br />

During 10 th Five Year Plan Rs. 187.00 lakh is the approved outlay. During <strong>2006</strong>-<strong>2007</strong>,<br />

no provision is kept for the road.<br />

2. Champhai – Tiau Road (18.50Km).<br />

During 10 th Five Year Plan Rs.115.00 lakh is the approved outlay. During <strong>2006</strong>-<strong>2007</strong>,<br />

Rs 25.00 lakh is approved for this road .


- 192 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Major District Roads<br />

1. Lungsen – Chawngte Road (53.25 Km)<br />

Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is made<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

2. Lawngtlai – Nalkawn – Chamdur Road (45Km).<br />

Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. Rs 10.00 lakh is<br />

approved for the road during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Champhai – N.Vanlaiphai Road (92.50Km).<br />

Rs. 124.00 lakh is approved outlay during 10 th Five Year Plan. Rs 20.00 lakh is<br />

approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Ngopa – Mimbung Road ( 52.73Km).<br />

Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. Rs 10.00 lakh is<br />

approved during <strong>2006</strong>-<strong>2007</strong>.<br />

5. Kawnpui – Hortoki Road (21Km).<br />

Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. No provision is<br />

earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />

6. Zemabawk – Selesih Road (14Km).<br />

Rs. 118.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

7. Thenzawl – Buarpui Road (45Km).<br />

Rs. 124.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

8. Phairuang – Bunghmun Road (69Km).<br />

Rs. 155.00 lakh is approved outlay during 10 th Five Year Plan. Rs 20.00 lakh<br />

provision is kept during <strong>2006</strong>-<strong>2007</strong>.<br />

9. Khawzawl – Ngopa Road.<br />

Rs. 155.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

10. Serkhan – Bagha Road (30Km).<br />

Rs. 68.00 lakh is approved outlay during 10 th Five Year Plan. Rs 20.00 lakh is<br />

approved during <strong>2006</strong>-<strong>2007</strong>.<br />

11. Kanhmun – Tuidam – Tuilutkawn Road (96Km).<br />

Rs. 124.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

12. Thenzawl – Bunghmun Road :-<br />

Rs. 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

Other District Roads<br />

1. Keitum – N.Vanlaiphai Road (48Km).<br />

Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.


- 193 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. Phullen – Suangpuilawn Road (28Km).<br />

Rs. 44.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Khawzawl – E.Lungdar Road (73Km).<br />

Rs. 80.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Bilkhawthlir – Chemphai – Saiphai Road (20Km).<br />

Rs. 18.00 lakh is approved outlay during 10 th Five Year Plan. Rs 16.00 lakh is<br />

approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

5. S.Hlimen – Samtlang – Lungleng Road (4Km).<br />

Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

6. Approach road to Kolodyne – R.Ngengpui (9Km).<br />

Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

7. Tlabung – Borapansury Road.<br />

Rs.62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

Village Roads<br />

1. Vairengte – Saiphai via Phainuam (16Km).<br />

Rs. 105.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

2. E.Lungdar – Chekawn Road (8Km).<br />

Rs. 102.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Zobawk – Haulawng Road (31.70Km).<br />

Rs. 59.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Tamdil approach Road (7.50Km).<br />

Rs. 31.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

5. Lunglei – Nghasih road.<br />

Rs. 59.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

6. Khawzawl – Phaisen Road (5Km).<br />

Rs. 50.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

7. Approach road to Maumual (4Km).<br />

Rs. 55.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

8. Lawngtlai – Saisihchhuah – Sangau Road (45Km).<br />

Rs. 146.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.


- 194 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

9. Champhai – Sazaiphai – Farkawn Road (20Km).<br />

Rs. 93.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

10. Tuisumpui – Lungpher Road.<br />

Rs. 37.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

11. Saiha – Lawngtlai feeder Road (28Km).<br />

Rs. 62.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

12. Chemphai – Phainuam via Burchep Road.<br />

Rs. 77.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

13. Baktawng – Hmawngkawn – Chawilung Road (15Km).<br />

Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is provided<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

14. Lailak – Buhban Road (5Km).<br />

Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

15. Builum – N.Hlimen Road (14Km).<br />

Rs. 25.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

16. Sertlangpui – Serte Road (4Km).<br />

Rs. 18.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kept<br />

during <strong>2006</strong> – <strong>2007</strong>.<br />

17. R.Mat – Lungmawi Road (12Km).<br />

Rs. 18.00 lakh is approved outlay during 10 th Five Year Plan. No provision is kepting<br />

<strong>2006</strong>-<strong>2007</strong>.<br />

18. Tuipuibari – W . Kawnpui Road :-<br />

No provision is kept for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

19. Kawlchaw – Tongkolong Road :-<br />

Rs. 10.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

Satellite Towns & Villages:<br />

A sum of Rs. 852.00 lakh is approved during 10 th Five Year Plan. Rs 92.00 lakh is<br />

approved for Improvement of Satellite Town and Village roads during <strong>2006</strong>-<strong>2007</strong> as below: -<br />

1. Improvement of Saitual internal road :-<br />

Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

2. Improvement of Hnahthial internal road :-<br />

Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Improvement of Sakawrdai internal road :-<br />

Rs 6.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Improvement of Khawzawl internal road :-<br />

Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.


- 195 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

5. Improvement of Tuidam internal road :-<br />

Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

6. Improvement of Kanhmun internal road :-<br />

Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

7. Improvement of W.Phaileng internal road :-<br />

Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

8. Improvement of Kawrthah internal road :-<br />

Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

9. Improvement of Thenzawl internal road :-<br />

Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

10. Improvement of Ngopa internal road :-<br />

Rs 5.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

11. Improvement of Sialsuk internal road :-<br />

Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

12. Improvement of Bualpui (Ng) internal road :-<br />

Rs 3.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

13. Improvement of Vairengte internal road :-<br />

Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

14. Improvement of Kawnpui internal road :-<br />

Rs 6.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

15. Improvement of Bilkhawthlir internal road :-<br />

Rs 4.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

16. Improvement of Tlabung internal road :-<br />

Rs 8.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

17. Improvement of Darlawn internal road :-<br />

Rs 4.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

18. Improvement of approach road to High School at Tlungvel :-<br />

Rs 2.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

Roads within Towns:<br />

A sum of Rs. 990.00 lakh is approved during 10 th Five Year Plan for eight Disricts.<br />

Rs.216.00 lakh is approved for Improvement of Aizawl City Roads and District town roads<br />

during <strong>2006</strong>-<strong>2007</strong> as below: -<br />

1. Improvement of Lunglei town roads :-<br />

Rs 30.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

2. Improvement of Saiha town roads :-<br />

Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Improvement of Champhai town roads :-<br />

Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.


- 196 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. Improvement of Serchhip town roads :-<br />

Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong><br />

5. Improvement of Mamit town roads :-<br />

Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

6. Improvement of Kolasib town roads :-<br />

Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

7. Improvement of Lawngtlai town roads :-<br />

Rs 20.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

8. Improvement of Aizawl city roads :-<br />

i) Roads within Aizawl Road ‘N’ Division :-<br />

Rs. 34. 00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

ii) Roads within Aizawl Road ‘S’ Division :-<br />

Rs. 32. 00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

Bridges :<br />

Rs. 328.00 lakh is approved during 10 th Five Year Plan. No provision is kept for<br />

Bridges during <strong>2006</strong>-<strong>2007</strong>.<br />

NABARD :<br />

Rs. 700.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong> for Hnahthial-Tarpho, Tumtukawn –<br />

Tarpho road and Lawipu – Tlawng roads. The financial targets for the projects are :<br />

1. Construction of Hnahthial – Tarpho road :-<br />

Rs. 300.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

2. Construction of Tumtukawn – Tarpho road :-<br />

Rs. 300.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Construction of Lawipu – Tlawng road :-<br />

Rs. 100.00 lakh is approved for this road during <strong>2006</strong>-<strong>2007</strong>.<br />

Counterpart Funding of World Bank Aided Project:<br />

A sum of Rs. 5250.00 lakh is approved during 10 th Five Year Plan and Rs. 1000.00<br />

lakh is approved for Counterpart funding of World Bank Aided Project during <strong>2006</strong>-<strong>2007</strong>.<br />

EAP (<strong>Mizoram</strong> State Road Project):<br />

A sum of Rs. 29750.00 lakh is approved during 10 th Five Year Plan and Rs. 7500.00<br />

lakh is approved for this project during <strong>2006</strong>-<strong>2007</strong> .<br />

BAFFACOS:<br />

A sum of Rs. 8000.00 lakh is approved during 10 th Five Year Plan and Rs. 595.00 lakh<br />

is approved for this project during <strong>2006</strong>-<strong>2007</strong> as below :<br />

1) Bamboo Link Road: Rs. 570.00 lakh is approved for this project during <strong>2006</strong>-<strong>2007</strong>.<br />

2) Village Connectivity: Rs. 25.00 lakh is approved for this project during <strong>2006</strong>-<strong>2007</strong>.


- 208 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ROAD TRANSPORT<br />

Road Transport continues to be important means of transportation system in<br />

<strong>Mizoram</strong> for easy movement of passengers and goods from one place to another at<br />

minimum rates of fare. The Government of <strong>Mizoram</strong>, with its blanket policy of Privatization<br />

of Government Vehicles, decided to phase out the M.S.T. Wing of the Transport Department.<br />

However, due to peculiar nature of public transportation service it delivers to the general<br />

public at low cost fare and freights, the M.S.T. service will also continue to play a vital role<br />

for some years ahead while this privatization programme is gradually implemented. It will<br />

also take time to gradually minimize the need of MST service for rural people.<br />

Simultaneously, the Transport Department, with its existing technical manpower<br />

resource, can conveniently act as a centralized nodal Department for maintenance of the<br />

remaining fleet of Government Vehicles. Declaring the Department as nodal Department will<br />

prove to ensure economy in Government expenditures as well as speedy mechanical service<br />

for various departments of the Government avoiding cumbersome procedures of engaging<br />

private workshops. This regulated practice will also prevent the Departments from incurring<br />

heavy liabilities to private firms for maintenance of their vehicles.<br />

The Annual Plan <strong>2006</strong>-07, therefore, aims to carry out this two-prong programme.<br />

On one hand, it was continue to function as important public transportation system<br />

delivering passengers and goods to various locations, and on the other hand, upgradation of<br />

its Central Workshop, to equip it with infrastructural needs of modernized machinery and<br />

tools. It also envisages for providing up gradation of the Central Workshop revamping its<br />

technical and mechanical skill and service to be able to cater the need for maintenance of all<br />

vehicles under the Government by promoting security, efficiency, economy and properly<br />

coordinated system of management. Thus, these schemes have been made for inclusion<br />

within the limited approved outlay of Rs. 500.00 lakh for the Annual Plan <strong>2006</strong>-07.<br />

The following are the schemes approved to be taken up during the Annual Plan<br />

<strong>2006</strong>-07.<br />

CODE<br />

NO.<br />

MAJOR /<br />

MINOR HEAD<br />

NAME OF SCHEME<br />

PROPOSED OUTLAY<br />

(Rs. in lakh)<br />

1 2 3 4<br />

07 3055 004 REVENUE SECTION<br />

3055 - ROAD TRANSPORT<br />

001 (01) - DIRECTION<br />

(01) Salary - 50.00<br />

(11) Travelling Expenses - 5.00<br />

(13) Office Expenses - 11.00<br />

(16) Publication - 5.00<br />

(34) Scholarship/stipend - 3.00<br />

(50) Other charges (MACT) - 20.00<br />

(51) Motor Vehicle - 119.00<br />

(52) Machinery & equipment - 4.00<br />

Sub-Total of Direction - 217.00<br />

800 (02) - BOOKING STATION<br />

(27) Minor works/Maintenance - 15.00<br />

Sub-Total - 15.00


CODE<br />

NO.<br />

MAJOR /<br />

MINOR HEAD<br />

- 209 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

NAME OF SCHEME<br />

PROPOSED OUTLAY<br />

(Rs. in lakh)<br />

1 2 3 4<br />

800 (03) CENTRAL WORKSHOP<br />

(01) Salary - 30.00<br />

(02) Wages - 0.50<br />

(11) Travelling Expenses - 2.00<br />

(13) Office Expenses - 5.00<br />

(50) Other Charges - 0.50<br />

(52) Machinery & Equipments - 14.00<br />

Sub-Total of Central Workshop - 52.50<br />

TOTAL OF 3055 - 284.00<br />

5055 – C.O. ON ROAD TRANSPORT<br />

CAPITAL SECTION<br />

103 (01) - Direction<br />

(53) Major Works – Constn. of Directorate Bdlg - 50.00<br />

103 (02) - Central Workshop<br />

(53) Major works - upgradation of Central Workshop - 2.00<br />

102 (01) - Acquisition of Fleet<br />

(51) Motor Vehicles - 54.00<br />

(24) POL for - 110.00<br />

Total of Capital Section - 216.00<br />

GRAND TOTAL OF ROAD TRANSPORT - 500.00<br />

ITEM-WISE BREAK UP OF THE SCHEME<br />

NAME OF SCHEME<br />

001 (01) - Direction<br />

Annual Plan <strong>2006</strong>-07<br />

Outlay<br />

(Rs. in lakh)<br />

(01) - For entertainment of existing 37 nos. of posts<br />

(11) - Traveling Expenses : To meet travelling<br />

- 50.00<br />

expenses of officers and staff<br />

(13) - Office Expenses :<br />

1) Stationeries & Advertisement<br />

- 5.00<br />

2) Purchase of uniform for entitled staff<br />

3) Normal Office expenses<br />

4) Purchase of furniture<br />

- 11.00<br />

(16) - Publication : For Printing of Forms & Tickets<br />

for MST buses, publication of Statistical<br />

Data and other booklets<br />

(34) - Scholarship/Stipend :<br />

- 5.00<br />

For imparting training of officers & staff<br />

(50) - Other Charges :<br />

- 3.00<br />

(a) Liabilities to be paid on compensation to<br />

Accident victims<br />

(51) – Motor Vehicle :<br />

- 20.00<br />

For maintenance of existing vehicles and purchase - 119.00<br />

of 1(one) two-wheeler for checking staff of MST Lunglei


- 210 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

NAME OF SCHEME<br />

(52) - Machinery & Equipments :<br />

1) Purchase of 2 Computers for initializing<br />

Annual Plan <strong>2006</strong>-07<br />

Outlay<br />

(Rs. in lakh)<br />

Computerization of Statistical data<br />

2) Annual maintenance etc. of existing<br />

computers / E-Governance<br />

- 4.00<br />

SUB TOTAL (DIRECTION) - 217.00<br />

800(02) - Booking Station :<br />

(27) - Minor Works :<br />

1) Construction of MST Booking office at Kanhmun<br />

2) Construction of quarters for MST Station - 15.00<br />

Superintendent at Saiha<br />

3) Constn. of Training-cum-Lecture hall at Chaltlang<br />

4) Improvement of various MST offices<br />

Sub-Total (Booking Station) - 15.00<br />

800(03) - Central Workshop :<br />

(01) For maintenance of existing 44 nos. of posts - 30.00<br />

(02) Wages : Wages for 2 nos. of casual labourer . 0.50<br />

(11) Traveling Expenses:<br />

For Traveling expenses of officers & staff - 2.00<br />

(13) Office Expenses :<br />

1) Stationeries<br />

2) Maintenance of 1(one) Light Vehicle - 5.00<br />

3) Normal Office expenses<br />

(50) Other Charges : Fees for Govt. Advocate - 0.50<br />

(52) Machinery & Equipments :<br />

For purchase of 1 no. of Crank shaft grinder, - 14.00<br />

special tools and accessories for workshop<br />

SUB TOTAL : (Central Workshop) - 52.00<br />

TOTAL OF 3055 - 284.00<br />

CAPITAL SECTION<br />

5055 – C.O. on Road Transport<br />

103(01) - Direction<br />

(53) Major Works : Constn. of Directorate Bldg. - 50.00<br />

103(02) - Central Workshop<br />

(53) Major works : Upgradation of Central Workshop - 2.00<br />

102(01) - Acquisition of Fleet :<br />

(51) - Motor Vehicles: Purchase of 5(five) Buses<br />

including 2(two) mini Buses for Lunglei - 54.00<br />

(24) - POL :<br />

1) Purchase of POL for CPP Aizawl 110.00<br />

2) Renovation of CCP Lunglei as a token<br />

TOTAL OF 5055 - 216.00<br />

GRAND TOTAL OF ROAD TRANSPORT - 500.00


INTRODUCTION:<br />

- 214 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

INLAND WATER TRANSPORT (I.W.T.)<br />

Due to the absence of good navigable waterways in <strong>Mizoram</strong>, less work is<br />

undertaken under Inland Water Transport. Presently, there is hardly any Inland Water<br />

Transport in use. This may be partly attributed to the discharge of rivers in <strong>Mizoram</strong> which<br />

varies very widely. During rainy season, the discharge of water become very high carrying<br />

large quantities of debris, logs, boulders etc. making navigation difficult whereas during dry<br />

period, water level is low and the debris, etc. deposited during rainy season becomes<br />

obstructions.<br />

The road network in <strong>Mizoram</strong> is such that in remote and interior areas, roads have to<br />

cross rivers. Bridges could not be constructed due to fund constraints. Marboat and Country<br />

boats have to be utilized for carrying vehicles and men across the rivers.<br />

Therefore, the fund provided under this head is approved to be utilized for<br />

improving river crossing facilities. Rs. 5.00 lakh is approved under this Head of Accounts<br />

during <strong>2006</strong> -<strong>2007</strong>.<br />

DIRECTION AND ADMINISTRATION:<br />

No provision is made for Direction and Administration during <strong>2006</strong> -<strong>2007</strong> under this<br />

Head of Account.<br />

MACHINERY AND EQUIPMENT:<br />

WORKS:<br />

No provision is kept for Machinery and Equipment during <strong>2006</strong>-<strong>2007</strong>.<br />

The following works will be taken up during <strong>2006</strong>-<strong>2007</strong> under this Head of Accounts.<br />

i) Improvement of Ferry and Marboat at Tuipui on Lawngtlai – Saiha Feeder roads:<br />

Rs.1.50 lakh is approved during <strong>2006</strong> - <strong>2007</strong> for improvement of existing Marboat at<br />

R.Tuipui.<br />

ii) Improvement of Ferry and Marboat at Bairabi: Rs.3.50 lakh is approved during<br />

<strong>2006</strong>-<strong>2007</strong> for improvement of ferry & Marboat at Bairabi.


- 218 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

MOTOR VEHICLE WING<br />

The Motor Vehicle Wing under Transport Department functions with its subordinate<br />

offices at District headquarters enforcing MV Acts and Rules and also looked after all<br />

matters relating to State Transport Authority (STA).<br />

Recently, the duties and responsibilities of MV Wing have considerably increased due<br />

to the enormously increasing vehicle population in the State. To cope with the future<br />

expansion, it is felt necessary to upgrade its standard with modern technology such as<br />

introduction of I.T. and computerization, strengthening and widening its functions.<br />

As a result, the State Government had already opened new Districts offices such as<br />

at Champhai, Kolasib and Serchhip and are functioning with no full-fledged establishment.<br />

Besides, two new DTO offices are proposed for opening at Lawngtlai and Mamit during this<br />

Annual Plan <strong>2006</strong>-07. Thus, entertainment of posts for these newly opened DTO offices is<br />

inevitable. Keeping in view the need for entertaining of posts and upgradation of newly<br />

establishments, the Annual Plan approved outlay for M.V. Wing for the year <strong>2006</strong>-07 comes<br />

to Rs. 100.00 lakh.<br />

The following are the schemes approved to be taken up during the Annual Plan<br />

<strong>2006</strong>-07.<br />

CODE NO. / MAJOR-MINOR HEAD /<br />

NAME OF SCHEME<br />

<strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07<br />

(Rs. in lakh)<br />

2041 - Taxes on Vehicles<br />

001(01) - Direction :<br />

(01) Salary - 9.25<br />

(02) Wages - 2.00<br />

(11) Travelling Expenses - 0.50<br />

(13) Office Expenses - 10.00<br />

(16) Publication - 3.00<br />

(27) Minor Works/Maintenance - 12.00<br />

(34) Scholarship/Stipend - 0.50<br />

(50) Other charges - 10.00<br />

(51) Motor vehicles - 2.50<br />

(52) Machinery & Equipments - 20.00<br />

Sub-Total : - 69.75<br />

001(02) - Administration<br />

(01) Salary - 16.00<br />

(02) Wages - 3.00<br />

(11) Travelling Expenses - 3.00<br />

(13) Office Expenses - 5.00<br />

(14) Rent - 0.25<br />

(51) Motor Vehicles - 3.00<br />

Sub-Total : - 30.25<br />

GRAND TOTAL : M.V. WING - 100.00


- 219 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ITEM-WISE BREAK-UP OF THE SCHEME :<br />

CODE NO. / MAJOR-MINOR HEAD /<br />

NAME OF SCHEME<br />

<strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07<br />

(Rs. in lakh)<br />

001 (01) - DIRECTION<br />

(01) Entertainment of posts : For entertainment of existing 3 nos.<br />

of posts and as a token for already approved 4 nos. of posts —<br />

a) Sr. Research Officer - 1 no.<br />

b) Deputy Commissioner of Transport - 1 no. - 9.25<br />

c) Inspector of Statistics - 2 nos.<br />

(02) Wages : Wages to be paid to casual labourer - 2.00<br />

(11) T.E. : To meet traveling expenses of STA/MV Wing - 0.50<br />

(13) O.E. : For office expenses including expenses from of DTO<br />

Offices such as Champhai, Kolasib and Serchhip -<br />

(a) Stationeries and advertisement<br />

(b) Maintenance of motor vehicle - 10.00<br />

(c) Purchase of uniforms for uniformed<br />

staff and IV Grade<br />

(d) Normal office expenses<br />

(16) Publication :<br />

(a) Printing of pre-printed Receipt memos,<br />

Registration Certificate, Fitness Certificate - 3.00<br />

(b) Publication of Passenger and Goods<br />

Taxation Acts & Rules<br />

(27) Minor Works/Maintenance:<br />

(a) Constr.of DTO Staff Qtrs at Champhai - 5.00<br />

(b) Constr.of DTO Staff Qtrs at Serchhip - 4.00 - 12.00<br />

(c) Maintenance of existing buildings - 3.00<br />

(34) Scholarship/Stipend :<br />

(a) For imparting training to enforcement staff - 0.50<br />

(b) Expenses for officers & staff who undergo training<br />

(50) Other Charges :<br />

1) Observation of Road Safety Week - 7.00<br />

2) Opening of DTO offices at Lawngtlai&Mamit - 2.00 - 10.00<br />

3) Annual maintenance of existing computers - 1.00<br />

(51) Motor Vehicle : Maintenance of existing vehicles - 2.50<br />

(52) Machineries and Equipments :<br />

(1) For purchase of weighbridge for DTO office,<br />

Aizawl – 1 no. - 20.00<br />

(2) For induction of e-governance in MV wing<br />

Sub-Total : 001 (01) - DIRECTION - 69.75


- 220 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

CODE NO. / MAJOR-MINOR HEAD /<br />

NAME OF SCHEME<br />

2041 - Taxes on Vehicles<br />

<strong>APPROVED</strong> OUTLAY <strong>2006</strong>-07<br />

(Rs. in lakh)<br />

001(02) - ADMINISTRATION<br />

(01) Entertainment of Posts :<br />

For entertainment of existing 16 nos. of posts and<br />

as a token for already approved 13 nos. of posts of —<br />

(a) D.T.O - 1 post for Serchhip<br />

(b) M.V.I - 3 posts for Serchhip, Champhai & Kolasib - 16.00<br />

(c) Enforcement Inspector - 3 posts<br />

(d) Enforcement Sub Inspector - 6 posts<br />

Wages : Wages to be paid to casual labour – 2 Nos. of skilled - 3.00<br />

and 6 Nos. of unskilled<br />

(11) T.E. : For meeting traveling expenses of officers and staff - 3.00<br />

under DTO's offices<br />

(13) Office Expenses :<br />

(a) Stationeries and advertisement<br />

(b) Maintenance of vehicles - 5.00<br />

(c) Purchase of uniform for uniformed staff and IV Grade<br />

(d) Normal Office expenses<br />

(14) Rent :<br />

Rent for Site Office of DTO Aizawl and DTO Lunglei - 0.25<br />

(51) Motor Vehicles :<br />

For maintenance of existing vehicle - 3.00<br />

Total of ADMINISTRATION : - 30.25<br />

GRAND TOTAL : (M.V. WING) - 100.00


- 224 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

At the start of the 10 th Plan, various Schemes/Projects were initiated and undertaken<br />

under Science, Technology & Environment. The Schemes/Projects approved to be<br />

undertaken during the Annual Plan <strong>2006</strong>-<strong>2007</strong> were continuation of the ones already<br />

started. No new scheme is approved.<br />

1. Direction and Administration: The following statement indicates both physical and<br />

financial targets for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Salary of existing Staff 22 29.00<br />

2. Accomodation (Rental) - 2.20<br />

3. Travelling Expenses - 2.00<br />

4. Office Expenses - 8.30<br />

5. Wages - 4.50<br />

6. Maintenance of Vehicle - 3.00<br />

T O T A L : 22 49.00<br />

2. Satellite Remote Sensing Centre: The State Satellite Remote Sensing Centre had<br />

carried out various projects and the data generated from the project had been utilised by<br />

concerned development Departments. It is proposed that Remote Sensing Projects will be<br />

carried out on a larger scale to provide more accurate database.<br />

The following statement indicates the approved physical and financial targets for the<br />

Annual Plan for <strong>2006</strong>-<strong>2007</strong>.<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Sl. No. Item of Expenditure<br />

Physical Financial<br />

1. Augmentation of Remote Sensing 3 12.00<br />

Laboratory Equipment<br />

T O T A L : 3 12.00<br />

3. Training of Scientific Manpower: This is an ongoing Scheme. Under this Scheme, a<br />

Post Matric Merit Science Scholarship Programme was introduced for students who are<br />

taking up basic science subjects in the College & University level to solve the problem of<br />

Scientific Manpower requirement of the State. The Scheme is approved to be continued.<br />

The following statement indicates the approved physical and financial targets for the<br />

Annual Plan for <strong>2006</strong>-<strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Post Matric Merit Science Scholarship 120 12.00<br />

T O T A L : 120 12.00


- 225 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. Assistance to Scientific Research Projects: Under this Scheme, Scientific Research<br />

Project which have direct relevance to the problems of the State were given financial<br />

assistance. The Scheme is approved to be continued.<br />

The following statement indicates the approved physical and financial targets for<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Assistance to Scientific Research Project 2 2.00<br />

T O T A L : 2 2.00<br />

5. Computer Centres: Being a coordinating Department for NIC, Government of India,<br />

we have established one State Unit of NIC at Aizawl and 3 District Units at Aizawl, Lunglei<br />

and Saiha. It is necessary to maintain the Centres. It is also approved to establish NIC<br />

Centres in the 5 newly created Districts in a phase manner.<br />

The following statement indicates the approved physical and financial targets for<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Maintenance of NIC Centres LS 3.00<br />

T O T A L : - 3.00<br />

6. Science Popularisation Programme: Under this Scheme, various activities such as<br />

publication of <strong>Mizoram</strong> Science Journal, holding of Science Exhibitions, Seminars, Science<br />

Fairs & Science Congress are taken up in collaboration with STAM, SCERT, MSS etc. The<br />

activities are approved to be continued.<br />

The following statement indicates the approved physical and financial targets for<br />

Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Sl. No. Item of Expenditure<br />

Physical Financial<br />

1. Publication of Science Journal 4000 cpm 5.00<br />

2. Science Exhibitions, Seminars,Science Congress - 3.00<br />

T O T A L : - 8.00


- 226 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

7. Low-Head Microturbine Project: Using Cross-flow turbine designed by DST,<br />

Government of India, a 50 KW Microturbine Project was proposed to be taken up at Sihmit<br />

river near Bulfekzawl within Champhai District. Out of the total estimate of Rs. 59.26 lakh,<br />

DST, Government of India had agreed to provide 90% of the cost and the State will have to<br />

bear 10% as matching share. The Project will be of 3 years duration.<br />

The following statement indicates the approved physical and financial targets for<br />

Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Expenditure for State Share - 3.00<br />

T O T A L : - 3.00<br />

8. Meteorological Centre: The following statement indicates the approved physical<br />

and financial targets for Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Maintenance of Equipments - 0.50<br />

T O T A L : - 0.50<br />

9. <strong>Mizoram</strong> Science Centre: The <strong>Mizoram</strong> Science Centre at Berawtlang, Aizawl was<br />

inaugurated on 26 th July, 2003 which is well appreciated by all sections of the people.<br />

However, some developmental works are still necessary to be carried out for smooth<br />

functioning of the Centre.<br />

The following statement indicates the approved physical and financial targets for<br />

Annual Plan <strong>2006</strong>-07.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Construction of Office bulding - 30.00<br />

2. Repairing / modification and development - 5.00<br />

of Exhibits<br />

3. Astronomical Telescope - 1.50<br />

4. Library - 1.00<br />

5. Plantation - 1.00<br />

6. Development / Maintenance of the Centre - 10.00<br />

7. Purchase of tools and machineries - 2.00<br />

T O T A L : - 50.50


- 227 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ECOLOGY & ENVIRONMENT<br />

1. Biotechnological Research: <strong>Mizoram</strong> is rich in natural resources which are yet to be<br />

tapped for economic growth. It is known that some of the valuable medicinal plants and<br />

orchids are on the brink of extinction due to deforestation through jhumming. It is<br />

proposed that extensive survey and documentation of these valuable plants be carried out.<br />

The germ-plasm of the rare species may be conserved and propagated through tissue<br />

culture.<br />

The following statement indicates the approved physical and financial targets for<br />

Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Purchase of Chemical Reagents - 1.00<br />

T O T A L : - 1.00<br />

2. Environment Awareness: Environment issue is a global one. It is felt necessary to<br />

educate the students and public on the importance of clean & healthy environment through<br />

seminars/exhibitions in and outside the state.<br />

The following statement indicates the approved physical and financial targets for<br />

Annual Plan for <strong>2006</strong> - <strong>2007</strong>.<br />

Sl. No. Item of Expenditure<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong>-07<br />

Physical Financial<br />

1. Expenditure for seminars / exhibitions 2 3.00<br />

T O T A L : 2 3.00


- 230 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

<strong>PLAN</strong>NING<br />

Planning Department is coordinating and also Nodal Department for all the<br />

Development Departments in the State. The main functions of the Department are as<br />

follows:<br />

1. Formulation of Five Year Plan and Annual Plan.<br />

2. Monitoring & Evaluation of Plan Schemes.<br />

3. District Planning Machinery.<br />

4. Monitoring & Evaluation of CSS, NLCPR and NEC Schemes.<br />

Due to inadequacy of Technical Manpower in the Department, only Plan<br />

Formulation has been taken up satisfactorily whereas Monitoring and Evaluation could not<br />

be taken up meaningfully during 9 th Plan period. During the 10 th Five Year Plan (2002–07),<br />

more emphasis will be given on District Planning Machinery, NLCPR, Centrally Sponsored<br />

Schemes and NEC schemes at the State level as well as in the District level and also on<br />

Evaluation and Monitoring. The approved outlay for 10 th Five Year Plan (2002–<strong>2007</strong>) is<br />

Rs.5473.00 lakh and the approved Annual Plan outlay during <strong>2006</strong>–07 is Rs. 3,496.00 lakh.<br />

I. Plan Formulation: This is the main function of the State Planning Board (State<br />

Planning Commission). Owing to inadequacy of technical manpower in the Department,<br />

Formulation of Annual Plan is being done by manual up to the end of 9 th Plan period. During<br />

the 10 th Five Year Plan, Formulation of Annual Plan will be computerized and 4 nos. of<br />

Computers and its accessories will be procured during <strong>2006</strong>–07. Detailed approved financial<br />

outlay under the Plan Formulation during <strong>2006</strong>–07 is given below: -<br />

(Rupees in lakh)<br />

1) Salary - 6.00<br />

2) Wages - 10.00<br />

3) TA/DA - 3.50<br />

4) Office Expenses - 44.50<br />

5) Other Charges - -<br />

6) Medical - 0.50<br />

TOTAL - 64.50<br />

II. (a) Monitoring & Evaluation: More emphasis will be given to Monitoring and Evaluation<br />

during 10 th Five Year Plan. A Monitoring Team under the Chairmanship of Vice Chairman,<br />

State Planning Board had already been set up by the State Government with four Members to<br />

make on the spot verification of all important schemes/projects implemented in the State.<br />

Besides, four Monitoring Team of officials have been engaged for physical verification of the<br />

Projects being implemented and they submit the report to the Government of India as well<br />

as Minister i/c Planning and all Heads of Department concerned for follow-up action where<br />

necessary. Special emphasis will be given to Monitoring & Evaluation of Plan Schemes, CSS<br />

and NEC Schemes during the 10 th Plan period 2002-07. All Monitoring and Evaluation will be<br />

computerised during the 10 th Five Year Plan and Rs. 1122.20 lakh is approved for<br />

maintenance of existing Officers/staff, purchase of computers and other materials during<br />

<strong>2006</strong>-07.


- 231 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Detail financial provision is given below: - (Rupees in lakh)<br />

1) Salary - 22.80<br />

2) TA/DA - 4.90<br />

3) Office Expenses - 99.90<br />

4) Other Charges - 2813.90<br />

5 Medical - 1.50<br />

TOTAL - 2943.00<br />

(b) Establishment of Monitoring & Evaluation Cell: Special emphasis will be given on<br />

Monitoring & Evaluation of all Plan Schemes/NEC/CSS/NLCPR/ BAFFACOS during the 10 th<br />

Five Year Plan period. But due to inadequacy of Technical Manpower the Department is<br />

unable to do Monitoring & Evaluation fruitfully. Such being the case, it is felt necessary to<br />

setting up a Monitoring & Evaluation Cell in the State Planning Board to do monitoring of all<br />

schemes, projects and programmes being implemented in the State. In order to<br />

strengthening the Monitoring and Evaluation, the Department is proposed for creation of<br />

the following bare minimum posts to Man Monitoring & Evaluation Cell in the State Planning<br />

Board and for this, a token provision of Rs. 0.50 lakh is approved during <strong>2006</strong>–<strong>2007</strong>.<br />

Sl. No. Name of post Scale of pay No. of post<br />

1. Deputy Adviser, Monitoring Rs.12000-16500/- 1 no.<br />

2. Sr. Research Officer (M) Rs.10000-15200/- 1 no.<br />

3. Research Officer (M) Rs. 8000-13500/- 2 nos.<br />

(Rupees in lakh)<br />

1) Salary - 0.20<br />

2) Other Charges - 0.10<br />

3) Office Expenses - 0.10<br />

4) TA/DA - 0.10<br />

TOTAL - 0.50<br />

TOTAL OF M & E - 2943.50<br />

III. District Planning Machinery: District Planning Machinery had been set up at the<br />

District level since the early part of 7 th Five Year Plan period. During 10 th Five Year Plan,<br />

District Planning Machinery will be set up in the District level for which the following posts<br />

have already been approved by Planning Commission (MLD), Government of India vide<br />

No.PC(P)/35/Mizo/97-MLD dated 28 th January 1998 for the 3(three) Districts, viz. — Aizawl,<br />

Lunglei and Chhimtuipui as shown against each: —<br />

1) Chief Planning Officer - 3 posts<br />

2) Project Experts/R.O. - 3 posts<br />

3) Asst. Research Officer - 3 posts<br />

4) L.D.C. - 3 posts<br />

5) Grade IV Staff - 3 posts<br />

Detailed financial provisions for establishment of District Planning Machinery during<br />

<strong>2006</strong>-<strong>2007</strong> are given here under: —<br />

(Rupees in lakh)<br />

1) Salary - 12.00<br />

2) TA/DA - 1.00<br />

3) Office Expenses - 10.00<br />

4) Minor Works - 50.00<br />

5) Other Charges - 1.00<br />

6) Medical Treatment - 1.00<br />

TOTAL - 75.00


- 232 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

IV. Pilot Project (Lunglei): The State Government has already been set District Planning<br />

Machinery at Lunglei District as a Pilot Project. Detailed financial provision for Pilot Project,<br />

Lunglei District during <strong>2006</strong>-07 is as follows: —<br />

(Rupees in lakh)<br />

1) Salary - 3.20<br />

2) Wages - 2.40<br />

3) Medical Treatment - 0.20<br />

4) Travelling Expenses - 1.00<br />

5) Office Expenses - 4.80<br />

6) Rent - 0.90<br />

7) Other Charges - 0.50<br />

TOTAL - 13.00<br />

V. Local Area Development Scheme: The Department provided Rs. 400.00 lakh for<br />

MLAs Area Development Scheme during <strong>2006</strong>-07.<br />

DISTRICT <strong>PLAN</strong>NING<br />

District Planning Committee:<br />

As mandated by Article 243ZD of the Constitution, District Planning Committee has<br />

not yet been enacted by the State Legislature. However, the 3 Autonomous District Councils<br />

viz. — Lai Auto. District Council, Mara Auto. District Council & Chakma Auto. District<br />

Council, which had been established under the Sixth Schedule of the Constitution prepare<br />

their own Plan under the jurisdiction.<br />

As desired by the MLP Division of the Planning Commission, District Planning<br />

Machinery was established in Lunglei District as a pilot project in 2002 by creating one post<br />

of Chief Planning Officer. District Planning Board in this Lunglei District has been<br />

established under the chairmanship of Deputy Commissioner / District Collector and the<br />

Chief Planning Officer is the Member Secretary. This Lunglei District Planning Board has<br />

initiated preparation of District Plan. However, this District Planning Board could not yet be<br />

functioned as it should be as supporting Officers and Staff under Chief Planning Officer<br />

could not be created due to ban on creation of new posts.<br />

In <strong>Mizoram</strong>, the system of Panchayats and Municipalities have not yet been<br />

introduced.<br />

Hence, the required information relating to resource envelope, devolution of powers<br />

and devolution of finance could not be furnished.<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

Government of <strong>Mizoram</strong> established Information & Communication Technology Cell<br />

in Planning Department at the allocation of fund during the Annual Plan <strong>2006</strong>-07 as below: -<br />

(Rs. in lakh)<br />

1. Capacity Building under E-Governance - 505.00<br />

2. State normal Plan - 25.00<br />

Total - 530.00


- 235 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

TOURISM<br />

Tourism Department is established as a full-fledged Directorate in 1987, bifurcating<br />

from IPR & T Department. The Department is one of the fastest growing Departments in<br />

<strong>Mizoram</strong>. The Department has concentrated its main thrust in creation and establishment of<br />

tourist infrastructure for providing accommodation and catering facilities in the District<br />

Headquarters, important places of tourist destination and also along the National and State<br />

highway in the state. Most of the projects are funded by the Ministry of Tourism, Govt. of<br />

India, under Centrally Sponsored Schemes, sanctioned liberally to promote Tourism in<br />

<strong>Mizoram</strong>. The approved outlay for Annual Plan <strong>2006</strong>-<strong>2007</strong>is Rs. 290.00 lakh during.<br />

The scheme-wise allocation and write-up are as follows: —<br />

1. TOURIST CENTRE:<br />

A. Reiek Tourist Recreational Centre: Reiek, is a small village situated a about 30 kms.<br />

Southwest of Aizawl and its hillocks are covered by green forest. Reiek hillock above the<br />

village is being developed for tourist recreational centre. A cafetaria and 6 nos. of Tourist<br />

Cottages under CSS have been constructed and already commissioned . Besides, Typical<br />

Mizo Village has been established in the adjacent area by constructing various types of Mizo<br />

Typical houses. For further improvement and maintenance of the compound such as<br />

improvement of internal roads, jungle clearance, etc., the approved outlay is Rs. 1.00 lakh<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

Non-Recurring : Rs. 1.00 lakh<br />

B. Tamdil Lake (Picnic Spot): A natural beautiful lake 87 kms East of Aizawl near<br />

Saitual town is being developed as a lake resort, providing water sports facilities. Cafeteria<br />

and 6(six) nos. of Tourist Cottages have already been commissioned. For further<br />

improvement and maintenance of the compound and internal road repairing, the approved<br />

outlay is Rs. 1.00 lakh during <strong>2006</strong> – <strong>2007</strong>.<br />

Non-Recurring : Rs. 1.00 lakh<br />

TOTAL OF ‘A’ & ‘B’ : Rs. 2.00 lakh<br />

2. TOURIST ACCOMODATION:<br />

Maintenance of Existing Staff: For meeting expenditure on salary and maintenance<br />

of existing regular staff (31 nos.) and other expenditures under Tourist Lodges at Chaltlang,<br />

Berawtlang, Kolasib, Vairengte, Lunglei, Saiha, Bairabi, Thenzawl, Champhai, Chhiahtlang<br />

and Luangmual, Rs. 143.75 lakh is approved. This includes Rs. 40.85 lakh provided for<br />

meeting expenditure for wages of 110 nos. Muster Roll employees engaged in various<br />

Tourist Establishments run by the Department.<br />

Salary : Rs. 28.00 lakh<br />

Wages for MR : Rs 40.85 lakh<br />

Medical Re-imbursement : Rs 4.00 lakh<br />

Travelling Expenses : Rs. 2.50 lakh<br />

Office Expenses : Rs. 26.90 lakh<br />

Materials & Supplies : Rs. 10.00 lakh<br />

Minor Works : Rs 1.50 lakh<br />

Other charges : Rs. 30.00 lakh<br />

TOTAL OF RECURRING : Rs.143.75 lakh


- 236 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. OTHER EXPENDITURE (TOURISM & REST HOUSE) :<br />

Maintenance of Existing Staff: For maintenance and continuation of the existing<br />

staff’s (12 nos.) Salary and Medical Re-imbursement, Rs. 9.90 lakh is approved for <strong>2006</strong>–07.<br />

Salary : Rs. 8.90 lakh<br />

Medical Re-imbursement : Rs. 1.00 lakh<br />

Recurring : Rs. 9.90 lakh<br />

4. DIRECTION AND ADMINISTRATION:<br />

Maintenance of Existing Staff: For maintenance and salary of 6 nos. of Officers and<br />

24 nos. of existing staff under the head, Direction & Administration, an amount of Rs.111.00<br />

lakh is approved during Annual Plan <strong>2006</strong> – <strong>2007</strong>.<br />

Salary : Rs. 45.50 lakh<br />

Medical Re-imbursement : Rs. 4.00 lakh<br />

Travelling Expenses : Rs. 4.00 lakh<br />

Office Expenses : Rs. 28.00 lakh<br />

Minor Works : Rs. 1.50 lakh<br />

Other charges : Rs. 28.00 lakh<br />

Recurring : Rs.111.00 lakh<br />

5. TRAINING:<br />

Stipend: The Department is sending trainees to undergo training in various courses<br />

of Travel Management, Hotel Management and Food Craft in various National Institute for<br />

which Rs. 1.90 lakh is approved for stipend, book grant, etc. during <strong>2006</strong> – <strong>2007</strong>.<br />

Recurring : Rs. 1.90 lakh<br />

6. PROMOTION & PUBLICITY:<br />

A. Promotion of Fairs and Festivals: Important festival in <strong>Mizoram</strong> like Chapchar Kut,<br />

Thalfavang Kut, Christmas will be continued to be celebrated regularly to attract tourist and<br />

the department will as well participate in National and International Travel and Tourism<br />

Fairs and Festivals for which Rs. 15.00 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

Recurring : Rs. 15.00 lakh<br />

B. Publication of Tourist Information & Literature: The Department earmarked a sum<br />

of Rs. 4.00 lakh for publication of Tourist Information & literature such as guide maps and<br />

different folders for wide circulation to promote Tourism in the State which was approved.<br />

Recurring : Rs. 4.00 lakh<br />

RECURRING ‘A’ & ‘B’ : Rs. 19.00 lakh<br />

TOTAL OF A & B : Rs. 19.00 lakh<br />

7. SURVEY & STATISTICS (OTHER EXPENDITURE) :<br />

For maintenance and salary of one staff, an expenditures amounting of Rs.2.45 lakh<br />

is provided during <strong>2006</strong> – <strong>2007</strong>.<br />

Salary : Rs. 2.45 lakh<br />

Total Recurring : Rs. 2.45 lakh<br />

TOTAL OF RECURRING : Rs. 288.00 lakh<br />

TOTAL OF NON-RECURRING : Rs. 2.00 lakh<br />

GRAND TOTAL : Rs. 290.00 lakh


- 237 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SUMMARY OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

OF TOURISM DEPARTMENT<br />

Sl. No. Major Head / Sub-Head of Development Rs. in lakh<br />

03452002 – TOURISM<br />

1. 01 – Tourist Infrastructure - NIL<br />

2. 101 – Tourist Centre - 2.00<br />

3. 102 – Tourist Accommodation - 143.75<br />

4. 103 – Tourist Transport Services - NIL<br />

5. 800 – Other Expenditure (Tourism & Rest House) - 9.90<br />

6. 80 – GENERAL<br />

001 – Direction & Administration - 111.00<br />

003 – Training - 1.90<br />

7. 800 – PROMOTION & PUBLICITY<br />

a) Fairs & Festivals - 15.00<br />

b) Publication of Tourist Information and - 4.00<br />

Literature<br />

c) Study Tour to Israel / Far East Asia/ - -<br />

Travelling abroad.<br />

8. 800 – Other Expenditure (Survey & Statistics) - 2.45<br />

9. 5452 – (Co.on Tourism) – Creation of - -<br />

Tourist Information Centres (EFC) at<br />

New Delhi, Kolkata & Guwahati<br />

G R A N D T O T A L - 290.00


- 244 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ECONOMICS & STATISTICS<br />

The main function of Economics & Statistics Department is to under take various<br />

kinds of Census and Surveys, collect up-to-date reliable Statistical data, and further to<br />

analyses, tabulate, published and disseminate them for use by Government planners,<br />

researchers, etc.<br />

Economics and Statistics Department has not been well equipped even today in<br />

terms of personnel and modern scientific equipments. Meanwhile the scope and coverage<br />

activity has been considerably increasing. In the coming Annual Plan, the Department is<br />

planning to streamline and re-vitalize the Statistical system to generate a more<br />

comprehensive data pertaining to every aspects of the economy of the State so as to<br />

facilitate all other Departments to formulate a sound data-base planning in the years to<br />

come. An amount of Rs. 155.00 lakh is approved during <strong>2006</strong>-07 for Economics & Statistics<br />

Department.<br />

Sl.<br />

ABSTRACT (FINANCIAL OUTLAY)<br />

Name of Scheme/Major Head/<br />

Outlay <strong>2006</strong>-<strong>2007</strong><br />

No.<br />

Minor head<br />

(Rs. in lakh)<br />

1 2 3<br />

1 Direction<br />

28.41<br />

2 Administration<br />

32.40<br />

3 Vital Statistics<br />

(1) State Plan<br />

42.10<br />

(2) State Matching Share<br />

-<br />

4 National Sample Survey (NSS)<br />

8.19<br />

5 Economic Advise & Statistics<br />

(1) State Income Estimation<br />

(2) Price Statistics<br />

(3) Public Finance<br />

(4) Socio-Economic Survey<br />

(5) Industrial Statistics<br />

7.00<br />

6 Computer Service<br />

3.00<br />

7 Other Expenditure: (1) Mini Press<br />

8.00<br />

8 Training of Statistical Personnel<br />

0.90<br />

9 Building<br />

25.00<br />

TOTAL: 155.00<br />

The Scheme-wise descriptions are as follows: —<br />

1. DIRECTION: The existing staff in the office of Economics & Statistics are maintained<br />

under Direction and Rs. 28.41 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

Sl.<br />

No.<br />

Name of Item/Scheme<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1. Deputy Director<br />

1 -<br />

2. Research Officer<br />

1 -<br />

3. Assistant Research Officer<br />

1 - 11.50<br />

4. Computer Operator<br />

1 -<br />

5. Stenographer – II<br />

1 -<br />

6. Driver<br />

2 -<br />

7. Travelling Expenses<br />

- -<br />

8. Wages<br />

- - 1.18


- 245 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1 2 3 4 5<br />

9.<br />

10.<br />

11.<br />

Office Expenses<br />

Publication<br />

House rent<br />

-<br />

-<br />

-<br />

11.50<br />

1.00<br />

3.23<br />

TOTAL: 7 28.41<br />

2. ADMINISTRATION: At present, the Department has only three District Offices at<br />

Aizawl, Lunglei and Saiha. It is proposed to establish three new Districts Offices at<br />

Champhai, Kolasib and Mamit during <strong>2006</strong>-<strong>2007</strong>. However, as there is no scope for creation<br />

of new posts, these new Districts Offices will be manned by existing Officers and Staff. An<br />

amount of Rs. 32.40 lakh is approved for maintenance of District Office for the year <strong>2006</strong>-<br />

07.<br />

Sl.<br />

No.<br />

Name of Item/Scheme<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1. Research Officer<br />

3 -<br />

2. Assistant<br />

3 -<br />

3. Driver<br />

3 - 21.80<br />

4. Grade – IV<br />

2 -<br />

5. Wages<br />

- - 0.10<br />

6. Travelling Expenses<br />

- - 4.50<br />

7. Office Expenses<br />

- - 6.00<br />

8. Opening of New Districts at<br />

- 3<br />

(1) Champhai, (2) Kolasib (3) Mamit<br />

-<br />

Total 32.40<br />

Under this Scheme, raw as well as tabulated, analysed and developed data<br />

temperature, rainfall and humidity in every district of <strong>Mizoram</strong> are needed to be stored in<br />

book form or CD/Floppy.<br />

3. VITAL STATISTICS: Under this scheme, data of vital events, births and deaths are<br />

collected through 700 local Registrars. Births and Deaths (RBD) Wing is functioning under<br />

this scheme. To strengthen this Wing and to achieve 100% registration as desired by<br />

Government of India, it is intended to undertake more effective inspection, conducting<br />

annual training for Registrars and monitoring, to ensure regular flow of reports and returns<br />

and to check irregularities in the registration system, an outlay of Rs. 42.10 lakh is provided<br />

for the year <strong>2006</strong>-07.<br />

Details of the scheme are as follows:<br />

Sl.<br />

No.<br />

Name of Item/Scheme<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Inspector of Statistics<br />

1 -<br />

2 L.D.C<br />

1 -<br />

-<br />

3 Driver<br />

1 -<br />

4 Group ‘D’<br />

2 -<br />

5 Wages (Honorarium of RBD)<br />

- - 26.60<br />

6 Travelling Expenses<br />

- - 5.50<br />

7 Office Expenses<br />

- - 10.00<br />

TOTAL : 5 42.10


- 246 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. NATIONAL SAMPLE SURVEY (NSS): National Sample Survey is conducted at National<br />

Level sponsored by Government of India. Surveys are taken up by State Government for<br />

both Central and State Samples. The Central share is 75% while the State Share is 25%.<br />

The following posts are to be maintained under the State Plan :<br />

Sl.<br />

No.<br />

Name of Item/Scheme<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 Inspector of Statistics<br />

2 -<br />

2 Sub-Inspector of Statistics<br />

7 - 4.00<br />

3 Travelling Expenses<br />

- - 1.19<br />

4 Office Expenses<br />

- - 3.00<br />

TOTAL: 9 8.19<br />

5. ECONOMIC ADVICE & STATISTICS:<br />

(1) State Income Estimation: Earlier this Scheme is integrated with Public Finance. Due<br />

to increase in workload, this scheme is bifurcated. Under this scheme, various baseline<br />

survey are to be undertaken, such as, Kitchen Garden production Survey, Computer<br />

software, transport and communication for the purpose of estimating State Domestic<br />

Products which is one of the most important indicators of the Economy of <strong>Mizoram</strong>. An<br />

outlay of Rs. 0.10 lakh is approved for the Annual Plan <strong>2006</strong>-07.<br />

(2) Price Statistics: Activities under this scheme is concerned mainly with Survey on –<br />

(1) Retail Price<br />

(2) Wholesale Price<br />

(3) Farm Harvest Price.<br />

Price situation, data on current price level and prices over a period of time largely<br />

effect the general masses, employers, employees and the administration as such observation<br />

of price situation is important. The department collects retail prices of essential<br />

commodities from every district headquarters and regularly published the Quarterly Price<br />

Bulletin. Besides, Survey on Farm Harvest price is periodically undertaken.<br />

But this Wing is still handicapped in the sense that uptil now Consumer Price Index<br />

(CPI) of <strong>Mizoram</strong> for Urban Non-Manual Employees (UNME) could not be constructed. The<br />

Department proposed to undertake FBE Survey for construction of CPI of <strong>Mizoram</strong> under<br />

the guidance of CSO, New Delhi. Detail physical and financial targets under this scheme are<br />

as follow :<br />

Sl.<br />

Name of Item/Scheme<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

No.<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1 A.R.O/Statistical Officer<br />

1 -<br />

2 Inspector of Statistics<br />

1 -<br />

3 Sub-Inspector of Statistics<br />

1 - 3.60<br />

4 Travelling Expenses<br />

- - 1.00<br />

5 Office Expenses<br />

- - 2.00<br />

TOTAL: 3 - 6.60


- 247 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(3) Public Finance: This Scheme covers a wide range of Statistics such as sources of<br />

revenue and expenditure of the government, plan outlay and investment, public debt and<br />

budget financing, domestic savings and capital formation. The Statistical data pertaining to<br />

these sectors are necessary for plan formulation and also for monitoring the plan and for<br />

assessment of the achievements. An outlay of Rs. 0.10 lakh is approved for Annual Plan<br />

<strong>2006</strong>-07.<br />

The Statistical analyses under this scheme mainly relates to:<br />

(i) Budget classification and analyses.<br />

(ii) Five Year Plan Analysis and reports, study of resource mobilization, etc.<br />

(iii) Census of Government Employees.<br />

(4) Socio-Economic Survey: Socio-Economic data is a true indicators of the economic<br />

condition of any State. Periodical Survey on Socio-economic Review for the official uses by<br />

the government and planners is a part and parcel of the activities of this Department.<br />

Besides, other activities to be taken under this scheme are:<br />

(i) Block Statistics (ii) Building and Housing Statistics<br />

An outlay of Rs. 0.10 lakh is approved for the coming financial year <strong>2006</strong>-07.<br />

(5) Industrial Statistics: Survey on trade, Annual Survey of Industries are pooled<br />

together and categories as Industrial Statistics. The study of this scheme will be concerned<br />

with the activities mainly :<br />

(i) Survey of Industries<br />

(ii) Trade Survey including distributive trade (tax)<br />

(iii) Man-power and labour Statistics.<br />

(iv) Mining and Quarrying<br />

(v) Electricity, Gas and water supply<br />

(vi) Construction.<br />

An outlay of Rs. 0.10 lakh is approved for <strong>2006</strong>-07.<br />

6. COMPUTER SERVICES /INFORMATION TECHNOLOGY: As this Department is dealing<br />

with all kinds of Statistical data, full computerization of work is necessary. Manual<br />

tabulation and processing of data could no longer sustain thework load, as such, it is<br />

emphasized to strengthen the computer wing.<br />

The Department proposed to purchase software and hardware i.e dot matrix printer<br />

and to improve and upgrade the existing Computers. Details are as given below:<br />

Sl.<br />

Name of Item/Scheme<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

No.<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1. Computer Operator<br />

- 1 0.50<br />

2. Purchase Dot Matrix Printer &<br />

accessories<br />

- 2 2.00<br />

3. Office Expenses<br />

- - 1.00<br />

TOTAL : - - 3.00


- 248 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

7. MINI PRESS AND PUBLICATION: The Department is running a small Printing Press<br />

for printing booklets, leaflets, various type of forms, covers of different publication. The<br />

physical and Financial targets for the year <strong>2006</strong>-07 are as below:<br />

Sl.<br />

Name of Item/Scheme<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

No.<br />

Physical Financial<br />

Existing New (Rs. in lakh)<br />

1 2 3 4 5<br />

1. Machine man<br />

1 -<br />

2. Compositor<br />

2 -<br />

3. Proof puller<br />

1 - 4.00<br />

4. Travelling Expenses<br />

- - 1.00<br />

5. O.E. / Purchase of Mini Offset &<br />

accessories<br />

- 1 3.00<br />

TOTAL : 4 - 8.00<br />

8. TRAINING OF STATISTICAL PERSONNEL: This scheme mainly emphasized to<br />

improve and augment the skill of Statistical personnel through training, especially primary<br />

and intermediate level of functionaries which is essential from time to time to effect<br />

improvement in their field of works.<br />

It is necessary to organize training in and outside <strong>Mizoram</strong> for primary and<br />

intermediate level and functionaries that will aim at widening their horizon by providing<br />

them with some useful Statistical tools and familiarize them with the latest development in<br />

various Statistical methodology. An amount of Rs. 0.90 lakh is approved for year <strong>2006</strong>-07.<br />

9. BUILDING: Economics and Statistics Department is not self-sufficient in office<br />

buildings and quarters. Even the Directorate office accomodates in a rented house. District<br />

Research Office-cum-Quarters at Saiha is likely to be completed during <strong>2006</strong>-<strong>2007</strong> and<br />

Rs.15.00 lakh is provided for completion. During <strong>2006</strong>-<strong>2007</strong>, Rs. 10.00 lakh is approved for<br />

contruction of Lunglei District office-Cum Quarter.


- 253 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />

The main task of the Department of Food, Civil Supplies & Consumer Affairs is to<br />

ensure food security in <strong>Mizoram</strong> through efficient Public Distribution System. The<br />

Department procures foodstuff from Food Corporation of India Depots and despatches<br />

them to various Supply Centres for equitable distribution to the public by Fair Price Shop<br />

retailers through Ration Cards. The Department is now functioning with 6 (six) District<br />

Offices, 4 (four) Sub-Divisional Offices, 9 (nine) Principal Distribution Centres, 18 Sub-<br />

Distribution Centres and 94 Supply Centres. The Department is having one of the largest<br />

network of operations among the various Departments in <strong>Mizoram</strong>.<br />

As per Government of <strong>Mizoram</strong> Notification No.A.46013/1/95-GAD/Loose,<br />

dt.17.11.04 Consumer Affairs which includes Consumer Protection, Management of State<br />

Commission and District Forum is allocated to the Department of Food & Civil Supplies and<br />

re-named as Food, Civil Supplies & Consumer Affairs Department.<br />

The approved outlay for the 10 th Five Year Plan 2002 - <strong>2007</strong> in respect of the<br />

Department of Food, Civil Supplies & Consumer Affairs is Rs 826.00 lakh. This will be<br />

utilised for maintenance of existing 27 posts of various categories of Officers & Staff under<br />

Plan, maintenance of 11 nos. of heavy vehicles and 20 nos. light vehicles under Plan<br />

Schemes. Besides, it is intended to repair and reconstruct approach roads of Godowns and<br />

also to provide funds for maintenance of the existing 188 nos. of Godowns and 250 nos. of<br />

Staff Quarters at various Supply Centres.<br />

The break-up of total approved outlay of Rs. 560.00 lakh for the Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong> under Food, Civil Supplies & Consumer Affairs Department are as follows :-<br />

1. CIVIL SUPPLIES<br />

A. Direction: An amount of Rs. 176.50 lakh is approved for maintenance of the<br />

existing 14 nos. of Staff, maintenance of heavy & light departmental vehicles, office<br />

expenses, materials & supply, travelling expenses, advertisement, other charges etc. under<br />

Plan Scheme and Rs. 70.00 lakh is specifically earmarked for clearing of department<br />

liabilities which are already incurred for maintenance of departmental vehicles and<br />

purchase of supply and materials.<br />

Sl. No. Particulars Amount approved<br />

(Rupees in lakh)<br />

1. Salary of existing 14 Staff - 22.50<br />

2. Medical treatment - 1.50<br />

3. Travelling expenses - 3.50<br />

4. Office expenses - 15.00<br />

5. Material & Supply - 50.00<br />

6. Advertisement - 2.00<br />

7. Other charges - 2.00<br />

8. Maintenance of vehicles - 80.00<br />

TOTAL - 176.50


- 254 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. STORAGE & WAREHOUSE :<br />

A. Administration: A sum of Rs. 22.50 lakh is approved during Annual Plan <strong>2006</strong> -<br />

<strong>2007</strong> for maintenance of the existing 13 nos. of Staff under Plan, Office Expenses and<br />

Travelling Expenses as given below :-<br />

Sl. No. Particulars Amount (Rs. in lakh)<br />

1. Salary of existing 13 Staff - 13.00<br />

2. Medical treatment - 1.00<br />

3. Travelling expenses - 2.00<br />

4. Office expenses - 6.50<br />

TOTAL - 22.50<br />

B. Food Subsidies: The Department of Food, Civil Supplies & Consumer Affairs is now<br />

having as much as 188 nos. of Godowns and 250 Staff Quarters. Some of these Godowns<br />

and Quarters were constructed more than 15 years ago, as such, repair works need to be<br />

done for these buildings. It is also proposed for repair of side drains, retaining walls and<br />

approach road to Godowns. For which an amount of Rs. 15.00 lakh is earmarked during<br />

Annual Plan 2005 - <strong>2006</strong>.<br />

3. CONSUMER AFFAIRS :<br />

A sum of Rs. 35.00 lakh is approved for maintenance of existing 13 nos. of Staff,<br />

Muster Rolls, O.E., T.E., etc. under Plan of State Commission & District Forum. There are<br />

7(seven) District Forums at Lunglei, Saiha, Champhai, Lawngtlai, Serchhip, Kolasib and<br />

Mamit now functioning on part time basis with 2(two) members each and their respective<br />

Deputy Commissioner as the President of the District Forum. The members are entitled<br />

consolidated Honorarium while they are sitting.<br />

A. STATE COMMISSION :<br />

An amount of Rs. 18.00 lakh is approved for O.E., T.E., and maintenance of existing<br />

7 nos. regular Staff and Muster Roll under State Commission.<br />

Sl. No. Particulars Amount (Rs. in lakh)<br />

1. Salary of existing 6 Staff - 10.10<br />

2. Wages of 1(one) M/R - 0.45<br />

3. Medical treatment - 0.70<br />

4. Domestic T.E. - 4.00<br />

5. Office Expenses - 2.00<br />

6. Other Charges - 0.85<br />

TOTAL - 18.00<br />

B. DISTRICT FORUM :<br />

An amount of Rs.17.00 lakh is approved for O.E., T.E. and maintenance of 6 nos. of<br />

regular Staff and one Muster Roll under District Forum.<br />

Sl. No. Particulars Amount (Rs. in lakh)<br />

1. Salary of existing 5 Staff - 8.00<br />

2. Wages of 1(one) M/R - 0.45<br />

3. Medical treatment - 0.50<br />

4. Domestic T.E. - 1.50<br />

5. Office Expenses - 3.55<br />

6. Other Charges - 3.00<br />

TOTAL - 17.00


- 255 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

FOOD STORAGE AND WAREHOUSING : RURAL GODOWN etc.<br />

1. MAJOR WORKS: Under this head, Rs. 20.00 lakh is earmarked during Annual Plan<br />

2005 - <strong>2006</strong> for installation of 10 (ten) passengers capacity lift (Elevator) at the Directorate<br />

building at Aizawl; the work is being started and the required fund is included in the<br />

earmarked outlay.<br />

2. BAFFACOS/ANNAPURNA: For implementation of these Schemes, Rs. 291.00 lakh is<br />

approved during Annual Plan 2005-<strong>2006</strong> and out of which Rs. 260.00 lakh is approved for<br />

BAFFACOS and TFC (earmarked scheme) and the remaining amount of Rs. 31.00 lakh is<br />

specifically earmarked for implementation of ANNAPURNA Scheme.<br />

A. BAFFACOS: Though the dreaded Mautam (flowering of Bamboos) is forecast to<br />

occur in <strong>2007</strong>, the Department of Food, Civil Supplies & Consumer Affairs is required to<br />

make advance preparation to adequately respond to the impending disaster in various<br />

aspects. As such, fund provision is made to undertake the following works:-<br />

(1) PROCUREMENT OF RICE: Rs. 124.50 lakh is earmarked for procurement of<br />

15000 quintals of Rice for stocking to the supply main Centres of the eight Districts for<br />

immidiate relief to the famine victims. Procurement of additional Quantity of foodstuff is<br />

required as the existing allotment is far too inadequate to meet the actual requirement.<br />

(2) TRANSPORTATION COST: Rs. 41.50 lakh is earmarked for payment of<br />

carriage of foodstuff from the main centres to the last outlets - the retailers during Annual<br />

Plan <strong>2006</strong>-<strong>2007</strong>. Normally, carriage charges of foodstuff from PDS to the last outlets are<br />

borned by the State under Non-Plan Fund but due to financial constraint, the Government is<br />

not in a position to provide adequate fund to meet the requirement.<br />

(3) PURCHASE OF COMPUTERS: Department of Food, Civil Supplies &<br />

Consumer Affairs is the implementing agencies of Public Distribution System in <strong>Mizoram</strong><br />

and it has one of the largest network of operations among the various Department in the<br />

State. In order to adequately respond to the impending famine due to MAUTAM, it is felt<br />

necessary to devise a system for more effective and efficient monitoring and regulating of<br />

the movement of Essential Commodities from the Despatching Centres to the Fed Centres. It<br />

is, therefore, proposed to arrange installation of Computers in the 6(six) District Offices,<br />

4(four) Sub-Division Offices and 9 (nine) Principal Distribution Centres in the State. And for<br />

which an amount of Rs. 14.00 lakh is earmarked for purchase of 19 (nineteen) Computers<br />

with Laser printers during the Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

(4) ANNAPURNA: Rs. 31.00 lakh is earmarked under Annapurna Scheme during<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong> and the fund will be utilised for procurement of Rice and payment<br />

of carriage charge. Under the Scheme, 2587 beneficiaries are identified from senior citizens<br />

above 65 years of age. To each beneficiary, 10 kgs. of Rice per month will be issued free of<br />

cost.<br />

(5) TFC: Under the 12 th Finance Commission, the Department proposes to take<br />

up various works under Food, Civil Supplies & Consumer Affairs Department such as,<br />

Construction of Godowns, Quarters, renovation of Office and Godowns within the amount<br />

of Rs. 80.00 lakh during the Financial Year of <strong>2006</strong>-<strong>2007</strong>.


Sl.<br />

No.<br />

- 256 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Detailed work schedules for the above scheme are as follows :-<br />

Name of Scheme with items of works<br />

and location<br />

Name of<br />

District<br />

Unit /<br />

Quantity<br />

Amount<br />

(in lakh)<br />

1. Construction of Godown at Saiphai DCSO ‘W’ 1 No. Rs. 3.00<br />

2. Construction of Staff quarter at Hortoki<br />

Supply Centre<br />

DCSO ‘W’ 1 No. Rs. 3.00<br />

3. Construction of Staff Quarter at<br />

Kawrtethawveng S. Centre<br />

DCSO ‘W’ 1 No. Rs. 3.00<br />

4. Construction of Staff Quarter at Bairabi<br />

Supply Centre<br />

DCSO ‘W’ 1 No. Rs. 3.00<br />

5. Construction of Godown at E. Lungdar<br />

Supply Centre<br />

DCSO ‘E’ 1 No. Rs. 3.00<br />

6. Construction of Godown at Khawhai<br />

Centre<br />

DCSO (CPI) 1 No. Rs. 3.00<br />

7. Construction of IF&CS Quarter at Kolasib DCSO ‘W’ 1 No. Rs. 3.00<br />

8. Construction of Godown at Sangau S.D.<br />

Centre<br />

DCSO (LLI) 1 No. Rs. 3.00<br />

9. Construction of Godown at Hnahthial<br />

S.D. Centre<br />

DCSO (LLI) 1 No. Rs. 3.00<br />

10. Construction of Staff Quarter at<br />

Khawzawl S.D. Centre<br />

DCSO (CPI) 1 No. Rs. 3.00<br />

11. Construction & repair of Approach roads<br />

to Chawngtlai Godown.<br />

DCSO (CPI) 1 No. Rs. 1.00<br />

12. Construction & repair of Approach roads<br />

to Darlung Godown.<br />

DCSO ‘W’ 1 No. Rs. 1.00<br />

13. Construction & repair of Approach roads<br />

to Hmuifang Godown<br />

DCSO ‘W’ 1 No. Rs. 1.00<br />

14. Construction & repair of Approach roads<br />

to E. Lungdar Godown<br />

DCSO ‘E’ 1 No. Rs. 1.00<br />

15. Construction & repair of Approach roads<br />

to Vanbawng Godown<br />

DCSO ‘E’ 1 No. Rs. 1.00<br />

16. Construction & repair of Approach roads<br />

to N. Vanlaiphai Godown<br />

DCSO ‘E’ 1 No. Rs. 1.00<br />

17. Repair of Godown at Champhai DCSO (CPI) 1 No. Rs. 1.00<br />

18. Repair of Godown at Hnahthial DCSO (LLI) 1 No. Rs. 1.00<br />

19. Repair of Godown No. III at Zuangtui Dte. of<br />

FCS&CA<br />

1 No. Rs. 1.00<br />

20. Construction of Staff quarter at<br />

Khawrihnim<br />

DCSO ‘W’ 1 No. Rs. 3.00<br />

21. Construction of Staff Quarter at<br />

Kanhmun<br />

DCSO ‘W’ 1 No. Rs. 3.00<br />

22. Construction of Approach Road at<br />

Khawrihnim<br />

DCSO ‘W’ 1 No. Rs. 1.00<br />

23. Construction of Godown at Kawlkulh DCSO (CPI) 1 No. Rs. 3.00<br />

24. Construction of Godown at Tawipui DCSO (LLI) 1 No. Rs. 3.00<br />

25. Construction of Godown at Serkawr DCSO (SHA) 1 No. Rs. 3.00<br />

26. Construction of Godown at Kawlchaw DCSO (SHA) 1 No. Rs. 3.00


Sl.<br />

No.<br />

- 257 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme with items of works<br />

and location<br />

Name of<br />

District<br />

Unit /<br />

Quantity<br />

Amount<br />

(in lakh)<br />

27. Construction of Approach Road at<br />

Kanhmun<br />

DCSO ‘W’ 1 No. Rs. 1.00<br />

28. Construction of Staff Quarter at<br />

Phuldungsei<br />

DCSO ‘W’ 1 No. Rs. 3.00<br />

29. Construction of Godown at Putlungasih DCSO (LLI) 1 No. Rs. 3.00<br />

30 Construction of Godown at Cherhlun DCSO (LLI) 1 No. Rs. 3.00<br />

31. Construction of Godown at Tuichawng DCSO (LLI) 1 No. Rs. 3.00<br />

32. Construction of Godown at Bungtlang (S) DCSO (LLI) 1 No. Rs. 3.00<br />

33. Construction & repair of Approach roads<br />

to Phullen Godown<br />

DCSO ‘E’ 1 No. Rs. 1.00<br />

34. Construction & repair of Approach roads<br />

to Khawzawl Godown<br />

DCSO (CPI) 1 No. Rs. 1.00<br />

35. Construction & repair of Approach roads<br />

to Vairengte Godown<br />

DCSO ‘W’ 1 No. Rs. 1.00<br />

36. Construction & repair of Approach roads Dte. of 1 No. Rs. 1.00<br />

to Zuangtui Godown<br />

FCS&CA<br />

37. Construction & repair of Approach Road<br />

to Pukzing Godown<br />

DCSO ‘W’ 1 No. Rs. 1.00<br />

38. Renovation of Godown at Bukpui DCSO’W’ 1 No. Rs. 1.00<br />

TOTAL Rs. 80.00


INTRODUCTION<br />

- 261 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

The Lai Autonomous District Council is located in the Southern part of<br />

<strong>Mizoram</strong> State and is 296 kms away from the State Capital, Aizawl. It is well-connected by<br />

the National Highway No. 54, having International Boundary with Myanmar and Mara<br />

Autonomous District Council in the East, Lunglei District in the North. And also Chakma<br />

Autonomous District Council in the West and again Myanmar and Mara District in the South.<br />

It is the largest District Council in area and in population in <strong>Mizoram</strong> State. It covered an<br />

area of 1870.75 Sq kms with a population of 58700. The State Government allocated an<br />

outlay of Annual Plan <strong>2006</strong>-<strong>2007</strong> for Rs. 875.00 lakh. Hence, the sectoral-wise allocation of<br />

approved Annual Plan <strong>2006</strong>-<strong>2007</strong> are as under :<br />

Sl. No. Name of Department<br />

10 th Plan<br />

Outlay<br />

Approved<br />

Outlay<br />

2005-06<br />

Approved<br />

Outlay<br />

<strong>2006</strong>-07<br />

I Agriculture & Horticulture 260.00 44.00 49.00<br />

II Fisheries Department 40.00 17.00 19.00<br />

III Public Health Engineering Department 120.00 30.00 32.00<br />

IV Industries Department 62.00 26.00 27.00<br />

V Sericulture Department 38.00 8.00 9.00<br />

VI AH & Vety Department 50.00 14.00 16.00<br />

VII Art & Culture Department 130.00 33.00 35.00<br />

VIII Social Welfare Department 100.00 29.00 30.00<br />

IX Soil Conservation Department 70.00 18.00 20.00<br />

X Local Administration Department 240.00 50.00 52.00<br />

XI Forest Department 190.00 37.00 38.00<br />

XII Transport Department 40.00 20.00 24.00<br />

XIII Sport & Youth Services Department 74.00 20.00 22.00<br />

XIV Co-operation Department 30.00 10.00 10.00<br />

XV Public Work Department 730.00 156.00 145.00<br />

XVI Education Department 952.00 285.00 285.00<br />

XVII Rural Development Department 180.00 49.00 55.00<br />

XVIII Water Ways Department 30.00 4.00 7.00<br />

Total = 3336.00 850.00 875.00


- 262 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

A BRIEF WRITE-UP OF SECTORE–WISE AND SCHEMES FOR<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong>, LAI AUTONOMOUS DISTRICT COUNCIL.<br />

1. AGRICULTURE & HORTICULTURE :<br />

‘A’ AGRICULTURE :<br />

This Sector is the economical backbone for the people of Lai in particular and also<br />

for the people of the whole country as a whole . Since, the Annual Plan Outlay is so limited,<br />

sufficient amount could not be allocated in this particular sector so as to solve the basic<br />

needs of the people . As such, the Executive Committee of Lai Autonomous District Council<br />

given priority in this particular sector. It is however, an idea to seek / pull-out a Central<br />

Fund (C.S.S ) a matching share so as to attaining self-sufficiency in food production within<br />

Lai Autonomous District Council Area. Hence, Rs. 29.20 lakh is approved for this sector, out<br />

of which, the following schemes are included :-<br />

1. Matching share for Land Development and Minor Irrigation - 15.30<br />

2. Financial Assistant to Cultivator - 5.70<br />

3. Purchase/Maint.of Bike - 0.20<br />

4. Administrative Costs :- (a) Office Expenses - 0.50<br />

(b) TA/DA - 0.50<br />

(c) Salary - 7.00<br />

Total of ‘A’ - 29.20<br />

‘B’ HORTICULTURE :<br />

The main object of the sector is to develop the Horticultural Plantation in the<br />

District Council in the Area. His Excellency, the Governor of <strong>Mizoram</strong> had given a priority to<br />

Agriculture and allied (i.e. Horticulture).The District Council also had given priority for the<br />

upliftment of the day-to-day economic life of the people and slightly increase the sectoral<br />

allocation for this sector. The total amount allocated for the Annual Plan <strong>2006</strong>-07 is<br />

Rs.19.80 lakh. The Scheme–wise description are as under :-<br />

1. Financial Assistant to Horticulturist in every villages who are<br />

Interested in this field of Trade. - 6.80<br />

2. Purchase of Seed / Seedling for distribution of Horticulture<br />

Farmer. - 4.00<br />

3. Maintenance of Mampui Seed Farm existing Farm - 0.80<br />

4. Purchase/Maintenance of Vehicle - 1.80<br />

5. Administrative Costs :- (a) Training Expenses - 0.60<br />

(b) Office Expenses - 0.40<br />

(c) TA/DA - 0.40<br />

(d) Salary - 5.00<br />

Total of ‘B’ - 19.80<br />

Grand Total - 49.00<br />

II. FISHERIES DEPARTMENT:-<br />

Though, this sector is not a major sector District Council given priority as per<br />

advised by his Excellency, the Governor of <strong>Mizoram</strong>, so as to increase fish production in the<br />

area. As such, Rs. 19.00 lakh is allocated for the Annual Plan <strong>2006</strong>-<strong>2007</strong> Schemes-wise<br />

allocation of fund in this sector are the following :-<br />

1. Purchase and supply of fish seed for distribution to<br />

Fish farmers - 3.00


- 263 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. Construction of fish pond for the enlightentment of the<br />

People - 9.00<br />

3 Administrative Costs : (a) Office Expenses - 0.40<br />

(b) TA/DA - 0.80<br />

(c) Salary - 5.80<br />

Total - 19.00<br />

III. P.H.E. DEPARTMENT :-<br />

The main aims and objects of this sector is to provide clean drinking water to the<br />

Public to achieve the policy of this sector, sufficient amount could not be allocated due to<br />

financial constrains. However, Rs. 32.00 lakh is approved for Annual Plan <strong>2006</strong>-07, out of<br />

which, the following schemes are provided to achieve the minimum needs of the people.<br />

1. Construction of R.C.C. Water Tank at different Villages<br />

so as to have clean drinking water for the Villagers - 5.00<br />

2. Construction of Water Tank - 2.00<br />

3. Harvesting of Rain Water for the needy persons - 6.00<br />

4. Repair of existing Water tank - 2.00<br />

5. Purchase of Polygon to be provided Executive Members<br />

and important Officials & LADC Rest House - 5.20<br />

6. Maintenance of Vehicle - 1.10<br />

7. Administrative Costs : (a) Office Expenses - 1.50<br />

(b) TA/DA - 0.50<br />

(c) Salary - 8.70<br />

Total - 32.00<br />

IV. INDUSTRY DEPARTMENT :-<br />

The Lai Autonomous District Council could not carry out the basic needs of the<br />

people in respect of Industrial purposes due to constrains of fund allocated to the Council.<br />

It is however, try to develop to the people in a small scale Industrial Units, and Rs. 27.00<br />

lakh is approved for Annual Plan <strong>2006</strong>-07 as given below: -<br />

1. (a) Production cum-Training Centre at Lawngtlai, which is<br />

existing/on going Schemes - 2.00<br />

(b) Procurement of raw materials for the above Training<br />

Centre - 1.50<br />

2. Installation of I.T. with Maintenance / Furnishing - 3.70<br />

3. Administrative Costs : (a) Office Expenses - 0.40<br />

(b) TA/DA - 0.60<br />

(c) Salary - 18.00<br />

Total - 27.00<br />

V. SERICULTURE DEPARTMENT :-<br />

The Lai Autonomous District Council area is quite suitable for rearing of Silk-Worm.<br />

Mulberry Plantation for selected Villages was operated from Central Sponsored Schemes<br />

executed by <strong>Mizoram</strong> Sericulture Department in collaboration with LADC Sericulture<br />

Department. The People living in this area interested in this field of Trade to a great extent.<br />

As such, Rs. 9.00 lakh only is approved for Annual Plan <strong>2006</strong>-07.<br />

The item-wise schemes are as under :-<br />

1. Maintenance of Sericulture Farm at Saikah - 0.60<br />

2. Purchase of DFLS ( Eggs ) - 1.00<br />

3. Purchase of Cocoon - 1.30


- 264 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. GIA to Silk-Worm rearer creations of Mulberry Farm - 3.50<br />

5. Purchase of rearing Tools and Equipment - 0.18<br />

6. Administrative Costs : (a) Office Expenses - 0.20<br />

(b) TA/DA - 0.22<br />

(c) Salary - 2.00<br />

Total - 9.00<br />

VI. AH & VETY. DEPARTMENT:-<br />

Priority has been given to this sector as desired by his Excellency, the Governor of<br />

<strong>Mizoram</strong>, for the upliftment of the People in respect of rearing domestic animals. Hence,<br />

Rs.16.00 lakh is approved for Annual Plan <strong>2006</strong>-07. The item–wise allocation are as follows:-<br />

1. Purchase of Medicine with Accessories - 1.50<br />

2. GIA to Cattle Rearer - 3.00<br />

3. Purchase of Chicks including feed for distribution to<br />

Poultry farmers - 4.00<br />

4. Maintenance of Scooter - 0.10<br />

5. Maintenance of Vehicle - 1.10<br />

6. Administrative Costs : (a) Office Expenses - 0.90<br />

(b) TA/DA - 0.40<br />

(c) Salary - 5.00<br />

Total - 16.00<br />

VII. ART & CULTURE DEPARTMENT :-<br />

‘A’ PROMOTION OF ART & CULTURE :-<br />

The main aims and objects of this Department is to preserve the Lai Culture and<br />

Tradition and also to collect the Historical Documentary of the Lai Tribe. As such, Rs. 18.60<br />

lakh is approved for Annual Plan <strong>2006</strong>-07. The item-wise allocation are as given below: -<br />

1. Preservation of Ancient Monument - 0.50<br />

2. Improvement of Music and Fine Arts/Training of<br />

Cultural Dance/Holding of Singing Competition etc - 2.50<br />

3. Collection of Cultural Dress - 1.00<br />

4. Printing of Books/Publication of Books - 2.00<br />

5. Renumeration of Casual Artist - 1.50<br />

6. House Rent and Law requisition for LSA Hostel - 3.00<br />

7. Improvement of Council Library - 0.50<br />

8. Maintenance of Video Camera - 0.20<br />

9. Maintenance of Vehicle - 1.00<br />

10. Administrative Costs : (a) Office Expenses - 0.50<br />

(b) TA/DA - 0.50<br />

(c) Salary - 5.30<br />

Total of ‘A’ - 18.60<br />

‘B’ INFORMATION :-<br />

This sector is the sub-sector of Art & Culture Department and this sub-sector is the<br />

main source of informatics event as well as publicity of the new event within Lai<br />

Autonomous District Council and abroad. However, sufficient amount could not be provided<br />

so far and only Rs. 16.40 lakh is approved for Annual Plan <strong>2006</strong>–07 with the following<br />

items: -<br />

1. Printing of Calendar - 1.00<br />

2. Advertisement Charge - 2.30<br />

3. Hospitality fund - 1.50


- 265 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. Subscription of News Paper - 1.50<br />

5. Subscription of Council ‘AW’ - 0.40<br />

6. Preparation and Maintenance of Reading Room - 1.00<br />

7. Purchase/Maintenance of Facimile - 0.10<br />

8. Purchase/Maintenance of PA Set - 0.30<br />

9. Maintenance of Steel Camera - 0.20<br />

10. Maintenance of Video camera - 0.20<br />

11. Purchase/Maintenance of Computer - 1.00<br />

12. Administrative Costs : (a) Office Expenses - 0.40<br />

(b) TA/DA - 0.30<br />

(c) Salary - 6.30<br />

Total of ‘B’ - 16.40<br />

Total of VII - 35.00<br />

VIII. SOCIAL WELFARE DEPARTMENT :-<br />

This Department targeted the upliftment of Social life of the people living in Lai<br />

District Council area.Hence, schemes in connection with social wings as well as grant-in-aid<br />

to NGO’s, Widows, Poor Patients, Physically Handicapped, Motherless Babies are provided<br />

assistance in this sector. The total approved allocation of outlay is Rs. 30.00 lakh for the<br />

Annual Plan <strong>2006</strong>-07. The item-wise allocation are as under :-<br />

1. Wages of old aged Pensioners - 10.10<br />

2. Financial Assistant to Widow - 1.00<br />

3. Financial Assistant to Physically Handicapped - 1.00<br />

4. Financial Assistant to Motherless Babies Home - 1.00<br />

5. Financial Assistant to Poor patient Leprosy - 2.45<br />

6. Financial Assistant to Motherless Babies - 1.00<br />

7. Financial Assistant to NGO - 2.50<br />

8. Financial Assistant to YLA Conference - 0.70<br />

9. Purchase/Supply of Cup - 2.00<br />

10. Construction of Grave-Yard Hut - 1.00<br />

11. Maintenance of Vehicle - 1.00<br />

12. Administrative Costs : (a) Office Expenses - 0.40<br />

(b) TA/DA - 0.30<br />

(c) Salary - 6.00<br />

Total of VIII - 30.00<br />

IX. SOIL CONSERVATION DEPARTMENT :-<br />

The Lai Autonomous District Council submitted Detail Project Report (DPR) for<br />

Watershed Development Project to DoNER and is being processed and also awaited for<br />

sanction. As such, some items/schemes has been provided to meet the minimum needs of<br />

the Department existing plantation and some new items have been provided in this sector.<br />

The total outlay for the scheme is Rs.20.00 lakh only as follows: -<br />

1. Hill Terracing - 2.00<br />

2. Creation of Avacoda plantation at Thingkah/Construction<br />

of RO Quarters at Hruitezawl - 1.95<br />

3. Fire line cutting - 0.20<br />

4. Creation of Plantation at Hruitezawl - 1.00<br />

5. Maintenance of existing Plantation - 1.20<br />

6. Creation/Maintenance of Nursery Beds - 0.80<br />

7. Maintenance of Vehicle - 0.05


- 266 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

8. Maintenance of Bike - 0.10<br />

9. Administrative Costs : (a) Office Expenses - 0.50<br />

(b) TA/DA - 0.50<br />

(c) Salary - 9.70<br />

Total of IX - 20.00<br />

X. LOCAL ADMINISTRATION DEPARTMENT :<br />

The main aims and objects of this sector is to be developed urban and rural areas of<br />

Lai Autonomous District Council. This sector is sub-divided into three sub-sectors viz.:<br />

‘A’ – Urban Development<br />

‘B’ – Minor Works<br />

‘C’ – Sanitation<br />

It has to ensure the safety of Towns and Villages and also to ensure the healthyness<br />

of general public which can be caused by Landslide, Erosion, Epidemic and diseases (like<br />

Malaria, Dysentry, Typhoid, etc.) respectively, schemes in connection with the above are<br />

provided in this sector.Moreover, the protection of Town and villages and other endangered<br />

area due to landslides and erosion have to be look in to by this sector. The total approved<br />

allocation of outlays for the scheme during Annual Plan <strong>2006</strong>-07 is Rs. 52.00 lakh only.<br />

‘A’ URBAN DEVELOPMENT :-<br />

1. Financial Assistant to Low-Income group<br />

for construction of Houses - 2.90<br />

2. TA/DA for Town Planning Committee Chairman - 0.20<br />

3. Office Expenses for Town Planning Committee - 0.20<br />

Total of ‘A’ - 3.30<br />

‘B’ MINOR WORKS :-<br />

1. Construction of M/Step at Lawngtlai town, and other division<br />

and sub-division of LADC etc. - 4.50<br />

2. Construction of M/Side Drain at Lawngtlai Town and other<br />

division and sub-division of LADC etc. - 4.00<br />

3. Construction of R./Wall at Lawngtlai Town and other division<br />

and sub-division of LADC etc. - 3.00<br />

4. Construction of Culvert/Stone Laying at Lawngtlai town - 1.00<br />

5. Repair of existing Step and Drainage - 1.00<br />

6. Purchase/Maintenance of Vehicle - 1.80<br />

7. Administrative Costs : (a) Office Expenses - 0.50<br />

(b) TA/DA - 0.50<br />

(c) Salary - 6.30<br />

Total of ‘B’ - 22.60<br />

‘C’ SANITATION :-<br />

1. Construction of Pucca Urinals for 20 nos. of different Villages<br />

School/Public places - 2.00<br />

2. Purchase of Sweeping Materials - 0.50<br />

3. Maintenance of Truck/Tripper - 3.00<br />

4. Construction of Slaughter House at Lawngtlai - 1.00<br />

5. Construction of Bazar Shed at Ngengpui kai - 1.00<br />

6. Purchase/Maintenance of Vehicle - 1.70<br />

7. Existing Bazar Shed


- 267 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(a) Lawngtlai - 0.40<br />

(b) Purchase of PA set for the use of Super Market at Lawngtlai - 0.30<br />

8. Administrative Costs : (a) TA/DA - 0.50<br />

(b) Office Expenses - 0.40<br />

(c) Salary - 15.30<br />

Total of ‘C’ - 26.10<br />

Total of X - 52.00<br />

XI. FOREST DEPARTMENT :-<br />

Fortunately, the Lai Autonomous District Council got a sanction for Forest<br />

Development Agency from Central Government and is being implemented in Lai<br />

Autonomous District Council area. For which a problem faced by the department have been<br />

solved to a great extend. As such, certain item of works/schemes are deliberately neglected<br />

from the District Council Budget. However, Rs. 37.00 lakh only is approved for the Annual<br />

Plan <strong>2006</strong>-07 with the following items: -<br />

1. Maintenance of previous Plantation - 2.30<br />

2. Construction of Forest Quarter/Office Check gate<br />

Rs.2.00 lakh per no. for 2 nos. - 4.00<br />

3. Construction of Sand Quarry Road at Kawlchaw - 5.00<br />

4. Repair of Department Gun - 0.20<br />

5. Purchase of Staff Uniform - 1.50<br />

6. Purchase of Boat for Official Duty purpose - 0.20<br />

7. Survey of Forest boundary - 0.60<br />

8. Training Expenses - 1.00<br />

9. Purchase of Bike with Maintenance - 0.20<br />

10.Maintenance of Vehicle - 1.00<br />

11.Administrative Costs : (a) Office Expenses - 1.00<br />

(b) TA/DA - 0.80<br />

(c) Salary - 20.20<br />

Total of XI - 38.00<br />

XII. TRANSPORT DEPARTMENT :-<br />

The Transport Department is solely responsible over the matter of vehicle owned by<br />

the Lai Autonomous District Council. The Officer concerned of the department is held<br />

responsible for controlling driver’s attendants, detailment of driver’s duty over all<br />

administration. Whatsoever, schemes is connected with the subject above are provided. The<br />

total approved outlay during Annual Plan <strong>2006</strong>-07 is Rs. 24.00 lakh only.<br />

1. Maintenance of Bike - 0.10<br />

2. Purchase/Maintenance of Vehicle - 15.60<br />

3. Purchase/Maintenance of Driver’s Uniform - 0.80<br />

4. Administrative Costs : (a) Office Expenses - 0.60<br />

(b) TA/DA - 0.60<br />

(c) Salary - 6.30<br />

Total of XII - 24.00<br />

XIII. SPORT & YOUTH SERVICES DEPARTMENT :-<br />

Promotions of every sport discipline within Lai Autonomous District Council area are<br />

the aims and objects of this Department. To achieve the policy of the Department, effort has<br />

been taken to various fields of sports among the sport lovers of youth. But sufficient fund<br />

could not be provided due to constrains of Budgetary Fund. During Annual Plan <strong>2006</strong>-07,<br />

Rs. 22.00 lakh only is approved under Sports & Youth Services as under: -


- 268 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. Construction of Volley Ball Court at Bungtlang - 1.00<br />

2. Purchase of Sport goods for distribution to Sporting Club - 4.50<br />

3. Promotion of Zonal Sport (conduct of Tournament) - 1.00<br />

4. (a) Conduct of Sport within District - 0.50<br />

(b) Conduct of Sport outside District - 1.00<br />

5. Maintenance of Vehicle - 1.80<br />

6. (a) Financial Assistant to Sporting Club - 1.50<br />

(b) Intensive Cash Award to the Player participating<br />

outside the District - 1.30<br />

7. Maintenance of Bike - 0.10<br />

8. Administrative Costs : (a) Office Expenses - 0.40<br />

(b) TA/DA - 0.40<br />

(c) Salary - 8.50<br />

Total of XIII - 22.00<br />

XIV. CO-OPERATION DEPARTMENT :-<br />

The Lai Autonomous District Council does have sufficient outlay of fund in plan<br />

sector, as such, Co-operation movement in the area is hardly taken up in a successful a<br />

standard of the Societies. Within the limited outlay of fund, several effort has been taken for<br />

the awareness of the Co-operative Societies in each and every Villages.There are numerous<br />

hindrances to carry out the awareness and the smooth functioning of every Societies.<br />

Rs.10.00 lakh only is approved for Cooperation as under: -<br />

1. Financial Assistant to various Co-operative Societies - 4.30<br />

2. Compilation by Law - 0.10<br />

3. Administrative Costs : (a) Training Expenses - 0.30<br />

(b) Office Expenses - 0.30<br />

(c) TA/DA - 0.30<br />

(d) Salary - 4.70<br />

Total of XIV - 10.00<br />

XV. PUBLIC WORKS DEPARTMENT :<br />

This Department is the major sector of developmental Department in Lai<br />

Autonomous District Council. The Lai Autonomous District council entrusted this<br />

Department for execution of all major works like Construction of Building, Road<br />

Construction and Maintenance of completed schemes. It had been constructed Main Office<br />

Building, Lai Autonomous District Council House, Dokulha Hall, Session Hall and other<br />

major works by this Department. To execute, monitor and supervise the works taken up by<br />

Lai Autonomous District Council, Officers and Technical Staff are provided in this sector.<br />

But on the eve of the preparation of Annual Plan <strong>2006</strong>-07, sufficient amount of fund<br />

could not be provided for such major works. Rs. 145.00 lakh is approved for the Annual<br />

Plan <strong>2006</strong>-07 with the following schemes: -<br />

1. (a) Furnishing of Dokulha’s Hall - 0.70<br />

(b) Maintenance/White Washing of Dokulha’s Hall - 3.00<br />

2. Maintenance of Lai House at Aizawl - 6.10<br />

3. Maintenance of Rest House at Chawngte, Vathuampui,<br />

Bungtlang’S’,Vawmbuk,Siachangkawn - 4.00<br />

4. Maintenance of EPABX, Xerox etc. - 2.00<br />

5. Construction of Session Hall - 20.00<br />

6. (a) Construction/Maintenance of RO/ARO Office at<br />

Diltlang, Chawngte, Vathuampui, Bualpui ‘NG’ & Sangau - 4.00


- 269 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(b) Constn. of ARO Office at Lungtian with Chowkider Quarters - 3.00<br />

7. Maintenance of District Council Quarter at Lawngtlai - 1.00<br />

8. Furnishing of RO/ARO Office at Diltlang, Chawngte,<br />

Vathuampui, Bualpui, Sangau, Lungtian - 2.00<br />

9. Construction of Jeep Road - 10.00<br />

10. Constn. of Stone Laying approach to Chandmary-II Rest House - 6.00<br />

11. Construction of R/Wall, Culvert, Side Drain at Lawngtlai<br />

Town Road AOC, Chandmary, College Veng, L-I , L-III - 6.00<br />

12. Maintenance of Truck/Jeep Road approach to District<br />

Council Quarry near Thingkah - 20.00<br />

13. Survey of Road Allignment - 1.00<br />

14. Purchase of Survey Materials - 0.50<br />

15. Purchase/Maintenance of Bike - 0.50<br />

16. Maintenance of Vehicle purchased - 7.20<br />

17. Maintenance of Main Office Bldg. i/c Repair of Step/Corridor - 4.00<br />

18. Administrative Costs: (a) Contingencies Telephone Charge - 3.00<br />

(b) Office Expenses - 3.00<br />

(c) TA/DA - 2.00<br />

(d) Training Expenses - 1.00<br />

(e) Salary - 35.00<br />

Total of XV - 145.00<br />

XVI. EDUCATION DEPARTMENT:-<br />

The Lai Autonomous District Council took School education in its areas. It is,<br />

therefore divided into three Administrative Heads for controlling the administration as well<br />

as smooth and better functioning of School Education. Such Head of Institutions are as<br />

follows: -<br />

(i) ADMINISTRATION: Headed by two Education Officers both Middle Schools and<br />

Primary Schools respectively with some Subordinate Officers and Staff.<br />

(ii) EXAMINATION BOARD: Headed by Board President with Secretary and Officers and<br />

Staff, for both Middle School and Primary School.<br />

(iii) CONTROLLER OF EXAMINATION: Headed by Controller of Examination both Primary<br />

School and Middle School respectively.<br />

In this Department, there are so many teaching Staff, for which a huge amount of<br />

money has to be spent for their Salary. It is however, constructed some of the School<br />

Buildings, both Primary and Middle Schools from Sarva Shiksha Abhiyan (SSA) and solved<br />

the problem faced by the Council. So, Rs. 285.00 lakh only is approved for the Annual Plan<br />

<strong>2006</strong>-07 under Education as under: -<br />

‘A’ MIDDLE SCHOOL (RECURRING)<br />

1. Salary - 62.70<br />

NON-RECURRING :<br />

1. Furniture - 2.50<br />

2. Board of School Education :<br />

(a) Office Expenses - 2.50<br />

(b) TA/DA - 1.00<br />

(c) Free Text Book - 4.00<br />

3. Office Expenses - 2.00<br />

4. TA/DA - 2.00<br />

5. TA/DA for DIET Training - 2.00


- 270 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

6. School Stationary - 2.00<br />

7. Conduct of Seminar - 0.60<br />

8. Orientation Training - 0.50<br />

9. Conduct of Games and Sport - 1.50<br />

‘B’ ADULT EDUCATION :<br />

10. Observation for International Literacy Day - 0.50<br />

11. Honorarium to 100 nos. of Inspector under (MPFL) - 1.50<br />

12. Honorarium to Animators under ( RFLP ) - 0.60<br />

13. Supply of Free Text Book to Adult Illiterate - 0.50<br />

14. Office Expenses - 0.50<br />

15. TA/DA - 0.30<br />

Total of ‘A’ - 87.20<br />

‘C’ PRIMARY SCHOOL (RECURRING)<br />

1. Salary - 181.30<br />

NON - RECURRING<br />

1. School Furniture - 3.00<br />

2. TA/DA - 2.50<br />

3. Orientation Training - 0.50<br />

4. Office Expenses - 2.00<br />

5. TA/DA for DIET Training - 2.50<br />

6. Teachers Seminer - 1.00<br />

7. Conduct of Games and Sport for Primary School - 1.50<br />

8. School Stationary - 3.50<br />

Total of ‘B’ - 197.80<br />

Total of XVI - 285.00<br />

XVII. RURAL DEVELOPMENT DEPARTMENT :<br />

The policy of this Department is to uplift the people inhabitant of rural areas. But<br />

sufficient fund could not be allocated for the upliftment of the people living in rural areas.<br />

It is, however, allocated some schemes like Rural Housing, Community Hall and Inter-Village<br />

Path are provided. The construction of Village Jeep Road is omitted this year since this has<br />

been undertaken by <strong>Mizoram</strong> PWD as well as Rural Development Department. The total<br />

outlay approved is Rs. 55.00 lakh during Annual Plan <strong>2006</strong>-07, the item-wise allocation are<br />

as follows: -<br />

1. Rural Housing Scheme - 16.00<br />

2. Repair of Community Hall at Rulkual, Diltlang, Lungtian,<br />

Bualpui and Rawlbuk - 2.40<br />

3. Furnishing of Community Hall at Chawngte’P’, Bungtlang,<br />

Rulkual, Lungtian, Rawlbuk, Bualpui - 2.20<br />

4. Maintenance of Inter-Village path within LADC Rural areas - 3.50<br />

5. Maint. of Vehicle/Maint. of Internal Jeep Road within LADC area - 9.10<br />

6. Implementation of Work Scheme etc:<br />

(a) TA/DA for Member - 1.50<br />

(b) Planning Programme Implementation - 1.00<br />

7. Purchase of Solar Lamp for Rural Area - 2.00<br />

8. Administrative Costs : (a) Office Expenses - 0.50<br />

(b) TA/DA - 0.60<br />

(c) Salary - 16.20<br />

Total of XVII - 55.00


- 271 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

XVIII. WATER WAY DEPARTMENT :<br />

This sector is a minor sector in Development Department. Hence, much effort could<br />

hardly be taken so far under this sector. A very few amount had been provided for<br />

construction and purchase of Speed Boat, Dugout Boat and other Administration Costs.<br />

Item-wise allocation of outlays are as under: -<br />

‘A’<br />

1. Purchase of Dugout Boat @ Rs. 10,000/- per Nos. - 0.50<br />

2. Purchase of Speed Boat 2 Nos @ Rs. 70,000/- per Nos - 1.40<br />

3. Administrative Costs : (a) Office Expenses - 0.20<br />

(b) TA/DA - 0.20<br />

(c) Salary - 4.70<br />

Total of XVIII - 7.00<br />

Grand Total - 875.00<br />

ABSTRACT STATEMENT OF COMPONENT BREAK-UP OF <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-07<br />

Sl. No. Name of Break-up Items Amount Percentage Remarks<br />

1 2 3 4 5<br />

1 Salary Component 440.80 50.00%<br />

2 Other Expenditure Costs -<br />

a) Office Expenses 26.70 3.05%<br />

b) Office Contingencies 3.00 0.35%<br />

c) TA/DA 18.42 2.10%<br />

d) Training Expenses 12.50 1.42%<br />

e) Maintenance of Vehicle 50.55 5.77%<br />

f) Wages 12.20 1.39%<br />

g) Minor Works 310.80 35.52%<br />

Sub-total of 2 (a) to (g) 434.20 50.00%<br />

Total (1 & 2) 875.00 100.00%<br />

‘B’ NO. OF POSTS MAINTAINED<br />

3. REGULAR POST:<br />

(a) Group ‘A’ - 3<br />

(b) Group ‘B’ - 24<br />

(c) Group ‘C’ - 259<br />

(d) Group ‘D’ - 75<br />

4. Total No. of Fixed Pay Employee - 33<br />

Total - 394


Introduction:<br />

- 292 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

By the provisions of paragraph 20-B of the Sixth Schedule to the CONSTITUTION OF<br />

INDIA, LAKHER REGIONAL COUNCIL along with PAWI AND CHAKMA REGIONAL COUNCIL<br />

were elevated to the status of District Council with effect from the 29 th April, 1972 under the<br />

MIZORAM DISTRICT COUNCIL (miscellaneous Provision) Order 1972. Thus, the LAKHER<br />

AUTONOMOUS DISTRICT COUNCIL came into existence and was re-named as the MARA<br />

AUTONOMOUS DISTRICT COUNCIL from 1 st May 1989. The area of the Council is 1445 Sq.<br />

Kms. with a population of 51,073 as per latest Census. It is lying on the South-eastern corner<br />

of <strong>Mizoram</strong>, contiguous by MYANMAR on the east and south and Lai District Council on the<br />

west.<br />

There are many rivers in the District, but only a few of them are worth mentioning.<br />

The most important and useful rivers are the KOLODYNE (Chhimtuipui), SALYU, TISI and<br />

PALA. There is one of the largest Lake in <strong>Mizoram</strong> called PALA LAKE in the District. This Lake<br />

has now being developed from the Centrally Sponsored Schemes.<br />

Agriculture is the main stay in this District. The people of this area live on jhuming<br />

and wet rice cultivation. They also grow cash crops like cotton, millet, maize, potatoes,<br />

groundnut, coffee, pepper, ginger, etc. in their jhum lands. They also reared all kinds of<br />

domestics’ animals.<br />

BRIEF SECTOR-WISE DESCRIPTION<br />

1. ENVIRONMENT & FOREST: The approved outlay is Rs. 33.00 lakh only. The Objective<br />

of the Schemes is for maintenance of existing Staff, Office Expenses, TA/DA, Maintenance of<br />

Vehicle, Purchase of Uniforms, Maintenance of Rest House, purchase of Arms & Ammunition,<br />

collection of seed, maintenance of previous year Plantation, maintenance of Forest buildings<br />

and creation of nursery beds.<br />

2. ARTS & CULTURE: The approved outlay for the scheme is Rs. 16.50 lakh only. Under<br />

the schemes, maintenance of staff, Office Expenses, TA/DA, research investigation,<br />

maintenance of Museum, Organisation of Cultural Meet, and musical articles, maintenance of<br />

Video and still Camera, Grant-in-aid to Local Artists, Drama, Essay, etc. competitions and<br />

organisation of cultural troupe will be taken up.<br />

3. RURAL DEVELOPMENT: The approved outlay under the schemes for the year 2005-06<br />

is Rs. 130.00 lakh only which would be utilised on the following schemes — Maintenance of<br />

existing staff, Office Expenses, TA/DA, maintenance of Vehicles, furniture for Quarters &<br />

Office, Maintenance of Mara House at Aizawl, Rural Communication, Community<br />

Development, Rural Housing and Information and Publicity.<br />

4. AGRI & HORTICULTURE: The approved outlay for the scheme is Rs. 49.00 lakh only.<br />

The following schemes will be taken up during the year. Such as, maintenance of Agri. Seedcum-demonstration<br />

farm, construction of Agriculture Link Road, Maize plantation schemes,<br />

land development by manual & purchase of plough animal for WRC, development of<br />

Horticulture Garden and Minor Irrigation.


- 293 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

5. SOIL & WATER CONSERVATION: The approved outlay for the schemes is Rs.22.00<br />

lakh. This Scheme provides maintenance of Coffee, Rubber and Passion fruit plantation, and<br />

maintenance of permanent nursery at Thosai etc.<br />

6. SOCIAL WELFARE: Under this programme, various schemes will be taken up during<br />

<strong>2006</strong>-07 such as — Assistance to Motherless Babies, handicapped persons, poor patients, Old<br />

aged pension, and procurement of socially needed materials for distribution. The approved<br />

outlay for the schemes is Rs. 17.00 lakh only.<br />

7. A.H. & VETY.: The approved outlay for the scheme is Rs. 21.00 lakh only. Under this<br />

programme, the following schemes are proposed to be implemented during the year — (a)<br />

Direction & Administration, (b) Cattle development, (c) Poultry development and d) Piggery<br />

Development<br />

8. INDUSTRY: The Rural Industry is purely a promotional scheme and is meant for<br />

upgrading skill of artisans by imparting necessary training in different trades in addition to<br />

rendering service facilities to small-scale Industry units. The following programmes are<br />

proposed to take up during <strong>2006</strong>-07. Such schemes are — Procurement of Equipment, grantin-aid<br />

to artisans & Carpentry tools. The approved outlay is Rs. 13.50 lakh only.<br />

9. FISHERY: The Annual Plan of Fisheries for the year <strong>2006</strong>-07 envisages procuring of<br />

Fish seeds for the Departmental Fish Pond and private farm as well. To encourage production<br />

of fish seeds in the private sector steps have been taken to select 5 private farms at Saiha in<br />

M.A.D.C area, which will be assisted by the department both financially and technically<br />

during the current, year and the approved outlay for the scheme is Rs. 10.00 lakh only.<br />

10. P.H.E.: The Proposed outlay for the scheme is Rs. 16.50 lakh only. Under this<br />

programme, the following schemes are proposed to be implemented during the year:<br />

Construction of RCC Water tanks, procurement of plumbing tools and repairing of Water<br />

Points /tanks.<br />

11. SERICULTURE: The scheme includes procurement of equipment, maintenance of seed<br />

farm and existing staff. Rs. 9.50 lakh is approved for the scheme during the year.<br />

12. L.A.D: The approved outlay for the scheme is Rs. 56.50 lakh only. Under this<br />

programme, the following schemes are earmarked to implement during the current year.<br />

Such schemes are construction of Bazar Shed, stone steps, pit latrines, dustbins, maintenance<br />

of slaughterhouses, and maintenance of existing staff.<br />

13. ROAD & TRANSPORT: An outlay of Rs. 12.50 lakh only is approved for the scheme.<br />

Under this programme Pay & Allowances of Drivers, handyman and other staff, management,<br />

operation, repairs and maintenance and other expenditure is provided.<br />

14. SPORTS & YOUTH SERVICES: This scheme includes procurement of Sports materials<br />

for free distribution, organisation of competition, construction of playfield and pavilion and<br />

maintenance of existing staff. The proposed outlay for the scheme is Rs. 14.00 lakh only.<br />

15. CO-OPERATION: This sector includes seminar / training for awareness and<br />

encouragement of Co-Operative Societies and maintenance of existing staff. The approved<br />

outlay for this sector is Rs. 3.50 lakh only.


- 294 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

16. P.W.D.: The approved outlay for the scheme is Rs. 104.00 lakh only. This sector<br />

includes construction of — (a) Revenue Office at Tipa/Phura (b) EM Quarters (c) Fresh Jeep<br />

able roads and (d) Stone steps, culverts & Side drain, maintenance of - a) Jeep roads b) Offices<br />

& Quarters and c) Existing staff & labours.<br />

17. WATERWAY (INLAND): The approved outlay for the scheme is Rs. 7.50 lakh only for<br />

employment of boatmen, purchase & maintenance of Boats are includes in the scheme.<br />

18. EDUCATION & HUMAN RESOURCES: This scheme includes organisation of Zonal<br />

Sports, Seminar, training, Adult Education programmes, maintenance of BSE, and other minor<br />

works to be implemented under this sector. The approved outlay for the scheme is Rs.210.00<br />

lakh only.<br />

Hence, total approved outlay for 18 Departments during the year <strong>2006</strong>-<strong>2007</strong> is<br />

Rs. 746.00 lakh only.<br />

AN ABSTRACT OF <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />

<strong>APPROVED</strong> OUTLAY<br />

'A' HEAD OF EXPENDITURES :<br />

Approved<br />

(Rs. In Lakh)<br />

Approved<br />

Sl. No. Head of Accounts<br />

outlay for outlay for<br />

2005-06 <strong>2006</strong>-07<br />

1 2 3 4<br />

1. Salary 442.62 442.70<br />

2. Wages 37.78 39.20<br />

3. Travelling Expenses 9.80 10.35<br />

4. Office Expenses 20.85 21.62<br />

5. Maintenance of Vehicle 20.10 20.20<br />

Total of Sl. No. 1 - 7 531.15 534.07<br />

6. Works (including maintenance) 189.85 211.93<br />

Grand Total 721.00 746.00<br />

'B' NUMBER OF POSTS MAINTAINED<br />

1. Regular Posts :<br />

a) Group 'A' 12 12<br />

b) Group 'B' 20 20<br />

c) Group 'C' 189 189<br />

d) Group 'D' 100 100<br />

Total of regular posts 321 321<br />

2. Total No. of Work Charge post - -<br />

3. Total No. of Muster Roll Labourers 84 84


- 312 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

Introduction:<br />

The Chakma Autonounous District Council was created in 1972 comprising of a<br />

portion of Chakma inhabited areas in the South-Western part of <strong>Mizoram</strong>. It has an area of<br />

about 1500 Sq.Km (approx). As per 2001 census the population of the areas was 34, 528<br />

souls and 6,900 (approx) number of families with 41.22% of literacy.<br />

The Chakma Community of Indian origin is having a long historical background and<br />

a rich cultural heritage. Chakmas are accused to settled cultivation i.e. wet rice cultivation.<br />

They are honest, hard working and peace loving.<br />

The topography, climatic condition, and quality of soil of the area is suitable for wet<br />

rice cultivation, and other cash crops like oilseed, ginger, chilies, seas am, turmeric, black<br />

pepper and various other horticulture plants. The vast fertile land available in the valleys of<br />

two major rivers. Thega and Tuichawng, if harnessed properly, self sufficiency in food grain<br />

can be attained. In spite of such potentiality and conducive condition, the area still remain<br />

tragically backward as road communication facility is not built up in the area and no such<br />

well planned schemes/project has so far been completed especially on road communication,<br />

administrative infrastructure like office buildings, survey instruments, computers, office<br />

furniture and fixtures which are inevitable for smooth functioning of any establishment,<br />

could not be built up yet.<br />

An outlay of Rs. 545.00 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong>. The sectorwise<br />

break up on priority basis is given below :<br />

Sl.<br />

No<br />

Name of Sector<br />

Amount approved<br />

for <strong>2006</strong> – <strong>2007</strong><br />

1 Agriculture & Horticulture Rs. 27.52 lakh<br />

2 Fishery Rs. 4.37 lakh<br />

3 Public Health Engineering Rs. 14.21 lakh<br />

4 Industry Rs. 11.30 lakh<br />

5 Sericulture Rs. 2.46 lakh<br />

6 Animal & Vety. Rs. 12.45 lakh<br />

7 Art & Culture Rs. 13.81 lakh<br />

8 Social Welfare Rs. 2.30 lakh<br />

9 Soil Conservation Rs. 9.55 lakh<br />

10 Local Administration Rs. 12.60 lakh<br />

11 Forest & Environment Rs. 14.11 lakh<br />

12 Road and Transport Rs. 46.29 lakh<br />

13 Sport & Youth Services Rs. 11.62 lakh<br />

14 Co-operation Rs. 0.03 lakh<br />

15 Public works Rs. 41.51 lakh<br />

16 Education Rs. 246.32 lakh<br />

17 District School Education Board Rs. 5.00 lakh<br />

18 Rural Development Rs. 20.90 lakh<br />

19 Water Ways Rs. 4.41 lakh<br />

20 Planning Rs. 30.60 lakh<br />

21 Information & Public Relation Rs. 12.84 lakh<br />

22 Land Revenue & Settlement Rs. 0.80 lakh<br />

TOTAL Rs. 545.00 lakh


- 313 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

WRITE-UP DESCRIPTION OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. Agriculture & Horticulture: The Department was divided into two sectors i.e.<br />

Agriculture and Horticulture. The main items of schemes are land development by<br />

manual @ Rs. 30,000/- per Hectares and financial assistance to Orange gardeners of<br />

Rajmandal for weeding the garding. Under Horticulture purchase of spade for<br />

distribution 90% subsidy, Salary and other administrative charges. A total of Rs. 27.52<br />

lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong> under this sector.<br />

2. Fishery: Under this sector Rs. 4.37 lakh is approved during during Annual Plan <strong>2006</strong>-<br />

<strong>2007</strong> for salary only.<br />

3. Public Health Engineering: Rs. 14.21 lakh is approved for Annual Plan <strong>2006</strong>-07. The<br />

main items are only improvement of village spring souces (IVSS), salary and wages and<br />

other administrative charges.<br />

4. Industry: Under this sector, Rs. 11.30 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

for salary and other administrative charges.<br />

5. Sericulture: Rs. 2.46 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong> under this sector<br />

for salary and office expenses only.<br />

6. Animal Husbandary & Veterinary: Under this sector, Rs. 12.45 lakh is approved for<br />

Annual Plan <strong>2006</strong>-<strong>2007</strong>. The main items in this sector are Financial assistance for<br />

Cattle farming, Piggery, Duckery, Poultry, Goat rearing etc.@ Rs. 5,000/- per family,<br />

salary and other administrative charges.<br />

7. Arts and Culture: Rs. 13.81 lakh is approved during Annual Plan <strong>2006</strong>-07 under this<br />

sector. The main items are production audio cassette, salary and other administrative<br />

charges.<br />

8. Social Welfare: Under this sector, Rs. 2.45 lakh is approved during Annual Plan <strong>2006</strong>-<br />

<strong>2007</strong> for salary only.<br />

9. Soil Conservation: Rs. 9.40 lakh is approved for Annual Plan <strong>2006</strong>-07 for salary only.<br />

10. Local Administrative: Under this sector, Rs. 12.60 lakh is approved during Annual<br />

Plan <strong>2006</strong>-<strong>2007</strong>. The main items of works are renovation supermarket building at<br />

K/nagar, construction of garbage bins, conduct of village council conference and salary<br />

and other administrative charges.<br />

11. Forest: Rs. 11.62 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong> under this sector. The<br />

main items included are maintenance of Children Park at K/nagar, construction of<br />

boundary wall at proposed Botanical garden at CHADARASORA, creation of road side<br />

plantation, salary and other administrative charges.<br />

12. Road Transport: Under this sector, Rs. 46.29 lakh is approved during Annual Plan<br />

during <strong>2006</strong>-<strong>2007</strong> for maintenance of vehicle, salary and other administrative charges.<br />

13. Sports and Youth Services: Rs. 11.62 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

The main items included are purchase of sports goods and books sport for<br />

departmental use and distribution, salary and other administrative charge.<br />

14. Co-operation: Under this sector, Rs. 0.03 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

for office expenses only.


- 314 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

15. Public Works Department: Rs. 41.51 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

The main items included are Hospitality/Discretionary, grants, construction of Guardwall<br />

/ boundary wall at CADC rest house, Lunglei, renovation of Chakma House, Annex<br />

at Aizawl, Vertical extension of Council guest house including furnishing at K/nagar,<br />

renovation of CADC rest house at NJS, black topping of CADC guest house courtyard<br />

at K/nagar, salary and other administrative charges.<br />

16. Education: Under this sector, Rs. 246.52 lakh is approved for Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

The items included are school stationeries, inter school sports meet, purchase of text<br />

books, scholarship for girls students, salary and other administrative charges.<br />

17. District School Education Board: Rs. 5.00 lakh is approved for Annual Plan <strong>2006</strong>-07.<br />

The main items included are grant-in-aid to D.S.E.B.<br />

18. Rural Development: Under this sector, Rs. 20.90 lakh is approved for Annual Plan<br />

<strong>2006</strong>-<strong>2007</strong>. The main items included are maintenance of IVP, salary and other<br />

administrative charges.<br />

19. Water ways: Rs. 4.41 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong> for salary only.<br />

20. Planning & Development: Under this sector, Rs. 30.60 lakh is approved for Annual<br />

Plan <strong>2006</strong>-07. The main items included are Maintenance of computers, Contingency<br />

charges, TA/DA purchase of Furniture, computers etc.<br />

21. Information & Public Relation: Under this sector, Rs.12.84 lakh is approved for<br />

Annual Plan <strong>2006</strong>-07. The main items included are celebration of festivals / National /<br />

important days, Publication of Calendars/diary, conduct of International Seminar on<br />

Chakma customary law scripts & language etc.<br />

22. Land Revenue & Settlement: Rs. 0.80 lakh is approved during Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

for office expenses only.<br />

‘A’ Head of Expenditure:<br />

Sl.<br />

No.<br />

ABSTRACT OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-07<br />

Head of Accounts<br />

Approved<br />

outlay for<br />

2005-06<br />

(Rs. in lakh)<br />

Approved<br />

outlay for<br />

<strong>2006</strong>-07<br />

1 2<br />

1. Salary 347.68 362.45<br />

2. Wages 0.51<br />

3. Travelling Expenses 6.91 15.00<br />

4. Office Expenses 4.26 4.51<br />

5. Maintenance of Vehicle 16.00 30.00<br />

6. Training Expenses 1.50<br />

Sub-total of Sl. No. 1 – 6 375.36 413.46<br />

7. Works (including maintenance) 144.64 131.54<br />

TOTAL 520.00 545.00


‘B’ Number of Posts Maintained:<br />

- 315 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. Regular Posts<br />

a) Group ‘A’ 12 12<br />

b) Group ‘B’ 8 8<br />

c) Group ‘C’ 242 242<br />

d) Group ‘D’ 51 51<br />

Total of Regular Posts 313 313<br />

2. Total No. of Work-Charge posts<br />

3. Total No. of Muster Roll labourers 2<br />

Major, Sub-Major, Minor Head,<br />

Detailed Head and Object Head<br />

of Account<br />

Budget<br />

Estimates<br />

per Demand<br />

for Grants<br />

<strong>2006</strong>-07<br />

Additional,<br />

if any, as<br />

per sectoral<br />

allocation of<br />

Planning<br />

Department<br />

Reduction,<br />

if any, as<br />

per sectoral<br />

allocation of<br />

Planning<br />

Department<br />

ANNEXURE ‘A’<br />

Total (2+3)<br />

or 2–4)<br />

1 2 3 4 5<br />

2225 - Welfare of SC/ST & Other Backward Classes<br />

800 - General<br />

800 - Other Expenditure<br />

800(03) - CADC (Plan)<br />

(31) - Grant-in-aid<br />

a) Salary 337.45 25.00 362.45<br />

b) Wages<br />

c) Office Expenses 4.51 4.51<br />

d) Travelling Expenses 15.00 15.00<br />

e) Others 163.04 163.04<br />

Grand Total 520.00 25.00 545.00


Sl.<br />

No.<br />

- 316 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ABSTRACT OF <strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />

Name of Department Salary O.E. TA/DA Vehicle Furniture Training<br />

Contingency/<br />

Hospitality/<br />

Maint. /<br />

Rents, etc.<br />

Other<br />

Schemes<br />

1. Agriculture 10.82 0.30 16.40 27.52<br />

2. Fishery 4.34 0.03 4.37<br />

3. Public Health Engineering 12.15 0.06 2.00 14.21<br />

4. Industry 10.20 0.10 1.00 11.30<br />

5. Sericulture 2.38 0.03 0.05 2.46<br />

6. Animal & Veterinary 2.42 0.03 10.00 12.45<br />

7. Art & Culture 12.96 0.15 0.70 13.81<br />

8. Social Welfare 2.20 0.10 2.30<br />

9. Soil Conservation 9.33 0.07 0.15 9.55<br />

10. Local Administration Department 3.00 0.30 9.30 12.60<br />

11. Forest & Environment 6.46 0.35 7.30 14.11<br />

12. Road Transport 16.19 0.10 30.00 46.29<br />

13. Sports & Youth Services 3.47 0.15 8.00 11.62<br />

14. Co-operation 0.03 0.03<br />

15. Public Works Department 15.66 0.35 1.50 24.00 41.51<br />

16. Education & HRD 231.72 0.50 1.50 12.60 246.32<br />

17. District Education Board 5.00 5.00<br />

18. Rural Development 14.80 0.10 6.00 20.90<br />

19. Waterways 4.35 0.06 4.41<br />

20. Planning 0.70 15.00 5.00 4.90 5.00 30.60<br />

21. Information & Public Relations 0.20 12.64 12.84<br />

22. Land Revenue & Settlement 0.80 0.80<br />

Grand Total 362.45 4.51 15.00 30.00 5.00 1.50 6.40 120.14 545.00<br />

Grand<br />

Total


- 320 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

LEGAL METROLOGY<br />

The approved Annual Plan <strong>2006</strong>-<strong>2007</strong> is Rs. 80.00 lakh. The Plan mainly aims for<br />

continuation of the existing establishment and strengthening thereof with a view to achieve<br />

better and more effective enforcement of Weights & Measures Act & Rules throughout the<br />

State.<br />

The break-up of the Plan outlays are as follows: -<br />

1. Administration : Rs. 72.00 lakh<br />

2. Supply & Materials : Rs. 3.00 lakh<br />

3. Minor Work : Rs. 5.00 lakh<br />

TOTAL : Rs. 80.00 lakh<br />

1. ADMINISTRATION: Rs. 72.00 lakh is earmark for administration during the year<br />

<strong>2006</strong>-07, and the break up are as follows: -<br />

a) Salary: Rs. 47.30 lakh is earmarked for salary of Officers and Staff under Plan.<br />

b) Wages: Due to shortage of manpower especially Manual Assistant to assist the<br />

Inspector on Enforcement duties, enforcement works hampered a lot causing inefficiency in<br />

our day today works. There are 17 Inspectors of Legal Metrology and only 13 Manual<br />

Assistants to assist them. It is therefore proposed to engage at least 5 (five) Manual Assistants<br />

on Muster Roll/Casual basis for which an amount of Rs. 2.00 lakh is earmarked for Wages.<br />

c) Medical Treatment: Besides, unforeseen medical expenses among the Staff, one<br />

Officer and 2 (two) other Staff required to undergo periodical treatment outside <strong>Mizoram</strong>.<br />

Therefore Rs. 3.20 lakh is earmarked for Medical Treatment.<br />

d) Traveling Expenses: The Enforcement Staff are required to visit different places,<br />

trading premises, Government godowns in towns and interior villages for effective<br />

enforcement of Weights and Measures Act & Rules in the interest of public services to<br />

protect consumers interest. Rs. 3.00 lakh is earmarked for Traveling Expenses.<br />

e) Office Expenses: Rs. 15.00 lakh is earmarked for Office Expenses for the following<br />

Offices viz. — Aizawl, Lunglei, Saiha, Kolasib and Champhai including for purchase of POL.<br />

f) Rent: The Department has got no Office building of its own at Aizawl, Lunglei and<br />

Saiha, the Department required to hired private building for which Rs. 1.50 lakh is<br />

earmarked for Rent.<br />

2. SUPPLY AND MATERIAL: Date Stamp and Date Plugs are statutory requirements of<br />

each Inspector of Legal Metrology every year. Besides other statutory verification tools of<br />

Weights and Measures are required to purchase for which Rs. 3.00 lakh is earmarked for<br />

Supply and Material.<br />

3. MINOR WORKS:<br />

It is proposed to construct Assistant Controller of Legal Metrology Office-cum-<br />

Laboratory building at Saiha for which Rs. 5.00 lakh is earmarked.<br />

Therefore, the total approved outlay comes Rs. 80.00 lakh.


- 324 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

LAW & JUDICIAL<br />

Approved Sectoral Allocation ofOutlays for Annual Plan <strong>2006</strong>-<strong>2007</strong><br />

B. Judiciary Building:<br />

For the development of infrastructural facilities for the judiciary, construction of<br />

District Court buildings and residential quarters for Judicial Officers in all District<br />

Headquarters of <strong>Mizoram</strong> including High Court have been taken up on 50:50 sharing basis<br />

between Central and State Government since 1993-1994.<br />

During 2005-06, the Department continued the ongoing projects on construction of<br />

residential quarters for Judicial Officers at Aizawl and Lunglei and District Court buildings<br />

at Saiha and Kolasib.<br />

During the Annual Plan <strong>2006</strong>-07, the Department proposes to continue the projects<br />

which were not completed during 2005-06 as follows: —<br />

1. Construction of Junior Judges’ quarters at Aizawl - Rs. 20.00 lakh<br />

2. Construction of Senior Judges’ quarters at Aizawl - Rs. 26.00 lakh<br />

3. Construction of District Court building at Kolasib - Rs. 11.00 lakh<br />

Total - Rs. 57.00 lakh<br />

The Head of Account under Judiciary buildings is —<br />

4059 - C.O. on P.W.<br />

01 - Office Buildings<br />

051 - Construction<br />

(01) - Judiciary Building (Plan)<br />

(51) - Major Works - Rs. 57.00 lakh<br />

C. Publication of Mizo Customary Law:<br />

The compilation of the Mizo Customary Law has completed and ready for<br />

publication. For the publication of Mizo Customary Law, Rs. 20.00 lakh is approved for the<br />

Annual Plan <strong>2006</strong>-07.<br />

The Head of Account for publication of Mizo Customary Law is —<br />

2014 - Admn. of Justice<br />

800 - Other Expenditure<br />

(05) - Customary Law / Plan<br />

(16) - Publication - Rs. 20.00 lakh<br />

D. I.T. in Courts:<br />

Law & Judicial Department have taken up computerisation of Courts on 50:50<br />

sharing between the Central and State Government since 2000-01 and all Courts are partly<br />

computerised. At present, computerisation of Courts is being taken up by the Government<br />

of India, Department of Justice in consultation with NIC.<br />

For the maintenance of computerisation of Courts, etc., Rs. 3.00 lakh is approved for<br />

the Annual Plan <strong>2006</strong>-07.


- 325 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The Head of Account under I.T. in Courts is shown below —<br />

2014 - Admn. of Justice<br />

800 - Other Expenditure<br />

(02) - I.T. in Courts<br />

(13) - Office Expenses - Rs. 3.00 lakh<br />

ABSTRACTION OF THE <strong>APPROVED</strong> OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. Judiciary Building - Rs. 57.00 lakh<br />

2. Publication of Mizo Customary Law - Rs. 20.00 lakh<br />

3. I.T. in Courts - Rs. 3.00 lakh<br />

TOTAL - Rs. 80.00 lakh


Sl.<br />

No.<br />

- 328 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SCHOOL EDUCATION<br />

Abstract for provision of different Heads of Account<br />

in the approved Annual Plan <strong>2006</strong>-07<br />

Name of Items<br />

Financial<br />

(Rs. in lakh)<br />

% to the<br />

Outlay<br />

1 2 3 4<br />

1 Salary 5764.50 75.35<br />

2 Wages 54.10 0.71<br />

3 Medical Treatment 24.80 0.32<br />

3 T.E. 35.90 0.47<br />

4 O.E. 116.00 1.52<br />

5 Scholarship 92.00 1.20<br />

6 Rent 0.40 0.01<br />

7 Publication 7.00 0.10<br />

8 PP & SS (Prof. Charges) 0.10 0.001<br />

9 M & S 5.00 0.07<br />

10 Minor Works 85.50 1.12<br />

11<br />

Other Charges - including Rs 350 lakhs for<br />

Cambridge (English Training)<br />

445.30 5.82<br />

12 GIA for Continuing Education 59.40 0.78<br />

13<br />

Matching Contribution (SSA, Computer<br />

Operator and Mid-day meal etc.)<br />

960.00 12.55<br />

Sl.<br />

No.<br />

GRAND TOTAL OF SCHOOL EDUCATION 7650.00<br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Outlay Physical Financial<br />

1 2 3 4 5<br />

I. ELEMENTARY EDUCATION<br />

1 DIRECTION AND ADMINISTRATION<br />

A Maintenance of Existing Staff 1 4.50<br />

B Wages 17 19.00<br />

C Medical Treatment 5.00<br />

D Office Expenses LS 15.00<br />

E Travelling Expenses LS 3.00<br />

F Other Charges<br />

Implementation of Mid-day Meal Programme in<br />

<strong>Mizoram</strong> 350.00<br />

TOTAL of Direction and Administration 45.00 396.50


Sl.<br />

No.<br />

- 329 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

Outlay<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Physical Financial<br />

1 2 3 4 5<br />

2 INSPECTION<br />

A Maintenance of existing Staff 27 30.00<br />

B Wages 28 15.00<br />

D Medical Treatment 10.00<br />

C Office Expenses LS 10.00<br />

D Travelling Expenses LS 5.00<br />

TOTAL of Inspection 222.00 70.00<br />

3 GOVT. PRIMARY SCHOOLS<br />

A Maintenance of existing Staff 299 499.00<br />

Regularisation of Fixed Pay Teachers 20 1.00<br />

B Office Expenses LS 10.00<br />

C Tralvelling Expenses LS 8.00<br />

D Grant-in-Aid for matching Share of SSA 600.00<br />

TOTAL of Govt. Primary Schools 1745.00 1118.00<br />

4 NON-GOVT. PRIMARY SCHOOL<br />

A Maintenance of existing staff 89 38.00<br />

TOTAL of Non-Govt. Primary School 38.00<br />

5 GOVT. MIDDLE SCHOOL<br />

A 1) Maintenance of existing staff 1402 2196.00<br />

2) Salary for Officiating / Substitute Teacher LS 1.00<br />

3) Condonation of educational qualification<br />

deficiencyof under graduate teachers LS 1.00<br />

B Office expenses LS 10.00<br />

C Travelling expenses LS 4.00<br />

Total of Govt. Middle Schools 658.00 2212.00<br />

6 OERATION BLACKBOARD<br />

A Maintenance of existing staff 89 30.00<br />

TOTAL of Operation Blackboard 30.00<br />

7 NON - GOVT. MIDDLE SCHOOL<br />

A Grant - in - aid for:<br />

1) Salary of Teaching and non-Teaching Staff 90<br />

66<br />

558.00<br />

2) G.I.A for Govt. Aided M/S<br />

Schools 81.00<br />

3) DCRG LS 10.00<br />

4) CPF LS 1.00<br />

TOTAL of Non- Govt. Middle School 5695.00 650.00


Sl.<br />

No.<br />

- 330 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

Outlay<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Physical Financial<br />

1 2 3 4 5<br />

8 GOVERNMENT ELEMENTARY (PMGY) -<br />

TOTAL of PMGY 500.00 -<br />

TOTAL OF ELEMENTARY EDUCATION 8865.00 4514.50<br />

II. SECONDARY EDUCATION<br />

9<br />

A<br />

DISTRICT INSTITUTE OF EDUCATION &<br />

TRAINING<br />

Maintenance of existing Post 9 20.00<br />

B Office Expenses LS 0.50<br />

C Traveling Expenses LS 1.00<br />

D Minor Works<br />

Restructuring of DIET Building<br />

Scholarship/Stipend/Book Grant for DIET<br />

LS 0.50<br />

E Trainees LS 10.00<br />

TOTAL OF DIET 85.00 32.00<br />

10 SCHOLARSHIP<br />

A Other Charges<br />

1. Merit Scholarship :<br />

(a) Middle School @ Rs 100/- pm 717 8.60<br />

(b) High School @ Rs 150/- pm 500 9.00<br />

2. Special Scholarship:<br />

(a) Middle School @ Rs 60/- pm 2750 19.80<br />

(b) High School @ Rs 80/- pm 2300 22.08<br />

3. Hostel Stipend @ Rs 1000/-p.a 202 2.02<br />

4. Sainik School Imphal 28 13.00<br />

5. Annual token Grant to Banasthali 20 1.00<br />

6. Armed Force Children LS 2.50<br />

7. RIMC Dehradun LS 1.00<br />

8. National Talent Search 200 1.00<br />

TOTAL OF SCHOLARSHIP 343.70 80.00


Sl.<br />

No.<br />

- 331 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

Outlay<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Physical Financial<br />

1 2 3 4 5<br />

11 S.C.E.R.T.<br />

A Maintenance of existing staff 28 50.00<br />

B Office expenses LS 3.00<br />

C Travelling expenses Ls 1.50<br />

D Publication LS 1.00<br />

E Award of stipend/Scholarship 5 -<br />

F Rents 1 0.40<br />

G Prof. Charges LS 0.10<br />

H Other Charges<br />

1) For Implemenation of Ed. Technology<br />

Programme (ICT) 2.50<br />

2) For Organising of Key Resources person<br />

training and revision of SBEC under ECE 2.00<br />

3) For conducting of Training & Career Conf.<br />

under Edn. & Voc. Guidance 2.00<br />

4) For implementation prog. of Minimum Level<br />

of Learning (MLL) 1.00<br />

5) For purchase of Library Books 1.00<br />

6) For training of Primary Schools under CCE 1.00<br />

7) For conducting of NTR exam 1.00<br />

8) Matching share of ICT 6.00<br />

9) Black topping of SCERT Complex 0.50<br />

10) Forr implementation of EOSE programme 0.70<br />

11) For organisation of AIEP<br />

training/programme 0.50<br />

12) For Teachers Training under Cambridge 350.00<br />

TOTAL OF SCERT 580.00 424.20<br />

12 SCIENCE PROMOTION :<br />

A Maintenance of existing staff 13 20.00<br />

B Office Expenses LS 1.00<br />

C Travelling expenses LS 0.80<br />

D Awrad/scholarship 300 stds 2.00<br />

E Other Charges<br />

1) For organisation of Science Seminar 1.50<br />

2) Workshop/Training of Teachers upto HSS<br />

level 5.00<br />

3) Science Fair 1.50<br />

Supply of Sc. Equipments to Schools 4.50<br />

TOTAL OF SCIENCE PROMOTION 299.50 36.30


Sl.<br />

No.<br />

- 332 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

Outlay<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Physical Financial<br />

1 2 3 4 5<br />

13 GOVT. HIGH SCHOOL<br />

A 1) Maintenance of existing staff 459 795.00<br />

2) Salary of Officiating/Subtitute Teachers LS 5.00<br />

B Wages 20 15.00<br />

C Office Expense LS 15.00<br />

D Travelling Expense<br />

Minor Works for Reconstruction of DEO's<br />

LS 5.00<br />

E Offices, Repair of School Buildings etc. LS 50.00<br />

TOTAL OF GOVT HIGH SCHOOL 1501.00 885.00<br />

14 NON-GOVT. HIGH SCHOOL<br />

A Grant-in-aid for<br />

1) Maintenance of existing staff 185<br />

132<br />

285.00<br />

2) G.I.A for Govt. Aided H/S<br />

Schools 160.00<br />

3) Matching contribution of CPF LS 1.00<br />

4) DCRG LS 4.00<br />

TOTAL OF NON-GOVT HIGH SCHOOL 3158.00 450.00<br />

15 GOVT. HIGHER SECONDARY SCHOOL :<br />

A 1) Maintenance of existing staff 274 367.00<br />

2) Leave/Training officiating salary LS 4.00<br />

3) Salary of PGT Teacher on fixed pay LS 3.00<br />

4) Opening of Science Streams in HSS LS 46.00<br />

B Office Expense LS 15.00<br />

C Travelling expense<br />

Minor Works - Repair/Rennovation and<br />

LS 5.00<br />

D Extension of H.S.S LS 30.00<br />

E Other Charges<br />

TOTAL OF GOVT. HIGHER SECONDARY<br />

LS 0.50<br />

SCHOOL 1668.80 470.50<br />

16 NON-GOVT. HIGHER SECONDARY SCHOOL<br />

A Grant-in-aid for:<br />

1) Maintenance of existing staff 134<br />

15<br />

252.80<br />

2) G.I.A for Govt. Aided H.S.S<br />

Schools 21.00<br />

3) Contribution of CPF LS 1.00<br />

4) DCRG<br />

TOTAL OF NON-GOVT. HIGHER SECONDARY<br />

LS 3.00<br />

SCHOOL 1009.00 277.80


Sl.<br />

No.<br />

- 333 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

Outlay<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Physical Financial<br />

1 2 3 4 5<br />

17 Voctionalisation of Secondary Education<br />

A Salary<br />

Grant-in-aid for matching contribution of VSE<br />

28 50.00<br />

B (CSS) staff LS 10.00<br />

Total of Vocationalisation of Sec. Education 60.00<br />

TOTAL OF SECONDARY EDUCATION 8645.00 2715.80<br />

III. ADULT EDUCATION<br />

18 DIRECTION & ADMINISTRATION<br />

A Maintenance of existing staff 1 0.20<br />

B Wages LS 0.10<br />

B Office expense LS 2.50<br />

C Publication of Meichher 12 issues 6.00<br />

D Matching Contrtibution of Continuing Education LS 59.40<br />

E Other charges<br />

1) EOTOS 3000 4.50<br />

2) Incentive award LS 0.50<br />

3) Teaching Learning Materials LS 1.00<br />

4) Celebration of ILD LS 1.50<br />

5) VAEC Contingency LS 0.50<br />

TOTAL OF DIRECTION & ADMN 152.50 76.20<br />

TOTAL OF ADULT EDUCATION 152.50 76.20<br />

IV. LANGUAGE DEVELOPMENT<br />

19 Propagation of Hindi<br />

A Maintenance of existing staff 67 125.00<br />

TOTAL OF PROMOTION OF MIL 390.00 125.00<br />

20 SPECIAL HINDI SCHOOL (MICE)<br />

A Salary 14 22.00<br />

B Office Expenses LS 0.50<br />

C Trevelling Expenses LS 0.10<br />

D Advertisement LS -<br />

E Minor Works: -<br />

Repair of School Buildings LS -<br />

F Machinery & Equipment LS -<br />

G Other Charges LS 0.20<br />

100.00 22.80<br />

TOTAL OF LANGUAGE DEVELOPMENT 490.00 147.80


Sl.<br />

No.<br />

- 334 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

Outlay<br />

(Rs in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Physical Financial<br />

1 2 3 4 5<br />

V. GENERAL<br />

21 DIRECTION & ADMINISTRATION<br />

A 1) Maintenance of existing staff 6 12.00<br />

B Wages 10 5.00<br />

C Medical Treatment 5.00<br />

B Office expenses LS 25.00<br />

C Travelling expenses<br />

Maintenance/ Re-painting of Office Buildings<br />

Ls 2.00<br />

D etc. LS 5.00<br />

E Other Charges<br />

1) Award to Teachers LS 1.40<br />

2) Advertisement LS 3.00<br />

2) Hospitality of State Guest etc. LS 2.50<br />

TOTAL OF 447.00 60.90<br />

22 STATISTICAL & EDUCATIONAL SURVEY<br />

A Maintenance of existing staff 9 18.00<br />

B Medical Treatment 2.80<br />

C Office expenses LS 5.00<br />

D Other Charges<br />

Implementation of IT, purchase of Computer &<br />

pheripherals etc.. LS 10.00<br />

TOTAL OF STATISTICAL & EDUCATIONAL<br />

SURVEY 115.00 35.80<br />

23 MIZORAM BOARD OF SCHOOL EDUCATION<br />

A Grant-in-aid for<br />

1) Salary of Staff 5 13.00<br />

2) Travelling expenses LS 2.00<br />

3) Repair & renovation LS 1.00<br />

4) Workshop /Seminar LS 4.50<br />

5) Contribution to Pension Fund LS 4.00<br />

6) DCRG LS 6.00<br />

7) Other charges/OE LS 6.00<br />

8) Medical Reimbursment LS 1.50<br />

9) Purchase of Computer with Installation of<br />

Computer network 2.00<br />

9) Purchase of Vehicle -<br />

TOTAL OF MIZORAM BOARD OF SCHOOL<br />

EDUCATION 226.00 40.00


Sl.<br />

No.<br />

- 335 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Name of Scheme<br />

Tenth<br />

Plan<br />

Agreed<br />

Outlay<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2006</strong>-07<br />

Physical Financial<br />

1 2 3 4 5<br />

24 PHYSICAL EDUCATION<br />

A Maintenance of existing staff 5 9.00<br />

B Medical treatment 2.00<br />

B Office expense LS 3.00<br />

C Travelling expense LS 1.00<br />

D Material Supply LS 5.00<br />

E Scholarship/Stipend - -<br />

F Other Charges<br />

Organisation of School Sports<br />

i) Organisation of Zonal Sport<br />

1) Primary School Zonal Sports<br />

185<br />

zones<br />

123<br />

5.55<br />

2) Middle School Zonal Sport<br />

zones 4.92<br />

3) District Sport for H.S<br />

<strong>Mizoram</strong> School Games Group A (High School<br />

8 District 3.50<br />

ii) Section)<br />

<strong>Mizoram</strong> School Games Group B (Higher Sec.<br />

LS 10.00<br />

iii) School Section) LS 9.00<br />

iv) Orientation of Training LS 2.00<br />

iv) National School Games LS 5.03<br />

TOTAL of PHYSICAL EDUCATION 442.50 60.00<br />

TOTAL OF GENERAL 788.00 196.70<br />

TOTAL OF SCHOOL EDUCATION 19383.00 7651.00


- 341 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HIGHER & TECHNICAL EDUCATION<br />

INDEX<br />

2202 – General Education / 03 – University & Higher Education<br />

Scheme Name of Schemes<br />

Annual Plan <strong>2006</strong> - <strong>2007</strong><br />

Revenue Capital Total<br />

(Rs. in lakh)<br />

Remarks<br />

1 2 3 4 5 6<br />

I Direction & Administration 18.40 18.40<br />

II Govt. Colleges 163.00 163.00<br />

III C.T.E. 15.10 15.10<br />

IV Collegiate Hostel 19.50 19.50<br />

V Asst. to Non-Govt. College 1,017.85 1,017.85<br />

VI Residential Science College 75.30 75.30<br />

VII MSB 12.00 12.00<br />

05 – Language Development<br />

VIII Miz. Hindi Trg. College 31.85 31.85<br />

Total of 2202 - Gen. Edn. 1,353.00 - 1,353.00<br />

2203 – Technical Education<br />

A Direction & Admn. 20.50 20.50<br />

B M.S.C.T.E. 4.00 4.00<br />

C M.P.L. 66.50 66.50<br />

D W.P.(A) 89.00 89.00<br />

Total of 2203 - Tech. Edn.<br />

(Plan)<br />

180.00 - 180.00


- 342 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-07 : HIGHER & TECHNICAL EDUCATION<br />

Scheme – I: Direction and Administration<br />

1. Maintenance of existing Post:<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Salary 1 1.50<br />

2. Establishment of Engineering Cell: The Department is badly in need of<br />

Technical hands to look after the existing buildings which are departmentally<br />

constructed and maintained and also for execution of work under Non-<br />

Lapsable Pool fund, CSS, etc. The existing post of Junior Engineer may be<br />

upgraded to the post of one Asstt. Engineer and, therefore, an Asstt. Engineer<br />

may be deputed to this Department during <strong>2006</strong>-07. For maintenance of the<br />

deputed Asst. Engineer, a provision of Rs. 0.10 lakh during the Annual Plan<br />

<strong>2006</strong>-07 is approved.<br />

3. Establishment of Statistical Cell: It is essential to collect and maintain the<br />

Statistical Data of the Department which is required by Govt. of India for the<br />

purpose of framing Plans and Programmes through Ministry of Human<br />

Resources Development. to prepare precise, concrete, factual and latest data,<br />

the existing one Inspector of Statistics is far from adequate, the post of<br />

Research Officer, sub-Inspector of Statistic and IV Grade are proposed to be<br />

created to which Research Officer and Sub-Inspector of Statistic may be<br />

deputed to this Department during the Annual Plan <strong>2006</strong>-07.<br />

Sl.<br />

No.<br />

Particulars<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

a] Research Officer [ 8000 – 13500] 1 0.10<br />

b] Sub-Inspector of Statistic [5000 – 8000] 1<br />

c] IV Grade [ 2650 – 4000] 1<br />

Sub-Total 0.10<br />

4. Medical Treatment LS 0.30<br />

5. Wages LS 0.50<br />

6. Office expenses LS 6.00<br />

7. Travelling expenses LS 0.20<br />

8. Maintenance/Minor works LS 1.00<br />

9. Advertisement LS 0.70<br />

10. Refresher Course/ Seminar/ O.C., etc. LS 6.00<br />

11. Motor vehicle LS 2.00<br />

TOTAL OF DIRECTION & ADMINISTRATION 18.40


Scheme – II: Government Colleges<br />

1. Maintenance of existing Post:<br />

- 343 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

Salary 82 117.70<br />

2. Guest Lecturers: Since the Government has banned appointment of<br />

substitute teachers against those teachers who were on study leave/<br />

maternity leave etc. and as per UGC Norms it is extremely essential to engage<br />

Lecturers on Contract basis @ Rs. 8000/- PM. And also when new subjects are<br />

introduced engagement of Contract Lecturers for a considerable period of<br />

time is required before regular Lecturers are appointed and a token provision<br />

is earmarked.<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Particulars<br />

Physical Financial<br />

a) Lecturer on contract basis 127 0.10<br />

3. Provincialisation of Deficit College: During <strong>2006</strong>-07, 12(twelve) Colleges<br />

are proposed to provincialise. A token provision of Rs. 0.20 lakh is<br />

earmarked for provincialisation of 12(twelve) Deficit Colleges during <strong>2006</strong>-07.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

i) Recurring expenditure LS 0.10<br />

ii) Non-recurring expenditure LS 0.10<br />

Sub-total 0.20<br />

4. Opening of Geology Subject: <strong>Mizoram</strong> University has started P.G. Course in<br />

Geology Subjects since 2002 - 2003. The No. of Students in P.G. Deptt. at MZU<br />

is less than intake capacity due to the degree level course is only in<br />

P.U.College. Introduction of Geology at degree level in Science College will<br />

help the youths in investigating and exploring our natural resources which<br />

will enhance the economic growth of the State. Further the P.G. Course<br />

available at MZU may be utilised for higher studies. It is, therefore, proposed<br />

new course viz. Geology may be introduced at Govt. Colleges where Science<br />

subjects are introduced.<br />

5. Medical Treatment LS 8.00<br />

6. Minor works LS 5.00<br />

7. O.E. LS 8.00<br />

8. T.E. LS 4.00<br />

9. Advertisement LS 1.00<br />

10. M.V. LS 5.00<br />

11. O.C. (includes incentive for Accredited Colleges) LS 14.00<br />

Total of Government Colleges 163.00


Scheme – III: College of Teacher Education<br />

Sl.<br />

No.<br />

- 344 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Salary 4 9.00<br />

2 Medical Treatment LS 1.50<br />

3 T.E. LS 0.30<br />

4 O.E. LS 2.00<br />

5 Advertisement LS 0.30<br />

6 O.C. LS 2.00<br />

Total of CTE 15.10<br />

Scheme – IV: Hostel for Post Matric Students<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Wages LS 5.50<br />

2 Rent 4 9.00<br />

3 Other Charges LS 3.00<br />

4 Maintenance / Minor Works LS 2.00<br />

Total of Hostel 19.50<br />

Scheme – V: Assistance to Non-Govt. Colleges<br />

Grants-in-aid for Maintenance of existing posts in Deficit Colleges<br />

1. Maintenance of existing posts:<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Salary 412 917.65<br />

2. Guest Lecturer: Since the Government has banned appointment of substitute<br />

teachers against those teachers who were on study leave/ Maternity leave<br />

etc., it is extremely essential to engage Guest Lecturers when classes are in<br />

full swing. And also for fulfillment of UGC Norms engagement of Lecturers<br />

on contract basis for a considerable period of time is required before regular<br />

Lecturers are appointed, a provision of Rs. 67.20 lakh is earmarked during<br />

<strong>2006</strong> - <strong>2007</strong> for 70 nos. of Lecturers on contract basis @ Rs. 8000/- pm.<br />

3. Matching contribution of CPF LS 10.00<br />

4. Gratuity/ pension fund etc. LS 1.00<br />

5.<br />

Non-recurring grants for existing Deficit Colleges<br />

and Private Colleges<br />

LS 2.00<br />

6.<br />

Grants-in-aid to Law College, upgradation to<br />

Deficit Status etc.<br />

LS 20.00<br />

Total of Assistance to Non-Govt. Colleges 1,017.85


- 345 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Scheme – VI: Zirtiri Residential Science College<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Salary 23 57.90<br />

2 Medical Treatment LS 4.00<br />

3 T.E. LS 0.80<br />

4 O.E. LS 3.00<br />

5 Advertisement LS 0.50<br />

6 Material & Supply LS 1.00<br />

7 M.V. LS 1.00<br />

8 O.C. LS 3.00<br />

9 Minor Works LS 4.00<br />

10<br />

Creation of new post for Lecturers in BCA<br />

& B.Sc. Computer Science<br />

4 0.10<br />

Total of ZRSC 75.30<br />

Scheme – VII: <strong>Mizoram</strong> Scholarship Board<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 O.E. LS 1.50<br />

2 Advertisement LS 0.50<br />

3 Stipend / Scholarship LS 7.00<br />

4 O.C. LS 3.00<br />

Total of <strong>Mizoram</strong> Scholarship Board 12.00<br />

Scheme – VIII: Language Development<br />

<strong>Mizoram</strong> Hindi Training College: (Rs. in lakh)<br />

Sl.<br />

No.<br />

Particulars<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Salary 7 15.50<br />

2 Medical Treatment LS 2.00<br />

3 Wages LS 0.85<br />

4 Office Expenses LS 2.00<br />

5 Travelling Expenses LS 0.50<br />

6 Other Charges LS 2.00<br />

7 Stipend / Book Grant LS 9.00<br />

Total of <strong>Mizoram</strong> Hindi Training College 31.85<br />

GRAND TOTAL OF 2202 – HIGHER<br />

EDUCATION (<strong>PLAN</strong>)<br />

1,353.00


Scheme – A: Direction & Administration<br />

Sl.<br />

No.<br />

- 346 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2203 – Technical Education<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Salary 1 4.00<br />

2 Medical Treatment LS 0.50<br />

3 Wages LS 2.00<br />

4 Travelling Expenses LS 1.00<br />

5 Office Expenses LS 3.00<br />

6 Advertisement LS 2.00<br />

7 Scho. to NERIST/ Stipend LS 5.00<br />

8<br />

Misc. expenditure for IT Development /<br />

O.C.<br />

LS 3.00<br />

Total of Direction & Administration 20.50<br />

Scheme – B: <strong>Mizoram</strong> State Council for Technical Education<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Travelling Expenses LS -<br />

2 Office Expenses LS 2.00<br />

3 Advertisement LS 1.00<br />

4 Other Charges LS 1.00<br />

Total of MSCTE 4.00<br />

Scheme – C: <strong>Mizoram</strong> Polytechnic, Lunglei<br />

Sl.<br />

No.<br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 Salary 14 21.00<br />

2 Medical Treatment LS 2.00<br />

3 Travelling Expenses LS 0.50<br />

4 Office Expenses LS 0.50<br />

5 Scholarship/ Stipend/ Book grant LS 42.00<br />

6 Materials & Supply<br />

7 Other Charges LS 0.50<br />

8 Maint/ Minor Works<br />

Total of <strong>Mizoram</strong> Polytechnic 66.50


Scheme – D: Women Polytechnic, Aizawl<br />

Sl.<br />

No.<br />

- 347 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Particulars<br />

(Rs. in lakh)<br />

Annual Plan <strong>2006</strong> - 07<br />

Physical Financial<br />

1 a) Salary 25 34.30<br />

b) Engagement of Lecturer on contract<br />

basis @ Rs. 8000/- pm<br />

10 9.60<br />

c) Lab. Technician on contract basis @<br />

Rs.5000/- pm<br />

6 3.60<br />

2 Medical Treatment LS 3.00<br />

3 Wages LS 0.70<br />

4 Travelling Expenses LS 0.50<br />

5 Office Expenses LS 1.96<br />

6 Advertisement<br />

7 Machinery & Equipment<br />

8 Purchase of Library Books/ M & S<br />

9 M.V.<br />

10 Scholarship/ Stipend/Book grants LS 33.74<br />

11 Other Charges LS 1.60<br />

Total of Women Polytechnic 89.00<br />

GRAND TOTAL OF TECHNICAL<br />

EDUCATION (<strong>PLAN</strong>)<br />

180.00


- 351 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SPORTS & YOUTH SERVICES<br />

The Department of Sports & Youth Services, <strong>Mizoram</strong> was established and bifurcated<br />

from Education Department on 8 th December, 1986 into a full-fledged Department with the<br />

sole purpose of promoting Sports of different disciplines and youth activities including<br />

Adventure Sports, Scouts & Guides, National Cadet Corp and National Service Scheme<br />

amongst the youths in <strong>Mizoram</strong>.<br />

Besides promotional of various Sports disciplines and other Youth activities<br />

programmes, construction of Sports infrastructures like Indoor Stadia, Open Stadia,<br />

Playground at city and towns is an important feature of the Department programme.<br />

Inspite of limited Officers and Ministerial staff as well as a handful of Coaches and<br />

other Field Staff of the Department, the Department within a short span of two decades,<br />

achieved a commendable records. The name <strong>Mizoram</strong> has been brought to the Notice of the<br />

Sports arena not only at the National Level but also at the International Level.<br />

The Department proposed to upgrade the existing Schemes and new establishment<br />

of NCC Units/Company and District Administrations - District Sports & Youth Offices,<br />

Kolasib and Champhai.<br />

The Scheme-wise financial break-up of the proposed Outlay are given below.<br />

(A) DIRECTION: The approved outlay under the direction in item-wise expenditure is as<br />

enumerated under: -<br />

1) Salaries - Rs. 8.00 lakh<br />

2) Wages - Rs. 10.00 lakh<br />

3) Medical Treatment - Rs. 2.60 lakh<br />

4) Foreign Travel Expenses - Rs. 1.50 lakh<br />

5) Domestic Travel expenses - Rs. 1.50 lakh<br />

6) Office expenses - Rs. 3.00 lakh<br />

7) Rents, Rates, Taxes - Rs. 0.90 lakh<br />

8) Supplies & Materials/Office Equipments - Rs. 8.00 lakh<br />

9) Advertising & Publicity - Rs. 1.50 lakh<br />

10) Minor Works/Maintenance - Rs. 3.00 lakh<br />

11) Other Charges/Trg./Participation Meeting/ - Rs. 10.00 lakh<br />

Conference, etc.<br />

TOTAL : - Rs. 70.00 lakh<br />

(B) DISTRICT ADMINISTRATION: There are 3 (three) District Offices under Sports &<br />

Youth Services Department at present (i) District Sports & Youth Office,Lunglei (ii) District<br />

Sports & Youth Office, Kolasib and (iii) District Sports & Youth Office Champhai.<br />

(1) District Sports & Youth Office, Lunglei:<br />

a) Salaries - Rs. 15.00 lakh<br />

b) Medical treatment - Rs. 1.00 lakh<br />

c) Domestic Travel Expenses - Rs. 1.00 lakh<br />

d) Office Expenses - Rs. 4.00 lakh<br />

e) Supplies and materials - Rs. 3.00 lakh<br />

f) Advertising and Publicity - Rs. 1.00 lakh<br />

g) Minor works - Rs. 4.00 lakh


- 352 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

h) Other Charges/Participations/coaching etc. - Rs. 6.00 lakh<br />

for implementation of the following Programmes :-<br />

i) Residential Athletic Coaching at Lunglei,<br />

Saiha and Lawngtlai - Rs. 0.90 lakh<br />

ii) Conduct of Rersidential Boxing Coaching<br />

at Lunglei, Saiha and Lawngtlai -Rs.0.90 lakh/-<br />

iii) Inter-District Football Tournament at Lawngtlai - Rs. 1.00 lakh<br />

iv) Orgn. of Inter-District Boxing Championship<br />

at Lunglei - Rs. 0.80 lakh<br />

v) Conduct of Basic Course for S & G and<br />

Refresher Course at Lunglei - Rs. 0.40 lakh<br />

vi) Conduct of Non-Residential Coaching of<br />

Table Tennis and organisation of Tournament - Rs. 0.40 lakh<br />

vii) Residential Coaching in Volleyball at Lunglei - Rs. 0.50 lakh<br />

viii) Orgn. of volleyball tournamenr (Men & Women)<br />

at Lunglei - Rs. 0.40 lakh<br />

ix) Orgn. of residential women Hockey coaching<br />

and conduct of Inter-District women Hockey<br />

championship at Lunglei - Rs. 0.70 lakh<br />

TOTAL - Rs. 35.00 lakh<br />

(2) District Sports & Youth Office, Kolasib:<br />

Since the District Sports & Youth Office, Kolasib is opened, the ministerial staff have<br />

not been filled up and posted to this District till date the requirement of fund have been<br />

approved for filling the vacant posts for promotion of Sports .<br />

The proposed expenditure is as below :<br />

(a) Salaries - Rs. 3.20 lakh<br />

(b) Wages - Rs. 1.00 lakh<br />

(c) Office expenses - Rs. 1.00 lakh<br />

(d) Rents, Rates, Taxes - Rs. 0.80 lakh<br />

(e) Supplies & materials - Rs. 1.50 lakh<br />

(f) Other charges/Participations/Tournaments/ - Rs. 2.50 lakh<br />

Coaching etc. for implementation of the<br />

following programmes :-<br />

i) Independence Day Tournament for Football/<br />

Volleyball/Tug of War at Kolasib - Rs. 0.55 lakh<br />

ii) Republic Day Celebration Tournament<br />

for Football/Basketball/Badmenton and<br />

Hockey at Kolasib - Rs. 0.55 lakh<br />

iii) Non-Residential Coaching in Hockey/<br />

Football/Volleyball/Badminton at Kolasib - Rs. 0.50 lakh<br />

iv) District Adventure Programme at Kolasib - Rs. 0.40 lakh<br />

v) Scouts & Guides Trg. Programme at Kolasib - Rs. 0.50 lakh<br />

TOTAL : - Rs. 10.00 lakh<br />

(3) District Sports & Youth Office, Champhai:<br />

Since the Government created this District Office, the posts for this District Office<br />

has not been created till date due to ban on creation under the State Government of<br />

<strong>Mizoram</strong>. It is proposed to establish to function in full-fledged District Office. The<br />

requirement of fund has to be incorporated in the Plan Scheme for <strong>2006</strong>-07.


- 353 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The approved expenditure in as below :<br />

(a) Wages - Rs. 1.50 lakh<br />

(b) Office expenses - Rs. 1.50 lakh<br />

(c) Rents, Rates, Taxes - Rs. 0.80 lakh<br />

(d) Supplies & materials - Rs. 0.60 lakh<br />

(e) Other Charges/Participation/Tournaments/ - Rs. 2.60 lakh<br />

Coaching, etc. for the following Programmes :-<br />

i) Conduct of Independence Day Tournament<br />

at Champhai in Aug, 06 - Rs. 0.40 lakh<br />

ii) Conduct of Republic Day Tournament<br />

at Champhai during January, 07 - Rs. 0.40 lakh<br />

iii) Conduct of various Adventure Programmes<br />

at Champhai - Rs. 0.60 lakh<br />

iv) Conduct of various Scouts 7 Guides Trg.<br />

Programmes at Champhai - Rs. 0.60 lakh<br />

v) Conduct of coaching for various Sports<br />

disciplines at Champhai - Rs. 0.60 lakh<br />

TOTAL : - Rs. 7.00 lakh<br />

(C) N.C.C.:<br />

Besides the existing NCC Units/Company (i.e. 20-MZ Indep Coy NCC and 1-MZ Bn.<br />

NCC/ Girl Cadet Coy), the High Level NCC Meeting held recently in New Delhi on 15.09.2005,<br />

the <strong>Mizoram</strong> State is advised to establish the two other Unit, Air Squadron NCC and Navy<br />

Wing NCC. Hence, the Department of Sports & Youth Services, <strong>Mizoram</strong> proposed to<br />

establish Air Squadron & Navy Wing of NCC during <strong>2006</strong>-07.<br />

The approved outlay in Scheme-wise are enumerated as below :-<br />

(1) 20- <strong>Mizoram</strong> NCC Indep Coy. :<br />

(a) Salaries - Rs. 4.00 lakh<br />

(b) Wages - Rs. 0.50 lakh<br />

(c) Medical Treatment - Rs. 0.50 lakh<br />

(d) Domestic Travel Expenses - Rs. 0.80 lakh<br />

(e) Office Expenses - Rs. 1.00 lakh<br />

(f) Supplies & materials - Rs. 0.50 lakh<br />

(g) Maintenance - Rs. 3.00 lakh<br />

(h) Coaching / Participation Training Camps etc. - Rs. 5.70 lakh<br />

for the following Targets of the programmes :-<br />

i) Nationation Integration Camp - Rs. 0.50 lakh<br />

ii) Basic Leadership Camp - Rs. 0.28 lakh<br />

iii) Advance Leadership Camp - Rs. 0.27 lakh<br />

iv) Indian Military Academy - Rs. 0.30 lakh<br />

v) Advance Course - Rs. 0.10 lakh<br />

vi) Pre-Republic Day Camps-I - III ; (20 Cadets) - Rs. 1.20 lakh<br />

vii) Pre-Republic Day Camp 5 Cadets - Rs. 1.50 lakh<br />

viii) Pre-Thal Sainik Camp (Boys) - Rs. 0.10 lakh<br />

ix) Pre-Thal Sainik Camp (Girls) - Rs. 0.10 lakh<br />

x) Thal Sainik Camp at Delhi - Rs. 0.25 lakh<br />

xi) Army atttachment - Rs. 0.28 lakh<br />

xii) Rock Climbing Training - Rs. 0.10 lakh<br />

xiii) Trekking - Rs. 0.15 lakh<br />

xiv) Mountainering - Rs. 0.10 lakh<br />

xv) Spl. Nation Integn. Camp. - Rs. 0.20 lakh<br />

x) Pre-Commission Course for caretaker - Rs. 0.27 lakh<br />

Total :- - Rs. 16.00 lakh


- 354 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(2) 1 <strong>Mizoram</strong> NCC Bn.<br />

(a) Wages - Rs. 3.80 lakh<br />

(b) Domestic Travel Expenses - Rs. 1.00 lakh<br />

(c) Office Expenses - Rs. 3.00 lakh<br />

(d) Rent - Rs. 2.50 lakh<br />

(e) Supplies & Materials - Rs. 1.00 lakh<br />

(f) Training, Participations/Other charges, etc. - Rs. 5.50 lakh<br />

for the following Programmes :-<br />

i) Nationation Integration Camp - Rs. 0.50 lakh<br />

ii) Basic Leadership Camp - Rs. 0.28 lakh<br />

iii) Advance Leadership Camp - Rs. 0.27 lakh<br />

iv) Indian Military Academy - Rs. 0.30 lakh<br />

v) Advance Course - Rs. 0.10 lakh<br />

vi) Pre-Republic Day Camps-I - III ; - Rs. 1.20 lakh<br />

( 20 Cadets ).<br />

vii) Pre-Republic Day Camp 5 Cadets - Rs. 1.50 lakh<br />

viii) Pre-Thal Sainik Camp (Boys) - Rs. 0.10 lakh<br />

ix) Pre-Thal Sainik Camp (Girls) - Rs. 0.10 lakh<br />

x) Thal Sainik Camp at Delhi - Rs. 0.25 lakh<br />

xi) Army atttachment - Rs. 0.28 lakh<br />

xii) Rock Climbing Training - Rs. 0.10 lakh<br />

xiii) Trekking - Rs. 0.15 lakh<br />

xiv) Mountainering - Rs. 0.17 lakh<br />

xv) Spl. Nation Integn. Camp. - Rs. 0.20 lakh<br />

TOTAL - Rs. 16.80 lakh<br />

(3) NCC Girls Cadet Coy. :<br />

(a) Office expenses - Rs. 0.05 lakh<br />

(b) Training/participations etc. - Rs. 0.05 lakh<br />

TOTAL : - Rs. 0.10 lakh<br />

(4) NCC Air Wing :<br />

(a) Office Expenses - Rs. 2.00 lakh<br />

(b) Training/Participation/Other Charges - Rs. 3.00 lakh<br />

TOTAL :- - Rs. 5.00 lakh<br />

(5) NCC Navy Wing :<br />

(a) Office Expenses: - Rs. 0.05 lakh<br />

(b) Training/Participation/Other charges - Rs. 0.05 lakh<br />

TOTAL - Rs. 0.10 lakh<br />

(D) SCOUTS & GUIDES:<br />

The Scouts & Guides movement in the State of <strong>Mizoram</strong> is run by the Department of<br />

Sports & Youth Services. During <strong>2006</strong>-07, the Department proposed conduct of various<br />

Training Camps and Courses and participations at the National/International Programmes.<br />

The approved outlay in item-wise expenditure are as below :<br />

(a) Salaries - Rs. 1.50 lakh<br />

(b) Wages - Rs. 1.00 lakh<br />

(c) Medical Treatment - Rs. 0.30 lakh<br />

(d) Domestic Travel expenses - Rs. 1.00 lakh<br />

(e) Office expenses - Rs. 3.00 lakh<br />

(f) Supplies & Materials - Rs. 2.00 lakh


- 355 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(g) Advertising & Publicity - Rs. 1.00 lakh<br />

(h) Other Charges/Diffirent Scouts Programmes :<br />

i) Conducting Basic Course for Scouters & Guiders - Rs. 0.80 lakh<br />

ii) Conducting Advanced Course for Scouters - Rs. 1.00 lakh<br />

& Guiders<br />

iii) Conducting Refresher Course for Unit Leaders - Rs. 0.80 lakh<br />

in districts<br />

iv) Organising State Rally - Rs. 2.30 lakh<br />

v) Organising Cub & Bulbul utsav in 8 district - Rs. 0.80 lakh<br />

vi) Conducting Advancement Courses for Scouts - Rs. 1.70 lakh<br />

& Guides, Rovers & Rangers Cubs & Bulbuls<br />

vii) Day, Earth Day, Cleanliness etc. - Rs. 1.10 lakh<br />

viii) Conducting competition for Rovers & Rangers, - Rs. 0.20 lakh<br />

Scouts & Guides, Cubs & Bulbuls<br />

ix) Development of State Training Centre,Tanhril - Rs. 3.00 lakh<br />

x) 5 th N.E. Mini Jamboree - Rs. 0.50 lakh<br />

xi) Participation in Youth Forum Patrol Leader - Rs. 0.50 lakh<br />

Jamboree Youth Leader Course, Adven. prog.<br />

xii) Participation in Sangam for Rovers & Rangers - Rs. 0.50 lakh<br />

Participation in Cub & Bulbul utsav (National) - Rs. 0.50 lakh<br />

TOTAL : - Rs. 25.00 lakh<br />

(E) YOUTH ADVENTURES:<br />

Promotion of all forms of Adventure activities in the State of <strong>Mizoram</strong> is the<br />

responsibility of Adventure Wing of Sports & Youth Services Department. The Adventure<br />

Wing of the Department proposed conducting Trekking, Watermanship, Mountaineering and<br />

Refresher Course etc. at Regional & National and International level.<br />

The approved outlay is as below :<br />

(a) Salaries - Rs. 8.05 lakh<br />

(b) Medical Treatment - Rs. 0.70 lakh<br />

(c) Domestic Travel Expenses - Rs. 1.00 lakh<br />

(d) Office Expenses - Rs. 2.00 lakh<br />

(e) Supplies and Materials - Rs. 2.30 lakh<br />

(f) Other Charges/Implementation of Adventure Programmes (Rs. 5.95 lakh) –<br />

Adventures Programmes:<br />

i) Basic Mountaineering course of HMI Darjeeling - Rs. 0.50 lakh<br />

ii) Advance Mountainering course at HMI Darjeeling - Rs. 0.50 lakh<br />

iii) Method of Instruction course at HMI Darjeeling - Rs. 0.15 lakh<br />

iv) Sports Climbing at Luangmual Sports Complex - Rs. 0.52 lakh<br />

v) Sending of competitors for N.E. Sports Climbing - Rs. 0.54 lakh<br />

Competition at Imphal, Manipur<br />

vi) Sending of participants for National Adventure Festival - Rs. 0.85 lakh<br />

at Chandigarh<br />

vii) Sending of participants for National Sports Climbing - Rs. 0.40 lakh<br />

competition at New Delhi<br />

viii) Rafting Expedition at River Chhimtuipui - Rs. 0.61 lakh<br />

ix) Sending of participants for National Adventure - Rs. 0.75 lakh<br />

Festival at Chandigarh<br />

x) 9 th Adventure Course at Hmuifang Trg. Centre - Rs. 0.78 lakh<br />

xi) 10 th Para Sailing Course at Multi-Trg. entre, Tuirial - Rs. 0.35 lakh<br />

Total - Rs. 20.00 lakh


- 356 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(F) NATIONAL SERVICE SCHEMES (NSS):<br />

The movement of NSS is based on the Central Grants-in-Aid Scheme under the<br />

Ministry of Youth Affairs & Sports, Govt.of India since so far in the College level of<br />

Educational Institutions co-ordinated by the Sports & Youth Services Department as a Nodal<br />

Department. The approved funding pattern of such Scheme is 75:25. The approved Estimate<br />

for <strong>2006</strong>-07 is Rs. 112.00 lakh, out of which the 70% Cenral Share is Rs. 84.00 lakh and 25%<br />

State Matching Share will be Rs. 28.00 lakh. The State Government requires to match the<br />

Central Grant on the basis of such approved funding pattern.<br />

Grants-in-Aid/Matching Share - Rs. 27.00 lakh<br />

(G) YOUTH WELFARE ACTIVITIES (GENERAL YOUTH):<br />

Youth Welfare activities basically covered all the activities of the programmes under<br />

Youth Hostel Assocition of India and general Youth programmes such as conduct of Blood<br />

Donation Camp, Tree Planting includes Seminar / Workshop and participation at various<br />

YHAI-National Trekking programmes like Himalayan Trekking, Desert Trekking and other<br />

National and International Programmes.<br />

(a) Office Expenses - Rs. 2.00 lakh<br />

(b) Supplies & Materials - Rs. 2.00 lakh<br />

(c) Maintenance of Youth Hostel, Luangmual, etc. - Rs. 5.00 lakh<br />

(d) Other Charges/Implementation of the following<br />

different YHAI National & State Programmes: -<br />

i) National Western Ghats & Goa Hill Trekking Expedition - Rs. 1.50 lakh<br />

ii) National or Inter-State Trekking Expeditions - Rs. 1.50 lakh<br />

iii) National Executive/Council Meeting, New Delhi, etc. - Rs. 1.00 lakh<br />

iv) Adventure Promotion Committee/Meetings - Rs. 1.50 lakh<br />

v) National Himalayan Trekking Expeditions - Rs. 1.50 lakh<br />

vi) Trekking Programme, Reiek - Rs. 1.00 lakh<br />

vii) National/State Trekking Expeditions - Rs. 1.50 lakh<br />

viii) Observance of YHAI State Tree Planting Prog. - Rs. 0.50 lakh<br />

ix) Observance/Celebration of Founder’s Day - Rs. 0.50 lakh<br />

x) Blood Donation Camp. - Rs. 0.50 lakh<br />

TOTAL : - Rs. 20.00 lakh<br />

(H) SPORTS & GAMES :<br />

(1) Sports & Games :<br />

The Coaching Wing of Sports & Youth Services Department is responsible for<br />

conduct of various Sports Coaching and participations at National Level, International Level<br />

Tournament. The <strong>Mizoram</strong> Team U-14, U-17 and NCC participated annually and won<br />

championship always.<br />

The approved outlay in Scheme-wise is as follows :-<br />

(a) Salaries - Rs. 15.00 lakh<br />

(b) Medical Treatment - Rs. 1.50 lakh<br />

(c) Domestic Travel Expenses - Rs. 1.50 lakh<br />

(d) Office expenses - Rs. 4.50 lakh<br />

(e) Supplies & Materials - Rs. 10.00 lakh<br />

(f) Scholarship/Stipend/ - Rs. 1.00 lakh<br />

(g) Other Charge/Conduct of Sports Tournaments/<br />

Coaching/Participation Programmes (Rs. 27.50 lakh):-<br />

i) Selection, Coaching k& pariticipation of Subroto Cup - Rs. 2.50 lakh<br />

Football U-17 at New Delhi.


- 357 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ii) Selection, Coaching & Participation of Subroto Cup - Rs. 2.50 lakh<br />

Football Tournament U-14, New Delhi.<br />

iii) Junior Nehru Hockey Tournament at New Delhi - Rs. 2.50 lakh<br />

(Girls) U-17.<br />

iv) Junior Nehru Hockey (Boys) at New Delhi (U-17) - Rs. 2.50 lakh<br />

v) Sub-Junior Nehru Hockey (Boys) U-14 at N.Delhi - Rs. 2.50 lakh<br />

vi) Selection, Coaching and participation in All India Rural - Rs. 2.00 lakh<br />

Sport Sports Meet (Group 1 - 3) Different Disciplines.<br />

vii) Selection, Coaching and participation in All India - Rs. 2.00 lakh<br />

Women Sports Ferstival (Group 1 - 3) Diff. Disciplines.<br />

viii) Coaching/Training in different Sports disciplines within - Rs. 2.00 lakh<br />

the State for development of Sports.<br />

ix) Incentive Cash Award/Sports Kit Allowances - Rs. 9.00 lakh<br />

TOTAL - Rs. 61.00 lakh<br />

(2) <strong>Mizoram</strong> State Sports Council :<br />

<strong>Mizoram</strong> State Sports Council is responsible for promotion of different disciplines<br />

through State Level Association and development of Sports Infrastructures in the State. It is<br />

also responsible for creation of Sports Infrastructure in the State. Less than the 50% of State<br />

Matching Share under Plan Fund was utilized during 2005-06 as per norms of the Govt. of<br />

India against their approved Schemes for construction of Sports Complex at Aizawl and<br />

other Districts, i.e, Mamit, Saiha, Lunglei, Champhai, Kolasib, Lawngtlai. The remaining<br />

balance of such State Matching Share is proposed for <strong>2006</strong>-07.<br />

The approved outlay in Scheme-wise is as follows :-<br />

(a) State Matching Share of CSS - Rs. 200.00 lakh<br />

(b) Promotional of Sport/Coaching/Participation etc. - Rs. 125.50 lakh<br />

(c) Payment of Liability of YMA Field on Court Order - Rs. 14.50 lakh<br />

(d) Maintenance of Sports Infrastructure including - Rs. 60.00 lakh<br />

Mini Hall at Bungkawn Damveng<br />

TOTAL : - Rs. 400.00 lakh<br />

(3) <strong>Mizoram</strong> Olympic Association :-<br />

(a) Establishment for <strong>Mizoram</strong> Olympic Association - Rs. 5.00 lakh<br />

(b) Assistance to different State Level Sports Assn. - Rs. 5.00 lakh<br />

(c) Organisation of <strong>Mizoram</strong> State Games (<strong>2006</strong>) - Rs. 5.00 lakh<br />

(d) Preliminary Selection State level (Dist. level) - Rs. 5.00 lakh<br />

Total - Rs. 20.00 lakh<br />

(4) State Hockey Academy, Thenzawl :<br />

The Department eastablished Women Residential Hockey Training Centre at<br />

Thenzawl in 2004. During 2004-05 <strong>Mizoram</strong> Women Hockey Team participated in the<br />

Eastern Zone Senior Women Hockey Championship and stood Runner-up. <strong>Mizoram</strong> Women<br />

Team now qualified for National Senior Women Hockey Championship and participated<br />

during 2005-06. This is the immediate result of the Women Residential Hockey Training at<br />

Thenzawl. The State Hockey Academy, Thenzawl may kindly be provided fund for <strong>2006</strong>-07.<br />

(a) Office Expenses - Rs. 2.00 lakh<br />

(b) Supplies & Materials - Rs. 4.00 lakh<br />

(c) Other Charges (Rs. 15.00 lakh) :-<br />

(i) Food for trainees - Rs. 9.00 lakh<br />

(ii) School fee for trainees - Rs. 1.00 lakh<br />

(iii) Uniform for trainees - Rs. 5.00 lakh<br />

TOTAL : - Rs. 22.00 lakh


- 358 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(5) State Sports Coaching Centre, Luangmual:<br />

(a) Office Expenses - Rs. 2.00 lakh<br />

(b) Other charges/Coaching/participation etc. - Rs. 8.00 lakh<br />

TOTAL - Rs. 10.00 lakh<br />

(6) Sports Museum:<br />

To boost up the morale of the Youth and to preserve their pictures, uniforms and<br />

their old sports gears, it is proposed to establish Sports Museum in the Department by<br />

hiring a private building at the initial stage.<br />

To start with a sum of Rs. 10.00 lakh is earmarked for the purpose.<br />

(a) Office Expenses - Rs. 3.00 lakh<br />

(b) Supplies & Materials/Equipments - Rs. 4.00 lakh<br />

(c) Other charges/Collection of old sports gears/ - Rs. 3.00 lakh<br />

photographs/Materials<br />

TOTAL - Rs. 10.00 lakh<br />

(7) Aizawl Sports Complex under 12 th Finance Commission:<br />

The 12 th Finance Commission provided Rs. 25.00 crore for construction of Aizawl<br />

Sports Complex (AR Ground) for the period from <strong>2006</strong>-07 to 2009-2010 in Rs. 6.25 crore<br />

each for four years. The High Level Monitoring Committee, <strong>Mizoram</strong> in its meeting the<br />

Department of Sports & Youth Services, <strong>Mizoram</strong> is entrusted the initiative and to utilise<br />

Rs.6.25 crore during <strong>2006</strong>-07 and to obtain the required amount for preparation of the<br />

Detailed Project Reports so as to enable to commence the construction works of Aizawl<br />

Sports Complex (A.R. Ground) from the financial year of <strong>2006</strong>-07.<br />

1) Major Works – Contruction of full-fledged - Rs. 625.00 lakh<br />

Sports Complex, Aizawl (Now A.R.Ground)<br />

TOTAL - Rs. 625.00 lakh<br />

GRAND TOTAL OF <strong>PLAN</strong> SCHEME - Rs.1400.00 lakh


- 364 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ART & CULTURE<br />

(ABSTRACT)<br />

1. Direction -<br />

(Rs. in lakh)<br />

40.11<br />

2. Administration - 2.22<br />

3. Publication Board - 10.40<br />

4. District Administration - 3.60<br />

5. Institute of Music & Fine Arts - 7.37<br />

6. Cultural Programme - 102.75<br />

7. Improvement of Vanapa Hall - 4.07<br />

8. Archaeology - 1.71<br />

9. Archaeological Survey - 1.00<br />

10. Archives - 3.46<br />

11. State Library - 12.89<br />

12. District Library - 7.66<br />

13. Museum & Art Gallery - 68.23<br />

14. District Museum - 1.38<br />

15. Anthropological Survey - 1.05<br />

16. District Gazetteer - 2.10<br />

17. Twelfth Finance Commission - 125.00<br />

GRAND TOTAL - 395.00<br />

XI - SOCIAL SERVICES 2205 - ART & CULTURE<br />

The Art & Culture Department is undertaking the task of promotion and<br />

preservation of Mizo culture in general. Survey of Archaeological, Anthropological and<br />

vanishing cultural heritage of <strong>Mizoram</strong> is being given importance. Promotion of Literature<br />

and Public Library Services are also becoming a big task of the Department. The Department<br />

is consisting of the following Wings :-<br />

1. Direction<br />

2. Administration<br />

3. Publication Board<br />

4. District Administration<br />

5. Institute of Music & Fine Arts<br />

6. Cultural Programme<br />

7. Improvement of Vanapa Hall<br />

8. Tribal Research Institute<br />

9. Archaeology<br />

10. Archaeological Survey<br />

11. Archives<br />

12. Public Library (State, District Libraries)<br />

13. Museum (State & District Museum)<br />

14. Anthropological Survey<br />

15. District Gazetteer.<br />

THE DIRECTORATE OF ART & CULTURE :<br />

Direction and supervision of all activities under the Department is under the<br />

Directorate. Various activities pertaining to Mizo culture have been undertaken through the<br />

Directorate. Sending cultural troupes outside <strong>Mizoram</strong>, receiving cultural troupes from<br />

outside <strong>Mizoram</strong> and giving cultural programmes at the reception functions for VIPs, VVIPs


- 365 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

and high dignitaries from outside <strong>Mizoram</strong> are some of the most important and unavoidable<br />

functions and duties of this Department.<br />

The Annual Plan provision is approved as under : -<br />

(Rs. in lakh)<br />

(1) Appointment (Salary)<br />

Existing -<br />

(a) Driver – 1 (Rs.3050-4590) - 1.14<br />

(2) M.R. - 0.10<br />

(3) Wages (Driver 4 nos,2 Art Instructor & 1<br />

Anthropological Survey Wing - Skilled I) - 3.31<br />

(4) Traveling Expenses - 2.00<br />

(5) Office Expenses - 5.00<br />

(6) Publication - -<br />

(7) Advertisement - 0.50<br />

(8) (a) G.I.A. to Voluntary Organizations - 7.00<br />

(9) Minor Works/Maintenance - 1.00<br />

(10) Motor Vehicle - 3.00<br />

(11) Other Charges (Participation in Inter State<br />

Cultural Programme, Local Cultural Programmes,<br />

Celebration of Important Days, Cultural<br />

Competition and Chapchar Kut etc.) - 17.00<br />

TOTAL - 40.11<br />

2. ADMINISTRATION<br />

CULTURAL CENTRE: The Cultural Centre aims at preservation of cultural heritage<br />

and protection of vanishing arts by way of setting up Traditional Mizo Village with all its<br />

activities around it. The Mizo houses are now deteriorating which need replacement for<br />

which Rs. 1.00 lakh is earmarked during the Annual Plan <strong>2006</strong>-<strong>2007</strong>.<br />

(Rs. in lakh)<br />

(1) Wages (Casual IV Grade Staff -1 no ) - 0.66<br />

(2) Minor Works for construction & maintenance<br />

of Traditional Mizo Village and<br />

erection of traditional monument - 1.00<br />

(3) Other Charges for purchase of<br />

Cultural implements materials,<br />

Hospitality, etc. - 0.56<br />

TOTAL - 2.22<br />

3. PUBLICATION BOARD: The <strong>Mizoram</strong> Publication Board Act of 1993 was passed and<br />

the Board has been constituted by the Govt. of <strong>Mizoram</strong>. At initial stage it is functioning as a<br />

cell under the supervision of Directorate of Art & Culture. Fund is provided in the form of<br />

Grants-in-Aid for which a provision is earmarked with Mizo Academy of Leters as follows:<br />

(Rs. in lakh)<br />

(1) Wages - -<br />

(2) Traveling Expenses - -<br />

(3) Office Expenses - -<br />

(4) Grant-in-Aid - 0.40<br />

(5) G.I.A. to Mizo Academy of Letters - 10.00<br />

TOTAL - 10.40


- 366 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. DISTRICT ADMINISTRATION: For better Administration and speedy discharge of<br />

works, District Office at Lunglei had been started since 1998 with existing staff of District<br />

Library Office and a few officers and staff drawn from other offices and attached<br />

temporarily as stop gap arrangement. This District Office is to cater the need of the whole<br />

of southern region. The Annual Plan aims at gradual improvement and expansion of the<br />

establishment construction of District Office is projected. The Annual Budget Provision is<br />

approved as follows: -<br />

(Rs. in lakh)<br />

(1) Wages (LDC-Cum-Typist, Driver & IV Grade Staff) - 1.70<br />

(2) Traveling Expenses - 0.20<br />

(3) Office Expenses - 0.50<br />

(4) Rents - 0.60<br />

(5) Other Charges - 0.60<br />

TOTAL - 3.60<br />

5. INSTITUTE OF MUSIC & FINE ARTS: The Institute of Music & Fine Arts consists<br />

mainly four trades like traditional music & dances, modern music, drama and fine arts. It<br />

conducts training in cultural dances and modern music regularly. Drama and fine arts have<br />

not been taken up much due to the fund constraints. Small beginning will be made for<br />

opening fine arts classes by engaging professionals when needed. Sophisticated Musical<br />

Instruments which have been purchased ten years back are now needed replacement for<br />

which a sum of Rs. 1.00 lakh is earmarked. The Annual Plan is worked out as follows.<br />

(1) Appointment (Salary) (Rs. in lakh)<br />

Existing Staff<br />

(a) Dance Instructor - 3 (Rs. 4000-6000) - 3.49<br />

(2) Medical Treatment - 0.80<br />

(3) Wages ( Professional Technician - 1 no.<br />

Skilled - I ) - 0.58<br />

(4) Traveling Expenses - 0.50<br />

(5) Office Expenses - 1.00<br />

(6) Publication of Leaflets folders, etc. - -<br />

(7) O.C. (Purchase of Costumes, Sounds,<br />

Musical Instruments, Engagement of<br />

Trained Artists, etc.) - 1.00<br />

TOTAL - 7.37<br />

6. CULTURAL PROGRAMME: <strong>Mizoram</strong> now has involved herself more and more in<br />

national level cultural activities. The Inter State Cultural Exchange Programme is an annual<br />

feature while the local programme is increasing rapidly. The minimum requirement of fund<br />

as earmarked is as follows: -<br />

(Rs. in lakh)<br />

(1) Wages - -<br />

(2) Traveling Expenses - 0.25<br />

(3) Office Expenses - 0.50<br />

(4) Professional Charges - -<br />

(5) O.C.(Art Workshop, Drama, Music Training,<br />

Inter State and State Cultural Exchange<br />

Programme, Organization of Cultural<br />

Competitions, Documentation,etc.)<br />

Corpus fund for NEZCC Rs.100 lakh - 102.00<br />

TOTAL - 102.75


- 367 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

7. IMPROVEMENT OF VANAPA HALL: The only standard auditorium Vanapa Hall is<br />

equipped with costly sophisticated sound and light systems for general public utility as well<br />

as for the Government. It is very necessary that it is manned efficiently and properly<br />

maintained. Now over all repair of the Building urgently needed. The following provision is<br />

approved.<br />

(Rs. in lakh)<br />

(1) Existing Post (Salary)<br />

(a) Programme Coordinator - 1 (Rs. 6500-10500) - 1.82<br />

(2) Medical Treatment - 0.20<br />

(3) Traveling Expenses - 0.05<br />

(4) Office Expenses - 0.50<br />

(5) Minor Works/Maintenance<br />

(Repair & Maintenance of Vanapa Hall) - 1.00<br />

(6) Other Charges - 0.50<br />

TOTAL - 4.07<br />

8. ARCHAEOLOGY: Proper survey of Archaeological wealth of <strong>Mizoram</strong> is being<br />

carried out in collaboration with Archaeological Survey of India. To execute the<br />

programmes, the following provision is approved.<br />

(Rs. in lakh)<br />

(1) Wages - 0.66<br />

(2) Traveling Expenses - 0.05<br />

(3) Office Expenses - 0.50<br />

(4) Other Charges 0.50<br />

TOTAL - 1.71<br />

9. ARCHAEOLOGICAL SURVEY: It is felt imperative to undertake the survey and<br />

documentation of the Archaeological Wealth of <strong>Mizoram</strong>. A token provision is approved as<br />

under: -<br />

(1) Office Expenses - 0.50<br />

(2) Other Charges - 0.50<br />

TOTAL - 1.00<br />

10. STATE ARCHIVES: The main function of State Archives is to concentrate in a single<br />

repository of all the non current records. All these records are being preserved in a<br />

Scientific manner. It may be mentioned here that this year a provision of Rs. 1.00 lakh has<br />

been earmarked under Minor Works for maintenance of Archives building. The financial<br />

implication for the approved Annual Plan <strong>2006</strong> - <strong>2007</strong> for this Wing are as follows: -<br />

(1) Approved post (Rs. in lakh)<br />

(a) Dark Room Attendant - 1 (Rs. 2650-4000)<br />

(2) Wages - 0.46<br />

(3) Traveling Expenses - 0.30<br />

(4) Office Expenses<br />

(including I.T. Programme) - 1.10<br />

(5) Advertisement - 0.10<br />

(6) Publication - -<br />

(7) Grants-in-Aid - -<br />

(8) Minor Works - 0.50<br />

(9) Other Charges<br />

(Including I.T.Programme) - 1.00<br />

TOTAL - 3.46


- 368 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

11. PUBLIC LIBRARY:<br />

STATE LIBRARY: Since the <strong>Mizoram</strong> Public Libraries Act 1993 has been passed by<br />

the <strong>Mizoram</strong> Legislative Assembly, gradual implementation of the act under the head State<br />

Library is proposed. In case additional fund is available the Department desired that this<br />

scheme be given priority and also proposed Casual Driver and Casual Computer Operator<br />

for this Wing. The financial implication for the approved Annual Plan of <strong>2006</strong>-<strong>2007</strong> as<br />

follows: -<br />

(1) Appointment Existing (Salary) (Rs. in lakh)<br />

(a) Assistant Librarian - 1 (Rs.6500-10500) - 1.96<br />

(2) Medical Treatment - 0.20<br />

(3) Wages - 0.61<br />

(4) Traveling Expenses - 0.20<br />

(5) Office Expenses - 1.00<br />

(6) Rents - 2.52<br />

(7) Publication - -<br />

(8) Grants-in-Aid for contribution fund to RRRLF - 5.00<br />

(9) Other Charges (including I.T. programme) - 1.40<br />

TOTAL - 12.89<br />

12. DISTRICT LIBRARY: Under the supervision of State Library, the four District<br />

Libraries are functioning with the following approved provision.<br />

(1) Salary of Existing Post (Rs. in lakh)<br />

IV Grade – 1 (Rs. 2650 - 4000) - 1.00<br />

(2) Medical Treatment - 0.20<br />

(3) Traveling Expenses - 0.50<br />

(4) Offices Expenses - 2.00<br />

(5) Rents - 1.76<br />

(6) Other Charges - 2.20<br />

TOTAL - 7.66<br />

13. MUSEUM & ART GALLERIES:<br />

STATE MUSEUM: The <strong>Mizoram</strong> State Museum started functioning in 1977. The main<br />

function is preservation, upkeep of Museum records, collection of Museum objects and<br />

display. The fund during the Annual Plan 2005-<strong>2006</strong> is concentrated for collection of<br />

Museum objects and for installation of internal equipments. Budget provision for the year<br />

<strong>2006</strong>-<strong>2007</strong> is approved as follows: -<br />

(1) Existing Posts (Salary) (Rs. in lakh)<br />

(a) Checker - 1 (Rs. 2650-4000)<br />

(b) Receptionist - 1 (Rs. 4000-6000) - 4.04<br />

(c) Museum Guide - 1 (Rs. 5500-9000)<br />

(2) Medical Treatment - 0.50<br />

(3) Wages (Gallery Attendant 3 Nos. Unskilled) - 0.99<br />

(4) Travelling Expenses - 0.10<br />

(5) Office Expenses - 1.00<br />

(6) Advertisement - 0.10<br />

(7) Maintenance - 0.50<br />

(8) Other Charges (Purchase of Museum Objects,<br />

Organisation of Seminars and Symposium, Art<br />

Exhibition, Purchase & Maintenance of Showcase) - 1.00<br />

(9) Major Works (Matching Share to Museum) - 60.00<br />

TOTAL - 68.23


- 369 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

14. DISTRICT MUSEUM: The National Policy is to extend Museum facility in the rural<br />

areas and as rural development has been given priority it is comperative to set up District<br />

Museum in the Southern District of Lunglei and Chhimtuipui.<br />

(Rs. in lakh)<br />

(1) Wages (Casual IV Grade Unskilled - 1 no ) - 0.33<br />

(2) Travelling Expenses - 0.05<br />

(3) Office Expenses - 0.50<br />

(4) Publication - -<br />

(5) Advertisement - -<br />

(6) Other Charges (Purchase of Museum Objects,<br />

Organisation of Seminars and Symposium,<br />

Art Exhibition, etc. at District Level) - 0.50<br />

TOTAL - 1.38<br />

15. ANTHROPOLOGICAL SURVEY: The Anthropological Survey has been part and<br />

parcel of this Department. The extreme South and South Eastern belt of <strong>Mizoram</strong> have to be<br />

surveyed where there are various ethnic groups of tribal.<br />

(Rs. in lakh)<br />

(1) Travelling Expenses - 0.05<br />

(2) Office Expenses - 0.50<br />

(3) Advertisement - -<br />

(4) Other Charges - 0.50<br />

TOTAL - 1.05<br />

16. DISTRICT GAZETTEER: The main assignment of District Gazetteer is to prepare<br />

<strong>Mizoram</strong> District Gazetteer. With <strong>Mizoram</strong> becoming a State, more Districts are coming up<br />

which enlarge the work of the unit.<br />

(Rs. in lakh)<br />

(1) Travelling Expenses - 0.10<br />

(2) Office Expenses - 0.50<br />

(3) Publication<br />

(reprint & rare books) - 1.00<br />

(4) Other Charges - 0.50<br />

TOTAL - 2.10<br />

SUB - TOTAL - 270.00<br />

Twelfth Finance Commission - 125.00<br />

GRAND TOTAL - 395.00


Head of Development<br />

A. Rural Health Services<br />

- 372 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HEALTH & FAMILY WELFARE<br />

Works<br />

PWD Deptt.<br />

(Rs. in lakh)<br />

Salary Others Total<br />

PHC (a) DHS 20.00 33.70 650.00 167.10 870.80<br />

(b) DHME - - 318.00 50.50 368.50<br />

B. (1) Hospital & Dispensary (a) DHS - - 300.00 27.99 327.99<br />

(b) DHME - 22.44 388.00 191.56 602.00<br />

(2) Referrral Hospital/NLPF(DHME) - - - 0.10 0.10<br />

(3) I.C.U. at C.H. Aizawl (DHME) - 0.05 - 0.05 0.10<br />

(4) State Hospital (DHME) - 0.01 0.02 0.07 0.10<br />

(5) Tele-medicine (DHME) - - - 1.00 1.00<br />

C. MER & T<br />

(1) Medical Education (DHME) - - - 147.00 147.00<br />

(2) Research (DHME) - - - 5.00 5.00<br />

(3) Training: (a) DHS - - - 10.00 10.00<br />

(b) DHME - - - 2.00 2.00<br />

(4) Nursing School, Lunglei (DHME) 0.50 - 32.00 28.10 60.60<br />

(5) College of Nursing (DHME) - - - 1.00 1.00<br />

D. ISM & H : (1) DHS - - 0.50 3.00 3.50<br />

(2) DHME - - 4.00 - 4.00<br />

E. Control of communicable diseases<br />

(1) NMEP (a) DHS - - 230.00 35.81 265.81<br />

(b) DHME - - 9.00 2.00 11.00<br />

(2) T.B. Control Prog.: (a) DHS - - 30.50 5.50 36.00<br />

(b) DHME - - 8.00 1.00 9.00<br />

(3) STD: (a) DHS - - 2.00 2.00 4.00<br />

(b) DHME - - 6.00 2.00 8.00<br />

(4) Epidemic Control: (DHS) - - 0.10 7.00 7.10<br />

(5) NLCP (a) DHS - - 45.00 20.10 65.10<br />

(b) DHME - - 7.00 2.00 9.00<br />

F. Non-Communicable Diseases<br />

(1) Cancer Research & Trg. Prog<br />

(a) DHS - - 12.00 12.00 24.00<br />

(b) DHME - 1.00 30.00 31.00 62.00<br />

(2) Cobalt Therapy Unit: (a) DHS - - 5.00 5.10 10.10<br />

(b) DHME - 1.00 15.00 14.00 30.00<br />

(3) Non-communicable Disease: (DHME) - - - 1.00 1.00<br />

(4) Disaster Management: (DHME) - - - 1.00 1.00<br />

(5) Bio-Medical waste: (DHME) - - - 3.00 3.00


- 373 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

G. Other Programmes:<br />

(1) Direction: (a) DHS - 16.00 32.00 78.00 126.00<br />

(b) DHME - 2.50 0.01 11.49 14.00<br />

(2) Administration: (a) DHS - 8.00 99.50 45.00 152.50<br />

(b) DHME - 5.00 15.20 24.30 44.50<br />

(3) Public Health Edn.: (DHS) - - 7.80 14.20 22.00<br />

(4) School Health Prog.: (DHS) - - 7.20 10.30 17.50<br />

(5) Drug Control Prog.: (DHS) - - 31.00 9.00 40.00<br />

(6) Medical Store Depot: (a) DHS - 10.00 20.00 148.80 178.80<br />

(b) DHME - - 1.00 158.00 159.00<br />

(7) Mental Health Prog.: (DHME) 0.01 - 0.02 0.07 0.10<br />

(8) NGCP: (DHS) - - 0.01 3.49 3.50<br />

(9) P.H. Laboratory (DHS) - - - 1.00 1.00<br />

(10) NPCB: (a) DHS - - 9.00 2.00 11.00<br />

(b) DHME - - 5.00 1.00 6.00<br />

(11) Baffacos: (DHS) - - - 115.00 115.00<br />

(12) IDSP: (DHS)<br />

(13) Grant-in-aid:<br />

- - - 6.30 6.30<br />

(a) Nursing Council (DHS) - - - 6.00 6.00<br />

(b) Pharmacy Council (DHS) - - - 3.00 3.00<br />

(c) Blood Transfusion Council (DHS) - - - 2.00<br />

H. Family Welfare Programme:<br />

(1) Rural Family Welfare Services<br />

2.00<br />

(a) DHS - - 43.00 7.00 50.00<br />

(b) DHME - - 25.00 7.00 32.00<br />

(2) P.P. Unit (Sub-Div.): (a) DHS - - 21.00 3.00 24.00<br />

(b) DHME - - 7.00 2.00 9.00<br />

(3) P.P. Unit (District): (a) DHS - - 14.00 3.00 17.00<br />

(b) DHME - - 8.00 2.00 10.00<br />

TOTAL (A-H) 20.51 9.70 2,437.86 1,441.93 4,000.00<br />

N.B. Revenue outlay: 3,879.79<br />

Capital outlay: 120.21<br />

TOTAL 4,000.00


- 374 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ITEMWISE DESCRIPTIONS OF THE SCHEMES :<br />

A. Rural Health Schemes :<br />

Rs. 870.80 lakh is provided for the following –<br />

1) PHC (a) DHS (Rs. in lakh)<br />

i) Salary - 650.00<br />

ii) Wages -<br />

iii) Medical Treatment - 20.00<br />

iv) T.E. - 20.50<br />

v) O.E. - 36.60<br />

vi) O.C. - 30.00<br />

vii) M & E - 20.00<br />

viii) M & S - 40.00<br />

ix) Minor Work/Maint. (Deptt.) - 33.70<br />

x) Major Work (PWD) - 20.00<br />

Sub-Total (a) - 870.80<br />

2) Break-up of Minor Works and Major Works:<br />

Minor Works (Deptt.): (Rs. in lakh)<br />

i) Reconstruction Staff Quarters at Ralvawng Sub- - 4.94<br />

Centres 2 nos. (for Male & Female Health Worker)<br />

ii) Reconstruction of M.O. Qtrs. at Lungsen PHC - 5.76<br />

iii) Reconstruction of Staff Quarters at Phairuangkai - 4.94<br />

Sub-Centres 2 nos. (for Male & Female Health Worker)<br />

iv) Reconstruction of Sub-Centre building and 1 no. - 4.94<br />

Staff Quarters at Thingsai<br />

v) Reconstruction / Repair of Departmental buildings/ - 13.12<br />

quarters at different places<br />

Total - 33.70<br />

Major Works (PWD): (Rs. in lakh)<br />

i) Reconstruction of PHC building at Buarpui - 15.00<br />

ii) Clearing liabilities for construction of - 0.70<br />

Phuldungsei PHC<br />

iii) Repair / Maintenance of existing / PHC (PWD) - 4.30<br />

Total - 20.00<br />

3) Staff : Entertainment of post already created ad creation of other essential posts<br />

during <strong>2006</strong>-07 are as follows: –<br />

Sl.<br />

No.<br />

Name of posts Scale of pay<br />

No. of post<br />

already created<br />

No. of posts<br />

already approved<br />

1 2 3 4 5<br />

1 Specialist (Surgeon) 10000-16500 3<br />

2 Specialist (Gynea.) -do- 3<br />

3 Specialist (Paed.) -do- 3<br />

4. Physician -do- 3<br />

5. M & HO 8000-13500 23 5<br />

6 Dental Surgeon -do- 12 2<br />

7 Asstt. Nursing Supdt. 6500-10500 1<br />

8 Com. Health Officer 5000-8000 32<br />

9 Health Super (M) -do- 28


- 375 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl.<br />

No.<br />

Name of posts Scale of pay<br />

No. of post<br />

already created<br />

No. of posts<br />

already approved<br />

1 2 3 4 5<br />

10 Health Super (F) -do- 25<br />

11 Sister 6500-10500 3<br />

12 Staff Nurse 5500-9000 119<br />

13 Lab. Technician 4500-7000 20<br />

14 X-ray Technician -do- 30<br />

15 Pharmacist -do- 34<br />

16 LDC 4000-6000 15<br />

17 Health Worker (M) 4500-7000 36<br />

18 Health Worker (F) -do- 45<br />

19 Microscopist 3050-4000 24<br />

20 Driver -do- 34<br />

21 Female Attendant 2650-4000 40<br />

22 Wardboy -do- 42<br />

23 Sweeper -do- 45<br />

24 Mali -do- 28<br />

25 Bhisty -do- 33<br />

26 Peon -do- 33<br />

27 Cook -do- 38<br />

28 A.C. Operator 4000-6000 2<br />

Total 738 19<br />

B. Hospital & Dispensaries :<br />

Rs. 327.99 lakh is provided under this programmes for the following –<br />

(a) Hospitals (DHS): (Rs. in lakh)<br />

i) Salary - 300.00<br />

ii) Wages - 1.00<br />

iii) Medical Treatment - 10.00<br />

iv) T.E. - 5.00<br />

v) O.E. - 10.00<br />

vi) O.C. - 1.99<br />

vii) Hospital expenses -<br />

viii) M & S -<br />

ix) M & E -<br />

x) Minor Work (Deptt) -<br />

xi) Major works (PWD) -<br />

Total (1) - 327.99<br />

(b) Staff : Rs. 300.00 lakh is approved for entertainment of post already created and<br />

other essential posts to be created.<br />

Sl. No. Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

No. of Posts<br />

already approved<br />

1 Consultant 12000-16500 2 4<br />

2 Dy. Medl. Supdt. -do- 1<br />

3 Sr. Specialist (Ortho.) 10000-15200 1<br />

4 Sr. Specialist (Surgery) -do- 1<br />

5 Sr. Specialist (Medicine) -do- 1


- 376 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl. No. Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

No. of Posts<br />

already approved<br />

6 Sr. Specialist (Eye) -do- 1<br />

7 Sr. Specialist (Psychiatrist -do- 1 -<br />

8 -do- Dermotologist -do- 1<br />

9 '-do- Pathologist -do- 1<br />

10 '-do- ENT -do- 1<br />

11 '-do- Cardiologist -do-<br />

12 -do- Gynae. -do- 1<br />

13. -do- Microbiologist -do-<br />

13 Cyto Technologist -do- 1<br />

14 Spl. Gyneacologist -do- 1<br />

15 Spl. Radiotherapist -do- 1<br />

16 Spl. Dermatologist -do- 1 1<br />

17 Spl. Psychiatrist -do- 1 1<br />

18 Spl. Pathologist -do- 3 1<br />

19 Spl. Bio-Chemist -do- 1<br />

20 Spl. Aneasthetist -do- 2<br />

21 Spl. Microbilogist -do- 1 1<br />

22 Spl. Orthosurgeon -do- 1<br />

23 Spl. General Surgeon -do- 1<br />

24 Spl. Forensic Specialist -do- 1<br />

25 Spl. ENT -do- 1<br />

26 Spl. Opthalmologist -do- 1<br />

27 Blood Bank Officer -do- 1<br />

28 Sr. Casualty Officer -do- 1<br />

29 Sr. B.D.S -do- 1 1<br />

30 Sr. Med. Recod Officer -do- 1<br />

31 MRO 8000-13500<br />

32 Dental Surgeon -do- 10 2<br />

33 M & HO -do- 6 5<br />

34 Nursing Supdt. -do- 1<br />

35 X-ray Technologist -do- 1 1<br />

36 Asstt. Nursing Supdt. 6500-10500 6<br />

37 Ward Supdt. -do- 12<br />

38 Dy.Med.Record Officer 5500-9000 1 1<br />

39 Staff Nurse -do- 94 30<br />

40 Staff Nurse (Contract) 4000/- Fixed. 65<br />

41 Sr. X-ray Tech. 5500-9000 2 1<br />

42 Sr. Lab. Tech. -do- 2 1<br />

43 Sr. CSSD Tech. -do- 1<br />

44 Sr. Cyto. Tech. -do- 1<br />

45 Sr. ECG Tech. -do- 1<br />

46 Sr. Orthotist/Prosth.Tech. -do- 1<br />

47 Sr. Ophth. Tech. -do- 1<br />

48 Computer Operator -do- 3<br />

49 U.D.C. 5000-8000 3<br />

50 X-ray Tech. 4500-7000 6<br />

51 Lab. Tech. -do- 8<br />

52 Cyto. Technician -do- 1 1<br />

53 Electrician -do- 3


- 377 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl. No. Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

No. of Posts<br />

already approved<br />

54 S.I. of Stats. -do- 4 1<br />

55 Pharmacist -do- 5 1<br />

56 Receptionist -do- 1<br />

57 A.C. Technician -do- 2 1<br />

58 Medl.Record Tech. -do- 6<br />

59 Pros /Ortho Tech -do- 2<br />

60 Medl. Record Asstt. 4000-6000 3<br />

61 Occupuncturist -do- 6<br />

62 LDC -do- 6<br />

63 Driver, Gr. II -do- 6<br />

64 Multi. Rehab Tech. -do-<br />

65 ECG Technician -do- 2<br />

66 Driver, 3050-5000 12<br />

67 Carpenter -do- 1<br />

68 Dark Room Asstt. -do- 3<br />

69 Barber -do- 4<br />

70 Tailor -do- 3<br />

71 Female Attendant -do- 51<br />

72 Ward boy -do- 52<br />

73 Sweeper -do- 50<br />

74 Mali -do- 18<br />

75 Cook -do- 20<br />

76 Bhisty -do- 18<br />

77 Peon -do- 20<br />

78 Guard -do- -<br />

79 CSSD Technician 4500-7000 1<br />

80 Laundry Supervisor -do- 1<br />

81 Laundry Operator 4000-6000 1<br />

Total 546 81<br />

C. MER & T:<br />

Training (DHS): (Rs. in lakh)<br />

i) T.E. - 5.00<br />

ii) O.E. - 5.00<br />

Total - 10.00<br />

1. Indian System of Medicine & Homeopathy (ISM & H) :<br />

Rs. 3.50 lakh is approved under this programme for the following –<br />

(a) Homeopathy (DHS):<br />

i) Salary - 0.50<br />

ii) T.E. - 1.00<br />

iii) O.E. - 1.00<br />

iv) M & S - 1.00<br />

Total - 3.50


- 378 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Post already created to be continue –<br />

Sl. No. Name of posts Scale of pay<br />

No. post of<br />

already created<br />

Post to be<br />

created<br />

1 B.H.M.S. / B.A.M.S. 8000-12500 5<br />

2 IV-Grade 2650-4000 2<br />

Sl.<br />

No.<br />

2. Control of Communicable Disases :<br />

i) National Malaria Eradication Programme (NMEP) - DHS :<br />

Rs. 265.81 lakh is provided for the following – (Rs. in lakh)<br />

i) Salary - 230.00<br />

ii) Wages - 0.01<br />

iii) T.E. - 20.00<br />

iv) M & E. - 5.60<br />

v) M & S - 0.10<br />

vi) O.E. - 10.00<br />

Total - 265.81<br />

Entertainment of posts already created to be continued are :<br />

Name of Posts Scales of pay<br />

No. of posts No. of post<br />

Already created Already approved<br />

1 Jt. Director ( Malaria) 12000-16500<br />

2 Dy. Director ( Malaria) 10000-15200 1<br />

3 Entomologist 8000-13500 1<br />

4 (Special Officer) -do- 1<br />

5 DMO 5000-8000 3 8<br />

6 Lab. Technician 4500-7000 2 10<br />

7 UDC -do- 3 5<br />

8 Health Worker (M) -do- 124<br />

9 Driver Gr. I -do- 2<br />

10 LDC 4000-6000 3 5<br />

11 Store Keeper -do- 1<br />

12 Microscopist -do- 16<br />

13 Sr. Malaria Inspector -do- 3<br />

14 Malaria Inspector -do- 6 2<br />

15 M.T. Mechanic -do- 1 1<br />

16 Insect Collector -do- 2<br />

17 Driver Gr. II -do- 3<br />

18 Driver 3050-4590 5<br />

19 Van Cleaner 2650-4000 4<br />

20 Sweeper -do- 1<br />

21 Peon -do- 5 4<br />

22 Chowkider -do- 4 4<br />

TOTAL 185 46<br />

ii) T.B. Control Programme:<br />

DHS i) Salary Rs. 30.50 lakh<br />

ii) Medical Treatment Rs. 3.00 lakh<br />

iii) T.E. Rs. 0.50 lakh<br />

iv) O.E. Rs. 1.00 lakh<br />

v) M & S Rs. 1.00 lakh<br />

Total Rs. 36.00 lakh


- 379 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Entertainment of posts already created to be continued are :-<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

Already<br />

created<br />

Already<br />

approved<br />

1 2 3 4 5<br />

1 State. T.B. Officer 12000-16500<br />

2 Dist. T.B. Officer 10000-15200 2<br />

3 M & HO 8000-13500 2<br />

4 I.E.C. Officer 8000-13500<br />

5 Sr. Accountant 6500-10500<br />

6 Assistant 5500-9000<br />

7 Data Entry Operator 5000-8000<br />

8 Staff Nurse 5500-9000 2 1<br />

9 U.D.C. 5000-8000 2<br />

10 Treatment Organise 5000-8000 2<br />

11 Lab. Technician 4500-7000 3 1<br />

12 X-Ray Technician -do- 2 1<br />

13 ECG Technician -do- 2<br />

14 LDC 4000-6000 2<br />

15 Driver Gr. II 4000-6000 2<br />

16 Lab. Assistant 3200-4900 1 1<br />

17 Technical Asstt. 4500-7000 2<br />

18 Peon 2650-4000 2<br />

TOTAL 26 4<br />

As per letter of understanding maintenance for the state TB Cell with staffing and<br />

resources as per the guidelines issued by the Govt. of India and assigned an officer of State<br />

Health System in the rank of Joint Director or above as full time State TB Officer to head of<br />

the State TB Cell.<br />

Therefore, to ensure that adequate staffing support in the State TB Cell, creation of<br />

various posts are proposed. Sufficient funds are to be made available in the Plan.<br />

iii) SEXUALY TRANSMITED DISEASE (STD) :<br />

Rs. 11.00 lakh is approved for the following:-<br />

DHS:<br />

i) Salary of Staff Rs. 2.00 Lakh<br />

ii) T.E. Rs. 1.00 Lakh<br />

iii) O.E. Rs. 0.50 Lakh<br />

iv) O.C. Rs. 0.50 Lakh<br />

Total of (a): Rs. 4.00 Lakh<br />

Entertainment of posts already created to be continued are :-<br />

Sl. No. Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

1. M & HO 8000-13500 1<br />

2. Staff Nurse 5500-9000 2<br />

3. L.D.C. 4000-6000 1<br />

4. Peon 2650-4000 1<br />

5. Sweeper -do- 1<br />

TOTAL : 6


- 380 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

iv) Epidemic Control (DHS) :<br />

Rs. 7.10 lakh is approved for the following –<br />

i) Salary Rs. 0.10 Lakh<br />

ii) Medicines & Supplies Rs. 2.00 Lakh<br />

iii) Office Expenses Rs. 5.00 Lakh<br />

Total : Rs. 7.10 Lakh<br />

v) National Leprosy Control Programme (a) DHS:<br />

i) Salary Rs. 45.00 Lakh<br />

ii) Medical Treatment Rs. 26.10 Lakh<br />

ii) Traveling Expenses Rs. 2.00 Lakh<br />

iii) Office Expenses Rs. 2.00 Lakh<br />

Total : Rs. 65.10 Lakh<br />

Sl. No. Name of posts Scale of pay No. of post<br />

1 DLO 10000-15200 1<br />

2 SMO -do- 1<br />

3 M & HO 8000-13500 2<br />

4 I .S. 5500-9000 2<br />

5 UDC 5000-8000 3<br />

6 Sr. Lab Tech. 5000-9000 2<br />

7 Sr, NMS -do- 1<br />

8 Sr. H.E. -do- 1<br />

9 Sr. PMO -do- 4<br />

10 PMO 4500-7000 10<br />

11 NMS 5000-8000 2<br />

12 Lab. Tech. 4500-7000 1<br />

13 S.I.S. 4000-6000 1<br />

14 LDC -do- 3<br />

15 Driver 2650-4000 4<br />

16 Sweeper -do- 1<br />

17 IV Grade -do- 3<br />

18 Peon -do- 2<br />

19 Helper -do- 2<br />

Total 46<br />

3. NON-COMMUNICABLE DISEASES :<br />

1) Cancer Research & Treatment Programme (a) DHS:<br />

i) Salary Rs. 12.00 lakh<br />

ii) Medical Treatment Rs. 2.00 lakh<br />

iii) T.E. Rs. 1.00 lakh<br />

iv) O.E. Rs. 2.00 lakh<br />

v) M & E Rs. 1.00 lakh<br />

vi) M & S Rs. 5.00 lakh<br />

vii) O.C. Rs. 1.00 lakh<br />

TOTAL Rs. 24.00 lakh


- 381 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Entertainment of Posts already created are :-<br />

Sl. No. Name of posts Scale of pay<br />

Already<br />

created<br />

Already<br />

approved<br />

1. Physician 10000-15200 1<br />

2. Surgeon -do- 1<br />

3. ENT Specialist -do- - 1<br />

4. Paediatrician -do- 1<br />

5. Dermatologist -do- 1<br />

6. Pathologist -do- 1<br />

7. Gynaecologist -do- 1<br />

8. M & HO 8000-15200 5<br />

9. Staff Nurse 5500-9000 10<br />

10. Assistant -do-<br />

11 Comp. Operator -do- 2<br />

12. Sweeper 2650-4000 2<br />

Total 18 3<br />

2) Cobalt Therapy Unit, Zemabawk (DHS):<br />

i) Salary Rs. 5.00 lakh<br />

ii) Medical Treatment Rs. 5.02 lakh<br />

iii) Wages Rs. 0.02 lakh<br />

iv) T.E. Rs. 0.02 lakh<br />

v) O.E.<br />

vi) M & E<br />

Rs. 0.02 lakh<br />

vii) M & S<br />

viii) Minor Works (deptt.)<br />

Rs. 0.02 lakh<br />

Total Rs. 10.10 lakh<br />

Entertainment of post already created are<br />

Sl.<br />

No.<br />

Name of posts Scale of pay<br />

Already<br />

created<br />

Already<br />

approved<br />

1 Radiotherapist 10000-15200 1<br />

2 Medl.Physicist 8000-13500 1<br />

3 Medical Officer -do- 2<br />

4 Radiotherapist Tech. 5500-9000 3<br />

5 X-ray Tech. 4500-7000 1<br />

6 Lab.Technician -do- - 1<br />

7 Driver 3050-5000 2<br />

8 Sweeper/Ward boy 2650-4000 -<br />

9 Guard -do- -<br />

10 Female Attendant -do- 2<br />

11 IV Grade -do- 2<br />

TOTAL 14 1


- 382 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

4. OTHER PROGRAMME:<br />

1) Directions (DHS): (Rs. in lakh)<br />

i) Salary - 32.00<br />

ii) Wages - 1.00<br />

iii) Medical Treatment - 3.00<br />

iv) T.E. - 15.00<br />

v) O.E. (Including I.T.) - 20.00<br />

vi) O.C. - 34.00<br />

vii) H.E. - 5.00<br />

viii) Minor Work (Deptt.) - 16.00<br />

Total - 126.00<br />

Entertainment of posts already created to be continued and to be created are: -<br />

Sl. No. Name of Posts Scale of pay already<br />

created<br />

1 Principal Director 16400-20900<br />

2 Jt.DHS (Plan) 12000-16500 1<br />

No. of posts<br />

Already<br />

approved<br />

3 Jt. Director (N) -do- 1<br />

4 Dy. DHS (SH) 10000-15200<br />

5 DD (Admn) -do- 1<br />

6 Executive Engineer -do- 1<br />

7 Sr. Research Officer -do- 1<br />

8 Assistant Engineer 8000-13500<br />

9 Junior Engineer 5500-9000 1<br />

10 Inspector of Stats. -do- 2<br />

11 Computer Operator -do- 1<br />

12 Vehicle Supervisor -do-<br />

13 Steno Grade III 5000-8000 4<br />

14 Motor Mechanic 4000-6000 1<br />

15 Despatch Rider 3050-4590<br />

16 Duftry -do- 2<br />

17 Driver -do-<br />

Total 14 2<br />

2) District & Sub-Division Administration :-<br />

Rs. 152.50 lakh is approved for the following :-<br />

i) Salary Rs. 99.50 Lakh<br />

ii) Medical Treatment Rs. 5.00 Lakh<br />

iii) T.E Rs. 10.00 Lakh<br />

iv) O.E (including I.T.) Rs. 20.00 Lakh<br />

v) O.C Rs. 10.00 Lakh<br />

vi) Minor works (deptt.) Rs. 8.00 Lakh<br />

TOTAL Rs.152.50 Lakh


Sl. No.<br />

- 383 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Entertainment of posts already created to be continue and to be created are –<br />

Name of Posts<br />

Scale of Pay<br />

No. of Posts<br />

already created<br />

No. of Posts<br />

already approved<br />

1 C.M.O. 10000-15200 6 4<br />

2 S.M.O. -do- 2 7<br />

3 Supdt.Pharmacist 6500-10500 4<br />

4 Head Assistant 5500-9000 1<br />

5 Inspector of Stats. -do- 2<br />

6 U.D.C. 5000-8000 17<br />

7 Steno G. III -do- 2<br />

8 Driver Gr. I -do- 1<br />

9 S.I. of Stats. 4500-7000 2<br />

10 LDC 4000-6000 17<br />

11 Driver Gr. II -do- 3<br />

12 Peon 2650-4000 4<br />

13 Chowkider -do- 5<br />

14 Sweeper -do- 9<br />

15 SPHNO -do- -<br />

16 Driver -do- -<br />

TOTAL 75 11<br />

3) Public Health Education (DHS) :<br />

Rs. 22.00 lakh is approved for the following :-<br />

i) Salary Rs. 7.80 Lakh<br />

ii) T.E. Rs. 3.00 Lakh<br />

iii) O.E. Rs. 3.00 Lakh<br />

iv) M & E Rs. 0.50 Lakh<br />

v) Advertisement Rs. 2.70 Lakh<br />

vi) Public Rs. 5.00 Lakh<br />

TOTAL Rs. 22.00 Lakh<br />

Entertainment of post already created to be continued are :-<br />

Sl. No. Name of Posts Scale of Pay No. of Posts<br />

1 U.D.C. 5000-8000 1<br />

2 L.D.C. 4000-6000 1<br />

3 Projectionist -do- 4<br />

4 Peon 2650-4000 2<br />

4) School Health Programme (DHS) :<br />

Rs. 17.50 lakh is provided for the following :-<br />

TOTAL 8<br />

i) Salary Rs. 7.20 lakh<br />

ii) T.E. Rs. 0.01 lakh<br />

iii) O.E. Rs. 4.00 lakh<br />

iv) M & E Rs. 1.29 lakh<br />

iv) M & S Rs. 5.00 lakh<br />

TOTAL Rs. 17.50 lakh


- 384 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Entertainment of posts already created to be continued under School Health<br />

Programme :<br />

Sl. No. Name of Posts Scale of pay No. of post<br />

1 Assistant 5500-9000 1<br />

2 U.D.C 5000-8000 1<br />

3 L.D.C 4000-6000 1<br />

4 Driver 3050-4500 1<br />

5 IV Grade 2650-4000 1<br />

5) Drugs Control (DHS):<br />

Rs. 40.00 lakh is provided for the following :-<br />

TOTAL 5<br />

i) Salary Rs. 31.0 Lakh<br />

ii) Medical Treatment Rs. 4.00 Lakh<br />

iii) T.E. Rs. 0.10 Lakh<br />

iv) O.E. Rs. 2.00 Lakh<br />

v) O.C. Rs. 2.00 Lakh<br />

TOTAL Rs. 40.00 Lakh<br />

Entertainment of posts already created to be continued and to be created are :-<br />

Sl. No. Name of posts Scale of pay<br />

No. of Post<br />

already created<br />

No. of post<br />

already approved<br />

1. Dy. Drugs Controller 12000-16500 - 1<br />

2. Asstt. Drugs Controller 10000-15200 1<br />

3. Drugs Inspector 8000-13200 11<br />

4. Grade IV 2650-4000 -<br />

TOTAL 12 1<br />

6) Medical Store Depot :<br />

Rs. 178.80 lakh is approved for the following :-<br />

i) Salary Rs. 20.00 Lakh<br />

ii) Medical Treatment Rs. 2.80 Lakh<br />

iii) T.E. Rs. 2.00 Lakh<br />

iv) O.E. Rs. 2.00 Lakh<br />

v) O.C. Rs. 2.00 Lakh<br />

vi) M & E Rs. 20.00 Lakh<br />

vii) M & S Rs. 120.00 Lakh<br />

viii) Minor Work (deptt.) Rs. 10.00 Lakh<br />

TOTAL Rs. 178.80 Lakh


- 385 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Entertainment of posts already created are :-<br />

Sl. No. Name of posts Scale of pay<br />

No. of post<br />

already created<br />

1 2 3 4<br />

1 Supdt. Pharmacist 6500-10500 1<br />

2 Pharmacist 5000-8000 2<br />

3 L.D.C. 4000-6000 3<br />

4 Packer 2650-4000 10<br />

5 IV Grade -do- 7<br />

TOTAL 23<br />

7) Mental Health Programme (DHME): Rs. 0.10 lakh is approved for the following :<br />

i) Salary Rs. 0.02 Lakh<br />

ii) T.E. Rs. 0.01 Lakh<br />

iii) O.E. Rs. 0.01 Lakh<br />

iv) O.C. Rs. 0.01 Lakh<br />

v) M & S Rs. 0.01 Lakh<br />

vi) MV Rs. 0.01 Lakh<br />

vii) M & E Rs. 0.01 Lakh<br />

viii) Rent Rs. 0.01 Lakh<br />

ix) Major Works (PWD) Rs. 0.01 Lakh<br />

Total Rs. 0.10 Lakh<br />

For implementation of Mental Health Programme, the following posts were approved<br />

to be created:<br />

Sl. No. Name of posts Scale of pay To be created<br />

1 Medl. Supdt. (INHUBAS) 12000-16500<br />

2 Psychiatrist 10000-15200<br />

3 M & HO 8000-12500<br />

4 Clinical Psychologist -do-<br />

5 Asstt. Nursing Supdt. 6500-10500<br />

6 Ward Sudpt. -do-<br />

7 Staff Nurse 5500-9000<br />

8 Medical Record Tech. 4500-7000<br />

9 Lab. Tech. -do-<br />

10 LDC cum Typist 4000-6000<br />

11 Driver 3050-5000<br />

12 Female Attandant 2650-4000<br />

13 Male Attandant 2650-4000<br />

14 Guard -do-<br />

15 Sweeper -do-<br />

16 Guard -do-<br />

Total<br />

8) National Goitre Control Programme (NGCP) DHS :<br />

Rs. 3.50 lakh is approved for the following :-<br />

i) Salary Rs. 0.01 Lakh<br />

ii) O.E. Rs. 2.00 lakh<br />

iii) T.E. Rs. 1.49 lakh<br />

Total Rs. 3.50 lakh


- 386 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Entertainment of one post of Lab. Tech. already created and to be continued.<br />

9) Public Health Laboratory (DHS):<br />

Rs. 1.00 lakh is provided for the following :-<br />

i) O.E. Rs. 0.50 lakh<br />

ii) O.C. Rs. 0.50 lakh<br />

Total Rs. 1.00 lakh<br />

10) National Programme for Control of Blindness (NPCB):<br />

i) Salary Rs. 9.00 lakh<br />

ii) T.E. Rs. 1.00 lakh<br />

iii) O.E. Rs. 1.00 lakh<br />

Total Rs. 11.00 lakh<br />

Entertainment of posts already created are as listed below –<br />

Sl. No. Name of post Scale of pay No. of post<br />

1 Dy. Director (BLN) 10000-15200 1<br />

2 Inpsector of Stat. 5500-9000 1<br />

3 Ophth. Asstt. 4500-7000 3<br />

4 LDC 4000-6000 1<br />

5 IV Grade 2650-4000 1<br />

Total 7<br />

11) Baffacos (DHS):<br />

Rs. 115.00 lakh is approved for the following: – (Rs. in lakh)<br />

i) Wages - 0.10<br />

ii) T.E. - 5.00<br />

iii) O.E. - 36.90<br />

iv) M & S - 25.00<br />

v) M & E - 15.00<br />

vi) O.C. - 30.00<br />

vii) Adv. - 3.00<br />

Total - 115.00<br />

12) I.D.S.P.: (Rs. in lakh)<br />

i) O.C. - 6.30<br />

13) Nursing Council (DHS) Rs. 6.00 lakh is approved in the form of G.I.A.<br />

14) Pharmacy Council (DHS): Rs. 3.00 lakh is approved in the form of G.I.A.<br />

15) Blood Transfusion Council (DHS)<br />

16) <strong>Mizoram</strong> Medical Council<br />

Rs. 2.00 lakh is approved in the form of G.I.A.


- 387 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

H. Family Welfare Programme :<br />

This programme has been taken up under Central Sponsored Scheme (C.S.S.) and<br />

discontinued by the Government of India wherefore it was directed that the following<br />

programmes should be taken up by State Government. As such amount of Rs. 1205.80 lakh<br />

is approved for continuation under Plan as follows –<br />

1) Rural Family Welfare Services (RFWS) –<br />

(a) DHS:<br />

i) Salary - Rs. 43.00 lakh<br />

ii) MT - Rs. 2.00 lakh<br />

iii) T.E. - Rs. 3.00 lakh<br />

iv) O.E. - Rs. 2.00 lakh<br />

Total - Rs. 50.00 lakh<br />

Entertainment of post already created to be continued are –<br />

Sl. No. Name of post Scale of pay No. of post<br />

1 M & HO 8000-13500 14<br />

2 Health Supervisor (F) 5000-8000 14<br />

3 U.D.C. -do- 7<br />

4 Extension Educator. 4500-7000 14<br />

5 V.W. -do- 14<br />

6 S.I.S. -do- 7<br />

Total 70<br />

2) P.P. Unit (Sub-Division) :<br />

(a) DHS<br />

i) Salary - Rs. 21.00 lakh<br />

ii) M.T. - Rs. 1.00 lakh<br />

iii) T.E. - Rs. 0.50 lakh<br />

iv) O.E. - Rs. 1.50 lakh<br />

Total - Rs. 24.00 lakh<br />

Entertainment of posts to be continued are -<br />

Sl. No. Name of post Scale of pay No. of post<br />

1 Spl. Paed. 10000-15200 1<br />

2 Spl. Gynea. -do- 3<br />

3 Paediatrician -do- 2<br />

4 O.T. Nurse 5500-9000 3<br />

5 LHV (H/S) 5000-8000 3<br />

6 Lab Tech. 4500-7000 3<br />

7 H.W. (M) -do- 3<br />

8 U.D.C. 5000-8000 3<br />

9 Driver 3050-4950 3<br />

10 O.T. Attendant 2650-4000 3<br />

Total 27


- 388 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3) P.P. Unit (District ) :<br />

(a) DHS:<br />

i) Salary - Rs. 14.00 lakh<br />

ii) M.T. - Rs. 1.00 lakh<br />

ii) T.E. - Rs. 1.00 lakh<br />

iii) O.E. - Rs. 1.00 lakh<br />

Total - Rs. 17.00 lakh<br />

Entertainment of posts to be continued are -<br />

Sl. No. Name of post Scale of pay No. of post<br />

1 M & HO 8000-13500 4<br />

2 Sister 6500-10500 2<br />

3 P.H.N. 5500-9000 2<br />

4 UDC 5000-8000 2<br />

5 H/W (M) 4500-7000 2<br />

Total 12


Head of Development<br />

A. Rural Health Services<br />

- 393 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HOSPITAL & MEDICAL EDUCATION<br />

Works<br />

PWD Deptt.<br />

(Rs. in lakh)<br />

Salary Others Total<br />

PHC (b) DHME - - 318.00 50.50 368.50<br />

B. (1) Hospital & Dispensary (b) DHME - 22.44 388.00 191.56 602.00<br />

(2) Referrral Hospital/NLPF(DHME) - - - 0.10 0.10<br />

(3) I.C.U. at C.H. Aizawl (DHME) - 0.05 - 0.05 0.10<br />

(4) State Hospital (DHME) - 0.01 0.02 0.07 0.10<br />

(5) Tele-medicine (DHME) - - - 1.00 1.00<br />

C. MER & T<br />

(1) Medical Education (DHME) - - - 147.00 147.00<br />

(2) Research (DHME) - - - 5.00 5.00<br />

(3) Training DHME - - - 2.00 2.00<br />

(4) Nursing School, Lunglei (DHME) 0.50 - 32.00 28.10 60.60<br />

(5) College of Nursing (DHME) - - - 1.00 1.00<br />

D. ISM & H : DHME - - 4.00 - 4.00<br />

E. Control of communicable diseases<br />

(1) NMEP DHME - - 9.00 2.00 11.00<br />

(2) T.B. Control Prog.: DHME - - 8.00 1.00 9.00<br />

(3) STD: DHME - - 6.00 2.00 8.00<br />

(5) NLCP DHME - - 7.00 2.00 9.00<br />

F. Non-Communicable Diseases<br />

(1) Cancer Research & Trg. Prog (DHME) - 1.00 30.00 31.00 62.00<br />

(2) Cobalt Therapy Unit (DHME) - 1.00 15.00 14.00 30.00<br />

(3) Non-communicable disease: (DHME) - - - 1.00 1.00<br />

(4) Disaster Management: (DHME) - - - 1.00 1.00<br />

(5) Bio-Medical waste: (DHME) - - - 3.00 3.00<br />

G. Other Programmes:<br />

(1) Direction: DHME - 2.50 0.01 11.49 14.00<br />

(2) Administration: DHME - 5.00 15.20 24.30 44.50<br />

(3) Medical Store Depot: DHME - - 1.00 158.00 159.00<br />

(4) Mental Health Prog.: DHME 0.01 - 0.02 0.07 0.10<br />

(5) NPCB: (a) DHME - - 5.00 1.00 6.00<br />

H. Family Welfare Programme:<br />

(1) Rural Family Welfare Services - - 25.00 7.00 32.00<br />

(2) P.P. Unit (Sub-Div.): DHME - - 7.00 2.00 9.00<br />

(3) P.P. Unit (District): DHME - - 8.00 2.00 10.00<br />

TOTAL (A-H) 0.51 32.00 878.25 689.24 1600.00<br />

N.B. Revenue outlay: 1,567.49<br />

Capital outlay: 32.51<br />

TOTAL 1,600.00


- 394 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ITEMWISE DESCRIPTIONS OF THE SCHEMES<br />

A. Rural Health Schemes:<br />

Rs. 368.50 lakh is provided for the following: –<br />

PHC : DHME (Rs. in lakh)<br />

i) Salary - 318.00<br />

ii) Wages - 0.50<br />

iii) Medical Treatment - 25.00<br />

iii) T.E. - 10.00<br />

iv) O.E. - 10.00<br />

v) O.C. - 5.00<br />

Total - 368.50<br />

Entertainment of post already created ad creation of other essential posts during<br />

2005-06 are as follows: –<br />

Sl. No. Name of posts Scale of pay<br />

No. of<br />

post<br />

already<br />

created<br />

No. of<br />

posts<br />

already<br />

approved<br />

No. of<br />

posts to<br />

be<br />

created<br />

1 2 3 4 5<br />

1 Specialist 10000-16500 3 17<br />

2 M & HO 8000-13500 22<br />

3 Dental Surgeon -do- 3<br />

4. Asstt. Nursing Supdt. 6500-10500 1<br />

5. Ward Supdt. -do- 1<br />

6 Staff Nurse 5500-9000 47 65<br />

7 C.H.O. 5000-8000 1<br />

8 Health Supervisor (M) -do- 1<br />

9 Pharmacist 4500-7000 2<br />

10 Health Worker (F) -do- 1<br />

11 LDC 4500-7000 3 10<br />

12 Lab. Technician -do- 6 4<br />

13 X-Ray Technician -do- 11<br />

14 A.C. Operator 4000-6000 2<br />

15 Microscopist 3050-5000 4<br />

16 Peon 2650-4000 24 10<br />

17 Ward Boy -do- 3 4<br />

18 Mali -do- 4 4<br />

19 Bhisty -do- 3 4<br />

20 Sweeper -do- 5 4<br />

21 F.A. -do- 10 4<br />

22 Cook -do- 1 4<br />

23 Driver -do- 7 4<br />

Total 165 134


- 395 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

B. 1) Hospital & Dispensaries:<br />

Rs. 602.00 lakh is provided under this programme for the following: –<br />

Hospitals (DHME): (Rs. in lakh)<br />

i) Salary - 388.00<br />

ii) Wages - 12.00<br />

iii) Medical Treatment - 30.00<br />

iv) T.E. - 20.00<br />

v) O.E. - 30.00<br />

vi) Publication - 5.00<br />

vii) Hospital expenses - 1.00<br />

viii) M & S - 11.00<br />

ix) M & E - 30.00<br />

x) O.C. - 50.00<br />

xi) Advertisement - 0.56<br />

xii) Major works (PWD) -<br />

xiii) Minor works (Deptt.) - 22.4<br />

xiv) M.V. - 2.00<br />

Total (1) - 602.00<br />

(b) Continuing Schemes :<br />

i) Construction / Repair/ Renovation etc. of - 22.44<br />

Hospitals / Staff Quarters (Deptt.)<br />

(c) Staff: Rs. 388.00 lakh is approved for entertainment of post already created<br />

and other essential posts to be created.<br />

Sl. No. Name of posts Scale of pay<br />

No. of post<br />

already created<br />

No. of posts to<br />

be created<br />

1 2 3 4 5<br />

1 Sr. Specialist 10000-16500 4 -<br />

2 Specialist -do- 5 30<br />

3 Sr. BDS -do- 1 -<br />

4. Medical Officer 8000-13500 7 8<br />

5. Dental Surgeon -do- 11 5<br />

6 Nursing Supdt. -do- 1 6<br />

7 Asstt. Nursing Supdt. 6500-10500 2 1<br />

8 Ward Supdt. -do- 4 12<br />

9 Staff Nurse 5500-9000 50 90<br />

10 Sr. X-Ray Technician -do- 1 -<br />

11 Pharmacist 5000-8000 3 4<br />

12 X-Ray Technician 4500-7000 2 9<br />

13 Lab. Technician -do- 3 10<br />

14 Electrician -do- 1 -<br />

15 S.I. of Statistic -do- 3 -<br />

16 Receptionist -do- 1 -<br />

17 M.R.T. -do- 5 6<br />

18 Pros/Ortho Tech. -do- 2 -<br />

19 Dietician -do- - 6<br />

20 Ophthalmic Assistant -do- - 6<br />

21 CSSD Technician -do- - 6<br />

22 ECG Technician -do- 2 6<br />

23 Health Educator -do- - 2


- 396 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

24 Projectionist 5000-8000 - 3<br />

25 Occupuncturist 4500-7000 2 -<br />

26 MRA 4000-7000 3 -<br />

27 Driver 4000-7000 6 4<br />

28 Lab. Assistant 3200-4900 - 11<br />

29. Tailor 3050-5000 2 -<br />

30. Barber -do- 3 -<br />

31. Dark room Asst. -do- 2 -<br />

32. IV Grade 2650-4000 18 10<br />

33. F.A. -do- 16 15<br />

34. Ward Boy -do- 3 15<br />

35. Sweeper -do- 25 15<br />

36. Cook -do- 7 15<br />

37. LDC 4000-7000 1 7<br />

38. UDC 5000-8000 - 7<br />

TOTAL 196 309<br />

2) Referral Hospital / NLPF (DHME): (Rs. in lakh)<br />

i) M & S - 0.05<br />

ii) M & E - 0.05<br />

Total - 0.10<br />

3) I.C.U. at Civil Hospital, Aizawl (DHME): (Rs. in lakh)<br />

i) M & E - 0.05<br />

ii) Minor works - 0.05<br />

Total - 0.10<br />

4) State Hospitals :<br />

i) Salary - 0.02<br />

ii) Wages - 0.01<br />

iii) T.E. - 0.01<br />

iv) O.E. - 0.01<br />

v) O.C. - 0.01<br />

vi) M & S - 0.01<br />

vii) M & E - 0.01<br />

viii Minor Work (Deptt) - 0.01<br />

ix) Major works (PWD) - 0.01<br />

Total - 0.10<br />

5) Tele-Medicine: (Rs. in lakh)<br />

i) O.E. - 1.00<br />

Total - 1.00<br />

C. MER & T:<br />

Under this programme, Rs. 21.60 lakh is approved for the followings: –<br />

1) Medical Education (DHME): (Rs. in lakh)<br />

i) O.E. - 1.00<br />

ii) O.C. - 1.00<br />

iii) Scho/Stipend/Pro-rata - 145.00<br />

Total - 147.00


- 397 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2) Research (DHME): (Rs. in lakh)<br />

i) T.E. - 1.00<br />

ii) O.E. - 1.00<br />

iii) O.C. - 0.50<br />

iv) M.V. - 2.50<br />

Total - 5.00<br />

3) Training (DHME): (Rs. in lakh)<br />

i) T.E. - 1.00<br />

ii) O.C. - 1.00<br />

Total - 2.00<br />

4) Nursing School, Lunglei (DHME): (Rs. in lakh)<br />

i) Salary - 32.00<br />

ii) Medical Treatment - 5.00<br />

iii) T.E. - 3.00<br />

iv) O.E. - 5.00<br />

v) Rent - 2.60<br />

vi) Stipend - 9.50<br />

vii) O.C. - 2.00<br />

viii) M & E - 1.00<br />

ix) Major Work (PWD) Constn. of Nursing School & Hostel - 0.50<br />

Total - 60.60<br />

Sl. No. Name of posts Scale of pay No. of existing posts<br />

1 Principal 8000-13500 1<br />

2 Tutor 6500-10500 5<br />

3 Librarian 5500-9000 1<br />

4 UDC 5000-8000 1<br />

5 Steno Gr. III -do- 1<br />

6 LDC 4500-7000 1<br />

7 Drivers 3000-4590 2<br />

8 IV Grade 2650-4000 11<br />

Total 23<br />

5) College of Nursing (DHME): (Rs. in lakh)<br />

i) Salary - 0.20<br />

ii) O.E. - 0.30<br />

iii) S/S - 0.50<br />

Total - 1.00<br />

Posts to be created:<br />

Sl. No. Name of post Scale of pay To be created<br />

1. Principal 12000-16500 1<br />

2. Professor 10000-15200 5<br />

3. Lecturer 8000-13500 8<br />

4. Demonstrator 6500-10500 16<br />

5. Librarian 5500-9000 1<br />

6. Lab. Attendant 2650-4000 1<br />

7. Warden 5500-9000 1<br />

8. House Keeper 5000-8000 1<br />

9. Cook 2650-4000 2


- 398 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

10. Peon 2650-4000 2<br />

11. Sweeper 2650-4000 2<br />

12. Chowkidar 2650-4000 2<br />

13. Superintendent 8000-13500 1<br />

14. Assistant 5500-9000 2<br />

15. UDC 5000-8000 3<br />

16. LDC 4000-6000 5<br />

17. PA to Principal 5000-8000 1<br />

18. Computer Operator 5500-9000 1<br />

19. Peon 2650-4000 6<br />

20. Sweeper 2650-4000 3<br />

21. Chowkidar 2650-4000 2<br />

22. Driver 3050-4590 4<br />

23. Lab. Attendant 2650-4000 3<br />

TOTAL 73<br />

D. Indian System of Medicine & Homeopathy (ISM & H):<br />

Rs. 4.00 lakh is approved under this programme for the following: –<br />

Homeopathy (DHME): (Rs. in lakh)<br />

i) Salary - 4.00<br />

Total - 4.00<br />

Post already created to be continue: –<br />

Sl. No. Name of posts Scale of pay<br />

No. post of already<br />

created<br />

1 M.O. 8000-13500 1<br />

E. Control of Communicable Diseases:<br />

1) National Malaria Eradication Programme (NMEP) - DHME: (Rs. in lakh)<br />

i) Salary - 9.00<br />

ii) T.E. - 1.00<br />

iii) O.E. - 1.00<br />

Total - 11.00<br />

Entertainment of posts already created to be continued are: -<br />

Sl. No. Name of Posts Scales of pay<br />

No. of posts<br />

already created<br />

1 UDC 5000-8000 1<br />

2 LDC 4500-7000 1<br />

3 Driver Gr. I -do- 1<br />

4 Microscopist 4000-6000 1<br />

5 Driver 3050-5000 2<br />

TOTAL 6<br />

2) T.B. Control Programme: (Rs. in lakh)<br />

i) Salary - 8.00<br />

ii) T.E. - 0.50<br />

iii) O.E. - 0.50<br />

Total - 9.00


- 399 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3) Sexually Transmitted Disease (STD):<br />

Rs. 8.00 lakh is approved for the following: - (Rs. in lakh)<br />

i) Salary - 6.00<br />

ii) T.E. - 1.00<br />

iii) O.E. - 1.00<br />

Total - 8.00<br />

Entertainment of posts already created to be continued are: -<br />

Sl.<br />

No.<br />

Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

1. Staff Nurse 5500-9000 2<br />

2. IV Grade 2650-4000 1<br />

TOTAL : 3<br />

4) National Leprosy Control Programme - DHME: (Rs. in lakh)<br />

i) Salary - 7.00<br />

ii) T.E. - 1.00<br />

iii) O.E. - 1.00<br />

Total - 9.00<br />

Sl. No. Name of posts Scale of pay No. of post<br />

1 M.O. 8000-13500 1<br />

2 UDC 5000-8000 1<br />

3 LDC 4500-7000 1<br />

4 Driver 3050-4590 1<br />

5 IV Grade 2650-4000 1<br />

6 Sweeper -do- 1<br />

Total 6<br />

F. NON-COMMUNICABLE DISEASES :<br />

1) Cancer Research & Treatment Programme - DHME: (Rs. in lakh)<br />

i) Salary - 30.00<br />

ii) Medical Treatment - 5.00<br />

iii) T.E. - 1.00<br />

iv) O.E. - 2.00<br />

v) M & S - 5.00<br />

vi) M & E - 18.00<br />

vii) Minor Works - 1.00<br />

TOTAL - 62.00<br />

Entertainment of Posts already created are :-<br />

Sl. No. Name of posts Scale of pay Already created<br />

1 Specialist 10000-15200 2<br />

2 M.O. 8000-13500 2<br />

3 Staff Nurse 5500-9000 2<br />

4 Computer Operator -do- 2<br />

5 F.A. 2650-4000 1<br />

6 Sweeper -do- 2<br />

Total 11


- 400 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2) Cobalt Therapy Unit, Zemabawk - DHME: (Rs. in lakh)<br />

i) Salary - 15.00<br />

ii) Wages - 1.00<br />

iii) Medical Treatment - 5.00<br />

iv) T.E. - 1.00<br />

v) O.E. - 1.00<br />

vi) M & E - 1.00<br />

vii) M & S - 5.00<br />

viii) Minor Works (deptt.) - 1.00<br />

Total - 30.00<br />

Entertainment of post already created are: -<br />

Sl. No. Name of posts Scale of pay Already created<br />

1 Medical Physicist 8000-13500 1<br />

2 X-Ray Technician 4500-7000 1<br />

3 F.A. 2650-4000 2<br />

4 Dark Room Assistant -do- 1<br />

5 Van Cleaner -do- 1<br />

TOTAL 6<br />

3) Non-Communicable Diseases (DHME): (Rs. in lakh)<br />

i) O.E. - 0.50<br />

ii) O.C. - 0.50<br />

Total - 1.00<br />

4) Disaster Management (DHME): (Rs. in lakh)<br />

i) O.C. - 0.50<br />

ii) M & E - 0.50<br />

Total - 1.00<br />

5) Bio-Medical Waste (DHME): (Rs. in lakh)<br />

i) O.C. - 1.00<br />

ii) M & E - 2.00<br />

Total - 3.00<br />

G. OTHER PROGRAMMES:<br />

1) Direction: Hospital & Medical Education<br />

For proper administration in the Deptt., creation of Principal Director is imperative.<br />

(Rs. in lakh)<br />

i) Salary - 0.01<br />

ii) Wages - 0.50<br />

iii) T.E. - 4.00<br />

iv) O.E. - 4.00<br />

v) O.C. - 1.99<br />

vi) H.E. - 1.00<br />

vi) Minor Works (deptt.) - 2.50<br />

Total - 14.00


- 401 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

For implementation of Directorate of Hospital & Medical Education, the following<br />

posts are approved to be created: –<br />

Sl. No. Name of Posts Scale of pay<br />

No. of post to be<br />

created<br />

1 Dy. Director (Admn.) 10000-15200 1<br />

2 Asst. Engineer 8000-13500 1<br />

3 Finance & Accounts Officer -do- 1<br />

4 Research Officer -do- 1<br />

5 Health Education Officer -do- 1<br />

6 Superintendent -do- 1<br />

7 Assistant 5500-9000 6<br />

8 Junior Engineer -do- 3<br />

9 Inspector of Statistics -do- 2<br />

10 Computer Operator -do- 4<br />

11 UDC 5000-8000 8<br />

12 LDC 4000-7000 9<br />

13 Steno Grade III 5000-8000 3<br />

14 IV Grade 2650-3000 20<br />

15 Driver 4000-7000 3<br />

Total 64<br />

2) District & Sub-Division Administration:<br />

Rs. 44.50 lakh is approved for the following: - (Rs. in lakh)<br />

i) Salary - 15.20<br />

ii) Medical Treatment - 7.30<br />

iii) T.E. - 2.00<br />

iv) O.E. (including I.T.) - 5.00<br />

v) O.C. - 5.00<br />

vi) Minor Works (deptt.) - 10.00<br />

Total - 44.50<br />

Entertainment of posts already created to be continue and to be created are –<br />

Sl. No. Name of Posts Scale of Pay<br />

No. of Posts<br />

already created<br />

No. of Posts<br />

already approved<br />

1 Supdt. Pharmacist 6500-10500 1 -<br />

2 Assistant 5500-9000 - 7<br />

3 Inspector of Statistics -do- - 7<br />

4 Computer Operator -do- - 7<br />

5 UDC 5000-8000 5 7<br />

6 LDC 4000-7000 7 7<br />

7 Driver 3050-4590 2 6<br />

8 IV Grade 2650-4000 1 6<br />

TOTAL 69<br />

3) Medical Store Depot:<br />

Rs. 159.00 lakh is approved for the following :- (Rs. in lakh)<br />

i) Salary - 1.00<br />

ii) T.E. - 1.00<br />

iii) O.E. - 1.00<br />

iv) O.C. - 1.00<br />

v) M & S - 135.00<br />

vi) M & E - 20.00<br />

Total - 159.00


- 402 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Entertainment of posts already created are: -<br />

Sl. No. Name of Posts Scale of pay<br />

No. of post<br />

already created<br />

1 2 3 4<br />

1 IV Grade 2650-4000 2<br />

Total 2<br />

4) Mental Health Programme (DHME):<br />

Rs. 0.10 lakh is approved for the following: - (Rs. in lakh)<br />

i) Salary - 0.02<br />

ii) T.E. - 0.01<br />

iii) O.E. - 0.01<br />

iv) O.C. - 0.01<br />

v) M & S - 0.01<br />

vi) MV - 0.01<br />

vii) M & E - 0.01<br />

viii) Rent - 0.01<br />

ix) Major Works (PWD) - 0.01<br />

Total - 0.10<br />

For implementation of Mental Health Programme, the following posts were approved<br />

to be created: -<br />

Sl. No. Name of Posts Scale of pay<br />

No. of post<br />

already created<br />

1 Medl. Supdt. (INHUBAS) 12000-16500 1<br />

2 Psychiatrist 10000-15200 2<br />

3 M & HO 8000-12500 3<br />

4 Clinical Psychologist -do- 1<br />

5 Asstt. Nursing Supdt. 6500-10500 1<br />

6 Ward Sudpt. -do- 2<br />

7 Staff Nurse 5500-9000 16<br />

8 Social Worker (Psy.) 5500-9000 1<br />

9 Medical Record Tech. 4500-7000 2<br />

10 Lab. Tech. -do- 1<br />

11 LDC-cum-Typist 4000-6000 1<br />

12 Driver 3050-5000 2<br />

13 Female Attandant 2650-4000 8<br />

14 Male Attandant 2650-4000- 8<br />

15 Guard -do- 8<br />

16 Sweeper -do- 8<br />

17 Guard -do- 4<br />

Total 69<br />

5) National Programme for Control of Blindness (NPCB): (Rs. in lakh)<br />

i) Salary - 5.00<br />

ii) T.E. - 0.50<br />

iii) O.E. - 0.50<br />

Total - 6.00<br />

Entertainment of posts already created are as listed below –<br />

Sl. No. Name of post Scale of pay No. of post<br />

1. Ophth. Asstt. 4500-7000 2<br />

Total 2


- 403 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

H. FAMILY WELFARE PROGRAMME:<br />

This programme has been taken up under Central Sponsored Scheme (C.S.S.) and<br />

discontinued by the Government of India wherefore it was directed that the following<br />

programmes should be taken up by State Government. As such fund is provided for<br />

continuation under Plan as follows: –<br />

1) Rural Family Welfare Services (RFWS): (Rs. in lakh)<br />

i) Salary - 25.00<br />

ii) MT - 5.00<br />

iii) T.E. - 1.00<br />

iv) O.E. - 1.00<br />

Total - 32.00<br />

Entertainment of post already created to be continued are –<br />

Sl. No. Name of post Scale of pay No. of post<br />

1. M.O. 8000-13500 7<br />

2. UDC 5000-8000 1<br />

Total 8<br />

2) P.P. Unit (Sub-Division): (Rs. in lakh)<br />

i) Salary - 7.00<br />

ii) M.T. - 1.00<br />

iii) T.E. - 0.50<br />

iv) O.E. - 0.50<br />

Total - 9.00<br />

Entertainment of posts to be continued are: -<br />

Sl. No. Name of post Scale of pay No. of post<br />

1. Specialist 10000-15200 2<br />

2. Staff Nurse 5500-9000 3<br />

3. IV Grade 2650-4000 1<br />

Total 6<br />

3) P.P. Unit (District):<br />

i) Salary - 8.00 lakh<br />

ii) M.T. - 1.00 lakh<br />

ii) T.E. - 0.50 lakh<br />

iii) O.E. - 0.50 lakh<br />

Total - 10.00 lakh<br />

Entertainment of posts to be continued are -<br />

Sl. No. Name of post Scale of pay No. of post<br />

1. M.O. 8000-13500 1<br />

2. Sister 6500-10500 2<br />

3. Staff Nurse 5500-9000 3<br />

Total 6


- 406 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

WATER SUPPLY & SANITATION<br />

The approved outlay during the 10 th Five Year Plan 2002-<strong>2007</strong> for Water Supply and<br />

Sanitation is Rs. 12,333.00 lakh. Out of which Rs. 7772.00 lakh is for Rural Sector,<br />

Rs.3373.00 lakh for Urban Sector and Rs. 1188.00 lakh for Other Sector. The detailed breakup<br />

is as below: —<br />

Sl. Head of Scheme 10 th Five Year Plan 2002-<strong>2007</strong><br />

No. State Plan Central Assistance<br />

A. RURAL SECTOR :<br />

1. Rural Water Supply :<br />

(a) Water Supply Scheme PWS, 5,000.00 8590.00<br />

IVSS, HPTW, RWHS etc.<br />

(b) Direction & Administration 2,590.00<br />

Wages/Salaries<br />

(c) Water Quality Testing / Monitoring 10.00<br />

(d) Emergency Water Supply 150.00<br />

(c) Survey & Investigation 2.00<br />

2. Rural Sanitation : 20.00 250.00<br />

SUB-TOTAL OF 'A' 7,772.00 8,840.00<br />

B. URBAN SECTOR :<br />

1. Urban Water Supply 3,373.00 2,000.00<br />

(UWS, AUWSP, NLPF etc.)<br />

2. Integrated Project of Aizawl (I.P.A.) - 30,000.00<br />

SUB-TOTAL OF 'B' 3,373.00 32,000.00<br />

C. OTHER SECTORS :<br />

1. Direction & Administration 1,026.00 -<br />

2. Research 2.00 -<br />

3. Training 10.00 -<br />

4. Machineries & Equipments 100.00 -<br />

5. Building 50.00 -<br />

6. Motor Vehicles - -<br />

SUB-TOTAL OF 'C' 1,188.00 -<br />

GRAND TOTAL 12,333.00 40,840.00<br />

There was joint survey conducted by representative of Government of India and<br />

Pachhunga University College, Aizawl during 1996 and 911 villages / habitations were<br />

identified in <strong>Mizoram</strong>. This is the main database for planning of Rural Water Supply<br />

Programme.<br />

After making much head way in rural water supply programme, the status of rural<br />

water supply as on 1.4.2005 had become as indicated below :<br />

Non- Covered Partially Covered Fully Covered Total<br />

(NC) (PC) (FC)<br />

112 799 911 Nil


- 407 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

There has been continuous depletion of capacity of water sources, rapid growth of<br />

population resulting in continuous change in the status of water supply. On the direction of<br />

Government of India, RGNDWM, Department of Drinking Water Supply, Ministry of Rural<br />

Development, New Delhi, habitation survey 2003 was conducted for assessing factual status<br />

of water supply in <strong>Mizoram</strong>. The habitation survey in 2003, after its validation by Indian<br />

Institute of Public Administration (IIPA), New Delhi has resulted in the status of water<br />

supply as indicated below and the same is under consideration of the Government of India<br />

for approval.<br />

Non-Covered Partially Covered Fully Covered Total<br />

(NC) (PC) (FC)<br />

187 430 159 776<br />

In addition, there are 110 habitations declared as uninhabited by the census 2001<br />

due to large scale of migration of Riang/Bru Community to neighbouring State which need<br />

to be covered with drinking water supply and sanitation following the Memorandum of<br />

Understanding (MoU) between Govt. of <strong>Mizoram</strong> and the Bru National Liberation Front (<br />

BNLF ) signed on 26.4.2005.<br />

After incorporation of the above said 110 habitations the final status will be as<br />

under :<br />

Non-Covered Partially Covered Fully Covered Total<br />

(NC) (PC) (FC)<br />

297 430 159 886<br />

Note: The Non-Covered (NC) habitations have increased drastically because -<br />

(i) Some water supply sources dry up or existing water supply system become<br />

defunct and non-serviceable due to activities of soil erosion, landslide and<br />

deforestation etc.<br />

(ii) Govt. of India advised that water supply level below 10 lpcd may be treated<br />

as NC due to which those habitations having water supply level below 10<br />

lpcd, which were earlier categorised as PC habitations are grouped under NC<br />

habitations.<br />

(iii) Lowering of ground water table resulting in depletion of ground water.<br />

(iv) 110 Rural Habitations declared as un-in habitat by Government of India,<br />

Census 2001 need to be covered with Drinking Water Supply and Sanitation<br />

facilities for the reason stated in the preceding paragraph for which<br />

Government of India, Department of Drinking Water Supply, Ministry of Rural<br />

Development has already been requested and is also being taken up with the<br />

Registrar General of India and Census Commissioner, New Delhi.<br />

In respect of urban water supply, there are 22 (twenty two) notified towns in<br />

<strong>Mizoram</strong>. However, Lawngtlai town, the capital of Lai District Council, though not notified<br />

town is considered as town by Public Health Engineering Department. The status of water<br />

supply in Urban Towns as on 1.4.2005 are as indicated below.


- 408 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl. No. Name of Town Status in Lpcd<br />

1. Aizawl 45<br />

2. Kolasib 70<br />

3. Bairabi 10<br />

4. Khawzawl 60<br />

5. Serchhip 70<br />

6. Tlabung 35<br />

7. Saiha 20<br />

8. Lunglei 70<br />

9. Sairang 70<br />

10. Darlawn 70<br />

11. Zawlnuam 40<br />

12. Hnahthial 30<br />

13. Vairengte 70<br />

14. Champhai -<br />

15. N.Kawnpui -<br />

16. Mamit -<br />

17. Saitual 60<br />

18. Thenzawl 70<br />

19. Lengpui 70<br />

20. Khawhai -<br />

21. N. Vanlaiphai -<br />

22. Biate -<br />

23. Lawngtlai -<br />

(Rupees in lakh)<br />

Sl. No. SECTOR DETAILS Budget Provision Remarks<br />

during <strong>2006</strong>-07<br />

A. RURAL SECTOR<br />

1. Rural Water Supply Rs 1,291.38 481.09 LIC, 607 CA<br />

2. Direction & Administration Rs 1,050.00 815 Salaries<br />

3. Emergency Water Supply Scheme by Truck Rs. 40.00<br />

4. Rural Sanitation(TSC) Rs 100.00<br />

5. Operation &Maintenance Rs 1000.00<br />

TOTAL Rs 3,481.38<br />

B. URBAN SECTOR<br />

1. Water Supply for New AR Complex<br />

at Zokhawsang Rs. 100.00 ACA<br />

2. Composite N.Kawnpui WSS Rs. 32.00<br />

3. Improvement of distribution lines and<br />

Zonal Tanks at various localities of Aizawl Rs. 112.91 40.91 LIC<br />

4. Improvement of gravity source of<br />

Aizawl Water Supply Scheme Phase-I Rs. 65.00<br />

5. Construction of Zonal Tank near Synod<br />

Conference Hall Rs. 28.00 ACA<br />

6. Zuangtui Water Supply Scheme(Aug) Rs. 17.00<br />

7. Greater Lunglei Water Supply Scheme Rs. 835.71 Liabilities<br />

8. O & M of Water Supply Schemes (<strong>2006</strong>-<strong>2007</strong>) Rs. 1,078.00<br />

TOTAL : Rs. 2,268.62<br />

GRAND TOTAL : Rs. 5,750.00


- 409 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

DETAILED DESCRIPTION OF <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PHE Department operates two sectors viz., Rural Sector and Urban Sector in which<br />

the following are the tentative fund allocation and work programmes.<br />

A. RURAL SECTOR<br />

1. Rural Water Supply:<br />

During <strong>2006</strong>-<strong>2007</strong>, water supply level in 110 numbers of Partially Covered (PC)<br />

habitations will be enhanced to Fully Covered (FC) category for which an amount of<br />

Rs.1291.38 lakh has been earmarked as the detailed break up shown below :<br />

4215 - Rural Water Supply ( LIC) = Rs. 481.09 lakh<br />

4215 - Rural Water Supply (ACA) = Rs 607.00 lakh<br />

4215 - Rural Water Supply = Rs. 69.30 lakh<br />

2215 - Rural Water Supply = Rs 5.40 lakh<br />

2215 - Sub-Mission ( State Share ) = Rs 128.59 lakh<br />

T O T A L = Rs 1291.38 lakh<br />

2. Direction and Administration:<br />

The approved outlay for Direction and Administration during <strong>2006</strong>-07 is Rs. 1050.00<br />

lakh and the detailed break up are as below :<br />

(1) Direction CE - Rs. 180.00<br />

(2) Direction SE - Rs. 145.00<br />

(3) Administration - Rs. 490.00<br />

(4) Medical - Rs. 50.00<br />

(5) O.E. - Rs. 85.00<br />

(6) T.E. - Rs. 30.00<br />

(7) M.V - Rs. 56.00<br />

(8) Scholarship & Stipend - Rs. 4.00<br />

(9) O.C (Other charges ) - Rs. 10.00<br />

T O T A L = Rs. 1050.00<br />

3. Emergency Water Supply:<br />

Emergency Water Supply by Truck has to be carried out in some towns during dry<br />

period for which an amount of Rs. 40.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Rural Sanitation:<br />

During <strong>2006</strong>-<strong>2007</strong> Total Sanitation Campaign (TSC) will be launched in all 8 (eight)<br />

Districts of <strong>Mizoram</strong> which is the new Rural Sanitation Programme introduced by<br />

Government of India. The total State Matching Share will be approximately Rs. 660.00 lakh<br />

out of which an amount of Rs. 100.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />

5. Operation and Maintenance (O&M):<br />

Proper Operation and Maintenance is very much essential for regular and sustainable<br />

water supply. An amount of Rs. 1000.00 lakh has been earmarked under Rural Sector during<br />

<strong>2006</strong>-<strong>2007</strong>.


B. URBAN SECTOR<br />

- 410 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. Water Supply for new AR Complex at Zokhawsang:<br />

As per the commitment of the State Government water supply has to be provided by<br />

State Government at the proposed new AR Complex at Zokhawsang. An amount of<br />

Rs.100.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong> under ACA.<br />

2. Composite N. Kawnpui Water Supply Scheme:<br />

Composite N. Kawnpui Water Supply Scheme is an on-going project, an amount of<br />

Rs. 32.00 lakh is provided during <strong>2006</strong>-<strong>2007</strong> for completion.<br />

3. Improvement of Distribution System of Aizawl:<br />

This project is an on-going scheme executed since 2004-2005. An amount of<br />

Rs.112.91 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong> out of which Rs. 40.91 lakh will be met from<br />

LIC loan.<br />

4. Improvement of Gravity source of Aizawl Water Supply Scheme Phase-I:<br />

This project is an on-going project executed since 2004-2005. An amount of Rs 65.00<br />

lakh is earmarked for continuation of the project during <strong>2006</strong>-<strong>2007</strong>.<br />

5. Construction of Zonal Tank near Synod Conference Hall:<br />

The existing P.S. Tank near Synod Confence Hall is very old, rusted now under under<br />

the condition of collapsing. So, construction of R.C.C. Zonal Tank is to be done immediately<br />

so an amount of Rs. 28.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong> under ACA.<br />

6. Zuangtui Water Supply Scheme (Aug) :<br />

Zuangtui Water Supply Scheme (Augmentation) by tapping gravity source from<br />

Zuangtui intake including construction reservoir for Zuangtui and Thuampui area to<br />

supplement the coverage by Aizawl Water Supply Scheme Phase-I is proposed. An amount of<br />

Rs. 17.00 lakh is earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />

7. Greater lunglei Water Supply Scheme :<br />

An amount of Rs. 835.71 lakh for clearing pending liabilities is to set aside for<br />

payment to M/S Subash Projects and Marketing Limited (SPML) as per agreement singed by<br />

SPML and the Government of <strong>Mizoram</strong>.<br />

8. Operation & Maintenance of Urban Water Supply Scheme :<br />

The PHE Department require approximately Rs 3500.00 lakh for O & M of various<br />

water supply project in <strong>Mizoram</strong>. The require fund cannot be made available due to fund<br />

constraint. An amount of Rs 2893.00 lakh is earmarked for salary, wages including<br />

operation and maintenance cost of Water Supply Scheme by Planning Department out of<br />

which Rs. 1000.00 lakh has already been earmarked for O&M under Rural Sector, Rs. 815.00<br />

lakh for salaries and Rs. 1078.00 lakh is earmarked under urban sector.


- 416 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

HOUSING (L.A.D.)<br />

A. Proposed Tenth Five Year Plan Outlay 2002 – <strong>2007</strong> - Rs. 20,060.00 lakh<br />

B. Revised App. Annual Plan Outlay for 2005 – <strong>2006</strong> - Rs. 3,742.00 lakh<br />

C. Approved Annual Plan Outlay for <strong>2006</strong> - <strong>2007</strong> - Rs. 3,692.00 lakh<br />

Following Schemes are approved to be taken up during <strong>2006</strong> - <strong>2007</strong>.<br />

A. 02 - URBAN HOUSING<br />

190 - INVESTMENT<br />

1. LIG Housing Loan - Rs. 80.00 lakh<br />

2. MIG Housing Loan - Rs. 120.00 lakh<br />

3. Composite Cash Loan to Govt. Servant (HBA) - Rs. 3,054.00 lakh<br />

TOTAL - Rs 3,254.00 lakh<br />

050 - LAND<br />

4. Common Cemetery - Rs NIL<br />

5 Housing for Staff - Rs 200.00 lakh<br />

6. Sites & Services - Rs 5.00 lakh<br />

7. Land Acquisition & Development - Rs. 152.00 lakh<br />

800 - OTHER EXPENDITURE<br />

8. E.W.S Housing - Rs. 3.00 lakh<br />

B. 03 - RURAL HOUSING<br />

80 - GENERAL<br />

13. Building Technology Extension - Rs. 20.00 lakh<br />

14. 01-Direction & Administration - Rs. 58.00 lakh<br />

Total - Rs. 3,692.00 lakh<br />

BRIEF DESCRIPTION OF THE SCHEME<br />

1. LOW INCOME GROUP HOUSING LOAN: During the 9 th Five Year Plan, many<br />

households were given LIG loans at the rate of Rs.0.30 lakh which was increased to Rs. 0.50<br />

lakh. This is an important scheme for developing dwelling houses in Urban Centres and is<br />

proposed to be continued in the 10 th Plan at the same rate. Each and every annual plan<br />

target has to be taken up as new items while the Scheme itself is a continuing one. The 10 th<br />

Plan Scheme is to grant LIG loan to 1800 households each @ Rs. 50,000/- within an outlay of<br />

Rs. 900.00 lakh and the Annual Plan for <strong>2006</strong> - <strong>2007</strong> is to provided 160 households within<br />

an outlay of Rs. 80.00 lakh.<br />

2. MIDDLE INCOME GROUP HOUSING LOAN: The 10 th Plan scheme is to benefit 1500<br />

households at the rate of Rs. 80,000 per one within an outlay of Rs. 1200.00 lakh. Target for<br />

Annual Plan <strong>2006</strong> - <strong>2007</strong> is to be provided 150 households within Rs. 120.00 lakh.


- 417 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. COMPOSITE CASH LOAN (HBA) TO GOVERNMENT EMPLOYEES: During the 9 th Plan<br />

period Rs. 106.10 crores were given to Government Employees in the form of HBA for house<br />

construction under this composite cash loan scheme. As many as 8910 Government<br />

Employees were benefited under the scheme. Loan recoveries and interest payments are<br />

effected from pay bills through Treasuries. The Scheme has been found to be very beneficial<br />

and fruitful and a proposal is made to continue the scheme during the 10 th Plan, Rs.<br />

3,054.00 lakh is provided during <strong>2006</strong> - <strong>2007</strong>.<br />

Physical Targets for the year 2005 - <strong>2006</strong> is as follows :<br />

(a) MIG I for 452 Nos. = Rs. 904.00 lakh @ 2.00 lakh<br />

(b) MIG II for 700 Nos. = Rs. 1050.00 lakh @ 1.50 lakh<br />

(c) LIG for 880 Nos = Rs. 1100.00 lakh @ 1.25 lakh<br />

TOTAL for 2032 Nos = Rs. 3054.00 lakh<br />

4. COMMON CEMETERY: No earmarked for <strong>2006</strong> - <strong>2007</strong>.<br />

5. HOUSING FOR STAFF: The District Offices at the District headquarters viz. — Lunglei,<br />

Champhai, Kolasib, Serchhip and Mamit have been functioning with out proper staff<br />

quarters. This led to acute problems in transfer and posting as most of the staff to have to<br />

put up themselves in a rented house. Hence, Rs 200.00 lakh is earmarked for Construction<br />

staff quarters in the Districts headquarters during <strong>2006</strong> – <strong>2007</strong> as under :-<br />

(a) Construction of DLAOs Office at Serchhip = Rs 65.00 lakh<br />

(b) Construction of DLAOs Staff quarters = Rs 135.00 lakh<br />

6. SITE AND SERVICES: The programme is to make house site plan, roads, parks etc. for<br />

developing land for house sites in cluster of dwelling houses in urban areas at a nominal rate of<br />

Rs. 1000/- per house-sites. The 10 th Five Year Plan scheme is to develop 5000 house sites in<br />

urban area within Rs. 50.00 lakh and it is proposed in the Annual plan <strong>2006</strong> - <strong>2007</strong> is to develop<br />

500 houses sites within Rs. 5.00 lakh which will be utilised in the District Headquarters.<br />

7. LAND AQUISITION AND DEVELOPMENT: With rapid expansion of Aizawl and Lunglei<br />

Towns as a result of mass migration of the people from villages, it becomes imperative to<br />

develop lands for human settlement in the Sub-Towns to attract persons to settle in subtowns<br />

with a view to checking further mass migration to Aizawl and Lunglei. The<br />

programme of land developments to make plans for houses sites, roads steps, etc. within<br />

the District Headquarters like Aizawl, Lunglei, Champhai, Kolasib, Mamit, Serchhip, Saiha<br />

and Lawngtlai areas. The scheme of 10 th Five Year Plan is to develop 322 hectares of land<br />

within Rs. 665.00 lakh and it is approved to develop in the Annual Plan <strong>2006</strong> - <strong>2007</strong> is 76.5<br />

hectares within Rs. 152.00 lakh.<br />

8. E.W.S. HOUSING: During the 9 th Plan, EWS Housing was introduced in the form of<br />

grant for giving Construction Assistance of Rs. 2500/- each per family in urban areas as has<br />

been done in rural areas under the scheme of construction Assistance. The scheme of the<br />

10 th Plan is to benefit 2000 families within Rs. 50.00 lakh, and Rs. 3.00 lakh is allocated for<br />

providing assistance to 120 families during <strong>2006</strong> – <strong>2007</strong>.<br />

9. PROVISION OF HOUSE SITE (MNP): No earmarked for 2005 - <strong>2006</strong>.<br />

10. CONSTRUCTION ASSISTANCE (MNP): No earmarked for 2005 - <strong>2006</strong>.<br />

11. INTERNAL IMPROVEMENT OF VILLAGES: No earmarked for 2005 - <strong>2006</strong>.<br />

12. RESETTLEMENT OF VILLAGES: No earmarked during 2005 – <strong>2006</strong>.


- 418 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

13. BUILDING TECHNOLOGY EXTENSION: This is new scheme started in 1995 - 96 with a<br />

meagre fund. <strong>Mizoram</strong> depends on building materials, mostly procured from neighboring<br />

states such as iron rods, GCI Sheets, Tiles, Brick, Cements etc. and the cost of house<br />

construction is very high. It is necessary to identify materials, which are locally available and<br />

technologically and economically sound for used in building construction for the purpose of<br />

reducing materials coming from neighbouring States as well as reducing the construction<br />

cost. Attempts shall be made to identify such materials and in collaboration with HUDCO.<br />

Aizawl Building Centre has been set up and Seminar and practical training on House<br />

Construction has been started. Rs. 50.00 lakh is proposed for the whole 10 th Plan. It is not<br />

readily possible to fix physical targets which will come to light after research, physical<br />

training etc., Rs. 20.00 lakh is provided during <strong>2006</strong> - <strong>2007</strong>.<br />

12. DIRECTION AND ADMINISTRATION: During the 8 th Plan, the following posts have<br />

been created and filled up to implement the housing plan. It is necessary to provide certain<br />

outlay for continuance and retention of the posts during the 10 th Plan. It is to be mentioned<br />

that just 137% of the whole outlay is required for such retention of posts, i.e., Rs. 250.00<br />

lakh for the whole 10 th Plan and it is provided amounting to Rs. 58.00 lakh for <strong>2006</strong> - <strong>2007</strong><br />

for retention of the following posts and other expenditures.<br />

1. 1 (one) Assistant Engineer - 8000 - 135000<br />

2. 3 (three) Assistant - 5500 - 9000<br />

3. 2 (two) Junior Engineer - 5500 - 9000<br />

4. 1 (one) U.D.C. - 5000 - 8000<br />

5. 6 (six) L.D.C. - 4000 - 6000<br />

6. 1 (one) Driver - 3050 - 4590<br />

7. 2 (two) IV Grade - 2650 - 4000<br />

Break-up of <strong>2006</strong> - <strong>2007</strong><br />

(a) Salary - Rs. 28.00 lakh<br />

(b) Wages - Rs. 4.50 lakh<br />

(c) Medical Treatment - Rs. 1.00 lakh<br />

(d) T.E - Rs. 1.50 lakh<br />

(e) Office Expenses - Rs. 13.50 lakh<br />

(f) Motor Vehicles - Rs. 8.00 lakh<br />

(f) Publication - Rs. 1.00 lakh<br />

(g) Advertising & Publicity - Rs. 0.50 lakh<br />

TOTAL - Rs. 58.00 lakh


- 422 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

GOVERNMENT HOUSING (P.W.D.)<br />

INTRODUCTION:<br />

The works falling under this Head of Accounts are mainly construction and<br />

improvement of Government Residential quarters at various places in and outside <strong>Mizoram</strong>.<br />

During <strong>2006</strong>-<strong>2007</strong>, Rs. 320.00 lakh is approved under this Head of Account.<br />

DIRECTION AND ADMINISTRATION:<br />

Rs.211.00 lakh is approved during 10 th Five Year Plan.<br />

Rs. 89.00 lakh is approved for salary and establishment of the existing staff during<br />

<strong>2006</strong>-<strong>2007</strong>.<br />

The breakup of Direction and Administration is as follows:<br />

1) Salary = Rs. 69.00 lakh<br />

2) T.E. = Rs. 5.00 lakh<br />

3) Office Expenses = Rs. 5.00 lakh<br />

4) Maintenance = Rs. 10.00 lakh<br />

Total = Rs. 89.00 lakh<br />

MACHINERY AND EQUIPMENT:<br />

No provision is kept for procurement of Machinery & Equipments during <strong>2006</strong>-07.<br />

WORKS:<br />

Rs. 231.00 lakh is approved for works under this Head of Account during <strong>2006</strong>-<strong>2007</strong>.<br />

Spill over Schemes<br />

Constn. of functional quarters for Engineer–in–Chief, PWD Office :<br />

Rs. 16.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

New Schemes<br />

1. Renovation of IE of various Govt. Buildings:<br />

Rs. 20.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>..<br />

2. Renovation, retrofitting of various Govt. quarters, septic tanks at Aizawl and<br />

Preparation of Raj Bhavan for Independence day, Republic Day :<br />

Rs. 39.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

3. Furnishing of VIP Bungalow :<br />

Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

4. Constn. of additional Staff Quarters at Bualpui (Ng).<br />

Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />

5. Construction of additional staff Quarters at Lawngtlai :<br />

Rs. 25.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>


- 423 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

6. Improvement and Renovation of Govt. Quarters at Lunglei :<br />

Rs. 25.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

7. Improvement and Renovation of Govt. Quarters at Saiha :<br />

Rs. 20.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

8. Improvement and Renovation of Govt. Quarters at Kolasib :<br />

Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

9. Improvement and Renovation of Govt. Quarters at Champhai :<br />

Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

10. Improvement and Renovation of Govt. Quarters at Mamit :<br />

Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

11. Improvement and Renovation of Govt. Quarters at Serchhip :<br />

Rs. 15.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

12. Construction of Treasury Officer’s Quarters at Saiha :<br />

Rs. 6.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>


- 429 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

POLICE HOUSING<br />

The fund provided under Police Housing plan is the main financial source for<br />

construction of office and residential quarters of Police Officers. Under this scheme, various<br />

types of residential quarters and administrative buildings such as office buildings, Police<br />

Station buildings and Out Post buildings, etc. had been constructed at various places in<br />

<strong>Mizoram</strong> since 1980. As a result of this, the condition of <strong>Mizoram</strong> Police is upgraded to<br />

some extend. As such, the introduction of Police Housing Schemes under Plan is very<br />

helpful for <strong>Mizoram</strong> Police.<br />

However, the State Government is unable to provide sufficient amount of fund for<br />

construction of more houses/buildings yearly as per requirement where sufficient lands are<br />

available, mainly due to financial constraint. The satisfaction level as targeted by BPR&D in<br />

respect of lower subordinate and upper subordinate is far from the present satisfaction<br />

level of <strong>Mizoram</strong> Police Housing.<br />

The State Government had fortunately increased the total annual outlay for 2005-06<br />

to Rs. 435.00 lakh. In addition to this, a sum of Rs. 130.00 lakh is further re-allocated under<br />

Police Housing (Plan) for clearing liabilities of fencing materials.<br />

The approved Annual Plan for the year <strong>2006</strong>-07 for construction of various types of<br />

residential and administrative buildings etc is prepared within the amount of Rs. 545.00<br />

lakh in accordance with Commissioner, Planning & Programme Implementation Department,<br />

Govt. of <strong>Mizoram</strong> letter No. G. 28014/55/<strong>2006</strong>-07/SPB dt. 02.02.06.<br />

As there is no other relevant Scheme / head of account, construction of approach<br />

roads to BOP N.E. Khawdungsei, OP Thenzawl, SP’s Office Serchhip, Kolasib, 2 nd IR Bn.<br />

Khawzawl and repair of Internal motorable road of PTC Lungverh, which was damaged by<br />

heavy rains this year are also included and proposed in this Annual Plan <strong>2006</strong>-07. These<br />

proposals are required to be taken up urgently.<br />

The detail item-wise of plan proposal for Annual Plan <strong>2006</strong>-07 is enclosed herewith<br />

for favour of consideration and approval of the Government.


- 430 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

WORKS TO BE TAKEN UP UNDER <strong>PLAN</strong> DURING <strong>2006</strong>-07<br />

(Amount in Rupees)<br />

Sl/N Location Type of buildings No. Rate Amount<br />

1 Aizawl IGP Residence 1 Token provision 10,00,000.00<br />

2 Serchhip S.P. Residence 1 Token provision 10,00,000.00<br />

3 Mamit S.P. Residence 1 Token provision 10,00,000.00<br />

4<br />

Lunglei, 2nd Bn.<br />

MAP<br />

Commandant<br />

Residence<br />

1 Token provision 10,00,000.00<br />

5 Lunglei S.P. Office 1 Token provision 10,00,000.00<br />

6 Aizawl S.P. Security Office 1 Token provision 10,00,000.00<br />

7<br />

Lunglei, 2nd Bn.<br />

MAP<br />

Type-IV 1 8,75,000.00 8,75,000.00<br />

8 Lungsen Type-III (Semi) 1 6,73,700.00 6,73,700.00<br />

9 Mamit Type-II, 2 Units (RCC) 1 10,92,000.00 10,92,000.00<br />

10 Saron Veng, Aizawl Type-II 6 Units (RCC) 1 26,12,000.00 26,12,000.00<br />

11 2nd IR Khawzawl Type-II, 2 Units 'B' 2 4,20,000.00 8,40,000.00<br />

12 2nd IR Khawzawl Type-II 2 3,50,000.00 7,00,000.00<br />

13 1st IR Bn. Mualvum Type-II (Semi) 2 5,46,000.00 10,92,000.00<br />

14<br />

Armed Veng,<br />

Aizawl<br />

Type-II 'B' 6 3,50,000.00 21,00,000.00<br />

15 Mimbung 15 Men Barrack 1 6,53,000.00 6,53,000.00<br />

16 Mimbung Kitchen-cum-Dining 1 2,82,000.00 2,82,000.00<br />

17 NE Khawdungsei Appr. road to BOP 1 6,00,000.00 6,00,000.00<br />

18 Thenzawl Appr. road to OP 1 6,00,000.00 6,00,000.00<br />

19 Serchhip<br />

Appr. road to SP<br />

Office & residence<br />

1 5,00,000.00 5,00,000.00<br />

20 Kolasib<br />

Approach road to SP<br />

Office Kolasib<br />

1 2,00,000.00 2,00,000.00<br />

21<br />

2nd IR Bn.<br />

Khawzawl<br />

Appr. Road to 2nd IR<br />

Bn. Khawzawl<br />

1 17,00,000.00 17,00,000.00<br />

22 PTC Lungverh Internal jeepable road 1 3,65,700.00<br />

23 Renovation 16,14,600.00<br />

24 Fencing material 150,00,000.00<br />

ON-GOING WORKS<br />

25 Kolasib<br />

26 Mamit<br />

27<br />

28<br />

2nd IR Bn.<br />

Khawzawl<br />

2nd Bn. MAP<br />

Lunglei<br />

29 Lawngtlai<br />

Administrative<br />

Building<br />

Administrative<br />

Building<br />

Administrative<br />

Building<br />

Administrative<br />

Building<br />

Administrative<br />

Building<br />

1 109,97,000.00 30,00,000.00<br />

1 109,97,000.00 30,00,000.00<br />

1 109,97,000.00 30,00,000.00<br />

1 122,37,000.00 30,00,000.00<br />

1 122,37,000.00 30,00,000.00<br />

30 Aizawl FSL Building 1 269,63,200.00 20,00,000.00<br />

TOTAL :<br />

36 nos. (i.e.<br />

44 units)<br />

545,00,000.00


- 433 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

URBAN DEVELOPMENT (L.A.D.)<br />

A. Proposed Tenth Five Year Plan 2002 – <strong>2007</strong> - Rs. 3,988.00 lakh<br />

B. Revised App. Annual Plan Outlay 2005-<strong>2006</strong> - Rs. 1727.00 lakh<br />

C. Approved Annual Plan Outlay1 <strong>2006</strong> – <strong>2007</strong> - Rs. 1358.00 lakh<br />

Following schemes are approved to be taken up during <strong>2006</strong> – <strong>2007</strong>: —<br />

050 - LAND<br />

1. Construction of Minor Roads - Rs. 5.00 lakh<br />

2. Construction of Parks - Rs. 40.53 lakh<br />

3. Construction of Steps - Rs. 150.00 lakh<br />

4. Dumping Ground - Rs. 10.00 lakh<br />

5. Monsoon Damage Scheme - Rs. 70.00 lakh<br />

051 - CONSTRUCTION<br />

6. RCC Footpath/Pedestrian Pavement - Rs. 30.00 lakh<br />

7. Office Building - Rs. 20.00 lakh<br />

8. Cleanliness Week /Beautification of City - Rs. 20.00 lakh<br />

052 - MACHINERY & EQUIPMENT<br />

9. Sanitation - Rs. 55.30 lakh<br />

800 - OTHER EXPENDITURE<br />

10. Clean <strong>Mizoram</strong> - Rs. 20.00 lakh<br />

11. Matching Share of SJSRY - Rs. 158.00 lakh<br />

12. Environmental Improvement of Urban Slum (EIUS) - Rs. 28.00 lakh<br />

13. 01-Direction & Adminstration - Rs. 76.17 lakh<br />

14. JN-NURM - Rs. 675.00 lakh<br />

TOTAL - Rs. 1358.00 lakh<br />

BRIEF DESCRIPTION OF THE SCHEME<br />

1. CONSTRUCTION OF MINOR ROADS: The programmed is to maintain approach road<br />

to Dumping Grounds and also for approach road to Departmental areas etc. and Rs. 5.00<br />

lakh is allocated for <strong>2006</strong> - <strong>2007</strong>.<br />

2. CONSTRUCTION OF PARKS: Busy and unrest lives in the congested Towns and Cities<br />

are in need of some recreational places, where people could enjoy their leisure time.<br />

Without such places, lives in Towns and Cities could be frustrated and vain. During the 9 th<br />

Plan, 2(two) such recreational places were created, one at Aizawl called Public Recreational<br />

Centres, at Lawibual and the other at Lunglei called District Park, at Zobawk. Within an<br />

expenditure of Rs. 60.00 lakh, many works have been done with very useful achievements.<br />

But there are many scopes of further improvement and the two places are again proposed to<br />

be continued in the 10 th Plan as continuing schemes. Apart from this, the Department is<br />

starting establishment of Recreation Centre & Public Park at Kolasib and at near Lengpui<br />

Airport. Fund amounting to Rs. 100.00 lakh is proposed for the 10 th Plan and Rs. 40.53 lakh<br />

is provided for <strong>2006</strong> - <strong>2007</strong> to continue the schemes.


- 434 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. CONSTRUCTIONS OF STEPS/RETAINING WALLS: Towns in <strong>Mizoram</strong> are situated on<br />

spur of Hills which steep down to the gorges of streams below between the spurs. Roads<br />

and residential lines go on the spurs in horizontal lines,. The only possible vertical link<br />

between the adjacent rows could be provided by construction of public foot steps just like<br />

staircases in multi-stories buildings. Due to irregular topography each and every spur in the<br />

Towns requires a number of foot steps. During the 9 th Plan, Rs. 275.00 lakh was utilised for<br />

construction of 39840 running metres of public steps at may places in the various Towns.<br />

Still much has to be done and the scheme is proposed to be continued in the 10 th Plan as<br />

new schemes in view of the fact that every item of works shall be taken up as new works.<br />

Rs. 950.00 lakh is proposed for the 10 th Plan for target of 103900 running meters Rs. 150.00<br />

lakh is provided for <strong>2006</strong> - <strong>2007</strong>. The allocation is for distribution to District Headquarters<br />

as necessary.<br />

4. DUMPING GROUND: The existing two dumping grounds in Aizawl City are in need of<br />

Improvement. Similarly, Dumping Ground in other towns viz. Lunglei, Champhai and<br />

Kolasib are in need of expansion and improvement. A need has been felt to construct<br />

another dumping ground in the other direction route in order that town garbages could be<br />

disposed off all through the seasons. For these purposes, Rs. 80.00 lakh is proposed for the<br />

10 th Plan Rs. 10.00 lakh is allocated for <strong>2006</strong>-<strong>2007</strong>. The main work shall be road<br />

construction for some distance from the main road, digging of dumping pits, construction<br />

of dumping platform as well as protection walls and vehicle turning points. etc.<br />

5 MONSOON DAMAGE SCHEME :<br />

Damage caused to roads, lanes, houses, properties and even lives due to heavy rains<br />

during rainy season are almost annual phenomenon in <strong>Mizoram</strong>.Here annual rainfall is<br />

mostly 250cm to 350cm, and the approximate intensity of rainfall is 70m per hour. Due to<br />

steep topography, the concentration flow of rain water is short and rapid. The very high<br />

peak flow of rain water causes landslides, thereby damaging roads, lanes, houses and<br />

properties. Hence restoration and repair works have to be taken up every year. A need is<br />

there to set apart certain outlay for such purposes as Monsoon damage fund. The proposed<br />

outlay for the 10 th Plan 2002 - <strong>2007</strong> is Rs. 300.00 lakh. Rs. 70.00 lakh is allocated for <strong>2006</strong> -<br />

<strong>2007</strong>.<br />

6. RCC FOOTPATH/PEDESTRIAN PAVEMENT: Rs. 30.00 lakh is earmarked for the<br />

construction and also for the maintenance of the existing Pedestrian pavements for the<br />

year <strong>2006</strong> - <strong>2007</strong><br />

7. HIGH MAST LIGHTING: No earmarked during <strong>2006</strong> – <strong>2007</strong>.<br />

8. FLY-OVER BRIDGE: No earmarked during <strong>2006</strong> – <strong>2007</strong>.<br />

9. OFFICE BUILDING: During the 9 th Plan, two District Level Offices were constructed in<br />

Aizawl and it is badly required the expansion of the size as well as activities of the<br />

department. There is an urgent need of extending the Directorate Office, the Circle Offices<br />

at Champhai, Kolasib and the DLAO Office at Aizawl and Lunglei. It is therefore proposed<br />

to provided Rs. 70.00 lakh during the 10 th Plan for Office building. During <strong>2006</strong> – <strong>2007</strong>, Rs.<br />

20.00 lakh is earmarked for the maintenance of Office Buildings.<br />

10. SOLID WASTE MANAGEMENT: No earmarked during 2005 – <strong>2006</strong>.<br />

11 GARBAGE TRUCK TERMINAL: No earmarked during 2005 – <strong>2006</strong>.


- 435 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

12. CLEANLINESS / BEAUTIFICATION OF CITY: Cleanliness Drive has been carried out in<br />

<strong>Mizoram</strong> since 1977 without break. Awareness campaign as well as physical works of<br />

cleanliness have been done every year. The local authorities, the NGO’s, the Church leaders<br />

and the students of various levels have been involved in such important drives. It has long<br />

been felt necessary to make plan provision for such kind of important public activities.<br />

Besides this, the Department is intending to take steps towards beautification of Aizawl City<br />

for the 10 th Plan. Rs. 80.00 lakh is proposed, Rs. 20.00 lakh is earmarked for implementation<br />

of the programme like observance of cleanliness week and also for the beautification of<br />

Aizawl City during <strong>2006</strong> – <strong>2007</strong>.<br />

13. SANITATION: The term Sanitation is hereby used to express the problems of<br />

garbage in the towns with clearance and disposal there of with all the required devices such<br />

as man powers, vehicles and other implements, maintenance of dumping grounds, public<br />

urinals and many other urban problems of the like nature. A seperate establishment to deal<br />

with this kind of problems has been set up in Aizawl mostly paid and run from Non-Plan<br />

provisions. A need has long been felt to expand the Sanitation establishment by creating few<br />

more posts like the Joint Director (Sanitation) field staff including Sweepers. The reasons is<br />

that the problems are numerous and the existing level of the one Sanitation Officer, two<br />

Assistant Sanitation Officers and Supporting Offices Staff and Field Staff could not cope<br />

with the problems. It is proposed to take up this expansion scheme in the plan side during<br />

the 10 th Plan. A need is also felt to open new Sanitation Establishments in Lunglei, Champhai<br />

and Kolasib. However, the details of the requirement for the expansion is shown against<br />

point No. 16 - Direction & Administrations. Exclusively for management of collection and<br />

disposal of garbage, daily cleaning of important public places, public urinals, etc. Rs. 200.00<br />

lakh is proposed for the 10 th Plan. Recently collection of garbage two times a day was<br />

introduced at Aizawl and for which Rs. 55.30 lakh is earmarked for maintenance and keep<br />

up of garbage trucks and other expenditures to run the sanitation function at Aizawl and<br />

other District Headquarters.<br />

Break up of Rs. 55.30 lakh.<br />

(13) O.E - Maintenance of Light Vehicle & Office expenditure - Rs. 7.00 lakh<br />

(3 Nos. of LMV & 8 Two wheeler)<br />

(50) O.C - Other charges - Rs. 9.00 lakh<br />

(51) M.V. - (a) P.O.L.<br />

(b) For repairing of Vehicle<br />

(c) For Purchase of Tyres<br />

(There are 19 Heavy Vehicles for Sanitation)<br />

- Rs. 39.30 lakh<br />

TOTAL - Rs. 55.30 lakh<br />

14. SHOPS AND MARKETING CENTRES: No provision during 2004 - 2005.<br />

15. CLEAN MIZORAM: CLEAN MIZORAM SOCIETY has been formed by the Government<br />

of <strong>Mizoram</strong> to propagate the gospel of cleanliness in the whole of the state since the last<br />

part of 2005 – <strong>2006</strong> and Rs. 20.00 lakh was provided during the year for the initial<br />

establishment.<br />

Since the Local Administration Department is a Nodal Department, fund provision is<br />

made against the Urban Development (LAD) and the provision is to be given to the society as<br />

Grants-in-Aid. Rs. 20.00 lakh is earmarked for the year <strong>2006</strong> – <strong>2007</strong>.


- 436 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

16. MATCHING SHARE OF SJSRY: During the 9 th Plan, the annual central grant for SJSRY<br />

in <strong>Mizoram</strong> is mostly Rs.128.00 lakh per year. It is expected to receive more grants every<br />

year and the proposed matching share is slightly higher for during the 10 th Plan than those<br />

during the 9 th Plan period. Hence, Rs. 158.00 lakh is earmarked during <strong>2006</strong> – <strong>2007</strong>.<br />

17. ENVIRONMENTAL IMPROVEMENT OF URBAN SLUM: Although any part or portion of<br />

towns in <strong>Mizoram</strong> has not been identified a Slum area, yet any parts there of, mostly in the<br />

lower reaches, are obviously in the condition of slums. Link road is a problem, scarcity of<br />

drinking water is there, electricity is a problem and above all drainage problems have<br />

assumed proportion that is more serious. With rapid urbanisation during the last 20 years,<br />

the towns are rapidly expanding and the larger parts of the towns now occupy the lower<br />

reaches of the hill slopes where drainage problems are very serious due to uncontrolled<br />

flow of storm water. In short, cluster of dwelling houses are without basic amenities. For<br />

the 10 th Plan, Rs. 175.00 lakh is proposed for EIUS. During <strong>2006</strong> - <strong>2007</strong>, Rs. 28.00 lakh is<br />

allocated for the schemes.<br />

18. DIRECTION AND ADMINISTRATION: During the 8 th Plan, the following post have<br />

been created and filled up, and were continued during the 9 th Plan. Obviously the posts are<br />

required to implement the 10 th Plan schemes as well as to carry on the Administrative<br />

aspects connected with the plans. In addition to the existing posts, certain new posts are<br />

also urgently required as briefly explained against point No. 12 (Sanitation). For the 10 th<br />

Plan, Rs. 400.00 lakh is proposed. Rs. 76.17 is earmarked during <strong>2006</strong> - <strong>2007</strong>.<br />

Break - up of 2004 - 2005 will be as follows :-<br />

(i) Salary : Rs. 33.67 lakh<br />

(ii) Wages : Rs. 8.00 lakh<br />

(iii) Medical Treatment : Rs 2.00 lakh<br />

(iii) T.E : Rs. 1.50 lakh<br />

(iv) O.E : Rs. 13.00 lakh<br />

(v) Motor Vehicles : Rs. 10.00 lakh<br />

(vi) Other Charges : Rs. 8.00 lakh<br />

Total : Rs. 75.00 lakh<br />

LIST OF EXISTING POSTS<br />

1. 1 (One) Joint Director - 12000 - 18000<br />

2. 2 (two) Deputy Director - 10000 - 15200<br />

3. 1 (one) Circle Officer - 6500 - 10500<br />

4. 1 (one) Assistant Engineer - 8000 - 13500<br />

5. 1 (one) Junior Engineer - 5500 - 9000<br />

6. 2 (two) Assistants - 5500 - 9000<br />

7. 3 (three) UDC’s - 5500 - 9000<br />

8. 5 (five) LDC’s - 4000 - 6000<br />

9. 2 (two) Town Supervisors - 4500 - 7000<br />

10. 1 (one) Steno Gr. III - 5000 - 8000<br />

11. 7 (seven) Drivers - 3050 - 4590<br />

12. 4 (four) Handyman - 2650 - 4000<br />

13. 7 (seven) Sweepers - 2650 - 4000


- 437 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PROPOSED NEW POSTS<br />

1. 1 (one) Jt Director or its equivalent post (Sanitation) - 12000 - 80000<br />

2. 1 (one) Steno Gr. III - 5000 - 8000<br />

3. 1 (one) Office Superintendent - 8000 - 13500<br />

4. 1 (one) Driver - 3050 - 4590<br />

5. 1 (one) Sanitation Officer (Lunglei) - 8000 - 13500<br />

6. 1 (one) Assistant (Lunglei) - 5500 - 9000<br />

7. 2(two) LDC (Lunglei) - 4000 - 6000<br />

8. 1 (one) Drive (Lunglei) - 3050 - 4590<br />

9. 40 (forty) Sweepers - 2650 - 4000<br />

10. 10 (ten) Lorry Attendants - 2650 - 4000<br />

19. Jawaharlal Nehru National Urban Renewal Mission (JN-NURM): A new scheme known<br />

as Jawaharlal Nehru National Urban Renewal Mission (JN-NURM) during the later part of<br />

2005-06. The Government of <strong>Mizoram</strong> has allocated / Earmarked amounting to Rs. 675.00<br />

lakh for the year <strong>2006</strong> – <strong>2007</strong>.


- 441 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

URBAN DEVELOPMENT<br />

(Incl. State Capital Project & Upgradation of Standard of Administration)<br />

1. Direction And Administration:<br />

A sum of Rs. 230.00 lakh is provided for Direction & Administration during 10 th Five<br />

Year Plan and Rs. 100.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

The break-up of Direction & Administration is as below: —<br />

1) Salary - Rs. 85.00 lakh<br />

2) T.E. - Rs. 2.00 lakh<br />

3) Office Expenses - Rs. 5.00 lakh<br />

4) Motor Vehicles - Rs. 4.00 lakh<br />

Total - Rs. 96.00 lakh<br />

2. Machinery and Equipment:<br />

No provision is kept for Machinery and Equipment during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Planning and Research:<br />

No provision is kept for Planning and Research during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Works (Urban Development):<br />

Rs. 2.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong> for improvement of road side<br />

drains within Aizawl City.<br />

Rs 2.00 lakh is approved during <strong>2006</strong> – <strong>2007</strong> for improvement of road side<br />

drains within Lunglei town.


- 445 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

TOWN & COUNTRY <strong>PLAN</strong>NING<br />

(Rs. in lakh)<br />

A. 2217 - 03 IDSMT (REVENUE SECTION): AIZAWL LUNGLEI TOTAL<br />

1. Land Planning & Development, Master<br />

Plan/Action Plan Project preparation : 3.00 1.00 4.00<br />

2. M & E – cum – I.T. : 6.00 - 6.00<br />

3. D & A : 42.00 12.50 55.00<br />

TOTAL OF 2217 : 51.50 13.50 65.00<br />

B. 4217 - 03 IDSMT (CAPITAL SECTION):<br />

1. Implementation of approved Master Plans Schemes,: Rs. 11.00 lakh<br />

viz. - Landuse Development Regulation & Control through<br />

Layout Plan/Sub.Division, Building Regulation & Control,<br />

Construction (formation cutting) of lane roads, construction<br />

of storm drains etc.<br />

2. State Matching Share for approved Projects, viz. -<br />

1) Hnahthial Action Plan Project : Rs. 20.00 lakh<br />

2) Lunglei Action Plan Project : Rs. 8.00 lakh<br />

3) Lengpui Action Plan Project : Rs. 2.00 lakh<br />

4) Mamit Action Plan Project : Rs. 2.00 lakh<br />

5) Bairabi Action Plan Project : Rs. 12.00 lakh<br />

6) Tlabung Action Plan Project : Rs. 12.00 lakh<br />

7) N. Kawnpui Action Plan Project : Rs. 12.00 lakh<br />

TOTAL OF 4217 : Rs. 79.00 lakh<br />

GRAND TOTAL (A+B) : Rs. 144.00 lakh<br />

C. ABSTRACT IN BRIEF:<br />

1. Land Planning & Development, Master<br />

1) WORK COMPONENT Rs. 83.00 lakh : 57.64 %<br />

2) PROCUREMENT OF TOOLS & <strong>PLAN</strong>TS Rs. 6.00 lakh : 4.16 %<br />

3) DIRECTION & ADMINISTRATION, ETC. Rs. 55.00 lakh : 38.20 %<br />

TOTAL Rs.144.00 lakh 100.00 %<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong> – <strong>2007</strong><br />

NAME OF OFFICE/DEPT. : Town & Country Planning Wing, L.A.D.<br />

SUBJECT : Integrated Deevelopment of Small & Medium Towns<br />

Town & Country Planning has a multifarious function. It deals with the problems of<br />

Urban Planning and Development in the state. It prepares Master Plan Development Scheme<br />

etc., for Cities and Towns in <strong>Mizoram</strong>. It prepared detail development schemes, projects and<br />

executes works under centrally sponsored schemes of Integrated Development of Small &<br />

Medium Towns (now Urban Infrastructure Development Schemes for Small & Medium<br />

Towns (UIDSSMT) and Schemes under Non-Lapsable Central Pool of Resources(NLCPR). In<br />

addition to this, landuse/development and construction of building has been regulated<br />

within the approved Master Plan areas by enforcing <strong>Mizoram</strong> Urban & Regional Development<br />

Act, 1990 amended in 1996 & 2004 and Rules, 1998.<br />

During <strong>2006</strong>–07, the department proposed to continue preparation Master Plan for<br />

district headquarter and implementation of approved Master Plan schemes, such as —<br />

regulation & control of land use/development, regulation & control of building construction,


- 446 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

construction (formation cutting) of lane roads, construction of storm water drains/retaining<br />

wall etc. and construcion of ongoing market etc. projects.<br />

It also proposed to continue the projects which are not completed during 2005–06<br />

and takes up under the new schemes of Urban Infrastructure Development Schemes for<br />

Small and Medium Towns (UIDSSMT) which is being introduced by Govt. of India, Ministry<br />

of Urban Development replacing the present centrally sponsored scheme of IDSMT.<br />

The approved financial outlay during <strong>2006</strong> – <strong>2007</strong> is as follow :-<br />

Annual Plan 2005 – <strong>2006</strong> ——————- Rs. 124.00 lakh<br />

Annual Plan <strong>2006</strong> – <strong>2007</strong> ——————- Rs. 144.00 lakh<br />

Details are as follows :-<br />

A. 2217 - INTEGRATED DEVELOPMENT OF SMALL & MEDIUM TOWNS (REV.)<br />

: AIZAWL LUNGLEI TOTAL<br />

1. D & A : 42.50 12.50 55.00<br />

2. M & E-cum-I.T. : 6.00 - 6.00<br />

3. Land Planning & Development, : 3.00 1.00 4.00<br />

Master Plan/Action Plan Project preparation<br />

TOTAL OF 2217 : 51.50 13.50 65.00<br />

DETAILS OF 2217 of IDSMT (Rev.)<br />

(Rs. in lakh)<br />

Sl. Aizawl Lunglei<br />

No. Detail Description Hq. Branch Office Total<br />

1. Salary 18.00 5.40 23.40<br />

2. Medical Treatment 2.00 0.60 2.60<br />

3. Wages 3.76 1.30 5.06<br />

4. Traveling Expenses 1.00 0.60 1.60<br />

5. Office Expenses 6.50 2.00 8.50<br />

6. Rent 1.94 - 1.94<br />

7. Land Planning & Development / 3.00 1.00 4.00<br />

Master Plan/Action Plan Project preparation<br />

8. Workshop/Seminar/Stipend 0.30 - 0.30<br />

9. Motor Vehicles 8.00 2.00 10.00<br />

10. Other Charges 1.00 0.60 1.60<br />

11. M & E 6.00 - 6.00<br />

TOTAL OF D & A : 51.50 13.50 65.00<br />

B. 4217 - INTEGRATED DEVELOPMENT OF SMALL & MEDIUM TOWNS<br />

(Now URBAN INFRASTRUCTURE DEVELOPMENT SCHEMES FOR SMALL & MEDIUM<br />

TOWNS)<br />

(CAPITAL SECTION)<br />

1. Land Planning & Development - - NIL-<br />

2. Construction - Rs. 79.00 lakh<br />

TOTAL - Rs. 79.00 lakh


- 447 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Detail of schemes proposed to be taken up during <strong>2006</strong> - <strong>2007</strong> under 4217 IDSMT<br />

(Capital) are as follows :<br />

A. IMPLEMENTATION OF <strong>APPROVED</strong> MASTER <strong>PLAN</strong> SCHEMES<br />

1) Aizawl Master Plan Schemes/Land/Building regulation & - Rs. 4.00 lakh<br />

Control/MC Hall Western slopes stability measures<br />

2) Hnahthial Master Plan Schemes/Land/Building regulation - Rs. 4.00 lakh<br />

Construction of Lane roads/storm drains/demarcation of plots<br />

3) Kolasib Master Plan Schemes/Land/Building regulation - Rs. 2.50 lakh<br />

Control/construciton of Lane roads<br />

4) Lunglei Master Plan Schemes/Land/Building Regulation & Control - Rs. 0.50 lakh<br />

TOTAL - Rs. 11.00 lakh<br />

B. DETAIL OF CONSTRUCTION (STATE MATCHING SHARE)<br />

Sl.No. Name of On-going Schemes Allocation of Funds<br />

1. LUNGLEI ACTION <strong>PLAN</strong>/PROJECT:<br />

1) Construction of Office Building/Vehicle Parking - Rs. 8.00 lakh<br />

2. HNAHTHIAL ACTION <strong>PLAN</strong>/PROJECT:<br />

1) Construction of C. Hall at Hnahthial - Rs. 20.00 lakh<br />

3. LENGPUI ACTION <strong>PLAN</strong>/PROJECT:<br />

1) Construction of Car/Vehicle Parking - Rs. 2.00 lakh<br />

4. MAMIT ACTION <strong>PLAN</strong>/PROJECT:<br />

1) Construction of Market buildings/Vehicle Parking/<br />

Playground - Rs. 2.00 lakh<br />

5. BAIRABI ACTION <strong>PLAN</strong>/PROJECT:<br />

1) Construction of Market Building/Vehicle Parking/<br />

Playground etc. - Rs. 12.00 lakh<br />

6. TLABUNG ACTION <strong>PLAN</strong>/PROJECT:<br />

1) Construction of Market Building, Side/<br />

Storm drains etc. - Rs. 12.00 lakh<br />

7. N. KAWNPUI ACTION <strong>PLAN</strong>/PROJECT:<br />

1) Construction of Market Building, side/ - Rs. 12.00 lakh<br />

storm drains/Pavement etc.<br />

TOTAL - Rs. 68.00 lakh<br />

TOTAL OF 4217 - Construction (A+B) - Rs. 79.00 lakh<br />

GRAND TOTAL OF ( 2217 + 4217 ) - Rs.144.00 lakh


- 448 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

A. SCHEME-WISE DESCRIPTION OF 2217 [REVENUE]<br />

1. LAND <strong>PLAN</strong>NING & DEVELOPMENT:<br />

Preparation of Development Plan/Master Plan: Rapid increase in urban population<br />

of the state has led to haphazard growth of towns which call for proper planning<br />

and regulated devleopment. Out of the total 22 nos. of statutory towns in <strong>Mizoram</strong><br />

only half a dozen of the towns have so far been planned. This indicated the need<br />

for preparation of Master Plan/Development Plan under relevant Act for<br />

meaningful planned growth and regulated development of these towns. Moreover,<br />

enforcement of the <strong>Mizoram</strong> Urban & Regional Development Act 1990 amended in<br />

1996 & 2004 and Rules 1998 necessitated all the towns in <strong>Mizoram</strong> to be planned for<br />

regulated development under the said Act & Rules. It is, however, understood that all<br />

the towns cannot be covered at a time and hence a provision of Rs. 3.00 lakh is<br />

envisaged during <strong>2006</strong> - <strong>2007</strong> for preparation of Master Plan/Development Plan viz. -<br />

Kawnpui, Mamit and Rawpuichhip.<br />

Besides, Rs. 1.00 lakh is envisaged for preparation of Master Plan of Tlabung.<br />

2. MACHINERY & EQUIPMENT INCLUDING INFORMATION TECHNOLOGY:<br />

The rapid urbanisation process in <strong>Mizoram</strong> coupled with tremendous urban<br />

problem necessitates Modern Equipments & Scientific Instruments like Computers/<br />

Laptop Computers with large format colour Scanner and ploter for degitising Maps,<br />

Drawings, Designs etc. These unstument are also required for protecting important<br />

department documents. In order to augment the technical capabilities of officers and<br />

staffs purchase of above stated machines (tools & plants) is necessary to procure<br />

during <strong>2006</strong> - <strong>2007</strong>. Hence, a token provision of Rs. 6.00 lakh is earmarked for<br />

purchase of instruments and maintenance of existing instruments.<br />

3. DIRECTION & ADMINISTRATION (D & A):<br />

i) Entertainment of Existing Staff / Salary & Creation of essential New Post etc.:<br />

There are 14 posts which have been maintained and continue to be maintained<br />

under Plan Scheme. Such posts are ——<br />

Sl.No. Name of Post No. of Post Scale of pay<br />

1. Sr. Town & Country Planner 1 Rs. 12000 - 375 - 165<br />

2. Town & Country Planner 2 Rs. 10000 - 325 - 15200<br />

3. Asst. Town & Country Planner 4 Rs. 8000 - 275 - 13500<br />

4. Planning Assistant/JE 3 Rs. 5500 - 175 - 9000<br />

5. Urban Surveyor I 1 Rs. 5500 - 175 - 9000<br />

6. Urban Surveyor II 1 Rs. 4500 - 125 - 7000<br />

7. Draft man II 1 Rs. 4500 - 125 - 7000<br />

8. U.D.C. 1 Rs. 5000 - 150 - 8000<br />

TOTAL 14<br />

Besides, the Town & Country Planning is facing serious problem in the execution of<br />

important schemes owing to inadequacy of technical man-power. Due to un-planned<br />

and un-regulated growth there is lot of problems in the urban areas such as natural<br />

and man-made disaster like landslides, un-scientific land development/cutting, undesigned<br />

building construction etc. It is, therefore, absolutely necessary to<br />

strengthen Town & Country Planning Administration by creating additional technical<br />

post such as Chief Town Planner and Stenographer Grade III to effectively deal with


- 449 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

land development and building regulation & control activities which come up rapidly<br />

on unsafe slope and undesigned High rise R.C.C. building construction and other<br />

urban problems.<br />

Hence, Rs. 23.40 lakh is earmarked for entertainment of existing staff.<br />

ii) Medical Treatment: Rs. 2.6 lakh is earmarked for the treatment of existing staff.<br />

iii) Wages: Due to ban on creation of post the Town & Country Planning Wing is<br />

facing tremendous problem both in fields and offices thereby resulting delay in<br />

preparation of Master Plan, Action Plan/Project/Schemes and execution of project<br />

works. So, a sum of Rs. 5.06 lakh is earmarked for engagement of existing Muster<br />

Roll employees like LDC/Typist etc. for the year <strong>2006</strong> - <strong>2007</strong>.<br />

iv) Travelling Expenses (T.E.): Apart from the ongoing works under NLCPR and<br />

IDSMT/UIDSSMT programmes, conduct of physical survey, traffic survey, building<br />

survey, identification of unsafe buildings and landslide prone areas, socio-economic<br />

survey, environment survey, etc. of various towns are part and parel of Master Plan<br />

preparation and implementation. Hence, a provision of Rs. 1.60 lakh i.e. Rs. 0.60 lakh<br />

for Lunglei and Rs. 1.00 lakh for Aizawl is earmarked during <strong>2006</strong>-07 to meet the<br />

Travelling Expenses and for inspection of building onstruction by the city dwellers<br />

and supervision of construction works under NLCPR and IDSMT/UIDSSMT which are<br />

scattered throughout the State and also for survey and investigation of the towns<br />

and growth centres.<br />

v) Office Expense (O.E.): A token provision of Rs. 8.50 lakh, of which Rs. 6.50 lakh<br />

for Aizawl Hq. & Rs. 2.00 lakh for Town & Country Plannng Branch Office Lunglei is<br />

earmarked to meet expenditure for stationery, furniture, maintenance of tools &<br />

plants and other miscellaneous articles during <strong>2006</strong> - <strong>2007</strong>.<br />

vi) Rent/Office Accommodation: Since the Office has no building of its own,<br />

private building is occupied for office on rent. Therefore, to meet the expenditure of<br />

rent for the whole year <strong>2006</strong> - <strong>2007</strong>, Rs. 1.94 lakh is earmarked.<br />

vii) Maintenance of Vehicle (M.V.): Projects undertaken by the Office are located far<br />

from Headquarters, hence good condition of Vehicle is absolutely necessary for<br />

supervision of Planning, land & building regulation & control, Development and<br />

Construction of Works. Therefore, a provision of Rs. 10.00 lakh, of which Rs. 8.00<br />

lakh for Aizawl Headquarters & Rs. 2.00 lakh for Town & Country Planning Branch<br />

Office Lunglei is earmarked for the year <strong>2006</strong> - <strong>2007</strong>.<br />

viii) Workshop/Seminar/Stipend: As per National Norms formulated by the<br />

Ministry of Urban Development, Government of India, One census/ notified town<br />

required 4 (four) number of qualified Town Planners, whereas, there are only 4<br />

(four) number of qualified Town Planners in the State to deal with 22 number of<br />

Town planning, development/land/building regulation & control, urbanisation<br />

problems in the State of <strong>Mizoram</strong>. Therefore, to send students to various Technical<br />

Institutes outside <strong>Mizoram</strong> and also to conduct Public Awareness Programme and<br />

organise Workshop/Seminar, a sum of Rs. 0.30 lakh is earmarked for the year <strong>2006</strong>-07.<br />

ix) Other Charges (OC): A provision of Rs.1.60 lakh is for other excharges, of which<br />

Rs. 1.00 lakh for Aizawl and Rs. 0.60 lakh for Lunglei.


B. 4217 - IDSMT - CAPITAL SECTION<br />

- 450 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. Implementation of Approved Master Plan Schemes: To arrest undesirable<br />

development and construction of buildings and for creation infrastructure &<br />

management of Towns/City, Master Plans has been prepared and approved by the<br />

State Government, Such as - Aizawl City (State Capital), Lunglei (Dist. Hq.), Champhai<br />

(Dist. Hq.), Kolasib (Dist. Hq.), Serchhip (Dist. Hq.), Hnahthial, Thenzawl etc. Hence<br />

for the implementation/execution of Master Plans schemes such as Landuse/<br />

Development regulation & control through Layout Plan/Land Sub-division, Building<br />

regulation & control, roads, parks, drains, slope stability measures, reconstituted of<br />

plots etc., a sum of Rs. 11.00 lakh is earmarked.<br />

2. State Maching Share of C.S.S.: In order to create urban infrastructures and to<br />

strengthen the economic base of towns and to generate employment opportunities,<br />

Integrated Action Plan Projects have been prepared and approved by the<br />

Government of India. Out of 22 census towns, 11 (eleven) priority towns have been<br />

approved by the Central Government under Centrally Sponsored Schemes for which<br />

State matching contribution is absolutely required to be provided. In fact, the<br />

required amount of State matching Share cannot be met in one financial year due to<br />

meage allocation of plan fund which necessitates provision of State share to be in a<br />

phase manner. During <strong>2006</strong> - <strong>2007</strong>, a provision of Rs. 68.00 lakh is earmarked for<br />

State matching contribution for the approved Action Plan Projects.<br />

3. Urban Infrastructure Development Scheme For Small & Medium Towns (UIDSSMT)<br />

Replace Previous IDSMT Scheme: The Government of India, Ministry of Urban<br />

Development has proposed to launch Urban Infrastructure Development Schemes for<br />

Small & Medium Towns (UIDSSMT). The Scheme aims at improvement in urban<br />

infrastructure in towns other than AIzawl City in a planned manner. This Scheme<br />

seeing replace IDSMT. The project under UIDSSMT is to be a big project which will<br />

involve large amount of fund.<br />

It is, therefore, extremely necessary for the State Govenment to provide more<br />

fund to match the Central grant so as to avail UIDSSMT scheme for other 21 towns in the<br />

State.


- 453 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

INFORMATION & PUBLIC RELATIONS<br />

Introduction:<br />

With the ushering in of an era of Peace in <strong>Mizoram</strong>, the role of Information & Public<br />

Relations has shifted from propaganda machine to publicity for public education of the<br />

various departmental schemes of the Government an added important role which is known<br />

as Public Relations has to be taken up in order that public confidence may be earned so that<br />

all the developmental schemes and plans may be translated into people’s movement.<br />

The Department is functioning with a Directorate at the Headquarters and Districts<br />

and Sub-Divisions in their respective areas. There are 6 (six) Rural Information Centers in<br />

the whole State manned by Technicians Grade III who function in the Centers in rented<br />

houses. With the rapid progress of development in various fields, it is felt inadequate to<br />

remit the functioning of the Department from these 6 (six) Rural Centers only as the<br />

majority of the people in the interior are deprived of their rights to information.<br />

With the advancement of Technology, it is indispensable for the Department to equip<br />

itself with modern techniques of communication such as Television / Video, Radio,<br />

Computers and all kinds of electronic media in order that the people of the State may be<br />

exposed to the rest of the country and vice-versa thus cementing National Integration to<br />

bring the people closer to the mainstream of National life. Cultural & Social Exchanges with<br />

other States must also be carried out.<br />

For combating the impending Famine due to Bamboo Flowering in the State, it is<br />

proposed to extend necessary assistance by executing various schemes during the year.<br />

Therefore, the following items are approved to be taken up during this year and<br />

Rs.270.00 lakh is earmarked during <strong>2006</strong> - <strong>2007</strong>.<br />

1. DIRECTION & ADMINISTRATION: During this year, we intended to carry out the<br />

following works as our place of work have to be strengthened and improved. And Rs. 30.00<br />

lakh is earmarked for these purposes: -<br />

1. Maintenance of our existing Directorate Building and<br />

completion of Conference Hall<br />

- Rs. 10.00 lakh<br />

2. Construction of Office building-cum-quarter at Mamit - Rs. 10.00 lakh<br />

3. Fencing of Departmental lands at various Districts - Rs. 10.00 lakh<br />

TOTAL - Rs. 30.00 lakh<br />

2. PRODUCTION OF FILMS: During the 9 th Five Year Plan, a few documentary video<br />

films are produced mainly for telecast over Doordarshan, New Delhi. Since it has not been<br />

possible for Doordarshan to make sufficient coverage on <strong>Mizoram</strong>, it has become necessary<br />

for the Government to produce a true image of <strong>Mizoram</strong> an its people so that the Mizos will<br />

be known to the rest of the country in a correct perspective and thereby removing<br />

misinformation about <strong>Mizoram</strong> and its people. The local transmission-cum-production<br />

centre of Doordarshan which came up recently is expected to open up more opportunities<br />

to participate in this powerful media. In addition to this, the Department produces <strong>Mizoram</strong><br />

Today, a video monthly news capsules which is included in the local programme of Cable<br />

T.V. Networks. To intensify production and improve standard and quality, better<br />

equipments and technical knowhow are required. Also we will continue Live Telecast of the<br />

Session of the State Legislative Assembly through local Cable T.V. Network. For these<br />

purposes, Rs. 8.00 lakh is earmarked for <strong>2006</strong>-<strong>2007</strong>.


- 454 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. PUBLIC EXHIBITION OF FILMS: With the growing menace of drug abuse and social<br />

evils it has become necessary to intensify public exhibition of films shows to educate the<br />

mass of people. For procurement and purchase of films on National Integration, Family<br />

Planning, Drug Abuse and other education films in the interior villages, an amount of<br />

Rs.6.00 lakh is provided during the year <strong>2006</strong>-<strong>2007</strong>.<br />

4. OTHERS:<br />

(a) TRAINING IN MASS COMMUNICATION: With the introduction of new techniques in<br />

Mass Communication, it is necessary for the Officers of this Department to undergo training<br />

courses to catch up with modern techniques and skills.<br />

(b) RESEARCH AND REFERENCE: Research and Reference Wing will have to be<br />

strengthened at the Directorate as well as in the Districts and Sub-Divisions.<br />

(c) Due to reallocation of the subject, the Right to Information Act, 2005 to the<br />

Department of Information & Public Relations. Intensive training will have to be conducted<br />

by this Department for State Public Information Officer, A.P.I.O. and Department Heads, etc.<br />

Hence, additional fund of Rs. 10.00 lakh is provided for the purpose of training in<br />

collaboration with Administrative Training Institute, Aizawl. With this additional proposal,<br />

the total amount of Rs. 16.00 lakh is set aside for training in Mass Communication, etc.<br />

during <strong>2006</strong>-07.<br />

5. ADVERTISING & VISUAL PUBLICITY: Advertising and Visual Publicity being the core<br />

of publicity for building the image of the Government in Government Public Relations<br />

works, it is proposed to intensify support of the developmental activities in the form of<br />

Advertising and Visual Publicity. Hence, an amount of Rs. 8.00 lakh is provided for the year<br />

<strong>2006</strong>-<strong>2007</strong>. In addition to this, due to the introduction of the Right to Information Act,<br />

Information, Research & Communication (IRC) has to be imparted to various functionaries of<br />

the Government in the State Capital as well as District and Sub-Divisional Headquarters.<br />

Hence, an additional amount of Rs. 10.00 lakh is provided for the year <strong>2006</strong>-07, thus making<br />

a total of Rs. 18.00 lakh.<br />

6. INFORMATION CENTRES: Information Centres in rural areas presently is<br />

operational and are housed in rented buildings and are inadequately staffed with minimum<br />

Audio visual equipments. To improve the conditions of this Information Centres and for<br />

renting of House for Information Centre at Delhi, an amount of Rs. 21.00 lakh is provided<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

7. PRESS INFORMATION SERVICES: Presently we are subscribing 3 (three) P.T.I.<br />

Services at Raj Bhawan, Chief Minister's Office and the Directorate and 3 (three) U.N.I.<br />

Services at Raj Bhawan, Chief Minister's Secretariat and the Directorate. During this year we<br />

proposed to continue subscription of PTI/UNI services. With price escalation and the<br />

subscription rate almost trebled, it has become necessary to increase the financial target to<br />

cover the expenditure for the services. Also the main function of the Departmental issue of<br />

Press Releases. For improving our press releases we proposed to purchase one high quality<br />

Xerox machine. Hence, Rs. 15.00 lakh is provided during 2005-<strong>2006</strong>.<br />

8. FIELD PUBLICITY: With the Government emphasis on rural development and<br />

bringing democracy at the grassroot level, it is necessary that field publicity is strengthened<br />

in all Districts, Sub-Division and wherever we have Information Centres, maximum mobility<br />

is necessary to reach the people at the grassroot level. For the functioning and maintenance<br />

of above, Rs. 21.00 lakh is provided during the year <strong>2006</strong>-<strong>2007</strong>.


- 455 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

9. SONGS AND DRAMA: To promote National Integration we have been receiving and<br />

sending cultural troupes from various states and to various states during the previous<br />

years. We propose to send more cultural troupes to different parts of the country. VVIPs/<br />

VIPs and officials from Central and other states visiting the state are gifted with traditional<br />

presentation items. An amount of Rs. 8.00 lakh is provided for taking up activities<br />

mentioned during <strong>2006</strong>-<strong>2007</strong>.<br />

10. PHOTO SERVICES: To record various development activities for publications as well<br />

as for release to the National papers, it has become necessary to enlarge and strengthen our<br />

Photo Service Section. As already mentioned earlier, with the commissioning of local T.V.<br />

Transmission-cum-Production Centre at Aizawl, it has become necessary to support this<br />

centre. We have to continue Photo coverages of important function within the State and the<br />

visit of VVIP/VIP and tours of our State VIPs. For this, an amount of Rs. 15.00 lakh is<br />

provided for the year <strong>2006</strong>-<strong>2007</strong>.<br />

11. PUBLICATION: Publication of developmental activities and facts about <strong>Mizoram</strong> will<br />

be intensified for both National as well as local consumption. It is also purposed to continue<br />

publication of Calendar and Diaries in the coming year. For this, an amount of Rs. 24.00<br />

lakh is provided during <strong>2006</strong>-<strong>2007</strong>.<br />

12. COMMUNITY RADIO AND TELEVISION: During the previous plans we have installed<br />

quite a number of Community Listening Sets as well as Community Viewing sets in rural<br />

areas. During this year, we propose to continue this scheme and Rs. 2.00 lakh is provided.<br />

13. CULTURAL AND SOCIAL ACTIVITIES: This Department is organising teams for<br />

performance both in <strong>Mizoram</strong> and outside. It has been the responsibility of this Department<br />

to receive visiting Cultural Troupes from outside <strong>Mizoram</strong>. Besides, the Department has also<br />

been sending Cultural Troupes to participate in the Republic Day Celebration in New Delhi.<br />

Also. At least 2 tribal representatives & escorting officers are proposed to be sent to New<br />

Delhi to witness Republic Day celebration of <strong>2006</strong>. For this, an amount of Rs. 14.00 lakh is<br />

earmarked during <strong>2006</strong>-<strong>2007</strong>.<br />

1. For sending of Tribal Representative and<br />

escorting officer in the Republic Day celebration<br />

2. Republic Day Celebration in State Capital / District Capital - Rs. 14.00 lakh<br />

3. Bharat Darshan Tour / Press Tour , etc.<br />

4. Aizawl Darshan<br />

14. BAFFACOS: For combating the impending Famine due to Bamboo Flowering by<br />

extending necessary assistance under various schemes worked out by the Department under<br />

the Baffacos Scheme, it is intended to execute the following schemes during the year a total<br />

amount of Rs. 70.00 lakh is provided as per break-up below: -<br />

1 Publication - Rs. 18.00 lakh<br />

2. Production of Documentary Films - Rs. 10.00 lakh<br />

3. Multi-Media Publicity Campaign - Rs. 17.00 lakh<br />

4. Conducted Tour of Media Persons and Travel Writers - Rs. 9.00 lakh<br />

5. Publicity and Advertisement within & outside the<br />

State<br />

- Rs. 16.00 lakh<br />

TOTAL - Rs. 70.00 lakh<br />

TOTAL OF NORMAL <strong>PLAN</strong> PROPOSAL - Rs. 270.00 lakh


- 459 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

LABOUR & EMPLOYMENT<br />

The Directorate of Labour & Employment came into being during the middle of 1980,<br />

while an Employment Exchange was established at Aizawl in 1958 and Industrial Training<br />

Institute existed since 1964 while <strong>Mizoram</strong> was a part of the erstwhile Assam. During the<br />

period of Union Territory two District Employment Exchanges were established at Lunglei<br />

and Saiha along with the opening of two Sub-Divisional Employment Exchanges at Champhai<br />

and Chawngte. After <strong>Mizoram</strong> attained full statehood, the Sub-Divisional Employment<br />

Exchange at Champhai had been upgraded to a full-fledged District Employment Exchange.<br />

With the creation of new Districts in <strong>Mizoram</strong>, the Council of Ministers in its meeting<br />

decided to open District Employment Exchange at Kolasib and Lawngtlai District<br />

Headquarters, and new functioning as full-fledged District Employment Exchange.<br />

Under the Centrally Sponsored Scheme, three new Special Employment Exchanges<br />

are being set up at Aizawl, Lunglei and Saiha exclusively for the benefit of the Physically<br />

Handicapped Persons at the Central-State share of 80:20 ratio.<br />

Similarly, under the Prime Minister’s Special Economic Package for North-Eastern<br />

States for Vocational Training Programme (Craftsmen Training Scheme) Government of<br />

India approved to strengthen/modernise the existing ITI at Aizawl and establish two new<br />

ITIs at Lunglei and Saiha with Central assistance to the tune of Rs.635.12 lakh. The scheme<br />

is to be financed from the Plan funds provided during FYs 2000-2003 Govt. of India.<br />

Ministry of Labour, DGET agreed to extend the Scheme upto <strong>2007</strong> with cent percent Central<br />

funds for salary and stipend. Accordingly new ITIs at Lunglei and Saiha are opened and ITI<br />

Aizawl is also strengthened simultaneously.<br />

There are three wings under the department namely :-<br />

1. LABOUR WELFARE<br />

2. EMPLOYMENT SERVICE<br />

3. CRAFTSMAN TRAINING<br />

The approved financial outlay for <strong>2006</strong>-07 for Labour & Employment Department is<br />

as under: -<br />

1. Direction - Rs. 25.90 lakh<br />

2. Labour Administration - Rs. 12.20 lakh<br />

3. Employment Service - Rs. 43.00 lakh<br />

4. Craftsmen Training - Rs. 64.40 lakh<br />

5. Matching share for the establishment - Rs. 4.50 lakh<br />

of Special Employment Exchange<br />

TOTAL :- - Rs. 251.30 lakh<br />

DESCRIPTION OF HEAD-WISE SUB SECTOR WISE ALLOTMENT OF FUND AND THE OUTLINE<br />

OF PHYSICAL TARGET<br />

1. DIRECTION:<br />

The Directorate of Labour & Employment has been run by just two Officers - one<br />

Director and one Deputy Director to look after Labour Administration, Employment Service<br />

and Craftsman Training. The main functions of the Directorate are :-


- 460 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(a) Labour Welfare: A considerable number of Central Acts are adapted under the State<br />

of <strong>Mizoram</strong>. Adaption of Laws order (No. 2) 1987 may be classified as Labour Laws. Certain<br />

Labour Acts promulgated after <strong>Mizoram</strong> became State on 20.2.1987 are also applicable to<br />

<strong>Mizoram</strong>. Framing regulations and rules and to implement in <strong>Mizoram</strong> as per statutory<br />

requirements of these Central Acts are the functions of the Directorate of Labour &<br />

Employment. A few number of such Acts which have been implemented and which still<br />

requires immediate implementation in <strong>Mizoram</strong> are given here under: -<br />

i) Minimum Wages Act<br />

ii) Payment of Wages Act<br />

iii) Workmen Compensation Act<br />

iv) Contract Labour (Abolition and Regulation) Act<br />

v) Trade Union Act<br />

vi) Shops and Establishment Act<br />

vii) Factories Act<br />

viii) Inter-State Migrant Workers’ Act<br />

ix) Payment of Bonus Act<br />

x) The Child Labour (Prohibition and Regulation) Act<br />

xi) Compulsory Notification of Vacancies Act<br />

xii) The Persons with Disabilities (Equal Opportunities, Protection of Rights and<br />

Full Participation) Act<br />

(b) Employment Service: The State Directorate of Labour & Employment functions as a<br />

man power organisation and planning agency for the state. It provides leadership, guidance<br />

and expertise in such technical fields as: -<br />

i) Surveys and studies relating to employment and un-employment<br />

ii) Manpower planning and forecasting<br />

iii) Enforcement of Employment Exchange compulsory Notification of Vacancies<br />

Act.<br />

iv) Collection of Employment Market Information and Public Relation in the<br />

matter of self- employment programmes.<br />

v) Vocational Training, Vocational Guidance and Career Advice.<br />

vi) Occupational Research and Information<br />

vii) Supervision of Employment Exchanges Coaching-cum-Guidance Centres in<br />

the State.<br />

viii) Staff Training.<br />

(c) Craftsmen Training Scheme: The Directorate exercises full control over Industrial<br />

Training Institute operating under the Craftsman Training Scheme. The scheme, the most<br />

important in the field of Vocational training, has been introduced to ensure a steady flow of<br />

skilled workers in different trades for industries as also for self-employment ventures to<br />

reduce un-employment among the educated youths by providing their employable training<br />

and to cultivate a technical and industrial attitude in the minds of the younger generation<br />

Supervision, evaluation, yearly conduct of tests and final trade tests for the intakes of these<br />

Industrial Training Institutes are the responsibilities of the Directorate.<br />

Strengthening of the Directorate<br />

The strength of the Directorate in terms of Officers and technical staff has remained<br />

unchanged for the last 23 years since its inception in 1980. It requires to be strengthened<br />

with at least one Joint Director to enable authoritative and decisive disposal of matters at<br />

high level and some essential additional inspectorial functionaries. It also requires to be<br />

strengthened to cope with variety of its functions, to be more relevant and responsive to<br />

changing scenario in industrial relations, labour employment market, day to day


- 461 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

administration of ITIs and to cater the needs of the physically handicapped persons along<br />

with the unemployed youths. Yet, in order to maintain maximum austerity in realisation of<br />

the adverse fiscal situation prevailing in <strong>Mizoram</strong>, only one post of Joint Director for<br />

Labour, Employment Services and Craftsman Training is proposed instead of separate<br />

incumbencies.<br />

In the light of above, it becomes vitally necessary to create and fill up the barest<br />

minimum posts in the Directorate. The proposed creation of posts may be summed up thus:<br />

1. Joint Director-cum-Deputy Labour Commissioner - 1(one) Post<br />

( Rs.12,000-15,200/- )<br />

2. District Employment Officer - 3(three) post<br />

( Rs 8,000-13,500/- )<br />

The Department of Labour & Employment has a suitable site for construction of<br />

Directorate Office. Plan and Estimate costing Rs. 100.00 lakh for construction of Directorate<br />

Building capable of providing accommodation for the Directorate Office, State Employment<br />

Exchange with Labour clearing and career counselling or Information Centre or Rooms,<br />

District Employment Exchange, Sub-Regional Office of the Coaching-cum-Guidance Centre<br />

has been prepared with the approval of Finance Department. Hence the proposal as per<br />

estimate prepared by Technocrats Ltd. It is approved to allocate Rs. 3.00 lakh for site plan,<br />

etc. during this year.<br />

The break-up of financial implication for Direction is as under: -<br />

i) Salary - Rs. 0.50 lakh<br />

ii) Wages - Rs. 0.50 lakh<br />

iii) Medical Treatment - Rs 0.20 lakh<br />

iv) Domestic Travel Expenses - Rs. 1.00 lakh<br />

v) O.E. - Rs. 8.00 lakh<br />

vi) Minor Works - Rs. 3.00 lakh<br />

vii) O.C. - Rs. 7.30 lakh<br />

viii) Grant-in-Aid to NGO - Rs. 2.00 lakh<br />

ix) Advertisement - Rs. 0.40 lakh<br />

x) Major Works Rs. 3.00 lakh<br />

TOTAL i.e. Directions - Rs. 25.90 lakh<br />

2. ADMINISTRATION:<br />

Administration of Labour & Labour Welfare involving enforcement of Labour Acts,<br />

Rules and Regulations is the responsibility of Labour & Employment Department. The<br />

activities also cover registration, inspection, authentication & issue of standing orders,<br />

conciliation adjudication of claims, etc.<br />

Under this head, the following posts had already been approved and created but not<br />

yet filled up: -<br />

a) Labour Officer (Rs.8000-13500) - 1(one) Post<br />

b) Inspector of Factories (Rs.8000-13500) - 1(one) Post<br />

c) Assistant Labour Officer (Rs.6500-10500) - 1(one) Post


- 462 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The following posts had already been filled up: -<br />

a) Assistant (Rs.5500-9000) - 1(one) Post<br />

b) U.D.C. (Rs.5000-8000) - 1(one) Post<br />

c) L.D.C. (Rs.4000-6000) - 1(one) Post<br />

d) Group ‘D’ (Rs.2650-4090) - 1(one) Post<br />

The break-up of financial implication for Administration is as under: -<br />

(a) Salary - Rs. 4.20 lakh<br />

(b) Domestic Travel Expenses - Rs. 0.30 lakh<br />

(c) O.E. - Rs. 4.00 lakh<br />

(d) O.C. - Rs. 3.50 lakh<br />

(e) Advertisement - Rs 0.20 lakh<br />

TOTAL - Rs.12.20 lakh<br />

3. EMPLOYMENT SERVICE :-<br />

As of today, there are 6(six) District Employment Exchanges, one each at Aizawl,<br />

Lunglei, Saiha, Champhai, Kolasib and Lawngtlai and 1(one) Sub Divisional Employment<br />

Exchange at Chawngte. The Exchanges constitute the basic unit for implementing and<br />

coordinating all programmes of employment assistance, career advice, collection, survey<br />

and studies of employment market information in the area.<br />

A. Provision is also made for maintenance of existing staff under Planned Schemes.<br />

B. Further, there is another Centrally Sponsored Scheme at the instance of Government<br />

of India, Ministry of Social Justice and Empowerment to set up three new and separate<br />

Special Employment Exchanges one each at Aizawl, Lunglei and Saiha exclusively for the<br />

benefit of the Physically Handicapped Persons at the Central-State share of 80:20 ratio.<br />

A. Staff for Three Special Employment Exchanges<br />

Recurring Expenditure (C.S.S)<br />

Sl. No. Designation & Pay Scale No. of Salary for one month for all<br />

Posts the three exchanges<br />

1. Assistant Director 3<br />

(Rs.8000-13500)<br />

2. Technical Officer(Placement) 3<br />

(Rs.6500-10500)<br />

3. UDC 3<br />

(Rs.5000-8000)<br />

4. LDC 6 2,04,416.66<br />

(Rs.4000-6000)<br />

5. Steno-Typist 3<br />

(Rs.5000-8000)<br />

6. Driver 3<br />

(Rs.3050-4590)<br />

7. Group ‘D’ Staff 9<br />

(Rs.2650-4000)<br />

(For each exchange) Total - 7 2,04,416.66<br />

(i.e. 2,04,417/-) x 12 Months<br />

24,53,004.00<br />

B. Rent, Expenses on POL and Other Contingent Expenditure = Nil.


C. Non-recurring Expenditure (C.S.S.)<br />

- 463 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

i) Purchase of Vehicle - Gypsy - 3 Nos (Soft Top 450000×3) Rs.13,50,000<br />

ii) Furniture -<br />

1) Such as Officer/Staff Table Chair<br />

2) Benches and Chairs for candidates @ 50000/- Rs. 1,50,000<br />

3) Cabinets, racks etc. for each exchange<br />

4) Almirah<br />

5) Other special equipments<br />

iii) Typewriter - 2 Nos. each 2 12500×5 Nos. Rs. 1,50,000<br />

Cyclostyling/Duplicating Machine @ 15800×3 Rs. 47,000<br />

TOTAL - Rs.16,97,000/-<br />

iv) Total approved expenditure i.e. (A+B+C) = Rs.41,50,000.00<br />

(Rs.2,04,417+16,97,000) as 100% share)<br />

v) Share of State Govt. (already sanctioned during 2005-06) = (-) Rs. 8,30,000.00<br />

(State share during <strong>2006</strong>-07)<br />

vi) 80% share of Govt. of India i.e. Grant to be released = Rs.33,20,000.00<br />

to State Government<br />

C. The Government of <strong>Mizoram</strong> have allotted a suitable land for District Employment<br />

Exchange, Champhai free of cost. In order to have drain on rent, it is approved to construct<br />

Office building for District Employment Exchange, Champhai during <strong>2006</strong>-07 at the<br />

minimum cost of Rs. 10.00 lakh.<br />

The break-up of financial implication for Employment Services is as under: -<br />

i) Salary - Rs. 1.00 lakh<br />

ii) Wages - Rs. 1.00 lakh<br />

iii) Medical Treatment - Rs 3.00 lakh<br />

iv) Domestic Travel Expenses - Rs. 2.00 lakh<br />

v) O.E. - Rs. 15.00 lakh<br />

vi) Rents - Rs. 1.00 lakh<br />

vii) Advertisement - Rs. 1.00 lakh<br />

viii) O.C. - Rs. 11.00 lakh<br />

ix) Minor works/Maintenance - Rs. 8.00 lakh<br />

x) Matching share (CSS) - Rs. 4.50 lakh<br />

GRAND TOTAL - Rs. 47.50 lakh<br />

4. CRAFTSMEN TRAINING SCHEME :-<br />

Till 2001, the pioneer ITI, Aizawl has been imparting training in 14 Vocational<br />

Trades of which 7 trades are under State Planned Scheme. As cited in the introductory note,<br />

existing ITI of Aizawl is strengthened with 9 (nine) additional trades and new ITIs at Lunglei<br />

and Saiha are also started with the following trades as approved by the Central and State<br />

Governments.


- 464 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

AIZAWL UNITS SEATING CAPACITY<br />

1. IT&ESM (Information Technology &<br />

Electronic System Maintenance) 2 32<br />

2. Surveyor 1 16<br />

3. Mechanic (Refrigerator & Air Conditioning) 2 32<br />

4. Mason (Building Constructor) 2 32<br />

5. COPA (Computer Operator & Programming<br />

Assistant) 1 16<br />

6. Cutting & Tailoring 1 16<br />

7. Hair & Skin Care 1 16<br />

8. Mechanic (Radio & T.V.) 1 16<br />

9. Draughtsman (Civil) 1 16<br />

TOTAL :- 12 196<br />

LUNGLEI<br />

1. Carpentry 1 16<br />

2. Mechanic (Motor Vehicle) 2 32<br />

3. Dress Making 1 16<br />

4. COPA 1 20<br />

TOTAL :- 5 84<br />

SAIHA<br />

1. Electrician 1 16<br />

2. Mechanic (Motor Vehicle) 2 32<br />

3. IT&ESM 2 32<br />

4. Hair & Skin Care 1 16<br />

TOTAL :- 6 96<br />

GRAND TOTAL :- 23 376<br />

With the opening of new ITIs, the following posts have also been created and filled<br />

on contract basis: -<br />

Designation AIZAWL LUNGLEI SAIHA TOTAL<br />

1. Principal/Superintendent - 1 1 2<br />

Non-Gazetted grade)<br />

2. Group Instructor 1 - - 1<br />

3. Vocational Instructor 12 5 6 23<br />

4. V.I.s for Engg. Drawing/ - 1 1 2<br />

Workshop calculation<br />

5. Workshop Attendant 1 2 2 5<br />

6. U.D.C. - 1 1 2<br />

7. L.D.C. - 1 1 2<br />

8. Chowkidar - 1 1 2<br />

9. Sweeper 1 1 1 3<br />

TOTAL :- 15 13 14 42


- 465 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

The existing posts under State Planned Scheme are as below: -<br />

1. INSTRUCTORS - 9 POSTS<br />

i) Stenography - 1(one) Post<br />

ii) Confectionery - 1(one) Post<br />

iii) Carpentry - 1(one) Post<br />

iv) Plumber - 1(one) Post<br />

v) Draughtsman - 1(one) Post<br />

vi) Diesel Mechanic - 1(one) Post<br />

vii) T.V. & Radio Mechanic - 1(one) Post<br />

viii) Electronic - 2(two) Posts<br />

2. Driver - 1(one) Post<br />

3. Workshop Attendant - 2(two) Posts<br />

4. Conductor - 1(one) Post<br />

Altogether, there are now 3 (three) ITIs in the State which impart Vocational Training<br />

Courses in 31 (thirty one) trades consisting of 44 Units with total seat capacity of 708.<br />

Trainees in these institutes are awarded a monthly stipend @ Rs. 500/- per head and book<br />

grant @ Rs. 1,000/- per annum.<br />

Government of India provides fund for the full cost of civil constructions,<br />

procurements of machineries including furniture at initial stage and salary and stipend/<br />

book grant for a period upto the end of 10 th Plan on March, <strong>2007</strong>. The rest of the operational<br />

cost viz. O.E., O.C. etc. required for maintenance and upkeep of machine tools etc. have to<br />

be borne by Government of <strong>Mizoram</strong> as per the procedure laid down for the Centrally<br />

Sponsored Scheme. An additional requirement of Rs. 11.30 lakh is worked out for the year<br />

<strong>2006</strong>-<strong>2007</strong> for such maintenance and upkeep etc. Hence, the total minimum requirement of<br />

Rs. 64.40 lakh for Craftsmen Training programmes is approved for the year <strong>2006</strong>-<strong>2007</strong>.<br />

The break-up of financial implication is as under: -<br />

i) Salary - Rs.15.00 lakh<br />

ii) Wages - Rs. 1.95 lakh<br />

iii) Medical Treatment - Rs. 1.00 lakh<br />

iv) Domestic Travel Expenses - Rs. 0.70 lakh<br />

v) Advertisement - Rs. 0.50 lakh<br />

vi) O.E. - Rs. 9.00 lakh<br />

vii) PP & SS - Rs. 0.25 lakh<br />

viii) Stipend/Book grant - Rs.20.00 lakh<br />

ix) Minor Works - Rs. 4.00 lakh<br />

x) O.C. - Rs. 3.00 lakh<br />

xii) Machinery & Equipment - Rs. 9.00 lakh<br />

TOTAL - Rs.64.40 lakh


Introduction:<br />

- 469 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

SOCIAL WELFARE<br />

The activities of the Department extends to formulation and endorsement of Social<br />

Legislation like Juvenile Justice Act; Immoral Traffic in Person etc.; Welfare of Handicapped<br />

Persons, Aged and Destitute Persons; Welfare of Women & Children; Social Defense against<br />

Drug Addicts & Alcoholism and strengthening of Non-Governmental Organizations by<br />

rendering Grants-in-aid to them. The Department also implements ICDS Scheme and Special<br />

Nutrition Programme.<br />

The approved Annual Plan <strong>2006</strong>-<strong>2007</strong> is Rs. 894.00 lakh including Scheme under<br />

Article 275(1) of the Constitution.<br />

The Abstract of Scheme-wise requirement of fund for Annual Plan during <strong>2006</strong>-07 is<br />

given below:-<br />

1. Direction & Administration - Rs. 39.21 lakh<br />

2. District Administration - Rs. 12.00 lakh<br />

3. Welfare of Handicapped - Rs. 22.03 lakh<br />

4. S.I.T. Act:<br />

(a) Protective Home - Rs. 21.84 lakh<br />

(b) Reception Centre - Rs. 18.10 lakh<br />

5. Welfare of Poor & Destitute:<br />

(a) National Old Age Pension Scheme (N.O.A.P.S.) - Rs. 249.60 lakh<br />

(b) National Family Benefit Scheme (N.F.B.S.) - Rs. 20.80 lakh<br />

(c) Old Age Home - Rs. 0.50 lakh<br />

6. Prohibition:<br />

(a) De-Addiction Centre - Rs. 85.54 lakh<br />

(b) M.S.D. & R.B. - Rs. 15.00 lakh<br />

7. Correctional Sevices:<br />

(a) Remand Home - Rs. 44.35 lakh<br />

(b) Special Approved School - Rs. 13.61 lakh<br />

(c) Children’s Court - Rs. 8.44 lakh<br />

(d) Social Service in Jails - Rs. 10.98 lakh<br />

8. Grants-in-aid to Voluntary Organizations - Rs. 17.00 lakh<br />

9. Schemes under Article 275(1) - Rs. 264.00 lakh<br />

10. Women & Child Development:<br />

(a) Child Welfare - Rs. 22.00 lakh<br />

11. Women Welfare:<br />

(a) Women Commission - Rs. 15.00 lakh<br />

(b) Socio Economic / I.W.E.P. etc. - Rs. 10.00 lakh<br />

(c) R.I.T.C. - Rs. 4.00 lakh<br />

TOTAL - Rs. 894.00 lakh


1. DIRECTION & ADMINISTRATION<br />

- 470 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(a) Direction :-<br />

For the maintenance of the existing post of Stenographer Gr. – III, an outlay of<br />

Rs.1.71 lakh is approved during <strong>2006</strong>-07.<br />

(b) Construction, repair and maintenance of Departmental buildings :-<br />

Department buildings, numbering more than 200, constructed under Plan, C.S.S. and<br />

B.D.A.P. Schemes are required to be maintained. As some of the buildings are now old and<br />

depleted, they require certain renovations and repairs. Rs. 10.00 lakh is approved for this<br />

purpose during <strong>2006</strong>-07.<br />

(c) Information Technology and Software Development :-<br />

Fund of Rs. 15.00 lakh only out of the total Annual Plan Outlay is required for the<br />

implementation of the Information Technology and Software Development vide letter<br />

No.G.28014/99-SPB dated 30.3.2000.<br />

As per direction from Government of India and Government of <strong>Mizoram</strong>, the<br />

Information Technology is planned to promote as shown below during <strong>2006</strong>-<strong>2007</strong>.<br />

Computers be installed in all Officer’s rooms.<br />

All Computers be connected together by means of net working.<br />

Bare minimum Printers be provided at each room except in the main Computer room where<br />

three types of Printers – Laser, Dot and Ink Jet Printers shall be installed.<br />

Internet connection be subscribed at the main Computer room.<br />

(d) Persons with disability / Senior Citizens :-<br />

As per Govt. of <strong>Mizoram</strong>, State Transport Authority, special concession in fare for<br />

traveling in Aizawl and Lunglei town buses be given to persons with disability and senior<br />

citizens (65 yrs. and above) an production of Identity Cards issued by the Department of<br />

Social Welfare. To enable these disabled persons / senior citizens to avail this benefit, it is<br />

proposed to issue ID Cards to persons with disabilities and senior citizens.<br />

Details of financial requirement is given below: -<br />

(i) Salary - Rs. 1.71 lakh<br />

(ii) Medical Treatment - Rs. 0.50 lakh<br />

(iii) Office Expenses - Rs. 15.00 lakh<br />

(iv) Minor Works - Rs. 10.00 lakh<br />

(v) O.C. - Rs. 12.00 lakh<br />

Total - Rs. 39.21 lakh<br />

2. DISTRICT ADMINISTRATION<br />

For strengthening and smooth functioning of the 4 (four) existing Offices of the<br />

District Social Welfare Officers, Rs. 12.00 lakh only is approved in addition to Rs. 50.42 lakh<br />

provided under Non-Plan Budget.<br />

Details of financial requirement is as below:-<br />

(i) T.E. - Rs. 4.00 lakh<br />

(ii) O.E. - Rs. 8.00 lakh<br />

Total - Rs. 12.00 lakh


- 471 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

3. WELFARE OF HANDICAPPED<br />

(a) Persons with Disabilities (Equal Opportunities, Protection of Rights and Full<br />

Participation) Act, 1995:-<br />

Parliament has passed the Persons with Disabilities (Equal Opportunities, Protection<br />

of Rights and Full Participation) Act, 1995. All States Governments except Jammu & Kashmir<br />

are instructed to implement this Act, 1995 immediately.<br />

As envisaged in the Act, ‘Disability’ includes –<br />

(i) Blindness; (ii) Low Vision; (iii) Leprosy cured; (iv) Hearing Impairment;<br />

(v) Mental Retardation and (vi) Mental Illness.<br />

It is approved to implement the following Schemes during <strong>2006</strong>-<strong>2007</strong>: -<br />

(i) Disability Pension<br />

(ii) G.I.A. to Handicapped Persons<br />

(iii) G.I.A. to Handicapped Educated Unemployed Allowances<br />

(i) Disability Pension: As many as 200 Disability Pensions are given to those<br />

handicapped persons who are totally blind and bedridden @ Rs. 100/- per month per head<br />

during 2005-06. It is approved to provide Disability Pension to 200 handicapped persons<br />

during <strong>2006</strong>-07. Financial requirement comes to Rs. 2.40 lakh.<br />

(ii) G.I.A. to Handicapped Persons: It is also proposed to give special appliances and<br />

Grants-in-aid to handicapped persons as per the individual needs like Artificial Limb Fittings<br />

and Plastic Surgery etc. Rs. 7.30 lakh is approved during <strong>2006</strong>-07.<br />

(iii) G.I.A. to Handicapped Educated Unemployed Allowances: All handicapped educated<br />

unemployed are proposed to be given financial assistance @ Rs.100/- per month per head<br />

during <strong>2006</strong>-07 and Rs. 0.30 lakh is approved.<br />

Financial requirement is as follows:-<br />

1. Grants-in-aid - Rs. 10.00 lakh<br />

Total - Rs. 10.00 lakh<br />

(b) Hostel for Handicapped Persons:-<br />

Male and female handicapped persons are given training in vocational trades like<br />

knitting, tailoring and shoemaking at Aizawl. Hostel facility is provided for these<br />

handicapped persons who have no relatives at Aizawl and to look after the Hostel, a post of<br />

Warden is created and Rs. 2.03 lakh is approved for salary and medical treatment during<br />

<strong>2006</strong>-07.<br />

Sl. No. Name of Post Scale of Pay Existing New Total<br />

1. Warden Rs. 5000-8000/- 1 - 1<br />

Financial requirement for <strong>2006</strong>-07 :-<br />

1. Salary - Rs. 1.53 lakh<br />

2. Medical Treatment - Rs. 0.50 lakh<br />

Total - Rs. 2.03 lakh


- 472 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(c) National Programme for Rehabilitation of Persons with Disabilities (N.P.R.P.D.) :-<br />

The N.P.R.P.D. is a new State Sector Scheme launched in the country during 1999-<br />

2000 with the basic objective of providing comprehensive rehabilitation services to persons<br />

with disabilities (PWDs). The Government of India released fund for the programme upto<br />

2001-02 and the State Government should continue the programme from its own resources<br />

for which the Secretary, Ministry of Social Justice & Empowerment (D.O. No.16-24/2000-<br />

NPRPD dt.14.5.2002) and the Planning Commission (D.O. No.PC(P)2/11/2001-SPC(Vol.III)<br />

dt.19.4.2002) wrote to the Chief Secretary to the Govt. of <strong>Mizoram</strong> to ensure adequate<br />

provision for rehabilitation services to the PWDs.<br />

It is proposed to maintain the existing two State Referral centres (separately for<br />

Mentally Retarded and Other Disabilities) and the District Referral Centre exclusively set up<br />

for the PWDs, training of persons in disabilities and manpower development for which<br />

Rs.10.00 lakh is earmarked during <strong>2006</strong>-07 as below:-<br />

(i) Maintenance of State and District Referral Centres - Rs. 6.00 lakh<br />

(ii) Training, Manpower Development - Rs. 4.00 lakh<br />

Total - Rs. 10.00 lakh<br />

4. S.I.T. ACT<br />

Immoral Traffic (Prevention) Act, 1986 :<br />

As envisaged in the Act, two kinds of institution are established viz. - the Reception<br />

Centre, where women arrested under the Act are remanded, and Protective Home, where<br />

persons convicted by the Court are institutionalized. Trainings of different trades are<br />

imparted for their economic rehabilitation and counseling and guidance for their moral<br />

rehabilitation. These institutions started since 1995-96 and will be continued during <strong>2006</strong>-07.<br />

(a) Protective Home:-<br />

Sl. No. Name of Post Scale of Pay Existing Total<br />

1. Superintendent Rs. 8000-13500/- 1 1<br />

2. Warden Rs. 5000-8000/- 1 1<br />

3. Instructor Rs. 4000-6000/- 1 1<br />

4. L.D.C. Rs. 4000-6000/- 1 1<br />

5. IV Grade Rs. 2650-4000/- 1 1<br />

Total 9 9<br />

Financial requirement during <strong>2006</strong>-07 is as below —<br />

1. Salary - Rs. 10.41 lakh<br />

2. Medical Treatment - Rs. 3.00 lakh<br />

3. T.E. - Rs. 0.10 lakh<br />

4. O.E. - Rs. 1.83 lakh<br />

5. M & S - Rs. 5.00 lakh<br />

6. Minor Works - Rs. 1.00 lakh<br />

7. Other Charges - Rs. 0.50 lakh<br />

Total - Rs. 21.84 lakh<br />

(b) Reception Centre :-<br />

Financial requirement for Reception Centre during <strong>2006</strong>-07 is given below :-<br />

1. Salary - Rs. 15.80 lakh<br />

2. Medical Treatment - Rs. 2.00 lakh<br />

3. Other Charges - Rs. 0.30 lakh<br />

Total - Rs. 18.10 lakh<br />

Sl. No. Name of Post Scale of Pay Existing New Total<br />

1. IV Grade Rs. 2650-4000/- 18 - 18


- 473 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

5. WELFARE OF POOR AND DESTITUTE<br />

(a) National Social Assistance Programme (N.S.A.P.) :-<br />

The N.S.A.P. is a Centrally Sponsored Programme to extend 100% Central Assistance<br />

to the States / U.T.s to provide the benefits under it in accordance with the norms,<br />

guidelines and conditions laid down by the Central Govt. The N.S.A.P. introduces a National<br />

Policy for Social Assistance to poor households. The Programme represents a significant<br />

step towards the fulfillment of the Directive Principles in Article 41 and 42 of the<br />

Constitution recognizing the concurrent responsibility of the Central and State Govt. in the<br />

matter.<br />

The N.S.A.P. Scheme includes —<br />

(i) National Old Age Pension Scheme (N.O.A.P.S.)<br />

(ii) National Family Benefit Scheme (N.F.B.S.)<br />

(i) National Old Age Pension Scheme (N.O.A.P.S.) :<br />

Beneficiaries under the State Plan were given Old Age Pension @ Rs. 100/- per month<br />

in the previous years. Those beneficiaries under the State Plan are now transferred to<br />

NOAPS due to paucity of fund under the State Plan. As the rate of Government of India (i.e.<br />

Rs. 75/- per month per head) is short of Rs. 25/- it was felt necessary to enhance the rate by<br />

Rs. 25/- per month per head so as to bring the rate to Rs. 100/- per month as was given to<br />

the beneficiaries under State Plan during 2001-2002. As mentioned earlier, the Central<br />

Government grants only Rs. 75/- per month per beneficiary and the State Govt. has to bear<br />

Rs. 25/- per month per head in order to bring the pension amount to Rs.100/- per month.<br />

From the year 2002-03, due to insufficient fund, the State’s contribution towards Old Age<br />

Pension had been stopped but the beneficiaries are still paid Rs. 100/- per month per<br />

beneficiary out of Central fund which is in violation to the Central norm, i.e. Rs. 75/- per<br />

month per beneficiary throughout the country.<br />

It is, therefore, decided to implement the scheme as per Central norm from <strong>2006</strong>-07.<br />

Besides, the existing beneficiaries i.e. 10525, additional beneficiaries numbering 10275<br />

persons could be accommodated. The State Government, therefore, needs to contribute fund<br />

amounting to Rs. 62.40 lakh as State’s Share (i.e. 20800×25×12) to enable the Department to<br />

implement the Scheme as per Central norms.<br />

(ii) National Family Benefit Scheme (N.F.B.S.):<br />

Under this Scheme the family of a household below the poverty line shall get an<br />

assistance of Rs. 10,000/- on the death of its primary breadwinner whose age is between<br />

18yrs. and 65 yrs. During the previous year, 400 persons were given this benefit and it is<br />

approved to continue the scheme during <strong>2006</strong>-<strong>2007</strong>. 208 persons are approved to be given<br />

this benefit during <strong>2006</strong>-<strong>2007</strong> and an amount of Rs. 20.80 lakh is approved for the scheme.<br />

Details of financial approval are as follows: -<br />

Total outlay for Annual Plan <strong>2006</strong>-07 in respect of N.S.A.P. - Rs. 208.00 lakh<br />

N.O.A.P.<br />

No. of existing beneficiaries - 10525 × 75 × 12 - Rs. 94,72,500.00<br />

No. of additional beneficiaries - 10275 × 75 × 12 - Rs. 92,47,500.00<br />

N.F.B.S. - 208 × 10,000 - Rs. 20,80,000.00<br />

Total of N.O.A.P. & N.F.B.S. - Rs. 208,00,000.00<br />

State Share for existing beneficiaries under NOAP - 10525 × 25 × 12 - Rs. 31,57,500.00<br />

State Share for additional beneficiaries under NOAP - 10725 × 25 × 12 - Rs. 30,82,500.00<br />

Total requirement to be contributed by the State - Rs. 62,40,000.00


- 474 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

(iii) Old Age Home:<br />

For the better maintenance of the Home, Rs. 0.50 lakh is approved in addition to<br />

Rs.8.75 lakh provided under Non Plan Budget.<br />

6. PROHIBITION<br />

(a) De-Addiction Centre / Aftercare Centre :-<br />

Aftercare Centre has been added to the existing De-addiction-cum-Rehabilitation<br />

Centre, Sethawn as an innovative approach in the field of drug abuse and alcoholism for<br />

recovering addicts in the State. The main aim of the Aftercare Unit is to provide skill and<br />

inputs to the youth so that once they leave the Centre, they are equipped with skills for<br />

survival and economic growth. In order to provide skills to the recovering addicts, trades<br />

like — (i) Mechanical (motor vehicles) (ii) Mechanical (Radio, TV, Tapes) (iii) Poultry (iv)<br />

Piggery have already been started in the Centre. The expected outcome for the Aftercare<br />

Unit is to reduce the high rate of relapse cases in the field of drug abuse and alcoholism.<br />

The requirement of fund during <strong>2006</strong>-07 is earmarked as under :<br />

Sl. No. Name of Post Scale of Pay Existing Post<br />

1. Centre Director Rs. 10000-15200/- 1<br />

2. Assistant project Director Rs. 8000-13500/- 1<br />

3. Case Worker Rs. 6500-10500/- 2<br />

4. Psychologist Rs. 6500-10500/- 1<br />

5. Staff Nurse Rs. 5500-9000/- 4<br />

6. Warden Rs. 5000-8000/- 1<br />

7. Vocational Instructor Rs. 4500-7000/- 4<br />

8. Security Officer Rs. 4500-7000/- 2<br />

9. Physical Instructor Rs. 4500-7000/- 2<br />

10. Counselor Rs. 4500-7000/- 3<br />

11. Mechanic Rs. 3050-3950/- 2<br />

12. Driver Grade – I Rs. 5000-8000/- 1<br />

13. Driver Grade – II Rs. 4000-6000/- 1<br />

14. IV Grade Rs. 2650-4000/- 5<br />

TOTAL - 30<br />

(+) 12<br />

Financial requirement is as follows :-<br />

1. Salary - Rs. 35.34 lakh<br />

2. Wages - Rs. 6.00 lakh<br />

3. Medical Treament - Rs. 2.00 lakh<br />

4. T.E. - Rs. 0.70 lakh<br />

5. O.E. - Rs. 15.50 lakh<br />

6. Minor Works - Rs. 10.00 lakh<br />

7. M & S (incl. Mess) - Rs. 15.00 lakh<br />

8. O.C. (incl. Purchase of medicines etc.) - Rs. 1.00 lakh<br />

Total - Rs. 85.54 lakh<br />

(b) <strong>Mizoram</strong> Social Defense & Rehabilitation Board (M.S.D.& R.B.) :<br />

As per the decision to the Minutes of the Meeting of Advisory Board on De-addiction<br />

Centre and Allied Institutions under the Chairmanship of Hon’ble Minister on the 17 th April<br />

1999, Rs. 1.00 crore should be allocated for the immediate successful implementation of the<br />

functioning of the Board on De-addiction Centre and Allied Institution, Rs. 15.00 lakh is<br />

approved during <strong>2006</strong>-07.


- 475 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

7. CORRECTIONAL SERVICES / JUVENILE JUSTICE ACT<br />

(a) Remand Home, Aizawl and Lunglei :-<br />

This Act primarily aims at prevention of crime committed by and against children<br />

upto the age of 16 yrs. in the case of boys and 18 yrs. in the case of girls. The Act also<br />

provides care and protection to children subjected to abuse and exploitation.<br />

Under the Act, a well-rounded Juvenile Justice System had been incorporated in<br />

conformity with the United Nations Standard Rules for the administration of the Juvenile<br />

Justice with a view of fulfilling the statutory responsibility of the State as laid down under<br />

this law. The Scheme strength of staff which will be continued during <strong>2006</strong>-<strong>2007</strong> is as table<br />

given below: -<br />

Remand Home, Aizawl :<br />

Sl. No. Name of Post Scale of Pay Existing Total<br />

1. Superintendent Rs. 8,000-13,500/- 1 1<br />

2. Probation Officer / Rs. 6,500-10,500/- 1 1<br />

Case Worker<br />

3. Warden Rs. 5,000-8,000/- 1 1<br />

4. Craft Instructor Rs. 4,000-6,000/- 1 1<br />

5. L.D.C. Rs. 4,000-6,000/- 1 1<br />

6. Driver Rs. 3,050-4,590/- 1 1<br />

7. IV Grade Rs. 2,650-4,000/- 3 3<br />

Total - 9 9<br />

Remand Home, Lunglei :<br />

Sl. No. Name of Post Scale of Pay Existing Total<br />

1. Superintendent Rs. 8,000-13,500/- 1 1<br />

2. Case Worker Rs. 6,500-10,500/- 1 1<br />

3. Instructor Rs. 4,000-6000/- 1 1<br />

4. Edn. Instructor Rs. 4,000-6000/- 1 1<br />

5. L.D.C. Rs. 4,000-6000/- 1 1<br />

6. IV Grade Rs. 4,000-6000/- 4 4<br />

Total - 9 9<br />

Financial requirement during <strong>2006</strong>-<strong>2007</strong> :-<br />

1. Salary - Rs. 22.79 lakh<br />

2. Medical Treatment - Rs. 4.00 lakh<br />

3. T.E. - Rs. 0.56 lakh<br />

4. O.E. - Rs. 3.00 lakh<br />

5. M & S - Rs. 8.00 lakh<br />

6. Minor Works - Rs. 5.00 lakh<br />

7. M & E - Rs. 1.00 lakh<br />

Total - Rs. 44.35 lakh<br />

(b) Juvenile Home / Certified School :<br />

Sl. No. Name of Post Scale of Pay Existing<br />

1. Superintendent Rs. 8,000-13,500/- 1<br />

2. Psychologist / Case Worker Rs. 6,500-10,500/- 1<br />

3. Warden Rs. 5,000-8,000/- 1<br />

4. Craft Instructor Rs. 4,000-6,000/- 1<br />

5. Driver Rs. 3,050-4,590/- 1<br />

6. IV Grade Rs. 2,650-4,000/- 6<br />

Total - 11


- 476 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Financial requirement of Juvenile Home / Certified School, Aizawl during <strong>2006</strong>-<strong>2007</strong><br />

is given below :<br />

1. Salary - Rs. 8.11 lakh<br />

2. Medical Treatment - Rs. 2.00 lakh<br />

3. T.E. - Rs. 0.50 lakh<br />

4. O.E. - Rs. 2.00 lakh<br />

5. O.C. - Rs. 1.00 lakh<br />

Total - Rs. 13.61 lakh<br />

(c) Children’s Court :<br />

Sl. No. Name of Post Scale of Pay No. of Post Existing<br />

1. Assistant 5,500-9,000/- 1 1<br />

2. U.D.C. 5,000-8,000/- 1 1<br />

3. L.D.C. 4,000-6,000/- 1 1<br />

4. IV Grade 2,650-4,000/- 2 2<br />

Total - 5 Posts 5<br />

Financial requirement for the year <strong>2006</strong>-<strong>2007</strong> is given below :-<br />

1. Salary - Rs. 6.44 lakh<br />

2. Medical Treatment - Rs. 2.00 lakh<br />

Total - Rs. 8.44 lakh<br />

(d) Social Services in Jail :<br />

Sl. No. Name of Post Scale of Pay No. of Post (existing)<br />

1. Vocational Instructor 4,000-6,000/- 2<br />

2. Educational Instructor 5,500-9,000/- 2<br />

3. L.D.C. 4,000-6,000/- 1<br />

Total - 5 Posts<br />

Financial requirement during <strong>2006</strong>-<strong>2007</strong> is given below :-<br />

1. Salary - Rs. 6.98 lakh<br />

2. Medical Treatment - Rs. 2.00 lakh<br />

3. O.E. - Rs. 2.00 lakh<br />

Total - Rs. 10.98 lakh<br />

8. GRANTS-IN-AID TO VOLUNTARY ORGANIZATIONS<br />

(a) For the purpose of strengthening and promoting voluntary organizations rendering<br />

welfare services, grants-in-aid, either in cash or in kind, are given. The bare minimum<br />

financial requirement during <strong>2006</strong>-<strong>2007</strong> in this account is Rs. 14.00 lakh.<br />

(b) Grants-in-aid to Rehabilitation Centre, de-addiction Centres and Counseling Centres<br />

run by NGOs: For the prevention of drug addicts, alcoholism and diseases relating to Aids<br />

etc, certain Centres have been established in <strong>Mizoram</strong> by NGOs. Rs. 3.00 lakh is approved<br />

during <strong>2006</strong>-07.<br />

9. CONSTRUCTION WORKS UNDER ARTICLE 275(1) OF THE CONSTITUTION<br />

Under Article 275(1), the Department proposes to undertake various construction<br />

works like construction of village steps with drains, small bridges, agriculture link roads<br />

type to facilitate MFP / SAP Collection, infrastructure for Community-cum-Sports /<br />

Recreation Centres etc.


- 477 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Rs. 264.00 lakh is, therefore, approved during <strong>2006</strong>-<strong>2007</strong> for execution of<br />

infrastructural development of rural areas as permissible under Article 275(1) of the<br />

Constitution.<br />

10. WOMEN & CHILD DEVELOPMENT<br />

(a) Child Welfare :<br />

(i) Motherless Babies Home:<br />

(a) For meeting the establishment and administrative charges of the staff of the<br />

Board for the Supervision & Control of Homes constituted under the <strong>Mizoram</strong><br />

Orphanages and Charitable Homes (Supervision and Control) Rules 2003 for<br />

the meeting expenses of the Board and for the expenses towards traveling<br />

allowances and other remunerations payable to the members of the Board.<br />

(b) For the implementation of Adoption Programme in the State, to regulate and<br />

to promote in-country adoptions.<br />

(c) For the provision of institutional care and protection of infants and children<br />

who are either abandoned / orphaned or destitute and their rehabilitation.<br />

(d) For support of the licensed Homes, Rs. 8.00 lakh is approved for this purpose<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

(ii) Juvenile Justice (Care & Protection of Children): In order to implement the <strong>Mizoram</strong><br />

Juvenile Justice Rules 2003, the Government of India has formed Juvenile Justice Act, Child<br />

Welfare Committee, State Advisory Board, Inspection Committee and Selection Committee.<br />

These various Boards and Committees have now functioned. To perform their various duties<br />

and functions, for sitting allowances, honorarium and remuneration, for traveling expenses<br />

and Office contingencies, certain amount of budget needs to be set aside for the<br />

implementation of Juvenile Justice Act. For this purpose, an amount of Rs. 5.00 lakh is<br />

approved during <strong>2006</strong>-07.<br />

11. WOMEN WELFARE<br />

(a) Women Commission :<br />

The Constitution guarantees to all its citizens Justice, Liberty, Equality and Fraternity<br />

without any discrimination. But even 45 yrs. after Independence, women continued to be<br />

treated as the single largest group of backward citizens in India. Parliament in 1990 has<br />

passed the National Commission for Women Act.<br />

Subsequently, Women Commission has been established in <strong>Mizoram</strong> during 2000-<br />

2001 and is proposed to continue during <strong>2006</strong>-<strong>2007</strong>.<br />

Sl. No. Name of Post No. of Post Scale of Pay (existing)<br />

1. Chairperson 1 Rs. 3,000/- Hon.<br />

2. Member Secretary 1 Rs. 12,000-18,000/-<br />

3. Project Officer 1 Rs. 8,000-13,500/-<br />

4. U.D.C. 1 Rs. 5,000-8,000/-<br />

5. L.D.C. 2 Rs. 4,000-6,000/-<br />

6. Driver 2 Rs. 3,050-4,590/-<br />

7. Chowkidar 1 Rs. 2,650-4,000/-<br />

8. IV Grade 3 Rs. 2,650-4,000/-<br />

Total 12 Posts


Financial requirement for <strong>2006</strong>-<strong>2007</strong>: -<br />

- 478 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

1. Salary - Rs. 3.32 lakh<br />

2. Medical Treatment - Rs. 1.50 lakh<br />

3. Wages - Rs. 1.20 lakh<br />

4. O.E. - Rs. 6.00 lakh<br />

5. Rent - Rs. 0.66 lakh<br />

6. M & S - Rs. 1.32 lakh<br />

7. O.C. - Rs. 1.00 lakh<br />

Total - Rs. 15.00 lakh<br />

(b) Socio Economic Programme for Poor & Destitute :<br />

Destitute widow who are desperately in need of care, protection and economic<br />

upliftment are proposed to be given socio economic grants. Rs. 9.00 lakh is approved for the<br />

Scheme during <strong>2006</strong>-<strong>2007</strong>.<br />

(c) Platform for Action Strategies for Women / I.W.E.P. :<br />

The 4 th U.N. World Conference on Women held in Beijing in 1995 resolved to<br />

establish ‘Platform for Action Strategies for Women’ towards gender justice for women and<br />

their empowerment. In view of this, Rs. 1.00 lakh is approved.<br />

(d) R.I.T.C. :<br />

As many as 40 destitute and distressed women are given training in tailoring,<br />

knitting and embroidery under this scheme every year. Since most of the trainees are from<br />

rural areas and have no relatives in Aizawl to stay with, they are required to be provided<br />

with hostel facilities. Rs. 1.86 lakh is approved during <strong>2006</strong>-<strong>2007</strong> in addition to Rs. 21.05<br />

lakh provided under Non-Plan Budget.<br />

Details of financial requirement is as below :-<br />

1. M & S - Rs. 3.00 lakh<br />

2. O.C. - Rs. 1.00 lakh<br />

Total - Rs. 4.00 lakh


- 483 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

NUTRITION<br />

The approved Annual Plan <strong>2006</strong>-07 Outlay for Nutrition Programme is made within<br />

Rs. 682.00 lakh, i.e. —<br />

1. Supplementary Nutrition Programme - Rs. 665.00 lakh<br />

2. Nutrition Programme for Adolescent Girls - Rs. 17.00 lakh<br />

The Nutrition Programme includes Schemes like: -<br />

1. Supplementary Nutrition Programme<br />

2. Carrying Charges / Transportation of Nutrition Foods.<br />

3. Food and Nutrition Extension Centre<br />

4. Analysis of Food & Monitoring<br />

5. Nutrition Programme for Adolescent Girls<br />

As per the Government of India, Ministry of Human Resource Development,<br />

Department of Women & Child Development’s letter F.No.19-5/2003-CD-I(Pt.) dt.19.10.04,<br />

the Central Government has revised the financial norms for Supplementary Nutrition under<br />

the I.C.D.S. Scheme as under: -<br />

1. Children (6 months to 72 months) @ Rs.2/- per day per child.<br />

2. Severely Malnourished Children (6 to 72 months) @ Rs.2.70 per day per child.<br />

3. Pregnant and Lactating Mothers @ Rs.2.30 per day per beneficiary.<br />

4. Adolescent Girls @ Rs.2.30 per day per beneficiary.<br />

The Supplementary Nutrition Programme is implemented in 23 I.C.D.S. Projects in<br />

<strong>Mizoram</strong>. Various categories of beneficiaries are as follows based on the survey report of<br />

the Projects during 2005-06.<br />

1. Children 6 – 36 months - 82620<br />

2. Severely Malnourished Children 6 – 36 months - 800<br />

3. Children 3 – 6 months - 42782<br />

4. Severely Malnourished Children 3 – 6 months - 187<br />

5. Pregnant and Lactating Mothers - 27752<br />

6. Adolescent Girls - 12631<br />

Total - 166772<br />

A. SUPPLEMENTARY NUTRITION PROGRAMME<br />

The Supplementary Nutrition Programme aims at eradicating the protein-calorie and<br />

micronutrient malnutrition / deficiency prevalence in the developing States.<br />

The approved expenditure for <strong>2006</strong>-07 under Supplementary Nutrition Programme is<br />

as follows :-<br />

Sl.<br />

No.<br />

1. Estimated Expenditure for Procurement of Foods :<br />

Target Group<br />

No. of<br />

Beneficiaries<br />

Daily<br />

Ceiling<br />

Daily<br />

Requirement<br />

(in Rs.)<br />

No. of<br />

Feeding<br />

Days<br />

Total Requirement<br />

for the<br />

Year (in Rs.)<br />

1. Children 6 – 72 months 125402 Rs.2.00 250,804.00 187 469,00,348.00<br />

2. Severely Malnourished<br />

Children 6-72 months<br />

987 Rs.2.70 2,664.90 187 498,336.30<br />

3. Pregnant & Lactating Mothers 27752 Rs.2.30 63,829.60 187 119,36,135.20<br />

TOTAL : 154141 317,298.50 187 593,34,819.50<br />

Against the national norm of 300 feeding days a year, only 187 feeding days could<br />

be had during <strong>2006</strong>-07 with the available fund.


- 484 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

2. Unit Cost of Maintenance :<br />

Transportation / Carrying Charges of Nutrition –<br />

Rs. 66,65,180/- only is set aside for transportation / carrying charges of nutrition<br />

food during <strong>2006</strong>-07.<br />

3. Food and Nutrition Extension Centre :<br />

As the model scheme furnished by the Ministry concerned, Community Food and<br />

Extension Centre is implemented and womenfolk are trained in the line of food preservation<br />

and nutrition education. For this, Rs. 100,000/- only is approved during <strong>2006</strong>-07.<br />

4. Analysis of Food & Monitoring:<br />

For this purpose, an amount of Rs. 400,000/- only is approved during <strong>2006</strong>-07.<br />

Grand Total of approved expenditure under Supplementary Nutrition Programme<br />

during <strong>2006</strong>-07 is :-<br />

1. Purchase of Food - Rs. 593,34,820.00<br />

2. Unit cost of Maintenance - Rs. 66,65,180.00<br />

3. F.N.E.C. - Rs. 100,000.00<br />

4. Analysis of Food & Monitoring - Rs. 400,000.00<br />

TOTAL - Rs. 665,00,000.00<br />

B. NUTRITION PROGRAMME FOR ADOLESCENT GIRLS (N.P.A.G.)<br />

The Adolescent Girls Scheme was started during 1991-1992 in 507 Blocks across the<br />

country. For the first time in India, a special intervention has been devised for Adolescent<br />

Girls using the ICDS infrastructure. The intervention focuses on school dropouts, girls in the<br />

age group of 11-18 yrs. The objective of the Scheme is to mobilize and enhance to potentials<br />

of these girls by meeting their needs of self-development, nutrition, health, education,<br />

literacy, recreation and skill formation. The scheme has been implemented only under<br />

Lungdar ‘E’ ICDS Project since 1991-1992, but extended to all the 21 ICDS Projects from the<br />

year 2000-2001. These adolescent girls are to be provided supplementary nutrition food at<br />

the Anganwadi, on the same scale as the pregnant and lactating mothers, i.e. to provide 500<br />

calories of energy and 20g. of protein for improvement of their nutritional and health<br />

status. Detail approved expenditure under the scheme during <strong>2006</strong>-07 is as under:-<br />

Sl.<br />

No.<br />

Target Group<br />

No. of<br />

Beneficiaries<br />

Daily<br />

Ceiling<br />

Nos. of<br />

Feeding<br />

Days<br />

Daily<br />

Requirement<br />

(in Rs.)<br />

Total Requirement<br />

for the<br />

Year (in Rs.)<br />

1. Adolescent Girls 11–18 yrs. 12631 Rs.2.30 59 29,051.30 17,14,026.70<br />

Calculation :<br />

Daily Requirement - 29,051.30<br />

No. of Feeding Days - 59 days<br />

Therefore, the total requirement for the year - Rs.17,14,026.70<br />

Say Rs.17,00,000.00<br />

The requirement for the year as per the norm of 300 feeding days is Rs. 87,15,390.00<br />

However, only 59 feeding days could be covered with the available fund.<br />

TOTAL OF A & B (Rs. 665,00,000.00 + 17,00,000.00) = Rs. 682,00,000.00


- 487 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PRISONS<br />

The administration of Jails in <strong>Mizoram</strong> in the past was mainly concentrated on<br />

security custody and confinement of prisioners. Most of the works taken up by the<br />

Department were security oriented with little scope for reformation and education of the jail<br />

inmates. It is now intended to take up the security aspect and reformation of prisoners on<br />

equal footing as recommended by Human Rights Commission and in line with the modern<br />

concepts of Prisons.<br />

At present, the following Jails are functioning in <strong>Mizoram</strong> —<br />

1) Central Jail, Aizawl<br />

2) District Jail, Aizawl<br />

3) District Jail, Lunglei<br />

4) District Jail, Saiha<br />

5) District Jail, Kolasib<br />

6) District Jail, Champhai<br />

The Annual Plan is prepared in line with the allocated outlay of Rs. 288.00 lakh for<br />

<strong>2006</strong>-07.<br />

1) 001(01) – Direction - Rs. 19.00 lakh<br />

2) 101(02) – District Jails - Rs. 167.00 lakh<br />

3) 102(01) – Jail Manufacture - Rs. 13.00 lakh<br />

800 – Other Expenditure<br />

4) Modernisation of Jails - Rs. 89.00 lakh<br />

Total - Rs. 288.00 lakh<br />

Scheme-wise Write-up<br />

1. 001(01) – Direction: At present, the Department is having 1(one) Junior Engineer and<br />

1(one) Store Keeper to look after Department buildings and stores. The existing<br />

Directorate Office building is in need of repair and renovation. Rs. 19.00 lakh is<br />

provided for maintenance of the exiting staff and for repair of Directorate Office<br />

building.<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

target<br />

Financial<br />

target<br />

1. Salary of Junior Engineer and<br />

Store Keeper<br />

No. 2 Rs. 3.50 lakh<br />

2. TE / OE LS LS Rs. 10.50 lakh<br />

3. Improvement / repair of<br />

Directorate Office building<br />

PC 100% Rs. 5.00 lakh<br />

Total Rs. 19.00 lakh<br />

2. 101(02) – District Jails: The existing Jail buildings is different palces are in need of<br />

repair and renovation. The Department is also facing fund problem to meet the<br />

expenses on feeding charges of prisoners. As such, Rs. 167.00 lakh is provided for<br />

repair of Jail buildings and for feeding charges of prisoners.


- 488 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

target<br />

Financial<br />

target<br />

1. Repair and renovation of Jail<br />

buildings<br />

PC 100% Rs. 50.00 lakh<br />

2. Feeding charges of prisoners LS LS Rs. 117.00 lakh<br />

Total Rs. 167.00 lakh<br />

3. 102(01) – Jails Manufacture: Vocational training in s few trades like handloom,<br />

carpentry, knitting and tailoring have been introduced for convict prisoners. For<br />

utilising the manpower, work connected with gardening is also introduced. A sum of<br />

Rs. 13.00 lakh for salary, wages of working prisoners and for purchase of tools and<br />

machineries is provided.<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

target<br />

Financial<br />

target<br />

1. Salary of Junior Instructress,<br />

Peon and Chowkider<br />

No. 4 Rs. 4.00 lakh<br />

2. Wages LS LS Rs. 3.00 lakh<br />

3. M & E LS LS Rs. 5.00 lakh<br />

4. Gardening M & E LS LS Rs. 1.00 lakh<br />

Total Rs. 13.00 lakh<br />

4. 800 – Other Expenditure<br />

Modernisation of Jails: Rs. 17.77 crore has been allocated by Government of India.<br />

Ministry of Home Affairs for Jail reforms on cost sharing basis of Central<br />

Government and State Government in the ratio of 75:25 for a period of five years<br />

from 2002 to <strong>2007</strong>. Government of India has already released Rs. 7.9875 crore for<br />

the years 2002-03, 2003-04 and 2004-05, and the allocation for the State for the<br />

coming year would be the same as that of the previous year. As per the fund<br />

allocation made by Central Government, a sum of Rs. 3.55 crore is to be spent every<br />

year for the five year period of 2002-03 to <strong>2006</strong>-07. Out of Rs. 3.55 crore, Rs. 2.6625<br />

crore would be Central Assistance and the balance amount of Rs. 0.8875 crore would<br />

be borne by the State Government as 25% matching contribution. A provision of<br />

Rs.89.00 lakh is thus made for matching contribution of the Central Assistance.<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

target<br />

Financial<br />

target<br />

1. Construction of new Jails No. 3 Rs. 41.25 lakh<br />

2. Expansion and renovation of<br />

existing Jails<br />

No. 6 Rs. 22.50 lakh<br />

3. Construction of staff quarters No. 6 Rs. 10.00 lakh<br />

4. Sanitation and water supply No. 6 Rs. 15.25 lakh<br />

Total Rs. 89.00 lakh


- 494 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PRINTING & STATIONERIES<br />

Printing & Stationery Department is being equipped with advanced printing<br />

equipment in order to execute timely completion of urgent & time-bound Govt. Publication.<br />

The approved Annual Outlay during 2005-06 was Rs. 100.00 lakh which is insufficient for<br />

purchase of Printing materials etc. The sectoral allocation for the approved Annual Plan<br />

<strong>2006</strong> - 07 in respect of Printing & Stationery Department is Rs. 180.00 lakh.<br />

Scheme-wise description of the Annual Plan of Printing & Stationery Department for<br />

the year <strong>2006</strong>-07 is as follows: -<br />

1. FORMS & STATIONERY:<br />

A. Rents/Office Accomodation: The Department does not yet have Building of its own<br />

at Government Press Champhai. Hence, Rs. 0.39 lakh is approved during <strong>2006</strong>-07 for<br />

accommodating office in rented house.<br />

B. Maintenance of Motor Vehicle: For maintenance of Departmental trucks, Rs.1.50<br />

lakh is approved during <strong>2006</strong>-07.<br />

2. GOVERNMENT PRESS:<br />

A. Maintenance of Staff: For maintenance of 2 Officers and engagement of Muster Roll,<br />

Rs. 14.67 lakh is approved as follows :-<br />

(a) Salary - Rs. 4.80 lakh<br />

(b) Wages - Rs. 1.67 lakh<br />

(a) T.E - Rs. 0.20 lakh<br />

(a) O.E - Rs. 7.00 lakh<br />

(a) O.C - Rs. 1.00 lakh<br />

TOTAL - Rs. 14.67 lakh<br />

B. Scholarship/Stipend: For imparting necessary training on D.T.P. (Desk Top<br />

Publishing) and to meet the stipend of trainee, Rs. 0.30 lakh is approved.<br />

C. Minor Works: For Annual repair and maintenance of Departmental Buildings at<br />

Aizawl, Lunglei & Saiha, Rs. 15.00 lakh is approved during <strong>2006</strong>-07.<br />

D. Machinery & Equipment: The existing machines at Government are old and<br />

required regular repair and for procurement of Binding Machine & Colour Offset Press,<br />

Rs.93.00 lakh is approved.<br />

E. Material & Supply: Since the Department can execute Colour printing works,<br />

requirement of the Printing materials increases. For procurement of Press materials,<br />

Rs.30.00 lakh is approved.<br />

3. GOVERNMENT PUBLICATION: The Government Press is entrusted with printing of<br />

important documents like Budget & Official Gazette etc. and purchase of materials for<br />

Colour printing works, Rs. 25.14 lakh is approved during <strong>2006</strong> - 07.<br />

GRAND TOTAL : Rs. 180.00


- 498 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

PUBLIC WORKS BUILDING<br />

Introduction:<br />

The works taken up under this Head of Accounts are mainly Construction and<br />

Improvement of office buildings of various Government Departments, <strong>Mizoram</strong> Houses at<br />

various places, Rest Houses at various places in <strong>Mizoram</strong> and other non-residential<br />

buildings. Rs. 1285.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

Direction and Administration:<br />

Rs. 685.00 lakh is approved during 10 th Five Year Plan. Rs. 302.00 lakh is approved<br />

during <strong>2006</strong> -<strong>2007</strong> for salary and establishment of existing staff..<br />

The breakup of Direction & Administration is as follows :<br />

1) Salary = Rs. 152.00 lakh<br />

2) T.E. = Rs. 4.00 lakh<br />

3) Office Expenses = Rs. 20.00 lakh<br />

4) Advertisement = Rs. 1.00 lakh<br />

5) Professional Charge = Rs. 1.00 lakh<br />

6) Other Charges = Rs. 1.00 lakh<br />

7) Motor Vehicles = Rs. 11.00 lakh<br />

8) Maintenance = Rs. 112.00 lakh<br />

Total = Rs. 302.00 lakh<br />

Machinery and Equipment:<br />

No provision is kept for Machinery and Equipment under this Head of Accounts<br />

during <strong>2006</strong>-<strong>2007</strong>.<br />

Works:<br />

Rs. 983.00 lakh is approved for works under this Head of Accounts during <strong>2006</strong>-07.<br />

Spill over Schemes: -<br />

1. Construction of <strong>Mizoram</strong> Legislative Assembly Annexe Building :<br />

Rs. 250.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

2. Construction of Excise Commisioner Office Building at Aizawl :<br />

Rs. 56.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />

3. Re-construction of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi:<br />

Rs. 100.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Construction of Treasury Office Building at 5 (five) new Districts:<br />

Rs. 80.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />

5. Construction of D.C. Office Building at Lunglei :<br />

Rs. 4.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />

6. Construction of 6 Nos SDOs office including full-fledged laboratory at Lunglei<br />

Phase-II:<br />

Rs. 21.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.


- 499 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

7. Construction of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi (SH: Architectural<br />

consultancy for design of building) :<br />

Rs. 10.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />

8. Construction of Finance Secratariat building at Aizawl :<br />

Rs. 10.50 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />

9. Vertical Extension of CM Secratariat building at Aizawl :<br />

Rs. 100.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />

10. Improvement of <strong>Mizoram</strong> House and staff quarters at Guwahati :<br />

Rs. 29.00 lakh is approved for this work during <strong>2006</strong>- <strong>2007</strong>.<br />

11. Construction of <strong>Mizoram</strong> House at Vasant Vihar, New Delhi :<br />

Rs. 17.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

New Schemes: -<br />

1. Construction of <strong>Mizoram</strong> House at Shillong :<br />

Rs. 80.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

2. Construction of Circuit Houses at various district headquarters :<br />

Rs. 100.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

3. Construction of PWD Divisional Office at Lawngtlai :<br />

Rs. 25.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />

4. Improvement and Renovation of I/E to Govt. buildings at various districts:<br />

Rs. 20.00 lakh is approved during <strong>2006</strong>-<strong>2007</strong><br />

5. Improvement of E-in-C, PWD office flooring:<br />

Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>.<br />

6. Installation of Sound System at <strong>Mizoram</strong> Assembly House, Aizawl :<br />

Rs. 43.50 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

7. Construction of Taxation Directorate Office building at Aizawl :<br />

Rs. 10.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong><br />

8. Installation of Submersible pump and enhancement of Power Transformer<br />

capacity at <strong>Mizoram</strong> House, Guwahati :<br />

Rs. 17.00 lakh is approved for this work during <strong>2006</strong>-<strong>2007</strong>


Introduction:<br />

- 506 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

Training for the purpose of capacity building os essential for improvement of<br />

administration and it is a corner stone for upgradation of the standard of administration. In<br />

<strong>Mizoram</strong>, proper Training Institute is yet to be set up. This Institute, started in 1983, is the<br />

only institute in the State which makes efforts to impart trainings to the different levels of<br />

employees of the State Government.<br />

1. Salary: At present, 8(eight) Gazetted Officers and 10(ten) Staff of various categories<br />

are on Institute’s payroll under Plan fund. For this purpose, a provision of Rs. 38.00<br />

lakh under 003(01)(01) - Salary is earmarked and provision for this is kept within<br />

this figure.<br />

2. Wages: Due to shortage of Office staff, 4(four) LDCs and 3(three) Peons on Muster<br />

Roll basis have to be engaged every year. In this regard, approval of Government was<br />

obtained and provision of fund of Rs. 3.50 lakh under 003(01)(02) - Wages has been<br />

earmarked.<br />

3. Domestic Travelling Expenses: The ATI has to develop a strong teaching ase. The<br />

faculty members are often required to travel to interior stations for conducting<br />

training sponsored by Government of India. Hence, a provision of Rs. 1.35 lakh has<br />

been set aside under 003(01)(11) as D.T.E.<br />

4. Office Expenses: For purchase of POL and maintenance of vehicles including<br />

purchase of stationsery articles, a provision of fund of Rs. 6.00 lakh under<br />

003(01)(13) – Office Expenses is earmarked for the effective conduct of in-house<br />

training courses and in the outstations.<br />

5. Rents: The Institute is, at present, accommodated in a rented building at<br />

Tuikhuahtlang, Aizawl. Although the building of its own is under construction in the<br />

New Capital Complex, actual occupation cannot be ascertained at present. Hence,<br />

provision of fund of Rs. 4.15 lakh under 003(01)(14) - Rents is earmarked.<br />

6. Supplies & Materials: For training purpose, ATI has to procure rule boks and other<br />

publications for its library. Moreover, training for Computer Course and Pitman Mizo<br />

Shorthand have been introduced. Maintenance of its accessories and equipments, as<br />

well as other office equipments, is necessary. Therefore, a provision of fund of<br />

Rs.1.00 lakh under 003(01)(21) - Supplies & Materials is kept for these purposes.<br />

7. Professional Service: In the existing ATI, there are three Training Halls with seating<br />

capacity of 30 trainees in 2 Halls each and one is Computer Training Hall with a<br />

seating capacity of 15 trainees. Due to shortage of accommodation, Refreshment<br />

Room cannot be provided to the trainees during refreshment hour. During <strong>2006</strong>-07,<br />

this Institute proposes to conduct 40 different training courses including Training<br />

for All – Support to State Training Activities. The number of participants likely to<br />

undergo the training are —


- 507 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

Officers - 250 nos.<br />

Staff - 490 nos.<br />

Total - 740 nos.<br />

In order to meet expenses on stationery for trainees, refreshment / working lunch<br />

for all the trainees and for payment of honorarium for Guest Faculty, a provision of<br />

fund of Rs. 2.00 lakh under 003(01)(28) - Professional Services is earmarked.<br />

8. Other Charges and Machinery & Equipment: The ATI will have a requirement of<br />

furnishing and fittings and of machineries and equipments. These provisions also<br />

take care of our requirement at existing level. As such, Rs. 3.00 lakh have been kept<br />

under 003(01)(50) - Machinery & Equipments to meet out time requirement.<br />

9. In view of the above considerations, the outlay of Rs. 60.00 lakh will be appropriated<br />

in the following manner during <strong>2006</strong>-07.<br />

A – REVENUE<br />

(01) - Salary - Rs. 38.00 lakh<br />

(02) - Wages - Rs. 3.50 lakh<br />

(11) - Domestic Travelling Expenses - Rs. 1.35 lakh<br />

(13) - Office Expenses - Rs. 6.00 lakh<br />

(14) - Rents, Rates & Taxes - Rs. 4.15 lakh<br />

(21) - Supplies & Materials - Rs. 1.00 lakh<br />

(28) - Professional Services - Rs. 2.00 lakh<br />

(50) - Other Charges - Rs. 3.00 lakh<br />

(52) - Machinery & Equipment - Rs. 1.00 lakh<br />

TOTAL - Rs. 60.00 lakh


- 510 -<br />

<strong>APPROVED</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2006</strong>-<strong>2007</strong><br />

FORENSIC SCIENCE LABORATORY<br />

The <strong>Mizoram</strong> State Forensic Science Laboratory was established in 2000 to cater to<br />

the need of the ever increasing demand of Law Enforcing Agencies for the Scientific analysis<br />

of Crime Cases. To upgrade and modernize the <strong>Mizoram</strong> State Forensic Science Laboratory,<br />

it is necessary to procure different types of materials and sophisticated equipments.<br />

However, all the required items could not be procured due to shortage of fund provided in<br />

the Plan. The approved Annual Plan <strong>2006</strong>-07 is prepared only within the amount of Rs. 4.00<br />

lakh as per Commissioner, Planning & Programme Implementation Department, Government<br />

of <strong>Mizoram</strong> letter No. G.28014/55/<strong>2006</strong>-07/SPB dt. 02.02.06.<br />

Detail item-wise proposal for Annual Plan <strong>2006</strong>-07 is enclosed herewith.<br />

LIST OF ITEMS TO BE PURCHASED UNDER <strong>PLAN</strong> FOR FSL<br />

DURING <strong>2006</strong>-07<br />

(Amount in Rs.)<br />

Sl. No. Name of Items Amount<br />

1 Chemical & Glassware 2,00,000.00<br />

2 Muffle Furnace YSPL-532 50,000.00<br />

3 Hot Air Oven 20,000.00<br />

4 Hot Water Bath 10,000.00<br />

5 Bullet recovery Water Tank 20,000.00<br />

6 Model of Human Figure 20,000.00<br />

7 Lajer Jet Colour Printer 80,000.00<br />

TOTAL 4,00,000.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!