Contract awarded 2<br />
for provisions .j<br />
for handicappedj<br />
Manly Miles j<br />
Contract awarded 3.<br />
to replace j<br />
switchgear, j.<br />
Mason, Abbot r<br />
and Shaw Halls \<br />
IC. BIDS AND CONTRACT AWARDS, continued September 26, 1975<br />
The following bids were received on August 20, 1975 for Manly Miles - Provisions<br />
for the Handicapped.<br />
Contractor<br />
McNeilly Construction, Inc.<br />
Nielsen Construction Co.<br />
Vector Construction, Inc.<br />
Charles Featherly Construction Co.<br />
Haussman Construction Co.<br />
Granger Construction Co.<br />
Hanel-Vance Construction Co.<br />
Erickson & Lindstrom Construction Co.<br />
Base Bid<br />
$23,957<br />
24,850<br />
25,872<br />
27,575<br />
28,300<br />
31,377<br />
33,250<br />
39,000<br />
Alternate No. 1<br />
(Deduct)<br />
$ 6,187<br />
5,500<br />
7,500<br />
8,000<br />
8,600<br />
6,000<br />
7,300<br />
11,000<br />
The base bid involves construction <strong>of</strong> a ramped entrance to the building, modifications<br />
to the elevator, first floor bathrooms, public telephones, and drinking<br />
fountains to accommodate the handicapped. Also as part <strong>of</strong> this project are modifications<br />
to the front entrance, including new steps, new entrance deck and exhaust<br />
air duct extension. The modification <strong>of</strong> the front entrance will correct the present<br />
problem <strong>of</strong> humid air being discharged under the entrance deck.<br />
Alternate No. 1 deletes all work related to the modifications <strong>of</strong> the front entrance.<br />
It is recommended that a contract be awarded to McNeilly Construction, Inc. <strong>of</strong><br />
Lansing, <strong>Michigan</strong> in the amount <strong>of</strong> $23,957, which accepts the base bid only, and<br />
that the following budget be established:<br />
McNeilly Construction, Inc.<br />
Contingencies<br />
Engineering, Supervision, and Expenditing<br />
Total Expected Expenditures<br />
$23,957<br />
3,543<br />
2,500<br />
$30,000<br />
Funds are available in account 21-2801 for this project.<br />
RESOLVED that the above contract be awarded and the budget be established<br />
as recommended.<br />
I<br />
Unanimously approved. Motion by Trustee Carrigan, seconded by Trustee Huff.<br />
The following bids were received on September 3, 1975 for Mason, Abbot and Shaw<br />
Halls - Replace Switchgear.<br />
Contractor<br />
Meacham Electric<br />
Superior Electric <strong>of</strong> Lansing, Inc.<br />
Hatzel & Buehler, Inc.<br />
Lansing Electric Motors Construction, Inc.<br />
Hall Electric Co.<br />
Admiral Electric, Inc.<br />
Central Electric Motor & Construction Co.<br />
Base Bid<br />
$48,134<br />
49,851<br />
52,400<br />
54,043<br />
54,720<br />
56,530<br />
62,500<br />
This project includes the replacement <strong>of</strong> the exposed high voltage switchgear in<br />
Mason, Abbot and Shaw Halls with metal enclosed equipment.<br />
It is recommended that a contract be awarded to Meacham Electric <strong>of</strong> Howell in<br />
the amount <strong>of</strong> $48,134, and that the following budget be established:<br />
Meacham Electric<br />
Contingencies<br />
Engineering, Supervision, and Expediting<br />
$48,134<br />
4,366<br />
3,500<br />
J. Total Expected Expenditures $56,000<br />
i<br />
\ Funds are available in accounts 21-2723 and 22-3166 for this project.<br />
i<br />
| RESOLVED that the above contract be awarded and the budget be established<br />
j as recommended.<br />
jUnanimously approved. Motion by Trustee Huff, seconded by Trustee Krolikowski.<br />