cniirli tioris imposed by ?.he board, iricreasing the<br />
approved project sj7e from 300 units to -540 uriitt;,<br />
after findiny LIlnt t.he board's conditions did riol make<br />
tile projeci uneconomic. We agree." H. at. 590.<br />
\\<br />
I .<br />
It was nefenddr.iL Att.itash's burden tu prove t.hat<br />
. the conditions imposed by the Board make it<br />
irripossi h1.e Lo proceed iri buil ding or operatinq low or<br />
mode.rate iricome hoiisiriy and st-ill reaJ.j.%e a reasonable<br />
return as defined by the app1.i cable subsidizi nq<br />
agency." 760 CMR 31.06(:3) (b). Yet ALtitash made no<br />
ciisc whatsoevcr that any of the conditions imposed by<br />
\\<br />
thc Board rendered tiic project uneconom1.c.<br />
"<br />
The<br />
developer submit.t.ed 110 evj.deiice Lending to show that<br />
the conditions "made it impossiblc to proceed in<br />
building or operati.ny low or modcrate j ncome housing<br />
arid sti Il rcalize a rcasonah1.e rcturn as defined by<br />
the appliciible suhsidiziny agency. "<br />
B. The IIAC has continually -. - held thdL it is<br />
-. withuutthe<br />
. . power . . Lo .. disturb conditions -. .. t-hat<br />
do not. rendr?r - -<br />
L.he project .. ~ir.ieconomi<br />
The 11AC long aqn recognized that its ro1.e<br />
pursuant to utat.ut.e was to review projects approved<br />
wit11 condit ions pursuant Lo the "unecuIioinic" standard<br />
Lound wjtiiin G.L .c.4OB, 9.20-23. Thc HAC has noted in<br />
its decisions t.hat tile appl icarit must . . . . - satisfy its<br />
. .<br />
c.