20.07.2013 Views

Workbook

Workbook

Workbook

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(continued)<br />

193<br />

Fermi National Accelerator Laboratory<br />

Master Listing of Proposals as of March 1,1995<br />

549 QUARK #549 Michael J. Longo UNIVERSITY OF MICHIGAN<br />

BEAM I Neutrlno Aru - Mlscellineous STANFORD UNIVERSIlY<br />

A SEARCH FOR FRACTIONAL CHARGES USING ACCELERATOR AND LOW TEMPERATURE TECHNIQUES.<br />

Request 2 MlY. 77 PlrlSitic Runnlng to expose It lust 12 nloblum spheres 1n the v1clnitY of I proton bum<br />

with Intensities of > 1 x 10 to the 13th per pulse<br />

Approvil 16 MIY. 77 PerlSltic Runnlng conUngent on the terget being preplred end provlded by the<br />

experimenters<br />

ApprovedlInlcU VI Oct. 78 1 Tlrget Exposure Cs) IS of 1 Oct 1978<br />

552 P-N SCATTERING #552 Felix Sannes IMPERIAL COLLEGE (ENGLAND)<br />

BEAM I Internl1 Tlrget Aru (C-O) UNIVERSIlY OF ROCHESTER<br />

A PROPOSAL TO STUDY P - P ELASTIC AND P - D COHERENT SCATTERING. RUTGERS UNIVERSITY<br />

Request 6 MIY. 77 900 Hours<br />

Approvil 25 Jun, 77 800 Hours condltionel on cryogenlc operltion of the Internll Terget Arel<br />

Completed 9 Apr. 78 950 Hours<br />

553 NEUTRINO #553 Paul F. Shepard<br />

BEAMI Neutrino Aru - Wide Band Horn<br />

A PROPOSAL TO SEARCH FOR SHORT-LIVED PARTICLES PRODUCED BY ANTINEUTRINOS AND<br />

NEUTRINOS<br />

(Using 8 hybrid emulsion-visual detecter.)<br />

Request 6 MIV, 77 2,000 Hours with 8 specific request for 4 x 10 to the 18th protons<br />

5 Mlr, 79 2.500 Hours totll with an IddiUonl1 1,000 hours for I run of at lelst 7 x 10 to<br />

the 18th protons With the brold bind belm tuned for neutrinos<br />

Approvel 24 Jun. 77 Plrasltic Runnlng condltionll on review of detector tests<br />

16 Nov. 77 Plrlsitic Running condltionll on review of detector tests In Janulry 1978<br />

1 Jul, 79 Plrlsitic Running concurrent with the next IS-foot bubble chlmber neutrino run with the<br />

WI de Sand Horn<br />

Completed Apr. 80 1.500 Hours<br />

CORNELL UNIVERSIlY<br />

UNIVERSIlY OF LIBRE (BELGIUM)<br />

UNIVERSIlY OF LUND (SWEDEN)<br />

UNIVERSITY OF OKLAHOMA<br />

UNIVERSllY OF PADOVA (ITALY)<br />

UNIVERSITY OF PITTSBURGH<br />

INFN. ROME (ITALY)<br />

UNIVERSIlY OF SYDNEY (AUSTRALIA)<br />

UNIVERSITY OF TORINO (ITALY)<br />

YORK UNIVERSIlY (CANADA)<br />

555 NEUTRAL HYPERON #555 Thomas J. Devlin UNIVERSIlY OF MICHIGAN<br />

BEAM I Meson Aru - M2 Bum UNIVERSIlY OF MINNESOTA<br />

A PROPOSAL TO STUDY CROSS SECTIONS AND POLARIZATION IN NEUTRAL STRANGE PARTICLE RUTGERS UNIVERSIlY<br />

PRODUCTION AT HIGH TRANSVERSE MOMENTUM. UNIVERSllY OF WISCONSIN-MADISON<br />

CUslng the neutral hyperon bum end essoc1eted experlmentel<br />

epparatus. )<br />

Request 6 May. 77 250 Hours for tuneup Ind deta<br />

19 Mey. 78 550 Hours for tuning and dltl at lntensltles of 1 x 10 to the 11th per pulse<br />

Approval 15 Nov, 78 450 Hours<br />

Completed 17 Feb. 82 650 Hours<br />

557 HADRON JETS #557 Ernest I. Malamud<br />

BEAM. Meson Arel - Test Belm<br />

PROPOSAL TO STUDY HADRON JETS WITH THE CALORIMETER TRIGGERED MULTIPARTICLE<br />

SPECTROMETER.<br />

(Contlnultlon of work begun In exp .260.)<br />

Request MIV, 77 1.600 Hours for dltl with e suggested run plan IS follows - 400 hours It 200 GeV,<br />

800 hours with upgrlded M6-beam It 300 GeV. Ind 400 hours at 400 GeV<br />

Approvil 24 Jun, 77 1.600 Hours condltlonll on a better understandlng of beam requ1rements for the<br />

experlment Ifter an upgradlng of the M6 beem<br />

Completed 14 Jul. 84 1,470 Hours<br />

564 15-FOOT & EMULSION/NEUTRIN0#564 Louis Voyvodic<br />

BEAM I Neutrlno Aru - Wlde Band Horn<br />

DIRECT DETECTION OF SHORT-LIVED PARTICLES FROM NEUTRINO INTERACTIONS IN NUCLEAR<br />

EMULSIONS INSIDE THE IS-FOOT BUBBLE CHAMBER.<br />

Request 11 Mav, 77 1,500 Hours wlth a speclflc request for neutrlnos from a totel proton flux of<br />

3 x 10 to the 18thl runnlng 1s proposed durlng the IS-foot running<br />

perlod With a deuterlum f11l pllnned for the sprlng of 1978<br />

8 Mav, 79 1.100 Hours Iddltlonal to be run paresltlcilly ln the 15-ft ch8mber. f1lm from<br />

two euxl1l1ry cameras Is requested for the neutrlno portlon of the<br />

runn1ng<br />

Approval 24 Jun, 77 Peres1tic Running w1th the understendlng thlt the experiment Impose onIv I sml1l Impact<br />

on the 15-ft chember operatlons<br />

1 Jul. 79 Plrlslti c Running with the understlnding thet the experiment Impose only e smlll 1mpact<br />

on the 15-ft chamber operet10ns<br />

Completed Mar. 81 277 K Plx<br />

• 27 •<br />

UNIVERSIlY OF ARIZONA<br />

CALIFORNIA INSTITUTE OF TECHNOLOGY<br />

FERMILAB<br />

FLORIDA STATE UNIVERSIlY<br />

GEORGE MASON UNIVERSIlY<br />

UNIV. OF ILLINOIS. CHICAGO CIRCLE<br />

INDIANA UNIVERSITY<br />

UNIVERSITY OF MARYLAND<br />

IHEP. PROTVINO (SERPUKHOV)(RUSSIA)<br />

RUTGERS UNIVERSIlY<br />

FERMILAB<br />

ILLINOIS INSTITUTE OF TECHNOLOGY<br />

JINR, DUBNA (RUSSIA)<br />

UNIVERSIlY OF KANSAS<br />

INP. KRAKOW (POLAND)<br />

ITEP. MOSCOW (RUSSIA)<br />

IHEP. PROTVINO (SERPUKHOV)(RUSSIA)<br />

INST.FOR NUCL. RESEARCH (BULGARIA)<br />

UNIVERSIlY OF SYDNEY (AUSTRALIA)<br />

UNIVERSIlY OF WASHINGTON

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!