20.07.2013 Views

Workbook

Workbook

Workbook

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(continued)<br />

183<br />

Fermi National Accelerator Laboratory<br />

Master Listing of Proposals as of March 1,1995<br />

344 3O-INCH PBAR - P @ 50 #344<br />

Laszlo J. Gutay<br />

BEAM I Neutrino Area - SO 1n. H.dron Be.m<br />

PROPOSAL TO SURVEY CENTRAL COLLISIONS IN PBAR - P TO MESONS BETWEEN SO AND 60 GEV/C<br />

IN THE SO-INCH BUBBLE CHAMBER AT FERMILAB.<br />

CNTRL RES INST, BUDAPEST (HUNGARY)<br />

FERMILAB<br />

PURDUE UNIVERSITY<br />

Request<br />

Approval<br />

4 Oct. 74<br />

27 Nov, 74<br />

100 K Pix to be taken In < 200K ch.mber expansions<br />

100 K Pix with the quaUfication th.t it must be possible to obtain these<br />

Pictures In no more than one cBlender month of running time<br />

Completed Nov, 76 145 K Pix<br />

345 3O-INCH PBAR • D @ 100 #345<br />

Gosta Ekspong<br />

BEAMs Neutrino Aru - SO In. H.dron 8eilm<br />

PROPOSAL TO STUDY MULTI PARTICLE PRODUCTION IN 100 GEV/C ANTI-PROTON-DEUTERIUM<br />

INTERACTIONS WITH THE FERMILAB SO-INCH BUBBLE CHAM8ER.<br />

UNIVERSITY OF LIVERPOOL (ENGLAND)<br />

UNIVERSITY OF STOCKHOLM (SWEDEN)<br />

VANDERBILT UNIVERSITY<br />

Request<br />

ApprovBl<br />

Completed<br />

5 Oct, 74<br />

4 Dec, 74<br />

Sep, 76<br />

100 K Pix with a Cerenkov hued Incoming bum<br />

100 K Pix with the quaUflcation th.t serious consideration be given to the useof<br />

the PWC downstrum system<br />

61 K Pix with S9K pix remalng to be taken under urUer approvBl when declared<br />

complete on 29 Jun 1977<br />

346 EMULSION/PROTONS @ 400 #346<br />

BEAM I Neutrino Area - Miscellaneous<br />

SEARCH FOR HEAVY, SHORTLIVED PARTICLES.<br />

Request<br />

Approval<br />

Completed<br />

6 Oct, 74<br />

21 Oct, 74<br />

9 Dec, 75<br />

Emulsion Exposure<br />

Emulsion Exposure<br />

1 Stack(s)<br />

350 INCLUSIVE NEUTRAL MESON #350<br />

BEAMs Meson Area - M2 8eam<br />

A PROPOSAL TO STUDY NEUTRAL PIONS AND MESON<br />

NEGATIVE PIONS IN THE TRIPLE REGGE REGION.<br />

(Usl ng the photon detector of exp sIll.)<br />

Request 11 Oct. 74 500 Hours<br />

Approval 21 NOv, 74 400 Hours<br />

16 Dec, 74 400 Hours<br />

Completed 24 Feb. 77 900 Hours<br />

Gosta Ekspong<br />

Robert W. Kenney<br />

INCLUSIVE PRODUCTION WITH INCIDENT<br />

with up to 150 hours approved for a particle search with the condition<br />

that this time be InclUded within the 900 hours BlrudY approved for<br />

for expsa 268 and S50<br />

UNIVERSITY OF STOCKHOLM (SWEDEN)<br />

BROOKHAVEN NATIONAL LABORATORY<br />

CALIFORNIA INSTITUTE OF TECHNOLOGY<br />

LAWRENCE BERKELEY LADORATORY<br />

356 NEUTRINO #356 Frank Sciulli CALIFORNIA INSTITUTE OF TECHNOLOGY<br />

BEAMI Neutrino Aru - Dichromatic FERMILAB<br />

STUDIES OF DEEP INELASTIC DIFFERENTIAL DISTRIBUTIONS AT HIGH ENERGIES FOR NEUTRINO UNIVERSITY OF ROCHESTER<br />

AND ANTI-NEUTRINO 8EAMS. ROCKEFELLER UNIVERSITY<br />

(A continuation of the work begun In exp a21A with a new narrow band<br />

beam and changed apparatus.)<br />

Request 18 Oct. 74 1,000 Hours<br />

Approval 22 Nov, 74 1,000 Hours With a formal commitment of 2 x 10 to the 18th protons contingent on<br />

the fusl blUty of developlns the improved 01 chromatic be.m<br />

Completed 17 Jan. 79 1.350 Hours<br />

357 PARTICLE SEARCH #357 Donald I. Meyer<br />

BEAM I Meson Area - M2 8••m<br />

A PROPOSAL TO SEARCH FOR CHARMED PARTICLES AND MEASUREMENTS OF<br />

CROSS SECTIONS AT LARGE P-TRANSVERSE.<br />

(Employing a two-.rm masnetic spectrometer.)<br />

TloIo-PARTICLE INCLUSIVE<br />

Request<br />

ApprovBl<br />

19 Oct. 74<br />

16 Dec, 74<br />

2,400 Hours<br />

600 Hours<br />

Completed 7 Jun. 76 1.700 Hours<br />

358 DI-MUON #358<br />

8EAMs Proton Aru - East<br />

DI-MUON PRODUCTION BY NEUTRONS.<br />

Request<br />

Approval<br />

Completed<br />

FERMILAB<br />

UNIVERSITY OF MICHIGAN<br />

PURDUE UNIVERSITY<br />

Wonyong Lee COLUMBIA UNIVERSITY<br />

CORNELL UNIVERSITY<br />

FERMILAB<br />

UNIVERSITY OF HAWAII AT MANOA<br />

UNIVERSITY OF ILLINOIS, CHAMPAIGN<br />

20 Oct. 74 Unspecifled<br />

27 Nov. 74 300 Hours of neutron runnlns to be lnterleaved Within the 600 hours already<br />

approved for IXp8 S7A<br />

Oct, 75 400 Hours<br />

361 LAMBDA BETA-DECAY #361 Lee G. Pondrom UNIVERSITY OF MICHIGAN<br />

BEAM I Meson Aree - M2 8eem UNIVERSITY OF MINNESOTA<br />

PRECISION MEASUREMENT OF LAM8DA BETA DECAY PARAMETERS. RUTGERS UNIVERSITY<br />

(101111 run with experimental set-up for neutral hyperon as.) UNIVERSITY OF WISCONSIN-MADISON<br />

Request 14 Nov, 74 300 Hours<br />

23 Jan, 76 350 Hours total lncludlng 150 hours ln unpolarlzed lambda-zero beam and 200<br />

Approval<br />

Completed<br />

15 Nov, 77 300 Hours<br />

29 Oct, 79 1,250 Hours<br />

hours ln polarlzed lambda-zero beam<br />

362 EMULSION/PI- @ 200 #362<br />

BEAM I Neutrlno Area - Mlscellaneous<br />

Piyare L. Jain<br />

INTERACTION OF 200 - 400 GEV PIONS WITH EMULSION NUCLEI.<br />

Request<br />

Approval<br />

15 Nov,<br />

25 Nov,<br />

74<br />

74<br />

Emulsion Exposure<br />

Emulslon Exposure<br />

Completed 9 Jun, 75 1 Stack(s)<br />

363 PARTICLE SEARCH #363 Stephen L. Olsen<br />

BEAMI Internal Target Area CC-O)<br />

A PROPOSAL TO SEARCH FOR CHARMED PARTICLE PRODUCTION NEAR THRESHOLD.<br />

Request<br />

Approval<br />

Completed<br />

24 Nov, 74<br />

16 Dec. 74<br />

9 Apr. 75<br />

365 PARTICLE SEARCH #365<br />

BEAM I Meson Area - M2 8eam<br />

A PROPOSAL TO SEARCH FOR THE<br />

Request<br />

Approval<br />

27 Nov, 74<br />

Sl Dec. 74<br />

Completed 5 Feb, 75<br />

Unspecified<br />

500 Hours of runnins with the rotating carbon fn.ment target<br />

650 Hours<br />

David A. Garelick<br />

PRODUCTION OF CHARMED MESONS IN PI - P INTERACTIONS.<br />

SUNY AT BUFFALO<br />

200 Hours lncludlng 40 hours for t.sting<br />

200 Hours during a two week run With a passlv" nonmasnetlzld st.el absorber to<br />

be used in conjunction with a muon trlSger<br />

200 Hour.<br />

• 17 •<br />

FLORIDA STATE UNIVERSITY<br />

IMPERIAL COLLEGE (ENGLAND)<br />

UNIVERSITY OF ROCHESTER<br />

RUTGERS UNIVERSITY<br />

NORTHEASTERN UNIVERSITY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!