(g) Transmission Proposals<br />
(i) Name and NGR of Transmitter Site<br />
(a) Name and National Grid Reference of site;<br />
Redruth (SW 690 374)<br />
Caradon Hill (SX 273 707)<br />
(b) Height of site above Ordnance datum (in metres);<br />
Redruth 229 metres<br />
Caradon Hill 369 metres<br />
(c) Height of transmitting aerial above ground level (in metres);<br />
Redruth 95 metres<br />
Caradon Hill 167 metres<br />
(d) Radiated power<br />
Redruth 10kW watts vertical +2. 5 kW watts horizontal<br />
Antenna pattern will be directional<br />
Caradon Hill 2kW vertical + 0.5kW horizontal<br />
Antenna Pattern will be directional<br />
NTL has offered us site-sharing facilities at Redruth and Caradon Hill. No planning permission is<br />
required as the existing antennas will be shared. All the additional equipment will be housed within the<br />
building.<br />
The existing antennas with the e.r.p stated above will meet the <strong>Ofcom</strong> restrictions for this licence.<br />
(ii) Coverage Predictions<br />
Please see the NTL Coverage Predictions for the area in the Engineering Appendix.<br />
(iii) Arrangements for transmission provision<br />
Our Transmission provider ntl is well resourced <strong>to</strong> install the complete system and subsequently<br />
maintain and moni<strong>to</strong>r the Transmission parameters. Telemetry and remote moni<strong>to</strong>ring systems provide<br />
information back <strong>to</strong> their control centre e.g. Carrier Power, lack of modulation etc on a 24 hr basis.<br />
Their maintenance personnel are highly trained with the necessary spares and test equipment <strong>to</strong><br />
resolve any problem quickly. <strong>Itchy</strong> <strong>FM</strong> intends <strong>to</strong> utilise a Total Broadcast Contract (TBC) with NTL.<br />
(iv) What is the anticipated time-lapse between the award of licence and start of broadcasting?<br />
<strong>Itchy</strong> <strong>FM</strong> would aim <strong>to</strong> be on air within 6 <strong>to</strong> 9 months from licence award.<br />