(g) Transmission Proposals<br />

(i) Name and NGR of Transmitter Site<br />

(a) Name and National Grid Reference of site;<br />

Redruth (SW 690 374)<br />

Caradon Hill (SX 273 707)<br />

(b) Height of site above Ordnance datum (in metres);<br />

Redruth 229 metres<br />

Caradon Hill 369 metres<br />

(c) Height of transmitting aerial above ground level (in metres);<br />

Redruth 95 metres<br />

Caradon Hill 167 metres<br />

(d) Radiated power<br />

Redruth 10kW watts vertical +2. 5 kW watts horizontal<br />

Antenna pattern will be directional<br />

Caradon Hill 2kW vertical + 0.5kW horizontal<br />

Antenna Pattern will be directional<br />

NTL has offered us site-sharing facilities at Redruth and Caradon Hill. No planning permission is<br />

required as the existing antennas will be shared. All the additional equipment will be housed within the<br />

building.<br />

The existing antennas with the e.r.p stated above will meet the <strong>Ofcom</strong> restrictions for this licence.<br />

(ii) Coverage Predictions<br />

Please see the NTL Coverage Predictions for the area in the Engineering Appendix.<br />

(iii) Arrangements for transmission provision<br />

Our Transmission provider ntl is well resourced <strong>to</strong> install the complete system and subsequently<br />

maintain and moni<strong>to</strong>r the Transmission parameters. Telemetry and remote moni<strong>to</strong>ring systems provide<br />

information back <strong>to</strong> their control centre e.g. Carrier Power, lack of modulation etc on a 24 hr basis.<br />

Their maintenance personnel are highly trained with the necessary spares and test equipment <strong>to</strong><br />

resolve any problem quickly. <strong>Itchy</strong> <strong>FM</strong> intends <strong>to</strong> utilise a Total Broadcast Contract (TBC) with NTL.<br />

(iv) What is the anticipated time-lapse between the award of licence and start of broadcasting?<br />

<strong>Itchy</strong> <strong>FM</strong> would aim <strong>to</strong> be on air within 6 <strong>to</strong> 9 months from licence award.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!