19.07.2013 Views

Appendix A of Report to Congress: National Plan of Integrated ... - FAA

Appendix A of Report to Congress: National Plan of Integrated ... - FAA

Appendix A of Report to Congress: National Plan of Integrated ... - FAA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bsd Acft The number <strong>of</strong> locally owned aircraft hangared or based at the airport. Included in<br />

these counts are single-engine; multi-engine; jets; and helicopters as reported by the<br />

airport and verified by the N number registry. Not included in these <strong>to</strong>tals are:<br />

military aircraft, ultra-lights, gliders, and balloons.<br />

Dev Cost The estimated 5-year costs for airport improvements that are eligible for Federal<br />

development grants under the Airport Improvement Program. The costs identified are<br />

for development only; approximately $775 million in planning costs are excluded<br />

from the development estimates. <strong>Plan</strong>ning costs have increased 137 percent from the<br />

last report ($448 million).<br />

Note: The data presented in these tables were largely compiled in 2009 with a few updates<br />

through February 2010.<br />

A-2 <strong>National</strong> <strong>Plan</strong> <strong>of</strong> <strong>Integrated</strong> Airport Systems (2011-2015)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!