19.07.2013 Views

BY ORDER OF THE AIR FORCE PAMPHLET 91-215 SECRETARY ...

BY ORDER OF THE AIR FORCE PAMPHLET 91-215 SECRETARY ...

BY ORDER OF THE AIR FORCE PAMPHLET 91-215 SECRETARY ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A5.5. Selecting risk controls when risks are high and risk control costs are important - use of decision<br />

matrices. An excellent tool for evaluating various risk control options is the decision matrix. On the<br />

vertical dimension of the matrix we list the mission supportive characteristics we are looking for in risk<br />

controls. Across the top of the matrix we list the various risk control options (individual options or<br />

packages of options). Then we rank each control option on a scale of 1 (very low) to 10 (very high) in<br />

each of the desirable characteristics. If we choose to, we can weight each desirable characteristic based on<br />

its mission significance and calculate the weighted score (illustrated below). All things being the same, the<br />

options with the higher scores are the stronger options. A generic illustration is provided at Figure A5.3.<br />

Figure A5.3. Sample Decision Matrix.<br />

RATING WEIGHT* RISK CONTROL OPTIONS/PACKAGES<br />

FACTOR #1 #2 #3 #4 #5 #6<br />

Low cost 5 9/45 6/30 4/20 5/25 8/40 8/40<br />

Easy to implement 4 10/40 7/28 5/20 6/24 8/32 8/32<br />

Positive operator 5 8/40 2/10 1/5 6/30 3/15 7/35<br />

involvement<br />

Consistent with 3 10/30 2/6 9/27 6/18 6/18 6/18<br />

culture<br />

Easy to integrate 3 9/27 5/15 6/18 7/21 6/18 5/15<br />

Easy to measure 2 10/20 10/20 10/20 8/16 8/16 5/10<br />

Low risk (sure to 3 9/27 9/27 10/30 2/6 4/12 5/15<br />

succeed)<br />

TOTALS 229 136 140 140 151 165<br />

* Weighting is optional and is designed to reflect the relative importance of the various factors.<br />

A5.6. Summary. It is not unusual for a risk control package to cost hundreds of thousands of dollars and<br />

even millions over time. Millions of dollars and critical missions may be at risk. The expenditure of several<br />

tens of thousands of dollars to get the decision right is sound management practice and good risk<br />

management.<br />

110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!