October - Library
October - Library
October - Library
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The Entek product family - complete<br />
enterprise health is now a reality!<br />
Leading automation technology company,<br />
Rockwell Automation, has developed the Entek<br />
p roduct family into a comprehensive suite of<br />
condition-based monitoring solutions and<br />
s e rvices offering optimal scalability and<br />
f l e x i b i l i t y. From hand-held vibration sensors to<br />
s u rveillance systems and plant-wide on-line<br />
p rotection networks, Rockwell Automation has<br />
you covered - now and in the future !<br />
• On-line continuous machine<br />
monitoring and protection: Solutions<br />
ranging from the configurable, single point<br />
Sentinel vibration monitor through to the<br />
fully scalable, modular Entek XM distributed<br />
protection system<br />
• On-line surveillance: Bridging the gap<br />
between portable data collectors and<br />
continuous monitoring, are the Enwatch online<br />
surveillance systems, a powerful yet<br />
extremely cost effective surveillance<br />
solution.<br />
• Diagnosis and analysis tools: A<br />
wide range of on- and off-line data analysis<br />
and diagnostic solutions including the<br />
Emonitor Odyssey V3.0 complete machinery<br />
information software system, and the<br />
Emonitor Enshare advanced Plant Asset<br />
Management [PAM] system<br />
• Data collectors and meters: A wide<br />
selection of condition monitoring data<br />
collectors and meters, from the low-cost<br />
Vistec portable data vibration meter through<br />
to the fully featured DataPAC 1500 and<br />
Enpac portable data collectors/analysers.<br />
• Industrial sensors: A complete suite of<br />
industrial sensors including accelerometers,<br />
laser tachometers, and non-contact<br />
proximity probes for a range of industries.<br />
• Condition monitoring audits and<br />
analysis services: Our experienced<br />
technical team are avaliable to provide a<br />
complete range of on-site or remote<br />
services.<br />
For more information, visit us at:<br />
www.entek.com or<br />
www.rockwellautomation.com.au<br />
or contact us on:<br />
Tel: +61 [0]3 9896 0300 Australia<br />
Tel: +64 [0]9 276 3070 New Zealand
A journal for all those interested in the<br />
maintenance, monitoring, servicing and<br />
management of plant, equipment,<br />
buildings and facilities.<br />
Volume 17, No 4.<br />
<strong>October</strong> 2004<br />
Published by:<br />
Engineering Information Transfer Pty Ltd<br />
Publisher and Managing Editor:<br />
Len Bradshaw<br />
Publishing Dates:<br />
Published in February, May, August and<br />
<strong>October</strong>.<br />
Material Submitted:<br />
Engineering Information Transfer Pty Ltd<br />
accept no responsibility for statements<br />
made or opinions expressed in articles,<br />
features, submitted advertising,<br />
advertising inserts and any other editorial<br />
contributions.<br />
Copyright:<br />
This publication is copyright. No part of<br />
it may be reproduced, stored in a<br />
retrieval system or transmitted in any<br />
form by any means, including electronic,<br />
mechanical, photocopying, recording or<br />
otherwise, without the prior written<br />
permission of the publisher.<br />
For all Enquiries Contact:<br />
Engineering Information Transfer Pty Ltd<br />
PO Box 703, Mornington,<br />
Victoria 3931, Australia<br />
Phone: (03) 5975 0083,<br />
Fax: (03) 5975 5735,<br />
E-mail: mail@maintenancejournal.com<br />
Web Site: www.maintenancejournal.com<br />
This issue’s cover shot is<br />
reprinted with permission<br />
from ABB Review Special<br />
Report - Industrial<br />
Services.<br />
Regular Features<br />
70<br />
74<br />
81<br />
PM Corner<br />
Condition Monitoring<br />
Standard - Steam Traps<br />
Maintenance News<br />
Current Maintenance and<br />
Product News<br />
Subscription Form<br />
Subscribe to either the<br />
Print or eMJ versions of<br />
The Maintenance Journal<br />
6<br />
8<br />
16<br />
18<br />
20<br />
24<br />
26<br />
31<br />
48<br />
52<br />
54<br />
56<br />
64<br />
Contents<br />
Optimizing The Role Of The Maintenance Department<br />
Joel Leonard<br />
RCM - Can It Deliver Performance<br />
John Gallimore<br />
Key Performance Indicators Leading Or Lagging And<br />
When To Use Them<br />
Ricky Smith<br />
Certification For Maintenance & Reliability Professionals<br />
Terrence O’Hanlon<br />
Improved Reliability Of Universal Joints On LPP Main<br />
Cooling Water Pump<br />
Rahimi Md Sharip<br />
The Importance Of CMMS In Schools<br />
Oren Tirosh<br />
The Strategic Importance Of Asset Management<br />
Daryl Mather<br />
2004 Survey Of Special Maintenance Applications Software<br />
Ian Bradshaw<br />
Plan For Maintenance Productivity<br />
Tom Westerkamp<br />
Unbelievable Resonances And Their Enormous Force<br />
Mathias Luft<br />
Hosted CMMS - Are You Ready For The Revolution?<br />
Computerized Facility Integration, L.L.C.<br />
Implementing Problem Solving Excellence Using Six Sigma<br />
D Jenkins & P Townson<br />
The Role Of Knowledge In Managing Maintenance For<br />
Business Success<br />
Dr. Mousumi Samanta & Dr. Bimil Samanta<br />
27 Research Drive, Croydon VIC 3136<br />
ph 03 9761 5088 fax 03 9761 5090<br />
email: sales@maintsys.com.au<br />
web: www.maintsys.com.au<br />
<strong>October</strong> 2004
A GREAT NEW INFRARED CAMERA<br />
FROM NEC<br />
FROM ANY VIEW!<br />
T h e rmo Tr a c e r<br />
T H 6 1 0 0<br />
• FULL SIZE IR DETECTOR 320 X 240 MEANS EXCELLENT RESOLUTION<br />
• 16 BIT FILE STORAGE WITH CONVENIENCE OF USB 2.0 DOWNLOAD<br />
• LARGE 10 CM TOUCH SCREEN LCD DISPLAY PLUS VIEWFINDER<br />
• EXCELLENT PORTABILITY AT 1.3KG INCLUDING BATTERIES<br />
• OPERATES FROM STANDARD ”AA“ BATTERIES<br />
• TEMPERATURE RANGE: - 40˚C TO + 500˚C<br />
• UPPER AND LOWER ALARM FUNCTIONS<br />
Infratherm Pty. Limited<br />
N E C<br />
NEC San-ei<br />
Infratherm Pty Ltd PO Box 117, NORTH RICHMOND, NSW 2756 AUSTRALIA<br />
Te l :+ 61 2 4579 7334 or +61 2 4322 2100 Fax: +61 2 4579 6333 or +61 2 4323 7439<br />
E-mail: jrobinson@infratherm.com.au - mratne@infratherm.com.au<br />
web: www.infratherm.com.au
<strong>October</strong><br />
Editorial<br />
Bill Baker MESA Memorial Lecture<br />
In August 04 I attended the inaugural William (Bill) Baker MESA Memorial Lecture in memory of Bill<br />
who was a founding member of the Maintenance Engineering Society of Australia (MESA) and Director<br />
and Principal Consultant of MACE Consulting Group from 1988 to 2003. Bill was a key figure in the<br />
development of Maintenance, Reliability and Asset Management in Australia. He was a leader in the<br />
Maintenance field and will be sadly missed.<br />
Bill Baker spent many years in the Australian Department of Defence eventually leaving with the rank<br />
of Major. It was there f o re appropriate that the first William (Bill) Baker MESA Memorial Lecture be<br />
p resented by Major Dean Reyniers. Comments from the lecture are provided below by Ross Francis (Ross<br />
Francis Consulting):<br />
Major Dean Reyniers, SO2 RAM, gave us an insight into his experience in Reliability and<br />
Maintainability Engineering in the Department of Defence (DMO). There is always much that<br />
private industry can learn from the armed forces. A few key points noted during his talk include:<br />
• 95% of the Life Cycle Costs (LCC) of an asset is locked in before equipment enters<br />
service. Thus the armed services focus for R&M Engineering is on acquisition activities<br />
• The opportunity to influence reliability diminishes rapidly once equipment is put into<br />
service<br />
• A minimum of 80% (some would say 90+%) of the LCC are expended during operations<br />
(often over a life of 20 years) and less than 20% for acquisition / construction<br />
• Reliability and maintainability issues must be dealt with at design and the emerging design<br />
m a n a g e d<br />
• Industry is focused on asset management from purely an in-service perspective and<br />
often invests in reliability through replacement and upgrades<br />
• To focus purely on existing assets is to sub-optimise from a life cycle perspective<br />
• Industry has many Maintenance Engineers and few Reliability Engineers<br />
• Industry should give much more feedback to OEM suppliers on reliability and<br />
maintainability issues<br />
• Aim must be to bring down the barriers between asset users, in-service managers and<br />
acquisition managers<br />
SURVEY FEATURE<br />
in the February<br />
2005 issue<br />
Survey of<br />
Communication Tools Used<br />
In Maintenance<br />
Applications And/Or Used In<br />
CMMS/EAM’s<br />
(May include data<br />
collection/communication devices;<br />
GPS; GIS; bar-coding; transportation;<br />
Palm devices; etc.)<br />
If your organisation is a provider of such<br />
communication tools or you are a<br />
provider of CMMS/EAM systems that<br />
incorporate such communication tools<br />
and you wish to be included in this<br />
s u r v e y, then please obtain the survey<br />
form by contacting Len Bradshaw at:<br />
mail@maintenancejournal.com<br />
Completed survey forms must be returned<br />
by 29 <strong>October</strong> 2004
7<br />
Optimizing The Role Of The Maintenance Department<br />
Optimizing<br />
The Role<br />
Of The<br />
Maintenance<br />
Department<br />
Joel Leonard<br />
E-mail: leonard.joel@mpactlearning.com<br />
Despite its often misconceived reputation, maintenance is more<br />
than a “fix it when it breaks”function. But because it is often treated<br />
as such, it’s not utilized to its full capacity. In order to avoid a “just fix<br />
it” maintenance department, plant managers must take re s p o n s i b i l i t y.<br />
Unless the maintenance organization is given (or develops) a pro a c t i v e<br />
list of goals and objectives, it will always be sub-optimized.<br />
Maintenance Goals<br />
In order to determine the proper goals and objectives for the<br />
maintenance organization, it is first necessary to define its<br />
responsibilities. Close examination reveals that the true goal of<br />
maintenance is to maintain the capability of the company’s assets to<br />
p e rf o rm their designed function. When one views maintenance in this<br />
w a y, many of the negative stereotypical perceptions about<br />
maintenance will change. For example, determining the “customer”<br />
of the maintenance organization takes on a new focus. In many<br />
companies, there is a belief that maintenance’s customer is the<br />
operation or production group, but the real customers of the<br />
maintenance department are the shareholders of the company. By<br />
caring for assets in which the shareholders have invested, plants can<br />
be sold with pro d u c t i o n - re a d y, well-maintained assets worth more<br />
than poorly maintained ready-to-scrap assets.<br />
The second goal of maintenance is to be as efficient and eff e c t i v e<br />
as possible in carrying out the repairs and services that are re q u i re d .<br />
By taking more responsibility for the costs within their depart m e n t ,<br />
maintenance personnel ultimately protect their jobs. Keeping costs<br />
down maximizes profitability and prevents wasted dollars while<br />
making a case against the idea that it is more economical to contract<br />
out maintenance functions.<br />
The third goal of maintenance is to reduce energy usage or energ y<br />
c o n s u m p t i o n . Well-maintained equipment re q u i res less energy to<br />
operate. The maintenance organization can have a large impact on<br />
the company’s bottom line by ensuring that all energ y - re l a t e d<br />
equipment is up to standard performance levels.<br />
Judicious Cost Cutting<br />
in the Maintenance Department In order to compete in this<br />
hypercompetitive global economy, companies strive to become more<br />
e fficient and effective. In order to do this, companies have taken to<br />
rolling out plans to elevate the bar of perf o rmance while again<br />
restricting available re s o u rces.”Doing more with less” has become a<br />
standard business mantra.<br />
Many companies have become so fanatical about cost cutting that<br />
many eff o rts have yielded disastrous and even dangero u s<br />
consequences. Indiscriminate cost cutting can handicap companies’<br />
ability to respond to new opportunities as well as to maintain and<br />
expand production capacity.<br />
Typical Objectives<br />
While the objectives of maintenance may vary from org a n i z a t i o n<br />
to organization, some typical maintenance objectives are defined as<br />
the following:<br />
1. Maximize production at the lowest cost, the highest quality, and<br />
within the optimum safety standards. This statement is very<br />
broad, but it is important for maintenance to have a proactive<br />
vision to help focus its activities. In fact, this statement should<br />
be tied to any corporate objective.
2. Identifying and implementing cost reductions. This is sometimes<br />
an overlooked aspect of maintenance, but there are many ways<br />
a maintenance organization can help a company reduce<br />
costs.For example,a change in a maintenance policy may<br />
lengthen production run times without damaging the equipment.<br />
This reduces maintenance cost and,at the same time, increases<br />
production capacity.<br />
3. Providing accurate equipment maintenance records allows a<br />
company to evaluate the performance metrics of equipment<br />
accurately in engineering terms such as “mean time between<br />
failure” or “mean time to repair.” Success in this endeavor,<br />
however, requires accurate documentation of each maintenance<br />
activity. That is why most organizations use some form of a<br />
computerized maintenance management system to track and<br />
report this information. But whether or not a computer is used,<br />
key information must be accurately tracked. This documentation<br />
provides legal defense to validate that proper maintenance on<br />
the assets are being performed.<br />
4. Optimizing maintenance resources includes eliminating waste<br />
with effective planning and scheduling techniques. In reactive<br />
maintenance organizations, it is estimated that up to one-third of<br />
maintenance expenditures are wasted. By optimizing<br />
maintenance resources, organizations improve their<br />
effectiveness in eliminating this waste. For example, if an<br />
organization has a maintenance budget of one million dollars<br />
and operates in a reactive mode, it is possible that the<br />
organization is wasting more than $300,000. When 80 to 90<br />
percent of all maintenance activities are planned and scheduled<br />
on a weekly basis, there is very little waste to the maintenance<br />
process.The goal for a reactive organization is to achieve this<br />
level of proficiency.<br />
5. Optimizing the lifespan of capital equipment is another key<br />
function of the maintenance department. Properly maintained<br />
equipment will last 30 to 40 percent longer than poorly<br />
maintained equipment. A preventive maintenance<br />
program,properly designed, will ensure that the routine needs of<br />
the equipment are addressed. Minimizing energy usage is a<br />
natural result of well-maintained equipment. Well-maintained<br />
equipment requires 6 to 11 percent less energy to operate than<br />
poorly maintained equipment. For example, heat exchangers and<br />
coolers that are not cleaned at the proper frequency will<br />
consume more energy when heating or cooling. HVAC systems<br />
that are not properly maintained will require more energy to<br />
provide proper ventilation to a plant or facility. Even small things<br />
can have a dramatic impact on energy consumption, e.g., the<br />
alignment of couplings in a plant that has a large amount of<br />
rotating equipment.<br />
6. Minimizing inventory on hand is another waste-eliminating<br />
objective for maintenance organizations. Approximately 50<br />
percent of a maintenance budget is spent on spare parts and<br />
material consumption. In organizations that are reactive, up to 20<br />
percent of spare parts cost may be waste. When organizations<br />
become more planned and controlled, this waste is eliminated.<br />
Some typical areas of waste in the inventory and purchasing<br />
function include: stocking too many spare parts; expediting<br />
spare part delivery; allowing shelf life to expire; single-line item<br />
purchase orders; and vanished spare parts. So, it is important for<br />
the maintenance organization to focus on controlling spare parts<br />
and their costs.<br />
An Easy Target<br />
Maintenance has been an easy target of indiscriminate cost<br />
cutting because most organizations do not fully understand or<br />
a p p reciate its mission and value. For example, an ambitious<br />
accountant at a Maryland manufacturing plant, despite the<br />
maintenance depart m e n t ’s passionate objections, dictated that no<br />
Optimizing The Role Of The Maintenance Department<br />
s p a re parts over $1,000 could be purchased for on-hand inventory.<br />
Shortly after this policy was made, the companies’ major production<br />
line was shut down for three months to wait for a $1,200 replacement<br />
component to arrive from a German manufacture r. That “cost savings”<br />
edict resulted in over $900,000 in lost revenue.<br />
This is a more common event than many realize. Even though<br />
maintenance contributes significantly, many businesses’ budget<br />
decisions are made with minimal input from maintenance.<br />
Taking Charge<br />
How to Survive and Thrive in an Adverse Economic Environment:<br />
1. Overcome shyness. Shyness has become recognized as a major<br />
inhibitor to maintenance performance. Many opportunities to<br />
present a case have been lost because maintenance personnel<br />
avoid speaking to groups.<br />
2. Increase your credibility. The Association for Facilities<br />
Engineering (www.afe.org) has received numerous testimonials<br />
from those who challenged themselves by taking the Certified<br />
Plant Maintenance Manager exam. Many recipients report that<br />
management’s perception of them increased and now have been<br />
invited to participate in key business meetings.<br />
3.”Value Proof” your department. In this adverse economic<br />
environment every expense is up for review. Maintenance is<br />
very misunderstood and therefore has been an easy target for<br />
indiscriminant cost cuts. Maintenance perception is critical to<br />
your ability to receive appropriate resources. Do not hesitate to<br />
bring in maintenance experts to help educate management on<br />
the role of the maintenance department. Work to convince<br />
management and operations to attend a Maintenance<br />
Excellence Workshop. Several companies who have attended<br />
these types of events have become more sensitive and<br />
supportive to maintenance initiatives.<br />
4. Be persistent.Take a lesson from some of the best sales people:<br />
your kids. Keep asking for key items until management gives in.<br />
Marketing statistics prove that it takes 21 exposures to an idea<br />
before gaining general acceptance.<br />
5. Become a “known” value provider and cost cutting crusader.<br />
Constantly search for new methods to reduce costs and subtly<br />
inform management of your successes. For example,many states<br />
will allow you to deduct spare parts inventory from your taxes.<br />
Also try becoming a showcase account for key suppliers;<br />
provide testimonials and referrals to your key suppliers in<br />
exchange for priority service and special pricing. Submit to win<br />
an industry maintenance achievement award, or try keeping<br />
everyone’s eyes on the prize by creating a “Maintenance Brag<br />
Board.” Showcase key performance indicators and highlight<br />
department successes.<br />
Rex Gallaher, Director of Maintenance for USPS instructs his team,<br />
“Become a leader first, become a businessman second and then<br />
become a maintenance re s o u rce.” Companies will continue to employ<br />
cost cutting measures. It is our responsibility to provide inform a t i o n<br />
to facilitate judicious decisions and to improve the org a n i z a t i o n ’s<br />
ability to respond to current and future challenges. Implement these<br />
tips and you and your business will thrive.<br />
8
9<br />
RCM - Can It Deliver Performance?<br />
RCM - Can It Deliver<br />
Performance?<br />
John Gallimore<br />
Director, GGR Associates Limited (UK)<br />
Published previously in The Maintenance and Asset Management Journal Vol 19 No 1<br />
Abstract<br />
Reliability Centred Maintenance has its advocates and detractors<br />
in fairly balanced numbers. This article shows how the industrial<br />
context is all important and that it is not a case of one methodology<br />
being good and others bad. There are industries, such as nuclear<br />
p o w e r, with potential for major disasters where standard RCM can do<br />
well. In other circumstances, particularly where the risk to the public<br />
is low and product variety is higher, the more recent developments of<br />
RCM provide a better option for improving plant perf o rmance and<br />
safety.<br />
INTRODUCTION<br />
So why is it necessary to write another paper on Reliability Centre d<br />
Maintenance when so much has already been published? The re a s o n<br />
is that previous papers have generally been written from a part i a l<br />
standpoint. They may, for example, have come from org a n i s a t i o n s<br />
whose sole reason for being is to promote standard RCM, or they may<br />
have been written to describe a particular application of the<br />
m e t h o d o l o g y. In the first case, exaggerated claims may have been<br />
made - certainly the weaker points will not get much coverage: in the<br />
second, the context of the paper is likely to be different from that of<br />
the reader and therefore of limited relevance.<br />
The aim of this paper is there f o re to provide a balanced view of<br />
RCM and its more recent derivatives, and to indicate where each is<br />
applicable<br />
THE BACKGROUND TO RCM<br />
Most readers will be familiar with the formulation of RCM in the<br />
1970s in the USA aviation industry and its use in the development of<br />
scheduled maintenance programmes for aircraft including the Boeing<br />
747. It was a huge success by any standard. So much so that equipment<br />
f a i l u re is now well down the list of reasons for aircraft disasters - after<br />
human erro r, extreme weather conditions and sabotage.<br />
RCM caused old beliefs to be questioned. Most noteworthy of<br />
these perhaps was the belief that there was a 'right time' when each<br />
item of equipment should be overhauled. The definitive text on RCM<br />
by Nolan and Heap [1] shows, in the initial maintenance schedules for<br />
the McDonnell Douglas DC8 and then for the DC10 and Boeing 747,<br />
how dramatically opinion changed - from a re q u i rement for scheduled<br />
removal for maintenance of 339 items on the DC8 to as few as seven<br />
or eight on the newer and far more complex aircraft.<br />
RCM brought with it new concepts to guide the selection of a<br />
preventive maintenance (PM) regime. These included -<br />
• A rigorous logic for identifying possible failures and deciding<br />
what to do about them<br />
• Recognition of six failure patterns, not just the "bath-tub" curve<br />
favoured by engineers<br />
• Realisation that most failures occur randomly and cannot<br />
therefore be prevented by fixed interval overhauls or<br />
replacements<br />
• A focus on the consequences of failure rather than the failure<br />
itself<br />
• A shift towards condition-based maintenance where the<br />
equipment is left undisturbed until early signs of failing can be<br />
detected<br />
• Enforcement of a re-design or change in operating procedures if<br />
serious failure consequences cannot be prevented by<br />
maintenance<br />
• Recognition of the importance of operating context - similar<br />
plant in different uses or configurations will have different failure<br />
consequences and will require different maintenance regimes.<br />
It looked as if a panacea for the maintenance professional had<br />
a rrived that would lead easily to a step improvement in plant re l i a b i l i t y<br />
throughout industry.<br />
WIDER APPLICATION OF RCM<br />
Success with the early application of RCM in the airline industry<br />
led rapidly to the application of the RCM methodology to other forms<br />
of transport, nuclear power and military systems. These industries<br />
share characteristics that include being -<br />
• safety-critical<br />
• involved with the public<br />
• heavily regulated<br />
• engineering dominated<br />
• based on high technology.<br />
It seemed an entirely logical move to extend the application of RCM<br />
to general process and manufacturing industries. Harris and Moss [2]<br />
reported, however, on the difficulties being encountered when RCM<br />
was applied in power, process and manufacturing industries. In<br />
p a rt i c u l a r, they highlighted the diff e rence in approach - from a<br />
p rescriptive approach by specialists in aviation to a co-operative<br />
approach by facilitator-led teams of plant operators and engineers in<br />
these other industries.<br />
Once the safety issues have been dealt with, the RCM process is<br />
competing with several other techniques for improving the reliability and<br />
p e rf o rmance of plant. We will there f o re look further at the characteristics<br />
of a range of industries and examine how well (or otherwise) RCM meets<br />
the re q u i rements of a perf o rmance improvement methodology.<br />
THE INDUSTRIAL CONTEXT<br />
With the establishment of a standard for RCM [3] has come some<br />
h a rdening of attitudes towards assertion that unless a methodology<br />
complies with this standard it is of little value. This is indeed a strange<br />
i rony considering how keen the RCM pioneers, Nowlan and Heap,<br />
w e re to ensure that any PM applied to plant should fully re c o g n i s e<br />
the context in which it is re q u i red to operate. The failure of many RCM<br />
initiatives in industry derives from the attempt to apply a cumbersome<br />
and inflexible methodology in industrial contexts that differ widely fro m<br />
those obtaining in aviation.
A simple classification of plant or industries is able to separate out<br />
the obviously safety critical. These include, for example, aviation,<br />
nuclear power generation and the armed forces. Such sectors have<br />
developed to become highly proceduralised, documented and<br />
regulated. In turn, adherence to the documented pro c e d u res is closely<br />
m o n i t o red and any lapse or 'near miss' is subjected to extensive<br />
review and possible disciplinary action. In such contexts, where<br />
engineering and technology dominate, it is not surprising that a<br />
l e n g t h y, documentation-intensive process such as RCM can be re a d i l y<br />
accepted.<br />
The industrial context for most commercial process and<br />
manufacturing industry is, however, quite diff e rent. Safety, while of<br />
serious concern to management, is not such a dominant factor. There<br />
a re fewer realistic possibilities for major disasters and the public is<br />
not often put at risk. By comparison, cost effectiveness, operating<br />
e fficiency and profit improvement come to the fore. Commonly, the<br />
characteristics of such industries are that they -<br />
• are led by Operations, not Engineering<br />
• have thinly stretched management<br />
• are focused on output, cost and productivity.<br />
Where safety is paramount, as in the nuclear industry, there is no<br />
option but to get the risk of critical failures as low as re a s o n a b l y<br />
practical (ALARP). This objective leads inevitably to defined<br />
p ro c e d u res and extensive training, supervision and monitoring.<br />
E ffective managers in industries where failures are not so safetycritical<br />
such as food, drink, paper and board manufacture have to<br />
strive for a different form of optimisation while recognising that they<br />
will never achieve it - and that means accepting compromise. For<br />
Third City Solutions Pty Ltd<br />
AMPRO<br />
AMPRO is the Asset Maintenance<br />
Management Solution your<br />
business needs.<br />
AMPRO will help cut costs while<br />
maximising the value of your<br />
investments in infrastructure and<br />
people.<br />
example, costs may be reduced if manpower (including supervision)<br />
is cut and a minimum of training is provided. Cut too much, though,<br />
and costs will rise and output will fall. Managers must keep chipping<br />
away at waste, stoppages, changeovers, break-downs and so on, just<br />
to stand still in perf o rmance terms - let alone actually improve line<br />
efficiency.<br />
The reality for most manufacturing and process industries is that<br />
management is stretched (layers have been taken out), few<br />
management services specialists remain and the workforce is no<br />
better trained or behaved than in the past. Yet against this backgro u n d<br />
the pressure for performance improvement is unrelenting.<br />
PROBLEMS WITH RCM<br />
RCM has great strengths as a methodology but it is unrealistic to<br />
expect a single standardised process to suit all situations. Feature s<br />
that may be valuable in some industries can be a problem for others.<br />
Table 1 shows how features of RCM may be both a strength and a<br />
weakness depending on the industrial context.<br />
These and other weaknesses associated with the application of<br />
RCM are outlined below under the headings, 'Excesses and<br />
Inflexibility' and 'Omissions'.<br />
Excesses and Inflexibility<br />
The RCM standard defines seven questions that must be answere d<br />
in the set sequence in order to comply with the standard and to<br />
d e t e rmine all significant failure modes, their consequences, and what<br />
p reventive tasks or other actions should be taken. These questions<br />
require the following to be recorded: -<br />
• the functions of the equipment<br />
• Familiar Microsoft® Outlook® style interface. • Track costs against Assets or Cost Centres.<br />
• Seamlessly integrated colour coded modules • Post messages, to a public message board<br />
• makes AMPRO intuitive for users. • within AMPRO, that all users can view.<br />
For more information and to download a free, fully functional demo, visit<br />
www.thirdcitysolutions.com<br />
Also available: Job Requests - an add-on module to AMPRO that allows<br />
the operators around your company to request jobs directly into AMPRO,<br />
where Engineering / Maintenance will create jobs, if required.<br />
RCM - Can It Deliver Performance?<br />
Priced from<br />
AU$2170<br />
GST not included<br />
52 Hill Pde Ph: +61 7 3885 2019 www.thirdcitysolutions.com<br />
Clontarf QLD 4019 Australia Fax: +61 7 3885 2099 info@thirdcitysolutions.com<br />
10
11<br />
RCM - Can It Deliver Performance?<br />
Table 1<br />
Strengths and weaknesses of RCM<br />
RCM Feature Strength Weakness<br />
A standard defines the Managers and buyers know Encourages a focus on<br />
methodology what they will get without having following the methodology<br />
to check each methodology on offer rather than obtaining<br />
benefits<br />
Required performance An essential step None<br />
standards must be identified<br />
Functions and functional Managers and buyers know what A cumbersome procedure<br />
failures route to identifying they will get without having to check often not well suited to<br />
failure modes the suitability of the methodology shopfloor involvement<br />
RCM decision logic Nothing comparable in any other Standard RCM logic has<br />
non-RCM based improvement a narrow focus on<br />
methodology maintenance tasks and<br />
equipment redesigns<br />
Focus on achieving the Well suited to safety critical plant Misses the point that for<br />
inherent reliability of the plant where reliability is of paramount most plant, breakdowns<br />
importance possibly account for only<br />
5 to 10% of the plant’s<br />
lost time<br />
Documentation Prescribes detailed descriptions May be excessively time<br />
at each step in the standard consuming<br />
methodology<br />
• functional failures<br />
• all the failure modes associated with each<br />
functional failure and for each failure mode:<br />
• the failure effects<br />
• the consequences of failure<br />
• preventive maintenance tasks if applicable and effective<br />
• default actions if no appropriate preventive maintenance task<br />
can be set.<br />
RCM terminology can present a barrier to acceptance by its users.<br />
Design engineers are probably comfortable with terms such as<br />
'functions', 'functional failures' and 'scheduled discard task' but they<br />
a re a switch-off for shopfloor staff. Much better to ask questions such<br />
as 'What can cause this item of plant to run slow?' and to talk of fixed<br />
i n t e rval overhauls and replacements. Review meetings can get<br />
bogged down in semantic debate and a standard RCM vocabulary that<br />
is alien to those who need to be involved in the process - the operators<br />
and the engineers who know the plant best.<br />
The safety-critical industries have well documented failure<br />
i n f o rmation and the more academically minded can deduce what<br />
failure modes might occur. However, industrial processes, such as a<br />
bottling line, often have little by way of documentation. They are<br />
usually one-off designs and the main components are fre q u e n t l y<br />
a l t e red or upgraded during their relatively short life. In such situations<br />
the risks to the public are near negligible and the employee is pro b a b l y<br />
safer at work than at home. The standard RCM approach for<br />
identifying failure modes is unattractive in these circumstances.<br />
• The information database may not exist outside the minds of the<br />
operators and engineers who run and look after the plant<br />
• These people do not take readily to academic discussion about<br />
functional failures and whether 'bearing cage disintegrates' is a<br />
failure mode or a failure effect<br />
• Their common sense tells them that the ponderous process with<br />
its heavy documentation takes too long and does not provide the<br />
company with value for money.<br />
• They do, however, have a wealth of undocumented but essential<br />
information to provide and will participate willingly and positively<br />
if asked questions they can relate to.<br />
The standard further defines what information must be gathere d<br />
and how all the information and decisions are to be documented. This<br />
level of documentation can be a burden and at odds with the need of<br />
most commercial organisations for rapid, cost-effective impro v e m e n t s .<br />
Omissions<br />
Outside the safety-critical industries, breakdowns usually account<br />
for only a small pro p o rtion of production losses. Start-up, setting and<br />
changeover losses and variations in raw materials are likely to be much<br />
m o re significant. A project to raise plant perf o rmance will need to tackle<br />
these issues, yet they are largely ignored by standard RCM. Many plant<br />
f a i l u res can be traced back to inadequate cleaning regimes and lack<br />
of, or inappropriate, lubrication. Where the environment is harsh or the<br />
p rocess involves aggressive, dusty or dirty materials, the associated<br />
f a i l u res may account for more than half of all failures. Again, little<br />
emphasis may be given to cleaning and lubrication tasks in RCM where<br />
they may need to be justified under the headings 'scheduled re s t o r a t i o n '<br />
and 'scheduled discard'. Review team members readily accept a sound<br />
logic for introducing a cleaning or lubrication task, but RCM's talk of<br />
the scheduled restoration or replacement of the damaged oil film is a<br />
mental gymnastic too far for most people. Another omission concern s<br />
assessing the criticality of failure consequences. It is a great stre n g t h<br />
of RCM that it emphasises the consequences of failure rather than the<br />
f a i l u re itself. But it makes little sense to give the same weight to a 'safety<br />
f a i l u re' that is highly improbable as to one where there is a good chance<br />
of someone being killed. RCM does not distinguish between these two<br />
situations by assessing criticality.
13<br />
RCM - Can It Deliver Performance?<br />
Figure 1<br />
Evolution of plant performance improvement methodologies<br />
FMEA<br />
RCM<br />
Review<br />
RCM<br />
Although achieving success with standard RCM is fre q u e n t l y<br />
difficult, there are situations where it is either the norm (for example,<br />
aviation) or where it should be considered. Pointers for a successful<br />
application of standard RCM are provided below.<br />
WHERE RCM SUCCEEDS<br />
As noted by Harris and Moss [ 2 ], RCM (subsequently re - b a d g e d<br />
as an SAE standard) was originally and successfully applied in<br />
situations that included these characteristics -<br />
• the systems were clearly specified<br />
• reliability data was generally available (or could be collected)<br />
• the substantial cost of the exercise could be spread over a large<br />
population (eg a fleet of aircraft)<br />
• the organisation was orientated towards design engineering<br />
rather than operations.<br />
A further characteristic that may be added is being safety critical,<br />
or having the potential to cause a major disaster (heavy pollution or<br />
n u m e rous people killed) in the event of catastrophic malfunction of the<br />
plant. Examples of industries with some or all of these characteristics<br />
include aviation, other forms of public transport, nuclear power,<br />
chemicals (some), petrochemicals and the armed forc e s .<br />
Moubray [ 4 ] highlights re g u l a t o ry issues to conclude that those<br />
involved in the management of physical assets '...need to take gre a t e r<br />
care than ever to ensure that every step they take in executing their<br />
official duties is beyond reproach'. Managers are reminded that they<br />
might face penalties of over $500,000 and seven years imprisonment<br />
if they fail to prevent workplace death or serious injury. His clear<br />
implication is that only those who have carried out a standard RCM<br />
analysis are likely to survive the subsequent enquiries. However, most<br />
responsible managers are aware of other effective risk assessment<br />
techniques and methodologies, such as HAZOPS [ 5 ] and Quantified<br />
FMECA<br />
Fast-track<br />
RCM<br />
TPM<br />
SMED<br />
Risk Assessment, and use them where appropriate.<br />
M a n u f a c t u rers and operators of aircraft and other plant with a<br />
potential for major disaster will no doubt take comfort from the pre s e n c e<br />
of voluminous RCM analyses to demonstrate that they have not been<br />
negligent. They have the technical re s o u rces to undertake the work<br />
and they need to ensure that people are not put at risk by plant failure .<br />
W h e re the use of RCM has become the firmly established norm (as<br />
in airlines and the armed forces) it is not worth even considering an<br />
a l t e rnative to standard RCM. Any attempt to improve the methodology<br />
will be resisted. There will also be issues of compatibility with pre v i o u s<br />
studies plus the comfort factor associated with the use of an<br />
established pro c e d u re. Managers and buyers of RCM services can<br />
get comparable quotations and a proven methodology and not have<br />
to argue the case for making a change to accepted practice.<br />
ALTERNATIVES TO STANDARD RCM<br />
It has already been shown that process and manufacturing<br />
industries face diff e rent challenges from those of the more safety<br />
critical industries such as airlines and nuclear power. As well as<br />
assuring safe operation, managers need to get the most out of their<br />
plant and people and be profitable. This inevitably calls for<br />
c o m p romises and doing right for the conditions in which they find<br />
themselves. Results are needed quickly and before the focus shifts to<br />
dealing with other issues.<br />
The author's company, for example, offers assistance to<br />
o rganisations to improve the perf o rmance of their plant. This includes<br />
s t a n d a rd RCM where appropriate, but much more commonly a<br />
derivative of RCM provides a better solution. Managers are right to<br />
question whether the 'one size fits all' nature of standard RCM makes<br />
it appropriate for their particular industrial context.<br />
The following describes how the requirements for alternatives to<br />
s t a n d a rd RCM became apparent and two ways by which these needs<br />
have been met.
Fast-track RCM<br />
This is a plant perf o rmance improvement methodology that covers<br />
p reventive maintenance needs, for example, to identify hidden failure s ,<br />
to maintain protective systems, to take account of operating context,<br />
and to document the analyses properly. The author's Fast-track RCM<br />
does all of these. However, most managers re q u i re more than this.<br />
They need a methodology that addresses their plant perf o rm a n c e<br />
objectives on a wide front (eg on waste, changeovers, materials) and<br />
they recognise that maintenance and reliability form only a part of the<br />
p roblem. Key re q u i rements of a perf o rmance impro v e m e n t<br />
methodology are therefore that it -<br />
• is easy to understand<br />
• is easy to apply<br />
• can tackle all aspects of plant performance, including preventive<br />
maintenance<br />
• incorporates the rigorous RCM decision logic<br />
• distinguishes between serious and minor faults and failures<br />
• is adaptable to achieve performance improvement objectives<br />
cost effectively<br />
• is quick to apply.<br />
S t a n d a rd RCM meets only one of these re q u i rements fully - hence<br />
the emergence of derivatives. Fast-track RCM brings in import a n t<br />
f e a t u res from other improvement methodologies in addition to the<br />
s t ru c t u red approach, attention to preventive maintenance, and<br />
decision logic of RCM. From Total Productive Maintenance (TPM)<br />
comes recognition of 'six losses of production': TPM's emphasis on<br />
cleaning and lubrication is given proper consideration for applicability<br />
RCM - Can It Deliver Performance?<br />
and effectiveness. Fast-track RCM also includes an assessment of the<br />
criticality of each failure mode along the lines of Failure Mode, Eff e c t ,<br />
and Criticality Analysis (FMECA). As a result, serious failures are<br />
highlighted and undue attention is not given to relatively trivial failure s .<br />
In many industries, there is more loss of perf o rmance (thro u g h p u t )<br />
at changeovers and start-ups than from plant breakdowns. The<br />
methodology that specifically addresses this problem is Single Minute<br />
Exchange of Dies (SMED). SMED works at several levels, fro m<br />
o rganisational improvement through to detailed activity re c o rding and<br />
analysis, in order to reduce the waste of changeovers. Most of the<br />
benefits are usually obtained at the first level and Fast-track RCM<br />
t h e re f o re includes consideration of the problems and faults that waste<br />
time and materials at changeovers.<br />
The consequence of a key component failure in plant depends very<br />
much on the engineering spares situation. If the component is held in<br />
stock, downtime may be a matter of minutes. If a replacement has to<br />
come from abroad, it could be days or weeks. Fast-track RCM pro v i d e s<br />
the logic for deciding whether spares need to be made available and<br />
at what level (eg held on site or held by the supplier).<br />
The end result is a methodology designed to identify and provide<br />
answers to the faults, failures and problems that impact plant safety<br />
and performance.<br />
Review RCM<br />
Review RCM starts with the existing maintenance schedules and<br />
uses RCM decision logic to see if they are appropriate and being<br />
carried out at the right frequency. The schedules are then amended<br />
accordingly. By comparison, standard RCM and Fast-track RCM take<br />
little or no account of existing PM routines during the initial equipment<br />
14
15<br />
RCM - Can It Deliver Performance?<br />
Figure 2<br />
Application of RCM and RCM derivatives<br />
Chernobyl (nuclear failure)<br />
Bhopal (chemicals failure)<br />
review process.<br />
In one company considering an RCM application, the maintenance<br />
schedules were clearly excessive and only a small proportion of the<br />
scheduled tasks were being completed. Engineers picked what they<br />
c o n s i d e red to be the most important jobs (or the ones they liked<br />
doing!). Adding RCM-based tasks into an environment where the<br />
printed schedules had no credibility would have been a disaster. Using<br />
the Review RCM approach, existing scheduled tasks were assessed<br />
against RCM decision logic and deleted or amended where<br />
a p p ropriate. In addition, checks were made to ensure that any<br />
p rotective systems had been identified and were being maintained<br />
appropriately.<br />
In this case, a few days using Review RCM were sufficient to make<br />
the schedules achievable and restore credibility to the maintenance<br />
systems before a perf o rmance improving Fast-track RCM pro g r a m m e<br />
was started. Within two weeks, over 90% of scheduled tasks were<br />
being completed and throughput had increased. This is just one<br />
example of the effective and responsible use of a Review RCM<br />
application (sometimes re f e rred to as 'Reverse RCM') that started with<br />
the existing maintenance tasks.<br />
At the other extreme, nuclear power plants have used a much more<br />
elaborate form of re t rospective RCM to improve maintenance re g i m e s<br />
that were formulated at a time when it was believed that more<br />
maintenance could only improve safety and re l i a b i l i t y. This belief<br />
i g n o red the fact that perhaps a third of all maintenance tasks do some<br />
damage to the plant - often quite minor, but occasionally serious, as<br />
in leaving a protective system in a failed state after maintenance. It<br />
is hard to conclude that, with all the expertise and regulation present<br />
in the nuclear industry, these organisations are putting the public at<br />
risk by their use of a retrospective RCM methodology.<br />
Evolution of RCM Derivatives<br />
R e f e rence has already been made to RCM's origins in the USA,<br />
and to its focus on equipment failure and preventive maintenance.<br />
Potential for<br />
catastrophic Failure<br />
Civil aviation<br />
Coal mining<br />
Petrochemicals<br />
Chemicals<br />
Variety of<br />
Iron & Steel<br />
Pharmaceuticals<br />
Products Low<br />
Military equipment<br />
High<br />
Rail travel<br />
Water<br />
RCM<br />
Plaster<br />
Cement<br />
Glass<br />
High<br />
RCM Derivatives<br />
Pulp & paper<br />
Plasterboard<br />
Low<br />
Food & Drink<br />
Vehicle Manufacturer<br />
Packaging<br />
The other main source for plant perf o rmance impro v e m e n t<br />
a p p roaches has been Japan, with its Total Quality Manufacture, To t a l<br />
Productive Maintenance and SMED.<br />
F i g u re 1 illustrates the evolution, in the last ten years, of plant<br />
p e rf o rmance improvement methodologies from Failure Mode and<br />
Effect Analysis (FMEA) in the 1950s to derivatives of RCM. Only RCM<br />
and its derivatives include a rigorous logic for deciding what<br />
p reventive maintenance tasks would be both applicable and<br />
w o rthwhile. Further information on RCM and its derivatives can be<br />
seen on the author's website [6].<br />
QUESTIONS FOR MANAGERS<br />
S t a n d a rd RCM is suitable for safety critical industries and those<br />
that have traditionally used RCM. It does not follow, however, that<br />
s t a n d a rd RCM is the only way - or indeed the best way - to avoid<br />
serious consequences from plant failure. Before embarking on an<br />
RCM application, managers should ask some pertinent questions -<br />
• What are the key objectives? Improving plant performance, major<br />
safety issues, environmental protection…?<br />
• Can safe operation of the plant be assured without using<br />
standard RCM - more quickly and at lower cost?<br />
• Is standard RCM the best process for identifying possible<br />
failures (failure modes)?<br />
• Does the RCM process meet my objectives or is its 'inherent<br />
plant reliability' focus too narrow?<br />
• Can a standard RCM project realistically be completed in an<br />
acceptable time and at an affordable cost?<br />
• Can the necessary technical skills and resources be made<br />
available?<br />
• Will the methodology be accepted by the workforce without<br />
undue coersion from management?<br />
The willing participation of review team members is important. It is
commonly implied that the RCM process will always identify all significant<br />
f a i l u re modes and the correct actions will be taken to deal with them. In<br />
practice, the RCM analysis will only be as good as the review team and<br />
the ability of its members to work together. Where there is a high degre e<br />
of prescription and a culture of conformance, staff will follow the<br />
p ro c e d u re whether or not it is well matched to the org a n i s a t i o n ' s<br />
re q u i rements. But where meetings are facilitator-led and attendance is<br />
m o re voluntary, the methodology must be clear, to the point, and<br />
p resented in a language and style appropriate for the part i c i p a n t s .<br />
Moubray draws attention to possible weaknesses in stre a m l i n e d<br />
RCM techniques. Such weaknesses undoubtedly exist in some of the<br />
techniques on offer but certainly not in all. Managers there f o re need<br />
to understand any methodology being proposed and assure themselves<br />
that there are no deficiencies in important areas, particularly the<br />
achievement of safe operation of the plant. However, where safety<br />
issues have already been satisfactorily addressed, any plant<br />
p e rf o rmance improvement methodology only needs to be cost-eff e c t i v e .<br />
F i g u re 2 shows a range of industries positioned appro x i m a t e l y<br />
according to their potential for disaster (eg major loss of life) and the<br />
variety of products or services provided. Candidates for RCM are<br />
typically in the top left sector, which is dominated by nuclear power<br />
and industries that are or were state-run or are heavily re g u l a t e d ;<br />
lower risk industries, often with greater product variety and facing<br />
greater commercial competition, require a more flexible approach to<br />
performance improvement as provided by derivatives of RCM.<br />
IN CONCLUSION<br />
It is a truism that no two organisations are the same. Each will have<br />
d i ff e rent plant perf o rmance improvement objectives and diff e re n t<br />
constraints in relation to the skills and re s o u rces that can be deployed.<br />
And all established organisations can point to management initiatives<br />
that have been introduced with a great fanfare only to be quietly<br />
buried a few weeks or months later. Improvements may be slow to<br />
materialise, managers may lose interest, or team members may simply<br />
find other things to do rather than attend review meetings.<br />
Such initiative failures can be avoided, particularly where the<br />
approach is cooperative, by closely matching the methodology to the<br />
objectives and ensuring that those involved are suitably trained and<br />
enthusiastic. If the initial appraisal and planning indicate that standard<br />
RCM is the best methodology for the project, it should be used; more<br />
l i k e l y, though, a derivative of RCM will offer a better, quicker and more<br />
costeffective solution. ?<br />
REFERENCES<br />
1. Nowlan F S and Heap H, Reliability-Centered Maintenance,<br />
National Technical Information Service, Springfield, Virginia,<br />
December 1978<br />
2. Harris J and Moss R, Practical RCM Analysis and its Information<br />
Requirements, Maintenance, September 1994<br />
3. RCM Standard, JA1011 - Evaluation Criteria for Reliability-<br />
Centered Maintenance Processes, SAE Publications,<br />
Warrendale, Pennyslvania<br />
4. Moubray J M, The Case against Streamlined RCM, Maintenance<br />
and Asset M a n a g e m e n t , Vol 16, No 3, 2001<br />
5. HAZOPS, Hazard and Operability Study, methodology<br />
descriptions at www.rsc.org/pdf/ehsc/HAZOP.pdf and<br />
http://slp.icheme.org/hazops.html<br />
6. GGR Associates Ltd, Plant Performance Improvement<br />
Methodologies, methodology descriptions at www.ggrassociates.co.uk<br />
Maintenance Spares Optimisation<br />
Does your plant or process site have a business issue regarding the level of maintenance<br />
spares held on site?<br />
• Are there excess spares?<br />
• Are there too few spares to properly support the maintenance effort?<br />
• Are new equipment spares being acquired and correct levels are not clear?<br />
• Are there insufficient resources to address these problems?<br />
Sparesoptimization.com has the solution.<br />
RCM - Can It Deliver Performance?<br />
Utilising the world’s leading Spares Optimisation methodology SOS, trained engineers are provided on a weekly basis<br />
and with minimal intrusion can address these and other spares issues.<br />
Results are guaranteed and are based on the repeated outcomes obtained within our world-wide user base.<br />
Futhermore, this is not a slash and burn approach. Recommended levels are established based on a detailed<br />
criticality assessment, taking into account both business and technical failure characteristics based issues.<br />
Any investment in Spares Optimisation Services will be immediately and measurably returned at the rate of 10-1 in<br />
our experience.<br />
Our dedicated web site for more information is:<br />
www.sparesoptimization.com<br />
No time to solve spares problems? We can assist.<br />
Please call on 0 2 9 9 7 6 5 3 3 8 or 0 4 1 2 8 6 3 5 5 6 and ask for Mark Challender<br />
Email: mark.challender@strategicorp.com<br />
16
17<br />
Key Performance Indicators Leading or Lagging and When to Use Them<br />
Key Performance<br />
Indicators<br />
Leading or Lagging<br />
and When to Use<br />
Them<br />
By Ricky Smith<br />
www.lce.com Life Cycle Engineering Inc.<br />
Initiating major change, such as moving from a re a c t i v e<br />
maintenance operation to one, which is proactive and employs Best<br />
Maintenance Practices to achieve Maintenance Excellence, re q u i re s<br />
s t a rt-up support from top management. In order to continue the journ e y<br />
t o w a rds Maintenance Excellence, the continued support fro m<br />
management will need justification. Upper management will not be<br />
satisfied with statements like “just wait until next year when you see<br />
all the benefits of this eff o rt.” They will want something a little more<br />
tangible if you are to gain further commitment from them. You will need<br />
to provide tangible evidence in the form of objective perf o rmance facts.<br />
That’s where metrics comes in. Metrics is just a term meaning “to<br />
m e a s u re” (either a process or a result). Combining several metrics<br />
yields i n d i c a t o r s, which serve to highlight some condition or highlight<br />
a question that we need an answer to. Key Perf o rmance Indicators<br />
(KPI) combine several metrics and indicators to yield objective<br />
p e rf o rmance facts. They provide an assessment of critical parameters<br />
Time<br />
or key processes. KPI for maintenance effectiveness have been<br />
discussed, defined and refined for as long as proactive maintenance<br />
has been around. KPI combine key metrics and indicators to measure<br />
maintenance performance in many areas.<br />
Metrics can be a two-edged sword. Metrics are essential for<br />
establishing goals and measuring perf o rmance. Metrics chosen or<br />
combined erroneously can produce misleading indicators that yield<br />
i n c o rrect and/or low perf o rmance measures. Inaccurate measure s<br />
produce bad management decisions.<br />
If you are involved in an equipment improvement program, such<br />
as Maintenance Excellence, you must have a thorough understanding<br />
of the financial metrics used by your company to measure results and<br />
track improvement. You will need to establish a direct link between<br />
i m p roved equipment reliability and overall company operational<br />
p e rf o rmance. At the bottom line, your metrics must yield a KPI in term s<br />
of financial performance.<br />
Reliability vs Production Budget Performance<br />
Production (as a percentage of full run<br />
capacity)<br />
Equipment Reliability (percentage operating<br />
availability)<br />
Time<br />
Projected Budget<br />
Actual Cost<br />
Maintenance Improvement Initiative Maintenance Improvement Initiative<br />
FIGURE 1
To determine maintenance strengths and weaknesses, KPI should<br />
be broken down into those areas for which you need to know the<br />
p e rf o rmance levels. In maintenance these are areas such as<br />
p reventive maintenance, materials management process, planning<br />
and scheduling, and so on until two major Maintenance Department<br />
KPIs are defined:<br />
✓ Maintenance Department Operating Costs (Budget Performance)<br />
✓ Equipment Reliability<br />
In turn, equipment reliability must correlate to production - both<br />
p roduction vs. capacity and cost per unit produced. On the other hand,<br />
operating costs must be carefully considered. Initiating change is<br />
going to initially increase maintenance department expenses.<br />
Accurately forecasting a budget centered on change is essential if<br />
KPI is going to accurately depict department budget perf o rm a n c e .<br />
(See Figure 1)<br />
Depending on KPI values we classify them as either l e a d i n g o r<br />
l a g g i n g indicators. Leading indicators are metrics that are task<br />
specific. They respond faster than results metrics and are selected to<br />
indicate pro g ress towards long term objectives. Leading indicators<br />
are indicators that measure and track performance before a problem<br />
arises. To illustrate this, think of a key perf o rmance indicators as<br />
yourself driving a car down a road. As you drive, you deviate from the<br />
driving lane and veer onto the shoulder of the road. The tires running<br />
over the “out of lane” indicators (typically a rough or ‘corru g a t e d ’<br />
section of pavement at the side of the road that serves to alert you to<br />
re t u rn to the driving lane before you veer completely off the pavement<br />
onto the shoulder of the road). These “out of lane” indicators are the<br />
KPI that you approaching a critical condition or problem. Your action<br />
is to correct your steering to bring you car back into the driving lane<br />
before you go off the road (proactive condition).<br />
If you did not have the indicators on the pavement edge, you would<br />
not be alerted to the impending crisis and you could veer so far out<br />
Reliability/Maintainability<br />
• MTBF (mean time between failures) by total operation and by<br />
area and then by equipment.<br />
• MTTR (mean time to repair) maintainability of individual<br />
equipment.<br />
• MTBR (mean time between repairs) equals MTBF minus MTTR<br />
• OEE (overall equipment effectiveness) Availability x Efficiency<br />
(slow speed) x Quality (all as a percentage)<br />
Preventive Maintenance (includes predictive maintenance)<br />
• PPM labour hrs. divided by Emergency labor hrs.<br />
• PPM WOs (work orders) divided by CM (corrective maintenance,<br />
planned/scheduled work) WOs as a result of PM inspections<br />
Planning and Scheduling<br />
• Planned / Schedule Compliance - (all maintenance labor hours<br />
for all work must be covered and not by “blanket work orders”)<br />
this a percentage of all labour hours actually completed to<br />
schedule divided by the total maintenance labor hours.<br />
• Planned work - a % of total labour hours planned divided by total<br />
labor hours in scheduled.<br />
Key Performance Indicators Leading or Lagging and When to Use Them<br />
Key Performance Indicators<br />
TABLE 1<br />
of the driving lane that you end up in the ditch. The condition of your<br />
c a r, sharply listing on the slope of the ditch, is a lagging indicator. Now<br />
you must call a wrecker to get you out of the ditch ( reactive condition).<br />
Lagging indicators, such as your budget, yield reliability issues, which<br />
will result in capacity issues.<br />
The necessity for tracking KPI other than just Equipment Reliability<br />
and Budget Perf o rmance is to pinpoint areas responsible for negative<br />
t rends (leading indicators). You would not want to scrap your<br />
Maintenance Excellence initiative when the only problem is that the<br />
Planner / Scheduler didn’t receive adequate training. By observ i n g<br />
and tracking Planned / Schedule Compliance and Planned Work as a<br />
p e rcentage of total labor you should be able to detect “non-impro v i n g ”<br />
or even negative perf o rmance early enough to identify and corre c t<br />
the training problem. The “lower tier” leading indicators are also<br />
n e c e s s a ry for establishing benchmarks (Best Maintenance Practices)<br />
and tracking departmental progress. For example, the benchmark for<br />
the KPI “Planned / Schedule Compliance” is generally accepted as<br />
90%. The tracking and public display of positive leading KPI also<br />
provides significant motivational stimuli for maintenance department<br />
personnel.<br />
A manager must know if his department is squarely in the driving<br />
lane and that everything is under control, as long as possible before<br />
it approaches and goes into the ditch. A list of some of the key<br />
performance indicators of the leading variety are illustrated in Table<br />
1. Note that some of these indicators could be both leading and<br />
lagging when combined with and applied to other KPIs (Key<br />
Performance Indicators).<br />
NOTE: KPIs must answer questions that you as a manager ask in<br />
o rder to control your maintenance process. Listed below is a sampling<br />
of recommended KPIs. They are listed by the areas in which a<br />
maintenance manager must ask questions<br />
Materials Management<br />
• Stores Service Level (% of stock outs) - Times a person comes<br />
to check out a part and receives a stock part divided by the<br />
number of times a person comes to the storeroom to check out<br />
a stocked part and the part is not available.<br />
• Inventory Accuracy as a percentage<br />
Skills Training (NOTE: A manager must notify maintenance<br />
craft personnel about the measurement of success of skills training<br />
• MTBF<br />
• Parts Usage - this is based on a specific area of training such<br />
as bearings<br />
Maintenance Supervision<br />
• Maintenance Control - a % of unplanned labor hours divided<br />
by total labour hours<br />
• Crew efficiency - a % of the actual hours completed on<br />
scheduled work divided by the estimated time<br />
• Work Order (WO) Discipline - the % of labour accounted for on<br />
WOs.<br />
Work Process Productivity<br />
• Maintenance costs divided by net asset value.<br />
• Total cost per unit produced<br />
• Overtime hours as % of total labour hours<br />
18
19<br />
C e rtification for Maintenance & Reliability Pro f e s s i o n a l s<br />
C e rtification for<br />
Maintenance &<br />
Reliability Pro f e s s i o n a l s<br />
By Terrence O’Hanlon<br />
CMRP, Director of Strategic Alliances and Joe Petersen, Business Manager, Society of the<br />
Maintenance and Reliability Professionals (SMRP) www.smrp.org info@smrp.org<br />
If you would like to manage your maintenance program for better<br />
results, you should consider taking the CMRP exam.<br />
All that separates some competitive industries is operation cost.<br />
Maintenance has a dramatic effect on operational costs. By learn i n g<br />
best practices for maintenance management through SMRP, your<br />
o rganization can improve pro d u c t i v i t y, re l i a b i l i t y, profits, workplace<br />
and morale. To support this process, you should consider becoming<br />
involved with the Maintenance and Reliability Pro f e s s i o n a l<br />
certification effort.<br />
Certification for maintenance and reliability professionals?<br />
How many times have you thought that nobody ever listens to the<br />
maintenance department?<br />
P e rhaps you've learned that in your company the only time the<br />
maintenance department gains favorable recognition is when a disaster<br />
has occurred and maintenance gets the plant up and running in re c o rd<br />
time. Maybe you’ve also felt that there is no clear path for care e r<br />
advancement, or that maintenance and reliability do not hold bright future s.<br />
As SMRP embarks on over 12 years of promoting maintenance as<br />
a profession, a new certification program is being off e red that<br />
changes the traditional paradigm of maintenance as “fixing things”<br />
to maintenance as a major enabler of profitable manufacturing and/or<br />
p rocesses. Over 600 people have now completed the Cert i f i e d<br />
Maintenance and Reliability Professional (CMRP) exam and they are<br />
achieving amazing results at their jobs as they transform maintenance<br />
traditions and perceptions.<br />
Benefits for You<br />
T h e re are both individual and company benefits to having<br />
personnel certified in the maintenance and reliability profession.<br />
One of the most important benefits that certification can offer you, as<br />
an individual, is increased confidence. Knowing that you’ve passed a<br />
c e rtifying examination can provide you with that little bit of extra poise,<br />
or empowerment, to more confidently propose your ideas and solutions<br />
to problems that you and your organization face. If you are more eff e c t i v e ,<br />
you could be in line for a greater number of promotions and higher pay.<br />
Once other people in your organization know that you have<br />
successfully completed a professional certifying examination, they will<br />
likely respect what you have to say a little more. Again, that can incre a s e<br />
your job effectiveness, resulting in improved visibility and recognition in<br />
your own organization-and possibly on a wider basis.<br />
By participating in a certifying examination, examinees often learn<br />
their strengths and weaknesses related to certain subject matter. This<br />
can provide valuable insight into future training opportunities for the<br />
individual to overcome and improve in those areas that might be sub-par.<br />
In the event that you want to change jobs, your new employer may<br />
re q u i re a certification in your profession. He/she might count the fact<br />
that you have a certification as a key diff e rentiation between you and<br />
another candidate. Just imagine going through 50 or more re s u m e s<br />
of candidates for a job. Someone who has been certified in his or her<br />
profession will likely have an edge. They stand out above the others.<br />
Maintenance and reliability is a profession in which the principles<br />
in one industry, like petrochemicals, translate very well to other<br />
industries such as auto manufacturing. While the products that are<br />
p roduced might be diff e rent and the machines that produce them<br />
might be diff e rent, the maintenance and reliability principles for<br />
ensuring effective utilization of those assets are the same.<br />
Successfully completing a professional certifying examination ensure s<br />
that you can move from industry to industry. This can be especially<br />
i m p o rtant in today's business environment, where complete industries<br />
could nearly disappear overseas in just a few years.<br />
Benefits for Your Company<br />
Companies gain benefits by employing and supporting pro f e s s i o n a l<br />
c e rtification as well. Having a maintenance and reliability org a n i z a t i o n<br />
made up of certified professionals who all know the correct theories and<br />
principles of maintenance will likely result in improved asset eff e c t i v e n e s s ,<br />
p roductivity and re l i a b i l i t y. This ultimately will result in lower costs.<br />
O rganizations are likely to see improvement in morale and<br />
productivity by recognizing those individuals who have successfully<br />
completed a certifying examination. If an organization supports its<br />
employees in their certification eff o rts toward maintenance and<br />
reliability, those employees know that they are valued individually by<br />
their organization and that the company values the maintenance and<br />
reliability function. Some companies, after adopting a policy of<br />
promoting certification for their employees, have seen an increase in<br />
the quality of candidates for new positions. These candidates say they<br />
want to work for a company that values maintenance and reliability.<br />
When selecting from possible candidates for a position within a<br />
company, management can have a greater degree of confidence in a<br />
new hire, if that candidate has successfully completed a pro f e s s i o n a l<br />
certification.<br />
Real-World Certification<br />
But, enough of all those "ivory tower" benefits. They sound great,<br />
don't they? Now, let’s talk about the real world.<br />
Every single one of those benefits is available in the maintenance<br />
and reliability industry today. As you know, there are certifications in<br />
a variety of technical disciplines, including vibration, lubrication and<br />
i n f r a red therm o g r a p h y, etc. Each of these maintenance and re l i a b i l i t y<br />
segments has developed bodies of knowledge and cert i f y i n g<br />
examinations to ensure that individuals in those specialties have at
least a minimum amount of practical and theoretical knowledge about<br />
how those functions should be perf o rmed. These certifying eff o rt s<br />
have been primarily accomplished by non-profit organizations re l a t e d<br />
to those technical specialties.<br />
T h e re are two types of certifications available in most markets,<br />
including maintenance and re l i a b i l i t y. One type of certification involves<br />
attending a course or workshop, and sometimes multiple courses, then<br />
passing an examination based on that material. This type of<br />
c e rtification is really an extension of the learning process. It allows<br />
the examinee and course provider the opportunity to determine how<br />
e ffectively the material has been presented and retained to that point<br />
in time. It should be noted that this doesn't mean the student/examinee<br />
has really learned the material. To really learn something it must be put<br />
into practice. There are a variety of studies that show how quickly the<br />
level of retention falls off after a course or workshop, and it falls off<br />
v e ry quickly unless put into practice immediately. Examples of this type<br />
of certification might include software courses, safety pro c e d u res or<br />
p e rhaps training certifications on specific types of equipment.<br />
A second type of certification is based more upon accumulated<br />
knowledge and experience. Although there typically are many re v i e w<br />
courses available, this type of certification is almost impossible to<br />
study for. That’s because the necessary amount of accumulated<br />
knowledge and experience is so broad. Examples of this type of<br />
c e rtification might include Professional Engineering Licensing exams,<br />
the Bar exam for attorneys or the CPA exam for accountants.<br />
The diff e rence between these types of certifications relates to the<br />
level of professionalism accorded to them. While passing a safety<br />
course that certifies one to perf o rm CPR is clearly important, this type<br />
of certification doesn't command the national or international re s p e c t<br />
that professional engineers, accountants or attorneys receive.<br />
C e rtification for Maintenance & Reliability Pro f e s s i o n a l s<br />
Becoming a CMRP<br />
The Society for Maintenance and Reliability Professionals (SMRP),<br />
an international organization with approximately 2,000 members, has<br />
developed a certifying examination for maintenance and re l i a b i l i t y<br />
p rofessionals. Ta rgeted toward engineers and managers in the<br />
maintenance and reliability function, successful completion of this<br />
exam results in the designation, Certified Maintenance and Reliability<br />
Professional (CMRP). The CMRP examination has been in existence<br />
for slightly more than two years and over 500 examinees have<br />
successfully completed it to date. Both individuals and companies are<br />
now citing the real benefits this type of certification provides.<br />
T h e re are no formal education or experience re q u i rements to sit<br />
for this certifying exam, which is off e red at numerous venues each<br />
y e a r. If individually, you would like gain confidence, improve your<br />
standing in your organization or improve your ability to move to a<br />
d i ff e rent position, you should consider taking the CMRP exam. If your<br />
o rganization would like to improve pro d u c t i v i t y, re l i a b i l i t y, pro f i t s ,<br />
workplace morale and quality of your work force, it should consider<br />
becoming involved with this certification eff o rt for engineers and<br />
managers in maintenance and reliability.<br />
Regular readers of this magazine should note that IMC-2004, The<br />
19th International Maintenance Conference in Bonita Springs Florida<br />
will be the site of a CMRP certification examination this December.<br />
Look for details concerning exact date, time and fees (including study<br />
guides) at w w w. m a i n t e n a n c e c o n f e re n c e . c o m . In the meantime, for<br />
more information on the exam itself, log on to www.smrp.org or call<br />
(800) 950-7354. Examinations are also held outside of North America<br />
(ie. in Australia)<br />
20
21<br />
Improved Reliability of Universal Joints on LPP Main Cooling Water Pump<br />
Improved Reliability<br />
of Universal Joints on<br />
LPP Main Cooling<br />
Water Pump<br />
Rahimi Md Sharip<br />
Technical Support Group, Teknik Janakuasa Sdn Bhd,<br />
Lumut Power Plant, Perak, Malaysia<br />
Abstract<br />
Lumut Power Plant (LPP) has four (4) units ( 4 x 25% duty ) vertical<br />
axial flow submersible pumps working as main cooling water<br />
circulating pumps with rated capacity of 8.6m 3 /s each. These pumps<br />
a re very critical in providing seawater for this 1303MW combined<br />
cycle power plant's once-through cooling condenser. Hence, high<br />
reliability is warranted to ensure optimum plant availability.<br />
N e v e rtheless, the main failure affecting the pump is the universal<br />
joints which connect the pump's coupling known as cardan shaft to<br />
the driver. This paper will outline the actions implemented on the<br />
universal joints in order to improve the overall pump reliability and<br />
eventually prevent the recurring defects.<br />
1.0 Introduction<br />
The universal joints as in this MCW pumps are a unique form of<br />
coupling. They are used to connect the shafts of two drive train<br />
members that have non-concentric centerlines. Basically the universal<br />
joints are connected at both end flanges of the cardan shaft. The<br />
complete assembly acts as a coupling in transmitting the torque fro m<br />
the driving ( motor ) to the driven ( pump ) unit. This configuration is<br />
applicable to the connection between two shafts arranged in out-ofline<br />
(parallel misalignment ) and allow angular deflection in<br />
changeable planes. Below are technical parameters of the card a n<br />
shaft and universal joints.<br />
Pump shaft power at rated capacity : 1434.5 KW<br />
Motor speed : 425 rpm<br />
Pump Flow Capacity : 8.6 m 3 /s<br />
Shaft length & weight : 1300mm & 420kg<br />
Offset : 50mm<br />
Shaft Flange size : 435 mm<br />
Operating Torque : 32,207 Nm (1434.5 x 9542/425)<br />
Max. Allowable Torque : 136,000 Nm ( Manufacturer's data )<br />
Lubricant used : Grease EP 2<br />
Greasing Interval : Once a month<br />
2.0 Description of Universal Joints<br />
Each universal joint has 4 journal crosses. Rolling elements are<br />
'sitting' on the running surfaces of the cross along the whole<br />
c i rc u m f e rence and separated at the center by a flat washer of the<br />
cross into lower and upper position. There are 46 rolling elements on<br />
each cross. The enclosure or casing for these items is called the<br />
bearing cap and at the end of it, a grease nipple is fitted for the gre a s e<br />
injection which can be viewed further in figure 6. Each universal joint<br />
will be connected at the both ends of the cardan shaft as shown in<br />
Figure 2. For universal joints to work efficiently, they need to operate<br />
at an angle and that is reason of the 50mm offset between the motor<br />
and pump.
Figure 1. A picture showing a universal joint with 4 crosses at<br />
90deg each.<br />
Figure 3. showing heavy wear on the one of journal crosses'<br />
running surfaces<br />
3.0 Description of Typical Failures<br />
Generally all installed cardan shaft experienced an average life of<br />
1 1/2 years after being put into service which is way below the OEM<br />
expected lifetime of 50,000 operating hours ( ~ 5 years ). Table 1<br />
highlights the failures re c o rd for all 4 pumps. Typically when failure<br />
o c c u rred, all resembled very similar failure patterns as the followings;<br />
• Some of the rolling elements from the opposite crosses were<br />
broken into several pieces<br />
• Greased formed into black 'coke' and solidified<br />
• Heavy wear on the journal crosses<br />
Pictures of typical failures can be viewed in Figures 3 and 4.<br />
4.0 Theory of Failure Modes<br />
F rom the heavy wear observed on the journal crosses, the most<br />
likely failure mode could be deduced as Adhesive We a r. The main<br />
reasons to substantiate this are the occurrence of two surfaces that<br />
are sliding and rubbing with each other and may or not be separated<br />
by lubricant. Rolling elements are always in sliding motion with the<br />
journal crosses and are not in pure rolling motion. It is believed that<br />
sliding under LOAD generate heat that must be dissipated usually by<br />
lubricant (grease). As similar to oil, bearings that operate at<br />
t e m p e r a t u re above 70˚C cut grease life by a factor of 1.5 for each10˚C<br />
rise as found in 'Predicting Lube life - Heat and contaminants are the<br />
biggest enemies of Bearing grease and oil' by Michael Khonsari, LSU<br />
Improved Reliability of Universal Joints on LPP Main Cooling Water Pump<br />
Figure 2. See how a universal joint is connected to the cardan shaft.<br />
Note the grease nipple installed on the bearing cap.<br />
Figure 4. Blackened rolling elements due to 'coked' grease and note<br />
some broken pieces of rolling elements<br />
and E.R.Booser in Machinery Lubrication Magazine, September 2003<br />
issue. Straightforw a rd l y, if good heat dissipation fails to occur, this<br />
will lead to varnish formation and then 'coke' to the grease at the<br />
elevated temperature. This 'coking' will destroy the ability of grease<br />
to lubricate the rolling elements. The ineffective lubrication will furt h e r<br />
i n c rease the friction and heat and eventually weaken the ro l l i n g<br />
elements microstructure and might cause fracture at the worst case.<br />
Based on this scenario, it can be concluded that there is excessive<br />
load presence that cause the inefficient lubrication. So, where does<br />
this excessive load or force comes from?<br />
Another theory that is worth for consideration is the offset angle<br />
that is operating slightly less than the recommended value of 3˚ as "<br />
O ffsets of less than three degrees can cause the bearings in the joints<br />
to rotate only part i a l l y. This causes uneven wear and can lead to<br />
p re m a t u re failure, especially needle bearing designs. " ( Universal<br />
Drive Shaft Maintenance - Will E. Johns III and David M. Cline - The<br />
Pump Handbook Series ). The one installed at site has 2.2˚ only with<br />
o ffset of 50mm and length 1300mm ( sinø = 50/1300 ). The paper<br />
suggested that optimal offset for proper operation of the shaft is 5˚ to<br />
insure that universal joints on the shaft get adequate lubrication.<br />
5.0 Possible Origins Of Excessive Loads<br />
In the bearing theory, load capacity is the main factor for the bearing<br />
life and hence its re l i a b i l i t y. If we can use the simplest method of life<br />
calculation ( ISO equation ) for basic rating life which is L10 = (C/P)p<br />
w h e re L10 = basic rating life, millions of revolutions, C= basic dynamic<br />
22
23<br />
Improved Reliability of Universal Joints on LPP Main Cooling Water Pump<br />
Table 1 - Defect history of cardan shaft that requires replacement<br />
DATE PUMP REMARKS<br />
25.5.99 Pump 4 Bottom cardan shaft bearing at 150˚C. High vibration - 70mm/S<br />
30.3.2000 Pump 1 High vibration<br />
Early May 2001 Pump 3 Motor overhaul<br />
19.5.2001 Pump 4 High vibration<br />
17.7.2001 Pump 4 Open up to check whether synthetic grease is working well<br />
15.8.2001 Pump 4 (New UJ) Open up to check the condition using new 'grease' due to pump shutdown.<br />
Line 1 gate lowered. -> GT12 - Reblading<br />
3.9.2001 Pump 1 Temperature reported high 150˚C!<br />
28.4.2002 Pump 4 Replacement of cardan shaft with complete balancing, temperature<br />
sticker and alignment.<br />
20.6.2002 Pump 1 Reported knocking sound and temperature high UJ replaced with the over expump<br />
4. Replacement done on 22.6.2002<br />
13.12.2002 Pump 3 Replaced due to elbow replacement. New UJ with balancing done.<br />
* The highlighted row is the subject universal joint for this paper.<br />
load rating, N, P= equivalent bearing load, N, p= exponent of the life<br />
equation ( p=10/3 for roller bearings ).Clearly, from this basic formula ,<br />
it's proven that load is a very important parameter for the bearing life.<br />
Calculation of dynamic bearing loads is a complex subject, not an<br />
easy quantifiable task.<br />
For this particular case, we evaluate the load imparted on the<br />
rolling elements by the qualitative basis.<br />
The loads acting on the bearing can be calculated according to<br />
the laws of mechanics if the external forces (e.g. forces from power<br />
transmission, work forces, inertia forces) are known or can be<br />
calculated plus the additional dynamic forces as a result of unbalance.<br />
The other source of 'extra load' might originated from the usage<br />
of Belleville spring washer (F i g u re 9) inside the bearing housing which<br />
could restrict the free sliding movement of the roller elements and<br />
hence provide the compressive forces that is detrimental. In order to<br />
prevent this high possibility, these washers are replaced with the flat<br />
washers to provide 'relaxation' to the rolling elements.<br />
The UJ is equipped with Four-Point Lubrication System where each<br />
bearing cap is fitted with the grease fitting, thus assuring that each<br />
bearing receives a proper amount of grease.<br />
6.0 Effect from Mass Imbalance?<br />
So, what is the effect of unbalance on a rotating part? At one<br />
e x t reme, if mounted in a rigid suspension, a damaging force must exist<br />
at support bearings or mounting surface to constrain the part. In fact,<br />
it is one of the major contributors to pre m a t u re bearing failure. The<br />
following formula (1) can be used to calculate the theoretical life of<br />
ball/roller bearings;<br />
H = (C/L + 6.7753 X 10 -5 MVF ) 3 X ( 16667/RPM ) where,<br />
H = Bearing life in hours<br />
C = Capacity of bearing in Ibs ( OEM specs )<br />
L = In service bearing load ( Ibs )<br />
M = Unbalance mass opposing vibration ( Ibs )<br />
V = Measured vibration in velocity ( inches per secs )<br />
F = Frequency of vibration in CPM or RPM<br />
From the above, it can be said that unbalance mass will affect the<br />
life of the roller bearings in the UJs of MCW pumps. Also, the amount<br />
of the unbalance increases the effects of centrifugal forces as shown<br />
by the following formula (1);<br />
F = UB ( gram-cm )x 0.01 x ( RPM/ 1000 ) 2 where ;<br />
F = Centrifugal force<br />
UB = unbalance<br />
RPM = shaft speed in rpm<br />
(Ref 1. Balancing - Identification and Correction, Lance Bisinger ,<br />
Computational Systems Incorporated Knoxville.)<br />
B a rry L. Ardell from Barry Ardell Technologies, Inc listed several<br />
causes for Universal joints problems in his article titled, ' Diagnosing<br />
Machines with Universal drives'. He mentioned that U-Joints installed<br />
without sufficient misalignment experience pre m a t u re bearing failure s<br />
and cause vibration when operated at an angle.<br />
7.0 Modifications Implemented<br />
Originally, the UJ lubrication system is a single -point lubrication<br />
w h e re a tendency for lubricant not reaching each journal cross is high<br />
and lead to a premature failure. This type was replaced with a fourpoint<br />
lubrication system where a grease fitting is fitted at each journ a l<br />
c ross cap. The new design will ensure that grease reaches each cro s s<br />
effectively and eventually improve its reliability. However, this is not<br />
the case since failures still occur.<br />
The existing grease<br />
channel was plugged<br />
permanently<br />
Grease grooves made with increased depth. New<br />
grooves perpendicular to the existing were made but<br />
not shown in the picture<br />
Figure 5. Side view of journal cross showing the modification done<br />
on greasing channel
Figure 6. - Exploded view of Universal joints. Note that rollers are<br />
installed in two -tiers in side the bearing casing<br />
Figure 7. Dimension drawing of complete assembly of cardan shaft<br />
The second minor modification was replacing the belleville spring<br />
washer that provide preload (compression ) to rolling elements.These<br />
items are located at the bottom and top of those bearing inside the<br />
j o u rnal cross. This type of washer was replaced with a flat washer<br />
instead.<br />
The most notable action taken was the sending of complete<br />
assembly of cardan shaft for the 2-plane dynamic balancing to check<br />
for any unbalance. It is mentioned in OEM's ( Clarke Tr a n s m i s s i o n s ,<br />
UK ) 'Installation and Maintenance of Universal shafts' document that<br />
'unbalance will cause uneven running and pre m a t u re wear of the<br />
universal shaft and the bearings of the connected units'. From the<br />
result an added mass of approximately 8kg is re q u i red for the<br />
Standard Lubrication<br />
System<br />
Cline Four-Point<br />
Lubrication System<br />
Figure 8. Lubrication system in universal joint. Pictures courtesy<br />
from The Cline Company, US.<br />
Improved Reliability of Universal Joints on LPP Main Cooling Water Pump<br />
c o rrection of unbalance. The masses are placed on the left end plane<br />
and the right end plane re s p e c t i v e l y. In this manner, the re s u l t a n t<br />
centrifugal force is zero and opposite in sense, so that they cancel<br />
each other. This results in a shaft completely balanced, i.e., balanced<br />
statically and dynamically. If unbalance not rectified, this centrifugal<br />
f o rce is balanced by reaction forces in the bearings, which tend to<br />
wear out the bearings with time. (Mark's Standard Handbook For<br />
Mechanical Engineers, 10th Edition, page 3-66 ) . P resence of very high<br />
centrifugal forces could cause grease to separate into oils and soaps<br />
as mentioned in the article titled ' G rease Separation Under<br />
Centrifugal Forces' by M.M.Calistrat (ASME member),Power<br />
Transmission Development Section, Koppers Company, Inc.<br />
Another task was the laser alignment work on the motor and pump<br />
that was carried out on 11 t h May 2002 by Total Solution Te c h n o l o g y<br />
Sdn Bhd. For information, pump centerline is offset 'in front' of motor<br />
centerline by 50mm facing sea direction. Conclusion was the machine<br />
has been aligned to its best possible allowable tolerance.<br />
8.0 Conclusion<br />
As of today ( July 2004 ), the balanced and modified cardan shaft<br />
has been installed in MCW pump No. 4 since 28th April 2002 which<br />
translated into more than 2 years in operation without failure. This<br />
signifies good improvement when previous average lifetime of<br />
universal joints is about 1 year or 1 1/2 years only compared to OEM's<br />
estimated one is 50,000 hrs ( 5 years ). Anyway, the target re l i a b i l i t y<br />
for this particular changes is 3 years.<br />
Nevertheless, the frequency of re-greasing should be maintained<br />
at the current interval of once monthly. This is also in line with another<br />
manufacturer's recommendation from US, Cline Co. who stated that'<br />
recommended interval for re - g reasing is every 3 months or 1000hrs<br />
in operation, whichever occurs first'.<br />
It can also be concluded that the lubricant used, EP 2 grade gre a s e<br />
is a recommended one by other manufacturers as well and previous<br />
failures were not related to the unsuitability of lubricant.<br />
Figure 9. Belleville* spring washer was replaced with a flat<br />
washer. This one was located at the top.<br />
It's highly recommended that the following tasks should be carr i e d<br />
out to ensure good reliability of the cardan shaft;<br />
1.Complete assembly of cardan shaft need to be sent out for<br />
dynamic balancing to correct any presence of unbalance. This is<br />
substantiated by Cline Co. statement that ' any shaft that is<br />
normally operated above 300rpm must be dynamically balanced'.<br />
2.Grease channel should be plugged and grease grooves to be<br />
made to ensure improved lubrication to the rollers<br />
3. Grease meter to be sourced and installed at the grease gun.<br />
This will ensure more effective re-greasing since the amount is<br />
quantified. This is also in alignment with the best practice in<br />
maintenance.<br />
9. Acknowledgement<br />
The author would like to extend his gratitude to the Mechanical<br />
Maintenance section for giving their cooperation and eff o rt in making<br />
this modification works went through successfully.<br />
*<br />
24
25<br />
Importance of CMMS in Schools<br />
Importance of<br />
CMMS in<br />
Schools<br />
By Oren Tirosh<br />
Techs4Biz Australia Pty Ltd www.pervidi.com.au<br />
Computerised Maintenance Management Systems (CMMS) are<br />
now a standard tool for planning and tracking maintenance activities.<br />
The CMMS can provide a fast, effective and efficient way to manage<br />
resources, assets, services, and operations. In addition, with the rise<br />
in popularity of wireless connection that include Personal Digital<br />
Assistants (PDAs) and smart mobile phones, maintenance personals<br />
can now receive work orders and record project/inspection data via<br />
handheld devices.<br />
Although there are many commercial CMMS software on the<br />
market, there isn’t one program that is specifically designed for school<br />
maintenance purposes. The schools pro p e rty or business manager,<br />
instead, need to understand the unique challenges and goals the<br />
school maintenance team has before choosing the most suitable<br />
software package. Generally, maintenance management software is<br />
designed to help ensure that facilities are, and will be, cared for<br />
a p p ro p r i a t e l y. Automation and electronic re c o rd keeping is an<br />
effective method of reducing operational costs , and enabling users<br />
to analyse information and identify trends that can impact on business<br />
planning, capital expenditures, and improved decision-making.<br />
A c c o rding to the School Capital Maintenance Report (Vi c t o r i a n<br />
Independent Schools BGA, August 2000), 48% of survey participants<br />
w e re without established maintenance processes and all schools<br />
responding to this survey agreed that there was a need for a<br />
maintenance program. Outsource agencies offering maintenance<br />
s e rvices are more expensive and cause major interruptions to the<br />
every day running of a school. Applying appropriate technology such<br />
as Computerised Maintenance Management Systems would enable<br />
the management of such maintenance processes to be more eff i c i e n t .<br />
School buildings and facilities are major parts of the educational<br />
environment and it is imperative that they are kept in good order. The<br />
need to protect and maintain school assets is part of the Vi c t o r i a n<br />
g o v e rnments policy emphasised in the Building Act and re l e v a n t<br />
Legislations. The new building regulations indicate that existing public<br />
buildings must be inspected periodically ensuring they are well<br />
maintained stru c t u r a l l y, and that all essential services such as safety<br />
equipment are regularly examined. According to the Vi c t o r i a n<br />
G o v e rn m e n t ’s Asset Management Series (January 1996), this eff e c t i v e<br />
management of assets will save money.<br />
CMMS should address the following facility manager’s daily<br />
activities:<br />
• Plan and schedule activities, preventative maintenance,<br />
inspections, and service activities<br />
• Incorporate templates for health and safety guidelines and<br />
regulation compliance<br />
• Assign work to staff based on skills, time and geographical<br />
availabilities<br />
• Record details about service activities with minimised ‘key<br />
strokes’ data entry<br />
• Retrieve and analyse information and produce operational and<br />
management reports based on the desired criteria<br />
• Set up automatic alerts and triggers to notify of upcoming or<br />
missed activities, both through reports and emails. (For example:<br />
‘Receive a weekly report of all overdue service activities’)<br />
• Record time allocated to each task and automatically produce<br />
timesheets and job costing<br />
• Utilise barcodes to improve data collection and processing<br />
• Automate re-occurring tasks<br />
• Provide staff with specific instructions regarding activities or<br />
equipment<br />
• Create custom escalation procedures that alert management<br />
when activities are not completed<br />
• Interface with other school’s systems (building management<br />
system, general ledger, etc...)<br />
C u rrent technologies allow software companies to develop<br />
packages with automation capabilities at aff o rdable prices. Before<br />
making any investment decisions, however, it is important to<br />
acknowledge that a fully operational automation system must include<br />
t h ree main components: 1) Desktop/server application, 2) Handheld<br />
Devices, and 2) Web Portal. Only the combination of these<br />
components will dramatically improve all aspects of inspection and<br />
maintenance activities.<br />
Components of a Computerised<br />
Maintenance Management System<br />
The Desktop / Server application<br />
The desktop/server application is the main component in the<br />
CMMS. It usually includes many functions, which allow sophisticated<br />
re p o rting and analysis. The CMMS server should store all the data and<br />
p rovide a variety of operational and management functions, such as:<br />
• Work Order Manager:<br />
Record, track, manage, report, and analyse a variety of work<br />
orders and activities. Provide users with access to historical<br />
information, search engines, and trend analysis capabilities<br />
• Scheduler: using a Graphic User Interface, display schedules,<br />
workloads and forecasting for dispatch personnel and service<br />
managers<br />
• Equipment and Asset Tracker: providing a complete and up to<br />
date picture of the organisation’s assets and equipment, as well<br />
as delivering automatic reminders for related information such<br />
as warranty expiry dates and lease termination dates<br />
• Event-driven and Automated Escalation Procedures: issuing<br />
emails, reminders, and reports based on user-defined criteria<br />
E v e ry school has its own special needs and re q u i rement. The<br />
CMMS software, there f o re, must be flexible in a cost-eff e c t i v e
m a n n e r, addressing the school’s exact re q u i rements and business<br />
criteria, without making major adjustments to the school existing<br />
technology.<br />
To maximize utilisation and re t u rn-on-investment, desktop/serv e r<br />
applications should not be stand-alone. They should be designed fro m<br />
the outset to transfer information to and from handheld devices, the<br />
Internet and other systems used by the school.<br />
Handheld Devices<br />
Handheld devices are designed to provide information that<br />
a l ready exists on paper forms or on the desktop, improving one’s ability<br />
to access and utilise the data. For example, if a user fills out a weekly<br />
inspection form providing specific information, the handheld device<br />
will fulfil the same function. A handheld user can pick from a checklist<br />
of possible choices writing or typing information, according to the<br />
s c h o o l ’s re q u i rements and pre f e rences. Handheld devices make<br />
current, past, and future information accessible and easy to use.<br />
In contrast with manual or paper-based processes, there are many,<br />
additional benefits of using handheld devices. The handheld device<br />
can list all the information re q u i red by technicians, engineers, and<br />
maintenance personnel for perf o rming their tasks and activities. It can<br />
p rovide easy to use navigational search capabilities, and quick access<br />
to information. Handheld devices can also include validations that<br />
allow or disallow data entry. They can also provide the user with<br />
historical information pertaining to previous service orders or<br />
particular pieces of equipment. Furthermore, by using barcodes and<br />
scanners attached to the handheld devices, quick identification of the<br />
equipment can improves efficiency, and minimizing human errors.<br />
Data re c o rded with the handheld device can then automatically<br />
be transferred to the desktop/server database without the need for<br />
ARMS Reliability Engineers: Providing Asset Management Solutions To Drive Business<br />
Performance.<br />
Uncertain how to approach equipment reliability and how to reduce the cost of failure?<br />
ARMS Reliability Engineers can help.<br />
IMPROVING YOUR BUSINESS RESULTS IS OUR GOAL<br />
With simple methods, powerful software and a proven delivery approach, many<br />
of the worlds leading companies are improving business profitability with:<br />
• Improved Asset Performance<br />
• Reduced risk of catastrophic incidents<br />
• Repetitive failures eliminated<br />
• Lower maintenance costs<br />
• Less plant downtime<br />
Whether you have a new project that is still being designed or an existing<br />
facility that you wish to improve, our simple to use reliability techniques<br />
coupled with proven software and powerful delivery approach, provide<br />
solutions so your operation can realize outstanding results.<br />
further data entry or data reformulation. The means of data transfer<br />
between handheld devices and the database can be through a<br />
s t a n d a rd cradle, wired modem, infrared, Bluetooth, or wire l e s s<br />
communications. The handheld software should be able to run on<br />
multiple hard w a re platforms, providing flexibility and utilisation of<br />
future technology without costly software upgrades.<br />
Web Portal<br />
A web portal for users, customers, or tenants, can enhance<br />
services and allow end-users to enter work requests for approval by<br />
the appropriate personnel. The application is host and managed by<br />
an Application Serviced Provider (ASP) at a data centre separate fro m<br />
your workplace. The web-based management tool helps businesses<br />
track and manage many classes of assets, each with unique<br />
requirements.<br />
The significant financial and operational benefits from an ASP<br />
solution are:<br />
1. Access anytime and anywhere with a standard Internet<br />
connection.<br />
2. Faster implementation.<br />
3. Automatic receipt of most updateable upgrades.<br />
Good maintenance is essential to protect the school facilities,<br />
t h e re f o re avoiding the necessity of spending larger sums of money in<br />
the future on the continued use of equipment. A pro f e s s i o n a l<br />
maintenance plan must be developed to include a computerised<br />
automation system that is tailored to the school’s needs. A CMMS that<br />
is comprised of a desktop/server application, handheld devices, and<br />
web portal can dramatically improve all aspects of inspection and<br />
maintenance activities, there f o re creating better efficiencies and<br />
saving the school large sums of money.<br />
PROVEN OUTCOMES<br />
For further information view us on the web at<br />
www.reliability.com.au or call us for a free<br />
appraisal of your needs call us on +61 3 5255 5357<br />
Importance of CMMS in Schools<br />
Make decisions to eliminate the root cause of failures<br />
Implement optimum strategies to maintain equipment at:<br />
- Reduced risk, Minimum Cost, Maximum Contribution to bottom line levels.<br />
Optimise system design to maximise:<br />
- Availability, Plant Production<br />
- Ensure Optimum balance of equipment reliability and maintainability.<br />
Identify hazards and find effective risk mitigation plans<br />
Proactively, manage the lifecycle performance of equipment<br />
26
27<br />
The Strategic Importance of Asset Management<br />
The Strategic<br />
Importance of<br />
Asset Management<br />
Daryl Mather<br />
darylm@klaron.net<br />
Daryl Mather is an Author, Speaker and Management Consultant<br />
(United Kingdom.)<br />
The intention of this paper is to provoke thought re g a rding some<br />
of the dramatic incidents that has occurred in the field of asset<br />
management in recent years. As well as some of their more immediate<br />
consequences and ramifications of changing societal attitudes<br />
regarding the failure of physical assets.<br />
In particular it examines the impact of these events on issues such<br />
as the selection and implementation of enterprise management<br />
s o f t w a re, the use of call centres and the outsourcing of asset<br />
management functions. There is also an overview of the evolution of<br />
asset management throughout the world that has brought us to this<br />
point.<br />
Introduction<br />
The past few years have been a critical period in the discipline of<br />
Asset Management. This was a result of a handful of events, the<br />
implications of which reverberated around the world. All of these<br />
events were, in some manner, due to a failure of physical assets.<br />
• The Colombia Space Shuttle Disaster<br />
• The New York blackout, the London blackout and the blackout in<br />
Italy<br />
• 6 people, responsible for the management and maintenance of<br />
the rail lines, charged with manslaughter regarding the Hatfield<br />
train disaster in the United Kingdom<br />
The global reaction to these events has been the culmination of a<br />
continuous series of changes in this area since the early 1970’s. These<br />
changes have encompassed attitudes within society, heightened<br />
levels of understanding as well as the competitive market forc e s<br />
acting on the function of physical asset management.<br />
Changing Attitudes<br />
Society has become increasingly intolerant of industrial incidents,<br />
particularly in the areas of safety and environmental integrity. It is no<br />
longer considered acceptable to cause harm to either the enviro n m e n t<br />
or to people and the communities that they live in.<br />
In the past ten years this has been reflected in various changes in<br />
legislation and regulation in countries around the world. Some of the<br />
recent developments in these areas include:<br />
• Changes to the regulations governing electricity providers in the<br />
United Kingdom. Now providing a high degree of focus on risk<br />
management and mitigation.<br />
• Wide ranging fraud legislation by the federal government of<br />
Canada in response to the Westray disaster<br />
• Legislation in response to the Longford disaster in Australia<br />
It is becoming obvious that in the future those responsible for the<br />
management of physical assets will be more likely to be called to<br />
account when there is a failure, and as can be seen by recent history,<br />
it is likely that it will not be companies but individuals.<br />
In extreme cases incidents can also mean irreversible damage to<br />
a companies public image. Think of such disasters as the Exxon-<br />
Valdez environmental incident, the Union Carbide disaster in Bhopal<br />
in India or more recently the linking of Powergen to the New Yo r k<br />
blackout. All of these incidents have remained chained to these<br />
companies in the public mind.<br />
Heightened Level of Understanding<br />
The publication of the re p o rt Reliability Centred Maintenance,I<br />
prepared by Stan Nowlan and Howard Heap, has enabled a quantum<br />
leap in the way in which we understand how maintenance should be<br />
managed.<br />
Many of the findings of this re p o rt fly in the face of long-held,<br />
“common-sense” type beliefs and have exposed the true complex<br />
n a t u re of asset management. They also force companies to look at<br />
their physical asset base in an entirely different manner.<br />
At a high level these can be summarised in the following points:<br />
• Changes to our understanding of how maintenance contributes<br />
to a company’s strategic advantage<br />
• Changes to the way in which we understand equipment failures<br />
• The maintenance department alone is not capable of developing<br />
a sustainable and adequate maintenance strategy regime<br />
• Maintenance is not about preventing failures, it is about<br />
preventing the consequences of failure<br />
• An understanding of the ability of operational maintenance to<br />
drive capital expenditure<br />
• More protection is not necessarily better<br />
• An understanding of new ways of maintaining items, particularly
those that don’t fail according to long-held views<br />
• Extensive data is not required to take decisions on maintenance<br />
policies.<br />
Many of these new ways of thinking have challenged long held<br />
i n d u s t ry views. So much so that they are often difficult for industry<br />
professionals to easily assimilate.<br />
They are even less likely to be understood by those outside of the<br />
field of asset management.<br />
As we move into the 21st century many are beginning to look<br />
towards asset management as a source of strategic advantages. To<br />
achieve this the organization will need to have a deep understanding<br />
of these issues, and others like them, integrated into their thinking and<br />
corporate cultures.<br />
Competitive Market Forces<br />
One of the key elements of the increasingly open global competitive<br />
e n v i ronment is pre s s u re on costs. Pre s s u res to increase pro f i t<br />
m a rgins, or in worse case scenarios retain profit margins under<br />
lowering retail prices.<br />
As one of the largest elements of both operational and capital<br />
spending, asset management is often an obvious target for re d u c t i o n s<br />
in this area.<br />
Maintenance costs are high, in some cases artificially high. Not<br />
only are they high but there is increasing pre s s u re on maintenance<br />
costs to rise. Areas such as increased regulation, complex and<br />
automated machinery, as well as rising costs of physical asset them<br />
selves are pushing maintenance operators to the wire. Pressures to<br />
do more are increasing while the pre s s u re to spend less is gre a t e r<br />
The Strategic Importance of Asset Management<br />
than it has ever been.<br />
One of the major factors behind this trend is that we are more<br />
dependent on machinery than at any time in the past. Where<br />
p reviously we would use people to do work, today we use machinery.<br />
This conflicting situation of pressures to increase the work done<br />
combined with pressures to reduce the costs of doing that work, has<br />
been one of the principal drivers behind many of the vast range of<br />
p roduct and service “solutions” that have appeared over the past<br />
three decades. These have generally been focussed on appealing to<br />
this management concern over rising direct costs.<br />
This situation has unfortunately led to more poor decisions and<br />
misunderstandings in asset management than any other influencing<br />
f a c t o r. The results of decisions based on these concerns alone, while<br />
often bringing some short-term gains, are rarely sustainable and can<br />
even be dangerous in the medium to long term.<br />
Ad-hoc or isolated cost cutting often leads to the eradication of<br />
skills or activities that assist in achieving production goals. In worse<br />
case scenarios they impinge on the safe operating environments of<br />
assets.<br />
This does not mean that direct cost reductions are not achievable<br />
in asset management.<br />
Much of the maintenance that we do today either achieves very<br />
little, or is actively counter productive. As such there is always scope<br />
for reducing areas of re d u n d a n c y. Added to that are other areas of<br />
i n e fficiency such as planning and scheduling, stores management and<br />
other key areas.<br />
The concept of direct cost reduction needs to be replaced with the<br />
focus on reducing maintenance unit costs. This re q u i res a re d i re c t i o n<br />
of costs from the present activities towards activities that we tru l y<br />
MainPlan<br />
Maintenance Management System<br />
Features include:<br />
• Windows 95/98/NT4/2000 Compliant<br />
• Easy to install and use<br />
• Powerful graphical report writer<br />
• LAN and WAN compatible<br />
• Citrix Metaframe certified<br />
• Training and Support throughout<br />
Australia by Dbase Developments<br />
From only $1,100 inc. GST<br />
For a FREE evaluation copy of MainPlan please contact Dbase Developments on 0500 59 59 55, fax this<br />
coupon to 03 9502 0250, send an email to sales@mainplan.com or visit us at www.mainplan.com<br />
Name: ____________________________________ Company:____________________________<br />
Address: ________________________________________________________________________<br />
Phone: _________________ Fax:__________________ Email:__________________________<br />
28
29<br />
The Strategic Importance of Asset Management<br />
Safety<br />
Production<br />
Costs Environment<br />
Asset Management<br />
Capital Planning Regulation<br />
must do to achieve adequate performance levels.<br />
Any increase in attention, no matter where it comes from, is of<br />
course welcome. However it needs to be reinforced with knowledge<br />
of the true nature of asset management, as well as the strategic<br />
importance to many facets of corporate activity.<br />
This may include re g u l a t o ry and legislative compliance, safety and<br />
e n v i ronmental integrity as well as the standard economic<br />
requirements of quality, production and efficiency.<br />
Implications for Asset Management<br />
The implications of the changing attitudes, understandings of<br />
physical assets and market conditions bring a broad array of<br />
implications for those responsible for asset management. The majority<br />
of these can be explained as “new accountabilities”.<br />
Many of these are accountabilities levelled at, or within,<br />
corporations themselves. However many will also be directed at the<br />
individuals taking or overseeing these decisions, often with daunting<br />
consequences for failure.<br />
New Levels of Accountability<br />
As previously highlighted, asset managers are beginning to find<br />
themselves increasingly called to account for the decisions that have<br />
been taken.<br />
Decisions will increasingly be judged<br />
against:<br />
• Higher standards for legislative and regulatory compliance<br />
• Increased understanding of the role of assets in areas of<br />
productivity, cost and quality<br />
• Risk of damage to the corporate image of the company<br />
• Failures to adequately understand production needs<br />
Legislation<br />
Quality<br />
• Failure to accurately determine capital planning requirements,<br />
based on current physical assets and future requirements<br />
This leads to two conclusions. Firstly those responsible for taking<br />
decisions re g a rding physical assets need to have a deep<br />
understanding of all of the issues and implications of those decisions,<br />
as well as the necessary authority to act on them.<br />
Secondly it will re q u i re the ability to adequately defend<br />
decisions taken. Not only in terms of considerations i n t e rnal to the<br />
c o m p a n y, but also in terms of defence in the case of potential legal<br />
actions. It is this second conclusion that has the most impact for<br />
maintenance managers of the future .<br />
The ability to state that asset management decisions are<br />
defendable is paramount. This means that they have been taken by<br />
people qualified and experienced enough to take them; in a manner<br />
that is in line with internationally accepted standards on the issue;<br />
and in a manner that provably complies with the first two pre m i s e s .<br />
That is to say, a manner that is totally auditable.<br />
Although these may stretch into many areas of corporate<br />
management, there are three “in vogue” elements of today’s market<br />
that are particularly of concern.<br />
They are:<br />
• Enterprise Resource Planning / Enterprise Asset Management<br />
decision making and management<br />
• Outsourcing of asset management functions<br />
• The use of call-centres as a viable asset management tool<br />
The E.A.M / E.R.P Market<br />
Asset Management, or Enterprise asset management as it is often<br />
re f e rred to within this industry, is one of the areas where there has<br />
been a definite decay in the decision making process.<br />
Although this area is by far the most expensive of the current range<br />
of solutions in asset management, it is easily the most misunderstood<br />
and counter-productive in many cases.<br />
Prior to 2003 many maintenance systems were implemented as a<br />
result of an ERP implementation. A logical follow on to what has been<br />
c o n s i d e red the “main game”. (Often financial, supply chain or<br />
i n f o rmation technology related) Decisions within this area have<br />
f requently been taken, or managed, by people with little or no tru e<br />
depth of knowledge in the asset management arena.<br />
Even in organizations where the importance of asset management<br />
is understood, those with a background in IT or finance, or other<br />
u n related discipline, are often responsible for these types of projects.<br />
As has been explained earlier the area of maintenance<br />
management is an area that is complex and not guided by re c o g n i s e d<br />
“common-sense” judgements. It is not an area that is easily nor<br />
rapidly understood by those outside of the discipline. While the use<br />
of quasi-experts may be sufficient in other areas of corporate activity,<br />
in asset management the stakes are simply too high.<br />
Even in the most cavalier of board rooms the corporate risk<br />
associated with this dangerous practice is becoming recognised. In<br />
the years that follow 2003, as accountability continues to be a marked<br />
factor of asset management, previous decisions will increasingly need<br />
to be revisited by those with the knowledge and depth of experience<br />
to do so.<br />
This marks a dramatic change in the stru c t u re of this market sector.<br />
Decisions re g a rding selection, implementation and postimplementation<br />
management must become more focussed on the tru e<br />
areas of asset management.<br />
Previously “requirements” were attached to processes currently<br />
in place, or more often a proposed future state of processes. As we<br />
move forward this will become driven more by the requirements that<br />
companies have of their physical asset base, in order to achieve<br />
strategic advantages within their market.<br />
Outsourcing in Asset Management<br />
O u t s o u rcing has become one of the catchcries of those off e r i n g<br />
solutions and regimes aimed at lowering direct costs. In some areas<br />
this may be relevant. Within the area of physical assets there are<br />
some major considerations that first need to be taken into account.<br />
R e g a rdless of who has been delegated the responsibility for<br />
maintaining the asset base, there is still only one asset owner. That is<br />
the corporation that operates and owns them. So while there it<br />
remains possible to delegate re s p o n s i b i l i t y, it is still not possible to<br />
delegate legal ramifications of these responsibilities. This has been<br />
shown dramatically in the recent events, previously mentioned, in the<br />
United Kingdom.<br />
This indicates that there are at least two areas of asset<br />
management that need to be retained under the strict control of the<br />
asset owners.<br />
Firstly is the judgement as to what should be done. T h e<br />
d e t e rmination of exactly what maintenance regimes should be applied<br />
in order to comply with the corporate re q u i rements of the physical<br />
assets. The asset owners are the only ones that can do this<br />
successfully as they are the only ones with full knowledge of the
corporate objectives in this area.<br />
Secondly there is a need to retain control, in some form or other,<br />
over how things should be done. This can better be explained as the<br />
s t a n d a rds to which a task must be completed, as well as the dates<br />
within which a task must be completed.<br />
Contracts for outsourced maintenance cannot be managed on the<br />
basis of merely handing over assets or a series of tasks to be<br />
managed. The execution of many tasks, derived in response to the<br />
asset re q u i rements, have small tolerances for execution They are<br />
driven by the way in which a piece of equipment fails as well as the<br />
consequences of that failure.<br />
A failure to carry out these tasks within the timeframes that are<br />
required is a failure of the asset management function.<br />
This carefully balanced combination of doing the right job a n d<br />
doing the job right is the essence of responsible asset steward s h i p<br />
and will be the basis on which asset managers, will be judged in the<br />
f u t u re, re g a rdless of who they have delegated responsibility to for<br />
executing this plan.<br />
The Use of Call-Centres<br />
The use of call centres for asset management is an extre m e l y<br />
disturbing development and one that is increasing in popularity.<br />
People with some form of engineering background often staff these<br />
i n i t i a l l y, but more often than not they become operated by data<br />
management and clerical type employees.<br />
If these are used only as a means of data capture then the situation<br />
is manageable. Yet in more extreme cases there have been efforts to<br />
almost fully automate the scheduling decision making process, using<br />
The Strategic Importance of Asset Management<br />
c e n t res such as these as points where work can be prioritised and<br />
dispatched for execution.<br />
Again the situation develops whereby people with little or no depth<br />
of understanding of the area of asset management are taking<br />
decisions that could have potentially disastrous consequences. This<br />
is often on the recommendations of other people with dubious levels<br />
of understanding of the ramifications and importance of asset<br />
management.<br />
All engineering judgement needs to take as its base curre n t<br />
operating conditions. These can often be intangible and changeable.<br />
This only increases the level of corporate exposure to risk. This<br />
situation is neither defendable nor is it logical.<br />
These are merely a few of the areas that are affected by the<br />
changes in perceptions re g a rding maintenance. There are, of course,<br />
many others throughout the entire range of activities and decisions<br />
that are taken on the subject.<br />
A New Framework for Asset Management<br />
As the level of understanding of these areas begins to rise, so to<br />
do the expectations that managers and companies will be able to meet<br />
modern requirements.<br />
In the past maintenance strategy has frequently been treated in a<br />
highly reactive manner. Maintenance regimes are often created in<br />
response to machine breakdowns or incidents. Often, in the afterm a t h<br />
of disasters, there are public statements made demanding, or<br />
promising, “more intensive maintenance”.<br />
While the intention is laudable, the result is often of such reactive<br />
actions is either noneffective or counter productive. Either way it is<br />
too late to stop the original incident from having occurred.<br />
30
31<br />
The Strategic Importance of Asset Management<br />
Managing assets needs to be done in a truly proactive approach,<br />
one that ties the management of physical assets to the corporate<br />
objectives.<br />
A modern approach to asset management can be visualised as a<br />
series of dominoes. Each domino needs the momentum from the<br />
previous area, and then proceeds to pass this momentum to the next<br />
domino in the line. Starting at any point other than the beginning will<br />
leave some dominoes standing.<br />
Modern asset management can be seen in the same way. Each of<br />
the dominoes re p resents one of the decision-making areas that are<br />
required to adequately manage assets.<br />
The initial momentum to begin the sequence comes from the vision<br />
of a future state. This needs to clearly re p resent the corporate<br />
objectives and goals, and expressing how asset management can play<br />
a part in achieving these goals.<br />
This energy is then carried forw a rd to impact on the remaining are a s<br />
of decision making. As with the dominoes, a decision to begin in the<br />
middle of this chain reaction will omit areas important to the end re s u l t .<br />
The Corporate Viewpoint<br />
P e rhaps more than any other management initiative, asset<br />
management is heavily driven by the corporate re q u i rements and<br />
objectives. Yet it is often overlooked or summed up in global<br />
statements regarding “improved efficiency” or “improved quality”.<br />
One of the more recent tools in the managers’ arsenal is the<br />
balanced score c a rd. This proven tool has been used successfully<br />
t h roughout the world as a means of communicating corporate<br />
s t r a t e g y, and converting strategy into results. However specific asset<br />
management goals and causality links are rarely included in corporate<br />
scorecards.<br />
By including asset management at this level of setting corporate<br />
objective this sets two powerful dynamics in motion. Firstly it raises<br />
the level of understanding throughout the company of this area and its<br />
i m p o rtance. Secondly it provides guidelines for future decisions that<br />
will need to be taken re g a rding the following steps in the chain<br />
re a c t i o n .<br />
Developing Maintenance Strategy<br />
The corporate objectives, once clearly defined and linked to asset<br />
management, act as “re q u i rements” in the creation of the strategy<br />
regimes.<br />
An example of this can be found in the linking of corporate<br />
objective re g a rding quality to asset perf o rmance. Determining exactly<br />
what the future acceptable level of poor quality will be immediately<br />
p rovides a guide for the perf o rmance standards re q u i red of the assets<br />
in the production lines.<br />
These then need to be considered along with all o t h e r<br />
re q u i rements that the company may have of its assets. There are a<br />
large number of areas that contribute to the company’s requirements<br />
of its assets, and all of these need to be considered in the re s u l t i n g<br />
analysis.<br />
When there is a clear definition of what it is that companies need<br />
from their asset base it will allow them to<br />
a) Understand if their assets are able to achieve these<br />
objectives in the first place and<br />
b) Determine the maintenance strategies required<br />
to ensure that they do or<br />
c) Determine what enhancement actions are required to meet<br />
corporate requirements<br />
Working through these two steps not only forces a radical change<br />
in the manner in which companies view their assets, it also leads to<br />
a radical change in the way that the assets are managed and that<br />
decisions are taken in this area.<br />
Applying Maintenance Strategy<br />
As work on maintenance strategy gets underway, work can begin<br />
on the steps relating to the application of maintenance strategy. This<br />
means taking the strategies and determining what are the support i n g<br />
business needs and processes that will be required to execute them.<br />
As the strategies are developed information re g a rding the clear<br />
re q u i rements of the materials and human re s o u rces functions will<br />
begin to emerge.<br />
This give a company the ability to totally plan and control the<br />
maintenance efforts and spending, from the strategies through to the<br />
materials and human resources dimensions all aligned with the true<br />
asset requirements.<br />
S i m i l a r l y, as these fundamental issues are addressed, there begins<br />
to be an understanding of what the business processes need to be.<br />
Quite often this can mean a radical change to existing processes.<br />
These can range from processes governing acquisition, installation<br />
and enhancements, through to the operational processes. In some<br />
cases it may re q u i re diff e rent maintenance scheduling fre q u e n c i e s ,<br />
in others it may re q u i re whole new skill bases to be developed or it<br />
may lead to changes in the ways that we plan, perf o rm and re c o rd<br />
works that are done.<br />
In stark contrast to conventional thinking in field of asset<br />
management systems, it becomes clear that business processes do<br />
not drive “re q u i rements”. In fact business processes, and the systems<br />
that are used to manage them, are driven by asset requirements.<br />
This is one of the key misconceptions to have emerged regarding<br />
enterprise asset management in recent years.<br />
Administering Maintenance Strategy<br />
With the asset re q u i rements, supporting business needs and work<br />
p rocesses defined, attention can now turn to the use of an existing or<br />
future computerised maintenance management system.<br />
It sometimes becomes clear that the systems in place are either<br />
inadequate for managing the asset portfolio or that it is being used in<br />
a manner that does not align with the newly defined business<br />
processes.<br />
This is often a startling revelation to companies expecting to be<br />
able to merely “roll out the maintenance modules” of their existing<br />
ERP that was bought for financial or other business reasons.<br />
This can often be a rude awakening when the amounts of money<br />
that are sometimes involved are taken into account.<br />
Conclusions<br />
There can be no doubt that the perceived importance of physical<br />
asset management has risen substantially during 2003. There can also<br />
be no doubt that this trend will continue into the future as it has done<br />
over the past three decades.<br />
It is beginning to become more widely understood that asset<br />
management is a complex and specialist area. One which can be a<br />
s o u rce of strategic advantages, but also one in which the implications<br />
of misjudgement can be extremely serious. Not only from a financial<br />
perspective but also in many areas of corporate activity.<br />
In order to exploit the advantages available in asset management,<br />
and ensure their responsible stewardship, will need to be based<br />
around three basic tenets:<br />
1. Using the correct people;<br />
2. With the correct knowledge;<br />
3. To make decisions in the correct way<br />
Bibliography<br />
1. Reliability-centred Maintenance report - Dolby Access Press<br />
2. Maintenance - A New Paradigm, John Moubray,<br />
available from www.aladon.com<br />
3. The case Against Streamlined RCM,<br />
John Moubray, available from www.aladon.com
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
2004 Survey Of<br />
Special Maintenance<br />
Applications Software<br />
Compiled by Ian Bradshaw , August 2004. The data given in this 2004 Special Maintenance Applications Survey Survey (SMAS) is extracted, as received, from the re s p o n d e n t s .<br />
EIT does not there f o re accept any liability for actions taken as a result of information given in this Surv e y.<br />
@ptitude (SKF Reliability<br />
Systems)<br />
@ptitude is an embedded knowledge based system<br />
that Integrates asset data; identifying symptoms<br />
and faults for use within corrective actions.<br />
Company Information:<br />
Name: Apt Group<br />
Address: Suite 22, 450 Elizabeth Street Surry<br />
Hills NSW 2010<br />
Contact: Ian Jones<br />
Phone: 02 9318 0213<br />
Fax: 02 9318 0776<br />
Email: info@aptgroup.com.au<br />
Web: http://www.aptgroup.com.au<br />
Software Details:<br />
@ptitude is modular solution that helps improve<br />
overall plant efficiency by replacing labour<br />
intensive data collection analysis with an<br />
automatic process for fault resolution.<br />
@ptitude provides the means to capture and<br />
retain knowledge of your most seasoned<br />
professional for use by everyone. The systems<br />
functions are oriented towards using collected<br />
plant data such as: Condition Monitoring A l a r m s<br />
to determine the best possible method to<br />
maintain plant life expectancy.<br />
Asset data capture, Symptom Resolution,<br />
Corrective Plant maintenance.<br />
Implement Proactive Reliability Maintenance<br />
Programs.<br />
Establish Risk based Preventative Maintenance<br />
Routines.<br />
Determine Reliability Centred Maintenance<br />
Inspection Routines<br />
Analyse asset failure (FMECA).<br />
AIMSS Authoring Tool<br />
AIMSS authoring tool set puts all the technical<br />
information you need to maintain complex systems<br />
at your fingertips.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
AIMSS puts all the technical information you<br />
need to maintain complex systems at your<br />
fingertips.<br />
The Advanced Integrated Maintenance Support<br />
System (AIMSS) is an interactive electronic<br />
technical manual (IETM) authoring tool set.<br />
AIMSS uses state-of-the-art object database<br />
technology that enables you to generate, display,<br />
store, retrieve, automate, and deliver Class 4 and<br />
5 IETM formatted projects from your<br />
workstation or personal computer. AIMSS is<br />
Windows? based software. Its graphical authoring<br />
environment requires no programming skills.<br />
APT INSPECTION<br />
APT-INSPECTION: calculates the best inspection,<br />
monitoring or test interval and quantifies the<br />
economics of risk-based inspection methods.<br />
Company Information:<br />
Name: Asset Performance Tools Ltd<br />
Address: Prince Henry House, Kingsclere<br />
Business Park, Kingsclere, Hampshire,<br />
RG20 4SW<br />
Contact: Bert Montgomery<br />
Phone: +44(0)1635 299200<br />
Email: bert.montgomery@aptools.co.uk<br />
Web: www.aptools.co.uk<br />
Software Details:<br />
Provides evidence of the correct<br />
inspection/testing strategies, giving auditable<br />
justification for compliance with safety or<br />
inspection requirements.<br />
It can show what the cost implications are of<br />
testing more or less often and how technical<br />
integrity is achieved by a particular monitoring<br />
programme.<br />
It can evaluate inspection and testing activities<br />
with combinations of benefits.<br />
The costs start at £4180.00 for a single user<br />
licence. (Multi user licence is also available<br />
APT LIFESPAN<br />
APT LIFESPAN: calculates the best life cycle for any<br />
asset and put numbers to the costs and benefits of<br />
alternative replacement, refurbishment and<br />
maintenance options.<br />
Company Information:<br />
Name: Asset Performance Tools Ltd<br />
Address: Prince Henry House, Kingsclere<br />
Business Park, Kingsclere, Hampshire,<br />
RG20 4SW<br />
Contact: Bert Montgomery<br />
Phone: +44(0)1635 299200 Email:<br />
bert.montgomery@aptools.co.uk<br />
Web: www.aptools.co.uk<br />
Software Details:<br />
It provides sophisticated modeling of<br />
deterioration and rapid economic evaluation of<br />
renewal, upgrade or disposal options.<br />
Lifespan will optimize the combination of capital<br />
investment, equipment reliability, performance,<br />
operating and maintenance costs, risk exposure<br />
and life expectancy.<br />
It provides rapid What-If analysis comparing<br />
different scenarios.<br />
The costs start at £5280.00 for a single user<br />
licence. (Multi user licence is also available).<br />
APT MAINTENANCE<br />
APT-MAINTENANCE calculates the best preventive<br />
maintenance interval or equipment replacement<br />
point and puts numbers to the costs, benefits and<br />
risks of alternative maintenance strategies.<br />
Company Information:<br />
Name: Asset Performance Tools Ltd<br />
Address: Prince Henry House, Kingsclere<br />
Business Park, Kingsclere, Hampshire,<br />
RG20 4SW<br />
Contact: Bert Montgomery<br />
Phone: +44(0)1635 299200 Email:<br />
bert.montgomery@aptools.co.uk<br />
Web: www.aptools.co.uk<br />
Software Details:<br />
It identifies the cost and risk optimal strategies,<br />
tests for sensitivity to weak and range estimated<br />
data and quantifies the impact of constraints or<br />
intangibles.<br />
Based on cost, risk performance optimisation it<br />
puts figures to the cost and benefits of alternative<br />
maintenance strategies.<br />
It allows you to select optimum combinations of<br />
preventive, condition-based and on-failure<br />
methods.<br />
The costs start at £5280.00 for a single user<br />
licence. (Multi user licence is also available).<br />
32
33<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
APT PROJECT<br />
APT PROJECT evaluates why some<br />
proposals/projects are not worthwhile. It provides<br />
a ranked listing of competing options, each<br />
evaluated for cost, risk and payback.<br />
Company Information:<br />
Name: Asset Performance Tools Ltd<br />
Address: Prince Henry House, Kingsclere<br />
Business Park, Kingsclere, Hampshire,<br />
RG20 4SW, UK<br />
Contact: Bert Montgomery<br />
Phone: +44(0)1635 299200<br />
Email: bert.montgomery@aptools.co.uk<br />
Web: www.aptools.co.uk<br />
Software Details:<br />
Evaluate and demonstrate why some proposals<br />
are not worthwhile.<br />
Compare and prioritise dissimilar projects or<br />
modifications.<br />
Use range estimates and engineering knowledge<br />
to the full.<br />
Discover what data is worth collecting and for<br />
what reason.<br />
Calculate the premium paid for safety, legal<br />
compliance, public image and other intangibles.<br />
Record the assumptions about anticipated<br />
benefits at the time of justification.<br />
The costs start at £3080.00 for a single user<br />
licence. (Multi user licence is also available).<br />
APT SCHEDULE<br />
APT SCHEDULE: Offers a unique opportunity to<br />
provide a comprehensive and fully quantified<br />
analysis of optimal shutdown and work scheduling<br />
strategy.<br />
Company Information:<br />
Name: Asset Performance Tools Ltd<br />
Address: Prince Henry House, Kingsclere<br />
Business Park, Kingsclere, Hampshire,<br />
RG20 4SW<br />
Contact: Bert Montgomery<br />
Phone: +44(0)1635 299200<br />
Email: bert.montgomery@aptools.co.uk<br />
Web: www.aptools.co.uk<br />
Software Details:<br />
APT SHCEDULE provides sophisticated and<br />
rapid ìwhat-ifî? Analysis of different task<br />
combinations.<br />
It can support decisions concerning the right<br />
time to shut down a plant or process for<br />
maintenance work.<br />
IT identifies the optimum combination and the<br />
cost/risk/performance impact of work<br />
programmes.<br />
The costs start at £5280.00 for a single user<br />
licence. (Multi user licence is also available).<br />
APT SPARES<br />
APT SPARES shows you which ‘slow moving’ or<br />
insurance spares to hold, and in what numbers.<br />
Company Information:<br />
Name: Asset Performance Tools Ltd<br />
Address: Prince Henry House, Kingsclere<br />
Business Park, Kingsclere, Hampshire,<br />
RG20 4SW<br />
Contact: Bert Montgomery<br />
Phone: +44(0)1635 299200<br />
Email: bert.montgomery@aptools.co.uk<br />
Web: www.aptools.co.uk<br />
Software Details:<br />
Determine which spares are worth holding, and<br />
in what numbers.<br />
Reduce stock-holding and/or risk exposure to<br />
downtime and unavailability costs.<br />
Evaluate 'pooling' options and shared stock<br />
strategies.<br />
Compare alternative vendors and supply routes.<br />
Discover what data is worth collecting, for what<br />
reason.<br />
The costs start at £3080.00 for a single user<br />
licence. (Multi user licence is also available).<br />
ASENT Toolkit<br />
ASENT is a comprehensive modular set of software<br />
tools that enables you to manage design tasks with<br />
ease.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
ASENT provides leading-edge reliability and<br />
maintainability computer-aided engineering<br />
solutions. ASENT is a comprehensive modular<br />
set of software tools that enables you to manage<br />
design tasks with ease. ASENT's tools, which are<br />
fully described in the ASENT Brochure allow<br />
engineers to turn data into useful, designimpacting<br />
information.<br />
ASENT stores all the analysis, performance, and<br />
manufacturing data for your entire company, and<br />
makes it available for use with any ASENT tool.<br />
And because you enter data once, but reuse it<br />
many times, ASENT provides a significant<br />
productivity boost for your company.<br />
ATC Professional<br />
Shutdown/Turnaround Management System<br />
Management system designed specifically for oil<br />
refinery and petrochemical plant<br />
shutdowns/turnarounds.<br />
Company Information:<br />
Name: InterPlan Systems Inc.<br />
Address: P.O. Box 590131<br />
Contact: Bernard Ertl<br />
Phone: 281-482-7126<br />
Fax: 281-648-1821<br />
Email: info@interplansystems.com<br />
Web: http://www.interplansystems.com/<br />
Software Details:<br />
ATC Professional is a proactive turnaround<br />
management system that is much more than just<br />
a Gantt chart program. ATC Professional<br />
incorporates procedures that involve the entire<br />
turnaround management team to promote<br />
ownership and visibility of the plan, and<br />
objectivity and communication in the reporting<br />
cycle for successful project management towards<br />
your time and budget goals. It encourages<br />
cooperation and allows all team members to<br />
contribute and succeed.<br />
BETAPLUS<br />
A new generation Common Cause Failure (CCF)<br />
partial beta model that takes account of proof-test<br />
intervals and involves positive scoring of CCF<br />
related features rather than a subjective "range<br />
score".<br />
Company Information:<br />
Name: Maintenance 2000 Limited<br />
Address: Broadhaugh<br />
Building<br />
Suite 110<br />
Camphill Road<br />
Broughty Ferry<br />
Dundee DD5 2ND<br />
Scotland<br />
Contact: Dr. David Smith<br />
Phone: +44 (0) 1382 803070<br />
Fax: +44 (0) 1382 737736<br />
Email: david@maint2k.com<br />
Web: www.maint2k.com<br />
Software Details:<br />
B E TAPLUS is a Common Cause Failure (partial<br />
Beta model) assessment technique that develops<br />
the partial Beta model beyond the currently<br />
available theories to include:<br />
• Recognising that proof test and auto-test<br />
intervals influence the value of Beta.<br />
• A positive calibration of the model using<br />
common mode/cause failure data.<br />
• Positive scoring of Beta related sub-factors<br />
rather than subjective assessment of a<br />
variable for each group of factors.<br />
• The facility of testing the effect, on Beta, of<br />
alternative design proposals and<br />
modifications.<br />
• The opportunity to add scoring criteria and<br />
re-calibrate against new common<br />
mode/cause failure data.<br />
• The opportunity to alter the weightings of<br />
each group of factors.<br />
h t t p : / / w w w. m a i n t 2 k . c o m / r e l i a b i l i t y - m a i n t e n a n c e -<br />
optimization-software.htm for further functional<br />
details and costs.<br />
CATLOC<br />
CATLOC is a sophisticated life cycle costing tool<br />
with a new unique flexible approach to LCC<br />
modeling.<br />
Company Information:<br />
Name: SYSTECON AB<br />
Address: BOX 5205<br />
SE10245<br />
STOCKHOLM<br />
SWEDEN<br />
Contact: Oskar Tengo<br />
Email: systecon@systecon.se<br />
Web: www.systecon.se
Software Details:<br />
CATLOC is a new whole life costing tool for<br />
calculations and comparative analyses of costs for<br />
development, production, operation and<br />
maintenance of technical systems throughout<br />
their life cycle. CATLOC offers a unique flexible<br />
approach to LCC modelling. Firstly, it allows cost<br />
equations and cost break down structures to be<br />
fully defined by the user. Secondly, in the analysis,<br />
it allows the user to categorize, slice and dice<br />
costs in almost any dimension including time.<br />
CATLOC has intuitive input views as well as<br />
flexible graphical result views for accurate<br />
analysis and interpretation of results. It is ideal<br />
for identifying cost drivers.<br />
COMPARE (Calculating<br />
Optimum Maintenance<br />
Parameters)<br />
A Reliability Centered Maintenance package that<br />
enables optimum spares levels, optimum proof test<br />
intervals and optimum replacement times to be<br />
obtained.<br />
Company Information:<br />
Name: Maintenance 2000 Limited<br />
Address: Broadhaugh Building<br />
Suite 110<br />
Camphill Road<br />
Broughty Ferry<br />
Dundee DD5 2ND<br />
Scotland<br />
Contact: Dr. David Smith<br />
Phone: +44 (0) 1382 803070<br />
Fax: +44 (0) 1382 737736<br />
Email: david@maint2k.com<br />
Web: www.maint2k.com<br />
Software Details:<br />
C O M PARE (Calculating Optimum<br />
Maintenance PARamEters) is a Reliability<br />
Centred Maintenance software package that<br />
enables significant cost savings to be made in<br />
spares and maintenance resources.<br />
• Having too many spares carries a cost<br />
penalty. Too few spares incurs expensive<br />
outage time. Using Markov analysis,<br />
COMPARE enables the optimum number<br />
of spares to be chosen for any combination<br />
of lead time, repair time, failure rate,<br />
number of active items and the degree of<br />
redundancy for that item.<br />
• Coincident dormant failures, otherwise<br />
protected by redundant configurations, will<br />
lead to costly outage. Too frequent proof<br />
testing, to reveal failed redundant units, will<br />
incur a waste of maintenance resource.<br />
COMPARE enables the optimum proof test<br />
interval to be calculated for a given outage<br />
cost, proof test cost, down time and failure<br />
rate.<br />
• The cost of an unplanned replacement may<br />
be much greater than the planned<br />
replacement of a part despite its not having<br />
failed. There will be an optimum<br />
replacement time for parts having a wearout<br />
characteristic. COMPARE enables the<br />
Weibull parameters of parts to be assessed<br />
from field or test data in order for the<br />
optimum time to be calculated.<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
• The COMPARE user manual covers the<br />
basic theory behind these techniques. It<br />
also includes reliability theory and the<br />
application of these techniques.<br />
• Graphical outputs for use in word<br />
processing packages.<br />
• FARADIP (FAilure RAte Data In<br />
Perspective) provides a failure rate data<br />
benchmark which can be used to review the<br />
field data which users apply to COMPARE<br />
or as a source of data where generic figures<br />
are required.<br />
D-LCC<br />
D-LCC is a powerful yet flexible Life Cycle<br />
Costing Program<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
D-LCC is a powerful yet flexible Life Cycle<br />
Costing Program. D-LCC (Decision by Life<br />
Cycle Cost) makes the LCC analysis easy and<br />
comprehensive. D-LCC is a key tool for<br />
managers, decision-makers, engineers, ILS<br />
personnel, and other staff involved in system<br />
34
35<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
acquisition, proposal writing, management,<br />
development, production and through-life<br />
support.<br />
EAGLE Toolkit<br />
EAGLE presents a complete logistics solution, from<br />
building logistics data and maintaining existing<br />
databases to providing reports, and other postproduction<br />
support.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
EAGLE Toolkit presents a complete logistics<br />
solution, from building logistics data and<br />
maintaining existing databases to providing<br />
reports, technical manuals, and other postproduction<br />
support.<br />
EAGLE is an enhanced integrated logistics<br />
support software system. Its LSAR (Logistic<br />
Support Analysis Record) relational database,<br />
based on and fully compatible with MIL-STD-<br />
1388-2B, provides a complete logistics<br />
architecture EAGLE goes beyond 1388-2B's<br />
specifications by adding engineering drawings,<br />
technical manuals, video support, and other<br />
functions. Current1388-2A and 1388-2B<br />
databases can easily be migrated to the EAGLE<br />
structure.<br />
eTaskMaker Project Planning<br />
System<br />
Flexible tool for standardizing and improving best<br />
practices in estimating, planning and scheduling<br />
maintenance work.<br />
Company Information:<br />
Name: InterPlan Systems Inc.<br />
Address: P.O. Box 590131<br />
Contact: Bernard Ertl<br />
Phone: 281-482-7126<br />
Fax: 281-648-1821<br />
Email: info@interplansystems.com<br />
Web: http://www.interplansystems.com/<br />
Software Details:<br />
e TaskMaker generates detailed, customized<br />
project schedules (including tasks, durations,<br />
resources and PDM schedule logic) for export to<br />
leading project management systems based upon<br />
quantities, dimensions and answers to multiple<br />
choice questions. Supported project<br />
management exports include ATC Professional,<br />
Primavera P3, P3e & P3e/c, Microsoft Project,<br />
Microsoft Excel (for cost estimating) and more.<br />
e TaskMaker includes over 100 estimating<br />
modules related to plant maintenance (including<br />
piping demolition, fabrication and installation).<br />
The eTaskMaker Module Editor allows you to<br />
edit/customize any module or easily build new<br />
ones.<br />
FARADIP (FAilure RAte Data In<br />
Perspective)<br />
FARADIP (FAilure RAte Data In Perspective) is one<br />
of the largest failure rate and failure mode data<br />
banks in the reliability profession.<br />
Company Information:<br />
Name: Maintenance 2000 Limited<br />
Address: Broadhaugh Building<br />
Suite 110<br />
Camphill Road<br />
Broughty Ferry<br />
Dundee DD5 2ND<br />
Scotland<br />
Contact: Dr. David Smith<br />
Phone: +44 (0) 1382 803070<br />
Fax: +44 (0) 1382 737736<br />
Email: david@maint2k.com<br />
Web: www.maint2k.com<br />
Software Details:<br />
FARADIP is one of the largest failure rate and<br />
failure mode data banks in the reliability<br />
profession, based on over 40 published data<br />
sources together with M2K's own reliability data<br />
collection. FARADIP has been available for 10<br />
years and is now widely used as a data reference.<br />
It provides failure rate data ranges for a nested<br />
hierarchy of items covering electrical, electronic,<br />
mechanical, pneumatic, instrumentation and<br />
protective devices. Failure mode percentages are<br />
also provided.<br />
• Nested menus of failure rates and failure<br />
modes from over 40 diverse data sources<br />
including military, telecommunications,<br />
offshore operations, process and aerospace<br />
industries.<br />
• Ranges of failure rates spanned by the<br />
majority of published sources and an<br />
indication of the most common values.<br />
• FMEA's for two system failure modes<br />
together with parts count and MTBF<br />
calculations.<br />
• Full editing facilities for global files and<br />
component entries.<br />
Equipment included:<br />
• Microelectronics (logic, linear & memory).<br />
• Discrete semiconductors, tubes, lamps.<br />
• Passive electrical components.<br />
• Instruments and analysers.<br />
• Connectors, switches, PCBs, cables.<br />
• Electromechanical and rotating machinery.<br />
• Power supplies, sources and transformers.<br />
• Mechanical items (incl. pumps and valves).<br />
• Pneumatic and hydraulic equipment.<br />
• Computers, DP and Comms.<br />
• Alarms, fire protection, arrestors, fuses.<br />
See<br />
h t t p : / / w w w. m a i n t 2 k . c o m / r e l i a b i l i t y - m a i n t e n a n c e -<br />
optimization-software.htm for further functional<br />
details and costs.<br />
Faultree Plus Version 10.0<br />
Reduce risk and improve safety with the worlds<br />
most popular faultree, event tree and markov<br />
analysis software package FaultTree+.<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove<br />
Victoria 3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 357<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.au<br />
Software Details:<br />
Fa u l t Tree+ is a fully interactive graphics and<br />
analysis program for performing probabilistic risk<br />
assessment using integrated fault tree, event tree<br />
and Markov analyses. The program runs under<br />
Microsoft Windows 95/98/2000, NT and Me and<br />
is capable of analysing large and complex fault<br />
and event trees producing the full minimal cut<br />
representation for fault tree TOP events and<br />
event tree consequences.<br />
Fa u l t Tree+ is used by many organisations as part<br />
of their implementation of IEC 61508.<br />
Fa u l t Tree+ provides CCF analysis, importance<br />
analysis, uncertainty and sensitivity analysis<br />
facilities. The program allows users to construct<br />
a single project database containing generic data<br />
and event tables, fault trees with multiple TOP<br />
events, event trees originating from different<br />
initiating events, CCF tables and consequence<br />
tables. Fault and event tree pagination is<br />
automatically controlled by the program. Fa u l t<br />
tree TOP events may be used to represent<br />
specific nodes in the event tree. Multiple<br />
branches are also handled to allow for partial<br />
failures. Fa u l t Tree+ uses efficient minimal cut<br />
set generation algorithms to analyse large and<br />
complex fault and event trees. NOT logic may<br />
be included in the fault and event trees at any<br />
level and event success states retained in the<br />
analysis results as an option.<br />
Faultree is used by a variety of industries<br />
worldwide, including aerospace, defence,<br />
automotive, nuclear, rail, chemical process plant,<br />
oil & gas and medical amongst many others. Fo r<br />
a free demonstration of version 10.1 please call<br />
ARMS Reliability Engineers on 52542922 or<br />
access us on the web at www.reliability.com.au<br />
FavoWeb - Failure Reporting<br />
Analysis & Corrective Action<br />
System<br />
FavoWeb is a Web based Failure Reporting<br />
Analysis & Corrective Action System<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
The Fa v o Web system is a logistic application<br />
allowing collection of failure information and<br />
other types of data like corrective action and<br />
testing from processes related to different<br />
activities of a product in an<br />
organization. The application supports activities<br />
in different Life Cycle Phases like production,<br />
development and maintenance.<br />
One of the most important characteristics
Fa v o Web has is its Definition Flexibility. No<br />
matter what industry the organization belongs to,<br />
the application can be customized to fit the<br />
requirements. This is done with the help of an<br />
administration utility. This utility helps the<br />
company's administrator to define each<br />
functional module (Failure reporting for<br />
instance), to include different input forms, userdefined<br />
fields for each input form, design and<br />
style output reports and even select interface<br />
language.<br />
FMEA-Pro 6<br />
FMEA-Pro 6 simplifies Failure Modes and Effects<br />
Analysis for automotive, aerospace and defense,<br />
electronics and general manufacturers<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
FMEA-Pro 6 simplifies Failure Modes and<br />
Effects Analysis for automotive, aerospace and<br />
defense, electronics and general manufacturers.<br />
FMEA-Pro includes a FMECA template for<br />
criticality analysis and a Control Plan for quality<br />
planning. In addition to export capabilities for<br />
HTML, PDF and Microsoft?Word, this FMEA<br />
software includes FMEA 3rd Edition (QS-9000)<br />
revisions for Design and Process FMEAs.<br />
FRACAS+<br />
Collect, record and analyze system failures across<br />
multiple sites, using The Failure Reporting Analysis<br />
and Corrective Action System (FRACAS).<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove Victoria<br />
3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 357<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.au<br />
Software Details:<br />
A major problem facing organizations today is<br />
there ability to record, analyze and control a<br />
variety of similar failures at various sites. The<br />
Failure Reporting Analysis and Corrective A c t i o n<br />
System (FRACAS) is the latest installment from<br />
English based software leader Isograph.<br />
Isograph have developed the FRACAS+ tool to<br />
compliment its current reliability, availability and<br />
maintainability analysis software suite. The<br />
recording of equipment or system failure is<br />
broken down by site and functional location in a<br />
hierarchical structure that can be easily<br />
understood. Beneath this, the hierarchical tree<br />
A year had passed since Greg had initially called Assetivity - and when he thought back to how things<br />
had been when he had made that call, he was pleasantly surprised by the improvements in<br />
Maintenance performance that Assetivity had been able to help implement.<br />
12 months ago, breakdown maintenance was rampent. The maintenance crew spent most of their<br />
time lurching from one crisis to another. Production targets weren’t being met, and most of the time<br />
Maintenance was to blame. The plant manager was putting pre s s u re on Greg to improve the situation,<br />
and it wasn’t a pleasant place to work.<br />
The improvement had been dramatic, Greg reflected, and had been achieved in a remarkably short<br />
time frame, considering the huge cultural change that had occurred.<br />
N o w, although occasional breakdowns still occurred, they were rare, and were treated as<br />
o p p o rtunities for improvement. Teamwork between Maintenance and Production had never been<br />
b e t t e r, and the plant operators were taking on more responsibility for perf o rming some tasks that had<br />
p reviously been considered to be “maintenance” tasks. Plant perf o rmance had improved, and not<br />
only were production targets now being constantly met, but quality and safety performance had also<br />
improved.<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
can be constructed to any level of complexity.<br />
Failure and repair reports are assigned to a<br />
particular piece of equipment with its<br />
movements to other locations recorded.<br />
Corrective Actions and Failure modes, along with<br />
personnel data details can then be assigned to<br />
each specific part of the failure report.<br />
The advantage of FRACAS over other systems is<br />
that as field failure and other maintenance data<br />
is entered in to the FRACAS system the data is<br />
automatically analyzed. The analyzed FRACAS<br />
data may then be used to optimize planned<br />
maintenance schedules, inspections and design<br />
changes using Isograph’s powerful availability<br />
simulation, reliability centred maintenance and<br />
Weibull software.<br />
Hazop Plus Version 2<br />
HazopPlus provides a visual environment in which<br />
to design and use the study and action forms that<br />
are the basis for entering Hazop information.<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove Victoria<br />
3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 357<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.auSoftware Details:<br />
• Hazop+ Version 2.0 helps you to customise<br />
your Hazop study, it provides a very<br />
But above all, the most dramatic change had been in the people. No longer did people “park their<br />
brains at the gate” on their way to work - the latent talents of the entire workforce were no longer<br />
hidden, everyone had the opportunity to contribute to the best of their ability. And they enjoyed doing<br />
so - a quick walk through the plant showed that you were far more likely to see people with a smile on their face than 12<br />
months ago. Greg, too, was getting far more enjoyment from his work, and this had followed on to his family life also. Greg<br />
wondered briefly whether he would have been able to achieve these gains in the given timeframe without Assetivity’s<br />
assistance… but he already knew the answer<br />
Assetivity Pty Ltd, Operations and Maintenance Consultants, PO Box 1315, Booragoon WA 6154 Ph 08 9474 4044<br />
www.assetivity.com.au<br />
36
37<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
convenient way to enter and store the<br />
Hazop study information which speeds up<br />
the process of recording and managing the<br />
potentially large amounts of information<br />
gathered, and it offers a powerful report<br />
generator for the creation and printing of<br />
professional quality reports.<br />
• Create list of Hazop participants and details<br />
• Create list of items in the system under study<br />
• Create list of parameters<br />
• Create list of guide words<br />
• Associate guide words with appropriate<br />
parameters<br />
• Associate parameters with appropriate items<br />
• Create the study form headings<br />
• Create the action form headings<br />
• Define risk ranking matrices, multiple<br />
matrices upto nine dimensions<br />
• Project Wizard The project wizard simplifies<br />
the creation of new projects. The wizard is<br />
allows the user to select study headings,<br />
action headings, parameters and guide<br />
words from the current library.<br />
• <strong>Library</strong> Facility The supplied library<br />
contains all the study headings, action<br />
headings, parameters and guide words. The<br />
user may add their own study headings,<br />
action headings, parameters and guide<br />
words to this category or create their own<br />
category and add items to that. In addition<br />
to modifying the supplied library the user<br />
may create their own libraries.<br />
For a free demonstration of the software please<br />
call ARMS Reliability Engineers on 52542922 or<br />
access us on the web at www.reliability.com.au<br />
Ivara EXP<br />
Asset reliability software providing real-time asset<br />
health management, performance analysis, and<br />
identification of the right work at the right time.<br />
Company Information:<br />
Name: Ivara Corporation<br />
Address: 935 Sheldon Court<br />
Burlington, Ontario<br />
L7L 5K6 Canada<br />
Contact: Ann Christie<br />
Email: ann.christie@ivara.com<br />
Web: www.ivara.com<br />
Software Details:<br />
EXP reliability software enables you to<br />
implement an asset reliability strategy. This<br />
innovative and easy-to-use software supports a<br />
reliability-based approach to asset management.<br />
EXP is a system that Maintenance and<br />
Operations use, day-to-day, to manage the health<br />
of their assets and to identify the right work at<br />
the right time to optimize asset reliability and<br />
drive business results - fast.<br />
The financial and business benefits of a<br />
reliability-driven approach to asset management<br />
are huge. Increased asset reliability reduces costs<br />
and increases output. Within three years,<br />
customers realize, on average, a recurring annual<br />
improvement of 20% of the maintenance budget.<br />
LCC Ware Version 3.0<br />
lccWare allows the user to define the cost<br />
elements of a system during its lifetime, from<br />
inception to disposal.<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove Victoria<br />
3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 357<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.au<br />
Software Details:<br />
Life cycle costing is a methodology for<br />
calculating the whole cost of a system from<br />
inception to disposal. The system will vary from<br />
industry to industry and could for instance be a<br />
building, a ship, a weapon system or a power<br />
station. Whatever the system, the life cycle<br />
costing technique will be the same, the major<br />
items of cost will be defined through its life.<br />
These items could include research and<br />
development, construction, operation and<br />
maintenance and disposal. The items may be<br />
further subdivided until the cost of each element<br />
can be defined as a mathematical equation. At a<br />
simple level this may be the number of manhours<br />
multiplied by a cost rate. The elements of<br />
cost will then be added together to give the total<br />
cost for each item and a grand total for the<br />
system through its full life. As the project<br />
develops you will want to alter your life cycle cost<br />
analysis model accordingly and you will also want<br />
to carry out sensitivity studies and cost trade off<br />
studies. Each of these will be require a<br />
recalculation of the model. lccWare gives you the<br />
power to create and develop a life cycle cost<br />
model in a familiar interactive visual<br />
environment. lccWare also provides you with<br />
professional quality reports. For a free<br />
demonstration of the software please call A R M S<br />
Reliability Engineers on 52542922 or access us<br />
on the web at www.reliability.com.au<br />
LOGAN Fault & Event tree<br />
Analysis Tool<br />
LOGAN FT&ET enables the construction and<br />
evaluation of fault and/or event trees and is widely<br />
used for Quantified Risk Assessment (QRA).<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
The well-established LOGAN Fault and Event<br />
Tree module enables the construction and<br />
evaluation of fault and/or event trees and is<br />
widely used for Quantified Risk A s s e s s m e n t<br />
(QRA). It allows the results from fault tree<br />
analysis to be incorporated into an event tree to<br />
provide a complete evaluation of the probability<br />
of hazards of various severities.<br />
LOGAN Monte Carlo<br />
Simulation Tool<br />
The LOGAN Monte Carlo analysis module is<br />
suitable for the evaluation of the availability of<br />
complex systems or processes.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
The LOGAN Monte Carlo analysis module is<br />
suitable for the evaluation of the availability of<br />
complex systems or processes. It allows the<br />
effects to be assessed of different levels of<br />
r e d u n d a n c y, standby arrangement, spares<br />
holdings, levels of manning, etc. It also enables<br />
time-dependent failure probabilities<br />
MaDCAT<br />
MaDCAT is a tool for categorization and analysis<br />
of experience data from the maintenance process.<br />
Company Information:<br />
Name: SYSTECON AB<br />
Address: BOX 5205<br />
SE10245 STOCKHOLM<br />
SWEDEN<br />
Contact: Oskar Tengo<br />
Email: systecon@systecon.se<br />
Web: www.systecon.se<br />
Software Details:<br />
M a D CAT (Maintenance Data Categorization<br />
and Analysis Tool) has special emphasis on<br />
analysing development of reliability, cost and<br />
system performance over time.<br />
For breakdown and accumulation of data (cost,<br />
number of events etc), MaDCAT uses a unique<br />
flexible combination of user-defined hierarchical<br />
structures, cost elements and information<br />
categories.<br />
MaDCAT analyses events as a function of time<br />
or any other time-based parameter. Tr e n d<br />
analysis is used to discover changes in event<br />
flows. Sequential test plans can be applied to<br />
verify failure flows. Analysis of failure intensity<br />
is used to determine maintenance intervals.<br />
Data is easily imported and exported from<br />
customer’s data sources.<br />
MaintenanceMax<br />
MaintenanceMax is the performance support<br />
system for maintenance personnel: a web-enabled<br />
tool that integrates procedures, schematics,<br />
training, forms, and more<br />
Company Information:<br />
Name: REI Systems, Inc.<br />
Address: 7620 Little River Turnpike, Suite 500,<br />
Annandale, Virginia 22003 USA<br />
Contact: Anna Liisa Van Mantgem
Phone: 1-703-256-2245<br />
Fax: 1-703-256-9372<br />
Email: avanmantgem@reisys.com<br />
Web: www.maintenancemax.com<br />
Software Details:<br />
MaintenanceMax is a portable, rugged, webenabled<br />
job aid that integrates procedures,<br />
schematics, training, illustrated parts<br />
breakdowns, forms, and other maintenance data<br />
into one user-friendly kit. Data is presented how<br />
maintenance technicians want it: task-based,<br />
with diagrams, references, part ordering, and<br />
more just a click or two away. MaintenanceMax<br />
is a complimentary technology for your<br />
CMMS/EAM. Features include: annotation<br />
c a p a b i l i t y, 3D equipment breakdown animations,<br />
wire tracing diagrams, automated work order<br />
completion, drag-and-drop content authoring,<br />
and more. Cost varies; site survey and pilot<br />
usually $30K-$100K (USD); ROI is easily<br />
achieved for organizations with 10+ maintainers.<br />
Microsoft XP or NT operating system required.<br />
Masterpiece<br />
Award winning software Masterpiece, cleans and<br />
manages large engineering databases. Masterpiece<br />
provides a cost effective solution to cleaning ‘dirty’<br />
data.<br />
Company Information:<br />
Name: The Asset Partnership Pty Ltd<br />
Address: Suite 1, 2 Culdees Road, BURWOOD<br />
NSW, 2136<br />
Contact: Stephen Young<br />
Email: mail@assetpartnership.com<br />
Web: www.assetpartnership.com<br />
Software Details:<br />
Masterpiece is sparesFinder’s award-winning<br />
system for cleaning and managing large<br />
engineering inventory databases. Masterpiece<br />
delivers a cost effective, web-based solution to a<br />
long standing problem of poor quality data in<br />
large inventory databases.<br />
The system has been designed to address the<br />
needs of large, complex organisations, particularly<br />
where improving and then maintaining data<br />
quality to a common standard will allow them to<br />
properly leverage ERP software investments. As<br />
well as a multi-lingual user interface, the system<br />
is designed to process legacy data supplied in<br />
many languages to produce a descriptive output<br />
in the desired language and format.<br />
Masterpiece operates independently of private<br />
cataloguing schemes and standards, and allows you<br />
to choose the approach which best suits your business<br />
needs. Masterpiece enables each line of your data to<br />
be cleaned in the most cost effective way.<br />
The sophisticated cleaning tools, pattern<br />
recognition capabilities and inventory dictionaries<br />
automate the task wherever 100% certainty of<br />
output is possible. Where manual intervention is<br />
required, the system provides a sophisticated<br />
interface to structure definitions and control the<br />
workflow and approval process.<br />
Masterpiece encourages a focus on value,<br />
allowing you to get data cleaned in the way which<br />
gives you most business benefit.<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
MEADEP - Measurement-<br />
Based Dependability Analysis<br />
Tool.<br />
Measurement-Based Dependability Analysis Tool.<br />
Sophisticated System Reliability - Availability<br />
Modelling Made Simple<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safety-<br />
software.com<br />
Software Details:<br />
Measurement-Based Dependability A n a l y s i s<br />
Tool.<br />
Sophisticated System Reliability - Av a i l a b i l i t y<br />
Modelling Made Simple!<br />
MEADEP consists of four modules. These<br />
modules are:<br />
• Data Pre-Processor (DPP)<br />
• Data Editor and Analyzer (DEA)<br />
• Model Generator (MG)<br />
• Model Evaluator (ME)<br />
38
39<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
ME Analyst<br />
ME Analyst is a maintenance engineering software<br />
suite that assists maintainers to conduct various<br />
maintenance analysis methodologies such as<br />
FMECA and RCM.<br />
Company Information:<br />
Name: GHD<br />
Address: Level 8, 180 Lonsdale St.<br />
Melbourne 3000<br />
Contact: Nicholas Phillips<br />
Phone: 613 8687 8000<br />
Fax: 613 8687 8111<br />
Email: maintenance_engineering@ghd.com.au<br />
Software Details:<br />
• Reliability Centered Maintenance (RCM)<br />
• Failure Mode, Effects and Criticality<br />
Analysis (FMECA)<br />
• Maintenance Task Analysis (MTA)<br />
• System lead step-by-step decision process<br />
• Automatic calculation of failure mode<br />
criticality, item criticality and task intverval<br />
• Complete history of original and subsequent<br />
analysis<br />
• Training is available<br />
MINCOM LinkOne<br />
LinkOne is an illustrated parts catalogue and<br />
documentation software which allows users to<br />
identify parts and maintain the equipment quickly<br />
and efficiently.<br />
Company Information:<br />
Name: GHD<br />
Address: Level 8, 180 Lonsdale St.<br />
Melbourne, 3000<br />
Contact: Hakim Mentes<br />
Phone: 03-8687 8000<br />
Fax: 03-8687 8111<br />
Email: maintenance_engineering@ghd.com.au<br />
Software Details:<br />
• Easy identification of parts by linking items<br />
on parts list to call outs on drawings.<br />
• Incorporating parts lists to manuals (html,<br />
pdf, doc)<br />
• Integration to major asset management<br />
software such as MINCOM Ellipse, SAP,<br />
etc<br />
• Web based viewer or stand alone viewer<br />
• Comes in two parts; LinkOne Viewer and<br />
Publisher<br />
System Requirement<br />
• Windows ME, 2000 or XP<br />
• 64 MB of RAM<br />
• 20 MB of space on hard disc (60 MB space<br />
for Publisher)<br />
• Microsoft IE 5.5 or higher<br />
NAP<br />
The Network Availability Program (NAP) enables<br />
users to predict the availability and reliability of<br />
communication networks.<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove Victoria<br />
3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 357<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.au<br />
Software Details:<br />
The Network Availability Program (NAP)<br />
enables users to predict the availability and<br />
reliability of communication networks. The NAP<br />
network availability model utilizes an extended<br />
Reliability Block Diagram (RBD) methodology<br />
that addresses the specific characteristics of<br />
network elements and their connections.<br />
Some of the extra features of NAP include:<br />
• Criticality Ranks<br />
• Parts <strong>Library</strong> allowing easy importing of<br />
parts data in their conveinient groups<br />
• Network Element <strong>Library</strong> allows easy<br />
construction of common network element<br />
diagrams<br />
Complex or simple networks may be modeled<br />
using NAP. Network elements may be logically<br />
modeled right down to part level using the<br />
powerful NAP pagination facility. Individual<br />
network elements diagrams have been extended<br />
beyond traditional RBDs to allow users to model<br />
multiple interfaces and their interactions with<br />
common equipment. Users may also restrict the<br />
analysis to network paths traversing a limited<br />
number of network elements (limiting the ‘hop’<br />
number). This useful feature eliminates<br />
unrealistic ‘snake like’ paths in complex networks.<br />
OPUS10<br />
OPUS10 is a comprehensive and flexible tool for<br />
spares optimisation and logistics support analysis,<br />
enabling maximum availability at minimum cost.<br />
Company Information:<br />
Name: SYSTECON AB<br />
Address: BOX 5205<br />
SE10245 STOCKHOLM<br />
SWEDEN<br />
Contact: Oskar Tengo<br />
Email: systecon@systecon.se<br />
Web: www.systecon.se<br />
Software Details:<br />
OPUS10 is the world-leading tool for cost<br />
effective spares optimisation, life support costing<br />
and evaluation of maintenance and supply<br />
concepts. Furthermore it includes the powerful<br />
LORA XT for system based, optimal allocation<br />
of repair resources.<br />
OPUS10 features a very flexible multi indenture,<br />
multi echelon model that accommodates any<br />
technology or support organisation. It can model<br />
flexible/lateral re-supply/backorder priority,<br />
preventive/ corrective maintenance as well as<br />
repairables, discardables and partly repairables.<br />
The optimisation is made from a system<br />
perspective and will facilitate increased<br />
availability combined with savings of 20-40%<br />
compared with other methods.<br />
PHA-Pro 6<br />
PHA-Pro 6 is the best-selling PHA software tool in<br />
the world.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
PHA-Pro 6 is the best-selling PHA software tool<br />
in the world, empowering process and allied<br />
industries to consistently document HAZOP,<br />
What If, Checklist, FMEA, SIL, LOPA, SVA ,<br />
PrHA and many other risk studies. Data analysis<br />
statistics, charting capabilities, and Microsoft<br />
Visio?integration make this an indispensable tool<br />
for almost any type of hazard analysis. Feature by<br />
feature, no other PHA software or HAZOP<br />
software compares to PHA-Pro..<br />
PMO2000<br />
Manages the initial review and creation of a<br />
maintenance strategy and the continuous<br />
improvement process that follows in a Reliability<br />
Assurance program.<br />
Company Information:<br />
Name: OMCS International<br />
Address: 7 / 92 Railway St Sth<br />
Contact: Steve Turner / Cameron Russell<br />
Phone: 61 3 9315 0330<br />
Email: steve@omcs.bz<br />
Web: www.reliabilityassurance.com<br />
Software Details:<br />
Planned Maintenance Optimisation (PMO) has<br />
become the preferred approach for defining the<br />
maintenance requirements of the physical assets<br />
of many of the world’s major companies. It has<br />
replaced RCM in these organizations because of<br />
its speed and the fact that PMO2000TM<br />
produces the same maintenance program as<br />
RCM in one sixth of the time with one sixth of<br />
the resource requirements. Together with our<br />
other tools, a typical outcome of our programs is<br />
that maintenance related downtime can be<br />
reduced by half in between 6 to 12 months.<br />
PMO2000TM is the software that supports the<br />
initial analysis and the subsequent continuous<br />
improvement of the maintenance activity.<br />
Combined with RIMSys and your downtime data<br />
collection system, PMO2000TM creates the<br />
baseline for your complete asset management<br />
and reliability assurance program.<br />
Key features:<br />
• Creates a comprehensive FMEA for<br />
reviewing.<br />
• Outputs schedules into Word or Adobe pdf<br />
documents that link seamlessly with<br />
modern CMMS.<br />
• Full import and export capability.<br />
• Performs labour balancing and resource<br />
budgeting functions.<br />
• Cuts grouping and review of RCM outputs<br />
by 90% over traditional methods.<br />
• Can perform both PMO and RCM analysis.<br />
• Fully networked with user’s access levels<br />
controlled by password.<br />
• Allows for the use of libraries to develop<br />
generic strategies.
• Now built on MSSQL database and<br />
available in Chinese.<br />
Used by nearly 100 sites around the world.<br />
Get your free evaluation copy available from<br />
www.reliabilityassurance.com.<br />
qRA Toolkit<br />
qRA Toolkit is locally developed software for<br />
qualitative Risk Analysis in accordance with<br />
AS/NZS 4360, 3931 and MDG 1010<br />
Company Information:<br />
Name: The Asset Partnership Pty Ltd<br />
Address: Suite 1, 2 Culdees Road, BURWOOD<br />
NSW, 2136<br />
Contact: Shane Chiddy<br />
Email: mail@assetpartnership.com<br />
Web: www.assetpartnership.com<br />
Software Details:<br />
Risk is an inherent part of everything we do and<br />
the qRA Toolkit is a unique software program to<br />
make possible the management of risk in a<br />
structured, systematic and defensible manner.<br />
As organisations face risks from all directions, a<br />
formal approach to Risk Management is<br />
essential. An organisation that has learned how<br />
to manage risks effectively will be able to make<br />
informed decisions and operate safely and<br />
efficiently.<br />
The qualitative approach does not require group<br />
members to be skilled in mathematics and is<br />
designed to create a valid and defensible risk<br />
Wells Work Scheduler<br />
assessment, even when hard data is not available.<br />
The qRA Toolkit leads the risk analysis facilitator<br />
through the risk identification and management<br />
process as defined by AS/NZS 4360, 3931 (IEC<br />
60300-3-9) and MDG 1010.<br />
This software was developed in A u s t r a l i a<br />
specifically for Australian and New Zealand<br />
Industry and is fully supported with<br />
comprehensive training. The software is<br />
available in stand-alone and network versions.<br />
The qRA Toolkit features a report generator<br />
which provides the complete risk analysis report<br />
in the right order in addition to:<br />
• Documentation of the analysis systems and<br />
sub-systems<br />
• Documentation of hazards, effects and<br />
existing controls<br />
• Selection and analysis of hazards requiring<br />
additional controls<br />
• Relative risk calculations using the<br />
probability/consequence matrix<br />
• Documentation of additional control, their<br />
cost/benefit and associated action plans<br />
• Automated sorting in risk, consequence,<br />
person responsible and required date<br />
• Common secure database for all risks<br />
• Built in audit and review capability<br />
RAM Commander R & M Tool<br />
RAM Commander is a Reliability and<br />
Maintainability software for reliability<br />
professionals and design engineers.<br />
This Advanced scheduling application provides the missing link between Maintenance and<br />
Operations so that jobs can be easily scheduled around the availability of equipment. It also<br />
enables the maintenance schedule to react quickly to windows of unexpected equipment<br />
availability to optimise maintenance utilisation and reduce future downtime.<br />
The Wells Work Scheduler will vastly improve maintenance scheduling in order to maximise<br />
resource utilisation and minimise equipment downtime.<br />
The Wells Work Scheduler comes with a 30 day money back guarantee, so can you aff o rd not to try !<br />
Take Control. Gantt and Resource Usage views clearly shows the automatically generated task<br />
schedule and resource utilisation. Tweak the schedule with manual overrides to control specific<br />
tasks, if required.<br />
Ideal for Shutdown planning! Work can be broken-down hierarchically, as required, to<br />
efficiently schedule and allocate work packages. Work can be structured on attributes<br />
including: Equipment Group, Location, Responsibility and Task Type.<br />
Manage resources graphically by setting calendar rules and resource<br />
availability. Adding extra shifts or contract resources can be<br />
accomplished in seconds.<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safety-<br />
software.com<br />
Software Details:<br />
RAM Commander is a Reliability and<br />
Maintainability software for reliability<br />
professionals and design engineers. This powerful<br />
software program covers the entire scope of<br />
engineering tasks related to reliability of<br />
electronic, electro-mechanical, and mechanical<br />
systems.<br />
Modules cover:<br />
• Reliability Prediction<br />
• Reliability Block Diagram<br />
• Maintainability<br />
• Spare Parts Analysis & Optimisation<br />
• Derating Guidelines and Reports<br />
• FMECA Analysis<br />
• Testability Analysis<br />
• Process & design FMEA<br />
• Fault Tree Analysis<br />
Makeover your work<br />
planning and scheduling<br />
with Wells Work Scheduler<br />
Automatically Schedule work around<br />
equipment availability, work priority and<br />
maintenance Resources.<br />
Link Operations and Maintenance to<br />
maximise resource utilisation and<br />
minimise equipment downtime.<br />
Ideal for Shutdown Planning to efficiently<br />
schedule and allocate work packages.<br />
Integration with CMMS applications<br />
for seamless generation and scheduling<br />
of maintenance task<br />
Phone 0419 413 139 Fax 02 9402 4532<br />
www.thesoftwarewell.com.au info@thesoftwarewell.com.au<br />
Save Time… Save Money… with Wells Work Scheduler<br />
40
MEX operates on all current Windows platforms<br />
including ‘95 ‘98 ‘00 NT & XP. It also allows the<br />
user to report directly into Word, Excel and Access.<br />
It is recommended that you have at least 32 Mb<br />
Ram, 152 Mb Hard Disk space and an 800 x 600<br />
display option with 256 colours.<br />
Other solutions available from Maintenance Experts<br />
include: FLEETMEX, MEX OPS, MEX STORES,<br />
EASYTIME, FUEL MEX, MEX LINKS & MEX<br />
INSPECTIONS.<br />
Your Maintenance - Our Expertise. Over 2400 Users Worldwide
M E X<br />
M A I N T E N A N C E<br />
M A N A G E M E N T<br />
S O F T W A R E<br />
Reduce Costs, Improve efficiency and help harness the full potential<br />
of your maintenance operation. MEX gives companies all the power to take<br />
c o n t rol of their maintenance operation. Whether you are managing the maintenance<br />
of a Processing Plant, Factory, Building Facility or even providing Contract<br />
Maintenance services, MEX has the flexibility to accommodate any situation. Let MEX<br />
launch your operation towards significant improvements in efficiency and pro d u c t i v i t y.<br />
Equipment Register<br />
A complete asset register, accurately<br />
tracking the value and status of all of<br />
your equipment.<br />
Work Orders<br />
Increase efficiency and profits, know<br />
who did what work, what it cost and<br />
when it was completed. Schedule and<br />
utilize your resources effectively.<br />
MEX’S Powerful Features Include:<br />
Equipment Usage/Performance<br />
Condition reporting. Record and monitor<br />
readings by any type including hours<br />
used, Kpa, km etc<br />
Maintenance Policies<br />
Reduce breakdowns and control routine<br />
preventive maintenance with automatic<br />
work orders and standard jobs.<br />
Reporting<br />
Essential and accurate information<br />
immediately. Customise your reports and<br />
graphs, and export to third party<br />
applications.<br />
MEX FROM $2178*<br />
FREE CD DEMONSTRATION<br />
COPY OF MEX<br />
History<br />
All your equipment history for<br />
performance and comparative analysis<br />
and life cycle costing.<br />
Stores<br />
Complete inventory management from<br />
issuing spares to vital information on<br />
parts availability and consumption.<br />
Invoicing<br />
Simple invoicing for customer<br />
maintenance work completed direct from<br />
your work orders.<br />
Inspections<br />
Utilise MEX and hand held devices to<br />
address risk management and safety<br />
obligations. Perform routine inspections<br />
and upload results into MEX with a press<br />
of a button.<br />
Work Requests<br />
Save time and eliminate paperwork.<br />
Remote requesting module to accurately<br />
track, approve, and monitor work<br />
requests.<br />
Just fax this form to Maintenance Experts +61 7 3392 4888 or mail to:<br />
MEX Maintenance Experts PO BOX 6118 Buranda Qld Australia 4102<br />
Name/Position:<br />
Company:<br />
Address:<br />
✂<br />
Phone: Fax:<br />
www.mex.com.au<br />
Equipment Register<br />
• View add and update all details from<br />
within a selected record<br />
• Record and report on details of<br />
supplier, costs, purchases date etc<br />
• Equipment movement tracking<br />
• Location hierarchy to any branch of<br />
equipment<br />
• Region/department hierarchy<br />
• Inclusion of all equipment details<br />
including graphics/pictures<br />
• Security and User access levels<br />
Work Orders<br />
• Multiple jobs for a work order<br />
• Resource and plan Labour, Materials<br />
and time<br />
• Prioritise, report on and control work<br />
in progress<br />
• Estimated and actual job costs<br />
• Internet and Intranet Work Requesting<br />
• Graphical schedules & tracking of work<br />
Readings<br />
• Monitor plant readings<br />
• Track plant usage times<br />
• Graph results<br />
Equipment usage/Performance<br />
• R e c o rd and re p o rt on any reading type<br />
• Calculate average usage rates for<br />
equipment<br />
• Report on equipment performance<br />
Maintenance Policies<br />
• Schedule work by conditions, hours<br />
used, km, months etc<br />
• Automatic work order creation<br />
• Standard jobs<br />
• Allocation and management of job<br />
spares, people and costs<br />
• Attach files to Policies<br />
Invoicing<br />
• Invoicing of work completed<br />
• Create invoices directly from Work<br />
Orders<br />
• Complete breakdown of costs, labour<br />
and parts<br />
• Invoice matching to line item level<br />
• Customer specific pricing<br />
Drawings<br />
• Complete Drawings register<br />
• Store equipment listing for each<br />
drawing<br />
History<br />
• Life cycle of costing and comparative<br />
analysis<br />
• Failure analysis codes<br />
• Full work details including description,<br />
labour parts<br />
• Account code charges<br />
• Down time/Repair time<br />
Reports<br />
• Ease of data capture<br />
• User customizable reports<br />
• Export data quickly and accurately
43<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
RAMP - Plant Availability<br />
Modelling Tool<br />
RAMP is a powerful availability modelling package<br />
developed specifically for the analysis of process<br />
systems.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
Do you know what are the most critical items of<br />
equipment on your plant? Do you know how<br />
often they fail and what the consequences on<br />
production are when they do? The answers to<br />
these questions can have a dramatic effect on<br />
your operations and maintenance strategies and<br />
also on bottom line performance.<br />
RAMP is a powerful availability modelling<br />
package developed specifically for the analysis of<br />
process systems. RAMP models the effects of<br />
scheduled and unscheduled downtime on<br />
process throughput, establishing relationships<br />
between equipment reliability, configuration,<br />
maintenance strategy, spares and resources.<br />
Raptor Reliability Simulation<br />
Tool<br />
The graphical user interface and strong emphasis<br />
on human factors make Raptor the pre-eminent<br />
reliability analysis tool.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
Raptor software allows a reliability novice to quickly<br />
model a system. The graphical user interface and<br />
strong emphasis on human factors make Raptor<br />
the pre-eminent reliability analysis tool.<br />
Because Raptor is so easy to use, there has been<br />
an explosion of requests from academic<br />
institutions for the tool; however, educators are<br />
not the only users. More than 2,500 commercial<br />
and government organizations also have copies<br />
of this tool. In addition, hundreds of customers<br />
in more than 75 countries use Raptor.<br />
RCA Rt - Root Cause Analysis<br />
RCA Rt software guides users through the problem<br />
solving process. It incorporates a management<br />
system where data, logic and solution history can<br />
be referenced to identify patterns and trends.<br />
Company Information:<br />
Name: RCA Rt Pty Ltd<br />
Address: GPO Box 407, Melbourne 3001<br />
Contact: Melissa Cameron<br />
Phone: 03 9248 1381<br />
Fax: 03 9248 1388<br />
Email: Melissa.cameron@sirfrt.com.au<br />
Web: www.rcart.com.au<br />
Software Details:<br />
R CA Rt is a comprehensive incident<br />
management system that is integrated with a<br />
thorough Root Cause Analysis process. RCA Rt<br />
is a straightforward and intuitive process. It is<br />
powerful productivity improvement tool that:<br />
• Enhances a culture of continuous<br />
improvement<br />
• Encourages better use of resources<br />
• Improves problem solving skills<br />
• Reduces recurring problems<br />
• Improves job satisfaction<br />
• Reduces operating cost<br />
• Entirely suited for the shop floor<br />
The RCA process may be enhanced by software<br />
to create a system to manage and analyse<br />
incidents and promote defect elimination. The<br />
software is a flexible package that guides users<br />
through the problem solving process in easy to<br />
follow steps.<br />
Use of this software:<br />
• Greatly enhances the speed and the depth<br />
of the RCA process,<br />
• Displays the cause tree as it grows<br />
• Allows easy amendment of the cause tree,<br />
• Ensures that no important information<br />
source is overlooked,<br />
• Incorporates information gained from<br />
brainstorming, practical investigations or<br />
other sources.<br />
• Facilitates follow up with action plans<br />
clearly identified<br />
• Records data, information and logic for<br />
future reference, and<br />
• Provides a simple and professional reporting<br />
tool.<br />
The corporate version has an administration<br />
module that enables management of incidents<br />
and conditions and provides a powerful search<br />
tool that assists with the identification of trends<br />
and repeating problems.<br />
Suitable for use on a site wide network or stand<br />
alone PCs’. RCA Rt is an Australian product with<br />
local software support that may be implemented<br />
with significant cost savings.<br />
RCM Toolkit<br />
Specifically designed to support SAE JA1011<br />
compliant RCM, this proven and robust software<br />
makes your RCM analysis easy and fast.<br />
Company Information:<br />
Name: The Asset Partnership Pty Ltd<br />
Address: Suite 1, 2 Culdees Road, BURWOOD<br />
NSW, 2136<br />
Contact: Stephen Young<br />
Email: mail@assetpartnership.com<br />
Web: www.assetpartnership.com<br />
Software Details:<br />
This software supports an RCM II process that<br />
complies with SAE JA 1011 and is used by the<br />
world leaders in the application of RCM.<br />
The RCM II process is designed to develop the<br />
most appropriate processes to manage the<br />
consequences of equipment failure and this<br />
software, developed to support complaint RCM<br />
analysis, quickly leads the RCM facilitator<br />
through the analysis process to determine the<br />
most appropriate maintenance at the right<br />
balance of risk, cost and performance. A<br />
particular feature of this software is the way in<br />
which the most appropriate management policies<br />
are developed using the Failure Finding Interval<br />
(FFI) calculator.<br />
This software provides all the features expected<br />
of an SAE JA1011 compliant RCM analysis in<br />
addition to a wide range of standard and user<br />
created reports to support your maintenance<br />
process including RCM worksheets in standard<br />
format, work packages sorted by task, frequency<br />
and skill set, fault finding guide (which allows<br />
for easy system fault diagnosis and hence a faster<br />
return to service), analysis statistics plus many<br />
more.<br />
The user can also easily merge maintenance tasks<br />
and create maintenance task packages for<br />
migration to your CMMS while maintaining the<br />
all important audit trail.<br />
The software is fully supported by a proven and<br />
world class training program and unlimited<br />
technical support. Available as standalone,<br />
network and internet versions.<br />
RCM Turbo<br />
Leading expert decision support methodology for<br />
the implementation of the principles of reliability<br />
centred maintenance and development of new,<br />
optimised maintenance schedules.<br />
Company Information:<br />
Name: Strategic Corporate Assessment<br />
Systems Pty Ltd<br />
Address: P.O. Box 427 Heidelberg,<br />
Vic, 3084 Australia<br />
Contact: Chris Kelly<br />
Phone: 03 9455 2211<br />
Fax: 03 9455 2233<br />
Email: chris.kelly@strategicorp.com<br />
Web: http://www.strategicorp.com<br />
Software Details:<br />
RCM Turbo was developed by and for<br />
maintenance professionals. Its process<br />
incorporates the established principles of<br />
reliability centred maintenance, with a strong<br />
business-based approach. It is a sound platform<br />
for the development of revised maintenance<br />
practice and evolution from reactive<br />
environments through to planned, lower cost,<br />
higher process reliability environments.<br />
The thrust of an RCM Turbo assessment is to<br />
put before assessors all the best available<br />
information required to facilitate and justify<br />
decisions. A number of expert components are<br />
combined to provide an information flow which<br />
leads directly to new, optimised maintenance<br />
schedules ready for export and implementation<br />
in the existing computerised maintenance<br />
management system. These include a criticality<br />
assessment, which prioritises equipment for<br />
assessment and strongly contributes to the<br />
'thoughtware' component of a reliability analysis.<br />
The detailed failure modes and effects analysis<br />
component of an RCM Turbo assessment
encourages assessors to explore alternative<br />
scenarios in order to gauge the resultant effects<br />
on both reliability and cost to the business. RCM<br />
Turbo seeks first to explore whether any<br />
predictive maintenance is technically (then on a<br />
cost basis) effective. If a predictive task cannot<br />
be found, then any preventative actions are<br />
explored. The full implication of doing no<br />
maintenance (or operate to failure) is then<br />
examined, so that in every significant decision<br />
there is a clear comparison between any new,<br />
planned environment and a scenario of operating<br />
to failure. RCM Turbo then provides a primary<br />
task optimisation module to support the decision<br />
on how often to perform these cost effective<br />
inspections.<br />
All the assessment is aimed at the minimisation<br />
of business consequence in the event of both<br />
operational and safety/environmental failure.<br />
Final optimised schedules are generated by RCM<br />
Turbo after a process of automatic generation of userdefined<br />
workgroups along with a workflow smoothing<br />
facility which matches the newly optimised activities<br />
to available maintenance resources.<br />
The successful usage of RCM Turbo is<br />
dependent on the level of assessor knowledge<br />
and understanding of reliability principles. RCM<br />
Turbo is not just a piece of software, it is a<br />
platform underpinning the methodology. Thus an<br />
implementation of RCM Turbo is carefully<br />
planned in the format of a high profile project,<br />
with defined deliverables and expected<br />
outcomes. Appropriate end user training is always<br />
scheduled as part of the project.<br />
The importance of local ownership, buy-in and<br />
commitment cannot be underestimated in an<br />
implementation of a project aimed at a review of<br />
maintenance strategy across a site.<br />
Strategic provides support services at all stages<br />
of a reliability project, carefully balancing local<br />
ownership implications with the need to provide<br />
the required deliverable.<br />
RCM Turbo is a 32 bit Windows (9x, NT, XP)<br />
application provided on CD-ROM for standalone<br />
or network use. Licences are provided on a<br />
perpetual basis, for unlimited users.<br />
Hardware required is Pentium level or better.<br />
Costings including training, implementation,<br />
audit, review and corporate licences are provided<br />
on application.<br />
RCM Professional 3.0<br />
RCM Pro 3.0 is an easy-to-use yet powerful<br />
reliability software program designed to hold,<br />
manipulate, and analyze Reliability-Centered<br />
Maintenance or FMEA data in an intuitive,<br />
structured, and flexible way.<br />
Company Information:<br />
Name: SNOINO.com<br />
Address: Broadhaugh Building Suite 110<br />
Camphill Road Broughty Ferry<br />
Dundee DD5 2ND Scotland<br />
Contact: Mr. V. Narayan<br />
Phone: +44 (0) 1382 803070<br />
Fax: +44 (0) 1382 737736<br />
Email: vee@snoino.com<br />
Web: www. snoino.com<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
Software Details:<br />
RCM Pro will hold any number of projects, with<br />
only one being open for input at any one time. A<br />
project may be of any size, from a single function<br />
with an associated functional failure and failure<br />
mode, to (for example) the safety systems on an<br />
oil platform.<br />
FREE evaluation trial (full program plus sample<br />
analysis) available.<br />
h t t p : / / w w w. s n o i n o . c o m / r e l i a b i l i t y - m a i n t e n a n c e -<br />
optimization-software.htm for further functional<br />
details and costs.<br />
RCMCost Version 4.0<br />
RCMCost helps oragnisations minimize costs,<br />
reach operational and environmental goals by<br />
providing a visual environment to decide the<br />
optimum preventive and inspection maintenance<br />
actions through a FMECA and powerful simulation<br />
facility.<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove<br />
Victoria 3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 357<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.au<br />
Software Details:<br />
RCMCost is a 32-bit application which runs<br />
44
45<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
under Microsoft Windows and provides the data<br />
management, reporting andanalytical facilities for<br />
developing and maintaining a Reliability-Centred<br />
Maintenance (RCM) programme. These<br />
facilities include :<br />
• Graphically constructed system hierarchy<br />
diagram<br />
• Failure Mode Effects and Criticality<br />
Analysis (FMECA)<br />
• Identification of critical failure modes<br />
• Advice for decision making based on<br />
performance simulation<br />
• Redundancy modelling<br />
• Weibull analysis of field data<br />
• Optimisation plots for alternative<br />
maintenance strategies<br />
• Group maintenance modelling<br />
• Flexible reporting providing customised<br />
worksheets<br />
• Copy and paste facilities for data transfer<br />
• Import/Export to databases and<br />
spreadsheets<br />
The RCMCost computer program provides the<br />
full framework for building the RCM model to<br />
represent your plant. It provides facilities for<br />
storing RCM data and analysing maintenance<br />
alternatives. It provides simulation algorithms to<br />
predict lifetime maintenance costs, spares costs<br />
and usage, maintenance crew manning<br />
requirements, safety and environmental risks and<br />
operational performance. In addition RCMCost<br />
identifies critical failure modes and compares the<br />
cost, safety and operational benefits of different<br />
maintenance intervals. The program is designed<br />
to combine well-established reliability prediction<br />
techniques with engineering experience. The<br />
program does not decide on which maintenance<br />
policy or combination of policies to adopt.<br />
Instead it advises the individual user or<br />
workgroup based on the operational data<br />
provided. The program may be used to filter the<br />
most critical item (component) failures before<br />
detailed maintenance decisions are made. For a<br />
free demonstration of the recently released<br />
Version 4.1 please call ARMS Reliability<br />
Engineers on 52542922 or access us on the web<br />
at www.reliability.com.au<br />
RCMeasy<br />
RCMeasy automates a re-defined RCM process<br />
with a strong emphasis on failure mode effect<br />
analysis, which it does very well.<br />
Company Information:<br />
Name: MCP AMIS Pty Ltd<br />
Address: 21 Activity Crescent, Ernest QLD 4214<br />
Contact: Tony Osborn<br />
Phone: 07 55646637<br />
Fax: 07 55646638<br />
Email: enquiries@mcp-cg.com<br />
Web: www.mcp-cg.com<br />
Software Details:<br />
The management of maintenance has become a<br />
central focus in the improvement of business<br />
performance. The need to reduce the cost of<br />
maintenance whilst maintaining high levels of<br />
plant reliability and availability is the key<br />
objective of RCMeasy.<br />
The RCMeasy technique involves the analysis of<br />
plant, machinery, equipment, buildings or other<br />
assets to develop the most effective maintenance<br />
strategy plan for the organisation. The RCMeasy<br />
approach can be used for existing processes and<br />
equipment or when developing maintenance<br />
plans for new sites or processes. A typical project<br />
involves a knowledgeable person acting as<br />
f a c i l i t a t o r, and staff drawn from the engineering,<br />
operational and production departments.<br />
The project team use their experience to<br />
determine the most critical items of equipment<br />
in the process and apply the RCMeasy technique<br />
to identify the most effective means of<br />
maintenance. The project data is captured and<br />
analysed using the RCMeasy software.<br />
RCMeasy can import equipment register data for<br />
an existing system, guides the user through<br />
criticality analysis and supports Failure Mode<br />
Analysis to produce maintenance tasks, times,<br />
frequency and resource requirements.<br />
Information produced can them be uploaded<br />
directly into your Computer Maintenance<br />
Management System.<br />
Windows Based MS Access database, stand-aloan<br />
or net workable<br />
Training and support available<br />
Site wide licence AUD$4,995.00<br />
RCS Toolkit<br />
Reliability-centred Spares (RCS) Toolkit is the<br />
leading edge technology for accurately matching<br />
spare parts holdings to maintenance and<br />
operational needs.<br />
Company Information:<br />
Name: The Asset Partnership Pty Ltd<br />
Address: Suite 1, 2 Culdees Road, BURWOOD<br />
NSW, 2136<br />
Contact: Stephen Young<br />
Email: mail@assetpartnership.com<br />
Web: www.assetpartnership.com<br />
Software Details:<br />
RCS Toolkit is applicable to any engineering<br />
inventory whether it is fast moving consumables<br />
or slow moving insurance spares. The software<br />
algorithms reflect the true reality of maintenance<br />
spares holdings and are configurable to reflect<br />
your operating context.<br />
Because the RCS logic takes into account both<br />
commercial and maintenance requirements, the<br />
outputs are defensible justifications for the<br />
holding of key items that the Asset Manager, the<br />
Finance Manager and the Inventory Manager<br />
can all understand.<br />
While best results are achieved by using your<br />
RCM analysis outputs, if you wish to assume<br />
your current maintenance strategy is correct,<br />
then RCS Toolkit provides a quick and definitive<br />
answer to the question of what engineering<br />
stocks should be held and where, as well as<br />
allowing you to you see the effect of uncertainties<br />
in downtime costs, part costs and lead times.<br />
Seeing the impact allows you to better manage<br />
your inventory and understand the risks.<br />
RCS Toolkit allows you to effectively manage the<br />
risk inherent in holding engineering spares and<br />
takes the guesswork out of deciding what to hold<br />
presented in table, text recommendations or<br />
graphical format.<br />
This software is fully supported by training and<br />
technical support.<br />
Reliability WorkBench Version<br />
9.1 Prediction Module<br />
The prediction software carries out the failure rate<br />
calculation as defined by the chosen standard and<br />
gives you the result.<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove<br />
Victoria 3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 367<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.au<br />
Software Details:<br />
The Telcordia (Bellcore) standard predicts the<br />
failure rates for mainly electronic components<br />
and is based on research on telecommunications<br />
applications. The MIL-HDBK-217 standard<br />
predicts failure rates for electronic equipment<br />
based on work carried out for the US DoD. The<br />
RDF 2000 standard predicts failure rates for<br />
electronic equipment based on the reliability<br />
data handbook published by UTE (Union<br />
Technique de l'Electricite). The NSWC<br />
handbook deals with mechanical components<br />
and is based on research carried out for the<br />
United States Navy.<br />
The components that make up a system can be<br />
defined in a tree structure. The tree may be<br />
composed entirely of components or it could be<br />
subdivided into blocks each of which could hold<br />
other blocks or components. In this way you can<br />
easily represent your system and sub-systems.<br />
The failure rate model for each component is<br />
made up of a base failure rate for that particular<br />
type of component and multiplying factors<br />
known as pi-factors. These factors depend on<br />
the operating conditions experienced by the<br />
component. You can input these conditions<br />
through simple dialogs and life is made even<br />
easier by providing default values for the<br />
parameters. If you don't like the default values<br />
you change them! The failure rates of<br />
components are calculated immediately and<br />
displayed on the tree diagram. The contributions<br />
of components failure rates to blocks and<br />
systems failure rates is also displayed. You can<br />
examine the effects of stresses caused by the<br />
various environmental conditions by displaying<br />
the base failure rates and pi-factors for each<br />
c o m p o n e n t .<br />
Reliability WorkBench Version<br />
9.1<br />
An integrated visual environment in which failure<br />
rate prediction, FMECA, Reliability Block Diagram,<br />
Fault Tree, Event Tree and Markov analysis are<br />
combined.<br />
Company Information:<br />
Name: ARMS Reliability Engineers<br />
Address: PO Box 501 Ocean Grove<br />
Victoria 3226<br />
Contact: Michael Drew<br />
Phone: 0352 555 357<br />
FAX: 0352 555 778<br />
Email: arms@reliability.com.au<br />
Web: www.reliability.com.au
Software Details:<br />
The Reliability Workbench is a fully integrated<br />
reliability prediction software toolkit which<br />
includes the following elements:<br />
• Reliability Prediction<br />
o MIL-217 F Notice 2<br />
o Telcordia (Bellcore) TR-332 Issue 6 and<br />
SR-332 Issue 1<br />
o NSWC standard 98/LE1<br />
o RDF 2000<br />
• MTTR Prediction<br />
• RAC Prism Link<br />
• FMECA, Process and Design FMEA<br />
o MIL-STD-1629A<br />
o QS-9000<br />
o SAE J1739<br />
o SAE ARP5580<br />
o BS 5760<br />
o EFA Format<br />
o Commercial Aircraft Format<br />
• RBD Analysis<br />
• Fault Tree Analysis<br />
• Event Tree Analysis<br />
• Markov Analysis<br />
• Maintainability<br />
All these powerful reliability analysis methods<br />
can be applied from within a single, fully<br />
integrated, program. You can now automatically<br />
generate fault trees from your prediction or<br />
F M E CA project and share data in this fully<br />
integrated environment. For further information<br />
or a demonstration of Reliability Wo r k b e n c h<br />
Version 9.1. you can contact ARMS on 035255<br />
5357 or via email arms@reliability.com.au.<br />
RelCode<br />
Weibull analysis of failure data to determine burnin,<br />
random or wear-out pattern, preventive<br />
replacement intervals, inspection intervals and<br />
spares requirements.<br />
Company Information:<br />
Name: Albany Interactive Pty Ltd<br />
Address: 16 Wellesley Road Ringwood North<br />
Victoria 3134 Australia<br />
Contact: Nick Hastings<br />
Email: Albany.interactive@bigpond.com<br />
Web: www.albanyint.com.au<br />
Software Details:<br />
Functional capabilities: Analysis of failure and<br />
successful performance data using the We i b u l l<br />
distribution, including Bi-Weibull; Preventive<br />
replacement interval analysis; Estimation of<br />
MTBF including confidence limits; Inspection<br />
and Condition Monitoring Intervals; Spare parts<br />
requirements projection; Data entry direct or<br />
from spreadsheet; Results to screen, printer or<br />
file in spreadsheet compatible format.<br />
Description: RelCode software is designed to<br />
assist maintenance and reliability managers to:<br />
1. Assess the failure pattern and mean life of<br />
components. This helps you to determine<br />
the root cause of failure and to select the<br />
most appropriate maintenance policy.<br />
Assessing the Mean Life helps to measure<br />
reliability and to determine spares<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
requirements.<br />
2. Calculate the best preventive replacement<br />
interval for components subject to wear-out.<br />
Calculate spares requirements related to the<br />
resulting policy.<br />
3. Determine inspection intervals.<br />
4. Apply Weibull and Bi-Weibull distribution<br />
fitting to any data, e.g. as a building block in<br />
simulation models.<br />
Input: RelCode can work from either numerical<br />
data supplied by the user or from estimates made<br />
by a person with experience with the relevant<br />
components.<br />
Output: Tabular and graphical outputs indicating<br />
Weibull parameters, Reliability plot against age,<br />
Failure rate plot against age, Cost against<br />
preventive replacement age, Availability against<br />
inspection interval for hidden failures, Probability<br />
of detection against monitoring interval for<br />
condition monitoring.<br />
Runs on IBM-PC. Site license cost $4400.<br />
Current version 9.04.<br />
Developed continuously since 1975.<br />
RIMSys - Reliability<br />
Incident Management System<br />
Manages the administration, storage, retrieval of<br />
investigations into reliability problems and<br />
incidents as well as minor projects. Interfaces with<br />
RCA, CMMS and PMO/RCM software.<br />
46
47<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
Company Information:<br />
Name: OMCS International<br />
Address: 7 / 92 Railway St Sth<br />
Contact: Steve Turner / Cameron Russell<br />
Phone: 61 3 9315 0330<br />
Email: steve@omcs.bz<br />
Web: www.reliabilityassurance.com<br />
Software Details:<br />
This is the first system of its kind - a must for<br />
organisations that are serious about eliminating<br />
failures.<br />
Many organisations initiate investigations into<br />
infrequent, high consequence plant failures or<br />
frequent, medium to low cost incidents.<br />
However, many times they:<br />
• fail to complete the investigation;<br />
• fail to implement the solution; or<br />
• have a poor system for storing, referencing<br />
or searching investigation reports.<br />
This situation leads to a cycle of repeated<br />
instances of the same failure and a waste of effort<br />
when investigations are half done or not<br />
implemented.<br />
Key Features<br />
• RIMSys is a system that supports the<br />
incident management process of:<br />
o recording,<br />
o allocating responsibilities,<br />
o investigating,<br />
o recommending actions,<br />
o approving,<br />
o implementing, and<br />
o closing.<br />
• Is network based allowing unlimited<br />
incident raisers.<br />
• Has definable staff access levels.<br />
• Stores records in formal database<br />
environment where records cannot be lost<br />
and status can be reviewed simply and<br />
quickly.<br />
• Allows grouping, filtering and reporting of<br />
the status of incidents including 'time in<br />
stage'.<br />
• Has extensive reporting capability.<br />
• Can be configured to automatically email<br />
people at different stages of the<br />
investigation / resolution process.<br />
• Allows linking to electronic documents<br />
including photographs.<br />
• User definable risk matrix.<br />
• Rapid risk ranking.<br />
• User definable incident consequence<br />
categories.<br />
• Can be used to manage Occupational<br />
Health and Safety (OH&S).<br />
• Can be interfaced with other systems such<br />
as CMMS, PLC, SCADA, CITECT or<br />
DCS.<br />
Get your free evaluation copy available from<br />
www.reliabilityassurance.com<br />
SIMLOX<br />
SIMLOX is a powerful and versatile tool for event<br />
based simulation and analysis of complex<br />
operational and logistic support scenarios.<br />
Company Information:<br />
Name: SYSTECON AB<br />
Address: BOX 5205 SE10245<br />
STOCKHOLM SWEDEN<br />
Contact: Oskar Tengo<br />
Email: systecon@systecon.se<br />
Web: www.systecon.se<br />
Software Details:<br />
SIMLOX is a powerful and versatile tool for<br />
simulation and analysis of complex operational<br />
and logistic support scenarios. It will simulate<br />
how performance varies over time given certain<br />
operational profile, support structure, spares<br />
assortment and maintenance resources.<br />
SIMLOX is ideal for capability assessments.<br />
Accurate simulations will identify and correct<br />
problems, bottlenecks and shortages before real<br />
world operations are compromised.<br />
SIMLOX provides graphs on system availability,<br />
resource utilisation, actual vs requested mission<br />
time etc.<br />
SIMLOX handles any technology or organisation.<br />
It will accommodate for ìrobbingî, battle<br />
damages, batched transports, lateral support,<br />
scheduled transfers (of systems, items or<br />
resources) and more.<br />
Spares Optimisation System<br />
(SOS)<br />
Unique expert decision support methodology for<br />
establishing whether or not to hold a spare and if<br />
so, in what max/min quantities<br />
Company Information:<br />
Name: Strategic Corporate Assessment<br />
Systems Pty Ltd<br />
Address: P.O. Box 427 Heidelberg, Vic, 3084,<br />
Australia<br />
Contact: Chris Kelly<br />
Phone: 03 9455 2211<br />
Fax: 03 9455 2233<br />
Email: chris.kelly@strategicorp.com<br />
Web: http://www.strategicorp.com<br />
Software Details:<br />
SOS is a Windows based software application<br />
which provides users with a consistent, auditable<br />
platform for deciding whether or not to hold a<br />
spare part. If the decision is to hold, then SOS<br />
will recommend an appropriate max/min quantity.<br />
SOS is unique in that it utilises an expert approach<br />
to the decision making process. Through a criticality<br />
assessment taking consideration of a combination<br />
of technical and business implications, SOS will<br />
make a holding recommendation ready for export<br />
to the existing computerised maintenance<br />
management system, or will justify the introduction<br />
of new items to the store.<br />
SOS does not rely on the mathematical<br />
manipulation of movement history, thus it can be<br />
applied to new equipment spares and equally to<br />
slow moving items. A final decision will be a<br />
direct reflection of current maintenance practice.<br />
Developed by and for maintenance engineers,<br />
SOS is an optimising tool, not a 'slash and burn<br />
' approach. Where the business is exposed to risk<br />
through insufficient holdings, SOS will clearly<br />
indicate the implications. A cost/risk module is<br />
provided for the assessment of contentious,<br />
expensive and capital/insurance items, where the<br />
cost and risk of stockout is graphically compared<br />
to the holding costs of the item.<br />
SOS is also a 'what if ?' tool. Users can explore<br />
the effect on recommended holdings based on<br />
alternative lead times, usage and repairability<br />
implications. This functionality can clarify the<br />
path to new, vendor arrangements while<br />
quantifying the effects.<br />
SOS is a 32 bit Windows (9x, NT, XP)<br />
application provided on CD-ROM for standalone<br />
or network use. Licences are provided on a<br />
perpetual basis, for unlimited users.<br />
Hardware required is Pentium level or better.<br />
Costings including training, implementation and<br />
corporate licences are provided on application.<br />
Strategic also offers spares optimisation services<br />
through its affiliate Sparesoptimization.com. See<br />
www.sparesoptimization.com<br />
SVA-Pro<br />
SVA-Pro is a comprehensive and innovative<br />
software tool for conducting Security Vulnerability<br />
Analysis.<br />
Company Information:<br />
Name: RELIASS<br />
Address: Cams Hall, Cams Hill, FAREHAM, UK,<br />
PO16 8AB<br />
Contact: Mr Kouroush Fassihi<br />
Phone: +44 1329 227 448<br />
Fax: +44 1329 227 449<br />
Email: info@reliass.com<br />
Web: http://www.reliability-safetysoftware.com<br />
Software Details:<br />
S VA-Pro 6 is a comprehensive and innovative<br />
software tool for conducting Security<br />
Vulnerability Analysis. This product is designed<br />
with the specific needs of security specialists in<br />
mind. It provides expert guidance for studying a<br />
full range of facilities to help companies identify<br />
critical assets and potential adversaries in order<br />
to eliminate threats and reduce vulnerability<br />
through improved countermeasures.<br />
trim<br />
Using streamlined methods, trim ranks<br />
equipment risk, applies predeveloped maintenance<br />
templates, and generates complete CMMS<br />
equipment PM work orders.<br />
Company Information:<br />
Name: CORE, Inc.<br />
Address: 5915 Braun Way<br />
Contact: J. K. August<br />
Phone: +1 (303) 425-7408<br />
Fax: +1 (303) 425-0861<br />
Email: jkaugust@msn.com<br />
Web: www.rcmtrim.com<br />
Software Details:<br />
Trim users pre-qualify equipment PM by risk,<br />
to apply equipment templates. They customapply<br />
template tasks on downloaded master<br />
CMMS equipment using simple, lookup<br />
selection methods. Knowledgeable staff has<br />
reports to review, verify and audit analysis,<br />
validate results and upload completed work.<br />
CMMS, Rounds, PDA's or other implementation<br />
system receives end products. Flexible<br />
workorder products trace tasks to standard,<br />
approved templates. Automatic computer<br />
software makes change update easy. Repetitive
changes provide living maintenance, with change<br />
justification basis. Trim? automates PM<br />
development in complex maintenance<br />
environments like power plants tasks<br />
TTREE<br />
A highly user friendly Fault Tree Analysis package<br />
that, unlike more complicated products, can be<br />
assimilated in less than an hour.<br />
Company Information:<br />
Name: Maintenance 2000 Limited<br />
Address: Broadhaugh Building Suite 110<br />
Camphill Road Broughty Ferry<br />
Dundee DD5 2ND Scotland<br />
Contact: Dr. David Smith<br />
Phone: +44 (0) 1382 803070<br />
Fax: +44 (0) 1382 737736<br />
Email: david@maint2k.com<br />
Web: www.maint2k.com<br />
Software Details:<br />
TTREE is a straightforward and fast Fault Tree<br />
Analysis package that caters for the majority of<br />
Fault Tree sizes encountered in practice. It<br />
provides:<br />
• A simple and logical tree input method that<br />
enables tree logic to be verified.<br />
• Clear outputs providing cut set ranking by<br />
unavailability and failure rate (six measures<br />
of cut-set and event importance).<br />
• Clear graphics, which can be easily<br />
imported into a word processing package<br />
(gate suppression facility).<br />
• The Technis Beta + method for taking<br />
account of common cause failure.<br />
• Facilities for one-shot probability such as<br />
human error.<br />
h t t p : / / w w w. m a i n t 2 k . c o m / r e l i a b i l i t y - m a i n t e n a n c e -<br />
optimization-software.htm for further functional<br />
details and costs.<br />
Wells Work Scheduler<br />
Advanced scheduling application that links<br />
Maintenance and Operations so that maintenance<br />
work can be easily scheduled around resource and<br />
equipment availability.<br />
Company Information:<br />
Name: The Software Well Pty Ltd<br />
Address: 47 Epping Dr<br />
Frenchs Forest 2086 NSW<br />
Contact: Steve Sydenham<br />
Phone: 0419 413 139<br />
Fax: 02 9402 4532<br />
Email: info@thesoftwarewell.com.au<br />
Web: www.thesoftwarewell.com.au<br />
Software Details:<br />
This advanced scheduling application integrates<br />
with CMMS applications to provide a seamless<br />
environment for generating maintenance tasks<br />
and then optimizing the maintenance schedule<br />
around task priority, resource availability and<br />
equipment availability to maximize resource<br />
utilization and minimize equipment downtime.<br />
The Gantt based graphical view of the work<br />
schedule clearly shows the automatically<br />
Infrared Thermography<br />
.... find temperature problems<br />
before they find you!<br />
Affordable Portable Thermal Imaging cameras<br />
and software start from under Aud $5,000.<br />
P roduct of<br />
the year 2003<br />
European<br />
Electronics<br />
Industry Awards<br />
Contact MSc for further details on our range of infrared<br />
Camera Systems or list of our authorised distributers.<br />
Survey 2004<br />
2004 Survey Of Special Maintenance Applications Software<br />
generated task schedule and resource utilization.<br />
Manual overrides can be used to tweak the<br />
schedule as required.<br />
Ideal for shutdown planning to efficiently<br />
schedule and allocate work packages based on a<br />
user definable work breakdown structure.<br />
Wells Work Scheduler includes the following<br />
features:<br />
o User Defined resource calendars<br />
o Scheduling based on Constraints, Priorities<br />
and Predecessors<br />
o Scheduling based on Resource and<br />
Equipment availability<br />
o Drag and drop task linking<br />
o Flexible sorting and filtering of work tasks<br />
o Printing of Schedule in Gantt format<br />
o Flexible project hierarchy<br />
o Manage stand alone projects<br />
o Integration with CMMS applications<br />
(optional)<br />
The Wells Wok Scheduler will vastly improve<br />
most maintenance scheduling applications and,<br />
as a result, maximize resource utilization and<br />
minimize equipment downtime.<br />
27 Research Drive, Croydon VIC 3136<br />
ph 03 9761 5088 fax 03 9761 5090<br />
email: sales@maintsys.com.au<br />
web: www.maintsys.com.au<br />
48
49<br />
Plan for maintenance productivity<br />
Plan for maintenance<br />
productivity<br />
By Tom Westerkamp<br />
Reprinted with the permission of the Institute of Industrial Engineers, 3577<br />
Parkway Lane, Suite 200, Norcross, GA 30092, 770-449-0461. Copyright©2001<br />
Increase Maintenance Productivity<br />
With Finite-capacity Planning<br />
Based on daily scheduling, comprehensive planning, and<br />
e n g i n e e red standards, maintenance finite-capacity planning can<br />
provide full utilization of the maintenance workforce and continuous<br />
skill development. Results of using finite-capacity planning for this<br />
application are a 20 percent to 40 percent increase in work completed<br />
with the same amount of staff, better customer service, impro v e d<br />
quality, and reduced cost per unit of maintenance service.<br />
Conventional maintenance departments receive requests and<br />
immediately route them to supervisors or technicians for action.<br />
Technicians respond by checking the job site, planning the work,<br />
deciding what materials and tools to bring to the job, and then<br />
returning to the shop to gather parts and tools. They return to the job,<br />
p e rhaps several times, to do the work. They make repairs when<br />
n e c e s s a ry, often under emergency conditions. They perf o rm periodic<br />
preventive maintenance on a regular annual schedule. They also do<br />
p rojects that involve modification or additions to the physical plant.<br />
These varying, random demands create peaks and valleys in the<br />
workload; consequently, the peaks re q u i re overtime (higher costs) and<br />
the valleys result in unutilized time (higher costs through lower output).<br />
Complicating this scenario is the usual result that, for a shop made<br />
up of, say, 100 technicians, there are easily several thousand open<br />
work orders in various stages of planning, waiting for materials, in<br />
p ro g ress, and so on. There is no control valve that adjusts random<br />
work requests automatically with the fairly constant available staff<br />
hours. Result: too many jobs in pro g ress and too few being completed;<br />
many late completions; equipment unavailable when needed, causing<br />
late customer deliveries; and too many work orders lost in desk<br />
drawers, tool boxes, and lockers waiting for action. Not a pre t t y<br />
picture.<br />
This situation is usually not the fault of maintenance technicians<br />
even if they are seen in the break room too often by higher<br />
management. Poor maintenance service is usually caused by the lack<br />
of up-todate management tools in the maintenance department. “But<br />
we just installed the latest version of our top-of-the-line computerized<br />
maintenance management system. We have the right tools!” you say.<br />
But what business process did you use when you installed the<br />
s o f t w a re? In many cases, it’s the same perf o rmance management<br />
p rocess that has been producing low productivity all along. So you<br />
automate a low-productivity system. The software cannot deliver any<br />
results without a good shop floor productivity management system<br />
integrated into the business process.<br />
Ask yourself these questions: What are the savings that resulted<br />
f rom our new software upgrade? How much productivity impro v e m e n t<br />
has resulted? What is the payback period (when savings equals cost)?<br />
What is the re t u rn on investment? If you can’t answer these questions,<br />
you probably are getting only 10 percent or 20 percent of the value<br />
out of your CMMS.<br />
A new option<br />
Maintenance finite-capacity planning is a maintenance pro d u c t i v i t y<br />
management tool used by supervisors and planners to plan, schedule,<br />
and dispatch sufficient work to utilize the full staff capacity every day.<br />
The purpose of maintenance finite-capacity planning is to control<br />
the release of only a well-planned amount of work that the staff can<br />
manage each day. It is based on the scientific management principle<br />
defined by Frederick Taylor as follows: The best productivity re s u l t s<br />
when each individual has a definite job to do, in a definite way, and<br />
in a definite time.<br />
The organization in conventional maintenance departments is<br />
usually composed of supervisors who direct the work and technical<br />
staff who plan and perform the work. There are many administrative<br />
responsibilities associated with this arrangement that are no one’s<br />
re s p o n s i b i l i t y, so they fall on the shoulders of the supervisor and<br />
technician. For example, they must do their own field checks, job<br />
planning, and deciding on the work content. They must do the material<br />
requisitioning and often have to hunt for in-stock material. They sort<br />
t h rough many work orders each day to find the ones they can work<br />
on; technicians schedule their own day.<br />
By contrast, the department using maintenance finite-capacity<br />
planning has a planning function (about one dedicated planner for<br />
e v e ry 30 technicians). The planners are skilled technicians, so their<br />
plans affect the productivity of all technicians, not just their own. Staff<br />
or a consultant trains the planners in formal planning of all types of<br />
maintenance work.<br />
The training also introduces work measurement to maintenance<br />
workers specifically, how to establish realistic times for the different<br />
maintenance work. The planners determine work content of the job,<br />
p r i o r i t y, tools and materials needed, safety re q u i rements, skills<br />
needed, and crew size. They requisition non-stock material and keep<br />
supervisors informed about the status of the backlog what jobs are<br />
high priority, what jobs are ready-to-work. The planners re l i e v e<br />
s u p e rvisors and technicians from these planning tasks so they can do<br />
more work.<br />
The introduction of maintenance time standards is an essential<br />
p a rt of the process since the time standards are the means to<br />
establish consistent, realistic job methods, and times. Standards are<br />
the yardstick by which management measures backlog of work, by<br />
skill, for staffing decisions and budget preparation.
The 15-step process<br />
The following 15 steps constitute a sequenced plan to implement<br />
maintenance finite-capacity planning.<br />
1. Operations managers, project managers, facilities managers,<br />
customer service personnel, supervisors, and planners submit work<br />
requests according to proper standard pro c e d u res. They document<br />
work on work orders and enable the enterprise to develop two to four<br />
weeks of backlog.<br />
T h e re are four types of maintenance work: emergency re p a i r,<br />
p reventive maintenance, routine corrective maintenance, and pro j e c t s<br />
(modification, additions, and other construction work). These jobs<br />
come into the maintenance department randomly sometimes not<br />
enough work requests to keep the available workforce busy, and<br />
sometimes too much. When too much work comes in, the solution is<br />
to use overtime, contractors, or to expand the workforce if the need<br />
is seen as a continuing one. Insufficient work results in idle time and<br />
high costs; too much work results in delays, incomplete jobs, and high<br />
costs.<br />
2. Prioritize the work. Sufficient leadtime is the key to on-time<br />
completion. An effective maintenance work order priority system is<br />
time-sensitive. Each of the four priority categories listed below has a<br />
specific, pre-established response time. This concept gives<br />
maintenance managers the tools to respond quickly to urgent work<br />
and time to evaluate the backlog of routine work. They can determ i n e<br />
how much work is due during each future time period. This ensures<br />
that sufficient lead-time exists to take corrective action if the workload<br />
and workforce get out of balance.<br />
Four levels of priority are used to ensure that response to a work<br />
request for maintenance service is made according to the urgency of<br />
the request:<br />
• Priority 1: Emergency. Includes emergency work needed to<br />
ensure personnel safety, to return mission-critical equipment to<br />
service, or to prevent major damage. Response is immediate and<br />
overtime is automatic if needed.<br />
• Priority 2: Urgent. Must be completed during this shift as soon as<br />
a maintenance person is available but does not interrupt other<br />
work. Overtime approval is automatic.<br />
• Priority 3: Service is needed within 24 hours. Specify that service<br />
is needed before the end of a certain shift by entering (1) for the<br />
night shift, (2) for the day shift, or (3) for the afternoon shift.<br />
Using the job assignment board<br />
Plan for maintenance productivity<br />
• Priority 4: Scheduled work. This work can wait more than 24<br />
hours. It includes routine repairs, preventive maintenance<br />
scheduled annually, and projects such as overhauls,<br />
installations, and modifications. The request must include a date<br />
when the equipment will be available and when work is to be<br />
completed.<br />
Safety re q u i rements are extremely important and should re c e i v e<br />
careful and continuing attention. These requirements will fall into all<br />
four categories shown above, from a safety guard missing (Priority 1)<br />
to a gradually wearing stair tread (Priority 4). Priorities should be<br />
established for safety work according to the circumstances of each<br />
situation. The service request should be clearly marked “Safety.”<br />
3. Plan each routine work order. Planning may be done informally<br />
or formally. The supervisor or technician may now do this informally<br />
as part of the job, but full-time planners could do it to free up time for<br />
s u p e rvisors and technicians. A good planning system includes<br />
defining the work content and scope, determining materials needed<br />
versus what is available, identifying skills needed and crew size,<br />
applying a standard time to the job, planning safety re q u i rements, and<br />
deciding what special tools or equipment may be re q u i red. This<br />
planning is a complex activity. It takes a lot of time. If the planning is<br />
all done by supervisors and technicians, they are very likely going to<br />
spend no more than a third of their time directing and doing the work,<br />
re s p e c t i v e l y. The other two-thirds will be time spent checking jobs,<br />
planning them, locating tools and materials, and sometimes hopping<br />
in the company truck and going to the hard w a re store for out-of-stock<br />
or nonstock items.<br />
4. The supervisor organizes the next day’s work. Only enough work<br />
to make full use of available staff, plus a small cushion, is re l e a s e d<br />
each day. Current excess work orders should be collected and<br />
reissued as the maintenance finite-capacity planning system is<br />
i n t roduced. As work orders are completed, new work orders are<br />
released.<br />
5. Load a job assignment board every day with enough work to<br />
utilize the full staff of technicians (see “Using the job assignment<br />
b o a rd”). The maintenance work order system does not start action on<br />
a job until the work order is assigned to a maintenance person. The<br />
maintenance supervisors use the job assignment board to assign<br />
p replanned routine corrective work, preplanned pre v e n t i v e<br />
maintenance work, and project work to each member of the crew.<br />
1. The supervisor loads the “To start” slot each day with enough work orders to make full use of each<br />
member of the crew all day plus 10 percent (or other amount based on experience) for unexpected<br />
circumstances. For example, customer-driven changes may mean that equipment scheduled for repair is<br />
unavailable; therefore, an alternate job is needed so that the maintenance person can be rescheduled<br />
with a minimum of lost time. Full “To start” and “In progress” slots indicate at a glance that the maintenance person has a job (so the<br />
crew leader knows where the person is) and has other work assigned ahead.<br />
2. When loading the job assignment board, the crew leader places the first job to be done in front, the second in back of the first, and so<br />
on. This ensures that work will be completed according to the priority set by the crew leader.<br />
3. When getting assignments, the maintenance person performs the work in the order that work orders are loaded in the job assignment<br />
board. The current job is moved to the “In progress” slot. After the technician completes the job, he or she notes comments, delays,<br />
and actual hours and places the completed work order in the “Complete” slot. If the job is not completed due to an interruption or lack<br />
of material, the work order is placed in the “Delayed” slot. When any work orders are in the “Delayed” slot, the crew leader knows at<br />
a glance that some action is required due to a condition not controllable by the maintenance person.<br />
4. The supervisor who checks the work orders for completeness and quality picks up completed jobs during the day and at the end of the<br />
day. Some jobs may necessitate visits to the job site to ensure that work is satisfactory to the requester. All jobs completed during the<br />
shift are turned in to the data entry clerk by the end of the shift so that closings can be kept current in the computer system. This<br />
ensures that the system reports are up to date.<br />
5. Complete pro c e d u res for filling out the work order are explained to each technician by the supervisor before the system is implemented.<br />
50
51<br />
Plan for maintenance productivity<br />
Figure 1. Cost per standard hour trend.<br />
Figure 2. Cumulative savings vs. cost resulting from productivity improvement..<br />
Figure 3. Backlog trend for planning next week’s work and future staffing.
6. The supervisor monitors work order progress daily and adjusts<br />
assignments for emergencies, delays, and completions. These<br />
conditions are part of the typical maintenance depart m e n t ’s<br />
experience, so the system must be flexible enough to roll with these<br />
minute-to-minute changes. If there are plenty of planned work ord e r s<br />
ready for assignment, they can be staged and ready when the ru s h<br />
work is done.<br />
7. The supervisor checks completed work orders for quality and<br />
completeness of work every day. The supervisor selects a sample of<br />
work orders each day, goes to the job site, and inspects the work. The<br />
site inspection may include discussion with the requester to ensure<br />
that the work is satisfactory from the user’s point of view.<br />
8. E v e ry day, the supervisor checks completed work orders for<br />
quality and completeness of re p o rting. In the typical maintenance<br />
shop, not all work is recorded on work orders. Some jobs may have<br />
been done on verbal authority. Some time may have been spent<br />
waiting for an assignment and not recorded anywhere.<br />
9. Completed work orders are turned in by the supervisor every<br />
day to ensure completeness of equipment histories and control re p o rt s<br />
and to verify that all hours worked are accounted for.<br />
1 0. Once a week, the supervisor reviews the previous week’s work,<br />
performance report results (Figures 1 and 2), and organizes the next<br />
week’s work (Figure 3) with the planner.<br />
1 1. Planners identify and obtain needed as-built drawings and<br />
manuals for vendor troubleshooting, preventive maintenance,<br />
c o rrective maintenance, and parts. Missing information is often a<br />
cause of delay. If critical information such as an equipment re p a i r<br />
manual is unavailable, several hours can be spent in wasted activity<br />
or hunting for the information. Ideally, all of this information should be<br />
online so that it can easily be obtained from a database using a searc h<br />
engine. If technicians have access to the database from a portable,<br />
w i reless computer, they can look at the information on a heads-up<br />
display while working.<br />
1 2. C o n v e rt troubleshooting into preventive maintenance or re -<br />
design of mission-critical equipment. Analysis of the failure<br />
i n f o rmation by the planning group can reveal the reasons for<br />
equipment failure or diminished capability. With this inform a t i o n ,<br />
management and the vendor can assess the problem and either adjust<br />
preventive maintenance tasks and frequency or look for more robust<br />
design to eliminate or reduce the problems.<br />
1 3. The maintenance engineer checks year-to-date equipment<br />
repair costs to see where the most improvement can be made. Focus<br />
attention there. Often, the work orders only distribute costs and<br />
seldom capitalize on the most important advantage - analyzing the<br />
costs to find out which equipment or locations are absorbing the most<br />
labor and material costs. Many computerized maintenance<br />
management systems have Pareto analysis re p o rts or SQL query<br />
c a p a b i l i t y. These tools can be used to sort costs by equipment or<br />
location in descending order of cost. Often the 80/20 rule 80 percent<br />
of costs are concentrated on 20 percent of the equipment re v e a l s<br />
where management attention will yield the greatest results.<br />
1 4. Integrate the scheduling into the CMMS by activating the work<br />
o rder scheduling application. Many computerized maintenance<br />
management systems have no scheduling function built in or have it<br />
but it is inactive. If daily scheduling had not been done in the past,<br />
t h e re would have been no need to install the scheduling function when<br />
the system was set up.<br />
This integrated approach is essential for a completely paperless<br />
system and an effective use of hand-held technology.<br />
15. Get all hours worked accounted for in the CMMS work order<br />
system. This may seem obvious. In fact, the assumption is frequently<br />
“ We already do that.” It is wise to check again. Unless you are alre a d y<br />
doing maintenance finite-capacity planning, no daily check is made<br />
to account for all hours worked, so it is up to chance. There are many<br />
ways actual hours worked can be overlooked when you try to<br />
reconcile them with hours reported on work orders:<br />
• Verbal assignments or technician initiated work orders,<br />
no hours reported.<br />
• Lunch and breaks, if paid, not included in reported hours.<br />
• Vacations, holidays, absence, but no reduction in available hours<br />
on report.<br />
• Training and meetings unreported.<br />
• Time spent due to delays not included on the control report.<br />
• Assisting contractor or vendor not reported and unplanned.<br />
• Field checking jobs and contacting the customer not reported.<br />
• Not all crewmembers’ hours reported on multi-person jobs.<br />
• Unscheduled time (time between assignments), no work order to<br />
report on. Should be reported as a delay on the next assignment.<br />
• Missing as-builts, manuals, and guides.<br />
Plan for maintenance productivity<br />
• On-the-job-training time unreported. Both trainee and trainer<br />
actual time should be re p o rted as work time.<br />
Note that you can run a report in the CMMS that shows the total<br />
hours for each technician on work orders for a period. By comparing<br />
this total with the total time each technician was available, you can<br />
d e t e rmine the source of any shortfall in time on work ord e r s .<br />
Finite-capacity planning starts with organizing a dedicated<br />
planning function and introducing pre d e t e rmined maintenance time<br />
s t a n d a rds. It includes daily scheduling of all labor hours available,<br />
even if the schedule has to be adjusted several times due to inevitable<br />
changes in priorities. It ends with a continuous improvement system<br />
that pays back the investment many times over. It increases the<br />
w o r k f o rce size without any hiring authority since each individual<br />
works more productively and with increasing skill. It frees superv i s o r s<br />
from planning so they have more time to be at the job sites ready to<br />
c a rry out their two most important responsibilities fully utilizing the<br />
workforce and developing the skills of their staff.<br />
For further reading<br />
1. Karger, Delmar W. and Franklin H. Bayha,<br />
Engineered Work Measurement, 4th ed., Industrial Press, 1987.<br />
2. Taylor, Frederick Winslow, The Principles Scientific<br />
Management, Dover Publications, 1998 (republication of the<br />
original vol. published by Harper & Bros., 1911).<br />
3. Westerkamp, Thomas A., Maintenance<br />
Manager’s Standard Manual, 2nd ed., Prentice-Hall, 1997.<br />
4. Zandin, Kjell B., editor-in-chief, Maynard’s<br />
Industrial Engineering Handbook, 5th ed., McGraw-Hill, 2001.<br />
5. Zandin, Kjell B., MOST Work Measurement<br />
Systems, 2nd Ed., Marcel Dekker, 1990.<br />
Tom Westerkamp is a consultant, author, and speaker. He is<br />
founder and CEO of Productivity Network Inc., a pro d u c t i v i t y<br />
i m p rovement consulting firm specializing in maintenance<br />
management, health care business office management, and telecom<br />
technology. Copyright©2001<br />
52
53<br />
Unbelievable: Resonances And Their Enormous Force<br />
Unbelievable:<br />
Resonances<br />
And Their<br />
Enormous Force<br />
Mathias Luft,<br />
PRÜFTECHNIK<br />
PRÜFTECHNIK was called in to evaluate damage on a supply air<br />
ventilator. The site was a scene of destruction and devastation.<br />
Both pedestal bearings of the ventilator shaft had been torn off and<br />
hurled away. The 80 mm thick shaft was bent by approx. 30 degrees<br />
on both sides of the impeller. The impeller itself had run into the left<br />
and right suction cones, completely destroying them and was itself<br />
badly dented. All fan belts were torn - in short, this aggregate was a<br />
total write-off. What had happened?<br />
An important clue was the evidence from the operator who said<br />
the damage had occurred during the startup of the ventilator. As a<br />
ventilator of the same type was in operation nearby, it was possible<br />
to re c o rd a so-called Bode diagram or run up curve. This<br />
m e a s u rement re c o rds the amplitude of the rotational fre q u e n c y<br />
vibrations (i.e. the part of the vibration caused by imbalance) as a<br />
function of the speed. It revealed a trend that indicated the cru c i a l<br />
c i rcumstantial evidence for the re c o n s t ruction of the damage<br />
p ro g ression (Fig. 1, right). At approx. 1130 rpm, and thus below the<br />
operating speed of 1300 rpm, a sudden rise in the rotational fre q u e n c y<br />
vibration amplitude to more than 80 mm/s (!!) appeared which then<br />
abruptly fell again above this critical speed. Consequently, the signal<br />
path corresponds precisely to the behavior of a rotor when passing<br />
t h rough its 1st flexing intrinsic vibration (Fig. 2). In addition to the<br />
distinctive rise in the rotational frequency vibrations, the phase<br />
rotation of 180˚ is especially typical.<br />
It was clear from this that only a rotor resonance could have been<br />
the underlying cause of the damage. However, the actual cause could<br />
have been increased imbalance of the impeller that could still have<br />
been absolutely permissible at the operational speed, but caused too<br />
l a rge a vibration excitation when passing through the resonance point.<br />
How high the vibration increases at the resonance point depends<br />
mainly on the damping of the rotor and on the dwell time in the area<br />
close to the point of resonance. Heavy rotors such as the turbine<br />
rotors of large steam turbines re q u i re more time to build up to high<br />
vibration amplitudes than, for example, light impellers. Thus, in addition<br />
to the optimum balance of the ro t o r, rapidly passing through the point<br />
of resonance is also a key factor in avoiding unacceptable vibrations<br />
near the point of resonance.<br />
A n y w a y, if the resonance point of the rotor is to be shifted,<br />
constructive changes are essential. In this case, the changing of the<br />
r i g i d i t y, the mass or the bearing spacing are the most import a n t<br />
parameters although such measures are often not possible for cost<br />
reasons. However, as an additional measure in variable- speed<br />
a g g regates, at least the speed range close to the resonant fre q u e n c y<br />
must be blocked in the converter control unit.
Rise In Resonance<br />
Figure 1. Amplitude Curve<br />
Figure 2a. Bode Diagram / Startup Curve<br />
Phase Shift by 180˚<br />
Resonance point<br />
1. Bending intrinsic form<br />
A= 82.6 mm/s<br />
n= 1132 rpm<br />
Figure 2b. Bode Diagram / Startup Curve<br />
Figure 3. Vibration From A Rotor<br />
Unbelievable: Resonances And Their Enormous Force<br />
Resonance<br />
Resonance<br />
54
55<br />
Hosted CMMS - Are You Ready For The Revolution?<br />
Hosted CMMS -<br />
Are You Ready<br />
For The Revolution?<br />
Computerised Facility Intergration, L.L.C,<br />
Well, are all of you ready for a shift in software distribution? For<br />
those of you who don’t know, a revolution in the way software is<br />
distributed is at hand. It is changing the way your vendors and serv i c e<br />
p roviders pro c u re, distribute, deploy, manage, and bill for software<br />
applications. What am I talking about? One of the most rapidly gro w i n g<br />
areas of the software industry, that of Application Service Providers<br />
(ASP) or hosted solutions.<br />
A S P ’s are comprehensive software and support serv i c e s ,<br />
developed to deliver state-of-the-art and world class computerized<br />
maintenance management systems (CMMS) right to your door via the<br />
I n t e rnet. The ASP companies allow you to access maintenance<br />
applications that are stored on servers, which are centrally managed<br />
and maintained. The ASP maintains your entire system, giving you<br />
access to it through a Web bro w s e r. Anything you could do with an<br />
in-house application can be done through the Net in exchange for a<br />
monthly service charge.<br />
So, what does this mean to you, the maintenance professional that<br />
has to live with the latest trend? Relief, is the word that comes to mind.<br />
How?<br />
Think of this all too familiar scenario:<br />
The maintenance department has again become the target for<br />
management improvements. You have been asked to impro v e<br />
p roductivity; increase PM completion; reduce inventory levels; get<br />
software, hardware, associated support costs under control; and, oh<br />
yeah, do not burden the IT department while your at it. Since the IT<br />
d e p a rtment doesn’t possess the re s o u rces and/or technical expert i s e<br />
to support your eff o rt, you are left with the same old questions. Do<br />
you have the necessary know how, budget, labor or software systems<br />
to implement the solutions?<br />
So here you are again. To get all the functionality you need, you<br />
purchase one-time software product licenses (based on the number<br />
of users and/or the size of your company) and high annual serv i c e<br />
contracts. You have to buy new hard w a re and also hire outside<br />
s e rvice professionals to help implement the application, configure the<br />
h a rd w a re, migrate the data and finally train your people. All the while,<br />
t rying to figure out how to pay for all these up-front costs out of<br />
c u rrent operating budgets. Not to mention, I’m sure all of you are tire d<br />
of writing large checks to consulting firms for projects that never seem<br />
to be finished or end in disillusionment.<br />
Well, the hosted industry is going to change all that. They are going<br />
to allow a business to have access to specialized, high quality, and<br />
complex software applications, such as CMMS, CAFM, and document<br />
management. The hosted companies manage updates and changes<br />
to the application, the database, the security, and the hard w a re. They<br />
o ffer training, setup, 24X7 help desk, data management and analytical<br />
s u p p o rt as part of standard packages. In addition, weigh-in the fact<br />
that your staff will have access to maintenance information at anytime<br />
and from anywhere, all they need is a bro w s e r, no special<br />
workstations. All this for a known, fixed monthly fee.<br />
CFI recently did an analysis for a CMMS client based on the<br />
following: 30 power users (supervisors, clerks, planners, scheduler,<br />
etc.), 90 work reporting only users (technicians), 50 PC’s that need to<br />
be upgraded, Internet cost of $20 per month per user, average IT<br />
loaded salary of $100,000 per year, CMMS license cost $2,850 per user<br />
with a 20% Software Annual customer service plan, and a Hosted cost<br />
of $207 per month per user.<br />
L e t ’s run their numbers. In dollars and cents, it takes an average<br />
of about $127,000 a year to set up and operate a CMMS application<br />
over 5 years, (see Table 1.) At the end of the five year period, hard w a re<br />
and software will probably have to be updated, so the cycle start s<br />
again. In contrast, the annual cost for a browser enabled hosted<br />
application is about $87,000 per year, (see Table 2.) So when all the<br />
numbers are run, the ASP approach winds up eliminating an average<br />
of 32% of the total cost of ownership of the application per year (Figure<br />
1.) With a company profit margin of 5%, that extra cost translates into<br />
a requirement of $800,000 in extra sales.<br />
Another factor to consider is the up front cost. Looking at Table 1<br />
again, the first year of in-house operation is $369,000 compared to a<br />
hosted of $97,000. That is a whopping 380% diff e rence. When you look<br />
at that, why would you go another way?<br />
Table 1: In-house application cost for 5 year period (estimated).<br />
Table 2: Host application cost for 5 year period (estimated).<br />
Figure 1: Cumulative Cost comparison.<br />
A S P ’s utilize standardized software setup packages and templates,<br />
this reduces customization by cutting out some of the bells and<br />
whistles you have come to expect (but which most companies don’t<br />
utilize anyway). Secondly, Internet data transfers are not yet reliable<br />
enough every w h e re to support all mission-critical data exchanges,<br />
they are getting better but not quite everywhere yet.<br />
The choice is yours. Realize, though that if your department is a<br />
target for improvement, an ASP may be the answer.<br />
Computerized Facility Integration, L.L.C. (CFI) is an Application<br />
S e rvice Provider (ASP) dedicated to leveraging the capabilities of<br />
web-based facilities management technology.
Traditional<br />
$700.000<br />
$600.000<br />
$500.000<br />
$400.000<br />
$300.000<br />
$200.000<br />
$100.000<br />
$0<br />
In-house<br />
Hosted<br />
Hosted vs In-House Analysis<br />
Year 1 Year 2 Year 3 Year 4 Year 5<br />
$369,112 $427,792 $486,472 $545,151 $635,506<br />
$96,720 $181,440 $266.160 $350,880 $435,600<br />
Figure 1. Cumulative Cost Comparison.<br />
Total Cost Of Application<br />
Cost Component Year 1 Year 2 Year 3 Year 4 Year 5 5 Year Total<br />
Hardware Database Server $7,000 $7,000<br />
Application Server $7,000 $7,000<br />
Web Server $7,000 $7,000<br />
Report Server $7,000 $7,000<br />
Upgrade PCs $62,500 $62,500<br />
Software Application Fees - MRO $168,600 $168,600<br />
Database Fees - SQL $9,600 $9,600<br />
Report Writer $1,800 $1,800<br />
Server Support Initial Configuration - 4 weeks $7,692 $7,692<br />
Set Up - 4 weeks $7,692 $7,692<br />
Database - 2 weeks $3,846 $3,846<br />
Web Install - 1 week $1,923 $1,923<br />
Security Setup - 4 weeks $7,692 $7,692<br />
On-going Maint. Client Server - (10 weeks p/yr) $19,231 $19,231 $19,231 $19,231 $19,231 $96,154<br />
Web Server - (5 weeks p/yr) $9,615 $9,615 $9,615 $9,615 $9,615 $48,077<br />
Communication Internet Fees $7,200 $7,200 $7,200 $7,200 $7,200 $36,000<br />
Maint & Support Software - ACSP $33,720 $33,720 $33,720 $33,720 $33,720 $168,600<br />
Hardware - 10% p/yr $9,615 $9,615 $9,615 $9,615 $36,200<br />
Upgrades Software Install (4 weeks p/yr) $7,692 $7,692 $7,692 $7,692 $30,769<br />
Hardware (2 weeks p/yr) $3,846 $3,846 $3,846 $3,846 $15,385<br />
Depreciation Capital Cost (35%) -$31,675 -$31,675 -$31,675 -$31,675 ($95.025)<br />
Yearly Cost $369,112 $58,680 $58,680 $58,680 $90,355 $635,506<br />
Cumulative Total $369,112 $427,472 $486,472 $545,151 $635,506<br />
Table 1. In-House application cost for 5 year period (estimated)<br />
Hosted<br />
ASP<br />
Software Lease $74,520 $74,520 $74,520 $74,520 $74,520 $372,600<br />
Communication EN2Max $15,000 $3,000 $3,000 $3,000 $3,000 $27,000<br />
Internet $7,200 $7,200 $7,200 $7,200 $7,200 $36,000<br />
Hardware Upgrade PCs $62,500 $62,500<br />
Depriciation Capital Cost (35%) -$21,875 -$21,875 -$21,875 ($65,625)<br />
Yearly Cost $96,720 $84,720 $84,720 $84,720 $84,720 $435,600<br />
Cumulative Total $96,720 $181,440 $266,160 $350,880 $435,600<br />
Table 2. Host application cost for 5 year period (estimated)<br />
Hosted CMMS - Are You Ready For The Revolution?<br />
56
57<br />
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
IMPLEMENTING<br />
PROBLEM SOLVING<br />
EXCELLENCE USING<br />
SIX SIGMA<br />
D Jenkins 1 & P Townson 2<br />
1 Maintenance Hatch Associates Pty Ltd<br />
2 Global Maintenance Network Full time member - BHP Billiton<br />
Summary<br />
To operate excellently, businesses must be faster and more<br />
e ffective at solving problems than their competitors. Hence, our<br />
purpose is to build a superior problem solving capability within BHP<br />
Billiton which we have called PSE (Problem Solving Excellence), one<br />
w h e re problems are identified early, the knowledge and experience<br />
of our people are applied to properly determine the root cause, and<br />
where team action is taken to improve the business performance by<br />
eliminating problem root causes.<br />
To date 17 PSE workshops have been facilitated around the world<br />
at businesses focused on mining and mineral processing. We have<br />
found some of the businesses have been successful in building a<br />
superior problem solving capability and produced real benefits, while<br />
others have been less successful.<br />
To understand the key success factors and learnings a review of<br />
the workshops was undertaken using the Six-sigma process for<br />
accelerated change. This process provides a framework of seven<br />
change elements that are required to make an effective change and<br />
include: Leading the way: Creating a shared urgency: Building<br />
coalitions and commitment: Focusing the vision: Chartering a transition<br />
road map: Aligning systems and stru c t u res: and Sustaining<br />
momentum.<br />
The review re i n f o rced that to develop an effective problem solving<br />
c u l t u re we need to think beyond a process for solving problems (of<br />
which there are many proven effective problem solving processes out<br />
t h e re) and move into the more difficult areas of people and change<br />
which most of us resist.<br />
After reading this paper it is obvious that we are well on the way<br />
to building a superior problem solving capability within BHP Billiton.<br />
We also have a real challenge in front of us to tackle some of the<br />
change elements that focus on people to realize the full benefit of PSE.<br />
If we can do this effectively and can get there before our competitors<br />
we will have a substantial competitive advantage and achieved<br />
something truly great. The good news is as a result of the review we<br />
now have a clear direction and we know what has to be done.<br />
K e y w o rds: Problem solving, change management, impro v e m e n t<br />
process, data analysis<br />
1 WHAT IS PROBLEM SOLVING<br />
EXCELLENCE AND WHY WAS IT<br />
DEVELOPED?<br />
To operate excellently, businesses must be faster and more<br />
e ffective at solving problems than their competitors. Hence, our<br />
purpose is to build a superior problem solving capability within BHP<br />
Billiton, one where problems are identified early, the knowledge and<br />
experience of our people are applied to properly determine the root<br />
cause, and where team action is taken to improve the business<br />
performance by eliminating problem root causes.<br />
PSE (Problem Solving Excellence) is a key global strategy that the<br />
Global Maintenance Network is rolling out across BHP Billiton to<br />
contribute to our company operating excellently. It is aligned with our<br />
Operating Excellence and Six Sigma Plus improvement programs.<br />
Our goal is to up-skill the majority of our people in team problem<br />
solving. Experience has shown strongly that the best way to achieve<br />
this is via a process of application learning and coaching in small<br />
teams to solve real problems at site. With support and follow-up the<br />
practices become natural for the work groups and the site as a whole,<br />
then the improvements become sustainable. In doing this our people<br />
become capable rather than trained.<br />
The PSE workshop process is designed to build a superior pro b l e m<br />
solving capability and doing so move a site from their current state to<br />
their desired result through a transition and learning phase as shown<br />
below (refer figure 1). The current state in which most businesses<br />
find themselves includes: they are experiencing ever incre a s i n g<br />
competition: margins are being squeezed: plant reliability could be<br />
better: and they know they have lots of problems although are not sure
w h e re to start. There are also differing levels of knowledge and<br />
understanding of problem solving as well as differing opinions on the<br />
relevance and importance of eliminating these problems. With so<br />
many differing opinions and people going in diff e rent directions it is<br />
not surprising that effective team based problem solving over the long<br />
term is difficult to achieve.<br />
A vision of a desired result that most businesses are driving for<br />
includes: they want to be proactive in addressing problem areas: use<br />
the knowledge of their people to solve problems: fully utilise their<br />
system to identify and monitor problems: and improve business<br />
p e rf o rmance by reducing losses. To achieve this the businesses<br />
would like a strategy to improve the plant reliability and performance<br />
that all parties have agreed to, are aligned to and own. With our PSE<br />
vision clear the question is, how effective have our eff o rts been to<br />
date?<br />
2 HOW EFFECTIVE HAVE OUR EFFORTS<br />
BEEN?<br />
To date 17 PSE workshops have been facilitated across a number<br />
of businesses around the world including North America (1), South<br />
America (2), South Africa (5) and Australia (9). The businesses are<br />
focused on mining and mineral processing. 250 people have attended<br />
the workshops, key site people coached to provide ongoing problem<br />
solving support to drive the improvements, 60 problems impacting the<br />
businesses bottom line were analysed for root cause including cost<br />
justifications. We have found some of the businesses have been<br />
successful in moving from their current state to their desired re s u l t<br />
and produced real benefits to their business, while others have been<br />
less successful.<br />
To understand the key success factors a review of the workshops<br />
was undertaken. To help us analyse the outcomes we used the Six-<br />
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
Figure 1: Problem solving excellence process<br />
sigma process for accelerated change as shown by the large arrow<br />
in figure 1 under the transition and learning phase. This pro c e s s<br />
p rovides a framework of seven change elements shown either side<br />
of the centerline, which are:<br />
• Leading the way<br />
• Creating a shared urgency<br />
• Building coalitions and commitment<br />
• Focusing the vision<br />
• Chartering a transition road map<br />
• Aligning systems and structures<br />
• Sustaining momentum<br />
These elements help us to move from our current state to our<br />
d e s i red result through a transition and learning phase. The change<br />
elements adjacent to the centerline do not need to be addressed in<br />
any order, rather they all need to be considered at the same time to<br />
e n s u re we can effectively move through the transition and learn i n g<br />
phases of change. Managing these elements is like spinning plates<br />
- we have to start each one and continually go back to keep them<br />
moving. The change elements furthest from the centerline (ie: Leading<br />
the way and Sustaining momentum) re q u i re constant attention all the<br />
time from the start of process through to the end, as these are<br />
fundamental to making any change happen successfully.<br />
The PSE workshop has a distinct step at the end of the pro c e s s<br />
that captures the part i c i p a n t ’s key learnings and perceived barr i e r s<br />
p reventing the site from moving from their current state to the desire d<br />
result. These captured thoughts were mapped against the change<br />
elements and provided us with a real insight into the PSE pro c e s s .<br />
The remainder of this paper explores our findings and discusses our<br />
success factors and learnings.<br />
58
59<br />
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
2.1 Leading the way<br />
For a change to be successful the change element “leading the<br />
way” re q u i res constant attention. The accelerated change transition<br />
model defines leading the way within figure 2.<br />
Leading the way<br />
“Having a champion who actively engages in and sponsors the<br />
change in an enduring way. Making a visible, relentless commitment<br />
via face-to-face communication, modeling change, and setting<br />
aggresive expectations for oneself and others”<br />
Success Factors: Learnings<br />
• Participants made personal • The business needs to lead the<br />
Commitment to leading the way to support participants<br />
way<br />
• Developed a thorough • Our expectations of the site<br />
approach to engage were not always clear<br />
management<br />
Participants Quotes:<br />
Our bosses behaviours don’t match their expectations, they shift their<br />
goals before completing an initiative<br />
(another initiative which never gets finished)<br />
Figure 2: Leading the way<br />
This definition certainly challenges us and asks for a serious<br />
commitment to effect a successful change. We identified that the PSE<br />
workshop engaged the participants and certainly got them leading the<br />
w a y, which was a real success factor. Conversely a learning was that<br />
even with the participants keen and ready to lead the change and<br />
solve problems, without the managers and the business also leading<br />
the way (as shown in the above participants quote) effective change<br />
will be a real challenge. Another success factor was that over the<br />
duration of the 17 PSE workshops a detailed engagement process has<br />
been developed to get managers on board and committed to the<br />
workshop. There is also a learning to raise the profile of the “leading<br />
the way” within the engagement process so as to set the corre c t<br />
expectations up front.<br />
2.2 Building coalitions & commitment<br />
E ffective problem solving cannot happen in isolation as the causes<br />
and solutions impact all parts of the business. To be successful a site<br />
must Build Coalitions & Commitment. The accelerated change<br />
transition model is defined in figure 3.<br />
A key objective of the PSE workshop is to coach the participants<br />
to identify real issues and develop effective solutions on their own<br />
site-specific problems, using a “learning by doing” methodology. This<br />
a p p roach has proved a real success factor, as the take up on the<br />
problem solving concepts has been extremely high. Having a cross<br />
functional team from a natural work area has ensured that actual<br />
causes are identified and effective solutions are developed pro v i d i n g<br />
real benefits. Automatically building collations and commitment and<br />
also solving real problems to kick start the business impro v e m e n t<br />
initiative.<br />
As with leading the way the same coalitions and commitment is<br />
needed to happen outside the workshop to ensure managers and the<br />
business are supporting PSE. Another good pick up was that we<br />
should not always accept the resistance to change, we should work<br />
this resistance and bring it out into the open and deal with it otherw i s e<br />
we will not get people truly committed.<br />
2.3 Creating a shared urgency<br />
Research has shown that the number one reason for change not<br />
being successful is the failure to create a shared urg e n c y, for this<br />
reason we need to get it right. The accelerated change transition<br />
model is defined in figure 4.<br />
Building coalitions & commitments<br />
“ T h e re is a strong commitment from key constituents to invest the<br />
change, make it work, and demand and receive management<br />
attention. Also consider what coalitions to build and what resistance<br />
is inevitable”<br />
Success Factors: Learnings<br />
• Having natural workgroups in • These same coalitions and<br />
the workshop builds coalitions commitment needs to happen<br />
and commitment outside the workshop<br />
• “Learning by doing” • We need to work with the<br />
methodology makes problems resistance and don’t<br />
solving relevant, fun and underestimate it<br />
builds teamwork<br />
Participants Quotes:<br />
If we want to get the root cause we need operations and production.<br />
Otherwise we will continue to blame each other and not solve the problem<br />
Figure 3: Building coalitions and commitment<br />
Some key success factors of the PSE include: completing data<br />
analysis on the business systems (eg: SAP, downtime) provided a gre a t<br />
understanding of the business’s current state and a feedstock of<br />
p roblems for the workshop process (refer figure 5). The constru c t i o n<br />
of the Uptime model provided a picture of how the plant is perf o rm i n g<br />
over a period of time. The uptime model helps the participants in the<br />
workshop to see the bigger picture and focus on what’s pre v e n t i n g<br />
the business from being competitive or making the best re t u rn on<br />
investment. This approach deliberately looks at all losses holistically<br />
to challenge the site review their performance as shown in figure 6.<br />
As with the other previous change elements there needs to be a<br />
sense of urgency outside the workshop to focus the business’s drive.<br />
To create this urgency re q u i res trust in the message the business<br />
analysis is sending (not Peter cried wolf) and strong leadership in<br />
conveying this message, if this is done well the site can start to build<br />
a coalition of commitment.<br />
Creating a shared urgency:<br />
“The keyword is shared - not by one leader, but all stakeholders.<br />
The reason to change now (not “next year”), whether driven by thre a t<br />
or opportunity, is instilled within the organisation and widely shared<br />
through data, demonstration, demand or diagnosis. The urgent need<br />
for change must exceed its resistance ”<br />
Success Factors: Learnings<br />
• Workshop data analysis • This same shared urgency<br />
focused participants on needs to happen outside the<br />
business opportunity workshop<br />
• Uptime model provides a • The business needs to be open<br />
holistic view to business and honest so people own the<br />
losses urgency<br />
Participants Quotes:<br />
The business says everything is urgent, even if we are not in trouble they<br />
are always crying wolf.<br />
Figure 4: Creating a shared urgency
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
Figure 5: Participant discussing their data to create a shared urgency<br />
Figure 6: Uptime to focus on business losses to create a shared urgency<br />
60
61<br />
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
2.4 Focusing on the vision<br />
Our desired state provides a vision for the business. The<br />
accelerated change transition model defines this within the following<br />
slide figure 7:<br />
Focusing the vision<br />
The desired outcome of change is clear, legitimate, widely<br />
understood and shared. A vision must be compelling and vivid enough<br />
to create action. Way beyond posters and plaques - a vision defines<br />
a future state clearly enough so people understand it and know<br />
whether they want to get on board.<br />
Success Factors: Learnings<br />
• Some businesses using • Take good uptime examples<br />
uptime targets to reduce and share with other<br />
losses over the next 5 years businesses<br />
• Starting to integrate PSE<br />
working into business<br />
strategic plans<br />
Participants Quotes:<br />
Our vision should stop the breakdown cycle, we are not doing PM’s<br />
because we have breakdowns and we have breakdowns because we are<br />
not doing our PM’s. Solving problems will break this cycle<br />
Figure 7: Focusing the vision<br />
Figure 8: Uptime providing a clear vision to reduce losses<br />
Most of the businesses that have completed a PSE workshop have<br />
a strategic plan. A success factor was leveraging off this good work<br />
a l ready done by providing a great opportunity to raise the profile of<br />
the strategic plan and make it real to the participants by showing them<br />
how they can contribute to making it effective. By doing this the<br />
p a rticipants can see the bigger picture and broaden their perspective.<br />
Supporting this plan some businesses had a clear vision as shown in<br />
figure 8.<br />
This business used the Uptime model and made it part of their<br />
m e a s u res for reliability and perf o rmance improvement. This picture<br />
p rovides them with some clear goals over the next five years to re d u c e<br />
their losses and increase production. The key focus for the business was<br />
to reduce unscheduled losses (breakdowns, urgent work, no operators<br />
etc) as these were compromising their market position by preventing the<br />
site from being a reliable supplier. A key learning was to share these<br />
good examples with other businesses as PSE is rolled out.<br />
2.5 Sustaining momentum<br />
The PSE workshop aims to sustain momentum although we<br />
recognize we are not around when the site is trying to do this. This<br />
is a key area that the workshop needs to develop to ensure there is<br />
constant follow up with the site to help them sustain momentum. The<br />
accelerated change transition model defines this within the following<br />
slide (figure 9).<br />
Some of the success factors included using data analysis and<br />
prioritising to find simple problems with a cost benefit. The problems<br />
we looked for had to impact on the business, be easy to solve with<br />
little eff o rt (minimal capital as this will always slow down<br />
i m p rovement) and we need to be confident that a solution existed.<br />
This approach ensured we got some early successes as shown in<br />
figure 10.
Sustaining Moments:<br />
“The transition zone of changes re q u i res constant attention to<br />
fueling the energy for forw a rd action. Fueling means planning to<br />
e n s u re early wins, publicising victories, celebrating early adopters,<br />
monitoring re s o u rce re q u i rements, and vigorously communicating the<br />
known and unknown”<br />
Success Factors: Learnings<br />
• Using data analysis we find • We need to integrate the PSE<br />
simple problems with other site initiatives<br />
• We have early successes as • Running follow up workshops<br />
we chose simple and easy at the same business is<br />
problem to work with producing better results than<br />
• Using facilitators speed up the multiple work shops at many<br />
process business<br />
Participants Quotes:<br />
When the workshop finished we had all this energy and once we went<br />
back to the day to day grind nothing happened. Is this just another initiative<br />
Figure 9: Sustaining momentum<br />
Sustaining Momentum:<br />
Get some early wins - and keep on winning<br />
List of Improvement<br />
opportunities<br />
Keep on winning through a<br />
shared understanding and<br />
ownership of the problem<br />
Pick some easy problems to start on - eg:<br />
• Simple, clear definition of problem<br />
• easy to analyse<br />
• confident in being able to solve<br />
• of benefit to the people involved<br />
Use a facilitator to drive the analysis and<br />
solution development process:<br />
• to speed up the process<br />
• to ensure its success<br />
• to coach our own people<br />
Achieve some good results:<br />
• benefits to the business<br />
• benefits for the people involved<br />
Publish the results to spread the news and<br />
encourage more improvement activities -<br />
and leverage more people into the process.<br />
Figure 10: Early success factors<br />
Some key learnings included integrating the PSE with other<br />
business initiatives as most businesses feel initiative overload and<br />
then the PSE arrives simply adding to list. By doing our homework we<br />
can demonstrate how the PSE supports the other business initiatives<br />
rather than being new.<br />
We have also found that businesses completing two or three of the<br />
PSE workshops over a 6-12 month period have produced significantly<br />
better results. By re t u rning for the second workshop we were able<br />
to catch up with participants and management and review the initial<br />
workshop. This continued dialogue has ensured that team based<br />
p roblem-solving stays on the businesses radar and helps to sustain<br />
momentum. This approach also provides an opportunity to revisit the<br />
data and look for new problems that can be targeted as part of the<br />
workshop, which provides a second kick-start for the site. The<br />
businesses have been calling for this follow-up support since the initial<br />
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
PSE workshops. We have struggled to develop an effective followup<br />
process due to the geographical locations and re s o u rces re q u i re d<br />
to support the businesses. The approach of running follow-up<br />
workshops at businesses rather than single workshops at multiple<br />
businesses looks to provide better results all round.<br />
2.6 Aligning systems and structures<br />
Of the seven change elements the PSE workshop and the<br />
businesses addressed, aligning systems and structures was the best<br />
c a t e red for. The accelerated change transition model is defined within<br />
the following slide figure 11.<br />
Key success factor is that the majority of businesses have<br />
adequate staffing, training, organization design, communication and<br />
information technology. Some businesses had detailed measures in<br />
place and re w a rds varied from individual perf o rmance goals to<br />
p roduction bonuses. The PSE workshop problem solving process has<br />
been refined over many years and is working well and delivering<br />
results, the process is shown in figure 12. The process has a number<br />
of key steps that the participants work through over 2 days, these<br />
steps include build understanding (identify problems), measure and<br />
analyse (root cause analysis), improve and monitor (implement<br />
solutions) and institutionalise (lock in the results).<br />
A key learning was to focus our eff o rts on the more difficult people<br />
and change elements, as this will give us the biggest re t u rn on our<br />
investment.<br />
Aligning systems and structures:<br />
“ T h e re are seven processes or systems that enable people and<br />
change efforts to succeed - staffing, training, measuring, rewarding,<br />
o rganisation design, comunication and information technology. These<br />
seven must be evaluated to determine which need to be modified to<br />
align them with the desired future state. These are powerful “levers”<br />
to help initiate and sustain change”<br />
Success Factors: Learnings<br />
• Most businesses have this • We do not need to focus our<br />
element covered e ff o rts on this element as there<br />
• The PSE process is working<br />
well delivering resullts which<br />
are measured<br />
a re bigger fish in the other<br />
elements<br />
Participants Quotes:<br />
When the workshop finished we had all this energy and once we went<br />
back to the day to day grind nothing happened. Is this just another initiative<br />
Figure 11: Aligning systems and structures<br />
2.7 Chartering a transition roadmap<br />
A Transition Roadmap enhances our ability to reward key events<br />
and milestones and builds momentum and commitment. It pro v i d e s<br />
us an accurate measure of the change initiative and provides focus<br />
and direction. The accelerated change transition model defines this<br />
within figure 13.<br />
To effectively implement PSE, we have developed a technical<br />
strategy (Q) as well as an acceptance strategy (A).<br />
The PSE workshop process focused heavily on the technical<br />
strategy: developing solutions, writing up action plans, developing<br />
some measures, setting up some dates and arranging follow meetings<br />
and workshops etc.<br />
Our approach also considered the cultural and org a n i z a t i o n a l<br />
change strategy (A) for enrolling the hearts and minds of those who<br />
must implement or will be impacted by the technical strategy. Wi t h o u t<br />
their acceptance of the solution, we will not get the behaviors, action,<br />
and urgency that impact the effectiveness of the strategy and its ability<br />
62
63<br />
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
to get the desired results.<br />
A key learning is that we must spend more time developing an<br />
o rganizational and cultural strategy to achieve and sustain the re s u l t s<br />
we want. It doesn’t mean we compromise the quality of the technical<br />
strategy in order to get acceptance. However we delude ourselves<br />
if we think we can get excellent results with only a technical strategy<br />
to the change. Often a less “perfect” solution combined with<br />
commitment and enthusiasm by those who have to implement it will<br />
help overcome the unforeseen bugs or flaws as people want it to<br />
work.<br />
Charting a transition roadmap:<br />
“A project plan for building the A must be as real as the plan for<br />
implementing the Q. Are milestones set and realised? Are there plans<br />
that establish accountability? What are the measures and feedback<br />
mechanisms to monitor pro g ress and give early warnings when the<br />
plan is off target?”<br />
Success Factors: Learnings<br />
• We have implemented some • Focusing on the technical<br />
solutions leading to business solution alone will not lead to<br />
benefits success<br />
• We are starting to track • We must work more on the<br />
problems solved in the acceptance strategy if we are<br />
workshop and monitor for to realise the total benefit<br />
results<br />
Participants Quotes:<br />
We can design out our problems, the operators will pick it up as we go<br />
along (we all know this is not the case, our research has shown 95% of<br />
simple problems don’t require capital, it is about how we work together<br />
Figure 13: Chartering a transition road map<br />
Figure 12: PSE process map<br />
3 WHAT HAVE WE LEARNT?<br />
The competitive market place is forcing us to be smarter at what<br />
we do and be more efficient in the process. Having an effective team<br />
based problem solving culture can provide a significant diff e re n t i a t o r<br />
between us and our competitors. To develop an effective pro b l e m<br />
solving culture we need to think beyond a process for solving<br />
problems (of which there are many proven effective problem solving<br />
p rocesses out there) and move into the more difficult areas of people<br />
and change which most of us resist.<br />
The PSE (Problem Solving Excellence) workshops to date have<br />
p roduced some good results. Some of the success factors and<br />
learnings are tabled below:<br />
Success factors<br />
• Participants made personal commitment to leading the way<br />
• Developed a thorough approach to engage management and the<br />
business<br />
• Workshop data analysis focused participants on business<br />
opportunities<br />
• Uptime model provided a holistic view to business losses<br />
• Some businesses using uptime targets to reduce losses over the<br />
next 5 years<br />
• Starting to integrate PSE workshop into business strategic plans<br />
• Having natural workgroups in the workshop builds coalitions and<br />
commitment<br />
• “Learning by doing” methodology makes problem solving<br />
relevant, fun and builds teamwork
• Most businesses have aligning system and structures change<br />
element covered<br />
• Using data analysis we find simple problems<br />
• We have early successes as we chose simple and easy<br />
problems to work with<br />
• The business needs to lead the way to support participants<br />
Learnings<br />
• Our expectations of the site were not always clear<br />
• This same shared urgency needs to happen outside the<br />
workshop<br />
• The business needs to be open and honest so people own the<br />
urgency<br />
• This same coalitions and commitment needs to happen outside<br />
the workshop<br />
• We need to work with the resistance to change and don't<br />
underestimate it<br />
• Focusing on the technical solution alone will not lead to success<br />
• We must work more on the acceptance strategy if we are to<br />
realise the total benefit<br />
• We need to integrate the PSE with other site initiatives.<br />
• Running follow-up workshops at the same business is producing<br />
better results than multiple workshops at many businesses<br />
On completing this paper it become obvious that we are well on<br />
the way to building a superior problem solving capability within BHP<br />
Billiton, one where problems are identified early, the knowledge and<br />
experience of our people are applied to properly determine the root<br />
cause, and where team action is taken to improve the business<br />
performance by eliminating problem root causes.<br />
We also have a real challenge in front of us to tackle some of the<br />
change elements that focus on people to realise the full benefit of<br />
PSE. If we can do this effectively and can get there before our<br />
competitors we will have a substantial competitive advantage and<br />
achieved something truly great. The good news is as a result of the<br />
review we now have a clear direction and we know what has to be<br />
done.<br />
“The authors would like to acknowledge the value of working with<br />
our colleagues Phil St Baker, Ian King, Craig Hurkett, Richard Blayden<br />
and the numerous site participants who actively commited themselves<br />
to team based problem solving. Over the past years we have all<br />
worked hard to help people develop the skills and processes re q u i re d<br />
to eliminate losses from their business’s bottom line.<br />
David Jenkins is a Senior Consultant with Hatch Consulting located<br />
in Brisbane (www.hatch.com.au) while Peter Townsend is a Full Ti m e<br />
member of BHP Billiton’s Global Maintenance Network and is also<br />
located in Brisbane.”<br />
Maintenance 2005 Seminars<br />
Course One<br />
Planned Maintenance & Maintenance People<br />
The What, When & Who of Maintenance<br />
Course Two<br />
Maintenance Planning<br />
Advances In Maintenance Planning, Maintenance Control & Feedback<br />
Course Three<br />
Maintenance Management<br />
Success & Excellence In Maintenance & Asset Management<br />
For more information see: www.maintenancejournal.com<br />
or Email: mail@maintenancejournal.com Phone: 03 5975 0083<br />
IMPLEMENTING PROBLEM SOLVING EXCELLENCE USING SIX SIGMA<br />
Attend Just one, two<br />
or all three of these<br />
one-day course<br />
PRESENTED BY<br />
Len Bradshaw<br />
Melbourne<br />
18-20 May 2005<br />
Townsville<br />
18-20 July 2005<br />
Sydney<br />
29-31 Aug 2005<br />
In-house presentation of these seminars will only be considered for organisations outside of Australia<br />
64
65<br />
The Role Of Knowledge In Managing Maintenance For Business Success<br />
The Role Of<br />
Knowledge In<br />
Managing<br />
Maintenance For<br />
Business Success<br />
Extracts from a paper by the following authors:<br />
Dr. Mousumi Samanta<br />
Lecturer, B.K.C. College, Kolkata, India<br />
Dr. Bimal Samanta<br />
Lecturer, Mine Survey Dept., Asansol, West Bengal, India<br />
1. Knowledge<br />
In an increasingly competitive business environment, there is an<br />
upsurge of interest in the business community about the importance<br />
of managing knowledge. Knowledge is regarded as a most valuable<br />
and strategic re s o u rce for creating sustainable competitive<br />
advantage. It is considered to be the capability for effective action.<br />
Definition of Knowledge<br />
In making an attempt to define ' knowledge' we are rather<br />
compelled to use such terms as 'consciousness', 'cognition',<br />
' a w a reness', 'experience' etc. which have more or less the same<br />
sense as the former and we are also confronted with the same<br />
situation if we attempt to define any of these terms themselves.<br />
Though it is somewhat difficult to define ' knowledge', yet it is not<br />
impossible to characterise knowledge in such a way that we can<br />
understand what it is as a form of consciousness as distinguished<br />
f rom other forms such as opinions, belief, doubt, emotions, desire s<br />
and volition etc. Knowledge as a form of consciousness can be<br />
defined as complete justified true belief. To say that 'we know' is to<br />
say that (a) what we are conscious of is true, (b) we believe that it is<br />
true and (c) we have adequate evidence to believe that it is true and<br />
obviously the above three are the main constituents of<br />
knowledge[Samanta, 1995].<br />
2. Data, Information and Knowledge<br />
Leaving behind the philosophical part of knowledge most<br />
re s e a rchers in KM literature agree in presuming that knowledge is<br />
something different from data and information. While the distinction<br />
between data and information may be clear-cut, that between<br />
information and knowledge is often less obvious. This is partly due to<br />
the human habit of taking information, accepting it and treating it as<br />
knowledge. In order to effectively apply and to understand KM, it is<br />
i m p o rtant to distinguish between knowledge and information and think<br />
of how knowledge and information relate.<br />
T h e re are three main schools of thought in defining knowledge.<br />
One group of re s e a rchers argues that data, information and<br />
knowledge focus on diff e rent parts of a value chain or hierarc h i c a l<br />
s t ru c t u re as shown in fig. 1a. The other focuses on the analysis of<br />
' p rocess' of knowing through which the knowledge is cre a t e d ,<br />
p rocessed and disseminated (Fig. 1b). The third group re g a rd s<br />
knowledge as 'thing' or 'object'. According to value chain, data are<br />
raw facts, figures or observation and information is data organised so<br />
that it has meaningful context, and knowledge is meaningfully<br />
o rganised accumulation of actionable information applicable to<br />
problem solving [11] .<br />
A c c o rding to process viewpoint, knowledge can be identified with<br />
both justified belief in mind (personalised information or the cognitive<br />
status of knowing) and commitment anchored to the overall<br />
epistemological stru c t u re(Sveiby1997, Malhotra1998, Nonaka&<br />
Takeuchi1995,). Data is uninterpreted material on which a decision is<br />
to be based, information is data interpreted in a given context.<br />
Knowledge is the cognitive ability to generate insight based on<br />
i n f o rmation and data [ 1 5 ] . Knowledge can also be considered as the end
of chain that begins with data as a commodity, while value is added<br />
to data when they are processed into information and inturn<br />
i n f o rmation gains further value when it is applied in meaning context<br />
becoming and transformed into knowledge. However, within the value<br />
chain approach, some re s e a rchers re g a rd knowledge as a thing or<br />
object that we can manage, store and manipulate [11] .<br />
T h e re are two types of knowledge: Tacit and Explicit. This<br />
distinction between tacit and explicit is increasingly recognised by<br />
scholars, subject of discussion and fundamental to the concept of KM.<br />
This important distinction between tacit and explicit knowledge with<br />
re g a rd to forms of knowledge is introduced by the chemist-turn e d<br />
philosopher M. Polanyi and used by Nonaka to formulate a theory of<br />
o rganisational learning that focuses on the conversion/ creation of<br />
knowledge between tacit and explicit forms. Explicit knowledge or<br />
know-what (sometimes re f e rred to as formal knowledge) is explicit<br />
and discrete types and most common type of knowledge. It is very<br />
often codified and stored in a written form such as manuals,<br />
b ro c h u res, technical drawings, scientific formula, patents; and re a d i l y<br />
communicated in symbolic form or in formal and systematic language<br />
and shared through print, electronic method and other formal means.<br />
It can be gained through education or structured study.<br />
Tacit knowledge (also informal knowledge), on the contrary, is<br />
primarily more tacit and hard to articulate with formal language. It is<br />
highly personal, and deeply rooted in an individual's experience,<br />
actions, understanding and involves personal belief, values,<br />
perspectives, insights and assumptions. It is highly contextual and<br />
culture-bound. It involves both cognitive and technical elements and<br />
is non-transferable without direct personal interaction( either physical<br />
or virtual). Therefore it is not found in manuals, books, documents or<br />
Acquire<br />
Information +<br />
∑ (Experience,<br />
values, patterns,<br />
implicit rules)<br />
Data + ∑ (Attribute,<br />
relevance, context)<br />
Raw facts, Figures,<br />
Observation<br />
Fig. 1a Data, Information and Knowlegde<br />
Data<br />
Quantity<br />
Process<br />
Knowledge<br />
Information<br />
Data<br />
Result Action<br />
The Role Of Knowledge In Managing Maintenance For Business Success<br />
Fig. 1b Data, Information, Knowledge and Decision making<br />
databases. Tacit dimensions of knowledge build-up overtime in<br />
peoples' heads, hands and relationships. People generally use stories,<br />
metaphors, analogies and demonstrations to convey their tacit<br />
knowledge to others. Polanyi( 1967) encapsulates the meaning of tacit<br />
knowledge as ' we are more than we can tell' e.g. swimming, ride a<br />
bicycle. It is assumed that tacit knowledge has more value than<br />
explicit knowledge. According to Nonaka( 1995) ' the key to knowledge<br />
creation lies in the mobilisation and conversion of tacit knowledge'.<br />
H o w e v e r, Bohn( 1994) advocates that knowledge is only valuable when<br />
it can be explicit. Even in philosophy this point is emphasised, since<br />
the question of knowledge does arise when there is proposition and<br />
only a proposition can be true or false. Actually, both forms of<br />
knowledge are important for maintenance effectiveness. The task of<br />
KM for maintenance effectiveness is, there f o re, to identify and<br />
facilitate the application of valuable tacit knowledge that is potentially<br />
useful when it becomes explicit.<br />
The dimension of tacit knowledge is divided into two categories:<br />
technical and cognitive. Technical tacit knowledge(TTK) consists of<br />
i n f o rmal personal skills or craft, sometime re f e rred to as ' k n o w - h o w '.<br />
Cognitive tacit knowledge(CTK)encompasses implicit mental models,<br />
perceptions, beliefs and values.<br />
I n f o rmation becomes knowledge once it is processed in the<br />
people’s mind( tacit knowledge as per Nonake'95 , Prusak,97) which<br />
then becomes information ( explicit knowledge as per Nonaka) once<br />
it is articulated or communicated to others in the form of spoken or<br />
written words, text, computer output or other means. There are some<br />
definition of knowledge as justified personal belief that increases an<br />
individual's capacity to take effective action.(Alavi& Leinder, ) .<br />
Davenport & Prusak ( 1998) describe knowledge as" a fluid of framed<br />
experience, values, contextual information and expert insight that<br />
p rovides a framework for evaluation and incorporating new<br />
experiences and information".<br />
3. Knowledge and Maintenance<br />
Maintenance effectiveness depends upon the interplay of many<br />
factors. These are decision making capability, the ability to deliver<br />
d e s i red maintenance by individuals and by department, technical and<br />
managerial capability i.e. design, fault prognosis and diagnosis etc.,<br />
the ability to act in time, and better co-ordination, communication,<br />
commitment, co-operation between, and joint effort of, maintenance<br />
and operation, or the equipment designer, manufacturer and user. All<br />
the above factors depend to significant degrees on eff e c t i v e<br />
a v a i l a b i l i t y, creation, share and application of good knowledge and<br />
clear understanding and consequently, broad and systematic<br />
management of knowledge. Maintenance knowledge is both explicit<br />
(engineering principles and technical drawing etc.), and tacit (in one's<br />
knowledge of organisations or location). There is a significant positive<br />
c o rrelation between measure of tacit knowledge and job perf o rm a n c e<br />
for all levels of management [20] .<br />
Analyzed or<br />
Information Knowledge<br />
Relevant and actionable<br />
Implementation Formulate<br />
Apply<br />
for<br />
• Decision Making<br />
• Strategic Formulation<br />
• Problem Solving<br />
• Inovation, Creativity<br />
66
67<br />
The Role Of Knowledge In Managing Maintenance For Business Success<br />
Complete Knowledge<br />
Under<br />
Certainty<br />
Under<br />
Risk<br />
Decision Making Condition<br />
Incomplete Knowledge<br />
Figure 2 The zones of decision making<br />
Under<br />
Uncertainty<br />
A decision is the selection of an alternative out of the several<br />
number of alternatives available at hand considering diff e rent re l a t e d<br />
criteria. Successful organisations get competitive advantage at least<br />
in three ways: by making right decisions, by making decisions in time,<br />
and by implementing decisions timely & rightly. Maintenance decision<br />
constitutes the most important thing that engineers do. One of the<br />
p r i m a ry roles of an engineer is to evaluate alternatives and choose<br />
the most appropriate. The more they know, better is their judgement [ 4 ] .<br />
In fact, decision making may be assumed as a process synonymous<br />
with the whole process of management. Again, one of the key skills<br />
required of a maintenance engineer is the ability to deliver machines<br />
that satisfy users' re q u i rements, by the correct configuration,<br />
re l i a b i l i t y, integration, operation and control and perf o rmance. In ord e r<br />
to determine an appropriate maintenance policy for machinery,<br />
management boils down to making a series of decisions concerning<br />
the following (i)why perform maintenance(ii) which equipment are to<br />
be maintained (iii) the average interval between component failures<br />
or when to perf o rm preventive maintenance(iv)which actions are<br />
required or what to do on the machine(v) what level of maintenance<br />
mix will be applied in each case (vi) how to do it and where to do it(vii)<br />
how is the maintenance work to be organised (viii)how long it takes.<br />
Outcome of the decision or choice/ solution depends on what the<br />
decision maker knows or believes(Turban'1988). Lack of knowledge<br />
is a major shortcoming of the above important decision. Figure 3<br />
classifies knowledge into three categories ranging from complete<br />
knowledge to ignorance [ 1 5 ] . Decision making under certainty (with<br />
complete knowledge) implies that consequences/outcomes that will<br />
follow are already known; decision making under risk(less than<br />
complete knowledge) means a probabilistic or stochastic decision<br />
situation and decision making under uncertainty (ignorance/ least<br />
knowledge) means the probability of occurrence of the possible<br />
outcome not known.<br />
We have already described that data are facts and figure s ( f i g .<br />
1b).Collection of quality failure/ operation/cost data are usually<br />
necessary in machine capability or effectiveness analysis for getting<br />
reliable and accurate results. Data collected from the field are<br />
assumed to be the best. Again, data are re q u i red to be collected over<br />
a period of time for providing satisfactory representation of the true<br />
f a i l u re characterisation of the machine. Data is of paramount<br />
i m p o rtance to determine facts, causes and failure rate, availability<br />
etc. Technical data are re q u i red for design and operational<br />
assessment. Data are processed or organised for meaningful analysis.<br />
Numeric data can be entered into spreadsheet, and trend, chart ,<br />
qualitative and quantitative analysis drawn. During the analysis phase,<br />
i n f o rmation is transformed into knowledge. This knowledge is now<br />
context specific, relevance and actionable for planing, scheduling and<br />
executing machine maintenance decision making, problem solving,<br />
p rognosis/diagnosis, creativity and innovation(fig.2b). Moubray '97<br />
advocates that knowledge enhances clear understanding of the<br />
nature of equipment failure as well as its design capability in relation<br />
to the desired performance of machine.<br />
4. Knowledge Management<br />
KM is concerned with two aspects, identifying and managing the<br />
knowledge that already exist in the organisation and enhancing the<br />
ability to create new knowledge to meet maintenance objectives.<br />
T h e re is not yet a clear, consensus and universally accepted definition<br />
of KM. There are several working definition of KM found at<br />
conference, in print and on Webs. Some of the best definitions of KM<br />
come from current re s e a rchers, whom are widely consulted<br />
practitioners and specialists in the field. The following are a<br />
re p resentative sample. Sveiby(1997) defines KM as ' art of cre a t i n g<br />
value from an organisation's intangible assets. Ruggles( 1998)<br />
describes KM as "an approach to adding or creating value by more<br />
actively leveraging the know-how, experience, and judgement<br />
resident within and, in many cases, outside of an organisation." KM<br />
is the "process of collecting, organising, classifying and disseminating<br />
i n f o rmation throughout an organisation, so as to make it purposeful<br />
to those who need it." (Albert, 1998). KM deals with the process of<br />
c reating value from an organisation's intangible<br />
assets(Liebowitz,1999). Beckman(1997) defines as "the formalisation<br />
of and access to experience, knowledge, and expertise that cre a t e<br />
new capabilities, enable superior perf o rmance, encourage innovation,<br />
and enhance customer value." [ 2 1 - 2 2 ] A c c o rding to Yo g e s h<br />
Malhotra(1997), "knowledge management caters to the critical issues<br />
of organisational adaption, survival and competence in face of<br />
i n c reasingly discontinuous environmental change. Essentially, it<br />
embodies organisational processes that seek synergistic combination<br />
of data and information processing capacity of inform a t i o n<br />
technologies, and the creative and innovative capacity of human<br />
beings". Malhotra argues that this is a strategic view of KM that takes<br />
into account the synergy between technological and behaviour<br />
aspects as necessary for survival in ' wicked environments'. The need<br />
for synergy of technological and human capabilities is based on the<br />
distinction between the 'old world' of business and the 'new world'<br />
of business. Some have defined KM as getting the right inform a t i o n<br />
to the right people at right time so that they can make the best<br />
decision. However, Malhotra advocates that in a world of radical<br />
discontinuous change, it is impossible for a system to predict in<br />
advance what the right information, right person or the right time will<br />
be at any given point in the future. KM focuses on 'doing the right<br />
t h i n g ' ( e ffectiveness) instead of 'doing things right' ( efficiency). KM<br />
is a framework within which the organisation views all its processes<br />
as knowledge processes. So it is found that there are several schools<br />
in the subject of KM till now. However, most gurus consider that KM<br />
is a process. This is based on the understanding organisation as a KM<br />
system. With this view, KM can be defined as a specified business<br />
p rocess through which organisations systematically and<br />
c o m p rehensively identify, create, store, share, and apply their<br />
institutional or collective knowledge to improve overall org a n i s a t i o n a l<br />
effectiveness(OOE) or overall maintenance effectiveness(OME).<br />
5. KM Framework for Maintenance<br />
Management<br />
There are several frameworks for KM developed by scholars. KM<br />
frameworks have been described diff e rently by diff e rent authors. In<br />
characterising the nature of KM phenomena, frameworks differ not<br />
only in their focus, but also in their breath and depth. In their reviews<br />
Holsapple and Joshi 1999; Lai and Chu, 2000 and Rubestein-Montano<br />
et al. 2001 discuss the components and assumptions in the existing<br />
frameworks for organisation context. There appears to be a<br />
consensus on the need for a more specific framework for the<br />
maintenance management context. We have developed a KM<br />
framework for maintenance purpose(Fig.3). Even though the existing<br />
and the suggested frameworks recognise varying org a n i s a t i o n a l<br />
contexts, they generally appear to ignore the diff e rences in the<br />
operating environmental contexts. The working of KM framework<br />
depends on individual knowledge capabilities(IC) or competencies,
o rganisational knowledge capabilities(OC) and enviro n m e n t a l<br />
influences(EI). The stru c t u re of the framework is as follows: first layer-<br />
Environmental influence, second layer-Organisational and Individual<br />
capabilities or competencies, third - KM process/ life cycle and finally<br />
Maintenance process. Environmental factors generally influence the<br />
KM process for uncertain future through employee and organisation.<br />
E n v i ronment can be viewed from diff e rent dimensions like sociocultural,<br />
political, Governmental, legal, economic, customer, supplier,<br />
competitors, product/ market change, design complexity, technology<br />
and community etc. Individual knowledge capabilities comprise of<br />
individual skill, knowledge, value, norm, education, experience, time<br />
and motivation. A person working in or with an organisation is the<br />
main actor of the KM process. On the other hand, org a n i s a t i o n a l<br />
knowledge capabilities include organisational culture, stru c t u re &<br />
strategy, infrastructure & technology particularly IT, human resource<br />
development, objectives, leadership, knowledge asset etc. The<br />
successful organisations are those that consistently manage the<br />
continuous and ongoing KM process of identifying, creating, storing,<br />
distributing and applying their knowledge that define the ' core<br />
competency'. In fact, an organisation re q u i res knowledge for<br />
o rganising and maintaining itself as a functioning enterprise.<br />
Organisation and environment interact with one another, as a result<br />
of which information is absorbed and knowledge originates and action<br />
is taken on the basis of its combination with the experience, values<br />
and internal rules (Davenport and Prusak).<br />
KM generally deals with a number of diff e rent core knowledge<br />
Environmental Influence<br />
process activities. KM activities have also been described differently<br />
by different authors. From research and experience and reviewing a<br />
broad range of KM process described in literature it is found that the<br />
following five basic knowledge process activities are sufficient and<br />
a p p ropriate: (1)Identify (2) C reate (3) S t o re (4) S h a re and (5) A p p l y.<br />
These are also called as knowledge life cycle. Though some<br />
a p p roaches have additional activities, they still include in our five<br />
basic activities.<br />
Identify: The first phase of KM process is the identification o f<br />
knowledge available within the organisation. Every organisation has<br />
some maintenance objectives. To reach any destination we must know<br />
w h e re we are. Similarly, to achieve the maintenance objective,<br />
o rganisations need to identify what knowledge they possess and what<br />
they are lacking. It is necessary to assess continuously the 'best<br />
practices'. It includes an analysis of re q u i rements of machine,<br />
o rganisational core capabilities and knowledge re q u i rements. In ord e r<br />
to avoid the reuse of knowledge to reinvent the wheel, the<br />
identification steps should be done before creating new knowledge.<br />
C reate: The next phase is the c reation of new knowledge to<br />
i m p rove maintenance perf o rmance and sustainable competitive<br />
advantage. Nonaka and Takeuchi(1995)in their dynamic model of<br />
knowledge creation suggest that knowledge is created and<br />
t r a n s f e rred through social interaction amongst individuals and<br />
o rganisations. Nonaka and Takeuchi also propose four diff e rent modes<br />
of knowledge conversion between tacit knowledge and explicit<br />
Equipment: Design complexity, cost of procurement, maintenance and spare parts<br />
Business: Threat, opportunity, competition and globalization.<br />
Availability: Maintenance alternatives, quality manpower and technology.<br />
Change: Culture, technology, economy, product market, customer requirements.<br />
Usable<br />
Machine<br />
Maintenance<br />
Implementation<br />
Organisational Capability<br />
And Individual Capabilities<br />
Maintenance<br />
Choice<br />
The Role Of Knowledge In Managing Maintenance For Business Success<br />
Identify<br />
KM<br />
Process<br />
Maintenance<br />
Alternatives e.g.<br />
corrective, preventive,<br />
RCM or TPM<br />
Figure 3 KM framework for maintenance<br />
Feedback<br />
Maintenance<br />
Problem e.g.<br />
machine breakdown<br />
or likely to fail<br />
68
69<br />
The Role Of Knowledge In Managing Maintenance For Business Success<br />
Tacit Knowledge<br />
From<br />
Explicit Knowledge<br />
Tacit Knowledge<br />
knowledge(Fig. 5) in a matrix :<br />
Socialisation ( f rom tacit to tacit): an individual acquires tacit<br />
knowledge directly from others through shared experience, imitation,<br />
o b s e rvation, practice, on job training, brainstorming and becomes<br />
'socialised' into a specific way of doing things.<br />
Externalisation (from tacit to explicit): It is a knowledge creation<br />
p rocess. By its nature, the conversion of tacit knowledge into explicit<br />
knowledge is somewhat difficult. Tacit knowledge is converted into<br />
explicit form with the help of stories, metaphors, analogies,<br />
demonstrations, concepts, hypothesis or models e.g. writing a report<br />
after attending a maintenance conference or workshop, dialog among<br />
teams members.<br />
C o m b i n a t i o n ( f rom explicit to explicit): combines discrete pieces<br />
of explicit knowledge into a new whole, e.g. compiling data fro m<br />
n u m e rous source to write a re p o rt. The re p o rt is constituted by this<br />
new explicit knowledge.<br />
Internalisation (from explicit to tacit): It is a process of ' learning<br />
by doing' and a verbalisation and documentation of maintenance<br />
experience. Individuals have to understand and internalise inform a t i o n<br />
which involves creating their own tacit knowledge so that they can<br />
act on it. These processes do not occur in isolation, but work together<br />
in different combinations in typical business situations. Knowledge is<br />
shared, articulated, and made available to others when as a result of<br />
the individuals' participation in these process organisational learn i n g<br />
takes place. Creation of new knowledge takes place through the<br />
p rocesses of combination and internalisation. Socialisation and<br />
externalisation are complex and human interactive process.<br />
S t o re: The next phase is the s t o r a g e of above newly cre a t e d<br />
knowledge in individual and organisational memory in order to build<br />
up knowledge assets for future benefit. This also includes storing it in<br />
the form of documents, data-based and records.<br />
S h a re: The purpose of this step is to distribute the new knowledge<br />
with the members of the organisation. Knowledge is transferred and<br />
made accessible to workers throughout the organisation thro u g h<br />
collaboration, training, coaching and workshops. In fact, if knowledge<br />
of any persons be not shared by others that will have only a limited<br />
organisational value. Again, unlike tangible assets knowledge grows<br />
when it is only shared, after all " a candle loses nothing by lighting<br />
another candle".<br />
Apply: Knowledge becomes valuable if it is practically applied in<br />
Socialisation Externalisation<br />
Internalisation<br />
To<br />
Explicit Knowledge<br />
Combination<br />
Figure 4 Knowledge created by four modes of knowledge conversion (after Nonaka and Takeuchi, 1995)<br />
the machine maintenance. On the other hand, if it is not so used, the<br />
same purpose is defeated. In fact, the firm's ability to create and<br />
sustain competitive advantage through maintenance should be<br />
fundamentally based on integration and application of specified<br />
knowledge of the members of the organisation. Valuable human and<br />
knowledge re s o u rces will be lost unless organisations make better<br />
use of their critical resources.<br />
As Knowledge is context specific, it depends on a particular time<br />
and space. In the fast changing business environment, knowledge<br />
also becomes obsolete over time unless organisations make better<br />
use of their creative workers who desire to apply their knowledge for<br />
value addition. Use of knowledge, there f o re, becomes an input for<br />
knowledge identification phase. In this way, each KM process step<br />
paves the input for the next step and that again for the next and so<br />
on. Since thus the cycle of knowledge is built upon itself, it becomes<br />
a knowledge spiral in the organisation as describe by Nonaka and<br />
Takeuchi(1995). However, an organisation cannot create knowledge<br />
without individuals.<br />
The output of such new knowledge will become the basis of all<br />
work done by the maintenance department. The maintenance<br />
engineers are re q u i red to translate the output of putting knowledge<br />
in practice to work into day to day activities that can be perf o rmed by<br />
the maintenance staff. In order to support proactive maintenance<br />
management, it is necessary first to know what events are likely to<br />
o c c u r. Knowledge of employees of the organisation substantially<br />
influences efficiency of its activity, the achievements of its goals and<br />
adaptation to complex changing conditions. In fact if the employees<br />
of an organisation have wide and deep knowledge the org a n i s a t i o n<br />
works better and will have greater potentiality for work in the future.<br />
For machine diagnosis a large amount of knowledge is also required,<br />
viz, knowledge of equipment and how it normally operates, knowledge<br />
about the failed equipment and its fault systems etc. In this context<br />
it may be said that Reliability Centred Maintenance( RCM) strategy is<br />
c o n c e rned with the technical aspects of the machine where as in<br />
Total Productive Maintenance(TPM) importance is given to human<br />
aspects of the implementation process. TPM is sensitive to the<br />
o rganisational culture and people's knowledge, where as RCM<br />
demands a higher level of technical knowledge about the systems/<br />
equipment under consideration. TPM aims at improving the<br />
o rganisational knowledge capabilities by enhancing the pro b l e m<br />
solving skills of individuals and enabling them to learn whatever they
have to learn in various functional areas [26] . People who operate and<br />
maintenain the equipment on a day-to-day basis, they tend to know<br />
how the equipment works, what goes wrong with it, how much each<br />
f a i l u re matters and what must be done to fix it- and if they don't know,<br />
they are the ones who have the most reason to find out[4]. History,<br />
experience and a precise knowledge of how a system operates<br />
regulates and controls the eventual success of maintenance strategy<br />
implementation. So TPM (people), RCM(technology) and content(<br />
knowledge) can be integrated for getting overall maintenance<br />
effectiveness( OME).<br />
6. Concluding Remarks<br />
KM is not new. It is an evolutionary development rather than a<br />
re v o l u t i o n a ry. Even before the term KM coined in the early 1990s, many<br />
o rganisations have a well-established system to manage and generate<br />
knowledge in a variety of approaches for upgrading the knowledge<br />
base of their employees. Prusak(2001) looks at " knowledge<br />
management like any system of thought that has value, is both old and<br />
new, and its combination of new ideas with ideas that everyone has<br />
known all along”.<br />
H o w e v e r, under increasing competitive pre s s u re many companies<br />
a re recognised KM as a strategic weapon in the market place for<br />
business or maintenance success either through knowledgeable<br />
people delivering task more effectively or through managing the<br />
intellectual capital wisely. Again, due to global competition and<br />
turbulent business environment, there has been an increasing amount<br />
of interest shown to create, store, share and apply knowledge in all<br />
o rganisations. So in the digital age, knowledge plays an important ro l e .<br />
It is found that an essential part of KM is, of course, knowledge itself.<br />
The questions of origin and nature of knowledge has been explored<br />
f rom philosophical and KM perspective. Knowledge is something that<br />
resides in the head of a person rather than in computers and is<br />
revealed in skill and ability to operate in certain conditions. Knowledge<br />
is something different from data and information. It is, however, more<br />
than information. There is a diff e rence between two main types<br />
knowledge: tacit and explicit knowledge. KM cannot be viewed as the<br />
implementation of technology alone; rather it is a multidiscipline<br />
a p p roach that integrates business strategy, cultures, value and<br />
maintenance work processes. Creation of KM re q u i res the pro c e s s e s<br />
of social interaction. The unique configuration of individuals that make<br />
up the organisation is there f o re, paramount to KM's long-term viability<br />
and its value to maintenance. So organisation environment should be<br />
such that where workers readily transfer and share what they know,<br />
i n t e rnalise it and apply it to create new knowledge for overall<br />
maintenance effectiveness.<br />
Selected References:<br />
1. Samanta, B. (2003): Some aspects of optimising maintenance<br />
strategy for mining machinery, Unpublished Ph.D. Dissertation,<br />
Jadavpur University, Kolkata.<br />
2. Drucker P. (1993): Post-Capitalist Society, Oxford.<br />
3. Malahota, Y (2003): Is knowledge the ultimate competitive<br />
advantage? Business Management Asia, September, URL:<br />
http://www.brint.com/interview/maeil.htm<br />
4. Moubray, J.(1997): Reliability Centred Maintenance .2nd Ed.<br />
Butterworth-Heinemann.<br />
5. Nonaka, I,(1991): The knowledge-creating company, Harvard<br />
Business Review, (November-December), 96-104<br />
6. Prusak, L.(1997): Knowledge in Organizations, Butterworth-<br />
Heinemann.<br />
7. Prusak, L(2001): Where did knowledge management come<br />
from? IBM Systems Journal,Vol. 40,no 4, pp 1002-07.<br />
8. Wah, L. (1999): Knowledge Management- Behind the buzz,<br />
Management Review, April, pp. 17-26.<br />
9. Samanta, M. (1995): Knowledge and Certainty, unpublished Ph.D.<br />
Dissertation, Jadavpur University, Kolkata.<br />
10. Samanta, S. C.( 1975): The problem of a Priori Knowledge: A<br />
The Role Of Knowledge In Managing Maintenance For Business Success<br />
critical survey, unpublished Ph.D. Dissertation, Calcutta<br />
University, Kolkata.<br />
11. Shin, M., Holden, T. and Schmidt, R.A.(2001): From knowledge<br />
theory to management practice: towards an<br />
integrated approach, Information Processing and<br />
Management, Vol. 37,pp 335-355<br />
12. Sveiby, K.E. (1997):The New Organizational Wealth: Managing<br />
and Measuring Knowledge-Based Assets, Berrett-Koehler, San<br />
Francisco, CA.<br />
13. Malahota, Y.(1998): Knowledge management, knowledge<br />
organisations & knowledge workers: A View from the Front<br />
Lines. URL: http://www.brint.com/interview/maeil.htm<br />
14. Nonaka, I. Takeuchi, I. (1995): The Knowledge Creating<br />
Company. How Japanese Companies create the dynamics of<br />
innovation, Oxford University Press, Oxford.<br />
15. Turban, E.(1988): Decision Support and Expert systems-<br />
Managerial Perspectives, Macmillan Publishing Co. New York.<br />
16. Polanyi, M(1967): The Tacit Dimension. Doubleday.<br />
17. Bohn, R. E. (1994), Measuring and managing technological<br />
knowledge. Sloan Management Review, Vol.26, no.1,pp 61-73.<br />
18. Alavi, M. , Leidner, D.( 1999): Knowledge Management Systems:<br />
emerging views and practices from the field, In Proceedings of<br />
the 32nd Annual Hawaii International Conference on Systems<br />
Sciences, Los Alamitos, CA, USA, IEEE Computer Society.<br />
19. Davenport, T.H. and Prusak, L. (1998): Working Knowledge: How<br />
Organizations Manage What They Know, Harvard Business<br />
School Press, Boston, MA.<br />
20. Smith, E.A.( 2001): The role of tacit and Explicit knowledge in the<br />
workplace, Journal of Knowledge Management, Vol. 5, No. 4,<br />
pp311-321.<br />
21. Shukla1,M(2003): Revisiting Knowledge Management:<br />
Integrating "Knower" with the Knowledge Processes, from Web<br />
22. Jinxi, W., Jisheng, L.(2003): Knowledge Chain<br />
Management:Emerging Models and Practices from the Field,<br />
from Web.<br />
23. Holsapple, C., Joshi, K. (1999): Description and analysis of<br />
existing knowledge management frameworks, In proceeding of<br />
the 32nd Hawail International conference on system science,<br />
Los Alamitos, CA, USA, IEEE Computer Society.<br />
24. Lai, H. and Chu, T.(2000): Knowledge Management: a theoretical<br />
frameworks and industrial cases, Proceedings of the 33rd<br />
Hawaii International Conference on System Sciences<br />
25. Rubenstein- Montano, B., Liebowitz, J., Buchwalter, J., McCaw,<br />
D., Newman, B., and Rebeck, K.and TKMM Team (2001): A<br />
Systems thinking Framework for Knowledge Management,<br />
Decision Support Systems, vol. 31,no 1, pp. 5-16.<br />
26. Samanta,B., Sarkar,B.and Mukherjee,S.K.(2001): Maintenance<br />
management- a key factor to success in mechanized coal mines.<br />
Coal Mining Technology and Management, Vol 6,No 2, pp 5-10.<br />
70
71<br />
Planned Maintenance Corner<br />
Each issue of the MJ will have a sample Condition Monitoring routine. This issues’ sample is provided from IDCON’s 3 volume series of books<br />
on “Condition Monitoring Standards”. This excellence series contains a useful range of Condition Monitoring / Planned Maintenance routines<br />
and is available from:<br />
IDCON:<br />
info@idcon.com www.idcon.com<br />
or for the Asia Pacific region:<br />
mail@maintenancejournal.com www.maintenancejournal.com<br />
Basic Principal<br />
The purpose of a steam trap is not as the name may indicate to trap steam, but rather to trap condensate in a steam line. The trap is<br />
mounted on or adjacent to a steam line. The trap should open and capture condensate when there is condensate in the steam line. The<br />
trap should be closed when steam is present in the line. It is usually important that the traps perf o rm closing and opening quickly to<br />
reduce steam and condensate losses. Condensate trapped in the steam trap may be purged into a condensate return system or may be<br />
purged to the atmosphere depending on system design.<br />
There are three types of steam traps, they are:<br />
Condition Monitoring Standard<br />
Steam Trap - Mechanical<br />
1. Ball float & bucket traps are mechanical steam traps. They operate be response to the difference density between and steam and<br />
condensate.<br />
2. Thermostatic steam traps operate by noticing the temperature difference between condensate and steam, see CMS for<br />
thermostatic steam traps for more information.<br />
3. Thermodynamic traps operate by the difference in thermodynamic energy between steam and condensate, see CMS for<br />
thermodynamic steam traps for more information.<br />
Ball Float Trap<br />
In the simplest form of the ball float trap, the float (B) is attached to the end of a rod (C). The opposite end of the rod is attached to a<br />
d i s c h a rge valve (D). When condensate fills the body of the trap the float rises, gradually opening the discharge valve. This trap is seldom<br />
used today without a thermostatic or bi-metallic plate to control discharge.<br />
Ball float steam trap Ball float steam trap principle of operation
Open Bucket Float<br />
The open bucket trap consists of a float (A) that is open at the top, a valve rod (D) extending through a discharge tube (E). The discharge<br />
valve (F) seats the orifice (G). Other parts are the fulcrum (C) and the body (B). In some designs the bucket surrounds the discharge tube,<br />
(see right picture), but operation is essentially the same.<br />
When condensates enter the trap, it gradually fills up and the bucket floats, causing it to push the valve close. The condensate will finally<br />
spill into the bucket, and the bucket sinks due to the added weight and pulls the valve open. The pre s s u re inside the trap will force the<br />
condensate through the discharge tube. As soon as the bucket has emptied it floats again and pushes the valve close.<br />
Inverted Bucket Float<br />
A newer and more commonly used mechanical steam trap is the invert e d<br />
bucket steam trap. The top of the bucket is attached to a valve rod (B), which<br />
p e rmits the discharge valve (C) to open and close as the bucket falls and<br />
raises. When the bucket is at rest it hangs downward with the valve open.<br />
Condensate enters the trap from the passage (D). As long as condensate is<br />
p resent the bucket stays down, but as soon as steam enters the trap, the<br />
bucket floats and rises causing the valve to close. Steam slowly condensates<br />
and also bleeds off through the small vent (F) at the top of the bucket.<br />
Another important purpose of the vent (F is to permit gases to escape. If it<br />
were not for the vent, the bucket would become filled with air and keep the<br />
valve closed all the time.<br />
KEY WHAT WHY<br />
Before checking the steam traps in a system, start by checking that steam pressure and<br />
temperature at the inlet of the system in the normal operating range.<br />
Always have in mind that some traps may have been installed incorrectly or have been<br />
poorly designed. For example:<br />
1. Supply line may be too small<br />
2. Condensate connection should be taken at lowest point in the apparatus.<br />
3. Condensate line should be sloped towards the trap.<br />
4. Is discharge line large enough to carry off the condensate?<br />
5. Is the backpressure in the return line higher than anticipated?<br />
6. Is there a check valve in the system, does it have the right capacity and does it<br />
function properly?<br />
T h e re is little point in checking all<br />
traps in a system before you<br />
know the system is running at<br />
normal operating parameters.<br />
72
73<br />
KEY WHAT WHY<br />
If the trap has a discharge to the atmosphere, a visual check can be done<br />
easily. If the condensate is transported in a condensate return system there<br />
should be a sample valve or a sight glass installed in order to do a visual<br />
check.<br />
The ball float valve is usually designed with a thermostatic or bi-metallic disc<br />
element today. Discharge will therefore be almost continuous, but the<br />
discharge will be condensate not steam.<br />
The bucket steam trap is easier to evaluate visually. If you can see the<br />
discharge and the trap discharges intermittently, the trap is working properly.<br />
Look for obvious leaks to the atmosphere on piping coming to and from the<br />
trap and on the trap itself. Continuous discharge to the atmosphere from a<br />
steam trap usually indicates a failed trap.<br />
It takes experience to learn to evaluate a steam trap. Different traps operate differently,<br />
and therefore have different sound characteristics. You should listen to the sound of the<br />
steam trap as you are watching the discharge. If you have a closed system (condensate<br />
return) watch the installed sight glass or use the nearby test valve. If neither test valve<br />
or sight glass is in place, make sure to install at next opportunity.<br />
Preferably use an ultrasonic listening device. An ultrasonic listening device will let you<br />
listen to specific frequencies without interf e rence from nearby equipment. If you don’t<br />
have an ultrasonic listener, use an industrial stethoscope. The instructions below are<br />
based on the following assumptions:<br />
1. Sound from the steam trap can be isolated, meaning there isn’t other steam traps close<br />
enough to distort the sound impression.<br />
2. The steam trap is designed right for the application. When inspecting, realize that all<br />
traps may not be perfectly sized for the operations, the guidelines below may therefore<br />
have to be tweaked to fit the application.<br />
Ball float with thermostatic element<br />
BALL STEAM TRAP<br />
At low loads the ball float<br />
traps have a tendancy to<br />
d i s c h a rge continuously, but<br />
at high pre s s u res the<br />
d i s c h a rge sound will be<br />
i n t e rmittent. If you hear a<br />
rythmic interm i t t e n t<br />
d i s c h a rge the trap is working<br />
properly.<br />
Condensate discharge will tell<br />
you if the trap is working pro p e r l y.<br />
P robable causes for impro p e r<br />
discharge:<br />
• Orifice worn<br />
• Malfunctioning trap<br />
• Plugged inlet line<br />
• Trap filled with dirt<br />
• Too high pressure<br />
• Inv. bucket: bucket vent filled<br />
with dirt<br />
Safety First!<br />
Steam systems can<br />
be extremely hot;<br />
do not touch any<br />
part of steam<br />
system.<br />
Listening to the cycle sound of a<br />
trap is a good indicator for<br />
evaluating the condition of the<br />
trap.<br />
A failed trap will have a different<br />
cycle sound than a well<br />
functioning trap.
KEY WHAT WHY<br />
BUCKET STEAM TRAP<br />
When the trap is working<br />
properly a hissing sound will<br />
be heard during discharg e .<br />
When the trap closes the<br />
hissing sound stops.<br />
Continuous hissing indicates<br />
failure.<br />
If you can see the discharge<br />
and the trap discharg e s<br />
i n t e rm i t t e n t l y, the trap is<br />
working properly.<br />
I N V E RTED BUCKET STEAM<br />
TRAP<br />
When the trap is working<br />
properly a hissing sound will<br />
be heard during discharg e .<br />
When the trap closes a tiny<br />
hissing sound will be heard<br />
since the trap may bleed<br />
t h rough the small vent (F),<br />
see above. Continuous loud<br />
hissing indicates failure .<br />
Often a rattling sound fro m<br />
the bucket can be heard<br />
when a trap has failed. If you<br />
can see the discharge and<br />
the trap discharg e s<br />
i n t e rm i t t e n t l y, the trap is<br />
working properly.<br />
Safety First! Steam systems can be extremely hot;<br />
do not touch any part of steam system.<br />
Te m p e r a t u re of the steam trap, discharge line and the inlet line usually has to be used<br />
conjunction with the methods above to be meaningful.<br />
Use an Infrared temperature gun for checking temperature.<br />
Cold inlet line can obviously tell you that the line is plugged or the system is down.<br />
The outlet line temperature is not a good indicator to draw any conclusions from unless<br />
you know the exact temperature of the steam, and the exact temperature of the<br />
condensate. Even though you know these temperatures, the outlet temperature may<br />
mislead you if a trap has failed closed since we don’t know the portion of condensate<br />
and steam in the line at the point we are measuring the temperature.<br />
A cold steam trap also indicates failure, but different traps may have different operating<br />
temperature depending of type and system parameters. A trap that is somewhat cooler<br />
than the system has not necessarily failed.<br />
Safety First!<br />
Steam systems can<br />
be extremely hot;<br />
do not touch any<br />
part of steam<br />
system.<br />
Cool trap is indicating failure.<br />
Cool inlet line indicates blockage<br />
in line<br />
Te m p e r a t u re in conjunction with<br />
ultrasonic can sometime help<br />
monitor the condition of the trap,<br />
but don’t rely on thermography by<br />
itself.<br />
74
75<br />
m a i n t e n a n news c e<br />
Skilled launches new Asset<br />
Management System -<br />
Skilled ASSET GUARDIAN<br />
Skilled Engineering recently launched - Skilled A S S E T<br />
GUARDIAN, a Computerised Maintenance<br />
Management System (CMMS) that assists companies<br />
in managing all aspects of their plant and facility<br />
maintenance operations.<br />
Along with maintenance-related tasks, the system can<br />
also be used for tracking assets of any type, such as:<br />
computers, audio visual equipment, vehicles, tools, dies,<br />
etc. It can even be used by service providers for<br />
tracking jobs on their client base.<br />
Skilled believes this new product is the perfect<br />
compliment to its contract maintenance and labour hire<br />
services and will allow it to provide a complete turnkey<br />
maintenance solution to companies - whether they<br />
simply require a CMMS, need some labour resources<br />
and a CMMS, or are looking to outsource their entire<br />
maintenance operation.<br />
The software is the result of a partnership with<br />
Canadian-based software developer Western Software<br />
Solutions and provides Skilled with a cutting edge<br />
CMMS that has the backup of a well established<br />
software development company.<br />
Greg Kastes, a Canadian who moved to Australia to<br />
further develop the market for the software, says Skilled<br />
ASSET GUARDIAN can be tailored to suit the<br />
maintenance operations of many different industries.<br />
“The software will track what has been done, notify of<br />
what needs to be done and will provide valuable tools<br />
such as spare parts lists and all maintenance costs with<br />
links to the source of the costs.<br />
“The value of the system is the history it builds up,” he said<br />
“There is also a huge benefit for Australian companies<br />
in that the support is right here should you need it.”<br />
Mr Kastes said, unlike some of its competitors, the<br />
software is thought out from a maintenance perspective<br />
and not a finance perspective, which means it provides<br />
everything you need plus some extras that are unique<br />
to maintenance situations.<br />
The software is easy to use and implement and provides<br />
all of the features that maintenance professionals expect.<br />
You can also “cherry pick” the features that you want<br />
to use and not be burdened by all the other features<br />
available in the system.<br />
If you would like more information about Skilled ASSET<br />
G UARDIAN please contact: Greg Kastes at Skilled<br />
Engineering on (03) 9924 2214.<br />
Avexus Showcases Mobile<br />
Computing MRO Solution was at<br />
Farnborough Airshow 2004<br />
Avexus Inc., has announced a new mobile computing<br />
capabilities that quickly and accurately capture critical<br />
data in point of work processes. This functionality speeds<br />
the flow of information from operations to all interfacing<br />
functions driving reduced costs and turn times.<br />
"Studies have shown that 20-30% of a worker’s<br />
production time is wasted on manual and inefficient<br />
tasks. Avexus' mobile solutions respond to our<br />
customers' growing need to extend operational<br />
efficiencies to point of work locations in the hanger or<br />
in the field," said Avexus’ CEO and president, Richard<br />
Bergmann. "Operators, third-party repair facilities and<br />
OEMs will now be able to use Avexus' MRO solutions<br />
with ruggedized mobile computing devices to increase<br />
efficiencies and productivity."<br />
The ability to use mobile computing at the point of work<br />
will ensure that on-wing or field work, such as that<br />
performed on aircraft during a non-routine inspection,<br />
is performed in the same consistent manner as off-wing<br />
work completed at a repair facility. Extending work<br />
management and execution to the point of work will<br />
also speed decision making concerning service and parts<br />
ordering; enable remote labor attendance monitoring<br />
and work order execution; ensure faster, more accurate<br />
material procurement; and enable integration of<br />
adaptive planning data with routine maintenance tasks.<br />
"Being able to climb onto an aircraft during an<br />
inspection and input codes for non-routine repair work<br />
will be a real boon to the enterprise that wants to<br />
reduce turn times and improve productivity," said<br />
Bergmann. "Data can be immediately transferred from<br />
the mobile device in the hanger to an engineer or<br />
production control specialist who can make quicker<br />
decisions about how to proceed most effectively based<br />
on other inputs and scheduled maintenance activities.<br />
These new efficiencies will speed assignment of<br />
resources, capacity planning and materials<br />
procurement. The ultimate benefit of these solutions<br />
is an overall increase in work productivity, work capacity<br />
and asset uptime.”<br />
w w w. a v e x u s . c o m .<br />
Barcode or RFID tags for asset<br />
tracking?<br />
Hardcat's Dan Drum suggests that it is important for<br />
the customer to be aware of both what it is they require<br />
in a tracking solution, as well as the many different<br />
variants of RFID tag currently fighting for market<br />
supremacy.<br />
"There are many RFID offerings on the market, and<br />
many more coming. The complexity varies from the<br />
selection of the tag, which could be active or passive.<br />
Then on top of that, is it LF, HF, UHF or GHz. That is<br />
followed by consideration of whether a fixed mounted<br />
or handheld reader required" says Mr Drum.<br />
A key consideration is that different readers are required<br />
to read the various tags available. Whereas it is possible<br />
to buy a barcode reader capable of reading the complete<br />
range of commonly available barcode formats, the same<br />
is not true for RFID.<br />
Whatever technology the customer chooses to tag their<br />
assets, they need to have some certainty that the
technology represents the best choice not only today,<br />
but in future. Also of importance is to be certain that<br />
the solution is ideal for tracking assets, as distinct from<br />
other tagged items such as warehouse pallets or<br />
supermarket goods, as there are important logistical<br />
considerations regarding the life of the tag, its sensitivity,<br />
and the cost of the infrastructure needed to read it.<br />
RFID technologies boast advantages that barcodes<br />
cannot deliver, such as active tags that allow movement<br />
of portable and attractive assets to be automatically<br />
detected, or embedded tags that are unlikely to risk<br />
tampering. However, barcoding retains key advantages<br />
for asset tracking - the technology is established and<br />
universal, and the label cost is very low, and the label<br />
is permanent and may potentially last for decades. Mr<br />
Drum suggests the consumer should weigh up the costs<br />
and benefits associated with either technology when<br />
making their decision.<br />
It is important also to remember that asset tags,<br />
whether barcode or RFID, should not be seen as the<br />
solution itself. They exist as a link between the physical<br />
asset item and the asset database. Mr Drum suggests<br />
that the most important consideration remains the<br />
functionality of the database software that forms the<br />
base of the solution. The Hardcat solution can be<br />
readily used with either RFID or barcode labels.<br />
Dan Drum www.hardcat.com<br />
Companies Launch First CMMS<br />
with Radio Frequency<br />
Identification<br />
Cathexis Innovations and MicroMain Corporation have<br />
announced their new strategic partnership. This<br />
partnership includes the launching of the first RFIDenabled<br />
computerized maintenance management<br />
system by a major CMMS vendor.<br />
With this new partnership, Cathexis and MicroMain<br />
have developed a fully integrated RFID-enabled version<br />
of MicroMain XM. This version incorporates Cathexis’<br />
RFID middleware solution, the RFID Engineô, so that<br />
assets can be managed with radio frequency<br />
identification in addition to or instead of bar codes.<br />
RFID improves asset identification, tracking and<br />
management through automation of the data collection<br />
and entry process. The RFID tags allow users to store<br />
information relevant to the asset directly on the tag itself.<br />
Customers then place RFID tags on their assets and use<br />
handheld RFID readers to immediately access and modify<br />
the information. This data typically includes make, model,<br />
serial number, owner, and maintenance history.<br />
Unlike bar codes, RFID does not require line of sight<br />
between the tag and reader, which increases speed in<br />
completing maintenance tasks or inspections. The<br />
benefits of RFID also include unique identification of<br />
assets in the field, “on-asset” maintenance history, and<br />
enhanced data integrity and accessibility for<br />
management and auditing. Because RFID minimizes<br />
data entry errors, accuracy is also improved.<br />
“The benefit of RFID technology in the domain of asset<br />
management is tremendous, and Cathexis is excited to<br />
be working with an industry leader like MicroMain to<br />
bring this ëout- of-the-box’ solution to market,” said<br />
Steven Taylor, President of Cathexis Innovations Inc.<br />
“This fully integrated solution is a marriage of Cathexis’<br />
cutting-edge RFID Engine middleware and MicroMain’s<br />
proven asset management suite,” he added. “The RFID<br />
Engine allows virtually any RFID or other A I D C<br />
(Automatic Identification and Data Capture) technology,<br />
such as bar codes, to be integrated into a software<br />
application. Users of the RIFD Engine typically<br />
experience reduction in development time, cost and<br />
complexity up to 75%. We are confident that this blend<br />
of innovative technology with a proven, reliable product<br />
like MicroMain XM, addresses a significant need in the<br />
market and offers tremendous value to end-users.”<br />
“MicroMain has achieved many ëfirsts,’ and now in<br />
partnering with Cathexis we are the first major vendor<br />
to offer an RFID-enabled CMMS,” said Pat Conroy,<br />
President of<br />
w w w. m i c r o m a i n . c o m<br />
FLUOR EARNS WORK ON<br />
AUSTRALIA’S NEWEST<br />
ALUMINA REFINERY<br />
Fluor Corporation has today announced that it has been<br />
contracted to provide asset management support<br />
services to Australia's newest alumina refinery with its<br />
joint venture partner Monadelphous Engineering Pty.<br />
Ltd.<br />
The Fluor Monadelphous Services team will provide<br />
integrated maintenance and shutdown services for the<br />
Comalco Alumina Refinery (CAR) owned by Comalco<br />
Alumina Ltd. The duration of the contract is five years.<br />
" We are really looking forward to combining the<br />
strengths of CAR and FMS in a positive relationship<br />
that will help us achieve a world-class refinery," said<br />
Maurice Schneider, Comalco superintendent of<br />
contract management.<br />
The refinery is planned for development in three stages<br />
and will operate using the Bayer process, the most<br />
economic means of producing alumina from bauxite.<br />
The plant initially will produce nearly one and one-half<br />
million tons of alumina annually, which will be shipped<br />
to other sites for further processing into aluminum metal.<br />
"This alliance is an example of true resource and<br />
systems integration,” said Matthew Langmaid, general<br />
manager of Fluor’s Operations & Maintenance group<br />
in Australia. “It is a rare example of pure alliance<br />
b e h a v i o r, where we have removed all traditional barriers<br />
to cooperation and apply daily the principles of<br />
openness, best for role, no duplication and sharing of<br />
best practice methods in everything we do.”<br />
F M S ’s services are designed to enable the refinery to<br />
effectively and efficiently manage its long-term<br />
reliability support, especially during times of peak<br />
workload, and provide an effective mechanism for<br />
supplying ongoing shutdown and routine maintenance<br />
support services.<br />
FMS is a joint venture of Fluor Australia Pty. Ltd., and<br />
Monadelphous Engineering Pty. Ltd, a leading<br />
Australian engineering construction, maintenance and<br />
industrial services company with a long-term presence<br />
in the Gladstone community. Together FMS and CAR<br />
are committed to supporting the development of local<br />
business and industry. w w w. f l u o r. c o m .<br />
76
77<br />
500,000 JOBS A MATER-NANCE<br />
MILESTONE<br />
B r i s b a n e ’s Mater Health Services has recorded its<br />
500,000th maintenance job in 13 years with the<br />
software package MAINPAC.<br />
Neil McMahon of the Mater’s engineering and<br />
environmental services group, says the milestone in the<br />
maintenance of buildings, infrastructure and even<br />
biomedical equipment, points to the need for<br />
appropriate information systems to support the<br />
emerging discipline of Enterprise Asset Management.<br />
"Immediate throughput of job costs and other relevant<br />
data to the plant and asset registers is essential to<br />
increase the accuracy of the Hospital’s financial and<br />
corporate reporting," Mr McMahon said.<br />
He predicts significant changes, beginning with a trend<br />
towards more "cost effective" maintenance.<br />
"It is becoming more common to replace or upgrade an<br />
item of equipment, rather than fix it continually.<br />
Hospital accreditation organisations are beginning to<br />
expect that benchmarking of activities with peer<br />
organisations occur on a regular basis.<br />
"There is a lot greater requirement for safe<br />
environments and more maintenance is being driven by<br />
workplace health and safety concerns. In the healthcare<br />
i n d u s t r y, accreditation and certification to certain<br />
external standards is a common event. More<br />
certification bodies are expecting specific areas within<br />
an entity to be able to report on the programmed<br />
maintenance for a period into the future to meet<br />
mandatory certification, so they can continue to provide<br />
services to the public," Mr McMahon said.<br />
By involving all levels of staff in the use of MAINPAC<br />
Mr McMahon’s department has continually developed<br />
new expectations and demands for improvement of the<br />
software. A Job Request module and functions to export<br />
data into the Mater’s finance system are examples of<br />
these improvements.<br />
The job request module can now give the entire 4500<br />
staff of Mater Health Services access to at least some<br />
part of MAINPAC. The job request and asset<br />
registration modules provide immediate feedback on<br />
plant or assets needing repair and work completed<br />
across the Mater’s 3 public and 4 private co-located<br />
hospitals across greater Brisbane.<br />
For further information please contact:<br />
Mr Peter Bates, Mainpac Pty Ltd,Telephone: 08 8130 7711<br />
Reliability Incident Management<br />
System<br />
During the last year, OMCS International has been<br />
quietly developing a new software product, RIMSys(TM)<br />
or Reliability Incident Management System.<br />
RIMSys(TM) is used to manage incidents deemed<br />
important enough to require formal investigation.<br />
It provides the following management functions:<br />
• a defined process of investigation, action,<br />
implementation and archive<br />
• incident recording<br />
• a summary screen for an overview<br />
• details screens for specifics, searching, filtering,<br />
data extraction and reporting<br />
• each incident is assigned a status in each step of<br />
the process<br />
• user definable consequences can be assigned to<br />
each incident to aid prioritising<br />
RIMSys(TM) also provides advanced functions of;<br />
• an email based notification system that can be<br />
configured to notify individuals and groups of<br />
certain events in the investigation resolution<br />
process<br />
• interfacing with PMO2000(TM) allowing quick<br />
retrieval of planned maintenance tasks associated<br />
with the equipment being investigated<br />
• a configurable Risk Assessment calculator<br />
• attachment of any type of file to each incident for<br />
archiving formal reports and including<br />
photographs<br />
RIMSys(TM) is designed to take the administrative<br />
effort out of investigation. Gone are the days when you<br />
can't find that piece of paper or when you cannot<br />
respond in seconds on the status of a specific<br />
investigation.<br />
D ownload a free Evaluation version Now :<br />
h t t p : / / m 1 e . n e t / c ? 3 0 8 5 4 3 7 5 - O K U u M 0 Y b J 5 K N M % 4 0 6 0 1 2 1 4 -<br />
Q . U k I r Q Y d n h M E<br />
CBM workshops cover all bases<br />
Effective use of condition based monitoring (CBM)<br />
contributes to increased plant uptime and reduced<br />
maintenance costs, which combine to increase the return<br />
on net assets of a manufacturing operation. To bring<br />
familiarity to this concept, and in particular that of vibration<br />
monitoring, Rockwell Automation Australia is running a<br />
series of hands-on workshops displaying its Entek XM<br />
Products. From July 2004 through to November, these<br />
Entek XM seminars will be held by Rockwell A u t o m a t i o n<br />
Australia distributors throughout NSW, Queensland, South<br />
Australia, Victoria and Western A u s t r a l i a .<br />
Each Entek XM seminar introduces the new Entek XM<br />
suite of on-line vibration monitoring modules, designed<br />
to monitor and protect machinery. The XM series is a<br />
family of relay and communications modules that may<br />
be applied as a stand-alone system, or integrated directly<br />
with control systems using the DeviceNet open standard<br />
communications network to provide key diagnostic<br />
information.<br />
According to Chris Baker, Rockwell A u t o m a t i o n<br />
Australia business manager asset management, the<br />
Entek XM workshops already run have generated an<br />
excellent response from customers. “This seminar<br />
provides all the information needed to get started with<br />
true integrated condition monitoring,” he said.<br />
The free four-hour workshops consist of theory and<br />
product information supported by some hands-on,<br />
online simulation practice. On completion, participants<br />
have the option of purchasing a half-price XM 120<br />
ëstarter kit’ consisting of the XM module and all<br />
necessary componentry to start real-time condition<br />
based monitoring.<br />
For further information or to register, contact your nearest<br />
authorized Rock well Automation Australia distributor,<br />
w h i ch can be located by visiting
MARK YOUR CALENDAR!<br />
DECEMBER 5 - 8, 2004<br />
19TH INTERNATIONAL MAINTENANCE CONFERENCE<br />
LEARN HOW MAINTENANCE & RELIABILITY<br />
PROFESSIONALS JUST LIKE YOU<br />
ARE CREATING SUCCESSFUL RESULTS
79<br />
w w w. r o ck we l l a u t o m a t i o n . c o m . a u .A l t e r n a t ive ly, p l e a s e<br />
contact Adem Adil on 0411 260 667.<br />
TechConnect--Rockwell’s site-wide<br />
scalable support solution<br />
An innovative, multi-tiered technical support program-<br />
-know as TechConnect--is now available to Australian<br />
customers of Rockwell Automation. TechConnect is a<br />
fully integrated program of phone support, software<br />
updates, technical reference tools, and support<br />
management services. Providing site-wide coverage for<br />
the Rockwell Automation hardware and software<br />
products, TechConnect offers unrivalled levels of<br />
flexibility and scalability, ensuring an optimal match<br />
with each customer’s technical support needs.<br />
Developed from Rockwell Automation Australia’s wellestablished<br />
customer service program, the new<br />
TechConnect program leverages the company’s realtime<br />
support model. This ensures immediate connection to<br />
a technical expert in over 90 per cent of calls, and first<br />
time resolution of problems in 50 per cent of cases.<br />
This uniquely flexible support program now provides<br />
coverage for an entire industrial site’s automation<br />
system, rather than tying the support to individual<br />
product items.<br />
The centrepiece to the program is the A u s t r a l i a n - b a s e d<br />
technical support centre--one of five such ëSupport<br />
Center Practices’ (SCP)-certified facilities located<br />
around the globe. Operating as a network, the five<br />
support centres ensure that control on delivery is tight,<br />
and underpin an optional 24-hour everyday support<br />
service offering.<br />
According to Breekveldt, TechConnect is most<br />
effectively used as a proactive maintenance tool, where<br />
customers are encouraged to pick up the telephone at<br />
the earliest signs of a problem. “The Te c h C o n n e c t<br />
program should be seen as less of a safety-net and more<br />
as an extension to the customer’s own maintenance and<br />
IT departments.” This is reflected in the program’s<br />
pricing structure, which allows unlimited calls and<br />
queries. In this way, the service can be used as a means<br />
of helping maintain plant up-time, rather than as a last<br />
resort to merely support breakdown repair activities.<br />
h t t p : / / s u p p o r t . r o ck we l l a u t o m a t i o n . c o m / s u p p o r t p r o g r a m . s<br />
Online Monitoring - intelligent<br />
and flexible<br />
PRÜFTECHNIK Condition Monitoring presents the<br />
VIBROWEB; a new, automated monitoring and<br />
diagnosis system for production-critical machines and<br />
systems. VIBROWEB is completely autonomous,<br />
running without PC connection which makes it<br />
particularly suitable for applications in distributed and<br />
out-of-the-way machine parks (pump stations,<br />
pipelines,...). The modular and flexible system<br />
configuration keeps investment and installation costs<br />
low and also enables the economic integration of<br />
VIBROWEB into existing monitoring infrastructures.<br />
VIBROWEB is designed to allow the logical connection<br />
of almost every type of sensor (ICP, DMS,<br />
LineDrive,...). The signal conditioning for each channel<br />
is carried out with the aid of special plug-in cards that<br />
are simple to replace as and when required. Of the 32<br />
analog measurement channels, two can be measured<br />
simultaneous, with other channels available for rpm<br />
measurements (8x) and for digital inputs and outputs<br />
(each 4x). As all the sensors are constantly supplied with<br />
p o w e r, the channel changeover times and thus also the<br />
duration of a measurement cycle are minimal.<br />
VIBROWEB applications include all machines with<br />
rotating parts, especially aggregates that work with<br />
variable rpm or under varying load conditions. If the<br />
measured values are too high, VIBROWEB carries out<br />
the necessary diagnostic measurements itself, where<br />
the system takes different operating states into account.<br />
If an alarm condition is detected, VIBROWEB promptly<br />
informs the maintenance technician by eMail or SMS<br />
and attaches the relevant measured data to the eMail.<br />
The evaluation and archiving of the data is carried out<br />
with the OMNITREND PC software. For tele diagnosis,<br />
the specialist logs onto the system via an online<br />
connection and Internet-capable browser.<br />
w w w. p r u f t e ch n i k . c o m<br />
Whitestone awarded $1.4 million<br />
DOE Contract for the Parametric<br />
Estimation of Deferred<br />
Maintenance at Eight National<br />
Laboratories<br />
Whitestone Research Corporation has been awarded<br />
a Department of Energy (DOE) contract for the<br />
parametric estimation of deferred maintenance at eight<br />
sites administered by the National Nuclear Security<br />
Administration. The award follows a demonstration<br />
project in which Whitestone's MARST cost forecast<br />
system was used to estimated deferred maintenance at<br />
Lawrence Livermore National Laboratory. MARST<br />
estimates were within 6 percent of the actual costs<br />
determined by facility inspectors, and more accurate<br />
than a competing methodology also evaluated. The<br />
Whitestone approach costs less than half of traditional<br />
condition assessments. The value of the contract is $1.4<br />
million.<br />
Whitestone Research, with headquarters in Santa<br />
Barbara, California, specializes in applied economic<br />
research and software development. Whitestone<br />
products and services are used every year by hundreds<br />
of major corporations, government agencies, and public<br />
and private institutions.<br />
For more information on Whitestone services and<br />
p r o d u c t s, please see the company's website at<br />
w w w. w h i t e s t o n e r e s e a r ch . c o m .<br />
Advance in Planned Maintenance<br />
Systems<br />
Det Norske Veritas (DNV) has approved a Planned<br />
Maintenance System (PMS) that offers a significant<br />
advance to the marine industry. It has appro v e d<br />
M A I N Telligence from Design Maintenance Systems Inc.<br />
(DMSI), (www.desmaint.com), which allows all ship<br />
maintenance re q u i rements to be managed by a single<br />
system using a single database. MAINTelligence's single<br />
system and database approach greatly simplifies the<br />
p rocess that ship operators must follow to avoid opening up
components for class survey.<br />
"This is truly a significant advance in marine condition<br />
monitoring," said Paul Jamer, MarEng, VP Technical &<br />
Product Development, AKA Group. "Marine companies that<br />
use MAINTelligence can now more easily leverage their<br />
p rograms to assist in reducing the costs associated with<br />
class inspections." Users of MAINTelligence may apply to<br />
DNV for a PMS Implementation Survey where machinery<br />
components are assessed based on the documented<br />
maintenance history contained in MAINTelligence, rather<br />
than through mandatory physical inspection.<br />
The approval, described as "an impre s s i v e<br />
accomplishment" by Mark Cusack, former Director of<br />
Operations and Technical Services, Department of Fisheries<br />
and Oceans (DFO) Canada, provides the marine industry with<br />
a important innovation in Planned Maintenance Systems. It<br />
gives an approved tool for simplifying the process of class<br />
s u rveys, planning the maintenance management functions<br />
and implementing a predictive maintenance program all in<br />
one system and in one database.<br />
" F i n a l l y, the shipping industry has the proper software<br />
tool for planned maintenance management function (PM),"<br />
said Ian Liddle, DMSI President, "that provides for PMS<br />
Implementation Surveys and has all the tools for a full<br />
p redictive maintenance (PdM) program, covering vibration,<br />
oil, thermography and engine analysis in one system and<br />
one database." MAINTelligence can also manage engine<br />
room data logging re q u i rements, using intrinsically safe<br />
handheld computers.<br />
For more information, contact: Michelle Po i t r a s, D e s i g n<br />
Maintenance Systems Inc. at +1-604-984-3674 or<br />
m i chellep@desmaint.com http://www. d e s m a i n t . c o m<br />
NEW DEVELOPMENTS<br />
REFLECTS COMING OF AGE<br />
FOR EAM<br />
Mainpac Pty Ltd, has stepped up its research and<br />
development activities by an order of magnitude with<br />
the aim of positioning itself at the forefront of<br />
information systems and methods to support the asset<br />
and maintenance discipline.<br />
The companyís Adelaide development centre is<br />
overseeing the most radical redesign of the software in<br />
its 20 year history while playing a pivotal role in a<br />
project code-named Longbow, the objective of which is<br />
to develop new methods for Enterprise A s s e t<br />
Management (EAM) process on demand.<br />
The Longbow project outcome is a process<br />
manufacturing environment for EAM that allows<br />
businesses to shape their processes themselves, perform<br />
continuous and incremental process improvements<br />
without impediment from technology while<br />
simultaneously exploiting low cost best of breed<br />
application component objects. Responding to events<br />
from sensors in the EAM environment, processes will<br />
be able to evolve and adapt in real time.<br />
Reflecting the significant changes in software technology<br />
that have occurred in the 20 years since John<br />
Cruickshank first unveiled a modest computerised<br />
maintenance management system, the newest software,<br />
Version 7 which is due to roll out in the next month is<br />
n- or multi-tiered. This means that the database, business<br />
rules and presentation layers of the software are no longer<br />
monolithic but for the first time are separated.<br />
This ensures the ease of connecting to other databases<br />
and the ability to tailor the software for specific users,<br />
organisations and industries.<br />
The opportunity to put Australia at the forefront of<br />
R&D for enterprise maintenance systems and expand<br />
the countryís export base has been recognised by the<br />
Australian Government. Earlier this year AusIndustry<br />
made a significant grant to Mainpac under the R&D<br />
Start scheme to help fund this highly innovative R&D<br />
project. The R&D Start Program, available to<br />
Australian companies, is a merit-based program<br />
designed to assist Australian industry to undertake<br />
research and development and commercialisation<br />
through a range of grants and loans.<br />
Mainpac has also partnered with CIEAM (Cooperative<br />
Research Centre for Integrated Engineering A s s e t<br />
Management) based at the Queensland University of<br />
Te c h n o l o g y. This part of the R&D program aims to<br />
integrate an advanced data acquisition system prototype<br />
and intelligent fault diagnosis and prognosis models<br />
with the Mainpac software system, using an open<br />
system architecture and the MIMOSA standard. The<br />
project will capitalise on the services based architecture<br />
of Longbow to demonstrate end to end integration of<br />
business process in a utility maintenance environment.<br />
The project will significantly reduce maintenance cost<br />
by more accurately predicting preventative maintenance<br />
requirements for routable equipment.<br />
The Longbow project aims to create a world benchmark<br />
in asset management processes to SMEs, scalable to large<br />
enterprise. The project will create a software environment<br />
that will continually adapt itself to seamlessly align with<br />
and support the most desired business process.<br />
Initially the project is being built on the .NET platform<br />
which provides the flexibility to not only use the<br />
Microsoft environment but also connect to any device,<br />
platform or database. Given that the open source<br />
community is now enabling the .NET environment,<br />
subsequent releases of the program will also cater for<br />
open source operating environments.<br />
Longbow uses the latest industry trends of business<br />
process flexibility, web services, services oriented<br />
architectures, component delivery and XML technology.<br />
To take full advantage of this new technology Mainpac<br />
is developing a completely new architecture that will<br />
not be constrained by legacy design limitations.<br />
A cornerstone of the project is the services oriented model<br />
which is a powerful means of creating a new functional<br />
user experience. Mainpacís 20 years of expertise and<br />
customer input will feed into a detailed process model of<br />
best practice EAM. This allows the problem to be looked<br />
at from the user point of view and the solution broken<br />
into discrete components of functional services. These<br />
services can be easily assembled in different ways as a<br />
business changes its processes.<br />
The use of webservices and XML technology based on<br />
open standards will allow Mainpac and third party<br />
services and to be sourced from any server on the<br />
Internet. The result is reusable software process services<br />
for asset management that can be loosely coupled with<br />
other components to accommodate new business<br />
processes on demand anywhere, any place, anytime.<br />
Events will be created and captured via a wide range of<br />
interfaces including electronic monitoring devices on<br />
assets, PDAs, phones, GPS aware devices, internet<br />
browser devices etc. The framework will manage the<br />
80
81<br />
discrete events within the context of an organisationís<br />
changing business processes.<br />
The system will achieve flexibility by creating EAM<br />
processes on demand through an architecture based on<br />
agility, dynamically linked services, event management<br />
and, asset management process repository.<br />
For further information please contact:<br />
Mr Peter Bates, Mainpac Pty Ltd,Telephone: 08 8130 7711<br />
Highly popular Irisys Handheld<br />
Thermal Imaging camera<br />
Maintenance Systems Consolidated P/L (MSc) have<br />
experienced tremendous success with the low cost Irisys<br />
IRI 1011 thermal imaging camera. Since its launch in<br />
Australia and New Zealand in late 2003, the Irisys<br />
Thermal Imager has been purchased by large multi-site<br />
companies right through to small electrical contractors.<br />
All these companies find the Irisys ideally suited to<br />
finding hot spots on electrical switch boards and<br />
componentry as well as for checking motors, pumps,<br />
gearboxes and other mechanical equipment. After all,<br />
over 100 users canít be wrong !!<br />
The Irisys is also available in both high temperature (3000C<br />
and 10000C) options and increased FOV - field of view<br />
(100 and 200) options. The device allows non-contact<br />
temperature measurement for industrial applications and<br />
is suitable as a diagnostic tool for workshop personnel, field<br />
service technicians and tradespeople.<br />
Use of the system ranges from the traditional industrial<br />
predictive maintenance applications such as the<br />
inspection of electrical and mechanical plant, through<br />
the design, troubleshooting and maintenance of<br />
domestic and commercial heating, air conditioning and<br />
electrical installations, to vehicle maintenance and<br />
automotive engineering. In real-time, equipment can<br />
be thermally imaged and component temperatures<br />
accurately measured.<br />
Similar in size and appearance to a small digital still<br />
camera, the ergonomically designed, lightweight,<br />
handheld imager incorporates complete optical imaging<br />
and microprocessor systems, built-in visual laser aiming<br />
device and one-hand control. The optional handle and<br />
slot-in Pocket PC can either be click-fixed to the imager<br />
to form a single, one-hand operated unit with an<br />
integrated display, or can be detached for two-handed<br />
operation of the system.<br />
This latter configuration enables the imager to be<br />
pointed at awkward angles or used in very small spaces,<br />
allowing the Pocket PC to be comfortably held in the<br />
handle for ease of viewing. It can also be used as a<br />
complete freestanding static unit using the tripod<br />
mounting point; this enables accurate positioning for<br />
remote imaging and temperature measurement, which<br />
can then be displayed in large format on a PC screen.<br />
The integrated circuit-mounted ceramic detector<br />
generates a 256 pixel realtime temperature display. An<br />
optical system projects the external scene onto the<br />
detector array, enabling the temperature at each of the<br />
256 pixels to be accurately measured at a rate of eight<br />
times every second.<br />
Full product specifications available at MSc we b s i t e :<br />
w w w. m a i n t s y s.com.au<br />
Contact Bret Jo n e s, Maintenance Systems Consolidated<br />
(MSc) on: Tel: (03) 9761 5088 Fax: (03) 9761 5090<br />
Email: info@maintsys.com.au<br />
IMPACT.Net - the most deployable<br />
system on the market<br />
SoftSols Group has announced the next generation of<br />
its internationally recognised IMPACTxp Maintenance<br />
and Enterprise Asset Management System.<br />
I M PA C T.Net is a zero footprint web browser based<br />
solution that can literally be accessed from anywhere<br />
at anytime via the Internet. All that is required is a<br />
standard browser on a PC, laptop or PDA. There are<br />
no initial downloads - just login and start processing.<br />
This pure simplicity of deployment means the system<br />
can be used by anyone in the organisation with a need<br />
to review or update work order, asset or maintenance<br />
related information. However, simplicity does not mean<br />
compromise in functionality or performance, far from<br />
it, as IMPA C T.Net provides unique features that mean<br />
the screen layouts, reports and menu options can be<br />
configured for every user to meet their specific<br />
requirements - ON LINE.<br />
No more waiting for the supplier to change the screen,<br />
no more waiting for the consultant to reconfigure the<br />
report - do it HERE and NOW. This unique facility<br />
makes IMPA C T.Net accessible to all in the organisation<br />
in the format they require. New fields can even be<br />
added to the database as required without affecting the<br />
integrity of the system or the need for programming<br />
skills. Customised validation and data look up features<br />
can be attached to the new field providing the richest<br />
possible functionality for an Enterprise A s s e t<br />
Management System with real-time flexibility.<br />
The look and feel of the system is driven by style sheets<br />
allowing you to incorporate your company logo and use<br />
in-house design guidelines to seamlessly integrate<br />
IMPACT.NET with other corporate solutions.<br />
Each user can be presented with their own live Key<br />
Performance Indicator charts (KPIís) as they log into<br />
the system bringing critical business intelligence to their<br />
attention and promoting rapid resolution of issues. The<br />
userís own unique view of the system can be configured<br />
to make their tasks as simple as possible, with the ability<br />
to attach photographs, documents, images, drawings<br />
and videos to any record. The information they need is<br />
at hand in the format they need, when they need it.<br />
Whatís more any reconfiguration of their view of the<br />
system can simply be done on-line as they need the<br />
change, without even logging out of their session.<br />
I M PA C T.Net can work with multiple databases<br />
including Microsoft SQL Server, Oracle and Progress.<br />
It uses Crystal Reports or Microsoft Reporting Services<br />
to provide on-line reporting and graphical analysis<br />
capabilities.<br />
This is the new generation of Asset Maintenance<br />
Management systems. You access it wherever you want,<br />
whenever you want, with the information you want, in<br />
the format you want. Why use a system that dictates<br />
how your information is displayed when you can<br />
implement IMPACT.Net, which lets you decide.<br />
M a ke it your own Asset Maintenance Management<br />
System with IMPAC T. N e t . Contact SoftSols Group now<br />
and get what you want at www. s o f t s o l s g r o u p.com or<br />
s a l e s @ s o f t s o l s g r o u p..com
Company/ Address<br />
Email<br />
Annual Subscription Form<br />
Name Position<br />
Phone Fax<br />
Cheque enclosed made payable to Engineering Information Transfer P/L A.C.N 006 752 978 ABN 67 330 738 613<br />
1<br />
I would prefer you to charge my credit card. American Express Mastercard Visa Card<br />
2<br />
The Maintenance Journal is now available in both a PRINT version and ELECTRONIC version.<br />
Publishing dates are: February, May, August and <strong>October</strong><br />
Prices are in Australian dollars (approx. Aus$1.00 = US$0.75).For Australia prices are inclusive of GST taxes<br />
Print Version: Includes postage anywhere in the world<br />
Print Version annual subscription is Aus$120<br />
Electronic Version - eMJ: Downloaded as a zipped PDF file<br />
Method of Payment (Please ✘ preferred box) FEE PAYA B L E AUS$<br />
Card Number<br />
eMJ Annual Subscription for Single Site Usage Aus$80<br />
May be distributed throughout your site intranet<br />
eMJ Annual Subscription for Multiple Sites Aus$300<br />
May be distributed to any sites within your world wide corporation<br />
Print plus eMJ: To receive both the Electronic and Print Maintenance Journal<br />
Annual Subscription for both Print and eMJ is Aus$154<br />
Start Issue<br />
For new subscriptions please indicate when you wish to start your subscription<br />
Signature Cardholder’s name<br />
This form may be photocopied<br />
Current Issue Next New Issue Other (tick or give month/year)<br />
Past Issues Cost of Past Issues is: Aus$44<br />
Price is inclusive of postage and local taxes. To see a listing of past issues go to: www.maintenancejournal.com<br />
All past issues are available in the Print format. Electronic version only available from the February 2003 issue onwards.<br />
Past Issues Required:<br />
(month and year)<br />
Expiry date:<br />
Please<br />
Indicate<br />
QTY<br />
Required<br />
Engineering Information Transfer, PO Box 703, Mornington, Victoria 3931, Australia. P h o n e : (Int) 61 (3) 5975 0083<br />
Fax: (Int) 61 (3) 5975 5735 E-mail: mail@maintenancejournal.com Web: w w w. M a i n t e n a n c e J o u rn a l . c o m
Maintenance<br />
Publications<br />
The following Maintenance Publications, available from EIT Pty Ltd, may be ordered by:<br />
Fax: 03 5975 5735 Email: mail@maintenancejournal.com Web: www.MaintenanceJournal.com<br />
ALL PRICES ARE IN AUSTRALIAN DOLLARS. / PRICES for AUSTRALIA INCLUDE POSTAGE COSTS AND GST<br />
ADD Aus$40 PER TOTAL ORDER FOR ALL DELIVERIES OUTSIDE OF AUSTRALIA.<br />
CD’S:<br />
WIREMAN SEMINARS - PPT SLIDES<br />
For the first time anywhere in the world we are able to offer for sale CD’s<br />
of hundreds of Power Point Slides from Te rry Wi re m a n ’s series of Maintenance<br />
Seminars. These CD’s are an invaluable training and learning tool for your<br />
maintenance personnel.<br />
1. BENCHMARKING MAINTENANCE MANAGEMENT<br />
CD Version Aus $295.00<br />
Benchmarking Introduction and Generic Benchmarks - 151 slides<br />
O rganizational Considerations, Education Problems, Work Order Systems,<br />
Maintenance Planning, Maintenance Scheduling, Preventive Maintenance,<br />
Maintenance Materials - 455 slides<br />
Benchmarking Best Practices and Benchmarking Survey - 256 slides. TOTAL:<br />
863 SLIDES<br />
2. COMPUTERISED MAINTENANCE MANAGEMENT SYSTEMS<br />
CD Version Aus $295.00<br />
Successfull CMMS - 31 slides<br />
Maintenance Practice Assessment - 53 slides<br />
Organizational Assessment - 18 slides<br />
CMMS Selection, CMMS Implementation, CMMS Usage - 264 slides<br />
Cost Justification and ROI - 32 slides<br />
CMMS, ERP and EAM, CMMS Issues - 70 slides.<br />
TOTAL: 468 slides<br />
3. MAINTENANCE PERFORMANCE INDICAT0RS<br />
CD Version Aus $295.00<br />
Introduction - Performance Indicators - 125 slides<br />
P reventive Maintenance Indicators, Inventory & Purchasing Indicators, Wo r k<br />
Flow Systems Indicators, CMMS/EAM Systems Indicators, Training Indicators,<br />
Operations/Facility Involvement PI’s, Predictive Maintenance Indicators, RCM<br />
Indicators, TPM Indicators, Statistical/Financial Optimization PI’s, Cont. Impro v.<br />
PI’s - 335 slides<br />
Building the Pyramid &The Future - 33 slides. TOTAL: 493 Slides<br />
4. TOTAL PRODUCTIVE MAINTENANCE<br />
CD Version Aus $295.00<br />
Introduction to TPM - 60 slides<br />
TPM Organizational Considerations - 100 slides<br />
Best Practices and TPM, Preventive Maintenance & TPM,<br />
TPM & Stores & Purchasing, TPM & Work Orders, TPM & CMMS,<br />
Zero Breakdown Strategies & TPM - 328 slides<br />
Financial Benefits of TPM - 66 slides<br />
TPM Conclusions - 37 slides.<br />
TOTAL: 591 Slides<br />
5. ZERO BREAKDOWN STRATEGIES<br />
CD Version Aus $295.00<br />
Achieving Zero Breakdown A Reality - 36 slides<br />
Improved Equipment Effectiveness - 314 slides<br />
Introduction, What Causes Failures?<br />
Understanding Basic Component Design<br />
Five Steps: Maintain Basic Conditions, Maintain Operating Standard s ,<br />
Deterioration Prevention, Improving Design Weaknesses<br />
Preventing Human Error, Beyond the Basics.<br />
TOTAL: 350 Slides<br />
MAINTENANCE - COMPUTER BASED TRAINING<br />
EIT P/L are pleased to offer in Australia the New Standard Institute’s range of<br />
‘e-Learning’ Products. The training products listed below are available to you<br />
as CDs.<br />
F e a t u re-packed, New Standard Institute's electronic bench re f e rences are<br />
enhanced with Pop-up Definitions, Enlargeable Graphics, Animation and<br />
interactive exercises.<br />
All the products listed below include narrated text.<br />
For full details of each CD see our web site at:<br />
www.maintenancejournal.com/maintenancebooks.htm<br />
6. MAINTENANCE STOREROOMS<br />
NEW LISTING CD Version 2004 Aus $450.00<br />
The Maintenance Store rooms computer based training (CBT) is taken fro m<br />
New Standard Institute's two-day seminar for Store room and Parts Managers<br />
and provides a comprehensive approach to the mechanics and mathematics<br />
of a well-run storeroom. CBT has full narrated text. Program also includes the<br />
Reorder Point Calculator.<br />
7. GASKETS & BOLTED FLANGES CONNECTIONS<br />
NEW LISTING CD Version 2004 Aus $190.00<br />
Containing fluids (liquids and gases) is essential to both safe and eff i c i e n t<br />
p rocess operation. Leaky systems can be costly as well as dangerous. The US<br />
EPA has set down regulations aimed at limiting emissions of volatile organic<br />
compounds (VOC) in pumps, compressors, valves, and flanged equipment. This<br />
training shows you how to achieve a good flanged connection as well as the<br />
essentials of studs, bolts and nuts.<br />
8. SHUTDOWN, TURNAROUNDS & OUTAGES<br />
CD Version 2003 Aus $450.00<br />
A shutdown, turnaround, or outage can be the biggest and most complicated<br />
demand on maintenance re s o u rces. Modern project management methods<br />
can enable a maintenance professional to identify, plan, staff and coordinate<br />
the eff o rt of hundreds of workers and their support equipment while minimizing<br />
downtime and costs.<br />
This e-Learning tool includes interactive critical path method training.<br />
9. MAINTENANCE PLANNING & SCHEDULING<br />
CD Version 2003 Aus $370.00<br />
This easy-to-use training is a solid MP&S re f e rence. The CD-format of the<br />
Maintenance Planning and Scheduling electronic training resource contains<br />
all of the enhancements of our downloadable material: Pop-up Definitions,<br />
Wo rd Search functionality, Enlargeable Graphics, Animation and interactive<br />
e x e rcises with the addition of voice-over narration. Provides the basics of<br />
Maintenance Planning and Scheduling training without leaving your facility.<br />
10. LUBRICATION<br />
CD VERSION 2003 Aus $130.00<br />
This material will provide you with a thorough understanding of lubricant<br />
choices. Several interactive aids have been added to make this a solid tool.<br />
Learn proper lubrication methods and how to analyze oil test results.<br />
11. AC MOTOR CONTROLS<br />
CD VERSION 2003 Aus $130.00<br />
Most AC motors are started through a standardized control system designed<br />
to protect the motor, the circuit, and operating personnel. This training tool<br />
focuses on ladder diagrams, wiring, and troubleshooting techniques for the<br />
most common motor used in industry, the AC induction motor. New interactive<br />
exercises and quizzes help you hone your troubleshooting skills.
TEXTS:<br />
Condition Monitoring Standards Volume I, II & III<br />
Condition Monitoring Standards [CMS] are the building blocks for setting up<br />
and running a preventive maintenance, and condition monitoring [PM/ECCM]<br />
system. The CMS documents have full color pictures to explain the function,<br />
condition monitoring as well as why and how each of these tasks should be<br />
executed. Each CMS contains brief inspection points, detailed instru c t i o n s<br />
and suggested intervals for each on-the-run and shutdown inspection.<br />
12. CONDITION MONITORING STANDARDS VOLUME 1<br />
Torbjorn Idhammar, 2001, 124pp [Colour], $330.00<br />
Section 1 - Preventive Maintenance Task List<br />
Section 2 - Condition Monitoring Standards<br />
Motor AC; Coupling Tire; Coupling Sure flex; Coupling Grid; Coupling Thomas;<br />
Coupling Wrap flex/Atra flex; Coupling Gear; Coupling Jar; Coupling Magnetic;<br />
Coupling To rus; Pump Vacuum Nash; Pump - Ve rtical - Multistage; Ta n k ;<br />
Conveyor Screw; Valve solenoid; Air Breather - Des Case; Flinger; Gear<br />
Reducer; Conveyor Belt; Conveyor Drag; Fan Axial; Agitator/Mixer; Compre s s o r<br />
Rotary Screw - Quincy; Dryer System - Air desiccant; Steam Joint - Valmet<br />
13. CONDITION MONITORING STANDARDS VOLUME II<br />
Torbjorn Idhammar, 2001, 130 pp [Colour], $330.00<br />
Section 1 - Preventive Maintenance Task List<br />
Section 2 - Condition Monitoring Standards<br />
Motion Detector; Backstop; Pump, Centrifugal; Heat Exchanger; Bearing, Pillow<br />
Block; Chain Drive; Hydraulic Unit; Feeder; Mechanical Seal; Packing; Check<br />
Valves; Screen Reciprocating; V Belt Drive; Screen - Vibrating; Screen - Disc;<br />
S c reen - Centrifugal; Lubrication Reservoir; Fan Radial; Pump Vane; Pump Gear;<br />
Pump Piston; Steam Trap Mechanical; Steam Trap Thermostatic; Steam Trap<br />
Thermodynamic; Valve with Actuator [S=Shutdown].<br />
14. CONDITION MONITORING STANDARDS VOLUME III<br />
Torbjorn Idhammar, 2003, 115 pp [Colour], $330.00<br />
Condition Monitoring Standards<br />
Universal Joint; Rope Sheaves; Regulator - Air; Pump - Pro g ressive Cavity;<br />
Blower - Rotary Lobe; Belt - Cog; Doctor Blade; Brake Disc; Bolts and Nuts;<br />
Cylinder - Air; Pump - Diaphragm; Motor DC; Valve; Clutch Centrifugal;<br />
Expansion Joint; Coupling - Fluid; Cylinder Hydraulic; Bearing - Oil Cooled;<br />
Hydraulic Motors; Pump - Multistage; Governor; Pneumatic Filter and Oil Most;<br />
Piping and Pipe Hangers; Steam Turbine [Small].<br />
15. LEAN MAINTENANCE<br />
Reduce Costs, Improve Quality, and Increase Market Shar e<br />
NEW LISTING. R Smith, B Hawkins 2004, 304 pp $120.00<br />
Moving the maintenance operation well into its own lean transformation is a<br />
m u s t - d o - p re requisite for successful manufacturing plant - or any process plant<br />
- Lean Transformations. This Handbook provides detailed, step-by-step, fully<br />
explained processes for each phase of Lean Maintenance implementation<br />
p roviding examples, checklists and methodologies of a quantity, detail and<br />
practicality that no previous publication has even approached. It is required<br />
reading, and a required reference, for every plant and facility that is planning,<br />
or even thinking of adopting ‘Lean’ as their mode of operation.<br />
16. PREDICTIVE MAINTENANCE OF PUMPS USING CM<br />
NEW LISTING . R S Beebe 2004, 181 pp $305.00<br />
The first book devoted to condition monitoring and predictive maintenance in<br />
pumps. Explains how to minimize energy costs, limit overhauls and re d u c e<br />
maintenance expenditure.<br />
This book show how condition monitoring can be applied to detect intern a l<br />
degradation in pumps so that appropriate maintenance can be decided upon<br />
based on actual condition rather than arbitrary time scales. The book focuses<br />
on the main condition monitoring techniques particularly relevant to pumps.<br />
Field examples show how condition monitoring is applied to detect intern a l<br />
degration in pumps.<br />
17. MANAGING MAINTENANCE SHUTDOWNS AND OUTAGES<br />
NEW LISTING. Joel Levitt 2004, 208 pp $95.00<br />
Now you can have the ability of saving money immediately just from reading<br />
and using this unique guide! Managing Maintenance Shutdowns and Outages<br />
will provide a deeper understanding of how to effectively manage larg e<br />
maintenance jobs such as power plant outages, re f i n e ry refits and many more .<br />
With this, users will have increased ability to plan and manage such projects.<br />
18. EFFECTIVE MAINTENANCE MANAGEMENT<br />
Risk and Reliability Strategies for Optimizing Performance<br />
NEW LISTING. V Narayan 2004, 288 pp $95.00<br />
P roviding readers with a clear rationale for implementing maintenance<br />
programs, this unique guide is written in a language and style that practicing<br />
engineers and managers can understand and apply easily. Eff e c t i v e<br />
Maintenance Management examines the role of maintenance in minimizing<br />
the risks relating to safety or environmental incidents, adverse publicity, and<br />
loss of pro f i t a b i l i t y. Bridge the gap between designers/maintainers and<br />
reliability engineers, this guide is sure to help businesses utilize their assets<br />
effectively, safely, and profitably.<br />
19. BENCHMARK BEST PRACTICES IN MAINT. MANAGEMENT<br />
NEW LISTING. Terry Wireman 2003, 228 pp $105.00<br />
As the only re f e rence that provides vital information in a concise and easy-touse<br />
format, Benchmarking Best Practices in Maintenance Management will<br />
provide users with all the necessary tools to be successful in benchmarking<br />
maintenance management. It presents a logical step-by-step methodology that<br />
will enable a company to conduct a cost-effective benchmarking eff o rt. It<br />
p resents an overview of the benchmarking process, a self analysis, and a<br />
database of the results of more than 100 companies that have used the<br />
analysis.<br />
20. RCM - GATEWAY TO WORLD CLASS MAINTENANCE<br />
A Smith & G Hinchcliffe 2003, 337 pp, $120.00<br />
Includes detailed instructions for implementing and sustaining an eff e c t i v e<br />
RCM program; Presents seven real-world successful case studies fro m<br />
d i ff e rent industries that have profited from RCM; Provides essential inform a t i o n<br />
on how RCM focuses your maintenance organization to become a recognized<br />
‘center for profit’. It provides valuable insights into current pre v e n t i v e<br />
maintenance practices and issues, while explaining how a transition from the<br />
c u rrent ‘pre s e rve equipment’ to ‘pre s e rve function’ mindset is the key<br />
ingredient in a maintenance optimization strategy. This book defines the four<br />
principal features of RCM and describes the nine essential steps to achieving<br />
a successful RCM program.<br />
21. CMMS A TIME SAVING IMPLEMENTATION PROCESS<br />
Daryl Mather, 2003, 320 pp, $225.00<br />
Computerised Maintenance Management System [CMMS] is now penetrating<br />
moderate to small corporations on an international level. These corporations<br />
need an efficient method to implement this effective but complicated system,<br />
but most of the currently available texts are written by theorists and involve<br />
complex approaches. In CMMS: A Time Saving Implementation Process, a<br />
p r a c t i t i o n e r- t u rned-consultant presents his field proven, practical appro a c h<br />
that can dramatically reduce the amount of time and cost needed to implement<br />
and maintain CMMS in any corporation.<br />
22. INDUSTRIAL MACHINERY REPAIR<br />
Best Maintenance Practices Pocket Guide<br />
R Smith, R K Mobley 2003, 537 pp $90.00<br />
The new standard re f e rence book for industrial and mechanical trades.<br />
Accessible pocketbook format facilitates on-the-job use.<br />
Industrial Machinery Repair provides a practical re f e rence for practicing plant<br />
engineers, maintenance supervisors, physical plant supervisors and<br />
mechanical maintenance technicians. It focuses on the skills needed to select,<br />
install and maintain electro-mechanical equipment in a typical industrial plant<br />
or facility which will keep equipment operating at peak reliability and<br />
companies functioning more profitably through reduced maintenance costs<br />
and increased productivity and capacity.<br />
23. AN INTRODUCTION TO PREDICTIVE MAINTENANCE 2ND Ed<br />
Keith Mobley 2002, 337 pp, $180.00<br />
This second edition of An Introduction to Predictive Maintenance helps plant,<br />
process, maintenance and reliability managers and engineers to develop and<br />
implement a comprehensive maintenance management program, pro v i d i n g<br />
p roven strategies for regularly monitoring critical process equipment and<br />
systems, predicting machine failures, and scheduling maintenance accord i n g l y.
MAINTENANCE PUBLICATIONS<br />
24. MAINTENANCE EXCELLENCE OPTIMIZING EQUIPMENT LIFE<br />
CYCLE DECISION<br />
J Campbell & A Jardine 2001, 536pp $190.00<br />
Maintenance Management Fundamentals; Maintenance Management<br />
Methodologies; Measurement in Maintenance Management; Data<br />
Acquisition; Materials Management Optimisation; Managing Equipment<br />
Reliability; Assessing and Managing Risk; Reliability By Design: Reliability<br />
Centred Maintenance; Reliability by Operator: Total Productive Maintenance;<br />
Optimising Maintenance Decisions; Reliability Management and Maintenance<br />
Optimisation: Basic Statistics and Economics; Maintenance Optimisation<br />
Models; Optimising Maintenance and Replacement Decisions Optimising<br />
Condition Based Maintenance; Conclusion: Achieving Maintenance<br />
Excellence;<br />
25. COMPUTER-MANAGED MAINTENANCE SYSTEMS 2nd Ed.<br />
By Mobley/Cato 2001, 200pp $140.00<br />
A comprehensive, practical guide that covers selection, justification, and<br />
implementation of an effective CMMS in any facility. In this new edition, the<br />
authors have added a chapter specifically on the latest technology, Application<br />
S e rvice Providers [ASPs], that has revolutionized the way computer- m a n a g e d<br />
maintenance systems are used and the benefits they can offer to a business.<br />
This solution provides integrated software, hard w a re, and networking<br />
technology along with Information Technology [IT] consulting services into an<br />
o u t s o u rced package. A new appendix on Key Perf o rmance Indicators has also<br />
been added.<br />
26. RELIABILITY, MAINTAINABILITY AND RISK 6th Ed.<br />
David Smith 2001. 336pp $135.00<br />
R e l i a b i l i t y, Maintainability and Risk has been updated to ensure that it re m a i n s<br />
the leading reliability textbook - cementing the book’s reputation for staying<br />
one step ahead of the competition. This sixth edition incorporates brand new<br />
material on the accuracy of reliability prediction and common cause failure .<br />
This book has now been established for over 20 years. It deals with all aspects<br />
of re l i a b i l i t y, maintainability and safety-related failures in a simple and<br />
straightforward style, explaining technical terms and jargon and handling the<br />
limitations of reliability parameters<br />
27. TPM A ROUTE TO WORLD CLASS PERFORMANCE<br />
Peter Willmott & Dennis McCarthy 2000, 264pp $190.00<br />
This title builds on Peter Wi l l m o t t ’s earlier book, ‘TPM the We s t e rn Wa y ’ ,<br />
updating the scope of applications and tools. The TPM route map is updated<br />
to include the journey to zero breakdowns & beyond. CONTENTS: From total<br />
p roductive maintenance to Total Productive Manufacturing; Designing the TPM<br />
u m b rella; TPM top down & bottom up roles; The TPM improvement PLAN<br />
TOOLBOX; standardizing best practice; TPM analysis, TPM in non<br />
manufacturing; TPM for design; Planning and launching TPM; Sustaining life<br />
after pilot; Case Studies.<br />
28. ASSET MANAGEMENT AND MAINTENANCE - THE CD<br />
By Nicholas A Hastings 2000, 820 slides $180.00<br />
This compact disk contains 19 PowerPoint presentations containing over 820<br />
slides dealing with Asset Management and Maintenance. Asset Management<br />
Overview; Life Cycle Costing; Maintenance. Organisation & Control; Spares &<br />
Consumables Management; Reliability Centered Maintenance; Total Pro d u c t i v e<br />
Maintenance; Failure Mode and Effects Analysis; Risk Analysis and Risk<br />
Management; Reliability Statistics & Life Distributions; Reliability Data<br />
Analysis; Age Based Replacement Policy Analysis; Case Study - Axle Bushes;<br />
Availability and Maintainability; Measuring and Improving Maintenance<br />
E ffectiveness; Reliability of Systems; Condition Monitoring; Job and Shutdown<br />
Planning; Continuous Improvement.<br />
29. PREVENTIVE MAINTENANCE, ESSENTIAL CARE AND<br />
CONDITION MONITORING<br />
Idhammar, Et Al. 1999, 337 pp, $390.00<br />
It is a unique re s o u rce for improving maintenance processes and learn i n g<br />
s m a rt inspection and trouble shooting techniques on a wide variety of<br />
components including, fasteners, pumps, conveyors, motors, gears, bearing,<br />
chain, pipes and valves, couplings, seals, fans, lubrications, lifting equipment,<br />
hydraulics, pneumatics, compressors, steam, electrical systems, etc. The<br />
inspection techniques are presented in the book together with inspection tools<br />
and examples of how to inspect a number of standard components. The book<br />
c a refully explains how to set up and improve a preventive maintenance system<br />
or process in any industry. Preventive Maintenance/Essential Care and<br />
Condition Monitoring teaches the reader how to organize condition monitoring,<br />
lubrication, alignment, cleaning, and other preventive maintenance systems<br />
into one orchestrated process.<br />
30. ENGINEERING MAINTAINABILITY: HOW TO DESIGN FOR<br />
REALIBILIITY AND EASY MAINTENANCE<br />
By B S Dhillon, PhD 1999, 254pp $205.00<br />
This book provides the guidelines and fundamental methods of estimation and<br />
calculation needed by maintainability engineers. It also covers the<br />
management of maintainability eff o rts, including issues of org a n i z a t i o n a l<br />
s t ru c t u re, cost, and planning processes. Questions and problems conclude<br />
each chapter. Contents: Introduction; Maintainability Management;<br />
Maintainability Measures, Functions, and Models; Maintainability To o l s ;<br />
Specific Maintainability Design Considerations; Human Factors Considerations;<br />
Safety Considerations; Cost Considerations; Reliability-Centred Maintenance;<br />
Maintainability Testing, Demonstration, and Data; Maintenance Models.<br />
31. ROOT CAUSE FAILURE ANALYSIS<br />
By R Keith Mobley 1999, 333pp $186.00<br />
Root Cause Failure Analysis provides the concepts needed to eff e c t i v e l y<br />
p e rf o rm industrial troubleshooting investigations. It describes the methodology<br />
to perf o rm Root Cause Failure Analysis [RCFA], one of the hottest topics<br />
c u rrently in maintenance engineering. It also includes detailed equipment<br />
design and troubleshooting guidelines, which are needed to perf o rm RCFA<br />
analysis on machinery found in most production facilities. This inform a t i o n<br />
will there f o re be invaluable to maintenance and plant managers wanting to<br />
increase their own knowledge, plan or provide training [and use this book in<br />
doing so], and to operators needing to improve their skills.<br />
32. TURNAROUND MANAGEMENT<br />
By Tom Lenahan 1999, 183pp $170.00<br />
T h e re are thousands of plants around the world that each re q u i re re g u l a r<br />
shutdown or turn a round maintenance but until now there has been almost<br />
nothing published in this specialized area. Turnaround management is project<br />
management - it has all its main elements. It also has a number of feature s<br />
which make it unique. This text for the first time looks at those unique aspects<br />
of turn a round management. Contents include : Initiating the turn a ro u n d ;<br />
validating the work scope; pre-shutdown work; contractor packages; planning<br />
the turn a round; the turn a round organization; site logistics; the cost profile; the<br />
safety plan; the quality plan; the communications package; executing the<br />
turnaround; terminating the turnaround.<br />
33. MAINTENANCE PLANNING & SCHEDULING MANUAL<br />
Richard D Palmer 1999, 400pp $195.00<br />
Must rate as one of the best texts ever published on Maintenance Planning.<br />
This text enables maintenance managers and maintenance planners to<br />
dramatically improve the productivity of their maintenance plan; Clearly<br />
identifies the six basic principles of planning and the six associated principles<br />
of scheduling; Provides how-to information on implementing a planning<br />
function, using work orders, and perf o rming in-house work sampling. An<br />
excellent hands-on text and one of the few published on maintenance<br />
planning.<br />
34. HANDBOOK OF MAINTENANCE MANAGEMENT<br />
By Joel Levitt [USA] 1997, 476pp $172.00<br />
This unusually comprehensive book is designed as a complete s u rvey of the<br />
field for students or maintenance professionals, as an introduction to maintenance<br />
for non maintenance people, as a review of the most advanced thinking in<br />
maintenance management, as a manual for cost reduction, a primer for the<br />
s t o c k room, and as an element of a training regime for new supervisors, managers<br />
and planners.<br />
35. INFRASTRUCTURE MANAGEMENT<br />
By W R Hudson, R Haas & W Uddin, 1997, 416pp $150.00<br />
The principles and the overall concept of effective infrastru c t u re management<br />
discussed in this book have never before been treated in such detail.<br />
All the varied tools and techniques that are used in planning, building,<br />
maintaining, and fixing our nation’s roads, bridges, airports, utilities, water and<br />
waste water facilities, parks, buildings, and sports complexes are thoroughly<br />
examined. Numerous examples of the technologies available for various uses<br />
are included. The book also discusses a host of high interest topics such as<br />
life cycle analysis of stru c t u res, decision support systems, database<br />
management, and analysis and modeling methods.
MAINTENANCE PUBLICATIONS - ORDER FORM<br />
All prices are AUSTRALIAN DOLLARS. PRICES for AUSTRALIA INCLUDES POSTAGE & GST.<br />
ADD Aus$40 PER TOTAL ORDER FOR ALL DELIVERIES OUTSIDE OF AUSTRALIA.<br />
Item Title Aus $ QTY<br />
1. Benchmarking Maintenance Management Course PPTs - CD $295.00<br />
2. Computerised Maintenance Management Systems Course PPTs - CD $295.00<br />
3. Maintenance Performance Indicators Course PPTs - CD $295.00<br />
4. Total productive Maintenance Course PPTs - CD $295.00<br />
5. Zero Breakdown Strategies Course PPTs - CD $295.00<br />
6. Maintenance Storerooms - Training CD $450.00<br />
7. Gaskets & Bolted Flanges Connections - Training CD $190.00<br />
8. Shutdowns, Turnarounds & Outages - Training CD $450.00<br />
9. Maintenance Planning & Scheduling - Training CD $370.00<br />
10. Lubrication - Training CD $130.00<br />
11. AC Motor Controls - Training CD $130.00<br />
12. Condition Monitoring Standards Volume I $330.00<br />
13. Condition Monitoring Standards Volume II $330.00<br />
14. Condition Monitoring Standards Volume III $330.00<br />
15. Lean Maintenance $120.00<br />
16. Predictive Maintenance of Pumps Using Condition Monitoring $305.00<br />
17. Managing Maintenance Shutdowns and Outages $95.00<br />
18. Effective Maintenance Management $95.00<br />
19. Benchmarking Best Practices in Maintenance Management $105.00<br />
20. RCM Gateway To World Class Maintenance $120.00<br />
21. CMMS A Timesaving Implementation Process $225.00<br />
22. Industrial Machinery repair $90.00<br />
23. Introduction To Predictive Maintenance 2nd Edition $180.00<br />
24. Maintenance Excellence Optimising Equip. Life Cycle Decisions $190.00<br />
25. Computer-Managed Maintenance Systems 2nd Edition $140.00<br />
26. Reliability, Maintainability & Risk $135.00<br />
27. TPM - A Route to World Class Performance $190.00<br />
28. Asset Management and Maintenance - the CD $180.00<br />
29. Preventive Maintenance, Essential Care and Condition Monitoring $390.00<br />
30. Engineering Maintainability: Design for Reliability &† Easy Maintenance $205.00<br />
31. Root Cause Failure Analysis $186.00<br />
32. Turnaround Management $170.00<br />
33. Maintenance Planning & Scheduling Manual $195.00<br />
34. Handbook of Maintenance Management $172.00<br />
35. Infrastructure Management $150.00<br />
NAME: COMPANY:<br />
ADDRESS:<br />
PHONE: FAX: Email:<br />
METHOD OF PAYMENT TOTAL FEE PAYABLE: AUS$<br />
1. CHEQUE ENCLOSED PAYABLE IN AUSTRALIAN DOLLARS TO : ENGINEERING INFORMATION TRANSFER P/L<br />
2. CHARGE MY CREDIT CARD::<br />
CARD NO: EXPIRY DATE:<br />
SIGNATURE: NAME ON CARD:<br />
This form may be photocopied<br />
PH: 61(3) 5975 0083 FAX: 61(3) 5975 5735<br />
Email: mail@maintenancejournal.com<br />
ENGINEERING INFORMATION TRANSFER P/L,<br />
P O BOX 703, MORNINGTON, VIC 3931 AUSTRALIA
Maintenance<br />
2005 Seminars<br />
Course One<br />
Planned Maintenance & Maintenance People<br />
The What, When & Who of Maintenance<br />
Course Tw o<br />
Maintenance Planning<br />
Advances in Maintenance Planning,<br />
Maintenance Control & Feedback<br />
Course Thre e<br />
Maintenance Management<br />
Success & Excellence in<br />
Maintenance & Asset Management<br />
Attend just one, two or all<br />
t h ree of these one-day courses.<br />
Venues<br />
Melbourne<br />
18-20 May 2005<br />
Townsville<br />
18-20 July 2005<br />
Sydney<br />
29-31 Aug 2005<br />
● Revisions & Updates for the 2005 Maintenance<br />
Seminars<br />
● Detailed Seminar Slides in Hard Copy<br />
● Plus a CD of Hundreds of Pages of Case<br />
Studies, Maintenance Related Facts, and<br />
Seminar Notes (400mb of Information)<br />
● Each seminar provides opportunities to discuss<br />
with other practisioners improved ways of<br />
managing and performing maintenance activities<br />
PRESENTED BY<br />
Len Bradsha w<br />
ORGANISED BY<br />
ENGINEERING INFORMATION<br />
TRANSFER PTY LTD<br />
AND<br />
THE MAINTENANCE JOURNAL<br />
THE MOST SUCCESSFUL AND MOST<br />
RECOGNISED MAINTENANCE RELATED SEMINARS<br />
★ As well as Maintenance Personnel, why not also send “Operations Personnel” to Course 1 ★<br />
In-house presentation of these seminars will only be considered for organisations outside of Australia
Course One<br />
Planned Maintenance<br />
And Maintenance People<br />
The What, When and Who of Maintenance<br />
1 . Maintenance Activities<br />
• The different activities performed in maintenance emergency, corrective, preventive, predictive, condition based,<br />
proactive, and designing for maintenance.<br />
• The pre-planning process in maintenance<br />
• Shutdown Maintenance - the dangers<br />
2 . Consequences of Good or<br />
Bad Maintenance<br />
• The direct and indirect costs of Maintenance.<br />
• What do you cost and what are you worth.<br />
• Effect of too little or too much planned maintenance.<br />
• Duties of proving due care of your assets.<br />
• Are “competent” people planning and doing the maintenance work.<br />
Discussion 1: H ave your organisations the correct mix of maintenance activities.<br />
Do you identify real maintenance costs and respond to those costs<br />
3 . Inspections & Condition<br />
Based Maintenance<br />
• What inspection and preventive/predictive techniques are now available in maintenance.<br />
• How often should you perform inspections and condition based maintenance activities.<br />
• Increasing the effectiveness of inspection and condition based maintenance activities.<br />
Discussion 2: What techniques for inspections & Condition Monitoring are used in your plant.<br />
Are they successful. If not why not.<br />
4 . Maintenance Planning<br />
and Contro l<br />
• The different processes and techniques involved with maintenance planning<br />
and control.<br />
• The functions performed by a computerised maintenance management system.<br />
5 .The People and Stru c t u res<br />
In Maintenance<br />
• People - The most important assets in maintenance.<br />
• The different organisational structures used for maintenance activities.<br />
• Restructured maintenance;flexibility and team based structures.<br />
• What motivates people to work with the company rather than against it.<br />
• Are teams achievable in your organization? How far can you go.<br />
• Utilising non maintenance resources.<br />
• TPM - Total Productive Maintenance.<br />
• Administrative responsibilities for teams.<br />
• Recruitment and Reward methods.<br />
• Maintenance Outsourcing/Contracting.<br />
• A range of Case Studies on people issues in Maintenance.<br />
Discussions 3: Are your organisations using the right people and structures in maintenance?<br />
Successes and failures in people issues.<br />
Who should attend?<br />
Planners,Team Leaders,Team Members,Supervisors,Tradesmen,Operations Personnel,Technicians,Engineers,Systems Managers,<br />
and others interested in maintenance of plant and assets.<br />
Each course costs AUS $660.00 per delegate per day (Inclusive of GST)<br />
1
Course Two<br />
Maintenance Planning<br />
Advances in Maintenance Planning,<br />
Maintenance Control and Feedback<br />
1 . Maintenance Planning<br />
in Diff e rent Stru c t u res<br />
• From chasing breakdowns to total productive and proactive maintenance.<br />
• How does the Maintenance organisational structure affect the roles of planner and supervisor.<br />
• Maintenance Planning in team structures, or for outsourced maintenance.<br />
Who should attend?<br />
Planners,Team Leaders,Team Members,Supervisors,Tradesmen,Operations Personnel,Technicians,Engineers,Systems Managers,Stores Personnel,and others interested in maintenance of<br />
plant and assets.<br />
Each course costs AUS $660.00 per delegate per day (Inclusive of GST)<br />
2<br />
• Who should be the Planner. Recruitment and Responsibilities/duties of the Planner.Who should not be the Planner. Full time or<br />
part time planners.<br />
• Planner to Maintenance Personnel ratio.<br />
• Value of effective planning and planners.<br />
2 . Maintenance Planning:<br />
Examples Of The Best<br />
• Examples of how the best plan and schedule their Maintenance Activities.Moving from Reactive Planning to Pro-active<br />
Maintenance Planning.<br />
• Improving Communication in the Planning process.<br />
Discussion 1: How is maintenance work Planned and Scheduled in your organisations.<br />
Planning strengths and weaknesses<br />
3 . Developing Maintenance Plans<br />
• Developing maintenance plans.Introducing the various methods currently used.<br />
• Sources of information and expertise.Who should be involved.Using a generic approach.Resources needs.<br />
Discussion 2: The Plan Development Methods in<br />
your organizations.Who does it & is it successful<br />
4 . Computerised Maintenance Management Systems<br />
• CMMS curre n t ly available and a demonstration of some of the improved fe a t u res of modern CMMS.<br />
• The maintenance planning and control process and how computer systems help improve that pro c e s s .<br />
• Automating the issue of work and reporting to history. Improving communication and quality of data.<br />
• The move towards Asset Management Systems and beyond the traditional CMMS.<br />
• Linkage to other management systems,control systems,GIS,GPS, Internet,etc.<br />
• Benefits & Problems associated with the use/implementation of a CMMS.<br />
• What makes for successful Maintenance Planning and a successful CMMS.What motivates people to work with the system<br />
rather than against it.<br />
• What factors need to be in place if we are to have a functioning system.What factors are required for the BEST functioning<br />
systems.<br />
Discussion 3: How well have your organisations selected,implemented and<br />
used your Planning Systems and CMMS.<br />
5 . Maintenance Stores<br />
• Who owns the store ? S t o res objective s .<br />
• I n t roduction to stock control methods for standard ,e x p e n s i ve or consumable stock items.<br />
• I m p roving service levels from your store.<br />
• Maintenance of parts in the stores.
Course Three<br />
Maintenance Management<br />
Success & Excellence in Maintenance<br />
and Asset Management<br />
1 . Business Success Via Better Maintenance<br />
• The key role that maintenance plays in achieving business success.Maintenance as a profit creator.<br />
• Justifying maintenance resources.<br />
• Proving your worth.<br />
• Maintenance Impact on Safety and Legal Costs.<br />
• Maintenance contributing to long-term competitive advantage.<br />
2 . Achieving Maintenance Excellence<br />
• Maintenance excellence - the common features of the best maintenance organizations in the world.<br />
• Excellence in People, Parts and Practices.<br />
2.1 People excellence:<br />
• Leadership, recruitment,training,flexibility, motivation,teams,TPM, performance, rewards, core skills and outsourcing<br />
2.2 Parts excellence:<br />
• Stores management,stores objectives,alliances, internet spares, parts optimisation, improved parts specifications,automated<br />
stores,stores personnel.<br />
Discussion 1: How well are you moving towards<br />
excellence in people and parts.<br />
2.3 Practices excellence:<br />
• Better corrective Preventive, Predictive, and Proactive maintenance.<br />
• Strategies for reducing down time / repair time.<br />
• Case study on Failure & Replacement analysis.<br />
• Moving through Preventive / Predictive to Proactive Maintenance.<br />
• Improving profits via Proactive Maintenance.<br />
Discussion 2: Discussions on Excellence in Maintenance Practices and introducing the Maintenance Excellence Survey.<br />
3 . Maintenance Strategies For The Future<br />
• Setting Strategies: From Policy Statements,Audits,Benchmarking,Gap Analysis and Objectives through to Maintenance<br />
Performance Measures and KPI’s.<br />
• Examples of Maintenance Objectives and Performance Measures.<br />
Discussion 3: What strategy development,setting of objectives & performance<br />
measures are used in your organisation.<br />
4 . Analytical Methods In Maintenance<br />
• Maintenance Plan Development and Optimisation Software.<br />
• Examples of how to collect, use, and understand maintenance data.<br />
• Fine tuning PM activities.<br />
5 . Asset Life Issues<br />
• Introduction to Plant Design considerations that improve reliability, availability and maintainability.<br />
• Introduction to life cycle costing of assets and terotechnology.<br />
• Plant replacement strategies;software tools.<br />
• Better maintenance specifications of machines and assemblies.<br />
Who should attend?<br />
Maintenance Team Members,Technicians,Planners,Engineers,Supervisors and Managers;plus Production Supervisors/Managers & Accounts/Financial Managers,and others interested in<br />
maintenance of plant and assets.<br />
Each course costs AUS $660.00 per delegate per day (Inclusive of GST)<br />
3
The seminar is presented by Len Bradshaw<br />
Len Bradshaw is a specialist in maintenance management and maintenance planning<br />
control and an international consultant in this field.Len has conducted over 280<br />
courses for in excess of 8,400 maintenance personnel,both in Australia and<br />
overseas.He is managing editor of the Maintenance Journal.He has a Masters<br />
Degree in Terotechnology (Maintenance Management) and has held several positions<br />
as Maintenance Engineer in the UK and other overseas nations.He is the author of<br />
four texts on maintenance management.Len has conducted maintenance<br />
management courses for all levels of maintenance staff from trades personnel to<br />
executive management.<br />
Seminar Fees AUS $660 per person per day (Inclusive of GST)<br />
The course fees given above also include Seminar notes as well as lunch and<br />
refreshments.Course fee does not include accommodation,which if required is the<br />
delegates own responsibility.<br />
C o n f i rm a t i o n<br />
A confirmation letter will be sent to each person on receipt of their re g i s t r a t i o n<br />
fo r m .<br />
Ti m e s<br />
The seminars start at 8:00am and end at 3:30pm, each day. Registration and coffee is<br />
f rom 7:45am each day.<br />
For Further Inform a t i o n<br />
Phone EIT (03) 5975-0083 or Fax Australia (03) 5975-5735,<br />
or email to: m a i l @ m a i n t e n a n c e j o u r n a l . c o m<br />
w w w. m a i n t e n a n c e j o u rn a l . c o m<br />
REGISTRATION FORM<br />
■ Course One: Aus$660 (Inclusive of GST)<br />
Planned Maintenance and Maintenance People<br />
■ Course Two: Aus$660 (Inclusive of GST)<br />
Maintenance Planning<br />
■ Course Three: Aus$660 (Inclusive of GST)<br />
Maintenance and Asset Management<br />
● Melbourne: 18 - 20 May 2005<br />
Course One:18 May 2005<br />
Course Two:19 May 2005<br />
Course Three:20 May 2005<br />
Rydges Carlton Hotel<br />
701 Swanston St,Melbourne<br />
Web:www.rydges.com<br />
● Townsville: 18 - 20 July 2005<br />
Course One:18 July 2005<br />
Course Two:19 July 2005<br />
Course Three:20 July 2005<br />
Southbank Hotel &<br />
Convention Center<br />
23 Palmer St,QLD 4810<br />
Web:www.southbankhotel.com.au<br />
● Sydney: 29 - 31 August 2005<br />
Course One:29 August 2005<br />
Course Two:30 August 2005<br />
Course Three:31 August 2005<br />
Swiss-Grand Hotel,Bondi Beach<br />
Beach Road,Bondi Beach NSW<br />
Web:www.swissgrand.com.au<br />
Course<br />
Name of delegate ________________________________________________________________ Position ______________________________<br />
Company _______________________________________________________________________________________________________________________<br />
Address_________________________________________________________________________________________________________________________<br />
1 . Fax the completed registration and<br />
p rovide credit card pay m e n t<br />
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Email_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ d _ e _t<br />
a i l s .<br />
Fax: 03 59 755735<br />
Telephone _____________________________________________________________Fax____________________________________________________<br />
Name of approving officer ________________________________________________________________________________________________<br />
Position _________________________________________________________________________________________________________________________<br />
Method of payment Fee payable $_________________<br />
★ Cheque enclosed made payable to Engineering Information Transfer Pty Ltd<br />
✓ Please Tick Course<br />
★ Charge to my credit card American Express Mastercard Visa Card<br />
Name on credit card _________________________________ Expiry Date _______________<br />
ENGINEERING INFORMATION TRANSFER ABN 67 330 738 613<br />
C a n c e l l a t i o n s : Should you (after having re g i s t e red) be unable to attend, a substitute delegate is alw ays we l c o m e.A l t e r n a t i ve ly, a full refund will be made for cancellations<br />
re c e i ved in writing 14 days befo re the seminar start s .Cancellations 7 to 14 days prior to the seminar dates will be refunded 40% of the registration fe e, in addition to a set of<br />
seminar notes.T h e re will be no refund for cancellations within 7 days of the seminar dates.This registration form may be photocopied.<br />
Venue<br />
✓ Please Tick Venue<br />
Melbourne<br />
Townsville<br />
Sydney<br />
How Do I Register?<br />
2. Mail the completed registration<br />
form together with your cheque<br />
made payable to:<br />
Engineering Information<br />
Transfer Pty Ltd<br />
P.O. Box 703, Mornington<br />
VIC 3931, Australia<br />
3. Email Indicate courses/ dates/<br />
venue required and provide details<br />
of method of payment to<br />
m a i l @ m a i n t e n a n c e j o u rn a l . c o m<br />
You may also register via<br />
our website:<br />
w w w. m a i n t e n a n c e j o u rn a l . c o m
Group of Companies NOVEMBER 2004<br />
Presents a 4 day Course, entitled:<br />
“Fundamentals of Precision Maintenance”<br />
Integrating practical Bearing Assembly, Oil Analysis & Dynamic Analysis to extend your machines lives<br />
By World Renowned: Bill Kruger<br />
SYDNEY MONDAY 15-18 NOVEMBER 2004 PERTH MONDAY 22-25 NOVEMBER 2004<br />
Who should Attend?<br />
Designed for plant personnel that seek a basic understanding of<br />
“Precision Maintenance” to reduce maintenance costs and improve plant<br />
Reliability.<br />
The course is specially designed for maintenance and operations<br />
supervisors, engineers, predictive maintenance personnel, tradesman<br />
and operations personnel; in fact, anyone who is interested improving<br />
plant operation.<br />
This course provides the fundamentals necessary to implement precision<br />
maintenance in your facility and to ensure maximum payback is obtained<br />
from your equipment investments.<br />
Biography - Bill Kruger combines 29 years of practical field experience with proven instructional techniques, including<br />
visual aids and demonstrations. Participants return to the plant able to immediately apply their learning’s. Those who<br />
understand the power of the solutions provided are best able to utilise equipment and significantly reduce unnecessary<br />
machinery problems.<br />
What is it about?<br />
Lowering maintenance costs and maximizing machine reliability using field proven “Precision Maintenance” methods and<br />
procedures. Learn how to extend machinery life and prevent most machine failures from occurring, through:<br />
Common Sense on-site oil analysis.<br />
Understanding threats to bearing reliability.<br />
Problem identification using vibration analysis.<br />
Applying the various vibration, balance and alignment standards.<br />
Taking & verifying reliable data through practical understanding and proper use of sensor types and limits.<br />
Actual Case histories are used to teach Root Cause Analysis Techniques, also, frequent misinterpretation and<br />
misapplication of industry standards are explored as major causes of machinery problems.<br />
1. How to extend Bearing and Seal Life.<br />
COURSE CONTENT<br />
Film thickness vs. friction and load wear vs. machinery life.<br />
Establishing an on site oil analysis program.<br />
2. Creating the Mental Model.<br />
Rotor behaviour, bearing clearances, orbits, energy waste, seal<br />
wear and bearing life.<br />
Vibration terminology, why & how machinery behaviour creates<br />
the vibration pattern and how to relate them.<br />
3. How to find most common failures.<br />
Resonance: Mass/Stiffness relationships, effects of resonance<br />
(fatigue, energy loss).<br />
Unbalance: Cause/Effect, shop field balance considerations and<br />
limitations.<br />
Misalignment: Cause/Effect, foundations & bases, determining<br />
thermal growth, precision alignment tolerances.<br />
4. Separating Sources occurring at 1X running speed.<br />
Identifying & preventing unbalance, misalignment, bent<br />
shaft, eccentricity and resonance.<br />
5. How to fix them forever.<br />
Proper-bearing installation and maintenance techniques.<br />
On-site analysis to maximize bearing and seal life.<br />
6. Real World Program Considerations.<br />
How to establish goals and objectives.<br />
Financial considerations.<br />
How to recognize and correct troublesome equipment.<br />
How to determine if you are getting the most from your<br />
condition monitoring equipment or program.<br />
To all who complete the training, a certificate will be<br />
issued for “ Professional Development Record Purposes”<br />
SEE OVER FOR ENROLMENT FORM<br />
apt Group Head Office: Level 1, Suite 22, 450 Elizabeth Street, Surry Hills NSW 2010. Australia<br />
www.aptgroup.com.au info@aptgroup.com.au Tel: 61 2 9318 0656 Fax: 61 2 9318 0776
Group of Companies NOVEMBER 2004<br />
Presents a 4 day Course, entitled:<br />
“Fundamentals of Precision Maintenance”<br />
Integrating practical Bearing Assembly, Oil Analysis & Dynamic Analysis to extend your machines lives<br />
Please select Venue<br />
SYDNEY<br />
MONDAY 15-18 NOVEMBER 2004<br />
REGISTRATION DETAILS<br />
PERTH<br />
MONDAY 22-25 NOVEMBER 2004<br />
Registration 8:15am – Finish 4:30pm daily. Accommodation booking required?<br />
Participant Details:<br />
NAME: ________________________________________________ POSITION: _____________________________<br />
COMPANY: ____________________________________________ DEPARTMENT: _________________________<br />
ADDRESS: _______________________________________________________________________________________<br />
STATE: ________ POSTCODE: ____________ EMAIL: ______________________________________________<br />
TELEPHONE: ___________________________________ FAX: __________________________________________<br />
FEES: AUD$1,790.00 (Ex. GST) per participant.<br />
FEES INCLUDE: Lunch, refreshments & course material.<br />
Notes<br />
1/ To ensure seat allocation, an official company purchase order should be lodged upon enrolment; cheques made payable to Apt<br />
Technology P/L and mailed to the address below; alternatively credit card payment is acceptable.<br />
2/ Cancellation policy: a 50% refund will be made for cancellations 10 or more working days before commencement of the course. If<br />
less than 10 working days, no refund can be given. For fees already paid, you may send a replacement participant.<br />
Please select method of payment:<br />
VISA MASTERCARD BANKCARD CHEQUE ENCLOSED<br />
NUMBER: EXPIRY DATE: ___________<br />
NAME ON CARD: _____________________________________ SIGNATURE: ______________________________<br />
Please either fax or post the registration form to secure a place now (duplicate form as required)<br />
Do you have Interest in any of our other training courses, educational tools or services?<br />
Precision Maintenance for Management - 1 day: public or in-house<br />
Precision Maintenance for Tradesman - 3 day: in-house (only)<br />
Advanced Machinery Inspection and Analysis - 5 day: public or in-house<br />
Lubricant Analysis for Condition Monitoring - 2 day: public or in-house<br />
Precision Alignment - 4 day Precision Balancing – 3 day (comb. 5 day): in-house (only)<br />
Electrical Plant Reliability – release 2005<br />
Computer Based Training – products & distance learning<br />
Machinery and Equipment Assessment Programs and Consulting Services (Mech. Elec. IT)<br />
apt Group Head Office: Level 1, Suite 22, 450 Elizabeth Street, Surry Hills NSW 2010. Australia<br />
www.aptgroup.com.au info@aptgroup.com.au Tel: 61 2 9318 0656 Fax: 61 2 9318 0776