May - Library

May - Library May - Library

library.resources.cqu.edu.au
from library.resources.cqu.edu.au More from this publisher
19.07.2013 Views

THE COMPLETE INFRARED CM/PM PACKAGE FROM NEC • EXCEPTIONAL TEMPERATURE RESOLUTION > 0.06˚ C • BUILT-IN DIGITAL, VISIBLE CAMERA AND VOICE RECORDER • EXCELLENT PORTABILITY AT 1.6KG INCLUDING BATTERY AND 3.5” LCD • HIGHEST ENVIRONMENTAL RATING IP54, 30G SHOCK, 3G VIBRATION • ON-BOARD IR “MOVIE” STORAGE, 1664 IMAGES AT 1/60 SEC FRAME RATE • SETTABLE ON-SCREEN VISIBLE AND AUDIBLE ALARMS • 150 MINUTES CONTINUOUS OPERATION FROM STANDARD BATTERY Infratherm Pty. Limited Infratherm Pty Ltd PO Box 117, NORTH RICHMOND, NSW 2756 AUSTRALIA Te l :+ 61 2 4579 7334 or +61 2 4322 2100 Fax: +61 2 4579 6333 or +61 2 4323 7439 E-mail: jrobinson@infratherm.com.au - mratne@infratherm.com.au web: www.infratherm.com.au

19 Downtime Priorities, Jack-Knife Diagrams, Business Cycle Figure 2: X-Y dispersion plot of mean repair times versus number of failures Figure 3: Log Scatterplot of mean repair times versus number of failures Figure 4: Log Scatterplot showing limit values Figure 5. Shovel Fleet Reliability Problems Figure 6. Shovel Fleet Availability Problems Figure 7. Shovel Fleet Maintainability Problems

19<br />

Downtime Priorities, Jack-Knife Diagrams, Business Cycle<br />

Figure 2: X-Y dispersion plot of mean repair times versus number<br />

of failures<br />

Figure 3: Log Scatterplot of mean repair times versus number<br />

of failures<br />

Figure 4: Log Scatterplot showing limit values<br />

Figure 5. Shovel Fleet Reliability Problems<br />

Figure 6. Shovel Fleet Availability Problems<br />

Figure 7. Shovel Fleet Maintainability Problems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!