19.07.2013 Views

CCNP TSHOOT 6.0 - Cisco Learning Home

CCNP TSHOOT 6.0 - Cisco Learning Home

CCNP TSHOOT 6.0 - Cisco Learning Home

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CCNP</strong>v6 <strong>TSHOOT</strong><br />

Test Plan<br />

In Phase 1, edge router R1 must become a BGP peer with the ISP, and the internal office clients must be<br />

able to access the Internet through the ISP. In Phase 2, the Internet clients must be able to access the hosted<br />

services network.<br />

Note: Trouble ticket A is related to the verification and acceptance of BGP Phase 1. Trouble tickets B and C<br />

are related to the second phase of BGP conversion. Any interfaces that have been shut down on routers R2<br />

and R3 should remain shut down for the duration of this lab exercise.<br />

Physical and Logical Topology Diagrams<br />

The physical and logical topologies for the existing EIGRP-based network are provided in this lab to assist the<br />

troubleshooting effort.<br />

All contents are Copyright © 1992–2010 <strong>Cisco</strong> Systems, Inc. All rights reserved. This document is <strong>Cisco</strong> Public Information. Page 4 of 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!