18.07.2013 Views

Hydro G Final report - Kildare.ie

Hydro G Final report - Kildare.ie

Hydro G Final report - Kildare.ie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Hydro</strong>-G FINAL REPORT<br />

There are two distinct water sources at the physical location where the drainage pipe from<br />

the Spa Well appears at ground level. Observations and f<strong>ie</strong>ld monitoring data suggest a small,<br />

but not significant, leakage from the canal.<br />

A number of discrete springs were noted at the 2 nd and 3 rd terraces. Water oozes from the<br />

ground and through the cliff face. The physio-chemical analysis suggests that this water is a<br />

mixture of the Spa Well water and the shallow system groundwater. F<strong>ie</strong>ld data suggests that the<br />

Spa Well directly influences some conduit flows that are relatively distant from the Spa Well itself.<br />

Water flow in the 4 th and 5 th terraces (floodplain) originates mainly from surface runoff<br />

contributions from the more elevated upper terraces. No springs were identif<strong>ie</strong>d within the 4th or<br />

5th terrace.<br />

F<strong>ie</strong>ld data suggest that the Intel boundary drain does not currently act as a drainage channel<br />

drawing groundwater from the wet-grassland habitat which has been <strong>report</strong>ed to be drying out.<br />

Data from a groundwater monitoring well on the Intel site suggests that water from the deeper<br />

groundwater system on the Leixlip Spa site influences hydrochemistry at that location.<br />

Project No.: 07_136 -14-<br />

Leixlip Spa

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!