18.07.2013 Views

BUILDING FOR SCHOOL AND COMMUNITY - Kennedy Bibliothek

BUILDING FOR SCHOOL AND COMMUNITY - Kennedy Bibliothek

BUILDING FOR SCHOOL AND COMMUNITY - Kennedy Bibliothek

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 13<br />

ORIGINAL PROPOSAL <strong>FOR</strong> A MIA TEACHING TEAM<br />

3 TEACHING ASSOCIATES<br />

(each figure represents a 1 day module)<br />

135. The Everywhere School has gone through a pre-demonstration phase<br />

(until 1970), a demonstration and operating phase (1976), and will now be<br />

implemented. Eight MIAs located in 3 groupings will he built, separated<br />

from the housing project rather than physically integrated as originally<br />

planned. Although the architectural design has been changed so that the<br />

buildings can be reconverted.into traditional classrooms, if this should<br />

103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!