(Rakyat Corporation Sdn Bhd) to be the project manager of the<br />
project.<br />
Merger Acceptance, the developer, is not a party in the action.<br />
Rakyat Corporation Sdn Bhd, whilst a party to the action before the<br />
High Court, being cited as the first defendant, however, is not a party<br />
to this appeal.<br />
In the present case, the original layout plan for the project was<br />
submitted by the appellants, as the architects of the project, to the<br />
local authority, Majlis Perbandaran Seberang Perai (‘MPSP’). It was<br />
prepared on the instruction of the developer and the project manager<br />
(the first defendant). It was subsequently submitted to MPSP on the<br />
instruction of the developer. MPSP approved the original layout plan<br />
on 20 December 1994. However, in reality, the road and drainage<br />
works were carried out not in accordance with the approved original<br />
layout plan. Instead, they were carried out in accordance with the<br />
Project Engineer’s Plan (Exh. D2A) prepared by the project engineer<br />
and approved by MPSP. But this was done not due to any oversight<br />