(Rakyat Corporation Sdn Bhd) to be the project manager of the<br />

project.<br />

Merger Acceptance, the developer, is not a party in the action.<br />

Rakyat Corporation Sdn Bhd, whilst a party to the action before the<br />

High Court, being cited as the first defendant, however, is not a party<br />

to this appeal.<br />

In the present case, the original layout plan for the project was<br />

submitted by the appellants, as the architects of the project, to the<br />

local authority, Majlis Perbandaran Seberang Perai (‘MPSP’). It was<br />

prepared on the instruction of the developer and the project manager<br />

(the first defendant). It was subsequently submitted to MPSP on the<br />

instruction of the developer. MPSP approved the original layout plan<br />

on 20 December 1994. However, in reality, the road and drainage<br />

works were carried out not in accordance with the approved original<br />

layout plan. Instead, they were carried out in accordance with the<br />

Project Engineer’s Plan (Exh. D2A) prepared by the project engineer<br />

and approved by MPSP. But this was done not due to any oversight<br />

5