Kaua’i <strong>Island</strong> <strong>Utility</strong> Cooperative<br />

<strong>Renewable</strong> <strong>Energy</strong> <strong>Technology</strong> <strong>Assessments</strong> 8.0 Hydro<br />

projects many not be feasible in all situations. KIUC will need to work closely with other<br />

parties to ensure the most appropriate arrangement.<br />

Plant Input Data Economic Input Data Rate Escalation<br />

Capital Cost ($1,000) 3,959 First Year Fixed O&M ($1,000) 90.25 3.0%<br />

Total Net Capacity (MW) 2.90 First Year Variable O&M ($1,000) 0.00 3.0%<br />

Capacity Factor 15% Fuel Rate ($/MWh) 0.00 3.0%<br />

Full Load Heat Rate, Btu/kWh (HHV) -<br />

Debt Term 25<br />

Project Life 50<br />

Present Worth Discount Rate 5.0%<br />

Hours per Year<br />

Annual<br />

8,760 Levelized Fixed Charge Rate 5.12%<br />

Avoided Avoided<br />

Capital<br />

Variable<br />

PW Total<br />

Capacity <strong>Energy</strong><br />

Cost Fixed O&M O&M Fuel Rate Fuel Cost Total Cost Cost Busbar Cost PW Cost Cost Cost<br />

Year ($1,000) ($1,000) ($1,000) ($/MBtu) ($1,000) ($1,000) ($1,000) ($/MWh) ($/MWh) ($/kW) ($/MWh)<br />

2009 203 90 -<br />

-<br />

-<br />

293 279<br />

74.93 71.36 0.00 111.89<br />

2010 203 93 -<br />

-<br />

-<br />

296 268<br />

75.62 68.59 0.00 121.46<br />

2011 203 96 -<br />

-<br />

-<br />

299 258<br />

76.34 65.94 0.00 131.10<br />

2012 203 99 -<br />

-<br />

-<br />

302 248<br />

77.07 63.41 0.00 133.40<br />

2013 203 102 -<br />

-<br />

-<br />

304 239<br />

77.83 60.98 0.00 139.93<br />

2014 203 105 -<br />

-<br />

-<br />

308 229<br />

78.61 58.66 160.34 146.48<br />

2015 203 108 -<br />

-<br />

-<br />

311 221<br />

79.41 56.43 162.00 155.09<br />

2016 203 111 -<br />

-<br />

-<br />

314 212<br />

80.24 54.31 160.15 159.54<br />

2017 203 114 -<br />

-<br />

-<br />

317 204<br />

81.09 52.27 192.08 155.25<br />

2018 203 118 -<br />

-<br />

-<br />

321 197<br />

81.96 50.32 192.80 164.57<br />

2019 203 121 -<br />

-<br />

-<br />

324 190<br />

82.87 48.45 192.35 168.47<br />

2020 203 125 -<br />

-<br />

-<br />

328 183<br />

83.80 46.66 183.14 166.80<br />

2021 203 129 -<br />

-<br />

-<br />

332 176<br />

84.75 44.95 203.74 163.22<br />

2022 203 133 -<br />

-<br />

-<br />

335 169<br />

85.74 43.30 200.11 168.86<br />

2023 203 137 -<br />

-<br />

-<br />

339 163<br />

86.76 41.73 196.32 159.73<br />

2024 203 141 -<br />

-<br />

-<br />

344 157<br />

87.80 40.22 214.88 164.41<br />

2025 203 145 -<br />

-<br />

-<br />

348 152<br />

88.88 38.78 202.03 166.83<br />

2026 203 149 -<br />

-<br />

-<br />

352 146<br />

89.99 37.39 206.07 170.16<br />

2027 203 154 -<br />

-<br />

-<br />

357 141<br />

91.14 36.07 210.19 173.57<br />

2028 203 158 -<br />

-<br />

-<br />

361 136<br />

92.31 34.79 214.40 177.04<br />

2029 203 163 -<br />

-<br />

-<br />

366 131<br />

93.53 33.57 218.68 180.58<br />

2030 203 168 -<br />

-<br />

-<br />

371 127<br />

94.78 32.40 223.06 184.19<br />

2031 203 173 -<br />

-<br />

-<br />

376 122<br />

96.07 31.28 227.52 187.87<br />

2032 203 178 -<br />

-<br />

-<br />

381 118<br />

97.39 30.20 232.07 191.63<br />

2033 203 183 -<br />

-<br />

-<br />

386 114<br />

98.76 29.16 236.71 195.46<br />

2034 -<br />

189 -<br />

-<br />

-<br />

189 53<br />

48.30 13.58 241.44 199.37<br />

2035 -<br />

195 -<br />

-<br />

-<br />

195 52<br />

49.75 13.33 246.27 203.36<br />

2036 -<br />

200 -<br />

-<br />

-<br />

200 51<br />

51.24 13.07 251.20 207.43<br />

2037 -<br />

206 -<br />

-<br />

-<br />

206 50<br />

52.78 12.82 256.22 211.58<br />

2038 -<br />

213 -<br />

-<br />

-<br />

213 49<br />

54.36 12.58 261.35 215.81<br />

2039 -<br />

219 -<br />

-<br />

-<br />

219 48<br />

55.99 12.34 266.57 220.12<br />

2040 -<br />

226 -<br />

-<br />

-<br />

226 47<br />

57.67 12.10 271.91 224.53<br />

2041 -<br />

232 -<br />

-<br />

-<br />

232 46<br />

59.40 11.87 277.34 229.02<br />

2042 -<br />

239 -<br />

-<br />

-<br />

239 46<br />

61.19 11.65 282.89 233.60<br />

2043 -<br />

247 -<br />

-<br />

-<br />

247 45<br />

63.02 11.43 288.55 238.27<br />

2044 -<br />

254 -<br />

-<br />

-<br />

254 44<br />

64.91 11.21 294.32 243.03<br />

2045 -<br />

262 -<br />

-<br />

-<br />

262 43<br />

66.86 10.99 300.21 247.90<br />

2046 -<br />

269 -<br />

-<br />

-<br />

269 42<br />

68.86 10.78 306.21 252.85<br />

2047 -<br />

277 -<br />

-<br />

-<br />

277 41<br />

70.93 10.58 312.33 257.91<br />

2048 -<br />

286 -<br />

-<br />

-<br />

286 41<br />

73.06 10.38 318.58 263.07<br />

2049 -<br />

294 -<br />

-<br />

-<br />

294 40<br />

75.25 10.18 324.95 268.33<br />

2050 -<br />

303 -<br />

-<br />

-<br />

303 39<br />

77.51 9.99 331.45 273.70<br />

2051 -<br />

312 -<br />

-<br />

-<br />

312 38<br />

79.83 9.80 338.08 279.17<br />

2052 -<br />

322 -<br />

-<br />

-<br />

322 38<br />

82.23 9.61 344.84 284.75<br />

2053 -<br />

331 -<br />

-<br />

-<br />

331 37<br />

84.69 9.43 351.74 290.45<br />

2054 -<br />

341 -<br />

-<br />

-<br />

341 36<br />

87.24 9.25 358.77 296.26<br />

2055 -<br />

352 -<br />

-<br />

-<br />

352 35<br />

89.85 9.07 365.95 302.18<br />

2056 -<br />

362 -<br />

-<br />

-<br />

362 35<br />

92.55 8.90 373.27 308.23<br />

2057 -<br />

373 -<br />

-<br />

-<br />

373 34<br />

95.32 8.73 380.73 314.39<br />

2058 -<br />

384 -<br />

-<br />

-<br />

384 33<br />

98.18 8.56 388.35 320.68<br />

Levelized Bus-bar Cost, $/MWh<br />

Net Levelized Cost ($1,000)<br />

Mauka<br />

Hydro<br />

79.07<br />

309.33<br />

Levelized Avoided Capacity Cost, $/MWh -<br />

Levelized Avoided <strong>Energy</strong> Cost, $/MWh 174.74<br />

Levelized Cost Premium, $/MWh (95.67)<br />

Figure 8-12. Life-cycle Cost for Waimea Mauka Hydro Project.<br />

21 March 2005 8-21 Black & Veatch