Renewable Energy Technology Assessments - Kauai Island Utility ...
Renewable Energy Technology Assessments - Kauai Island Utility ...
Renewable Energy Technology Assessments - Kauai Island Utility ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Kaua’i <strong>Island</strong> <strong>Utility</strong> Cooperative<br />
<strong>Renewable</strong> <strong>Energy</strong> <strong>Technology</strong> <strong>Assessments</strong> 8.0 Hydro<br />
projects many not be feasible in all situations. KIUC will need to work closely with other<br />
parties to ensure the most appropriate arrangement.<br />
Plant Input Data Economic Input Data Rate Escalation<br />
Capital Cost ($1,000) 3,959 First Year Fixed O&M ($1,000) 90.25 3.0%<br />
Total Net Capacity (MW) 2.90 First Year Variable O&M ($1,000) 0.00 3.0%<br />
Capacity Factor 15% Fuel Rate ($/MWh) 0.00 3.0%<br />
Full Load Heat Rate, Btu/kWh (HHV) -<br />
Debt Term 25<br />
Project Life 50<br />
Present Worth Discount Rate 5.0%<br />
Hours per Year<br />
Annual<br />
8,760 Levelized Fixed Charge Rate 5.12%<br />
Avoided Avoided<br />
Capital<br />
Variable<br />
PW Total<br />
Capacity <strong>Energy</strong><br />
Cost Fixed O&M O&M Fuel Rate Fuel Cost Total Cost Cost Busbar Cost PW Cost Cost Cost<br />
Year ($1,000) ($1,000) ($1,000) ($/MBtu) ($1,000) ($1,000) ($1,000) ($/MWh) ($/MWh) ($/kW) ($/MWh)<br />
2009 203 90 -<br />
-<br />
-<br />
293 279<br />
74.93 71.36 0.00 111.89<br />
2010 203 93 -<br />
-<br />
-<br />
296 268<br />
75.62 68.59 0.00 121.46<br />
2011 203 96 -<br />
-<br />
-<br />
299 258<br />
76.34 65.94 0.00 131.10<br />
2012 203 99 -<br />
-<br />
-<br />
302 248<br />
77.07 63.41 0.00 133.40<br />
2013 203 102 -<br />
-<br />
-<br />
304 239<br />
77.83 60.98 0.00 139.93<br />
2014 203 105 -<br />
-<br />
-<br />
308 229<br />
78.61 58.66 160.34 146.48<br />
2015 203 108 -<br />
-<br />
-<br />
311 221<br />
79.41 56.43 162.00 155.09<br />
2016 203 111 -<br />
-<br />
-<br />
314 212<br />
80.24 54.31 160.15 159.54<br />
2017 203 114 -<br />
-<br />
-<br />
317 204<br />
81.09 52.27 192.08 155.25<br />
2018 203 118 -<br />
-<br />
-<br />
321 197<br />
81.96 50.32 192.80 164.57<br />
2019 203 121 -<br />
-<br />
-<br />
324 190<br />
82.87 48.45 192.35 168.47<br />
2020 203 125 -<br />
-<br />
-<br />
328 183<br />
83.80 46.66 183.14 166.80<br />
2021 203 129 -<br />
-<br />
-<br />
332 176<br />
84.75 44.95 203.74 163.22<br />
2022 203 133 -<br />
-<br />
-<br />
335 169<br />
85.74 43.30 200.11 168.86<br />
2023 203 137 -<br />
-<br />
-<br />
339 163<br />
86.76 41.73 196.32 159.73<br />
2024 203 141 -<br />
-<br />
-<br />
344 157<br />
87.80 40.22 214.88 164.41<br />
2025 203 145 -<br />
-<br />
-<br />
348 152<br />
88.88 38.78 202.03 166.83<br />
2026 203 149 -<br />
-<br />
-<br />
352 146<br />
89.99 37.39 206.07 170.16<br />
2027 203 154 -<br />
-<br />
-<br />
357 141<br />
91.14 36.07 210.19 173.57<br />
2028 203 158 -<br />
-<br />
-<br />
361 136<br />
92.31 34.79 214.40 177.04<br />
2029 203 163 -<br />
-<br />
-<br />
366 131<br />
93.53 33.57 218.68 180.58<br />
2030 203 168 -<br />
-<br />
-<br />
371 127<br />
94.78 32.40 223.06 184.19<br />
2031 203 173 -<br />
-<br />
-<br />
376 122<br />
96.07 31.28 227.52 187.87<br />
2032 203 178 -<br />
-<br />
-<br />
381 118<br />
97.39 30.20 232.07 191.63<br />
2033 203 183 -<br />
-<br />
-<br />
386 114<br />
98.76 29.16 236.71 195.46<br />
2034 -<br />
189 -<br />
-<br />
-<br />
189 53<br />
48.30 13.58 241.44 199.37<br />
2035 -<br />
195 -<br />
-<br />
-<br />
195 52<br />
49.75 13.33 246.27 203.36<br />
2036 -<br />
200 -<br />
-<br />
-<br />
200 51<br />
51.24 13.07 251.20 207.43<br />
2037 -<br />
206 -<br />
-<br />
-<br />
206 50<br />
52.78 12.82 256.22 211.58<br />
2038 -<br />
213 -<br />
-<br />
-<br />
213 49<br />
54.36 12.58 261.35 215.81<br />
2039 -<br />
219 -<br />
-<br />
-<br />
219 48<br />
55.99 12.34 266.57 220.12<br />
2040 -<br />
226 -<br />
-<br />
-<br />
226 47<br />
57.67 12.10 271.91 224.53<br />
2041 -<br />
232 -<br />
-<br />
-<br />
232 46<br />
59.40 11.87 277.34 229.02<br />
2042 -<br />
239 -<br />
-<br />
-<br />
239 46<br />
61.19 11.65 282.89 233.60<br />
2043 -<br />
247 -<br />
-<br />
-<br />
247 45<br />
63.02 11.43 288.55 238.27<br />
2044 -<br />
254 -<br />
-<br />
-<br />
254 44<br />
64.91 11.21 294.32 243.03<br />
2045 -<br />
262 -<br />
-<br />
-<br />
262 43<br />
66.86 10.99 300.21 247.90<br />
2046 -<br />
269 -<br />
-<br />
-<br />
269 42<br />
68.86 10.78 306.21 252.85<br />
2047 -<br />
277 -<br />
-<br />
-<br />
277 41<br />
70.93 10.58 312.33 257.91<br />
2048 -<br />
286 -<br />
-<br />
-<br />
286 41<br />
73.06 10.38 318.58 263.07<br />
2049 -<br />
294 -<br />
-<br />
-<br />
294 40<br />
75.25 10.18 324.95 268.33<br />
2050 -<br />
303 -<br />
-<br />
-<br />
303 39<br />
77.51 9.99 331.45 273.70<br />
2051 -<br />
312 -<br />
-<br />
-<br />
312 38<br />
79.83 9.80 338.08 279.17<br />
2052 -<br />
322 -<br />
-<br />
-<br />
322 38<br />
82.23 9.61 344.84 284.75<br />
2053 -<br />
331 -<br />
-<br />
-<br />
331 37<br />
84.69 9.43 351.74 290.45<br />
2054 -<br />
341 -<br />
-<br />
-<br />
341 36<br />
87.24 9.25 358.77 296.26<br />
2055 -<br />
352 -<br />
-<br />
-<br />
352 35<br />
89.85 9.07 365.95 302.18<br />
2056 -<br />
362 -<br />
-<br />
-<br />
362 35<br />
92.55 8.90 373.27 308.23<br />
2057 -<br />
373 -<br />
-<br />
-<br />
373 34<br />
95.32 8.73 380.73 314.39<br />
2058 -<br />
384 -<br />
-<br />
-<br />
384 33<br />
98.18 8.56 388.35 320.68<br />
Levelized Bus-bar Cost, $/MWh<br />
Net Levelized Cost ($1,000)<br />
Mauka<br />
Hydro<br />
79.07<br />
309.33<br />
Levelized Avoided Capacity Cost, $/MWh -<br />
Levelized Avoided <strong>Energy</strong> Cost, $/MWh 174.74<br />
Levelized Cost Premium, $/MWh (95.67)<br />
Figure 8-12. Life-cycle Cost for Waimea Mauka Hydro Project.<br />
21 March 2005 8-21 Black & Veatch