Renewable Energy Technology Assessments - Kauai Island Utility ...
Renewable Energy Technology Assessments - Kauai Island Utility ... Renewable Energy Technology Assessments - Kauai Island Utility ...
Kaua’i Island Utility Cooperative Renewable Energy Technology Assessments 8.0 Hydro capacity was incorporated into the original design. Nevertheless the capacity of the penstock has also eroded over time due to corrosion on the inside of the steel pipe. Recommendations for rehabilitation of the conveyance canal and power plant have been made since at least the early 1980’s. The history of these recommendations are summarized in a February 2003 study by Pacific Hydroelectric Company. 84 The most recently proposed project would upgrade the plant from 500 kW to 800 kW by replacing the Iliiliula Intake trashrack, restoring the debilitated Iliiliula Flume, increasing the penstock diameter from 36 to 42 inches, and adding a 300 kW Pelton turbine at the existing powerhouse. Additional work to restore other segments of the conveyance system and increase its capacity to 32 MGD were assumed to take place in advance of this project. This additional work would include improving and restoring abandoned stream gages and adding a sluice gate to the Waioki Intake. Cost information for this project is summarized in a May 2003 Pacific Hydroelectric report. 85 Figure 8-6. Lower Lihue Plant 800 kW Turbine. 8.4.3 Wailua The Wailua River has been the subject of numerous studies in the last 25 years because of its productive watershed. In fact, Wailua is the only Kauai hydro project that is currently listed in the State’s Renewable Energy Resource Assessment and 84 Pacific Hydropower Company, Upper Waiahi Hydro: Preliminary Source Investigation and Feasibility Study for a Second Turbine, prepared for Kauai Island Utility Cooperative, February 2003. 85 Pacific Hydropower Company, Waiahi Upgrade Budgetary Cost Estimate, prepared for Kauai Island Utility Cooperative, May 2003. 21 March 2005 8-10 Black & Veatch
Kaua’i Island Utility Cooperative Renewable Energy Technology Assessments 8.0 Hydro Development Program. 86 The proposed 6.6 MW scheme diverts water above Wailua Falls to a downstream power plant. It has the advantage of being located in already developed areas, ensuring ready access and avoiding disturbance of pristine habitat. In the 1980’s Island Power pursued a project and completed an Environmental Impact Statement. Reportedly, development was halted not so much from overwhelming opposition to the project, but poor presentation of the project details showing knowledge of local conditions. In 2001, Northwest Power, a hydropower developer operating under the name Symbiotics LLC, filed a Preliminary Permit Application with the Federal Energy Regulatory Commission (FERC) on the Wailua project. 87 This application was one of 250 filed by Northwest Power with FERC, but the only one in Hawaii. Concerned responses from individuals, local groups and state and federal agencies were filed shortly thereafter, primarily directed at environmental concerns. In 2004, under pressure from FERC to demonstrate progress on this application, Northwest Power, operating now under the name Pacific Energy Resources, filed a new Preliminary Permit Application for the same project. The application was accepted for filing under Project No. 12534 on December 17, 2004. Completion of the permitting process is expected to take three to five years. 88 To our knowledge, this makes Wailua the only project currently under active pursuit in Kauai. The project addresses the primary environmental concern of diverting water above the prominent Wailua Falls by maintaining minimum instream flows of 15 cubic feet per second. Wailua Falls is widely known because of its feature in the 1978-1984 television series, Fantasy Island. Project components are planned to be invisible from the Wailua Falls overlook, a popular tourist destination. Portions of the project fall within Wailua River State Park. Because the Wailua project is active, it presents a glimpse of current attitudes towards hydropower development in Kauai. Many on Kauai are in favor of renewable energy including hydropower. After a visit by the U.S. Bureau of Reclamation to a potential hydropower site near Wailua Reservoir near the Himalayan Academy, this Hindu monastery posted pictures of the visit with the comment that “a local renewable source will be a small contribution to the new world order of self-sustaining cultures.” 89 Some however, will apparently be opposed to this project regardless of how development is approached. The Kauai Development Digest urges petitions to FERC against the 86 State of Hawaii, Department of Business, Economic Development and Tourism, Renewable Energy Resource Assessment and Development Program, 1995, updated in 2000 and 2004. 87 Symbiotics, LLC, Lower Wailua Hydroelectric Project, FERC No. 12025, 4 pp., no data. 88 TenBruggencate, Jan, “Proposal for dam rekindled on Kaua’i,” Honolulu Advertiser, January 11, 2005, 21 March 2005 8-11 Black & Veatch
- Page 169 and 170: Kaua’i Island Utility Cooperative
- Page 171 and 172: Kaua’i Island Utility Cooperative
- Page 173 and 174: Kaua’i Island Utility Cooperative
- Page 175 and 176: Kaua’i Island Utility Cooperative
- Page 177 and 178: Kaua’i Island Utility Cooperative
- Page 179 and 180: Kaua’i Island Utility Cooperative
- Page 181 and 182: Kaua’i Island Utility Cooperative
- Page 183 and 184: Kaua’i Island Utility Cooperative
- Page 185 and 186: Kaua’i Island Utility Cooperative
- Page 187 and 188: Kaua’i Island Utility Cooperative
- Page 189 and 190: Kaua’i Island Utility Cooperative
- Page 191 and 192: Kaua’i Island Utility Cooperative
- Page 193 and 194: Kaua’i Island Utility Cooperative
- Page 195 and 196: Kaua’i Island Utility Cooperative
- Page 197 and 198: Kaua’i Island Utility Cooperative
- Page 199 and 200: Kaua’i Island Utility Cooperative
- Page 201 and 202: Kaua’i Island Utility Cooperative
- Page 203 and 204: Kaua’i Island Utility Cooperative
- Page 205 and 206: Kaua’i Island Utility Cooperative
- Page 207 and 208: Kaua’i Island Utility Cooperative
- Page 209 and 210: Kaua’i Island Utility Cooperative
- Page 211 and 212: Kaua’i Island Utility Cooperative
- Page 213 and 214: Kaua’i Island Utility Cooperative
- Page 215 and 216: Kaua’i Island Utility Cooperative
- Page 217 and 218: Kaua’i Island Utility Cooperative
- Page 219: Kaua’i Island Utility Cooperative
- Page 223 and 224: Kaua’i Island Utility Cooperative
- Page 225 and 226: Kaua’i Island Utility Cooperative
- Page 227 and 228: Kaua’i Island Utility Cooperative
- Page 229 and 230: Kaua’i Island Utility Cooperative
- Page 231 and 232: Kaua’i Island Utility Cooperative
- Page 233 and 234: Kaua’i Island Utility Cooperative
- Page 235 and 236: Kaua’i Island Utility Cooperative
- Page 237 and 238: Kaua’i Island Utility Cooperative
- Page 239 and 240: Kaua’i Island Utility Cooperative
- Page 241 and 242: Kaua’i Island Utility Cooperative
- Page 243 and 244: Kaua’i Island Utility Cooperative
- Page 245 and 246: Kaua’i Island Utility Cooperative
- Page 247 and 248: Kaua’i Island Utility Cooperative
- Page 249 and 250: Kaua’i Island Utility Cooperative
- Page 251 and 252: Kaua’i Island Utility Cooperative
- Page 253 and 254: Kaua’i Island Utility Cooperative
- Page 255 and 256: Kaua’i Island Utility Cooperative
- Page 257 and 258: Kaua’i Island Utility Cooperative
- Page 259 and 260: Kaua’i Island Utility Cooperative
- Page 261 and 262: Kaua’i Island Utility Cooperative
- Page 263 and 264: Kaua’i Island Utility Cooperative
- Page 265 and 266: Kaua’i Island Utility Cooperative
- Page 267 and 268: Kaua’i Island Utility Cooperative
- Page 269 and 270: Kaua’i Island Utility Cooperative
Kaua’i <strong>Island</strong> <strong>Utility</strong> Cooperative<br />
<strong>Renewable</strong> <strong>Energy</strong> <strong>Technology</strong> <strong>Assessments</strong> 8.0 Hydro<br />
capacity was incorporated into the original design. Nevertheless the capacity of the<br />
penstock has also eroded over time due to corrosion on the inside of the steel pipe.<br />
Recommendations for rehabilitation of the conveyance canal and power plant<br />
have been made since at least the early 1980’s. The history of these recommendations<br />
are summarized in a February 2003 study by Pacific Hydroelectric Company. 84 The most<br />
recently proposed project would upgrade the plant from 500 kW to 800 kW by replacing<br />
the Iliiliula Intake trashrack, restoring the debilitated Iliiliula Flume, increasing the<br />
penstock diameter from 36 to 42 inches, and adding a 300 kW Pelton turbine at the<br />
existing powerhouse. Additional work to restore other segments of the conveyance<br />
system and increase its capacity to 32 MGD were assumed to take place in advance of<br />
this project. This additional work would include improving and restoring abandoned<br />
stream gages and adding a sluice gate to the Waioki Intake. Cost information for this<br />
project is summarized in a May 2003 Pacific Hydroelectric report. 85<br />
Figure 8-6. Lower Lihue Plant 800 kW Turbine.<br />
8.4.3 Wailua<br />
The Wailua River has been the subject of numerous studies in the last 25 years<br />
because of its productive watershed. In fact, Wailua is the only <strong>Kauai</strong> hydro project that<br />
is currently listed in the State’s <strong>Renewable</strong> <strong>Energy</strong> Resource Assessment and<br />
84<br />
Pacific Hydropower Company, Upper Waiahi Hydro: Preliminary Source Investigation and Feasibility<br />
Study for a Second Turbine, prepared for <strong>Kauai</strong> <strong>Island</strong> <strong>Utility</strong> Cooperative, February 2003.<br />
85<br />
Pacific Hydropower Company, Waiahi Upgrade Budgetary Cost Estimate, prepared for <strong>Kauai</strong> <strong>Island</strong><br />
<strong>Utility</strong> Cooperative, May 2003.<br />
21 March 2005 8-10 Black & Veatch