Kaua’i <strong>Island</strong> <strong>Utility</strong> Cooperative<br />

<strong>Renewable</strong> <strong>Energy</strong> <strong>Technology</strong> <strong>Assessments</strong> 7.0 Biomass and Municipal Solid Waste<br />

7.3.2 WTE Project Screening<br />

Scale is also the principal question for the MSW option, but only two sizes have<br />

been considered, 200 tpd and 300 tpd. As with the biomass option, the larger plant will<br />

be more efficient and have a lower capital cost per kilowatt. Further, staffing costs, a<br />

large portion of the overall O&M costs, will be similar between the two sizes. Black &<br />

Veatch modeled the two sizes. For the reasons listed above, it appears that even if there<br />

is a shortage of MSW and biomass has to be purchased, the larger plant produces lower<br />

cost energy. For this reason, it has been recommended that only the 300 tpd size be<br />

evaluated further for the Final Report.<br />

Figure 7-4 shows two levelized busbar cost curves that are generated for various<br />

sized MSW plants with two different tipping fees. Both plant size and tipping fee<br />

strongly impact the results of the busbar cost calculation.<br />

Levelized Busbar Cost, $/MWh<br />

200.0<br />

150.0<br />

100.0<br />

50.0<br />

0.0<br />

0 5 10 15 20 25 30 35<br />

-50.0<br />

-100.0<br />

$56<br />

$90<br />

Gate fee $/ton<br />

Plant Capacity, MW<br />

Figure 7-4. Comparative MSW Busbar Cost with Varying Fuel Price.<br />

7.3.3 Combined Biomass and MSW Project Screening<br />

At the screening level, the levelized costs for the standalone biomass and MSW<br />

projects are high. Neither project achieves a large enough capacity to take advantage of<br />

significant economies of scale. Plants of this type and size are particularly impacted by<br />

high staffing requirements. Combining the MSW and biomass in a single project is<br />

technically feasible, will better utilize staff, and has promise to offer better economic<br />

21 March 2005 7-7 Black & Veatch