16.07.2013 Views

JAEA-Testing-2011-007.pdf:46.74MB - 日本原子力研究開発機構

JAEA-Testing-2011-007.pdf:46.74MB - 日本原子力研究開発機構

JAEA-Testing-2011-007.pdf:46.74MB - 日本原子力研究開発機構

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Final finishing<br />

<strong>JAEA</strong>-<strong>Testing</strong> <strong>2011</strong>-007<br />

<strong>JAEA</strong>-<strong>Testing</strong> <strong>2011</strong>-007<br />

(1) Measure ambient dose rate at the condition without pool water<br />

(a) Measure the ambient dose rate at the bottom of the swimming pool and pool<br />

side.<br />

Survey ambient dose rates at the same measurement points as those before<br />

starting the work (Record 2: Ambient dose rate map of the swimming pool and<br />

pool side before the work)<br />

Measurement points are at four corners and the center, in principle, of the bottom<br />

of the swimming pool. Add locations where drain water is collected such as drain<br />

port as measurement points.<br />

Write down the measurement results in the form, “Record 19: Ambient dose rate<br />

map at the pool and pool side”.<br />

(b) Survey ambient dose rate at the places used for the work<br />

Survey ambient dose rate at the same measurement points as those in the<br />

swimming pool, outlet to external water way, along work flow lines, temporary<br />

storage of waste surveyed before starting the procedures, and write down the<br />

measurement results in the form, “Record 20: Ambient dose rate map in the work<br />

area (after the work)”.<br />

- 175<br />

175<br />

-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!