(4) Set a time schedule of the work<br />
<strong>JAEA</strong>-<strong>Testing</strong> <strong>2011</strong>-007<br />
<strong>JAEA</strong>-<strong>Testing</strong> <strong>2011</strong>-007<br />
Set a time schedule of the work using the form, “Record 5: Time schedule of the<br />
work” based on information obtained in the precedent steps such as dimension of<br />
swimming pool (volume of pool water), number of available materials and tools,<br />
available number of staffs and overall schedule.<br />
Approximate times that are assumed to require for each task are shown below.<br />
【Briefing of the procedures】 1 hour<br />
Briefings are held before starting the procedures. It will include explanation to<br />
all of the program members to inform about the entire procedures and detailed<br />
explanation to each task group members about practical method and note to be<br />
aware of.<br />
【Securing of a discharge flow path (removal of sediment)】 0.5 day<br />
Remove mud and fallen leaves accumulated in the discharge flow path.<br />
【Radiation survey before work】 3 hours<br />
Sample swimming pool water at predetermined sampling points, and measure<br />
radioactivity concentration with a radioactivity detector. If the radioactivity<br />
detector is not available at the site, time required to transport the samples<br />
needs to be added to the above time.<br />
【Discharge of supernatant】 1 day<br />
When the radioactivity concentration in the pool water is lower than the<br />
criteria for discharge, discharge the supernatant with engine pumps, while<br />
taking care of not to pumping up mud or fallen leaves accumulated on the<br />
bottom.<br />
【Treatment in 1 ton plastic tank】 1.5 hour/one tank<br />
When the radioactivity concentration is higher than the criteria for the<br />
discharge, pump up the pool water together with mud and fallen leaves<br />
accumulated on the bottom. It takes 20 minutes to feed zeolite, flocculant and<br />
neutralizer. Leave at rest 30 minutes to allow sufficient precipitation. It takes<br />
15 minute for discharging the supernatant and 15 minutes for recovery of the<br />
precipitate on the bottom of the plastic tank.<br />
- 123 -<br />