You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>GUJARAT</strong> <strong>POLLUTION</strong> <strong>CONTROL</strong> <strong>BOARD</strong><br />
REGIONAL OFFICE, NANIBA PATHSHALA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
7.<br />
6.<br />
7.<br />
Guiarat Pollution Control Board<br />
Regional Office, Naniba Pathshala Building, Nr. Patwadi Gate, Bhuj, Dist - Kutch..<br />
Public Hearing Proceedings<br />
It is hereby informed that as per the Ministry of Invironment and Forests, Govemment ot<br />
India, New Delhi vide its Notification no. S.O. 1553 dated September 14, 2006 ar.d<br />
amendment dated December 1, 2009. Public Hearing was fixed for the folowing project<br />
covered under Category-B, of M/S. Star Clay Tech Pvt. Ltd for their proposed manufacturing<br />
activity of Activated Bleaching Earth 800 MI/M at S.No.824/1,825, Village - Faladi, Ta<br />
Mandvi, Dist Kutch, Gujarat.<br />
A copy of the draft Envilonment Impact Assessment report and the Summary of<br />
Env oment lmpact Assessment Report was sent to the following authodties or offices to<br />
make available the draft EIA Report for inspection to the public dudng nolmal offices hours,<br />
till the Public Hearing is over.<br />
. The Distxict Collector Office, Bhuj, District - Kutch.<br />
. District Development Office. Bhuj, District - Kutch.<br />
. Dishict Industy Centre, Bhuj, Distlict - Kutch.<br />
. Ministry of Envhonments & Foresti, Govt. of India, Regional Office (West Zone),<br />
Kenddya Paryavaran Bhavan, E 5, Arera Colony, Link Road3, Ravisar*ar Colony,<br />
Bhopal- 4620L6.<br />
. Regional Office, GPCB, Naniba Pathshala Building, Near Patwadi Gate, Bhuj, Dtut -<br />
Kutch .<br />
. The Taluka Development officer, Taluka Development office, Mandvi Dist - Kutch.<br />
Other conc€med persons having plausible stake in the environment aspects were rcquested<br />
to send their response in writing to the concemed regulatory authorihes. They were<br />
requested to send their comments to tle regulatory authodties as under.<br />
. The Secretary, State Level Env onment Impact Assessm€nt Authority, Paryavaran<br />
Bhavan, S€ctor 10 A, Gandhinagar,382 010.<br />
The Public Hearing was scheduled on 12.10.2010 at 11:00 hrs at Matushree Jethibai Dharamshi<br />
Smruti Pratishthan, Puaskrut Jheel Ramatgamat Sankul, B/h. Faradi primary School, Village<br />
- Faradi, Ta - Mandvi, Dist Kutch. An advertisemmt in English was publjshed in "The<br />
Times of India" dated 05-09-2010, and in Gujarati language in "Kachchl Mitxa", on dated 04<br />
09-2070.<br />
The Additional Djshict Magjshate & Additional District Collector, Kukh supervised and<br />
presided over the entre public headng process.<br />
A statement showing participants present dudng the public hearing is enclosed as Annexure<br />
A statement showing issues raised by the participants and responded by the represmtatives<br />
of the applicant during the public headng is enclosed as Annexure B -1 (EngUsh) ngu.Llce-2, & B -2<br />
(Gujarati) .<br />
y -lt'+-''V"
Annexure A<br />
A stat€ment showing participants present during the Public Ilearitrg<br />
As per the Ministry of Environment and Forest, Govemment of lndia" New Delhi vide its Notification No.<br />
S.O.-1553 dated September 14,2006; Public Hearing was fixed for the following project covered under<br />
Category B, NVs, Star Clay Tech Pvt Ltd. Located at Survey No. 82411,825, Villag€ - Faradi' Ta -<br />
Manivi, Dist - xutch, for proposed manufacturing activity of Activated Bleaching E&rtb 800 MT^VI<br />
(9600 MTA), the Public Hearing held on 12 10.2010, at 11.00 am, at Matushree Jethibai Dharamshi<br />
Smruti Prati;hthan, Puraskrut Jleei Ramatgamat Sankul, B/h. Fradi primary School, Village - Faradi, Ta<br />
- Mandvi, Dist - Kutch.<br />
The list showing participants prcsent du ng the Public Hearing:<br />
drllq t?. - qo nolo ol.t i)t 5et9 Ueetotl aii34t dlgst.tt E?ta]t Jtlat4t t|{ tais z4dl<br />
1, zlq ari ?,lqoult di{t{ €l? sai ldJt)saL s€kltcL sA 4) G {le.t etaldt coo >l ' a"t<br />
}la 4t+r stcu"tt Ujatd<br />
q*sa 4D !"6 +i.isl?.tl %tb?4lall dt lu-oc-eoo€ rn"a\4[<br />
qqlqrgitq a)s g.ucts'tla{i Gqf&ld'I"lt 4La! , .lla:i<br />
"ua d?rt ttAA qlet .<br />
(tad5) (dt4 ata claigi "tt4) c+r€t)<br />
I<br />
Ke-+-y , -R-rrdult<br />
.<br />
41"et"dR.l4r*l ,<br />
Lhit e^t"t D"-t ^ HltrrldaL<br />
"A-<br />
3 a"ul ssilt **;s)"r. n<br />
197noPaL2s-t'^\<br />
d<br />
o!1 g,"n,t",&"g,^t{, {"1€]<br />
&e.<br />
CJ. hL*: De^t,<br />
'v--;----'----.<br />
wm<br />
q<br />
lctmt zlcr,c*\ ZA< *
dtlu +eLl sd. )s 9L6da fd.li)s'rL {ir
E.<br />
dri+L vLi sd )s gLt5da IAJit)s.tL UiQr,t D*sa aL) e'LLq\ff.t dt e'2 - 10 1o1o<br />
"tL \Lz- rc : oo 3(r[] aLqdt *3IorL6 q?4t) +atfi ]Ja\5r.t 31?q.t $tet tat cLart<br />
sar €?tA ytPrlas rttqtfl utaq JtLa- sttAt . 4t- atil4l . ff s?tg qtt q\h\e<br />
alE u"tL.rflai GqJRl4 et)s\.il qtet.<br />
(tatis) lara otd cLLagi<br />
ata;<br />
c{€u<br />
, n<br />
$116q"1c"1rr.1 \^*1 ;[lit'(, WsL-<br />
"{. ? i.rrriln h6- t 1,,'tl<br />
U4.4 :? y z1:
i.rir leLr sd )s gLsde ldliL)saL qJircr y'L*sa aL) etLq\ff\")<br />
\ tt r7<br />
\arql<br />
35<br />
""-\'", t &soi1,, .-...lir\,<br />
:e(l<br />
\ €>'1<br />
'.) e_.1\\/-"<br />
.rj-r5r.r4!r 1<br />
3< xlCY\L<br />
G.n< +1\t) *<br />
3e<br />
C.
dtlu vLr sd )s lL6da fdh)saL Q-Lo })*-sa aL) utq)ft.t dl. c? - co - xolo<br />
aL \rt tr : oo 3Gtt5 aLqdL i-BLott6 elrariL qJi IRo6L't 3r+q.t :fue tad cLad<br />
{.*e *uh }tarlirs rLtutt4t qLteul. rtt4- $ttel , (t- ats{.t,6 setg tnLLh dh\e<br />
e\E uaL.{CIai Gql?rd q\s)41 qth.<br />
(ta[s] (.tta ota Jttad ata) c+t€t)<br />
"Drn1 4rn3 d:.,tl<br />
T-) ] \<br />
j'flqptlt,( LJ\ a et"ni'! t{!! {,iu.,n'l^-.<br />
6< lA,yxt,r-, fi(nr,-'1 9+-R4
tria +aLr sd )s 9L6da IdJl)saL gliL.t y\*sa aL) e'tLq'Lffd ctL cr 10 - 1ol,o<br />
.rL \L%. e.e. : oo seLS aLqdL *tlorLr5 qrar$L +aG }ja\5rd U?€J iler rao .Larc<br />
USq. lrt gtelfdts rttuttdl qtaul Jl.[at- $?[eI , dt- atl3{.1 , 6- s1 ;'
dil+ tLr sA. )s 9L6iLa fdli)s.tL XJira 9\*sa at) e'tLq.Iff,t dl 11 - co - ?oto<br />
.tL tq- qq r oo aeLi arL(laTt b-Iqtt5 q?atfl +a!a 9Ja\Et.t g?+s.d $\et lat ctalc<br />
iig4. strel grulis ut,ltdt qtuul ctlal- 5?t0t, dL 4l3Q , ff- se:g t'ui. q\tt\e<br />
q\E tdrql/ilai €qj*r.r er\sldl 4tet.<br />
(94t4) (. ?t std J[atg .r[al) c+r€l)<br />
sr ,.66t de'4 *,:-S-t'^<br />
eg 2Sh^tl ),\1\^ 4t\ i)<br />
sq<br />
zt 4/ 9( z,',1 c,zr
d+itr +aLr sd )s lLr5da IAJiL)saL q.Fro 9\*sa att> ?4tqlftd dl 1? 10 - 1o1.o<br />
"r[ \rt sr : oo Stt[] aLqdt ]rAorL6 q?a[{tl taUa gRtaLa grts3 $Ie lao tLad<br />
dier t?t ltr|its tLLuLLdt qtaq rLLa- grLh , cL- aisdt , fi- aue lltt 'I%L{a<br />
elE rdLqElai e{Qt
<strong>GUJARAT</strong> <strong>POLLUTION</strong> <strong>CONTROL</strong> <strong>BOARD</strong><br />
REGIONAL OFFICE, NANIBA PATHSHATA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
Annexure B I<br />
A Statement showing issued raised by the participants and responded by the<br />
representative ofthe applicant during the Public Ilearing:<br />
As per the Ministry of Envirorment and Forcsts, Government of India, New Delhi vides its<br />
Notification no. S.O. 1553 dated September 14,2006 and amendment dated December 1,2009.<br />
Public hearing was fixed for the following prcject covered under category B, M/S. Star Clay Tech<br />
Plt. Ltd. For their proposed Activated Beaching Earth 800 MT Month, at Survey No. 82411 , 825,<br />
Village Faradi, Ta Mandvi, Dist - Kutch. The public hearing held on dated 12-10-2010 at<br />
11:00 hrs at Matushree Jethibai Dharamshi Smruti Pratishthan, Puraskrut Jheel Ramatgamat<br />
Sanlol, B,4L Faradi primary School, Village Faradi, Ta - Mandvi, Dist Kutch.<br />
Shri Kc.Pancholi, representative of the Member secretary, GPCB and Regional officer,<br />
RO, GPCB, Bhuj explained about the background of the environmental clearance<br />
required for the project proponent and opportunity of Public Hearing being provided to<br />
the affected people residing in and around project site as per the aforesaid notification<br />
Published by MOEF, Govemment of lndia. Then after with a permission of Additionai<br />
District Magistrate & Additional District Collector, Bhuj he asked th€ concemed Project<br />
proponent to make the presentation about their project.<br />
Shri Jayendrasinh K Parmar rcpresentative of IvtS. Star Clay Tech Plt Ltd., made presentation<br />
about Proposed Project.<br />
The various points / issues raised by the participants and its response given by the project<br />
proponent during the public hearing is as under.<br />
Issued rais€d by person Response giY€n by the<br />
represetrtativ€ of lhe Project<br />
Proponent<br />
Shri Jadeja Himmatsinl Khanji,<br />
Village Faradi<br />
- Company has not informed<br />
to villagen rcgarding the<br />
proposed project.<br />
On behalf of representative of the<br />
company, their consultant Shri<br />
Shaileshbhai Patel replied that<br />
- All the local affected villages<br />
located within the 10 Kms radius<br />
of the study area have been given<br />
executive summary in Gujarati<br />
through respective $am<br />
panchayat.
V cu:nnAT PoLLUTtoN coNTRoL BoARD<br />
REGIONAL OFFICE, NANIBA PATHSHATA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
Time of Public Hearing is<br />
not suitable as fameN are<br />
busy in doing faming.<br />
Company should staft the<br />
work before pdor<br />
permission of Gram<br />
panchayat.<br />
Faradi canal is passing<br />
beside the company.<br />
Company has not provided<br />
display board at the gate of<br />
existing factory.<br />
2 Jadeja Gajendmsini Mulji,<br />
Ex. Saeanch.<br />
whether Company has<br />
obtained pemission of<br />
gram Panchayat?<br />
Since when the existing<br />
unit is working?<br />
The time and date of the public<br />
hearing of proposed project has<br />
been decided by the dishict<br />
magistrate and districtcollector.<br />
No Objection certificate from<br />
Talati of village - Faradi and NA<br />
cerlificate from concem<br />
competent authority has been<br />
obtained.<br />
Canal will not be affected due to<br />
proposed project.<br />
Welcome the suggestion.<br />
On behalf of rcpresentative of the<br />
company, their consultant Shri<br />
Shaileshbhai Patel replied that<br />
No Objection certificate from<br />
Talati of village - Faradi and NA<br />
certificate from concem<br />
comp€tent authority has been<br />
obtained for the eisting unit.<br />
Existing unit is working since<br />
last 06 months for bentonite<br />
g nding.<br />
Y.---(* )J
w \rt <strong>GUJARAT</strong> <strong>POLLUTION</strong> <strong>CONTROL</strong> <strong>BOARD</strong><br />
REGIONAL OFFICE, NANIBA PATHSHALA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
3 Jadeja Arvindsinh Jagubha,<br />
Village - Famdi.<br />
Company should gve<br />
p ority in employment<br />
to Faradi Villagers.<br />
Company should follow<br />
the promise.<br />
Company will be<br />
responsible for<br />
damage to land<br />
crops.<br />
held<br />
any<br />
and<br />
4 Shd Shakaramji Puju,<br />
Village - Pipli<br />
- People should get direct<br />
and indirsect<br />
employment due to<br />
proposed project.<br />
5 Jadeja Ajitsinn Ganubh4<br />
Viuage - Faradi.<br />
SM Bipinbhai Thakkar Director of<br />
the company with an assurance to<br />
give in writing replied that<br />
Company will give first<br />
priority in employment to<br />
Faradi Villagers.<br />
Company will do all CSR<br />
activity.<br />
Bag filter and dust Collector<br />
will be provided as Air<br />
Pollution Conhol measures.<br />
Effluont treatment plant will<br />
be Fovided for trealment of<br />
genemteo efiluent.<br />
Environment maragement<br />
system will be opemted<br />
regularly and efficiently.<br />
Hence pollution Foblems will<br />
not adse.<br />
Shri Bipinbhai Thaktar Director of<br />
the company, replied that<br />
- They have welcome the<br />
suggeslon.<br />
Shi Bipinbhai Thakkar Director of<br />
the company with a assurance to give<br />
in uriting replied that
V cu:nnAT PoLLUTtoN coNTRoL BoARD<br />
REGIONAL OFFICE, NANIBA PATHSHALA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
Company should give<br />
prio ty in employment<br />
to Faradi Villagers.<br />
6. Shd Maiesh Gor, Village<br />
Faradi<br />
Because of the prcposed<br />
Foject due to the<br />
transportation of overloaded<br />
vehicles the road of the<br />
Faradi Village will be<br />
damaged and also the gate<br />
of the company is just<br />
adjacent to the road henc€<br />
traffic problem will arise.<br />
Company should PaY<br />
attention to this.<br />
Company should provide<br />
the local employment ancl<br />
strictly obey the labor laws.<br />
Company should prcvide<br />
safety equipment 10<br />
worke$.<br />
company should take care<br />
for air pollution and dusting<br />
due to the Particulates.<br />
Company will give first<br />
priority in employment to<br />
skilled and unskilled people<br />
of Faradi Villag€rc as per the<br />
company's requirement.<br />
Shri Bipinbhai Thakkar Dircctor of<br />
the company, replied that<br />
- welcome the suggestion and<br />
informed that du€ to the Proposed<br />
project the company will take<br />
care that their villagers should<br />
not suffer any Problem.<br />
Tmnsportation of raw material<br />
and finished goods would be<br />
done scienti{ically.<br />
- Priority will be given for local<br />
Employment and will shictly<br />
follow the labor laws.<br />
Company will provide helmet<br />
handgloves, goggles, Ear Plug<br />
and safety shoes to the workers.<br />
Bag ilter and dust Collector will<br />
be provided as Air Pollution<br />
Control measures and it will be<br />
operated<br />
efriciently.<br />
regularly and<br />
Y-l
\\!'- <strong>GUJARAT</strong> <strong>POLLUTION</strong> <strong>CONTROL</strong> <strong>BOARD</strong><br />
REGIONAL OFFICE, NANIBA PATHSHALA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
Annexure B 2<br />
e\s u.rLqsflai arrr A4r? +t€qtJtt?'r) ktr?r G5rde ?,td. dsatdt<br />
qJR]aQt krLlL erLqqLaiL dLder qgdr.<br />
qa e{i ,r{Lcrtse ai erri @ttd ursL? adL GaAaL .[A$]rra tais e]u e]L rw: rtLqx<br />
uQ.aon xoos E5ur. dtiir uLr sA. )s yLt5da lAfrt)sal ilsld)s o4lLtli"L e'r{ zoo<br />
)r. a.r }Ji autt s?crto {irs 9t6dc IAJA)saL yJiJ;rf{d i+r)aL gJirc<br />
elsa tat i. ?di-u lric r5.a{[l5.2t'. trq\idr ridLtr t\ igeaLi srcu tvLLcg.<br />
dtr4l crCL<br />
4) t\.gJte,riah *rL .uaar +d "r. .a6le., zr..l ai ?'tL.l.u[ d{{ terq sa<br />
>* )t6dc, IQf4)sai dseld)s odtell"L r'ttigj roo h . aa gft aLr 6 u€.r srqr.r {ad<br />
9)tsa Jlri )>a)ra sg.<br />
ei)s U.rLCr\t €taqror tg?'rLd staLt +rrLhs r'Larsai e)s\4[ igr'rLrL aL) 4e-t Uea)<br />
SlscLai uLcrt\. at)s u.uq \4L €iaqLol @ttrt daLt eqLtL GaLqcrLai e,rLd.et gtLoNd<br />
iqdl"tL fJaJafq e.utL !.g'R tiLr{qLal ?,rLcq\ t 4Le) gtor &.<br />
9aiIs 0ir ?t a14t?ddtat t?ott.t s?dtla dsa.tL !i"llt4l r.rLr"<br />
ot!{q[a[ o de ]dgdl<br />
"al"rL dl'rrt{le qLtdl, ?J. sqr4<br />
j,r.{Id<br />
"LLqairiri<br />
rrc| 31e -i{1.<br />
\riL uerLl uldLL{<br />
t'isAe ei.{,<br />
j.{.{hL 11h[i[q .{dl 3,{.ft.r1<br />
s-uea-a ,{l riA\retLd ,r)et ngrLL r,rL.d<br />
r giirc ui*s2.fl q-o D.'[.-{I<br />
ht.itr1l ?4t.taL o1q]i qL'l<br />
.i+Lra rLl+il gtlLdl urL{<br />
uL.r.lL'rL uL{e d.<br />
o gha ni*ra-rL ..r,{.n,lL<br />
elJ<br />
a.-/a't'<br />
.lttr
RFcurnnAT poLLUTtoN coNTRoL BoARD<br />
REGIONAL OFFICE, NANISA PATHSHALA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
trt u35
Vcu.rRRAT poLLUTIoN coNTRoL BoARD<br />
REGIONAL OFFICE, NANIBA PATHSHALA BUILDING, NR. PATWADI GATE, BHUI-370001.<br />
rtrt lLrd !zt, otL't<br />
: ,{lql'l<br />
j.{.{l uL.{.{Lr{l e'tiA n.,{St - .{ita<br />
ii"roLL{t rruttl .<br />
zL uBa{lu .r1ou, rd. +tr<br />
3,r-0 ri"r"LL?'l qL) &L[iiLi ueraL<br />
44.<br />
r c[it, rg. si[{l<br />
ut !q-{I-u .,u.l.tt{l ,x-{ht<br />
uiqretil s qrs-r-{l uctt %q?e{l<br />
stLdL "LLtr-rL<br />
?krLi gsut-{I e1 .<br />
*i e{I{ oLLqe'L'A a3a{l$ q3{t, dQtt<br />
j.r-{l-il tL6a iLsi us'li t} a{l<br />
lLR3-{l +r\rqt { 6sotE a 6itqa<br />
j.+-{l atL.r A.<br />
i.r-{I rerLli-s dsii ?i%ctL?:l ]ttt<br />
d2u 3lrrsrl [i{\ig (aoLr eilrrd)<br />
qrcr.r 3l.<br />
srqsn'li {sA{ +uq.ti utq.<br />
i\-{I.|i €.u rg.r$ / i%3cii I 6l<br />
tL) t3l1 .roLetL d.<br />
etcLLs"rL?L trLtrii i.{l g{ A*tdL<br />
,leL.{.rLqi UL.lrl. *{l<br />
:rgueL-{I *rr+rL l}ri tol<br />
j,{.[l.[r 3rt.tl3z?<br />
l,gu uttd,<br />
o grrti r,tLcsLL.rL.d ,{L{ &.<br />
j..L-{I-rL sLrt :{I c{I.{l.r
€ cu:nRAT PoLLUTtoN coNTRoL BoARD<br />
REGIONAL OFFICE, NANIBA PATHSHALA BUILDING, NR. PATWADI GATE, BHUJ-370001.<br />
Annexure C<br />
The written comments if received by the regulatory authority in<br />
response to the public notice and clarification submitted by the<br />
project proponent.<br />
1. Representation from Paryavaran Mitra.<br />
2. Reply from project proponent with respect to respect to<br />
representation of Paryavaran Mitra.<br />
3. Representation from Pravin Sheth<br />
4. Reply from project proponent with respect to respect to<br />
reDresentation of Pravin Sheth.<br />
5. Representation from Jadeja Virendrasinh D<br />
6. Reply from projeci proponent with respect to respect to<br />
representation of Jadeja Virendrasinh D<br />
7. Reoresentation from Dashrathsinh Balubha.<br />
8. Reply from project proponent with respect to respect to<br />
representation of Dashrathsinh Balubha.<br />
9. Representation from Harpalsinh R jadeja.<br />
10. Reply from project proponent with respect to respect to<br />
representation of Harpalsinh R jadeja.<br />
I I<br />
Y-n)a"'"-''l--''-
PAF 1A. RRAF NI'EE<br />
0?9268513?l<br />
PARYAVARAN MITRA<br />
(JANVI:{AS)<br />
502, Rai Avenue. ghaikska NagEr Road, Nr. Tialiej Cross Road, Thaltei, Ahmedabad - 380 059<br />
Telstat - (079) 2685'132r'Phono: (o79) 25851801<br />
Emait I psryavarenmitra@yahoo com Vycbsite : hhpJ/paryrvaronmilra org'in<br />
Rcfi #l'M/MP/('15i2010<br />
Io<br />
ShriHardil Shrl}l<br />
(.iLlr-.:rl Pollurion CDntrol BoJrd<br />
D,|tc: I I October.20l0<br />
\ub. r En!;r,rnmcn(nl Publi. Ucaring of StsrChy Tcth htLtd. on l2-10.20t0:rl<br />
Vill!gc: l'!r!di, Tel: Mrndvi' Kulch<br />
Sir.<br />
Paryrvaran Mitrn lcorn visitcd lhc Faradi vill'rge & stuJy arc$ lbr thc projcct M/s Sta.r Clay<br />
Tcoh lt\4. Lrd...urd carritxl out public con:tuhulion wirh ldcal at{cctcd pcoplc. Duting which<br />
wc cirmc to koow that tlc proJccl has alroady \tirted construdion work without Environmcnt<br />
Clcrrdncc. Also .,{c camc 1() know by locrl peoplc tl&t fm)duct lcsling was nlso donc by this<br />
proiccl. Wc lllso lvrotc a lcttcr to you dolcd ') Octoher 2010 (Ref no: PM/MP/64412010\ fot<br />
(}ic contfuction work which is cl,j.rly visiLtlc cvcn in CoaAlc MaP<br />
Evcn though the construction wo.k is strrtcd thcrc isn'1 my board inlbrmiovmcnlioninil rhe<br />
We hrlc rc\i.wed l-l^ repon of afx)vc mcntioncd proiccr. |olk)wing aJc our<br />
conrmrnr5/)julllcslions/obscfl riions rcgarding Projcct and EIA rcport.<br />
lkswrilkninthcEtARepo(nndexeculilcsumtna.ryofthcprojccttholthccompanyhai<br />
clnildy sbncd corlstructi(,n work and glccotclL i$ olso dcvelopcd. This is violation o DI<br />
Norificalion 2006 as thc projcct is slill swaitin8 Environmcnl ClcArance from Lhc<br />
Minist y ofEnvironmcnl lrd forcst.<br />
2. when djd you apply for F:nvironmcnul Clenrancc atrd whcn ToR wrs issucd?<br />
J. llow wgs land ccquircd lbr pmpoxqd Fmjcct? wlcthcr thc acquiNd land is agricultlml<br />
lind or wij-\!e l.nd? Pteasc givc lol|d brc*ufr ofacquired lalld.<br />
4, Gwll,lc(cr confirtns wutc. supply of0.020 Ml,D walcr whilc Tablc 2,1| slalcs GWll.<br />
watcr as 45 Kl-D. Plcnscju\tify.<br />
5. D(rcs company hilvc any olhcr opcntion al srjnc sitc aparl frorn proposcd projccl 8oitrtl<br />
6. Total lind acquirrd by $c projccr propoDcnt is 44515.421 sq-m whilc greeobcll<br />
dcvclopmcnr is in 12000 sq.n). urca wh;ch is only 26 % oflolal land. Plcdscjustify<br />
? I:or dclcloping grccnbcll in 27015 sq m rrcr !!nd mainlirin cxisting 12000 sq rn arca.<br />
daily water rcqurrcmcnt ol l 5000 L ir on iowcr side. Plclllic justiry-
ccr lr ro 04i42P 'lRRTAVhRFI i I IRF 0?92545t321<br />
PARYAV4,R,*,N MITRA<br />
5C2 Fat Avenuc. Ar.oir,"f" r.raga, nOuO, f,fr fira r<br />
Toratar . to7c1 ,.!.r,,. - -,j crcss Foad,<br />
Torerar ._to7s)<br />
Thahoj, Ahmedabad -<br />
?68513?'' . 3gc<br />
r^"; osg<br />
Email i piryav.r.nmiua@yahoo.com i;;;;;;:;.$;<br />
Weasitc : r,i".rjr-<br />
8 Doncnjc qats ,Lluiraricnt ^f 5000 L rda,<br />
" r,,,'*" ;;,.*.';; ;:'1,,.:;;',:T,J""",;'?"IiHU,;::;i:l',;0.;,"."<br />
" ii:# *l ;H;lls*t;*')':,:'**".<br />
, r w-n w"ut,t Uc cna * ofspcnr<br />
ac;di<br />
ii,l,fi .Tl",i::fff:Tvr'm qqrcnnFnd mon ronnsl<br />
*,,<br />
cohpnnicr<br />
""d sra, c,rrech ror<br />
, . :t. .- "- -" "<br />
""., ":di;;;J<br />
'" ' ' pnrsranmc n k'n\ of rypc ,!.a no or<br />
,- r,($. f,,e nunes of irrFr.red acyct,,r! ro whu,n hazJ.do$ $tr.J v$r.., oiJ qould o(<br />
't<br />
*. ,nsr,;rrcd r{.oprc riom<br />
;[;ff;di.i[,<br />
lurolndins arca win gct cmproymen in<br />
Y. JN rtutJ<br />
Cc:<br />
l.<br />
2.<br />
,''l\<br />
/ i ' ---....-.-<br />
ill'Y"llHHffiili*s.and chuinnao Epn comnidce. Kurc,:
Date: 12-10-2010<br />
To,<br />
Mr. Hardik Shah<br />
Member Secretary,<br />
SEIAA,<br />
Paryavaran Bhavan,<br />
Gandhinagar.<br />
Sub: Reply to letter of Paryavaran Mitra<br />
Respected Sir,<br />
In connection wlth above stated subject we here by giving our clarification as follows.<br />
1. lt's written in EIA report and executive summary ofthe project that the company has already<br />
started construction work and greenbelt is also developed. This is violation of EIA<br />
Notiflcation 2006 as the project is still awaiting Environmental Clearance from the ministry<br />
of Environment & Forests.<br />
The greenbelt and construction was already developed by M/s.star bentonite Exports, from<br />
which we have taken a land on rental basis. we have not violating of EIA Notification.<br />
2. when did you apply for Environmental Clearance and when ToR was issued?<br />
We had applied for environmental Clerance on 28108/2009 and we have received TOR on<br />
77 /72/2009.<br />
3. How was land acquired for proposed project? Whether the acquired land is a8riculture or<br />
waste land? Pleaseglve land breakup ofacquired land.<br />
Our totalacquired non agriculture land is44515 m'z.<br />
4. GWIL letter confirms water supply of 0.02 MLD water while Table 2.11 states GWIL water as<br />
45 KLD. Please justiry.<br />
AD!|1fl.0FFICE I<br />
PL0TN0 3&4 SECToFT0-B TNDLISTRALAREA,GANDN DNAM(KUTCH)-370201, rNDA<br />
PNoNE 91 2836 232062 FAX:9i - 2836'232037 Ema l: nfo@slarbentonitaaxports conr Webs te : www slarbent0nit6sxp0ris.c0m<br />
REEI]. OFFICE:<br />
D 4, SHAIRYASAPPABTIT]ENT, FLATNO. OO1/003, GRD FLOOR SARVODAYA PARSNWANATH NAGAR, NAI]UR, MI]LI]ND (W),I'IUMBA '4OOO8O<br />
PHoNE 91- 22 -25683685 FM:91'22-25644917<br />
" oualiiy [,lanagmenl Syslem Cerlilied by DNV as per lS0 9001 : 2008"
l -<br />
D (
11. What would be end use ofspent acid?<br />
^$. Ct-.'.rt".^ t"t'<br />
We will use lime to treat spent acid and ultimately it will convert into gypsum, which can be<br />
sale to authorized companies. The generated eifluent will be treated in effluent treatment<br />
plant and RO system.<br />
12. What were the dates of baseline environmental monitoring?<br />
1'r November- 2OO9 to 31*January 2010.<br />
13. Please provide details greenbelt development programme, in terms of type and no of<br />
species, area and water requirement?<br />
a. We will select following plant species<br />
Azarirachta indica (Limdo) , Prosopis juliflora (Vilayati Baval) , Tamarindus indica<br />
{Amli) , Albizia lebbeck (Kalo Sarsado)<br />
b. No. ofSpecies - 4000<br />
c. Area - 16,000 Sq. meters.<br />
d. Water Requirement - 15.0 Kl/Day<br />
14. Please give names of registered recyclers to whom hazardous solid waste / oil would be<br />
given.<br />
For gypsum waste Gujarat Ambuja cement limited, Siddhi Cement Limited, Aadi Cement Pvt<br />
Ltd for used oilto alka Barrelcompany,<br />
15. How many skilled and unskilled people from surrounding area will 8et employment in<br />
proposed project?<br />
5K teo - 55<br />
Unskilled -15<br />
Thanking You.<br />
CC To:<br />
502, RajAvenue, Bhajkaka nagar,<br />
Nr. Thaltejcross Road, Thaltej, Ahmedabad - 380059<br />
ADMIT. OfFICE:<br />
PLOTNO 3&4,SECTOF]O.B,INDUSTRLALAREA,GANDN<br />
DNAIV(KUTCH).370201, NDA<br />
PlloNE 91- 2836232062 FM:91- 2836<br />
r'rilTsls<br />
flrlCl?4<br />
_ 232037 Ema l:info@slarbenioniteexpods com Webs h:uwwslarb"'nionieexpons com<br />
REGO. OFFICE:<br />
D.4 sHA RYAS APPAnT|\,|ENI FLATN0 001/003 GFD' FL0oR' SARVoDAYA PAFSNWANATN NAGAF, NAIIL]B MULUND (W) MU|r,1BA|.400 080<br />
PHoNE : 91 -22- 2568368s IPJ: 91' 22 25644917<br />
" ouality Managment System Certifisd by DNV as per lS0 9001 :2008"
oa Oct, eolO 4! S0PH GFCE RO E HI.]J oaa3aa506al<br />
lf onmonr C!E.!qrI9I!99!991!9!<br />
Envlronment P rlngottr tflh. pvt Ltd. Ta MandY<br />
5fl'i;ont un.rn, o.., *"llndt Ap!.fbnent, ohlkrir'ldt ankl€shwlf-39€Ool oul'r'!<br />
6rdior Clti'en I T€chfloctrG<br />
c!ll No. ; 99t?79599!!l<br />
To,<br />
coov<br />
coPY<br />
ltleflber sEdre!ary<br />
n,O,'CPCe, DrlL oollector<br />
oujr ! Fo lutlon ccnirol-Borrd,<br />
1el zoo"rt flft r*.*<br />
6ubar EnwitffiDftPsnltc h€ldng-of *gleEFa-!sLjr!1-tld" on1rft6oct io tt Tt r'rlAdvl' blt!('rtch'<br />
Plsd-eu<br />
*' 3yl'JsEtf ttrsfJ,ii:ng H'$5lT,i!f i'#'f#ii,tfrt6'6"'i'.i$il'#?l$'[tY*.<br />
02<br />
03<br />
04<br />
05<br />
06<br />
07<br />
08<br />
!E<br />
.10<br />
11<br />
st6d Mr. HardlkShah 8rh.D'<br />
SUSTAINABILITY?<br />
o Bi"rti'ili#iil,lio,*r,"rbq:t!q91-"-:19T-!ff.'.1nr{voIofProlectPtopon6nt('pPrro<br />
i-'i;; i ;;il;dt ik-..'!"-le :!l?T,Iff :i :5f Xl:'j'^'v;<br />
lli'?"'jfi:ilHfl"ffi ;;:i:E -n;i!;;ii-bl!<br />
!"1Tf-11fi-"1t^1"'1i.1;;j<br />
i,l,fl$lLil"L?JLilPil',f"i&':-.:li::!;l:.*rli:Tli:11*.H::,Si:.#<br />
grriiEEiavct rnonttorcu at sn<br />
' -""<br />
iT6ind b6ln0 hlgh nolr.<br />
" * - -' -;i';"artaiii ct ocPltioz fltr cxineuhh'rs'<br />
r1'jfs!3t!*t""":f"ssffli"'"fl fJil;:ili,;:;.-"IJ"',i v"i,--qur.: vou Eq{tr' ro (o ror.<br />
ll?Ti..Hfi 3lilXt"fifi';;;iffiii€''i.iil h""*nv "sEtors<br />
t6r.'rs\t<br />
ditcner'per crvt piprovtd. plentlry out<br />
i'ii ili i ri'iiiit s.or'n b'li irer' /ou w r.<br />
"i,"rt rsq-vrro.dtllv 15 ml w!t'r?<br />
'<br />
?t'd lio'n botl"?<br />
whrt la ciEmictl anlly3 r ol w'att wrt'l 63n'r.<br />
illll |'JHJ';"uii';ftffirl.i" iiJi*r"ir ' u'<br />
'eEci's' "' lt I:i"e-"-9lll":^",'ti:ll<br />
r! ip!4ggillb4' brt' l3t know'<br />
/ou propda tor.Lct Jou o1006l. tor.r.cfpo pollutenl tol.rrit Plaft<br />
:&-, ,-I r r E wthln cpcB eoEcmec no<br />
fuhri!ra tlkely Pollutlntr yau for "e-tnd wrEt<br />
;hich p..nt t;;clE- wtll b. tEl.oed?<br />
whllwijt b.lf! APfl v!lu.i?<br />
wrrtwltt be tt'r.udlvrl rate?<br />
whst t3 wrtertrbt. !t Faak EUmm6rtairton.<br />
ra!9a not rlrfirblt or R.o, p{!n!hrt bas€i dowF?<br />
,xff,jS:lY1:i1f,Ell""i:11:ll l'"1'0""".H'Lim;i;;i"i,iJoi."apo.nfronr' rr oo, pt s:ve coterrs<br />
what 13 or;l€ctcortrndP.y hick F€riod?<br />
m.er lny ch.ntcrtpoioonlng to arv.ldr of.mF oys.?<br />
whlt Aiirl bolEg .nd qtv wlll b. k pt n .0y to<br />
l'riiill'irl,"ii. ilvH.n;Gi",. rit *"pti"oiiii'iipdini oi u'i'"' pt P'|dvld€ !to6s! .ank d€ieiir<br />
"rrr<br />
AUGGESnOtI 1 if !ootPt!bl')<br />
1 I Pr calab|qto o rch y€! r' world onvl ro ntn6nl Csy q nd ' rch 'mploye5 should plrnt o n0 re'<br />
''<br />
i*-rii -pi<br />
iiiri"i,L'or thk Prbll4 hctrlng to wline!' 'nd loln thl' frrnctron<br />
Pl. contact ms it wu flrld !!YllJts!9LJrE4!l!!!lg<br />
Thrnk & r.€rrde<br />
YVLth ooodwhht. - -.<br />
V*l;i *rrr+' '("v{r''-.<br />
PEvlnbhllSheth<br />
"ti."l0..*<br />
Plaasa rqglatal my view! rnd Incutlgln dlnutr' wlth thtl p'rty'E t'ply'<br />
05i6rtr5,1'1o/zqlo<br />
tlle r Ectpldtd fiandvl.<br />
Jal Gr'vl Oul'r!G'- Jsl Hlnd<br />
lnd{etag6 etg w'E;;; but htrt th' cort of 'nvltonment'<br />
.' rhrlBhcth, Ankl'shwrr'C'l No 0s377ESt840<br />
Oralt REIA Report r.vl.tFd by Pr'vtn!
Date:. '12-1O-2O1O<br />
To,<br />
Mr. Hardik Shah<br />
Member Secretary,<br />
SEIAA,<br />
Paryavaran Bhavan,<br />
Gandhinagar.<br />
ff. tarc.'"rt..^ r"t.<br />
Sub: - Clarification with respect to your received letter from Pravinbhai Sheth on<br />
Dt. 08-10-2010.<br />
Respected Sir,<br />
ln connection with above stated subject we here by inform you that we have<br />
received your letter on 08 -10 -2010. For that we here by giving you clarification<br />
as follows.<br />
1. GWIL letter for raw water supply permission & legal supplementary<br />
agreement is not in favor of project proponent (i.e. on Star Clay Tech<br />
Pvt Ltd.) How do you assure project sustainability?<br />
We have all the land supporting documents like 7 -12 certificate, 8_A<br />
certificate, NA Certificate, 6 -A Certiflcate by the name of Star Bentonite<br />
Exports.<br />
Star Bentonite Exports has given this land to M/s. Star Clay Tech Pvt Ltd.<br />
on renlal basis for 25 years from the date l9-08-2009.<br />
We here by enclosed the copy of all the land supporting documents and<br />
rental agreement. Please refer Annexure: 0l<br />
ADMIN. OFFICE:<br />
PLOTNO.3&4,SECTOR10.8, NDLJSIBALAREA,GANDH]DNAM(KUTCH).37020],<br />
NDA<br />
PH0NE:9l-2836232062 FIJ.:91-2836- 232037 Emai nio@slarb€nlont$xpons.com Websle:wwwstarbenlonteexpoi$.com<br />
n[Go.oFflCE I<br />
D.4. SIIAIFYAS APPARTMENI FLAT NO. OOl /003, GRD. FLOOR, SABVODAYA PABSHWANATH NAGAF NAHUR, ML.]LUND (!q, [41]MBA]-4OOO8O<br />
PNoNE:91 22'25683685 FAX:91- 22 -25644s17<br />
" 0ualily Manaqment Syslem Certified by DNV as per lS0 9001 :2008"
AOMIil.<br />
[6***<br />
@<br />
iiirilil<br />
{qm-.'.tt".^<br />
So, the GWIL letter for raw water supply permission & legal<br />
supplementary agreement is not in favor of project proponent (i'e on<br />
Star Clay Tech Pvt Ltd.) but in favor of Star Bentonite Exports Thus '<br />
permission given by GWIL to M/s. Star Bentonite Exports is<br />
automatically extended to M/s. Star Clay tech Pvt Ltd'<br />
2. Water balance diagram fig 2.3 is not available in draft EIA Report'<br />
We have already enclosed water balance diagram in our draft EIA<br />
Report (Hard copy + soft copy) and submitted to following places'<br />
a. The District Collector, office of the District Collector, Bhuj, Dist -<br />
t"-'<br />
Kutch.<br />
D. The District development Officer, district Panchayat Office,Bhuj'<br />
c. The General Manager, DlC, Bhuj, Dist - Kutch<br />
A The Chief Conservator of forest, Bhopal.<br />
The Taluka Development Officer, Taluka Development Officer,<br />
Mandvi, Dist - Kutch<br />
f. The Regional officer, Regional Office, Gujarat Pollution Control<br />
Board, Bhuj.<br />
We have alreadysubmitted<br />
our draft EIA Report (Hard copy + soft<br />
copy) to the Headoffice,<br />
Gujarat Pollution Control Board, Gandhinagar'<br />
OFFICE:<br />
PLOTNO.3&4. SECToR 10-8, LNDUSTRIALAREA GANDHIDHAI'I (KUTCH) _ 370 201' INDIA<br />
iiiiri,bi: zri-e1s;j,j6i iex,sj -zeoo,zszogz Fmal i ni;@sbrbenloniieaxporrs.com webs le iwww srarbentonireexoons.com<br />
REGO. OFFIGE:<br />
O.I. SHE'"IS APPEA''',IEN '*T NO. OO1 /OO3' GRD, FLOOR, SABVODAYA PABSHWANATH NA6AR' NAHUR' MULUND (W)' MLJI'IBAI'4OO O8O<br />
PNONE I 91 . 22 - 25683685 lM .91 '22'25644911<br />
" 0uality Managm€nt System CertiliEd by DNV as per lS0 9001 : 2008'
3. Totaf plot area 44515 m2 is allotted to 5500 m'? construction of<br />
plant and 12000 m2 + 27015 m2 green areas. Where is the<br />
4.<br />
-lstaf ctovtech Pvt, Ltd,<br />
We have also submifted the details of water consumption and<br />
wastewater generation in tabular form also. Please Refer Table No.<br />
2.11,2.12 and2.13.<br />
provision of allowing free space at four directions as per building<br />
construction norms?<br />
The total plot area of our unit is 44,515 Sq. meter. From that we will do<br />
construction activity for 5500 Sq. meter' At presently we had done<br />
green areas for'12,000 Sq. meter. Additionally we will do gardening<br />
and plantation lrcm 27105 Sq, meter after provision of allowing free<br />
soace at four directions as per building construction norms. So,<br />
additionally we will do gardening and plantation for - 4000 Sq meter'<br />
So, our total green belt area will be 16,000 Sq. meter i e 35 94 % of the<br />
total Dlot area.<br />
Has noise level monitored at SH which is hardly at 3 km and being<br />
high noise level area?<br />
No. High level of noise monitored at SH is due to vehicular traffic. We<br />
do not emissive any activity within our premises that will generate high<br />
level of noise. However, we will provide ear plugs to workers as and<br />
when required. We will also provide adequate gardening and plantation<br />
and ecoacaustic system.<br />
A0lllN.oFflCE I<br />
ihBli:,?:i,:'JJ,%;,'<br />
'ill:$lltlll$,$-'ilTiH'Sl1?lll"-1li'331;"I?11' webs rs: M sldentoniteaxpon com<br />
REGD. OFFICE:<br />
0.4' SHA|RYAS APPAFTMENI FLAT No' 001 / 003' GRD' FL00R, SARVoDAYA PARSHWANATH NAGAR' NAHUB, M LJLUND (w)' |uU MBA . 400 080<br />
PNONEr91- 22 -25683685 FM 91-22'25644917<br />
" oualily lilanagment Syst€m Certilied by DNV as per lS0 9001 : 200$'
16<br />
,A<br />
@<br />
5. Canal /nala supplying irrigation water is hardly at 0.5 km, will it<br />
have any diversification?<br />
No such irrigation canal in 05 km radius of our site and no any<br />
diversification due to our project.<br />
6. H2SOa storage tank will be underground or over ground? What will<br />
be minimum inventory level?<br />
H2SO4 storage tank will be over ground. The minimum inventory level<br />
will be 60 KL.<br />
7. What area th6 fire prone area / chemicals? Please provide details<br />
of DCP /CO2 fire extinguishers.<br />
We will use Raw Bentonite, Sulphuric Acid and Lime as a raw material.<br />
We will provide storage facility for Sulphuric acid i.e. 50 MT x 03 tanks<br />
= 150 MT. we will also provide Dykewalll to the entire storage tank of<br />
SulDhuric acid.<br />
We will also provide Dry chemical foam and CO2 type extinguishers<br />
as per the guideline of the safety department. The bottom of the<br />
fire extinguishers will be 75 cm above the floor level. Water spray<br />
will be used to cool containers exposed to fire. We will avoid use<br />
of water where there is a danger of spreading the acid.<br />
aoi .oFFtcE:<br />
PLOT NO.3&4, SECTOR 1O-8, INDUSTF]AL AREA, GANOHIDHAM (KUTCH) - 370 201,INDIA<br />
NIN PIoNE : 91 - 2836 232062 FAX:91-2836- 232037 Email : info@siarbsnlonllssxports.com Web sile r ww\,v. starbento n iteexpo rls.co m<br />
$ltStS<br />
fi!IC0?4 REGD.oFFICE I<br />
D-4, SHAIBYAS APPABTMENI FLAT N0. 001 / 003 GRD. FL00n, SABVoDAYA PARSHWANATN NAGAn, NAHU R, rl/tULUND (W) MUMBAI _ 400 080<br />
PNoNE : 9l - 22 - 25683685cM : 91 - 22 - 25644917<br />
" ouallly Managment Syslem Csdilied by DNV as per lS0 9001 : 2008"
ADIII , OFFICE:<br />
[6*x..,.<br />
@l<br />
i1i'iir)I<br />
We have already provided all the spill prevention control and counter<br />
measure for hazardous chemical i.e. Sulphuric Acid I our Draft EIA<br />
Report. Please Refer Chapter 2, 2.6 - Details of Hazardous Chemicals.<br />
L Ref. T 2.9, considering batch cycle time of 16 hrs. How many<br />
reactob you require to take eight batches per day? Pleas6<br />
provide<br />
layout plan.<br />
Considering batch cycle time of 16 hrs, we required 04 vessels to take<br />
eight batches per day. We have already enclosed layout plan in our<br />
EIA Report..<br />
9. Ref, T 2.11, for how much green belt area, you will require daily 15<br />
m3 water?<br />
For 16,000 Sq. Meter green belt area we will require l5 m3of water.<br />
10.What is chemical analysis of wastewater generated<br />
from boiler?<br />
Characteristics of Boiler Blow Down<br />
Sr. no. Parameter Result<br />
2 SS<br />
pH 4.2<br />
3 TDS 240-260<br />
4 Oil & Grease<br />
5 coD < 10<br />
PLOTNO.s&4 SECTORlO'B,INDUSIRIALAREA,GANON<br />
DIIAM(KUTCH).370201. INDIA<br />
PHONE:91-2836232062 FAX 91_ 2836 _232037 Ema l:inlo@starbantonitaaxpons com webs te : www slarb8ntonile€xpofts com<br />
REGD.oFFICE I<br />
D.4 SNA RYAS APPAR IIVIENI FLAT NO OOl /OO3 GRD. FLOOR, SARVODAYA PARSNWANATI] NAGAF, NANLJR, I\'1ULI]ND (W) ]VUMBAI-4OO()8O<br />
PHoNE:9r'22- 25683685 FAx : 91 - 22 ' 25644917<br />
" 0uality Managment Syslem Cerlilied by DNV as per lS0 900'l : 2008"
d. What will be it's survival rate?<br />
tr6**,"<br />
@<br />
iiniiii<br />
6 BOD<br />
tar.'.rt"". t"t,<br />
iiS.<br />
7 Sulphate 20-30<br />
Note: All the Parameters are in mg /Liter.<br />
ll.What are the other industries in the study area? Either one using<br />
coal as a fuel?<br />
No, any other industries in the study area.<br />
12.you propose to select pollutant tolerance plant species , it is<br />
appreciated but let know,<br />
a. What are likely pollutants you for see and whether will it be<br />
within GPCB specified norms?<br />
We see the pollutants<br />
SPM and SO2 and it will be within the<br />
permissible limit due to proper operation and adequate<br />
installtion of air pollution control system.<br />
b. Which plant species will be selected?<br />
Azarirachta indica (Limdo) , Prosopis juliflora (Vilayati Baval)<br />
, Tamarindus indica (Amli), Albizia lebbeck (Kalo Sarsado)<br />
c. What will be its APTI values?<br />
37.63 Vo,32.20 Vo,34.88 Yo,62.0Q Yo<br />
A0lillN.0FFICE I<br />
PLOT NO. 3&4,SECTOF 10,9, NDUSTR ALABEA GANDHIOHAI4 (KUTCH)'370201, INOIA<br />
PNoNE : 91 - 2836 232062 FAX : 91 - 2836 - 232037 Emai r inio@skdenlonlleexporG.com W".bsile : ww.siarbentonileexports.com<br />
REGo.offtcE:<br />
D.4, SHAIRYAS APPARTMENI FLAINO.OO] /003, GBO. FLOOF, SAFVODAYA PAFSHWANAII] NAGAB. NAHI]R MULUND(W) MUI\,IBAI.4OO O8O<br />
PFoNE:91- 22 - 25683685 FAX:91 22 -25644917<br />
" oualily Managm€nt System Cedified by DNV as per lS0 9001 : 2008"
ADIUI<br />
[6*x.,,<br />
@<br />
iii'rbdir<br />
Survival rate will be - 55-60%.<br />
e. What is water table at peak summer season?<br />
More than 400 ft<br />
l3.What is the alternative arrangement if in case GWIL water not<br />
available or RO plant has break down?<br />
In case GWIL water not available or RO plant has break down We will<br />
stop our produclion activity.<br />
14. ls there any left out r€idue from l3 KLD RO reject water sent for<br />
evaporation? lf so, pleas€ give details.<br />
Our second RO rejected 13 KLD will be go to Evaporator system. After<br />
evaporation - 3.33 MT evaporation residues will be generated and that<br />
will be disposed to TSDF site.<br />
15.What is project cost and pay back period?<br />
Our project cost is 4.1 Grores. Payback period iss years.<br />
16.What antidotes and qty will be kept ready to meet any chemical<br />
poisoning to save life of employee?<br />
Our mainly hazardous chemical is Suiphuric Acid.<br />
, OFFIGE:<br />
PLOINO 3&4 SECTOFlO.B,INDUSTNIALAFEA,GANDN<br />
DNAM(KUTCH).370201. INDA<br />
PHoNE 91-2836232062 FAX 91-2836 '232037 Ema l:info@starbentoniteexpods com Webs te : www slarbenlon ieexpods com<br />
BEGO. OFFICE:<br />
0.4, SHA BYAS APPABTI\4FNI. FLAT NO. OO1 / OO3, GRD. FLOOR SARVODAYA PARSHWANATH NAGAR, NAHUF, MU LLJND (W), I,IUMBAI . 4OO O8O<br />
PHoNE : 91 ' 22 - 25683685 tA}. 91-22-25644917<br />
" oualily Managment System Cerlilied by DNV as pst lS0 9001 :2008"
I@q @ f,luiii)i<br />
-lscaf ctovrech Pvt, Lrd,<br />
As per the information regarding Antidotes & Spillage we will kept<br />
Sodium Hydrocarbonate (4 % Solution) as an antidotes with sufficient<br />
quantity.<br />
As per the emergency treatment of Acid, we will give milk /water to the<br />
injures person. lf required then we will give him antacids like Aluminium<br />
Hydroxide, magnesia.<br />
DescriDtion Hazards<br />
First Aid Measures<br />
Eyes Eyelids will hold open and eyes will<br />
immediately rinsed with cool running water<br />
at least 15 minutes. Medical treatment will<br />
qiven after rinsing.<br />
Skin Affected skin will be washed thoroughly with<br />
soaD and water. Will be rinsed for 15 minutes.<br />
Contaminated clothing will be discarded.<br />
Medical treatment will be oiven after rinsino.<br />
Ingestion Vomiting will not be induced. Plenty of water will<br />
be given to drink. To an unconscious person<br />
anything given by mouth will be avoided.<br />
Medical treatment will be qiven immediatelv.<br />
Inhalation Fresh air will be given to suffer personal. lf can<br />
not breath; artificial respiration will be given. lf<br />
breathing is difficult oxygen will be given.<br />
Medical treatment will be qiven immediatelv.<br />
'l7.What minimum qty of firewater will be kept ready at any point of<br />
time, please provide storage tank details.<br />
Aoillil.oFFICE I<br />
PLOT NO.3&4, SECTOB 10.8, INDUSTFIAL AREA, GANDHIDHAIVI (KUTCH) . 370 201,INDIA<br />
PNoNE : 9l - 2836 232062 FAx : 91 ' 2836 - 232037 Emall : into@starbsntonllsoxporrs.mm W".bsile : M.siadentonilasxports.com<br />
8EGD.offlcEI<br />
0.4. SHAIFYAS APPAFTMENI FLAT NO. OO1 / OO3, ORD. FLOOR, SARVODAYA PARSHWANATH NAGAF, NAHUR MULUND (W), MUI\4BAI . 4OO O8O<br />
PNoNE : 91 . 22 ' 25683685 FAX: 91 - 22 -25644917<br />
" ouality Ma[a0m€nt System Cenlfisd by DNV as per lS0 9001 ; 2008"<br />
for<br />
DE
We will provide firewater storage tank in such a way that the water should<br />
be provided 550 Liter /Hr and sufficient to supply atleast for 100 minutes.<br />
18.Please celebrate each year world environment day and each<br />
employee should plant one tree. Invite participants of this public<br />
hearing to witness and join this function.<br />
We are very thankful for your suggestion. We will surely celebrate world<br />
environment day and each employee will plant one tree on that day.<br />
Thanking you.<br />
I[USTAR CLAYTECH PW. LTD.<br />
\''".*r'X1*b<br />
cc ro. l@tbid sigMtory<br />
\str.\\<br />
l,l0fll YS<br />
Rrlff?4<br />
lvlr. Pravinbhai Sheth,<br />
A -8, Kalindi Appartment,<br />
Chikuwadi, Ankleshwar - 393001,<br />
Gujarat.<br />
;$-<br />
taf .'"rt..^ t"t,<br />
ADIII , OFFICE:<br />
PLOTNO 3&4 SECTOFlO.B,I''IDUSTRIALAFEA,GANDNIDHAM(KLJTCII)'37O2O1,INDIA<br />
PHoNE 91-2836232062 FAX:9l - 2836'232037 Ema!:inlo@starbsntonilaexporls.cori websil". : M.slarbentonit"aexporls com<br />
RE6O. OFFICE:<br />
0,4 SHA RYAS APPARTI\4ENT, FLAINO, {]{]l /003, GFD. FLOOB, SARVODAYA PARSNWANATN NAGAF, NAHI]R MULUND (W), MUIlBAI.4OO08!<br />
PHoNE :91 -22- 25683685 FM: 91' 22' 25644917<br />
" oualily Managment Syslem CerliliEd by DNV as per lS0 9001 : 2008"
^ 61t' v)<br />
.YICl<br />
'<br />
aJr trl9l "'' Rhnfi;L-)I-<br />
ry'J ./.fi * Crl:o5 ra"<br />
qUieracflq C.fu +grrr c-r sQ a,rvr 6C,<br />
'ita-rra" +a r< sitj st-at. &a€).<br />
ctr-"trBc4 @d.g21?.<br />
r-n-".eu g,),<br />
6jtd:-A+. @nZQ;. O<br />
ej?414 &t1t I<br />
.trr?,'i r. L{ lto/toto<br />
fdezs r 41- Lal?-dleal.o<br />
{ +e,< sd-:} qr.Gn "t<br />
\ztt@aac:t)u c*ts a{-lr.rcQu,' C'O 9 tlA --}ii-.1S<br />
aTe-Al c1 .<br />
saQ-r
tu[4,<br />
?teq {rqc{r{I,<br />
drt.6.q16.,,).d.,<br />
ttlcreL ru-t,<br />
i,szL-to-{,<br />
cLitfitcLt.<br />
r,rLr+.tL Ur-t-t'i t.tLbt -tl{ 3Zt't &.<br />
t)<br />
L ^<br />
\tsGef ctowech Pvr, Lrd,<br />
f4qrr : uL,t.rL qa.i rtt.qt/to/toto tL u.rLq...<br />
q.ti c)tlaqle{l 6er.t+aL ugtt \Lc{l.i Effluent Treatment Plant rrl<br />
Primary Treatment r'ttu{t 6rtL R.O. Plant +tL {ai--a sr.'l{. R.O. Plant<br />
.{I e.rdL t.ro 4.a[t. / R.r+t4l]iL.<br />
r.) c.s.I,{L 'tD qliL re., 4.e{I./B.ra R.O. Plant qL,{L fL{+r,rU qr![, yr.,<br />
4.e[./8..1rt 6{lvL s'lc-4a rLc[I, ,,r.i sl..x Sl.e[L/Eq{ dl,r qquii. *}rir{l ez<br />
-iL.rz.x 4.e0. +\-z r,l.+{ls 6eoL.rs'i d?rL i'Lidl vl.z 4.e[. dilu.ri qLdL<br />
c{qu{i lti 1q., 4.4[. 6.11.,{1.'rL "rr'1. ritrri.dl ttl.o 4.e0. (eoz -ii<br />
+t-a i.{ls 6ec{.{e1 i 6.dt.'il.'tl "rl'1. *r{I ziaat 1?e.z 4.cf[./Rq.+r tq-a<br />
d+{ls 6+g,r-a fla{-a eL-z'Li "t{1. qqLlL R.O. Plant -ft }ti{ldl }t'tLc}<br />
r,t.ri urLd?'l q$rl_ dla,1.<br />
.UC{ lqlil :r{I<br />
vL}vL dll1{le sl.<br />
"tLt , $tr4, ctL.qis.{I, dt. sia.<br />
r'tLu-ti hr+Lg,<br />
For STAR CLAYTECH PW. LTD.<br />
$^..-*'-F1#<br />
Y AtdtoiftedSilnat.'<br />
ADIIIIN. OFFICE I<br />
PLoTN0.3&4,SECToR10'8, NDUSTRALAFEA GANDHIDHAI,](KUTCH)-370201,<br />
NDA<br />
PHoNE : 91 - 2836 232062 FAX : 91 - @<br />
2836 - 232037 Emai : inio@stadonlonilo8xpoirs.com Wabs 16 : www starbenlonileexpons.com<br />
REGD.0FfICE I<br />
@ D.4 SNA RYAS APPARTI\,IENT FLAINO OOl /O{]3 GRD. FLOOF, SARVODAYA PARSHWANATH NAGAF, NAHUR, MULUNO (W), ML.]MBAI.4OO O8O<br />
PHoNE:91 -22-25083685 FIJ.:91 -22 25644917<br />
Ii0l,llSlS<br />
RrAC[?4<br />
" ouality Managmenl Syslem Ce ilied by DNV as per lS0 9001 : 2008"
YG,<br />
aa ea41 q/), ry.!', €-zrq*<br />
'ib 1
qh,<br />
tc*.f af\.t:[I ,<br />
d+r.6.q16.t.{.,<br />
u,rleleL c*t+-t,<br />
{szr-ro-,,),<br />
rLit{lcLt.<br />
t)<br />
Jstaf ctovrech Pvt, Ltd,<br />
fQqrr : ltL.{.tL ,{a.it aL. rrito/roto .ti "dqtq. . .<br />
uL n'i*rad gc< t tiqrt\ q'roo qi . '[Iat s?.'{L'tL tild .<br />
.rL, 6.rtL6.{. 'rL&1.tLtL.ti<br />
9la.<br />
art tag 6,<br />
l-t ?r i ue
uld,<br />
+tc*q qh.ir{I,<br />
{+t.tl.+116.{.d.,<br />
ttletcL ore-r,<br />
0sat-to-r,1.,<br />
"Lit{l-rcLL.<br />
dw<br />
fq,q,r : uLlHL qaii cL. re./ro/roto -il Afttortl v"{r6r. . .<br />
r,1,r.tL lo-t-ti v.rLor -tl{ SVor 0.<br />
c) j.r4.l crL.rLths qLcfl4 r3{llLcr xu 4.e{1. / tBe+r"{I r}.<br />
t)<br />
.gzrLcr .iLar d.lLqrlr afl.{l)3 lrL{4 e1+a{ x.r 4.e{I. 'rLefl QqqqLrL<br />
ts'lq. q.l ,,rLr+-{l .rLcL<br />
"tL.n r'rrti r4d scLLq'lr,} tslr,i },<br />
"jvl.Lo<br />
dLzt<br />
r!.qLqrrR etl.{l)s { ri'r.j too 4.e{I. r+ren }rL.r.rLiL sr.L?. siat d.<br />
e) clrrLt +iar $qL+1s+z e{l.t'l}s q*tLrL 3it? U"/qt<br />
vStltLr 3rt'L{ uLe[ uL,rii.<br />
r'L.i r'tt.i r'r.LLel<br />
y) eLq.-u dots] r'rL.{l rjd tLs,{dL eLcLc{l .tr{l rtLrt grtl o["rL r.,iLa a?'l] il*e<br />
erL(-s drar. qiqit'lJL-ft ,n.rLt"[L euli. ec1r,1 "6qni 6qq'r"L sfltl.<br />
.L) oL, zi gzrL.r eiar.6qL+4t,rr. e{I.tDs{ uLctl tdl tr4.ri z1r'l ur+L.tcll<br />
edi +qL{s,trLg[t-i_'t 6l+q'icL Si'Lt. lrLefttL ?.a'tc -ft,{L t mrr t 'rL) urti qclo1<br />
vuL-[ iliar,r d"rtLti u.rer sr1$<br />
ADMIN. ()FFICE I<br />
PLOTNO.3&4,SECTOR1O,B, NDUSTRALAREA GANDHIDHAI\4(KUTCH)'370201,]NDA<br />
PHONE : 91 - 2836 232062 FAX i91-2836- 232037 Emai rnio@sta$enlonleexports.com Websle:wwwstatenlonileexpoi$.com<br />
BEGo.0fflCE I<br />
D.4 5I]A RYASAPPANTMENT FLAI NO OO1/OO3 GBD. FLOOF, SAFVODAYA PAFSHWANATH NAGAF. NAHUR, MULUND (W), [T]LJMBAI.4OO O8O<br />
PHoNE:9l'22-25683685 FAX:91 22-25644917<br />
" 0ualily Managment Syslem Co ilied by oNV as per lS0 9001 : 2008"
16<br />
,4,<br />
@<br />
{St^-'.,"-""^ t<br />
e) g%trd qiat tS.1Lqau a{I'{l2s'iL'ig{l-tL .La'{I {se 6'qL6.d. r'lqiJ'Li<br />
ltAe slet r}.<br />
ta.<br />
ULu.ri l+r.rLg,<br />
i3q ?clL-lt :-<br />
*[I ezrrLcn{le raLt. rLlrL<br />
oLL*t ' $ttdl,<br />
dL..rls.iI<br />
dl. s?re.<br />
RNU'<br />
FSTSTAR CLAY'TECH PW. LTD.<br />
O..','- n-1?'tr''<br />
V lutlonse4 signmory<br />
A0illx.0fFlCEl<br />
PLOT NO.3&4. SECTOR 10.8, INDIJS'IRIAL ARFA, GANDHLDHA]II (KUTCH)'37O2OI' INDIA<br />
pi"oNiisi:i836rsrdor'iex,it-zsgo-zszofi Emait i inrd@starbenionileexpons.com<br />
wobsile: wv,n.slarbentonllsexports com<br />
RrlCll?4REGD.<br />
OFFICE:<br />
D.4'SHA|BYASAPPAF'|MENIFLATNo'001/003'0RD'FL0oR,SARVoDAYAPARSHWANATHNAGAn,NAHUR'MUL<br />
PNONE:91- 22 - 25683685 tM 91-22- 25644917<br />
" ouality Managment System Certilied by DtlV as per lS0 9001 : 2008"